PLANILLA DE METRADO

PROYECTO: “CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO

ENTIDAD:

UBICACIÓN: SECTOR 5 - COLUMNA PASCO

PROYECTISTA: GRUPO 8

Nº DE
PARTIDA Nº DESCRIPCION DE PARTIDA UND. VECES

01.00.00 PAVIMENTADO DE VIAS

01.01.00 OBRAS PROVISIONALES

01.01.01 ALMACEN Y CASETA DE GUARDIANIA GLB 1.00

01.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00

01.01.03 CARTEL DE OBRA 3.00X5.00M UNA CARA UND 1.00

01.01.03 HABILIT.DE DESVIOS PROV., PERFILADO Y COMPACTADO M2

CALLE TAHUANTINSUYO 1.00

CALLE AYACUCHO 1.00

CALLE MARIATEGUI 1.00

01.02.00 TRABAJOS PRELIMINARES

01.02.01 SEÑALIZACION DE SEGURIDAD Y/O DESVIO DE TRAFICO UND

CALLE TAHUANTINSUYO 2.00

CALLE AYACUCHO 3.00

CALLE MARIATEGUI 2.00

01.02.02 TRAZO Y REPLANTEO PRELIMINAR INICIAL ML

CALLE TAHUANTINSUYO 1.00

CALLE AYACUCHO 1.00

CALLE MARIATEGUI 1.00

01.02.03 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION M2

CALLE TAHUANTINSUYO 1.00

CALLE AYACUCHO 1.00


CALLE MARIATEGUI 1.00

01.03.00 MOVIMIENTO DE TIERRAS

01.03.01 CORTE DE TERRENO CON MAQUINARIA M3

CALLE TAHUANTINSUYO ( De Metrado de Explanaciones) 1.00

CALLE AYACUCHO ( De Metrado de Explanaciones) 1.00


PLANILLA DE METRADO

PROYECTO: “CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO

ENTIDAD:

UBICACIÓN: SECTOR 5 - COLUMNA PASCO

PROYECTISTA: GRUPO 8

Nº DE
PARTIDA Nº DESCRIPCION DE PARTIDA UND. VECES

CALLE MARIATEGUI ( De Metrado de Explanaciones) 1.00

01.03.02 CORTE Y EXCAVACION EN FORMA MANUAL M3

ZONA DE ARRANQUES DE VIAS ADYACENTES A=Cad

CRUCE CALLE TAHUANTINSUYO - CALLE AYACUCHO (MARGEN DERECHO) 19.68

CRUCE CALLE AYACUCHO - CALLE LA VICTORIA (MARGEN DERECHO) 14.58

CRUCE CALLE AYACUCHO - CALLE 28 DE JULIO (MARGEN DERECHO) 22.74

CRUCE CALLE AYACUCHO - CALLE MARIATEGUI (MARGEN DERECHO) 22.64

CRUCE CALLE MARIATEGUI - CALLE LA PAZ (MARGEN DERECHO) 22.18

CRUCE CALLE MARIATEGUI - CALLE LOS LIBERTADORES (MARGEN DERECHO) 22.97

MAS 20% DE EXCAVACION FUERA DEL ARRANQUE 0.20

01.03.03 CARGUIO DE MATERIAL EXCEDENTE M3

CORTE EN MATERIAL SUELTO CON MAQUINARIA 1.20

CORTE Y EXCAVACION EN FORMA MANUAL 1.20

01.03.03 TRANSPORTE DE MATERIAL EXCEDENTE M3

CORTE EN MATERIAL SUELTO CON MAQUINARIA 1.20

CORTE Y EXCAVACION EN FORMA MANUAL 1.20

01.03.05 PERFILADO Y COMPACTADO EN ZONA DE CORTE M2

CALLE TAHUANTINSUYO 1.00

CALLE AYACUCHO 1.00

CALLE MARIATEGUI 1.00

MAS EN LAS ZONAS DE ARRANQUE

CRUCE CALLE TAHUANTINSUYO - CALLE AYACUCHO (MARGEN DERECHO) 19.68

CRUCE CALLE AYACUCHO - CALLE LA VICTORIA (MARGEN DERECHO) 14.58

CRUCE CALLE AYACUCHO - CALLE 28 DE JULIO (MARGEN DERECHO) 22.74

CRUCE CALLE AYACUCHO - CALLE MARIATEGUI (MARGEN DERECHO) 22.64

CRUCE CALLE MARIATEGUI - CALLE LA PAZ (MARGEN DERECHO) 22.18

CRUCE CALLE MARIATEGUI - CALLE LOS LIBERTADORES (MARGEN DERECHO) 22.97


PLANILLA DE METRADO

PROYECTO: “CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO

ENTIDAD:

UBICACIÓN: SECTOR 5 - COLUMNA PASCO

PROYECTISTA: GRUPO 8

Nº DE
PARTIDA Nº DESCRIPCION DE PARTIDA UND. VECES

01.04.00 MEJORAMIENTO DE SUB RASANTE

01.04.01 EXTRACCION Y APILAMIENTO DE MATERIAL DE SUB RASANTE M3

CALLE TAHUANTINSUYO 1.00

CALLE AYACUCHO 1.00

CALLE MARIATEGUI 1.00

ZONA DE ARRANQUES DE VIAS ADYACENTES A=Cad

CRUCE CALLE TAHUANTINSUYO - CALLE AYACUCHO (MARGEN DERECHO) 19.68

CRUCE CALLE AYACUCHO - CALLE LA VICTORIA (MARGEN DERECHO) 14.58

CRUCE CALLE AYACUCHO - CALLE 28 DE JULIO (MARGEN DERECHO) 22.74

CRUCE CALLE AYACUCHO - CALLE MARIATEGUI (MARGEN DERECHO) 22.64

CRUCE CALLE MARIATEGUI - CALLE LA PAZ (MARGEN DERECHO) 22.18

CRUCE CALLE MARIATEGUI - CALLE LOS LIBERTADORES (MARGEN DERECHO) 22.97

01.04.02 CARGUIO DE MATERIAL SELECCIONADO M3 1.20

01.04.03 TRANSPORTE DE MATERIAL SELECCIONADO M3 1.20

01.04.04 RIEGO PARA COMPACTADO M3 0.10

01.04.05 CONFORMACION DE SUB RASANTE M3 1.00

01.05.00 SUB BASE GRANULAR

01.05.01 EXTRACCION Y APILAMIENTO DE MATERIAL DE SUB BASE M3

CALLE TAHUANTINSUYO 0.50

CALLE AYACUCHO 0.50

CALLE MARIATEGUI 0.50

ZONA DE ARRANQUES DE VIAS ADYACENTES A=Cad

CRUCE CALLE TAHUANTINSUYO - CALLE AYACUCHO (MARGEN DERECHO) 19.68

CRUCE CALLE AYACUCHO - CALLE LA VICTORIA (MARGEN DERECHO) 14.58

CRUCE CALLE AYACUCHO - CALLE 28 DE JULIO (MARGEN DERECHO) 22.74


PLANILLA DE METRADO

PROYECTO: “CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO

ENTIDAD:

