Documentos de Académico
Documentos de Profesional
Documentos de Cultura
PRESUPUESTO PARA LA JOYA 1 Diciembre Del 2015
PRESUPUESTO PARA LA JOYA 1 Diciembre Del 2015
COSTO DIRECTO
I.G.V. (18%)
TOTAL PRESUPUESTO
METRADO P.U. PARCIAL
S/. 451,784.70
S/. 81,321.25
S/. 533,105.94
TRAZADO REPLANTEO
TOTAL 1,994.42
CERCO PROVICIONAL
9.72
6.50
14.90
32.97
100.15
42.79
4.84
3.09
7.08
9.96
9.29
15.98
72.33
Err:522
SOLADO
197.76
CIMIENTO
CONCRETO 158.21
ENCOFRADO 527.36
SOBRECIMIENTO REFORZADO
CONCRETO 25.71
ENCOFRADO 395.52
TOTAL 1,915.88
TOTAL 898.33
MURO CONTENCION
CONCRETO
CIMIENTO MURO M1
314.48 0.60 3.70 698.15
PANTALLA
314.48 0.35 3.50 385.24
CIMIENTOMURO M2
162.33 0.70 3.90 443.16
PANTALLA MURO M2
162.33 0.55 5.30 473.19
TOTAL 1,999.74
MURO M1
314.48 0.60 2.00 377.38
MURO M2
162.33 0.70 2.00 227.26
TOTAL 604.64
TOTAL 3,922.06
ACERO
M1
ZAPATA
338.28 38.00 1.57 20,181.78
4.30 1,797.00 1.57 12,131.55
4.25 1,797.00 1.57 11,990.48
PANTALLA
4.77 1,797.00 0.99 8,485.97
4.72 1,258.00 0.99 5,878.38
314.48 9.00 0.99 2,802.02
314.48 18.00 0.99 5,604.03
M2
ZAPATA
174.93 40.00 1.57 10,985.60
4.50 2,164.00 1.57 15,288.66
PANTALLA
6.86 928.00 1.57 9,994.75
6.81 649.00 1.57 6,938.91
2.75 464.00 1.57 2,003.32
162.33 24.00 0.99 3,856.96
162.33 27.00 1.57 6,881.17
TOTAL 123,023.59
COLUMNAS
TOTAL 26.75
ENCOFRADO COLUMNAS
COLUMNAS NORMALES 47.00 0.85 2.75 109.86
45.00 0.60 2.75 74.25
43.00 0.70 2.75 82.78
CA-2 1.00 1.41 2.75 3.88
CJT-1 1.00 0.72 2.75 1.98
CJT-2 3.00 0.93 2.75 7.67
CJT-3 1.00 0.75 2.75 2.06
CJT-4 1.00 0.90 2.75 2.48
CJT-5 2.00 0.97 2.75 5.34
CJT-6 1.00 1.21 2.75 3.33
CJT-7 2.00 0.99 2.75 5.45
CJT-8 2.00 0.91 2.75 5.01
CJT-9 1.00 0.88 2.75 2.42
TOTAL 306.49
ACERO
COLUMNAS NORMALES 135.00 4.66 4.00 0.99 2,491.24
ESTRIBO 135.00 0.88 24.00 0.27 769.82
CA-2 1.00 4.66 6.00 0.99 27.68
ESTRIBO 1.00 1.36 24.00 0.27 8.81
CJT-1 1.00 4.66 6.00 0.99 27.68
ESTRIBO 1.00 0.98 24.00 0.27 6.35
CJT-2 3.00 4.66 6.00 0.99 83.04
ESTRIBO 3.00 1.01 24.00 0.27 19.63
CJT-3 1.00 4.66 6.00 0.99 27.68
ESTRIBO 1.00 1.08 24.00 0.27 7.00
CJT-4 1.00 4.66 6.00 0.99 27.68
ESTRIBO 1.00 0.98 24.00 0.27 6.35
CJT-5 2.00 4.66 6.00 0.99 55.36
ESTRIBO 2.00 1.05 24.00 0.27 13.61
CJT-6 1.00 4.66 6.00 0.99 27.68
ESTRIBO 1.00 1.29 24.00 0.27 8.36
CJT-7 2.00 4.66 6.00 0.99 55.36
ESTRIBO 2.00 1.31 24.00 0.27 16.98
