CALCULO DE HUMEDADES
26
ARENA g1/2 g3/4
A = Peso del recipiente (g) 188 206 188
B = material húmedo + recipiente (g) 754
C1 = mat. seco + recip. Pesaje 1 (g) 722
C2 = mat. seco + recip. Pesaje 2 (g) 722 0 0
Cc = mat. seco + recip. Masa constante (g) 722 0 0
D = material seco neto (g) = Cc -A 534 -206 -188
E = peso del agua = B - Cc 32 0 0
P = contenido de hum. (%) = (E/D)*100 5.99 0.00 0.00
Q = Absorción 1.21 1.25 1.25
H = Humedad Libre 4.78 -1.25 -1.25
0 0 0
0 0 0
-188 -206 -188
0 0 0
0.00 0.00 0.00
3.50 3.50 1.50
-3.50 -3.50 -1.50
27.0
ARENA g1/2 g3/4
205 184 188
0 0 0
0 0 0
-205 -184 -188
0 0 0
0.00 0.00 0.00
1.21 1.25 1.25
-1.21 -1.25 -1.25
205.4
0
-205.4
0
0.00 arena g 1/2 g 3/4
1.21 1.40 1.20 1.00
-1.21
188
1656
CALCULO RENDIMIENTO VOLUMETRICO
3.6
Conductor Carro Peajes Precio Fecha
Jaime Rueda 401 2 $37,800 12/19/2018
Leydi 455 $10,000 12/19/2018
Observaciones
Recarga
SEGUNDOS ESFUERZO MPA VELOCIDAD
68 19.7 0.2897058824
Pulgadas a Densidad
Total Cementante Kte Pulgadas
Subir Aditivo
1 0.025 0 1.11 0.000
2 264 0.050 0.132 1.11 0.119
3 264 0.075 0.198 1.11 0.178
4 0.100 0 1.11 0.000
Carga 220 KN
Area 78.54 CM2
Fuerza 22426.09582059 F
Esfuerzo 285.5372526177 Kg/Cm2
MR 33.795695147 Kg/Cm2 3.37956951 MPA
25.5
Ancho2 150
Altura 149
Distan Frac 197
279.06 35.5 Carga KN 43.5
257.29 32.8 3Pa 25708.5
248.19 31.6
bd2 3352500
Cantidad Cantidad L
Despachar
7 0
2.25 0.2675675676
0.77
2.25 0.4013513514
0
247
F 2534.67713603 44
291
24.86518 KN
3 30.3
1 29
1:00 60
1:00 60
1.5 30.2 5.0
Fecha Litros Carro
5/17/2018 0.28 577
5/17/2018 1.1 577
5/22/2018 1.5 399
5/22/2018 1 455
5/22/2018 3 398
5/22/2018 4 398
Motivo
Retornado, el command no calcula el aditivo faltante
Asentamiento bajo, se abre NC producto en proceso Muestra 7435
Asentamiento bajo, cargue incial del dia sin humedades
Asentamiento bajo, cargue incial del dia sin humedades
Prueba Mortero
Prueba Mortero
CALCULO PASA 200
3/5/2016 Muestra 5493, fallo como un acelerado esta mal marcado 412,7 Kn 52,4 Mpa
17-05-206 Muestra 5608 Traida de Obra despues de muchos procesos de arreglado de agua 3 Dias 80,5 Kn 10,2
5/20/2016 Muestras se arreglaron reeelargas con humedad bajas, salian 1 pulagadas por encime del maximo
5612 Muestra extraña sin tanto mortero salio reelargo
5/21/2016 Muestra 5614 se le adiciono 40L de agua para arreglarllo , no me di de cuenta de la adicion de agua
Muestra 5615 cargdo manual en planta, se saco una sola viga y dos cilindros, toca cuadrar la viga a 2
5/21/2016 Muestra 5616 Muestra se ve extraña, si tanto mortero salio reelargo de planta
6/14/2016 5659 Muestra arreglada a punta de aditivo
5660 Muestra lista de planta
6/18/2016 Muestra 5666 N170300000 Real 10Mpa toca subirle 13Mp 13Mp a 7 dias lo subo a 15 MP
5665 C210
do de agua 3 Dias 80,5 Kn 10,2 Mpa 47% 7 dias 102kn 13,02 Mpa 61%
das por encime del maximo
458229
21024194
21024267
21024295
Remision
2
458229
21024194
21024267
21024295
473568
474024
Coeficiente de
Variacion
2 CILINDROS 3 CILINDROS
Tolerancia
2.80%
3.60%
3%
2.20%
Diseño #1 #2 #3
N210300000 1.5 1.7 1.8
N280300000 1.7
N210301000 3.1
C210300000 1.5
C280300000 1.6 1.6 1.7
C310400000 2.0 1.7 2.2
N280301900 6.0 5.7 6.0
N210301900 6.0 6.0
C170301900 5.3
C210301900 5.8
C280301900 5.3 6.1 5.8
F210301900 6.0 6.0 5.9
#4 #5 #6 Promedio 1 20000
1.7 1.5 1.5 1.6 2 19984
1.7 3 19998
3.1 4 20002
1.5 5 19982
1.6 6 19992
2.0 7 19990
6.1 5.4 5.8 8 20002
6.0 9 19986
5.3 10 19998
5.8 11 20026
6.5 5.9 12 20002
6.0 6.0 13 20002
14 20006
15 19992
16 19984
17 19994
18 20008
19 20014
20 20002
21 19998
22 19978
23 19994
24 19996
25 19980
20000
39984
59982
79984
99966
119958
139948
159950
179936
199934
219960
239962
259964
279970
299962
319946
339940
359948
379962
399964
419962
439940
459934
479930
499910
Limite Rest.
