901.85 100.00% - - 0.00%
3,345.28 100.00% - - 0.00%
3,016.48 100.00% - - 0.00%
1,717.28 100.00% - - 0.00%
243.40 100.00% - - 0.00%
281.24 100.00% - - 0.00%
245.85 100.00% - - 0.00%
- -
1,397.41 100.00% - - 0.00%
650.76 100.00% - - 0.00%
- -
621.27 100.00% - - 0.00%
612.07 100.00% - - 0.00%
- -
1,944.00 100.00% - - 0.00%
127.98 100.00% - - 0.00%
1,387.98 100.00% - - 0.00%
996.21 100.00% - - 0.00%
754.74 100.00% - - 0.00%
- -
4,633.20 100.00% - - 0.00%
103.50 100.00% - - 0.00%
- -
- -
1.03 100.00% - - 0.00%
1.35 100.00% - - 0.00%
- -
13.24 100.00% - - 0.00%
PARA EJECUCION SALDO
- -
283.54 100.00% - - 0.00%
63.92 100.00% - - 0.00%
353.22 100.00% - - 0.00%
- -
309.66 100.00% - - 0.00%
- -
1,180.91 100.00% - - 0.00%
1,535.88 100.00% - - 0.00%
523.68 100.00% - - 0.00%
1,078.18 100.00% - - 0.00%
309.69 100.00% - - 0.00%
2,987.71 100.00% - - 0.00%
- -
634.26 100.00% - - 0.00%
460.04 100.00% - - 0.00%
130.68 100.00% - - 0.00%
- -
1,013.38 100.00% - - 0.00%
242.76 100.00% - - 0.00%
167.72 100.00% - - 0.00%
14.90 100.00% - - 0.00%
185.38 100.00% - - 0.00%
- -
- -
7.13 100.00% - - 0.00%
8.44 100.00% - - 0.00%
- -
105.35 100.00% - - 0.00%
PARA EJECUCION SALDO
- -
279.65 100.00% - - 0.00%
- -
1,068.44 100.00% - - 0.00%
1,665.92 100.00% - - 0.00%
453.38 100.00% - - 0.00%
1,169.94 100.00% - - 0.00%
278.80 100.00% - - 0.00%
3,439.68 100.00% - - 0.00%
951.39 100.00% - - 0.00%
690.06 100.00% - - 0.00%
97.34 100.00% - - 0.00%
- -
1,520.07 100.00% - - 0.00%
364.14 100.00% - - 0.00%
251.58 100.00% - - 0.00%
22.35 100.00% - - 0.00%
205.77 100.00% - - 0.00%
- -
- -
12.29 100.00% - - 0.00%
8.94 100.00% - - 0.00%
- -
47.80 100.00% - - 0.00%
25.16 100.00% - - 0.00%
178.62 100.00% - - 0.00%
- -
121.87 100.00% - - 0.00%
- -
PARA EJECUCION SALDO
- -
56.59 100.00% - - 0.00%
14.90 100.00% - - 0.00%
36.72 100.00% - - 0.00%
- -
50.88 100.00% - - 0.00%
- -
1,001.71 100.00% - - 0.00%
621.60 100.00% - - 0.00%
- -
148.40 100.00% - - 0.00%
- -
849.66 100.00% - - 0.00%
1,634.85 100.00% - - 0.00%
- -
- -
248.06 86.47% 28.75 38.81 13.53%
189.26 86.47% 28.75 29.61 13.53%
- -
2,108.55 86.47% 27.40 329.91 13.53%
1,580.52 86.47% 34.25 247.29 13.53%
- -
1,061.31 86.47% 1.24 166.06 13.53%
5,770.18 86.47% 31.62 902.82 13.53%
- -
5,275.37 86.47% 2.65 825.40 13.53%
12,246.38 86.47% 82.98 1,916.10 13.53%
5,365.91 86.47% 220.94 839.56 13.53%
- -
PARA EJECUCION SALDO
15,631.25
1,244.28
-
781.56
-
-
-
17,657.10
3.36%
PRESUPUESTO DE PARTIDAS A DEDUCIR
Costo SALDO
ITEM PARTIDAS UND Unitario
METRADO COSTO %
(S/.)
