PRESUPUESTO DETALLADO POR PARTIDAS

DESCRIPCIÓN UND CANT P.U PARCIAL 24-Jul 25-Jul 26-Jul 27-Jul 28-Jul 29-Jul 30-Jul 31-Jul 1-Aug 2-Aug 3-Aug 4-Aug 5-Aug 6-Aug 7-Aug 8-Aug 9-Aug 10-Aug 11-Aug 12-Aug 13-Aug 14-Aug 15-Aug 16-Aug 17-Aug 18-Aug 19-Aug 20-Aug 21-Aug 22-Aug 23-Aug 24-Aug 25-Aug 26-Aug 27-Aug 28-Aug 29-Aug 30-Aug 31-Aug 1-Sep 2-Sep 3-Sep 4-Sep 5-Sep 6-Sep 7-Sep 8-Sep 9-Sep 10-Sep 11-Sep 12-Sep 13-Sep 14-Sep 15-Sep 16-Sep 17-Sep 18-Sep 19-Sep 20-Sep 21-Sep 22-Sep 23-Sep 24-Sep

OBRAS PROVISIONALES Y PRELIM INARES


OBRAS PRELIM INARES S/. 130,902.48
LIMPIEZA PERMANENTE EN OBRA mes 5.50 3,598.27 S/. 19,790.49 0.03 0.03
TOPOGRAFIA DURANTE LA EJECUCION DE LA OBRA mes 5.50 20,202.18 S/. 111,111.99 0.03 0.03
OBRAS PROVISIONALES S/. 168,084.00
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb. 1.00 9,540.00 S/. 9,540.00 0.030 0.03
CAMPAMENTO PROVISIONAL DE OBRA(OFICINA,ALMACEN, CASETA VIG.,SSHH) mes 5.50 5,200.00 S/. 28,600.00 0.03 0.03
GUARDIANIA EN OBRA mes 5.50 12,900.00 S/. 70,950.00 0.03 0.03
SEGURIDAD Y SEÑALIZACIÓN PERMANENTE EN OBRA mes 5.00 9,210.00 S/. 46,050.00 0.03 0.03
MANTENIMIENTO Y RIEGO DE VIAS PARA CONTROL DE POLVOS mes 4.00 3,236.00 S/. 12,944.00 0.03 0.03

M ATRIZ Y CONEXIONES DOM ICILIARIAS DE ALCANTARILLADO -


EXC. DE ZANJAS PARA ALCANTARILLADO S/. 84,853.91
EXC. DE ZANJA C/MAQ. H = 1.50M. m 2,816.10 8.31 S/. 23,401.79 164.79 295.82
EXC. DE ZANJA C/MAQ. H = 2.00M. m 769.40 11.38 S/. 8,755.77 34.13
EXC. DE ZANJA C/MAQ. H = 2.50M. m 763.78 13.51 S/. 10,318.67
EXC. DE ZANJA C/MAQ. H = 3.00M. m 192.05 21.63 S/. 4,154.04
ENTIBADO Y DESENTIBADO H≥2.00M. m 955.83 39.99 S/. 38,223.64
REFINE Y NIVELACION DE ZANJAS PARA ALCANTARILLADO S/. 13,925.01
REFINE DE ZANJAS Y NIVELACION DE TUBOS hasta 2.00 m. m 3,585.50 2.94 S/. 10,541.37 198.92 295.82
REFINE DE ZANJAS Y NIVELACION DE TUBOS hasta 3.00 m. m 955.83 3.54 S/. 3,383.64
RELLENO Y COM PACTACION DE ZANJAS PARA ALCANTARILLADO S/. 100,717.12
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 1.50M. m 2,816.10 20.97 S/. 59,053.62 162.91 195.56
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 2.00M. m 769.40 22.68 S/. 17,449.99
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 2.50M. m 763.78 24.80 S/. 18,941.74
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 3.00M. m 192.05 27.45 S/. 5,271.77
SUM INISTRO E INSTALACIÓN DE TUBERÍAS S/. 150,321.74
SUMINISTRO E INSTALACION DE TUBO PVC SN4UF DN 200MM m 4,106.39 30.40 S/. 124,834.26 102.05
SUMINISTRO E INSTALACION DE TUBO PVC SN4UF DN 250MM m 434.94 58.60 S/. 25,487.48 86.32
PRUEBA HIDRAULICA DE TUBERIA P/ALCANTARILLADO S/. 16,461.87
PRUEBA HIDRAULICA DE TUBO PVC SN4UF DN 200MM m 4,106.39 3.60 S/. 14,783.00 659.42 358.76
PRUEBA HIDRAULICA DE TUBO PVC SN4UF DN 250MM m 434.94 3.86 S/. 1,678.87
BUZONES S/. 168,281.50
EXCAVACION PARA BUZONES (92und.) m3 307.00 40.27 S/. 12,362.89 7.80 13.42
BUZON Di=1.20m x 1.20MPP. und. 30.00 1,547.45 S/. 46,423.50 2.00 4.00
BUZON Di=1.20m x 1.50MPP. und. 26.00 1,770.29 S/. 46,027.54 1.00 3.00
BUZON Di=1.20m x 2.00MPP. und. 19.00 1,840.57 S/. 34,970.83
BUZON Di=1.20m x 2.50MPP. und. 9.00 1,935.05 S/. 17,415.45
BUZON Di=1.20m x 3.00MPP. und. 5.00 2,083.98 S/. 10,419.90
EMPALME BUZON Y/O RED EXISTENTE und. 1.00 661.39 S/. 661.39
CONEXIONES DOM ICILIARIAS DE ALCANTARILLADO S/. 473,079.27
EXC. ZANJA CONEXIÓN DOMICILIARIA ALCANTARILLADO m 5,583.49 8.14 S/. 45,449.61
REFINE DE ZANJA Y NIVELEACION DE TUBERIA m 5,583.49 3.47 S/. 19,374.71
CONEXION DOMIC. ALCANT. (M.O., SUMINISTRO DE TUBERIA Y ACCESORIOS PVC, und. 800.00 349.63 S/. 279,704.00
CAJAS C°,MARCO
RELLENO Y TAPA C°A°)
Y COMPACTACION DE ZANJA PARA CONEX. DOMICIL. ALCANT. m 5,583.49 18.85 S/. 105,248.79
PRUEBA HIDRAULICA DE CONEXIÓN DOMICILIARIA m 5,583.49 3.60 S/. 20,100.56
PRUEBA DE COMPACTACIÓN DE SUELOS und. 80.00 40.02 S/. 3,201.60
OTROS S/. 9,093.22
PRUEBA DE COMPACTACION DE SUELOS (ZANJAS REDES DE ALCANTARILLADO) und. 101.00 40.02 S/. 4,042.02
ACARREO DE MATERIAL EXCEDENTE DE CORTE A MANZANAS CERCANAS m3 880.00 5.74 S/. 5,051.20

M ATRIZ Y CONEXIONES DOM ICILIARIAS- AGUA POTABLE


EXC. DE ZANJAS PARA REDES DE AGUA POTABLE S/. 46,477.31
EXC. DE ZANJAS PARA REDES DE AGUA POTABLE m 4,295.50 10.82 S/. 46,477.31 200.00
REFINE Y NIVELACIÓN REDES DE AGUA POTABLE S/. 15,206.07
REFINE Y NIVELACIÓN FONDO DE ZANJA PARA TUBERIA REDES DE AGUA m 4,295.50 3.54 S/. 15,206.07
RELLENO DE ZANJA PARA REDES DE AGUA POTABLE S/. 77,361.96
RELLENO Y COMPACTADO C/MATERIAL SELECCIONADO PARA ZANJA REDES DE AGUA m 4,295.50 18.01 S/. 77,361.96
POTABLE
SUM INISTRO E INSTALACIÓN DE TUBERÍAS S/. 85,669.43
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 63MM INC. ANILLOS m 176.90 7.43 S/. 1,314.37
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 90MM INC. ANILLOS m 2,483.10 11.82 S/. 29,350.24
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 110MM INC. ANILLOS m 984.70 15.06 S/. 14,829.58
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 160MM INC. ANILLOS m 650.80 28.32 S/. 18,430.66
DADOS DE ANCLAJE F'C=140Kg/cm2 DN(63-90mm) und. 111.00 110.68 S/. 12,285.48
DADOS DE ANCLAJE F'C=140Kg/cm2 DN(110-160mm) und. 64.00 113.38 S/. 7,256.32
EMPALME DE TUBERIA A RED EXISTENTE DE (63-160)MM glb. 1.00 401.88 S/. 401.88
PRUEBAS DE COMPACTACION DE SUELOS und. 45.00 40.02 S/. 1,800.90
PRUEBAS HIDRAÚLICAS Y DESINFECCIÓN DE TUBERÍAS S/. 21,427.86
PRUEBA HIDRAULICA + DESINF. TUB. DN 63MM m 176.90 4.56 S/. 806.66
PRUEBA HIDRAULICA + DESINF. TUB. DN 90MM m 2,483.10 4.83 S/. 11,993.37
PRUEBA HIDRAULICA + DESINF. TUB. DN 110MM m 984.10 5.13 S/. 5,048.43
PRUEBA HIDRAULICA + DESINF. TUB. DN 160MM m 650.80 5.50 S/. 3,579.40
SUM INISTRO E INSTALACIÓN DE ACCESORIOS S/. 55,163.96
CODO PVC 90 MM X 11.25° UF und. 2.00 62.93 S/. 125.86
CODO PVC 110 MM X 11.25° UF und. 1.00 69.00 S/. 69.00
CODO PVC 160 MM X 11.25° UF und. 3.00 134.68 S/. 404.04
CODO PVC 63 MM X 22.5° UF und. 1.00 82.89 S/. 82.89
CODO PVC 90 MM X 22.5° UF und. 4.00 62.93 S/. 251.72
CODO PVC 110 MM X 22.5° UF und. 4.00 93.33 S/. 373.32
CODO PVC 63 MM X 45° UF und. 5.00 69.04 S/. 345.20
CODO PVC 90 MM X 45° UF und. 5.00 102.30 S/. 511.50
CODO PVC 110 MM X 45° UF und. 2.00 136.43 S/. 272.86
CODO PVC 160 MM X 45° UF und. 6.00 200.82 S/. 1,204.92
CODO PVC 90 MM X 90° UF und. 6.00 106.54 S/. 639.24
CODO PVC 110 MM X 90° UF und. 5.00 140.67 S/. 703.35
CODO PVC 160 MM X 90° UF und. 2.00 217.77 S/. 435.54
TEE PVC UF 63 MM und. 3.00 78.78 S/. 236.34
TEE PVC UF 90 MM und. 22.00 134.07 S/. 2,949.54
TEE PVC UF 110 MM und. 9.00 180.91 S/. 1,628.19
TEE PVC UF 160 MM und. 3.00 264.36 S/. 793.08
TEE PVC RED UF 90 X 63 MM und. 2.00 147.24 S/. 294.48
TEE PVC RED UF 110 X 90 MM und. 6.00 159.86 S/. 959.16
TEE PVC RED UF 160 X 110 MM und. 1.00 244.57 S/. 244.57
TAPON PVC UF 63 MM und. 10.00 90.09 S/. 900.90
TAPON PVC UF 90 MM und. 27.00 95.09 S/. 2,567.43
TAPON PVC UF 110 MM und. 7.00 125.14 S/. 875.98
TAPON PVC UF 160 MM und. 1.00 130.14 S/. 130.14
REDUCCION PVC UF 90 X 63 MM und. 4.00 61.09 S/. 244.36
REDUCCION PVC UF 110 X 90 MM und. 8.00 88.44 S/. 707.52
REDUCCION PVC UF 160 X 90 MM und. 1.00 331.75 S/. 331.75
REDUCCION PVC UF 160 X 110 MM und. 3.00 333.60 S/. 1,000.80
VÁLVULA COMPUERTA HIERRO DÚCTIL DN 90 mm UF C/PALETA DE BRONCE und. 11.00 443.48 S/. 4,878.28
VÁLVULA COMPUERTA HIERRO DÚCTIL DN 110 mm UF C/PALETA DE BRONCE und. 10.00 492.78 S/. 4,927.80
VÁLVULA COMPUERTA HIERRO DÚCTIL DN 160 mm UF C/PALETA DE BRONCE und. 2.00 715.94 S/. 1,431.88
GRIFO CONTRAINCENDIOS HIERRO DÚCTIL DN 110 mm UF C/ANILLO T/POSTE C/02 und. 4.00 1,176.28 S/. 4,705.12
BOCAS DE AIRE DOBLE FUNCION DN 1"
VALVULA und. 3.00 3,810.28 S/. 11,430.84
VALVULA DE PURGA DN 2" DE ASIENTO ELESTOF und. 2.00 4,253.18 S/. 8,506.36
CONEXIONES DOM ICILIARIAS DE AGUA S/. 365,374.37
EXCAV. ZANJA CONEXIÓN DOMICILIARIA m 4,177.20 10.31 S/. 43,066.93
REFINE/NIVELACION ZANJA CONEXIÓN m 4,177.20 2.86 S/. 11,946.79
CONEXIÓN DIMICILIARIA(M.O., TUBERIA, ABRAZADERAS,CAJA REGISTRO, MARCO Y und. 814.00 256.96 S/. 209,165.44
TAPA TERMOPLASTICA)
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DE AGUA m 4,177.20 4.00 S/. 16,708.80
RELLENO Y COMPACTACION DE ZANJA m 4,177.20 19.44 S/. 81,204.77
PRUEBA DE COMPACTACION DE SUELOS und. 82.00 40.02 S/. 3,281.64
OTROS S/. 2,009.00
ACARREO DE MATERIAL EXCEDENTE DE CORTE A MANZANAS MAS CERCANAS m3 350.00 5.74 S/. 2,009.00
PAVIM ENTACION, SARDINELES Y VEREDAS
PAVIM ENTACIÓN DE VÍAS S/. 1,286,381.05
M OVIM IENTO DE TIERRAS
CORTE EN TERRENO NATURAL A NIVEL DE SUB-RASANTE C/EQUIPO. m3 14,378.00 3.98 S/. 57,224.44
RELLENO A NIVEL DE SUB RASANTE CON MATERIAL PROPIO m3 1,120.00 13.80 S/. 15,456.00
LOTIZACION Y COLOCACION DE HITOS und. 800.00 41.84 S/. 33,472.00
NIVELACION DE MANZANAS m2 77,514.78 1.08 S/. 83,715.96
ACARREO DE MATERIAL EXCEDENTE DE CORTE A MANZANAS MAS CERCANAS m3 13,228.00 5.74 S/. 75,928.72
CALLES
PERFILADO Y COMPACTADO EN SUB RASANTE m2 24,062.66 4.14 S/. 99,619.41
SUB-BASE GRANULAR, E=20 cm. m2 24,062.66 10.99 S/. 264,448.63
BASE GRANULAR E=0.20 m m2 24,062.66 12.53 S/. 301,505.13
TRANSPORTE DE MATERIAL DE PRÉSTAMO calles m3 12,031.33 4.65 S/. 55,945.68
ESTACIONAM IENTOS
PERFILADO Y COMPACTADO EN SUB RASANTE m2 9,784.56 4.34 S/. 42,464.99
SUB-BASE GRANULAR, E=20 cm. m2 9,784.56 11.10 S/. 108,608.62
BASE GRANULAR E=0.20 m m2 9,784.56 12.80 S/. 125,242.37
TRANSPORTE DE MATERIAL DE PRÉSTAMO m3 4,892.28 4.65 S/. 22,749.10

SARDINELES S/. 261,249.80


SARDINEL SUM ERGIDO
CORTE DE ZANJA PARA SARDINEL m 5,678.20 3.22 S/. 18,283.80
ENCOFRADO Y DESENCOFRADO PARA SARDINELES m 5,678.20 23.82 S/. 135,254.72
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN SARDINEL (0.15X0.40) m 5,678.20 7.46 S/. 42,359.37
JUNTAS ASFALTICAS EN SARDINEL m 1,876.00 4.88 S/. 9,154.88
SARDINEL PERALTADO
CORTE DE ZANJA PARA SARDINEL m 818.85 3.22 S/. 2,636.70
ACERO 4,200 KG/CM2 GRADO 60 kg 2,983.02 4.31 S/. 12,856.82
ENCOFRADO Y DESENCOFRADO PARA SARDINELES m 818.85 37.13 S/. 30,403.90
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN SARDINEL (0.15X0.40) m 818.85 12.13 S/. 9,932.65
JUNTAS ASFALTICAS EN SARDINEL m 66.00 5.56 S/. 366.96

VEREDAS S/. 732,187.52


M OVIM IENTO DE TIERRAS
CORTE EN TERRENO PARA VEREDAS m3 1,846.00 34.57 S/. 63,816.22
RELLENO A NIVEL DE SUB RASANTE P/VEREDAS m3 382.00 13.80 S/. 5,271.60
NIVELACION Y CONFORMACION DE SUB-RASANTE PARA VEREDAS m2 13,413.94 3.51 S/. 47,082.93
BASE GRANULAR PARA VEREDAS, e=10 cm. m2 13,413.94 7.79 S/. 104,494.59
CONCRETO
ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 3,291.16 31.56 S/. 103,868.88
COLOCACIÓN DE CONCRETO F'C= 175 KG/CM2, e=10cm CABADO SEMIPULIDO m2 13,413.94 18.73 S/. 251,243.10
CURADO CON ADITIVO EN CONCRETO m2 13,413.94 1.39 S/. 18,645.38
BRUÑAS DE 1CM. m 22,560.00 2.16 S/. 48,729.60
JUNTAS ASFALTICAS EN VEREDAS m 4,102.00 4.19 S/. 17,187.38
CICLOVIAS
CORTE EN TERRENO PARA CONCRETO EN CICLO VIAS m3 152.00 34.57 S/. 5,254.64
NIVELACION Y CONFORMACION DE SUB-RASANTE PARA CONCRETO EN CICLO VIA m2 1,875.45 3.51 S/. 6,582.83
BASE GRANULAR PARA CICLO VIA, e=10 cm. m2 1,875.45 7.79 S/. 14,609.76
ENCOFRADO Y DESENCOFRADO EN CICLO VIAS m2 257.16 22.35 S/. 5,747.53
COLOCACION DE CONCRETO F'C= 175 KG/CM2, e=10cm ACABADO RUGOSO(PEINADO) m2 1,875.45 18.73 S/. 35,127.18
CURADO CON ADITIVO EN CONCRETO m2 1,875.45 1.39 S/. 2,606.88
JUNTAS ASFALTICAS EN CICLO VIA m 458.00 4.19 S/. 1,919.02

RAM PAS S/. 10,150.88


NIVELACION Y CONFORMACION DE SUB-RASANTE PARA RAMPAS m2 159.60 3.51 S/. 560.20
BASE GRANULAR PARA RAMPAS, e=10 cm. m2 159.60 7.79 S/. 1,243.28
ENCOFRADO Y DESENCOFRADO EN RAMPAS m2 49.98 31.56 S/. 1,577.37
COLOCACION DE CONCRETO F'C= 175 KG/CM2, e=10cm m2 159.60 18.73 S/. 2,989.31
BRUÑAS ml 1,539.00 2.16 S/. 3,324.24
CURADO CON ADITIVO EN CONCRETO m2 159.60 1.39 S/. 221.84
JUNTAS ASFALTICAS EN RAMPAS ml 56.00 4.19 S/. 234.64

VARIOS S/. 2,870.00


DRENAJE PLUVIAL Und. 7.00 410.00 S/. 2,870.00

ORNAM ENTACIÓN DE PARQUES S/. 1,314,066.13


ISLAS DE ADOQUIN
CORTE A NIVEL DE SUB RASANTE P/ADOQUIN 0.20 X 0.10 X 04 CM m3 210.00 34.57 S/. 7,259.70
NIVELACION Y CONFORMACION DE SUB RASANTE PARA ADOQUIN m2 2,062.57 3.51 S/. 7,239.62
BASE GRANULAR PARA ADOQUIN DE CIRCULACION, e=10cm m2 2,062.57 7.79 S/. 16,067.42
CORTE DE ZANJA PARA SARDINEL SUMERGIDO 35cm x 15cm P/ADOQUIN m 1,531.98 5.15 S/. 7,889.70
ENCOFRADO Y DESENCOFRADO PARA SARDINELES m 1,531.98 40.49 S/. 62,029.87
COLOCACION CONCRETO f'c=175 kg/cm2 EN SARDINEL (0.15 x 0.35) m 1,531.98 7.46 S/. 11,428.57
JUNTAS ASFALTICAS EN SARDINEL m 255.00 4.88 S/. 1,244.40
CONFORMACION DE ARENA PARA ADOQUIN 4CM m2 2,062.57 14.85 S/. 30,629.16
PISO DE ADOQUIN DE CONCRETO 20 x 10 x 04cm m2 2,062.57 33.26 S/. 68,601.08
AREAS DE ESPARCIM IENTO
RELLENO NIV. Y COMP. MATERIAL PRESTAMO ARENA FINA m2 1,831.51 19.87 S/. 36,392.10
RELLENO NIV. Y COMP. MATERIAL PRESTAMO CONFITILLO m2 64.75 21.40 S/. 1,385.65
M ODULO DE AJEDREZ
MODULO DE AJEDREZ uni 2.00 3,383.81 S/. 6,767.62
M ODULO JUEGO DE LABERINTO
MODULO JUEGO DE LABERINTO uni 2.00 19,444.97 S/. 38,889.94
M ODULO JUEGO ESCULTURAS
MODULO JUEGO DE ESCULTURAS uni 2.00 5,202.92 S/. 10,405.84
M ODULO DE SEM I ESFERAS
MODULO DE SEMI ESFERAS uni 1.00 5,202.92 S/. 5,202.92
BANCAS DE CONCRETO ARM ADO
BANCAS DE CONCRETO ARMADO uni 167.00 883.37 S/. 147,522.79
VEREDAS DE CIRCULACION
CORTE EN TERRENO PARA VEREDA DE CIRCULACION m3 6.15 34.57 S/. 212.61
NIVELACION Y CONFORMACION DE SUB-RASANTE PARA CONCRETO m2 3,068.67 2.15 S/. 6,597.64
BASE GRANULAR PARA VEREDA DE CIRCULACION, e=10cm m2 3,068.67 26.36 S/. 80,890.14
ENCOFRADO Y DESENCOFRADO EN VEREDA DE CIRCULACION m2 540.16 59.66 S/. 32,225.95
COLOCACION DE CONCRETO EN VEREDA DE CIRCULACION F'C= 175 KG/CM2, e=10cm m2 3,068.67 38.66 S/. 118,634.78
CURADO CON ADITIVO EN CONCRETO m2 3,068.67 0.66 S/. 2,025.32
JUNTAS ASFALTICAS EN VEREDAS DE CIRCULACION m 855.00 4.88 S/. 4,172.40
AREAS VERDES
CONFORMACIÓN DE SUB RASANTE PARA ÁREAS VERDES m2 15,496.70 8.17 S/. 126,608.04
COMPOSICIÓN, COLOCACIÓN Y SUMINISTRO DE TIERRA ORGÁNICA e=0.30 m2 15,496.70 14.35 S/. 222,377.65
GRASS NATURAL (TIPO APTENIA) m2 12,051.93 11.86 S/. 142,935.89
GRASS NATURAL (TIPO AMERICANO) m2 3,127.27 14.20 S/. 44,407.23
GRASS NATURAL PARA CAMPO DEPORTIVO m2 317.50 20.92 S/. 6,642.10
SUMINISTRO E INSTALACIÓN DE ARBOL PONCIANA und. 254.00 25.00 S/. 6,350.00
PINTADO Y DEMARCACIÓN DE CAMPO DEPORTIVO Glb. 1.00 2,150.00 S/. 2,150.00
APARATOS DEPORTIVOS
SUMINISTRO E INSTALACION DE ESCALADORA Und. 3.00 5,865.00 S/. 17,595.00
SUMINISTRO E INSTALACION DE ELIPTICA Und. 3.00 3,680.00 S/. 11,040.00
SUMINISTRO E INSTALACION DE ESQUI Und. 3.00 3,335.00 S/. 10,005.00
M OBILIARIO URBANO
SUMINISTRO E INSTALACION DE PAPELERA O TACHO DE BASURA (FIBRA DE VIDRIO) Und. 44.00 330.00 S/. 14,520.00
ARCOS DE FULBITO INC. MALLA Und. 2.00 2,860.00 S/. 5,720.00

OTRAS OBRAS
CERCO PERIM ETRICO S/. 273,388.09
CIM IENTO CORRIDO
EXCAVACION DE ZANJA P/CIMIENTO CORRIDO m3 399.00 34.57 S/. 13,793.43
ENCOFRADO Y DESENCOFRADO EN CIMIENTO CORRIDO m2 821.00 43.08 S/. 35,368.68
COLOCACION DE CONCRETO F'C=100 KG/CM2 EN CIMIENTO CORRIDO m3 165.00 50.30 S/. 8,299.50
SOBRECIM IENTO ARM ADO
ACERO FY = 4200 KG/CM2 kg 4,166.00 4.16 S/. 17,330.56
ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO ARMADO m2 456.00 47.44 S/. 21,632.64
COLOCACION DE CONCRETO F'C=175 KG/CM2 EN SOBRECIMIENTO ARMADO m3 35.00 62.26 S/. 2,179.10
COLUM NAS
ACERO FY = 4200 KG/CM2 kg 3,961.00 4.16 S/. 16,477.76
ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 383.00 49.71 S/. 19,038.93
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN COLUMNAS m3 36.00 54.16 S/. 1,949.76
VIGUETA
ACERO FY = 4200 KG/CM2 kg 754.00 4.16 S/. 3,136.64
ENCOFRADO Y DESENCOFRADO DE VIGUETAS m2 183.00 47.44 S/. 8,681.52
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN VIGUETAS m3 14.00 55.51 S/. 777.14
M URO DE LADRILLO KING KONG ARTESANAL DE SOGA m2 824.00 65.89 S/. 54,293.36
COBERTURA DE LADRILLO PASTELERO m 512.00 27.62 S/. 14,141.44
SOLAQUEADO DE COLUMNAS Y VIGUETAS m2 1,022.00 5.69 S/. 5,815.18
CERCO METALICO TIPO MALLA und 49.00 925.05 S/. 45,327.45
AREAS VERDES
SUMNISTRO E INSTALACION DE PLANTAS TREPADORAS und 98.00 27.50 S/. 2,695.00
SUMNISTRO E INSTALACION DE PLANTONES (PONCIANOS) und 98.00 25.00 S/. 2,450.00

SEÑALIZACIÓN S/. 106,778.39


SEÑALIZACION HORIZONTAL
MARCAS EN EL PAVIMENTO (SIMBOLOS Y CRUCES) m2 520.00 35.00 S/. 18,200.00
MARCAS EN EL PAVIMENTO (LINEA DISCONTINUA) m 4,490.52 3.00 S/. 13,471.56
MARCAS EN EL PAVIMENTO (LINEA CONTINUA) m 299.25 3.15 S/. 942.64
PINTURA AMARILLA EN SARDINEL PERALTADO (BERMAS) Y MARTILLOS m 1,334.34 3.20 S/. 4,269.89
PINTURA BLANCA EN SARDINEL SUMERGIDO Y CICLOVIA m 6,391.97 3.20 S/. 20,454.30
SEÑALIZACION VERTICAL
SEÑAL R-1 "PARE" 0.60 x 0.60 m. CON POSTE und 103.00 230.00 S/. 23,690.00
SEÑAL R-2 INFORMATIVA 0.75 x 0.25 m. CON POSTE und 103.00 250.00 S/. 25,750.00

