CRONOGRAMA DE ADQUISICION DE INSUMOS - PRIMERA ETAPA

PROYECTO : “AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS RECREATIVOS, CIVICO Y CULTURALES EN LA PLAZA DE LARMENTA, DISTRITO DE IZCUCHACA - HU

UBICACIÓN : LIRCAY- ANGARAES - HUANCAVELICA

FECHA : ENERO - 2018

COSTO 1º MES 2º MES


ITEM DESCRIPCION UND CANTIDAD P.U
TOTAL % Cant. C.Parcial % Cant.

MANO DE OBRA
1 OPERARIO hh 8,537.3798 10.11 86,312.91 20% 1,707.48 17,262.58 30% 2,561.21
2 OFICIAL hh 2,925.8558 8.39 24,547.93 20% 585.17 4,909.59 30% 877.76
3 PEON hh 50,885.3549 7.58 385,710.99 30% 15,265.61 115,713.30 40% 20,354.14
4 OPERADOR DE EQUIPO PESADO hh 66.7264 12.50 834.08 20% 13.35 166.82 30% 20.02
5 OPERADOR DE EQUIPO LIVIANO hh 5,241.4560 10.11 52,991.12 20% 1,048.29 10,598.22 30% 1,572.44
6 OPERARIO TALLADOR DE PIEDRA hh 11,519.6800 12.50 143,996.00 0% 30% 3,455.90
7 TOPOGRAFO hh 61.2040 12.50 765.05 50% 30.60 382.53 50% 30.60
8 CONTROLADOR hh 4.9610 8.39 41.62 50% 2.48 20.81 50% 2.48
9 NIVELADOR hh 61.2040 12.50 765.05 50% 30.60 382.53 50% 30.60
10 PERSONAL TECNICO SANITARIO hh 55.0287 12.50 687.86
MATERIALES
1 ACEITE PARA MOTOR GRADO SAE 30 gal 43.6242 62.00 2,704.70 30% 13.09 811.41 40% 17.45
2 GASOLINA 90 OCTANOS gal 3,036.3747 15.00 45,545.62 30% 910.91 13,663.69 40% 1,214.55
3 ASFALTO RC-250 gal 49.2655 60.00 2,955.93 20% 9.85
4 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA glb 1.0000 2,600.00 2,600.00 100% 1.00 2,600.00
5 FLETE RURAL glb 1.0000 7,360.00 7,360.00 100% 1.00 7,360.00
6 ALAMBRE NEGRO RECOCIDO N° 8 kg 68.7246 6.50 446.71 50% 34.36 223.35 50% 34.36
7 ALAMBRE NEGRO RECOCIDO N° 16 kg 1,703.0632 6.50 11,069.91 50% 851.53 5,534.96 50% 851.53
8 ANGULOS DE ACERO ESTRUCTURAL DE 1 1/2"X1 1/2'X3/16" X 6 m, ASTM A36 var 78.9566 34.00 2,684.52 60% 47.37
9 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 29,847.9405 3.70 110,437.38 20% 5,969.59 22,087.48 50% 14,923.97
10 ACERO LISO EN VARILLAS DE 5/8" X 6 m var 21.4081 32.00 685.06 60% 12.84
11 CLAVOS PARA MADERA CON CABEZA DE 1" kg 3.2960 6.50 21.42 30% 0.99 6.43 40% 1.32
12 CLAVOS PARA MADERA CON CABEZA DE 2" kg 14.2800 6.50 92.82 30% 4.28 27.85 40% 5.71
CRONOGRAMA DE ADQUISICION DE INSUMOS - PRIMERA ETAPA

PROYECTO : “AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS RECREATIVOS, CIVICO Y CULTURALES EN LA PLAZA DE LARMENTA, DISTRITO DE IZCUCHACA - HU

