OBRA : CREACIÓN DEL CAMAL MUNICIPAL DEL DISTRITO DE VIRU, PROVINCIA DE VIRU - LA LIBERTAD
PARTIDA DESCRIPCION TOTAL 1er MES 2° MES 3° MES 4° MES 5° MES 6° MES 7° MES
COSTO DIRECTO 5,266,410.45 283,219.31 573,394.75 793,274.74 960,609.73 975,901.82 745,227.51 571,122.47
GASTOS GENERALES (10.00%) 526,641.05 28,321.93 57,339.47 79,327.47 96,060.97 97,590.18 74,522.75 57,112.25
UTILIDAD (5.00%) 263,320.52 14,160.97 28,669.74 39,663.74 48,030.49 48,795.09 37,261.38 28,556.12
SUB TOTAL 6,056,372.02 325,702.21 659,403.96 912,265.95 1,104,701.19 1,122,287.10 857,011.63 656,790.84
I.G.V. 18.00 % 1,090,146.96 58,626.40 118,692.71 164,207.87 198,846.21 202,011.68 154,262.09 118,222.35
PRESUPUESTO DE LA OBRA 7,146,518.98 384,328.61 778,096.67 1,076,473.82 1,303,547.41 1,324,298.77 1,011,273.72 775,013.19
2,003,775.31
219,879.99 2,198,799.91
14,447.05 57,788.18
12,417.64 124,176.36
414,208.91
116,915.45 467,661.78
363,660.12 5,266,410.45
36,366.01 526,641.05
18,183.01 263,320.52
418,209.13 6,056,372.02
75,277.64 1,090,146.96
493,486.78 7,146,518.98
6.91
100.00
S10
Presupuesto
Presupuesto 0304028
Subpresupuesto 001
Cliente MUNICIPALIDAD PROVINCIAL DE VIRU Costo al
Lugar LA LIBERTAD - VIRU - VIRU
SUB TOTAL 2,
IGV 18.0000%
=========
TOTAL PRESUPUESTADO 2,
SON : DOS MILLONES SETECIENTOS DIECINUEVE MIL CIENTO VEINTITRES Y 10/100 NUEVOS SOLES
Página
Costo al 12/10/2017
48,030.11
32,122.32
73,877.90
405,686.58
4,908.12
15,092.65
6,659.80
3,968.38
2,388.22
9,792.55
145,063.68
8,237.86
168,692.38
153,854.63
11,392.47
297,544.45
48,879.43
22,706.46
241,941.61
180,607.36
11,747.62
2,106.05
18,374.25
13,878.69
2,003,775.31
200,377.53
100,188.77
=============
2,304,341.61
414,781.49
=================
2,719,123.10
S10
Presupuesto
Presupuesto 0304028 "CREACION DEL CAMAL MUNICIPAL DEL DISTRITO DE VIRU, PROVINCIA DE VIRU - LA LIBERTAD"
Subpresupuesto 002 ARQUITECTURA
Cliente MUNICIPALIDAD PROVINCIAL DE VIRU
Lugar LA LIBERTAD - VIRU - VIRU
06 ZOCALOS Y CONTRAZOCALOS
06.01 CONTRAZOCALO CEMENTO SIN COLOREAR H=10 CM PULIDO ML 92.70
06.02 CONTRAZOCALO DE PORCELANATO H=0.10 m. ML 229.26
06.03 CONTRAZOCALO SANITARIO DE TERRAZO VACIADO IN SITU H=10 m 356.82
06.04 ZOCALO DE CERAMICA DE COLOR (30x30) m2 1,891.63
06.05 ZOCALO DE CEMENTO PULIDO H=0.50M MEZ 1:4 m2 31.71
07 CUBIERTAS
07.01 COBERTURA CON MORTERO CON IMPERMEABILIZANTE E=1.5CM CON BRUÑAS A/S m2 1,252.58
09 CARPINTERIA METALICA
09.01 PASAMANOS DE FIERRO DE Ø=2" P/ESCALERAS ML 8.28
09.02 BARANDA METALICA CON TUBO DE 2"x1.8mm - SEGUN DISEÑO m 156.31
09.03 CANTONERA P/ESTRIADA 2"x2"x3/16" EN ESCALERAS ML 64.20
09.04 TECHO CON POLICARBONATO ALVEOLAR E=6MM SOBRE TUBO CUADRADO m2 60.76
09.05 PUERTAS METALICAS DE FIERRO CON MALLA (Según diseño) Incluye bisagr. y cerrojos. m2 86.93
09.14 PUERTA METALICA DE TUBO DE FIERRO CON PLANCHA Y MALLA (Segun Diseño, inc. bisagras y m2 8.37
cerradura)
09.15 PUERTA METALICA DE MARCO DE TUBO REDONDO Ø 1" Y SEPARADORES DE 1/2", inc. bisagras y m2 20.34
