Documentos de Académico
Documentos de Profesional
Documentos de Cultura
SUB
CONTRATISTA:
FECHA: 12/04/2019 al 26/04/2019
01 ESTRUCTURA
01.08.01 ZAPATA
01.08.05 COLUMNAS
METRADO
2.39
2.96
20.84
43.28
209.25
PLANILLA DE SUSTENTACION DE METRADOS - ENCOFRADO
OBRA :
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PUBLICA SAN PEDRO P.J. MIRAMAR B
PROVINCIA DE SANTA - DEPARTAMENTO DE ANCASH - I ETAPA
SUB CONTRATISTA :
FORMULA : ESTRUCTURAS
METRADOS: Del 10/04/2019 al 26/04/2019
01. ESTRUCTURAS
01.08. OBRAS DE CONCRETO ARMADO
01.08.01 ZAPATA
1.76
1.89
2.95 1.30
01.08.01.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ZAPATAS
Fecha Descripcion N° Veces N° Elemen Long (m)
12/04/2019 al Zapata Z-2 (2.45x1.65)
26/04/2019 2.00
1
.
1 1 1 3.36
Viga
6
cimenta
1 1 4.94
1.50
22/04/2019 al
Longitudinal 2 1 9.40
26/04/2019
Extremos 4 1 0.20
Sadinel Peraltado - Cerco Metalico
Longitudinal 2 1 17.05
Extremos 2 1 0.20
Unidad: M2
Ancho (m) Alto (m) Area (m2) Parcial
1.68
0.5
0.705
0.5
Unidad: M2
Ancho (m) Alto (m) Area (m2) Parcial
2.96
0.6
15.68
0.80
0.80
27.60
0.80
0.80
Unidad: M2
Ancho (m) Alto (m) Area (m2) Parcial
16.21
0.55
0.55
20.36
0.55
0.55
17.06
0.55
0.55
20.41
0.55
0.55
19.27
0.55
0.55
20.34
0.55
0.55
32.67
0.55
0.55
17.01
0.55
0.55
13.61
0.55
0.55
32.31
0.55
0.55
OBRA :
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PUBLICA SAN PEDRO P.J. MIRAMAR B
PROVINCIA DE SANTA - DEPARTAMENTO DE ANCASH - I ETAPA
SUB CONTRATISTA :
FORMULA : ESTRUCTURAS
METRADOS: Del 10/04/2019 al 26/04/2019
01. ESTRUCTURAS
01.03 MOVIMIENTO DE TIERRAS
2.77 1.85 1 1
7.25
SARDINEL PERALTADO EN CERCO METAL
12/4/19 AL 26/4/19
0.45
1 1 67.70
0.80
0.70
1 1 1.00
1.00
0.70
1 1 9.40
9.40
Metrado Total (M3)
1.85
1 1
1.20
0.95
1.85
1 1
2.77
7.25
SARDINEL PERALTADO (MI)(e=2")
0.30 1 1 76.76
0.30 1 1 93.6
1.00 1 1 1.00
0.70
En inicio de curva
1 1 18.30
0.80
18.30
4/15/2019
1 1 49.40
0.80
49.40
9.40
1.30
1 1
1.89
Zapata (1.65x1.00)
Acero longitudinal 5/8 1 6
Acero transversal 5/8 1 9
4/12/2019
Zapata (2.45x1.65)
Acero longitudinal 5/8 1 9
Acero transversal 5/8 1 13
Metrado Total (KG)
4/12/2019 0.30
1 1 3.44
3.44
Metrado Total (M3)
1 1 4.94
1.50
01.08.02.03 ACERO ESTRUCTURAL DE REFUERZO Fy= 4200 KG/CM2 PARA VIGA DE CIMENTACION
Acero longitudinal
5/8 1 6
4/12/2019 1/2 1 2
Estribado
4/12/2019
3/8 1 45
Metrado Total (KG)
01.08.05 COLUMNAS
4/12/2019 Portico 03
Columna C-1
Acero longitudinal
5/8 2 10
Estribado
3/8 2 32
Columna C-2
Acero longitudinal
1/2 1 6
Estribado
3/8 1 30
4/12/2019 Cerco metalico
Columna (LL) Cerco Metalico
Acero longitudinal
5/8 1 6
Estribado
3/8 1 56