CJT-8 2.00 4.66 6.00 0.99 55.36
ESTRIBO 2.00 1.00 24.00 0.27 12.96
CJT-9 1.00 4.66 6.00 0.99 27.68
ESTRIBO 1.00 0.96 24.00 0.27 6.22
TOTAL 3,782.54
VIGAS
CONCRETO
329.60 0.15 0.13 6.43
ENCOFRADO
329.60 0.15 2.00 98.88
ACERO
329.60 2.00 0.57 375.74
ESTRIBO 0.36 1,648.00 0.27 160.19
TOTAL 535.93
MURO LADRILLO
1.00 1.43
2.00 3.25
3.00 3.25
4.00 2.33
5.00 3.25
6.00 3.12
7.00 3.25
8.00 3.25
9.00 3.25
10.00 3.20
11.00 3.25
12.00 3.25
13.00 3.25
14.00 3.25
15.00 3.25
16.00 3.25
17.00 3.25
18.00 3.25
19.00 0.80
20.00 3.25
21.00 3.25
22.00 3.25
23.00 3.25
24.00 3.25
25.00 3.25
26.00 3.25
27.00 3.25
28.00 3.25
29.00 3.25
30.00 3.25
31.00 3.25
32.00 3.25
33.00 3.25
34.00 3.25
35.00 3.25
36.00 3.25
37.00 3.25
38.00 3.25
39.00 3.25
40.00 3.25
41.00 3.25
42.00 3.25
43.00 3.25
44.00 3.25
45.00 3.25
46.00 3.25
47.00 0.89
48.00 3.25
49.00 3.25
50.00 3.25
51.00 3.25
52.00 3.25
53.00 3.25
54.00 3.25
55.00 3.25
56.00 3.25
57.00 3.25
58.00 3.25
59.00 2.94
60.00 3.25
61.00 0.81
62.00 2.39
63.00 3.25
64.00 2.42
65.00 3.25
66.00 3.25
67.00 1.43
68.00 2.47
69.00 3.25
70.00 2.55
71.00 0.78
72.00 3.25
73.00 3.25
74.00 3.25
75.00 3.65
76.00 3.25
77.00 0.47
78.00 3.25
79.00 3.25
80.00 3.25
81.00 3.25
82.00 3.25
83.00 3.25
84.00 3.25
85.00 3.25
86.00 2.42
87.00 1.84
88.00 3.25
89.00 2.76
90.00 3.25
91.00 3.25
92.00 0.62
93.00 3.25
94.00 3.25
95.00 3.25
96.00 3.25
97.00 3.25
98.00 0.45
BRUÑA
1,119.40
2.9
0.6
0.8
-0.04
-0.07
-7
METRAD
UND NOVIEMBRE
O
23 24 25 26
DESCRIPCION
L M M J
CRONOGRAMA METRADOS DIARIOS MILO HUISA
ESTRUCTURAS
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y
SALUD
OBRAS PROVISIONALES
ALMACEN, OFICINA, CASETA Y GUARDIANIA UND 1.00 0.33 0.33 0.33
CERCO PROVISIONAL ML 329.61 109.87 109.87 109.87
ARMADO DE DUCHAS Y LAVADEROS DE MANO UND 1.00 0.33 0.33 0.33
TRABAJOS PRELIMINARES
DEMOLICION DE CIMIENTOS DE CONCRETO, SOBRECIMIENTO,
ML 329.60 329.60
COLUMNAS, MUROS DE LADRILLO Y VIGAS C/EQUIPO 1RA PARTE
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GBL 1.00 1.00
MOVIMIENTO DE TIERRAS
NIVELACION DE TERRENO
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
M2 1,994.41
MUROS CONTENCION
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACTADORA
M2 197.97
CIMIENTO CORRIDO
RELLENO
RELLENO COMPACTADO C/COMPACTADORA 7 HP MAT. PROPIO
M3 12,159.03
