CURVA "S" DE AVANCE DE OBRA

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación TINTAY - AYMARAES - APURIMAC
Entidad MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista CONSORCIO SEÑOR DE ANIMAS
Supervision CONSORCIO SUPERVISOR TINTAY
Factor (Fr) : 1.0
Total Valor Referencial: 12,236,127.02

CURVA GENERAL DE AVANCE DE OBRA: PROGRAMADO VS. EJECUTADO ACUMULADO

100.00% 100.00%
96.98%

90.00% 91.36%

84.21%
80.00%
75.19%
70.00%

63.63% PROGRAMADO
60.00%
EJECUTADO

50.00%
48.27%

SITUACION ACTUAL DE LA
40.00% OBRA:
ADELANTADA
33.48%
30.00%

20.00% 20.59%
19.68%

10.00% 10.50%
8.84%

0.00% 0.00% 0.55%


0.00%

MONTOS VALORIZADOS PROGRAMADOS MONTOS VALORIZADOS EJECUTADOS


MONTO TOTAL (CON IGV) PORCENTAJES MONTO TOTAL (CON IGV) PORCENTAJES
MES PARCIAL ACUMUL PARCIAL ACUMUL MES PARCIAL ACUMUL PARCIAL ACUMUL
S/. S/. % % S/. S/. % %
11/27/2017 - - - - 11/27/2017 - - 0.00% 0.00%
noviembre noviembre 91,896.01 91,896.01 0.55% 0.55% noviembre - - 0.00% 0.00%
diciembre diciembre 1,379,958.18 1,471,854.20 8.29% 8.84% diciembre 1,748,433.87 1,748,433.87 10.50% 10.50%
enero enero 1,806,232.26 3,278,086.46 10.85% 19.68% enero 1,680,134.98 3,428,568.85 10.09% 20.59%
febrero febrero 2,298,658.51 5,576,744.97 13.80% 33.48% febrero
marzo marzo 2,462,644.03 8,039,389.00 14.79% 48.27% marzo
abril abril 2,557,352.09 10,596,741.09 15.35% 63.63% abril
mayo mayo 1,926,066.73 12,522,807.82 11.56% 75.19% mayo
junio junio 1,502,504.41 14,025,312.23 9.02% 84.21% junio
julio julio 1,190,648.13 15,215,960.36 7.15% 91.36% julio
agosto agosto 935,936.73 16,151,897.08 5.62% 96.98% agosto
septiembre septiembre 503,062.49 16,654,959.57 3.02% 100.00% septiembre

TOTAL COSTO (CON IGV) 16,654,959.57 TOTAL COSTO (CON IGV) 3,428,568.85
CONTROL GENERAL DE AVANCE DE OBRA

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación TINTAY - AYMARAES - APURIMAC
Entidad MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista CONSORCIO SEÑOR DE ANIMAS
Supervision CONSORCIO SUPERVISOR TINTAY
Factor (Fr) : 1.0
Total Valor Referencial: 12,236,127.02

VALORIZACION PROGRAMADO EJECUTADO SITUACION


Nº MES PARCIAL % ACUMULADO % PARCIAL % ACUMULADO % PARCIAL ACUMULADO

1 noviembre 91,896.01 00.55% 91,896.01 00.55% 0.00 00.00% 0.00


2 diciembre 1,379,958.18 08.29% 1,471,854.20 08.84% 1,748,433.87 10.50% 1,748,433.87 10.50% ADELANTADA ADELANTADA
3 enero 1,806,232.26 10.85% 3,278,086.46 19.68% 1,680,134.98 10.09% 3,428,568.85 20.59% ATRASADA ADELANTADA
4 febrero 2,298,658.51 13.80% 5,576,744.97 33.48% 00.00%
5 marzo 2,462,644.03 14.79% 8,039,389.00 48.27%
6 abril 2,557,352.09 15.35% 10,596,741.09 63.63%
7 mayo 1,926,066.73 11.56% 12,522,807.82 75.19%
8 junio 1,502,504.41 09.02% 14,025,312.23 84.21%
9 julio 1,190,648.13 07.15% 15,215,960.36 91.36%
10 agosto 935,936.73 05.62% 16,151,897.08 96.98%
11 septiembre 503,062.49 03.02% 16,654,959.57 100.00%

ACUMULADO : 16,654,959.57 3,428,568.85


CRONOGRAMA VALORIZADO DE EJECUCIÓN DE OBRA
OBRA: MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación
Entidad MUNICIPALIDAD DISTRITAL DE TIINTAY DURACION : 300 DIAS CALENDARIOS

Contratista CONSORCIO SEÑOR DE ANIMAS


Supervision CONSORCIO SUPERVISOR TINTAY
Presup MES 1 MES 2 MES 3 MES 4 MES 5
ITEM PARTIDA Obra(S/.) OCTUBRE (01-31) NOVIEMBRE (01 - 30) DICIEMBRE (01-31) ENERO (01 - 31) FEBRERO (01-27)
CRONOGRAMA VALORIZADO DE EJECUCIÓN DE OBRA
OBRA: MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación
Entidad MUNICIPALIDAD DISTRITAL DE TIINTAY DURACION : 300 DIAS CALENDARIOS

Contratista CONSORCIO SEÑOR DE ANIMAS


Supervision CONSORCIO SUPERVISOR TINTAY
Presup MES 1 MES 2 MES 3 MES 4 MES 5
ITEM PARTIDA Obra(S/.) OCTUBRE (01-31) NOVIEMBRE (01 - 30) DICIEMBRE (01-31) ENERO (01 - 31) FEBRERO (01-27)
VALORIZACION FISICA DE OBRA Nº 02
RESUMEN MENSUAL
ENERO de 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE
VISACOCHA, CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES -
APURIMAC”,

Ubicación TINTAY - AYMARAES - APURIMAC

Entidad MUNICIPALIDAD DISTRITAL DE TINTAY

Contratista CONSORCIO SEÑOR DE ANIMAS

Supervision CONSORCIO SUPERVISOR TINTAY

Factor (Fr) : 1.0

MONTO ACUMULADO VALORIZACION ACTUAL SALDO


ITEM DESCRIPCIÓN CONTRATADO ANTERIOR ACTUAL ACUMULADO
(S/.) (S/.) (S/.) (S/.) (S/.)

1.00 VALORIZACIONES Y REAJUSTES

1.01 VISACOCHA 698,245.01 158,395.43 46,985.43 205,380.86 492,864.15


1.02 CHIHUAPAMPA 531,665.85 111,476.28 61,077.20 172,553.48 359,112.37
1.03 PAMPATAMA 895,978.04 143,208.63 45,636.12 188,844.75 707,133.29
1.04 SAN MATEO #REF! #REF! #REF! #REF! #REF!
1.05 HUANCARPUQUIO 1,705,958.72 258,693.46 466,432.52 725,125.98 980,832.74
1.06 TAQUEBAMBA 3,251,582.43 138,463.95 265,412.04 403,875.99 2,847,706.44
1.07 MINUNE 764,850.02 147,267.23 56,508.97 203,776.20 561,073.82

1.03 REINTEGROS (*) 0.00 0.00 0.00

A TOTAL VALORIZACIÓN REAJUSTADA #REF! #REF! #REF! #REF! #REF!

2.00 AMORTIZACIONES
2.10 ADELANTO DIRECTO (0.0%) 0.00 0.00 0.00 0.00 0.00
2.20 ADELANTO DE MATERIALES (0.0%) 0.00 0.00 0.00 0.00 0.00

B TOTAL AMORTIZACIONES 0.00 0.00 0.00 0.00 0.00

C TOTAL VALORIZACIÓN - AMORTIZACIONES #REF! #REF! #REF! #REF! #REF!

3.00 OTROS PAGOS


3.10 GASTOS GENERALES (10.35%) #REF! #REF! #REF! #REF! #REF!
3.20 UTILIDAD (5.00%) #REF! #REF! #REF! #REF! #REF!

D TOTAL OTROS PAGOS EFECTUADOS #REF! #REF! #REF! #REF! #REF!

E TOTAL ( C + D ) #REF! #REF! #REF! #REF! #REF!

4.00 I.G.V. 18 % DE (E) #REF! #REF! #REF! #REF! #REF!

5.00 TOTAL VALOR REFERENCIAL #REF! #REF! #REF! #REF! #REF!


7.00 VALOR A PAGAR AL CONTRATISTA #REF! #REF! #REF! #REF! #REF!
(*) = Reajuste que se pagara al final de las valorizaciones por disposicion de la Entidad.
PAGO A CUENTA A CANCELAR AL CONTRATISTA
VALORIZACIÓN Nº 02
ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación TINTAY - AYMARAES - APURIMAC
Entidad MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista CONSORCIO SEÑOR DE ANIMAS
Supervision CONSORCIO SUPERVISOR TINTAY
Factor (Fr) : 1.0

CONCEPTO S/.

Monto valorizado en el presente mes :


1.01 VISACOCHA 46,985.43
1.02 CHIHUAPAMPA 61,077.20
1.03 PAMPATAMA 45,636.12
1.04 SAN MATEO 292,315.45
1.05 HUANCARPUQUIO 466,432.52
1.06 TAQUEBAMBA 265,412.04
1.07 MINUNE 56,508.97
1. Valorización del Mes (Costo Directo) 1,234,367.73
2. Gastos Generales 10.35% 127,757.07
3. Utilidad 5.00% 61,718.39
. Sub Total (1+2+3) 1,423,843.19

Reajuste de las valorizaciones (*) : -


. Reajuste de la valorización No. -

Amortizaciones : -
. Del Adelanto en Efectivo en la Valorización -
. Del Adelanto de Materiales en la Valorización -

Deduccion del reajuste que no corresponde : -


. Por Adelanto en Efectivo en la Valorizacion -
. Por Adelanto de Materiales de la Valorización -

I.- MONTO FACTURABLE (Sin IGV) 1,423,843.19

Otros :
. Retencion por Retraso en la Obra -
. Multas -
. (*) Reajuste a descontar porque se cancelara al final de las valorizaciones -

II.- TOTAL RETENCION -

III.- MONTO LIQUIDO A PAGAR ( I - II ) 1,423,843.19

IV.- I.G.V. ( 18% de III ) 256,291.77

V.- MONTO A PAGAR AL CONTRATISTA ( III + IV) 1,680,134.96

VI.-VALOR DEDUCIDO POR LA ENTIDAD POR CAPACITACION (% VALOR X S/. 18,000) -

VII.-MONTO NETO A FACTURAR POR EL CONTRATISTA 1,680,134.96

VIII.-PORCENTAJE DE LA VALORIZACIÓN (%) #REF!

IX.- DETRACCIÓN (4% de (V)) 67,205.40

X.- NETO A PAGAR AL CONTRATISTA ( V-VII) 1,612,929.56


(*) = Reajuste que se pagara al final de las valorizaciones por disposicion de la Entidad.
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra :: MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
01 COMUNIDAD DE VISACOCHA 698,245.01 158,395.43 46,985.43 29.41% 205,380.85 29.41% 0.00 492,864.16
01.01 LOCALIDAD DE VISACOCHA 698,245.01 158,395.43 46,985.43 29.41% 205,380.85 29.41% 0.00 492,864.16
01.01.01 SISTEMA DE AGUA POTABLE 217,790.16 32,688.55 0.00 15.01% 32,688.55 15.01% 0.00 185,101.61
01.01.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
01.01.01.01.01 OBRAS PROVISIONALES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
01.01.01.01.01.01 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 1,760.72 1,760.72 1.00 1,760.72 100.00% 0.00 0.00% 1.00 1,760.72 100.00% 0.00 0.00 0.00%
01.01.01.01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 797.66 797.66 1.00 797.66 100.00% 0.00 0.00% 1.00 797.66 100.00% 0.00 0.00 0.00%
01.01.01.02 CONSTRUCCION DE CAPTACION TIPO - 1 5,240.41 74.91 0.00 74.91 1.43% 0.00 5,165.50
01.01.01.02.01 TRABAJOS PRELIMINARES 74.91 74.91 0.00 74.91 100.00% 0.00 0.00
01.01.01.02.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 16.50 2.44 40.26 16.50 40.26 100.00% 0.00 0.00% 16.50 40.26 100.00% 0.00 0.00 0.00%
01.01.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 16.50 2.10 34.65 16.50 34.65 100.00% 0.00 0.00% 16.50 34.65 100.00% 0.00 0.00 0.00%
01.01.01.02.02 MOVIMIENTO DE TIERRAS 887.73 0.00 0.00 0.00 0.00% 0.00 887.73
01.01.01.02.02.01 EXCAVACION EN TERRENO NORMAL CAPTACION m3 8.25 39.64 327.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.25 327.03 100.00%
01.01.01.02.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 4.95 40.54 200.67 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.95 200.67 100.00%
01.01.01.02.02.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE (50 M ) m3 10.31 34.92 360.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.31 360.03 100.00%
01.01.01.02.03 CONCRETO SIMPLE 210.73 0.00 0.00 0.00 0.00% 0.00 210.73 100.00%
01.01.01.02.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS m3 0.81 260.16 210.73 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.81 210.73 100.00%
01.01.01.02.04 CONCRETO ARMADO 1,416.99 0.00 0.00 0.00 0.00% 0.00 1,416.99
01.01.01.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 10.37 48.31 500.97 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.37 500.97 100.00%
01.01.01.02.04.02 ACERO FY=4200 KG/CM2 kg 61.78 6.66 411.45 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.78 411.45 100.00%
01.01.01.02.04.03 CONCRETO FC=210 KG/CM2 m3 1.22 413.58 504.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.22 504.57 100.00%
01.01.01.02.05 REVOQUES ENLUCIDOS Y MOLDURAS 212.46 0.00 0.00 0.00 0.00% 0.00 212.46
01.01.01.02.05.01 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 6.04 20.00 120.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 120.80 100.00%
01.01.01.02.05.02 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 3.29 27.86 91.66 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.29 91.66 100.00%
01.01.01.02.06 VALVULAS, TAPAS Y ACCESORIOS 782.42 0.00 0.00 0.00 0.00% 0.00 782.42
01.01.01.02.06.01 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.60X0.60M Y 0.40X0 und 1.00 352.51 352.51 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 352.51 100.00%
01.01.01.02.06.02 SUMINISTRO E INST. VALVULA COMPUERTA H. DUCTIL, Y ACCESORIOS und 1.00 429.91 429.91 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 429.91 100.00%
01.01.01.02.07 FILTROS 59.77 0.00 0.00 0.00 0.00% 0.00 59.77
01.01.01.02.07.01 FILTROS DE GRAVA m3 0.22 109.19 24.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.22 24.02 100.00%
01.01.01.02.07.02 FILTROS DE ARENA m3 0.29 123.26 35.75 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.29 35.75 100.00%
01.01.01.02.08 PINTURA 162.30 0.00 0.00 0.00 0.00% 0.00 162.30
01.01.01.02.08.01 PINTURA EN TAPAS METALICAS m2 0.52 22.08 11.48 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.52 11.48 100.00%
01.01.01.02.08.02 PINTURA EN MUROS EXTERIORES (CAPTACION) m2 6.04 24.97 150.82 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 150.82 100.00%
01.01.01.02.09 CERCO PERIMETRICO 1,433.10 0.00 0.00 0.00 0.00% 0.00 1,433.10
01.01.01.02.09.01 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 51.00 28.10 1,433.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.00 1,433.10 100.00%
01.01.01.03 LINEA DE CONDUCCION 315.48 39.13 0.00 39.13 12.40% 0.00 276.35
01.01.01.03.01 TENDIDO DE TUBERIA PVC SAP 315.48 39.13 0.00 39.13 12.40% 0.00 276.35
01.01.01.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 4.22 2.10 8.86 4.22 8.86 100.00% 0.00 0.00% 4.22 8.86 100.00% 0.00 0.00 0.00%
01.01.01.03.01.02 EXCAVACION MANUAL DE ZANJA DE TERRENO CONGLOMERADO m3 2.46 34.92 85.90 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.46 85.90 100.00%
01.01.01.03.01.03 REFINE Y NIVELACION DE ZANJA m 7.04 4.08 28.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.04 28.72 100.00%
01.01.01.03.01.04 CAMA DE APOYO E=10CM. m 7.04 1.66 11.69 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.04 11.69 100.00%
01.01.01.03.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 1.18 23.80 28.08 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.18 28.08 100.00%
01.01.01.03.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 1.77 57.17 101.19 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.77 101.19 100.00%
01.01.01.03.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 1.77 8.15 14.43 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.77 14.43 100.00%
01.01.01.03.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 7.04 4.30 30.27 7.04 30.27 100.00% 0.00 0.00% 7.04 30.27 100.00% 0.00 0.00 0.00%
01.01.01.03.01.09 PRUEBA HIDRAULICA DE LA LINEA DE CONDUCCION m 7.04 0.90 6.34 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.04 6.34 100.00%
01.01.01.04 RESERVORIO (8 M3) 21,354.15 86.66 0.00 86.66 0.41% 0.00 21,267.49
01.01.01.04.01 RESERVORIO 17,278.85 59.25 0.00 59.25 0.34% 0.00 17,219.60
01.01.01.04.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 13.05 2.44 31.84 13.05 31.84 100.00% 0.00 0.00% 13.05 31.84 100.00% 0.00 0.00 0.00%
01.01.01.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.05 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
01.01.01.04.01.03 EXCAVACION EN TERRENO NORMAL RESERVORIO m3 6.53 34.92 228.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.53 228.03 100.00%
01.01.01.04.01.04 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 8.16 14.23 116.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.16 116.12 100.00%
01.01.01.04.01.05 SOLADO C:H 1:8 (h= 0.10 m) m2 1.13 189.58 214.23 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.13 214.23 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra :: MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
01.01.01.04.01.06 CONCRETO F'C= 210 KG/CM2 EN RESERVORIO m3 6.38 413.58 2,638.64 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.38 2,638.64 100.00%
01.01.01.04.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 55.40 48.31 2,676.37 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.40 2,676.37 100.00%
01.01.01.04.01.08 ACERO FY=4200 KG/CM2 kg 272.32 6.66 1,813.65 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 272.32 1,813.65 100.00%
01.01.01.04.01.09 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 71.79 27.86 2,000.07 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 2,000.07 100.00%
01.01.01.04.01.10 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 71.79 20.00 1,435.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 1,435.80 100.00%
01.01.01.04.01.11 TAPA SANITARIA METALICA DE 0.60x0.60 mts und 2.00 197.60 395.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 395.20 100.00%
01.01.01.04.01.12 INSTALACION DE ACCESORIOS TUB. VENTILACION 2" und 2.00 118.31 236.62 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 236.62 100.00%
01.01.01.04.01.13 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS DE 3/4" und 1.00 496.89 496.89 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 496.89 100.00%
01.01.01.04.01.14 INSTALACION DE ACCESORIOS EN RESERVORIO und 2.00 872.43 1,744.86 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1,744.86 100.00%
01.01.01.04.01.15 PINTADO DE MURO EXTERIOR m2 71.79 15.54 1,115.62 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 1,115.62 100.00%
01.01.01.04.01.16 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 75.00 28.10 2,107.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.00 2,107.50 100.00%
01.01.01.04.02 CASETA DE CLORACION POR GOTEO 4,075.30 27.41 0.00 27.41 0.67% 0.00 4,047.89
01.01.01.04.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.05 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
01.01.01.04.02.02 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5X23 m2 11.54 71.15 821.07 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.54 821.07 100.00%
01.01.01.04.02.03 TARRAJEO EN INTERIORES Y EXTERIORES m2 20.50 28.40 582.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.50 582.20 100.00%
01.01.01.04.02.04 REJILLA METALICA SEGUN DISEÑO INC. COLOCADO und 1.00 421.12 421.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 421.12 100.00%
01.01.01.04.02.05 COBERTURA DE CALAMINA EN CASETA DE CLORACION m2 4.00 58.15 232.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 232.60 100.00%
01.01.01.04.02.06 INSTALACION DE PUERTA METÁLICA (SEGÚN DISEÑO) und 1.00 257.57 257.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 257.57 100.00%
01.01.01.04.02.07 INSTALACION DE ACCESORIOS EN CASETA DE CLORACION und 1.00 1,557.57 1,557.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,557.57 100.00%
01.01.01.04.02.08 PINTADO DE MURO EXTERIOR m2 11.31 15.54 175.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 175.76 100.00%
01.01.01.05 LINEA DE ADUCCION Y RED DE DISTRIBUCION 162,775.24 26,821.14 0.00 26,821.14 16.48% 0.00 135,954.10
01.01.01.05.01 TENDIDO DE TUBERIA DE ADUCCION Y DISTRIBUCION PVC SAP 152,561.12 26,794.52 0.00 26,794.52 17.56% 0.00 125,766.60
01.01.01.05.01.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 1,610.83 8.03 12,934.96 1,610.83 12,934.96 100.00% 0.00 0.00% 1,610.83 12,934.96 100.00% 0.00 0.00 0.00%
01.01.01.05.01.02 EXCAVACION MANUAL ZANJA EN TERRENO CONGLOMERADO m3 935.65 58.58 54,810.38 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 935.65 54,810.38 100.00%
01.01.01.05.01.03 REFINE Y NIVELACION DE ZANJA m 2,684.72 2.04 5,476.83 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,684.72 5,476.83 100.00%
01.01.01.05.01.04 CAMA DE APOYO E=10CM. m 2,684.72 1.66 4,456.64 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,684.72 4,456.64 100.00%
01.01.01.05.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 451.03 23.80 10,734.51 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 451.03 10,734.51 100.00%
01.01.01.05.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 676.55 57.17 38,678.36 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 676.55 38,678.36 100.00%
01.01.01.05.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 676.55 8.15 5,513.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 676.55 5,513.88 100.00%
01.01.01.05.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1/2" m 762.13 12.29 9,366.58 609.70 7,493.21 80.00% 0.00 0.00% 609.70 7,493.21 80.00% 152.43 1,873.37 20.00%
01.01.01.05.01.09 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 1,316.33 4.30 5,660.22 1,053.06 4,528.16 80.00% 0.00 0.00% 1,053.06 4,528.16 80.00% 263.27 1,132.06 20.00%
01.01.01.05.01.10 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 3/4" m 606.26 3.79 2,297.73 485.01 1,838.19 80.00% 0.00 0.00% 485.01 1,838.19 80.00% 121.25 459.54 20.00%
01.01.01.05.01.11 PRUEBA HIDRAULICA m 2,684.72 0.98 2,631.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,684.72 2,631.03 100.00%
01.01.01.05.02 VALVULA DE CONTROL 4,339.69 9.76 0.00 9.76 0.22% 0.00 4,329.93
01.01.01.05.02.01 LIMPIEZA DE TERRENO MANUAL m2 3.60 0.61 2.20 3.60 2.20 100.00% 0.00 0.00% 3.60 2.20 100.00% 0.00 0.00 0.00%
01.01.01.05.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.60 2.10 7.56 3.60 7.56 100.00% 0.00 0.00% 3.60 7.56 100.00% 0.00 0.00 0.00%
01.01.01.05.02.03 EXCAVACION DE ZANJA m3 1.44 34.92 50.28 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.44 50.28 100.00%
01.01.01.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 1.80 8.15 14.67 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.80 14.67 100.00%
01.01.01.05.02.05 CONCRETO F'C= 175 KG/CM2 m3 0.48 384.28 184.45 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.48 184.45 100.00%
01.01.01.05.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 16.00 48.31 772.96 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.00 772.96 100.00%
01.01.01.05.02.07 TARRAJEO CON IMPERMEABILIZANTE m2 16.00 29.19 467.04 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.00 467.04 100.00%
01.01.01.05.02.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 6.40 28.40 181.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.40 181.76 100.00%
01.01.01.05.02.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 1.00 512.25 512.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 512.25 100.00%
01.01.01.05.02.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 10.00 213.49 2,134.90 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 2,134.90 100.00%
01.01.01.05.02.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.16 72.62 11.62 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.16 11.62 100.00%
01.01.01.05.03 VALVULA DE PURGA 2,711.09 4.88 0.00 4.88 0.18% 0.00 2,706.21
01.01.01.05.03.01 LIMPIEZA DE TERRENO MANUAL m2 1.80 0.61 1.10 1.80 1.10 100.00% 0.00 0.00% 1.80 1.10 100.00% 0.00 0.00 0.00%
01.01.01.05.03.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.80 2.10 3.78 1.80 3.78 100.00% 0.00 0.00% 1.80 3.78 100.00% 0.00 0.00 0.00%
01.01.01.05.03.03 EXCAVACION DE ZANJA m3 0.90 34.92 31.43 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.90 31.43 100.00%
01.01.01.05.03.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 1.13 8.15 9.21 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.13 9.21 100.00%
01.01.01.05.03.05 CONCRETO F'C= 175 KG/CM2 m3 0.66 384.28 253.62 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.66 253.62 100.00%
01.01.01.05.03.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 13.00 48.31 628.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 628.03 100.00%
01.01.01.05.03.07 TARRAJEO CON IMPERMEABILIZANTE m2 12.00 29.19 350.28 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 350.28 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra :: MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
01.01.01.05.03.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 4.80 28.40 136.32 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.80 136.32 100.00%
01.01.01.05.03.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN CAJA DE GLB 1.00 224.06 224.06 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 224.06 100.00%
01.01.01.05.03.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 5.00 213.49 1,067.45 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 1,067.45 100.00%
01.01.01.05.03.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.08 72.62 5.81 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.08 5.81 100.00%
01.01.01.05.04 CAMARA ROMPE PRESION T - VI y VII 3,163.34 11.98 0.00 11.98 0.38% 0.00 3,151.36
01.01.01.05.04.01 LIMPIEZA DE TERRENO MANUAL m2 4.42 0.61 2.70 4.42 2.70 100.00% 0.00 0.00% 4.42 2.70 100.00% 0.00 0.00 0.00%
01.01.01.05.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.42 2.10 9.28 4.42 9.28 100.00% 0.00 0.00% 4.42 9.28 100.00% 0.00 0.00 0.00%
01.01.01.05.04.03 EXCAVACION DE ZANJA m3 3.98 34.92 138.98 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.98 138.98 100.00%
01.01.01.05.04.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 4.98 8.15 40.59 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.98 40.59 100.00%
01.01.01.05.04.05 CONCRETO F'C= 175 KG/CM2 m3 1.22 384.28 468.82 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.22 468.82 100.00%
01.01.01.05.04.06 ACERO FY=4200 KG/CM2 kg 63.92 6.66 425.71 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 63.92 425.71 100.00%
01.01.01.05.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 18.01 48.31 870.06 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.01 870.06 100.00%
01.01.01.05.04.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 6.58 46.31 304.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.58 304.72 100.00%
01.01.01.05.04.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C.R.P. TIPO GLB 1.00 187.57 187.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 187.57 100.00%
01.01.01.05.04.10 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C.R.P. TIPO GLB 1.00 205.99 205.99 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 205.99 100.00%
01.01.01.05.04.11 TAPA METALICA Y MARCO DE 0.60x0.60 m e=1/8" EN C.R.P. TIPO VI und 1.00 213.02 213.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 213.02 100.00%
01.01.01.05.04.12 TAPA METALICA Y MARCO DE 0.60x0.60m y 0.30x0.30m e=1/8" EN C.R.P. TIPOund 1.00 278.02 278.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 278.02 100.00%
01.01.01.05.04.13 PINTURA EN TAPAS METALICAS m2 0.81 22.08 17.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.81 17.88 100.00%
01.01.01.06 CONEXIONES DOMICILIARIAS 25,546.50 3,108.33 0.00 3,108.33 12.17% 0.00 22,438.17
01.01.01.06.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 387.09 8.03 3,108.33 387.09 3,108.33 100.00% 0.00 0.00% 387.09 3,108.33 100.00% 0.00 0.00 0.00%
01.01.01.06.02 EXCAVACION MANUAL DE ZANJA EN TERRENO CONGLOMERADO m3 174.19 23.12 4,027.27 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 174.19 4,027.27 100.00%
01.01.01.06.03 REFINE Y NIVELACION DE ZANJA m 645.15 4.08 2,632.21 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 645.15 2,632.21 100.00%
01.01.01.06.04 CAMA DE APOYO E=10CM. m 645.15 1.66 1,070.95 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 645.15 1,070.95 100.00%
01.01.01.06.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 172.45 23.80 4,104.31 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 172.45 4,104.31 100.00%
01.01.01.06.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 19.16 57.17 1,095.38 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.16 1,095.38 100.00%
01.01.01.06.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 19.16 8.15 156.15 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.16 156.15 100.00%
01.01.01.06.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" m 645.15 3.46 2,232.22 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 645.15 2,232.22 100.00%
01.01.01.06.09 CONEXIÓN DOMICILIARIA INC. CAJA DE AGUA POTABLE MATRIZ Ø 1 1/2" @ Øund 48.00 136.23 6,539.04 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 6,539.04 100.00%
01.01.01.06.10 PRUEBA HIDRAULICA EN TUBERIA INSTALADA m 645.15 0.90 580.64 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 645.15 580.64 100.00%