cerradura)
10 CARPINTERIA DE MADERA
10.01 PUERTA CONTRAPLACADA CON TRIPLAY Y MARCO DE MADERA DE CEDRO m2 54.21
10.02 MUEBLE DE MELAMINE EN COCINA (Segun diseño) m 7.73
11 CERRAJERIA
11.01 CERRADURA TIPO PESADA DE SOBREPONER TRES GOLPES pza 11.00
11.02 CERRADURA DE POMO CON PESTILLO pza 51.00
11.03 BISAGRA CAPUCHINA DE 4" X 3" P/PUERTAS pza 43.00
11.04 MANIJA DE BRONCE DE 4" Und. 13.00
11.05 CERROJO SIMPLE DE 3" Und. 13.00
11.06 BISAGRA CAPUCHINA DE 3" x 3" P/PUERTAS pza 24.00
12 VIDRIOS, CRISTALES Y SIMILARES
12.01 VENT. SISTEMA DIRECTO C/VIDRIO TEMPLADO 6 mm, Incoloro m2 59.71
12.02 PUERTA CON SISTEMA DIRECTO C/VIDRIO CRUDO 6 mm, Incoloro m2 5.99
12.03 VENT. SISTEMA DIRECTO C/VIDRIO CRUDO 6 mm, Incoloro m2 13.57
12.04 MURO CORTINA m2 46.94
13 PINTURA
13.01 PINTURA DE MUROS INTERIORES C/OLEO MATE, 2 MANOS m2 2,113.42
13.02 PINTURA DE MUROS EXTERIORES C/OLEO MATE 2 MANOS m2 1,332.02
13.03 PINTURA DE COLUMNAS Y VIGAS C/ OLEO MATE 2 MANOS m2 1,369.83
13.04 PINTURA LATEX PARA CIELO RASO 2 MANOS m2 1,120.23
13.05 PINTURA AL DUCO EN CARPINTERIA DE MADERA m2 93.68
13.06 PINTURA EN CONTRAZOCALOS C/ESMALTE SINTETICO E=10 cm. m 135.12
13.07 PINTURA EN CONTRAZOCALOS C/OLEO MATE H=50 cm. m 51.10
13.08 PINTURA EN SENDA PEATONAL CON PINTURA REFELECTIVA m2 130.03
13.09 PINTURA DE SEÑALIZACION EN PAVIMENTO C/PINT. REFLECTIVA m 44.78
14 RIELERIA
14.01 SUMINISTRO DE MATERIALES PARA RIELERIA Und. 1.00
14.02 MONTAJE DE RIELERIA m 316.07
15 SEGURIDAD Y SEÑALIZACION
15.01 SEÑALIZACION CON STIKERTS DE PLASTICO Und. 189.00
16 VARIOS
16.01 MESA DE CONCRETO REVESTIDA CON PORCELANATO m2 96.93
16.02 GARGOLAS, SEGUN DISEÑO Und. 19.00
16.03 RODILUVIO m2 34.91
16.04 JUNTA DE DILATACION e=1" m 647.91
16.05 TAPAJUNTAS CON PLANCHA DE BRONCE E=1/32 (FLASING) EN VIGAS ML 54.96
16.06 TAPAJUNTA CON ACERO INOXIDABLE 8" x 3/32" EN COLUMNAS m 37.82
16.07 CERCO DE PALOS DE MADERA DE Ø 4" CON ALAMBRES DE PUAS m 197.00
16.08 LETRAS DE ALUMINIO Und. 18.00
17 MOBILIARIO
17.01 MOBILIARIO DE CAMAL Und. 1.00
COSTO DIRECTO
GASTOS GENERALES 10.0000%
UTILIDAD 5.0000%
SUB TOTAL
IGV 18.0000%
TOTAL PRESUPUESTADO
SON : DOS MILLONES NOVECIENTOS OCHENTITRES MIL SETECIENTOS SETENTIUNO Y 48/100 NUEVOS SOLES
Página 1
U - LA LIBERTAD"
Costo al 12/10/2017
127,082.54
60.52 81,516.20
89.33 45,566.34
204,235.56
20.44 27,122.86
21.45 44,458.77
25.42 34,714.57
24.01 6,054.36
34.81 24,502.06
50.73 49,279.12
30.97 479.73
34.81 3,314.61
34.81 1,512.15
13.05 4,849.90
7.15 3,413.62
10.72 4,533.81
60,172.82
39.81 60,172.82
284,481.44
22.19 32,446.00
17.00 1,856.40
46.99 34,078.09
54.86 13,047.90
55.41 6,412.05
64.14 81,679.72
62.05 19,762.30
63.71 2,782.22
48.87 10,912.67
43.12 7,898.72
8.20 1,385.47
3.38 4,335.12
39.61 50,802.99
72.31 17,081.79
2,873.27
79.85 1,044.44
70.03 1,570.77
25.25 258.06
128,020.20
12.19 1,130.01
22.72 5,208.79
21.06 7,514.63
59.75 113,024.89
36.01 1,141.88
44,873.14
22.67 28,395.99
52.10 16,477.15
16,006.05