UBICACIÓN : LIRCAY- ANGARAES - HUANCAVELICA

FECHA : ENERO - 2018

COSTO 1º MES 2º MES


ITEM DESCRIPCION UND CANTIDAD P.U
TOTAL % Cant. C.Parcial % Cant.
13 CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg 20.0074 6.50 130.05 30% 6.00 39.01 40% 8.00
14 CLAVOS PARA MADERA CON CABEZA DE 3" kg 95.2308 6.50 619.00 30% 28.57 185.70 40% 38.09
15 CLAVOS PARA MADERA CON CABEZA DE 4" kg 12.8900 6.50 83.79 30% 3.87 25.14 40% 5.16
16 CLAVOS PARA CALAMINA DE 3" kg 5.0540 7.00 35.38 100% 5.05 35.38
17 MALLA DE ALAMBRE GALVANIZADO TEJIDO TIPO COCO DE 2"X2" Nº10 m2 213.6800 16.50 3,525.72
18 TAPA METALICA DE 0.90mx0.90m, CON MARCO DE AGUALO DE 1 1/2"X1/4" Y PLANCHA ESTRIADA E=3mm und 3.0000 210.00 630.00
19 TUBERIA PVC-SAP C-10 S/P DE 2" X 5 m und 2,164.0500 7.30 15,797.57 40% 865.62
20 CODO PVC SAP S/P 2" X 45° und 16.0000 6.50 104.00
21 NIPLE DE PVC DE 2"X4" und 48.0000 5.50 264.00
22 ADAPTADOR PVC-SAP C/R 2" und 48.0000 8.20 393.60
23 UNION UNIVERSAL PVC-SAP C/R 2" und 48.0000 12.10 580.80
24 TUBERIA PVC PARA ALCANTARILLADO ISO 4435 DN=160mmX6m, S-25, INCLUYE ANILLO pza 19.9500 165.00 3,291.75 20% 3.99
25 CODO PVC UNION FLEXIBLE DN 160mm x 45°, INCLUYE ANILLO pza 4.0000 38.00 152.00
26 CODO PVC UNION FLEXIBLE DN 200mm x 45°, INCLUYE ANILLO pza 12.0000 76.00 912.00
27 TUBERIA PVC-SAL 3/4" X 3 m und 42.8419 7.50 321.31
28 PIEDRA CHANCADA 1/2" m3 249.5589 80.00 19,964.71 30% 74.87
29 ARENA FINA m3 41.6441 95.00 3,956.19 30% 12.49
30 ARENA GRUESA m3 635.9099 90.00 57,231.89 30% 190.77
31 HORMIGON m3 129.5934 70.00 9,071.54 100% 129.59
32 MATERIAL GRANULAR (AFIRMADO) m3 254.1198 45.00 11,435.39 60% 152.47
33 AGUA PUESTA EN OBRA m3 570.3700 8.00 4,562.96 40% 228.15
34 POLIESTIRENO EXPANDIDO (TECNOPOR), E=3/4" pln 51.0596 35.00 1,787.09
35 WATER STOP PVC DE 6" TIPO "O" m 465.9375 25.30 11,788.22 60% 279.56
36 CEMENTO PORTLAND TIPO I (42.5 kg) bol 4,233.6596 25.00 105,841.49 40% 1,693.46
37 YESO BOLSA 28 kg bol 173.6367 12.00 2,083.64 60% 104.18 1,250.18 40% 69.45
38 OCRE ROJO kg 70.0367 12.00 840.44 50% 35.02 420.22 50% 35.02
CRONOGRAMA DE ADQUISICION DE INSUMOS - PRIMERA ETAPA

PROYECTO : “AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS RECREATIVOS, CIVICO Y CULTURALES EN LA PLAZA DE LARMENTA, DISTRITO DE IZCUCHACA - HU