01.01.02 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO DOMICILIARIAS 424,389.61 93,447.30 39,952.56 9.41% 133,399.86 31.43% 290,989.75
0.00
01.01.02.01 CONSTRUCCION DE CASETA DE BAÑO 281,276.18 39,573.09 22,637.44 62,210.53 22.12% 0.00 219,065.65
01.01.02.01.01 OBRAS PROVISIONALES 3,518.51 3,518.51 0.00 3,518.51 100.00% 0.00 0.00
01.01.02.01.01.01 LETRINAS DE HOYO SECO VENTILADO (PARA PERSONAL OBRERO) 1,904.75 1,904.75 0.00 1,904.75 100.00% 0.00 0.00
01.01.02.01.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.38 0.61 2.06 3.38 2.06 100.00% 0.00 0.00% 3.38 2.06 100.00% 0.00 0.00 0.00%
01.01.02.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.38 2.10 7.10 3.38 7.10 100.00% 0.00 0.00% 3.38 7.10 100.00% 0.00 0.00 0.00%
01.01.02.01.01.01.03 EXCAVACION DE ZANJA m3 6.42 34.92 224.19 6.42 224.19 100.00% 0.00 0.00% 6.42 224.19 100.00% 0.00 0.00 0.00%
01.01.02.01.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.03 8.15 65.44 8.03 65.44 100.00% 0.00 0.00% 8.03 65.44 100.00% 0.00 0.00 0.00%
01.01.02.01.01.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.24 48.31 301.45 6.24 301.45 100.00% 0.00 0.00% 6.24 301.45 100.00% 0.00 0.00 0.00%
01.01.02.01.01.01.06 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.94 364.59 342.71 0.94 342.71 100.00% 0.00 0.00% 0.94 342.71 100.00% 0.00 0.00 0.00%
01.01.02.01.01.01.07 ACERO FY=4200 KG/CM2 kg 18.14 6.66 120.81 18.14 120.81 100.00% 0.00 0.00% 18.14 120.81 100.00% 0.00 0.00 0.00%
01.01.02.01.01.01.08 CONCRETO F'C= 175 KG/CM2 m3 0.17 384.28 65.33 0.17 65.33 100.00% 0.00 0.00% 0.17 65.33 100.00% 0.00 0.00 0.00%
01.01.02.01.01.01.09 CASETA PARA LETRINAS INC. PUERTA DE CALAMINA und 2.00 346.09 692.18 2.00 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
01.01.02.01.01.01.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.00 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
01.01.02.01.01.02 DUCHAS O VESTUARIOS (PARA PERSONAL OBRERO) 1,335.92 1,335.92 0.00 1,335.92 100.00% 0.00 0.00
01.01.02.01.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 4.00 0.61 2.44 4.00 2.44 100.00% 0.00 0.00% 4.00 2.44 100.00% 0.00 0.00 0.00%
01.01.02.01.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.10 8.40 4.00 8.40 100.00% 0.00 0.00% 4.00 8.40 100.00% 0.00 0.00 0.00%
01.01.02.01.01.02.03 EXCAVACION DE ZANJA m3 2.04 34.92 71.24 2.04 71.24 100.00% 0.00 0.00% 2.04 71.24 100.00% 0.00 0.00 0.00%
01.01.02.01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.55 8.15 20.78 2.55 20.78 100.00% 0.00 0.00% 2.55 20.78 100.00% 0.00 0.00 0.00%
01.01.02.01.01.02.05 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 2.00 72.62 145.24 2.00 145.24 100.00% 0.00 0.00% 2.00 145.24 100.00% 0.00 0.00 0.00%
01.01.02.01.01.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.40 48.31 115.94 2.40 115.94 100.00% 0.00 0.00% 2.40 115.94 100.00% 0.00 0.00 0.00%
01.01.02.01.01.02.07 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.27 364.59 98.44 0.27 98.44 100.00% 0.00 0.00% 0.27 98.44 100.00% 0.00 0.00 0.00%
01.01.02.01.01.02.08 CASETA PARA DUCHAS INC. PUERTA DE CALAMINA m2 2.00 346.09 692.18 2.00 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
01.01.02.01.01.02.09 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 2.00 48.89 97.78 2.00 97.78 100.00% 0.00 0.00% 2.00 97.78 100.00% 0.00 0.00 0.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra :: MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
01.01.02.01.01.02.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.00 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
01.01.02.01.01.03 LAVADERO DE GRANITO (PARA PERSONAL OBRERO) 277.84 277.84 0.00 277.84 100.00% 0.00 0.00
01.01.02.01.01.03.01 SUMINISTRO E INSTALACIÓN DE LAVADERO DE GRANITO und 2.00 138.92 277.84 2.00 277.84 100.00% 0.00 0.00% 2.00 277.84 100.00% 0.00 0.00 0.00%
01.01.02.01.02 TRABAJOS PRELIMINARES 1,000.97 1,000.97 0.00 1,000.97 100.00% 0.00 0.00
01.01.02.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 369.36 0.61 225.31 369.36 225.31 100.00% 0.00 0.00% 369.36 225.31 100.00% 0.00 0.00 0.00%
01.01.02.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 369.36 2.10 775.66 369.36 775.66 100.00% 0.00 0.00% 369.36 775.66 100.00% 0.00 0.00 0.00%
01.01.02.01.03 MOVIMIENTO DE TIERRAS 7,750.39 7,243.46 0.00 7,243.46 93.46% 0.00 506.93
01.01.02.01.03.01 EXCAVACION DE TERRENO NORMAL m3 90.47 34.92 3,159.21 90.47 3,159.21 100.00% 0.00 0.00% 90.47 3,159.21 100.00% 0.00 0.00 0.00%
01.01.02.01.03.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 113.09 8.15 921.68 50.89 414.75 45.00% 0.00 0.00% 50.89 414.75 45.00% 62.20 506.93 55.00%
01.01.02.01.03.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 38.40 95.56 3,669.50 38.40 3,669.50 100.00% 0.00 0.00% 38.40 3,669.50 100.00% 0.00 0.00 0.00%
01.01.02.01.04 OBRAS DE CONCRETO SIMPLE 49,334.19 26,954.87 0.00 26,954.87 54.64% 0.00 22,379.32
01.01.02.01.04.01 CIMIENTOS CORRIDOS 11,472.06 11,472.06 0.00 100.00% 11,472.06 100.00% 0.00 0.00
01.01.02.01.04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 49.44 232.04 11,472.06 49.44 11,472.06 100.00% 0.00 0.00% 49.44 11,472.06 100.00% 0.00 0.00 0.00%
01.01.02.01.04.02 SOBRECIMIENTOS 15,482.81 15,482.81 0.00 15,482.81 100.00% 0.00 0.00
01.01.02.01.04.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 226.56 44.52 10,086.45 226.56 10,086.45 100.00% 0.00 0.00% 226.56 10,086.45 100.00% 0.00 0.00 0.00%
01.01.02.01.04.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 16.99 317.62 5,396.36 16.99 5,396.36 100.00% 0.00 0.00% 16.99 5,396.36 100.00% 0.00 0.00 0.00%
01.01.02.01.04.03 PISO INTERIOR 4,756.63 0.00 0.00 0.00 0.00% 0.00 4,756.63
01.01.02.01.04.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO CEMENTO PULI m2 106.08 44.84 4,756.63 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 106.08 4,756.63 100.00%
01.01.02.01.04.04 SARDINEL DE DUCHA 918.94 0.00 0.00 0.00 0.00% 0.00 918.94
01.01.02.01.04.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 15.84 48.31 765.23 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.84 765.23 100.00%
01.01.02.01.04.04.02 CONCRETO F'C= 175 KG/CM2 m3 0.40 384.28 153.71 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.40 153.71 100.00%
01.01.02.01.04.05 VEREDA PERIMETRAL 16,703.75 0.00 0.00 0.00 0.00% 0.00 16,703.75 100.00%
01.01.02.01.04.05.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 53.28 42.84 2,282.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 53.28 2,282.52 100.00%
01.01.02.01.04.05.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑADO m2 218.16 44.84 9,782.29 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 218.16 9,782.29 100.00%
01.01.02.01.04.05.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 12.73 364.41 4,638.94 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.73 4,638.94 100.00%
01.01.02.01.05 OBRAS DE CONCRETO ARMADO 45,913.75 0.00 13,545.02 13,545.02 29.50% 0.00 32,368.73
01.01.02.01.05.01 COLUMNAS 32,508.05 0.00 13,545.02 13,545.02 41.67% 0.00 18,963.03
01.01.02.01.05.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 14.40 384.28 5,533.63 0.00 0.00 0.00% 6.00 2,305.68 41.67% 6.00 2,305.68 41.67% 8.40 3,227.95 58.33%
01.01.02.01.05.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 307.20 45.29 13,913.09 0.00 0.00 0.00% 128.00 5,797.12 41.67% 128.00 5,797.12 41.67% 179.20 8,115.97 58.33%
01.01.02.01.05.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 1,961.16 6.66 13,061.33 0.00 0.00 0.00% 817.15 5,442.22 41.67% 817.15 5,442.22 41.67% 1,144.01 7,619.11 58.33%
01.01.02.01.05.02 VIGAS 13,405.70 0.00 0.00 0.00 0.00% 0.00 13,405.70
01.01.02.01.05.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 8.21 384.28 3,154.94 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.21 3,154.94 100.00%
01.01.02.01.05.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 150.48 50.83 7,648.90 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 150.48 7,648.90 100.00%
01.01.02.01.05.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 390.67 6.66 2,601.86 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 390.67 2,601.86 100.00%
01.01.02.01.06 MUROS DE LADRILLO 29,094.45 0.00 9,092.42 9,092.42 31.25% 0.00 20,002.03
01.01.02.01.06.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5X23 m2 400.75 72.60 29,094.45 0.00 0.00 0.00% 125.24 9,092.42 31.25% 125.24 9,092.42 31.25% 275.51 20,002.03 68.75%
01.01.02.01.07 REVOQUES Y ENLUCIDOS 30,542.66 0.00 0.00 0.00 0.00% 0.00 30,542.66
01.01.02.01.07.01 ZÓCALO: TARRAJEADO Y PULIDO CON IMPERMEABILIZANTE / MEZCLA 1:5 m2 307.20 38.45 11,811.84 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 307.20 11,811.84 100.00%
01.01.02.01.07.02 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 274.08 20.82 5,706.35 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 274.08 5,706.35 100.00%
01.01.02.01.07.03 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINAS m2 342.96 24.59 8,433.39 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 342.96 8,433.39 100.00%
01.01.02.01.07.04 BRUÑA DE 1 CM m 324.00 14.17 4,591.08 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 324.00 4,591.08 100.00%
01.01.02.01.08 PINTURA 7,459.33 0.00 0.00 0.00 0.00% 0.00 7,459.33
01.01.02.01.08.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 274.08 11.37 3,116.29 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 274.08 3,116.29 100.00%
01.01.02.01.08.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINAS EXTERIO m2 312.00 13.92 4,343.04 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 312.00 4,343.04 100.00%
01.01.02.01.09 COBERTURA LIVIANA PARA TECHO 18,857.47 0.00 0.00 0.00 0.00% 0.00 18,857.47
01.01.02.01.09.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 144.00 38.28 5,512.32 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 144.00 5,512.32 100.00%
01.01.02.01.09.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 3.00 m und 192.00 25.91 4,974.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 192.00 4,974.72 100.00%
01.01.02.01.09.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.30 mm m2 345.60 24.22 8,370.43 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 345.60 8,370.43 100.00%
01.01.02.01.10 CARPINTERIA DE MADERA 19,007.52 0.00 0.00 0.00 0.00% 0.00 19,007.52
01.01.02.01.10.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/TRIPLAY DE 6 und 48.00 304.49 14,615.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 14,615.52 100.00%
01.01.02.01.10.02 SUMIN. E INSTAL. DE VENTANA DE MADERA SEGUN DISEÑO und 48.00 91.50 4,392.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 4,392.00 100.00%
01.01.02.01.11 INSTALACIONES SANITARIAS 46,865.74 855.28 0.00 855.28 1.82% 0.00 46,010.46
01.01.02.01.11.01 TRABAJOS PRELIMINARES 855.28 0.00 855.28 0.00 100.00% 0.00 855.28 100.00% 0.00 0.00 0.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra :: MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
01.01.02.01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 315.60 0.61 192.52 315.60 192.52 100.00% 0.00 0.00% 315.60 192.52 100.00% 0.00 0.00 0.00%
01.01.02.01.11.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 315.60 2.10 662.76 315.60 662.76 100.00% 0.00 0.00% 315.60 662.76 100.00% 0.00 0.00 0.00%
01.01.02.01.11.02 MOVIMIENTO DE TIERRAS 11,239.04 0.00 0.00 0.00 0.00% 0.00 11,239.04 100.00%
01.01.02.01.11.02.01 EXCAVACION DE TERRENO NORMAL m3 156.18 34.92 5,453.81 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 156.18 5,453.81 100.00%
01.01.02.01.11.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 138.42 40.54 5,611.55 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 138.42 5,611.55 100.00%
01.01.02.01.11.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 21.31 8.15 173.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.31 173.68 100.00%
01.01.02.01.11.03 TUBERIAS Y ACCESORIOS 16,233.99 0.00 0.00 0.00 0.00% 0.00 16,233.99
01.01.02.01.11.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 144.00 23.00 3,312.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 144.00 3,312.00 100.00%
01.01.02.01.11.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + ACCESORIOS und 48.00 63.39 3,042.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 3,042.72 100.00%
01.01.02.01.11.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 216.00 5.14 1,110.24 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 216.00 1,110.24 100.00%
01.01.02.01.11.03.04 TUBERIA PVC SAL Ø 2" m 470.40 7.99 3,758.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 470.40 3,758.50 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra :: MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
01.01.02.01.11.03.05 TUBERIA PVC SAL Ø 4" m 393.60 12.73 5,010.53 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 393.60 5,010.53 100.00%
01.01.02.01.11.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 18,537.43 0.00 0.00 0.00 0.00% 0.00 18,537.43
01.01.02.01.11.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 101.52 48.31 4,904.43 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 101.52 4,904.43 100.00%
01.01.02.01.11.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 9.40 265.70 2,497.58 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.40 2,497.58 100.00%
01.01.02.01.11.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 69.12 32.70 2,260.22 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 69.12 2,260.22 100.00%
01.01.02.01.11.04.04 SALIDA DE DESAGUE PVC-SAL 2" pto 96.00 41.74 4,007.04 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 96.00 4,007.04 100.00%
01.01.02.01.11.04.05 SALIDA DE DESAGUE PVC-SAL 4" pto 48.00 42.49 2,039.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 2,039.52 100.00%
01.01.02.01.11.04.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 48.00 58.93 2,828.64 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 2,828.64 100.00%
01.01.02.01.12 APARATOS Y ACCESORIOS SANITARIOS 13,039.68 0.00 0.00 0.00 0.00% 0.00 13,039.68
01.01.02.01.12.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0.74 M und 48.00 148.78 7,141.44 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 7,141.44 100.00%
01.01.02.01.12.02 SUMINISTRO E INSTALACION DE LAVATORIO und 48.00 73.99 3,551.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 3,551.52 100.00%
01.01.02.01.12.03 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 48.00 48.89 2,346.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 2,346.72 100.00%
01.01.02.01.13 INSTALACIONES ELECTRICAS 8,891.52 0.00 0.00 0.00 0.00% 0.00 8,891.52 100.00%
01.01.02.01.13.01 SALIDA PARA INTERRUPTOR DOBLE und 48.00 22.42 1,076.16 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 1,076.16 100.00%
01.01.02.01.13.02 SALIDA PARA CENTRO DE LUZ und 96.00 65.44 6,282.24 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 96.00 6,282.24 100.00%
01.01.02.01.13.03 SALIDA PARA TOMACORRIENTES und 48.00 31.94 1,533.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 1,533.12 100.00%
01.01.02.02 INSTALACION DE BIODIGESTOR DE 600 LTS 74,370.01 43,589.02 5,139.85 48,728.87 65.52% 0.00 25,641.14
01.01.02.02.01 TRABAJOS PRELIMINARES 245.45 245.45 0.00 245.45 100.00% 0.00 0.00
01.01.02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 90.57 0.61 55.25 90.57 55.25 100.00% 0.00 0.00% 90.57 55.25 100.00% 0.00 0.00 0.00%
01.01.02.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 90.57 2.10 190.20 90.57 190.20 100.00% 0.00 0.00% 90.57 190.20 100.00% 0.00 0.00 0.00%
01.01.02.02.02 MOVIMIENTO DE TIERRAS 7,047.00 6,336.65 0.00 6,336.65 89.92% 0.00 710.35
01.01.02.02.02.01 EXCAVACION DE TERRENO NORMAL m3 128.99 34.92 4,504.33 128.99 4,504.33 100.00% 0.00 0.00% 128.99 4,504.33 100.00% 0.00 0.00 0.00%
01.01.02.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 59.26 30.92 1,832.32 59.26 1,832.32 100.00% 0.00 0.00% 59.26 1,832.32 100.00% 0.00 0.00 0.00%
01.01.02.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 87.16 8.15 710.35 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 87.16 710.35 100.00%
01.01.02.02.03 OBRAS DE CONCRETO SIMPLE 372.75 0.00 0.00 0.00 0.00% 0.00 372.75
01.01.02.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 0.97 384.28 372.75 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.97 372.75 100.00%
01.01.02.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 17,362.25 0.00 0.00 0.00 0.00% 0.00 17,362.25
01.01.02.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 159.36 48.31 7,698.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 159.36 7,698.68 100.00%
01.01.02.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODOS m3 15.65 364.74 5,708.18 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.65 5,708.18 100.00%
01.01.02.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 120.96 32.70 3,955.39 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 120.96 3,955.39 100.00%
01.01.02.02.05 BIODIGESTOR DE 600 Lts. 49,342.56 37,006.92 5,139.85 42,146.77 85.42% 0.00 7,195.79
01.01.02.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 Lts und 48.00 1,027.97 49,342.56 36.00 37,006.92 75.00% 5.00 5,139.85 10.42% 41.00 42,146.77 85.42% 7.00 7,195.79 14.58%
01.01.02.03 CONSTRUCCIÓN DE POZO PERCOLADOR 68,743.42 10,285.19 12,175.27 22,460.46 32.67% 0.00 46,282.96
01.01.02.03.01 TRABAJOS PRELIMINARES 312.87 312.87 0.00 312.87 100.00% 0.00 0.00
01.01.02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 115.45 0.61 70.42 115.45 70.42 100.00% 0.00 0.00% 115.45 70.42 100.00% 0.00 0.00 0.00%
01.01.02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 115.45 2.10 242.45 115.45 242.45 100.00% 0.00 0.00% 115.45 242.45 100.00% 0.00 0.00 0.00%
01.01.02.03.02 MOVIMIENTO DE TIERRAS 15,208.61 9,972.32 0.00 9,972.32 65.57% 0.00 5,236.29
01.01.02.03.02.01 EXCAVACION DE TERRENO NORMAL m3 252.43 34.92 8,814.86 252.43 8,814.86 100.00% 0.00 0.00% 252.43 8,814.86 100.00% 0.00 0.00 0.00%
01.01.02.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 315.60 8.15 2,572.14 142.02 1,157.46 45.00% 0.00 0.00% 142.02 1,157.46 45.00% 173.58 1,414.68 55.00%
01.01.02.03.02.03 RELLENO CON GRAVA 1" m3 39.82 64.85 2,582.33 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.82 2,582.33 100.00%
01.01.02.03.02.04 FILTRO DE GRAVA Ø 1" m3 19.11 64.85 1,239.28 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.11 1,239.28 100.00%
01.01.02.03.03 OBRAS DE CONCRETO SIMPLE 13,139.82 0.00 5,475.57 5,475.57 41.67% 0.00 7,664.25
01.01.02.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 67.56 48.31 3,263.82 0.00 0.00 0.00% 28.15 1,359.93 41.67% 28.15 1,359.93 41.67% 39.41 1,903.89 58.33%
01.01.02.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 25.70 384.28 9,876.00 0.00 0.00 0.00% 10.71 4,115.64 41.67% 10.71 4,115.64 41.67% 14.99 5,760.36 58.33%
01.01.02.03.04 OBRAS DE CONCRETO ARMADO 7,922.46 0.00 0.00 0.00 0.00% 0.00 7,922.46
01.01.02.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 9.06 384.28 3,481.58 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.06 3,481.58 100.00%
01.01.02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 23.37 48.31 1,129.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.37 1,129.00 100.00%
01.01.02.03.04.03 ACERO FY=4200 KG/CM2 kg 497.28 6.66 3,311.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 497.28 3,311.88 100.00%
01.01.02.03.05 MUROS DE LADRILLO 32,159.66 0.00 6,699.70 6,699.70 20.83% 0.00 25,459.96
01.01.02.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 CM m2 352.86 91.14 32,159.66 0.00 0.00 0.00% 73.51 6,699.70 20.83% 73.51 6,699.70 20.83% 279.35 25,459.96 79.17%
01.01.03 ESTUDIOS COMPLEMENTARIOS 1,710.00 0.00 490.00 28.65% 490.00 28.65% 0.00 1,220.00
01.01.03.01 DISEÑO DE MEZCLA und 3.00 450.00 1,350.00 0.00 0.00 0.00% 1.00 450.00 33.33% 1.00 450.00 33.33% 2.00 900.00 66.67%
01.01.03.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 9.00 40.00 360.00 0.00 0.00 0.00% 1.00 40.00 11.11% 1.00 40.00 11.11% 8.00 320.00 88.89%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra :: MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
01.01.04 FLETE 40,324.47 32,259.58 4,032.45 90.00% 36,292.02 90.00% 0.00 4,032.45
01.01.04.01 FLETE TERRESTRE Y ACARREO VISACOCHA GLB 1.00 40,324.47 40,324.47 0.80 32,259.58 80.00% 0.10 4,032.45 10.00% 0.90 36,292.02 90.00% 0.10 4,032.45 10.00%
01.01.05 PROGRAMA DE MITIGACION E IMPACTO AMBIENTAL 6,030.77 0.00 10.42 0.17% 10.42 0.17% 0.00 6,020.35
01.01.05.01 PROGRAMA DE PREVENCION DE MITIGACION 708.92 0.00 10.42 10.42 1.47% 0.00 698.50
01.01.05.01.01 CARTELES PERMANENTES und 5.00 63.56 317.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 317.80 100.00%
01.01.05.01.02 CARTELES TEMPORALES und 5.00 67.80 339.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 339.00 100.00%
01.01.05.01.03 CINTAS DE SEÑAL DE TRABAJO rll 1.00 52.12 52.12 0.00 0.00 0.00% 0.20 10.42 20.00% 0.20 10.42 20.00% 0.80 41.70 80.00%
01.01.05.02 PROGRAMA DE ABANDONO DE OBRA 5,321.85 0.00 0.00 0.00 0.00% 0.00 5,321.85
01.01.05.02.01 REACONDICIONAMIENTO DE AREA OCUPADA (CAMPAMENTO Y MAQUINARI m2 1,250.00 3.22 4,025.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,250.00 4,025.00 100.00%
01.01.05.02.02 REACONDICIONAMIENTO DE CANTERAS Y ACCESOS HA 3.00 157.27 471.81 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 471.81 100.00%
01.01.05.02.03 REFORESTACION EN CAPTACIONES Y RESERVORIO m2 29.55 27.92 825.04 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.55 825.04 100.00%
01.01.06 ADECUADO CONOCIMIENTO DE EDUCACION SANITARIA 4,000.00 0.00 2,500.00 62.50% 2,500.00 62.50% 0.00 1,500.00
01.01.06.01 CAPACITACION ANTES DE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.00 0.00 0.00% 4.00 2,000.00 100.00% 4.00 2,000.00 100.00% 0.00 0.00 0.00%
01.01.06.02 CAPACITACION DURANTE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.00 0.00 0.00% 1.00 500.00 25.00% 1.00 500.00 25.00% 3.00 1,500.00 75.00%
EFICIENTE GESTION TECNICA Y ADMINISTRATIVA DE LOS SERVICIOS DE
01.01.07 4,000.00 0.00 0.00 0.00% 0.00 0.00% 4,000.00
AGUA Y SANEAMIENTO A TRAVES DEL LAS JASS 0.00
01.01.07.01 PROGRAMA DE FORTALECIMIENTO DE CAPACIDADES PARA LA POBLACION und 4.00 1,000.00 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 4,000.00 100.00%

COSTO DIRECTO 698,245.01 158,395.43 46,985.43 6.73% 205,380.85 29.41% 492,864.16 70.59%

TOTAL PRESPUESTO 698,245.01 158,395.43 46,985.43 6.73% 205,380.85 29.41% 492,864.16 70.59%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
02 COMUNIDAD DE CHIHUAPAMPA 531,665.85 111,476.28 61,077.20 32.46% 172,553.48 32.46% 0.00 359,112.37
02.01 LOCALIDAD DE CHIHUAPAMPA 531,665.85 111,476.28 61,077.20 32.46% 172,553.48 32.46% 0.00 359,112.37
02.01.01 SISTEMA DE AGUA POTABLE 240,449.87 33,488.38 0.00 13.93% 33,488.38 13.93% 0.00 206,961.49
02.01.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
02.01.01.01.01 OBRAS PROVISIONALES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
02.01.01.01.01.0 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 1,760.72 1,760.72 1.0 1,760.72 100.00% 0.00 0.00% 1.00 1,760.72 100.00% 0.00 0.00 0.00%
02.01.01.01.01.0 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 797.66 797.66 1.0 797.66 100.00% 0.00 0.00% 1.00 797.66 100.00% 0.00 0.00 0.00%
02.01.01.02 LINEA DE CONDUCCION 893.43 107.00 0.00 107.00 11.98% 0.00 786.43
02.01.01.02.01 TENDIDO DE TUBERIA PVC SAP 893.43 107.00 0.00 107.00 11.98% 0.00 786.43
02.01.01.02.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 10.00 2.10 21.00 10.0 21.00 100.00% 0.00 0.00% 10.00 21.00 100.00% 0.00 0.00 0.00%
02.01.01.02.01.0 EXCAVACION MANUAL DE ZANJA DE TERRENO CONGLOMERADO m3 7.00 34.92 244.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 244.44 100.00%
02.01.01.02.01.0 REFINE Y NIVELACION DE ZANJA m 20.00 4.08 81.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.00 81.60 100.00%
02.01.01.02.01.0 CAMA DE APOYO E=10CM. m 20.00 1.66 33.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.00 33.20 100.00%
02.01.01.02.01.0 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 3.36 23.80 79.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.36 79.97 100.00%
02.01.01.02.01.0 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 5.04 57.17 288.14 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.04 288.14 100.00%
02.01.01.02.01.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 5.04 8.15 41.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.04 41.08 100.00%
02.01.01.02.01.0 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 20.00 4.30 86.00 20.0 86.00 100.00% 0.00 0.00% 20.00 86.00 100.00% 0.00 0.00 0.00%
02.01.01.02.01.0 PRUEBA HIDRAULICA DE LA LINEA DE CONDUCCION m 20.00 0.90 18.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.00 18.00 100.00%
02.01.01.03 RESERVORIO (5 M3) 18,614.77 76.44 0.00 76.44 0.41% 0.00 18,538.33
02.01.01.03.01 RESERVORIO 14,539.47 49.03 0.00 49.03 0.34% 0.00 14,490.44
02.01.01.03.01.0 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 10.80 2.44 26.35 10.8 26.35 100.00% 0.00 0.00% 10.80 26.35 100.00% 0.00 0.00 0.00%
02.01.01.03.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 10.80 2.10 22.68 10.8 22.68 100.00% 0.00 10.80 22.68 100.00% 0.00 0.00 0.00%
02.01.01.03.01.0 EXCAVACION EN TERRENO NORMAL RESERVORIO m3 5.40 34.92 188.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.40 188.57 100.00%
02.01.01.03.01.0 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 6.75 14.23 96.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.75 96.05 100.00%
02.01.01.03.01.0 SOLADO C:H 1:8 (h= 0.10 m) m2 0.96 189.58 182.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.96 182.00 100.00%
02.01.01.03.01.0 CONCRETO F'C= 210 KG/CM2 EN RESERVORIO m3 6.18 413.58 2,555.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.18 2,555.92 100.00%
02.01.01.03.01.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 48.75 48.31 2,355.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.75 2,355.11 100.00%
02.01.01.03.01.0 ACERO FY=4200 KG/CM2 kg 213.15 6.66 1,419.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 213.15 1,419.58 100.00%
02.01.01.03.01.0 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 61.28 27.86 1,707.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.28 1,707.26 100.00%
02.01.01.03.01.1 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 61.28 20.00 1,225.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.28 1,225.60 100.00%
02.01.01.03.01.1 TAPA SANITARIA METALICA DE 0.60x0.60 mts und 2.00 197.60 395.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 395.20 100.00%
02.01.01.03.01.1 INSTALACION DE ACCESORIOS TUB. VENTILACION 2" und 1.00 118.31 118.31 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 118.31 100.00%
02.01.01.03.01.1 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS DE 3/4" und 1.00 496.89 496.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 496.89 100.00%
02.01.01.03.01.1 INSTALACION DE ACCESORIOS EN RESERVORIO und 1.00 872.43 872.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 872.43 100.00%
02.01.01.03.01.1 PINTADO DE MURO EXTERIOR m2 60.40 15.54 938.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 60.40 938.62 100.00%
02.01.01.03.01.1 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 69.00 28.10 1,938.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 69.00 1,938.90 100.00%
02.01.01.03.02 CASETA DE CLORACION POR GOTEO 4,075.30 27.41 0.00 27.41 0.67% 0.00 4,047.89
02.01.01.03.02.0 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
02.01.01.03.02.0 MURO DE SOGA LADRILLO DE ARCILLA CORRIENTE CON CEMENTO m2 11.54 71.15 821.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.54 821.07 100.00%
02.01.01.03.02.0 TARRAJEO EN INTERIORES Y EXTERIORES m2 20.50 28.40 582.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.50 582.20 100.00%
02.01.01.03.02.0 REJILLA METALICA SEGUN DISEÑO INC. COLOCADO und 1.00 421.12 421.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 421.12 100.00%
02.01.01.03.02.0 COBERTURA DE CALAMINA EN CASETA DE CLORACION m2 4.00 58.15 232.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 232.60 100.00%
02.01.01.03.02.0 INSTALACION DE PUERTA METÁLICA (SEGÚN DISEÑO) und 1.00 257.57 257.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 257.57 100.00%
02.01.01.03.02.0 INSTALACION DE ACCESORIOS EN CASETA DE CLORACION und 1.00 1,557.57 1,557.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,557.57 100.00%
02.01.01.03.02.0 PINTADO DE MURO EXTERIOR m2 11.31 15.54 175.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 175.76 100.00%
02.01.01.04 LINEA DE ADUCCION Y RED DE DISTRIBUCION 206,742.46 29,038.05 0.00 29,038.05 14.05% 0.00 177,704.41
02.01.01.04.01 TENDIDO DE TUBERIA DE ADUCCION Y DISTRIBUCION PVC SAP 192,130.52 28,976.19 0.00 28,976.19 15.08% 0.00 163,154.33
02.01.01.04.01.0 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 2,060.02 8.03 16,541.96 2,060.0 16,541.96 100.00% 0.00 0.00% 2,060.02 16,541.96 100.00% 0.00 0.00 0.00%
02.01.01.04.01.0 EXCAVACION MANUAL ZANJA EN TERRENO CONGLOMERADO m3 1,201.68 58.58 70,394.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,201.68 70,394.41 100.00%
02.01.01.04.01.0 REFINE Y NIVELACION DE ZANJA m 3,433.37 2.04 7,004.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3,433.37 7,004.07 100.00%
02.01.01.04.01.0 CAMA DE APOYO E=10CM. m 3,433.37 1.66 5,699.39 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3,433.37 5,699.39 100.00%
02.01.01.04.01.0 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 576.81 23.80 13,728.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 576.81 13,728.08 100.00%
02.01.01.04.01.0 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 865.21 57.17 49,464.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 865.21 49,464.06 100.00%
02.01.01.04.01.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 865.21 8.15 7,051.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 865.21 7,051.46 100.00%
02.01.01.04.01.0 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1/2" m 543.00 12.29 6,673.47 434.4 5,338.78 80.00% 0.00 0.00% 434.40 5,338.78 80.00% 108.60 1,334.69 20.00%
02.01.01.04.01.0 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 2,483.20 4.30 10,677.76 1,363.0 5,860.90 54.89% 0.00 0.00% 1,363.00 5,860.90 54.89% 1,120.20 4,816.86 45.11%
02.01.01.04.01.1 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 3/4" m 407.17 3.79 1,543.17 325.7 1,234.55 80.00% 0.00 0.00% 325.74 1,234.55 80.00% 81.43 308.62 20.00%
02.01.01.04.01.1 PRUEBA HIDRAULICA m 3,421.11 0.98 3,352.69 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3,421.11 3,352.69 100.00%
02.01.01.04.02 VALVULA DE CONTROL 5,486.46 12.68 0.00 12.68 0.23% 0.00 5,473.78
02.01.01.04.02.0 LIMPIEZA DE TERRENO MANUAL m2 4.68 0.61 2.85 4.7 2.85 100.00% 0.00 0.00% 4.68 2.85 100.00% 0.00 0.00 0.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
02.01.01.04.02.0 TRAZO Y REPLANTEO PRELIMINAR m2 4.68 2.10 9.83 4.7 9.83 100.00% 0.00 0.00% 4.68 9.83 100.00% 0.00 0.00 0.00%
02.01.01.04.02.0 EXCAVACION DE ZANJA m3 1.87 34.92 65.30 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.87 65.30 100.00%
02.01.01.04.02.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.34 8.15 19.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.34 19.07 100.00%
02.01.01.04.02.0 CONCRETO F'C= 175 KG/CM2 m3 0.62 384.28 238.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.62 238.25 100.00%
02.01.01.04.02.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 20.80 48.31 1,004.85 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.80 1,004.85 100.00%
02.01.01.04.02.0 TARRAJEO CON IMPERMEABILIZANTE m2 20.80 29.19 607.15 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.80 607.15 100.00%
02.01.01.04.02.0 TARRAJEO EN INTERIORES Y EXTERIORES m2 8.32 28.40 236.29 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.32 236.29 100.00%
02.01.01.04.02.0 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 1.00 512.25 512.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 512.25 100.00%
02.01.01.04.02.1 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 13.00 213.49 2,775.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 2,775.37 100.00%
02.01.01.04.02.1 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.21 72.62 15.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.21 15.25 100.00%
02.01.01.04.03 VALVULA DE PURGA 4,872.83 31.22 0.00 31.22 0.64% 0.00 4,841.61
02.01.01.04.03.0 LIMPIEZA DE TERRENO MANUAL m2 11.52 0.61 7.03 11.5 7.03 100.00% 0.00 0.00% 11.52 7.03 100.00% 0.00 0.00 0.00%
02.01.01.04.03.0 TRAZO Y REPLANTEO PRELIMINAR m2 11.52 2.10 24.19 11.5 24.19 100.00% 0.00 0.00% 11.52 24.19 100.00% 0.00 0.00 0.00%
02.01.01.04.03.0 EXCAVACION DE ZANJA m3 8.06 34.92 281.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.06 281.46 100.00%
02.01.01.04.03.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 10.08 8.15 82.15 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.08 82.15 100.00%
02.01.01.04.03.0 CONCRETO F'C= 175 KG/CM2 m3 1.22 384.28 468.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.22 468.82 100.00%
02.01.01.04.03.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 24.00 48.31 1,159.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.00 1,159.44 100.00%
02.01.01.04.03.0 TARRAJEO CON IMPERMEABILIZANTE m2 22.40 29.19 653.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.40 653.86 100.00%
02.01.01.04.03.0 TARRAJEO EN INTERIORES Y EXTERIORES m2 8.96 28.40 254.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.96 254.46 100.00%
02.01.01.04.03.0 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN CAJA DE GLB 1.00 224.06 224.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 224.06 100.00%
02.01.01.04.03.1 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 8.00 213.49 1,707.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 1,707.92 100.00%
02.01.01.04.03.1 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.13 72.62 9.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.13 9.44 100.00%
02.01.01.04.04 CAMARA ROMPE PRESION T - VII 4,252.65 17.96 0.00 17.96 0.42% 0.00 4,234.69
02.01.01.04.04.0 LIMPIEZA DE TERRENO MANUAL m2 6.63 0.61 4.04 6.6 4.04 100.00% 0.00 0.00% 6.63 4.04 100.00% 0.00 0.00 0.00%
02.01.01.04.04.0 TRAZO Y REPLANTEO PRELIMINAR m2 6.63 2.10 13.92 6.6 13.92 100.00% 0.00 0.00% 6.63 13.92 100.00% 0.00 0.00 0.00%
02.01.01.04.04.0 EXCAVACION DE ZANJA m3 5.97 34.92 208.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.97 208.47 100.00%
02.01.01.04.04.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 7.47 8.15 60.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.47 60.88 100.00%
02.01.01.04.04.0 CONCRETO F'C= 175 KG/CM2 m3 1.82 384.28 699.39 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.82 699.39 100.00%
02.01.01.04.04.0 ACERO FY=4200 KG/CM2 kg 60.64 6.66 403.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 60.64 403.86 100.00%
02.01.01.04.04.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 27.02 48.31 1,305.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.02 1,305.34 100.00%
02.01.01.04.04.0 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 9.87 46.31 457.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.87 457.08 100.00%
02.01.01.04.04.0 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C.R.P. TIPOGLB 1.00 205.99 205.99 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 205.99 100.00%
02.01.01.04.04.1 TAPA METALICA Y MARCO DE 0.60x0.60m y 0.30x0.30m e=1/8" EN C.R.P. TIPund 3.00 278.02 834.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 834.06 100.00%
02.01.01.04.04.1 PINTURA EN TAPAS METALICAS m2 2.70 22.08 59.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.70 59.62 100.00%
02.01.01.05 CONEXIONES DOMICILIARIAS 11,640.83 1,708.51 0.00 1,708.51 14.68% 0.00 9,932.32
02.01.01.05.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 135.13 8.03 1,085.09 135.1 1,085.09 100.00% 0.00 0.00% 135.13 1,085.09 100.00% 0.00 0.00 0.00%
02.01.01.05.02 EXCAVACION MANUAL DE ZANJA EN TERRENO CONGLOMERADO m3 78.83 23.12 1,822.55 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 78.83 1,822.55 100.00%
02.01.01.05.03 REFINE Y NIVELACION DE ZANJA m 225.22 4.08 918.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 225.22 918.90 100.00%
02.01.01.05.04 CAMA DE APOYO E=10CM. m 225.22 1.66 373.87 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 225.22 373.87 100.00%
02.01.01.05.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 85.13 23.80 2,026.09 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 85.13 2,026.09 100.00%
02.01.01.05.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 9.46 57.17 540.83 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.46 540.83 100.00%
02.01.01.05.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 9.46 8.15 77.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.46 77.10 100.00%
02.01.01.05.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" m 225.22 3.46 779.26 180.2 623.42 80.00% 0.00 0.00% 180.18 623.42 80.00% 45.04 155.84 20.00%
02.01.01.05.09 CONEXIÓN DOMICILIARIA INC. CAJA DE AGUA POTABLE MATRIZ Ø 1 1/2" @ und 28.00 136.23 3,814.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 3,814.44 100.00%
02.01.01.05.10 PRUEBA HIDRAULICA EN TUBERIA INSTALADA m 225.22 0.90 202.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 225.22 202.70 100.00%