#Muestra Cilindro Resistencia Promedio Limite Min
Max Especificada
1 5701 21.3 22.1 19.2 25.0 21.0
2 5719 23.6 22.1 19.2 25.0 21.0
3 5723 19.9 22.1 19.2 25.0 21.0
4 5744 21.3 22.1 19.2 25.0 21.0
5 5748 15.7 22.1 19.2 25.0 21.0
6 5752 23.1 22.1 19.2 25.0 21.0
7 5753 21.9 22.1 19.2 25.0 21.0
8 5759 20.0 22.1 19.2 25.0 21.0
9 5762 22.2 22.1 19.2 25.0 21.0
10 5764 21.8 22.1 19.2 25.0 21.0
11 5768 22.7 22.1 19.2 25.0 21.0
12 5771 28.0 22.1 19.2 25.0 21.0
13 5772 24.1 22.1 19.2 25.0 21.0
14 5779 21.4 22.1 19.2 25.0 21.0
15 5785 27.6 22.1 19.2 25.0 21.0
16 5789 18.3 22.1 19.2 25.0 21.0
Varianza 8.7
Desviacion Estandar 2.9
Coeficiente de Variacion 13.4 %
N210300000
30.0
25.0
20.0
15.0
10.0
5.0
0.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Res i stenci a Promedi o Li mi te Mi n
Limi te Max Rest. Es peci fica da
0 11 12 13 14 15 16
Li mi te Mi n
da
CRISTIAN HORA HORA
TURNO HE
BONILLA ENTRADA SALIDA
SABADO 01 7:00:00 15:30:00 8:30:00 0:00:00
LUNES 03 6:00:00 15:00:00 8:30:00 0:30:00
MARTES 04 6:00:00 16:30:00 8:30:00 2:00:00
MIERCOLES 05 8:00:00 17:30:00 8:30:00 1:00:00
JUEVES 06 8:00:00 17:30:00 8:30:00 1:00:00
VIERNES 07 8:00:00 16:30:00 8:30:00 0:00:00
TOTAL HE 4:30
8:30:00
9:00:00
10:30:00
9:30:00
9:30:00
8:30:00
18.4
2
18.1 3.9
1 20.000 20.000
2 19.990 39.990
3 20.006 59.996
4 20.016 80.012
5 19.990 100.002
6 19.980 119.982
7 19.984 139.966
8 20.004 159.970
9 19.998 179.968
10 19.992 199.960
11 20.000 219.960
12 19.990 239.950
13 20.006 259.956
14 19.998 279.954
15 19.988 299.942
16 19.994 319.936
17 19.994 339.930
18 19.990 359.920
19 20.002 379.922
20 19.996 399.918
21 19.994 419.912
22 19.980 439.892
23 19.990 459.882
24 19.980 479.862
25 20.010 499.872
Dia Muestra 1 Dia 2 Dias 3 Dias
12/12/2018 477 8.5 Mpa 40% 12.8 Mpa 61%
12/13/2018 7942 6.2 Mpa 29% 16.0 Mpa 76%
14 Dias Descripcion
Despacho antes de Aumento de cemento
16.3 Mpa 78% Pruebas
11.0 Mpa 52% Pruebas
12/21/2018 12/22/2018
ARENA g1/2 g3/4 ARENA
A = Peso del recipiente (g) 188 206 184 188
B = material húmedo + recipiente (g) 966 1572 2068 768
C1 = mat. seco + recip. Pesaje 1 (g) 920 1538 2020 732
C2 = mat. seco + recip. Pesaje 2 (g) 920 1538 2020 732
Cc = mat. seco + recip. Masa constante (g) 920 1538 2020 732
D = material seco neto (g) = Cc -A 732 1332 1836 544
E = peso del agua = B - Cc 46 34 48 36
P = contenido de hum. (%) = (E/D)*100 6.28 2.55 2.61 6.62
Q = Absorción 1.21 1.25 1.25 1.21
H = Humedad Libre 5.07 1.30 1.36 5.41
12/27/2018 12/28/2018
ARENA g1/2 g3/4 ARENA
188 206 184 188
964 1568 2228 962
920 1538 2184 914
920 1538 2184 914
920 1538 2184 914
732 1332 2000 726
