Está en la página 1de 13

HOJA DE METRADOS (ESTRUCTURAS CERCO PERIMETRICO)

Proyecto: #REF!

#REF! :ALEX SOCCO BENDEZU


#REF! :25 DE ABRIL DEL 2019
#REF! :CONSTRUCCION DEL CERCO PERIMETRICO

UBICACIÓN DE LARGO ANCHO ALTO


ITEM PARTIDA DESCRIPCIÓN CANT. PARCIAL TOTAL UND
ELEMENTO (m) (m) (m)
01 CONSTRUCCION DE CERCO PERIMETRICO
01.01 ESTRUCTURAS
01.01.01 TRABAJOS PRELIMINARES
01.01.01.01 LIMPIEZA DE TERRENO MANUAL 250.00 M2
1.00 250.00 1.00 250.00

01.01.01.02 TRAZO Y REPLANTEO 250.00 M2


1.00 250.00 1.00 250.00

01.01.01.03 TRAZO, NIVEL Y REPLANTEO DURANTE EL PROCESO 250.00 M2


1.00 250.00 1.00 250.00

01.01.02 MOVIMIENTO DE TIERRAS


01.01.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.00 M TERRENO NORMAL AREA CAD 85.53 M3
TRAMO "A-B" 1.00 7.138 0.50 3.57
TRAMO "B-C" 1.00 13.83 0.50 6.91
TRAMO "C-D" 1.00 13.48 0.50 6.74
TRAMO "D-E" 1.00 41.38 0.50 20.69
TRAMO "E-F" 1.00 20.65 0.50 10.33
TRAMO "F-G" 1.00 34.43 0.50 17.22
TRAMO "G-H" 1.00 40.16 0.50 20.08

01.01.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO A MANO 71.32 M3


TRAMO "A-B" 1.00 8.72 AREA 0.29 2.53
TRAMO "B-C" 1.00 17.93 AREA 0.29 5.20
TRAMO "C-D" 1.00 16.04 AREA 0.29 4.65
TRAMO "D-E" 1.00 45.90 AREA 0.29 13.31
TRAMO "E-F" 1.00 33.11 AREA 0.29 9.60
TRAMO "F-G" 1.00 80.19 AREA 0.29 23.25
TRAMO "G-H" 1.00 44.05 AREA 0.29 12.77

01.01.02.03 ELIMINACION DE MATERIAL EXEDENTE CON EQUIPO DIST.=2.5 KM Esp.=25% 21.33 M3


De Excavación Manual de Zanjas para Cimientos en material suelto 1.00 Vol= 85.53 1.25 106.92
De Relleno y compactado con Material Propio P/Cimientos -1.00 Vol= 71.32 1.20 -85.58

01.01.03 OBRAS DE CONCRETO SIMPLE


01.01.03.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 73.78 M3
HOJA DE METRADOS (ESTRUCTURAS CERCO PERIMETRICO)

Proyecto: #REF!

#REF! :ALEX SOCCO BENDEZU


#REF! :25 DE ABRIL DEL 2019
#REF! :CONSTRUCCION DEL CERCO PERIMETRICO

UBICACIÓN DE LARGO ANCHO ALTO


ITEM PARTIDA DESCRIPCIÓN CANT. PARCIAL TOTAL UND
ELEMENTO (m) (m) (m)
TRAMO "A-B" 1.00 8.72 0.50 0.60 2.61
TRAMO "B-C" 1.00 17.93 0.50 0.60 5.38
TRAMO "C-D" 1.00 16.04 0.50 0.60 4.81
TRAMO "D-E" 1.00 45.90 0.50 0.60 13.77
TRAMO "E-F" 1.00 33.11 0.50 0.60 9.93
TRAMO "F-G" 1.00 80.19 0.50 0.60 24.06
TRAMO "G-H" 1.00 44.05 0.50 0.60 13.22

01.01.03.02 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS 18.44 M3


TRAMO "A-B" 1.00 8.72 0.15 0.50 0.65
TRAMO "B-C" 1.00 17.93 0.15 0.50 1.34
TRAMO "C-D" 1.00 16.04 0.15 0.50 1.20
TRAMO "D-E" 1.00 45.90 0.15 0.50 3.44
TRAMO "E-F" 1.00 33.11 0.15 0.50 2.48
TRAMO "F-G" 1.00 80.19 0.15 0.50 6.01
TRAMO "G-H" 1.00 44.05 0.15 0.50 3.30

01.01.03.03 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS H=Variable 245.93 M2