02.01.02 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO DOMICILIARIAS 249,022.35 55,301.62 55,240.99 44.39% 110,542.61 44.39% 138,479.74
0.00
02.01.02.01 CONSTRUCCION DE CASETA DE BAÑO 165,539.68 24,550.31 29,054.04 53,604.35 32.38% 0.00 111,935.33
02.01.02.01.01 OBRAS PROVISIONALES 3,518.51 3,518.51 0.00 3,518.51 100.00% 0.00 0.00
02.01.02.01.01.0 LETRINAS DE HOYO SECO VENTILADO (PARA PERSONAL OBRERO) 1,904.75 1,904.75 0.00 1,904.75 100.00% 0.00 0.00
02.01.02.01.01.0 LIMPIEZA DE TERRENO MANUAL m2 3.38 0.61 2.06 3.4 2.06 100.00% 0.00 0.00% 3.38 2.06 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 3.38 2.10 7.10 3.4 7.10 100.00% 0.00 0.00% 3.38 7.10 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 EXCAVACION DE ZANJA m3 6.42 34.92 224.19 6.4 224.19 100.00% 0.00 0.00% 6.42 224.19 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.03 8.15 65.44 8.0 65.44 100.00% 0.00 0.00% 8.03 65.44 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.24 48.31 301.45 6.2 301.45 100.00% 0.00 0.00% 6.24 301.45 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.94 364.59 342.71 0.9 342.71 100.00% 0.00 0.00% 0.94 342.71 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 ACERO FY=4200 KG/CM2 kg 18.14 6.66 120.81 18.1 120.81 100.00% 0.00 0.00% 18.14 120.81 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 CONCRETO F'C= 175 KG/CM2 m3 0.17 384.28 65.33 0.2 65.33 100.00% 0.00 0.00% 0.17 65.33 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 CASETA PARA LETRINAS INC. PUERTA DE CALAMINA und 2.00 346.09 692.18 2.0 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.0 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 DUCHAS O VESTUARIOS (PARA PERSONAL OBRERO) 1,335.92 1,335.92 0.00 1,335.92 100.00% 0.00 0.00
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
02.01.02.01.01.0 LIMPIEZA DE TERRENO MANUAL m2 4.00 0.61 2.44 4.0 2.44 100.00% 0.00 0.00% 4.00 2.44 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.10 8.40 4.0 8.40 100.00% 0.00 0.00% 4.00 8.40 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 EXCAVACION DE ZANJA m3 2.04 34.92 71.24 2.0 71.24 100.00% 0.00 0.00% 2.04 71.24 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.55 8.15 20.78 2.6 20.78 100.00% 0.00 0.00% 2.55 20.78 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 2.00 72.62 145.24 2.0 145.24 100.00% 0.00 0.00% 2.00 145.24 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.40 48.31 115.94 2.4 115.94 100.00% 0.00 0.00% 2.40 115.94 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.27 364.59 98.44 0.3 98.44 100.00% 0.00 0.00% 0.27 98.44 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 CASETA PARA DUCHAS INC. PUERTA DE CALAMINA m2 2.00 346.09 692.18 2.0 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 2.00 48.89 97.78 2.0 97.78 100.00% 0.00 0.00% 2.00 97.78 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.0 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
02.01.02.01.01.0 LAVADERO DE GRANITO (PARA PERSONAL OBRERO) 277.84 277.84 0.00 277.84 100.00% 0.00 0.00
02.01.02.01.01.0 SUMINISTRO E INSTALACIÓN DE LAVADERO DE GRANITO und 2.00 138.92 277.84 2.0 277.84 100.00% 0.00 0.00% 2.00 277.84 100.00% 0.00 0.00 0.00%
02.01.02.01.02 TRABAJOS PRELIMINARES 583.90 583.90 0.00 583.90 100.00% 0.00 0.00
02.01.02.01.02.0 LIMPIEZA DE TERRENO MANUAL m2 215.46 0.61 131.43 215.5 131.43 100.00% 0.00 0.00% 215.46 131.43 100.00% 0.00 0.00 0.00%
02.01.02.01.02.0 TRAZO Y REPLANTEO PRELIMINAR m2 215.46 2.10 452.47 215.5 452.47 100.00% 0.00 0.00% 215.46 452.47 100.00% 0.00 0.00 0.00%
02.01.02.01.03 MOVIMIENTO DE TIERRAS 4,521.28 4,225.59 0.00 4,225.59 93.46% 0.00 295.69
02.01.02.01.03.0 EXCAVACION DE TERRENO NORMAL m3 52.78 34.92 1,843.08 52.8 1,843.08 100.00% 0.00 0.00% 52.78 1,843.08 100.00% 0.00 0.00 0.00%
02.01.02.01.03.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 65.97 8.15 537.66 29.7 241.97 45.01% 0.00 0.00% 29.69 241.97 45.01% 36.28 295.69 54.99%
02.01.02.01.03.0 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 22.40 95.56 2,140.54 22.4 2,140.54 100.00% 0.00 0.00% 22.40 2,140.54 100.00% 0.00 0.00 0.00%
02.01.02.01.04 OBRAS DE CONCRETO SIMPLE 28,774.59 15,723.40 0.00 15,723.40 54.64% 0.00 13,051.19
02.01.02.01.04.0 CIMIENTOS CORRIDOS 6,692.03 6,692.03 0.00 6,692.03 100.00% 0.00 0.00
02.01.02.01.04.0 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 28.84 232.04 6,692.03 28.8 6,692.03 100.00% 0.00 0.00% 28.84 6,692.03 100.00% 0.00 0.00 0.00%
02.01.02.01.04.0 SOBRECIMIENTOS 9,031.37 9,031.37 0.00 9,031.37 100.00% 0.00 0.00
02.01.02.01.04.0 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 132.16 44.52 5,883.76 132.2 5,883.76 100.00% 0.00 0.00% 132.16 5,883.76 100.00% 0.00 0.00 0.00%
02.01.02.01.04.0 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 9.91 317.62 3,147.61 9.9 3,147.61 100.00% 0.00 0.00% 9.91 3,147.61 100.00% 0.00 0.00 0.00%
02.01.02.01.04.0 PISO INTERIOR 2,774.70 0.00 0.00 0.00 0.00% 0.00 2,774.70
02.01.02.01.04.0 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO CEMENTO PUL m2 61.88 44.84 2,774.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.88 2,774.70 100.00%
02.01.02.01.04.0 SARDINEL DE DUCHA 534.76 0.00 0.00 0.00 0.00% 0.00 534.76
02.01.02.01.04.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 9.24 48.31 446.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.24 446.38 100.00%
02.01.02.01.04.0 CONCRETO F'C= 175 KG/CM2 m3 0.23 384.28 88.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.23 88.38 100.00%
02.01.02.01.04.0 VEREDA PERIMETRAL 9,741.73 0.00 0.00 0.00 0.00% 0.00 9,741.73
02.01.02.01.04.0 ENCOFRADO Y DESENCOF. DE VEREDAS m2 31.08 42.84 1,331.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 31.08 1,331.47 100.00%
02.01.02.01.04.0 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑADO m2 127.26 44.84 5,706.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 127.26 5,706.34 100.00%
02.01.02.01.04.0 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 7.42 364.41 2,703.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.42 2,703.92 100.00%
02.01.02.01.05 OBRAS DE CONCRETO ARMADO 26,783.34 0.00 16,931.29 16,931.29 63.22% 0.00 9,852.05
02.01.02.01.05.0 COLUMNAS 18,963.03 0.00 16,931.29 16,931.29 89.29% 0.00 2,031.74
02.01.02.01.05.0 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 8.40 384.28 3,227.95 0.0 0.00 0.00% 7.50 2,882.10 89.29% 7.50 2,882.10 89.29% 0.90 345.85 10.71%
02.01.02.01.05.0 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 179.20 45.29 8,115.97 0.0 0.00 0.00% 160.00 7,246.40 89.29% 160.00 7,246.40 89.29% 19.20 869.57 10.71%
02.01.02.01.05.0 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 1,144.01 6.66 7,619.11 0.0 0.00 0.00% 1,021.44 6,802.79 89.29% 1,021.44 6,802.79 89.29% 122.57 816.32 10.71%
02.01.02.01.05.0 VIGAS 7,820.31 0.00 0.00 0.00 0.00% 0.00 7,820.31
02.01.02.01.05.0 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 4.79 384.28 1,840.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.79 1,840.70 100.00%
02.01.02.01.05.0 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 87.78 50.83 4,461.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 87.78 4,461.86 100.00%
02.01.02.01.05.0 ACERO FY=4200 KG/CM2 PARA VIGAS kg 227.89 6.66 1,517.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 227.89 1,517.75 100.00%
02.01.02.01.06 MUROS DE LADRILLO 16,971.70 0.00 12,122.75 12,122.75 71.43% 0.00 4,848.95
02.01.02.01.06.0 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5X2 m2 233.77 72.60 16,971.70 0.0 0.00 0.00% 166.98 12,122.75 71.43% 166.98 12,122.75 71.43% 66.79 4,848.95 28.57%
02.01.02.01.07 REVOQUES Y ENLUCIDOS 17,816.55 0.00 0.00 0.00 0.00% 0.00 17,816.55
02.01.02.01.07.0 ZÓCALO: TARRAJEADO Y PULIDO CON IMPERMEABILIZANTE / MEZCLA 1: m2 179.20 38.45 6,890.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 179.20 6,890.24 100.00%
02.01.02.01.07.0 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 159.88 20.82 3,328.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 159.88 3,328.70 100.00%
02.01.02.01.07.0 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINA m2 200.06 24.59 4,919.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 200.06 4,919.48 100.00%
02.01.02.01.07.0 BRUÑA DE 1 CM m 189.00 14.17 2,678.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 189.00 2,678.13 100.00%
02.01.02.01.08 PINTURA 4,351.28 0.00 0.00 0.00 0.00% 0.00 4,351.28
02.01.02.01.08.0 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 159.88 11.37 1,817.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 159.88 1,817.84 100.00%
02.01.02.01.08.0 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINAS EXTERI m2 182.00 13.92 2,533.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 182.00 2,533.44 100.00%
02.01.02.01.09 COBERTURA LIVIANA PARA TECHO 11,000.19 0.00 0.00 0.00 0.00% 0.00 11,000.19
02.01.02.01.09.0 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 84.00 38.28 3,215.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 84.00 3,215.52 100.00%
02.01.02.01.09.0 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 3.00 m und 112.00 25.91 2,901.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 112.00 2,901.92 100.00%
02.01.02.01.09.0 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.30 mm m2 201.60 24.22 4,882.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 201.60 4,882.75 100.00%
02.01.02.01.10 CARPINTERIA DE MADERA 11,087.72 0.00 0.00 0.00 0.00% 0.00 11,087.72
02.01.02.01.10.0 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/TRIPLAY DE und 28.00 304.49 8,525.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 8,525.72 100.00%
02.01.02.01.10.0 SUMIN. E INSTAL. DE VENTANA DE MADERA SEGUN DISEÑO und 28.00 91.50 2,562.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 2,562.00 100.00%
02.01.02.01.11 INSTALACIONES SANITARIAS 27,337.42 498.91 0.00 498.91 1.83% 0.00 26,838.51
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
02.01.02.01.11.0 TRABAJOS PRELIMINARES 498.91 0.0 498.91 0.00 0.00 498.91 100.00% 0.00 0.00
02.01.02.01.11.0 LIMPIEZA DE TERRENO MANUAL m2 184.10 0.61 112.30 184.1 112.30 100.00% 0.00 0.00% 184.10 112.30 100.00% 0.00 0.00 0.00%
02.01.02.01.11.0 TRAZO Y REPLANTEO PRELIMINAR m2 184.10 2.10 386.61 184.1 386.61 100.00% 0.00 0.00% 184.10 386.61 100.00% 0.00 0.00 0.00%
02.01.02.01.11.0 MOVIMIENTO DE TIERRAS 6,556.06 0.00 0.00 0.00 0.00% 0.00 6,556.06
02.01.02.01.11.0 EXCAVACION DE TERRENO NORMAL m3 91.11 34.92 3,181.56 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 91.11 3,181.56 100.00%
02.01.02.01.11.0 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 80.74 40.54 3,273.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.74 3,273.20 100.00%
02.01.02.01.11.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 12.43 8.15 101.30 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.43 101.30 100.00%
02.01.02.01.11.0 TUBERIAS Y ACCESORIOS 9,469.83 0.00 0.00 0.00 0.00% 0.00 9,469.83
02.01.02.01.11.0 SALIDA DE AGUA FRIA PVC 1/2¨ pto 84.00 23.00 1,932.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 84.00 1,932.00 100.00%
02.01.02.01.11.0 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + ACCESORIOS und 28.00 63.39 1,774.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 1,774.92 100.00%
02.01.02.01.11.0 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 126.00 5.14 647.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 126.00 647.64 100.00%
02.01.02.01.11.0 TUBERIA PVC SAL Ø 2" m 274.40 7.99 2,192.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 274.40 2,192.46 100.00%
02.01.02.01.11.0 TUBERIA PVC SAL Ø 4" m 229.60 12.73 2,922.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 229.60 2,922.81 100.00%
02.01.02.01.11.0 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 10,812.62 0.00 0.00 0.00 0.00% 0.00 10,812.62
02.01.02.01.11.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 59.22 48.31 2,860.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 59.22 2,860.92 100.00%
02.01.02.01.11.0 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 5.48 265.70 1,456.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.48 1,456.04 100.00%
02.01.02.01.11.0 TARRAJEO CON IMPERMEABILIZANTE m2 40.32 32.70 1,318.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.32 1,318.46 100.00%
02.01.02.01.11.0 SALIDA DE DESAGUE PVC-SAL 2" pto 56.00 41.74 2,337.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.00 2,337.44 100.00%
02.01.02.01.11.0 SALIDA DE DESAGUE PVC-SAL 4" pto 28.00 42.49 1,189.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 1,189.72 100.00%
02.01.02.01.11.0 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 28.00 58.93 1,650.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 1,650.04 100.00%
02.01.02.01.12 APARATOS Y ACCESORIOS SANITARIOS 7,606.48 0.00 0.00 0.00 0.00% 0.00 7,606.48
02.01.02.01.12.0 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0.74 M und 28.00 148.78 4,165.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 4,165.84 100.00%
02.01.02.01.12.0 SUMINISTRO E INSTALACION DE LAVATORIO und 28.00 73.99 2,071.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 2,071.72 100.00%
02.01.02.01.12.0 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 28.00 48.89 1,368.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 1,368.92 100.00%
02.01.02.01.13 INSTALACIONES ELECTRICAS 5,186.72 0.00 0.00 0.00 0.00% 0.00 5,186.72
02.01.02.01.13.0 SALIDA PARA INTERRUPTOR DOBLE und 28.00 22.42 627.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 627.76 100.00%
02.01.02.01.13.0 SALIDA PARA CENTRO DE LUZ und 56.00 65.44 3,664.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.00 3,664.64 100.00%
02.01.02.01.13.0 SALIDA PARA TOMACORRIENTES und 28.00 31.94 894.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 894.32 100.00%
02.01.02.02 INSTALACION DE BIODIGESTOR DE 600 LTS 43,384.29 25,426.82 7,311.07 32,737.89 75.46% 0.00 10,646.40
02.01.02.02.01 TRABAJOS PRELIMINARES 143.17 143.17 0.00 143.17 100.00% 0.00 0.00
02.01.02.02.01.0 LIMPIEZA DE TERRENO MANUAL m2 52.83 0.61 32.23 52.8 32.23 100.00% 0.00 0.00% 52.83 32.23 100.00% 0.00 0.00 0.00%
02.01.02.02.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 52.83 2.10 110.94 52.8 110.94 100.00% 0.00 0.00% 52.83 110.94 100.00% 0.00 0.00 0.00%
02.01.02.02.02 MOVIMIENTO DE TIERRAS 4,110.63 3,696.28 0.00 3,696.28 89.92% 0.00 414.35
02.01.02.02.02.0 EXCAVACION DE TERRENO NORMAL m3 75.24 34.92 2,627.38 75.2 2,627.38 100.00% 0.00 0.00% 75.24 2,627.38 100.00% 0.00 0.00 0.00%
02.01.02.02.02.0 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 34.57 30.92 1,068.90 34.6 1,068.90 100.00% 0.00 0.00% 34.57 1,068.90 100.00% 0.00 0.00 0.00%
02.01.02.02.02.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 50.84 8.15 414.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 50.84 414.35 100.00%
02.01.02.02.03 OBRAS DE CONCRETO SIMPLE 219.04 0.00 115.28 115.28 52.63% 0.00 103.76
02.01.02.02.03.0 CONCRETO F'C= 175 KG/CM2 m3 0.57 384.28 219.04 0.0 0.00 0.00% 0.30 115.28 52.63% 0.30 115.28 52.63% 0.27 103.76 47.37%
02.01.02.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 10,128.29 0.00 0.00 0.00 0.00% 0.00 10,128.29
02.01.02.02.04.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 92.96 48.31 4,490.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 92.96 4,490.90 100.00%
02.01.02.02.04.0 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODOS m3 9.13 364.74 3,330.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.13 3,330.08 100.00%
02.01.02.02.04.0 TARRAJEO CON IMPERMEABILIZANTE m2 70.56 32.70 2,307.31 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 70.56 2,307.31 100.00%
02.01.02.02.05 BIODIGESTOR DE 600 Lts. 28,783.16 21,587.37 7,195.79 28,783.16 100.00% 0.00 0.00
02.01.02.02.05.0 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 Lts und 28.00 1,027.97 28,783.16 21.0 21,587.37 75.00% 7.00 7,195.79 25.00% 28.00 28,783.16 100.00% 0.00 0.00 0.00%
02.01.02.03 CONSTRUCCIÓN DE POZO PERCOLADOR 40,098.38 5,324.49 18,875.88 24,200.37 60.35% 0.00 15,898.01
02.01.02.03.01 TRABAJOS PRELIMINARES 182.52 182.52 0.00 182.52 100.00% 0.00 0.00
02.01.02.03.01.0 LIMPIEZA DE TERRENO MANUAL m2 67.35 0.61 41.08 67.4 41.08 100.00% 0.00 0.00% 67.35 41.08 100.00% 0.00 0.00 0.00%
02.01.02.03.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 67.35 2.10 141.44 67.4 141.44 100.00% 0.00 0.00% 67.35 141.44 100.00% 0.00 0.00 0.00%
02.01.02.03.02 MOVIMIENTO DE TIERRAS 8,871.94 5,141.97 0.00 5,141.97 57.96% 0.00 3,729.97
02.01.02.03.02.0 EXCAVACION DE TERRENO NORMAL m3 147.25 34.92 5,141.97 147.3 5,141.97 100.00% 0.00 0.00% 147.25 5,141.97 100.00% 0.00 0.00 0.00%
02.01.02.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 184.10 8.15 1,500.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 184.10 1,500.42 100.00%
02.01.02.03.02.0 RELLENO CON GRAVA 1" m3 23.23 64.85 1,506.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.23 1,506.47 100.00%
02.01.02.03.02.0 FILTRO DE GRAVA Ø 1" m3 11.15 64.85 723.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.15 723.08 100.00%
02.01.02.03.03 OBRAS DE CONCRETO SIMPLE 7,664.26 0.00 5,475.57 5,475.57 71.44% 0.00 2,188.69
02.01.02.03.03.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 39.41 48.31 1,903.90 0.0 0.00 0.00% 28.15 1,359.93 71.43% 28.15 1,359.93 71.43% 11.26 543.97 28.57%
02.01.02.03.03.0 CONCRETO F'C= 175 KG/CM2 m3 14.99 384.28 5,760.36 0.0 0.00 0.00% 10.71 4,115.64 71.45% 10.71 4,115.64 71.45% 4.28 1,644.72 28.55%
02.01.02.03.04 OBRAS DE CONCRETO ARMADO 4,619.40 0.00 0.00 0.00 0.00% 0.00 4,619.40
02.01.02.03.04.0 CONCRETO F'C= 175 KG/CM2 m3 5.28 384.28 2,029.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.28 2,029.00 100.00%
02.01.02.03.04.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 13.63 48.31 658.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.63 658.47 100.00%
02.01.02.03.04.0 ACERO FY=4200 KG/CM2 kg 290.08 6.66 1,931.93 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 290.08 1,931.93 100.00%
02.01.02.03.05 MUROS DE LADRILLO 18,760.26 0.00 13,400.31 13,400.31 71.43% 0.00 5,359.95
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
02.01.02.03.05.0 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 CM m2 205.84 91.14 18,760.26 0.0 0.00 0.00% 147.03 13,400.31 71.43% 147.03 13,400.31 71.43% 58.81 5,359.95 28.57%
02.01.03 ESTUDIOS COMPLEMENTARIOS 1,710.00 0.00 490.00 28.65% 490.00 28.65% 0.00 1,220.00
02.01.03.01 DISEÑO DE MEZCLA und 3.00 450.00 1,350.00 0.0 0.00 0.00% 1.00 450.00 33.33% 1.00 450.00 33.33% 2.00 900.00 66.67%
02.01.03.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 9.00 40.00 360.00 0.0 0.00 0.00% 1.00 40.00 11.11% 1.00 40.00 11.11% 8.00 320.00 88.89%
02.01.04 FLETE 28,357.85 22,686.28 2,835.79 90.00% 25,522.07 90.00% 0.00 2,835.78
02.01.04.01 FLETE TERRESTRE Y ACARREO CHIHUAPAMPA GLB 1.00 28,357.85 28,357.85 0.8 22,686.28 80.00% 0.10 2,835.79 10.00% 0.90 25,522.07 90.00% 0.10 2,835.78 10.00%
02.01.05 PROGRAMA DE MITIGACION E IMPACTO AMBIENTAL 4,125.78 0.0 0.00 10.42 0.25% 0.00 10.42 0.25% 0.00 4,115.36
02.01.05.01 PROGRAMA DE PREVENCION DE MITIGACION 708.92 0.00 10.42 10.42 1.47% 0.00 698.50
02.01.05.01.01 CARTELES PERMANENTES und 5.00 63.56 317.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 317.80 100.00%
02.01.05.01.02 CARTELES TEMPORALES und 5.00 67.80 339.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 339.00 100.00%
02.01.05.01.03 CINTAS DE SEÑAL DE TRABAJO rll 1.00 52.12 52.12 0.0 0.00 0.00% 0.20 10.42 20.00% 0.20 10.42 20.00% 0.80 41.70 80.00%
02.01.05.02 PROGRAMA DE ABANDONO DE OBRA 3,416.86 0.00 0.00 0.00 0.00% 0.00 3,416.86
02.01.05.02.01 REACONDICIONAMIENTO DE AREA OCUPADA (CAMPAMENTO Y MAQUINARIm2 800.00 3.22 2,576.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 800.00 2,576.00 100.00%
02.01.05.02.02 REACONDICIONAMIENTO DE CANTERAS Y ACCESOS HA 0.50 157.27 78.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.50 78.64 100.00%
02.01.05.02.03 REFORESTACION EN CAPTACIONES Y RESERVORIO m2 27.30 27.92 762.22 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.30 762.22 100.00%
02.01.06 ADECUADO CONOCIMIENTO DE EDUCACION SANITARIA 4,000.00 0.00 2,500.00 62.50% 2,500.00 62.50% 0.00 1,500.00
02.01.06.01 CAPACITACION ANTES DE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 4.00 2,000.00 100.00% 4.00 2,000.00 100.00% 0.00 0.00 0.00%
02.01.06.02 CAPACITACION DURANTE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 1.00 500.00 25.00% 1.00 500.00 25.00% 3.00 1,500.00 75.00%
02.01.07 EFICIENTE GESTION TECNICA Y ADMINISTRATIVA DE LOS SERVICIOS DE AGUA Y SANEAMIENTO A TRAVES DEL LA 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 4,000.00
02.01.07.01 PROGRAMA DE FORTALECIMIENTO DE CAPACIDADES PARA LA POBLACION und 4.00 1,000.00 4,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 4,000.00 100.00%