UBICACIÓN: SECTOR 5 - COLUMNA PASCO

PROYECTISTA: GRUPO 8

Nº DE
PARTIDA Nº DESCRIPCION DE PARTIDA UND. VECES

CRUCE CALLE AYACUCHO - CALLE MARIATEGUI (MARGEN DERECHO) 22.64

CRUCE CALLE MARIATEGUI - CALLE LA PAZ (MARGEN DERECHO) 22.18

CRUCE CALLE MARIATEGUI - CALLE LOS LIBERTADORES (MARGEN DERECHO) 22.97

01.05.02 CARGUIO DE MATERIAL SELECCIONADO SUB BASE M3 1.20

01.05.03 TRANSPORTE DE MATERIAL SELECCIONADO M3 1.20

01.05.03 EXTRACCION Y APILAMIENTO DE MATERIAL HORMIGON M3

CALLE TAHUANTINSUYO 0.50

CALLE AYACUCHO 0.50

CALLE MARIATEGUI 0.50

ZONA DE ARRANQUES DE VIAS ADYACENTES A=Cad

CRUCE CALLE TAHUANTINSUYO - CALLE AYACUCHO (MARGEN DERECHO) 19.68

CRUCE CALLE AYACUCHO - CALLE LA VICTORIA (MARGEN DERECHO) 14.58

CRUCE CALLE AYACUCHO - CALLE 28 DE JULIO (MARGEN DERECHO) 22.74

CRUCE CALLE AYACUCHO - CALLE MARIATEGUI (MARGEN DERECHO) 22.64

CRUCE CALLE MARIATEGUI - CALLE LA PAZ (MARGEN DERECHO) 22.18

CRUCE CALLE MARIATEGUI - CALLE LOS LIBERTADORES (MARGEN DERECHO) 22.97

01.05.05 CARGUIO DE MATERIAL APILADO HORMIGON M3 1.20

01.05.06 TRANSPORTE DE MATERIAL HORMIGON M3 1.20

01.05.07 MEZCLADO DE MATERIAL SELECCIONADO Y HORMIGON M3

MATERIAL DE CANTERA 1.20

MATERIAL HORMIGON 1.20

01.05.08 TRANSPORTE DE MATERIAL MEZCLADO M3 1.00

01.05.09 RIEGO PARA COMPACTADO M3 0.10

01.05.10 CONFORMACION DE SUB BASE CON EQUIPO M3 1.00


PLANILLA DE METRADO

PROYECTO: “CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO

ENTIDAD:

UBICACIÓN: SECTOR 5 - COLUMNA PASCO

PROYECTISTA: GRUPO 8

Nº DE
PARTIDA Nº DESCRIPCION DE PARTIDA UND. VECES

01.06.00 LOSA DE RODADURA

01.06.01 CONEXION ENTRE LOSAS RIGIDAS (PAVIMENTOS) S/D UND

LONGITUDINAL

CALLE TAHUANTINSUYO 160.00

CALLE AYACUCHO 414.67

CALLE MARIATEGUI 137.33

ZONA DE ARRANQUES DE VIAS ADYACENTES

CRUCE CALLE TAHUANTINSUYO - CALLE AYACUCHO (MARGEN DERECHO) 4.00

CRUCE CALLE AYACUCHO - CALLE LA VICTORIA (MARGEN DERECHO) 4.00

CRUCE CALLE AYACUCHO - CALLE 28 DE JULIO (MARGEN DERECHO) 4.00

CRUCE CALLE AYACUCHO - CALLE MARIATEGUI (MARGEN DERECHO) 4.00

CRUCE CALLE MARIATEGUI - CALLE LA PAZ (MARGEN DERECHO) 4.00

CRUCE CALLE MARIATEGUI - CALLE LOS LIBERTADORES (MARGEN DERECHO) 4.00

TRANSVERSAL

CALLE TAHUANTINSUYO 1,000.00

CALLE AYACUCHO 2,591.67

CALLE MARIATEGUI 858.33

ZONA DE ARRANQUES DE VIAS ADYACENTES No existe

01.06.02 ENCOFRADO Y DESENCOFRADO PAVIMENTO RIGIDO M2

LONGITUDINAL

CALLE TAHUANTINSUYO 3.00

CALLE AYACUCHO 3.00

CALLE MARIATEGUI 3.00

ZONA DE ARRANQUES DE VIAS ADYACENTES

CRUCE CALLE TAHUANTINSUYO - CALLE AYACUCHO (MARGEN DERECHO) 3.00

CRUCE CALLE AYACUCHO - CALLE LA VICTORIA (MARGEN DERECHO) 3.00


PLANILLA DE METRADO

PROYECTO: “CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO

ENTIDAD:

UBICACIÓN: SECTOR 5 - COLUMNA PASCO

PROYECTISTA: GRUPO 8

Nº DE
PARTIDA Nº DESCRIPCION DE PARTIDA UND. VECES

CRUCE CALLE AYACUCHO - CALLE 28 DE JULIO (MARGEN DERECHO) 3.00

CRUCE CALLE AYACUCHO - CALLE MARIATEGUI (MARGEN DERECHO) 3.00

CRUCE CALLE MARIATEGUI - CALLE LA PAZ (MARGEN DERECHO) 3.00

CRUCE CALLE MARIATEGUI - CALLE LOS LIBERTADORES (MARGEN DERECHO) 3.00

TRANSVERSAL

CALLE TAHUANTINSUYO 30.00

CALLE AYACUCHO 25.75

CALLE MARIATEGUI 25.75

ZONA DE ARRANQUES DE VIAS ADYACENTES

CRUCE CALLE TAHUANTINSUYO - CALLE AYACUCHO (MARGEN DERECHO) 2.00

CRUCE CALLE AYACUCHO - CALLE LA VICTORIA (MARGEN DERECHO) 2.00

CRUCE CALLE AYACUCHO - CALLE 28 DE JULIO (MARGEN DERECHO) 2.00

CRUCE CALLE AYACUCHO - CALLE MARIATEGUI (MARGEN DERECHO) 2.00

CRUCE CALLE MARIATEGUI - CALLE LA PAZ (MARGEN DERECHO) 2.00

CRUCE CALLE MARIATEGUI - CALLE LOS LIBERTADORES (MARGEN DERECHO) 2.00


PLANILLA DE METRADO

PROYECTO: “CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO

ENTIDAD:

UBICACIÓN: SECTOR 5 - COLUMNA PASCO

PROYECTISTA: GRUPO 8

Nº DE
PARTIDA Nº DESCRIPCION DE PARTIDA UND. VECES

01.06.03 LOSAS MACIZA - CONCRETO F'C=180 KG/CM2 M3

CALLE TAHUANTINSUYO 1.00

CALLE AYACUCHO 1.00

CALLE MARIATEGUI 1.00

ZONA DE ARRANQUES DE VIAS ADYACENTES A=Cad

CRUCE CALLE TAHUANTINSUYO - CALLE AYACUCHO (MARGEN DERECHO) 19.68

CRUCE CALLE AYACUCHO - CALLE LA VICTORIA (MARGEN DERECHO) 14.58

CRUCE CALLE AYACUCHO - CALLE 28 DE JULIO (MARGEN DERECHO) 22.74

CRUCE CALLE AYACUCHO - CALLE MARIATEGUI (MARGEN DERECHO) 22.64

CRUCE CALLE MARIATEGUI - CALLE LA PAZ (MARGEN DERECHO) 22.18

CRUCE CALLE MARIATEGUI - CALLE LOS LIBERTADORES (MARGEN DERECHO) 22.97

01.06.03 JUNTA DE DILATACION CON TECNOPORT E=1" Hmax=25cms M

LONGITUDINAL

CALLE TAHUANTINSUYO 3.00

CALLE AYACUCHO 3.00

CALLE MARIATEGUI 3.00

ZONA DE ARRANQUES DE VIAS ADYACENTES

CRUCE CALLE TAHUANTINSUYO - CALLE AYACUCHO (MARGEN DERECHO) 3.00

CRUCE CALLE AYACUCHO - CALLE LA VICTORIA (MARGEN DERECHO) 3.00

CRUCE CALLE AYACUCHO - CALLE 28 DE JULIO (MARGEN DERECHO) 3.00

CRUCE CALLE AYACUCHO - CALLE MARIATEGUI (MARGEN DERECHO) 3.00

CRUCE CALLE MARIATEGUI - CALLE LA PAZ (MARGEN DERECHO) 3.00

CRUCE CALLE MARIATEGUI - CALLE LOS LIBERTADORES (MARGEN DERECHO) 3.00

TRANSVERSAL

CALLE TAHUANTINSUYO 30.00

CALLE AYACUCHO 77.75


PLANILLA DE METRADO

PROYECTO: “CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO

ENTIDAD:

UBICACIÓN: SECTOR 5 - COLUMNA PASCO

PROYECTISTA: GRUPO 8

Nº DE
PARTIDA Nº DESCRIPCION DE PARTIDA UND. VECES

CALLE MARIATEGUI 25.75

ZONA DE ARRANQUES DE VIAS ADYACENTES

CRUCE CALLE TAHUANTINSUYO - CALLE AYACUCHO (MARGEN DERECHO) 1.00

CRUCE CALLE AYACUCHO - CALLE LA VICTORIA (MARGEN DERECHO) 1.00

CRUCE CALLE AYACUCHO - CALLE 28 DE JULIO (MARGEN DERECHO) 1.00

CRUCE CALLE AYACUCHO - CALLE MARIATEGUI (MARGEN DERECHO) 1.00

CRUCE CALLE MARIATEGUI - CALLE LA PAZ (MARGEN DERECHO) 1.00

CRUCE CALLE MARIATEGUI - CALLE LOS LIBERTADORES (MARGEN DERECHO) 1.00

01.06.06 PINTURA EN PAVIMENTO LINEA CONTINUA M

LONGITUDINAL

CALLE TAHUANTINSUYO 1.00

CALLE AYACUCHO 1.00

CALLE MARIATEGUI 1.00

TRANSVERSAL (CRUCES Y SEÑALES DE DIRECCION) Nº PASES

CRUCE CALLE TAHUANTINSUYO - CALLE AYACUCHO (MARGEN DERECHO) 2.00

CRUCE CALLE AYACUCHO - CALLE LA VICTORIA (MARGEN DERECHO) 10.00

CRUCE CALLE AYACUCHO - CALLE 28 DE JULIO (MARGEN DERECHO) 2.00

CRUCE CALLE AYACUCHO - CALLE MARIATEGUI (MARGEN DERECHO) 10.00

CRUCE CALLE MARIATEGUI - CALLE LA PAZ (MARGEN DERECHO) 2.00

CRUCE CALLE MARIATEGUI - CALLE LOS LIBERTADORES (MARGEN DERECHO) 10.00

01.07.00 VARIOS Y LIMPIEZA

01.07.01 NIVELACION DE BUZONES EXISTENTES UND

CALLE TAHUANTINSUYO 2.00

CALLE AYACUCHO 5.00


PLANILLA DE METRADO

PROYECTO: “CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO

ENTIDAD:

UBICACIÓN: SECTOR 5 - COLUMNA PASCO

PROYECTISTA: GRUPO 8

Nº DE
PARTIDA Nº DESCRIPCION DE PARTIDA UND. VECES

CALLE MARIATEGUI 2.00

01.07.02 LIMPIEZA FINAL DE OBRA M2

IDEM AL TRAZO Y REPLANTEO DE LA OBRA 1.00

02.00.00 CONSTRUCCION DE VEREDAS

02.01.00 TRABAJOS PRELIMINARES

02.01.01 TRAZO Y REPLANTEO PRELIMINAR ML

CALLE TAHUANTINSUYO

1RA DERECHA 1.00

1RA IZQUIERDA 1.00

CALLE AYACUCHO

1RA DERECHA 1.00

1RA IZQUIERDA 1.00

2DA DERECHA 1.00

2DA IZQUIERDA 1.00

3RA DERECHA 1.00

3RA IZQUIERDA 1.00

5TA DERECHA 1.00

5TA IZQUIERDA 1.00

CALLE MARIATEGUI

1RA DERECHA 1.00

1RA IZQUIERDA 1.00

02.01.02 DEMOLICION DE ESTRUCTURAS DE CONCRETO E=10CM M2

VEREDAS EXISTENTES 1.00

02.02.00 MOVIMIENTO DE TIERRAS


PLANILLA DE METRADO

PROYECTO: “CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO

ENTIDAD:

UBICACIÓN: SECTOR 5 - COLUMNA PASCO

PROYECTISTA: GRUPO 8

Nº DE
PARTIDA Nº DESCRIPCION DE PARTIDA UND. VECES

02.02.01 EXCAVACION MANUAL M3

AREA - CORTE SUPERFICIAL PARA VEREDAS x ALTURA 1.00

02.02.02 EXCAVACION SUPERFICIAL PARA VEREDAS H=0.20M M2

CALLE TAHUANTINSUYO 1.00

CALLE AYACUCHO 1.00

CALLE MARIATEGUI 1.00

02.02.03 ACARREO DE MATERIAL EXCEDENTE M3

DEL CORTE SUPERFICIAL 1.20

DE LA EXCAVACION MANUAL 1.20

DE LA DEMOLICION 1.20

02.02.03 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE M3

DEL ACARREO DE MATERIAL EXCEDENTE 1.00

02.02.05 RELLENO COMP. C/MAT. PRESTAMO, CON PLANCHA COMP. M3

DEL CORTE SUPERFICIAL PARA VEREDAS x ESP 1.20

02.03.00 OBRAS DE CONCRETO Y MAMPOSTERIA

02.03.01 VEREDAS, ENCOFRADO Y DESENCOFRADO M2

ENTRE JUNTAS DE PAÑO A PAÑO 369.77

DE LA LONGITUD TOTAL - POSTERIORES 1,109.31

02.03.02 VEREDAS - CONCRETO f'c= 175 kg/cm2 E=0.10M M2

AREA - CORTE SUPERFICIAL PARA VEREDAS 1.00

02.03.03 VEREDAS - ACABADO FROTACHADO DE PISO CON MORTERO 1:2 X 1.5 cm DE ES ML

AREA - CORTE SUPERFICIAL PARA VEREDAS 1.00

02.03.04 VEREDAS, BRUÑAS DE 1.5 CM ML

Longitudinal 1.00

Transversal 739.54

02.03.05 VEREDAS, JUNTA ASFALTICA 1" ML


PLANILLA DE METRADO

PROYECTO: “CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO

ENTIDAD:

UBICACIÓN: SECTOR 5 - COLUMNA PASCO

PROYECTISTA: GRUPO 8

Nº DE
PARTIDA Nº DESCRIPCION DE PARTIDA UND. VECES

ENTRE PAÑOS A CADA 3M 1.00

03.00.00 CONEXIONES DOMICILIARIAS DE AGUA Y DESAGUE

03.01.00 CONEXION DE AGUA 1/2" TERRENO SUELTO DE 8.01-12 m UND

CALLE TAHUANTINSUYO

MARGENDERECHO

1ra cuadra 1.00

CALLE AYACUCHO

MARGENDERECHO

1ra cuadra 2.00

2da cuadra 4.00

3ra cuadra 8.00

MARGENIZQUIERDO

2da cuadra 3.00

2da cuadra 5.00

CALLE MARIATEGUI

MARGENDERECHO

1ra cuadra 1.00

2da cuadra 3.00

03.02.00 CONEXION DE DESAGUE TUBO UPVC 4", TERRENO SUELTO 8.01-12 m UND

CALLE TAHUANTINSUYO

MARGENDERECHO

1ra cuadra 1.00

CALLE AYACUCHO

MARGENDERECHO

1ra cuadra 2.00

2da cuadra 4.00


PLANILLA DE METRADO

PROYECTO: “CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO

ENTIDAD:

UBICACIÓN: SECTOR 5 - COLUMNA PASCO

PROYECTISTA: GRUPO 8

Nº DE
PARTIDA Nº DESCRIPCION DE PARTIDA UND. VECES

3ra cuadra 3.00

MARGENIZQUIERDO

2da cuadra 3.00

2da cuadra 5.00

CALLE MARIATEGUI

MARGENDERECHO

1ra cuadra 1.00

2da cuadra 3.00

04.00.00 FLETE

04.01.00 FLETE DE MATERIALES GBL 1.00

05.00.00 PRUEBAS DE CONTROL DE CALIDAD

05.01.00 DISEÑO DE MEZCLAS DE CONCRETO UND 1.00

05.02.00 PRUEBA DE RESISTENCIA A LA COMPRESION DE CONCRETO UND

PRUEBAS EN LOZA RIGIDA 3.00

06.00.00 CONTROL DE MEDIO AMBIENTE

06.01.00 MITIGACION DE MEDIO AMBIENTE GLB

MEDIDAS DE MITIGACION VARIAS 1.00


PLANILLA DE METRADO

COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO - PASCO"

MEDIDAS
Nº DE PARCIAL TOTAL
VECES
LARGO ANCHO ALTO

1.00 1.00 1.00

1.00 1.00 1.00

1.00 1.00 1.00

5,340.00

120.00 10.00 1,200.00

311.00 10.00 3,110.00

103.00 10.00 1,030.00

7.00

2.00

3.00

2.00

534.00

120.00 120.00

311.00 311.00

103.00 103.00

5,340.00

120.00 10.00 1,200.00

311.00 10.00 3,110.00


103.00 10.00 1,030.00

3,277.07

917.05

1,722.54
PLANILLA DE METRADO

COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO - PASCO"

MEDIDAS
Nº DE PARCIAL TOTAL
VECES
LARGO ANCHO ALTO

637.48

134.77

112.31

0.90 17.71

0.90 13.12

0.90 20.47

0.90 20.38

0.90 19.96

0.90 20.67

Volumen 112.31 22.46

4,094.21

3,277.07 3,932.48

134.77 161.73

4,094.21

3,277.07 3,932.48

134.77 161.73

5,464.79

120.00 10.00 1,200.00

311.00 10.00 3,110.00

103.00 10.00 1,030.00

124.79

19.68

14.58

22.74

22.64

22.18

22.97
PLANILLA DE METRADO

COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO - PASCO"