OTROS S/. 3,000.00


PLANOS DE REPLANTEO Y MEMORIA DESCRIPTIVA und 150.00 20.00 S/. 3,000.00

LINEA DE IMPULSIÓN DN 200-250 MM - TRAMO 460 ML. - POZO N° 02 A


S/. 51,430.45
RESERVORIO
TUB L. IM PULSION PVC NTP-ISO 1452 DN 200M M (8") C-10 POZO TUBULAR PPN°
01 - PIE DE RESERVORIO
EXCAV.C/EQ.P.AGUA APOYADO
T.NORMAL RPA-410M3
A= 0.60M H=1.50M ml 302.90 10.82 S/. 3,277.38
REFINE Y NIVELACION FONDO DE ZANJA TN A= 0.60M ml 302.90 2.94 S/. 890.53
RELLENO ZANJA MAT.PROPIO.COMPACT.C/EQUIPO A=0.60M H=1.50M ml 302.90 18.01 S/. 5,455.23
ACARREO DE MATERIAL EXCEDENTE-C/EQUIPO m3 45.00 6.49 S/. 292.05
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 21.00 15.66 S/. 328.86
SUMINISTRO E INSTALACION DE TUBERIA DE PVC ISO DN 200 mm. C-10 U.F. ml 302.90 58.60 S/. 17,749.94
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS PVC ISO U.F. DN 200mm. ml 302.90 4.56 S/. 1,381.22
PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) u 5.00 40.02 S/. 200.10
TUB L. IM PULSION PVC NTP-ISO 1452 DN 250M M (10") C-10 PUNTO DE REUNION
PPN° 02 C/PPN° 03 - PIE DE RESERVORIO
EXCAV.C/EQ.P.AGUA.T.NORMAL ELEVADO RPE-755M3
A=0.80M H=1.50M ml 135.46 10.82 S/. 1,465.68
REFINE Y NIVELACION FONDO DE ZANJA TN A= 0.80M ml 135.46 2.94 S/. 398.25
RELLENO ZANJA MAT.PROPIO.COMPACT.C/EQUIPO A=0.80M H=1.50M ml 135.46 18.01 S/. 2,439.63
ACARREO DE MATERIAL EXCEDENTE-C/EQUIPO m3 22.00 6.49 S/. 142.78
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 18.00 15.52 S/. 279.36
SUMINISTRO E INSTALACION DE TUBERIA DE PVC ISO DN 250 mm. C-10 U.F. ml 135.46 85.45 S/. 11,575.06
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS PVC ISO U.F. DN 250mm. ml 135.46 6.57 S/. 889.97
PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) u 3.00 40.02 S/. 120.06
SUM INISTRO E INSTALACION DE ACCESORIOS L/ IM PULSION
CODO LUFLEX ISO 2531 HD 200 X 22.5º u 1.00 230.30 S/. 230.30
CODO LUFLEX ISO 2531 HD 200 X 45º u 4.00 277.36 S/. 1,109.44
CODO LUFLEX ISO 2531 HD 200 X 90º u 1.00 359.86 S/. 359.86
CODO LUFLEX ISO 2531 HD 250 X 45º u 2.00 441.08 S/. 882.16
CODO LUFLEX ISO 2531 HD 250 X 90º u 1.00 634.11 S/. 634.11
TEE LUFLEX ISO 2531 HD 250 X 200 u 1.00 528.86 S/. 528.86
REDUCCION HD ISO 250 X 200 U.F. PN-10 u 1.00 436.36 S/. 436.36
TAPON PVC ISO Ø 200mm U.F. C-10 u 1.00 153.26 S/. 153.26
ANCLAJE DE CONCRETO F'C=140KG/CM2 P/ ACCESORIO + ENCOFRADO DN 90-250MM u 6.00 35.00 S/. 210.00

LÍNEA DE ADUCCIÓN DN 200 M M S/. 28,700.12


TUB L. ADUCCION PVC ISO 1452 DN 200 M M C-7.5
EXCAVACION DE ZANJA C/EQUIP.T.NORMAL HASTA 1.50MPP m 323.58 10.82 S/. 3,501.14
REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA T. NORMAL 0.6m m 323.58 2.94 S/. 951.33
RELLENO ZANJA MAT.PROPIO.COMPACT.C/EQUIPO A=0.60M H=1.50M m 323.58 18.01 S/. 5,827.68
ACARREO DE MATERIAL EXCEDENTE-C/EQUIPO m3 38.00 6.49 S/. 246.62
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 19.00 15.66 S/. 297.54
SUMINISTRO E INSTALACION DE TUBERIA DE PVC ISO DN 200 mm. C-7.5 U.F. m 323.58 41.11 S/. 13,302.37
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS PVC ISO U.F. DN 200mm. m 323.58 6.57 S/. 2,125.92
PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) u 3.00 40.02 S/. 120.06
SUM INISTRO E INSTALACION DE ACCESORIOS L/ADUCCON
CODO LUFLEX ISO 2531 HD 200 X 45º u 3.00 277.36 S/. 832.08
TEE LUFLEX ISO 2531 HD 200 X 200 u 1.00 528.86 S/. 528.86
TAPON PVC ISO Ø 200mm U.F. C-10 u 2.00 153.26 S/. 306.52
ANCLAJE DE CONCRETO F'C=140KG/CM2 P/ ACCESORIO + ENCOFRADO DN 90-250MM u 6.00 110.00 S/. 660.00

COSTO DIRECTO (S/.) S/. 6,054,612.51

GASTOS GENERALES 9.30% S/. 563,197.00

UTILIDADES 5.00% S/. 302,730.63

SUB TOTAL (S/.) S/. 6,920,540.14


IGV (18%) 18.00% S/. 1,245,697.22

TOTAL S/. (con IGV) S/. 8,166,237.36

TIEM PO DE EJECUCIÓN ( días cal endari os) 165


25-Sep 26-Sep 27-Sep 28-Sep 29-Sep 30-Sep 1-Oct 2-Oct 3-Oct 4-Oct 5-Oct 6-Oct 7-Oct 8-Oct 9-Oct 10-Oct 11-Oct 12-Oct 13-Oct 14-Oct 15-Oct 16-Oct 17-Oct 18-Oct 19-Oct 20-Oct 21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov 25-Nov 26-Nov 27-Nov 28-Nov 29-Nov 30-Nov 1-Dec 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec 8-Dec 9-Dec 10-Dec
11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan 16-Jan 17-Jan 18-Jan 19-Jan 20-Jan 21-Jan 22-Jan 23-Jan 24-Jan 25-Jan 26-Jan 27-Jan 28-Jan 29-Jan 30-Jan 31-Jan 1-Feb 2-Feb 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb 8-Feb 9-Feb 10-Feb 11-Feb 12-Feb 13-Feb 14-Feb 15-Feb 16-Feb 17-Feb 18-Feb 19-Feb
PRESUPUESTO DETALLADO POR PARTIDAS

HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2


UBICACIÓN: M OCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC
FECHA: JULIO 2017

SAP PEP DESCRIPCIÓN UND CANT P.U PARCIAL ACUMULADO COSTO

OBRAS PROVISIONALES Y PRELIM INARES


10 19U1.255H.C.52.A-1-01.01 OBRAS PRELIM INARES S/. 130,902.48
LIMPIEZA PERMANENTE EN OBRA mes 5.50 3,598.27 S/. 19,790.49 0.87 3,118.50
TOPOGRAFIA DURANTE LA EJECUCION DE LA OBRA mes 5.50 20,202.18 S/. 111,111.99 0.87 17,508.56
20 19U1.255H.C.52.A-1-01.02 OBRAS PROVISIONALES S/. 168,084.00 - -
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb. 1.00 9,540.00 S/. 9,540.00 0.56 5,342.40
CAMPAMENTO PROVISIONAL DE OBRA(OFICINA,ALMACEN, CASETA VIG.,SSHH) mes 5.50 5,200.00 S/. 28,600.00 0.87 4,506.67
GUARDIANIA EN OBRA mes 5.50 12,900.00 S/. 70,950.00 0.87 11,180.00
SEGURIDAD Y SEÑALIZACIÓN PERMANENTE EN OBRA mes 5.00 9,210.00 S/. 46,050.00 0.87 7,982.00
MANTENIMIENTO Y RIEGO DE VIAS PARA CONTROL DE POLVOS mes 4.00 3,236.00 S/. 12,944.00 0.87 2,804.53
- -
M ATRIZ Y CONEXIONES DOM ICILIARIAS DE ALCANTARILLADO - -
30 19U1.255H.C.52.A-1-03.01 EXC. DE ZANJAS PARA ALCANTARILLADO S/. 84,853.91 - -
EXC. DE ZANJA C/MAQ. H = 1.50M. m 2,816.10 8.31 S/. 23,401.79 1,188.93 9,880.01
EXC. DE ZANJA C/MAQ. H = 2.00M. m 769.40 11.38 S/. 8,755.77 535.27 6,091.37
EXC. DE ZANJA C/MAQ. H = 2.50M. m 763.78 13.51 S/. 10,318.67 228.52 3,087.31
EXC. DE ZANJA C/MAQ. H = 3.00M. m 192.05 21.63 S/. 4,154.04 191.97 4,152.31
ENTIBADO Y DESENTIBADO H≥2.00M. m 955.83 39.99 S/. 38,223.64 - -
40 19U1.255H.C.52.A-1-03.02 REFINE Y NIVELACION DE ZANJAS PARA ALCANTARILLADO S/. 13,925.01 - -
REFINE DE ZANJAS Y NIVELACION DE TUBOS hasta 2.00 m. m 3,585.50 2.94 S/. 10,541.37 1,825.70 5,367.56
REFINE DE ZANJAS Y NIVELACION DE TUBOS hasta 3.00 m. m 955.83 3.54 S/. 3,383.64 191.97 679.57
50 19U1.255H.C.52.A-1-03.03 RELLENO Y COM PACTACION DE ZANJAS PARA ALCANTARILLADO S/. 100,717.12 - -
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 1.50M. m 2,816.10 20.97 S/. 59,053.62 562.00 11,785.14
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 2.00M. m 769.40 22.68 S/. 17,449.99 105.40 2,390.47
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 2.50M. m 763.78 24.80 S/. 18,941.74 - -
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 3.00M. m 192.05 27.45 S/. 5,271.77 - -
60 19U1.255H.C.52.A-1-03.04 SUM INISTRO E INSTALACIÓN DE TUBERÍAS S/. 150,321.74 - -
SUMINISTRO E INSTALACION DE TUBO PVC SN4UF DN 200MM m 4,106.39 30.40 S/. 124,834.26 1,289.84 39,211.14
SUMINISTRO E INSTALACION DE TUBO PVC SN4UF DN 250MM m 434.94 58.60 S/. 25,487.48 86.32 5,058.35
70 19U1.255H.C.52.A-1-03.05 PRUEBA HIDRAULICA DE TUBERIA P/ALCANTARILLADO S/. 16,461.87 - -
PRUEBA HIDRAULICA DE TUBO PVC SN4UF DN 200MM m 4,106.39 3.60 S/. 14,783.00 1,236.23 4,450.43
PRUEBA HIDRAULICA DE TUBO PVC SN4UF DN 250MM m 434.94 3.86 S/. 1,678.87 - -
80 19U1.255H.C.52.A-1-03.06 BUZONES S/. 168,281.50 - -
EXCAVACION PARA BUZONES (92und.) m3 307.00 40.27 S/. 12,362.89 265.64 10,697.27
BUZON Di=1.20m x 1.20MPP. und. 30.00 1,547.45 S/. 46,423.50 27.00 41,781.15
BUZON Di=1.20m x 1.50MPP. und. 26.00 1,770.29 S/. 46,027.54 19.00 33,635.51
BUZON Di=1.20m x 2.00MPP. und. 19.00 1,840.57 S/. 34,970.83 4.00 7,362.28
BUZON Di=1.20m x 2.50MPP. und. 9.00 1,935.05 S/. 17,415.45 - -
BUZON Di=1.20m x 3.00MPP. und. 5.00 2,083.98 S/. 10,419.90 - -
EMPALME BUZON Y/O RED EXISTENTE und. 1.00 661.39 S/. 661.39 - -
90 19U1.255H.C.52.A-1-03.07 CONEXIONES DOM ICILIARIAS DE ALCANTARILLADO S/. 473,079.27 - -
EXC. ZANJA CONEXIÓN DOMICILIARIA ALCANTARILLADO m 5,583.49 8.14 S/. 45,449.61 - -
REFINE DE ZANJA Y NIVELEACION DE TUBERIA m 5,583.49 3.47 S/. 19,374.71 - -
und. 800.00 349.63 S/. 279,704.00 - -
RELLENO Y COMPACTACION DE ZANJA PARA CONEX. DOMICIL. ALCANT. m 5,583.49 18.85 S/. 105,248.79 - -
PRUEBA HIDRAULICA DE CONEXIÓN DOMICILIARIA m 5,583.49 3.60 S/. 20,100.56 - -
PRUEBA DE COMPACTACIÓN DE SUELOS und. 80.00 40.02 S/. 3,201.60 - -
100 19U1.255H.C.52.A-1-03.08 OTROS S/. 9,093.22 - -
PRUEBA DE COMPACTACION DE SUELOS (ZANJAS REDES DE ALCANTARILLADO) und. 101.00 40.02 S/. 4,042.02 - -
ACARREO DE MATERIAL EXCEDENTE DE CORTE A MANZANAS CERCANAS m3 880.00 5.74 S/. 5,051.20 - -
- -
M ATRIZ Y CONEXIONES DOM ICILIARIAS- AGUA POTABLE - -
110 19U1.255H.C.52.A-1-04.01 EXC. DE ZANJAS PARA REDES DE AGUA POTABLE S/. 46,477.31 - -
EXC. DE ZANJAS PARA REDES DE AGUA POTABLE m 4,295.50 10.82 S/. 46,477.31 200.00 2,164.00
120 19U1.255H.C.52.A-1-04.02 REFINE Y NIVELACIÓN REDES DE AGUA POTABLE S/. 15,206.07 - -
REFINE Y NIVELACIÓN FONDO DE ZANJA PARA TUBERIA REDES DE AGUA m 4,295.50 3.54 S/. 15,206.07 - -
130 19U1.255H.C.52.A-1-04.03 RELLENO DE ZANJA PARA REDES DE AGUA POTABLE S/. 77,361.96 - -
RELLENO Y COMPACTADO C/MATERIAL SELECCIONADO PARA ZANJA REDES DE AGUA POTABLE m 4,295.50 18.01 S/. 77,361.96 - -
140 19U1.255H.C.52.A-1-04.04 SUM INISTRO E INSTALACIÓN DE TUBERÍAS S/. 85,669.43 - -
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 63MM INC. ANILLOS m 176.90 7.43 S/. 1,314.37 - -
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 90MM INC. ANILLOS m 2,483.10 11.82 S/. 29,350.24 - -
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 110MM INC. ANILLOS m 984.70 15.06 S/. 14,829.58 - -
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 160MM INC. ANILLOS m 650.80 28.32 S/. 18,430.66 - -
DADOS DE ANCLAJE F'C=140Kg/cm2 DN(63-90mm) und. 111.00 110.68 S/. 12,285.48 - -
DADOS DE ANCLAJE F'C=140Kg/cm2 DN(110-160mm) und. 64.00 113.38 S/. 7,256.32 - -
EMPALME DE TUBERIA A RED EXISTENTE DE (63-160)MM glb. 1.00 401.88 S/. 401.88 - -
PRUEBAS DE COMPACTACION DE SUELOS und. 45.00 40.02 S/. 1,800.90 - -
150 19U1.255H.C.52.A-1-04.05 PRUEBAS HIDRAÚLICAS Y DESINFECCIÓN DE TUBERÍAS S/. 21,427.86 - -
PRUEBA HIDRAULICA + DESINF. TUB. DN 63MM m 176.90 4.56 S/. 806.66 - -
PRUEBA HIDRAULICA + DESINF. TUB. DN 90MM m 2,483.10 4.83 S/. 11,993.37 - -
PRUEBA HIDRAULICA + DESINF. TUB. DN 110MM m 984.10 5.13 S/. 5,048.43 - -
PRUEBA HIDRAULICA + DESINF. TUB. DN 160MM m 650.80 5.50 S/. 3,579.40 - -
160 19U1.255H.C.52.A-1-04.06 SUM INISTRO E INSTALACIÓN DE ACCESORIOS S/. 55,163.96 - -
CODO PVC 90 MM X 11.25° UF und. 2.00 62.93 S/. 125.86 - -
CODO PVC 110 MM X 11.25° UF und. 1.00 69.00 S/. 69.00 - -
CODO PVC 160 MM X 11.25° UF und. 3.00 134.68 S/. 404.04 - -
CODO PVC 63 MM X 22.5° UF und. 1.00 82.89 S/. 82.89 - -
CODO PVC 90 MM X 22.5° UF und. 4.00 62.93 S/. 251.72 - -
CODO PVC 110 MM X 22.5° UF und. 4.00 93.33 S/. 373.32 - -
CODO PVC 63 MM X 45° UF und. 5.00 69.04 S/. 345.20 - -
CODO PVC 90 MM X 45° UF und. 5.00 102.30 S/. 511.50 - -
CODO PVC 110 MM X 45° UF und. 2.00 136.43 S/. 272.86 - -
CODO PVC 160 MM X 45° UF und. 6.00 200.82 S/. 1,204.92 - -
CODO PVC 90 MM X 90° UF und. 6.00 106.54 S/. 639.24 - -
CODO PVC 110 MM X 90° UF und. 5.00 140.67 S/. 703.35 - -
CODO PVC 160 MM X 90° UF und. 2.00 217.77 S/. 435.54 - -
TEE PVC UF 63 MM und. 3.00 78.78 S/. 236.34 - -
TEE PVC UF 90 MM und. 22.00 134.07 S/. 2,949.54 - -
TEE PVC UF 110 MM und. 9.00 180.91 S/. 1,628.19 - -
TEE PVC UF 160 MM und. 3.00 264.36 S/. 793.08 - -
TEE PVC RED UF 90 X 63 MM und. 2.00 147.24 S/. 294.48 - -
TEE PVC RED UF 110 X 90 MM und. 6.00 159.86 S/. 959.16 - -
TEE PVC RED UF 160 X 110 MM und. 1.00 244.57 S/. 244.57 - -
TAPON PVC UF 63 MM und. 10.00 90.09 S/. 900.90 - -
TAPON PVC UF 90 MM und. 27.00 95.09 S/. 2,567.43 - -
TAPON PVC UF 110 MM und. 7.00 125.14 S/. 875.98 - -
TAPON PVC UF 160 MM und. 1.00 130.14 S/. 130.14 - -
REDUCCION PVC UF 90 X 63 MM und. 4.00 61.09 S/. 244.36 - -
REDUCCION PVC UF 110 X 90 MM und. 8.00 88.44 S/. 707.52 - -
REDUCCION PVC UF 160 X 90 MM und. 1.00 331.75 S/. 331.75 - -
REDUCCION PVC UF 160 X 110 MM und. 3.00 333.60 S/. 1,000.80 - -
VÁLVULA COMPUERTA HIERRO DÚCTIL DN 90 mm UF C/PALETA DE BRONCE und. 11.00 443.48 S/. 4,878.28 - -
VÁLVULA COMPUERTA HIERRO DÚCTIL DN 110 mm UF C/PALETA DE BRONCE und. 10.00 492.78 S/. 4,927.80 - -
VÁLVULA COMPUERTA HIERRO DÚCTIL DN 160 mm UF C/PALETA DE BRONCE und. 2.00 715.94 S/. 1,431.88 - -
GRIFO CONTRAINCENDIOS HIERRO DÚCTIL DN 110 mm UF C/ANILLO T/POSTE C/02 BOCAS und. 4.00 1,176.28 S/. 4,705.12 - -
VALVULA DE AIRE DOBLE FUNCION DN 1" und. 3.00 3,810.28 S/. 11,430.84 - -
VALVULA DE PURGA DN 2" DE ASIENTO ELESTOF und. 2.00 4,253.18 S/. 8,506.36 - -
170 19U1.255H.C.52.A-1-04.07 CONEXIONES DOM ICILIARIAS DE AGUA S/. 365,374.37 - -
EXCAV. ZANJA CONEXIÓN DOMICILIARIA m 4,177.20 10.31 S/. 43,066.93 - -
REFINE/NIVELACION ZANJA CONEXIÓN m 4,177.20 2.86 S/. 11,946.79 - -
CONEXIÓN DIMICILIARIA(M.O., TUBERIA, ABRAZADERAS,CAJA REGISTRO, MARCO Y TAPA TERMOPLASTICA) und. 814.00 256.96 S/. 209,165.44 - -
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DE AGUA m 4,177.20 4.00 S/. 16,708.80 - -
RELLENO Y COMPACTACION DE ZANJA m 4,177.20 19.44 S/. 81,204.77 - -
PRUEBA DE COMPACTACION DE SUELOS und. 82.00 40.02 S/. 3,281.64 - -
180 19U1.255H.C.52.A-1-04.08 OTROS S/. 2,009.00 - -
ACARREO DE MATERIAL EXCEDENTE DE CORTE A MANZANAS MAS CERCANAS m3 350.00 5.74 S/. 2,009.00 - -
PAVIM ENTACION, SARDINELES Y VEREDAS - -
190 19U1.255H.C.52.A-1-05.01 PAVIM ENTACIÓN DE VÍAS S/. 1,286,381.05 - -
M OVIM IENTO DE TIERRAS - -
CORTE EN TERRENO NATURAL A NIVEL DE SUB-RASANTE C/EQUIPO. m3 14,378.00 3.98 S/. 57,224.44 13,550.00 53,929.00
RELLENO A NIVEL DE SUB RASANTE CON MATERIAL PROPIO m3 1,120.00 13.80 S/. 15,456.00 - -
LOTIZACION Y COLOCACION DE HITOS und. 800.00 41.84 S/. 33,472.00 - -
NIVELACION DE MANZANAS m2 77,514.78 1.08 S/. 83,715.96 - -
ACARREO DE MATERIAL EXCEDENTE DE CORTE A MANZANAS MAS CERCANAS m3 13,228.00 5.74 S/. 75,928.72 - -
CALLES - -
PERFILADO Y COMPACTADO EN SUB RASANTE m2 24,062.66 4.14 S/. 99,619.41 - -
SUB-BASE GRANULAR, E=20 cm. m2 24,062.66 10.99 S/. 264,448.63 - -
BASE GRANULAR E=0.20 m m2 24,062.66 12.53 S/. 301,505.13 - -
TRANSPORTE DE MATERIAL DE PRÉSTAMO calles m3 12,031.33 4.65 S/. 55,945.68 - -
ESTACIONAM IENTOS - -
PERFILADO Y COMPACTADO EN SUB RASANTE m2 9,784.56 4.34 S/. 42,464.99 - -
SUB-BASE GRANULAR, E=20 cm. m2 9,784.56 11.10 S/. 108,608.62 - -
BASE GRANULAR E=0.20 m m2 9,784.56 12.80 S/. 125,242.37 - -
TRANSPORTE DE MATERIAL DE PRÉSTAMO m3 4,892.28 4.65 S/. 22,749.10 - -
- -
200 19U1.255H.C.52.A-1-05.03 SARDINELES S/. 261,249.80 - -
SARDINEL SUM ERGIDO - -
CORTE DE ZANJA PARA SARDINEL m 5,678.20 3.22 S/. 18,283.80 - -
ENCOFRADO Y DESENCOFRADO PARA SARDINELES m 5,678.20 23.82 S/. 135,254.72 - -
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN SARDINEL (0.15X0.40) m 5,678.20 7.46 S/. 42,359.37 - -
JUNTAS ASFALTICAS EN SARDINEL m 1,876.00 4.88 S/. 9,154.88 - -
SARDINEL PERALTADO - -
CORTE DE ZANJA PARA SARDINEL m 818.85 3.22 S/. 2,636.70 - -
ACERO 4,200 KG/CM2 GRADO 60 kg 2,983.02 4.31 S/. 12,856.82 - -
ENCOFRADO Y DESENCOFRADO PARA SARDINELES m 818.85 37.13 S/. 30,403.90 - -
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN SARDINEL (0.15X0.40) m 818.85 12.13 S/. 9,932.65 - -
JUNTAS ASFALTICAS EN SARDINEL m 66.00 5.56 S/. 366.96 - -
- -
210 19U1.255H.C.52.A-1-05.04 VEREDAS S/. 732,187.52 - -
M OVIM IENTO DE TIERRAS - -
CORTE EN TERRENO PARA VEREDAS m3 1,846.00 34.57 S/. 63,816.22 - -
RELLENO A NIVEL DE SUB RASANTE P/VEREDAS m3 382.00 13.80 S/. 5,271.60 - -
NIVELACION Y CONFORMACION DE SUB-RASANTE PARA VEREDAS m2 13,413.94 3.51 S/. 47,082.93 - -
BASE GRANULAR PARA VEREDAS, e=10 cm. m2 13,413.94 7.79 S/. 104,494.59 - -
CONCRETO - -
ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 3,291.16 31.56 S/. 103,868.88 - -
COLOCACIÓN DE CONCRETO F'C= 175 KG/CM2, e=10cm CABADO SEMIPULIDO m2 13,413.94 18.73 S/. 251,243.10 - -
CURADO CON ADITIVO EN CONCRETO m2 13,413.94 1.39 S/. 18,645.38 - -
BRUÑAS DE 1CM. m 22,560.00 2.16 S/. 48,729.60 - -
JUNTAS ASFALTICAS EN VEREDAS m 4,102.00 4.19 S/. 17,187.38 - -
CICLOVIAS - -
CORTE EN TERRENO PARA CONCRETO EN CICLO VIAS m3 152.00 34.57 S/. 5,254.64 - -
NIVELACION Y CONFORMACION DE SUB-RASANTE PARA CONCRETO EN CICLO VIA m2 1,875.45 3.51 S/. 6,582.83 - -
BASE GRANULAR PARA CICLO VIA, e=10 cm. m2 1,875.45 7.79 S/. 14,609.76 - -
ENCOFRADO Y DESENCOFRADO EN CICLO VIAS m2 257.16 22.35 S/. 5,747.53 - -
COLOCACION DE CONCRETO F'C= 175 KG/CM2, e=10cm ACABADO RUGOSO(PEINADO) m2 1,875.45 18.73 S/. 35,127.18 - -
CURADO CON ADITIVO EN CONCRETO m2 1,875.45 1.39 S/. 2,606.88 - -
JUNTAS ASFALTICAS EN CICLO VIA m 458.00 4.19 S/. 1,919.02 - -
- -
220 19U1.255H.C.52.A-1-05.05 RAM PAS S/. 10,150.88 - -
NIVELACION Y CONFORMACION DE SUB-RASANTE PARA RAMPAS m2 159.60 3.51 S/. 560.20 - -
BASE GRANULAR PARA RAMPAS, e=10 cm. m2 159.60 7.79 S/. 1,243.28 - -
ENCOFRADO Y DESENCOFRADO EN RAMPAS m2 49.98 31.56 S/. 1,577.37 - -
COLOCACION DE CONCRETO F'C= 175 KG/CM2, e=10cm m2 159.60 18.73 S/. 2,989.31 - -
BRUÑAS ml 1,539.00 2.16 S/. 3,324.24 - -
CURADO CON ADITIVO EN CONCRETO m2 159.60 1.39 S/. 221.84 - -
JUNTAS ASFALTICAS EN RAMPAS ml 56.00 4.19 S/. 234.64 - -
- -
230 19U1.255H.C.52.A-1-06 VARIOS S/. 2,870.00 - -
DRENAJE PLUVIAL Und. 7.00 410.00 S/. 2,870.00 - -
- -
240 19U1.255H.C.52.A-1-07 ORNAM ENTACIÓN DE PARQUES S/. 1,314,066.13 - -
ISLAS DE ADOQUIN - -
CORTE A NIVEL DE SUB RASANTE P/ADOQUIN 0.20 X 0.10 X 04 CM m3 210.00 34.57 S/. 7,259.70 - -
NIVELACION Y CONFORMACION DE SUB RASANTE PARA ADOQUIN m2 2,062.57 3.51 S/. 7,239.62 - -
BASE GRANULAR PARA ADOQUIN DE CIRCULACION, e=10cm m2 2,062.57 7.79 S/. 16,067.42 - -
CORTE DE ZANJA PARA SARDINEL SUMERGIDO 35cm x 15cm P/ADOQUIN m 1,531.98 5.15 S/. 7,889.70 - -
ENCOFRADO Y DESENCOFRADO PARA SARDINELES m 1,531.98 40.49 S/. 62,029.87 - -
COLOCACION CONCRETO f'c=175 kg/cm2 EN SARDINEL (0.15 x 0.35) m 1,531.98 7.46 S/. 11,428.57 - -
JUNTAS ASFALTICAS EN SARDINEL m 255.00 4.88 S/. 1,244.40 - -
CONFORMACION DE ARENA PARA ADOQUIN 4CM m2 2,062.57 14.85 S/. 30,629.16 - -
PISO DE ADOQUIN DE CONCRETO 20 x 10 x 04cm m2 2,062.57 33.26 S/. 68,601.08 - -
AREAS DE ESPARCIM IENTO - -
RELLENO NIV. Y COMP. MATERIAL PRESTAMO ARENA FINA m2 1,831.51 19.87 S/. 36,392.10 - -
RELLENO NIV. Y COMP. MATERIAL PRESTAMO CONFITILLO m2 64.75 21.40 S/. 1,385.65 - -
M ODULO DE AJEDREZ - -
MODULO DE AJEDREZ uni 2.00 3,383.81 S/. 6,767.62 - -
M ODULO JUEGO DE LABERINTO - -
MODULO JUEGO DE LABERINTO uni 2.00 19,444.97 S/. 38,889.94 - -
M ODULO JUEGO ESCULTURAS - -
MODULO JUEGO DE ESCULTURAS uni 2.00 5,202.92 S/. 10,405.84 - -
M ODULO DE SEM I ESFERAS - -
MODULO DE SEMI ESFERAS uni 1.00 5,202.92 S/. 5,202.92 - -
BANCAS DE CONCRETO ARM ADO - -
BANCAS DE CONCRETO ARMADO uni 167.00 883.37 S/. 147,522.79 - -
VEREDAS DE CIRCULACION - -
CORTE EN TERRENO PARA VEREDA DE CIRCULACION m3 6.15 34.57 S/. 212.61 - -
NIVELACION Y CONFORMACION DE SUB-RASANTE PARA CONCRETO m2 3,068.67 2.15 S/. 6,597.64 - -
BASE GRANULAR PARA VEREDA DE CIRCULACION, e=10cm m2 3,068.67 26.36 S/. 80,890.14 - -
ENCOFRADO Y DESENCOFRADO EN VEREDA DE CIRCULACION m2 540.16 59.66 S/. 32,225.95 - -
COLOCACION DE CONCRETO EN VEREDA DE CIRCULACION F'C= 175 KG/CM2, e=10cm m2 3,068.67 38.66 S/. 118,634.78 - -
CURADO CON ADITIVO EN CONCRETO m2 3,068.67 0.66 S/. 2,025.32 - -
JUNTAS ASFALTICAS EN VEREDAS DE CIRCULACION m 855.00 4.88 S/. 4,172.40 - -
AREAS VERDES - -
CONFORMACIÓN DE SUB RASANTE PARA ÁREAS VERDES m2 15,496.70 8.17 S/. 126,608.04 - -
COMPOSICIÓN, COLOCACIÓN Y SUMINISTRO DE TIERRA ORGÁNICA e=0.30 m2 15,496.70 14.35 S/. 222,377.65 - -
GRASS NATURAL (TIPO APTENIA) m2 12,051.93 11.86 S/. 142,935.89 - -
GRASS NATURAL (TIPO AMERICANO) m2 3,127.27 14.20 S/. 44,407.23 - -
GRASS NATURAL PARA CAMPO DEPORTIVO m2 317.50 20.92 S/. 6,642.10 - -
SUMINISTRO E INSTALACIÓN DE ARBOL PONCIANA und. 254.00 25.00 S/. 6,350.00 - -
PINTADO Y DEMARCACIÓN DE CAMPO DEPORTIVO Glb. 1.00 2,150.00 S/. 2,150.00 - -
APARATOS DEPORTIVOS - -
SUMINISTRO E INSTALACION DE ESCALADORA Und. 3.00 5,865.00 S/. 17,595.00 - -
SUMINISTRO E INSTALACION DE ELIPTICA Und. 3.00 3,680.00 S/. 11,040.00 - -
SUMINISTRO E INSTALACION DE ESQUI Und. 3.00 3,335.00 S/. 10,005.00 - -
M OBILIARIO URBANO - -
SUMINISTRO E INSTALACION DE PAPELERA O TACHO DE BASURA (FIBRA DE VIDRIO) Und. 44.00 330.00 S/. 14,520.00 - -
ARCOS DE FULBITO INC. MALLA Und. 2.00 2,860.00 S/. 5,720.00 - -
-
OTRAS OBRAS -
250 19U1.255H.C.52.A-4-03 CERCO PERIM ETRICO S/. 273,388.09 - -
CIM IENTO CORRIDO -
EXCAVACION DE ZANJA P/CIMIENTO CORRIDO m3 399.00 34.57 S/. 13,793.43 - -
ENCOFRADO Y DESENCOFRADO EN CIMIENTO CORRIDO m2 821.00 43.08 S/. 35,368.68 - -
COLOCACION DE CONCRETO F'C=100 KG/CM2 EN CIMIENTO CORRIDO m3 165.00 50.30 S/. 8,299.50 - -
SOBRECIM IENTO ARM ADO -
ACERO FY = 4200 KG/CM2 kg 4,166.00 4.16 S/. 17,330.56 - -
ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO ARMADO m2 456.00 47.44 S/. 21,632.64 - -
COLOCACION DE CONCRETO F'C=175 KG/CM2 EN SOBRECIMIENTO ARMADO m3 35.00 62.26 S/. 2,179.10 - -
COLUM NAS - -
ACERO FY = 4200 KG/CM2 kg 3,961.00 4.16 S/. 16,477.76 - -
ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 383.00 49.71 S/. 19,038.93 - -
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN COLUMNAS m3 36.00 54.16 S/. 1,949.76 - -
VIGUETA -
ACERO FY = 4200 KG/CM2 kg 754.00 4.16 S/. 3,136.64 - -
ENCOFRADO Y DESENCOFRADO DE VIGUETAS m2 183.00 47.44 S/. 8,681.52 - -
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN VIGUETAS m3 14.00 55.51 S/. 777.14 - -
M URO DE LADRILLO KING KONG ARTESANAL DE SOGA m2 824.00 65.89 S/. 54,293.36 -
COBERTURA DE LADRILLO PASTELERO m 512.00 27.62 S/. 14,141.44 -
SOLAQUEADO DE COLUMNAS Y VIGUETAS m2 1,022.00 5.69 S/. 5,815.18 - -
CERCO METALICO TIPO MALLA und 49.00 925.05 S/. 45,327.45 - -
AREAS VERDES -
SUMNISTRO E INSTALACION DE PLANTAS TREPADORAS und 98.00 27.50 S/. 2,695.00 - -
SUMNISTRO E INSTALACION DE PLANTONES (PONCIANOS) und 98.00 25.00 S/. 2,450.00 - -
-
260 19U1.255H.C.52.A-4-05 SEÑALIZACIÓN S/. 106,778.39 - -
SEÑALIZACION HORIZONTAL -
MARCAS EN EL PAVIMENTO (SIMBOLOS Y CRUCES) m2 520.00 35.00 S/. 18,200.00 - -
MARCAS EN EL PAVIMENTO (LINEA DISCONTINUA) m 4,490.52 3.00 S/. 13,471.56 - -
MARCAS EN EL PAVIMENTO (LINEA CONTINUA) m 299.25 3.15 S/. 942.64 - -
PINTURA AMARILLA EN SARDINEL PERALTADO (BERMAS) Y MARTILLOS m 1,334.34 3.20 S/. 4,269.89 - -
PINTURA BLANCA EN SARDINEL SUMERGIDO Y CICLOVIA m 6,391.97 3.20 S/. 20,454.30 - -
SEÑALIZACION VERTICAL -
SEÑAL R-1 "PARE" 0.60 x 0.60 m. CON POSTE und 103.00 230.00 S/. 23,690.00 - -
SEÑAL R-2 INFORMATIVA 0.75 x 0.25 m. CON POSTE und 103.00 250.00 S/. 25,750.00 - -
-
270 19U1.255H.C.52.A-4-07 OTROS S/. 3,000.00 - -
PLANOS DE REPLANTEO Y MEMORIA DESCRIPTIVA und 150.00 20.00 S/. 3,000.00 - -
-
280 19U1.255H.C.52.A-4-02 LINEA DE IM PULSIÓN DN 200-250 M M - TRAM O 460 M L. - POZO N° 02 A RESERVORIO S/. 51,430.45 -
- -
EXCAV.C/EQ.P.AGUA T.NORMAL A= 0.60M H=1.50M ml 302.90 10.82 S/. 3,277.38 - -
REFINE Y NIVELACION FONDO DE ZANJA TN A= 0.60M ml 302.90 2.94 S/. 890.53 - -
RELLENO ZANJA MAT.PROPIO.COMPACT.C/EQUIPO A=0.60M H=1.50M ml 302.90 18.01 S/. 5,455.23 - -
ACARREO DE MATERIAL EXCEDENTE-C/EQUIPO m3 45.00 6.49 S/. 292.05 - -
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 21.00 15.66 S/. 328.86 - -
SUMINISTRO E INSTALACION DE TUBERIA DE PVC ISO DN 200 mm. C-10 U.F. ml 302.90 58.60 S/. 17,749.94 - -
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS PVC ISO U.F. DN 200mm. ml 302.90 4.56 S/. 1,381.22 - -
PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) u 5.00 40.02 S/. 200.10 - -
-
EXCAV.C/EQ.P.AGUA.T.NORMAL A=0.80M H=1.50M ml 135.46 10.82 S/. 1,465.68 - -
REFINE Y NIVELACION FONDO DE ZANJA TN A= 0.80M ml 135.46 2.94 S/. 398.25 - -
RELLENO ZANJA MAT.PROPIO.COMPACT.C/EQUIPO A=0.80M H=1.50M ml 135.46 18.01 S/. 2,439.63 - -
ACARREO DE MATERIAL EXCEDENTE-C/EQUIPO m3 22.00 6.49 S/. 142.78 - -
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 18.00 15.52 S/. 279.36 - -
SUMINISTRO E INSTALACION DE TUBERIA DE PVC ISO DN 250 mm. C-10 U.F. ml 135.46 85.45 S/. 11,575.06 - -
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS PVC ISO U.F. DN 250mm. ml 135.46 6.57 S/. 889.97 - -
PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) u 3.00 40.02 S/. 120.06 - -
SUM INISTRO E INSTALACION DE ACCESORIOS L/ IM PULSION - -
CODO LUFLEX ISO 2531 HD 200 X 22.5º u 1.00 230.30 S/. 230.30 - -
CODO LUFLEX ISO 2531 HD 200 X 45º u 4.00 277.36 S/. 1,109.44 - -
CODO LUFLEX ISO 2531 HD 200 X 90º u 1.00 359.86 S/. 359.86 - -
CODO LUFLEX ISO 253
PLANILLA DE PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14 DEL VALLE ETAPA 2


