VALORIZACION DE OBRA Nº 2

OBRA : “MEJORAMIENTO DE CARRETERA CA-103:PE-06B (SANTA CRUZ DE SUCCHUBAMBA) – ROMERO CIRCA – LA LAGUNA – CATILLUC – EMP. PE-06C (EL EMPALME)
SUPERVISOR – CAJAMARCA”
: GOBIERNO REGIONAL DE CAJAMARCA INFORME Nº 02
CONTRATISTA : CONSORCIO CATILLUC MONTO
LUGAR EMPALME - SANTA CRUZ TRAMO KM 32+000 AL KM 40+500 TIEMPO DE EJECUCION : 240 DIAS CALENDARIOS FECHA 30/09/2017
00/01/1900
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE VALORIZACION ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA DESCRIPCION UND. METRADO P.U. BASE MONTO MONTO MONTO MONTO
METRADO % METRADO % METRADO % METRADO %
S/. S/. S/. S/. S/. S/.
01 TRABAJOS PRELIMINARES 113,562.15 32,016.65 23,779.82 55,796.47 57,765.68
01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 0.20 276,905.44 55,381.09 0.04 11,076.22 20.00 0.02 5,538.11 10.00 0.06 16,614.33 30.00 0.14 38,766.76 70.00
01.02 TOPOGRAFIA Y GEOREFERENCIACION KM 10.00 970.75 9,707.50 2.00 1,941.50 20.00 8.00 7,766.00 80.00 10.00 9,707.50 100.00 0.00 0.00 0.00
01.03 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL DURANTE LA EJEC DE OBRA
GLB 0.10 458,702.20 45,870.22 0.04 18,348.09 40.00 0.02 9,174.04 20.00 0.06 27,522.13 60.00 0.04 18,348.09 40.00
01.04 CAMPAMENTOS DE OBRA GLB 0.04 65,083.62 2,603.34 0.01 650.84 25.00 0.02 1,301.67 50.00 0.03 1,952.51 75.00 0.01 650.83 25.00

02 MOVIMIENTO DE TIERRAS 191,185.95 0.00 20,893.41 20,893.41 170,292.54


02.02 CORTE EN MATERIAL SUELTO, H=2,300-3,800 MSNM M3 9,733.00 3.88 37,764.04 0.00 0.00 0.00 5,384.90 20,893.41 55.33 5,384.90 20,893.41 55.33 4,348.10 16,870.63 44.67
02.03 CORTE EN ROCA SUELTA, H=2300-3800 MSNM M3 1,397.16 12.19 17,031.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,397.16 17,031.38 100.00
02.04 CORTE EN ROCA FIJA, H=2300-3800 MSNM M3 1,397.16 20.98 29,312.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,397.16 29,312.42 100.00
02.05 TERRAPLENES, H=2,300-3,800 MSNM M3 20,944.39 4.93 103,255.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,944.39 103,255.84 100.00
02.05 MEJORAMIENTO DE SUBRASANTE, e=0.60 MTS. M3 204.29 18.71 3,822.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 204.29 3,822.27 100.00

03 PAVIMENTOS 1,701,572.14 0.00 0.00 0.00 1,701,572.14


03.01 PERFILADO Y COMPACTADO SUBRASANTE, ZONAS DE CORTE M2 48,328.69 0.86 41,562.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48,328.69 41,562.67 100.00
03.02 SUB BASE GRANULAR, EXTRAC. CON EXPLOSIVOS, M3 13,883.11 31.07 431,348.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13,883.11 431,348.23 100.00
03.03 BASE GRANULAR, EXTRAC. CON EXPLOSIVOS, M3 12,831.27 28.07 360,173.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12,831.27 360,173.75 100.00
03.04 IMPRIMACION ASFALTICA M2 71,894.66 2.26 162,481.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 71,894.66 162,481.93 100.00
03.05 TRATAMIENTO SUPERFICIAL BICAPA, e=1" M2 71,894.66 9.82 706,005.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 71,894.66 706,005.56 100.00

