CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

OBRA : CREACIÓN DEL CAMAL MUNICIPAL DEL DISTRITO DE VIRU, PROVINCIA DE VIRU - LA LIBERTAD

LUGAR : LA LIBERTAD - TRUJILLO - VIRU

PARTIDA DESCRIPCION TOTAL 1er MES 2° MES 3° MES 4° MES 5° MES 6° MES 7° MES

01 ESTRUCTURAS 2,003,775.31 200,377.53 400,755.06 400,755.06 400,755.06 400,755.06 200,377.53

02 ARQUITECTURA 2,198,799.91 219,879.99 439,759.98 439,759.98 439,759.98 439,759.98

03 INSTALACIONES SANITARIAS 57,788.18 5,778.82 5,778.82 5,778.82 11,557.64 14,447.05

04 POZO A TAJO ABIERTO Y TANQUE ELEVADO 124,176.36 37,252.91 37,252.91 37,252.91

05 PRETRATAMIENTO DE AGUAS RESIDUALES 414,208.91 82,841.78 82,841.78 82,841.78 82,841.78 82,841.78

06 INSTALACIONES ELECTRICAS 467,661.78 46,766.18 46,766.18 46,766.18 93,532.36 116,915.45

COSTO DIRECTO 5,266,410.45 283,219.31 573,394.75 793,274.74 960,609.73 975,901.82 745,227.51 571,122.47

GASTOS GENERALES (10.00%) 526,641.05 28,321.93 57,339.47 79,327.47 96,060.97 97,590.18 74,522.75 57,112.25

UTILIDAD (5.00%) 263,320.52 14,160.97 28,669.74 39,663.74 48,030.49 48,795.09 37,261.38 28,556.12

SUB TOTAL 6,056,372.02 325,702.21 659,403.96 912,265.95 1,104,701.19 1,122,287.10 857,011.63 656,790.84

I.G.V. 18.00 % 1,090,146.96 58,626.40 118,692.71 164,207.87 198,846.21 202,011.68 154,262.09 118,222.35

PRESUPUESTO DE LA OBRA 7,146,518.98 384,328.61 778,096.67 1,076,473.82 1,303,547.41 1,324,298.77 1,011,273.72 775,013.19

AVANCE PARCIAL ( % ) 5.38 10.89 15.06 18.24 18.53 14.15 10.84


AVANCE ACUMULADO ( % ) 5.38 16.27 31.33 49.57 68.10 82.25 93.09
8° MES TOTAL S/.

2,003,775.31

219,879.99 2,198,799.91

14,447.05 57,788.18

12,417.64 124,176.36

414,208.91

116,915.45 467,661.78

363,660.12 5,266,410.45

36,366.01 526,641.05

18,183.01 263,320.52

418,209.13 6,056,372.02

75,277.64 1,090,146.96

493,486.78 7,146,518.98

6.91
100.00
S10

Presupuesto
Presupuesto 0304028
Subpresupuesto 001
Cliente MUNICIPALIDAD PROVINCIAL DE VIRU Costo al
Lugar LA LIBERTAD - VIRU - VIRU

Item Descripción Und. Metrado Precio S/.

01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD


01.01 OBRAS PROVISIONALES
01.02 OBRAS PRELIMINARES
01.03 SEGURIDAD Y SALUD
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.02 CONCRETO SIMPLE
02.02.02 CIMIENTOS CORRIDO
02.02.04 RAMPA
02.02.06 FALSO PISO ARMADO
02.02.07 PISO ARMADO
02.02.08 DADOS DE CONCRETO
02.02.09 CONCRETO EN ESTRIBOS
02.03 CONCRETO ARMADO
02.03.01 ZAPATAS
02.03.02 ZAPATAS EN DADOS
02.03.03 VIGAS DE CIMENTACION
02.03.04 SOBRECIMIENTOS
02.03.05 MUROS DE CONCRETO C°
02.03.06 COLUMNAS
02.03.07 PLACAS
02.03.08 COLUMNETAS
02.03.09 VIGAS
02.03.10 LOSAS
02.03.11 ESCALERAS
02.03.12 DADO DEL GRUPO ELECTROGENO
02.03.13 CONCRETO ARMADO PARA PUENTE DE ACCESO
02.04 VARIOS
COSTO DIRECTO 2,
GASTOS GENERALES 10.0000%
UTILIDAD 5.0000%
=====

SUB TOTAL 2,
IGV 18.0000%
=========

TOTAL PRESUPUESTADO 2,

SON : DOS MILLONES SETECIENTOS DIECINUEVE MIL CIENTO VEINTITRES Y 10/100 NUEVOS SOLES
Página

Costo al 12/10/2017

Precio S/. Parcial S/.

48,030.11
32,122.32
73,877.90

405,686.58

4,908.12
15,092.65
6,659.80
3,968.38
2,388.22
9,792.55

145,063.68
8,237.86
168,692.38
153,854.63
11,392.47
297,544.45
48,879.43
22,706.46
241,941.61
180,607.36
11,747.62
2,106.05
18,374.25
13,878.69
2,003,775.31
200,377.53
100,188.77
=============

2,304,341.61
414,781.49
=================

2,719,123.10
S10

Presupuesto
Presupuesto 0304028 "CREACION DEL CAMAL MUNICIPAL DEL DISTRITO DE VIRU, PROVINCIA DE VIRU - LA LIBERTAD"
Subpresupuesto 002 ARQUITECTURA
Cliente MUNICIPALIDAD PROVINCIAL DE VIRU
Lugar LA LIBERTAD - VIRU - VIRU

Item Descripción Und. Metrado

01 MUROS Y TABIQUES DE ALBAÑILERIA


01.01 MURO DE LADRILLLO KK 18 HUECOS TIPO IV SOGA m2 1,346.93
01.02 MURO DE LADRILLLO KK 18 HUECOS TIPO IV CABEZA m2 510.09
02 REVOQUES Y ENLUCIDOS
02.01 TARRAJEO PRIMARIO RAYADO CON MORTERO C:A / 1:5 m2 1,326.95
02.02 TARRAJEO EN MUROS INTERIORES m2 2,072.67
02.03 TARRAJEO EN MUROS EXTERIORES m2 1,365.64
02.04 TARRAJEO EN MUROS INTERIORES Y EXTERIORES DE CERCO m2 252.16
02.05 TARRAJEO DE COLUMNAS m2 703.88
02.06 TARRAJEO DE VIGAS m2 971.40
02.07 TARRAJEO CON IMPERMEABILIZANTE m2 15.49
02.08 TARRAJEO EN PLACAS m2 95.22
02.09 TARRAJEO EN MURO ARMADO m2 43.44
02.10 VESTIDURA DE DERRAMES ML 371.64
02.11 BRUÑAS E=1 cm ML 477.43
02.12 BRUÑAS E=2" ML 422.93
03 CIELORRASOS
03.01 CIELORRASOS C/ MEZCLA C:A / 1:4 m2 1,511.50
04 PISOS Y PAVIMENTOS
04.01 CONTRAPISO DE 40 mm m2 1,462.19
04.02 ACABADO DE PISO CEMENTOPULIDO Y BRUÑADO COLOR GRIS e=1 cm. m2 109.20
04.03 VEREDA DE CONCRETO " f'c=175 Kg/cm2, BRUÑADO, e=4" m2 725.22
04.04 PISO DE ADOQUINES DE CONCRETO e= 6cm. m2 237.84
04.05 PISO DE CERAMICO ALTO TRANSITO 30x30 cm. m2 115.72
04.06 PISO DE PORCELANATO DE 60x60 cm (Antideslizante) m2 1,273.46
04.07 PISO DE CEMENTO GRIS FROTACHADO Y BRUÑADO E=0.15 M. (C° f'c=210kg/cm2) m2 318.49
04.08 RAMPA DE CONCRETO f'c= 175 Kg/cm2 (Según Detalle) m2 43.67
04.09 SARDINEL BAJO DE CONCRETO f'c= 175 Kg/cm2 (0.45x0.15) m 223.30
04.10 CANALETA DE CONCRETO f'c= 175 Kg/cm2 P/DRENAJE m 183.18
04.11 CANALETA PLUVIAL CON TUBO DE Ø 3" PVC SAL m 168.96
04.12 IMPRIMACION ASFALTICA (Manual) m2 1,282.58
04.13 CARPETA ASFALTICA EN CALEINTE DE 2" m2 1,282.58
04.14 PAVIMENTO RIGIDO DE CONCRETO F'C=210 KG/CM2 E=0.20M. m2 236.23
05 REVESTIMIENTOS Y TABIQUERIA
05.01 REVESTIMIENTO C/PORCELANATO ANTIDESLIZANTE DE PASOS Y CONTRAPASOS EN ESCALERA m2 13.08