HABILITACIÓN URBANA_ALTOS
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC
FECHA: JULIO 2017

SAP PEP DESCRIPCIÓN UND CANT P.U PARCIAL

OBRAS PROVISIONALES Y PRELIMINARES


10 19U1.255H.C.52.A-1-01.01 OBRAS PRELIMINARES S/. 130,902.48
LIMPIEZA PERMANENTE EN OBRA mes 5.50 3,598.27 S/. 19,790.49
TOPOGRAFIA DURANTE LA EJECUCION DE LA OBRA mes 5.50 20,202.18 S/. 111,111.99
20 19U1.255H.C.52.A-1-01.02 OBRAS PROVISIONALES S/. 168,084.00
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb. 1.00 9,540.00 S/. 9,540.00
CAMPAMENTO PROVISIONAL DE OBRA(OFICINA,ALMACEN, CASETA VIG.,SSHH) mes 5.50 5,200.00 S/. 28,600.00
GUARDIANIA EN OBRA mes 5.50 12,900.00 S/. 70,950.00
SEGURIDAD Y SEÑALIZACIÓN PERMANENTE EN OBRA mes 5.00 9,210.00 S/. 46,050.00
MANTENIMIENTO Y RIEGO DE VIAS PARA CONTROL DE POLVOS mes 4.00 3,236.00 S/. 12,944.00

MATRIZ Y CONEXIONES DOMICILIARIAS DE ALCANTARILLADO


30 19U1.255H.C.52.A-1-03.01 EXC. DE ZANJAS PARA ALCANTARILLADO S/. 84,853.91
EXC. DE ZANJA C/MAQ. H = 1.50M. m 2,816.10 8.31 S/. 23,401.79
EXC. DE ZANJA C/MAQ. H = 2.00M. m 769.40 11.38 S/. 8,755.77
EXC. DE ZANJA C/MAQ. H = 2.50M. m 763.78 13.51 S/. 10,318.67
EXC. DE ZANJA C/MAQ. H = 3.00M. m 192.05 21.63 S/. 4,154.04
ENTIBADO Y DESENTIBADO H≥2.00M. m 955.83 39.99 S/. 38,223.64
40 19U1.255H.C.52.A-1-03.02 REFINE Y NIVELACION DE ZANJAS PARA ALCANTARILLADO S/. 13,925.01
REFINE DE ZANJAS Y NIVELACION DE TUBOS hasta 2.00 m. m 3,585.50 2.94 S/. 10,541.37
REFINE DE ZANJAS Y NIVELACION DE TUBOS hasta 3.00 m. m 955.83 3.54 S/. 3,383.64
50 19U1.255H.C.52.A-1-03.03 RELLENO Y COMPACTACION DE ZANJAS PARA ALCANTARILLADO S/. 100,717.12
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 1.50M. m 2,816.10 20.97 S/. 59,053.62
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 2.00M. m 769.40 22.68 S/. 17,449.99
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 2.50M. m 763.78 24.80 S/. 18,941.74
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 3.00M. m 192.05 27.45 S/. 5,271.77
60 19U1.255H.C.52.A-1-03.04 SUMINISTRO E INSTALACIÓN DE TUBERÍAS S/. 150,321.74
SUMINISTRO E INSTALACION DE TUBO PVC SN4UF DN 200MM m 4,106.39 30.40 S/. 124,834.26
SUMINISTRO E INSTALACION DE TUBO PVC SN4UF DN 250MM m 434.94 58.60 S/. 25,487.48
70 19U1.255H.C.52.A-1-03.05 PRUEBA HIDRAULICA DE TUBERIA P/ALCANTARILLADO S/. 16,461.87
PRUEBA HIDRAULICA DE TUBO PVC SN4UF DN 200MM m 4,106.39 3.60 S/. 14,783.00
PRUEBA HIDRAULICA DE TUBO PVC SN4UF DN 250MM m 434.94 3.86 S/. 1,678.87
80 19U1.255H.C.52.A-1-03.06 BUZONES S/. 168,281.50
EXCAVACION PARA BUZONES (92und.) m3 307.00 40.27 S/. 12,362.89
BUZON Di=1.20m x 1.20MPP. und. 30.00 1,547.45 S/. 46,423.50
BUZON Di=1.20m x 1.50MPP. und. 26.00 1,770.29 S/. 46,027.54
BUZON Di=1.20m x 2.00MPP. und. 19.00 1,840.57 S/. 34,970.83
BUZON Di=1.20m x 2.50MPP. und. 9.00 1,935.05 S/. 17,415.45
BUZON Di=1.20m x 3.00MPP. und. 5.00 2,083.98 S/. 10,419.90
EMPALME BUZON Y/O RED EXISTENTE und. 1.00 661.39 S/. 661.39
90 19U1.255H.C.52.A-1-03.07 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO S/. 473,079.27
EXC. ZANJA CONEXIÓN DOMICILIARIA ALCANTARILLADO m 5,583.49 8.14 S/. 45,449.61
REFINE DE ZANJA Y NIVELEACION DE TUBERIA m 5,583.49 3.47 S/. 19,374.71
CONEXION DOMIC. ALCANT. (M.O., SUMINISTRO DE TUBERIA Y ACCESORIOS PVC, CAJAS C°,MARCO Y TAPA und. 800.00 349.63 S/. 279,704.00
C°A°)
RELLENO Y COMPACTACION DE ZANJA PARA CONEX. DOMICIL. ALCANT. m 5,583.49 18.85 S/. 105,248.79
PRUEBA HIDRAULICA DE CONEXIÓN DOMICILIARIA m 5,583.49 3.60 S/. 20,100.56
PRUEBA DE COMPACTACIÓN DE SUELOS und. 80.00 40.02 S/. 3,201.60
100 19U1.255H.C.52.A-1-03.08 OTROS S/. 9,093.22
PRUEBA DE COMPACTACION DE SUELOS (ZANJAS REDES DE ALCANTARILLADO) und. 101.00 40.02 S/. 4,042.02
ACARREO DE MATERIAL EXCEDENTE DE CORTE A MANZANAS CERCANAS m3 880.00 5.74 S/. 5,051.20

MATRIZ Y CONEXIONES DOMICILIARIAS- AGUA POTABLE


110 19U1.255H.C.52.A-1-04.01 EXC. DE ZANJAS PARA REDES DE AGUA POTABLE S/. 46,477.31
EXC. DE ZANJAS PARA REDES DE AGUA POTABLE m 4,295.50 10.82 S/. 46,477.31
120 19U1.255H.C.52.A-1-04.02 REFINE Y NIVELACIÓN REDES DE AGUA POTABLE S/. 15,206.07
REFINE Y NIVELACIÓN FONDO DE ZANJA PARA TUBERIA REDES DE AGUA m 4,295.50 3.54 S/. 15,206.07
130 19U1.255H.C.52.A-1-04.03 RELLENO DE ZANJA PARA REDES DE AGUA POTABLE S/. 77,361.96
RELLENO Y COMPACTADO C/MATERIAL SELECCIONADO PARA ZANJA REDES DE AGUA POTABLE m 4,295.50 18.01 S/. 77,361.96
140 19U1.255H.C.52.A-1-04.04 SUMINISTRO E INSTALACIÓN DE TUBERÍAS S/. 85,669.43
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 63MM INC. ANILLOS m 176.90 7.43 S/. 1,314.37
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 90MM INC. ANILLOS m 2,483.10 11.82 S/. 29,350.24
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 110MM INC. ANILLOS m 984.70 15.06 S/. 14,829.58
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 160MM INC. ANILLOS m 650.80 28.32 S/. 18,430.66
DADOS DE ANCLAJE F'C=140Kg/cm2 DN(63-90mm) und. 111.00 110.68 S/. 12,285.48
DADOS DE ANCLAJE F'C=140Kg/cm2 DN(110-160mm) und. 64.00 113.38 S/. 7,256.32
EMPALME DE TUBERIA A RED EXISTENTE DE (63-160)MM glb. 1.00 401.88 S/. 401.88
PRUEBAS DE COMPACTACION DE SUELOS und. 45.00 40.02 S/. 1,800.90
150 19U1.255H.C.52.A-1-04.05 PRUEBAS HIDRAÚLICAS Y DESINFECCIÓN DE TUBERÍAS S/. 21,427.86
PRUEBA HIDRAULICA + DESINF. TUB. DN 63MM m 176.90 4.56 S/. 806.66
PRUEBA HIDRAULICA + DESINF. TUB. DN 90MM m 2,483.10 4.83 S/. 11,993.37
PRUEBA HIDRAULICA + DESINF. TUB. DN 110MM m 984.10 5.13 S/. 5,048.43
PRUEBA HIDRAULICA + DESINF. TUB. DN 160MM m 650.80 5.50 S/. 3,579.40
PLANILLA DE PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14 DEL VALLE ETAPA 2


HABILITACIÓN URBANA_ALTOS
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC
FECHA: JULIO 2017

160 19U1.255H.C.52.A-1-04.06 SUMINISTRO E INSTALACIÓN DE ACCESORIOS S/. 55,163.96


CODO PVC 90 MM X 11.25° UF und. 2.00 62.93 S/. 125.86
CODO PVC 110 MM X 11.25° UF und. 1.00 69.00 S/. 69.00
CODO PVC 160 MM X 11.25° UF und. 3.00 134.68 S/. 404.04
CODO PVC 63 MM X 22.5° UF und. 1.00 82.89 S/. 82.89
CODO PVC 90 MM X 22.5° UF und. 4.00 62.93 S/. 251.72
CODO PVC 110 MM X 22.5° UF und. 4.00 93.33 S/. 373.32
CODO PVC 63 MM X 45° UF und. 5.00 69.04 S/. 345.20
CODO PVC 90 MM X 45° UF und. 5.00 102.30 S/. 511.50
CODO PVC 110 MM X 45° UF und. 2.00 136.43 S/. 272.86
CODO PVC 160 MM X 45° UF und. 6.00 200.82 S/. 1,204.92
CODO PVC 90 MM X 90° UF und. 6.00 106.54 S/. 639.24
CODO PVC 110 MM X 90° UF und. 5.00 140.67 S/. 703.35
CODO PVC 160 MM X 90° UF und. 2.00 217.77 S/. 435.54
TEE PVC UF 63 MM und. 3.00 78.78 S/. 236.34
TEE PVC UF 90 MM und. 22.00 134.07 S/. 2,949.54
TEE PVC UF 110 MM und. 9.00 180.91 S/. 1,628.19
TEE PVC UF 160 MM und. 3.00 264.36 S/. 793.08
TEE PVC RED UF 90 X 63 MM und. 2.00 147.24 S/. 294.48
TEE PVC RED UF 110 X 90 MM und. 6.00 159.86 S/. 959.16
TEE PVC RED UF 160 X 110 MM und. 1.00 244.57 S/. 244.57
TAPON PVC UF 63 MM und. 10.00 90.09 S/. 900.90
TAPON PVC UF 90 MM und. 27.00 95.09 S/. 2,567.43
TAPON PVC UF 110 MM und. 7.00 125.14 S/. 875.98
TAPON PVC UF 160 MM und. 1.00 130.14 S/. 130.14
REDUCCION PVC UF 90 X 63 MM und. 4.00 61.09 S/. 244.36
REDUCCION PVC UF 110 X 90 MM und. 8.00 88.44 S/. 707.52
REDUCCION PVC UF 160 X 90 MM und. 1.00 331.75 S/. 331.75
REDUCCION PVC UF 160 X 110 MM und. 3.00 333.60 S/. 1,000.80
VÁLVULA COMPUERTA HIERRO DÚCTIL DN 90 mm UF C/PALETA DE BRONCE und. 11.00 443.48 S/. 4,878.28
VÁLVULA COMPUERTA HIERRO DÚCTIL DN 110 mm UF C/PALETA DE BRONCE und. 10.00 492.78 S/. 4,927.80
VÁLVULA COMPUERTA HIERRO DÚCTIL DN 160 mm UF C/PALETA DE BRONCE und. 2.00 715.94 S/. 1,431.88
GRIFO CONTRAINCENDIOS HIERRO DÚCTIL DN 110 mm UF C/ANILLO T/POSTE C/02 BOCAS und. 4.00 1,176.28 S/. 4,705.12
VALVULA DE AIRE DOBLE FUNCION DN 1" und. 3.00 3,810.28 S/. 11,430.84
VALVULA DE PURGA DN 2" DE ASIENTO ELESTOF und. 2.00 4,253.18 S/. 8,506.36
170 19U1.255H.C.52.A-1-04.07 CONEXIONES DOMICILIARIAS DE AGUA S/. 365,374.37
EXCAV. ZANJA CONEXIÓN DOMICILIARIA m 4,177.20 10.31 S/. 43,066.93
REFINE/NIVELACION ZANJA CONEXIÓN m 4,177.20 2.86 S/. 11,946.79
CONEXIÓN DIMICILIARIA(M.O., TUBERIA, ABRAZADERAS,CAJA REGISTRO, MARCO Y TAPA TERMOPLASTICA) und. 814.00 256.96 S/. 209,165.44
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DE AGUA m 4,177.20 4.00 S/. 16,708.80
RELLENO Y COMPACTACION DE ZANJA m 4,177.20 19.44 S/. 81,204.77
PRUEBA DE COMPACTACION DE SUELOS und. 82.00 40.02 S/. 3,281.64
180 19U1.255H.C.52.A-1-04.08 OTROS S/. 2,009.00
ACARREO DE MATERIAL EXCEDENTE DE CORTE A MANZANAS MAS CERCANAS m3 350.00 5.74 S/. 2,009.00
PAVIMENTACION, SARDINELES Y VEREDAS
190 19U1.255H.C.52.A-1-05.01 PAVIMENTACIÓN DE VÍAS S/. 1,286,381.05
MOVIMIENTO DE TIERRAS
CORTE EN TERRENO NATURAL A NIVEL DE SUB-RASANTE C/EQUIPO. m3 14,378.00 3.98 S/. 57,224.44
RELLENO A NIVEL DE SUB RASANTE CON MATERIAL PROPIO m3 1,120.00 13.80 S/. 15,456.00
LOTIZACION Y COLOCACION DE HITOS und. 800.00 41.84 S/. 33,472.00
NIVELACION DE MANZANAS m2 77,514.78 1.08 S/. 83,715.96
ACARREO DE MATERIAL EXCEDENTE DE CORTE A MANZANAS MAS CERCANAS m3 13,228.00 5.74 S/. 75,928.72
CALLES
PERFILADO Y COMPACTADO EN SUB RASANTE m2 24,062.66 4.14 S/. 99,619.41
SUB-BASE GRANULAR, E=20 cm. m2 24,062.66 10.99 S/. 264,448.63
BASE GRANULAR E=0.20 m m2 24,062.66 12.53 S/. 301,505.13
TRANSPORTE DE MATERIAL DE PRÉSTAMO calles m3 12,031.33 4.65 S/. 55,945.68
ESTACIONAMIENTOS
PERFILADO Y COMPACTADO EN SUB RASANTE m2 9,784.56 4.34 S/. 42,464.99
SUB-BASE GRANULAR, E=20 cm. m2 9,784.56 11.10 S/. 108,608.62
BASE GRANULAR E=0.20 m m2 9,784.56 12.80 S/. 125,242.37
TRANSPORTE DE MATERIAL DE PRÉSTAMO m3 4,892.28 4.65 S/. 22,749.10

200 19U1.255H.C.52.A-1-05.03 SARDINELES S/. 261,249.80


SARDINEL SUMERGIDO
CORTE DE ZANJA PARA SARDINEL m 5,678.20 3.22 S/. 18,283.80
ENCOFRADO Y DESENCOFRADO PARA SARDINELES m 5,678.20 23.82 S/. 135,254.72
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN SARDINEL (0.15X0.40) m 5,678.20 7.46 S/. 42,359.37
JUNTAS ASFALTICAS EN SARDINEL m 1,876.00 4.88 S/. 9,154.88
SARDINEL PERALTADO
CORTE DE ZANJA PARA SARDINEL m 818.85 3.22 S/. 2,636.70
ACERO 4,200 KG/CM2 GRADO 60 kg 2,983.02 4.31 S/. 12,856.82
ENCOFRADO Y DESENCOFRADO PARA SARDINELES m 818.85 37.13 S/. 30,403.90
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN SARDINEL (0.15X0.40) m 818.85 12.13 S/. 9,932.65
JUNTAS ASFALTICAS EN SARDINEL m 66.00 5.56 S/. 366.96
PLANILLA DE PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14 DEL VALLE ETAPA 2


HABILITACIÓN URBANA_ALTOS
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC
FECHA: JULIO 2017

210 19U1.255H.C.52.A-1-05.04 VEREDAS S/. 732,187.52


MOVIMIENTO DE TIERRAS
CORTE EN TERRENO PARA VEREDAS m3 1,846.00 34.57 S/. 63,816.22
RELLENO A NIVEL DE SUB RASANTE P/VEREDAS m3 382.00 13.80 S/. 5,271.60
NIVELACION Y CONFORMACION DE SUB-RASANTE PARA VEREDAS m2 13,413.94 3.51 S/. 47,082.93
BASE GRANULAR PARA VEREDAS, e=10 cm. m2 13,413.94 7.79 S/. 104,494.59
CONCRETO
ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 3,291.16 31.56 S/. 103,868.88
COLOCACIÓN DE CONCRETO F'C= 175 KG/CM2, e=10cm CABADO SEMIPULIDO m2 13,413.94 18.73 S/. 251,243.10
CURADO CON ADITIVO EN CONCRETO m2 13,413.94 1.39 S/. 18,645.38
BRUÑAS DE 1CM. m 22,560.00 2.16 S/. 48,729.60
JUNTAS ASFALTICAS EN VEREDAS m 4,102.00 4.19 S/. 17,187.38
CICLOVIAS
CORTE EN TERRENO PARA CONCRETO EN CICLO VIAS m3 152.00 34.57 S/. 5,254.64
NIVELACION Y CONFORMACION DE SUB-RASANTE PARA CONCRETO EN CICLO VIA m2 1,875.45 3.51 S/. 6,582.83
BASE GRANULAR PARA CICLO VIA, e=10 cm. m2 1,875.45 7.79 S/. 14,609.76
ENCOFRADO Y DESENCOFRADO EN CICLO VIAS m2 257.16 22.35 S/. 5,747.53
COLOCACION DE CONCRETO F'C= 175 KG/CM2, e=10cm ACABADO RUGOSO(PEINADO) m2 1,875.45 18.73 S/. 35,127.18
CURADO CON ADITIVO EN CONCRETO m2 1,875.45 1.39 S/. 2,606.88
JUNTAS ASFALTICAS EN CICLO VIA m 458.00 4.19 S/. 1,919.02