04 OBRAS DE ARTE Y DRENAJE 2,789,930.88 0.00 0.00 0.00 2,789,930.88


04.01 REMOCION ALCANTARILLAS EXISTENTES 28.93 0.00 0.00 0.00 28.93
04.01.01 PERFILADO Y COMPACTADO SUBRASANTE, ZONAS DE CORTE M2 33.64 0.86 28.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.64 28.93 100.00
4.02 ALCANTARILLAS TMC CIRCULARES 34 UNIDADES 916,168.83 0.00 0.00 0.00 916,168.83
04.02.01 TRAZO Y REPLANTEO ESTRUCTURAS/M2 HA 769.08 2.58 1,984.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 769.08 1,984.23 100.00
04.02.02 EXCAVACION NO CLASIFICADA CON EQUIPO P/ESTRUCTURAS M3 1,281.80 6.68 8,562.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,281.80 8,562.42 100.00
04.02.03 CAMA DE APOYO CON MATERIAL DE AFIRMADO M3 39.78 124.01 4,933.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.78 4,933.12 100.00
04.02.04 RELLENO CON MATERIAL DE AFIRMADO M3 925.14 179.54 166,099.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 925.14 166,099.64 100.00
04.02.05 ELIMINACION DE MATERIAL EXCEDENTE MANUAL, D=30 M M3 364.14 10.95 3,987.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 364.14 3,987.33 100.00
04.02.06 ENCOFRADO Y DESENCOFRADO M3 519.52 26.13 13,575.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 519.52 13,575.06 100.00
04.02.07 CONCRETO CICLOPEO, CLASE G, 13.7 MPa (f'c=140 KG/CM2) M3 109.82 179.74 19,739.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 109.82 19,739.05 100.00
04.02.08 CONCRETO CICLOPEO, CLASE E 17.2 (f'c=175 KG/CM2) M3 374.00 263.52 98,556.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 374.00 98,556.48 100.00
04.02.09 ACERO FY=4200 KG/CM2 PARAPETOS KG 374.00 6.48 2,423.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 374.00 2,423.52 100.00
04.02.10 ALCANTARILLA TMC Ø=36" M 374.00 210.50 78,727.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 374.00 78,727.00 100.00
04.02.11 ALCANTARILLA TMC Ø=48" M 34.00 366.47 12,459.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.00 12,459.98 100.00
04.02.12 ALCANTARILLA TMC Ø=60" M 954.72 522.37 498,717.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 954.72 498,717.09 100.00
04.02.13 ENCOFRADO Y DESENCOFRADO CARAVISTA-PARAPETOS M2 34.00 30.26 1,028.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.00 1,028.84 100.00
04.02.14 PINTURA DE PARAPETOS M2 954.72 5.63 5,375.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 954.72 5,375.07 100.00

4.03 PASES DE AGUA PVC 1,822.25 0.00 0.00 0.00 1,822.25


04.03.01 TRAZO Y REPLANTEO ESTRUCTURAS M2 5.79 2.58 14.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.79 14.93 100.00
04.03.02 EXCAVACION NO CLASIFICADA MANUAL, P/ESTRUCTURAS M3 4.57 21.90 99.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.57 99.99 100.00
VALORIZACION DE OBRA Nº 2