196.92 13,855.29
130.13 728.73
113.49 1,422.03
117,867.46
55.23 457.30
139.12 21,745.85
24.54 1,575.47
84.81 5,153.06
249.28 21,669.91
83.34 183.35
89.17 16,252.12
66.31 4,458.02
89.50 3,763.48
20.46 73.66
178.85 22,163.09
148.60 13,188.25
245.78 1,568.08
354.40 2,966.33
130.26 2,649.49
25,861.61
441.04 23,908.78
252.63 1,952.83
4,893.90
76.52 841.72
59.78 3,048.78
10.62 456.66
17.78 231.14
9.36 121.68
8.08 193.92
55,205.80
219.00 13,076.49
101.20 606.19
155.59 2,111.36
839.62 39,411.76
75,815.40
11.84 25,022.89
13.81 18,395.20
11.49 15,739.35
11.48 12,860.24
13.32 1,247.82
4.24 572.91
8.88 453.77
10.02 1,302.90
4.92 220.32
259,547.29
192,075.83 192,075.83
213.47 67,471.46
2,405.97
12.73 2,405.97
29,989.84
84.21 8,162.48
138.04 2,622.76
71.53 2,497.11
4.11 2,662.91
60.11 3,303.65
41.64 1,574.82
43.59 8,587.23
32.16 578.88
759,467.62
759,467.62 759,467.62
2,198,799.91
219,879.99
109,940.00
=============
2,528,619.90
455,151.58
=================
2,983,771.48
SOLES
S10
Presupuesto
Presupuesto 0701018 "CREACION DEL CAMAL MUNICIPAL DEL DISTRITO DE VIRU, PROVINCIA DE VIRU - LA LIBERTAD"
Subpresupuesto 001 INSTALACIONES SANITARIAS GENERALES
Cliente MUNICIPALIDAD PROVINCIAL DE VIRU
Lugar LA LIBERTAD - VIRU - VIRU
SUBTOTAL
IGV(18%)
PRESUPUESTO TOTAL
U - LA LIBERTAD"
Costo al 12/10/2017
8,120.64
219.30 3,289.50
121.75 1,948.00
215.43 646.29
29.58 443.70
26.36 342.68
829.51 829.51
77.62 620.96
18,333.37
26.60 1,090.60
22.01 242.11
16.62 947.34
5.01 962.17
9.27 321.67
10.01 1,215.21
19.44 1,373.05
21.15 232.65
14.49 304.29
85.80 600.60
34.92 663.48
20.19 201.90
160.19 1,121.33
4,781.98
20.50 143.50
19.15 229.80
18.05 18.05
23.47 1,736.78
23.21 69.63
40.16 562.24
25.33 25.33
27.79 1,194.97
26.60 79.80
15.33 153.30
17.28 34.56
16.73 334.60
21.45 42.90
29.02 116.08
13.48 40.44
6.30 1,791.91
1.78 506.29
6.95 1,976.79
29,326.01
43.00 4,988.00
8.08 368.04
4.43 746.68
3.38 1,564.16
17.65 808.37
63.17 694.87
63.43 951.45
7,834.63
16.73 334.60
25.46 229.14
14.57 320.54
13.09 1,243.55
13.09 52.36
14.61 73.05
16.73 1,271.48
13.51 878.15
17.07 273.12
24.87 99.48
24.04 96.16
16.66 66.64
18.78 244.14
75.14 1,202.24
105.56 105.56
36.95 1,145.45
198.97 198.97
6.30 3,194.10
1.78 902.46
6.95 3,523.65
3,749.60
574.81 1,149.62
866.66 2,599.98
2,008.16
10.01 553.55
160.19 640.76
6.30 348.39
6.95 384.34
81.12 81.12
57,788.18
5,778.82
2,889.41
-------------------------
66,456.41
11,962.15
=================
78,418.56
Fecha : 13/10/2017 5:24:59 PM
S10
Presupuesto
Presupuesto 0701018 "CREACION DEL CAMAL MUNICIPAL DEL DISTRITO DE VIRU, PROVINCIA DE VIRU - LA LIBERTAD"
Subpresupuesto 002 POZO A TAJO ABIERTO Y TANQUE ELEVADO
Cliente MUNICIPALIDAD PROVINCIAL DE VIRU
Lugar LA LIBERTAD - VIRU - VIRU
01 OBRAS PRELIMINARES
01.01 LIMPIEZA DE TERRENO m2 60.99
01.02 TRAZO Y REPLANTEO m2 60.99
02 MOVIMIENTO DE TIERRAS
02.01 EXCAVACION MASIVA CON MAQ.EN TERRENO NATURAL m3 164.64
02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 65.63