UBICACIÓN : LIRCAY- ANGARAES - HUANCAVELICA

FECHA : ENERO - 2018

COSTO 1º MES 2º MES


ITEM DESCRIPCION UND CANTIDAD P.U
TOTAL % Cant. C.Parcial % Cant.
39 PERNO HEXAGONAL ROSCA CORRIENTE 5/16" X 6" CON TUERCA Y ARANDELA jgo 12.0000 1.80 21.60 100% 12.00 21.60
40 TAPA DE CONCRETO REFORZADO PARA BUZON DE 0.60m, CON MARCO DE FIEERO FUNDIDO pza 12.0000 430.00 5,160.00
41 TUBERIA PVC-UF DN 200MM, C/ ANILLO INTEGRADO m 3,045.0000 34.00 103,530.00
42 PEGAMENTO PARA PVC gal 2.7612 94.00 259.55
43 LUBRICANTE PARA TUBERIAS DE UNION FLEXIBLE gal 25.2282 40.00 1,009.13
44 DESMOLDADOR PARA ENCOFRADO gal 13.9997 30.00 419.99 20% 2.80
45 ADITIVO IMPERMEABILIZANTE PARA MORTERO SIKA gal 3.7648 42.00 158.12 40% 1.51
46 CALAMINA GALVANIZADA DE 1.83MX0.83MX0.22MM pln 50.5400 25.00 1,263.50 100% 50.54 1,263.50
47 CUARTON DE MADERA ROBLE CORRIENTE 2"x 3"x10' und 53.5500 16.00 856.80 100% 53.55 856.80
48 MACHIHENBRADO DE MADERA DE ROBLE DE 4"X3/4" und 237.7620 14.00 3,328.67 100% 237.76 3,328.67
49 CUARTON DE MADERA ROBLE CORRIENTE 2"x 2"x10' und 153.7060 10.00 1,537.06 100% 153.71 1,537.06
50 ROLLISO DE EUCALIPTO DE D=15CM, L=6.00M und 10.0000 45.00 450.00 20% 2.00 90.00 40% 4.00
51 MADERA ROBLE CORRIENTE p2 4,097.5199 3.80 15,570.58 20% 819.50
52 ROLLISO DE EUCALIPTO DE D=4", L=3.80M und 6.0000 25.00 150.00 100% 6.00 150.00
53 COMPUERTA METALICA DE 0.60mX0.50m C/AGULOS DE 1 1/2"X1 1/2"X3/16", C/TORNILLO SIN FIN DE 1" und 1.0000 530.00 530.00
54 COMPUERTA METALICA DE 0.40mX0.40m C/AGULOS DE 1"X1"X1/8", C/TORNILLO SIN FIN DE 1" und 2.0000 420.00 840.00
55 REJILLA METALICA DE ACERO LISO DE 1/2", Ø=250mm und 14.0000 55.00 770.00
56 LEÑA mll 4.8000 540.00 2,592.00 30% 1.44 777.60 70% 3.36
57 TRIPLAY DE 1.20X2.40 m X 4 mm und 7.4160 24.00 177.98 100% 7.42 177.98
58 BISAGRA CAPUCHINA DE ACERO INOXIDABLE 4"X4" und 2.0000 8.00 16.00 100% 2.00 16.00
59 LIJA DE FIERRO #80 plg 44.3750 2.00 88.75 20% 8.88
60 PINTURA ESMALTE gal 30.4342 38.00 1,156.50
61 IMPRIMANTE PARA JUNTAS DE POLIURETANO gal 2.2188 115.00 255.16
62 SELLANTE ELASTOMERICO DE POLIURETANO gal 48.8125 105.00 5,125.31
63 CINTA TEFLON und 6.0000 2.20 13.20
64 UNION BRIDA DE ACERO PARA EMPERNAR DE 160MM, PARA VALVULAS MARIPOSAS pza 4.0000 280.00 1,120.00
CRONOGRAMA DE ADQUISICION DE INSUMOS - PRIMERA ETAPA

PROYECTO : “AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS RECREATIVOS, CIVICO Y CULTURALES EN LA PLAZA DE LARMENTA, DISTRITO DE IZCUCHACA - HU