05.02 REVESTIMIENTO C/PORCELANATO ANTIDESLIZANTE EN DESCANSOS DE ESCALERA m2 22.43

05.03 REVESTIMIENTO C/CEMENTO PULIDO DE PASOS Y CONTRAPASOS EN GRADERIA m2 10.22

06 ZOCALOS Y CONTRAZOCALOS
06.01 CONTRAZOCALO CEMENTO SIN COLOREAR H=10 CM PULIDO ML 92.70
06.02 CONTRAZOCALO DE PORCELANATO H=0.10 m. ML 229.26
06.03 CONTRAZOCALO SANITARIO DE TERRAZO VACIADO IN SITU H=10 m 356.82
06.04 ZOCALO DE CERAMICA DE COLOR (30x30) m2 1,891.63
06.05 ZOCALO DE CEMENTO PULIDO H=0.50M MEZ 1:4 m2 31.71
07 CUBIERTAS
07.01 COBERTURA CON MORTERO CON IMPERMEABILIZANTE E=1.5CM CON BRUÑAS A/S m2 1,252.58

07.02 COBERTURA DE LADRILLO PASTELERO m2 316.26


08 CARPINTERIA DE ALUMINIO
08.01 PUERTA CON MARCO DE ALUMINIO, CON VIDRIO TEMPLADO E=8MM m2 70.36
08.02 PUERTA CON TUBO DE ALUMINIO DE 2" Y PLANCHA DE MELAMINE 18mm m2 5.60
08.03 PANELES DIVISORIOS CON TUBO DE ALUMINIO DE Ø = 2" Y PLANCHA DE MELAMINE 18mm m2 12.53

09 CARPINTERIA METALICA
09.01 PASAMANOS DE FIERRO DE Ø=2" P/ESCALERAS ML 8.28
09.02 BARANDA METALICA CON TUBO DE 2"x1.8mm - SEGUN DISEÑO m 156.31
09.03 CANTONERA P/ESTRIADA 2"x2"x3/16" EN ESCALERAS ML 64.20
09.04 TECHO CON POLICARBONATO ALVEOLAR E=6MM SOBRE TUBO CUADRADO m2 60.76
09.05 PUERTAS METALICAS DE FIERRO CON MALLA (Según diseño) Incluye bisagr. y cerrojos. m2 86.93

09.06 VENTANAS METALICAS CON MALLA GALVANIZADA (Segun diseño) m2 2.20


09.07 REJILLA PARA CANALETA METALICA m 182.26
09.08 PROTECTOR METALICO DE FIERRO m2 67.23
09.09 MARCO DE TUBO CON MALLA GALVANIZADA # 10(Segun diseño) m2 42.05
09.10 TUBO DE FIERRO NEGRO Ø 2" PARA CERCO PERIMETRICO m 3.60
09.11 CERCO SEPARADOR EN CORRALES m 123.92
09.12 VENTANAS METALICAS CON CON CELOSIA DE PLATINA Y MALLA DE ACERO m2 88.75
09.13 PUERTA METALICA DE TUBO DE FIERRO CON PLANCHA (Segun Diseño, inc. bisagras y cerradura) m2 6.38

09.14 PUERTA METALICA DE TUBO DE FIERRO CON PLANCHA Y MALLA (Segun Diseño, inc. bisagras y m2 8.37
cerradura)
09.15 PUERTA METALICA DE MARCO DE TUBO REDONDO Ø 1" Y SEPARADORES DE 1/2", inc. bisagras y m2 20.34
cerradura)
10 CARPINTERIA DE MADERA
10.01 PUERTA CONTRAPLACADA CON TRIPLAY Y MARCO DE MADERA DE CEDRO m2 54.21
10.02 MUEBLE DE MELAMINE EN COCINA (Segun diseño) m 7.73
11 CERRAJERIA
11.01 CERRADURA TIPO PESADA DE SOBREPONER TRES GOLPES pza 11.00
11.02 CERRADURA DE POMO CON PESTILLO pza 51.00
11.03 BISAGRA CAPUCHINA DE 4" X 3" P/PUERTAS pza 43.00
11.04 MANIJA DE BRONCE DE 4" Und. 13.00
11.05 CERROJO SIMPLE DE 3" Und. 13.00
11.06 BISAGRA CAPUCHINA DE 3" x 3" P/PUERTAS pza 24.00
12 VIDRIOS, CRISTALES Y SIMILARES
12.01 VENT. SISTEMA DIRECTO C/VIDRIO TEMPLADO 6 mm, Incoloro m2 59.71
12.02 PUERTA CON SISTEMA DIRECTO C/VIDRIO CRUDO 6 mm, Incoloro m2 5.99
12.03 VENT. SISTEMA DIRECTO C/VIDRIO CRUDO 6 mm, Incoloro m2 13.57
12.04 MURO CORTINA m2 46.94
13 PINTURA
13.01 PINTURA DE MUROS INTERIORES C/OLEO MATE, 2 MANOS m2 2,113.42
13.02 PINTURA DE MUROS EXTERIORES C/OLEO MATE 2 MANOS m2 1,332.02
13.03 PINTURA DE COLUMNAS Y VIGAS C/ OLEO MATE 2 MANOS m2 1,369.83
13.04 PINTURA LATEX PARA CIELO RASO 2 MANOS m2 1,120.23
13.05 PINTURA AL DUCO EN CARPINTERIA DE MADERA m2 93.68
13.06 PINTURA EN CONTRAZOCALOS C/ESMALTE SINTETICO E=10 cm. m 135.12
13.07 PINTURA EN CONTRAZOCALOS C/OLEO MATE H=50 cm. m 51.10
13.08 PINTURA EN SENDA PEATONAL CON PINTURA REFELECTIVA m2 130.03
13.09 PINTURA DE SEÑALIZACION EN PAVIMENTO C/PINT. REFLECTIVA m 44.78
14 RIELERIA
14.01 SUMINISTRO DE MATERIALES PARA RIELERIA Und. 1.00
14.02 MONTAJE DE RIELERIA m 316.07
15 SEGURIDAD Y SEÑALIZACION
15.01 SEÑALIZACION CON STIKERTS DE PLASTICO Und. 189.00
16 VARIOS
16.01 MESA DE CONCRETO REVESTIDA CON PORCELANATO m2 96.93
16.02 GARGOLAS, SEGUN DISEÑO Und. 19.00
16.03 RODILUVIO m2 34.91
16.04 JUNTA DE DILATACION e=1" m 647.91
16.05 TAPAJUNTAS CON PLANCHA DE BRONCE E=1/32 (FLASING) EN VIGAS ML 54.96
16.06 TAPAJUNTA CON ACERO INOXIDABLE 8" x 3/32" EN COLUMNAS m 37.82
16.07 CERCO DE PALOS DE MADERA DE Ø 4" CON ALAMBRES DE PUAS m 197.00
16.08 LETRAS DE ALUMINIO Und. 18.00
17 MOBILIARIO
17.01 MOBILIARIO DE CAMAL Und. 1.00
COSTO DIRECTO
GASTOS GENERALES 10.0000%
UTILIDAD 5.0000%

SUB TOTAL
IGV 18.0000%

TOTAL PRESUPUESTADO

SON : DOS MILLONES NOVECIENTOS OCHENTITRES MIL SETECIENTOS SETENTIUNO Y 48/100 NUEVOS SOLES
Página 1

U - LA LIBERTAD"

Costo al 12/10/2017

Precio S/. Parcial S/.