SELECCIONADO C/AGUA
OBRAS DE CONCRETO SIMPLE
CIMIENTOS CORRIDOS
CONCRETO EN CIMIENTO CORRIDO F'C=140 KG/CM2 + 30% PG
M2 158.07
(CONCRETO PREMEZCLADO)
ENCOFRADO Y DESENCOFRADO NORMAL CIMIENTOS CORRIDOS 527.47
SUBZAPATAS O FALSA ZAPATA
CONCRETO EN SUBZAPATA F'C=100 KG/CM2 + 30% PG (CONCRETO
M3 898.39
PREMEZCLADO)
ENCOFRADO Y DESENCOFRADO NORMAL SUBZAPATAS M2 238.42
SOLADOS 0.00
SOLADO DE CONCRETO F'C= 100 KG/CM2 E=0.10 M M2 197.97
OBRAS DE CONCRETO ARMADO
SOBRECIMIENTO REFORZADO
CONCRETO EN SOBRECIMIENTO REFORZADO F'C= 210 KG/CM2
M3 25.50
(CONCRETO PREMEZCLADO)
ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO M2 395.52
ACERO FY=4200 KG/CM2 REND:250 KG/DIA KG 1,915.95
MURO DE CONTENCION
CONCRETO EN MURO DE CONTENCION F'C= 210 KG/CM2 (CONCRETO
M3 2,000.03
PREMEZCLADO)
ENCOFRADO Y DESENCOFRADO NORMAL DE MURO DE CONTENCION M2 604.83
ENCOFRADO Y DESENCOFRADO CARAVISTA MURO DE CONTENCION M2 3,922.36
ACERO FY=4200 KG/CM2 REND:250 KG/DIA KG ###
COLUMNAS
CONCRETO EN COLUMNAS TIPO I F'C= 210 KG/CM2 (CONCRETO
M3 26.69
PREMEZCLADO)
ENCOFRADO Y DESENCOFRADO NORMAL DE COLUMNA M2 306.57
ACERO FY=4200 KG/CM2 REND:250 KG/DIA KG 3,782.40
VIGAS
CONCRETO EN VIGAS TIPO I F'C= 210 KG/CM2 (CONCRETO
M3 6.33
PREMEZCLADO)
ENCOFRADO Y DESENCOFRADO NORMAL VIGAS RECTAS M2 99.00
ACERO FY=4200 KG/CM2 REND:250 KG/DIA KG 535.81
ARQUITECTURA
MUROS Y TABIQUE DE ALBAÑILERIA
MURO LADR. KK MEZCLA C:A 1:5 TIPO IV P/TARRAJEO DE SOGA CON REFZ
M2 797.54
ACERO D=1/4" C/3 HILADAS
REVOQUES Y REVESTIMIENTOS
TARRAJEO MUROS INTERIORES M2 1,275.01
TARRAJEO COLUMNAS Y PLACAS MEZC. C:A 1:5 E=1.5 CM M2 306.56
TARRAJEO VIGAS MEZC. C:A 1:5 E=1.5 CM M2 103.80
BRUÑAS DE 1.0 CM (SOLO MANO DE OBRA LOS MAT. ESTAN EN
ML 1,119.30
TARRAJEO)
NOVIEMBRE
27 28 29 30 1 2 3 4 5 6 7 8 9 10
V S D L M M J V S D L M M J
17.14 24.93 24.93 24.93 24.93 24.93 17.14 24.93 24.93 24.93 24.93 24.93
7.72 11.23 11.23 11.23 11.23 11.23 7.72 11.23 11.23 11.23 11.23 11.23
2.05 2.98 2.98 2.98 2.98 2.98 2.05 2.98 2.98 2.98 2.98 2.98
17.19 25.00 25.00 25.00 25.00 25.00 17.19 25.00 25.00 25.00 25.00 25.00
5.20 7.56 7.56 7.56 7.56 7.56 5.20 7.56 7.56 7.56 7.56 7.56
35.02 50.94 50.94 50.94 50.94 50.94 35.02 50.94 50.94 50.94 50.94 50.94
### 1,557.26 ### 1,557.26 1,557.26 1,557.26 1,070.62 1,557.26 ### ### ### 1,557.26
25 26 27 28 29 30 31 1 2 3 4 5 6 7