MEDIDAS
Nº DE PARCIAL TOTAL
VECES
LARGO ANCHO ALTO

2,185.92

120.00 10.00 0.40 480.00

311.00 10.00 0.40 1,244.00

103.00 10.00 0.40 412.00

0.40 7.87

0.40 5.83

0.40 9.10

0.40 9.06

0.40 8.87

0.40 9.19

2,185.92 2,623.10 2,623.10

2,185.92 2,623.10 2,623.10

2,623.10 262.31 262.31

2,623.10 2,623.10 2,623.10

819.72

120.00 10.00 0.30 180.00

311.00 10.00 0.30 466.50

103.00 10.00 0.30 154.50

0.50 0.30 2.95

0.50 0.30 2.19

0.50 0.30 3.41


PLANILLA DE METRADO

COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO - PASCO"

MEDIDAS
Nº DE PARCIAL TOTAL
VECES
LARGO ANCHO ALTO

0.50 0.30 3.40

0.50 0.30 3.33

0.50 0.30 3.45

819.72 983.66 983.66

819.72 983.66 983.66

819.72

120.00 10.00 0.30 180.00

311.00 10.00 0.30 466.50

103.00 10.00 0.30 154.50

0.50 0.30 2.95

0.50 0.30 2.19

0.50 0.30 3.41

0.50 0.30 3.40

0.50 0.30 3.33

0.50 0.30 3.45

819.72 983.66 983.66

819.72 983.66 983.66

1,967.32

819.72 983.66

819.72 983.66

1,967.32 1,967.32 1,967.32

1,967.32 196.73 196.73

1,967.32 1,967.32 1,967.32


PLANILLA DE METRADO

COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO - PASCO"

MEDIDAS
Nº DE PARCIAL TOTAL
VECES
LARGO ANCHO ALTO

6,658

2,136.00

3.00 120.00 480.00

3.00 311.00 1,244.00

3.00 103.00 412.00

72.00

3.00 3.00 12.00

3.00 3.00 12.00

3.00 3.00 12.00

3.00 3.00 12.00

3.00 3.00 12.00

3.00 3.00 12.00

4,450.00

10.00 1,000.00

10.00 2,591.67

10.00 858.33

0.00

316.16

123.60

120.00 0.20 61.80

311.00 0.20 0.00

103.00 0.20 61.80

10.80

3.00 0.20 1.80

3.00 0.20 1.80


PLANILLA DE METRADO

COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO - PASCO"

MEDIDAS
Nº DE PARCIAL TOTAL
VECES
LARGO ANCHO ALTO

3.00 0.20 1.80

3.00 0.20 1.80

3.00 0.20 1.80

3.00 0.20 1.80

163.00

10.00 0.20 60.00

10.00 0.20 51.50

10.00 0.20 51.50

Ancho Prom.= 18.76

7.30 0.20 2.92

5.59 0.20 2.23

8.39 0.20 3.36

8.36 0.20 3.34

8.84 0.20 3.54

8.43 0.20 3.37


PLANILLA DE METRADO

COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO - PASCO"

MEDIDAS
Nº DE PARCIAL TOTAL
VECES
LARGO ANCHO ALTO

1,092.96

120.00 10.00 0.20 240.00

311.00 10.00 0.20 622.00

103.00 10.00 0.20 206.00

24.96

0.20 3.94

0.20 2.92

0.20 4.55

0.20 4.53

0.20 4.44

0.20 4.59

1,960.40

1,602.00

120.00 360.00

311.00 933.00

103.00 309.00

54.00

3.00 9.00

3.00 9.00

3.00 9.00

3.00 9.00

3.00 9.00

3.00 9.00

257.50

10.00 300.00

10.00 777.50
PLANILLA DE METRADO

COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO - PASCO"

MEDIDAS
Nº DE PARCIAL TOTAL
VECES
LARGO ANCHO ALTO

10.00 257.50

Long. de Ancho Prom.= Cune 46.90

7.30 7.30

5.59 5.59

8.39 8.39

8.36 8.36

8.84 8.84

8.43 8.43

257.50

1,428.80

120.00 300.00

311.00 777.50

103.00 257.50

2,386.00

3.00 0.50 8.00 24.00

3.00 0.50 10.00 150.00

1.80 3.60

1.80 18.00

5.00 0.50 18.00

5.00 0.50 25.00

9.00

2.00

5.00
PLANILLA DE METRADO

COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO - PASCO"

MEDIDAS
Nº DE PARCIAL TOTAL
VECES
LARGO ANCHO ALTO

2.00

5,340.00

5,340.00 5,340.00

1,109.31

110.26 110.26

108.37 108.37

39.33 39.33

37.58 37.58

103.69 103.69

102.93 103.69

115.69 115.69

117.15 117.15

65.15 65.15

98.65 98.65

103.43 103.43

106.32 106.32

4.50

4.50 4.50
PLANILLA DE METRADO

COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO - PASCO"

MEDIDAS
Nº DE PARCIAL TOTAL
VECES
LARGO ANCHO ALTO

400.23

4,002.27 0.10 400.23

Areas Total en Cad 4,002.27

540.60 540.60

2,931.61 2,931.61

530.06 530.06

1,441.36

4,002.27 0.20 960.54

400.23 480.27

4.50 0.10 0.54

1,441.36

1,441.36 1,441.36

720.41

4,002.27 0.15 720.41

184.89

1.00 0.20 73.95

1.00 0.10 110.93

4,002.27

4,002.27 4,002.27

4,002.27

4,002.27 4,002.27

3,032.11

1,109.31 1.00 1,109.31

1,109.31 2.60 1,922.80

961.40
PLANILLA DE METRADO

COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO - PASCO"

MEDIDAS
Nº DE PARCIAL TOTAL
VECES
LARGO ANCHO ALTO

369.77 2.60 961.40

27.00

1.00

2.00

4.00

8.00

3.00

5.00

1.00

3.00

22.00

1.00

2.00

4.00
PLANILLA DE METRADO

COLUMNA PASCO-SECTOR 5 - YANACANCHA – PASCO - PASCO"