UBICACIÓN : LIRCAY- ANGARAES - HUANCAVELICA

FECHA : ENERO - 2018

COSTO 1º MES 2º MES


ITEM DESCRIPCION UND CANTIDAD P.U
TOTAL % Cant. C.Parcial % Cant.
65 VALVULA MARIPOSA RANURADA CON TIMOM DE 160mm pza 2.0000 550.00 1,100.00
66 VALVULA COMPUERTA DE BRONCE DE 2" und 24.0000 115.00 2,760.00
67 SOLDADURA ELECTRICA CELLOCORD P 1/8" kg 26.5850 4.50 119.63 30% 7.98 35.89 60% 15.95
68 MECHA LENTA m 5,757.7200 2.00 11,515.44 40% 2,303.09 4,606.18 40% 2,303.09
69 FULMINANTE und 5,757.7167 1.80 10,363.89 30% 1,727.32 3,109.17 60% 3,454.63
70 DINAMITA kg 1,247.8350 20.00 24,956.70 40% 499.13 9,982.68 60% 748.70
71 TUBO DE ACERO LAC ASTM A500 DE DN=2", E=2.5mm Y L= 6.40 und 26.1800 48.00 1,256.64 60% 15.71
72 GIGANTOGRAFIA DE 3.60MX2.40M und 1.0000 220.00 220.00 100% 1.00 220.00
73 CINTA PLASTICA SEÑALIZADORA m 6,441.1091 0.55 3,542.61 100% 6,441.11 3,542.61
74 HIPOCLORITO DE CALCIO AL 70% kg 20.6100 15.00 309.15 100% 20.61 309.15
75 ALCOHOL ETILICO l 36.8313 12.00 441.98
76 CINTA MASKIGTAPE CREPE 500 MULTIUSOS 1" X 40 yd. und 26.6250 3.50 93.19
77 CHINCHES cja 0.5000 14.00 7.00 100% 0.50 7.00
78 BARRENO DE 5'X7/8" und 47.5393 280.00 13,311.00 30% 14.26 3,993.30 50% 23.77
EQUIPOS
1 ESTACION TOTAL (INCLUIDO PRISMAS) hm 88.3244 25.00 2,208.11 50% 44.16 1,104.06 50% 44.16
2 NIVEL DE INGENIERO (INCLUIDO MIRAS) hm 88.3247 15.00 1,324.87 50% 44.16 662.44 50% 44.16
3 HERRAMIENTAS MANUALES %mo 1.0000 26,562.90 26,562.90 100% 1.00 26,562.90
4 BOMBA PARA PRUEBA DE AGUA hm 55.0287 20.00 1,100.57
5 REGLA DE ALUMINIO 3/4" X 4" X 8' und 1.8914 96.00 181.57 30% 0.57
6 CORTADOR ELECTRICO RADIAL PARA TUBOS Y PERFILES MATALICAS hm 72.9551 5.00 364.78 60% 43.77
7 COMPACTADORA VIBRATORIA TIPO CANGURO DE 85 - 95 KG hm 1,770.2089 15.00 26,553.13 10% 177.02 2,655.31 50% 885.10
8 MARTILLO NEUMATICO DE 25 kg hm 293.2218 50.00 14,661.09 40% 117.29 5,864.44 50% 146.61
9 MOTOPERFORADORA TIPO PIONJAR 120 hm 1,013.4380 10.00 10,134.38 50% 506.72 5,067.19 30% 304.03
10 COMPRESORA NEUMATICA 250 - 330 PCM - 87 HP hm 73.3696 90.00 6,603.26 50% 36.68 3,301.63 30% 22.01
11 CARGADOR SOBRE LLANTAS DE 160-195 HP 3.5 yd3, INCL./COMBUSTIBLE hm 18.9729 240.00 4,553.50 60% 11.38 2,732.10 40% 7.59
CRONOGRAMA DE ADQUISICION DE INSUMOS - PRIMERA ETAPA

PROYECTO : “AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS RECREATIVOS, CIVICO Y CULTURALES EN LA PLAZA DE LARMENTA, DISTRITO DE IZCUCHACA - HU