127,082.54
60.52 81,516.20
89.33 45,566.34
204,235.56
20.44 27,122.86
21.45 44,458.77
25.42 34,714.57
24.01 6,054.36
34.81 24,502.06
50.73 49,279.12
30.97 479.73
34.81 3,314.61
34.81 1,512.15
13.05 4,849.90
7.15 3,413.62
10.72 4,533.81
60,172.82
39.81 60,172.82
284,481.44
22.19 32,446.00
17.00 1,856.40
46.99 34,078.09
54.86 13,047.90
55.41 6,412.05
64.14 81,679.72
62.05 19,762.30
63.71 2,782.22
48.87 10,912.67
43.12 7,898.72
8.20 1,385.47
3.38 4,335.12
39.61 50,802.99
72.31 17,081.79
2,873.27
79.85 1,044.44

70.03 1,570.77

25.25 258.06

128,020.20
12.19 1,130.01
22.72 5,208.79
21.06 7,514.63
59.75 113,024.89
36.01 1,141.88
44,873.14
22.67 28,395.99

52.10 16,477.15
16,006.05
196.92 13,855.29
130.13 728.73
113.49 1,422.03

117,867.46
55.23 457.30
139.12 21,745.85
24.54 1,575.47
84.81 5,153.06
249.28 21,669.91

83.34 183.35
89.17 16,252.12
66.31 4,458.02
89.50 3,763.48
20.46 73.66
178.85 22,163.09
148.60 13,188.25
245.78 1,568.08

354.40 2,966.33

130.26 2,649.49

25,861.61
441.04 23,908.78
252.63 1,952.83
4,893.90
76.52 841.72
59.78 3,048.78
10.62 456.66
17.78 231.14
9.36 121.68
8.08 193.92
55,205.80
219.00 13,076.49
101.20 606.19
155.59 2,111.36
839.62 39,411.76
75,815.40
11.84 25,022.89
13.81 18,395.20
11.49 15,739.35
11.48 12,860.24
13.32 1,247.82
4.24 572.91
8.88 453.77
10.02 1,302.90
4.92 220.32
259,547.29
192,075.83 192,075.83
213.47 67,471.46
2,405.97
12.73 2,405.97
29,989.84
84.21 8,162.48
138.04 2,622.76
71.53 2,497.11
4.11 2,662.91
60.11 3,303.65
41.64 1,574.82
43.59 8,587.23
32.16 578.88
759,467.62
759,467.62 759,467.62
2,198,799.91
219,879.99
109,940.00
=============

2,528,619.90
455,151.58
=================

2,983,771.48

SOLES
S10

Presupuesto
Presupuesto 0701018 "CREACION DEL CAMAL MUNICIPAL DEL DISTRITO DE VIRU, PROVINCIA DE VIRU - LA LIBERTAD"
Subpresupuesto 001 INSTALACIONES SANITARIAS GENERALES
Cliente MUNICIPALIDAD PROVINCIAL DE VIRU
Lugar LA LIBERTAD - VIRU - VIRU

Item Descripción Und. Metrado

01 APARATOS Y ACCESORIOS SANITARIOS


01.01 INODORO-TANQUE BAJO BLANCO pza 15.00
01.02 LAVATORIO TIPO MANANTIAL pza 16.00
01.03 URINARIO TIPO BAMBI pza 3.00
01.04 PAPELERA DE LOSA pza 15.00
01.05 DOSIFICADOR DE JABON LIQUIDO CON REPUESTO und 13.00
01.06 LAVAPLATOS C/2 POZAS DE ACERO INOXIDABLE und 1.00
01.07 LLAVE DE DUCHA CON SALIDA pza 8.00
02 INSTALACIONES DE DESAGÜE
02.01 SALIDA DE PVC SAL PARA DESAGUE DE 4" pto 41.00
02.02 SALIDA DE PVC SAL PARA DESAGUE DE 3" pto 11.00
02.03 SALIDA DE PVC SAL PARA DESAGUE DE 2" pto 57.00
02.04 RED DE PVC SAL PARA DESAGUE DE 2" m 192.05
02.05 RED DE PVC SAL PARA DESAGUE DE 3" m 34.70
02.06 RED DE PVC SAL PARA DESAGUE DE 4" m 121.40
02.07 SUMINISTRO E INSTALACION DE TUBERIA PVC SN4 UF. DN 160 MM. m 70.63
02.08 SUMIDERO ROSCADO DE BRONCE 3" und 11.00
02.09 SUMIDERO ROSCADO DE BRONCE 2" und 21.00
02.10 REGISTRO ROSCADO DE BRONCE 6" und 7.00
02.11 REGISTRO ROSCADO DE BRONCE 4" und 19.00
02.12 REGISTRO ROSCADO DE BRONCE 2" und 10.00
02.13 CAJA DE REGISTRO DE DESAGUE 12" X 24" - INCLUYE INSTALACION und 7.00
02.14 ACCESORIOS
02.14.01 CODO PVC-SAL 4" C/REDUCCION 2" und 7.00
02.14.02 CODO PVC SAL 4"X90° und 12.00
02.14.03 CODO PVC SAL 3"X45° und 1.00
02.14.04 CODO PVC SAL 2"X90° und 74.00
02.14.05 CODO PVC SAL 2"X45° und 3.00
02.14.06 TEE SANITARIA PVC 4"x4" und 14.00
02.14.07 TEE SANITARIA PVC 2"x2" und 1.00
02.14.08 YEE PVC-SAL 4" und 43.00
02.14.09 YEE PVC-SAL 3" und 3.00
02.14.10 YEE PVC-SAL 2" und 10.00
02.14.11 REDUCCIONES PVC-SAL 4" A 2" und 2.00
02.14.12 TRAMPA "P" DE PVC SAL PARA DESAGUE DE 2" und 20.00
02.14.13 TRAMPA "P" DE PVC SAL PARA DESAGUE DE 3" und 2.00
02.14.14 TRAMPA "P" DE PVC SAL PARA DESAGUE DE 4" und 4.00
02.14.15 SOMBRERO VENTILACION PVC DE 2" und 3.00
02.15 EXCAVACION DE ZANJAS PARA DESAGÜE INTERIOR m 284.43
02.16 REFINE Y NIVELACION DE ZANJAS m 284.43
02.17 RELLENO COMP.ZANJA CON MATERIAL PROPIO DESAGÜE INTERIOR m 284.43
03 INSTALACIONES DE AGUA POTABLE
03.01 SALIDA DE AGUA FRIA pto 116.00
03.02 RED DE AGUA POTABLE Ø 2" PVC C-10 m 45.55
03.03 RED DE AGUA POTABLE Ø 1" PVC C-10 m 168.55
03.04 RED DE AGUA POTABLE Ø 1/2" PVC C-10 m 462.77
03.05 RED DE AGUA TUB. ACERO GALV. Ø1/2" m 45.80
03.06 VALVULAS ESFERICA DE 1/2" und 11.00
03.07 VALVULA COMPUERTA DE BRONCE 1/2" und 15.00
03.08 ACCESORIOS
03.08.01 CODO DE F°G° DE 1/2"x90º und 20.00
03.08.02 TEE DE F°G° DE 1/2" und 9.00
03.08.03 ABRAZADERA PARA TUBERIA DE 1/2" und 22.00
03.08.04 CODO PVC DE 1/2"x90° PN 10 und 95.00
03.08.05 CODO PVC DE 1/2"x45° PN 10 und 4.00
03.08.06 CODO PVC DE 1"x90° PN 10 und 5.00
03.08.07 CODO DE F°G° DE 1/2"x90º und 76.00
03.08.08 TEE PVC PN 10 DIAM. 1/2"x1/2" und 65.00
03.08.09 TEE PVC PN 10 DIAM. 1"x1" und 16.00
03.08.10 TEE PVC PN 10 DIAM. 2"x2" und 4.00
03.08.11 REDUCCION PVC DE 2" - 1" und 4.00
03.08.12 REDUCCION PVC DE 2" - 1/2" und 4.00
03.08.13 REDUCCION PVC DE 1" - 1/2" und 13.00
03.08.14 LLAVE PARA LAVATORIO und 16.00
03.08.15 LLAVE PARA LAVAPLATOS und 1.00
03.08.16 GRIFO PARA RIEGO 1/2" und 31.00
03.08.17 BARANDA DE SEGURIDAD PARA BAÑO und 1.00
03.09 EXCAVACION DE ZANJAS PARA AGUA INTERIOR m 507.00
03.10 REFINE Y NIVELACION DE ZANJAS m 507.00
03.11 RELLENO COMP.ZANJA CON MATERIAL PROPIO m 507.00
03.12 EQUIPOS
03.12.01 ELECTROBOMBA PARA DUCHA DE ANIMALES und 2.00
03.12.02 EQUIPO HIDRONEUMATICO und 3.00
04 SISTEMA PLUVIAL
04.01 RED DE PVC SAL PARA DESAGUE DE 4" m 55.30
04.02 CAJA DE REGISTRO DE DESAGUE 12" X 24" - INCLUYE INSTALACION und 4.00
04.03 EXCAVACION DE ZANJAS PARA DESAGÜE INTERIOR m 55.30
04.04 RELLENO COMP.ZANJA CON MATERIAL PROPIO DESAGÜE INTERIOR m 55.30
04.05 DADOS DE C° DE 0.50 x 0.50M. und 1.00
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDADES (5%)

SUBTOTAL
IGV(18%)

PRESUPUESTO TOTAL

SON : SETENTIOCHO MIL CUATROCIENTOS DIECIOCHO Y 56/100 NUEVOS SOLES


Fecha :
Página 1

U - LA LIBERTAD"

Costo al 12/10/2017

Precio S/. Parcial S/.

