MATERIALES
1 ACEITE PARA MOTOR SAE-30 gal 0.01 64.00 0.38
2 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 94.19 2.35 221.35
3 AGUA m3 0.26 8.00 2.07
4 ALAMBRE NEGRO RECOCIDO # 16 kg 5.28 5.20 27.47
5 ARENA GRUESA m3 0.72 45.75 32.94
6 CEMENTO PORTLAND TIPO IP (42.5 kg) bol 13.25 16.19 214.49
7 GASOLINA 84 OCTANOS gal 0.50 13.16 6.63
8 GRASA MULTIPLE EP lb 0.01 10.50 0.14
9 PIEDRA CHANCADA DE 1/2" m3 1.15 60.80 70.04
10 REGLA DE MADERA p2 0.09 6.50 0.56
576.07
MANO DE OBRA
1 CAPATAZ hh 0.68 21.23 14.35
2 OFICIAL hh 3.86 14.65 56.59
3 OPERADOR DE EQUIPO LIVIANO hh 1.15 17.85 20.56
4 OPERARIO hh 3.86 19.95 77.07
5 PEON hh 7.49 14.40 107.83
276.40
EQUIPOS
1 HERRAMIENTAS MANUALES %MO 10.29 1.00 10.29
2 MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 0.58 11.56 6.66
3 VIBRADOR DE CONCRETO 4 HP 2.40" hm 0.58 8.00 4.61
21.56
ACEROS EN VARILLAS
1 ACERO DE 3/8" X 9M var 8.8 15.2 133.76
2 ACERO DE 1/2" X 9M var 5.87 27 158.49
292.25
1166.28
LISTADO DE RECURSOS DE MURO VERTICAL
MATERIALES
1 ACEITE MOTOR GASOLINERO MULTIGRADO gal 0.01 50.15 0.50
2 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 217.48 2.35 511.07
3 AGUA m3 0.43 8.00 3.46
4 ALAMBRE NEGRO RECOCIDO # 16 kg 12.20 5.20 63.41
5 ARENA GRUESA m3 1.20 45.75 54.90
6 CEMENTO PORTLAND TIPO IP (42.5 kg) bol 22.08 16.19 357.48
7 GASOLINA 84 OCTANOS gal 0.72 13.16 9.48
8 GRASA MULTIPLE EP lb 0.05 10.50 0.50
9 PIEDRA CHANCADA DE 1/2" m3 1.92 60.80 116.74
10 REGLA DE MADERA p2 0.14 6.50 0.94
1118.48
MANO DE OBRA
1 CAPATAZ hh 0.99 21.23 21.02
2 OFICIAL hh 9.46 14.65 138.59
3 OPERADOR DE EQUIPO LIVIANO hh 3.20 17.85 57.12
4 OPERARIO hh 9.46 19.95 188.73
5 PEON hh 16.40 14.40 236.16
641.62
EQUIPOS
1 HERRAMIENTAS MANUALES %MO 31.95 1.00 31.95
2 MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm 1.60 11.56 18.50
3 VIBRADOR DE CONCRETO 4 HP 1.50" hm 1.60 7.14 11.42
4 WINCHE ELECTRICO 3.6 HP DE DOS BALDES hm 1.60 15.80 25.28
87.15
ACEROS EN VARILLAS
1 ACERO DE 3/8" X 9M var 5.99 15.2 91.05
2 ACERO DE 1/2" X 9M var 21.62 27 583.74
674.79
2522.04
METRADOS GENERALES
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS EN TERRENO NORMAL m3 1.64 34.04
OBRAS DE CONCRETO ARMADO
LOSA DE CIMENTACION 210
CONCRETO PARA LOSA DE CIMENTACION F'C=210 KG/CM2 m3 1.44 327.5
ACERO CORRUGADO F'Y= 4200 kg/cm2 GRADO 60 kg 88.03 4.01
MUROS DE CONTENCION 210
CONCRETO PARA MUROS DE CONTENCION F'C=210 KG/CM2 m3 2.4 426.85
ACERO CORRUGADO F'Y= 4200 kg/cm2 GRADO 60 kg 203.25 4.01
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
OTROS
Parcial
2719.9
55.83
55.83
2664.07
471.6
353
1024.44
815.03
0
0