UBICACIÓN : LIRCAY- ANGARAES - HUANCAVELICA

FECHA : ENERO - 2018

COSTO 1º MES 2º MES


ITEM DESCRIPCION UND CANTIDAD P.U
TOTAL % Cant. C.Parcial % Cant.
12 EXCAVADORA SOBRE ORUGAS 115-165 HP, INCLUYE COMBUSTIBLE hm 3.2759 380.00 1,244.84 70% 2.29 871.39 30% 0.98
13 TRACTOR ORUGA D7 INCLUYE COMBUSTIBLE hm 9.9219 380.00 3,770.32 80% 7.94 3,016.26 20% 1.98
14 CAMION VOLQUETE DE 15 m3, INCL./COMBUSTIBLE hm 37.8321 180.00 6,809.78 20% 7.57 1,361.96 30% 11.35
15 GRUPO ELECTROGENO DE 250 KW. hm 72.9551 70.00 5,106.86 40% 29.18 2,042.74 40% 29.18
16 SOLDADORA ELECTRICA MONOFASICA DE 295A hm 60.4551 40.00 2,418.20
17 VIBRADOR DE CONCRETO 4 HP 1.25" hm 335.8800 11.50 3,862.62 10% 33.59 386.26 40% 134.35
18 MEZCLADORA DE CONCRETO 11 P3 (23 HP) hm 469.3180 25.00 11,732.95 10% 46.93 1,173.30 40% 187.73
19 CIZALLA PARA ACERO DE CONSTRUCCION HASTA 1" und 2.7894 305.00 850.77 50% 1.39
20 ZARANDA CON MARCO Y MALA DE ACERO DE E=1/2" hm 466.5728 4.00 1,866.29 30% 139.97 559.89 40% 186.63
ICION DE INSUMOS - PRIMERA ETAPA

Y CULTURALES EN LA PLAZA DE LARMENTA, DISTRITO DE IZCUCHACA - HUANCAVELICA – HUANCAVELICA”

PROVINCIA ANGARAES
DEPARTAMENTO HUANCAVELICA
DISTRITO LIRCAY
LOCALIDAD SAN JUAN DE DIOS

2º MES 3º MES 4º MES


C.Parcial % Cant. C.Parcial % Cant. C.Parcial

25,893.87 30% 2,561.21 25,893.87 20% 1,707.48 17,262.58


7,364.38 30% 877.76 7,364.38 20% 585.17 4,909.59
154,284.40 20% 10,177.07 77,142.20 10% 5,088.54 38,571.10
250.22 30% 20.02 250.22 20% 13.35 166.82
15,897.34 30% 1,572.44 15,897.34 20% 1,048.29 10,598.22
43,198.80 40% 4,607.87 57,598.40 30% 3,455.90 43,198.80
382.53
20.81
382.53
100% 55.03 687.86

1,081.88 20% 8.72 540.94 10% 4.36 270.47


18,218.25 30% 910.91 13,663.69
591.19 80% 39.41 2,364.74

223.35
5,534.96
1,610.71 40% 31.58 1,073.81
55,218.69 30% 8,954.38 33,131.21
411.04 40% 8.56 274.02
8.57 30% 0.99 6.43
37.13 30% 4.28 27.85
ICION DE INSUMOS - PRIMERA ETAPA

Y CULTURALES EN LA PLAZA DE LARMENTA, DISTRITO DE IZCUCHACA - HUANCAVELICA – HUANCAVELICA”

PROVINCIA ANGARAES
DEPARTAMENTO HUANCAVELICA
DISTRITO LIRCAY
LOCALIDAD SAN JUAN DE DIOS

2º MES 3º MES 4º MES


C.Parcial % Cant. C.Parcial % Cant. C.Parcial
52.02 30% 6.00 39.01
247.60 30% 28.57 185.70
33.51 30% 3.87 25.14