8,120.64
219.30 3,289.50
121.75 1,948.00
215.43 646.29
29.58 443.70
26.36 342.68
829.51 829.51
77.62 620.96
18,333.37
26.60 1,090.60
22.01 242.11
16.62 947.34
5.01 962.17
9.27 321.67
10.01 1,215.21
19.44 1,373.05
21.15 232.65
14.49 304.29
85.80 600.60
34.92 663.48
20.19 201.90
160.19 1,121.33
4,781.98
20.50 143.50
19.15 229.80
18.05 18.05
23.47 1,736.78
23.21 69.63
40.16 562.24
25.33 25.33
27.79 1,194.97
26.60 79.80
15.33 153.30
17.28 34.56
16.73 334.60
21.45 42.90
29.02 116.08
13.48 40.44
6.30 1,791.91
1.78 506.29
6.95 1,976.79
29,326.01
43.00 4,988.00
8.08 368.04
4.43 746.68
3.38 1,564.16
17.65 808.37
63.17 694.87
63.43 951.45
7,834.63
16.73 334.60
25.46 229.14
14.57 320.54
13.09 1,243.55
13.09 52.36
14.61 73.05
16.73 1,271.48
13.51 878.15
17.07 273.12
24.87 99.48
24.04 96.16
16.66 66.64
18.78 244.14
75.14 1,202.24
105.56 105.56
36.95 1,145.45
198.97 198.97
6.30 3,194.10
1.78 902.46
6.95 3,523.65
3,749.60
574.81 1,149.62
866.66 2,599.98
2,008.16
10.01 553.55
160.19 640.76
6.30 348.39
6.95 384.34
81.12 81.12
57,788.18
5,778.82
2,889.41
-------------------------

66,456.41
11,962.15
=================

78,418.56
Fecha : 13/10/2017 5:24:59 PM
S10

Presupuesto
Presupuesto 0701018 "CREACION DEL CAMAL MUNICIPAL DEL DISTRITO DE VIRU, PROVINCIA DE VIRU - LA LIBERTAD"
Subpresupuesto 002 POZO A TAJO ABIERTO Y TANQUE ELEVADO
Cliente MUNICIPALIDAD PROVINCIAL DE VIRU
Lugar LA LIBERTAD - VIRU - VIRU

Item Descripción Und. Metrado

01 OBRAS PRELIMINARES
01.01 LIMPIEZA DE TERRENO m2 60.99
01.02 TRAZO Y REPLANTEO m2 60.99
02 MOVIMIENTO DE TIERRAS
02.01 EXCAVACION MASIVA CON MAQ.EN TERRENO NATURAL m3 164.64
02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 65.63
02.03 ELIM.MAT.CARGUIO MAQ.VOLQUETE 15M3 R=30 D= >a 10KM. m3 27.73
03 CONCRETO SIMPLE
03.01 SOLADOS CONCRETO f'c=100 kg/cm2 E=0.10 M. m2 36.42
03.02 CIMIENTOS CORRIDOS
03.02.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 5.60
03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 28.00
03.03 SOBRECIMIENTOS
03.03.01 CONCRETO EN SOBRECIMIENTOS 1:8 + 25% DE PM m3 1.50
03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 12.00
04 CONCRETO ARMADO
04.01 ZAPATA DE CIMENTACION
04.01.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 25.09
04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 17.92
04.01.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 752.58
04.02 COLUMNAS
04.02.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 14.30
04.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 127.99
04.02.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 2,837.98
04.03 VIGAS
04.03.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 7.52
04.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 51.44
04.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1,668.35
04.04 LOSA MACIZA
04.04.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 1.59
04.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 10.03
04.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 234.45
04.05 CUBA DE RESERVORIO ELEVADO
04.05.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 6.56
04.05.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 54.83
04.05.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 908.72
04.06 CAJA DE PURGA Y REBOSE
04.06.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 0.27
04.06.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 3.06
04.06.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 31.48
04.07 POZO A TAJO ABIERTO
04.07.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 15.76
04.07.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 207.50
04.07.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1,100.48
04.07.04 ANILLO DE ACERO CON PLANCHA DE 3/8" m 5.72
05 MUROS Y TABIQUES DE ALBAÑILERIA
05.01 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-ARENA m2 18.90
06 REVOQUES Y ENLUCIDOS
06.01 ENLUCIDO PULIDO CON IMPERMEABILIZANTE m2 33.00
06.02 VESTIDURA DE DERRAMES m 5.50
06.03 TARRAJEO DE CONTRAZOCALOS INTERIOR Y EXTERIOR m2 3.56
06.04 ENLUCIDO DE CIELO RASO m2 5.53
07 PISOS Y PAVIMENTOS
07.01 VEREDAS DE CONCRETO E=0.10M. (C° f'c=175kg/cm2) m2 16.90
07.02 ENCOFRADO Y DESENCOFRADO CARAVISTA - VEREDAS m2 5.07
07.03 PISO DE CONCRETO F'C=140KG/CM2 - ACABADO 1:2 C:A E=0.10M m2 11.30
07.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 108.01
08 CARPINTERIA METALICA
08.01 EN TANQUE ELEVADO
08.01.01 PUERTA METALICA LAF 1/16" CON MARCO 1-1/4"X1-1/4"X1/8" Y REFUERZOS m2 2.03
08.01.02 REJILLA DE DE CAJA DE PURGA DE 0.45 x 0.45 M und 1.00
08.01.03 TAPA METALICA INGRESO A TANQUE 0.90 x 0.90 M und 1.00
08.01.04 TAPA METALICA INGRESO A CASETA 0.85 x 0.85 M und 1.00
08.01.05 BARANDA METALICA CON TUBO DE 2"x1.8mm - SEGUN DISEÑO EN ESCALERA m 8.38
08.01.06 ESCALERA METALICA TIPO MARINERA C/CANASTILLA DE SEGURIDAD m 18.93
08.01.07 ESCALERA DE GATO DE TUBERIA DE ACERO INOX. m 1.73
08.02 EN POZO
08.02.01 TAPA Y MARCO METALICO Ø=0.60 m und 1.00
08.02.02 TAPA Y MARCO METALICO 0.40 x 0.40 m und 1.00
08.02.03 ESCALERA DE GATO DE TUBERIA DE ACERO INOX. m 1.80
08.02.04 SOPORTE PARA TUBO und 1.00
09 PINTURA
09.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES 2 MANOS m2 242.21
09.02 PINTURA ANTICORROSIVA EN PUERTAS Y VENTANAS m2 2.25
09.03 PINTURA ESMALTE 2 MANOS EN ZOCALO Y CONTRAZOCALO DE CEMENTO m2 3.56
09.04 PINTURA EN CIELO RASO 2 MANOS m2 5.53
10 INSTALACIONES HIDRAULICAS
10.01 TUBERIA DE DN 50mm BB-HD PN16 m 68.70
10.02 BRIDA ROMPE AGUA DN 50MM und 3.00
10.03 BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DE 2" (50 mm) und 8.00
10.04 CODO BB 90°x50mm HD PN16 und 10.00
10.05 CODO BB 45°x50mm HD PN16 und 7.00
10.06 TEE 50x50mm BB-HD PN16 und 2.00
10.07 CANASTILLA ADUCTORA DE HD DN (2") 50mm und 1.00
10.08 UNION FLEXIBLE TIPO DRESSER DE 2" (50mm) und 5.00
10.09 ADAPTADOR HBD 50mm x PVC 63mm und 2.00
10.10 VALVULA COMPUERTA BB-HD DN50mm und 3.00
10.11 VALVULA CHECK BB-HD DN50mm und 1.00
10.12 SOPORTE PARA TUBO und 10.00
10.13 MANOMETRO DE 0-100 PSI und 1.00
10.14 DADOS DE C° DE 0.50 x 0.50M. und 6.00
10.15 TUBO DE VENTILACION DE TANQUE ELEVADO und 1.00
10.16 ELECTROBOMBA SUMERGIBLE 01 HP und 2.00
10.17 MONTAJE E INSTALACIONES HIDRAULICAS glb 1.00
10.18 PRUEBA HIDRAULICA Y DESINFECCION DE TANQUE ELEVADO glb 1.00
11 VARIOS
11.01 GRAVA GRUESA 1/2" a 1/4" m3 0.88
11.02 GRAVA GRUESA 2" a 1" m3 0.88
11.03 GRAVA GRUESA 4" a 3" m3 0.88
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDADES (5%)

SUBTOTAL
IGV(18%)

PRESUPUESTO TOTAL

SON : CIENTO SESENTIOCHO MIL QUINIENTOS SIETE Y 33/100 NUEVOS SOLES

Fecha :
Página 1

U - LA LIBERTAD"

Costo al 12/10/2017

Precio S/. Parcial S/.