MEDIDAS
Nº DE PARCIAL TOTAL
VECES
LARGO ANCHO ALTO

3.00

3.00

5.00

1.00

3.00

1.00 1.00

1.00 1.00

3.00

3.00

1.00

1.00
METRADO DE EXPLANACIONES

“CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTO


OBRA :
YANACANCHA – PASCO - PASCO"
UBICACIÓN : SECTOR 5 - COLUMNA PASCO
PROPIETARIO :
PROYECTISTA: GRUPO 8

CALLE - TAHUANTINSUYO
RELLEN
VOLUMEN M3 O CON CLASIFICAC
TIPO DE
PROG AC AR DIST VC VR MAT. CORTES
SUELO
PREST CL
0+000 7.75 --
0+010 8.31 10 80.30 -- -- 80.30
0+020 8.43 10 83.70 -- -- 83.70
0+030 7.65 10 80.40 -- -- 80.40
0+040 4.50 3.62 10 60.75 18.10 -- 60.75
0+050 5.87 2.43 10 51.85 30.25 -- 51.85
0+060 7.70 10 67.85 12.15 -- 67.85
0+070 8.03 10 78.65 -- -- 78.65
0+080 7.73 10 78.80 -- -- 78.80
0+090 8.35 10 80.40 -- -- 80.40
0+100 8.52 10 84.35 -- -- 84.35
0+110 7.34 10 79.30 -- -- 79.30
0+120 9.62 10 90.70 -- -- 90.70

TOTAL 917.05 60.5 0.00 917.05

Relleno préstamo 60.50


Eliminacion Exced. 917.05

CALLE - AYACUCHO
VOLUMEN M3 CLASIFICAC
PROG AC AR DIST VC VR CORTES
TIPO DE RELLEN
SUELO O CON
MAT.
PREST CL
0+000 6.27 0.00 -- -- 0.00
0+010 7.12 10 66.95 -- -- 66.95
0+020 4.82 10 59.70 -- -- 59.70
0+030 5.44 10 51.30 -- -- 51.30
0+040 4.95 10 51.95 -- -- 51.95
0+050 6.16 10 55.55 -- -- 55.55
0+060 4.55 10 53.55 -- -- 53.55
0+070 4.47 10 45.10 -- -- 45.10
METRADO DE EXPLANACIONES

“CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTO


OBRA :
YANACANCHA – PASCO - PASCO"
UBICACIÓN : SECTOR 5 - COLUMNA PASCO
PROPIETARIO :
PROYECTISTA: GRUPO 8

CALLE - TAHUANTINSUYO
RELLEN
VOLUMEN M3 O CON CLASIFICAC
TIPO DE
PROG AC AR DIST VC VR MAT. CORTES
SUELO
PREST CL
0+000 7.75 --
0+010 8.31 10 80.30 -- -- 80.30
0+020 8.43 10 83.70 -- -- 83.70
0+030 7.65 10 80.40 -- -- 80.40
0+040 4.50 3.62 10 60.75 18.10 -- 60.75
0+050 5.87 2.43 10 51.85 30.25 -- 51.85
0+060 7.70 10 67.85 12.15 -- 67.85
0+070 8.03 10 78.65 -- -- 78.65
0+080 7.73 10 78.80 -- -- 78.80
0+090 8.35 10 80.40 -- -- 80.40
0+100 8.52 10 84.35 -- -- 84.35
0+110 7.34 10 79.30 -- -- 79.30
0+120 9.62 10 90.70 -- -- 90.70

TOTAL 917.05 60.5 0.00 917.05

Relleno préstamo 60.50


Eliminacion Exced. 917.05

CALLE - AYACUCHO
VOLUMEN M3 CLASIFICAC
PROG AC AR DIST VC VR CORTES
TIPO DE RELLEN
SUELO O CON
MAT.
PREST CL
0+080 4.46 10 44.65 -- -- 44.65
0+090 4.29 10 43.75 -- -- 43.75
0+100 4.86 10 45.75 -- -- 45.75
0+110 5.75 10 53.05 -- -- 53.05
0+120 4.60 10 51.75 -- -- 51.75
0+130 4.66 0.28 10 46.30 1.40 -- 46.30
0+140 7.91 10 62.85 1.40 -- 62.85
0+150 9.10 10 85.05 -- -- 85.05
METRADO DE EXPLANACIONES

“CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTO


OBRA :
YANACANCHA – PASCO - PASCO"
UBICACIÓN : SECTOR 5 - COLUMNA PASCO
PROPIETARIO :
PROYECTISTA: GRUPO 8

CALLE - TAHUANTINSUYO
RELLEN
VOLUMEN M3 O CON CLASIFICAC
TIPO DE
PROG AC AR DIST VC VR MAT. CORTES
SUELO
PREST CL
0+000 7.75 --
0+010 8.31 10 80.30 -- -- 80.30
0+020 8.43 10 83.70 -- -- 83.70
0+030 7.65 10 80.40 -- -- 80.40
0+040 4.50 3.62 10 60.75 18.10 -- 60.75
0+050 5.87 2.43 10 51.85 30.25 -- 51.85
0+060 7.70 10 67.85 12.15 -- 67.85
0+070 8.03 10 78.65 -- -- 78.65
0+080 7.73 10 78.80 -- -- 78.80
0+090 8.35 10 80.40 -- -- 80.40
0+100 8.52 10 84.35 -- -- 84.35
0+110 7.34 10 79.30 -- -- 79.30
0+120 9.62 10 90.70 -- -- 90.70

TOTAL 917.05 60.5 0.00 917.05

Relleno préstamo 60.50


Eliminacion Exced. 917.05

CALLE - AYACUCHO
VOLUMEN M3 CLASIFICAC
PROG AC AR DIST VC VR CORTES
TIPO DE RELLEN
SUELO O CON
MAT.
PREST CL
0+160 7.34 10 82.20 -- -- 82.20
0+170 8.46 10 79.00 -- -- 79.00
0+180 4.39 10 64.25 -- -- 64.25
0+190 7.04 10 57.15 -- -- 57.15
0+200 4.67 10 58.55 -- -- 58.55
0+210 5.99 10 53.30 -- -- 53.30
0+220 4.67 10 53.30 -- -- 53.30
0+230 5.89 10 52.80 -- -- 52.80
METRADO DE EXPLANACIONES

“CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTO


OBRA :
YANACANCHA – PASCO - PASCO"
UBICACIÓN : SECTOR 5 - COLUMNA PASCO
PROPIETARIO :
PROYECTISTA: GRUPO 8

CALLE - TAHUANTINSUYO
RELLEN
VOLUMEN M3 O CON CLASIFICAC
TIPO DE
PROG AC AR DIST VC VR MAT. CORTES
SUELO
PREST CL
0+000 7.75 --
0+010 8.31 10 80.30 -- -- 80.30
0+020 8.43 10 83.70 -- -- 83.70
0+030 7.65 10 80.40 -- -- 80.40
0+040 4.50 3.62 10 60.75 18.10 -- 60.75
0+050 5.87 2.43 10 51.85 30.25 -- 51.85
0+060 7.70 10 67.85 12.15 -- 67.85
0+070 8.03 10 78.65 -- -- 78.65
0+080 7.73 10 78.80 -- -- 78.80
0+090 8.35 10 80.40 -- -- 80.40
0+100 8.52 10 84.35 -- -- 84.35
0+110 7.34 10 79.30 -- -- 79.30
0+120 9.62 10 90.70 -- -- 90.70

TOTAL 917.05 60.5 0.00 917.05

Relleno préstamo 60.50


Eliminacion Exced. 917.05

CALLE - AYACUCHO
VOLUMEN M3 CLASIFICAC
PROG AC AR DIST VC VR CORTES
TIPO DE RELLEN
SUELO O CON
MAT.
PREST CL
0+240 4.21 10 50.50 -- -- 50.50
0+250 5.45 10 48.30 -- -- 48.30
0+260 5.18 10 53.15 -- -- 53.15
0+270 5.56 10 53.70 -- -- 53.70
0+280 4.42 10 49.90 -- -- 49.90
0+290 4.97 10 46.95 -- -- 46.95
0+300 4.65 10 48.10 -- -- 48.10
0+310 5.19 10 49.20 -- -- 49.20
METRADO DE EXPLANACIONES

“CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTO


OBRA :
YANACANCHA – PASCO - PASCO"
UBICACIÓN : SECTOR 5 - COLUMNA PASCO
PROPIETARIO :
PROYECTISTA: GRUPO 8

CALLE - TAHUANTINSUYO
RELLEN
VOLUMEN M3 O CON CLASIFICAC
TIPO DE
PROG AC AR DIST VC VR MAT. CORTES
SUELO
PREST CL
0+000 7.75 --
0+010 8.31 10 80.30 -- -- 80.30
0+020 8.43 10 83.70 -- -- 83.70
0+030 7.65 10 80.40 -- -- 80.40
0+040 4.50 3.62 10 60.75 18.10 -- 60.75
0+050 5.87 2.43 10 51.85 30.25 -- 51.85
0+060 7.70 10 67.85 12.15 -- 67.85
0+070 8.03 10 78.65 -- -- 78.65
0+080 7.73 10 78.80 -- -- 78.80
0+090 8.35 10 80.40 -- -- 80.40
0+100 8.52 10 84.35 -- -- 84.35
0+110 7.34 10 79.30 -- -- 79.30
0+120 9.62 10 90.70 -- -- 90.70

TOTAL 917.05 60.5 0.00 917.05

Relleno préstamo 60.50


Eliminacion Exced. 917.05

CALLE - AYACUCHO
VOLUMEN M3 CLASIFICAC
PROG AC AR DIST VC VR CORTES
TIPO DE RELLEN
SUELO O CON
MAT.
PREST CL
0+311 4.68 1 4.94 -- -- 4.94

TOTAL 1722.54 2.80 0.00 1722.54

Relleno préstamo 2.80


Eliminacion Exced. 1722.54

CALLE - MARIATEGUI
METRADO DE EXPLANACIONES

“CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTO


OBRA :
YANACANCHA – PASCO - PASCO"
UBICACIÓN : SECTOR 5 - COLUMNA PASCO
PROPIETARIO :
PROYECTISTA: GRUPO 8

CALLE - TAHUANTINSUYO
RELLEN
VOLUMEN M3 O CON CLASIFICAC
TIPO DE
PROG AC AR DIST VC VR MAT. CORTES
SUELO
PREST CL
0+000 7.75 --
0+010 8.31 10 80.30 -- -- 80.30
0+020 8.43 10 83.70 -- -- 83.70
0+030 7.65 10 80.40 -- -- 80.40
0+040 4.50 3.62 10 60.75 18.10 -- 60.75
0+050 5.87 2.43 10 51.85 30.25 -- 51.85
0+060 7.70 10 67.85 12.15 -- 67.85
0+070 8.03 10 78.65 -- -- 78.65
0+080 7.73 10 78.80 -- -- 78.80
0+090 8.35 10 80.40 -- -- 80.40
0+100 8.52 10 84.35 -- -- 84.35
0+110 7.34 10 79.30 -- -- 79.30
0+120 9.62 10 90.70 -- -- 90.70

TOTAL 917.05 60.5 0.00 917.05

Relleno préstamo 60.50


Eliminacion Exced. 917.05

CALLE - AYACUCHO
VOLUMEN M3 CLASIFICAC
PROG AC AR DIST VC VR CORTES
TIPO DE RELLEN
SUELO O CON
MAT.
PREST CL
RELLEN
VOLUMEN M3 O CON CLASIFICAC
TIPO DE
PROG AC AR DIST VC VR MAT. CORTES
SUELO
PREST CL
0+000 2.52 --
0+010 6.87 10 46.95 -- -- 46.95
0+020 4.67 10 57.70 -- -- 57.70
0+030 2.98 10 38.25 -- -- 38.25
0+040 7.54 10 52.60 -- -- 52.60
METRADO DE EXPLANACIONES

“CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTO


OBRA :
YANACANCHA – PASCO - PASCO"
UBICACIÓN : SECTOR 5 - COLUMNA PASCO
PROPIETARIO :
PROYECTISTA: GRUPO 8

CALLE - TAHUANTINSUYO
RELLEN
VOLUMEN M3 O CON CLASIFICAC
TIPO DE
PROG AC AR DIST VC VR MAT. CORTES
SUELO
PREST CL
0+000 7.75 --
0+010 8.31 10 80.30 -- -- 80.30
0+020 8.43 10 83.70 -- -- 83.70
0+030 7.65 10 80.40 -- -- 80.40
0+040 4.50 3.62 10 60.75 18.10 -- 60.75
0+050 5.87 2.43 10 51.85 30.25 -- 51.85
0+060 7.70 10 67.85 12.15 -- 67.85
0+070 8.03 10 78.65 -- -- 78.65
0+080 7.73 10 78.80 -- -- 78.80
0+090 8.35 10 80.40 -- -- 80.40
0+100 8.52 10 84.35 -- -- 84.35
0+110 7.34 10 79.30 -- -- 79.30
0+120 9.62 10 90.70 -- -- 90.70

