PREDIMENSIONAMIENTO DE VIGAS
Peralte h = L/14
Ancho b = h/2
b mín. = 25.00 cm

PREDIMENSIONAMIENTO DE VIGAS EN LA DIRECCIÓN X-X


EJES LUZ (L) L/14 Dimensiones vigas X-X
ENTRE A-B' 4.65 m 33.21 cm h= 0.35 m
1 ENTRE C'-D 2.52 m 18.00 cm b= 0.25 m
ENTRE D-E 3.43 m 24.50 cm
ENTRE A-B 3.33 m 23.79 cm
ENTRE B-C 2.55 m 18.21 cm
2
ENTRE C-D 3.75 m 26.79 cm
ENTRE D-E 3.43 m 24.50 cm
ENTRE A-B 3.33 m 23.79 cm
ENTRE B-C 2.55 m 18.21 cm
3
ENTRE C-D 3.75 m 26.79 cm
ENTRE D-E 3.43 m 24.50 cm
ENTRE A-B 3.33 m 23.79 cm
ENTRE B-C 2.55 m 18.21 cm
4
ENTRE C-D 3.75 m 26.79 cm
ENTRE D-E 3.43 m 24.50 cm
Peralte h = 33.21 cm
h asumido 35.00 cm

PREDIMENSIONAMIENTO DE VIGAS EN LA DIRECCIÓN Y-Y

EJES LUZ (L) L/14 Dimensiones vigas Y-Y


ENTRE 1-2 3.15 m 22.50 cm h= 0.40 m
A ENTRE 2-3 5.38 m 38.43 cm b= 0.25 m
ENTRE 3-4 3.95 m 28.21 cm
ENTRE 2-3 5.38 m 38.43 cm
B
ENTRE 3-4 3.95 m 28.21 cm
B' ENTRE 1-2 3.15 m 22.50 cm
ENTRE 2-3 5.38 m 38.43 cm
C
ENTRE 3-4 3.95 m 28.21 cm
C' ENTRE 1-2 3.15 m 22.50 cm
ENTRE 1-2 3.15 m 22.50 cm
D ENTRE 2-3 5.38 m 38.43 cm
ENTRE 3-4 3.95 m 28.21 cm
ENTRE 1-2 3.15 m 22.50 cm
E ENTRE 2-3 5.38 m 38.43 cm
ENTRE 3-4 3.95 m 28.21 cm
Peralte h = 38.43 cm
h asumido 40.00 cm