225.66
1.58 96.36
2.12 129.30
2,761.15
9.38 1,544.32
13.20 866.32
12.64 350.51
3,603.45
20.21 736.05
2,064.78
157.21 880.38
42.30 1,184.40
802.62
196.68 295.02
42.30 507.60
79,517.49
12,084.90
327.27 8,211.20
42.30 758.02
4.14 3,115.68
23,036.04
327.27 4,679.96
51.62 6,606.84
4.14 11,749.24
12,023.37
327.27 2,461.07
51.62 2,655.33
4.14 6,906.97
2,008.73
327.27 520.36
51.62 517.75
4.14 970.62
8,739.31
327.27 2,146.89
51.62 2,830.32
4.14 3,762.10
376.65
327.27 88.36
51.62 157.96
4.14 130.33
21,248.49
327.27 5,157.78
51.62 10,711.15
4.14 4,555.99
143.98 823.57
1,632.02
86.35 1,632.02
1,724.96
40.27 1,328.91
17.96 98.78
16.77 59.70
42.96 237.57
2,158.47
54.73 924.94
51.62 261.71
46.43 524.66
4.14 447.16
10,352.85
9,285.84
170.84 346.81
72.69 72.69
254.72 254.72
224.72 224.72
139.12 1,165.83
360.51 6,824.45
229.26 396.62
1,067.01
217.15 217.15
197.15 197.15
229.26 412.67
240.04 240.04
3,919.18
15.45 3,742.14
17.44 39.24
12.92 46.00
16.60 91.80
18,150.21
40.89 2,809.14
11.31 33.93

78.72 787.20
78.72 551.04
156.02 312.04
84.75 84.75
40.90 204.50
58.43 116.86
166.24 498.72
354.00 354.00
240.04 2,400.40
99.99 99.99
81.12 486.72
103.47 103.47
1,267.96 2,535.92
6,033.12 6,033.12
738.41 738.41
130.92
49.59 43.64
49.59 43.64
49.59 43.64
124,176.36
12,417.64
6,208.82
-------------------------

142,802.82
25,704.51
=================

168,507.33

Fecha : 13/10/2017 5:26:01 PM


S10

Presupuesto
Presupuesto 0701018 "CREACION DEL CAMAL MUNICIPAL DEL DISTRITO DE VIRU, PROVINCIA DE VIRU - LA LIBERTAD"
Subpresupuesto 003 PRETRATAMIENTO DE AGUAS RESIDUALES
Cliente MUNICIPALIDAD PROVINCIAL DE VIRU
Lugar LA LIBERTAD - VIRU - VIRU

Item Descripción Und. Metrado

01 OBRAS PRELIMINARES
01.01 TRAZO Y REPLANTEO m2 406.63
02 TRAMPA DE GRASA
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACION DE ZANJAS PARA ESTRUCTURAS m3 12.35
02.01.02 ACARREO DE MATERIAL EXCEDENTE HASTA 30m m3 15.44
02.01.03 ELIM.MAT.CARGUIO MAQ.VOLQUETE 15M3 R=30 D= >a 10KM. m3 15.44
02.02 CONCRETO SIMPLE
02.02.01 SOLADOS CONCRETO f'c=100 kg/cm2 E=0.10 M. m2 2.19
02.03 CONCRETO ARMADO
02.03.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 1.67
02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.99
02.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 49.38
02.04 TARRAJEO Y ENLUCIDOS
02.04.01 ENLUCIDO PULIDO CON IMPERMEABILIZANTE m2 5.53
02.05 VARIOS
02.05.01 ASA DE FIERRO LISO 3/8 und 6.00
03 CAMARA DE BOMBEO N°01
03.01 MOVIMIENTO DE TIERRAS
03.01.01 EXCAVACION DE ZANJAS PARA ESTRUCTURAS m3 17.75
03.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 11.51
03.01.03 ACARREO DE MATERIAL EXCEDENTE HASTA 30m m3 7.80
03.01.04 ELIM.MAT.CARGUIO MAQ.VOLQUETE 15M3 R=30 D= >a 10KM. m3 7.80
03.02 CONCRETO SIMPLE
03.02.01 SOLADOS CONCRETO f'c=100 kg/cm2 E=0.10 M. m2 2.84
03.03 CONCRETO ARMADO
03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 23.39
03.03.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 136.28
03.03.03 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 3.11
03.04 TARRAJEO Y ENLUCIDOS
03.04.01 ENLUCIDO PULIDO CON IMPERMEABILIZANTE m2 9.78
03.05 CARPINTERIA METALICA
03.05.01 TAPA DE F° ESTRIADA HERMETICO 1.00 x 0.50 m m2 0.50
03.05.02 TAPA DE F° ESTRIADA HERMETICO 0.65 x 0.65 m m2 0.42
03.05.03 ESCALERA F°G° ACCESO A CAMARA m 1.40
03.05.04 SOPORTE METALICO P/TUBERIA und 1.00
03.06 INSTALACIONES HIDRAULICAS
03.06.01 ELECTROBOMBA SUMERGIBLE PARA DESAGUE 01 HP und 2.00
03.06.02 TUBERIA DE DN 50mm BB-HD PN16 m 7.15
03.06.03 CODO BB 90°x50mm HD PN16 und 3.00
03.06.04 CODO BB 45°x50mm HD PN16 und 1.00
03.06.05 YEE 50x50mm BB-HD PN16 und 1.00
03.06.06 TEE 50x50mm BB-HD PN16 und 2.00
03.06.07 MANOMETRO DE 0-100 PSI und 1.00
03.06.08 VALVULA CHECK BB-HD DN50mm und 2.00
03.06.09 UNION AUTOPORTANTE BB-HD DN50mm und 2.00
03.06.10 VALVULA COMPUERTA BB-HD DN50mm und 3.00
03.06.11 VALVULA VENTOSA DE SANEAMIENTO BB-HD DN50mm und 1.00
03.06.12 VALVULA DE ALIVIO BB-HD DN50mm und 1.00
03.06.13 MONTAJE E INSTALACIONES HIDRAULICAS DE ESTACION DE BOMBEO glb 1.00
03.07 VARIOS
03.07.01 DADOS DE C° DE 0.50 x 0.50M. und 5.00
04 REACTOR ANAEROBIO DE FLUJO ASCENDENTE (RAFA)
04.01 MOVIMIENTO DE TIERRAS
04.01.01 EXCAVACION DE ZANJAS PARA ESTRUCTURAS m3 74.70
04.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 42.20
04.01.03 ACARREO DE MATERIAL EXCEDENTE HASTA 30m m3 20.31
04.01.04 ELIM.MAT.CARGUIO MAQ.VOLQUETE 15M3 R=30 D= >a 10KM. m3 20.31
04.02 CONCRETO SIMPLE
04.02.01 SOLADOS CONCRETO f'c=100 kg/cm2 E=0.10 M. m2 20.74
04.03 CONCRETO ARMADO
04.03.01 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 273.17
04.03.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 2,814.84
04.03.03 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 47.14
04.04 TARRAJEO Y ENLUCIDOS
04.04.01 ENLUCIDO PULIDO CON IMPERMEABILIZANTE m2 96.78
04.05 CARPINTERIA METALICA
04.05.01 TAPA METÁLICA SANITARIA .60 x .60m und 2.00
04.05.02 SOPORTE METALICO P/TUBERIA und 4.00
04.06 INSTALACIONES HIDRAULICAS
04.06.01 TUBERIA DE DN 150mm BB-HD PN16 m 11.28
04.06.02 TUBERIA DE DN 100mm BB-HD PN16 m 8.64
04.06.03 CODO BB 90°x150mm HD PN16 und 4.00
04.06.04 CODO BB 90°x100mm HD PN16 und 2.00
04.06.05 BRIDA ROMPE AGUA DN 150MM und 4.00
04.06.06 BRIDA ROMPE AGUA DN 100MM und 2.00
04.06.07 TEE 150x100mm BB-HD PN16 und 2.00
04.06.08 VALVULA COMPUERTA BB-HD DN150mm und 2.00
04.06.09 TUBERIA PVC PN10 - DN 50mm m 80.00
04.06.10 DIFUSORES PVC Ø 1_1/2" und 16.00
04.06.11 TUBERIA PVC Ø2" PN10 m 12.00
04.06.12 VALVULA GLOBO PVC Ø2" und 10.00
04.06.13 MONTAJE E INSTALACIONES HIDRAULICAS glb 1.00
04.07 VARIOS
04.07.01 CAMPANA R.A.F.A. DE PLASTICO REFORZADO DE FIBRA DE VIDRIO (PRFV), SEGUN DISEÑO und 2.00