OBRA : “MEJORAMIENTO DE CARRETERA CA-103:PE-06B (SANTA CRUZ DE SUCCHUBAMBA) – ROMERO CIRCA – LA LAGUNA – CATILLUC – EMP. PE-06C (EL EMPALME)
SUPERVISOR – CAJAMARCA”
: GOBIERNO REGIONAL DE CAJAMARCA INFORME Nº 02
CONTRATISTA : CONSORCIO CATILLUC MONTO
LUGAR EMPALME - SANTA CRUZ TRAMO KM 32+000 AL KM 40+500 TIEMPO DE EJECUCION : 240 DIAS CALENDARIOS FECHA 30/09/2017
00/01/1900
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE VALORIZACION ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA DESCRIPCION UND. METRADO P.U. BASE MONTO MONTO MONTO MONTO
METRADO % METRADO % METRADO % METRADO %
S/. S/. S/. S/. S/. S/.
04.03.03 CAMA DE APOYO CON MATERIAL DE AFIRMADO M3 0.46 124.01 56.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.46 56.42 100.00
04.03.04 RELLENO CON MATERIAL DE AFIRMADO M3 2.98 179.54 534.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.98 534.43 100.00
04.03.05 ELIMINACION DE MATERIAL EXCEDENTE MANUAL, D=30 M M3 1.57 10.95 17.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.57 17.19 100.00
04.03.06 CONCRETO F'C=175 KG/CM2 + 25% PM M3 0.65 194.30 125.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.65 125.49 100.00
04.03.07 ENCOFRADO Y DESENCOFRADO M2 4.09 26.13 106.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.09 106.80 100.00
04.03.08 TUBERIA PVC 12" M 7.50 115.60 867.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.50 867.00 100.00

4.04 BADENES DE CONCRETO 54,976.66 0.00 0.00 0.00 54,976.66


04.04.01 TRAZO Y REPLANTEO ESTRUCTURAS M2 482.45 2.58 1,244.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 482.45 1,244.72 100.00
04.04.02 EXCAVACION NO CLASIFICADA CON EQUIPO P/ESTRUCTURAS M3 332.53 6.66 2,214.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 332.53 2,214.65 100.00
04.04.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL, D=30 M M3 415.67 19.95 8,292.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 415.67 8,292.62 100.00
04.04.04 CONCRETO CLASE D, 20.6 MPa (f'c=210 KG/CM2) M3 120.78 279.41 33,747.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.78 33,747.14 100.00
04.04.05 ENCOFRADO Y DESENCOFRADO M2 135.94 26.13 3,552.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 135.94 3,552.11 100.00
04.04.06 MAMPOSTERIA DE PIEDRA ASENTADA CON CONCRETO F'C=140 KG/CM2 M3 46.47 126.44 5,875.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 46.47 5,875.67 100.00
04.04.07 JUNTAS DE DILATACION M 11.49 4.33 49.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.49 49.75 100.00

4.05 MUROS DE CONCRETO CICLOPEO 442,427.11 0.00 0.00 0.00 442,427.11


04.05.01 TRAZO Y REPLANTEO ESTRUCTURAS M2 807.01 2.58 2,082.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 807.01 2,082.09 100.00
04.05.02 EXCAVACION NO CLASIFICADA CON EQUIPO P/ESTRUCTURAS M3 807.01 6.66 5,374.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 807.01 5,374.69 100.00
04.05.03 RELLENO CON MATERIAL DE AFIRMADO M3 807.01 179.74 145,051.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 807.01 145,051.98 100.00
04.05.04 ELIMINACION DE MATERIAL EXCEDENTE MANUAL, D=30 M M3 807.01 10.95 8,836.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 807.01 8,836.76 100.00
04.05.05 ENCOFRADO Y DESENCOFRADO M2 807.01 26.13 21,087.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 807.01 21,087.17 100.00
04.05.06 CONCRETO CICLOPEO, CLASE G, 13.7 MPa (f'c=140 KG/CM2) M3 807.01 179.74 145,051.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 807.01 145,051.98 100.00
04.05.07 RELLENO CON MATERIAL FILTRANTE M3 807.01 67.54 54,505.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 807.01 54,505.46 100.00
04.05.08 TUBERIA PVC SAL 2" M 807.01 2.11 1,702.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 807.01 1,702.79 100.00
04.05.09 TUB. PVC SAL 6"-PERFORADO M 807.01 31.60 25,501.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 807.01 25,501.52 100.00
04.05.10 ENCOFRADO Y DESENCOFRADO CARAVISTA-PARAPETOS M2 807.01 30.26 24,420.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 807.01 24,420.12 100.00
04.05.11 PINTURA DE PARAPETOS M2 807.01 5.99 4,833.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 807.01 4,833.99 100.00
04.05.12 JUNTAS DE DILATACION M 807.01 4.93 3,978.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 807.01 3,978.56 100.00