02.03 ELIM.MAT.CARGUIO MAQ.VOLQUETE 15M3 R=30 D= >a 10KM. m3 27.73
03 CONCRETO SIMPLE
03.01 SOLADOS CONCRETO f'c=100 kg/cm2 E=0.10 M. m2 36.42
03.02 CIMIENTOS CORRIDOS
03.02.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 5.60
03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 28.00
03.03 SOBRECIMIENTOS
03.03.01 CONCRETO EN SOBRECIMIENTOS 1:8 + 25% DE PM m3 1.50
03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 12.00
04 CONCRETO ARMADO
04.01 ZAPATA DE CIMENTACION
04.01.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 25.09
04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 17.92
04.01.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 752.58
04.02 COLUMNAS
04.02.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 14.30
04.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 127.99
04.02.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 2,837.98
04.03 VIGAS
04.03.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 7.52
04.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 51.44
04.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1,668.35
04.04 LOSA MACIZA
04.04.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 1.59
04.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 10.03
04.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 234.45
04.05 CUBA DE RESERVORIO ELEVADO
04.05.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 6.56
04.05.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 54.83
04.05.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 908.72
04.06 CAJA DE PURGA Y REBOSE
04.06.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 0.27
04.06.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 3.06
04.06.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 31.48
04.07 POZO A TAJO ABIERTO
04.07.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 15.76
04.07.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 207.50
04.07.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1,100.48
04.07.04 ANILLO DE ACERO CON PLANCHA DE 3/8" m 5.72
05 MUROS Y TABIQUES DE ALBAÑILERIA
05.01 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARENA m2 18.90
06 REVOQUES Y ENLUCIDOS
06.01 ENLUCIDO PULIDO CON IMPERMEABILIZANTE m2 33.00
06.02 VESTIDURA DE DERRAMES m 5.50
06.03 TARRAJEO DE CONTRAZOCALOS INTERIOR Y EXTERIOR m2 3.56
06.04 ENLUCIDO DE CIELO RASO m2 5.53
07 PISOS Y PAVIMENTOS
07.01 VEREDAS DE CONCRETO E=0.10M. (C° f'c=175kg/cm2) m2 16.90
07.02 ENCOFRADO Y DESENCOFRADO CARAVISTA - VEREDAS m2 5.07
07.03 PISO DE CONCRETO F'C=140KG/CM2 - ACABADO 1:2 C:A E=0.10M m2 11.30
07.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 108.01
08 CARPINTERIA METALICA
08.01 EN TANQUE ELEVADO
08.01.01 PUERTA METALICA LAF 1/16" CON MARCO 1-1/4"X1-1/4"X1/8" Y REFUERZOS m2 2.03
08.01.02 REJILLA DE DE CAJA DE PURGA DE 0.45 x 0.45 M und 1.00
08.01.03 TAPA METALICA INGRESO A TANQUE 0.90 x 0.90 M und 1.00