220 19U1.255H.C.52.A-1-05.05 RAMPAS S/. 10,150.88


NIVELACION Y CONFORMACION DE SUB-RASANTE PARA RAMPAS m2 159.60 3.51 S/. 560.20
BASE GRANULAR PARA RAMPAS, e=10 cm. m2 159.60 7.79 S/. 1,243.28
ENCOFRADO Y DESENCOFRADO EN RAMPAS m2 49.98 31.56 S/. 1,577.37
COLOCACION DE CONCRETO F'C= 175 KG/CM2, e=10cm m2 159.60 18.73 S/. 2,989.31
BRUÑAS ml 1,539.00 2.16 S/. 3,324.24
CURADO CON ADITIVO EN CONCRETO m2 159.60 1.39 S/. 221.84
JUNTAS ASFALTICAS EN RAMPAS ml 56.00 4.19 S/. 234.64

230 19U1.255H.C.52.A-1-06 VARIOS S/. 2,870.00


DRENAJE PLUVIAL Und. 7.00 410.00 S/. 2,870.00

240 19U1.255H.C.52.A-1-07 ORNAMENTACIÓN DE PARQUES S/. 1,314,066.13


ISLAS DE ADOQUIN
CORTE A NIVEL DE SUB RASANTE P/ADOQUIN 0.20 X 0.10 X 04 CM m3 210.00 34.57 S/. 7,259.70
NIVELACION Y CONFORMACION DE SUB RASANTE PARA ADOQUIN m2 2,062.57 3.51 S/. 7,239.62
BASE GRANULAR PARA ADOQUIN DE CIRCULACION, e=10cm m2 2,062.57 7.79 S/. 16,067.42
CORTE DE ZANJA PARA SARDINEL SUMERGIDO 35cm x 15cm P/ADOQUIN m 1,531.98 5.15 S/. 7,889.70
ENCOFRADO Y DESENCOFRADO PARA SARDINELES m 1,531.98 40.49 S/. 62,029.87
COLOCACION CONCRETO f'c=175 kg/cm2 EN SARDINEL (0.15 x 0.35) m 1,531.98 7.46 S/. 11,428.57
JUNTAS ASFALTICAS EN SARDINEL m 255.00 4.88 S/. 1,244.40
CONFORMACION DE ARENA PARA ADOQUIN 4CM m2 2,062.57 14.85 S/. 30,629.16
PISO DE ADOQUIN DE CONCRETO 20 x 10 x 04cm m2 2,062.57 33.26 S/. 68,601.08
AREAS DE ESPARCIMIENTO
RELLENO NIV. Y COMP. MATERIAL PRESTAMO ARENA FINA m2 1,831.51 19.87 S/. 36,392.10
RELLENO NIV. Y COMP. MATERIAL PRESTAMO CONFITILLO m2 64.75 21.40 S/. 1,385.65
MODULO DE AJEDREZ
MODULO DE AJEDREZ uni 2.00 3,383.81 S/. 6,767.62
MODULO JUEGO DE LABERINTO
MODULO JUEGO DE LABERINTO uni 2.00 19,444.97 S/. 38,889.94
MODULO JUEGO ESCULTURAS
MODULO JUEGO DE ESCULTURAS uni 2.00 5,202.92 S/. 10,405.84
MODULO DE SEMI ESFERAS
MODULO DE SEMI ESFERAS uni 1.00 5,202.92 S/. 5,202.92
BANCAS DE CONCRETO ARMADO
BANCAS DE CONCRETO ARMADO uni 167.00 883.37 S/. 147,522.79
VEREDAS DE CIRCULACION
CORTE EN TERRENO PARA VEREDA DE CIRCULACION m3 6.15 34.57 S/. 212.61
NIVELACION Y CONFORMACION DE SUB-RASANTE PARA CONCRETO m2 3,068.67 2.15 S/. 6,597.64
BASE GRANULAR PARA VEREDA DE CIRCULACION, e=10cm m2 3,068.67 26.36 S/. 80,890.14
ENCOFRADO Y DESENCOFRADO EN VEREDA DE CIRCULACION m2 540.16 59.66 S/. 32,225.95
COLOCACION DE CONCRETO EN VEREDA DE CIRCULACION F'C= 175 KG/CM2, e=10cm m2 3,068.67 38.66 S/. 118,634.78
CURADO CON ADITIVO EN CONCRETO m2 3,068.67 0.66 S/. 2,025.32
JUNTAS ASFALTICAS EN VEREDAS DE CIRCULACION m 855.00 4.88 S/. 4,172.40
AREAS VERDES
CONFORMACIÓN DE SUB RASANTE PARA ÁREAS VERDES m2 15,496.70 8.17 S/. 126,608.04
COMPOSICIÓN, COLOCACIÓN Y SUMINISTRO DE TIERRA ORGÁNICA e=0.30 m2 15,496.70 14.35 S/. 222,377.65
GRASS NATURAL (TIPO APTENIA) m2 12,051.93 11.86 S/. 142,935.89
GRASS NATURAL (TIPO AMERICANO) m2 3,127.27 14.20 S/. 44,407.23
GRASS NATURAL PARA CAMPO DEPORTIVO m2 317.50 20.92 S/. 6,642.10
SUMINISTRO E INSTALACIÓN DE ARBOL PONCIANA und. 254.00 25.00 S/. 6,350.00
PINTADO Y DEMARCACIÓN DE CAMPO DEPORTIVO Glb. 1.00 2,150.00 S/. 2,150.00
APARATOS DEPORTIVOS
PLANILLA DE PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14 DEL VALLE ETAPA 2


HABILITACIÓN URBANA_ALTOS
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC
FECHA: JULIO 2017

SUMINISTRO E INSTALACION DE ESCALADORA Und. 3.00 5,865.00 S/. 17,595.00


SUMINISTRO E INSTALACION DE ELIPTICA Und. 3.00 3,680.00 S/. 11,040.00
SUMINISTRO E INSTALACION DE ESQUI Und. 3.00 3,335.00 S/. 10,005.00
MOBILIARIO URBANO
SUMINISTRO E INSTALACION DE PAPELERA O TACHO DE BASURA (FIBRA DE VIDRIO) Und. 44.00 330.00 S/. 14,520.00
ARCOS DE FULBITO INC. MALLA Und. 2.00 2,860.00 S/. 5,720.00

OTRAS OBRAS
250 19U1.255H.C.52.A-4-03 CERCO PERIMETRICO S/. 273,388.09
CIMIENTO CORRIDO
EXCAVACION DE ZANJA P/CIMIENTO CORRIDO m3 399.00 34.57 S/. 13,793.43
ENCOFRADO Y DESENCOFRADO EN CIMIENTO CORRIDO m2 821.00 43.08 S/. 35,368.68
COLOCACION DE CONCRETO F'C=100 KG/CM2 EN CIMIENTO CORRIDO m3 165.00 50.30 S/. 8,299.50
SOBRECIMIENTO ARMADO
ACERO FY = 4200 KG/CM2 kg 4,166.00 4.16 S/. 17,330.56
ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO ARMADO m2 456.00 47.44 S/. 21,632.64
COLOCACION DE CONCRETO F'C=175 KG/CM2 EN SOBRECIMIENTO ARMADO m3 35.00 62.26 S/. 2,179.10
COLUMNAS
ACERO FY = 4200 KG/CM2 kg 3,961.00 4.16 S/. 16,477.76
ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 383.00 49.71 S/. 19,038.93
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN COLUMNAS m3 36.00 54.16 S/. 1,949.76
VIGUETA
ACERO FY = 4200 KG/CM2 kg 754.00 4.16 S/. 3,136.64
ENCOFRADO Y DESENCOFRADO DE VIGUETAS m2 183.00 47.44 S/. 8,681.52
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN VIGUETAS m3 14.00 55.51 S/. 777.14
MURO DE LADRILLO KING KONG ARTESANAL DE SOGA m2 824.00 65.89 S/. 54,293.36
COBERTURA DE LADRILLO PASTELERO m 512.00 27.62 S/. 14,141.44
SOLAQUEADO DE COLUMNAS Y VIGUETAS m2 1,022.00 5.69 S/. 5,815.18
CERCO METALICO TIPO MALLA und 49.00 925.05 S/. 45,327.45
AREAS VERDES
SUMNISTRO E INSTALACION DE PLANTAS TREPADORAS und 98.00 27.50 S/. 2,695.00
SUMNISTRO E INSTALACION DE PLANTONES (PONCIANOS) und 98.00 25.00 S/. 2,450.00

260 19U1.255H.C.52.A-4-05 SEÑALIZACIÓN S/. 106,778.39


SEÑALIZACION HORIZONTAL
MARCAS EN EL PAVIMENTO (SIMBOLOS Y CRUCES) m2 520.00 35.00 S/. 18,200.00
MARCAS EN EL PAVIMENTO (LINEA DISCONTINUA) m 4,490.52 3.00 S/. 13,471.56
MARCAS EN EL PAVIMENTO (LINEA CONTINUA) m 299.25 3.15 S/. 942.64
PINTURA AMARILLA EN SARDINEL PERALTADO (BERMAS) Y MARTILLOS m 1,334.34 3.20 S/. 4,269.89
PINTURA BLANCA EN SARDINEL SUMERGIDO Y CICLOVIA m 6,391.97 3.20 S/. 20,454.30
SEÑALIZACION VERTICAL
SEÑAL R-1 "PARE" 0.60 x 0.60 m. CON POSTE und 103.00 230.00 S/. 23,690.00
SEÑAL R-2 INFORMATIVA 0.75 x 0.25 m. CON POSTE und 103.00 250.00 S/. 25,750.00

270 19U1.255H.C.52.A-4-07 OTROS S/. 3,000.00


PLANOS DE REPLANTEO Y MEMORIA DESCRIPTIVA und 150.00 20.00 S/. 3,000.00

280 19U1.255H.C.52.A-4-02 LINEA DE IMPULSIÓN DN 200-250 MM - TRAMO 460 ML. - POZO N° 02 A RESERVORIO S/. 51,430.45
TUB L. IMPULSION PVC NTP-ISO 1452 DN 200MM (8") C-10 POZO TUBULAR PPN° 01 - PIE DE
RESERVORIO APOYADO
EXCAV.C/EQ.P.AGUA RPA-410M3
T.NORMAL A= 0.60M H=1.50M ml 302.90 10.82 S/. 3,277.38
REFINE Y NIVELACION FONDO DE ZANJA TN A= 0.60M ml 302.90 2.94 S/. 890.53
RELLENO ZANJA MAT.PROPIO.COMPACT.C/EQUIPO A=0.60M H=1.50M ml 302.90 18.01 S/. 5,455.23
ACARREO DE MATERIAL EXCEDENTE-C/EQUIPO m3 45.00 6.49 S/. 292.05
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 21.00 15.66 S/. 328.86
SUMINISTRO E INSTALACION DE TUBERIA DE PVC ISO DN 200 mm. C-10 U.F. ml 302.90 58.60 S/. 17,749.94
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS PVC ISO U.F. DN 200mm. ml 302.90 4.56 S/. 1,381.22
PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) u 5.00 40.02 S/. 200.10
TUB L. IMPULSION PVC NTP-ISO 1452 DN 250MM (10") C-10 PUNTO DE REUNION PPN° 02 C/PPN° 03 -
PIE DE RESERVORIO ELEVADO
EXCAV.C/EQ.P.AGUA.T.NORMAL RPE-755M3
A=0.80M H=1.50M ml 135.46 10.82 S/. 1,465.68
REFINE Y NIVELACION FONDO DE ZANJA TN A= 0.80M ml 135.46 2.94 S/. 398.25
RELLENO ZANJA MAT.PROPIO.COMPACT.C/EQUIPO A=0.80M H=1.50M ml 135.46 18.01 S/. 2,439.63
ACARREO DE MATERIAL EXCEDENTE-C/EQUIPO m3 22.00 6.49 S/. 142.78
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 18.00 15.52 S/. 279.36
SUMINISTRO E INSTALACION DE TUBERIA DE PVC ISO DN 250 mm. C-10 U.F. ml 135.46 85.45 S/. 11,575.06
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS PVC ISO U.F. DN 250mm. ml 135.46 6.57 S/. 889.97
PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) u 3.00 40.02 S/. 120.06
SUMINISTRO E INSTALACION DE ACCESORIOS L/ IMPULSION
CODO LUFLEX ISO 2531 HD 200 X 22.5º u 1.00 230.30 S/. 230.30
CODO LUFLEX ISO 2531 HD 200 X 45º u 4.00 277.36 S/. 1,109.44
CODO LUFLEX ISO 2531 HD 200 X 90º u 1.00 359.86 S/. 359.86
CODO LUFLEX ISO 2531 HD 250 X 45º u 2.00 441.08 S/. 882.16
CODO LUFLEX ISO 2531 HD 250 X 90º u 1.00 634.11 S/. 634.11
TEE LUFLEX ISO 2531 HD 250 X 200 u 1.00 528.86 S/. 528.86
REDUCCION HD ISO 250 X 200 U.F. PN-10 u 1.00 436.36 S/. 436.36
TAPON PVC ISO Ø 200mm U.F. C-10 u 1.00 153.26 S/. 153.26
PLANILLA DE PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14 DEL VALLE ETAPA 2


HABILITACIÓN URBANA_ALTOS
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC
FECHA: JULIO 2017

ANCLAJE DE CONCRETO F'C=140KG/CM2 P/ ACCESORIO + ENCOFRADO DN 90-250MM u 6.00 35.00 S/. 210.00

290 19U1.255H.C.52.A-4-02 LÍNEA DE ADUCCIÓN DN 200 MM S/. 28,700.12


TUB L. ADUCCION PVC ISO 1452 DN 200 MM C-7.5
EXCAVACION DE ZANJA C/EQUIP.T.NORMAL HASTA 1.50MPP m 323.58 10.82 S/. 3,501.14
REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA T. NORMAL 0.6m m 323.58 2.94 S/. 951.33
RELLENO ZANJA MAT.PROPIO.COMPACT.C/EQUIPO A=0.60M H=1.50M m 323.58 18.01 S/. 5,827.68
ACARREO DE MATERIAL EXCEDENTE-C/EQUIPO m3 38.00 6.49 S/. 246.62
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 19.00 15.66 S/. 297.54
SUMINISTRO E INSTALACION DE TUBERIA DE PVC ISO DN 200 mm. C-7.5 U.F. m 323.58 41.11 S/. 13,302.37
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS PVC ISO U.F. DN 200mm. m 323.58 6.57 S/. 2,125.92
PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) u 3.00 40.02 S/. 120.06
SUMINISTRO E INSTALACION DE ACCESORIOS L/ADUCCON
CODO LUFLEX ISO 2531 HD 200 X 45º u 3.00 277.36 S/. 832.08
TEE LUFLEX ISO 2531 HD 200 X 200 u 1.00 528.86 S/. 528.86
TAPON PVC ISO Ø 200mm U.F. C-10 u 2.00 153.26 S/. 306.52
ANCLAJE DE CONCRETO F'C=140KG/CM2 P/ ACCESORIO + ENCOFRADO DN 90-250MM u 6.00 110.00 S/. 660.00

A COSTO DIRECTO (S/.) S/. 6,054,612.51

A.1 GASTOS GENERALES 9.30% S/. 563,197.00

A.2 UTILIDADES 5.00% S/. 302,730.63

B SUB TOTAL (S/.) S/. 6,920,540.14

B.1 IGV (18%) 18.00% S/. 1,245,697.22

C TOTAL S/. (con IGV) S/. 8,166,237.36

C.1 TIEMPO DE EJECUCIÓN ( días calendarios) 165


RESUMEN DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC
FECHA: JULIO 2017

SAP PEP DESCRIPCIÓN UND CANT ACUMULADO % AVANCE

OBRAS PROVISIONALES Y PRELIMINARES


10 19U1.255H.C.52.A-1-01.01 OBRAS PRELIMINARES
LIMPIEZA PERMANENTE EN OBRA mes 5.50 1.00 18%
TOPOGRAFIA DURANTE LA EJECUCION DE LA OBRA mes 5.50 1.00 18%
20 19U1.255H.C.52.A-1-01.02 OBRAS PROVISIONALES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb. 1.00 0.50 50%
CAMPAMENTO PROVISIONAL DE OBRA(OFICINA,ALMACEN, CASETA VIG.,SSHH) mes 5.50 1.00 18%
GUARDIANIA EN OBRA mes 5.50 1.00 18%
SEGURIDAD Y SEÑALIZACIÓN PERMANENTE EN OBRA mes 5.00 1.00 20%
MANTENIMIENTO Y RIEGO DE VIAS PARA CONTROL DE POLVOS mes 4.00 1.00 25%

MATRIZ Y CONEXIONES DOMICILIARIAS DE ALCANTARILLADO


30 19U1.255H.C.52.A-1-03.01 EXC. DE ZANJAS PARA ALCANTARILLADO
EXC. DE ZANJA C/MAQ. H = 1.50M. m 2,816.10 1,252.80 44%
EXC. DE ZANJA C/MAQ. H = 2.00M. m 769.40 726.91 94%
EXC. DE ZANJA C/MAQ. H = 2.50M. m 763.78 393.59 52%
EXC. DE ZANJA C/MAQ. H = 3.00M. m 192.05 84.90 44%
ENTIBADO Y DESENTIBADO H≥2.00M. m 955.83 86.05 9%
40 19U1.255H.C.52.A-1-03.02 REFINE Y NIVELACION DE ZANJAS PARA ALCANTARILLADO
REFINE DE ZANJAS Y NIVELACION DE TUBOS hasta 2.00 m. m 3,585.50 2,373.30 66%
REFINE DE ZANJAS Y NIVELACION DE TUBOS hasta 3.00 m. m 955.83 84.90 9%
50 19U1.255H.C.52.A-1-03.03 RELLENO Y COMPACTACION DE ZANJAS PARA ALCANTARILLADO
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 1.50M. m 2,816.10 215.99 8%
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 2.00M. m 769.40 70.67 9%
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 2.50M. m 763.78 - 0%
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 3.00M. m 192.05 - 0%
60 19U1.255H.C.52.A-1-03.04 SUMINISTRO E INSTALACIÓN DE TUBERÍAS
SUMINISTRO E INSTALACION DE TUBO PVC SN4UF DN 200MM m 4,106.39 2,458.20 60%
SUMINISTRO E INSTALACION DE TUBO PVC SN4UF DN 250MM m 434.94 - 0%
70 19U1.255H.C.52.A-1-03.05 PRUEBA HIDRAULICA DE TUBERIA P/ALCANTARILLADO
PRUEBA HIDRAULICA DE TUBO PVC SN4UF DN 200MM m 4,106.39 659.42 16%
PRUEBA HIDRAULICA DE TUBO PVC SN4UF DN 250MM m 434.94 - 0%
80 19U1.255H.C.52.A-1-03.06 BUZONES
EXCAVACION PARA BUZONES (92und.) m3 307.00 233.98 76%
BUZON Di=1.20m x 1.20MPP. und. 30.00 18.75 63%
BUZON Di=1.20m x 1.50MPP. und. 26.00 13.50 52%
BUZON Di=1.20m x 2.00MPP. und. 19.00 14.25 75%
BUZON Di=1.20m x 2.50MPP. und. 9.00 5.25 58%
BUZON Di=1.20m x 3.00MPP. und. 5.00 3.75 75%
EMPALME BUZON Y/O RED EXISTENTE und. 1.00 - 0%
90 19U1.255H.C.52.A-1-03.07 CONEXIONES DOMICILIARIAS DE ALCANTARILLADO
EXC. ZANJA CONEXIÓN DOMICILIARIA ALCANTARILLADO m 5,583.49 - 0%
REFINE DE ZANJA Y NIVELEACION DE TUBERIA m 5,583.49 - 0%
CONEXION DOMIC. ALCANT. (M.O., SUMINISTRO DE TUBERIA Y ACCESORIOS PVC, CAJAS C°,MARCO Y TAPA und. 800.00 - 0%
C°A°)
RELLENO Y COMPACTACION DE ZANJA PARA CONEX. DOMICIL. ALCANT. m 5,583.49 - 0%
PRUEBA HIDRAULICA DE CONEXIÓN DOMICILIARIA m 5,583.49 - 0%
PRUEBA DE COMPACTACIÓN DE SUELOS und. 80.00 - 0%
100 19U1.255H.C.52.A-1-03.08 OTROS
PRUEBA DE COMPACTACION DE SUELOS (ZANJAS REDES DE ALCANTARILLADO) und. 101.00 - 0%
ACARREO DE MATERIAL EXCEDENTE DE CORTE A MANZANAS CERCANAS m3 880.00 - 0%

MATRIZ Y CONEXIONES DOMICILIARIAS- AGUA POTABLE


110 19U1.255H.C.52.A-1-04.01 EXC. DE ZANJAS PARA REDES DE AGUA POTABLE
EXC. DE ZANJAS PARA REDES DE AGUA POTABLE m 4,295.50 171.00 4%
120 19U1.255H.C.52.A-1-04.02 REFINE Y NIVELACIÓN REDES DE AGUA POTABLE
REFINE Y NIVELACIÓN FONDO DE ZANJA PARA TUBERIA REDES DE AGUA m 4,295.50 171.00 4%
130 19U1.255H.C.52.A-1-04.03 RELLENO DE ZANJA PARA REDES DE AGUA POTABLE
RELLENO Y COMPACTADO C/MATERIAL SELECCIONADO PARA ZANJA REDES DE AGUA POTABLE m 4,295.50 - 0%
140 19U1.255H.C.52.A-1-04.04 SUMINISTRO E INSTALACIÓN DE TUBERÍAS
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 63MM INC. ANILLOS m 176.90 - 0%
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 90MM INC. ANILLOS m 2,483.10 171.00 7%
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 110MM INC. ANILLOS m 984.70 - 0%
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 160MM INC. ANILLOS m 650.80 - 0%
DADOS DE ANCLAJE F'C=140Kg/cm2 DN(63-90mm) und. 111.00 - 0%
DADOS DE ANCLAJE F'C=140Kg/cm2 DN(110-160mm) und. 64.00 - 0%
EMPALME DE TUBERIA A RED EXISTENTE DE (63-160)MM glb. 1.00 - 0%
PRUEBAS DE COMPACTACION DE SUELOS und. 45.00 - 0%
150 19U1.255H.C.52.A-1-04.05 PRUEBAS HIDRAÚLICAS Y DESINFECCIÓN DE TUBERÍAS
PRUEBA HIDRAULICA + DESINF. TUB. DN 63MM m 176.90 - 0%
PRUEBA HIDRAULICA + DESINF. TUB. DN 90MM m 2,483.10 - 0%
PRUEBA HIDRAULICA + DESINF. TUB. DN 110MM m 984.10 - 0%
PRUEBA HIDRAULICA + DESINF. TUB. DN 160MM m 650.80 - 0%
160 19U1.255H.C.52.A-1-04.06 SUMINISTRO E INSTALACIÓN DE ACCESORIOS
CODO PVC 90 MM X 11.25° UF und. 2.00 - 0%
CODO PVC 110 MM X 11.25° UF und. 1.00 - 0%
CODO PVC 160 MM X 11.25° UF und. 3.00 - 0%
RESUMEN DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC
FECHA: JULIO 2017

CODO PVC 63 MM X 22.5° UF und. 1.00 - 0%


CODO PVC 90 MM X 22.5° UF und. 4.00 - 0%
CODO PVC 110 MM X 22.5° UF und. 4.00 - 0%
CODO PVC 63 MM X 45° UF und. 5.00 - 0%
CODO PVC 90 MM X 45° UF und. 5.00 - 0%
CODO PVC 110 MM X 45° UF und. 2.00 - 0%
CODO PVC 160 MM X 45° UF und. 6.00 - 0%
CODO PVC 90 MM X 90° UF und. 6.00 - 0%
CODO PVC 110 MM X 90° UF und. 5.00 - 0%
CODO PVC 160 MM X 90° UF und. 2.00 - 0%
TEE PVC UF 63 MM und. 3.00 - 0%
TEE PVC UF 90 MM und. 22.00 - 0%
TEE PVC UF 110 MM und. 9.00 - 0%
TEE PVC UF 160 MM und. 3.00 - 0%
TEE PVC RED UF 90 X 63 MM und. 2.00 - 0%
TEE PVC RED UF 110 X 90 MM und. 6.00 - 0%
TEE PVC RED UF 160 X 110 MM und. 1.00 - 0%
TAPON PVC UF 63 MM und. 10.00 - 0%
TAPON PVC UF 90 MM und. 27.00 - 0%
TAPON PVC UF 110 MM und. 7.00 - 0%
TAPON PVC UF 160 MM und. 1.00 - 0%
REDUCCION PVC UF 90 X 63 MM und. 4.00 - 0%
REDUCCION PVC UF 110 X 90 MM und. 8.00 - 0%
REDUCCION PVC UF 160 X 90 MM und. 1.00 - 0%
REDUCCION PVC UF 160 X 110 MM und. 3.00 - 0%
VÁLVULA COMPUERTA HIERRO DÚCTIL DN 90 mm UF C/PALETA DE BRONCE und. 11.00 - 0%
VÁLVULA COMPUERTA HIERRO DÚCTIL DN 110 mm UF C/PALETA DE BRONCE und. 10.00 - 0%
VÁLVULA COMPUERTA HIERRO DÚCTIL DN 160 mm UF C/PALETA DE BRONCE und. 2.00 - 0%
GRIFO CONTRAINCENDIOS HIERRO DÚCTIL DN 110 mm UF C/ANILLO T/POSTE C/02 BOCAS und. 4.00 - 0%
VALVULA DE AIRE DOBLE FUNCION DN 1" und. 3.00 - 0%
VALVULA DE PURGA DN 2" DE ASIENTO ELESTOF und. 2.00 - 0%
170 19U1.255H.C.52.A-1-04.07 CONEXIONES DOMICILIARIAS DE AGUA
EXCAV. ZANJA CONEXIÓN DOMICILIARIA m 4,177.20 - 0%
REFINE/NIVELACION ZANJA CONEXIÓN m 4,177.20 - 0%
CONEXIÓN DIMICILIARIA(M.O., TUBERIA, ABRAZADERAS,CAJA REGISTRO, MARCO Y TAPA TERMOPLASTICA) und. 814.00 - 0%
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIA DE AGUA m 4,177.20 - 0%
RELLENO Y COMPACTACION DE ZANJA m 4,177.20 - 0%
PRUEBA DE COMPACTACION DE SUELOS und. 82.00 - 0%
180 19U1.255H.C.52.A-1-04.08 OTROS
ACARREO DE MATERIAL EXCEDENTE DE CORTE A MANZANAS MAS CERCANAS m3 350.00 - 0%
PAVIMENTACION, SARDINELES Y VEREDAS
190 19U1.255H.C.52.A-1-05.01 PAVIMENTACIÓN DE VÍAS
MOVIMIENTO DE TIERRAS
CORTE EN TERRENO NATURAL A NIVEL DE SUB-RASANTE C/EQUIPO. m3 14,378.00 13,761.48 96%
RELLENO A NIVEL DE SUB RASANTE CON MATERIAL PROPIO m3 1,120.00 - 0%
LOTIZACION Y COLOCACION DE HITOS und. 800.00 - 0%
NIVELACION DE MANZANAS m2 77,514.78 - 0%
ACARREO DE MATERIAL EXCEDENTE DE CORTE A MANZANAS MAS CERCANAS m3 13,228.00 6,587.00 50%
CALLES
PERFILADO Y COMPACTADO EN SUB RASANTE m2 24,062.66 - 0%
SUB-BASE GRANULAR, E=20 cm. m2 24,062.66 - 0%
BASE GRANULAR E=0.20 m m2 24,062.66 - 0%
TRANSPORTE DE MATERIAL DE PRÉSTAMO calles m3 12,031.33 - 0%
ESTACIONAMIENTOS
PERFILADO Y COMPACTADO EN SUB RASANTE m2 9,784.56 - 0%
SUB-BASE GRANULAR, E=20 cm. m2 9,784.56 - 0%
BASE GRANULAR E=0.20 m m2 9,784.56 - 0%
TRANSPORTE DE MATERIAL DE PRÉSTAMO m3 4,892.28 - 0%

200 19U1.255H.C.52.A-1-05.03 SARDINELES


SARDINEL SUMERGIDO
CORTE DE ZANJA PARA SARDINEL m 5,678.20 - 0%
ENCOFRADO Y DESENCOFRADO PARA SARDINELES m 5,678.20 - 0%
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN SARDINEL (0.15X0.40) m 5,678.20 - 0%
JUNTAS ASFALTICAS EN SARDINEL m 1,876.00 - 0%
SARDINEL PERALTADO
CORTE DE ZANJA PARA SARDINEL m 818.85 - 0%
ACERO 4,200 KG/CM2 GRADO 60 kg 2,983.02 - 0%
ENCOFRADO Y DESENCOFRADO PARA SARDINELES m 818.85 - 0%
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN SARDINEL (0.15X0.40) m 818.85 - 0%
JUNTAS ASFALTICAS EN SARDINEL m 66.00 - 0%