TRAMO "A-B" 2.00 8.72 0.50 8.72
TRAMO "B-C" 2.00 17.93 0.50 17.93
TRAMO "C-D" 2.00 16.04 0.50 16.04
TRAMO "D-E" 2.00 45.90 0.50 45.90
TRAMO "E-F" 2.00 33.11 0.50 33.11
TRAMO "F-G" 2.00 80.19 0.50 80.19
TRAMO "G-H" 2.00 44.05 0.50 44.05
01.01.04 CONCRETO ARMADO
01.01.04.01 COLUMNAS
01.01.04.01.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 20.48 M3
TRAMO "A-B" C-1 6.00 0.25 0.25 2.85 1.07
TRAMO "B-C" C-1 8.00 0.25 0.25 2.85 1.43
TRAMO "C-D" C-1 10.00 0.25 0.25 2.85 1.78
TRAMO "D-E" C-1 26.00 0.25 0.25 2.85 4.63
TRAMO "E-F" C-1 15.00 0.25 0.25 2.85 2.67
TRAMO "F-G" C-1 28.00 0.25 0.25 2.85 4.99
TRAMO "G-H" C-1 22.00 0.25 0.25 2.85 3.92
01.01.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS 275.31 M2
TRAMO "A-B" C-1 6.00 Pert. = 0.84 2.85 14.36
HOJA DE METRADOS (ESTRUCTURAS CERCO PERIMETRICO)

Proyecto: #REF!

#REF! :ALEX SOCCO BENDEZU


#REF! :25 DE ABRIL DEL 2019
#REF! :CONSTRUCCION DEL CERCO PERIMETRICO

UBICACIÓN DE LARGO ANCHO ALTO


ITEM PARTIDA DESCRIPCIÓN CANT. PARCIAL TOTAL UND
ELEMENTO (m) (m) (m)
TRAMO "B-C" C-1 8.00 Pert. = 0.84 2.85 19.15
TRAMO "C-D" C-1 10.00 Pert. = 0.84 2.85 23.94
TRAMO "D-E" C-1 26.00 Pert. = 0.84 2.85 62.24
TRAMO "E-F" C-1 15.00 Pert. = 0.84 2.85 35.91
TRAMO "F-G" C-1 28.00 Pert. = 0.84 2.85 67.03
TRAMO "G-H" C-1 22.00 Pert. = 0.84 2.85 52.67
01.01.04.01.03 ACERO FY=4200 KG/CM2 3,697.99 KG

01.01.04.02 VIGAS
01.01.04.02.01 CONCRETO EN VIGAS f'c=175 kg/cm2 8.61 M3
TRAMO "A-B" VA-1 1.00 8.72 AREA= 0.04 0.31
TRAMO "B-C" VA-1 1.00 17.93 AREA= 0.04 0.63
TRAMO "C-D" VA-1 1.00 16.04 AREA= 0.04 0.56
TRAMO "D-E" VA-1 1.00 45.90 AREA= 0.04 1.61
TRAMO "E-F" VA-1 1.00 33.11 AREA= 0.04 1.16
TRAMO "F-G" VA-1 1.00 80.19 AREA= 0.04 2.81
TRAMO "G-H" VA-1 1.00 44.05 AREA= 0.04 1.54

01.01.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VIGAS 73.78 M2


TRAMO "A-B" VA-1 1.00 8.72 PERIMET. = 0.30 2.61
TRAMO "B-C" VA-1 1.00 17.93 PERIMET. = 0.30 5.38
TRAMO "C-D" VA-1 1.00 16.04 PERIMET. = 0.30 4.81
TRAMO "D-E" VA-1 1.00 45.90 PERIMET. = 0.30 13.77
TRAMO "E-F" VA-1 1.00 33.11 PERIMET. = 0.30 9.93
TRAMO "F-G" VA-1 1.00 80.19 PERIMET. = 0.30 24.06
TRAMO "G-H" VA-1 1.00 44.05 PERIMET. = 0.30 13.22
01.01.04.02.03 ACERO FY=4200 KG/CM2 VA-1 761.84 KG

01.01.04.03 VARIOS
01.01.04.03.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA DE COMPRESION) 5.00 5.00 5.00 UND
HOJA DE METRADOS (ESTRUCTURAS CERCO PERI

:''MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE NIVEL PRIMARIO DE LA I.E. N° 36


Proyecto:
POBLADO DE ALLATO, DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCA
Responsab: ING.RIDER W. MONGE GALA
Fecha : DICIEMBRE - 2018
Formula : COMPONENTE 8 - CONSTRUCCION DE CERCO PERIMETRICO