COSTO DIRECTO 531,665.85 111,476.28 61,077.20 11.49% 172,553.48 32.46% 359,112.37 67.54%

TOTAL PRESPUESTO 531,665.85 111,476.28 61,077.20 11.49% 172,553.48 32.46% 359,112.37 67.54%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
03 COMUNIDAD DE PAMPATAMA 895,978.04 143,208.63 0.00% 45,636.12 21.08% 188,844.76 21.08% 0.00 707,133.28
03.01 LOCALIDAD DE PAMPATAMA 895,978.04 143,208.63 0.00% 45,636.12 21.08% 188,844.76 21.08% 0.00 707,133.28
03.01.01 SISTEMA DE AGUA POTABLE 342,780.23 53,182.75 0.00 15.52% 53,182.75 15.52% 0.00 289,597.48
03.01.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
03.01.01.01.01 OBRAS PROVISIONALES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
03.01.01.01.01.0 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 1,760.72 1,760.72 1.0 1,760.72 100.00% 0.00 0.00% 1.00 1,760.72 100.00% 0.00 0.00 0.00%
03.01.01.01.01.0 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 797.66 797.66 1.0 797.66 100.00% 0.00 0.00% 1.00 797.66 100.00% 0.00 0.00 0.00%
03.01.01.02 CONSTRUCCION DE CAPTACION TIPO - 1 5,072.96 74.91 0.00 74.91 1.48% 0.00 4,998.05
03.01.01.02.01 TRABAJOS PRELIMINARES 74.91 74.91 0.00 74.91 100.00% 0.00 0.00
03.01.01.02.01.0 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 16.50 2.44 40.26 16.5 40.26 100.00% 0.00 0.00% 16.50 40.26 100.00% 0.00 0.00 0.00%
03.01.01.02.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 16.50 2.10 34.65 16.5 34.65 100.00% 0.00 0.00% 16.50 34.65 100.00% 0.00 0.00 0.00%
03.01.01.02.02 MOVIMIENTO DE TIERRAS 887.73 0.0 0.00 0.00 0.00 0.00 0.00% 0.00 887.73
03.01.01.02.02.0 EXCAVACION EN TERRENO NORMAL CAPTACION m3 8.25 39.64 327.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.25 327.03 100.00%
03.01.01.02.02.0 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 4.95 40.54 200.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.95 200.67 100.00%
03.01.01.02.02.0 ELIMINACION MANUAL DE MATERIAL EXCEDENTE (50 M ) m3 10.31 34.92 360.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.31 360.03 100.00%
03.01.01.02.03 CONCRETO SIMPLE 210.73 0.0 0.00 0.00 0.00 0.00 0.00% 0.00 210.73
03.01.01.02.03.0 CONCRETO F'C=100 KG/CM2.PARA SOLADOS m3 0.81 260.16 210.73 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.81 210.73 100.00%
03.01.01.02.04 CONCRETO ARMADO 1,416.99 0.00 0.00 0.00 0.00% 0.00 1,416.99
03.01.01.02.04.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 10.37 48.31 500.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.37 500.97 100.00%
03.01.01.02.04.0 ACERO FY=4200 KG/CM2 kg 61.78 6.66 411.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.78 411.45 100.00%
03.01.01.02.04.0 CONCRETO FC=210 KG/CM2 m3 1.22 413.58 504.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.22 504.57 100.00%
03.01.01.02.05 REVOQUES ENLUCIDOS Y MOLDURAS 212.46 0.00 0.00 0.00 0.00% 0.00 212.46
03.01.01.02.05.0 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 6.04 20.00 120.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 120.80 100.00%
03.01.01.02.05.0 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 3.29 27.86 91.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.29 91.66 100.00%
03.01.01.02.06 VALVULAS Y TAPAS Y ACCESORIOS 603.49 0.00 0.00 0.00 0.00% 0.00 603.49
03.01.01.02.06.0 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.60X0.60M und 0.36 352.51 126.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.36 126.90 100.00%
03.01.01.02.06.0 SUMINISTRO E INST. VALVULA COMPUERTA H. DUCTIL, Y ACCESORIOS und 1.00 429.91 429.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 429.91 100.00%
03.01.01.02.06.0 CODO FºDº DN 160X90º ISO ED und 4.00 11.67 46.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 46.68 100.00%
03.01.01.02.07 FILTROS 59.77 0.00 0.00 0.00 0.00% 0.00 59.77
03.01.01.02.07.0 FILTROS DE GRAVA m3 0.22 109.19 24.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.22 24.02 100.00%
03.01.01.02.07.0 FILTROS DE ARENA m3 0.29 123.26 35.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.29 35.75 100.00%
03.01.01.02.08 PINTURA 173.78 0.00 0.00 0.00 0.00% 0.00 173.78
03.01.01.02.08.0 PINTURA EN TAPAS METALICAS m2 1.04 22.08 22.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.04 22.96 100.00%
03.01.01.02.08.0 PINTURA EN MUROS EXTERIORES (CAPTACION) m2 6.04 24.97 150.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 150.82 100.00%
03.01.01.02.09 CERCO PERIMETRICO 1,433.10 0.00 0.00 0.00 0.00% 0.00 1,433.10
03.01.01.02.09.0 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 51.00 28.10 1,433.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.00 1,433.10 100.00%
03.01.01.03 LINEA DE CONDUCCION 90,211.66 8,239.20 0.00 8,239.20 9.13% 0.00 81,972.46
03.01.01.03.01 TENDIDO DE TUBERIA PVC SAP 85,594.09 8,234.00 0.00 8,234.00 9.62% 0.00 77,360.09
03.01.01.03.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 971.35 2.10 2,039.84 971.4 2,039.84 100.00% 0.00 0.00% 971.35 2,039.84 100.00% 0.00 0.00 0.00%
03.01.01.03.01.0 EXCAVACION MANUAL DE ZANJA DE TERRENO CONGLOMERADO m3 566.62 34.92 19,786.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 566.62 19,786.37 100.00%
03.01.01.03.01.0 REFINE Y NIVELACION DE ZANJA m 1,618.92 4.08 6,605.19 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,618.92 6,605.19 100.00%
03.01.01.03.01.0 CAMA DE APOYO E=10CM. m 1,618.92 1.66 2,687.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,618.92 2,687.41 100.00%
03.01.01.03.01.0 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 271.98 23.80 6,473.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 271.98 6,473.12 100.00%
03.01.01.03.01.0 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 407.97 57.17 23,323.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 407.97 23,323.64 100.00%
03.01.01.03.01.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 407.97 8.15 3,324.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 407.97 3,324.96 100.00%
03.01.01.03.01.0 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1/2" m 1,618.92 12.29 19,896.53 504.0 6,194.16 31.13% 0.00 0.00% 504.00 6,194.16 31.13% 1,114.92 13,702.37 68.87%
03.01.01.03.01.0 PRUEBA HIDRAULICA DE LA LINEA DE CONDUCCION m 1,618.92 0.90 1,457.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,618.92 1,457.03 100.00%
03.01.01.03.02 CAMARA ROMPE PRESION T - VI 4,617.57 5.20 0.00 5.20 0.11% 0.00 4,612.37
03.01.01.03.02.0 LIMPIEZA DE TERRENO MANUAL m2 1.92 0.61 1.17 1.9 1.17 100.00% 0.00 0.00% 1.92 1.17 100.00% 0.00 0.00 0.00%
03.01.01.03.02.0 TRAZO Y REPLANTEO PRELIMINAR m2 1.92 2.10 4.03 1.9 4.03 100.00% 0.00 0.00% 1.92 4.03 100.00% 0.00 0.00 0.00%
03.01.01.03.02.0 EXCAVACION DE ZANJA m3 1.92 34.92 67.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 67.05 100.00%
03.01.01.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.40 8.15 19.56 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.40 19.56 100.00%
03.01.01.03.02.0 CONCRETO F'C= 175 KG/CM2 m3 1.14 384.28 438.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.14 438.08 100.00%
03.01.01.03.02.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 18.90 48.31 913.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.90 913.06 100.00%
03.01.01.03.02.0 ACERO FY=4200 KG/CM2 kg 131.13 6.66 873.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 131.13 873.33 100.00%
03.01.01.03.02.0 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 18.90 46.31 875.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.90 875.26 100.00%
03.01.01.03.02.0 TARRAJEO EN INTERIORES Y EXTERIORES m2 18.90 28.40 536.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.90 536.76 100.00%
03.01.01.03.02.1 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C.R.P. TIPOGLB 1.00 187.57 187.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 187.57 100.00%
03.01.01.03.02.1 TAPA METALICA Y MARCO DE 0.60x0.60 m e=1/8" EN C.R.P. TIPO VI und 3.00 213.02 639.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 639.06 100.00%
03.01.01.03.02.1 PINTADO DE MURO EXTERIOR C/LATEX ACRILICO (SUPERLATEX O SIM) m2 10.80 5.80 62.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.80 62.64 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
03.01.01.04 RESERVORIO (8 M3) 21,354.15 86.66 0.00 86.66 0.41% 0.00 21,267.49
03.01.01.04.01 RESERVORIO 17,278.85 59.25 0.00 59.25 0.34% 0.00 17,219.60
03.01.01.04.01.0 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 13.05 2.44 31.84 13.1 31.84 100.00% 0.00 0.00% 13.05 31.84 100.00% 0.00 0.00 0.00%
03.01.01.04.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
03.01.01.04.01.0 EXCAVACION EN TERRENO NORMAL RESERVORIO m3 6.53 34.92 228.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.53 228.03 100.00%
03.01.01.04.01.0 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 8.16 14.23 116.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.16 116.12 100.00%
03.01.01.04.01.0 SOLADO C:H 1:8 (h= 0.10 m) m2 1.13 189.58 214.23 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.13 214.23 100.00%
03.01.01.04.01.0 CONCRETO F'C= 210 KG/CM2 EN RESERVORIO m3 6.38 413.58 2,638.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.38 2,638.64 100.00%
03.01.01.04.01.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 55.40 48.31 2,676.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.40 2,676.37 100.00%
03.01.01.04.01.0 ACERO FY=4200 KG/CM2 kg 272.32 6.66 1,813.65 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 272.32 1,813.65 100.00%
03.01.01.04.01.0 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 71.79 27.86 2,000.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 2,000.07 100.00%
03.01.01.04.01.1 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 71.79 20.00 1,435.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 1,435.80 100.00%
03.01.01.04.01.1 TAPA SANITARIA METALICA DE 0.60x0.60 mts und 2.00 197.60 395.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 395.20 100.00%
03.01.01.04.01.1 INSTALACION DE ACCESORIOS TUB. VENTILACION 2" und 2.00 118.31 236.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 236.62 100.00%
03.01.01.04.01.1 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS DE 3/4" und 1.00 496.89 496.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 496.89 100.00%
03.01.01.04.01.1 INSTALACION DE ACCESORIOS EN RESERVORIO und 2.00 872.43 1,744.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1,744.86 100.00%
03.01.01.04.01.1 PINTADO DE MURO EXTERIOR m2 71.79 15.54 1,115.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 1,115.62 100.00%
03.01.01.04.01.1 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 75.00 28.10 2,107.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.00 2,107.50 100.00%
03.01.01.04.02 CASETA DE CLORACION POR GOTEO 4,075.30 27.41 0.00 27.41 0.67% 0.00 4,047.89
03.01.01.04.02.0 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
03.01.01.04.02.0 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5X2 m2 11.54 71.15 821.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.54 821.07 100.00%
03.01.01.04.02.0 TARRAJEO EN INTERIORES Y EXTERIORES m2 20.50 28.40 582.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.50 582.20 100.00%
03.01.01.04.02.0 REJILLA METALICA SEGUN DISEÑO INC. COLOCADO und 1.00 421.12 421.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 421.12 100.00%
03.01.01.04.02.0 COBERTURA DE CALAMINA EN CASETA DE CLORACION m2 4.00 58.15 232.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 232.60 100.00%
03.01.01.04.02.0 INSTALACION DE PUERTA METÁLICA (SEGÚN DISEÑO) und 1.00 257.57 257.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 257.57 100.00%
03.01.01.04.02.0 INSTALACION DE ACCESORIOS EN CASETA DE CLORACION und 1.00 1,557.57 1,557.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,557.57 100.00%
03.01.01.04.02.0 PINTADO DE MURO EXTERIOR m2 11.31 15.54 175.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 175.76 100.00%
03.01.01.05 LINEA DE ADUCCION Y RED DE DISTRIBUCION 197,158.55 37,101.91 0.00 37,101.91 18.82% 0.00 160,056.64
03.01.01.05.01 TENDIDO DE TUBERIA DE ADUCCION Y DISTRIBUCION PVC SAP 185,445.72 37,052.73 0.00 37,052.73 19.98% 0.00 148,392.99
03.01.01.05.01.0 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 1,879.97 8.03 15,096.16 1,880.0 15,096.16 100.00% 0.00 0.00% 1,879.97 15,096.16 100.00% 0.00 0.00 0.00%
03.01.01.05.01.0 EXCAVACION MANUAL ZANJA EN TERRENO CONGLOMERADO m3 1,096.65 58.58 64,241.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,096.65 64,241.76 100.00%
03.01.01.05.01.0 REFINE Y NIVELACION DE ZANJA m 3,133.28 2.04 6,391.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3,133.28 6,391.89 100.00%
03.01.01.05.01.0 CAMA DE APOYO E=10CM. m 3,133.28 1.66 5,201.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3,133.28 5,201.24 100.00%
03.01.01.05.01.0 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 526.39 23.80 12,528.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 526.39 12,528.08 100.00%
03.01.01.05.01.0 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 787.97 57.17 45,048.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 787.97 45,048.24 100.00%
03.01.01.05.01.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 787.97 8.15 6,421.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 787.97 6,421.96 100.00%
03.01.01.05.01.0 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 2" m 263.85 14.16 3,736.12 211.1 2,988.89 80.00% 0.00 0.00% 211.08 2,988.89 80.00% 52.77 747.23 20.00%
03.01.01.05.01.0 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1/2" m 1,468.63 12.29 18,049.46 1,174.9 14,439.52 80.00% 0.00 0.00% 1,174.90 14,439.52 80.00% 293.73 3,609.94 20.00%
03.01.01.05.01.1 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 688.56 4.30 2,960.81 550.9 2,368.66 80.00% 0.00 0.00% 550.85 2,368.66 80.00% 137.71 592.15 20.00%
03.01.01.05.01.1 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 3/4" m 712.24 3.79 2,699.39 569.8 2,159.50 80.00% 0.00 0.00% 569.79 2,159.50 80.00% 142.45 539.89 20.00%
03.01.01.05.01.1 PRUEBA HIDRAULICA m 3,133.28 0.98 3,070.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3,133.28 3,070.61 100.00%
03.01.01.05.02 VALVULA DE CONTROL 3,572.76 7.81 0.00 7.81 0.22% 0.00 3,564.95
03.01.01.05.02.0 LIMPIEZA DE TERRENO MANUAL m2 2.88 0.61 1.76 2.9 1.76 100.00% 0.00 0.00% 2.88 1.76 100.00% 0.00 0.00 0.00%
03.01.01.05.02.0 TRAZO Y REPLANTEO PRELIMINAR m2 2.88 2.10 6.05 2.9 6.05 100.00% 0.00 0.00% 2.88 6.05 100.00% 0.00 0.00 0.00%
03.01.01.05.02.0 EXCAVACION DE ZANJA m3 1.15 34.92 40.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.15 40.16 100.00%
03.01.01.05.02.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 1.44 8.15 11.74 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.44 11.74 100.00%
03.01.01.05.02.0 CONCRETO F'C= 175 KG/CM2 m3 0.38 384.28 146.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.38 146.03 100.00%
03.01.01.05.02.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 12.80 48.31 618.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.80 618.37 100.00%
03.01.01.05.02.0 TARRAJEO CON IMPERMEABILIZANTE m2 12.80 29.19 373.63 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.80 373.63 100.00%
03.01.01.05.02.0 TARRAJEO EN INTERIORES Y EXTERIORES m2 5.12 28.40 145.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.12 145.41 100.00%
03.01.01.05.02.0 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 1.00 512.25 512.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 512.25 100.00%
03.01.01.05.02.1 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 8.00 213.49 1,707.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 1,707.92 100.00%
03.01.01.05.02.1 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.13 72.62 9.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.13 9.44 100.00%
03.01.01.05.03 VALVULA DE PURGA 3,709.06 23.41 0.00 23.41 0.63% 0.00 3,685.65
03.01.01.05.03.0 LIMPIEZA DE TERRENO MANUAL m2 8.64 0.61 5.27 8.6 5.27 100.00% 0.00 0.00% 8.64 5.27 100.00% 0.00 0.00 0.00%
03.01.01.05.03.0 TRAZO Y REPLANTEO PRELIMINAR m2 8.64 2.10 18.14 8.6 18.14 100.00% 0.00 0.00% 8.64 18.14 100.00% 0.00 0.00 0.00%
03.01.01.05.03.0 EXCAVACION DE ZANJA m3 6.05 34.92 211.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.05 211.27 100.00%
03.01.01.05.03.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 7.56 8.15 61.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.56 61.61 100.00%
03.01.01.05.03.0 CONCRETO F'C= 175 KG/CM2 m3 0.91 384.28 349.69 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.91 349.69 100.00%
03.01.01.05.03.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 18.00 48.31 869.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 869.58 100.00%
03.01.01.05.03.0 TARRAJEO CON IMPERMEABILIZANTE m2 16.80 29.19 490.39 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.80 490.39 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
03.01.01.05.03.0 TARRAJEO EN INTERIORES Y EXTERIORES m2 6.72 28.40 190.85 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.72 190.85 100.00%
03.01.01.05.03.0 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN CAJA DE GLB 1.00 224.06 224.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 224.06 100.00%
03.01.01.05.03.1 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 6.00 213.49 1,280.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 1,280.94 100.00%
03.01.01.05.03.1 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.10 72.62 7.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.10 7.26 100.00%
03.01.01.05.04 CAMARA ROMPE PRESION T - VII 4,431.01 17.96 0.00 17.96 0.41% 0.00 4,413.05
03.01.01.05.04.0 LIMPIEZA DE TERRENO MANUAL m2 6.63 0.61 4.04 6.6 4.04 100.00% 0.00 0.00% 6.63 4.04 100.00% 0.00 0.00 0.00%
03.01.01.05.04.0 TRAZO Y REPLANTEO PRELIMINAR m2 6.63 2.10 13.92 6.6 13.92 100.00% 0.00 0.00% 6.63 13.92 100.00% 0.00 0.00 0.00%
03.01.01.05.04.0 EXCAVACION DE ZANJA m3 5.97 34.92 208.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.97 208.47 100.00%
03.01.01.05.04.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 7.47 8.15 60.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.47 60.88 100.00%
03.01.01.05.04.0 CONCRETO F'C= 175 KG/CM2 m3 1.82 384.28 699.39 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.82 699.39 100.00%
03.01.01.05.04.0 ACERO FY=4200 KG/CM2 kg 87.42 6.66 582.22 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 87.42 582.22 100.00%
03.01.01.05.04.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 27.02 48.31 1,305.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.02 1,305.34 100.00%
03.01.01.05.04.0 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 9.87 46.31 457.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.87 457.08 100.00%
03.01.01.05.04.0 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C.R.P. TIPO GLB 1.00 205.99 205.99 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 205.99 100.00%
03.01.01.05.04.1 TAPA METALICA Y MARCO DE 0.60x0.60m y 0.30x0.30m e=1/8" EN C.R.P. TIP und 3.00 278.02 834.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 834.06 100.00%
03.01.01.05.04.1 PINTURA EN TAPAS METALICAS m2 2.70 22.08 59.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.70 59.62 100.00%
03.01.01.06 CONEXIONES DOMICILIARIAS 26,424.53 5,121.69 0.00 5,121.69 19.38% 0.00 21,302.84
03.01.01.06.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 405.09 8.03 3,252.87 405.1 3,252.87 100.00% 0.00 0.00% 405.09 3,252.87 100.00% 0.00 0.00 0.00%
03.01.01.06.02 EXCAVACION MANUAL DE ZANJA EN TERRENO CONGLOMERADO m3 182.29 23.12 4,214.54 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 182.29 4,214.54 100.00%
03.01.01.06.03 REFINE Y NIVELACION DE ZANJA m 675.15 4.08 2,754.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 675.15 2,754.61 100.00%
03.01.01.06.04 CAMA DE APOYO E=10CM. m 675.15 1.66 1,120.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 675.15 1,120.75 100.00%
03.01.01.06.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 181.83 23.80 4,327.55 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 181.83 4,327.55 100.00%
03.01.01.06.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 9.57 57.17 547.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.57 547.12 100.00%
03.01.01.06.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 9.57 8.15 78.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.57 78.00 100.00%
03.01.01.06.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" m 675.15 3.46 2,336.02 540.1 1,868.82 80.00% 0.00 0.00% 540.12 1,868.82 80.00% 135.03 467.20 20.00%
03.01.01.06.09 CONEXIÓN DOMICILIARIA INC. CAJA DE AGUA POTABLE MATRIZ Ø 1 1/2" @ und 52.00 136.23 7,083.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.00 7,083.96 100.00%
03.01.01.06.10 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 12.45 8.15 101.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.45 101.47 100.00%
03.01.01.06.11 PRUEBA HIDRAULICA EN TUBERIA INSTALADA m 675.15 0.90 607.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 675.15 607.64 100.00%
03.01.02 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO DOMICILIARIAS 459,457.48 49,647.62 37,849.17 19.04% 87,496.79 19.04% 0.00 371,960.69
03.01.02.01 CONSTRUCCION DE CASETA DE BAÑO 304,421.30 8,951.95 20,951.15 29,903.10 9.82% 0.00 274,518.20
03.01.02.01.01 OBRAS PROVISIONALES 3,518.51 3,518.51 0.00 3,518.51 100.00% 0.00 0.00
03.01.02.01.01.0 LETRINAS DE HOYO SECO VENTILADO (PARA PERSONAL OBRERO) 1,904.75 1,904.75 0.00 1,904.75 100.00% 0.00 0.00
03.01.02.01.01.0 LIMPIEZA DE TERRENO MANUAL m2 3.38 0.61 2.06 3.4 2.06 100.00% 0.00 0.00% 3.38 2.06 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 3.38 2.10 7.10 3.4 7.10 100.00% 0.00 0.00% 3.38 7.10 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 EXCAVACION DE ZANJA m3 6.42 34.92 224.19 6.4 224.19 100.00% 0.00 0.00% 6.42 224.19 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.03 8.15 65.44 8.0 65.44 100.00% 0.00 0.00% 8.03 65.44 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.24 48.31 301.45 6.2 301.45 100.00% 0.00 0.00% 6.24 301.45 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.94 364.59 342.71 0.9 342.71 100.00% 0.00 0.00% 0.94 342.71 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 ACERO FY=4200 KG/CM2 kg 18.14 6.66 120.81 18.1 120.81 100.00% 0.00 0.00% 18.14 120.81 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 CONCRETO F'C= 175 KG/CM2 m3 0.17 384.28 65.33 0.2 65.33 100.00% 0.00 0.00% 0.17 65.33 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 CASETA PARA LETRINAS INC. PUERTA DE CALAMINA und 2.00 346.09 692.18 2.0 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.0 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 DUCHAS O VESTUARIOS (PARA PERSONAL OBRERO) 1,335.92 1,335.92 0.00 1,335.92 100.00% 0.00 0.00
03.01.02.01.01.0 LIMPIEZA DE TERRENO MANUAL m2 4.00 0.61 2.44 4.0 2.44 100.00% 0.00 0.00% 4.00 2.44 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.10 8.40 4.0 8.40 100.00% 0.00 0.00% 4.00 8.40 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 EXCAVACION DE ZANJA m3 2.04 34.92 71.24 2.0 71.24 100.00% 0.00 0.00% 2.04 71.24 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.55 8.15 20.78 2.6 20.78 100.00% 0.00 0.00% 2.55 20.78 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 2.00 72.62 145.24 2.0 145.24 100.00% 0.00 0.00% 2.00 145.24 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.40 48.31 115.94 2.4 115.94 100.00% 0.00 0.00% 2.40 115.94 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.27 364.59 98.44 0.3 98.44 100.00% 0.00 0.00% 0.27 98.44 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 CASETA PARA DUCHAS INC. PUERTA DE CALAMINA m2 2.00 346.09 692.18 2.0 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 2.00 48.89 97.78 2.0 97.78 100.00% 0.00 0.00% 2.00 97.78 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.0 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
03.01.02.01.01.0 LAVADERO DE GRANITO (PARA PERSONAL OBRERO) 277.84 0.0 277.84 0.00 100.00% 0.00 277.84 100.00% 0.00 0.00
03.01.02.01.01.0 SUMINISTRO E INSTALACIÓN DE LAVADERO DE GRANITO und 2.00 138.92 277.84 2.0 277.84 100.00% 0.00 0.00% 2.00 277.84 100.00% 0.00 0.00 0.00%
03.01.02.01.02 TRABAJOS PRELIMINARES 1,084.38 1,084.38 0.00 1,084.38 100.00% 0.00 0.00
03.01.02.01.02.0 LIMPIEZA DE TERRENO MANUAL m2 400.14 0.61 244.09 400.1 244.09 100.00% 0.00 0.00% 400.14 244.09 100.00% 0.00 0.00 0.00%
03.01.02.01.02.0 TRAZO Y REPLANTEO PRELIMINAR m2 400.14 2.10 840.29 400.1 840.29 100.00% 0.00 0.00% 400.14 840.29 100.00% 0.00 0.00 0.00%
03.01.02.01.03 MOVIMIENTO DE TIERRAS 8,397.30 3,422.51 1,528.96 4,951.47 58.97% 0.00 3,445.83
03.01.02.01.03.0 EXCAVACION DE TERRENO NORMAL m3 98.01 34.92 3,422.51 98.0 3,422.51 100.00% 0.00 0.00% 98.01 3,422.51 100.00% 0.00 0.00 0.00%
03.01.02.01.03.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 122.52 8.15 998.54 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 122.52 998.54 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
03.01.02.01.03.0 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 41.61 95.56 3,976.25 0.0 0.00 0.00% 16.00 1,528.96 38.45% 16.00 1,528.96 38.45% 25.61 2,447.29 61.55%
03.01.02.01.04 OBRAS DE CONCRETO SIMPLE 53,445.10 0.00 9,618.60 9,618.60 18.00% 0.00 43,826.50
03.01.02.01.04.0 CIMIENTOS CORRIDOS 12,428.06 0.00 4,780.02 4,780.02 38.46% 0.00 7,648.04
03.01.02.01.04.0 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 53.56 232.04 12,428.06 0.0 0.00 0.00% 20.60 4,780.02 38.46% 20.60 4,780.02 38.46% 32.96 7,648.04 61.54%
03.01.02.01.04.0 SOBRECIMIENTOS 16,774.37 0.00 4,838.58 4,838.58 28.85% 0.00 11,935.79
03.01.02.01.04.0 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 245.44 44.52 10,926.99 0.0 0.00 0.00% 70.80 3,152.02 28.85% 70.80 3,152.02 28.85% 174.64 7,774.97 71.15%
03.01.02.01.04.0 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 18.41 317.62 5,847.38 0.0 0.00 0.00% 5.31 1,686.56 28.84% 5.31 1,686.56 28.84% 13.10 4,160.82 71.16%
03.01.02.01.04.0 PISO INTERIOR 5,153.01 0.00 0.00 0.00 0.00% 0.00 5,153.01
03.01.02.01.04.0 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO CEMENTO PUL m2 114.92 44.84 5,153.01 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 114.92 5,153.01 100.00%
03.01.02.01.04.0 SARDINEL DE DUCHA 994.24 0.00 0.00 0.00 0.00% 0.00 994.24
03.01.02.01.04.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 17.16 48.31 829.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.16 829.00 100.00%
03.01.02.01.04.0 CONCRETO F'C= 175 KG/CM2 m3 0.43 384.28 165.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.43 165.24 100.00%
03.01.02.01.04.0 VEREDA PERIMETRAL 18,095.42 0.00 0.00 0.00 0.00% 0.00 18,095.42
03.01.02.01.04.0 ENCOFRADO Y DESENCOF. DE VEREDAS m2 57.72 42.84 2,472.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 57.72 2,472.72 100.00%
03.01.02.01.04.0 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑADO m2 236.34 44.84 10,597.49 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 236.34 10,597.49 100.00%
03.01.02.01.04.0 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 13.79 364.41 5,025.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.79 5,025.21 100.00%
03.01.02.01.05 OBRAS DE CONCRETO ARMADO 49,738.39 0.00 6,772.54 6,772.54 13.62% 0.00 42,965.85
03.01.02.01.05.0 COLUMNAS 35,217.12 0.00 6,772.54 6,772.54 19.23% 0.00 28,444.58
03.01.02.01.05.0 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 15.60 384.28 5,994.77 0.0 0.00 0.00% 3.00 1,152.84 19.23% 3.00 1,152.84 19.23% 12.60 4,841.93 80.77%
03.01.02.01.05.0 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 332.80 45.29 15,072.51 0.0 0.00 0.00% 64.00 2,898.56 19.23% 64.00 2,898.56 19.23% 268.80 12,173.95 80.77%
03.01.02.01.05.0 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 2,124.60 6.66 14,149.84 0.0 0.00 0.00% 408.58 2,721.14 19.23% 408.58 2,721.14 19.23% 1,716.02 11,428.70 80.77%
03.01.02.01.05.0 VIGAS 14,521.27 0.00 0.00 0.00 0.00% 0.00 14,521.27
03.01.02.01.05.0 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 8.89 384.28 3,416.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.89 3,416.25 100.00%
03.01.02.01.05.0 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 163.02 50.83 8,286.31 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 163.02 8,286.31 100.00%
03.01.02.01.05.0 ACERO FY=4200 KG/CM2 PARA VIGAS kg 423.23 6.66 2,818.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 423.23 2,818.71 100.00%
03.01.02.01.06 MUROS DE LADRILLO 31,519.29 0.00 3,031.05 3,031.05 9.62% 0.00 28,488.24
03.01.02.01.06.0 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5X2 m2 434.15 72.60 31,519.29 0.0 0.00 0.00% 41.75 3,031.05 9.62% 41.75 3,031.05 9.62% 392.40 28,488.24 90.38%
03.01.02.01.07 REVOQUES Y ENLUCIDOS 33,087.87 0.00 0.00 0.00 0.00% 0.00 33,087.87
03.01.02.01.07.0 ZÓCALO: TARRAJEADO Y PULIDO CON IMPERMEABILIZANTE / MEZCLA 1: m2 332.80 38.45 12,796.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 332.80 12,796.16 100.00%
03.01.02.01.07.0 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 296.92 20.82 6,181.87 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 296.92 6,181.87 100.00%
03.01.02.01.07.0 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINASm2 371.54 24.59 9,136.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 371.54 9,136.17 100.00%
03.01.02.01.07.0 BRUÑA DE 1 CM m 351.00 14.17 4,973.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 351.00 4,973.67 100.00%
03.01.02.01.08 PINTURA 8,080.94 0.00 0.00 0.00 0.00% 0.00 8,080.94
03.01.02.01.08.0 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 296.92 11.37 3,375.98 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 296.92 3,375.98 100.00%
03.01.02.01.08.0 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINAS EXTERI m2 338.00 13.92 4,704.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 338.00 4,704.96 100.00%
03.01.02.01.09 COBERTURA LIVIANA PARA TECHO 20,428.93 0.00 0.00 0.00 0.00% 0.00 20,428.93
03.01.02.01.09.0 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 156.00 38.28 5,971.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 156.00 5,971.68 100.00%
03.01.02.01.09.0 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 3.00 m und 208.00 25.91 5,389.28 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 208.00 5,389.28 100.00%
03.01.02.01.09.0 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.30 mm m2 374.40 24.22 9,067.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 374.40 9,067.97 100.00%
03.01.02.01.10 CARPINTERIA DE MADERA 20,591.48 0.00 0.00 0.00 0.00% 0.00 20,591.48
03.01.02.01.10.0 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/TRIPLAY DE und 52.00 304.49 15,833.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.00 15,833.48 100.00%
03.01.02.01.10.0 SUMIN. E INSTAL. DE VENTANA DE MADERA SEGUN DISEÑO und 52.00 91.50 4,758.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.00 4,758.00 100.00%
03.01.02.01.11 INSTALACIONES SANITARIAS 50,770.31 926.55 0.00 926.55 1.82% 0.00 49,843.76
03.01.02.01.11.0 TRABAJOS PRELIMINARES 926.55 926.55 0.00 926.55 100.00% 0.00 0.00
03.01.02.01.11.0 LIMPIEZA DE TERRENO MANUAL m2 341.90 0.61 208.56 341.9 208.56 100.00% 0.00 0.00% 341.90 208.56 100.00% 0.00 0.00 0.00%
03.01.02.01.11.0 TRAZO Y REPLANTEO PRELIMINAR m2 341.90 2.10 717.99 341.9 717.99 100.00% 0.00 0.00% 341.90 717.99 100.00% 0.00 0.00 0.00%
03.01.02.01.11.0 MOVIMIENTO DE TIERRAS 12,175.61 0.00 0.00 0.00 0.00% 0.00 12,175.61
03.01.02.01.11.0 EXCAVACION DE TERRENO NORMAL m3 169.20 34.92 5,908.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 169.20 5,908.46 100.00%
03.01.02.01.11.0 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 149.95 40.54 6,078.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 149.95 6,078.97 100.00%
03.01.02.01.11.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 23.09 8.15 188.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.09 188.18 100.00%
03.01.02.01.11.0 TUBERIAS Y ACCESORIOS 17,586.81 0.00 0.00 0.00 0.00% 0.00 17,586.81
03.01.02.01.11.0 SALIDA DE AGUA FRIA PVC 1/2¨ pto 156.00 23.00 3,588.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 156.00 3,588.00 100.00%
03.01.02.01.11.0 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + ACCESORIOS und 52.00 63.39 3,296.28 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.00 3,296.28 100.00%
03.01.02.01.11.0 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 234.00 5.14 1,202.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 234.00 1,202.76 100.00%
03.01.02.01.11.0 TUBERIA PVC SAL Ø 2" m 509.60 7.99 4,071.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 509.60 4,071.70 100.00%
03.01.02.01.11.0 TUBERIA PVC SAL Ø 4" m 426.40 12.73 5,428.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 426.40 5,428.07 100.00%
03.01.02.01.11.0 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 20,081.34 0.00 0.00 0.00 0.00% 0.00 20,081.34
03.01.02.01.11.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 109.98 48.31 5,313.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 109.98 5,313.13 100.00%
03.01.02.01.11.0 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 10.18 265.70 2,704.83 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.18 2,704.83 100.00%
03.01.02.01.11.0 TARRAJEO CON IMPERMEABILIZANTE m2 74.88 32.70 2,448.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 74.88 2,448.58 100.00%
03.01.02.01.11.0 SALIDA DE DESAGUE PVC-SAL 2" pto 104.00 41.74 4,340.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 104.00 4,340.96 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
03.01.02.01.11.0 SALIDA DE DESAGUE PVC-SAL 4" pto 52.00 42.49 2,209.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.00 2,209.48 100.00%
03.01.02.01.11.0 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 52.00 58.93 3,064.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.00 3,064.36 100.00%
03.01.02.01.12 APARATOS Y ACCESORIOS SANITARIOS 14,126.32 0.00 0.00 0.00 0.00% 0.00 14,126.32
03.01.02.01.12.0 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0.74 M und 52.00 148.78 7,736.56 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.00 7,736.56 100.00%
03.01.02.01.12.0 SUMINISTRO E INSTALACION DE LAVATORIO und 52.00 73.99 3,847.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.00 3,847.48 100.00%
03.01.02.01.12.0 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 52.00 48.89 2,542.28 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.00 2,542.28 100.00%
03.01.02.01.13 INSTALACIONES ELECTRICAS 9,632.48 0.00 0.00 0.00 0.00% 0.00 9,632.48
03.01.02.01.13.0 SALIDA PARA INTERRUPTOR DOBLE und 52.00 22.42 1,165.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.00 1,165.84 100.00%
03.01.02.01.13.0 SALIDA PARA CENTRO DE LUZ und 104.00 65.44 6,805.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 104.00 6,805.76 100.00%
03.01.02.01.13.0 SALIDA PARA TOMACORRIENTES und 52.00 31.94 1,660.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.00 1,660.88 100.00%
03.01.02.02 INSTALACION DE BIODIGESTOR DE 600 LTS 80,565.72 40,356.73 5,174.35 45,531.08 56.51% 0.00 35,034.64
03.01.02.02.01 TRABAJOS PRELIMINARES 265.90 265.90 0.00 265.90 100.00% 0.00 0.00
03.01.02.02.01.0 LIMPIEZA DE TERRENO MANUAL m2 98.12 0.61 59.85 98.1 59.85 100.00% 0.00 0.00% 98.12 59.85 100.00% 0.00 0.00 0.00%
03.01.02.02.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 98.12 2.10 206.05 98.1 206.05 100.00% 0.00 0.00% 98.12 206.05 100.00% 0.00 0.00 0.00%
03.01.02.02.02 MOVIMIENTO DE TIERRAS 7,634.30 0.00 5,016.80 5,016.80 65.71% 0.00 2,617.50
03.01.02.02.02.0 EXCAVACION DE TERRENO NORMAL m3 139.74 34.92 4,879.72 0.0 0.00 0.00% 102.12 3,566.03 73.08% 102.12 3,566.03 73.08% 37.62 1,313.69 26.92%
03.01.02.02.02.0 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 64.20 30.92 1,985.06 0.0 0.00 0.00% 46.92 1,450.77 73.08% 46.92 1,450.77 73.08% 17.28 534.29 26.92%
03.01.02.02.02.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 94.42 8.15 769.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 94.42 769.52 100.00%
03.01.02.02.03 OBRAS DE CONCRETO SIMPLE 403.49 0.00 157.55 157.55 39.05% 0.00 245.94
03.01.02.02.03.0 CONCRETO F'C= 175 KG/CM2 m3 1.05 384.28 403.49 0.0 0.00 0.00% 0.41 157.55 39.05% 0.41 157.55 39.05% 0.64 245.94 60.95%
03.01.02.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 18,807.59 0.00 0.00 0.00 0.00% 0.00 18,807.59
03.01.02.02.04.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 172.64 48.31 8,340.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 172.64 8,340.24 100.00%
03.01.02.02.04.0 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODOS m3 16.95 364.74 6,182.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.95 6,182.34 100.00%
03.01.02.02.04.0 TARRAJEO CON IMPERMEABILIZANTE m2 131.04 32.70 4,285.01 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 131.04 4,285.01 100.00%
03.01.02.02.05 BIODIGESTOR DE 600 Lts. 53,454.44 0.0 40,090.83 0.00 0.00 40,090.83 75.00% 0.00 13,363.61
03.01.02.02.05.0 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 Lts und 52.00 1,027.97 53,454.44 39.0 40,090.83 75.00% 0.00 0.00% 39.00 40,090.83 75.00% 13.00 13,363.61 25.00%
03.01.02.03 CONSTRUCCIÓN DE POZO PERCOLADOR 74,470.46 338.94 11,723.67 12,062.61 16.20% 0.00 62,407.85
03.01.02.03.01 TRABAJOS PRELIMINARES 338.94 338.94 0.00 338.94 100.00% 0.00 0.00
03.01.02.03.01.0 LIMPIEZA DE TERRENO MANUAL m2 125.07 0.61 76.29 125.1 76.29 100.00% 0.00 0.00% 125.07 76.29 100.00% 0.00 0.00 0.00%
03.01.02.03.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 125.07 2.10 262.65 125.1 262.65 100.00% 0.00 0.00% 125.07 262.65 100.00% 0.00 0.00 0.00%
03.01.02.03.02 MOVIMIENTO DE TIERRAS 16,476.38 0.00 6,978.41 6,978.41 42.35% 0.00 9,497.97
03.01.02.03.02.0 EXCAVACION DE TERRENO NORMAL m3 273.46 34.92 9,549.22 0.0 0.00 0.00% 199.84 6,978.41 73.08% 199.84 6,978.41 73.08% 73.62 2,570.81 26.92%
03.01.02.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 341.90 8.15 2,786.49 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 341.90 2,786.49 100.00%
03.01.02.03.02.0 RELLENO CON GRAVA 1" m3 43.14 64.85 2,797.63 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 43.14 2,797.63 100.00%
03.01.02.03.02.0 FILTRO DE GRAVA Ø 1" m3 20.71 64.85 1,343.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.71 1,343.04 100.00%
03.01.02.03.03 OBRAS DE CONCRETO SIMPLE 14,234.17 0.00 2,735.62 2,735.62 19.22% 0.00 11,498.55
03.01.02.03.03.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 73.19 48.31 3,535.81 0.0 0.00 0.00% 14.07 679.72 19.22% 14.07 679.72 19.22% 59.12 2,856.09 80.78%
03.01.02.03.03.0 CONCRETO F'C= 175 KG/CM2 m3 27.84 384.28 10,698.36 0.0 0.00 0.00% 5.35 2,055.90 19.22% 5.35 2,055.90 19.22% 22.49 8,642.46 80.78%
03.01.02.03.04 OBRAS DE CONCRETO ARMADO 8,580.88 0.00 0.00 0.00 0.00% 0.00 8,580.88
03.01.02.03.04.0 CONCRETO F'C= 175 KG/CM2 m3 9.81 384.28 3,769.79 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.81 3,769.79 100.00%
03.01.02.03.04.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 25.32 48.31 1,223.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.32 1,223.21 100.00%
03.01.02.03.04.0 ACERO FY=4200 KG/CM2 kg 538.72 6.66 3,587.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 538.72 3,587.88 100.00%
03.01.02.03.05 MUROS DE LADRILLO 34,840.09 0.0 0.00 2,009.64 0.00 2,009.64 5.77% 0.00 32,830.45
03.01.02.03.05.0 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 CM m2 382.27 91.14 34,840.09 0.0 0.00 0.00% 22.05 2,009.64 5.77% 22.05 2,009.64 5.77% 360.22 32,830.45 94.23%
03.01.03 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO INSTITUCIONALES 28,084.11 2,419.60 0.00 8.62% 2,419.60 8.62% 0.00 25,664.51
03.01.03.01 CONSTRUCCION DE CASETA DE BAÑO 21,713.72 116.84 0.00 116.84 0.54% 0.00 21,596.88
03.01.03.01.01 TRABAJOS PRELIMINARES 81.20 81.20 0.00 81.20 100.00% 0.00 0.00
03.01.03.01.01.0 LIMPIEZA DE TERRENO MANUAL m2 29.96 0.61 18.28 30.0 18.28 100.00% 0.00 0.00% 29.96 18.28 100.00% 0.00 0.00 0.00%
03.01.03.01.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 29.96 2.10 62.92 30.0 62.92 100.00% 0.00 0.00% 29.96 62.92 100.00% 0.00 0.00 0.00%
03.01.03.01.02 MOVIMIENTO DE TIERRAS 603.79 0.00 0.00 0.00 0.00% 0.00 603.79
03.01.03.01.02.0 EXCAVACION DE TERRENO NORMAL m3 7.22 34.92 252.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.22 252.12 100.00%
03.01.03.01.02.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 9.03 8.15 73.59 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.03 73.59 100.00%
03.01.03.01.02.0 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 2.91 95.56 278.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.91 278.08 100.00%
03.01.03.01.03 OBRAS DE CONCRETO SIMPLE 3,943.76 0.00 0.00 0.00 0.00% 0.00 3,943.76
03.01.03.01.03.0 CIMIENTOS CORRIDOS 972.25 0.00 0.00 0.00 0.00% 0.00 972.25
03.01.03.01.03.0 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 4.19 232.04 972.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.19 972.25 100.00%
03.01.03.01.03.0 SOBRECIMIENTOS 1,346.23 0.0 0.00 0.00 0.00 0.00 0.00% 0.00 1,346.23
03.01.03.01.03.0 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 19.68 44.52 876.15 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.68 876.15 100.00%
03.01.03.01.03.0 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 1.48 317.62 470.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.48 470.08 100.00%
03.01.03.01.03.0 PISO INTERIOR 473.51 0.00 0.00 0.00 0.00% 0.00 473.51
03.01.03.01.03.0 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO CEMENTO PUL m2 10.56 44.84 473.51 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.56 473.51 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
03.01.03.01.03.0 VEREDA PERIMETRAL 1,151.77 0.00 0.00 0.00 0.00% 0.00 1,151.77
03.01.03.01.03.0 ENCOFRADO Y DESENCOF. DE VEREDAS m2 3.26 42.84 139.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.26 139.66 100.00%
03.01.03.01.03.0 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑADO m2 16.07 44.84 720.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.07 720.58 100.00%
03.01.03.01.03.0 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.80 364.41 291.53 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.80 291.53 100.00%
03.01.03.01.04 OBRAS DE CONCRETO ARMADO 3,059.13 0.00 0.00 0.00 0.00% 0.00 3,059.13
03.01.03.01.04.0 COLUMNAS 2,031.74 0.00 0.00 0.00 0.00% 0.00 2,031.74
03.01.03.01.04.0 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 0.90 384.28 345.85 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.90 345.85 100.00%
03.01.03.01.04.0 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 19.20 45.29 869.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.20 869.57 100.00%
03.01.03.01.04.0 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 122.57 6.66 816.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 122.57 816.32 100.00%
03.01.03.01.04.0 VIGAS 1,027.39 0.00 0.00 0.00 0.00% 0.00 1,027.39
03.01.03.01.04.0 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 0.63 384.28 242.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.63 242.10 100.00%
03.01.03.01.04.0 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 11.55 50.83 587.09 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.55 587.09 100.00%
03.01.03.01.04.0 ACERO FY=4200 KG/CM2 PARA VIGAS kg 29.76 6.66 198.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.76 198.20 100.00%
03.01.03.01.05 MUROS DE LADRILLO 2,772.59 0.00 0.00 0.00 0.00% 0.00 2,772.59
03.01.03.01.05.0 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5X2 m2 38.19 72.60 2,772.59 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 38.19 2,772.59 100.00%
03.01.03.01.06 REVOQUES Y ENLUCIDOS 1,816.25 0.00 0.00 0.00 0.00% 0.00 1,816.25
03.01.03.01.06.0 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 66.26 20.82 1,379.53 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 66.26 1,379.53 100.00%
03.01.03.01.06.0 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINASm2 17.76 24.59 436.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.76 436.72 100.00%
03.01.03.01.07 PINTURA 1,000.60 0.00 0.00 0.00 0.00% 0.00 1,000.60
03.01.03.01.07.0 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 66.26 11.37 753.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 66.26 753.38 100.00%
03.01.03.01.07.0 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINAS EXTERI m2 17.76 13.92 247.22 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.76 247.22 100.00%
03.01.03.01.08 COBERTURA LIVIANA PARA TECHO 1,385.19 0.00 0.00 0.00 0.00% 0.00 1,385.19
03.01.03.01.08.0 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 10.00 38.28 382.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 382.80 100.00%
03.01.03.01.08.0 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 5.60 m und 8.00 43.92 351.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 351.36 100.00%
03.01.03.01.08.0 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.30 mm m2 26.88 24.22 651.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.88 651.03 100.00%
03.01.03.01.09 CARPINTERIA DE MADERA 2,435.92 0.00 0.00 0.00 0.00% 0.00 2,435.92
03.01.03.01.09.0 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/TRIPLAY DE und 8.00 304.49 2,435.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 2,435.92 100.00%
03.01.03.01.10 INSTALACIONES SANITARIAS 2,466.65 35.64 0.00 35.64 1.44% 0.00 2,431.01
03.01.03.01.10.0 TRABAJOS PRELIMINARES 35.64 35.64 0.00 35.64 100.00% 0.00 0.00
03.01.03.01.10.0 LIMPIEZA DE TERRENO MANUAL m2 13.15 0.61 8.02 13.2 8.02 100.00% 0.00 0.00% 13.15 8.02 100.00% 0.00 0.00 0.00%
03.01.03.01.10.0 TRAZO Y REPLANTEO PRELIMINAR m2 13.15 2.10 27.62 13.2 27.62 100.00% 0.00 0.00% 13.15 27.62 100.00% 0.00 0.00 0.00%
03.01.03.01.10.0 MOVIMIENTO DE TIERRAS 468.83 0.00 0.00 0.00 0.00% 0.00 468.83
03.01.03.01.10.0 EXCAVACION DE TERRENO NORMAL m3 6.51 34.92 227.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.51 227.33 100.00%
03.01.03.01.10.0 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 5.77 40.54 233.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.77 233.92 100.00%
03.01.03.01.10.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 0.93 8.15 7.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.93 7.58 100.00%
03.01.03.01.10.0 TUBERIAS Y ACCESORIOS 748.67 0.00 0.00 0.00 0.00% 0.00 748.67
03.01.03.01.10.0 SALIDA DE AGUA FRIA PVC 1/2¨ pto 8.00 23.00 184.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 184.00 100.00%
03.01.03.01.10.0 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + ACCESORIOS und 2.00 63.39 126.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 126.78 100.00%
03.01.03.01.10.0 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 11.00 5.14 56.54 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.00 56.54 100.00%
03.01.03.01.10.0 TUBERIA PVC SAL Ø 2" m 21.60 7.99 172.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.60 172.58 100.00%
03.01.03.01.10.0 TUBERIA PVC SAL Ø 4" m 16.40 12.73 208.77 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.40 208.77 100.00%
03.01.03.01.10.0 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 1,213.51 0.00 0.00 0.00 0.00% 0.00 1,213.51
03.01.03.01.10.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 4.23 48.31 204.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.23 204.35 100.00%
03.01.03.01.10.0 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 0.39 265.70 103.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.39 103.62 100.00%
03.01.03.01.10.0 TARRAJEO CON IMPERMEABILIZANTE m2 2.88 32.70 94.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.88 94.18 100.00%
03.01.03.01.10.0 SALIDA DE DESAGUE PVC-SAL 4" pto 8.00 42.49 339.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 339.92 100.00%
03.01.03.01.10.0 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 8.00 58.93 471.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 471.44 100.00%
03.01.03.01.11 APARATOS Y ACCESORIOS SANITARIOS 1,190.24 0.00 0.00 0.00 0.00% 0.00 1,190.24
03.01.03.01.11.0 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0.74 M und 8.00 148.78 1,190.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 1,190.24 100.00%
03.01.03.01.12 INSTALACIONES ELECTRICAS 958.40 0.00 0.00 0.00 0.00% 0.00 958.40
03.01.03.01.12.0 SALIDA PARA INTERRUPTOR DOBLE und 8.00 22.42 179.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 179.36 100.00%
03.01.03.01.12.0 SALIDA PARA CENTRO DE LUZ und 8.00 65.44 523.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 523.52 100.00%
03.01.03.01.12.0 SALIDA PARA TOMACORRIENTES und 8.00 31.94 255.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 255.52 100.00%
03.01.03.02 INSTALACION DE BIODIGESTOR DE 1,300 LTS 3,505.72 2,289.73 0.00 2,289.73 65.31% 0.00 1,215.99
03.01.03.02.01 TRABAJOS PRELIMINARES 13.69 13.69 0.00 13.69 100.00% 0.00 0.00
03.01.03.02.01.0 LIMPIEZA DE TERRENO MANUAL m2 5.05 0.61 3.08 5.1 3.08 100.00% 0.00 0.00% 5.05 3.08 100.00% 0.00 0.00 0.00%
03.01.03.02.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 5.05 2.10 10.61 5.1 10.61 100.00% 0.00 0.00% 5.05 10.61 100.00% 0.00 0.00 0.00%
03.01.03.02.02 MOVIMIENTO DE TIERRAS 477.95 0.00 0.00 0.00 0.00% 0.00 477.95
03.01.03.02.02.0 EXCAVACION DE TERRENO NORMAL m3 8.67 34.92 302.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.67 302.76 100.00%
03.01.03.02.02.0 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 4.19 30.92 129.55 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.19 129.55 100.00%
03.01.03.02.02.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 5.60 8.15 45.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.60 45.64 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
03.01.03.02.03 OBRAS DE CONCRETO SIMPLE 15.37 0.00 0.00 0.00 0.00% 0.00 15.37
03.01.03.02.03.0 CONCRETO F'C= 175 KG/CM2 m3 0.04 384.28 15.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.04 15.37 100.00%
03.01.03.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 722.67 0.00 0.00 0.00 0.00% 0.00 722.67
03.01.03.02.04.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.64 48.31 320.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.64 320.78 100.00%
03.01.03.02.04.0 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODOS m3 0.65 364.74 237.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.65 237.08 100.00%
03.01.03.02.04.0 TARRAJEO CON IMPERMEABILIZANTE m2 5.04 32.70 164.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.04 164.81 100.00%
03.01.03.02.05 BIODIGESTOR DE 1,300 Lts. 2,276.04 2,276.04 0.00 2,276.04 100.00% 0.00 0.00
03.01.03.02.05.0 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 1,300 Lts und 2.00 1,138.02 2,276.04 2.0 2,276.04 100.00% 0.00 0.00% 2.00 2,276.04 100.00% 0.00 0.00 0.00%
03.01.03.03 CONSTRUCCIÓN DE POZO PERCOLADOR 2,864.67 13.03 0.00 13.03 0.45% 0.00 2,851.64
03.01.03.03.01 TRABAJOS PRELIMINARES 13.03 13.03 0.00 13.03 100.00% 0.00 0.00
03.01.03.03.01.0 LIMPIEZA DE TERRENO MANUAL m2 4.81 0.61 2.93 4.8 2.93 100.00% 0.00 0.00% 4.81 2.93 100.00% 0.00 0.00 0.00%
03.01.03.03.01.0 TRAZO Y REPLANTEO PRELIMINAR m2 4.81 2.10 10.10 4.8 10.10 100.00% 0.00 0.00% 4.81 10.10 100.00% 0.00 0.00 0.00%
03.01.03.03.02 MOVIMIENTO DE TIERRAS 634.06 0.00 0.00 0.00 0.00% 0.00 634.06
03.01.03.03.02.0 EXCAVACION DE TERRENO NORMAL m3 10.52 34.92 367.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.52 367.36 100.00%
03.01.03.03.02.0 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 13.15 8.15 107.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.15 107.17 100.00%
03.01.03.03.02.0 RELLENO CON GRAVA 1" m3 1.66 64.85 107.65 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.66 107.65 100.00%
03.01.03.03.02.0 FILTRO DE GRAVA Ø 1" m3 0.80 64.85 51.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.80 51.88 100.00%
03.01.03.03.03 OBRAS DE CONCRETO SIMPLE 546.93 0.00 0.00 0.00 0.00% 0.00 546.93
03.01.03.03.03.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.81 48.31 135.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.81 135.75 100.00%
03.01.03.03.03.0 CONCRETO F'C= 175 KG/CM2 m3 1.07 384.28 411.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.07 411.18 100.00%
03.01.03.03.04 OBRAS DE CONCRETO ARMADO 330.89 0.00 0.00 0.00 0.00% 0.00 330.89
03.01.03.03.04.0 CONCRETO F'C= 175 KG/CM2 m3 0.38 384.28 146.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.38 146.03 100.00%
03.01.03.03.04.0 ENCOFRADO Y DESENCOFRADO NORMAL m2 0.97 48.31 46.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.97 46.86 100.00%
03.01.03.03.04.0 ACERO FY=4200 KG/CM2 kg 20.72 6.66 138.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.72 138.00 100.00%
03.01.03.03.05 MUROS DE LADRILLO 1,339.76 0.00 0.00 0.00 0.00% 0.00 1,339.76
03.01.03.03.05.0 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 CM m2 14.70 91.14 1,339.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.70 1,339.76 100.00%
03.01.04 ESTUDIOS COMPLEMENTARIOS 1,710.00 0.00 490.00 28.65% 490.00 28.65% 0.00 1,220.00
03.01.04.01 DISEÑO DE MEZCLA und 3.00 450.00 1,350.00 0.0 0.00 0.00% 1.00 450.00 33.33% 1.00 450.00 33.33% 2.00 900.00 66.67%
03.01.04.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 9.00 40.00 360.00 0.0 0.00 0.00% 1.00 40.00 11.11% 1.00 40.00 11.11% 8.00 320.00 88.89%
03.01.05 FLETE 47,448.33 37,958.66 4,744.83 90.00% 42,703.50 90.00% 0.00 4,744.83
03.01.05.01 FLETE TERRESTRE Y ACARREO PAMPATAMA GLB 1.00 47,448.33 47,448.33 0.8 37,958.66 80.00% 0.10 4,744.83 10.00% 0.90 42,703.50 90.00% 0.10 4,744.83 10.00%
03.01.06 PROGRAMA DE MITIGACION E IMPACTO AMBIENTAL 8,497.89 0.00 52.12 0.61% 52.12 0.61% 0.00 8,445.77
03.01.06.01 PROGRAMA DE PREVENCION DE MITIGACION 761.04 0.00 52.12 52.12 6.85% 0.00 708.92
03.01.06.01.01 CARTELES PERMANENTES und 5.00 63.56 317.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 317.80 100.00%
03.01.06.01.02 CARTELES TEMPORALES und 5.00 67.80 339.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 339.00 100.00%
03.01.06.01.03 CINTAS DE SEÑAL DE TRABAJO rll 2.00 52.12 104.24 0.0 0.00 0.00% 1.00 52.12 50.00% 1.00 52.12 50.00% 1.00 52.12 50.00%
03.01.06.02 PROGRAMA DE ABANDONO DE OBRA 7,736.85 0.00 0.00 0.00 0.00% 0.00 7,736.85
03.01.06.02.01 REACONDICIONAMIENTO DE AREA OCUPADA (CAMPAMENTO Y MAQUINARIm2 2,000.00 3.22 6,440.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,000.00 6,440.00 100.00%
03.01.06.02.02 REACONDICIONAMIENTO DE CANTERAS Y ACCESOS HA 3.00 157.27 471.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 471.81 100.00%
03.01.06.02.03 REFORESTACION EN CAPTACIONES Y RESERVORIO m2 29.55 27.92 825.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.55 825.04 100.00%
03.01.07 ADECUADO CONOCIMIENTO DE EDUCACION SANITARIA 4,000.00 0.00 2,500.00 62.50% 2,500.00 62.50% 0.00 1,500.00
03.01.07.01 CAPACITACION ANTES DE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 4.00 2,000.00 100.00% 4.00 2,000.00 100.00% 0.00 0.00 0.00%
03.01.07.02 CAPACITACION DURANTE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 1.00 500.00 25.00% 1.00 500.00 25.00% 3.00 1,500.00 75.00%
EFICIENTE GESTION TECNICA Y ADMINISTRATIVA DE LOS SERVICIOS DE
03.01.08 4,000.00 0.00 0.00 0.00% 0.00 0.00% 4,000.00
AGUA Y SANEAMIENTO A TRAVES DEL LAS JASS 0.00
03.01.08.01 PROGRAMA DE FORTALECIMIENTO DE CAPACIDADES PARA LA POBLACION und 4.00 1,000.00 4,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 4,000.00 100.00%