210 19U1.255H.C.52.A-1-05.04 VEREDAS


MOVIMIENTO DE TIERRAS
CORTE EN TERRENO PARA VEREDAS m3 1,846.00 - 0%
RELLENO A NIVEL DE SUB RASANTE P/VEREDAS m3 382.00 - 0%
NIVELACION Y CONFORMACION DE SUB-RASANTE PARA VEREDAS m2 13,413.94 - 0%
BASE GRANULAR PARA VEREDAS, e=10 cm. m2 13,413.94 - 0%
CONCRETO
RESUMEN DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC
FECHA: JULIO 2017

ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 3,291.16 - 0%


COLOCACIÓN DE CONCRETO F'C= 175 KG/CM2, e=10cm CABADO SEMIPULIDO m2 13,413.94 - 0%
CURADO CON ADITIVO EN CONCRETO m2 13,413.94 - 0%
BRUÑAS DE 1CM. m 22,560.00 - 0%
JUNTAS ASFALTICAS EN VEREDAS m 4,102.00 - 0%
CICLOVIAS
CORTE EN TERRENO PARA CONCRETO EN CICLO VIAS m3 152.00 - 0%
NIVELACION Y CONFORMACION DE SUB-RASANTE PARA CONCRETO EN CICLO VIA m2 1,875.45 - 0%
BASE GRANULAR PARA CICLO VIA, e=10 cm. m2 1,875.45 - 0%
ENCOFRADO Y DESENCOFRADO EN CICLO VIAS m2 257.16 - 0%
COLOCACION DE CONCRETO F'C= 175 KG/CM2, e=10cm ACABADO RUGOSO(PEINADO) m2 1,875.45 - 0%
CURADO CON ADITIVO EN CONCRETO m2 1,875.45 - 0%
JUNTAS ASFALTICAS EN CICLO VIA m 458.00 - 0%

220 19U1.255H.C.52.A-1-05.05 RAMPAS


NIVELACION Y CONFORMACION DE SUB-RASANTE PARA RAMPAS m2 159.60 - 0%
BASE GRANULAR PARA RAMPAS, e=10 cm. m2 159.60 - 0%
ENCOFRADO Y DESENCOFRADO EN RAMPAS m2 49.98 - 0%
COLOCACION DE CONCRETO F'C= 175 KG/CM2, e=10cm m2 159.60 - 0%
BRUÑAS ml 1,539.00 - 0%
CURADO CON ADITIVO EN CONCRETO m2 159.60 - 0%
JUNTAS ASFALTICAS EN RAMPAS ml 56.00 - 0%

230 19U1.255H.C.52.A-1-06 VARIOS


DRENAJE PLUVIAL Und. 7.00 - 0%

240 19U1.255H.C.52.A-1-07 ORNAMENTACIÓN DE PARQUES


ISLAS DE ADOQUIN
CORTE A NIVEL DE SUB RASANTE P/ADOQUIN 0.20 X 0.10 X 04 CM m3 210.00 - 0%
NIVELACION Y CONFORMACION DE SUB RASANTE PARA ADOQUIN m2 2,062.57 - 0%
BASE GRANULAR PARA ADOQUIN DE CIRCULACION, e=10cm m2 2,062.57 - 0%
CORTE DE ZANJA PARA SARDINEL SUMERGIDO 35cm x 15cm P/ADOQUIN m 1,531.98 - 0%
ENCOFRADO Y DESENCOFRADO PARA SARDINELES m 1,531.98 - 0%
COLOCACION CONCRETO f'c=175 kg/cm2 EN SARDINEL (0.15 x 0.35) m 1,531.98 - 0%
JUNTAS ASFALTICAS EN SARDINEL m 255.00 - 0%
CONFORMACION DE ARENA PARA ADOQUIN 4CM m2 2,062.57 - 0%
PISO DE ADOQUIN DE CONCRETO 20 x 10 x 04cm m2 2,062.57 - 0%
AREAS DE ESPARCIMIENTO
RELLENO NIV. Y COMP. MATERIAL PRESTAMO ARENA FINA m2 1,831.51 - 0%
RELLENO NIV. Y COMP. MATERIAL PRESTAMO CONFITILLO m2 64.75 - 0%
MODULO DE AJEDREZ
MODULO DE AJEDREZ uni 2.00 - 0%
MODULO JUEGO DE LABERINTO
MODULO JUEGO DE LABERINTO uni 2.00 - 0%
MODULO JUEGO ESCULTURAS
MODULO JUEGO DE ESCULTURAS uni 2.00 - 0%
MODULO DE SEMI ESFERAS
MODULO DE SEMI ESFERAS uni 1.00 - 0%
BANCAS DE CONCRETO ARMADO
BANCAS DE CONCRETO ARMADO uni 167.00 - 0%
VEREDAS DE CIRCULACION
CORTE EN TERRENO PARA VEREDA DE CIRCULACION m3 6.15 - 0%
NIVELACION Y CONFORMACION DE SUB-RASANTE PARA CONCRETO m2 3,068.67 - 0%
BASE GRANULAR PARA VEREDA DE CIRCULACION, e=10cm m2 3,068.67 - 0%
ENCOFRADO Y DESENCOFRADO EN VEREDA DE CIRCULACION m2 540.16 - 0%
COLOCACION DE CONCRETO EN VEREDA DE CIRCULACION F'C= 175 KG/CM2, e=10cm m2 3,068.67 - 0%
CURADO CON ADITIVO EN CONCRETO m2 3,068.67 - 0%
JUNTAS ASFALTICAS EN VEREDAS DE CIRCULACION m 855.00 - 0%
AREAS VERDES
CONFORMACIÓN DE SUB RASANTE PARA ÁREAS VERDES m2 15,496.70 - 0%
COMPOSICIÓN, COLOCACIÓN Y SUMINISTRO DE TIERRA ORGÁNICA e=0.30 m2 15,496.70 - 0%
GRASS NATURAL (TIPO APTENIA) m2 12,051.93 - 0%
GRASS NATURAL (TIPO AMERICANO) m2 3,127.27 - 0%
GRASS NATURAL PARA CAMPO DEPORTIVO m2 317.50 - 0%
SUMINISTRO E INSTALACIÓN DE ARBOL PONCIANA und. 254.00 - 0%
PINTADO Y DEMARCACIÓN DE CAMPO DEPORTIVO Glb. 1.00 - 0%
APARATOS DEPORTIVOS
SUMINISTRO E INSTALACION DE ESCALADORA Und. 3.00 - 0%
SUMINISTRO E INSTALACION DE ELIPTICA Und. 3.00 - 0%
SUMINISTRO E INSTALACION DE ESQUI Und. 3.00 - 0%
MOBILIARIO URBANO
SUMINISTRO E INSTALACION DE PAPELERA O TACHO DE BASURA (FIBRA DE VIDRIO) Und. 44.00 - 0%
ARCOS DE FULBITO INC. MALLA Und. 2.00 - 0%

OTRAS OBRAS
250 19U1.255H.C.52.A-4-03 CERCO PERIMETRICO
CIMIENTO CORRIDO
EXCAVACION DE ZANJA P/CIMIENTO CORRIDO m3 399.00 - 0%
ENCOFRADO Y DESENCOFRADO EN CIMIENTO CORRIDO m2 821.00 - 0%
COLOCACION DE CONCRETO F'C=100 KG/CM2 EN CIMIENTO CORRIDO m3 165.00 - 0%
RESUMEN DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC
FECHA: JULIO 2017

SOBRECIMIENTO ARMADO
ACERO FY = 4200 KG/CM2 kg 4,166.00 - 0%
ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO ARMADO m2 456.00 - 0%
COLOCACION DE CONCRETO F'C=175 KG/CM2 EN SOBRECIMIENTO ARMADO m3 35.00 - 0%
COLUMNAS
ACERO FY = 4200 KG/CM2 kg 3,961.00 - 0%
ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 383.00 - 0%
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN COLUMNAS m3 36.00 - 0%
VIGUETA
ACERO FY = 4200 KG/CM2 kg 754.00 - 0%
ENCOFRADO Y DESENCOFRADO DE VIGUETAS m2 183.00 - 0%
COLOCACION DE CONCRETO f'c=175 kg/cm2 EN VIGUETAS m3 14.00 - 0%
MURO DE LADRILLO KING KONG ARTESANAL DE SOGA m2 824.00 - 0%
COBERTURA DE LADRILLO PASTELERO m 512.00 - 0%
SOLAQUEADO DE COLUMNAS Y VIGUETAS m2 1,022.00 - 0%
CERCO METALICO TIPO MALLA und 49.00 - 0%
AREAS VERDES
SUMNISTRO E INSTALACION DE PLANTAS TREPADORAS und 98.00 - 0%
SUMNISTRO E INSTALACION DE PLANTONES (PONCIANOS) und 98.00 - 0%

260 19U1.255H.C.52.A-4-05 SEÑALIZACIÓN


SEÑALIZACION HORIZONTAL
MARCAS EN EL PAVIMENTO (SIMBOLOS Y CRUCES) m2 520.00 - 0%
MARCAS EN EL PAVIMENTO (LINEA DISCONTINUA) m 4,490.52 - 0%
MARCAS EN EL PAVIMENTO (LINEA CONTINUA) m 299.25 - 0%
PINTURA AMARILLA EN SARDINEL PERALTADO (BERMAS) Y MARTILLOS m 1,334.34 - 0%
PINTURA BLANCA EN SARDINEL SUMERGIDO Y CICLOVIA m 6,391.97 - 0%
SEÑALIZACION VERTICAL
SEÑAL R-1 "PARE" 0.60 x 0.60 m. CON POSTE und 103.00 - 0%
SEÑAL R-2 INFORMATIVA 0.75 x 0.25 m. CON POSTE und 103.00 - 0%

270 19U1.255H.C.52.A-4-07 OTROS


PLANOS DE REPLANTEO Y MEMORIA DESCRIPTIVA und 150.00 - 0%

280 19U1.255H.C.52.A-4-02 LINEA DE IMPULSIÓN DN 200-250 MM - TRAMO 460 ML. - POZO N° 02 A RESERVORIO
TUB L. IMPULSION PVC NTP-ISO 1452 DN 200MM (8") C-10 POZO TUBULAR PPN° 01 - PIE DE
RESERVORIO APOYADO
EXCAV.C/EQ.P.AGUA RPA-410M3
T.NORMAL A= 0.60M H=1.50M ml 302.90 - 0%
REFINE Y NIVELACION FONDO DE ZANJA TN A= 0.60M ml 302.90 - 0%
RELLENO ZANJA MAT.PROPIO.COMPACT.C/EQUIPO A=0.60M H=1.50M ml 302.90 - 0%
ACARREO DE MATERIAL EXCEDENTE-C/EQUIPO m3 45.00 - 0%
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 21.00 - 0%
SUMINISTRO E INSTALACION DE TUBERIA DE PVC ISO DN 200 mm. C-10 U.F. ml 302.90 - 0%
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS PVC ISO U.F. DN 200mm. ml 302.90 - 0%
PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) u 5.00 - 0%
TUB L. IMPULSION PVC NTP-ISO 1452 DN 250MM (10") C-10 PUNTO DE REUNION PPN° 02 C/PPN° 03 -
PIE DE RESERVORIO ELEVADOA=0.80M
EXCAV.C/EQ.P.AGUA.T.NORMAL RPE-755M3
H=1.50M ml 135.46 - 0%
REFINE Y NIVELACION FONDO DE ZANJA TN A= 0.80M ml 135.46 - 0%
RELLENO ZANJA MAT.PROPIO.COMPACT.C/EQUIPO A=0.80M H=1.50M ml 135.46 - 0%
ACARREO DE MATERIAL EXCEDENTE-C/EQUIPO m3 22.00 - 0%
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 18.00 - 0%
SUMINISTRO E INSTALACION DE TUBERIA DE PVC ISO DN 250 mm. C-10 U.F. ml 135.46 - 0%
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS PVC ISO U.F. DN 250mm. ml 135.46 - 0%
PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) u 3.00 - 0%
SUMINISTRO E INSTALACION DE ACCESORIOS L/ IMPULSION
CODO LUFLEX ISO 2531 HD 200 X 22.5º u 1.00 - 0%
CODO LUFLEX ISO 2531 HD 200 X 45º u 4.00 - 0%
CODO LUFLEX ISO 2531 HD 200 X 90º u 1.00 - 0%
CODO LUFLEX ISO 2531 HD 250 X 45º u 2.00 - 0%
CODO LUFLEX ISO 2531 HD 250 X 90º u 1.00 - 0%
TEE LUFLEX ISO 2531 HD 250 X 200 u 1.00 - 0%
REDUCCION HD ISO 250 X 200 U.F. PN-10 u 1.00 - 0%
TAPON PVC ISO Ø 200mm U.F. C-10 u 1.00 - 0%
ANCLAJE DE CONCRETO F'C=140KG/CM2 P/ ACCESORIO + ENCOFRADO DN 90-250MM u 6.00 - 0%

290 19U1.255H.C.52.A-4-02 LÍNEA DE ADUCCIÓN DN 200 MM


TUB L. ADUCCION PVC ISO 1452 DN 200 MM C-7.5
EXCAVACION DE ZANJA C/EQUIP.T.NORMAL HASTA 1.50MPP m 323.58 - 0%
REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA T. NORMAL 0.6m m 323.58 - 0%
RELLENO ZANJA MAT.PROPIO.COMPACT.C/EQUIPO A=0.60M H=1.50M m 323.58 - 0%
ACARREO DE MATERIAL EXCEDENTE-C/EQUIPO m3 38.00 - 0%
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 19.00 - 0%
SUMINISTRO E INSTALACION DE TUBERIA DE PVC ISO DN 200 mm. C-7.5 U.F. m 323.58 - 0%
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS PVC ISO U.F. DN 200mm. m 323.58 - 0%
PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) u 3.00 - 0%
SUMINISTRO E INSTALACION DE ACCESORIOS L/ADUCCON
CODO LUFLEX ISO 2531 HD 200 X 45º u 3.00 - 0%
TEE LUFLEX ISO 2531 HD 200 X 200 u 1.00 - 0%
TAPON PVC ISO Ø 200mm U.F. C-10 u 2.00 - 0%
ANCLAJE DE CONCRETO F'C=140KG/CM2 P/ ACCESORIO + ENCOFRADO DN 90-250MM u 6.00 - 0%
PRESUPUESTO DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC -
FECHA: JULIO 2017

SAP PEP DESCRIPCIÓN UND CANT P.U PARCIAL

OBRAS PROVISIONALES Y PRELIMINARES


10 19U1.255H.C.52.A-1-01.01 OBRAS PRELIMINARES S/. 130,902.48 FECHA INICIO FECHA FINAL TOTAL
LIMPIEZA PERMANENTE EN OBRA mes 5.50 3,598.27 S/. 19,790.49 01/08/2017 31/08/2017 1.00
TOPOGRAFIA DURANTE LA EJECUCION DE LA OBRA mes 5.50 20,202.18 S/. 111,111.99 04/07/2017 31/07/2017 1.00
20 19U1.255H.C.52.A-1-01.02 OBRAS PROVISIONALES S/. 168,084.00 FECHA INICIO FECHA FINAL TOTAL
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb. 1.00 9,540.00 S/. 9,540.00 0.40
CAMPAMENTO PROVISIONAL DE OBRA(OFICINA,ALMACEN, CASETA VIG.,SSHH) mes 5.50 5,200.00 S/. 28,600.00 01/08/2017 31/08/2017 1.00
GUARDIANIA EN OBRA mes 5.50 12,900.00 S/. 70,950.00 01/08/2017 31/08/2017 1.00
SEGURIDAD Y SEÑALIZACIÓN PERMANENTE EN OBRA mes 5.00 9,210.00 S/. 46,050.00 01/08/2017 31/08/2017 1.00
MANTENIMIENTO Y RIEGO DE VIAS PARA CONTROL DE POLVOS mes 4.00 3,236.00 S/. 12,944.00 01/08/2017 31/08/2017 1.00

MATRIZ Y CONEXIONES DOMICILIARIAS DE ALCANTARILLADO


30 19U1.255H.C.52.A-1-03.01 EXC. DE ZANJAS PARA ALCANTARILLADO S/. 84,853.91 TRAMO L TOTAL
EXC. DE ZANJA C/MAQ. H = 1.50M. m 2,816.10 8.31 S/. 23,401.79 1,390.77 1,366.63
Bz21-Bz22 39.70
Bz56-Bz65 79.06
Bz10-Bz8 38.73
Bz9-Bz10 14.38
Bz55-Bz46 49.31
Bz18-Bz19 40.62
Bz51-Bz52 26.58
Bz30-Bz41 62.42
Bz41-Bz57 54.92
Bz59-Bz66 40.00
Bz51-Bz61 46.58
Bz90-Bz61 16.36
Bz8-Bz14 46.73
Bz8-Bz7 54.90
Bz10-Bz11 53.08
Bz54-Bz53 28.89
Bz88-Bz89 12.38
Bz4-Bz5 15.67
Bz46-Bz45 71.63
Bz45-Bz56 42.38
Bz16-Bz17 18.21
Bz44-Bz43 15.92
Bz42-Bz43 58.17
Bz61-Bz60 82.75
Bz31-Bz30 43.32
Bz7-Bz6 54.90
Bz22-Bz23 39.61
Bz52-Bz53 16.32
Bz57-Bz59 44.58
Bz65-Bz66 44.70
PRESUPUESTO DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC -
FECHA: JULIO 2017

Bz60-Bz64 57.02
Bz68-Bz69 44.27
Bz70-Bz69 36.68
EXC. DE ZANJA C/MAQ. H = 2.00M. m 769.40 11.38 S/. 8,755.77 682.87 85.00
Bz6-Bz5 55.00
Bz30-Bz29 45.13
Bz11-Bz12 43.21
Bz47-Bz46 44.04
Bz15-Bz16 34.75
Bz13-Bz17 19.00
Bz12-Bz13 24.40
Bz88-Bz33 44.44
Bz14-Bz15 46.63
Bz5-Bz23 40.75
Bz53-Bz47 17.81
Bz19-Bz20 40.62
Bz89-Bz20 15.38
Bz43-Bz32 41.96
Bz33-Bz47 68.45
Bz32-Bz31 63.70
Bz17-Bz34 37.60

EXC. DE ZANJA C/MAQ. H = 2.50M. m 763.78 13.51 S/. 10,318.67 393.59 368.23
Bz20-Bz25 29.38
Bz25-Bz32 44.36
Bz1-Bz3 78.10
Bz48-Bz34 65.92
Bz23-Bz24 23.10
Bz25-Bz26 45.58
Bz27-Bz28 61.57
Bz26-Bz27 45.58
EXC. DE ZANJA C/MAQ. H = 3.00M. m 192.05 21.63 S/. 4,154.04 84.90 107.07
Bz3-Bz24 42.40
Bz24-Bz27 42.50

ENTIBADO Y DESENTIBADO H≥2.00M. m 955.83 39.99 S/. 38,223.64 86.05 869.29


41.69
44.36
40 19U1.255H.C.52.A-1-03.02 REFINE Y NIVELACION DE ZANJAS PARA ALCANTARILLADO S/. 13,925.01 TRAMO L TOTAL
REFINE DE ZANJAS Y NIVELACION DE TUBOS hasta 2.00 m. m 3,585.50 2.94 S/. 10,541.37 2,467.23
Bz21-Bz22 39.70
Bz56-Bz65 79.06
Bz10-Bz8 38.73
Bz9-Bz10 14.38
Bz55-Bz46 49.31
Bz18-Bz19 40.62
PRESUPUESTO DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC -
FECHA: JULIO 2017

Bz51-Bz52 26.58
Bz30-Bz41 62.42
Bz41-Bz57 54.92
Bz59-Bz66 40.00
Bz51-Bz61 46.58
Bz90-Bz61 16.36
Bz8-Bz14 46.73
Bz8-Bz7 54.90
Bz10-Bz11 53.08
Bz54-Bz53 28.89
Bz88-Bz89 12.38
Bz4-Bz5 15.67
Bz46-Bz45 71.63
Bz45-Bz56 42.38
Bz16-Bz17 18.21
Bz44-Bz43 15.92
Bz42-Bz43 58.17
Bz61-Bz60 82.75
Bz31-Bz30 43.32
Bz7-Bz6 54.90
Bz22-Bz23 39.61
Bz52-Bz53 16.32
Bz57-Bz59 44.58
Bz65-Bz66 44.70
Bz6-Bz5 55.00
Bz30-Bz29 45.13
Bz11-Bz12 43.21
Bz47-Bz46 44.04
Bz15-Bz16 34.75
Bz13-Bz17 19.00
Bz12-Bz13 24.40
Bz88-Bz33 44.44
Bz14-Bz15 46.63
Bz5-Bz23 40.75
Bz53-Bz47 17.81
Bz19-Bz20 40.62
Bz89-Bz20 15.38
Bz43-Bz32 41.96
Bz33-Bz47 68.45
Bz32-Bz31 63.70
Bz17-Bz34 37.60

Bz20-Bz25 29.38
Bz25-Bz32 44.36
Bz1-Bz3 78.10
Bz48-Bz34 65.92
PRESUPUESTO DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC -
FECHA: JULIO 2017

Bz23-Bz24 23.10
Bz25-Bz26 45.58
Bz27-Bz28 61.57
Bz26-Bz27 45.58
Bz60-Bz64 57.02
Bz68-Bz69 44.27
Bz70-Bz69 36.68
REFINE DE ZANJAS Y NIVELACION DE TUBOS hasta 3.00 m. m 955.83 3.54 S/. 3,383.64 84.90
Bz3-Bz24 42.40
Bz24-Bz27 42.50
50 19U1.255H.C.52.A-1-03.03 RELLENO Y COMPACTACION DE ZANJAS PARA ALCANTARILLADO S/. 100,717.12 TRAMO L TOTAL
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 1.50M. m 2,816.10 20.97 S/. 59,053.62 215.99
Bz10-Bz8 38.73
Bz9-Bz10 14.38
Bz8-Bz7 54.90
Bz10-Bz11 53.08
Bz7-Bz6 54.90
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 2.00M. m 769.40 22.68 S/. 17,449.99 TRAMO L TOTAL
70.67
Bz6-Bz5 55.00
Bz4-Bz5 15.67
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 2.50M. m 763.78 24.80 S/. 18,941.74 TRAMO L TOTAL

RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 3.00M. m 192.05 27.45 S/. 5,271.77 TRAMO L TOTAL

60 19U1.255H.C.52.A-1-03.04 SUMINISTRO E INSTALACIÓN DE TUBERÍAS S/. 150,321.74 TRAMO L TOTAL


SUMINISTRO E INSTALACION DE TUBO PVC SN4UF DN 200MM m 4,106.39 30.40 S/. 124,834.26 2,532.13
Bz21-Bz22 39.70
Bz56-Bz65 79.06
Bz10-Bz8 38.73
Bz9-Bz10 14.38
Bz55-Bz46 49.31
Bz18-Bz19 40.62
Bz51-Bz52 26.58
Bz30-Bz41 62.42
Bz41-Bz57 54.92
Bz59-Bz66 40.00
Bz51-Bz61 46.58
Bz90-Bz61 16.36
Bz8-Bz14 46.73
Bz8-Bz7 54.90
Bz10-Bz11 53.08
Bz54-Bz53 28.89
Bz88-Bz89 12.38
Bz4-Bz5 15.67
Bz46-Bz45 71.63
PRESUPUESTO DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC -
FECHA: JULIO 2017

Bz45-Bz56 42.38
Bz16-Bz17 18.21
Bz44-Bz43 15.92
Bz42-Bz43 58.17
Bz61-Bz60 82.75
Bz31-Bz30 43.32
Bz7-Bz6 54.90
Bz22-Bz23 39.61
Bz52-Bz53 16.32
Bz57-Bz59 44.58
Bz65-Bz66 44.70
Bz6-Bz5 55.00
Bz30-Bz29 45.13
Bz11-Bz12 43.21
Bz47-Bz46 44.04
Bz15-Bz16 34.75
Bz13-Bz17 19.00
Bz12-Bz13 24.40
Bz88-Bz33 44.44
Bz14-Bz15 46.63
Bz5-Bz23 40.75
Bz53-Bz47 17.81
Bz19-Bz20 40.62
Bz89-Bz20 15.38
Bz43-Bz32 41.96
Bz33-Bz47 68.45
Bz32-Bz31 63.70
Bz17-Bz34 37.60
Bz34-Bz33 44.04
Bz20-Bz25 29.38
Bz25-Bz32 44.36
Bz1-Bz3 78.10
Bz48-Bz34 65.92
Bz23-Bz24 23.10
Bz25-Bz26 45.58
Bz27-Bz28 61.57
Bz26-Bz27 45.58
Bz3-Bz24 42.40
Bz24-Bz27 42.50
Bz68-Bz69 44.27
Bz70-Bz69 29.66
SUMINISTRO E INSTALACION DE TUBO PVC SN4UF DN 250MM m 434.94 58.60 S/. 25,487.48
70 19U1.255H.C.52.A-1-03.05 PRUEBA HIDRAULICA DE TUBERIA P/ALCANTARILLADO S/. 16,461.87 TRAMO L TOTAL
PRUEBA HIDRAULICA DE TUBO PVC SN4UF DN 200MM m 4,106.39 3.60 S/. 14,783.00 659.42
Bz1-Bz3 78.10
Bz4-Bz5 15.67
PRESUPUESTO DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC -
FECHA: JULIO 2017

Bz5-Bz23 40.75
Bz21-Bz22 39.70
Bz22-Bz23 39.61
Bz6-Bz5 55.00
Bz7-Bz6 54.90
Bz8-Bz7 54.90
Bz10-Bz8 38.73
Bz9-Bz10 14.38
Bz10-Bz11 53.08
Bz8-Bz14 46.73
Bz14-Bz15 46.63
Bz18-Bz19 40.62
Bz19-Bz20 40.62
PRUEBA HIDRAULICA DE TUBO PVC SN4UF DN 250MM m 434.94 3.86 S/. 1,678.87
80 19U1.255H.C.52.A-1-03.06 BUZONES S/. 168,281.50
EXCAVACION PARA BUZONES (92und.) m3 307.00 40.27 S/. 12,362.89 BZ A= πr2 H V=TOTAL
294.24
Bz64 2.01 1.20 2.41
Bz30 2.01 1.20 2.41
Bz57 2.01 1.20 2.41
Bz8 2.01 1.20 2.41
Bz18 2.01 1.20 2.41
Bz2 2.01 1.20 2.41
Bz21 2.01 1.20 2.41
Bz22 2.01 1.20 2.41
Bz4 2.01 1.20 2.41
Bz42 2.01 1.20 2.41
Bz44 2.01 1.20 2.41
Bz46 2.01 1.20 2.41
Bz51 2.01 1.20 2.41
Bz54 2.01 1.20 2.41
Bz63 2.01 1.20 2.41
Bz68 2.01 1.20 2.41
Bz72 2.01 1.20 2.41
Bz73 2.01 1.20 2.41
Bz88 2.01 1.20 2.41
Bz9 2.01 1.20 2.41
Bz90 2.01 1.20 2.41
Bz58 2.01 1.20 2.41
Bz69 2.01 1.20 2.41
Bz65 2.01 1.20 2.41
Bz56 2.01 1.20 2.42
Bz81 2.01 1.21 2.42
Bz10 2.01 1.24 2.50
Bz59 2.01 1.28 2.57
Bz16 2.01 1.29 2.60
PRESUPUESTO DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC -
FECHA: JULIO 2017

Bz71 2.01 1.30 2.61


Bz78 2.01 1.30 2.61
Bz40 2.01 1.34 2.69
Bz66 2.01 1.35 2.71
Bz67 2.01 1.36 2.74
Bz79 2.01 1.40 2.81
Bz80 2.01 1.40 2.81
Bz19 2.01 1.40 2.82
Bz55 2.01 1.40 2.81
Bz52 2.01 1.41 2.84
Bz41 2.01 1.42 2.86
Bz61 2.01 1.43 2.88
Bz6 2.01 1.43 2.88
Bz70 2.01 1.48 2.98
Bz60 2.01 1.52 3.05
Bz11 2.01 1.53 3.08
Bz14 2.01 1.54 3.10
Bz7 2.01 1.55 3.12
Bz74 2.01 1.57 3.16
Bz17 2.01 1.58 3.18
Bz53 2.01 1.59 3.19
Bz12 2.01 1.59 3.20
Bz13 2.01 1.63 3.29
Bz89 2.01 1.66 3.34
Bz5 2.01 1.67 3.36
Bz45 2.01 1.67 3.36
Bz43 2.01 1.74 3.50
Bz31 2.01 1.78 3.59
Bz23 2.01 1.79 3.59
Bz1 2.01 1.83 3.68
Bz15 2.01 1.88 3.77
Bz29 2.01 1.92 3.86
Bz47 2.01 1.97 3.95
Bz33 2.01 2.13 4.28
Bz20 2.01 2.19 4.40
Bz48 2.01 2.19 4.40
Bz28 2.01 2.20 4.42
Bz25 2.01 2.30 4.61
Bz32 2.01 2.31 4.65
Bz26 2.01 2.47 4.96
Bz34 2.01 2.54 5.11
Bz77 2.01 2.67 5.38
Bz3 2.01 2.90 5.83
Bz24 2.01 2.97 5.97
Bz27 2.01 3.04 6.11
BUZON Di=1.20m x 1.20MPP. und. 30.00 1,547.45 S/. 46,423.50 BZ H und TOTAL
PRESUPUESTO DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC -
FECHA: JULIO 2017