4.06 PONTONES-LOSA DE CONCRETO 865,442.12 0.00 0.00 0.00 865,442.12


04.06.01 DEMOLICION ESTRUCTURAS DE CONCRETO, C/EQUIPO M3 133.68 33.64 4,497.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 133.68 4,497.00 100.00
04.06.02 TRAZO Y REPLANTEO ESTRUCTURAS M2 254.90 2.58 657.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 254.90 657.64 100.00
04.06.03 EXCAVACION EN ROCA FIJA M3 350.97 15.61 5,478.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 350.97 5,478.64 100.00
04.06.04 EXCAVACION NO CLASIFICADA CON EQUIPO P/ESTRUCTURAS M3 872.35 6.66 5,809.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 872.35 5,809.85 100.00
04.06.05 RELLENO CON MATERIAL DE AFIRMADO M3 438.71 179.54 78,765.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 438.71 78,765.99 100.00
04.06.06 ELIMINACION DE MATERIAL EXCEDENTE MANUAL, D=30 M M3 55.08 10.95 603.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 55.08 603.13 100.00
04.06.07 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON M2 108.21 26.80 2,900.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 108.21 2,900.03 100.00
04.06.08 CONCRETO F'C=175 KG/CM2 + 25% PM M3 127.14 194.30 24,703.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 127.14 24,703.88 100.00
04.06.09 CONCRETO CLASE E, 17.2 MPa (f'c=175 KG/CM2) M3 1.39 263.52 366.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.39 366.29 100.00
04.06.10 CONCRETO CLASE D, 20.6 MPa (f'c=210 KG/CM2) M3 32.78 279.41 9,159.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.78 9,159.06 100.00
04.06.11 CONCRETO CLASE C, 27.4 MPa (f'c=280 KG/CM2) M3 453.53 324.73 147,274.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 453.53 147,274.80 100.00
VALORIZACION DE OBRA Nº 2

OBRA : “MEJORAMIENTO DE CARRETERA CA-103:PE-06B (SANTA CRUZ DE SUCCHUBAMBA) – ROMERO CIRCA – LA LAGUNA – CATILLUC – EMP. PE-06C (EL EMPALME)
SUPERVISOR – CAJAMARCA”
: GOBIERNO REGIONAL DE CAJAMARCA INFORME Nº 02
CONTRATISTA : CONSORCIO CATILLUC MONTO
LUGAR EMPALME - SANTA CRUZ TRAMO KM 32+000 AL KM 40+500 TIEMPO DE EJECUCION : 240 DIAS CALENDARIOS FECHA 30/09/2017
00/01/1900
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE VALORIZACION ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA DESCRIPCION UND. METRADO P.U. BASE MONTO MONTO MONTO MONTO
METRADO % METRADO % METRADO % METRADO %
S/. S/. S/. S/. S/. S/.
04.06.12 ENCOFRADO Y DESENCOFRADO M2 22,078.79 26.13 576,918.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22,078.79 576,918.85 100.00
04.06.13 ACERO F'Y=4200 KG/CM2 KG 23.85 6.48 154.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.85 154.52 100.00
04.06.14 JUNTAS DE DILATACION M 79.24 4.45 352.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79.24 352.62 100.00
04.06.15 APOYO MOVIL-NEOPRENE M2 2.91 835.32 2,431.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.91 2,431.83 100.00
04.06.16 INSTALACION DE LLORONAS, PVC SAL 3" UND 26.00 38.68 1,005.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.00 1,005.68 100.00
04.06.17 ENCOFRADO Y DESENCOFRADO CARAVISTA-GUARDERAS M2 16.20 30.26 490.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.20 490.33 100.00
04.06.18 BARANDA TUBO FºGº 3" - INCLUYE PINTURA M 45.62 80.92 3,691.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 45.62 3,691.57 100.00
04.06.19 PINTURA DE GUARDERAS M2 32.04 5.63 180.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.04 180.41 100.00