05 REACTOR BIOLOGICO DE LODOS ACTIVADOS


05.01 MOVIMIENTO DE TIERRAS
05.01.01 EXCAVACION DE ZANJAS PARA ESTRUCTURAS m3 34.43
05.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 13.60
05.01.03 ACARREO DE MATERIAL EXCEDENTE HASTA 30m m3 26.04
05.01.04 ELIM.MAT.CARGUIO MAQ.VOLQUETE 15M3 R=30 D= >a 10KM. m3 26.04
05.02 CONCRETO SIMPLE
05.02.01 SOLADOS CONCRETO f'c=100 kg/cm2 E=0.10 M. m2 12.25
05.03 CONCRETO ARMADO
05.03.01 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 125.69
05.03.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1,538.02
05.03.03 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 20.45
05.04 TARRAJEO Y ENLUCIDOS
05.04.01 ENLUCIDO PULIDO CON IMPERMEABILIZANTE m2 57.00
05.05 INSTALACIONES HIDRAULICAS
05.05.01 AEREDOR SUMERGIBLE 05 HP und 1.00
05.05.02 TUBERIA DE DN 150mm BB-HD PN16 m 1.20
05.05.03 CODO BB 90°x150mm HD PN16 und 2.00
05.05.04 BRIDA ROMPE AGUA DN 150MM und 3.00
05.05.05 MONTAJE E INSTALACIONES HIDRAULICAS glb 1.00
06 SEDIMENTADOR (DORMUNT)
06.01 MOVIMIENTO DE TIERRAS
06.01.01 EXCAVACION DE ZANJAS PARA ESTRUCTURAS m3 43.47
06.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 33.07
06.01.03 ACARREO DE MATERIAL EXCEDENTE HASTA 30m m3 13.00
06.01.04 ELIM.MAT.CARGUIO MAQ.VOLQUETE 15M3 R=30 D= >a 10KM. m3 13.00
06.02 CONCRETO SIMPLE
06.02.01 SOLADOS CONCRETO f'c=100 kg/cm2 E=0.10 M. m2 0.70
06.03 CONCRETO ARMADO
06.03.01 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 58.66
06.03.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 985.06
06.03.03 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 8.47
06.04 TARRAJEO Y ENLUCIDOS
06.04.01 ENLUCIDO PULIDO CON IMPERMEABILIZANTE m2 15.64
06.05 CARPINTERIA METALICA
06.05.01 TUBO DE ACERO DE DIAM. 0.80m m 1.80
06.05.02 SOPORTE PARA TUBO und 4.00
06.05.03 CANALETA DE RECOLECCION DENTADA DE F°G° m 9.44
06.05.04 SOPORTE METALICO P/CANALETA und 8.00
06.05.05 BARANDA METALICA CON TUBO DE 2"x1.8mm - SEGUN DISEÑO EN PASARELA m 6.32
06.06 INSTALACIONES HIDRAULICAS
06.06.01 TUBERIA DE DN 150mm BB-HD PN16 m 7.10
06.06.02 CODO BB 90°x150mm HD PN16 und 3.00
06.06.03 YEE 150x150mm BB-HD PN16 und 1.00
06.06.04 BRIDA ROMPE AGUA DN 150MM und 3.00
06.06.05 JUNTA DE DESMONTAJE DN 150mm und 1.00
06.06.06 VALVULA MARIPOSA DN 150mm und 1.00
06.06.07 ADAPTADOR HBD 150mm x PVC 160mm und 1.00
06.06.08 MONTAJE E INSTALACIONES HIDRAULICAS glb 1.00
07 CAMARA DE BOMBEO N°02
07.01 MOVIMIENTO DE TIERRAS
07.01.01 EXCAVACION DE ZANJAS PARA ESTRUCTURAS m3 19.76
07.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 13.53
07.01.03 ACARREO DE MATERIAL EXCEDENTE HASTA 30m m3 7.79
07.01.04 ELIM.MAT.CARGUIO MAQ.VOLQUETE 15M3 R=30 D= >a 10KM. m3 7.79
07.02 CONCRETO SIMPLE
07.02.01 SOLADOS CONCRETO f'c=100 kg/cm2 E=0.10 M. m2 2.84
07.03 CONCRETO ARMADO
07.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 26.06
07.03.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 146.97
07.03.03 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 3.11
07.04 TARRAJEO Y ENLUCIDOS
07.04.01 ENLUCIDO PULIDO CON IMPERMEABILIZANTE m2 10.95
07.05 CARPINTERIA METALICA
07.05.01 TAPA DE F° ESTRIADA HERMETICO 1.00 x 0.50 m m2 1.00
07.05.02 TAPA DE F° ESTRIADA HERMETICO 0.65 x 0.65 m m2 1.00
07.05.03 ESCALERA F°G° ACCESO A CAMARA m 1.45
07.05.04 SOPORTE METALICO P/TUBERIA und 1.00
07.06 INSTALACIONES HIDRAULICAS
07.06.01 ELECTROBOMBA SUMERGIBLE PARA DESAGUE 02 HP und 2.00
07.06.02 TUBERIA DE DN 50mm BB-HD PN16 m 8.41
07.06.03 CODO BB 90°x50mm HD PN16 und 4.00
07.06.04 CODO BB 45°x50mm HD PN16 und 5.00
07.06.05 YEE 50x50mm BB-HD PN16 und 1.00
07.06.06 TEE 50x50mm BB-HD PN16 und 3.00
07.06.07 MANOMETRO DE 0-100 PSI und 1.00
07.06.08 VALVULA CHECK BB-HD DN50mm und 2.00
07.06.09 VALVULA COMPUERTA BB-HD DN50mm und 5.00
07.06.10 VALVULA VENTOSA DE SANEAMIENTO BB-HD DN50mm und 1.00
07.06.11 VALVULA DE ALIVIO BB-HD DN50mm und 1.00
07.06.12 MONTAJE E INSTALACIONES HIDRAULICAS DE ESTACION DE BOMBEO glb 1.00
07.07 VARIOS
07.07.01 DADOS DE C° DE 0.50 x 0.50M. und 5.00
08 DISTRIBUIDOR DE REPARTO
08.01 MOVIMIENTO DE TIERRAS
08.01.01 EXCAVACION DE ZANJAS PARA ESTRUCTURAS m3 6.16
08.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.52
08.01.03 ACARREO DE MATERIAL EXCEDENTE HASTA 30m m3 3.30
08.01.04 ELIM.MAT.CARGUIO MAQ.VOLQUETE 15M3 R=30 D= >a 10KM. m3 3.30
08.02 CONCRETO SIMPLE
08.02.01 SOLADOS CONCRETO f'c=100 kg/cm2 E=0.10 M. m2 3.08
08.03 CONCRETO ARMADO
08.03.01 ZAPATAS
08.03.01.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 2.46
08.03.01.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 28.83
08.03.02 COLUMNAS
08.03.02.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 0.91
08.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL COLUMNAS m2 13.35
08.03.02.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 138.99
08.03.03 VIGAS
08.03.03.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 0.05
08.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 0.39
08.03.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 11.26
08.03.04 CAJA DE REPARTO
08.03.04.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 0.44
08.03.04.02 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 6.37
08.03.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 13.42
08.03.05 TARRAJEO Y ENLUCIDOS
08.03.05.01 ENLUCIDO PULIDO CON IMPERMEABILIZANTE m2 3.77
08.03.06 VARIOS
08.03.06.01 PANTALLA PVC DE REPARTO m2 2.38
09 TRAMPA DE SOLIDOS
09.01 MOVIMIENTO DE TIERRAS
09.01.01 EXCAVACION DE ZANJAS PARA ESTRUCTURAS m3 8.17