25
Bz64 1.20 1.00
Bz30 1.20 1.00
Bz57 1.20 1.00
Bz8 1.20 1.00
Bz18 1.20 1.00
Bz2 1.20 1.00
Bz21 1.20 1.00
Bz22 1.20 1.00
Bz4 1.20 1.00
Bz42 1.20 1.00
Bz44 1.20 1.00
Bz46 1.20 1.00
Bz51 1.20 1.00
Bz54 1.20 1.00
Bz63 1.20 1.00
Bz68 1.20 1.00
Bz72 1.20 1.00
Bz73 1.20 1.00
Bz88 1.20 1.00
Bz9 1.20 1.00
Bz90 1.20 1.00
Bz58 1.20 1.00
Bz69 1.20 1.00
Bz65 1.20 1.00
Bz56 1.20 1.00
BUZON Di=1.20m x 1.50MPP. und. 26.00 1,770.29 S/. 46,027.54 BZ H und TOTAL
18.00
Bz81 1.21 1.00
Bz10 1.24 1.00
Bz59 1.28 1.00
Bz16 1.29 1.00
Bz71 1.30 1.00
Bz78 1.30 1.00
Bz40 1.34 1.00
Bz66 1.35 1.00
Bz67 1.36 1.00
Bz79 1.40 1.00
Bz80 1.40 1.00
Bz19 1.40 1.00
Bz55 1.40 1.00
Bz52 1.41 1.00
Bz41 1.42 1.00
Bz61 1.43 1.00
Bz6 1.43 1.00
Bz70 1.48 1.00
PRESUPUESTO DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC -
FECHA: JULIO 2017

BUZON Di=1.20m x 2.00MPP. und. 19.00 1,840.57 S/. 34,970.83 BZ H und TOTAL
19.00
Bz60 1.52 1.00
Bz11 1.53 1.00
Bz14 1.54 1.00
Bz7 1.55 1.00
Bz74 1.57 1.00
Bz17 1.58 1.00
Bz53 1.59 1.00
Bz12 1.59 1.00
Bz13 1.63 1.00
Bz89 1.66 1.00
Bz5 1.67 1.00
Bz45 1.67 1.00
Bz43 1.74 1.00
Bz31 1.78 1.00
Bz23 1.79 1.00
Bz1 1.83 1.00
Bz15 1.88 1.00
Bz29 1.92 1.00
Bz47 1.97 1.00
BUZON Di=1.20m x 2.50MPP. und. 9.00 1,935.05 S/. 17,415.45 BZ H und TOTAL
7.00
Bz33 2.13 1.00
Bz20 2.19 1.00
Bz48 2.19 1.00
Bz28 2.20 1.00
Bz25 2.30 1.00
Bz32 2.31 1.00
Bz26 2.47 1.00
BUZON Di=1.20m x 3.00MPP. und. 5.00 2,083.98 S/. 10,419.90 BZ H und TOTAL
5.00
Bz34 2.54 1.00
Bz77 2.67 1.00
Bz3 2.90 1.00
Bz24 2.97 1.00
Bz27 3.04 1.00
EMPALME BUZON Y/O RED EXISTENTE und. 1.00 661.39 S/. 661.39
MATRIZ Y CONEXIONES DOMICILIARIAS- AGUA POTABLE
110 19U1.255H.C.52.A-1-04.01 EXC. DE ZANJAS PARA REDES DE AGUA POTABLE S/. 46,477.31 TRAMO L TOTAL
EXC. DE ZANJAS PARA REDES DE AGUA POTABLE m 4,295.50 10.82 S/. 46,477.31 171.00
calle 15 171.00
120 19U1.255H.C.52.A-1-04.02 REFINE Y NIVELACIÓN REDES DE AGUA POTABLE S/. 15,206.07 TRAMO L TOTAL
REFINE Y NIVELACIÓN FONDO DE ZANJA PARA TUBERIA REDES DE AGUA m 4,295.50 3.54 S/. 15,206.07 171.00
calle 15 171.00
130 19U1.255H.C.52.A-1-04.03 RELLENO DE ZANJA PARA REDES DE AGUA POTABLE S/. 77,361.96 TRAMO L TOTAL
PRESUPUESTO DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC -
FECHA: JULIO 2017

RELLENO Y COMPACTADO C/MATERIAL SELECCIONADO PARA ZANJA REDES DE AGUA POTABLE m 4,295.50 18.01 S/. 77,361.96

140 19U1.255H.C.52.A-1-04.04 SUMINISTRO E INSTALACIÓN DE TUBERÍAS S/. 85,669.43 TRAMO L TOTAL


SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 63MM INC. ANILLOS m 176.90 7.43 S/. 1,314.37
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 90MM INC. ANILLOS m 2,483.10 11.82 S/. 29,350.24 171.00
calle 15 171.00
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 110MM INC. ANILLOS m 984.70 15.06 S/. 14,829.58
SUMINIST. E INST. TUBERIA PVC AGUA C-7.5 UF DN 160MM INC. ANILLOS m 650.80 28.32 S/. 18,430.66
DADOS DE ANCLAJE F'C=140Kg/cm2 DN(63-90mm) und. 111.00 110.68 S/. 12,285.48
DADOS DE ANCLAJE F'C=140Kg/cm2 DN(110-160mm) und. 64.00 113.38 S/. 7,256.32
EMPALME DE TUBERIA A RED EXISTENTE DE (63-160)MM glb. 1.00 401.88 S/. 401.88
PRUEBAS DE COMPACTACION DE SUELOS und. 45.00 40.02 S/. 1,800.90
150 19U1.255H.C.52.A-1-04.05 PRUEBAS HIDRAÚLICAS Y DESINFECCIÓN DE TUBERÍAS S/. 21,427.86 TRAMO L TOTAL
PRUEBA HIDRAULICA + DESINF. TUB. DN 63MM m 176.90 4.56 S/. 806.66
PRUEBA HIDRAULICA + DESINF. TUB. DN 90MM m 2,483.10 4.83 S/. 11,993.37
PRUEBA HIDRAULICA + DESINF. TUB. DN 110MM m 984.10 5.13 S/. 5,048.43
PRUEBA HIDRAULICA + DESINF. TUB. DN 160MM m 650.80 5.50 S/. 3,579.40
190 19U1.255H.C.52.A-1-05.01 PAVIMENTACIÓN DE VÍAS S/. 1,286,381.05 TRAMO L ANCHO DE VIA H
MOVIMIENTO DE TIERRAS
CORTE EN TERRENO NATURAL A NIVEL DE SUB-RASANTE C/EQUIPO. m3 14,378.00 3.98 S/. 57,224.44
Bz21-Bz22 39.70 10.00 0.35
Bz56-Bz65 79.06 10.00 0.35
Bz10-Bz8 38.73 10.00 0.40
Bz9-Bz10 14.38 10.00 0.56
Bz57-Bz59 44.58 10.00 0.48
Bz55-Bz46 49.31 10.00 0.41
Bz55-Bz46 49.31 10.00 0.69
Bz18-Bz19 40.62 10.00 0.71
Bz51-Bz52 26.58 10.00 0.50
Bz30-Bz41 62.42 10.00 0.52
Bz41-Bz57 54.92 10.00 0.63
Bz59-Bz66 40.00 10.00 0.63
Bz51-Bz61 46.58 10.00 0.60
Bz90-Bz61 16.36 10.00 0.50
Bz8-Bz14 46.73 10.00 0.30
Bz8-Bz7 54.90 10.00 0.50
Bz10-Bz11 53.08 10.00 0.57
Bz54-Bz53 28.89 10.00 0.63
Bz88-Bz89 12.38 10.00 0.65
Bz4-Bz5 15.67 10.00 0.63
Bz46-Bz45 71.63 10.00 0.61
Bz45-Bz56 42.38 10.00 0.63
Bz16-Bz17 18.21 10.00 0.52
Bz44-Bz43 15.92 10.00 0.52
Bz42-Bz43 58.17 10.00 0.60
Bz61-Bz60 82.75 10.00 0.60
PRESUPUESTO DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC -
FECHA: JULIO 2017

Bz31-Bz30 43.32 10.00 0.58


Bz7-Bz6 54.90 10.00 0.58
Bz22-Bz23 39.61 10.00 0.70
Bz52-Bz53 16.32 10.00 0.50
Bz8-Bz14 46.73 10.00 0.36
Bz14-Bz15 46.63 10.00 0.39
Bz59-Bz66 40.00 10.00 0.36
Bz6-Bz5 55.00 10.00 0.39
Bz30-Bz29 45.13 10.00 0.51
Bz11-Bz12 43.21 10.00 0.51
Bz47-Bz46 44.04 10.00 0.48
Bz15-Bz16 34.75 10.00 0.65
Bz13-Bz17 19.00 10.00 0.65
Bz12-Bz13 24.40 10.00 0.63
Bz88-Bz33 44.44 10.00 0.62
Bz14-Bz15 46.63 10.00 0.62
Bz5-Bz23 40.75 10.00 0.65
Bz53-Bz47 17.81 10.00 0.68
Bz19-Bz20 40.62 10.00 0.62
Bz89-Bz20 15.38 10.00 0.52
Bz43-Bz32 41.96 10.00 0.58
Bz33-Bz47 68.45 10.00 0.58
Bz32-Bz31 63.70 10.00 0.52
Bz17-Bz34 37.60 10.00 0.30
Bz20-Bz25 29.38 10.00 0.45
Bz25-Bz32 44.36 10.00 0.45
Bz1-Bz3 78.10 10.00 0.65
Bz48-Bz34 65.92 10.00 0.56
Bz23-Bz24 23.10 10.00 0.58
Bz25-Bz26 45.58 10.00 0.58
Bz27-Bz28 61.57 10.00 0.59
Bz26-Bz27 45.58 10.00 0.58
Bz3-Bz24 42.40 10.00 0.52
Bz24-Bz27 42.50 10.00 0.52
RELLENO A NIVEL DE SUB RASANTE CON MATERIAL PROPIO m3 1,120.00 13.80 S/. 15,456.00
LOTIZACION Y COLOCACION DE HITOS und. 800.00 41.84 S/. 33,472.00
NIVELACION DE MANZANAS m2 77,514.78 1.08 S/. 83,715.96
ACARREO DE MATERIAL EXCEDENTE DE CORTE A MANZANAS MAS CERCANAS m3 13,228.00 5.74 S/. 75,928.72

CALLES
PERFILADO Y COMPACTADO EN SUB RASANTE m2 24,062.66 4.14 S/. 99,619.41
SUB-BASE GRANULAR, E=20 cm. m2 24,062.66 10.99 S/. 264,448.63
BASE GRANULAR E=0.20 m m2 24,062.66 12.53 S/. 301,505.13
TRANSPORTE DE MATERIAL DE PRÉSTAMO calles m3 12,031.33 4.65 S/. 55,945.68
ESTACIONAMIENTOS
PERFILADO Y COMPACTADO EN SUB RASANTE m2 9,784.56 4.34 S/. 42,464.99
PRESUPUESTO DETALLADO POR PARTIDAS

PROYECTO: CORRESPONDIENTE DEL 14


HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
AL 30 DE JUNIO DEL 2016
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC -
FECHA: JULIO 2017

SUB-BASE GRANULAR, E=20 cm. m2 9,784.56 11.10 S/. 108,608.62


BASE GRANULAR E=0.20 m m2 9,784.56 12.80 S/. 125,242.37
TRANSPORTE DE MATERIAL DE PRÉSTAMO m3 4,892.28 4.65 S/. 22,749.10
VALORIZACION N°02 DE OBRA
PROYECTO:
UBICACIÓN:
CLIENTE:
CONTRATISTA:
FECHA:
ANTERIOR ACTUAL ACUMULADO SALDO

SAP PEP DESCRIPCIÓN UND CANT P.U PARCIAL Cantidad Monto S/. Cantidad Monto S/. Cantidad Monto S/. Cantidad Monto S/.
OBRAS PROVISIONALES Y PRELIMINARES
10 19U1.255H.C.52.A-1-01.01 OBRAS PRELIMINARES S/. 130,902.48 S/. 23,800.45 S/. 23,800.45 S/. 47,600.90 S/. 83,301.58
LIMPIEZA PERMANENTE EN OBRA mes 5.50 3,598.27 S/. 19,790.49 1.00 S/. 3,598.27 1.00 S/. 3,598.27 2.00 7,196.54 3.50 12,593.95
TOPOGRAFIA DURANTE LA EJECUCION DE LA OBRA mes 5.50 20,202.18 S/. 111,111.99 1.00 S/. 20,202.18 1.00 S/. 20,202.18 2.00 40,404.36 3.50 70,707.63
20 19U1.255H.C.52.A-1-01.02 OBRAS PROVISIONALES S/. 168,084.00 S/. 35,316.00 0 S/. 34,362.00 S/. 69,678.00 S/. 98,406.00
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb. 1.00 9,540.00 S/. 9,540.00 0.50 S/. 4,770.00 0.40 S/. 3,816.00 0.90 8,586.00 0.10 954.00
CAMPAMENTO PROVISIONAL DE OBRA(OFICINA,ALMACEN, CASETA VIG.,SSHH) mes 5.50 5,200.00 S/. 28,600.00 1.00 S/. 5,200.00 1.00 S/. 5,200.00 2.00 10,400.00 3.50 18,200.00
GUARDIANIA EN OBRA mes 5.50 12,900.00 S/. 70,950.00 1.00 S/. 12,900.00 1.00 S/. 12,900.00 2.00 25,800.00 3.50 45,150.00
SEGURIDAD Y SEÑALIZACIÓN PERMANENTE EN OBRA mes 5.00 9,210.00 S/. 46,050.00 1.00 S/. 9,210.00 1.00 S/. 9,210.00 2.00 18,420.00 3.00 27,630.00
MANTENIMIENTO Y RIEGO DE VIAS PARA CONTROL DE POLVOS mes 4.00 3,236.00 S/. 12,944.00 1.00 S/. 3,236.00 1.00 S/. 3,236.00 2.00 6,472.00 2.00 6,472.00
0
MATRIZ Y CONEXIONES DOMICILIARIAS DE ALCANTARILLADO -
30 19U1.255H.C.52.A-1-03.01 EXC. DE ZANJAS PARA ALCANTARILLADO S/. 84,853.91 S/. 29,923.29 S/. - S/. 54,377.61 S/. 84,300.90 S/. 553.01
EXC. DE ZANJA C/MAQ. H = 1.50M. m 2,816.10 8.31 S/. 23,401.79 1,390.77 S/. 11,557.30 1,366.63 S/. 11,356.70 2,757.40 22,913.99 58.70 487.80
EXC. DE ZANJA C/MAQ. H = 2.00M. m 769.40 11.38 S/. 8,755.77 682.87 S/. 7,771.06 85.00 S/. 967.30 767.87 8,738.36 1.53 17.41
EXC. DE ZANJA C/MAQ. H = 2.50M. m 763.78 13.51 S/. 10,318.67 393.59 S/. 5,317.40 368.23 S/. 4,974.79 761.82 10,292.19 1.96 26.48
EXC. DE ZANJA C/MAQ. H = 3.00M. m 192.05 21.63 S/. 4,154.04 84.90 S/. 1,836.39 107.07 S/. 2,315.92 191.97 4,152.31 0.08 1.73
ENTIBADO Y DESENTIBADO H≥2.00M. m 955.83 39.99 S/. 38,223.64 86.05 S/. 3,441.14 869.29 S/. 34,762.91 955.34 38,204.05 0.49 19.60
40 19U1.255H.C.52.A-1-03.02 REFINE Y NIVELACION DE ZANJAS PARA ALCANTARILLADO S/. 13,925.01 S/. 7,554.20 S/. - S/. 6,196.74 S/. 13,750.94 S/. 174.06
REFINE DE ZANJAS Y NIVELACION DE TUBOS hasta 2.00 m. m 3,585.50 2.94 S/. 10,541.37 2,467.23 S/. 7,253.66 1,059.57 S/. 3,115.14 3,526.80 10,368.79 58.70 172.58
REFINE DE ZANJAS Y NIVELACION DE TUBOS hasta 3.00 m. m 955.83 3.54 S/. 3,383.64 84.90 S/. 300.55 870.51 S/. 3,081.61 955.41 3,382.15 0.42 1.49
50 19U1.255H.C.52.A-1-03.03 RELLENO Y COMPACTACION DE ZANJAS PARA ALCANTARILLADO S/. 100,717.12 S/. 6,132.11 S/. - S/. 91,453.77 S/. 97,585.87 S/. 3,131.25
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 1.50M. m 2,816.10 20.97 S/. 59,053.62 215.99 S/. 4,529.31 2,452.04 S/. 51,419.28 2,668.03 55,948.59 148.07 3,105.03
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 2.00M. m 769.40 22.68 S/. 17,449.99 70.67 S/. 1,602.80 698.48 S/. 15,841.53 769.15 17,444.32 0.25 5.67
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 2.50M. m 763.78 24.80 S/. 18,941.74 - S/. - 763.56 S/. 18,936.29 763.56 18,936.29 0.22 5.46
RELLENO Y COMPACTACION DE ZANJA CON MATERIAL PROPIO HASTA H = 3.00M. m 192.05 27.45 S/. 5,271.77 - S/. - 191.50 S/. 5,256.68 191.50 5,256.68 0.55 15.10
60 19U1.255H.C.52.A-1-03.04 SUMINISTRO E INSTALACIÓN DE TUBERÍAS S/. 150,321.74 S/. 76,976.75 S/. - S/. 69,218.62 S/. 146,195.37 S/. 4,126.37
SUMINISTRO E INSTALACION DE TUBO PVC SN4UF DN 200MM m 4,106.39 30.40 S/. 124,834.26 2,532.13 S/. 76,976.75 1,553.97 S/. 47,240.69 4,086.10 124,217.44 20.29 616.82
SUMINISTRO E INSTALACION DE TUBO PVC SN4UF DN 250MM m 434.94 58.60 S/. 25,487.48 - S/. - 375.05 S/. 21,977.93 375.05 21,977.93 59.89 3,509.55
70 19U1.255H.C.52.A-1-03.05 PRUEBA HIDRAULICA DE TUBERIA P/ALCANTARILLADO S/. 16,461.87 S/. 2,373.91 S/. - S/. 13,861.38 S/. 16,235.29 S/. 226.58
PRUEBA HIDRAULICA DE TUBO PVC SN4UF DN 200MM m 4,106.39 3.60 S/. 14,783.00 659.42 S/. 2,373.91 3,446.97 S/. 12,409.09 4,106.39 14,783.00 - -
PRUEBA HIDRAULICA DE TUBO PVC SN4UF DN 250MM m 434.94 3.86 S/. 1,678.87 - S/. - 376.24 S/. 1,452.29 376.24 1,452.29 58.70 226.58
80 19U1.255H.C.52.A-1-03.06 BUZONES S/. 157,200.21 S/. 116,906.73 S/. - S/. 40,262.67 S/. 157,169.40 S/. 30.81
EXCAVACION PARA BUZONES (92und.) m3 307.00 40.27 S/. 12,362.89 294.24 S/. 11,849.04 12.00 S/. 483.04 306.24 12,332.08 0.76 30.81
BUZON Di=1.20m x 1.20MPP. und. 30.00 1,547.45 S/. 46,423.50 22.00 S/. 34,043.90 8.00 S/. 12,379.60 30.00 46,423.50 - -
BUZON Di=1.20m x 1.50MPP. und. 26.00 1,770.29 S/. 46,027.54 19.00 S/. 33,635.51 7.00 S/. 12,392.03 26.00 46,027.54 - -
BUZON Di=1.20m x 2.00MPP. und. 19.00 1,840.57 S/. 34,970.83 14.00 S/. 25,767.98 5.00 S/. 9,202.85 19.00 34,970.83 - -
BUZON Di=1.20m x 2.50MPP. und. 9.00 1,935.05 S/. 17,415.45 6.00 S/. 11,610.30 3.00 S/. 5,805.15 9.00 17,415.45 - -
- S/. - 5.00 S/. - 5.00 - (5.00) -
- S/. - 1.00 S/. - 1.00 - (1.00) -
90 19U1.255H.C.52.A-1-03.07 S/. - S/. - S/. - S/. - S/. -
- S/. - 3,839.00 S/. - 3,839.00 - (3,839.00) -
- S/. - 3,839.00 S/. - 3,839.00 - (3,839.00) -
- S/. - 524.00 S/. - 524.00 - (524.00) -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
100 19U1.255H.C.52.A-1-03.08 S/. - S/. - S/. - S/. - S/. -
VALORIZACION N°02 DE OBRA
PROYECTO:
UBICACIÓN:
CLIENTE:
CONTRATISTA:
FECHA:
ANTERIOR ACTUAL ACUMULADO SALDO

- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
0
-
110 19U1.255H.C.52.A-1-04.01 S/. - S/. - S/. - S/. - S/. -
171.00 S/. - 3,718.64 S/. - 3,889.64 - (3,889.64) -
120 19U1.255H.C.52.A-1-04.02 S/. - S/. - S/. - S/. - S/. -
171.00 S/. - 3,718.64 S/. - 3,889.64 - (3,889.64) -
130 19U1.255H.C.52.A-1-04.03 S/. - S/. - S/. - S/. - S/. -
- S/. - - S/. - - - - -
140 19U1.255H.C.52.A-1-04.04 S/. - S/. - S/. - S/. - S/. -
- S/. - 172.67 S/. - 172.67 - (172.67) -
171.00 S/. - 2,312.10 S/. - 2,483.10 - (2,483.10) -
- S/. - 831.70 S/. - 831.70 - (831.70) -
- S/. - 595.78 S/. - 595.78 - (595.78) -
- S/. - 84.00 S/. - 84.00 - (84.00) -
- S/. - 56.00 S/. - 56.00 - (56.00) -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
150 19U1.255H.C.52.A-1-04.05 S/. - S/. - S/. - S/. - S/. -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
160 19U1.255H.C.52.A-1-04.06 S/. - S/. - S/. - S/. - S/. -
- S/. - 2.00 S/. - 2.00 - (2.00) -
- S/. - 1.00 S/. - 1.00 - (1.00) -
- S/. - 2.00 S/. - 2.00 - (2.00) -
- S/. - 1.00 S/. - 1.00 - (1.00) -
- S/. - 4.00 S/. - 4.00 - (4.00) -
- S/. - 4.00 S/. - 4.00 - (4.00) -
- S/. - 5.00 S/. - 5.00 - (5.00) -
- S/. - 5.00 S/. - 5.00 - (5.00) -
- S/. - 2.00 S/. - 2.00 - (2.00) -
- S/. - 6.00 S/. - 6.00 - (6.00) -
- S/. - 6.00 S/. - 6.00 - (6.00) -
- S/. - 5.00 S/. - 5.00 - (5.00) -
- S/. - 1.00 S/. - 1.00 - (1.00) -
- S/. - 1.00 S/. - 1.00 - (1.00) -
- S/. - 19.00 S/. - 19.00 - (19.00) -
- S/. - 8.00 S/. - 8.00 - (8.00) -
- S/. - 3.00 S/. - 3.00 - (3.00) -
- S/. - 2.00 S/. - 2.00 - (2.00) -
- S/. - 6.00 S/. - 6.00 - (6.00) -
- S/. - 1.00 S/. - 1.00 - (1.00) -
- S/. - 10.00 S/. - 10.00 - (10.00) -
- S/. - 24.00 S/. - 24.00 - (24.00) -
- S/. - 7.00 S/. - 7.00 - (7.00) -
- S/. - 1.00 S/. - 1.00 - (1.00) -
- S/. - 4.00 S/. - 4.00 - (4.00) -
- S/. - 6.00 S/. - 6.00 - (6.00) -
VALORIZACION N°02 DE OBRA
PROYECTO:
UBICACIÓN:
CLIENTE:
CONTRATISTA:
FECHA:
ANTERIOR ACTUAL ACUMULADO SALDO

- S/. - 1.00 S/. - 1.00 - (1.00) -


- S/. - 3.00 S/. - 3.00 - (3.00) -
- S/. - 4.00 S/. - 4.00 - (4.00) -
- S/. - 1.00 S/. - 1.00 - (1.00) -
- S/. - 1.00 S/. - 1.00 - (1.00) -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
170 19U1.255H.C.52.A-1-04.07 S/. - 0 S/. - S/. - S/. -
- S/. - 630.00 S/. - 630.00 - (630.00) -
- S/. - 630.00 S/. - 630.00 - (630.00) -
- S/. - 90.00 S/. - 90.00 - (90.00) -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
180 19U1.255H.C.52.A-1-04.08 S/. - S/. - S/. - S/. - S/. -
- S/. - - S/. - - - - -
S/. -
190 19U1.255H.C.52.A-1-05.01 S/. - S/. - S/. - S/. - S/. -
-
13,761.48 S/. - (0.00) S/. - 13,761.48 - (13,761.48) -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
6,584.00 S/. - 5,000.00 S/. - 11,584.00 - (11,584.00) -
0 - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
200 19U1.255H.C.52.A-1-05.03 S/. - S/. - S/. - S/. - S/. -
-
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
210 19U1.255H.C.52.A-1-05.04 S/. - 0 S/. - S/. - S/. -
-
VALORIZACION N°02 DE OBRA
PROYECTO:
UBICACIÓN:
CLIENTE:
CONTRATISTA:
FECHA:
ANTERIOR ACTUAL ACUMULADO SALDO

- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
220 19U1.255H.C.52.A-1-05.05 S/. - 0 S/. - S/. - S/. -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
230 19U1.255H.C.52.A-1-06 S/. - 0 S/. - S/. - S/. -
- S/. - - S/. - - - - -
0
240 19U1.255H.C.52.A-1-07 S/. - 0 S/. - S/. - S/. -
-
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
-
VALORIZACION N°02 DE OBRA
PROYECTO:
UBICACIÓN:
CLIENTE:
CONTRATISTA:
FECHA:
ANTERIOR ACTUAL ACUMULADO SALDO

- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
- S/. - 1,000.00 S/. - 1,000.00 - (1,000.00) -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
0
-
250 19U1.255H.C.52.A-4-03 S/. - 0 S/. - S/. - S/. -
0
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
-
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
- S/. - - S/. - - - - -
MURO DE LADRILLO KING KONG ARTESANAL DE SOGA m2 824.00 S/. - - S/. - - S/. - - - 824.00 -
COBERTURA DE LADRILLO PASTELERO m 512.00 S/. - - S/. - - S/. - - - 512.00 -
SOLAQUEADO DE COLUMNAS Y VIGUETAS m2 1,022.00 S/. - - S/. - - S/. - - - 1,022.00 -
CERCO METALICO TIPO MALLA und 49.00 S/. - - S/. - - S/. - - - 49.00 -
AREAS VERDES -
SUMNISTRO E INSTALACION DE PLANTAS TREPADORAS und 98.00 S/. - - S/. - - S/. - - - 98.00 -
SUMNISTRO E INSTALACION DE PLANTONES (PONCIANOS) und 98.00 S/. - - S/. - - S/. - - - 98.00 -
VALORIZACION N°02 DE OBRA
PROYECTO:
UBICACIÓN:
CLIENTE:
CONTRATISTA:
FECHA:
ANTERIOR ACTUAL ACUMULADO SALDO