ITEM PARTIDA DESCRIPCION

01.00.00 TRABAJOS PROVICIONAL


01.01.00 ALQUILER DE LOCAL PARA LA OBRA

01.02.00 CARTEL DE OBRA IMPRESO DE BANER DE 3.60 X 2.40

01.03.00 SENALIZACION EN OBRA DURANTE LA EJECUCION

01.04.00 SENALIZACION TEMPORAL EN OBRA

01.05.00 CONTRUCION DE LETRINAS PROVICIONAL PARA LA OBRA


TRUCTURAS CERCO PERIMETRICO)

IMARIO DE LA I.E. N° 36231 DEL CENTRO


DE ANGARAES - HUANCAVELICA''

LARGO ANCHO
CANT. ALTO (m) PARCIAL TOTAL UND
(m) (m)

2 MES

1.00 1.00 UND

250.00 250.00 M

250.00 250.00 M

2.00 UND
2.00 2.00
HOJA DE METRADOS ACERO (COLUMNA)

Proyecto:

Responsable
Fecha
Formula

TIPO LONG CANT DE Nº DE Ø Ø


ITEM PARTIDA DESCRIPCION Ø 1" Ø 1/2" Ø 3/8" Ø 1/4"
Ø PARCIAL ELEMENTOS VECES 3/4" 5/8"
01.01.04.01.03 ACERO FY=4200 KG/CM2
TRAMO A-B
C-1 Ø 1/2" 4.12 4.00 6.00 98.88
estribos Ø 3/8" 0.98 27.00 6.00 158.76

TRAMO B-C
C-1 Ø 1/2" 4.12 4.00 8.00 131.84
estribos Ø 3/8" 0.98 27.00 8.00 211.68

TRAMO C-D
C-1 Ø 1/2" 4.12 4.00 10.00 164.80
estribos Ø 3/8" 0.98 27.00 10.00 264.60

TRAMO D-E
C-1 Ø 1/2" 4.12 4.00 26.00 428.48
estribos Ø 3/8" 0.98 27.00 26.00 687.96

TRAMO E-F
C-1 Ø 1/2" 4.12 4.00 15.00 247.20
estribos Ø 3/8" 0.98 27.00 15.00 396.90

TRAMO F-G
C-1 Ø 1/2" 4.12 4.00 28.00 461.44
estribos Ø 3/8" 0.98 27.00 28.00 740.88

TRAMO G-A
C-1 Ø 1/2" 4.12 4.00 22.00 362.56
estribos Ø 3/8" 0.98 27.00 22.00 582.12

TOTAL (ML) 0.00 0.00 0.00 ### 3,042.90 0.00


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL (KG) 0.00 0.00 0.00 ### 1,764.88 0.00
3,697.99
HOJA DE METRADOS ACERO (VIGA)

Proyecto: Proyecto:

Responsable Responsable
Fecha Fecha
Formula Formula

LONGITUD CANTIDAD DE Nº DE
ITEM PARTIDA DESCRIPCION TIPO Ø PARCIAL (ML) Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
ELEMENTOS VECES

01.01.04.02.03 01.01.04.03.03
VA-1
TRAMO "A-B" Ø 3/8" 8.72 3.00 1.00 26.15
estribos Ø 1/4" 0.81 64.00 1.00 51.84

TRAMO "B-C" Ø 3/8" 17.93 3.00 1.00 53.80


estribos Ø 1/4" 0.81 127.00 1.00 102.87

TRAMO "C-D" Ø 3/8" 16.04 3.00 1.00 48.11


estribos Ø 1/4" 0.81 11.00 1.00 8.91

TRAMO "D-E" Ø 3/8" 45.90 3.00 1.00 137.70


estribos Ø 1/4" 0.81 316.00 1.00 255.96

TRAMO "E-F" Ø 3/8" 33.11 3.00 1.00 99.32


estribos Ø 1/4" 0.81 237.00 1.00 191.97

TRAMO "F-G" Ø 3/8" 80.19 3.00 1.00 240.56


estribos Ø 1/4" 0.81 585.00 1.00 473.85

TRAMO "G-H" Ø 3/8" 44.05 3.00 1.00 132.15


estribos Ø 1/4" 0.81 309.00 1.00 250.29

TOTAL (ML) 0.00 0.00 0.00 0.00 737.79 1,335.69


4.04 2.26 1.60 1.02 0.58 0.25
TOTAL (KG) 0.00 0.00 0.00 0.00 427.92 333.92
761.84
HOJA DE METRADOS (ESTRUCTURAS CERCO PER