08.01.04 TAPA METALICA INGRESO A CASETA 0.85 x 0.85 M und 1.00
08.01.05 BARANDA METALICA CON TUBO DE 2"x1.8mm - SEGUN DISEÑO EN ESCALERA m 8.38
08.01.06 ESCALERA METALICA TIPO MARINERA C/CANASTILLA DE SEGURIDAD m 18.93
08.01.07 ESCALERA DE GATO DE TUBERIA DE ACERO INOX. m 1.73
08.02 EN POZO
08.02.01 TAPA Y MARCO METALICO Ø=0.60 m und 1.00
08.02.02 TAPA Y MARCO METALICO 0.40 x 0.40 m und 1.00
08.02.03 ESCALERA DE GATO DE TUBERIA DE ACERO INOX. m 1.80
08.02.04 SOPORTE PARA TUBO und 1.00
09 PINTURA
09.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 242.21
09.02 PINTURA ANTICORROSIVA EN PUERTAS Y VENTANAS m2 2.25
09.03 PINTURA ESMALTE 2 MANOS EN ZOCALO Y CONTRAZOCALO DE CEMENTO m2 3.56
09.04 PINTURA EN CIELO RASO 2 MANOS m2 5.53
10 INSTALACIONES HIDRAULICAS
10.01 TUBERIA DE DN 50mm BB-HD PN16 m 68.70
10.02 BRIDA ROMPE AGUA DN 50MM und 3.00
10.03 BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DE 2" (50 mm) und 8.00
10.04 CODO BB 90°x50mm HD PN16 und 10.00
10.05 CODO BB 45°x50mm HD PN16 und 7.00
10.06 TEE 50x50mm BB-HD PN16 und 2.00
10.07 CANASTILLA ADUCTORA DE HD DN (2") 50mm und 1.00
10.08 UNION FLEXIBLE TIPO DRESSER DE 2" (50mm) und 5.00
10.09 ADAPTADOR HBD 50mm x PVC 63mm und 2.00
10.10 VALVULA COMPUERTA BB-HD DN50mm und 3.00
10.11 VALVULA CHECK BB-HD DN50mm und 1.00
10.12 SOPORTE PARA TUBO und 10.00
10.13 MANOMETRO DE 0-100 PSI und 1.00
10.14 DADOS DE C° DE 0.50 x 0.50M. und 6.00
10.15 TUBO DE VENTILACION DE TANQUE ELEVADO und 1.00
10.16 ELECTROBOMBA SUMERGIBLE 01 HP und 2.00
10.17 MONTAJE E INSTALACIONES HIDRAULICAS glb 1.00
10.18 PRUEBA HIDRAULICA Y DESINFECCION DE TANQUE ELEVADO glb 1.00
11 VARIOS
11.01 GRAVA GRUESA 1/2" a 1/4" m3 0.88
11.02 GRAVA GRUESA 2" a 1" m3 0.88
11.03 GRAVA GRUESA 4" a 3" m3 0.88
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDADES (5%)
SUBTOTAL
IGV(18%)
PRESUPUESTO TOTAL
Fecha :
Página 1
U - LA LIBERTAD"
Costo al 12/10/2017
225.66
1.58 96.36
2.12 129.30
2,761.15
9.38 1,544.32
13.20 866.32
12.64 350.51
3,603.45
20.21 736.05
2,064.78
157.21 880.38
42.30 1,184.40
802.62
196.68 295.02
42.30 507.60
79,517.49
12,084.90
327.27 8,211.20
42.30 758.02
4.14 3,115.68
23,036.04
327.27 4,679.96
51.62 6,606.84
4.14 11,749.24
12,023.37
327.27 2,461.07
51.62 2,655.33
4.14 6,906.97
2,008.73
327.27 520.36
51.62 517.75
4.14 970.62
8,739.31
327.27 2,146.89
51.62 2,830.32
4.14 3,762.10
376.65
327.27 88.36
51.62 157.96
4.14 130.33
21,248.49
327.27 5,157.78
51.62 10,711.15
4.14 4,555.99
143.98 823.57
1,632.02
86.35 1,632.02
1,724.96
40.27 1,328.91
17.96 98.78
16.77 59.70
42.96 237.57
2,158.47
54.73 924.94
51.62 261.71
46.43 524.66
4.14 447.16
10,352.85
9,285.84
170.84 346.81
72.69 72.69
254.72 254.72
224.72 224.72
139.12 1,165.83
360.51 6,824.45
229.26 396.62
1,067.01
217.15 217.15
197.15 197.15
229.26 412.67
240.04 240.04
3,919.18
15.45 3,742.14
17.44 39.24
12.92 46.00
16.60 91.80
18,150.21
40.89 2,809.14
11.31 33.93
78.72 787.20
78.72 551.04
156.02 312.04
84.75 84.75
40.90 204.50