V S D L M M J V S D L M M J
17.14 24.93 24.93 24.93 24.93 17.14 24.93 24.93 24.93 24.93
111.46 162.12 162.12 162.12 162.12 111.46 162.12 162.12 162.12 162.12
7.72 11.23 11.23 11.23 11.23 7.72 11.23 11.23 11.23 11.23
2.05 2.98 2.98 2.98 2.98 2.05 2.98 2.98 2.98 2.98
17.19 25.00 25.00 25.00 25.00 17.19 25.00 25.00 25.00 25.00
5.20 7.56 7.56 7.56 7.56 5.20 7.56 7.56 7.56 7.56
35.02 50.94 50.94 50.94 50.94 35.02 50.94 50.94 50.94 50.94
1,070.62 1,557.26 1,557.26 ### 1,557.26 1,070.62 ### 1,557.26 1,557.26 1,557.26
PROGRAMACION DE METRADOS DE AVANCE DIARIO
ENERO
8 9 10 11 12 13 14 15 16 17 18 19 20 21
V S D L M M J V S D L M M J
24.93 17.14 24.93 24.93 24.93 24.93 24.93 17.14 24.93 24.93 24.93 24.93
0.49 2.72 3.96 3.96 3.96 3.96 3.96 2.72 3.96 3.96 3.96 3.96
162.12 111.46 162.12 162.12 162.12 162.12 162.12 111.46 162.12 162.12 162.12 162.12
11.23 7.72 11.23 11.23 11.23 11.23 11.23 7.72 11.23 11.23 11.23 11.23
2.98 2.05 2.98 2.98 2.98 2.98 2.98 2.05 2.98 2.98 2.98 2.98
3.21 3.96 3.96 3.96 3.96 2.72 3.96 3.96 3.96 3.96
25.00 17.19 25.00 25.00 25.00 25.00 25.00 17.19 25.00 25.00 25.00 25.00
7.56 5.20 7.56 7.56 7.56 7.56 7.56 5.20 7.56 7.56 7.56 7.56
50.94 35.02 50.94 50.94 50.94 50.94 50.94 35.02 50.94 50.94 50.94 50.94
1,557.26 1,070.62 ### 1,557.26 1,557.26 ### 1,557.26 1,070.62 ### 1,557.26 1,557.26 ###
7.98 15.95 15.95 15.95 15.95
NCE DIARIO
22 23 24 25 26 27 28 29 30 31 1 2 3 4
V S D L M M J V S D L M M J
24.93 17.14 24.93 24.93 24.93 24.93 24.93 17.14 24.93 24.93 24.93 24.93
3.96 2.72 3.96 3.96 3.96 3.96 3.96 2.72 3.96 3.96 3.96 3.96
162.12 111.46 162.12 162.12 162.12 162.12 162.12 111.46 162.12 162.12 162.12 162.12
3.16 2.18 3.16 3.16 3.16 3.16 3.16 2.18 3.16 3.16 3.16 3.16
10.55 7.25 10.55 10.55 10.55 10.55 10.55 7.25 10.55 10.55 10.55 10.55
11.23 7.72 11.23 11.23 11.23 11.23 11.23 7.72 11.23 11.23 11.23 11.23
2.98 2.05 2.98 2.98 2.98 2.98 2.98 2.05 2.98 2.98 2.98 2.98
3.96 2.72 3.96 3.96 3.96 3.96 3.96 2.72 3.96 3.96 3.96 3.96
0.51 0.35 0.51 0.51 0.51 0.51 0.51 0.35 0.51 0.51 0.51 0.51
7.91 5.44 7.91 7.91 7.91 7.91 7.91 5.44 7.91 7.91 7.91 7.91
38.32 26.34 38.32 38.32 38.32 38.32 38.32 26.34 38.32 38.32 38.32 38.32
25.00 17.19 25.00 25.00 25.00 25.00 25.00 17.19 25.00 25.00 25.00 25.00
7.56 5.20 7.56 7.56 7.56 7.56 7.56 5.20 7.56 7.56 7.56 7.56