:''MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE NIVEL PRIMARIO DE LA I.E. N° 3


Proyecto:
POBLADO DE ALLATO, DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANC
Responsab: ING.RIDER W. MONGE GALA
Fecha : DICIEMBRE - 2018
Formula : COMPONENTE 8 - CONSTRUCCION DE CERCO PERIMETRICO

UBICACIÓN DE
ITEM PARTIDA DESCRIPCION
ELEMENTO
01.02 ARQUITECTURA
01.02.01 MUROS Y TABIQUERIA DE ALBAÑILERIA
01.02.01.
MURO DE LADRILLO 18 HUECOS DE SOGA DE 9X12.5X23cm C.A-1:4 X 1.5
01
TRAMO "A-B"
TRAMO "A-B"
TRAMO "B-C"
TRAMO "B-C"
TRAMO "C-D"
TRAMO "C-D"
TRAMO "D-E"
TRAMO "D-E"
TRAMO "E-F"
TRAMO "E-F"
TRAMO "F-G"
TRAMO "F-G"
TRAMO "G-H"
TRAMO "G-H"

01.02.02 REVOQUES ENLUCIDOS Y MOLDADURAS


01.02.02.
TARRAJEO EN COLUMNAS CON C:A 1:5X1.5CM
01
TRAMO "A-B" C-1
TRAMO "B-C" C-1
TRAMO "C-D" C-1
TRAMO "D-E" C-1
TRAMO "E-F" C-1
TRAMO "F-G" C-1
TRAMO "G-H" C-1
01.02.02.
TARRAJEO EN VIGAS CON C:A 1:5X1.50 CM
02
TRAMO "A-B" VA-1
TRAMO "B-C" VA-1
TRAMO "C-D" VA-1
TRAMO "D-E" VA-1
TRAMO "E-F" VA-1
TRAMO "F-G" VA-1
TRAMO "G-H" VA-1
01.02.02.
TARRAJEO EN SOBRECIMIENTO CON CEMENTO-ARENA
03
TRAMO "A-B"
TRAMO "B-C"
TRAMO "C-D"
TRAMO "D-E"
TRAMO "E-F"
TRAMO "F-G"
TRAMO "G-H"
01.02.03 CARPINTERIA METALICA Y HERRERIA

01.02.03.
TUBO NEGRO DE 2''x2 mm PARA PARANTES
01
TRAMO "A-B"

TRAMO "B-C"
01.02.03.
FIERRO LISO Ø 5/8"
02
TRAMO "A-B"

TRAMO "B-C"

01.02.03.
PLATINA DE 2''x1/8'' PARA SELLAR TUBERIA DE CERCO
03
TRAMO "A-B"

TRAMO "B-C"
01.02.03 PINTURA
01.02.03.
PINTURA EN MUROS EXTERIORES 2 MANOS CON BARNIZ MARINO
01
TRAMO "A-B"
TRAMO "A-B"
TRAMO "B-C"
TRAMO "B-C"
TRAMO "C-D"
TRAMO "C-D"
TRAMO "D-E"
TRAMO "D-E"
TRAMO "E-F"
TRAMO "E-F"
TRAMO "F-G"
TRAMO "F-G"
TRAMO "G-H"
TRAMO "G-H"

01.02.03.
PINTURA EN COLUMNAS AL OLEO - 2 MANOS INCL. IMPRIMACION
02
TRAMO "A-B" C-1
TRAMO "B-C" C-1
TRAMO "C-D" C-1
TRAMO "D-E" C-1
TRAMO "E-F" C-1
TRAMO "F-G" C-1
TRAMO "G-H" C-1
01.02.03.
PINTURA EN VIGAS AL OLEO - 2 MANOS INCL. IMPRIMACION
03
TRAMO "A-B" VA-1
TRAMO "B-C" VA-1
TRAMO "C-D" VA-1
TRAMO "D-E" VA-1
TRAMO "E-F" VA-1
TRAMO "F-G" VA-1
TRAMO "G-H" VA-1
01.02.03.
PINTURA ESMALTE SINTETICO EN SOBRECIMIENTOS 2 MANOS
04
TRAMO "A-B"
TRAMO "B-C"
TRAMO "C-D"
TRAMO "D-E"
TRAMO "E-F"
TRAMO "F-G"
TRAMO "G-H"
01.02.04 VARIOS
01.02.04.
JUNTAS DE CONSTRUCCION DE TECKNOPORT
01
TRAMO "A-B"
TRAMO "B-C"
TRAMO "C-D"
TRAMO "D-E"
TRAMO "E-F"
TRAMO "F-G"
TRAMO "G-H"
01.02.04.02 PLACA RECORDATORIA
PLACA RECORDATORIO INCLUIDO COLOCACION
RUCTURAS CERCO PERIMETRICO)