09.01.02 ACARREO DE MATERIAL EXCEDENTE HASTA 30m m3 10.21
09.01.03 ELIM.MAT.CARGUIO MAQ.VOLQUETE 15M3 R=30 D= >a 10KM. m3 10.21
09.02 CONCRETO SIMPLE
09.02.01 SOLADOS CONCRETO f'c=100 kg/cm2 E=0.10 M. m2 4.95
09.03 CONCRETO ARMADO
09.03.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 3.10
09.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 17.83
09.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 101.61
09.04 TARRAJEO Y ENLUCIDOS
09.04.01 ENLUCIDO PULIDO CON IMPERMEABILIZANTE m2 17.83
09.05 CARPINTERIA METALICA
09.05.01 TAPA DE F° ESTRIADA HERMETICO 0.80 x 0.80 m m2 0.64
09.05.02 TAPA DE F° ESTRIADA HERMETICO 0.40 x 0.40 m m2 0.16
09.05.03 REJILLA METALICA GALV. C/SEPARACION HASTA 1" (SEGUN DISEÑO) und 1.00
09.06 INSTALACIONES HIDRAULICAS
09.06.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SN4 UF. DN 160 MM. m 8.20
09.06.02 SUMINISTRO E INSTALACION DE CODO PVC DN=160MM x 90° und 1.00
09.07 VARIOS
09.07.01 DADOS DE C° DE 0.50 x 0.50M. und 2.00
09.07.02 EXCAVACION PARA RED DE TUBERIA m 8.20
09.07.03 RELLENO CON MATERIAL PROPIO PARA RED m 8.20
10 LECHOS DE SECADO DE LODOS
10.01 MOVIMIENTO DE TIERRAS
10.01.01 EXCAVACION DE ZANJAS PARA ESTRUCTURAS m3 51.87
10.01.02 GRAVA GRUESA 1_1/2" a 1" m3 16.36
10.01.03 GRAVA GRUESA 1/2" a 1/4" m3 6.76
10.01.04 GRAVA GRUESA 1/4" a 1/8" m3 6.76
10.01.05 ARENA FINA m3 21.87
10.02 CONCRETO SIMPLE
10.02.01 SOLADOS CONCRETO f'c=100 kg/cm2 E=0.10 M. m2 22.00
10.03 CONCRETO ARMADO
10.03.01 CONCRETO f'c=210 kg/cm2 - CEMENTO TIPO MS m3 18.18
10.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 152.50
10.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 814.91
10.04 TARRAJEO Y ENLUCIDOS
10.04.01 ENLUCIDO PULIDO CON IMPERMEABILIZANTE m2 152.50
10.05 INSTALACIONES SANITARIAS
10.05.01 SUMINISTRO E INSTALACION DE TUBERIA PVC PN 10 UF. DN 110 MM. m 26.40
10.05.02 SUMINISTRO E INSTALACION DE CODO PVC DN=110MM x 90° und 2.00
10.05.03 SOMBRERO VENTILACION PVC Ø4" und 2.00
10.06 INSTALACIONES HIDRAULICAS
10.06.01 TUBERIA DE DN 50mm BB-HD PN16 m 4.35
10.06.02 VALVULA COMPUERTA BB-HD DN50mm und 2.00
10.06.03 CODO BB 90°x50mm HD PN16 und 5.00
10.06.04 TEE 50x50mm BB-HD PN16 und 1.00
10.06.05 ADAPTADOR HBD 50mm x PVC 63mm und 1.00
10.06.06 MONTAJE E INSTALACIONES HIDRAULICAS glb 1.00
10.07 VARIOS
10.07.01 DADOS DE C° DE 0.50 x 0.50M. und 6.00
11 INSTALACION DE TUBERIAS
11.01 TRAZO NIVELACION Y REPLANTEO m 54.05
11.02 EXCAVACION EN TERRENO NORMAL "C" TUBERIA 3"-6" HASTA 1.50 M m 54.05
11.03 REFINE Y NIVELACION EN TERRENO NORMAL m 54.05
11.04 CAMA DE APOYO E=0.10 M. PARA CONEXIONES m 54.05
11.05 RELLENO COMP.ZANJA CON MATERIAL PROPIO m 54.05
11.06 ELIM.MAT.CARGUIO MAQ.VOLQUETE 15M3 R=30 D= >a 10KM. m3 1.23
11.07 SUMINISTRO E INSTALACION DE TUBERIAS
11.07.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SN4 UF. DN 160 MM. m 16.39
11.07.02 SUMINISTRO E INSTALACION DE TUBERIA PVC PN 10 UF. DN 110 MM. m 32.92
11.08 SUMINISTRO E INSTALACION DE ACCESORIOS
11.08.01 SUMINISTRO E INSTALACION DE CODO PVC DN=160MM x 45° und 2.00
11.08.02 SUMINISTRO E INSTALACION DE CODO PVC DN=110MM x 45° und 2.00
12 CAJA DE DISTRIBUCION
12.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" - INCLUYE INSTALACION und 4.00
12.02 CAJA DE REGISTRO DE DESAGUE 24" X 24" - INCLUYE INSTALACION und 3.00
13 REDES DE ALCANTARILLADO SANITARIO
13.01 OBRAS PRELIMINARES
13.01.01 LIMPIEZA DE TERRENO m 1,030.13
13.01.02 TRAZO NIVELACION Y REPLANTEO m 1,030.13
13.02 SEÑALIZACION DE TRANSITO
13.02.01 PARANTE CON CINTA PLASTICA PARA SEÑALIZACION m 2,060.25
13.02.02 TRANQUERAS DE MADERA 1.20X1.10 m PARA DESVIO TRANSITO VEHICULAR und 5.00
13.02.03 PUENTE PASE PEATONAL und 1.00
13.02.04 SEÑALIZACION NOCTURNA d 5.00
13.02.05 CONO FOSFORESCENTE PARA SEÑALIZACION und 10.00
13.03 MOVIMIENTO DE TIERRAS
13.03.01 EXCAVACION CON MAQ.TERRENO NORMAL"C" TUB. 6"-10" HASTA 1.50 M PF. m 507.04
13.03.02 EXCAVACION CON MAQ.TERRENO NORMAL"C" TUB. 6"-10" HASTA 2.00 M PF. m 287.09
13.03.03 EXCAVACION CON MAQ.TERRENO NORMAL"C" TUB. 6"-10" HASTA 2.50 M PF. m 236.00
13.03.04 REFINE Y NIVELACION EN TERRENO NORMAL m 1,030.13
13.03.05 CAMA DE APOYO ZANJAS TERR. NORMAL PARA TUBERIA 8"-16" E=0.10 M. m 1,030.13
13.03.06 RELLENO COMP. ZANJA TERRENO NORMAL "C" TUBERIA 6"-10" HASTA 1.50 M m 507.04
13.03.07 RELLENO COMP. ZANJA TERRENO NORMAL "C" TUBERIA 6"-10" HASTA 2.00 M m 287.09
13.03.08 RELLENO COMP. ZANJA TERRENO NORMAL "C" TUBERIA 6"-10" HASTA 2.50 M m 236.00
13.03.09 EXCAVACION MANUAL DE BUZONES m3 111.31
13.03.10 ENTIBADO Y DESENTIBADO DE ZANJAS m2 1,805.28
13.03.11 ELIM.MAT.CARGUIO MAQ.VOLQUETE 15M3 R=30 D= >a 10KM. m3 164.05
13.04 SUMINISTRO E INSTALACION DE TUBERIAS
13.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SN4 UF. DN 160 MM. m 996.54
13.04.02 PRUEBA HIDRAULICA PARA TUBERIA DE DESAGÜE DN 160 mm m 996.54
13.05 BUZONES Y/O CAJAS DE INSPECCION
13.05.01 BUZON TIPO I TERRENO NORMAL DIAM. 1.20M. HASTA 1.25 m. PF. und 5.00
13.05.02 BUZON TIPO I TERRENO NORMAL DIAM. 1.20M. HASTA 1.50 m. PF. und 8.00
13.05.03 BUZON TIPO I TERRENO NORMAL DIAM. 1.20M. HASTA 1.75 m. PF. und 2.00
13.05.04 BUZON TIPO I TERRENO NORMAL DIAM. 1.20M. HASTA 2.00 m. PF. und 8.00
13.05.05 BUZON TIPO I TERRENO NORMAL DIAM. 1.20M. HASTA 2.25 m. PF. und 2.00
13.05.06 BUZON TIPO I TERRENO NORMAL DIAM. 1.20M. HASTA 2.50 m. PF. und 3.00
13.05.07 SUMINISTRO E INSTALACION DE TAPA DE BUZON C°A° - DIAM. 0.65 M. und 28.00
13.06 VARIOS
13.06.01 EMPALME A BUZON EXISTENTE und 1.00
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDADES (5%)