COSTO DIRECTO 895,978.04 143,208.63 45,636.12 5.09% 188,844.76 21.08% 707,133.28 78.92%

TOTAL PRESPUESTO 895,978.04 143,208.63 45,636.12 5.09% 188,844.76 21.08% 707,133.28 78.92%
VALORIZACIÓN DE OBRA N° 03 : CORRESPONDIENTE AL MES : ABRIL 2018

Obra : MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 04

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
04.05 LOCALIDAD DE CCOLLONTA - A 1,462,300.20 543,665.53 262,974.25 17.98% 806,639.77 55.16% 0.00 655,660.43 44.84%
04.05.01 SISTEMA DE AGUA POTABLE 569,635.94 238,499.11 111,343.19 19.55% 349,842.30 61.42% 0.00 219,793.64 38.58%
04.05.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00 0.00%
04.05.01.01.01 OBRAS PROVISIONALES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00 0.00%
04.05.01.01.01.01 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 1,760.72 1,760.72 1.00 1,760.72 100.00% 0.00 0.00% 1.00 1,760.72 100.00% 0.00 0.00 0.00%
04.05.01.01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 797.66 797.66 1.00 797.66 100.00% 0.00 0.00% 1.00 797.66 100.00% 0.00 0.00 0.00%
04.05.01.02 CONSTRUCCION DE CAPTACION TIPO - 1 5,072.96 74.91 0.00 74.91 1.48% 0.00 4,998.05 98.52%
04.05.01.02.01 TRABAJOS PRELIMINARES 74.91 74.91 0.00 74.91 100.00% 0.00 0.00 0.00%
04.05.01.02.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 16.50 2.44 40.26 16.50 40.26 100.00% 0.00 0.00% 16.50 40.26 100.00% 0.00 0.00 0.00%
04.05.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 16.50 2.10 34.65 16.50 34.65 100.00% 0.00 0.00% 16.50 34.65 100.00% 0.00 0.00 0.00%
04.05.01.02.02 MOVIMIENTO DE TIERRAS 887.73 0.00 0.00 0.00 0.00% 0.00 887.73 100.00%
04.05.01.02.02.01 EXCAVACION EN TERRENO NORMAL CAPTACION m3 8.25 39.64 327.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.25 327.03 100.00%
04.05.01.02.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 4.95 40.54 200.67 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.95 200.67 100.00%
04.05.01.02.02.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE (50 M ) m3 10.31 34.92 360.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.31 360.03 100.00%
04.05.01.02.03 CONCRETO SIMPLE 210.73 0.00 0.00 0.00 0.00% 0.00 210.73 100.00%
04.05.01.02.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS m3 0.81 260.16 210.73 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.81 210.73 100.00%
04.05.01.02.04 CONCRETO ARMADO 1,416.99 0.00 0.00 0.00 0.00% 0.00 1,416.99 100.00%
04.05.01.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 10.37 48.31 500.97 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.37 500.97 100.00%
04.05.01.02.04.02 ACERO FY=4200 KG/CM2 kg 61.78 6.66 411.45 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.78 411.45 100.00%
04.05.01.02.04.03 CONCRETO FC=210 KG/CM2 m3 1.22 413.58 504.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.22 504.57 100.00%
04.05.01.02.05 REVOQUES ENLUCIDOS Y MOLDURAS 212.46 0.00 0.00 0.00 0.00% 0.00 212.46 100.00%
04.05.01.02.05.01 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 6.04 20.00 120.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 120.80 100.00%
04.05.01.02.05.02 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 3.29 27.86 91.66 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.29 91.66 100.00%
04.05.01.02.06 VALVULAS Y TAPAS Y ACCESORIOS 603.49 0.00 0.00 0.00 0.00% 0.00 603.49 100.00%
04.05.01.02.06.01 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.60X0.60M und 0.36 352.51 126.90 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.36 126.90 100.00%
04.05.01.02.06.02 SUMINISTRO E INST. VALVULA COMPUERTA H. DUCTIL, Y ACCESORIO und 1.00 429.91 429.91 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 429.91 100.00%
04.05.01.02.06.03 CODO FºDº DN 160X90º ISO ED und 4.00 11.67 46.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 46.68 100.00%
04.05.01.02.07 FILTROS 59.77 0.00 0.00 0.00 0.00% 0.00 59.77 100.00%
04.05.01.02.07.01 FILTROS DE GRAVA m3 0.22 109.19 24.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.22 24.02 100.00%
04.05.01.02.07.02 FILTROS DE ARENA m3 0.29 123.26 35.75 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.29 35.75 100.00%
04.05.01.02.08 PINTURA 173.78 0.00 0.00 0.00 0.00% 0.00 173.78 100.00%
04.05.01.02.08.01 PINTURA EN TAPAS METALICAS m2 1.04 22.08 22.96 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.04 22.96 100.00%
04.05.01.02.08.02 PINTURA EN MUROS EXTERIORES (CAPTACION) m2 6.04 24.97 150.82 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 150.82 100.00%
04.05.01.02.09 CERCO PERIMETRICO 1,433.10 0.00 0.00 0.00 0.00 0.00% 0.00 1,433.10 100.00%
04.05.01.02.09.01 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 51.00 28.10 1,433.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.00 1,433.10 100.00%
04.05.01.03 LINEA DE CONDUCCION 3,179.92 3,179.92 0.00 3,179.92 100.00% 0.00 0.00 0.00%
04.05.01.03.01 TENDIDO DE TUBERIA PVC SAP 3,179.92 3,179.92 0.00 3,179.92 100.00% 0.00 0.00 0.00%
04.05.01.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 36.08 2.10 75.77 36.08 75.77 100.00% 0.00 0.00% 36.08 75.77 100.00% 0.00 0.00 0.00%
04.05.01.03.01.02 EXCAVACION MANUAL DE ZANJA DE TERRENO CONGLOMERADO m3 21.05 34.92 735.07 21.05 735.07 100.00% 0.00 0.00% 21.05 735.07 100.00% 0.00 0.00 0.00%
04.05.01.03.01.03 REFINE Y NIVELACION DE ZANJA m 60.14 4.08 245.37 60.14 245.37 100.00% 0.00 0.00% 60.14 245.37 100.00% 0.00 0.00 0.00%
04.05.01.03.01.04 CAMA DE APOYO E=10CM. m 60.14 1.66 99.83 60.14 99.83 100.00% 0.00 0.00% 60.14 99.83 100.00% 0.00 0.00 0.00%
04.05.01.03.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 10.10 23.80 240.38 10.10 240.38 100.00% 0.00 0.00% 10.10 240.38 100.00% 0.00 0.00 0.00%
04.05.01.03.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 15.16 57.17 866.70 15.16 866.70 100.00% 0.00 0.00% 15.16 866.70 100.00% 0.00 0.00 0.00%
04.05.01.03.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 15.16 8.15 123.55 15.16 123.55 100.00% 0.00 0.00% 15.16 123.55 100.00% 0.00 0.00 0.00%
04.05.01.03.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1/2" m 60.14 12.29 739.12 60.14 739.12 100.00% 0.00 0.00% 60.14 739.12 100.00% 0.00 0.00 0.00%
04.05.01.03.01.09 PRUEBA HIDRAULICA DE LA LINEA DE CONDUCCION m 60.14 0.90 54.13 60.14 54.13 100.00% 0.00 0.00% 60.14 54.13 100.00% 0.00 0.00 0.00%
04.05.01.04 RESERVORIO (15 M3) 20,894.05 100.05 0.00 100.05 0.48% 0.00 20,794.00 99.52%
04.05.01.04.01 RESERVORIO 16,818.75 72.64 0.00 72.64 0.43% 0.00 16,746.11 99.57%
04.05.01.04.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 16.00 2.44 39.04 16.00 39.04 100.00% 0.00 0.00% 16.00 39.04 100.00% 0.00 0.00 0.00%
04.05.01.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 16.00 2.10 33.60 16.00 33.60 100.00% 0.00 0.00% 16.00 33.60 100.00% 0.00 0.00 0.00%
04.05.01.04.01.03 EXCAVACION EN TERRENO NORMAL RESERVORIO m3 8.00 34.92 279.36 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 279.36 100.00%
04.05.01.04.01.04 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 10.00 14.23 142.30 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 142.30 100.00%
04.05.01.04.01.05 SOLADO C:H 1:8 (h= 0.10 m) m2 1.66 189.58 314.70 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.66 314.70 100.00%
04.05.01.04.01.06 CONCRETO F'C= 210 KG/CM2 EN RESERVORIO m3 7.52 413.58 3,110.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.52 3,110.12 100.00%
04.05.01.04.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 54.77 48.31 2,645.94 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.77 2,645.94 100.00%
04.05.01.04.01.08 ACERO FY=4200 KG/CM2 kg 359.76 6.66 2,396.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 359.76 2,396.00 100.00%
04.05.01.04.01.09 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 52.61 27.86 1,465.71 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.61 1,465.71 100.00%
04.05.01.04.01.10 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 52.61 20.00 1,052.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.61 1,052.20 100.00%
04.05.01.04.01.11 TAPA SANITARIA METALICA DE 0.60x0.60 mts und 2.00 197.60 395.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 395.20 100.00%
04.05.01.04.01.12 INSTALACION DE ACCESORIOS TUB. VENTILACION 2" und 1.00 118.31 118.31 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 118.31 100.00%
04.05.01.04.01.13 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS DE 3/4" und 1.00 496.89 496.89 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 496.89 100.00%
VALORIZACIÓN DE OBRA N° 03 : CORRESPONDIENTE AL MES : ABRIL 2018