MARIO DE LA I.E. N° 36231 DEL CENTRO


E ANGARAES - HUANCAVELICA''

LARGO ANCHO
CANT. ALTO (m) PARCIAL TOTAL UND
(m) (m)

511.13 M2
2.00 3.00 2.35 14.10
1.00 1.15 2.35 2.70
4.00 3.00 2.35 28.20
1.00 3.96 2.35 9.30
4.00 3.00 2.35 28.20
1.00 1.58 2.35 3.72
12.00 3.00 2.35 84.60
1.00 3.56 2.35 8.37
9.00 3.00 2.35 63.45
1.00 2.47 2.35 5.81
23.00 3.00 2.35 162.15
1.00 4.29 2.35 10.08
12.00 3.00 2.35 84.60
1.00 2.49 2.35 5.85

229.43 M2
6.00 Pert. = 0.70 2.85 11.97
8.00 Pert. = 0.70 2.85 15.96
10.00 Pert. = 0.70 2.85 19.95
26.00 Pert. = 0.70 2.85 51.87
15.00 Pert. = 0.70 2.85 29.93
28.00 Pert. = 0.70 2.85 55.86
22.00 Pert. = 0.70 2.85 43.89
172.15 M2
1.00 8.72 PERIMET. = 0.70 6.10
1.00 17.93 PERIMET. = 0.70 12.55
1.00 16.04 PERIMET. = 0.70 11.23
1.00 45.90 PERIMET. = 0.70 32.13
1.00 33.11 PERIMET. = 0.70 23.18
1.00 80.19 PERIMET. = 0.70 56.13
1.00 44.05 PERIMET. = 0.70 30.84
189.28 M2
2.00 8.72 0.50 8.72
2.00 17.93 0.50 17.93
2.00 16.04 0.50 16.04
2.00 45.90 0.50 45.90
1.00 33.11 0.50 16.55
1.00 80.19 0.50 40.09
2.00 44.05 0.50 44.05

257.60 ML
84.00 2.15 180.60
14.00 1.20 16.80
28.00 2.15 60.20
27.60 ML
6.00 3.00 18.00
2.00 1.80 3.60
2.00 3.00 6.00

126.00 UND
84.00 84.00
14.00 14.00
28.00 28.00

1,022.25 M2
4.00 3.00 2.35 28.20
2.00 1.15 2.35 5.41
8.00 3.00 2.35 56.40
2.00 3.96 2.35 18.60
8.00 3.00 2.35 56.40
2.00 1.58 2.35 7.44
24.00 3.00 2.35 169.20
2.00 3.56 2.35 16.73
18.00 3.00 2.35 126.90
2.00 2.47 2.35 11.61
46.00 3.00 2.35 324.30
2.00 4.29 2.35 20.16
24.00 3.00 2.35 169.20
2.00 2.49 2.35 11.71

245.81 M2
6.00 Pert. = 0.75 2.85 12.83
8.00 Pert. = 0.75 2.85 17.10
10.00 Pert. = 0.75 2.85 21.38
26.00 Pert. = 0.75 2.85 55.58
15.00 Pert. = 0.75 2.85 32.06
28.00 Pert. = 0.75 2.85 59.85
22.00 Pert. = 0.75 2.85 47.03
172.15 M2
1.00 8.72 PERIMET. = 0.70 6.10
1.00 17.93 PERIMET. = 0.70 12.55
1.00 16.04 PERIMET. = 0.70 11.23
1.00 45.90 PERIMET. = 0.70 32.13
1.00 33.11 PERIMET. = 0.70 23.18
1.00 80.19 PERIMET. = 0.70 56.13
1.00 44.05 PERIMET. = 0.70 30.84
245.93 M2
2.00 8.72 0.50 8.72
2.00 17.93 0.50 17.93
2.00 16.04 0.50 16.04
2.00 45.90 0.50 45.90
2.00 33.11 0.50 33.11
2.00 80.19 0.50 80.19
2.00 44.05 0.50 44.05

31.50 M2
3.00 0.25 3.00 2.25
3.00 0.25 3.00 2.25
5.00 0.25 3.00 3.75
13.00 0.25 3.00 9.75
5.00 0.25 3.00 3.75
4.00 0.25 3.00 3.00
9.00 0.25 3.00 6.75
1 UND
1.00 1