4.07 SUBDRENAJES 51,664.38 0.00 0.00 0.00 51,664.38


04.07.01 SUBREN CON MAC DRAIN 2L M 129.81 398.00 51,664.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 129.81 51,664.38 100.00
4.08 CUNETAS Y ZANJAS DE CORONACION
04.08.01 CUNETAS REVESTIDAS 0.75x0.50, e=0.10 m, CONCRETO f'c=140 Kg/cm2 457,400.60 0.00 0.00 0.00 457,400.60
04.08.01.01 CONFORMACION M2 16,321.36 3.28 53,534.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16,321.36 53,534.06 100.00
04.08.01.02 ENCOFRADO Y DESENCOFRADO M2 960.08 28.30 27,170.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 960.08 27,170.26 100.00
04.08.01.03 CONCRETO CLASE F, 13.7 MPa (f'c=140 KG/CM2) M3 1,440.12 222.35 320,210.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,440.12 320,210.68 100.00
04.08.01.04 CURADO M2 14,226.64 1.06 15,080.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14,226.64 15,080.24 100.00
04.08.01.05 JUNTAS DE DILATACION M 9,484.43 4.28 40,593.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,484.43 40,593.36 100.00
04.08.01.06 ZANJAS DE CORONACION M 70.00 11.60 812.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.00 812.00 100.00

05 TRANSPORTE 1,142,989.83 34,415.00 24,322.75 58,737.75 1,084,252.08


05.01 TRANSPORTE MATERIAL EXCEDENTE, D<=1 KM. M3K 6,549.70 4.81 31,504.06 6,500.00 31,265.00 99.24 4,971.67 23,913.73 75.91 11,471.67 55,178.73 175.15 -4,921.97 -23,674.67 -75.15
05.02 TRANSPORTE MATERIAL EXCEDENTE, D>1 KM. M3K 48,271.29 1.26 60,821.82 2,500.00 3,150.00 5.18 324.62 409.02 0.67 2,824.62 3,559.02 5.85 45,446.67 57,262.80 94.15
05.03 TRANSPORTE MATERIAL DE CANTERA P/SUBBASE, D<=1 KM. M3K 13,883.11 4.24 58,864.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13,883.11 58,864.39 100.00
05.04 TRANSPORTE MATERIAL DE CANTERA P/SUBBASE, D>1 KM. M3K 328,752.04 1.30 427,377.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 328,752.04 427,377.66 100.00
05.05 TRANSPORTE MATERIAL DE CANTERA P/BASE, D<=1 KM. M3K 12,831.27 5.35 68,647.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12,831.27 68,647.29 100.00
05.06 TRANSPORTE MATERIAL DE CANTERA P/BASE, D>1 KM. M3K 303,844.47 1.21 367,651.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303,844.47 367,651.81 100.00
05.07 TRANSPORTE DE AGREGADOS PARA TSB, D<=1 KM. M3K 1,924.69 5.98 11,509.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,924.69 11,509.65 100.00
05.08 TRANSPORTE DE AGREGADOS PARA TSB, D>1 KM. M3K 85,744.96 1.36 116,613.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 85,744.96 116,613.15 100.00