Columna Interna Cerco Metalico
Acero longitudinal
5/8 8 4
Estribado
3/8 8 28
Metrado Total (KG)
Longitudinal 2 1 9.40
Extremos 4 1 0.20
4/26/2019 Sadinel Peraltado - Cerco Metalico
Longitudinal 2 1 17.05
Extremos 2 1 0.20
01.09. ALBAÑILERIA
01.09.02 MURO DE CABEZA LADRILLO K.K. DE 18 HUECOS DE 9.5 x 14 x 24 CM, CON C-A, 1:4: E=1.5 CM
Fecha Descripcion N° Veces N° Elemen Long (m)
4/24/2019 Portico 03 - Jr Casma Alto
Tramo 1 (Entre C1-C2) 1 1 4.6
Tramo 2 (Entre C2-C1) 1 1 1.5
Metrado Total (M2)
STRUCTURAS
1.20 9.86
27.65
0.80 0.45
0.70 0.45
0.70 0.45
Unidad: M2
Ancho (m) Alto (m) Area (m2) Parcial
9.86
9.86
9.86
23.03
0.30
28.08
0.3
0.32
0.70 0.45
6.59
0.80 0.45
17.78
0.80 0.45
3.38
0.80 0.45
Unidad: M3
Ancho (m) Alto (m) Area (m2) Parcial
0.5
0.705
0.5
Desperdicio
Longitud (m) Peso/ml Parcial
104%
36.51
1.90 1.55 18.38
1.25 1.55 18.14
74.80
2.70 1.55 39.17
1.70 1.55 35.63
Metrado Total (KG) . 111.31
Unidad: M3
Ancho (m) Alto (m) Area (m2) Parcial
0.62
0.3 0.6
Unidad: M2
Ancho (m) Alto (m) Area (m2) Parcial
2.96
0.6
E CIMENTACION Unidad: KG
Desperdicio
Longitud (m) Peso/ml Parcial
104%
78.18
6.65 1.55 64.32
6.73 0.99 13.86
45.08
1.72 0.56 45.08
Metrado Total (KG) . 123.25
Unidad: M3
Ancho (m) Alto (m) Area (m2) Parcial
0.25 3.83 1.65
0.25 3.83 0.24
0.25 0.35 0.15
0.25 0.35 0.02
Unidad: M2
Ancho (m) Alto (m) Area (m2) Parcial
3.83 17.01
3.83 3.83
0.35 1.38
0.35 0.18
Desperdicio
Longitud (m) Peso/ml Parcial
104%
214.40
6.65 1.55 214.40
74.55
2.00 0.56 74.55
41.08
6.65 0.99 41.08
13.63
0.78 0.56 13.63
41.88
4.33 1.55 41.88
27.72
0.85 0.56 27.72
222.33
4.31 1.55 222.33
75.67
0.58 0.56 75.67
Metrado Total (KG) . 711.25
Unidad: M3
Ancho (m) Alto (m) Area (m2) Parcial
15.68
0.80
0.80
27.60
0.80
0.80
Unidad: M2
Ancho (m) Alto (m) Area (m2) Parcial
16.21
0.55
0.55
20.36
0.55
0.55
17.06
0.55
0.55
20.41
0.55
0.55
19.27
0.55
0.55
20.34
0.55
0.55
32.67
0.55
0.55
17.01
0.55
0.55
13.61
0.55
0.55
32.31
0.55
0.55
Desperdicio
Longitud (m) Peso/ml Parcial
104%
39.64
0.55 0.99 39.64
32.85
2.82 0.56 32.85
47.57
0.55 0.99 47.57
39.42
2.82 0.56 39.42
221.41
1.28 0.99 221.41
96.68
4.15 0.56 96.68
57.99
1.28 0.99 57.99
80.28
9.19 0.56 80.28
50.97
0.55 0.99 50.97
34.94
3.00 0.56 34.94
61.16
0.55 0.99 61.16
41.93
3.00 0.56 41.93
61.16
0.55 0.99 61.16
41.93
3.00 0.56 41.93
61.16
0.55 0.99 61.16
41.93
3.00 0.56 41.93
61.16
0.55 0.99 61.16
41.93
3.00 0.56 41.93
50.97
0.55 0.99 50.97
34.94
3.00 0.56 34.94
40.77
0.55 0.99 40.77
27.96
3.00 0.56 27.96
49.01
0.56 0.99 49.01
33.20
2.85 0.56 33.20
PERIODO:
SUB
CONTRATISTA:
ITEM DESCRIPCION
01 ESTRUCTURA
01.08.01 ZAPATA