50.94 35.02 50.94 50.94 50.94 50.94 50.94 35.02 50.94 50.94 50.94 50.94
### 1,070.62 1,557.26 1,557.26 ### 1,557.26 1,557.26 ### 1,557.26 1,557.26 1,557.26 1,557.26
15.95 10.97 15.95 15.95 15.95 15.95 15.95 10.97 15.95 15.95 15.95 15.95
FEBRERO
5 6 7 8 9 10 11 12 13 14 15 16 17 18
V S D L M M J V S D L M M J
24.93 17.14 24.93 24.93 24.93 24.93 24.93 17.14 24.93 24.93 24.93 24.93
3.96 2.72 3.96 3.96 3.96 3.96 3.96 2.72 3.96 3.96 3.96 3.96
162.12 111.46 162.12 162.12 162.12 162.12 162.12 111.46 162.12 162.12 162.12 162.12
3.16 2.18 3.16 3.16 3.16 3.16 3.16 2.18 3.16 3.16 3.16 3.16
10.55 7.25 10.55 10.55 10.55 10.55 10.55 7.25 10.55 10.55 10.55 10.55
11.23 7.72 11.23 11.23 11.23 11.23 11.23 7.72 11.23 11.23 11.23 11.23
2.98 2.05 2.98 2.98 2.98 2.98 2.98 2.05 2.98 2.98 2.98 2.98
3.96 2.72 3.96 3.96 3.96 3.96 3.96 2.72 3.96 3.96 3.96 3.96
0.51 0.35 0.51 0.51 0.51 0.51 0.51 0.35 0.51 0.51 0.51 0.51
7.91 5.44 7.91 7.91 7.91 7.91 7.91 5.44 7.91 7.91 7.91 7.91
38.32 26.34 38.32 38.32 38.32 38.32 38.32 26.34 38.32 38.32 38.32 38.32
25.00 17.19 25.00 25.00 25.00 25.00 25.00 17.19 25.00 25.00 25.00 25.00
7.56 5.20 7.56 7.56 7.56 7.56 7.56 5.20 7.56 7.56 7.56 7.56
50.94 35.02 50.94 50.94 50.94 50.94 50.94 35.02 50.94 50.94 50.94 50.94
1,557.26 1,070.62 1,557.26 1,557.26 1,557.26 1,557.26 1,557.26 1,070.62 1,557.26 1,557.26 1,557.26 1,557.26
24.93 17.14 24.93 24.93 24.93 24.93 24.93 17.14 24.93 24.93 24.93 24.93
3.96 2.72 3.96 3.96 3.96 3.96 3.96 2.72 3.96 3.96 3.96 3.96
162.12 111.46 162.12 162.12 162.12 162.12 162.12 111.46 162.12 162.12 162.12 162.12
3.16 2.18 3.16 3.16 3.16 3.16 3.16 2.18 3.16 3.16 3.16 3.16
10.55 7.25 10.55 10.55 10.55 10.55 10.55 7.25 10.55 10.55 10.55 10.55
11.23 7.72 11.23 11.23 11.23 11.23 11.23 7.72 11.23 11.23 11.23 11.23
2.98 2.05 2.98 2.98 2.98 2.98 2.98 2.05 2.98 2.98 2.98 2.98
3.96 2.72 3.96 3.96 3.96 3.96 3.96 2.72 3.96 3.96 3.96 3.96
0.51 0.35 0.51 0.51 0.51 0.51 0.51 0.35 0.51 0.51 0.51 0.51
7.91 5.44 7.91 7.91 7.91 7.91 7.91 5.44 7.91 7.91 7.91 7.91
38.32 26.34 38.32 38.32 38.32 38.32 38.32 26.34 38.32 38.32 38.32 38.32
25.00 17.19 25.00 25.00 25.00 25.00 25.00 17.19 25.00 25.00 25.00 25.00
7.56 5.20 7.56 7.56 7.56 7.56 7.56 5.20 7.56 7.56 7.56 7.56
50.94 35.02 50.94 50.94 50.94 50.94 50.94 35.02 50.94 50.94 50.94 50.94