58.43 116.86
166.24 498.72
354.00 354.00
240.04 2,400.40
99.99 99.99
81.12 486.72
103.47 103.47
1,267.96 2,535.92
6,033.12 6,033.12
738.41 738.41
130.92
49.59 43.64
49.59 43.64
49.59 43.64
124,176.36
12,417.64
6,208.82
-------------------------
142,802.82
25,704.51
=================
168,507.33
Presupuesto
Presupuesto 0701018 "CREACION DEL CAMAL MUNICIPAL DEL DISTRITO DE VIRU, PROVINCIA DE VIRU - LA LIBERTAD"
Subpresupuesto 003 PRETRATAMIENTO DE AGUAS RESIDUALES
Cliente MUNICIPALIDAD PROVINCIAL DE VIRU
Lugar LA LIBERTAD - VIRU - VIRU
01 OBRAS PRELIMINARES
01.01 TRAZO Y REPLANTEO m2 406.63
02 TRAMPA DE GRASA
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACION DE ZANJAS PARA ESTRUCTURAS m3 12.35
02.01.02 ACARREO DE MATERIAL EXCEDENTE HASTA 30m m3 15.44
02.01.03 ELIM.MAT.CARGUIO MAQ.VOLQUETE 15M3 R=30 D= >a 10KM. m3 15.44
02.02 CONCRETO SIMPLE
02.02.01 SOLADOS CONCRETO f'c=100 kg/cm2 E=0.10 M. m2 2.19
02.03 CONCRETO ARMADO
02.03.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 1.67
02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.99
02.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 49.38
02.04 TARRAJEO Y ENLUCIDOS
02.04.01 ENLUCIDO PULIDO CON IMPERMEABILIZANTE m2 5.53
02.05 VARIOS
02.05.01 ASA DE FIERRO LISO 3/8 und 6.00
03 CAMARA DE BOMBEO N°01
03.01 MOVIMIENTO DE TIERRAS
03.01.01 EXCAVACION DE ZANJAS PARA ESTRUCTURAS m3 17.75
03.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 11.51
03.01.03 ACARREO DE MATERIAL EXCEDENTE HASTA 30m m3 7.80
03.01.04 ELIM.MAT.CARGUIO MAQ.VOLQUETE 15M3 R=30 D= >a 10KM. m3 7.80
03.02 CONCRETO SIMPLE
03.02.01 SOLADOS CONCRETO f'c=100 kg/cm2 E=0.10 M. m2 2.84
03.03 CONCRETO ARMADO
03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 23.39
03.03.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 136.28
03.03.03 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 3.11
03.04 TARRAJEO Y ENLUCIDOS
03.04.01 ENLUCIDO PULIDO CON IMPERMEABILIZANTE m2 9.78
03.05 CARPINTERIA METALICA
03.05.01 TAPA DE F° ESTRIADA HERMETICO 1.00 x 0.50 m m2 0.50
03.05.02 TAPA DE F° ESTRIADA HERMETICO 0.65 x 0.65 m m2 0.42
03.05.03 ESCALERA F°G° ACCESO A CAMARA m 1.40
03.05.04 SOPORTE METALICO P/TUBERIA und 1.00
03.06 INSTALACIONES HIDRAULICAS
03.06.01 ELECTROBOMBA SUMERGIBLE PARA DESAGUE 01 HP und 2.00
03.06.02 TUBERIA DE DN 50mm BB-HD PN16 m 7.15
03.06.03 CODO BB 90°x50mm HD PN16 und 3.00
03.06.04 CODO BB 45°x50mm HD PN16 und 1.00
03.06.05 YEE 50x50mm BB-HD PN16 und 1.00
03.06.06 TEE 50x50mm BB-HD PN16 und 2.00
03.06.07 MANOMETRO DE 0-100 PSI und 1.00
03.06.08 VALVULA CHECK BB-HD DN50mm und 2.00
03.06.09 UNION AUTOPORTANTE BB-HD DN50mm und 2.00
03.06.10 VALVULA COMPUERTA BB-HD DN50mm und 3.00
03.06.11 VALVULA VENTOSA DE SANEAMIENTO BB-HD DN50mm und 1.00
03.06.12 VALVULA DE ALIVIO BB-HD DN50mm und 1.00
03.06.13 MONTAJE E INSTALACIONES HIDRAULICAS DE ESTACION DE BOMBEO glb 1.00
03.07 VARIOS
03.07.01 DADOS DE C° DE 0.50 x 0.50M. und 5.00