44 30 44 48
6.01 2.25 2.20 6.61
1.21 1.25 1.25 1.21
4.80 1.00 0.95 5.40
1/3/2019 1/4/2019
ARENA g1/2 g3/4 ARENA
188 206 184 188
1264 1602 2408 1052
1204 1578 2372 1008
1204 1578 2372 1008
1204 1578 2372 1008
1016 1372 2188 820
60 24 36 44
5.91 1.75 1.65 5.37
1.21 1.25 1.25 1.21
4.70 0.50 0.40 4.16
1/8/2019 1/9/2019
ARENA g1/2 g3/4 ARENA
188 206 184 188
954 1608 2402 1150
916 1588 2372 1106
916 1588 2372 1106
916 1588 2372 1106
728 1382 2188 918
38 20 30 44
5.22 1.45 1.37 4.79
1.21 1.25 1.25 1.21
4.01 0.20 0.12 3.58
1/11/2019 1/12/2019
ARENA g1/2 g3/4 ARENA
188 206 184 188
790 1664 2066 822
760 1642 2040 792
760 1642 2040 792
760 1642 2040 792
572 1436 1856 604
30 22 26 30
5.24 1.53 1.40 4.97
1.21 1.25 1.25 1.21
4.03 0.28 0.15 3.76
1/15/2019 1/16/2019
ARENA g1/2 g3/4 ARENA
188 206 184 188
1066 1982 2022 669
1022 1958 1994 644
1022 1958 1994 644
1022 1958 1994 644
834 1752 1810 456
44 24 28 25
5.28 1.37 1.55 5.48
1.21 1.25 1.25 1.21
4.07 0.12 0.30 4.27
12/28/2018 1/2/2019
g1/2 g3/4 ARENA g1/2 g3/4
206 184 188 206 184
1572 2064 884 1762 2044
1544 2032 844 1732 2002
1544 2032 844 1732 2002
1544 2032 844 1732 2002
1338 1848 656 1526 1818
28 32 40 30 42
2.09 1.73 6.10 1.97 2.31
1.25 1.25 1.21 1.25 1.25
0.84 0.48 4.89 0.72 1.06
1/4/2019 1/5/2019
g1/2 g3/4 ARENA g1/2 g3/4
206 184 188 206 184
1598 2004 884 1772 2162
1578 1978 848 1750 2134
1578 1978 848 1750 2134
1578 1978 848 1750 2134
1372 1794 660 1544 1950
20 26 36 22 28
1.46 1.45 5.45 1.42 1.44
1.25 1.25 1.21 1.25 1.25
0.21 0.20 4.24 0.17 0.19
1/9/2019 1/10/2019
g1/2 g3/4 ARENA g1/2 g3/4
206 184 188 206 184
1598 2030 862 1574 2268
1578 2002 828 1552 2236
1578 2002 828 1552 2236
1578 2002 828 1552 2236
1372 1818 640 1346 2052
20 28 34 22 32
1.46 1.54 5.31 1.63 1.56
1.25 1.25 1.21 1.25 1.25
0.21 0.29 4.10 0.38 0.31
1/12/2019 1/14/2019
g1/2 g3/4 ARENA g1/2 g3/4
206 184 188 206 184
1558 2102 938 1530 2230
1538 2072 900 1508 2198
1538 2072 900 1508 2198
1538 2072 900 1508 2198
1332 1888 712 1302 2014
20 30 38 22 32
1.50 1.59 5.34 1.69 1.59
1.25 1.25 1.21 1.25 1.25
0.25 0.34 4.13 0.44 0.34
1/16/2019 1/17/2019
g1/2 g3/4 ARENA g1/2 g3/4
206 184 188 206 184
1608 2172 974 1578 2208
1588 2142 934 1558 2178
1588 2142 934 1558 2178
1588 2142 934 1558 2178
1382 1958 746 1352 1994
20 30 40 20 30
1.45 1.53 5.36 1.48 1.50
1.25 1.25 1.21 1.25 1.25
0.20 0.28 4.15 0.23 0.25
18/01/2019 tarde
g1/2 g3/4
206 184
1538 2232
1518 2202
1518 2202
1518 2202
1312 2018
20 30
1.52 1.49
1.25 1.25
0.27 0.24
19/01/2019 tarde
g1/2 g3/4
206 184
1920 2121
1892 2090
1892 2090
1892 2090
1686 1906
28 31
1.66 1.63
1.25 1.25