60% 128.21 2,115.43 40% 85.47 1,410.29


100% 3.00 630.00
6,319.03 40% 865.62 6,319.03 20% 432.81 3,159.51
100% 16.00 104.00
100% 48.00 264.00
100% 48.00 393.60
100% 48.00 580.80
658.35 50% 9.98 1,645.88 30% 5.99 987.53
100% 4.00 152.00
100% 12.00 912.00
100% 42.84 321.31
5,989.41 50% 124.78 9,982.36 20% 49.91 3,992.94
1,186.86 50% 20.82 1,978.09 20% 8.33 791.24
17,169.57 40% 254.36 22,892.76 30% 190.77 17,169.57
9,071.54
6,861.23 40% 101.65 4,574.16
1,825.18 30% 171.11 1,368.89 30% 171.11 1,368.89
100% 51.06 1,787.09
7,072.93 40% 186.38 4,715.29
42,336.60 40% 1,693.46 42,336.60 20% 846.73 21,168.30
833.46
420.22
ICION DE INSUMOS - PRIMERA ETAPA

Y CULTURALES EN LA PLAZA DE LARMENTA, DISTRITO DE IZCUCHACA - HUANCAVELICA – HUANCAVELICA”

PROVINCIA ANGARAES
DEPARTAMENTO HUANCAVELICA
DISTRITO LIRCAY
LOCALIDAD SAN JUAN DE DIOS

2º MES 3º MES 4º MES


C.Parcial % Cant. C.Parcial % Cant. C.Parcial

100% 12.00 5,160.00


60% 1,827.00 62,118.00 40% 1,218.00 41,412.00
100% 2.76 259.55
100% 25.23 1,009.13
84.00 40% 5.60 168.00 40% 5.60 168.00
63.25 40% 1.51 63.25 20% 0.75 31.62

180.00 40% 4.00 180.00


3,114.12 50% 2,048.76 7,785.29 30% 1,229.26 4,671.17

100% 1.00 530.00


100% 2.00 840.00
100% 14.00 770.00
1,814.40

17.75 60% 26.63 53.25 20% 8.88 17.75


60% 18.26 693.90 40% 12.17 462.60
100% 2.22 255.16
100% 48.81 5,125.31
100% 6.00 13.20
100% 4.00 1,120.00
ICION DE INSUMOS - PRIMERA ETAPA

Y CULTURALES EN LA PLAZA DE LARMENTA, DISTRITO DE IZCUCHACA - HUANCAVELICA – HUANCAVELICA”

PROVINCIA ANGARAES
DEPARTAMENTO HUANCAVELICA
DISTRITO LIRCAY
LOCALIDAD SAN JUAN DE DIOS

2º MES 3º MES 4º MES


C.Parcial % Cant. C.Parcial % Cant. C.Parcial
100% 2.00 1,100.00
100% 24.00 2,760.00
71.78 10% 2.66 11.96
4,606.18 20% 1,151.54 2,303.09
6,218.33 10% 575.77 1,036.39
14,974.02
753.98 40% 10.47 502.66

100% 36.83 441.98


100% 26.63 93.19

6,655.50 20% 9.51 2,662.20

1,104.06
662.44

100% 55.03 1,100.57


54.47 70% 1.32 127.10
218.87 40% 29.18 145.91
13,276.57 30% 531.06 7,965.94 10% 177.02 2,655.31
7,330.55 10% 29.32 1,466.11
3,040.31 20% 202.69 2,026.88
1,980.98 20% 14.67 1,320.65
1,821.40
ICION DE INSUMOS - PRIMERA ETAPA

Y CULTURALES EN LA PLAZA DE LARMENTA, DISTRITO DE IZCUCHACA - HUANCAVELICA – HUANCAVELICA”

PROVINCIA ANGARAES
DEPARTAMENTO HUANCAVELICA
DISTRITO LIRCAY
LOCALIDAD SAN JUAN DE DIOS

2º MES 3º MES 4º MES


C.Parcial % Cant. C.Parcial % Cant. C.Parcial
373.45
754.06
2,042.93 30% 11.35 2,042.93 20% 7.57 1,361.96
2,042.74 20% 14.59 1,021.37
60% 36.27 1,450.92 40% 24.18 967.28
1,545.05 40% 134.35 1,545.05 10% 33.59 386.26
4,693.18 30% 140.80 3,519.89 20% 93.86 2,346.59
425.38 40% 1.12 340.31 10% 0.28 85.08
746.52 30% 139.97 559.89