Obra : MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 04

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
04.05.01.04.01.14 INSTALACION DE ACCESORIOS EN RESERVORIO und 1.00 872.43 872.43 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 872.43 100.00%
04.05.01.04.01.15 PINTADO DE MURO EXTERIOR m2 32.59 15.54 506.45 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 32.59 506.45 100.00%
04.05.01.04.01.16 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 105.00 28.10 2,950.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 105.00 2,950.50 100.00%
04.05.01.04.02 CASETA DE CLORACION POR GOTEO 4,075.30 27.41 0.00 27.41 0.67% 0.00 4,047.89 99.33%
04.05.01.04.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.05 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
04.05.01.04.02.02 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5 m2 11.54 71.15 821.07 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.54 821.07 100.00%
04.05.01.04.02.03 TARRAJEO EN INTERIORES Y EXTERIORES m2 20.50 28.40 582.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.50 582.20 100.00%
04.05.01.04.02.04 REJILLA METALICA SEGUN DISEÑO INC. COLOCADO und 1.00 421.12 421.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 421.12 100.00%
04.05.01.04.02.05 COBERTURA DE CALAMINA EN CASETA DE CLORACION m2 4.00 58.15 232.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 232.60 100.00%
04.05.01.04.02.06 INSTALACION DE PUERTA METÁLICA (SEGÚN DISEÑO) und 1.00 257.57 257.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 257.57 100.00%
04.05.01.04.02.07 INSTALACION DE ACCESORIOS EN CASETA DE CLORACION und 1.00 1,557.57 1,557.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,557.57 100.00%
04.05.01.04.02.08 PINTADO DE MURO EXTERIOR m2 11.31 15.54 175.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 175.76 100.00%
04.05.01.05 LINEA DE ADUCCION Y RED DE DISTRIBUCION 496,920.32 228,107.68 96,954.06 325,061.74 65.42% 0.00 171,858.58 34.58%
04.05.01.05.01 TENDIDO DE TUBERIA DE ADUCCION Y DISTRIBUCION PVC SAP 433,976.54 227,849.36 96,954.06 324,803.42 74.84% 0.00 109,173.12 25.16%
04.05.01.05.01.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 4,520.98 8.03 36,303.47 4,520.98 36,303.47 100.00% 0.00 0.00% 4,520.98 36,303.47 100.00% 0.00 0.00 0.00%
04.05.01.05.01.02 EXCAVACION MANUAL ZANJA EN TERRENO CONGLOMERADO m3 2,637.24 58.58 154,489.52 1,541.70 90,312.79 58.46% 901.14 52,788.78 34.17% 2,442.84 143,101.57 92.63% 194.40 11,387.95 7.37%
04.05.01.05.01.03 REFINE Y NIVELACION DE ZANJA m 7,534.96 2.04 15,371.32 4,404.86 8,985.91 58.46% 2,574.68 5,252.35 34.17% 6,979.54 14,238.26 92.63% 555.42 1,133.06 7.37%
04.05.01.05.01.04 CAMA DE APOYO E=10CM. m 7,534.96 1.66 12,508.03 4,404.86 7,312.07 58.46% 2,574.68 4,273.97 34.17% 6,979.54 11,586.04 92.63% 555.42 921.99 7.37%
04.05.01.05.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 1,265.87 23.80 30,127.71 701.50 16,695.70 55.42% 432.55 10,294.69 34.17% 1,134.05 26,990.39 89.59% 131.82 3,137.32 10.41%
04.05.01.05.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 1,898.81 57.17 108,554.97 375.00 21,438.75 19.75% 162.20 9,272.97 8.54% 537.20 30,711.72 28.29% 1,361.61 77,843.25 71.71%
04.05.01.05.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 1,898.81 8.15 15,475.30 375.00 3,056.25 19.75% 162.20 1,321.93 8.54% 537.20 4,378.18 28.29% 1,361.61 11,097.12 71.71%
04.05.01.05.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-5 Ø 2" m 1,700.03 14.16 24,072.42 1,700.03 24,072.42 100.00% 0.00 0.00% 1,700.03 24,072.42 100.00% 0.00 0.00 0.00%
04.05.01.05.01.09 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 2" m 243.43 14.16 3,446.97 243.43 3,446.97 100.00% 0.00 0.00% 243.43 3,446.97 100.00% 0.00 0.00 0.00%
04.05.01.05.01.10 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1/2" m 468.67 12.29 5,759.95 314.86 3,869.63 67.18% 0.00 0.00% 314.86 3,869.63 67.18% 153.81 1,890.32 32.82%
04.05.01.05.01.11 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 2,092.33 4.30 8,997.02 1,590.00 6,837.00 75.99% 311.80 1,340.74 14.90% 1,901.80 8,177.74 90.89% 190.53 819.28 9.11%
04.05.01.05.01.12 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 3/4" m 3,030.50 3.79 11,485.60 520.00 1,970.80 17.16% 2,332.14 8,838.81 76.96% 2,852.14 10,809.61 94.11% 178.36 675.99 5.89%
04.05.01.05.01.13 PRUEBA HIDRAULICA m 7,534.96 0.98 7,384.26 3,620.00 3,547.60 48.04% 3,642.67 3,569.82 48.34% 7,262.67 7,117.42 96.39% 272.29 266.84 3.61%
04.05.01.05.02 VALVULA DE CONTROL 15,480.25 33.17 0.00 33.17 0.21% 0.00 15,447.08 99.79%
04.05.01.05.02.01 LIMPIEZA DE TERRENO MANUAL m2 12.24 0.61 7.47 12.24 7.47 100.00% 0.00 0.00% 12.24 7.47 100.00% 0.00 0.00 0.00%
04.05.01.05.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 12.24 2.10 25.70 12.24 25.70 100.00% 0.00 0.00% 12.24 25.70 100.00% 0.00 0.00 0.00%
04.05.01.05.02.03 EXCAVACION DE ZANJA m3 4.90 34.92 171.11 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.90 171.11 100.00%
04.05.01.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 6.12 8.15 49.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.12 49.88 100.00%
04.05.01.05.02.05 CONCRETO F'C= 175 KG/CM2 m3 2.72 384.28 1,045.24 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.72 1,045.24 100.00%
04.05.01.05.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 54.40 48.31 2,628.06 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.40 2,628.06 100.00%
04.05.01.05.02.07 TARRAJEO CON IMPERMEABILIZANTE m2 54.40 29.19 1,587.94 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.40 1,587.94 100.00%
04.05.01.05.02.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 21.76 28.40 617.98 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.76 617.98 100.00%
04.05.01.05.02.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 4.00 512.25 2,049.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2,049.00 100.00%
04.05.01.05.02.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 34.00 213.49 7,258.66 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 34.00 7,258.66 100.00%
04.05.01.05.02.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.54 72.62 39.21 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.54 39.21 100.00%
04.05.01.05.03 VALVULA DE PURGA 16,355.03 105.37 0.00 105.37 0.64% 0.00 16,249.66 99.36%
04.05.01.05.03.01 LIMPIEZA DE TERRENO MANUAL m2 38.88 0.61 23.72 38.88 23.72 100.00% 0.00 0.00% 38.88 23.72 100.00% 0.00 0.00 0.00%
04.05.01.05.03.02 TRAZO Y REPLANTEO PRELIMINAR m2 38.88 2.10 81.65 38.88 81.65 100.00% 0.00 0.00% 38.88 81.65 100.00% 0.00 0.00 0.00%
04.05.01.05.03.03 EXCAVACION DE ZANJA m3 27.22 34.92 950.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.22 950.52 100.00%
04.05.01.05.03.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 34.02 8.15 277.26 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 34.02 277.26 100.00%
04.05.01.05.03.05 CONCRETO F'C= 175 KG/CM2 m3 4.10 384.28 1,575.55 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.10 1,575.55 100.00%
04.05.01.05.03.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 81.00 48.31 3,913.11 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 81.00 3,913.11 100.00%
04.05.01.05.03.07 TARRAJEO CON IMPERMEABILIZANTE m2 75.60 29.19 2,206.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.60 2,206.76 100.00%
04.05.01.05.03.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 30.24 28.40 858.82 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.24 858.82 100.00%
04.05.01.05.03.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN CAJA GLB 3.00 224.06 672.18 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 672.18 100.00%
04.05.01.05.03.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 27.00 213.49 5,764.23 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.00 5,764.23 100.00%
04.05.01.05.03.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.43 72.62 31.23 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.43 31.23 100.00%
04.05.01.05.04 CAMARA ROMPE PRESION T - VII 31,108.50 119.78 0.00 119.78 0.39% 0.00 30,988.72 99.61%
04.05.01.05.04.01 LIMPIEZA DE TERRENO MANUAL m2 44.20 0.61 26.96 44.20 26.96 100.00% 0.00 0.00% 44.20 26.96 100.00% 0.00 0.00 0.00%
04.05.01.05.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 44.20 2.10 92.82 44.20 92.82 100.00% 0.00 0.00% 44.20 92.82 100.00% 0.00 0.00 0.00%
04.05.01.05.04.03 EXCAVACION DE ZANJA m3 39.83 34.92 1,390.86 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.83 1,390.86 100.00%
04.05.01.05.04.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 49.79 8.15 405.79 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.79 405.79 100.00%
04.05.01.05.04.05 CONCRETO F'C= 175 KG/CM2 m3 12.16 384.28 4,672.84 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.16 4,672.84 100.00%
04.05.01.05.04.06 ACERO FY=4200 KG/CM2 kg 404.25 6.66 2,692.31 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 404.25 2,692.31 100.00%
04.05.01.05.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 180.13 48.31 8,702.08 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 180.13 8,702.08 100.00%
04.05.01.05.04.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 65.80 46.31 3,047.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 65.80 3,047.20 100.00%
04.05.01.05.04.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C.R.P. TIGLB 20.00 205.99 4,119.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.00 4,119.80 100.00%
VALORIZACIÓN DE OBRA N° 03 : CORRESPONDIENTE AL MES : ABRIL 2018

Obra : MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 04

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
04.05.01.05.04.10 TAPA METALICA Y MARCO DE 0.60x0.60m y 0.30x0.30m e=1/8" EN C.R.P. und 20.00 278.02 5,560.40 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.00 5,560.40 100.00%
04.05.01.05.04.11 PINTURA EN TAPAS METALICAS m2 18.00 22.08 397.44 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 397.44 100.00%
04.05.01.06 CONEXIONES DOMICILIARIAS 41,010.31 4,478.17 14,389.13 18,867.30 46.01% 0.00 22,143.01 53.99%
04.05.01.06.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 557.68 8.03 4,478.17 557.68 4,478.17 100.00% 0.00 0.00% 557.68 4,478.17 100.00% 0.00 0.00 0.00%
04.05.01.06.02 EXCAVACION MANUAL DE ZANJA EN TERRENO CONGLOMERADO m3 278.84 23.12 6,446.78 0.00 0.00 0.00% 125.48 2,901.10 45.00% 125.48 2,901.10 45.00% 153.36 3,545.68 55.00%
04.05.01.06.03 REFINE Y NIVELACION DE ZANJA m 929.46 4.08 3,792.20 0.00 0.00 0.00% 418.26 1,706.50 45.00% 418.26 1,706.50 45.00% 511.20 2,085.70 55.00%
04.05.01.06.04 CAMA DE APOYO E=10CM. m 929.46 1.66 1,542.90 0.00 0.00 0.00% 418.26 694.31 45.00% 418.26 694.31 45.00% 511.20 848.59 55.00%
04.05.01.06.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 276.05 23.80 6,569.99 0.00 0.00 0.00% 124.22 2,956.44 45.00% 124.22 2,956.44 45.00% 151.83 3,613.55 55.00%
04.05.01.06.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 30.67 57.17 1,753.40 0.00 0.00 0.00% 13.80 788.95 45.00% 13.80 788.95 45.00% 16.87 964.45 55.00%
04.05.01.06.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 30.67 8.15 249.96 0.00 0.00 0.00% 13.80 112.47 45.00% 13.80 112.47 45.00% 16.87 137.49 55.00%
04.05.01.06.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" m 929.46 3.46 3,215.93 0.00 0.00 0.00% 418.26 1,447.18 45.00% 418.26 1,447.18 45.00% 511.20 1,768.75 55.00%
04.05.01.06.09 CONEXIÓN DOMICILIARIA INC. CAJA DE AGUA POTABLE MATRIZ Ø 1 1/2" und 89.00 136.23 12,124.47 0.00 0.00 0.00% 25.00 3,405.75 28.09% 25.00 3,405.75 28.09% 64.00 8,718.72 71.91%
04.05.01.06.10 PRUEBA HIDRAULICA EN TUBERIA INSTALADA m 929.46 0.90 836.51 0.00 0.00 0.00% 418.26 376.43 45.00% 418.26 376.43 45.00% 511.20 460.08 55.00%
04.05.02 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO DOMICILIARIAS 783,821.83 230,752.51 145,879.71 18.61% 376,632.21 48.05% 0.00 407,189.62 51.95%
04.05.02.01 CONSTRUCCION DE CASETA DE BAÑO 518,474.91 134,332.33 80,577.93 214,910.27 41.45% 0.00 303,564.64 58.55%
04.05.02.01.01 OBRAS PROVISIONALES 3,518.51 3,518.51 0.00 3,518.51 100.00% 0.00 0.00 0.00%
04.05.02.01.01.01 LETRINAS DE HOYO SECO VENTILADO (PARA PERSONAL OBRERO) 1,904.75 1,904.75 0.00 1,904.75 100.00% 0.00 0.00 0.00%
04.05.02.01.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.38 0.61 2.06 3.38 2.06 100.00% 0.00 0.00% 3.38 2.06 100.00% 0.00 0.00 0.00%
04.05.02.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.38 2.10 7.10 3.38 7.10 100.00% 0.00 0.00% 3.38 7.10 100.00% 0.00 0.00 0.00%
04.05.02.01.01.01.03 EXCAVACION DE ZANJA m3 6.42 34.92 224.19 6.42 224.19 100.00% 0.00 0.00% 6.42 224.19 100.00% 0.00 0.00 0.00%
04.05.02.01.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.03 8.15 65.44 8.03 65.44 100.00% 0.00 0.00% 8.03 65.44 100.00% 0.00 0.00 0.00%
04.05.02.01.01.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.24 48.31 301.45 6.24 301.45 100.00% 0.00 0.00% 6.24 301.45 100.00% 0.00 0.00 0.00%
04.05.02.01.01.01.06 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.94 364.59 342.71 0.94 342.71 100.00% 0.00 0.00% 0.94 342.71 100.00% 0.00 0.00 0.00%
04.05.02.01.01.01.07 ACERO FY=4200 KG/CM2 kg 18.14 6.66 120.81 18.14 120.81 100.00% 0.00 0.00% 18.14 120.81 100.00% 0.00 0.00 0.00%
04.05.02.01.01.01.08 CONCRETO F'C= 175 KG/CM2 m3 0.17 384.28 65.33 0.17 65.33 100.00% 0.00 0.00% 0.17 65.33 100.00% 0.00 0.00 0.00%
04.05.02.01.01.01.09 CASETA PARA LETRINAS INC. PUERTA DE CALAMINA und 2.00 346.09 692.18 2.00 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
04.05.02.01.01.01.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.00 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
04.05.02.01.01.02 DUCHAS O VESTUARIOS (PARA PERSONAL OBRERO) 1,335.92 1,335.92 0.00 1,335.92 100.00% 0.00 0.00 0.00%
04.05.02.01.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 4.00 0.61 2.44 4.00 2.44 100.00% 0.00 0.00% 4.00 2.44 100.00% 0.00 0.00 0.00%
04.05.02.01.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.10 8.40 4.00 8.40 100.00% 0.00 0.00% 4.00 8.40 100.00% 0.00 0.00 0.00%
04.05.02.01.01.02.03 EXCAVACION DE ZANJA m3 2.04 34.92 71.24 2.04 71.24 100.00% 0.00 0.00% 2.04 71.24 100.00% 0.00 0.00 0.00%
04.05.02.01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.55 8.15 20.78 2.55 20.78 100.00% 0.00 0.00% 2.55 20.78 100.00% 0.00 0.00 0.00%
04.05.02.01.01.02.05 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 2.00 72.62 145.24 2.00 145.24 100.00% 0.00 0.00% 2.00 145.24 100.00% 0.00 0.00 0.00%
04.05.02.01.01.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.40 48.31 115.94 2.40 115.94 100.00% 0.00 0.00% 2.40 115.94 100.00% 0.00 0.00 0.00%
04.05.02.01.01.02.07 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.27 364.59 98.44 0.27 98.44 100.00% 0.00 0.00% 0.27 98.44 100.00% 0.00 0.00 0.00%
04.05.02.01.01.02.08 CASETA PARA DUCHAS INC. PUERTA DE CALAMINA m2 2.00 346.09 692.18 2.00 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
04.05.02.01.01.02.09 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 2.00 48.89 97.78 2.00 97.78 100.00% 0.00 0.00% 2.00 97.78 100.00% 0.00 0.00 0.00%
04.05.02.01.01.02.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.00 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
04.05.02.01.01.03 LAVADERO DE GRANITO (PARA PERSONAL OBRERO) 277.84 277.84 0.00 0.00 277.84 100.00% 0.00 0.00 0.00%
04.05.02.01.01.03.01 SUMINISTRO E INSTALACIÓN DE LAVADERO DE GRANITO und 2.00 138.92 277.84 2.00 277.84 100.00% 0.00 0.00% 2.00 277.84 100.00% 0.00 0.00 0.00%
04.05.02.01.02 TRABAJOS PRELIMINARES 1,855.97 1,269.78 479.64 1,749.41 94.26% 0.00 106.56 5.74%
04.05.02.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 684.86 0.61 417.76 468.55 285.82 68.42% 176.99 107.96 25.84% 645.54 393.78 94.26% 39.32 23.98 5.74%
04.05.02.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 684.86 2.10 1,438.21 468.55 983.96 68.42% 176.99 371.68 25.84% 645.54 1,355.63 94.26% 39.32 82.58 5.74%
04.05.02.01.03 MOVIMIENTO DE TIERRAS 14,371.63 4,813.16 5,013.35 9,826.51 68.37% 0.00 4,545.12 31.63%
04.05.02.01.03.01 EXCAVACION DE TERRENO NORMAL m3 167.75 34.92 5,857.83 113.09 3,949.10 67.42% 43.35 1,513.78 25.84% 156.44 5,462.88 93.26% 11.31 394.95 6.74%
04.05.02.01.03.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 209.69 8.15 1,708.97 106.02 864.06 50.56% 54.19 441.65 25.84% 160.21 1,305.71 76.40% 49.48 403.26 23.60%
04.05.02.01.03.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 71.21 95.56 6,804.83 0.00 0.00 0.00% 32.00 3,057.92 44.94% 32.00 3,057.92 44.94% 39.21 3,746.91 55.06%
04.05.02.01.04 OBRAS DE CONCRETO SIMPLE 91,470.71 33,694.38 12,915.55 46,609.94 50.96% 0.00 44,860.77 49.04%
04.05.02.01.04.01 CIMIENTOS CORRIDOS 21,271.11 14,340.07 5,497.03 19,837.10 93.26% 0.00 1,434.01 6.74%
04.05.02.01.04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 91.67 232.04 21,271.11 61.80 14,340.07 67.42% 23.69 5,497.03 25.84% 85.49 19,837.10 93.26% 6.18 1,434.01 6.74%
04.05.02.01.04.02 SOBRECIMIENTOS 28,710.17 19,354.31 7,418.52 26,772.84 93.25% 0.00 1,937.33 6.75%
04.05.02.01.04.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 420.08 44.52 18,701.96 283.20 12,608.06 67.42% 108.56 4,833.09 25.84% 391.76 17,441.16 93.26% 28.32 1,260.80 6.74%
04.05.02.01.04.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 31.51 317.62 10,008.21 21.24 6,746.25 67.41% 8.14 2,585.43 25.83% 29.38 9,331.68 93.24% 2.13 676.53 6.76%
04.05.02.01.04.03 PISO INTERIOR 8,819.58 0.00 0.00 0.00 0.00% 0.00 8,819.58 100.00%
04.05.02.01.04.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO CEMENTO P m2 196.69 44.84 8,819.58 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 196.69 8,819.58 100.00%
04.05.02.01.04.04 SARDINEL DE DUCHA 1,699.38 0.00 0.00 0.00 0.00% 0.00 1,699.38 100.00%
04.05.02.01.04.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 29.37 48.31 1,418.86 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.37 1,418.86 100.00%
04.05.02.01.04.04.02 CONCRETO F'C= 175 KG/CM2 m3 0.73 384.28 280.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.73 280.52 100.00%
04.05.02.01.04.05 VEREDA PERIMETRAL 30,970.47 0.00 0.00 0.00 0.00% 0.00 30,970.47 100.00%
04.05.02.01.04.05.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 98.79 42.84 4,232.16 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.79 4,232.16 100.00%
04.05.02.01.04.05.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑADO m2 404.51 44.84 18,138.23 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 404.51 18,138.23 100.00%
VALORIZACIÓN DE OBRA N° 03 : CORRESPONDIENTE AL MES : ABRIL 2018

Obra : MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 04

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
04.05.02.01.04.05.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 23.60 364.41 8,600.08 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.60 8,600.08 100.00%
04.05.02.01.05 OBRAS DE CONCRETO ARMADO 85,131.05 58,371.33 9,232.17 67,603.51 79.41% 0.00 17,527.54 20.59%
04.05.02.01.05.01 COLUMNAS 60,275.42 54,180.08 2,809.85 56,989.93 94.55% 0.00 3,285.49 5.45%
04.05.02.01.05.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 26.70 384.28 10,260.28 24.00 9,222.72 89.89% 0.00 0.00% 24.00 9,222.72 89.89% 2.70 1,037.56 10.11%
04.05.02.01.05.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 569.60 45.29 25,797.18 512.00 23,188.48 89.89% 32.00 1,449.28 5.62% 544.00 24,637.76 95.51% 25.60 1,159.42 4.49%
04.05.02.01.05.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 3,636.33 6.66 24,217.96 3,268.60 21,768.88 89.89% 204.29 1,360.57 5.62% 3,472.89 23,129.45 95.51% 163.44 1,088.51 4.49%
04.05.02.01.05.02 VIGAS 24,855.63 4,191.25 6,422.32 10,613.58 42.70% 0.00 14,242.05 57.30%
04.05.02.01.05.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 15.22 384.28 5,848.74 2.57 987.60 16.89% 3.93 1,510.22 25.82% 6.50 2,497.82 42.71% 8.72 3,350.92 57.29%
04.05.02.01.05.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 279.02 50.83 14,182.59 47.03 2,390.53 16.86% 72.11 3,665.35 25.84% 119.14 6,055.89 42.70% 159.88 8,126.70 57.30%
04.05.02.01.05.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 724.37 6.66 4,824.30 122.09 813.12 16.85% 187.20 1,246.75 25.84% 309.29 2,059.87 42.70% 415.08 2,764.43 57.30%
04.05.02.01.06 MUROS DE LADRILLO 53,946.16 31,079.33 13,941.38 45,020.71 83.45% 0.00 8,925.45 16.55%
04.05.02.01.06.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5 m2 743.06 72.60 53,946.16 428.09 31,079.33 57.61% 192.03 13,941.38 25.84% 620.12 45,020.71 83.45% 122.94 8,925.45 16.55%
04.05.02.01.07 REVOQUES Y ENLUCIDOS 56,631.30 0.00 3,181.65 3,181.65 5.62% 0.00 53,449.65 94.38%
04.05.02.01.07.01 ZÓCALO: TARRAJEADO Y PULIDO CON IMPERMEABILIZANTE / MEZCLAm2 569.60 38.45 21,901.12 0.00 0.00 0.00% 32.00 1,230.40 5.62% 32.00 1,230.40 5.62% 537.60 20,670.72 94.38%
04.05.02.01.07.02 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 508.19 20.82 10,580.52 0.00 0.00 0.00% 28.55 594.41 5.62% 28.55 594.41 5.62% 479.64 9,986.11 94.38%
04.05.02.01.07.03 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS Y ESQUI m2 635.91 24.59 15,637.03 0.00 0.00 0.00% 35.73 878.60 5.62% 35.73 878.60 5.62% 600.18 14,758.43 94.38%
04.05.02.01.07.04 BRUÑA DE 1 CM m 600.75 14.17 8,512.63 0.00 0.00 0.00% 33.75 478.24 5.62% 33.75 478.24 5.62% 567.00 8,034.39 94.38%
04.05.02.01.08 PINTURA 13,830.84 0.00 0.00 0.00 0.00% 0.00 13,830.84 100.00%
04.05.02.01.08.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 508.19 11.37 5,778.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 508.19 5,778.12 100.00%
04.05.02.01.08.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINAS EXTE m2 578.50 13.92 8,052.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 578.50 8,052.72 100.00%
04.05.02.01.09 COBERTURA LIVIANA PARA TECHO 34,964.90 0.00 7,071.55 7,071.55 20.22% 0.00 27,893.35 79.78%
04.05.02.01.09.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 267.00 38.28 10,220.76 0.00 0.00 0.00% 54.00 2,067.12 20.22% 54.00 2,067.12 20.22% 213.00 8,153.64 79.78%
04.05.02.01.09.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 3.00 m und 356.00 25.91 9,223.96 0.00 0.00 0.00% 72.00 1,865.52 20.22% 72.00 1,865.52 20.22% 284.00 7,358.44 79.78%
04.05.02.01.09.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.30 mm m2 640.80 24.22 15,520.18 0.00 0.00 0.00% 129.60 3,138.91 20.22% 129.60 3,138.91 20.22% 511.20 12,381.27 79.78%
04.05.02.01.10 CARPINTERIA DE MADERA 35,243.11 0.00 0.00 0.00 0.00% 0.00 35,243.11 100.00%
04.05.02.01.10.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/TRIPLAY und 89.00 304.49 27,099.61 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 89.00 27,099.61 100.00%
04.05.02.01.10.02 SUMIN. E INSTAL. DE VENTANA DE MADERA SEGUN DISEÑO und 89.00 91.50 8,143.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 89.00 8,143.50 100.00%
04.05.02.01.11 INSTALACIONES SANITARIAS 86,846.63 1,585.84 25,964.04 27,549.88 31.72% 0.00 59,296.75 68.28%
04.05.02.01.11.01 TRABAJOS PRELIMINARES 1,585.84 1,585.84 0.00 0.00 1,585.84 100.00% 0.00 0.00 0.00%
04.05.02.01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 585.18 0.61 356.96 585.18 356.96 100.00% 0.00 0.00% 585.18 356.96 100.00% 0.00 0.00 0.00%
04.05.02.01.11.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 585.18 2.10 1,228.88 585.18 1,228.88 100.00% 0.00 0.00% 585.18 1,228.88 100.00% 0.00 0.00 0.00%
04.05.02.01.11.02 MOVIMIENTO DE TIERRAS 20,838.81 0.00 3,512.49 3,512.49 16.86% 0.00 17,326.32 83.14%
04.05.02.01.11.02.01 EXCAVACION DE TERRENO NORMAL m3 289.58 34.92 10,112.13 0.00 0.00 0.00% 48.81 1,704.45 16.86% 48.81 1,704.45 16.86% 240.77 8,407.68 83.14%
04.05.02.01.11.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 256.65 40.54 10,404.59 0.00 0.00 0.00% 43.26 1,753.76 16.86% 43.26 1,753.76 16.86% 213.39 8,650.83 83.14%
04.05.02.01.11.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 39.52 8.15 322.09 0.00 0.00 0.00% 6.66 54.28 16.85% 6.66 54.28 16.85% 32.86 267.81 83.15%
04.05.02.01.11.03 TUBERIAS Y ACCESORIOS 30,100.51 0.00 5,073.12 5,073.12 16.85% 0.00 25,027.39 83.15%
04.05.02.01.11.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 267.00 23.00 6,141.00 0.00 0.00 0.00% 45.00 1,035.00 16.85% 45.00 1,035.00 16.85% 222.00 5,106.00 83.15%
04.05.02.01.11.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + ACCESORIO und 89.00 63.39 5,641.71 0.00 0.00 0.00% 15.00 950.85 16.85% 15.00 950.85 16.85% 74.00 4,690.86 83.15%
04.05.02.01.11.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 400.50 5.14 2,058.57 0.00 0.00 0.00% 67.50 346.95 16.85% 67.50 346.95 16.85% 333.00 1,711.62 83.15%
04.05.02.01.11.03.04 TUBERIA PVC SAL Ø 2" m 872.20 7.99 6,968.88 0.00 0.00 0.00% 147.00 1,174.53 16.85% 147.00 1,174.53 16.85% 725.20 5,794.35 83.15%
04.05.02.01.11.03.05 TUBERIA PVC SAL Ø 4" m 729.80 12.73 9,290.35 0.00 0.00 0.00% 123.00 1,565.79 16.85% 123.00 1,565.79 16.85% 606.80 7,724.56 83.15%
04.05.02.01.11.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 34,321.47 0.00 17,378.43 17,378.43 50.63% 0.00 16,943.04 49.37%
04.05.02.01.11.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 188.24 48.31 9,093.87 0.00 0.00 0.00% 95.18 4,598.15 50.56% 95.18 4,598.15 50.56% 93.06 4,495.72 49.44%
04.05.02.01.11.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 17.24 265.70 4,580.67 0.00 0.00 0.00% 8.81 2,340.82 51.10% 8.81 2,340.82 51.10% 8.43 2,239.85 48.90%
04.05.02.01.11.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 128.16 32.70 4,190.83 0.00 0.00 0.00% 64.80 2,118.96 50.56% 64.80 2,118.96 50.56% 63.36 2,071.87 49.44%
04.05.02.01.11.04.04 SALIDA DE DESAGUE PVC-SAL 2" pto 178.00 41.74 7,429.72 0.00 0.00 0.00% 90.00 3,756.60 50.56% 90.00 3,756.60 50.56% 88.00 3,673.12 49.44%
04.05.02.01.11.04.05 SALIDA DE DESAGUE PVC-SAL 4" pto 89.00 42.49 3,781.61 0.00 0.00 0.00% 45.00 1,912.05 50.56% 45.00 1,912.05 50.56% 44.00 1,869.56 49.44%
04.05.02.01.11.04.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 89.00 58.93 5,244.77 0.00 0.00 0.00% 45.00 2,651.85 50.56% 45.00 2,651.85 50.56% 44.00 2,592.92 49.44%
04.05.02.01.12 APARATOS Y ACCESORIOS SANITARIOS 24,177.74 0.00 0.00 0.00 0.00% 0.00 24,177.74 100.00%
04.05.02.01.12.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0.74 M und 89.00 148.78 13,241.42 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 89.00 13,241.42 100.00%
04.05.02.01.12.02 SUMINISTRO E INSTALACION DE LAVATORIO und 89.00 73.99 6,585.11 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 89.00 6,585.11 100.00%
04.05.02.01.12.03 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 89.00 48.89 4,351.21 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 89.00 4,351.21 100.00%
04.05.02.01.13 INSTALACIONES ELECTRICAS 16,486.36 0.00 2,778.60 2,778.60 16.85% 0.00 13,707.76 83.15%
04.05.02.01.13.01 SALIDA PARA INTERRUPTOR DOBLE und 89.00 22.42 1,995.38 0.00 0.00 0.00% 15.00 336.30 16.85% 15.00 336.30 16.85% 74.00 1,659.08 83.15%
04.05.02.01.13.02 SALIDA PARA CENTRO DE LUZ und 178.00 65.44 11,648.32 0.00 0.00 0.00% 30.00 1,963.20 16.85% 30.00 1,963.20 16.85% 148.00 9,685.12 83.15%
04.05.02.01.13.03 SALIDA PARA TOMACORRIENTES und 89.00 31.94 2,842.66 0.00 0.00 0.00% 15.00 479.10 16.85% 15.00 479.10 16.85% 74.00 2,363.56 83.15%
04.05.02.02 INSTALACION DE BIODIGESTOR DE 600 LTS 137,892.26 55,261.80 32,889.54 88,151.33 63.93% 0.00 49,740.93 36.07%
04.05.02.02.01 TRABAJOS PRELIMINARES 455.09 455.09 0.00 455.09 100.00% 0.00 0.00 0.00%
04.05.02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 167.93 0.61 102.44 167.93 102.44 100.00% 0.00 0.00% 167.93 102.44 100.00% 0.00 0.00 0.00%
04.05.02.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 167.93 2.10 352.65 167.93 352.65 100.00% 0.00 0.00% 167.93 352.65 100.00% 0.00 0.00 0.00%
04.05.02.02.02 MOVIMIENTO DE TIERRAS 13,066.43 6,100.15 2,202.28 8,302.42 63.54% 0.00 4,764.01 36.46%
VALORIZACIÓN DE OBRA N° 03 : CORRESPONDIENTE AL MES : ABRIL 2018