COMPONENTE 01 SISTEMA DE AGUA POTABLE
02.09.05 SUMINISTRO E INSTALACION DE ACCESORIOS
02.09.05.03 SUMINISTRO E INSTALACION DE CAJA DE VALVULA DE CONTROL DOMICILIARIO GLB 68.81 23.00 1,582.63 13.53%
02.12.03 OBRAS DE CONCRETO SIMPLE
02.12.03.01 SOLADO DE 2" MEZCLA 1:12 CEMENTO-HORMIGON m2 12.98 4.05 52.57 100.00%
02.12.04 OBRAS DE CONCRETO ARMADO -
02.12.04.01 CONCRETO F'C=175 KG/CM2 P/ MURO Y LOSA FONDO m3 312.06 3.20 998.59 100.00%
02.12.04.02 ENCOFRADO Y DESENCOFRADO MUROS m2 18.5 30.00 555.00 100.00%
02.12.05 TARRAJEOS -
02.12.05.01 TARRAJEO EN EXTERIORES (MORTERO 1:5), E=2cm m2 13.25 12.00 159.00 100.00%
02.12.06 SUMINISTRO Y COLOCACION DE ACCESORIOS -
02.12.06.01 TAPA METALICA und 121.38 5.00 606.90 100.00%
02.12.06.02 SUMINISTRO Y COLOCACION DE ACCESORIOS und 233.55 5.00 1,167.75 100.00%
2.14 LAVADERO - PILETA ( 170 UND.) -
02.14.01 TRABAJOS PRELIMINARES -
02.14.01.01 TRAZO Y REPLANTEO m2 1.35 28.75 38.81 13.53%
02.14.01.02 LIMPIEZA DE TERRENO MANUAL m2 1.03 28.75 29.61 13.53%
02.14.02 MOVIMIENTO DE TIERRAS -
02.14.02.01 EXCAVACION MANUAL EN TERREO SUELTO m3 12.04 27.40 329.91 13.53%
02.14.02.02 ACARREO DE MATERIAL EXCEDENTE m3 7.22 34.25 247.29 13.53%
02.14.03 OBRAS DE CONCRETO SIMPLE -
02.14.03.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS m3 133.7 1.24 166.06 13.53%
Costo SALDO
ITEM PARTIDAS UND Unitario
METRADO COSTO %
(S/.)
02.14.03.02 EMPEDRADO DE PISO CON MORTERO m2 28.55 31.62 902.82 13.53%
02.14.04 OBRAS DE CONCRETO ARMADO -
02.14.04.01 CONCRETO F'C=175 KG/CM2 m3 312.06 2.65 825.40 13.53%
02.14.04.02 ENCOFRADO Y DESENCOFRADO m2 23.09 82.98 1,916.10 13.53%
02.14.04.03 ACERO CORRUGADO FY=4200 KG/CM2 kg 3.8 220.94 839.56 13.53%
02.14.05 MUROS Y TABIQUES DE ALBAÑILERIA -
02.14.05.01 MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM. m2 67.35 16.56 1,115.32 13.53%
02.14.06 REVOQUES ENLUCIDOS Y MOLDURAS -
02.14.06.01 TARRAJEO EN EXTERIORES (MORTERO 1:5), E=2cm m2 14.15 35.42 501.19 13.53%
02.14.07 SUMINISTRO E INSTALACION DE ACCESORIOS -
02.14.07.01 TUBERIA PVC SAP CLASE - 10, Ø 1/2" m 2.67 115.00 307.05 13.53%
02.14.07.02 TUBERIA PVC SAL, Ø 2" m 3.8 69.00 262.20 13.53%
02.14.07.03 SUMINISTRO Y COLOCACION DE ACCESORIOS DE BATEA und 105.03 23.00 2,415.69 13.53%
02.14.07.04 SUMINISTRO Y COLOCACION DE ACCESORIOS PILETA PUBLICA und 113.16 - - 0.00%
02.14.07.05 FILTRO DE GRAVA m3 26.6 23.00 611.80 13.53%
Costo
ITEM PARTIDAS UND METRADO Unitario COSTO
(S/.)
DESCRIPCION MONTO
PRESUPUESTO ADICIONAL N° 01 S/. 117,679.60
PRESUPUESTO DEDUCTIVO N° 01 S/. 83,430.16
PRESUPUESTO ADICIONAL SOLICITADO S/. 34,249.44