-
260 19U1.255H.C.52.A-4-05 SEÑALIZACIÓN S/. 36,884.09 S/. - 0 S/. - S/. - S/. 36,884.09
SEÑALIZACION HORIZONTAL -
MARCAS EN EL PAVIMENTO (SIMBOLOS Y CRUCES) m2 520.00 35.00 S/. 18,200.00 - S/. - - S/. - - - 520.00 18,200.00
MARCAS EN EL PAVIMENTO (LINEA DISCONTINUA) m 4,490.52 3.00 S/. 13,471.56 - S/. - - S/. - - - 4,490.52 13,471.56
MARCAS EN EL PAVIMENTO (LINEA CONTINUA) m 299.25 3.15 S/. 942.64 - S/. - - S/. - - - 299.25 942.64
PINTURA AMARILLA EN SARDINEL PERALTADO (BERMAS) Y MARTILLOS m 1,334.34 3.20 S/. 4,269.89 - S/. - - S/. - - - 1,334.34 4,269.89
PINTURA BLANCA EN SARDINEL SUMERGIDO Y CICLOVIA m 6,391.97 S/. - - S/. - - S/. - - - 6,391.97 -
SEÑALIZACION VERTICAL -
SEÑAL R-1 "PARE" 0.60 x 0.60 m. CON POSTE und 103.00 S/. - - S/. - - S/. - - - 103.00 -
SEÑAL R-2 INFORMATIVA 0.75 x 0.25 m. CON POSTE und 103.00 S/. - - S/. - - S/. - - - 103.00 -
-
270 19U1.255H.C.52.A-4-07 OTROS S/. 3,000.00 S/. - 0 S/. - S/. - S/. 3,000.00
PLANOS DE REPLANTEO Y MEMORIA DESCRIPTIVA und 150.00 20.00 S/. 3,000.00 - S/. - - S/. - - - 150.00 3,000.00
-
280 19U1.255H.C.52.A-4-02 LINEA DE IMPULSIÓN DN 200-250 MM - TRAMO 460 ML. - POZO N° 02 A RESERVORIO S/. 1,328.48 S/. - 0 S/. - S/. - S/. 1,328.48
TUB L. IMPULSION PVC NTP-ISO 1452 DN 200MM (8") C-10 POZO TUBULAR PPN° 01 - PIE DE -
RESERVORIO APOYADO
EXCAV.C/EQ.P.AGUA RPA-410M3
T.NORMAL A= 0.60M H=1.50M ml 302.90 S/. - - S/. - - S/. - - - 302.90 -
REFINE Y NIVELACION FONDO DE ZANJA TN A= 0.60M ml 302.90 S/. - - S/. - - S/. - - - 302.90 -
RELLENO ZANJA MAT.PROPIO.COMPACT.C/EQUIPO A=0.60M H=1.50M ml 302.90 S/. - - S/. - - S/. - - - 302.90 -
ACARREO DE MATERIAL EXCEDENTE-C/EQUIPO m3 45.00 S/. - - S/. - - S/. - - - 45.00 -
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 21.00 S/. - - S/. - - S/. - - - 21.00 -
SUMINISTRO E INSTALACION DE TUBERIA DE PVC ISO DN 200 mm. C-10 U.F. ml 302.90 S/. - - S/. - - S/. - - - 302.90 -
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS PVC ISO U.F. DN 200mm. ml 302.90 S/. - - S/. - - S/. - - - 302.90 -
PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) u 5.00 S/. - - S/. - - S/. - - - 5.00 -
TUB L. IMPULSION PVC NTP-ISO 1452 DN 250MM (10") C-10 PUNTO DE REUNION PPN° 02 C/PPN° 03 - -
PIE DE RESERVORIO ELEVADO
EXCAV.C/EQ.P.AGUA.T.NORMAL RPE-755M3
A=0.80M H=1.50M ml 135.46 S/. - - S/. - - S/. - - - 135.46 -
REFINE Y NIVELACION FONDO DE ZANJA TN A= 0.80M ml 135.46 S/. - - S/. - - S/. - - - 135.46 -
RELLENO ZANJA MAT.PROPIO.COMPACT.C/EQUIPO A=0.80M H=1.50M ml 135.46 S/. - - S/. - - S/. - - - 135.46 -
ACARREO DE MATERIAL EXCEDENTE-C/EQUIPO m3 22.00 S/. - - S/. - - S/. - - - 22.00 -
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 18.00 S/. - - S/. - - S/. - - - 18.00 -
SUMINISTRO E INSTALACION DE TUBERIA DE PVC ISO DN 250 mm. C-10 U.F. ml 135.46 S/. - - S/. - - S/. - - - 135.46 -
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS PVC ISO U.F. DN 250mm. ml 135.46 S/. - - S/. - - S/. - - - 135.46 -
PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) u 3.00 S/. - - S/. - - S/. - - - 3.00 -
SUMINISTRO E INSTALACION DE ACCESORIOS L/ IMPULSION -
CODO LUFLEX ISO 2531 HD 200 X 22.5º u 1.00 S/. - - S/. - - S/. - - - 1.00 -
CODO LUFLEX ISO 2531 HD 200 X 45º u 4.00 S/. - - S/. - - S/. - - - 4.00 -
CODO LUFLEX ISO 2531 HD 200 X 90º u 1.00 S/. - - S/. - - S/. - - - 1.00 -
CODO LUFLEX ISO 2531 HD 250 X 45º u 2.00 S/. - - S/. - - S/. - - - 2.00 -
CODO LUFLEX ISO 2531 HD 250 X 90º u 1.00 S/. - - S/. - - S/. - - - 1.00 -
TEE LUFLEX ISO 2531 HD 250 X 200 u 1.00 528.86 S/. 528.86 - S/. - - S/. - - - 1.00 528.86
REDUCCION HD ISO 250 X 200 U.F. PN-10 u 1.00 436.36 S/. 436.36 - S/. - - S/. - - - 1.00 436.36
TAPON PVC ISO Ø 200mm U.F. C-10 u 1.00 153.26 S/. 153.26 - S/. - - S/. - - - 1.00 153.26
ANCLAJE DE CONCRETO F'C=140KG/CM2 P/ ACCESORIO + ENCOFRADO DN 90-250MM u 6.00 35.00 S/. 210.00 - S/. - - S/. - - - 6.00 210.00
-
290 19U1.255H.C.52.A-4-02 LÍNEA DE ADUCCIÓN DN 200 MM S/. 966.52 S/. - 0 S/. - S/. - S/. 966.52
TUB L. ADUCCION PVC ISO 1452 DN 200 MM C-7.5 -
EXCAVACION DE ZANJA C/EQUIP.T.NORMAL HASTA 1.50MPP m 323.58 S/. - - S/. - - S/. - - - 323.58 -
REFINE, NIVELACION Y CONFORMACION DE FONDO DE ZANJA T. NORMAL 0.6m m 323.58 S/. - - S/. - - S/. - - - 323.58 -
RELLENO ZANJA MAT.PROPIO.COMPACT.C/EQUIPO A=0.60M H=1.50M m 323.58 S/. - - S/. - - S/. - - - 323.58 -
ACARREO DE MATERIAL EXCEDENTE-C/EQUIPO m3 38.00 S/. - - S/. - - S/. - - - 38.00 -
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 19.00 S/. - - S/. - - S/. - - - 19.00 -
VALORIZACION N°02 DE OBRA
PROYECTO:
UBICACIÓN:
CLIENTE:
CONTRATISTA:
FECHA:
ANTERIOR ACTUAL ACUMULADO SALDO

SUMINISTRO E INSTALACION DE TUBERIA DE PVC ISO DN 200 mm. C-7.5 U.F. m 323.58 S/. - - S/. - - S/. - - - 323.58 -
PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS PVC ISO U.F. DN 200mm. m 323.58 S/. - - S/. - - S/. - - - 323.58 -
PRUEBA COMPACTACION SUELOS (DENSIDAD DE CAMPO) u 3.00 S/. - - S/. - - S/. - - - 3.00 -
SUMINISTRO E INSTALACION DE ACCESORIOS L/ADUCCON -
CODO LUFLEX ISO 2531 HD 200 X 45º u 3.00 S/. - - S/. - - S/. - - - 3.00 -
TEE LUFLEX ISO 2531 HD 200 X 200 u 1.00 S/. - - S/. - - S/. - - - 1.00 -
TAPON PVC ISO Ø 200mm U.F. C-10 u 2.00 153.26 S/. 306.52 - S/. - - S/. - - - 2.00 306.52
ANCLAJE DE CONCRETO F'C=140KG/CM2 P/ ACCESORIO + ENCOFRADO DN 90-250MM u 6.00 110.00 S/. 660.00 - S/. - - S/. - - - 6.00 660.00

A COSTO DIRECTO (S/.) S/. 864,645.43 298,983.44 333,533.24 632,516.68 232,128.75

A.1 GASTOS GENERALES 9.30% S/. 80,428.88 S/. 27,811.29 S/. 31,025.09 S/. 58,836.38 S/. 21,592.50

A.2 UTILIDADES 5.00% S/. 43,232.27 S/. 14,949.17 S/. 16,676.66 S/. 31,625.83 S/. 11,606.44

B SUB TOTAL (S/.) S/. 988,306.58 S/. 341,743.90 S/. 381,234.99 S/. 722,978.90 S/. 265,327.69

B.1 IGV (18%) 18.00% S/. 177,895.18 S/. 61,513.90 S/. 68,622.30 S/. 130,136.20 S/. 47,758.98

C TOTAL S/. (con IGV) S/. 1,166,201.76 S/. 403,257.81 S/. 449,857.29 S/. 853,115.10 S/. 313,086.67

C.1 TIEMPO DE EJECUCIÓN ( días calendarios) 165

RETENCIO (5%) 5.00% S/. 49,415.33 S/. 17,087.20 S/. 19,061.75 S/. 36,148.94 S/. 13,266.38

C TOTAL A PAGAR S/. (Sin retencion IGV) S/. 1,116,786.43 S/. 386,170.61 S/. 430,795.54 S/. 816,966.16 S/. 299,820.29
VALORIZACION N°02 DE OBRA - RESUMEN
CORRESPONDIENTE DEL 14 AL 30 DE JUNIO DEL 2016
PROYECTO: HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2
UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATIST: ESPARQ CIESA CONTRATISTAS GENERALES SAC
FECHA: JULIO 2017

ITEM DESCRIPCION PRESUPUESTO VALORIZ ACUM ANTERIOR VALORIZ ACTUAL VALORIZ ACUM ACTUAL SALDO POR VALORIZAR

BASE PARCIAL % PARCIAL % PARCIAL % PARCIAL %


1.00 OBRAS PROVISIONALES Y PRELIMINARES S/. 298,986.48 S/. 59,116.45 19.8% S/. 58,162.45 19.5% S/. 117,278.90 39.2% S/. 181,707.58 60.8%
2.00 MATRIZ Y CONEXIONES DOMICILIARIAS DE ALCANTARILLADO S/. 523,479.86 S/. 239,866.99 45.8% S/. 275,370.79 52.6% S/. 515,237.78 98.4% S/. 8,242.08 1.6%
3.00 MATRIZ Y CONEXIONES DOMICILIARIAS- AGUA POTABLE S/. - S/. - #DIV/0! S/. - #DIV/0! S/. - #DIV/0! S/. - #DIV/0!
4.00 PAVIMENTACION, SARDINELES Y VEREDAS S/. - S/. - #DIV/0! S/. - #DIV/0! S/. - #DIV/0! S/. - #DIV/0!
5.00 OTRAS OBRAS S/. 42,179.09 S/. - 0.0% S/. - 0.0% S/. - 0.0% S/. 42,179.09 100.0%

COSTO DIRECTO (S/.) S/. 864,645.43 S/. 298,983.44 34.6% S/. 333,533.24 38.6% S/. 632,516.68 73.2% S/. 232,128.75 26.8%

GASTOS GENERALES (9.30 %) S/. 80,428.88 S/. 27,811.29 34.6% S/. 31,025.09 38.6% S/. 58,836.38 73.2% S/. 21,592.50 26.8%

UTILIDADES (5.00 %) S/. 43,232.27 S/. 14,949.17 34.6% S/. 16,676.66 38.6% S/. 31,625.83 73.2% S/. 11,606.44 26.8%

SUB TOTAL (S/.) S/. 988,306.58 S/. 341,743.90 34.6% S/. 381,234.99 38.6% S/. 722,978.90 73.2% S/. 265,327.68 26.8%

IGV (18%) S/. 177,895.18 S/. 61,513.90 34.6% S/. 68,622.30 38.6% S/. 130,136.20 73.2% S/. 47,758.98 26.8%

TOTAL S/. (con IGV) S/. 1,166,201.77 S/. 403,257.81 34.6% S/. 449,857.29 38.6% S/. 853,115.10 73.2% S/. 313,086.67 26.8%
VALORIZACION N°02 DE OBRA - HOJA DE LIQUIDACION)

PROYECTO: HABILITACIÓN URBANA_ALTOS DEL VALLE ETAPA 2


UBICACIÓN: MOCHE - TRUJILLO
CLIENTE: CENTENARIO URBANIZACIONES S.A.C.
CONTRATISTA: ESPARQ CIESA CONTRATISTAS GENERALES SAC
FECHA: AGOSTO 2017

MONTO CONTRATO: (CON IGV) S/. 1,166,201.77


MONTO CONTRATO: (SIN IGV) S/. 988,306.58

CONCEPTO PARCIAL SUB TOTAL

MONTO DE VALORIZACION (V) S/. 449,857.29


Valorización ( sin IGV) S/. 449,857.29

REAJUSTES ( R) S/. 0.00


Intereses S/. 0.00
Reajustes por la Formula Polinómica (K) S/. 0.00
Regularización de Reajustes: S/. 0.00

VALORIZACIÓN BRUTA (VB) = (V) + (R) S/. 449,857.29

AMORTIZACIONES -S/IGV (A) S/. 89,971.46


Por Adelanto Directo S/. 89,971.46
Por Adelanto de Materiales S/. 0.00

VALORIZACIÓN NETA (VN) = (VB)- (A) S/. 359,885.83

IMPUESTO GENERAL A LAS VENTAS (IGV) 18% S/. 64,779.45

MONTO A CANCELAR AL CONTRATISTA S/. 424,665.29


Err:511
SETECIENTOS CINCUENTA MIL QUINIENTOS TREINTA Y OCHO CON 73/100 NUEVOS SOLES
SON
RETENCION POR FONDO DE GARANTÍA (G) S/. 22,492.86
Retencion por Fondo de Garantia (10%) 5%

NETO A RECIBIR S/. 402,172.43


COTA DE COTA DE COTA DE COTA DE
N° H= N° H=
CALLE O FONDO SALIDA TAPA FONDO
ETAPA MANZ
AVENID
BUZONES DE ARRANQUE BUZONES DE LLEGAD

1 1.830 ### 3 25.827 27.657 3 ### ###


2 1.200 ### 3 26.378 27.578 3 ### ###
136.69 3 2.898 ### 3 24.530 27.428 24 ### ###
4 1.200 ### 3 26.444 27.644 5 ### ###
5 1.669 ### 3 25.825 27.494 23 ### ###
23 1.786 ### 3 25.586 27.372 24 ### ###
24 2.967 ### 3 24.339 27.306 27 ### ###
27 3.040 ### 3 24.148 27.188 28 ### ###
28 2.200 ### 3 23.852 26.052 29 ### ###
29 1.922 ### 3 23.675 25.597 40 ### ###
40 1.338 ### 3 23.428 24.766 58 ### ###
58 1.177 ### 3 23.226 24.403 67 ### ###
67 1.363 ### 3 23.024 24.387 68 ### ###
68 1.200 ### 3 22.761 23.961 81 ### ###
81 1.205 ### 3 22.604 23.809 82 ### ###
82 1.200 ### 3 22.337 23.537 82B ### ###
82B 1.300 ### 3 22.206 23.506 85EX ### ###
9 1.200 ### 3 29.646 30.846 10 ### ###
10 1.242 ### 3 29.462 30.704 8 ### ###
8 1.199 ### 3 29.084 30.283 7 ### ###
7 1.552 ### 3 27.948 29.500 6 ### ###
6 1.433 ### 3 26.904 28.337 5 ### ###
10 1.242 ### 3 29.462 30.704 11 ### ###
11 1.530 ### 3 28.816 30.346 12 ### ###
12 1.594 ### 3 28.622 30.216 13 ### ###
13 1.634 ### 3 28.512 30.146 17 ### ###
17 1.584 ### 3 28.426 30.010 34 ### ###
34 2.540 ### 3 26.945 29.485 33 ### ###
33 2.130 ### 3 26.747 28.877 47 ### ###
47 1.967 ### 3 26.439 28.406 46 ### ###
46 1.200 ### 3 26.236 27.436 45 ### ###
45 1.671 ### 3 24.744 26.415 56 ### ###
56 1.203 ### 3 24.550 25.753 65 ### ###
65 1.201 ### 3 24.184 25.385 66 ### ###
66 1.347 ### 3 23.254 24.601 67 ### ###
8 1.199 ### 3 29.084 30.283 14 ### ###
14 1.541 ### 3 28.874 30.415 15 ### ###
15 1.877 ### 3 28.664 30.541 16 ### ###
16 1.293 ### 3 28.508 29.801 17 ### ###
18 1.200 ### 3 28.410 29.610 19 ### ###
19 1.404 ### 3 28.085 29.489 20 ### ###
20 2.189 ### 3 27.530 29.719 25 ### ###
25 2.295 ### 3 26.204 28.499 26 ### ###
26 2.468 ### 3 25.383 27.851 27 ### ###
21 1.200 ### 3 27.742 28.942 22 ### ###
22 1.200 ### 3 27.024 28.224 23 ### ###
88 1.200 ### 3 28.154 29.354 33 ### ###
88 1.200 ### 3 28.154 29.354 89 ### ###
89 1.662 ### 3 27.874 29.536 20 ### ###
25 2.295 ### 3 26.204 28.499 32 ### ###
32 2.314 ### 3 25.771 28.085 31 ### ###
31 1.784 ### 3 25.484 27.268 30 ### ###
30 1.199 ### 3 25.241 26.440 29 ### ###
44 1.200 ### 3 26.944 28.144 43 ### ###
42 1.200 ### 3 26.425 27.625 43 ### ###
43 1.741 ### 3 25.960 27.701 32 ### ###
30 1.199 ### 3 25.241 26.440 41 ### 24.116
41 1.421 24.116 3 24.116 25.537 57 ### ###
57 1.199 ### 3 23.677 24.876 59 ### ###
59 1.280 ### 3 23.434 24.714 66 ### ###
48 2.189 ### 3 27.472 29.661 34 ### ###
55 1.400 ### 3 26.768 28.168 46 ### ###
54 1.200 ### 3 27.008 28.208 53 ### ###
50 1.351 ### 3 28.988 30.339 51 ### ###
51 1.200 ### 3 27.036 28.236 52 ### ###
52 1.411 ### 3 26.903 28.314 53 ### ###
53 1.585 ### 3 26.777 28.362 47 ### ###
90 1.200 ### 3 27.454 28.654 61 ### ###
51 1.200 ### 3 27.036 28.236 61 ### ###
61 1.431 ### 3 26.648 28.079 60 ### ###
60 1.516 ### 3 26.234 27.750 64 ### ###
64 1.199 ### 3 25.919 27.118 71 ### ###
71 1.299 ### 3 25.548 26.847 70 ### ###
70 1.484 ### 3 24.527 26.011 69 ### 23.115
69 1.200 23.115 3 23.115 24.315 68 ### ###
72 1.200 ### 3 25.750 26.950 71 ### ###
79 1.399 ### 3 24.988 26.387 70 ### ###
80 1.400 ### 3 23.539 24.939 69 ### 23.115
63 1.200 ### 3 27.616 28.816 74 ### ###
74 1.573 ### 3 27.250 28.823 77 ### ###
74 1.573 ### 3 27.250 28.823 73 ### 26.110
73 1.200 26.110 3 26.110 27.310 78 ### ###
76 1.718 ### 3 28.182 29.900 77 ### ###
77 2.674 ### 3 27.046 29.720 78 ### ###
78 1.300 ### 3 25.872 27.172 85 ### ###
39 1.200 ### 3 30.510 31.710 38 ### ###
38 1.464 ### 3 30.016 31.480 37 ### ###
37 1.473 ### 3 29.735 31.208 36 ### ###
36 1.351 ### 3 29.527 30.878 35 ### ###
35 1.350 ### 3 29.362 30.712 49 ### ###
49 1.350 ### 3 29.175 30.525 50 ### ###
50 1.351 ### 3 28.988 30.339 62 ### ###
62 1.350 ### 3 28.702 30.052 75 ### ###
75 1.395 ### 3 28.421 29.816 76 ### ###
76 1.718 ### 3 28.182 29.900 87 ### ###
87 2.308 ### 3 27.959 30.267 86 ### ###
86 1.853 ### 3 27.678 29.531 85 ### ###
85 1.682 ### 3 25.624 27.306 84 ### ###
84 1.200 ### 3 24.920 26.120 83 ### ###
83 1.200 ### 3 24.012 25.212 82a ### ###
82a 1.200 ### 3 22.827 24.027 82 ### ###

1.200 base cuerpo


1 1.83 0.402 1.840
2 1.20 0.402 1.206
3 2.90 0.402 2.913
4 1.20 0.402 1.206
5 1.67 0.402 1.678
6 1.43 0.402 1.441
7 1.55 0.402 1.560
8 1.20 0.402 1.205
9 1.20 0.402 1.206
10 1.20 0.402 1.204
11 1.53 0.402 1.538
12 1.59 0.402 1.602
13 1.63 0.402 1.643
14 1.54 0.402 1.549
15 1.88 0.402 1.887
16 1.29 0.402 1.300
17 1.58 0.402 1.592
18 1.20 0.402 1.206
19 1.40 0.402 1.411
20 2.19 0.402 2.201
21 1.20 0.402 1.206
22 1.20 0.402 1.206
23 1.79 0.402 1.795
24 2.97 0.402 2.983
25 2.30 0.402 2.307
26 2.47 0.402 2.481
27 3.04 0.402 3.056
28 2.20 0.402 2.212
29 2.10 0.402 2.110
30 1.20 0.402 1.205
31 1.78 0.402 1.793
32 2.31 0.402 2.326
33 2.13 0.402 2.141
34 2.54 0.402 2.553
35 1.35 0.402 1.357
36 1.35 0.402 1.358
37 1.47 0.402 1.481
38 1.46 0.402 1.472
39 1.20 0.402 1.206
40 1.34 0.402 1.345
41 1.42 0.402 1.429
42 1.20 0.402 1.206
43 1.24 0.402 1.248
44 1.20 0.402 1.206
45 1.67 0.402 1.680
46 1.20 0.402 1.206
47 1.97 0.402 1.977
48 2.19 0.402 2.201
49 1.35 0.402 1.357
50 1.35 0.402 1.358
51 1.20 0.402 1.206
52 1.41 0.402 1.418
53 1.59 0.402 1.593
54 1.20 0.402 1.206
55 1.40 0.402 1.407
56 1.20 0.402 1.209
57 1.20 0.402 1.205
58 1.18 0.402 1.183
59 1.28 0.402 1.287
60 1.52 0.402 1.524
61 1.43 0.402 1.439
62 1.35 0.402 1.357
63 1.20 0.402 1.206
64 1.20 0.402 1.205
65 1.20 0.402 1.207
66 1.35 0.402 1.354
67 1.36 0.402 1.370
68 1.20 0.402 1.206
69 1.20 0.402 1.206
70 1.48 0.402 1.492
71 1.30 0.402 1.306
72 1.20 0.402 1.206
73 1.20 0.402 1.206
74 1.57 0.402 1.581
75 1.40 0.402 1.402
76 1.72 0.402 1.727
77 2.67 0.402 2.688
78 1.30 0.402 1.307
79 1.40 0.402 1.406
80 1.40 0.402 1.407
81 1.21 0.402 1.211
82 1.20 0.402 1.206
83 1.20 0.402 1.206
84 1.20 0.402 1.206
85 1.68 0.402 1.691
86 1.85 0.402 1.863
87 2.31 0.402 2.320
88 1.20 0.402 1.206
89 1.20 0.402 1.206
90 1.20 0.402 1.206
82a 1.20 0.402 1.206
82B 1.30 0.402 1.307

216.207
237.82817
261.61098
21000
COTA DE COTA DE PROFUND CANTIDAD
DIFEREN LONGITUD
LLEGADA TAPA PROFUN PROM TUBOS
CIA DE
D PROM
COTA
BUZONES DE LLEGADA m Und

3 24.530 ### 1.297 2.364 13.000 2.364 78.10 13.23


3 24.530 ### 1.848 2.049 23.000 2.049 13.52 2.00
3 24.339 ### 0.191 2.933 54.000 2.933 42.40 7.03
3 25.825 ### 0.619 1.435 45.000 1.435 15.67 2.38
3 25.586 ### 0.239 1.728 73.000 1.728 40.75 6.74
3 24.339 ### 1.247 2.377 254.000 2.377 23.10 3.67
3 24.148 ### 0.191 3.004 267.000 3.004 42.50 7.04
3 23.852 ### 0.296 2.620 298.000 2.620 61.57 10.36
3 23.675 ### 0.177 2.061 309.000 2.061 44.31 7.36
3 23.428 ### 0.247 1.630 330.000 1.630 67.30 11.36
3 23.226 ### 0.202 1.258 458.000 1.258 67.30 11.36
3 23.024 ### 0.202 1.270 647.000 1.270 67.30 11.36
3 22.761 ### 0.263 1.282 738.000 1.282 47.83 7.97
3 22.604 ### 0.157 1.203 761.000 1.203 44.84 7.45
3 22.337 ### 0.267 1.203 892.000 1.203 36.36 5.98
3 22.206 ### 0.131 1.250 #VALUE! 1.250 23.58 3.75
3 22.083 ### 0.123 1.457 #VALUE! 1.457 36.12 5.93
3 29.462 ### 0.184 1.221 100.000 1.221 14.38 2.15
3 29.084 ### 0.378 1.221 108.000 1.221 38.73 6.39
3 27.948 ### 1.136 1.376 87.000 1.376 54.90 9.20
3 26.904 ### 1.044 1.493 76.000 1.493 54.90 9.20
3 25.825 ### 1.079 1.551 65.000 1.551 55.00 9.22
3 28.816 ### 0.646 1.386 111.000 1.386 53.08 8.88
3 28.622 ### 0.194 1.562 122.000 1.562 43.21 7.17
3 28.512 ### 0.110 1.614 133.000 1.614 24.40 3.90
3 28.426 ### 0.086 1.609 147.000 1.609 19.00 2.96
3 26.945 ### 1.481 2.062 204.000 2.062 37.60 6.19
3 26.747 ### 0.198 2.335 373.000 2.335 44.04 7.31
3 26.439 ### 0.308 2.049 377.000 2.049 68.45 11.56
3 26.236 ### 0.203 1.584 516.000 1.584 44.04 7.31
3 24.744 ### 1.492 1.436 505.000 1.436 71.63 12.11
3 24.550 ### 0.194 1.437 506.000 1.437 42.38 7.02
3 24.184 ### 0.366 1.202 625.000 1.202 79.06 13.40
3 23.254 ### 0.930 1.274 716.000 1.274 44.70 7.43
3 23.024 ### 0.230 1.355 727.000 1.355 44.27 7.35
3 28.874 ### 0.210 1.370 94.000 1.370 46.73 7.78
3 28.664 ### 0.210 1.709 155.000 1.709 46.63 7.76
3 28.508 ### 0.156 1.585 166.000 1.585 34.75 5.70
3 28.426 ### 0.082 1.439 177.000 1.439 18.21 2.82
3 28.085 ### 0.325 1.302 199.000 1.302 40.62 6.72
3 27.530 ### 0.555 1.797 210.000 1.797 40.62 6.72
3 26.204 ### 1.326 2.242 225.000 2.242 29.38 4.76
3 25.383 ### 0.821 2.382 276.000 2.382 45.58 7.58
3 24.148 ### 1.235 2.754 287.000 2.754 45.58 7.58
3 27.024 ### 0.718 1.200 232.000 1.200 39.70 6.56
3 25.586 ### 1.438 1.493 243.000 1.493 39.61 6.54
3 26.747 ### 1.407 1.665 913.000 1.665 44.44 7.38
3 27.874 ### 0.280 1.431 969.000 1.431 12.38 1.81
3 27.530 ### 0.344 1.926 910.000 1.926 15.38 2.33
3 25.771 ### 0.433 2.305 282.000 2.305 44.36 7.37
3 25.484 ### 0.287 2.049 351.000 2.049 63.70 10.73
3 25.241 ### 0.243 1.492 340.000 1.492 43.32 7.19
3 23.675 ### 1.566 1.561 329.000 1.561 45.13 7.50
3 25.960 ### 0.984 1.471 483.000 1.471 15.92 2.42
3 25.960 ### 0.465 1.471 463.000 1.471 58.17 9.77
3 25.771 ### 0.189 2.028 462.000 2.028 41.96 6.95
3 24.116 ### 1.125 1.310 341.000 1.310 62.42 10.51
3 23.677 ### 0.439 1.310 467.000 1.310 54.92 9.20
3 23.434 ### 0.243 1.240 629.000 1.240 44.58 7.41
3 23.254 ### 0.180 1.314 656.000 1.314 40.00 6.61
3 26.945 ### 0.527 2.365 514.000 2.365 65.92 11.12
3 26.236 ### 0.532 1.300 596.000 1.300 49.31 8.23
3 26.777 ### 0.231 1.393 593.000 1.393 28.89 4.68
3 27.036 ### 1.952 1.276 551.000 1.276 49.19 8.21
3 26.903 ### 0.133 1.306 562.000 1.306 26.58 4.27
3 26.777 ### 0.126 1.498 573.000 1.498 16.32 2.49
3 26.439 ### 0.338 1.776 577.000 1.776 17.81 2.75
3 26.648 ### 0.806 1.316 961.000 1.316 16.36 2.50
3 26.648 ### 0.388 1.316 571.000 1.316 46.58 7.75
3 26.234 ### 0.414 1.474 670.000 1.474 82.75 14.04
3 25.919 27.118 0.315 1.358 664.000 1.358 57.02 9.57
3 25.548 ### 0.371 1.249 711.000 1.249 39.01 6.44
3 24.527 26.011 1.021 1.392 780.000 1.392 36.95 6.08
3 23.115 ### 1.412 1.342 769.000 1.342 41.80 6.92
3 22.761 ### 0.354 1.200 758.000 1.200 44.27 7.35
3 25.548 ### 0.202 1.250 791.000 1.250 23.59 3.75
3 24.527 26.011 0.461 1.442 860.000 1.442 57.58 9.67
3 23.115 ### 0.424 1.300 869.000 1.300 51.95 8.69
3 27.250 ### 0.366 1.387 704.000 1.387 45.79 7.62
3 27.046 ### 0.204 2.124 817.000 2.124 45.28 7.53
3 26.110 ### 1.140 1.387 813.000 1.387 74.08 12.54
3 25.872 ### 0.238 1.250 808.000 1.250 45.50 7.57
3 27.046 ### 1.136 2.196 837.000 2.196 48.94 8.16
3 25.872 ### 1.174 1.987 848.000 1.987 74.16 12.55
3 25.624 ### 0.248 1.491 865.000 1.491 49.00 8.17
3 30.016 ### 0.494 1.332 428.000 1.332 61.78 10.40
3 29.735 ### 0.281 1.469 417.000 1.469 62.38 10.50
3 29.527 ### 0.208 1.412 406.000 1.412 46.78 7.79
3 29.362 ### 0.165 1.351 395.000 1.351 37.00 6.09
3 29.175 ### 0.187 1.350 399.000 1.350 41.53 6.87
3 28.988 ### 0.187 1.351 540.000 1.351 41.48 6.87
3 28.702 ### 0.286 1.351 562.000 1.351 63.86 10.76
3 28.421 ### 0.281 1.373 695.000 1.373 62.38 10.50
3 28.182 ### 0.239 1.557 826.000 1.557 54.18 9.07
3 27.959 ### 0.223 2.013 847.000 2.013 49.03 8.18
3 27.678 ### 0.281 2.081 956.000 2.081 62.46 10.51
3 25.624 ### 2.054 1.768 945.000 1.768 60.64 10.20
3 24.920 ### 0.704 1.441 934.000 1.441 53.20 8.90
3 24.012 ### 0.908 1.200 923.000 1.200 53.20 8.90
3 22.827 ### 1.185 1.200 #VALUE! 1.200 40.28 6.66
3 22.337 ### 0.490 1.200 #VALUE! 1.200 16.13 2.46