Obra : MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 04

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
04.05.02.02.02.01 EXCAVACION DE TERRENO NORMAL m3 239.17 34.92 8,351.82 114.21 3,988.21 47.75% 40.31 1,407.63 16.85% 154.52 5,395.84 64.61% 84.65 2,955.98 35.39%
04.05.02.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 109.88 30.92 3,397.49 58.73 1,815.93 53.45% 18.52 572.64 16.85% 77.25 2,388.57 70.30% 32.63 1,008.92 29.70%
04.05.02.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 161.61 8.15 1,317.12 36.32 296.01 22.47% 27.24 222.01 16.86% 63.56 518.01 39.33% 98.05 799.11 60.67%
04.05.02.02.03 OBRAS DE CONCRETO SIMPLE 691.70 391.97 115.28 507.25 73.33% 0.00 184.45 26.67%
04.05.02.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 1.80 384.28 691.70 1.02 391.97 56.67% 0.30 115.28 16.67% 1.32 507.25 73.33% 0.48 184.45 26.67%
04.05.02.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 32,189.71 0.00 7,956.64 7,956.64 24.72% 0.00 24,233.07 75.28%
04.05.02.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 295.48 48.31 14,274.64 0.00 0.00 0.00% 73.04 3,528.56 24.72% 73.04 3,528.56 24.72% 222.44 10,746.08 75.28%
04.05.02.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODOS m3 29.01 364.74 10,581.11 0.00 0.00 0.00% 7.17 2,615.19 24.72% 7.17 2,615.19 24.72% 21.84 7,965.92 75.28%
04.05.02.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 224.28 32.70 7,333.96 0.00 0.00 0.00% 55.44 1,812.89 24.72% 55.44 1,812.89 24.72% 168.84 5,521.07 75.28%
04.05.02.02.05 BIODIGESTOR DE 600 Lts. 91,489.33 48,314.59 22,615.34 70,929.93 77.53% 0.00 20,559.40 22.47%
04.05.02.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 Lts und 89.00 1,027.97 91,489.33 47.00 48,314.59 52.81% 22.00 22,615.34 24.72% 69.00 70,929.93 77.53% 20.00 20,559.40 22.47%
04.05.02.03 CONSTRUCCIÓN DE POZO PERCOLADOR 127,454.66 41,158.38 32,412.24 73,570.61 57.72% 0.00 53,884.05 42.28%
04.05.02.03.01 TRABAJOS PRELIMINARES 580.13 580.13 0.00 580.13 100.00% 0.00 0.00 0.00%
04.05.02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 214.07 0.61 130.58 214.07 130.58 100.00% 0.00 0.00% 214.07 130.58 100.00% 0.00 0.00 0.00%
04.05.02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 214.07 2.10 449.55 214.07 449.55 100.00% 0.00 0.00% 214.07 449.55 100.00% 0.00 0.00 0.00%
04.05.02.03.02 MOVIMIENTO DE TIERRAS 28,199.34 7,160.03 6,336.69 13,496.71 47.86% 0.00 14,702.63 52.14%
04.05.02.03.02.01 EXCAVACION DE TERRENO NORMAL m3 468.04 34.92 16,343.96 174.35 6,088.30 37.25% 105.18 3,672.89 22.47% 279.53 9,761.19 59.72% 188.51 6,582.77 40.28%
04.05.02.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 585.18 8.15 4,769.22 131.50 1,071.73 22.47% 131.50 1,071.73 22.47% 263.00 2,143.45 44.94% 322.18 2,625.77 55.06%
04.05.02.03.02.03 RELLENO CON GRAVA 1" m3 73.83 64.85 4,787.88 0.00 0.00 0.00% 16.59 1,075.86 22.47% 16.59 1,075.86 22.47% 57.24 3,712.02 77.53%
04.05.02.03.02.04 FILTRO DE GRAVA Ø 1" m3 35.44 64.85 2,298.28 0.00 0.00 0.00% 7.96 516.21 22.46% 7.96 516.21 22.46% 27.48 1,782.07 77.54%
04.05.02.03.03 OBRAS DE CONCRETO SIMPLE 24,358.41 13,604.37 8,503.70 22,108.06 90.76% 0.00 2,250.35 9.24%
04.05.02.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 125.26 48.31 6,051.31 45.04 2,175.88 35.96% 28.15 1,359.93 22.47% 73.19 3,535.81 58.43% 52.07 2,515.50 41.57%
04.05.02.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 47.64 384.28 18,307.10 29.74 11,428.49 62.43% 18.59 7,143.77 39.02% 48.33 18,572.25 101.45% -0.69 -265.15 -1.45%
04.05.02.03.04 OBRAS DE CONCRETO ARMADO 14,686.61 1,110.10 4,171.54 5,281.64 35.96% 0.00 9,404.97 64.04%
04.05.02.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 16.79 384.28 6,452.06 0.00 0.00 0.00% 6.04 2,321.05 35.97% 6.04 2,321.05 35.97% 10.75 4,131.01 64.03%
04.05.02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 43.34 48.31 2,093.76 5.84 282.13 13.47% 9.74 470.54 22.47% 15.58 752.67 35.95% 27.76 1,341.09 64.05%
04.05.02.03.04.03 ACERO FY=4200 KG/CM2 kg 922.04 6.66 6,140.79 124.32 827.97 13.48% 207.20 1,379.95 22.47% 331.52 2,207.92 35.96% 590.52 3,932.87 64.04%
04.05.02.03.05 MUROS DE LADRILLO 59,630.17 18,703.75 13,400.31 32,104.07 53.84% 0.00 27,526.10 46.16%
04.05.02.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 CM m2 654.27 91.14 59,630.17 205.22 18,703.75 31.37% 147.03 13,400.31 22.47% 352.25 32,104.07 53.84% 302.02 27,526.10 46.16%
04.05.03 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO INSTITUCIONALES 14,050.78 71.81 0.00 0.00% 71.81 0.51% 0.00 13,978.97 99.49%
04.05.03.01 CONSTRUCCION DE CASETA DE BAÑO 10,861.71 58.43 0.00 58.43 0.54% 0.00 10,803.28 99.46%
04.05.03.01.01 TRABAJOS PRELIMINARES 40.60 40.60 0.00 40.60 100.00% 0.00 0.00 0.00%
04.05.03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 14.98 0.61 9.14 14.98 9.14 100.00% 0.00 0.00% 14.98 9.14 100.00% 0.00 0.00 0.00%
04.05.03.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 14.98 2.10 31.46 14.98 31.46 100.00% 0.00 0.00% 14.98 31.46 100.00% 0.00 0.00 0.00%
04.05.03.01.02 MOVIMIENTO DE TIERRAS 302.34 0.00 0.00 0.00 0.00% 0.00 302.34 100.00%
04.05.03.01.02.01 EXCAVACION DE TERRENO NORMAL m3 3.61 34.92 126.06 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.61 126.06 100.00%
04.05.03.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 4.51 8.15 36.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.51 36.76 100.00%
04.05.03.01.02.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 1.46 95.56 139.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.46 139.52 100.00%
04.05.03.01.03 OBRAS DE CONCRETO SIMPLE 1,973.26 0.00 0.00 0.00 0.00% 0.00 1,973.26 100.00%
04.05.03.01.03.01 CIMIENTOS CORRIDOS 487.28 0.00 0.00 0.00 0.00% 0.00 487.28 100.00%
04.05.03.01.03.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 2.10 232.04 487.28 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.10 487.28 100.00%
04.05.03.01.03.02 SOBRECIMIENTOS 673.12 0.00 0.00 0.00 0.00% 0.00 673.12 100.00%
04.05.03.01.03.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 9.84 44.52 438.08 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.84 438.08 100.00%
04.05.03.01.03.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 0.74 317.62 235.04 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.74 235.04 100.00%
04.05.03.01.03.03 PISO INTERIOR 236.76 0.00 0.00 0.00 0.00% 0.00 236.76 100.00%
04.05.03.01.03.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO CEMENTO P m2 5.28 44.84 236.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.28 236.76 100.00%
04.05.03.01.03.04 VEREDA PERIMETRAL 576.10 0.00 0.00 0.00 0.00% 0.00 576.10 100.00%
04.05.03.01.03.04.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 1.63 42.84 69.83 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.63 69.83 100.00%
04.05.03.01.03.04.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑADO m2 8.04 44.84 360.51 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.04 360.51 100.00%
04.05.03.01.03.04.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.40 364.41 145.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.40 145.76 100.00%
04.05.03.01.04 OBRAS DE CONCRETO ARMADO 1,531.77 0.00 0.00 0.00 0.00% 0.00 1,531.77 100.00%
04.05.03.01.04.01 COLUMNAS 1,015.90 0.00 0.00 0.00 0.00% 0.00 1,015.90 100.00%
04.05.03.01.04.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 0.45 384.28 172.93 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.45 172.93 100.00%
04.05.03.01.04.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 9.60 45.29 434.78 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.60 434.78 100.00%
04.05.03.01.04.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 61.29 6.66 408.19 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.29 408.19 100.00%
04.05.03.01.04.02 VIGAS 515.87 0.00 0.00 0.00 0.00% 0.00 515.87 100.00%
04.05.03.01.04.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 0.32 384.28 122.97 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.32 122.97 100.00%
04.05.03.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 5.78 50.83 293.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.78 293.80 100.00%
04.05.03.01.04.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 14.88 6.66 99.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.88 99.10 100.00%
04.05.03.01.05 MUROS DE LADRILLO 1,385.93 0.00 0.00 0.00 0.00% 0.00 1,385.93 100.00%
04.05.03.01.05.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5 m2 19.09 72.60 1,385.93 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.09 1,385.93 100.00%
VALORIZACIÓN DE OBRA N° 03 : CORRESPONDIENTE AL MES : ABRIL 2018

Obra : MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 04

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
04.05.03.01.06 REVOQUES Y ENLUCIDOS 908.13 0.00 0.00 0.00 0.00% 0.00 908.13 100.00%
04.05.03.01.06.01 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 33.13 20.82 689.77 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 33.13 689.77 100.00%
04.05.03.01.06.02 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS Y ESQUI m2 8.88 24.59 218.36 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.88 218.36 100.00%
04.05.03.01.07 PINTURA 500.30 0.00 0.00 0.00 0.00% 0.00 500.30 100.00%
04.05.03.01.07.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 33.13 11.37 376.69 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 33.13 376.69 100.00%
04.05.03.01.07.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINAS EXTE m2 8.88 13.92 123.61 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.88 123.61 100.00%
04.05.03.01.08 COBERTURA LIVIANA PARA TECHO 692.60 0.00 0.00 0.00 0.00% 0.00 692.60 100.00%
04.05.03.01.08.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 5.00 38.28 191.40 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 191.40 100.00%
04.05.03.01.08.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 5.60 m und 4.00 43.92 175.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 175.68 100.00%
04.05.03.01.08.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.30 mm m2 13.44 24.22 325.52 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.44 325.52 100.00%
04.05.03.01.09 CARPINTERIA DE MADERA 1,217.96 0.00 0.00 0.00 0.00% 0.00 1,217.96 100.00%
04.05.03.01.09.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/TRIPLAY und 4.00 304.49 1,217.96 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 1,217.96 100.00%
04.05.03.01.10 INSTALACIONES SANITARIAS 1,234.50 17.83 0.00 17.83 1.44% 0.00 1,216.67 98.56%
04.05.03.01.10.01 TRABAJOS PRELIMINARES 17.83 17.83 0.00 0.00 17.83 100.00% 0.00 0.00 0.00%
04.05.03.01.10.01.01 LIMPIEZA DE TERRENO MANUAL m2 6.58 0.61 4.01 6.58 4.01 100.00% 0.00 0.00% 6.58 4.01 100.00% 0.00 0.00 0.00%
04.05.03.01.10.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 6.58 2.10 13.82 6.58 13.82 100.00% 0.00 0.00% 6.58 13.82 100.00% 0.00 0.00 0.00%
04.05.03.01.10.02 MOVIMIENTO DE TIERRAS 234.00 0.00 0.00 0.00 0.00% 0.00 234.00 100.00%
04.05.03.01.10.02.01 EXCAVACION DE TERRENO NORMAL m3 3.25 34.92 113.49 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.25 113.49 100.00%
04.05.03.01.10.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 2.88 40.54 116.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.88 116.76 100.00%
04.05.03.01.10.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 0.46 8.15 3.75 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.46 3.75 100.00%
04.05.03.01.10.03 TUBERIAS Y ACCESORIOS 374.34 0.00 0.00 0.00 0.00% 0.00 374.34 100.00%
04.05.03.01.10.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 4.00 23.00 92.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 92.00 100.00%
04.05.03.01.10.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + ACCESORIO und 1.00 63.39 63.39 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 63.39 100.00%
04.05.03.01.10.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 5.50 5.14 28.27 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.50 28.27 100.00%
04.05.03.01.10.03.04 TUBERIA PVC SAL Ø 2" m 10.80 7.99 86.29 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.80 86.29 100.00%
04.05.03.01.10.03.05 TUBERIA PVC SAL Ø 4" m 8.20 12.73 104.39 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.20 104.39 100.00%
04.05.03.01.10.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 608.33 0.00 0.00 0.00 0.00% 0.00 608.33 100.00%
04.05.03.01.10.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.12 48.31 102.42 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.12 102.42 100.00%
04.05.03.01.10.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 0.20 265.70 53.14 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.20 53.14 100.00%
04.05.03.01.10.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 1.44 32.70 47.09 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.44 47.09 100.00%
04.05.03.01.10.05 SALIDA DE DESAGUE PVC-SAL 4" pto 4.00 42.49 169.96 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 169.96 100.00%
04.05.03.01.10.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 4.00 58.93 235.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 235.72 100.00%
04.05.03.01.11 APARATOS Y ACCESORIOS SANITARIOS 595.12 0.00 0.00 0.00 0.00% 0.00 595.12 100.00%
04.05.03.01.11.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0.74 M und 4.00 148.78 595.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 595.12 100.00%
04.05.03.01.12 INSTALACIONES ELECTRICAS 479.20 0.00 0.00 0.00 0.00% 0.00 479.20 100.00%
04.05.03.01.12.01 SALIDA PARA INTERRUPTOR DOBLE und 4.00 22.42 89.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 89.68 100.00%
04.05.03.01.12.02 SALIDA PARA CENTRO DE LUZ und 4.00 65.44 261.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 261.76 100.00%
04.05.03.01.12.03 SALIDA PARA TOMACORRIENTES und 4.00 31.94 127.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 127.76 100.00%
04.05.03.02 INSTALACION DE BIODIGESTOR DE 1,300 LTS 1,754.35 6.85 0.00 6.85 0.39% 0.00 1,747.50 99.61%
04.05.03.02.01 TRABAJOS PRELIMINARES 6.85 6.85 0.00 6.85 100.00% 0.00 0.00 0.00%
04.05.03.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 2.53 0.61 1.54 2.53 1.54 100.00% 0.00 0.00% 2.53 1.54 100.00% 0.00 0.00 0.00%
04.05.03.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.53 2.10 5.31 2.53 5.31 100.00% 0.00 0.00% 2.53 5.31 100.00% 0.00 0.00 0.00%
04.05.03.02.02 MOVIMIENTO DE TIERRAS 238.64 0.00 0.00 0.00 0.00% 0.00 238.64 100.00%
04.05.03.02.02.01 EXCAVACION DE TERRENO NORMAL m3 4.33 34.92 151.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.33 151.20 100.00%
04.05.03.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 2.09 30.92 64.62 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.09 64.62 100.00%
04.05.03.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.80 8.15 22.82 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.80 22.82 100.00%
04.05.03.02.03 OBRAS DE CONCRETO SIMPLE 7.69 0.00 0.00 0.00 0.00% 0.00 7.69 100.00%
04.05.03.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 0.02 384.28 7.69 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.02 7.69 100.00%
04.05.03.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 363.15 0.00 0.00 0.00 0.00% 0.00 363.15 100.00%
04.05.03.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 3.32 48.31 160.39 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.32 160.39 100.00%
04.05.03.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODOS m3 0.33 364.74 120.36 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.33 120.36 100.00%
04.05.03.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 2.52 32.70 82.40 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.52 82.40 100.00%
04.05.03.02.05 BIODIGESTOR DE 1,300 Lts. 1,138.02 0.00 0.00 0.00 0.00% 0.00 1,138.02 100.00%
04.05.03.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 1,300 Lts und 1.00 1,138.02 1,138.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,138.02 100.00%
04.05.03.03 CONSTRUCCIÓN DE POZO PERCOLADOR 1,434.72 6.53 0.00 6.53 0.46% 0.00 1,428.19 99.54%
04.05.03.03.01 TRABAJOS PRELIMINARES 6.53 6.53 0.00 6.53 100.00% 0.00 0.00 0.00%
04.05.03.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 2.41 0.61 1.47 2.41 1.47 100.00% 0.00 0.00% 2.41 1.47 100.00% 0.00 0.00 0.00%
04.05.03.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.41 2.10 5.06 2.41 5.06 100.00% 0.00 0.00% 2.41 5.06 100.00% 0.00 0.00 0.00%
04.05.03.03.02 MOVIMIENTO DE TIERRAS 317.00 0.00 0.00 0.00 0.00% 0.00 317.00 100.00%
04.05.03.03.02.01 EXCAVACION DE TERRENO NORMAL m3 5.26 34.92 183.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.26 183.68 100.00%
04.05.03.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 6.57 8.15 53.55 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.57 53.55 100.00%
VALORIZACIÓN DE OBRA N° 03 : CORRESPONDIENTE AL MES : ABRIL 2018

Obra : MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 04

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
04.05.03.03.02.03 RELLENO CON GRAVA 1" m3 0.83 64.85 53.83 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.83 53.83 100.00%
04.05.03.03.02.04 FILTRO DE GRAVA Ø 1" m3 0.40 64.85 25.94 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.40 25.94 100.00%
04.05.03.03.03 OBRAS DE CONCRETO SIMPLE 275.63 0.00 0.00 0.00 0.00% 0.00 275.63 100.00%
04.05.03.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 1.41 48.31 68.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.41 68.12 100.00%
04.05.03.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 0.54 384.28 207.51 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.54 207.51 100.00%
04.05.03.03.04 OBRAS DE CONCRETO ARMADO 165.68 0.00 0.00 0.00 0.00% 0.00 165.68 100.00%
04.05.03.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 0.19 384.28 73.01 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.19 73.01 100.00%
04.05.03.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 0.49 48.31 23.67 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.49 23.67 100.00%
04.05.03.03.04.03 ACERO FY=4200 KG/CM2 kg 10.36 6.66 69.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.36 69.00 100.00%
04.05.03.03.05 MUROS DE LADRILLO 669.88 0.00 0.00 0.00 0.00% 0.00 669.88 100.00%
04.05.03.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 CM m2 7.35 91.14 669.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.35 669.88 100.00%
04.05.04 ESTUDIOS COMPLEMENTARIOS 1,710.00 1,590.00 80.00 97.66% 1,670.00 97.66% 0.00 40.00 2.34%
04.05.04.01 DISEÑO DE MEZCLA und 3.00 450.00 1,350.00 3.00 1,350.00 100.00% 0.00 0.00% 3.00 1,350.00 100.00% 0.00 0.00 0.00%
04.05.04.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 9.00 40.00 360.00 6.00 240.00 66.67% 2.00 80.00 22.22% 8.00 320.00 88.89% 1.00 40.00 11.11%
04.05.05 FLETE 75,926.96 68,334.26 3,796.35 95.00% 72,130.61 95.00% 0.00 3,796.35 5.00%
04.05.05.01 FLETE TERRESTRE Y ACARREO CCOLLONTA - A GLB 1.00 75,926.96 75,926.96 0.90 68,334.26 90.00% 0.05 3,796.35 5.00% 0.95 72,130.61 95.00% 0.05 3,796.35 5.00%
04.05.06 PROGRAMA DE MITIGACION E IMPACTO AMBIENTAL 9,154.69 1,417.84 0.00 15.49% 1,417.84 15.49% 0.00 7,736.85 84.51%
04.05.06.01 PROGRAMA DE PREVENCION DE MITIGACION 1,417.84 1,417.84 0.00 1,417.84 100.00% 0.00 0.00 0.00%
04.05.06.01.01 CARTELES PERMANENTES und 10.00 63.56 635.60 10.00 635.60 100.00% 0.00 0.00% 10.00 635.60 100.00% 0.00 0.00 0.00%
04.05.06.01.02 CARTELES TEMPORALES und 10.00 67.80 678.00 10.00 678.00 100.00% 0.00 0.00% 10.00 678.00 100.00% 0.00 0.00 0.00%
04.05.06.01.03 CINTAS DE SEÑAL DE TRABAJO rll 2.00 52.12 104.24 2.00 104.24 100.00% 0.00 0.00% 2.00 104.24 100.00% 0.00 0.00 0.00%
04.05.06.02 PROGRAMA DE ABANDONO DE OBRA 7,736.85 0.00 0.00 0.00 0.00% 0.00 7,736.85 100.00%
04.05.06.02.01 REACONDICIONAMIENTO DE AREA OCUPADA (CAMPAMENTO Y MAQUIN m2 2,000.00 3.22 6,440.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,000.00 6,440.00 100.00%
04.05.06.02.02 REACONDICIONAMIENTO DE CANTERAS Y ACCESOS HA 3.00 157.27 471.81 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 471.81 100.00%
04.05.06.02.03 REFORESTACION EN CAPTACIONES Y RESERVORIO m2 29.55 27.92 825.04 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.55 825.04 100.00%
04.05.07 ADECUADO CONOCIMIENTO DE EDUCACION SANITARIA 4,000.00 2,000.00 375.00 59.38% 2,375.00 59.38% 0.00 1,625.00 40.63%
04.05.07.01 CAPACITACION ANTES DE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 2.00 1,000.00 50.00% 0.50 250.00 12.50% 2.50 1,250.00 62.50% 1.50 750.00 37.50%
04.05.07.02 CAPACITACION DURANTE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 2.00 1,000.00 50.00% 0.25 125.00 6.25% 2.25 1,125.00 56.25% 1.75 875.00 43.75%
04.05.08 EFICIENTE GESTION TECNICA Y ADMINISTRATIVA DE LOS SERVICIOS DE AGUA Y SANEAMIENTO A TRAVES DEL 4,000.00 1,000.00 1,500.00 62.50% 2,500.00 62.50% 0.00 1,500.00 37.50%
04.05.08.01 PROGRAMA DE FORTALECIMIENTO DE CAPACIDADES PARA LA POBLACI und 4.00 1,000.00 4,000.00 1.00 1,000.00 25.00% 1.50 1,500.00 37.50% 2.50 2,500.00 62.50% 1.50 1,500.00 37.50%
04.06 LOCALIDAD DE CCOLLONTA - B 293,148.18 60,759.89 29,341.20 10.01% 90,101.08 30.74% 0.00 203,047.10 69.26%
04.06.01 SISTEMA DE AGUA POTABLE 144,030.37 32,930.33 25,066.38 17.40% 57,996.71 40.27% 0.00 86,033.66 59.73%
04.06.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00 0.00%
04.06.01.01.01 OBRAS PROVISIONALES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00 0.00%
04.06.01.01.01.01 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 1,760.72 1,760.72 1.00 1,760.72 100.00% 0.00 0.00% 1.00 1,760.72 100.00% 0.00 0.00 0.00%
04.06.01.01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 797.66 797.66 1.00 797.66 100.00% 0.00 0.00% 1.00 797.66 100.00% 0.00 0.00 0.00%
04.06.01.02 CONSTRUCCION DE CAPTACION TIPO - 1 5,072.96 74.91 0.00 74.91 1.48% 0.00 4,998.05 98.52%
04.06.01.02.01 TRABAJOS PRELIMINARES 74.91 74.91 0.00 74.91 100.00% 0.00 0.00 0.00%
04.06.01.02.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 16.50 2.44 40.26 16.50 40.26 100.00% 0.00 0.00% 16.50 40.26 100.00% 0.00 0.00 0.00%
04.06.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 16.50 2.10 34.65 16.50 34.65 100.00% 0.00 0.00% 16.50 34.65 100.00% 0.00 0.00 0.00%
04.06.01.02.02 MOVIMIENTO DE TIERRAS 887.73 0.00 0.00 0.00 0.00% 0.00 887.73 100.00%
04.06.01.02.02.01 EXCAVACION EN TERRENO NORMAL CAPTACION m3 8.25 39.64 327.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.25 327.03 100.00%
04.06.01.02.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 4.95 40.54 200.67 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.95 200.67 100.00%
04.06.01.02.02.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE (50 M ) m3 10.31 34.92 360.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.31 360.03 100.00%
04.06.01.02.03 CONCRETO SIMPLE 210.73 0.00 0.00 0.00 0.00% 0.00 210.73 100.00%
04.06.01.02.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS m3 0.81 260.16 210.73 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.81 210.73 100.00%
04.06.01.02.04 CONCRETO ARMADO 1,416.99 0.00 0.00 0.00 0.00% 0.00 1,416.99 100.00%
04.06.01.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 10.37 48.31 500.97 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.37 500.97 100.00%
04.06.01.02.04.02 ACERO FY=4200 KG/CM2 kg 61.78 6.66 411.45 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.78 411.45 100.00%
04.06.01.02.04.03 CONCRETO FC=210 KG/CM2 m3 1.22 413.58 504.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.22 504.57 100.00%
04.06.01.02.05 REVOQUES ENLUCIDOS Y MOLDURAS 212.46 0.00 0.00 0.00 0.00% 0.00 212.46 100.00%
04.06.01.02.05.01 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 6.04 20.00 120.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 120.80 100.00%
04.06.01.02.05.02 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 3.29 27.86 91.66 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.29 91.66 100.00%
04.06.01.02.06 VALVULAS Y TAPAS Y ACCESORIOS 603.49 0.00 0.00 0.00 0.00% 0.00 603.49 100.00%
04.06.01.02.06.01 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.60X0.60M und 0.36 352.51 126.90 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.36 126.90 100.00%
04.06.01.02.06.02 SUMINISTRO E INST. VALVULA COMPUERTA H. DUCTIL, Y ACCESORIO und 1.00 429.91 429.91 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 429.91 100.00%
04.06.01.02.06.03 CODO FºDº DN 160X90º ISO ED und 4.00 11.67 46.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 46.68 100.00%
04.06.01.02.07 FILTROS 59.77 0.00 0.00 0.00 0.00% 0.00 59.77 100.00%
04.06.01.02.07.01 FILTROS DE GRAVA m3 0.22 109.19 24.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.22 24.02 100.00%
04.06.01.02.07.02 FILTROS DE ARENA m3 0.29 123.26 35.75 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.29 35.75 100.00%
04.06.01.02.08 PINTURA 173.78 0.00 0.00 0.00 0.00% 0.00 173.78 100.00%
VALORIZACIÓN DE OBRA N° 03 : CORRESPONDIENTE AL MES : ABRIL 2018

Obra : MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 04

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
04.06.01.02.08.01 PINTURA EN TAPAS METALICAS m2 1.04 22.08 22.96 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.04 22.96 100.00%
04.06.01.02.08.02 PINTURA EN MUROS EXTERIORES (CAPTACION) m2 6.04 24.97 150.82 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 150.82 100.00%
04.06.01.02.09 CERCO PERIMETRICO 1,433.10 0.00 0.00 0.00 0.00% 0.00 1,433.10 100.00%
04.06.01.02.09.01 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 51.00 28.10 1,433.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.00 1,433.10 100.00%
04.06.01.03 LINEA DE CONDUCCION 11,669.07 9,247.99 2,421.08 11,669.07 100.00% 0.00 0.00 0.00%
04.06.01.03.01 TENDIDO DE TUBERIA PVC SAP 11,669.07 9,247.99 2,421.08 11,669.07 100.00% 0.00 0.00 0.00%
04.06.01.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 156.00 2.10 327.60 156.00 327.60 100.00% 0.00 0.00% 156.00 327.60 100.00% 0.00 0.00 0.00%
04.06.01.03.01.02 EXCAVACION MANUAL DE ZANJA DE TERRENO CONGLOMERADO m3 91.00 34.92 3,177.72 91.00 3,177.72 100.00% 0.00 0.00% 91.00 3,177.72 100.00% 0.00 0.00 0.00%
04.06.01.03.01.03 REFINE Y NIVELACION DE ZANJA m 260.00 4.08 1,060.80 260.00 1,060.80 100.00% 0.00 0.00% 260.00 1,060.80 100.00% 0.00 0.00 0.00%
04.06.01.03.01.04 CAMA DE APOYO E=10CM. m 260.00 1.66 431.60 260.00 431.60 100.00% 0.00 0.00% 260.00 431.60 100.00% 0.00 0.00 0.00%
04.06.01.03.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 43.68 23.80 1,039.58 39.44 938.67 90.29% 4.24 100.91 9.71% 43.68 1,039.58 100.00% 0.00 0.00 0.00%
04.06.01.03.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 65.52 57.17 3,745.78 30.00 1,715.10 45.79% 35.52 2,030.68 54.21% 65.52 3,745.78 100.00% 0.00 0.00 0.00%
04.06.01.03.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 65.52 8.15 533.99 30.00 244.50 45.79% 35.52 289.49 54.21% 65.52 533.99 100.00% 0.00 0.00 0.00%
04.06.01.03.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 260.00 4.30 1,118.00 260.00 1,118.00 100.00% 0.00 0.00% 260.00 1,118.00 100.00% 0.00 0.00 0.00%
04.06.01.03.01.09 PRUEBA HIDRAULICA DE LA LINEA DE CONDUCCION m 260.00 0.90 234.00 260.00 234.00 100.00% 0.00 0.00% 260.00 234.00 100.00% 0.00 0.00 0.00%
04.06.01.04 RESERVORIO (4 M3) 17,747.12 893.88 0.00 893.88 5.04% 0.00 16,853.24 94.96%
04.06.01.04.01 RESERVORIO 13,671.82 45.40 0.00 45.40 0.33% 0.00 13,626.42 99.67%
04.06.01.04.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 10.00 2.44 24.40 10.00 24.40 100.00% 0.00 0.00% 10.00 24.40 100.00% 0.00 0.00 0.00%
04.06.01.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 10.00 2.10 21.00 10.00 21.00 100.00% 0.00 0.00% 10.00 21.00 100.00% 0.00 0.00 0.00%
04.06.01.04.01.03 EXCAVACION EN TERRENO NORMAL RESERVORIO m3 5.00 34.92 174.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 174.60 100.00%
04.06.01.04.01.04 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 6.25 14.23 88.94 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.25 88.94 100.00%
04.06.01.04.01.05 SOLADO C:H 1:8 (h= 0.10 m) m2 0.86 189.58 163.04 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.86 163.04 100.00%
04.06.01.04.01.06 CONCRETO F'C= 210 KG/CM2 EN RESERVORIO m3 5.42 413.58 2,241.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.42 2,241.60 100.00%
04.06.01.04.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 46.24 48.31 2,233.85 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 46.24 2,233.85 100.00%
04.06.01.04.01.08 ACERO FY=4200 KG/CM2 kg 200.66 6.66 1,336.40 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 200.66 1,336.40 100.00%
04.06.01.04.01.09 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 56.25 27.86 1,567.13 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.25 1,567.13 100.00%
04.06.01.04.01.10 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 56.25 20.00 1,125.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.25 1,125.00 100.00%
04.06.01.04.01.11 TAPA SANITARIA METALICA DE 0.60x0.60 mts und 2.00 197.60 395.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 395.20 100.00%
04.06.01.04.01.12 INSTALACION DE ACCESORIOS TUB. VENTILACION 2" und 1.00 118.31 118.31 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 118.31 100.00%
04.06.01.04.01.13 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS DE 3/4" und 1.00 496.89 496.89 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 496.89 100.00%
04.06.01.04.01.14 INSTALACION DE ACCESORIOS EN RESERVORIO und 1.00 872.43 872.43 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 872.43 100.00%
04.06.01.04.01.15 PINTADO DE MURO EXTERIOR m2 56.25 15.54 874.13 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.25 874.13 100.00%
04.06.01.04.01.16 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 69.00 28.10 1,938.90 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 69.00 1,938.90 100.00%
04.06.01.04.02 CASETA DE CLORACION POR GOTEO 4,075.30 848.48 0.00 848.48 20.82% 0.00 3,226.82 79.18%
04.06.01.04.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.05 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
04.06.01.04.02.02 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5 m2 11.54 71.15 821.07 11.54 821.07 100.00% 0.00 0.00% 11.54 821.07 100.00% 0.00 0.00 0.00%
04.06.01.04.02.03 TARRAJEO EN INTERIORES Y EXTERIORES m2 20.50 28.40 582.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.50 582.20 100.00%
04.06.01.04.02.04 REJILLA METALICA SEGUN DISEÑO INC. COLOCADO und 1.00 421.12 421.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 421.12 100.00%
04.06.01.04.02.05 COBERTURA DE CALAMINA EN CASETA DE CLORACION m2 4.00 58.15 232.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 232.60 100.00%
04.06.01.04.02.06 INSTALACION DE PUERTA METÁLICA (SEGÚN DISEÑO) und 1.00 257.57 257.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 257.57 100.00%
04.06.01.04.02.07 INSTALACION DE ACCESORIOS EN CASETA DE CLORACION und 1.00 1,557.57 1,557.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,557.57 100.00%
04.06.01.04.02.08 PINTADO DE MURO EXTERIOR m2 11.31 15.54 175.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 175.76 100.00%
04.06.01.05 LINEA DE ADUCCION Y RED DE DISTRIBUCION 101,255.62 19,541.84 22,160.99 41,702.83 41.19% 0.00 59,552.79 58.81%
04.06.01.05.01 TENDIDO DE TUBERIA DE ADUCCION Y DISTRIBUCION PVC SAP 85,515.85 19,479.29 22,160.99 41,640.28 48.69% 0.00 43,875.57 51.31%
04.06.01.05.01.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 861.40 8.03 6,917.04 861.40 6,917.04 100.00% 0.00 0.00% 861.40 6,917.04 100.00% 0.00 0.00 0.00%
04.06.01.05.01.02 EXCAVACION MANUAL ZANJA EN TERRENO CONGLOMERADO m3 502.48 58.58 29,435.28 195.04 11,425.44 38.82% 129.01 7,557.41 25.67% 324.05 18,982.85 64.49% 178.43 10,452.43 35.51%
04.06.01.05.01.03 REFINE Y NIVELACION DE ZANJA m 1,435.67 2.04 2,928.77 557.26 1,136.81 38.82% 368.61 751.96 25.68% 925.87 1,888.77 64.49% 509.80 1,040.00 35.51%
04.06.01.05.01.04 CAMA DE APOYO E=10CM. m 1,435.67 1.66 2,383.21 0.00 0.00 0.00% 925.87 1,536.94 64.49% 925.87 1,536.94 64.49% 509.80 846.27 35.51%
04.06.01.05.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 241.19 23.80 5,740.32 0.00 0.00 0.00% 155.55 3,702.09 64.49% 155.55 3,702.09 64.49% 85.64 2,038.23 35.51%
04.06.01.05.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 361.79 57.17 20,683.53 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 361.79 20,683.53 100.00%
04.06.01.05.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 361.79 8.15 2,948.59 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 361.79 2,948.59 100.00%
04.06.01.05.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1/2" m 897.76 12.29 11,033.47 0.00 0.00 0.00% 493.67 6,067.20 54.99% 493.67 6,067.20 54.99% 404.09 4,966.27 45.01%
04.06.01.05.01.09 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 3/4" m 537.91 3.79 2,038.68 0.00 0.00 0.00% 432.20 1,638.04 80.35% 432.20 1,638.04 80.35% 105.71 400.64 19.65%
04.06.01.05.01.10 PRUEBA HIDRAULICA m 1,435.67 0.98 1,406.96 0.00 0.00 0.00% 925.87 907.35 64.49% 925.87 907.35 64.49% 509.80 499.61 35.51%
04.06.01.05.02 VALVULA DE CONTROL 3,277.47 6.83 0.00 6.83 0.21% 0.00 3,270.64 99.79%
04.06.01.05.02.01 LIMPIEZA DE TERRENO MANUAL m2 2.52 0.61 1.54 2.52 1.54 100.00% 0.00 0.00% 2.52 1.54 100.00% 0.00 0.00 0.00%
04.06.01.05.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.52 2.10 5.29 2.52 5.29 100.00% 0.00 0.00% 2.52 5.29 100.00% 0.00 0.00 0.00%
04.06.01.05.02.03 EXCAVACION DE ZANJA m3 1.01 34.92 35.27 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.01 35.27 100.00%
04.06.01.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 1.26 8.15 10.27 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.26 10.27 100.00%
04.06.01.05.02.05 CONCRETO F'C= 175 KG/CM2 m3 0.56 384.28 215.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.56 215.20 100.00%
04.06.01.05.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 11.20 48.31 541.07 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.20 541.07 100.00%
VALORIZACIÓN DE OBRA N° 03 : CORRESPONDIENTE AL MES : ABRIL 2018