1,557.26 1,070.62 1,557.26 1,557.26 1,557.26 1,557.26 1,557.26 1,070.62 1,557.26 1,557.26 1,557.26 1,557.26
0.89 0.61 0.89 0.89 0.89 0.89 0.89 0.61 0.89 0.89 0.89 0.89
10.22 7.02 10.22 10.22 10.22 10.22 10.22 7.02 10.22 10.22 10.22 10.22
126.08 86.68 126.08 126.08 126.08 126.08 126.08 86.68 126.08 126.08 126.08 126.08
0.21 0.15 0.21 0.21 0.21 0.21 0.21 0.15 0.21 0.21 0.21 0.21
3.30 2.27 3.30 3.30 3.30 3.30 3.30 2.27 3.30 3.30 3.30 3.30
17.86 12.28 17.86 17.86 17.86 17.86 17.86 12.28 17.86 17.86 17.86 17.86
15.95 10.97 15.95 15.95 15.95 15.95 15.95 10.97 15.95 15.95 15.95 15.95
29.22 42.50 42.50 42.50 42.50 42.50 29.22 42.50 42.50 42.50 42.50 42.50
7.02 10.22 10.22 10.22 10.22 10.22 7.02 10.22 10.22 10.22 10.22 10.22
2.38 3.46 3.46 3.46 3.46 3.46 2.38 3.46 3.46 3.46 3.46 3.46
25.65 37.31 37.31 37.31 37.31 37.31 25.65 37.31 37.31 37.31 37.31 37.31
MARZO
4 5 6 7 8 9 10 11 12 13 14 15 16 17
V S D L M M J V S D L M M J
162.12 111.46 162.12 162.12 162.12 162.12 162.12 111.46 162.12 162.12 162.12 162.12
0.51 0.35 0.51 0.51 0.51 0.51 0.51 0.35 0.51 0.51 0.51
7.91 5.44 7.91 7.91 7.91 7.91 7.91 5.44 7.91 7.91
38.32 26.34 38.32 38.32 38.32 38.32 38.32 26.34 38.32 38.32
25.00 17.19 25.00 25.00 25.00 25.00 25.00 17.19 25.00 25.00 25.00
7.56 5.20 7.56 7.56 7.56 7.56 7.56 5.20 7.56 7.56
50.94 35.02 50.94 50.94 50.94 50.94 50.94 35.02 50.94
1,557.26 1,070.62 1,557.26 1,557.26 1,557.26 1,557.26 1,557.26 1,070.62 1,557.26
0.89 0.61 0.89 0.89 0.89 0.89 0.89 0.61 0.89 0.89 0.89 0.89
10.22 7.02 10.22 10.22 10.22 10.22 10.22 7.02 10.22 10.22 10.22 10.22
126.08 86.68 126.08 126.08 126.08 126.08 126.08 86.68 126.08 126.08 126.08 126.08
0.21 0.15 0.21 0.21 0.21 0.21 0.21 0.15 0.21 0.21 0.21 0.21
3.30 2.27 3.30 3.30 3.30 3.30 3.30 2.27 3.30 3.30 3.30 3.30
17.86 12.28 17.86 17.86 17.86 17.86 17.86 12.28 17.86 17.86 17.86 17.86
15.95 10.97 15.95 15.95 15.95 15.95 15.95 10.97 15.95 15.95 15.95 15.95
29.22 42.50 42.50 42.50 42.50 42.50 29.22 42.50 42.50 42.50 42.50
7.02 10.22 10.22 10.22 10.22 10.22 7.02 10.22 10.22 10.22 10.22
2.38 3.46 3.46 3.46 3.46 3.46 2.38 3.46 3.46 3.46 3.46
25.65 37.31 37.31 37.31 37.31 37.31 25.65 37.31 37.31 37.31 37.31
18 19 20 21
V S D L
162.12
0.89
10.22
126.08
0.21
3.30
17.86
42.50 S/. 29.22 S/. 13.28
10.22 S/. 7.02 S/. 3.19
3.46 S/. 2.38 S/. 1.08