01.08.02.03 ACERO ESTRUCTURAL DE REFUERZO Fy= 4200 KG/CM2 PARA VIGA DE CIMENTACION
01.08.05 COLUMNAS
01.09 ALBAÑILERIA
01.09.02 MURO DE CABEZA LADRILLO K.K. DE 18 HUECOS DE 9.5 x 14 x 24 CM, CON C-A, 1:4: E=1.5 C
A
BLICA SAN PEDRO P.J. MIRAMAR BAJO
I ETAPA
UNIDAD METRADO
M2 39.48
M2 60.97
M3 28.07
M3 3.34
M2 2.39
KG 111.31
M3 0.62
M2 2.96
KG 123.25
M3 2.06
M2 20.84
KG 711.25
M3 22.17
M2 209.25
KG 1,350.94
M2 3.66
PLANILLA DE SUSTENTACION DE METRADOS - ESTRUCTURAS
OBRA :
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PUBLICA SAN PEDRO P.J. MIRAMAR B
PROVINCIA DE SANTA - DEPARTAMENTO DE ANCASH - I ETAPA
SUB CONTRATISTA :
FORMULA : ESTRUCTURAS
METRADOS: Del 10/04/2019 al 26/04/2019
01. ESTRUCTURAS
01.08.05 COLUMNAS
01.08.09.04 ACERO ESTRUCTURAL DE REFUERZO Fy= 4200 KG/CM2 PARA LOSAS ALIGERADAS
Longitudinal 2 1 9.40
Extremos 4 1 0.20
4/26/2019 Sadinel Peraltado - Cerco Metalico
Longitudinal 2 1 17.05
Extremos 2 1 0.20
01.09. ALBAÑILERIA
01.09.02 MURO DE CABEZA LADRILLO K.K. DE 18 HUECOS DE 9.5 x 14 x 24 CM, CON C-A, 1:4: E=1.5 CM
Fecha Descripcion N° Veces N° Elemen Long (m)
4/24/2019 Portico 03 - Jr Casma Alto
Tramo 1 (Entre C1-C2) 1 1 4.6
Tramo 2 (Entre C2-C1) 1 1 1.5
Metrado Total (M2)
STRUCTURAS
Unidad: M2
Ancho (m) Alto (m) Area (m2) Parcial
Unidad: M2
Ancho (m) Alto (m) Area (m2) Parcial
0.35 1.38
0.35 0.18
0.35 4.45
0.25 1.53
0.35 4.45
0.25 1.53
Unidad: M3
Ancho (m) Alto (m) Area (m2) Parcial
0.25 0.35 0.56
Unidad: M2
Ancho (m) Alto (m) Area (m2) Parcial
0.35 4.45
0.25 1.53
O Unidad: M2
Ancho (m) Alto (m) Area (m2) Parcial
0.35 4.45
0.25 1.53
Metrado Total (M2) . 5.97
ALIGERADAS Unidad: KG
Desperdicio
Longitud (m) Peso/ml Parcial
104%
#REF!
7.1 1.55 #REF!
#REF!
1.08 0.56 #REF!
Metrado Total (KG) . #REF!
Unidad: M3
Ancho (m) Alto (m) Area (m2) Parcial
15.68
0.80
0.80
27.60
0.80
0.80
Unidad: M2
Ancho (m) Alto (m) Area (m2) Parcial
16.21
0.55
0.55
20.36
0.55
0.55
17.06
0.55
0.55
20.41
0.55
0.55
19.27
0.55
0.55
20.34
0.55
0.55
32.67
0.55
0.55
17.01
0.55
0.55
13.61
0.55
0.55
32.31
0.55
0.55
Desperdicio
Longitud (m) Peso/ml Parcial
104%
39.64
0.55 0.99 39.64
32.85
2.82 0.56 32.85
47.57
0.55 0.99 47.57
39.42
2.82 0.56 39.42
221.41
1.28 0.99 221.41
96.68
4.15 0.56 96.68
57.99
1.28 0.99 57.99
80.28
9.19 0.56 80.28
50.97
0.55 0.99 50.97
34.94
3.00 0.56 34.94
61.16
0.55 0.99 61.16
41.93
3.00 0.56 41.93
61.16
0.55 0.99 61.16
41.93
3.00 0.56 41.93
61.16
0.55 0.99 61.16
41.93
3.00 0.56 41.93
61.16
0.55 0.99 61.16
41.93
3.00 0.56 41.93
50.97
0.55 0.99 50.97
34.94
3.00 0.56 34.94
40.77
0.55 0.99 40.77
27.96
3.00 0.56 27.96
49.01
0.56 0.99 49.01
33.20
2.85 0.56 33.20