04 REACTOR ANAEROBIO DE FLUJO ASCENDENTE (RAFA)
04.01 MOVIMIENTO DE TIERRAS
04.01.01 EXCAVACION DE ZANJAS PARA ESTRUCTURAS m3 74.70
04.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 42.20
04.01.03 ACARREO DE MATERIAL EXCEDENTE HASTA 30m m3 20.31
04.01.04 ELIM.MAT.CARGUIO MAQ.VOLQUETE 15M3 R=30 D= >a 10KM. m3 20.31
04.02 CONCRETO SIMPLE
04.02.01 SOLADOS CONCRETO f'c=100 kg/cm2 E=0.10 M. m2 20.74
04.03 CONCRETO ARMADO
04.03.01 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 273.17
04.03.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 2,814.84
04.03.03 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 47.14
04.04 TARRAJEO Y ENLUCIDOS
04.04.01 ENLUCIDO PULIDO CON IMPERMEABILIZANTE m2 96.78
04.05 CARPINTERIA METALICA
04.05.01 TAPA METÁLICA SANITARIA .60 x .60m und 2.00
04.05.02 SOPORTE METALICO P/TUBERIA und 4.00
04.06 INSTALACIONES HIDRAULICAS
04.06.01 TUBERIA DE DN 150mm BB-HD PN16 m 11.28
04.06.02 TUBERIA DE DN 100mm BB-HD PN16 m 8.64
04.06.03 CODO BB 90°x150mm HD PN16 und 4.00
04.06.04 CODO BB 90°x100mm HD PN16 und 2.00
04.06.05 BRIDA ROMPE AGUA DN 150MM und 4.00
04.06.06 BRIDA ROMPE AGUA DN 100MM und 2.00
04.06.07 TEE 150x100mm BB-HD PN16 und 2.00
04.06.08 VALVULA COMPUERTA BB-HD DN150mm und 2.00
04.06.09 TUBERIA PVC PN10 - DN 50mm m 80.00
04.06.10 DIFUSORES PVC Ø 1_1/2" und 16.00
04.06.11 TUBERIA PVC Ø2" PN10 m 12.00
04.06.12 VALVULA GLOBO PVC Ø2" und 10.00
04.06.13 MONTAJE E INSTALACIONES HIDRAULICAS glb 1.00
04.07 VARIOS
04.07.01 CAMPANA R.A.F.A. DE PLASTICO REFORZADO DE FIBRA DE VIDRIO (PRFV), SEGUN DISEÑO und 2.00
SUBTOTAL
IGV(18%)
PRESUPUESTO TOTAL
Fecha :
Página 1
U - LA LIBERTAD"
Costo al 12/10/2017
862.06
2.12 862.06
2,235.56
662.40
31.52 389.27
5.05 77.97
12.64 195.16
44.26
20.21 44.26
1,046.65
327.27 546.54
42.30 295.68
4.14 204.43
222.69
40.27 222.69
259.56
43.26 259.56
26,264.40
849.39
31.52 559.48
13.20 151.93
5.05 39.39
12.64 98.59
57.40
20.21 57.40
2,571.41
42.30 989.40
4.14 564.20
327.27 1,017.81
393.84
40.27 393.84
720.32
351.30 175.65
351.30 147.55
191.27 267.78
129.34 129.34
21,266.44
4,245.02 8,490.04
40.89 292.36
78.72 236.16
78.72 78.72
50.12 50.12
156.02 312.04
99.99 99.99
354.00 708.00
40.90 81.80
166.24 498.72
1,415.37 1,415.37
2,970.00 2,970.00
6,033.12 6,033.12
405.60
81.12 405.60
69,574.41
3,270.87
31.52 2,354.54
13.20 557.04
5.05 102.57
12.64 256.72
419.16
20.21 419.16
41,181.99
51.62 14,101.04
4.14 11,653.44
327.27 15,427.51
3,897.33
40.27 3,897.33
787.26
134.95 269.90
129.34 517.36
7,510.32
125.71 1,418.01
76.92 664.59
241.64 966.56
157.44 314.88
11.31 45.24
28.11 56.22
292.03 584.06
567.61 1,135.22
2.64 211.20
4.48 71.68
3.94 47.28
27.97 279.70
1,715.68 1,715.68
12,507.48
6,253.74 12,507.48
43,180.37
1,725.40
31.52 1,085.23
13.20 179.52
5.05 131.50
12.64 329.15
247.57
20.21 247.57
19,548.19
51.62 6,488.12
4.14 6,367.40
327.27 6,692.67
2,295.39
40.27 2,295.39
19,363.82
16,980.08 16,980.08
125.71 150.85
241.64 483.28
11.31 33.93
1,715.68 1,715.68