SUBTOTAL
IGV(18%)

PRESUPUESTO TOTAL

SON : QUINIENTOS SESENTIDOS MIL OCHENTIUNO Y 50/100 NUEVOS SOLES

Fecha :
Página 1

U - LA LIBERTAD"

Costo al 12/10/2017

Precio S/. Parcial S/.

862.06
2.12 862.06
2,235.56
662.40
31.52 389.27
5.05 77.97
12.64 195.16
44.26
20.21 44.26
1,046.65
327.27 546.54
42.30 295.68
4.14 204.43
222.69
40.27 222.69
259.56
43.26 259.56
26,264.40
849.39
31.52 559.48
13.20 151.93
5.05 39.39
12.64 98.59
57.40
20.21 57.40
2,571.41
42.30 989.40
4.14 564.20
327.27 1,017.81
393.84
40.27 393.84
720.32
351.30 175.65
351.30 147.55
191.27 267.78
129.34 129.34
21,266.44
4,245.02 8,490.04
40.89 292.36
78.72 236.16
78.72 78.72
50.12 50.12
156.02 312.04
99.99 99.99
354.00 708.00
40.90 81.80
166.24 498.72
1,415.37 1,415.37
2,970.00 2,970.00
6,033.12 6,033.12
405.60
81.12 405.60
69,574.41
3,270.87
31.52 2,354.54
13.20 557.04
5.05 102.57
12.64 256.72
419.16
20.21 419.16
41,181.99
51.62 14,101.04
4.14 11,653.44
327.27 15,427.51
3,897.33
40.27 3,897.33
787.26
134.95 269.90
129.34 517.36
7,510.32
125.71 1,418.01
76.92 664.59
241.64 966.56
157.44 314.88
11.31 45.24
28.11 56.22
292.03 584.06
567.61 1,135.22
2.64 211.20
4.48 71.68
3.94 47.28
27.97 279.70
1,715.68 1,715.68
12,507.48
6,253.74 12,507.48

43,180.37
1,725.40
31.52 1,085.23
13.20 179.52
5.05 131.50
12.64 329.15
247.57
20.21 247.57
19,548.19
51.62 6,488.12
4.14 6,367.40
327.27 6,692.67
2,295.39
40.27 2,295.39
19,363.82
16,980.08 16,980.08
125.71 150.85
241.64 483.28
11.31 33.93
1,715.68 1,715.68
23,288.77
2,036.66
31.52 1,370.17
13.20 436.52
5.05 65.65
12.64 164.32
14.15
20.21 14.15
9,878.16
51.62 3,028.03
4.14 4,078.15
327.27 2,771.98
629.82
40.27 629.82
5,912.14
398.06 716.51
240.04 960.16
145.94 1,377.67
247.32 1,978.56
139.12 879.24
4,817.84
125.71 892.54
241.64 724.92
583.83 583.83
11.31 33.93
138.59 138.59
567.61 567.61
160.74 160.74
1,715.68 1,715.68
29,105.52
939.25
31.52 622.84
13.20 178.60
5.05 39.34
12.64 98.47
57.40
20.21 57.40
2,728.61
42.30 1,102.34
4.14 608.46
327.27 1,017.81
440.96
40.27 440.96
1,109.28
351.30 351.30
351.30 351.30
191.27 277.34
129.34 129.34
23,424.42
4,898.10 9,796.20
40.89 343.88
78.72 314.88
78.72 393.60
50.12 50.12
156.02 468.06
99.99 99.99
354.00 708.00
166.24 831.20
1,415.37 1,415.37
2,970.00 2,970.00
6,033.12 6,033.12
405.60
81.12 405.60
3,717.39
299.00
31.52 194.16
13.20 46.46
5.05 16.67
12.64 41.71
62.25
20.21 62.25
3,356.14
924.44
327.27 805.08
4.14 119.36
1,437.95
327.27 297.82
42.30 564.71
4.14 575.42
85.78
327.27 16.36
58.47 22.80
4.14 46.62
528.38
327.27 144.00
51.62 328.82
4.14 55.56
151.82
40.27 151.82
227.77
95.70 227.77
4,286.49
438.13
31.52 257.52
5.05 51.56
12.64 129.05
100.04
20.21 100.04
2,189.42
327.27 1,014.54
42.30 754.21
4.14 420.67
718.01
40.27 718.01
344.24
351.30 224.83
351.30 56.21
63.20 63.20
240.77
19.44 159.41
81.36 81.36
255.88
81.12 162.24
6.30 51.66
5.12 41.98
31,110.35
4,664.39
31.52 1,634.94
64.77 1,059.64
49.59 335.23
64.77 437.85
54.72 1,196.73
444.62
20.21 444.62
15,774.25
327.27 5,949.77
42.30 6,450.75
4.14 3,373.73
6,141.18
40.27 6,141.18
765.11
22.37 590.57
54.64 109.28
32.63 65.26
2,834.08
40.89 177.87
166.24 332.48
78.72 393.60
156.02 156.02
58.43 58.43
1,715.68 1,715.68
486.72
81.12 486.72
2,871.67
1.55 83.78
12.81 692.38
2.52 136.21
4.46 241.06
6.95 375.65
12.64 15.55
1,055.04
19.44 318.62
22.37 736.42
272.00
81.36 162.72
54.64 109.28
1,254.80
160.19 640.76
204.68 614.04
176,457.12
2,245.68
0.63 648.98
1.55 1,596.70
4,156.61
1.52 3,131.58
130.32 651.60
78.38 78.38
13.25 66.25
22.88 228.80
98,143.39
10.67 5,410.12
12.81 3,677.62
14.24 3,360.64
2.52 2,595.93
4.59 4,728.30
17.60 8,923.90
20.42 5,862.38
24.34 5,744.24
42.02 4,677.25
28.30 51,089.42
12.64 2,073.59
23,079.87
19.44 19,372.74
3.72 3,707.13
48,655.22
1,293.13 6,465.65
1,358.06 10,864.48
1,581.45 3,162.90
1,644.43 13,155.44
2,175.70 4,351.40
2,193.97 6,581.91
145.48 4,073.44
176.35
176.35 176.35
414,208.91
41,420.89
20,710.45
-------------------------

476,340.25
85,741.25
=================

562,081.50

Fecha : 13/10/2017 5:26:25 PM


S10

Presupuesto
Presupuesto 0701018 "CREACION DEL CAMAL MUNICIPAL DEL DISTRITO DE VIRU, PROVINCIA DE VIRU - LA LIBERTAD"
Subpresupuesto 004 INSTALACIONES ELECTRICAS GENERALES
Cliente MUNICIPALIDAD PROVINCIAL DE VIRU
Lugar LA LIBERTAD - VIRU - VIRU

Item Descripción Und. Metrado

INSTALACIONES ELECTRICAS EN BAJA TENSION und 1.00


COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDADES (5%)

SUBTOTAL
IGV(18%)

PRESUPUESTO TOTAL

SON : SEISCIENTOS TRENTICUATRO MIL SEISCIENTOS DIECISIETE Y 04/100 NUEVOS SOLES


Página 1

U - LA LIBERTAD"

Costo al 12/10/2017

Precio S/. Parcial S/.

467,661.78 467,661.78
467,661.78
46,766.18
23,383.09
-------------------------

537,811.05
96,805.99
=================

634,617.04

También podría gustarte