TOTAL 917.05 60.5 0.00 917.05

Relleno préstamo 60.50


Eliminacion Exced. 917.05

CALLE - AYACUCHO
VOLUMEN M3 CLASIFICAC
PROG AC AR DIST VC VR CORTES
TIPO DE RELLEN
SUELO O CON
MAT.
PREST CL
0+050 3.98 10 57.60 -- -- 57.60
0+060 7.43 10 57.05 -- -- 57.05
0+070 6.78 10 71.05 -- -- 71.05
0+080 8.43 10 76.05 -- -- 76.05
0+090 8.21 10 83.20 -- -- 83.20
0+100 7.56 10 78.85 -- -- 78.85
0+103 4.56 3 18.18 -- -- 18.18
METRADO DE EXPLANACIONES

“CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTO


OBRA :
YANACANCHA – PASCO - PASCO"
UBICACIÓN : SECTOR 5 - COLUMNA PASCO
PROPIETARIO :
PROYECTISTA: GRUPO 8

CALLE - TAHUANTINSUYO
RELLEN
VOLUMEN M3 O CON CLASIFICAC
TIPO DE
PROG AC AR DIST VC VR MAT. CORTES
SUELO
PREST CL
0+000 7.75 --
0+010 8.31 10 80.30 -- -- 80.30
0+020 8.43 10 83.70 -- -- 83.70
0+030 7.65 10 80.40 -- -- 80.40
0+040 4.50 3.62 10 60.75 18.10 -- 60.75
0+050 5.87 2.43 10 51.85 30.25 -- 51.85
0+060 7.70 10 67.85 12.15 -- 67.85
0+070 8.03 10 78.65 -- -- 78.65
0+080 7.73 10 78.80 -- -- 78.80
0+090 8.35 10 80.40 -- -- 80.40
0+100 8.52 10 84.35 -- -- 84.35
0+110 7.34 10 79.30 -- -- 79.30
0+120 9.62 10 90.70 -- -- 90.70

TOTAL 917.05 60.5 0.00 917.05

Relleno préstamo 60.50


Eliminacion Exced. 917.05

CALLE - AYACUCHO
VOLUMEN M3 CLASIFICAC
PROG AC AR DIST VC VR CORTES
TIPO DE RELLEN
SUELO O CON
MAT.
PREST CL
TOTAL 637.48 0 0.00 637.48

Relleno préstamo 0.00


Eliminacion Exced. 637.48
METRADO DE EXPLANACIONES

“CONSTRUCCION DE PISTAS Y VEREDAS EN EL PPJJ COLUMNA PASCO-SECTO


OBRA :
YANACANCHA – PASCO - PASCO"
UBICACIÓN : SECTOR 5 - COLUMNA PASCO
PROPIETARIO :
PROYECTISTA: GRUPO 8

CALLE - TAHUANTINSUYO
RELLEN
VOLUMEN M3 O CON CLASIFICAC
TIPO DE
PROG AC AR DIST VC VR MAT. CORTES
SUELO
PREST CL
0+000 7.75 --
0+010 8.31 10 80.30 -- -- 80.30
0+020 8.43 10 83.70 -- -- 83.70
0+030 7.65 10 80.40 -- -- 80.40
0+040 4.50 3.62 10 60.75 18.10 -- 60.75
0+050 5.87 2.43 10 51.85 30.25 -- 51.85
0+060 7.70 10 67.85 12.15 -- 67.85
0+070 8.03 10 78.65 -- -- 78.65
0+080 7.73 10 78.80 -- -- 78.80
0+090 8.35 10 80.40 -- -- 80.40
0+100 8.52 10 84.35 -- -- 84.35
0+110 7.34 10 79.30 -- -- 79.30
0+120 9.62 10 90.70 -- -- 90.70

TOTAL 917.05 60.5 0.00 917.05

Relleno préstamo 60.50


Eliminacion Exced. 917.05

CALLE - AYACUCHO
VOLUMEN M3 CLASIFICAC
PROG AC AR DIST VC VR CORTES
TIPO DE RELLEN
SUELO O CON
MAT.
PREST CL

Volumen Volumen
Resumen de Volumen Total de Total de
Corte. Relleno.

3277.07 63.30
S

COLUMNA PASCO-SECTOR 5 -

CLASIFICACION
CORTES
R.S. R.F.

-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --

0 0

CLASIFICACION
CORTES

GM-GC R.F.

-- --
-- --
-- --
-- --
-- --
-- --
-- --
S

COLUMNA PASCO-SECTOR 5 -

CLASIFICACION
CORTES
R.S. R.F.

-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --

0 0

CLASIFICACION
CORTES

GM-GC R.F.
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
S

COLUMNA PASCO-SECTOR 5 -

CLASIFICACION
CORTES
R.S. R.F.

-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --

0 0

CLASIFICACION
CORTES

GM-GC R.F.
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
S

COLUMNA PASCO-SECTOR 5 -

CLASIFICACION
CORTES
R.S. R.F.

-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --

0 0

CLASIFICACION
CORTES

GM-GC R.F.
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
S

COLUMNA PASCO-SECTOR 5 -

CLASIFICACION
CORTES
R.S. R.F.

-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --

0 0

CLASIFICACION
CORTES

GM-GC R.F.
-- --

0.00 0.00
S

COLUMNA PASCO-SECTOR 5 -

CLASIFICACION
CORTES
R.S. R.F.

-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --

0 0

CLASIFICACION
CORTES

GM-GC R.F.
CLASIFICACION
CORTES
R.S. R.F.

-- --
-- --
-- --
-- --
S

COLUMNA PASCO-SECTOR 5 -

CLASIFICACION
CORTES
R.S. R.F.

-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --

0 0

CLASIFICACION
CORTES

GM-GC R.F.
-- --
-- --
-- --
-- --
-- --
-- --
-- --
S

COLUMNA PASCO-SECTOR 5 -

CLASIFICACION
CORTES
R.S. R.F.

-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --

0 0

CLASIFICACION
CORTES

GM-GC R.F.
0 0
MATERIAL UND CANT.

ARENA FINA m3 58.5697


ARENA GRUESA m3 967.5694
MATERIAL DE PRESTAMO (LASTRE) m3 797.7600
PIEDRA ZARANDEADA DE 1/2" PUESTO EN OBRA m3 1,059.9539
HORMIGON m3 47.8000
TOTAL m3 2,931.6530

COSTO UNITARIO DE FLETE m3 20.0000


COSTO TOTAL M3 58,633.0600