06 SEÑALIZACIÓN Y SEGURIDAD VIAL 261,214.42 0.00 0.00 0.00 261,214.42


06.01 HITOS KILOMÉTRICOS UND 10.00 62.42 624.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 624.20 100.00
06.02 SEÑALES PREVENTIVAS UND 23.00 270.18 6,214.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.00 6,214.14 100.00
06.03 SEÑALES INFORMATIVAS UND 6.00 420.28 2,521.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 2,521.68 100.00
06.04 MARCAS EN EL PAVIMENTO M2 2,683.67 8.80 23,616.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,683.67 23,616.30 100.00
06.05 GUARDAVÍAS M 500.00 244.20 122,100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 500.00 122,100.00 100.00
06.06 TACHAS REFLECTIVAS BIDIRECCIONALES UND 10,000.00 9.27 92,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10,000.00 92,700.00 100.00
06.07 REDUCTOR DE VELOCIDAD, TIPO RESALTO, UND 5.00 2,687.62 13,438.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 13,438.10 100.00
TRAPEZOIDAL
07 MITIGACION AMBIENTAL 159,265.13 0.00 11,792.93 11,792.93 147,472.20
07.01 DEPOSITO DE MATERIAL EXCEDENTE M3 36,939.12 2.19 80,896.67 0.00 0.00 0.00 5,384.90 11,792.93 14.58 5,384.90 11,792.93 14.58 31,554.22 69,103.74 85.42
VALORIZACION DE OBRA Nº 2

OBRA : “MEJORAMIENTO DE CARRETERA CA-103:PE-06B (SANTA CRUZ DE SUCCHUBAMBA) – ROMERO CIRCA – LA LAGUNA – CATILLUC – EMP. PE-06C (EL EMPALME)
SUPERVISOR – CAJAMARCA”
: GOBIERNO REGIONAL DE CAJAMARCA INFORME Nº 02
CONTRATISTA : CONSORCIO CATILLUC MONTO
LUGAR EMPALME - SANTA CRUZ TRAMO KM 32+000 AL KM 40+500 TIEMPO DE EJECUCION : 240 DIAS CALENDARIOS FECHA 30/09/2017
00/01/1900
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE VALORIZACION ACUMULADO ACTUAL SALDO POR VALORIZAR
PARTIDA DESCRIPCION UND. METRADO P.U. BASE MONTO MONTO MONTO MONTO
METRADO % METRADO % METRADO % METRADO %
S/. S/. S/. S/. S/. S/.
07.02 READECUACION AMBIENTAL DE CAMPAMENTOS, M2 1,920.00 0.78 1,497.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,920.00 1,497.60 100.00
ALMACENES Y PATIOS DE MAQUINARIAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.03 RETIRO DE VEGETACION (CHAMPAS) M2 9,650.00 4.49 43,328.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,650.00 43,328.50 100.00
07.04 ALMACENAMIENTO DE SUELOS LUGAR ADYACENTE M3 1,447.50 0.96 1,389.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,447.50 1,389.60 100.00
07.05 REPOSICION DE SUELO ORGANICO M2 9,650.00 1.89 18,238.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,650.00 18,238.50 100.00
07.06 ENROCADO CON PIEDRA GRANDE M3 1,239.72 1.69 2,095.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,239.72 2,095.13 100.00
07.07 SEÑALES AMBIENTALES UND 1.20 270.43 324.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.20 324.52 100.00
07.08 REPOSICION DE CERCOS (POSTE MADERA+ALAMBRE M 254.70 45.13 11,494.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 254.70 11,494.61 100.00

08 VARIOS 2,094.00 0.00 0.00 0.00 2,094.00


08.01 PINTURA EN BARANDAS METALICAS-PUENTES M 38.00 1.10 41.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.00 41.80 100.00
EXISTENTES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
08.01 PINTURA EN BARANDAS METALICAS-PUENTES M 10.00 205.22 2,052.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 2,052.20 100.00
TOTAL COSTO DIRECTO 6,361,814.50 66,431.65 80,788.91 147,220.56 6,214,593.94
IGV 18.00% 1,145,126.61 11,957.70 14,542.00 26,499.70 1,118,626.91
TOTAL PRESUPUESTO 7,506,941.11 78,389.35 95,330.91 173,720.26 7,333,220.85
PORCENTAJE DE AVANCE VALORIZADO 100.00% 1.04% 1.27% 2.31% 97.69%