23,288.77
2,036.66
31.52 1,370.17
13.20 436.52
5.05 65.65
12.64 164.32
14.15
20.21 14.15
9,878.16
51.62 3,028.03
4.14 4,078.15
327.27 2,771.98
629.82
40.27 629.82
5,912.14
398.06 716.51
240.04 960.16
145.94 1,377.67
247.32 1,978.56
139.12 879.24
4,817.84
125.71 892.54
241.64 724.92
583.83 583.83
11.31 33.93
138.59 138.59
567.61 567.61
160.74 160.74
1,715.68 1,715.68
29,105.52
939.25
31.52 622.84
13.20 178.60
5.05 39.34
12.64 98.47
57.40
20.21 57.40
2,728.61
42.30 1,102.34
4.14 608.46
327.27 1,017.81
440.96
40.27 440.96
1,109.28
351.30 351.30
351.30 351.30
191.27 277.34
129.34 129.34
23,424.42
4,898.10 9,796.20
40.89 343.88
78.72 314.88
78.72 393.60
50.12 50.12
156.02 468.06
99.99 99.99
354.00 708.00
166.24 831.20
1,415.37 1,415.37
2,970.00 2,970.00
6,033.12 6,033.12
405.60
81.12 405.60
3,717.39
299.00
31.52 194.16
13.20 46.46
5.05 16.67
12.64 41.71
62.25
20.21 62.25
3,356.14
924.44
327.27 805.08
4.14 119.36
1,437.95
327.27 297.82
42.30 564.71
4.14 575.42
85.78
327.27 16.36
58.47 22.80
4.14 46.62
528.38
327.27 144.00
51.62 328.82
4.14 55.56
151.82
40.27 151.82
227.77
95.70 227.77
4,286.49
438.13
31.52 257.52
5.05 51.56
12.64 129.05
100.04
20.21 100.04
2,189.42
327.27 1,014.54
42.30 754.21
4.14 420.67
718.01
40.27 718.01
344.24
351.30 224.83
351.30 56.21
63.20 63.20
240.77
19.44 159.41
81.36 81.36
255.88
81.12 162.24
6.30 51.66
5.12 41.98
31,110.35
4,664.39
31.52 1,634.94
64.77 1,059.64
49.59 335.23
64.77 437.85
54.72 1,196.73
444.62
20.21 444.62
15,774.25
327.27 5,949.77
42.30 6,450.75
4.14 3,373.73
6,141.18
40.27 6,141.18
765.11
22.37 590.57
54.64 109.28
32.63 65.26
2,834.08
40.89 177.87
166.24 332.48
78.72 393.60
156.02 156.02
58.43 58.43
1,715.68 1,715.68
486.72
81.12 486.72
2,871.67
1.55 83.78
12.81 692.38
2.52 136.21
4.46 241.06
6.95 375.65
12.64 15.55
1,055.04
19.44 318.62
22.37 736.42
272.00
81.36 162.72
54.64 109.28
1,254.80
160.19 640.76
204.68 614.04
176,457.12
2,245.68
0.63 648.98
1.55 1,596.70
4,156.61
1.52 3,131.58
130.32 651.60
78.38 78.38
13.25 66.25
22.88 228.80
98,143.39
10.67 5,410.12
12.81 3,677.62
14.24 3,360.64
2.52 2,595.93
4.59 4,728.30
17.60 8,923.90
20.42 5,862.38
24.34 5,744.24
42.02 4,677.25
28.30 51,089.42
12.64 2,073.59
23,079.87
19.44 19,372.74
3.72 3,707.13
48,655.22
1,293.13 6,465.65
1,358.06 10,864.48
1,581.45 3,162.90
1,644.43 13,155.44
2,175.70 4,351.40
2,193.97 6,581.91
145.48 4,073.44
176.35
176.35 176.35
414,208.91
41,420.89
20,710.45
-------------------------
476,340.25
85,741.25
=================
562,081.50
Presupuesto
Presupuesto 0701018 "CREACION DEL CAMAL MUNICIPAL DEL DISTRITO DE VIRU, PROVINCIA DE VIRU - LA LIBERTAD"
Subpresupuesto 004 INSTALACIONES ELECTRICAS GENERALES
Cliente MUNICIPALIDAD PROVINCIAL DE VIRU
Lugar LA LIBERTAD - VIRU - VIRU
SUBTOTAL
IGV(18%)
PRESUPUESTO TOTAL
U - LA LIBERTAD"
Costo al 12/10/2017
467,661.78 467,661.78
467,661.78
46,766.18
23,383.09
-------------------------
537,811.05
96,805.99
=================
634,617.04