###
13
23
45
54
65
73
76
87
94
100
108
111
122
133
147
155
166
177
199
204
210
225
232
243
254
267
276
282
287
298
309
329
330
340
341
351
373
377
395
399
406
417
428
458
462
463
467
483
505
506
514
516
540
551
562
562
571
573
577
593
596
625
629
647
656
664
670
695
704
711
716
727
738
758
761
769
780
791
808
813
817
826
837
847
848
860
865
869
892
910
913
923
934
945
956
961
969
#VALUE!
#VALUE!
#VALUE!
#VALUE!
tuberia de
PENDIENT TUEBRIA tuberia de 6
1m

0/00 TUBERIA

16.61 DN 200 2 13.50


136.69 DN 200 2 2.50
4.50 DN 200 2 7.50
39.50 DN 200 2 2.50
5.87 DN 200 2 7.00
53.98 DN 200 2 4.00
4.49 DN 200 2 7.50
4.81 DN 200 2 10.50
3.99 DN 250 2 7.50
3.67 DN 250 2 11.50
3.00 DN 250 2 11.50
3.00 DN 250 2 11.50
5.50 DN 250 2 8.00
3.50 DN 250 2 7.50
7.34 DN 250 2 6.00
5.56 DN 250 2 4.00
3.41 DN 250 2 6.00
12.80 DN 200 2 2.50
9.76 DN 200 2 6.50
20.69 DN 200 2 9.50
19.02 DN 200 2 9.50
19.62 DN 200 2 9.50
12.17 DN 200 2 9.00
4.49 DN 200 2 7.50
4.51 DN 200 2 4.00
4.53 DN 200 2 3.00
39.39 DN 200 2 6.50
4.50 DN 200 2 7.50
4.50 DN 200 2 12.00
4.61 DN 200 2 7.50
20.83 DN 200 2 12.50
4.58 DN 200 2 7.50
4.63 DN 200 2 13.50
20.81 DN 200 2 7.50
5.20 DN 200 2 7.50
4.49 DN 200 2 8.00
4.50 DN 200 2 8.00
4.49 DN 200 2 6.00
4.50 DN 200 2 3.00
8.00 DN 200 2 7.00
13.66 DN 200 2 7.00
45.13 DN 200 2 5.00
18.01 DN 200 2 8.00
27.10 DN 200 2 8.00
18.09 DN 200 2 7.00
36.30 DN 200 2 7.00
31.66 DN 200 2 7.50
22.62 DN 200 2 2.00
22.37 DN 200 2 2.50
9.76 DN 200 2 7.50
4.51 DN 200 2 11.00
5.61 DN 200 2 7.50
34.70 DN 200 2 7.50
61.81 DN 200 2 2.50
7.99 DN 200 2 10.00
4.50 DN 200 2 7.00
18.02 DN 200 2 10.50
7.99 DN 200 2 9.50
5.45 DN 200 2 7.50
4.50 DN 200 2 7.00
7.99 DN 200 2 11.50
10.79 DN 200 2 8.50
8.00 DN 200 2 5.00
39.68 DN 200 2 8.50
5.00 DN 200 2 4.50
7.72 DN 200 2 2.50
18.98 DN 200 2 3.00
49.27 DN 200 2 2.50
8.33 DN 200 2 8.00
5.00 DN 200 2 14.50
5.52 DN 200 2 10.00
9.51 DN 200 2 6.50
27.63 DN 200 2 6.50
33.78 DN 200 2 7.00
8.00 DN 200 2 7.50
8.56 DN 200 2 4.00
8.01 DN 200 2 10.00
8.16 DN 200 2 9.00
7.99 DN 200 2 8.00
4.51 DN 200 2 8.00
15.39 DN 200 2 13.00
5.23 DN 200 2 8.00
23.21 DN 200 2 8.50
15.83 DN 200 2 13.00
5.06 DN 200 2 8.50
8.00 DN 200 2 10.50
4.50 DN 200 2 10.50
4.45 DN 200 2 8.00
4.46 DN 200 2 6.50
4.50 DN 200 2 7.00
4.51 DN 200 2 7.00
4.48 DN 200 2 11.00
4.50 DN 200 2 10.50
4.41 DN 200 2 9.50
4.55 DN 200 2 8.50
4.50 DN 200 2 11.00
33.87 DN 200 2 10.50
13.23 DN 200 2 9.00
17.07 DN 200 2 9.00
29.42 DN 200 2 7.00
30.38 DN 200 2 2.50

unidad
TUBERIA SN4 DIAMETRO 200mm PVC S20 UF DN200 (8") 706.00
NIPLES DE 1M SN4 DIAMETRO 200mm PVC S20 UF DN200 (8") 184.00
- PVC S20 UF DN200 (8") 74.00
NIPLES DE 1M SN4 DIAMETRO 200mm PVC S20 UF DN200 (10") 18.00
0 1.001 1.251 1.501 1.751 2.001
1 1.25 1.5 1.75 2 2.5
1.1255 1.3755 1.6255 1.8755 2.2505
1 2 3 4 5 6

ALTURA Desde 1 Hasta Desde 1.25 Desde 1.5 Hasta Desde 1.75 Desde 2 Hasta
PARA SN 1.25 m Hasta 1.5 m 1.75 m Hasta 2 m 2.5 m

LONGITUD DE TRAMO DE ACUERDO A PROFUNDIDAD DE LA ZANJA

SN2 78.10
SN2 13.52
SN2
SN2 15.67
SN2 40.75
SN2 23.10
SN2
SN2
SN2 44.31
SN2 67.30
SN2 67.30
SN2 67.30
SN2 47.83
SN2 44.84
SN2 36.36
SN2 23.58
SN2 36.12
SN2 14.38
SN2 38.73
SN2 54.90
SN2 54.90
SN2 55.00
SN2 53.08
SN2 43.21
SN2 24.40
SN2 19.00
SN2 37.60
SN2 44.04
SN2 68.45
SN2 44.04
SN2 71.63
SN2 42.38
SN2 79.06
SN2 44.70
SN2 44.27
SN2 46.73
SN2 46.63
SN2 34.75
SN2 18.21
SN2 40.62
SN2 40.62
SN2 29.38
SN2 45.58
SN2
SN2 39.70
SN2 39.61
SN2 44.44
SN2 12.38
SN2 15.38
SN2 44.36
SN2 63.70
SN2 43.32
SN2 45.13
SN2 15.92
SN2 58.17
SN2 41.96
SN2 62.42
SN2 54.92
SN2 44.58
SN2 40.00
SN2 65.92
SN2 49.31
SN2 28.89
SN2 49.19
SN2 26.58
SN2 16.32
SN2 17.81
SN2 16.36
SN2 46.58
SN2 82.75
SN2 57.02
SN2 39.01
SN2 36.95
SN2 41.80
SN2 44.27
SN2 23.59
SN2 57.58
SN2 51.95
SN2 45.79
SN2 45.28
SN2 74.08
SN2 45.50
SN2 48.94
SN2 74.16
SN2 49.00
SN2 61.78
SN2 62.38
SN2 46.78
SN2 37.00
SN2 41.53
SN2 41.48
SN2 63.86
SN2 62.38
SN2 54.18
SN2 49.03
SN2 62.46
SN2 60.64
SN2 53.20
SN2 53.20
SN2 40.28
SN2 16.13

583.210 2,232.920 518.830 208.610 805.730


2.501 3.001 3.501 4.001 altura
3 3.5 4 5
2.7505 3.2505 3.7505 4.5005 #DIV/0!
7 8 9 10

Desde 2.5 Hasta 3 Desde 3 Hasta Desde 3.5 Hasta 4


Desde 4 Hasta 5 m CANT
m 3.5 m m

CUERDO A PROFUNDIDAD DE LA ZANJA

5 23.0
6 3.0
42.40 7 9.0
8 4.0
9 12.0
10 0.0
42.50 11 5.0
61.57 12 7.0
13 3.0
14 10.0
15 7.0
16 10.0
17 6.0
18 6.0
19 3.0
20 0.0
21 0.0
22 0.0
23 10.0
24 17.0
25 15.0
26 15.0
27 5.0
28 7.0
29 3.0
30 3.0
31 6.0
32 5.0
33 19.0
34 3.0
35 16.0
36 0.0
37 22.0
38 8.0
39 3.0
40 8.0
41 13.0
42 1.0
43 1.0
44 12.0
45 3.0
46 7.0
47 14.0
45.58 48 8.0
49 12.0
50 9.0
51 11.0
52 0.0
53 1.0
54 4.0
55 17.0
56 4.0
57 4.0
58 3.0
59 14.0
60 6.0
61 18.0
62 6.0
63 13.0
64 12.0
65 19.0
66 14.0
67 6.0
68 6.0
69 5.0
70 2.0
71 3.0
72 3.0
73 11.0
74 27.0
75 0.0
76 10.0
77 10.0
78 7.0
79 3.0
80 1.0
81 13.0
82 16.0
83 12.0
84 2.0
85 20.0
86 1.0
87 11.0
88 22.0
89 7.0
90 9.0
91 10.0
92 6.0
93 6.0
94 7.0
95 3.0
96 8.0
97 6.0
98 5.0
99 1.0
100 6.0
101 9.0
102 2.0
103 9.0
104 7.0
105 0.0

149.550 42.500 0.000 0.000 791.000


0.1 0.1 0.2 1 1 1

2 3 4 5 6 7

long Prom Desde 1 Hasta Desde 1.25 Desde 1.5 Hasta Desde 1.75 Desde 2 Hasta Desde 2.5 Hasta
planta 1.25 m Hasta 1.5 m 1.75 m Hasta 2 m 2.5 m 3m

CONEXIÓN DOMICILIARIAS

5.70 154.10
5.70 20.10
5.70 60.30
5.70 23.20
5.70 70.80
0.00 0.00
5.70
5.70 46.90
7.30 24.90
6.75 69.50
6.75 47.95
8.10 82.00
8.10 49.20
8.10 49.20
8.10 24.60
0.00 0.00
0.00 0.00
0.00 0.00
5.75 58.50
5.70 98.60
5.70 87.00
5.70 88.50
5.40 27.50
5.89 42.63
6.20 19.20
4.01 12.63
5.60 39.60
5.60 33.00
5.70 127.30
5.60 17.40
5.60 91.20
0.00 0.00
5.70 127.60
5.20 42.40
5.70 17.40
5.70 46.40
5.70 76.70
5.70 5.90
5.70 5.80
5.70 69.60
5.70 20.10
7.20 57.40
7.20 114.80
7.20 65.60
5.80 70.80
5.70 52.20
7.20 81.40
0.00 0.00
7.50 8.50
5.70 26.80
6.70 130.90
3.70 15.20
3.70 15.60
5.70 17.40
5.70 81.20
5.70 40.20
5.70 104.40
7.70 46.80
8.20 107.90
5.70 69.60
6.20 136.80
6.20 88.20
6.20 37.80
6.70 40.80
7.20 36.50
8.70 17.60
7.20 24.60
5.60 17.10
5.60 62.70
5.70 156.60
0.00 0.00
8.20 83.00
5.60 57.00
5.60 39.90
5.60 17.10
5.70 5.80
5.90 78.00
6.20 100.80
6.90 84.00
6.60 15.20
6.20 126.00
9.10 9.20
9.10 111.10
9.10 222.20
9.10 64.40
10.05 91.35
9.90 100.00
9.52 57.72
10.05 60.90
9.70 68.60
9.70 29.40
10.70 86.40
10.60 64.20
12.05 61.25
15.85 16.85
9.30 61.80
9.30 92.70
9.30 18.80
9.30 84.60
9.30 65.80
0.00 0.00
0.00
647.170 704.100 2,659.820 561.510 368.100 1,110.850 172.800

6.00 5.700
6.00 5.700
6.00 5.700
6.00 5.700
6.00 5.700
0.00 0.000
6.00 5.700
6.00 5.700
7.60 7.300
7.05 6.750
7.05 6.750
8.40 8.100
8.40 8.100
8.40 8.100
8.40 8.100
0.000
0.000
0.000
6.05 5.750
6.00 5.700
6.00 5.700
6.00 5.700
5.70 5.400
6.19 5.890
6.50 6.200
4.31 4.010
5.90 5.600
5.90 5.600
6.00 5.700
5.90 5.600
5.90 5.600
0.000
6.00 5.700
5.50 5.200
6.00 5.700
6.00 5.700
6.00 5.700
6.00 5.700
6.00 5.700
6.00 5.700
6.00 5.700
7.50 7.200
7.50 7.200
7.50 7.200
6.10 5.800
6.00 5.700
7.50 7.200
0.000
7.80 7.500
6.00 5.700
7.00 6.700
4.00 3.700
4.00 3.700
6.00 5.700
6.00 5.700
6.00 5.700
6.00 5.700
8.00 7.700
8.50 8.200
6.00 5.700
6.50 6.200
6.50 6.200
6.50 6.200
7.00 6.700
7.50 7.200
9.00 8.700
7.50 7.200
5.90 5.600
5.90 5.600
6.00 5.700
0.00 0.000
8.50 8.200
5.90 5.600
5.90 5.600
5.90 5.600
6.00 5.700
6.20 5.900
6.50 6.200
7.20 6.900
6.90 6.600
6.50 6.200
9.40 9.100
9.40 9.100
9.40 9.100
9.40 9.100
10.35 10.050
10.20 9.900
9.82 9.520
10.35 10.050
10.00 9.700
10.00 9.700
11.00 10.700
10.90 10.600
12.35 12.050
16.15 15.850
9.60 9.300
9.60 9.300
9.60 9.300
9.60 9.300
9.60 9.300
0.000
0.000
1 3.1 4.05

8 9 10

Desde 3 Hasta Desde 3.5 Hasta Desde 4 Hasta 5


A 2
3.5 m 4m m

COTA TAPA

154.10 1.83 BZ 1 27.657


37.20 1.2 BZ 2 27.578
111.60 2.898 BZ 3 27.428
46.00 1.2 BZ 4 27.644
139.20 1.669 BZ 5 27.494
0.00 1.433 BZ 6 28.337
33.50 62.00 1.552 BZ 7 29.5
86.80 1.199 BZ 8 30.283
46.80 1.2 BZ 9 30.846
137.00 1.242 BZ 10 30.704
95.20 1.53 BZ 11 30.346
163.00 1.594 BZ 12 30.216
97.80 1.634 BZ 13 30.146
97.80 1.541 BZ 14 30.415
48.90 1.877 BZ 15 30.541
0.00 1.293 BZ 16 29.801
0.00 1.584 BZ 17 30.01
0.00 1.2 BZ 18 29.61
116.00 1.404 BZ 19 29.489
195.50 2.189 BZ 20 29.719
172.50 1.2 BZ 21 28.942
174.00 1.2 BZ 22 28.224
54.50 1.786 BZ 23 27.372
83.86 2.967 BZ 24 27.306
37.80 2.295 BZ 25 28.499
24.66 2.468 BZ 26 27.851
73.20 3.04 BZ 27 27.188
61.00 2.2 BZ 28 26.052
235.60 1.922 BZ 29 25.597
34.20 1.199 BZ 30 26.44
180.80 1.784 BZ 31 27.268
0.00 2.314 BZ 32 28.085
253.00 2.13 BZ 33 28.877
84.00 2.54 BZ 34 29.485
34.50 1.35 BZ 35 30.712
92.00 1.351 BZ 36 30.878
150.80 1.473 BZ 37 31.208
11.60 1.464 BZ 38 31.48
11.50 1.2 BZ 39 31.71
138.00 1.338 BZ 40 24.766
37.20 1.421 BZ 41 25.537
107.80 1.2 BZ 42 27.625
215.60 1.741 BZ 43 27.701
123.20 1.2 BZ 44 28.144
140.40 1.671 BZ 45 26.415
103.50 1.2 BZ 46 27.436
160.60 1.967 BZ 47 28.406
0.00 2.189 BZ 48 29.661
16.00 1.35 BZ 49 30.525
49.60 1.351 BZ 50 30.339
244.80 1.2 BZ 51 28.236
30.00 1.411 BZ 52 28.314
30.40 1.585 BZ 53 28.362
34.50 1.2 BZ 54 28.208
161.00 1.4 BZ 55 28.168
74.40 1.203 BZ 56 25.753
207.00 1.199 BZ 57 24.876
93.00 1.177 BZ 58 24.403
214.50 1.28 BZ 59 24.714
138.00 1.516 BZ 60 27.75
254.60 1.431 BZ 61 28.079
175.00 1.35 BZ 62 30.052
75.00 1.2 BZ 63 28.816
81.00 1.199 BZ 64 27.118
72.50 1.201 BZ 65 25.385
35.00 1.347 BZ 66 24.601
46.20 1.363 BZ 67 24.387
33.90 1.2 BZ 68 23.961
124.30 1.2 BZ 69 24.315
310.50 1.484 BZ 70 26.011
0.00 1.299 BZ 71 26.847
165.00 1.2 BZ 72 26.95
113.00 1.2 BZ 73 27.31
79.10 1.573 BZ 74 28.823
33.90 1.395 BZ 75 29.816
11.50 1.718 BZ 76 29.9
154.70 2.674 BZ 77 29.72
200.00 1.3 BZ 78 27.172
166.80 1.399 BZ 79 26.387
28.40 1.4 BZ 80 24.939
250.00 1.205 BZ 81 23.809
18.30 1.2 BZ 82 23.537
211.20 1.2 BZ 82A 24.027
422.40 1.3 BZ 82B 23.506
128.10 1.2 BZ 83 25.212
181.80 1.2 BZ 84 26.12
199.00 1.682 BZ 85 27.306
114.84 1.613 BZ 85EX 23.696
121.20 1.853 BZ 86 29.531
136.50 2.308 BZ 87 30.267
58.50 1.2 BZ 88 29.354
172.00 1.662 BZ 89 29.536
127.80 1.2 BZ 90 28.654
121.50
32.70
117.60
176.40
37.40
168.30
130.90
0.00

33.500 0.000 0.000

1.2
1.2
1.2
1.32
1.47
1.5
1.5
1.52
1.58
1.59
1.61
1.67
1.71
1.74
1.75
1.8
1.8
1.82
1.82
1.88
1.89
1.9
2.07
2.1
2.13
2.15
2.25
2.26
2.55
3.72
4.18
4.2
4.26
4.38
4.41

7
6

1
1
5
Cachimba de 160 Codo de 45°
3 4 5 6
mm 160m m

COTA DE FONDO COTA SALIDA COTA SALIDA COTA SALIDA ACCESORIOS DOMICILIAR

25.827 23.00 23.00


26.378 3.00 3.00
24.53 9.00 9.00
26.444 4.00 4.00
25.825 12.00 12.00
26.904 0.00 0.00
27.948 5.00 5.00
29.084 7.00 7.00
29.646 3.00 3.00
29.462 10.00 10.00
28.816 7.00 7.00
28.622 10.00 10.00
28.512 6.00 6.00
28.874 6.00 6.00
28.664 3.00 3.00
28.508 0.00 0.00
28.426 0.00 0.00
28.41 0.00 0.00
28.085 10.00 10.00
27.53 17.00 17.00
27.742 15.00 15.00
27.024 15.00 15.00
25.586 5.00 5.00
24.339 7.00 7.00
26.204 3.00 3.00
25.383 3.00 3.00
24.148 6.00 6.00
23.852 5.00 5.00
23.675 19.00 19.00
25.241 3.00 3.00
25.484 16.00 16.00
25.771 0.00 0.00
26.747 22.00 22.00
26.945 8.00 8.00
29.362 3.00 3.00
29.527 8.00 8.00
29.735 13.00 13.00
30.016 1.00 1.00
30.51 1.00 1.00
23.428 12.00 12.00
24.116 3.00 3.00
26.425 7.00 7.00
25.96 14.00 14.00
26.944 8.00 8.00
24.744 12.00 12.00
26.236 9.00 9.00
26.439 11.00 11.00
27.472 0.00 0.00
29.175 1.00 1.00
28.988 4.00 4.00
27.036 17.00 17.00
26.903 4.00 4.00
26.777 4.00 4.00
27.008 3.00 3.00
26.768 14.00 14.00
24.55 6.00 6.00
23.677 18.00 18.00
23.226 6.00 6.00
23.434 13.00 13.00
26.234 12.00 12.00
26.648 19.00 19.00
28.702 14.00 14.00
27.616 6.00 6.00
25.919 6.00 6.00
24.184 5.00 5.00
23.254 2.00 2.00
23.024 3.00 3.00
22.761 3.00 3.00
23.115 11.00 11.00
24.527 27.00 27.00
25.548 0.00 0.00
25.75 10.00 10.00
26.11 10.00 10.00
27.25 7.00 7.00
28.421 3.00 3.00
28.182 1.00 1.00
27.046 13.00 13.00
25.872 16.00 16.00
24.988 12.00 12.00
23.539 2.00 2.00
22.604 20.00 20.00
22.337 1.00 1.00
22.827 11.00 11.00
22.206 22.00 22.00
24.012 7.00 7.00
24.92 9.00 9.00
25.624 10.00 10.00
22.083 6.00 6.00
27.678 6.00 6.00
27.959 7.00 7.00
28.154 3.00 3.00
27.874 8.00 8.00
27.454 6.00 6.00
5.00 5.00
1.00 1.00
6.00 6.00
9.00 9.00
2.00 2.00
9.00 9.00
7.00 7.00
0.00 0.00

791.000 791.000

1.357344
1.88783928
1.62089496
1.75549824
1.35621288
1.357344
1.40485104
1.7306136
1.80300528
1.84825008
1.74305592
2.12311224
1.46253816
1.79169408
1.357344
1.58809248
2.47602168
1.357344
1.357344
2.02018032
3.35603304
2.5959204
2.79160416
3.4386048
2.488464
2.17401264
1.35621288
2.01791808
2.61741168
2.4092856
2.8730448
1.527012
1.52814312
1.66613976
1.65595968
1.89010152
#REF!
#REF!
#REF!
#REF!
1.357344
1.357344
1.357344
1.4930784
1.6627464
1.69668
1.69668
1.7193024
1.7871696
1.7984808
1.8211032
1.8889704
1.9342152
1.9681488
1.97946
2.036016
2.036016
2.0586384
2.0586384
2.1265056
2.1378168
2.149128
2.3414184
2.375352
2.4092856
2.431908
#REF!
Tuberia de salida 4" Tuberia PVC S-25
Caja de concreto
x 30 cm D=160

ACCESORIOS DOMICILIARIOS

23.00 6.90 154.10


3.00 0.90 20.10
9.00 2.70 60.30
4.00 1.20 23.20
12.00 3.60 70.80
0.00 0.00 0.00
5.00 1.50 33.50
7.00 2.10 46.90
3.00 0.90 24.90
10.00 3.00 69.50
7.00 2.10 47.95
10.00 3.00 82.00
6.00 1.80 49.20
6.00 1.80 49.20
3.00 0.90 24.60
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
10.00 3.00 58.50
17.00 5.10 98.60
15.00 4.50 87.00
15.00 4.50 88.50
5.00 1.50 27.50
7.00 2.10 42.63
3.00 0.90 19.20
3.00 0.90 12.63
6.00 1.80 39.60
5.00 1.50 33.00
19.00 5.70 127.30
3.00 0.90 17.40
16.00 4.80 91.20
0.00 0.00 0.00
22.00 6.60 127.60
8.00 2.40 42.40
3.00 0.90 17.40
8.00 2.40 46.40
13.00 3.90 76.70
1.00 0.30 5.90
1.00 0.30 5.80
12.00 3.60 69.60
3.00 0.90 20.10
7.00 2.10 57.40
14.00 4.20 114.80
8.00 2.40 65.60
12.00 3.60 70.80
9.00 2.70 52.20
11.00 3.30 81.40
0.00 0.00 0.00
1.00 0.30 8.50
4.00 1.20 26.80
17.00 5.10 130.90
4.00 1.20 15.20
4.00 1.20 15.60
3.00 0.90 17.40
14.00 4.20 81.20
6.00 1.80 40.20
18.00 5.40 104.40
6.00 1.80 46.80
13.00 3.90 107.90
12.00 3.60 69.60
19.00 5.70 136.80
14.00 4.20 88.20
6.00 1.80 37.80
6.00 1.80 40.80
5.00 1.50 36.50
2.00 0.60 17.60
3.00 0.90 24.60
3.00 0.90 17.10
11.00 3.30 62.70
27.00 8.10 156.60
0.00 0.00 0.00
10.00 3.00 83.00
10.00 3.00 57.00
7.00 2.10 39.90
3.00 0.90 17.10
1.00 0.30 5.80
13.00 3.90 78.00
16.00 4.80 100.80
12.00 3.60 84.00
2.00 0.60 15.20
20.00 6.00 126.00
1.00 0.30 9.20
11.00 3.30 111.10
22.00 6.60 222.20
7.00 2.10 64.40
9.00 2.70 91.35
10.00 3.00 100.00
6.00 1.80 57.72
6.00 1.80 60.90
7.00 2.10 68.60
3.00 0.90 29.40
8.00 2.40 86.40
6.00 1.80 64.20
5.00 1.50 61.25
1.00 0.30 16.85
6.00 1.80 61.80
9.00 2.70 92.70
2.00 0.60 18.80
9.00 2.70 84.60
7.00 2.10 65.80
0.00 0.00 0.00

791.000 237.300 5,610.680