Obra : MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 04

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
04.06.01.05.02.07 TARRAJEO CON IMPERMEABILIZANTE m2 11.20 29.19 326.93 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.20 326.93 100.00%
04.06.01.05.02.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 4.48 28.40 127.23 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.48 127.23 100.00%
04.06.01.05.02.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 1.00 512.25 512.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 512.25 100.00%
04.06.01.05.02.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 7.00 213.49 1,494.43 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 1,494.43 100.00%
04.06.01.05.02.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.11 72.62 7.99 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.11 7.99 100.00%
04.06.01.05.03 VALVULA DE PURGA 3,128.58 19.51 0.00 19.51 0.62% 0.00 3,109.07 99.38%
04.06.01.05.03.01 LIMPIEZA DE TERRENO MANUAL m2 7.20 0.61 4.39 7.20 4.39 100.00% 0.00 0.00% 7.20 4.39 100.00% 0.00 0.00 0.00%
04.06.01.05.03.02 TRAZO Y REPLANTEO PRELIMINAR m2 7.20 2.10 15.12 7.20 15.12 100.00% 0.00 0.00% 7.20 15.12 100.00% 0.00 0.00 0.00%
04.06.01.05.03.03 EXCAVACION DE ZANJA m3 5.04 34.92 176.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.04 176.00 100.00%
04.06.01.05.03.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 6.30 8.15 51.35 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.30 51.35 100.00%
04.06.01.05.03.05 CONCRETO F'C= 175 KG/CM2 m3 0.76 384.28 292.05 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.76 292.05 100.00%
04.06.01.05.03.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 15.00 48.31 724.65 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.00 724.65 100.00%
04.06.01.05.03.07 TARRAJEO CON IMPERMEABILIZANTE m2 14.00 29.19 408.66 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 408.66 100.00%
04.06.01.05.03.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 5.60 28.40 159.04 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.60 159.04 100.00%
04.06.01.05.03.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN CAJA GLB 1.00 224.06 224.06 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 224.06 100.00%
04.06.01.05.03.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 5.00 213.49 1,067.45 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 1,067.45 100.00%
04.06.01.05.03.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.08 72.62 5.81 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.08 5.81 100.00%
04.06.01.05.04 CAMARA ROMPE PRESION T - VII 9,333.72 36.21 0.00 36.21 0.39% 0.00 9,297.51 99.61%
04.06.01.05.04.01 LIMPIEZA DE TERRENO MANUAL m2 13.36 0.61 8.15 13.36 8.15 100.00% 0.00 0.00% 13.36 8.15 100.00% 0.00 0.00 0.00%
04.06.01.05.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 13.36 2.10 28.06 13.36 28.06 100.00% 0.00 0.00% 13.36 28.06 100.00% 0.00 0.00 0.00%
04.06.01.05.04.03 EXCAVACION DE ZANJA m3 11.95 34.92 417.29 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.95 417.29 100.00%
04.06.01.05.04.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 14.94 8.15 121.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.94 121.76 100.00%
04.06.01.05.04.05 CONCRETO F'C= 175 KG/CM2 m3 3.65 384.28 1,402.62 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.65 1,402.62 100.00%
04.06.01.05.04.06 ACERO FY=4200 KG/CM2 kg 121.28 6.66 807.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 121.28 807.72 100.00%
04.06.01.05.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 54.04 48.31 2,610.67 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.04 2,610.67 100.00%
04.06.01.05.04.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 19.74 46.31 914.16 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.74 914.16 100.00%
04.06.01.05.04.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C.R.P. TIGLB 6.00 205.99 1,235.94 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 1,235.94 100.00%
04.06.01.05.04.10 TAPA METALICA Y MARCO DE 0.60x0.60m y 0.30x0.30m e=1/8" EN C.R.P. und 6.00 278.02 1,668.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 1,668.12 100.00%
04.06.01.05.04.11 PINTURA EN TAPAS METALICAS m2 5.40 22.08 119.23 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.40 119.23 100.00%
04.06.01.06 CONEXIONES DOMICILIARIAS 5,727.22 613.33 484.31 1,097.64 19.17% 0.00 4,629.58 80.83%
04.06.01.06.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 76.38 8.03 613.33 76.38 613.33 100.00% 0.00 0.00% 76.38 613.33 100.00% 0.00 0.00 0.00%
04.06.01.06.02 EXCAVACION MANUAL DE ZANJA EN TERRENO CONGLOMERADO m3 38.19 23.12 882.95 0.00 0.00 0.00% 5.73 132.48 15.00% 5.73 132.48 15.00% 32.46 750.47 85.00%
04.06.01.06.03 REFINE Y NIVELACION DE ZANJA m 127.30 4.08 519.38 0.00 0.00 0.00% 19.10 77.93 15.00% 19.10 77.93 15.00% 108.20 441.45 85.00%
04.06.01.06.04 CAMA DE APOYO E=10CM. m 127.30 1.66 211.32 0.00 0.00 0.00% 19.10 31.71 15.00% 19.10 31.71 15.00% 108.20 179.61 85.00%
04.06.01.06.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 37.81 23.80 899.88 0.00 0.00 0.00% 5.67 134.95 15.00% 5.67 134.95 15.00% 32.14 764.93 85.00%
04.06.01.06.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 4.20 57.17 240.11 0.00 0.00 0.00% 0.63 36.02 15.00% 0.63 36.02 15.00% 3.57 204.09 85.00%
04.06.01.06.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 4.20 8.15 34.23 0.00 0.00 0.00% 0.63 5.13 15.00% 0.63 5.13 15.00% 3.57 29.10 85.00%
04.06.01.06.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" m 127.30 3.46 440.46 0.00 0.00 0.00% 19.10 66.09 15.00% 19.10 66.09 15.00% 108.20 374.37 85.00%
04.06.01.06.09 CONEXIÓN DOMICILIARIA INC. CAJA DE AGUA POTABLE MATRIZ Ø 1 1/2" und 13.00 136.23 1,770.99 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 1,770.99 100.00%
04.06.01.06.10 PRUEBA HIDRAULICA EN TUBERIA INSTALADA m 127.30 0.90 114.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 127.30 114.57 100.00%
04.06.02 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO DOMICILIARIAS 117,502.12 12,333.60 0.00 10.50% 12,333.60 10.50% 0.00 105,168.52 89.50%
04.06.02.01 CONSTRUCCION DE CASETA DE BAÑO 78,743.82 12,182.39 0.00 12,182.39 15.47% 0.00 66,561.43 84.53%
04.06.02.01.01 OBRAS PROVISIONALES 3,518.51 3,518.51 0.00 3,518.51 100.00% 0.00 0.00 0.00%
04.06.02.01.01.01 LETRINAS DE HOYO SECO VENTILADO (PARA PERSONAL OBRERO) 1,904.75 1,904.75 0.00 1,904.75 100.00% 0.00 0.00 0.00%
04.06.02.01.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.38 0.61 2.06 3.38 2.06 100.00% 0.00 0.00% 3.38 2.06 100.00% 0.00 0.00 0.00%
04.06.02.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.38 2.10 7.10 3.38 7.10 100.00% 0.00 0.00% 3.38 7.10 100.00% 0.00 0.00 0.00%
04.06.02.01.01.01.03 EXCAVACION DE ZANJA m3 6.42 34.92 224.19 6.42 224.19 100.00% 0.00 0.00% 6.42 224.19 100.00% 0.00 0.00 0.00%
04.06.02.01.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.03 8.15 65.44 8.03 65.44 100.00% 0.00 0.00% 8.03 65.44 100.00% 0.00 0.00 0.00%
04.06.02.01.01.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.24 48.31 301.45 6.24 301.45 100.00% 0.00 0.00% 6.24 301.45 100.00% 0.00 0.00 0.00%
04.06.02.01.01.01.06 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.94 364.59 342.71 0.94 342.71 100.00% 0.00 0.00% 0.94 342.71 100.00% 0.00 0.00 0.00%
04.06.02.01.01.01.07 ACERO FY=4200 KG/CM2 kg 18.14 6.66 120.81 18.14 120.81 100.00% 0.00 0.00% 18.14 120.81 100.00% 0.00 0.00 0.00%
04.06.02.01.01.01.08 CONCRETO F'C= 175 KG/CM2 m3 0.17 384.28 65.33 0.17 65.33 100.00% 0.00 0.00% 0.17 65.33 100.00% 0.00 0.00 0.00%
04.06.02.01.01.01.09 CASETA PARA LETRINAS INC. PUERTA DE CALAMINA und 2.00 346.09 692.18 2.00 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
04.06.02.01.01.01.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.00 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
04.06.02.01.01.02 DUCHAS O VESTUARIOS (PARA PERSONAL OBRERO) 1,335.92 1,335.92 0.00 1,335.92 100.00% 0.00 0.00 0.00%
04.06.02.01.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 4.00 0.61 2.44 4.00 2.44 100.00% 0.00 0.00% 4.00 2.44 100.00% 0.00 0.00 0.00%
04.06.02.01.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.10 8.40 4.00 8.40 100.00% 0.00 0.00% 4.00 8.40 100.00% 0.00 0.00 0.00%
04.06.02.01.01.02.03 EXCAVACION DE ZANJA m3 2.04 34.92 71.24 2.04 71.24 100.00% 0.00 0.00% 2.04 71.24 100.00% 0.00 0.00 0.00%
04.06.02.01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.55 8.15 20.78 2.55 20.78 100.00% 0.00 0.00% 2.55 20.78 100.00% 0.00 0.00 0.00%
04.06.02.01.01.02.05 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 2.00 72.62 145.24 2.00 145.24 100.00% 0.00 0.00% 2.00 145.24 100.00% 0.00 0.00 0.00%
04.06.02.01.01.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.40 48.31 115.94 2.40 115.94 100.00% 0.00 0.00% 2.40 115.94 100.00% 0.00 0.00 0.00%
VALORIZACIÓN DE OBRA N° 03 : CORRESPONDIENTE AL MES : ABRIL 2018

Obra : MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 04

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
04.06.02.01.01.02.07 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.27 364.59 98.44 0.27 98.44 100.00% 0.00 0.00% 0.27 98.44 100.00% 0.00 0.00 0.00%
04.06.02.01.01.02.08 CASETA PARA DUCHAS INC. PUERTA DE CALAMINA m2 2.00 346.09 692.18 2.00 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
04.06.02.01.01.02.09 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 2.00 48.89 97.78 2.00 97.78 100.00% 0.00 0.00% 2.00 97.78 100.00% 0.00 0.00 0.00%
04.06.02.01.01.02.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.00 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
04.06.02.01.01.03 LAVADERO DE GRANITO (PARA PERSONAL OBRERO) 277.84 277.84 0.00 277.84 100.00% 0.00 0.00 0.00%
04.06.02.01.01.03.01 SUMINISTRO E INSTALACIÓN DE LAVADERO DE GRANITO und 2.00 138.92 277.84 2.00 277.84 100.00% 0.00 0.00% 2.00 277.84 100.00% 0.00 0.00 0.00%
04.06.02.01.02 TRABAJOS PRELIMINARES 271.10 271.10 0.00 271.10 100.00% 0.00 0.00 0.00%
04.06.02.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 100.04 0.61 61.02 100.04 61.02 100.00% 0.00 0.00% 100.04 61.02 100.00% 0.00 0.00 0.00%
04.06.02.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 100.04 2.10 210.08 100.04 210.08 100.00% 0.00 0.00% 100.04 210.08 100.00% 0.00 0.00 0.00%
04.06.02.01.03 MOVIMIENTO DE TIERRAS 2,098.99 855.54 0.00 855.54 40.76% 0.00 1,243.45 59.24%
04.06.02.01.03.01 EXCAVACION DE TERRENO NORMAL m3 24.50 34.92 855.54 24.50 855.54 100.00% 0.00 0.00% 24.50 855.54 100.00% 0.00 0.00 0.00%
04.06.02.01.03.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 30.63 8.15 249.63 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.63 249.63 100.00%
04.06.02.01.03.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 10.40 95.56 993.82 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.40 993.82 100.00%
04.06.02.01.04 OBRAS DE CONCRETO SIMPLE 13,362.58 0.00 0.00 0.00 0.00% 0.00 13,362.58 100.00%
04.06.02.01.04.01 CIMIENTOS CORRIDOS 3,107.02 0.00 0.00 0.00 0.00 0.00% 0.00 3,107.02 100.00%
04.06.02.01.04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 13.39 232.04 3,107.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.39 3,107.02 100.00%
04.06.02.01.04.02 SOBRECIMIENTOS 4,192.80 0.00 0.00 0.00 0.00% 0.00 4,192.80 100.00%
04.06.02.01.04.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 61.36 44.52 2,731.75 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.36 2,731.75 100.00%
04.06.02.01.04.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 4.60 317.62 1,461.05 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.60 1,461.05 100.00%
04.06.02.01.04.03 PISO INTERIOR 1,288.25 0.00 0.00 0.00 0.00% 0.00 1,288.25 100.00%
04.06.02.01.04.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO CEMENTO P m2 28.73 44.84 1,288.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.73 1,288.25 100.00%
04.06.02.01.04.04 SARDINEL DE DUCHA 249.52 0.00 0.00 0.00 0.00% 0.00 249.52 100.00%
04.06.02.01.04.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 4.29 48.31 207.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.29 207.25 100.00%
04.06.02.01.04.04.02 CONCRETO F'C= 175 KG/CM2 m3 0.11 384.28 42.27 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.11 42.27 100.00%
04.06.02.01.04.05 VEREDA PERIMETRAL 4,524.99 0.00 0.00 0.00 0.00% 0.00 4,524.99 100.00%
04.06.02.01.04.05.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 14.43 42.84 618.18 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.43 618.18 100.00%
04.06.02.01.04.05.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑADO m2 59.09 44.84 2,649.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 59.09 2,649.60 100.00%
04.06.02.01.04.05.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 3.45 364.41 1,257.21 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.45 1,257.21 100.00%
04.06.02.01.05 OBRAS DE CONCRETO ARMADO 12,433.90 7,305.59 0.00 7,305.59 58.76% 0.00 5,128.31 41.24%
04.06.02.01.05.01 COLUMNAS 8,804.28 7,305.59 0.00 7,305.59 82.98% 0.00 1,498.69 17.02%
04.06.02.01.05.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 3.90 384.28 1,498.69 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.90 1,498.69 100.00%
04.06.02.01.05.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 83.20 45.29 3,768.13 83.20 3,768.13 100.00% 0.00 0.00% 83.20 3,768.13 100.00% 0.00 0.00 0.00%
04.06.02.01.05.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 531.15 6.66 3,537.46 531.15 3,537.46 100.00% 0.00 0.00% 531.15 3,537.46 100.00% 0.00 0.00 0.00%
04.06.02.01.05.02 VIGAS 3,629.62 0.00 0.00 0.00 0.00% 0.00 3,629.62 100.00%
04.06.02.01.05.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 2.22 384.28 853.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.22 853.10 100.00%
04.06.02.01.05.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 40.76 50.83 2,071.83 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.76 2,071.83 100.00%
04.06.02.01.05.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 105.81 6.66 704.69 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 105.81 704.69 100.00%
04.06.02.01.06 MUROS DE LADRILLO 7,880.00 0.00 0.00 0.00 0.00% 0.00 7,880.00 100.00%
04.06.02.01.06.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5 m2 108.54 72.60 7,880.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 108.54 7,880.00 100.00%
04.06.02.01.07 REVOQUES Y ENLUCIDOS 8,272.10 0.00 0.00 0.00 0.00% 0.00 8,272.10 100.00%
04.06.02.01.07.01 ZÓCALO: TARRAJEADO Y PULIDO CON IMPERMEABILIZANTE / MEZCLAm2 83.20 38.45 3,199.04 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 83.20 3,199.04 100.00%
04.06.02.01.07.02 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 74.23 20.82 1,545.47 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 74.23 1,545.47 100.00%
04.06.02.01.07.03 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS Y ESQUI m2 92.89 24.59 2,284.17 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 92.89 2,284.17 100.00%
04.06.02.01.07.04 BRUÑA DE 1 CM m 87.75 14.17 1,243.42 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 87.75 1,243.42 100.00%
04.06.02.01.08 PINTURA 2,020.24 0.00 0.00 0.00 0.00% 0.00 2,020.24 100.00%
04.06.02.01.08.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 74.23 11.37 844.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 74.23 844.00 100.00%
04.06.02.01.08.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINAS EXTE m2 84.50 13.92 1,176.24 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 84.50 1,176.24 100.00%
04.06.02.01.09 COBERTURA LIVIANA PARA TECHO 5,107.23 0.00 0.00 0.00 0.00% 0.00 5,107.23 100.00%
04.06.02.01.09.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 39.00 38.28 1,492.92 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 1,492.92 100.00%
04.06.02.01.09.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 3.00 m und 52.00 25.91 1,347.32 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.00 1,347.32 100.00%
04.06.02.01.09.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.30 mm m2 93.60 24.22 2,266.99 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 93.60 2,266.99 100.00%
04.06.02.01.10 CARPINTERIA DE MADERA 5,147.87 0.00 0.00 0.00 0.00% 0.00 5,147.87 100.00%
04.06.02.01.10.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/TRIPLAY und 13.00 304.49 3,958.37 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 3,958.37 100.00%
04.06.02.01.10.02 SUMIN. E INSTAL. DE VENTANA DE MADERA SEGUN DISEÑO und 13.00 91.50 1,189.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 1,189.50 100.00%
04.06.02.01.11 INSTALACIONES SANITARIAS 12,691.60 231.65 0.00 231.65 1.83% 0.00 12,459.95 98.17%
04.06.02.01.11.01 TRABAJOS PRELIMINARES 231.65 231.65 0.00 0.00 231.65 100.00% 0.00 0.00 0.00%
04.06.02.01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 85.48 0.61 52.14 85.48 52.14 100.00% 0.00 0.00% 85.48 52.14 100.00% 0.00 0.00 0.00%
04.06.02.01.11.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 85.48 2.10 179.51 85.48 179.51 100.00% 0.00 0.00% 85.48 179.51 100.00% 0.00 0.00 0.00%
04.06.02.01.11.02 MOVIMIENTO DE TIERRAS 3,043.99 0.00 0.00 0.00 0.00% 0.00 3,043.99 100.00%
04.06.02.01.11.02.01 EXCAVACION DE TERRENO NORMAL m3 42.30 34.92 1,477.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 42.30 1,477.12 100.00%
04.06.02.01.11.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 37.49 40.54 1,519.84 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.49 1,519.84 100.00%
VALORIZACIÓN DE OBRA N° 03 : CORRESPONDIENTE AL MES : ABRIL 2018

Obra : MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 04

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
04.06.02.01.11.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 5.77 8.15 47.03 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.77 47.03 100.00%
04.06.02.01.11.03 TUBERIAS Y ACCESORIOS 4,396.71 0.00 0.00 0.00 0.00% 0.00 4,396.71 100.00%
04.06.02.01.11.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 39.00 23.00 897.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 897.00 100.00%
04.06.02.01.11.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + ACCESORIO und 13.00 63.39 824.07 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 824.07 100.00%
04.06.02.01.11.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 58.50 5.14 300.69 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 58.50 300.69 100.00%
04.06.02.01.11.03.04 TUBERIA PVC SAL Ø 2" m 127.40 7.99 1,017.93 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 127.40 1,017.93 100.00%
04.06.02.01.11.03.05 TUBERIA PVC SAL Ø 4" m 106.60 12.73 1,357.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 106.60 1,357.02 100.00%
04.06.02.01.11.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 5,019.25 0.00 0.00 0.00 0.00% 0.00 5,019.25 100.00%
04.06.02.01.11.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 27.50 48.31 1,328.53 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.50 1,328.53 100.00%
04.06.02.01.11.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 2.54 265.70 674.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.54 674.88 100.00%
04.06.02.01.11.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 18.72 32.70 612.14 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.72 612.14 100.00%
04.06.02.01.11.04.04 SALIDA DE DESAGUE PVC-SAL 2" pto 26.00 41.74 1,085.24 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.00 1,085.24 100.00%
04.06.02.01.11.04.05 SALIDA DE DESAGUE PVC-SAL 4" pto 13.00 42.49 552.37 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 552.37 100.00%
04.06.02.01.11.04.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 13.00 58.93 766.09 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 766.09 100.00%
04.06.02.01.12 APARATOS Y ACCESORIOS SANITARIOS 3,531.58 0.00 0.00 0.00 0.00% 0.00 3,531.58 100.00%
04.06.02.01.12.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0.74 M und 13.00 148.78 1,934.14 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 1,934.14 100.00%
04.06.02.01.12.02 SUMINISTRO E INSTALACION DE LAVATORIO und 13.00 73.99 961.87 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 961.87 100.00%
04.06.02.01.12.03 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 13.00 48.89 635.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 635.57 100.00%
04.06.02.01.13 INSTALACIONES ELECTRICAS 2,408.12 0.00 0.00 0.00 0.00% 0.00 2,408.12 100.00%
04.06.02.01.13.01 SALIDA PARA INTERRUPTOR DOBLE und 13.00 22.42 291.46 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 291.46 100.00%
04.06.02.01.13.02 SALIDA PARA CENTRO DE LUZ und 26.00 65.44 1,701.44 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.00 1,701.44 100.00%
04.06.02.01.13.03 SALIDA PARA TOMACORRIENTES und 13.00 31.94 415.22 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 415.22 100.00%
04.06.02.02 INSTALACION DE BIODIGESTOR DE 600 LTS 20,141.25 66.47 0.00 66.47 0.33% 0.00 20,074.78 99.67%
04.06.02.02.01 TRABAJOS PRELIMINARES 66.47 66.47 0.00 66.47 100.00% 0.00 0.00 0.00%
04.06.02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 24.53 0.61 14.96 24.53 14.96 100.00% 0.00 0.00% 24.53 14.96 100.00% 0.00 0.00 0.00%
04.06.02.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 24.53 2.10 51.51 24.53 51.51 100.00% 0.00 0.00% 24.53 51.51 100.00% 0.00 0.00 0.00%
04.06.02.02.02 MOVIMIENTO DE TIERRAS 1,908.45 0.00 0.00 0.00 0.00% 0.00 1,908.45 100.00%
04.06.02.02.02.01 EXCAVACION DE TERRENO NORMAL m3 34.93 34.92 1,219.76 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 34.93 1,219.76 100.00%
04.06.02.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 16.05 30.92 496.27 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.05 496.27 100.00%
04.06.02.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 23.61 8.15 192.42 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.61 192.42 100.00%
04.06.02.02.03 OBRAS DE CONCRETO SIMPLE 99.91 0.00 0.00 0.00 0.00% 0.00 99.91 100.00%
04.06.02.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 0.26 384.28 99.91 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.26 99.91 100.00%
04.06.02.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 4,702.81 0.00 0.00 0.00 0.00 0.00% 0.00 4,702.81 100.00%
04.06.02.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 43.16 48.31 2,085.06 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 43.16 2,085.06 100.00%
04.06.02.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODOS m3 4.24 364.74 1,546.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.24 1,546.50 100.00%
04.06.02.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 32.76 32.70 1,071.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 32.76 1,071.25 100.00%
04.06.02.02.05 BIODIGESTOR DE 600Lts. 13,363.61 0.00 0.00 0.00 0.00% 0.00 13,363.61 100.00%
04.06.02.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 Lts und 13.00 1,027.97 13,363.61 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 13,363.61 100.00%
04.06.02.03 CONSTRUCCIÓN DE POZO PERCOLADOR 18,617.05 84.74 0.00 84.74 0.46% 0.00 18,532.31 99.54%
04.06.02.03.01 TRABAJOS PRELIMINARES 84.74 84.74 0.00 84.74 100.00% 0.00 0.00 0.00%
04.06.02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 31.27 0.61 19.07 31.27 19.07 100.00% 0.00 0.00% 31.27 19.07 100.00% 0.00 0.00 0.00%
04.06.02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 31.27 2.10 65.67 31.27 65.67 100.00% 0.00 0.00% 31.27 65.67 100.00% 0.00 0.00 0.00%
04.06.02.03.02 MOVIMIENTO DE TIERRAS 4,119.14 0.00 0.00 0.00 0.00% 0.00 4,119.14 100.00%
04.06.02.03.02.01 EXCAVACION DE TERRENO NORMAL m3 68.37 34.92 2,387.48 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 68.37 2,387.48 100.00%
04.06.02.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 85.48 8.15 696.66 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 85.48 696.66 100.00%
04.06.02.03.02.03 RELLENO CON GRAVA 1" m3 10.78 64.85 699.08 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.78 699.08 100.00%
04.06.02.03.02.04 FILTRO DE GRAVA Ø 1" m3 5.18 64.85 335.92 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.18 335.92 100.00%
04.06.02.03.03 OBRAS DE CONCRETO SIMPLE 3,558.66 0.00 0.00 0.00 0.00% 0.00 3,558.66 100.00%
04.06.02.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 18.30 48.31 884.07 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.30 884.07 100.00%
04.06.02.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 6.96 384.28 2,674.59 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.96 2,674.59 100.00%
04.06.02.03.04 OBRAS DE CONCRETO ARMADO 2,144.26 0.00 0.00 0.00 0.00% 0.00 2,144.26 100.00%
04.06.02.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 2.45 384.28 941.49 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.45 941.49 100.00%
04.06.02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.33 48.31 305.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.33 305.80 100.00%
04.06.02.03.04.03 ACERO FY=4200 KG/CM2 kg 134.68 6.66 896.97 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 134.68 896.97 100.00%
04.06.02.03.05 MUROS DE LADRILLO 8,710.25 0.00 0.00 0.00 0.00% 0.00 8,710.25 100.00%
04.06.02.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 CM m2 95.57 91.14 8,710.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 95.57 8,710.25 100.00%
04.06.03 ESTUDIOS COMPLEMENTARIOS 1,710.00 1,350.00 0.00 78.95% 1,350.00 78.95% 0.00 360.00 21.05%
04.06.03.01 DISEÑO DE MEZCLA und 3.00 450.00 1,350.00 3.00 1,350.00 100.00% 0.00 0.00% 3.00 1,350.00 100.00% 0.00 0.00 0.00%
04.06.03.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 9.00 40.00 360.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 360.00 100.00%
04.06.04 FLETE 17,158.25 9,437.04 3,774.82 77.00% 13,211.85 77.00% 0.00 3,946.40 23.00%
04.06.04.01 FLETE TERRESTRE Y ACARREO CCOLLONTA - B GLB 1.00 17,158.25 17,158.25 0.55 9,437.04 55.00% 0.22 3,774.82 22.00% 0.77 13,211.85 77.00% 0.23 3,946.40 23.00%
VALORIZACIÓN DE OBRA N° 03 : CORRESPONDIENTE AL MES : ABRIL 2018

Obra : MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 04

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
04.06.05 PROGRAMA DE MITIGACION E IMPACTO AMBIENTAL 4,747.44 708.92 0.00 14.93% 708.92 14.93% 0.00 4,038.52 85.07%
04.06.05.01 PROGRAMA DE PREVENCION DE MITIGACION 708.92 708.92 0.00 708.92 100.00% 0.00 0.00 0.00%
04.06.05.01.01 CARTELES PERMANENTES und 5.00 63.56 317.80 5.00 317.80 100.00% 0.00 0.00% 5.00 317.80 100.00% 0.00 0.00 0.00%
04.06.05.01.02 CARTELES TEMPORALES und 5.00 67.80 339.00 5.00 339.00 100.00% 0.00 0.00% 5.00 339.00 100.00% 0.00 0.00 0.00%
04.06.05.01.03 CINTAS DE SEÑAL DE TRABAJO rll 1.00 52.12 52.12 1.00 52.12 100.00% 0.00 0.00% 1.00 52.12 100.00% 0.00 0.00 0.00%
04.06.05.02 PROGRAMA DE ABANDONO DE OBRA 4,038.52 0.00 0.00 0.00 0.00% 0.00 4,038.52 100.00%
04.06.05.02.01 REACONDICIONAMIENTO DE AREA OCUPADA (CAMPAMENTO Y MAQUIN m2 1,000.00 3.22 3,220.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,000.00 3,220.00 100.00%
04.06.05.02.02 REACONDICIONAMIENTO DE CANTERAS Y ACCESOS HA 0.50 157.27 78.64 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.50 78.64 100.00%
04.06.05.02.03 REFORESTACION EN CAPTACIONES Y RESERVORIO m2 26.50 27.92 739.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.50 739.88 100.00%
04.06.06 ADECUADO CONOCIMIENTO DE EDUCACION SANITARIA 4,000.00 2,000.00 250.00 56.25% 2,250.00 56.25% 0.00 1,750.00 43.75%
04.06.06.01 CAPACITACION ANTES DE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 2.00 1,000.00 50.00% 0.25 125.00 6.25% 2.25 1,125.00 56.25% 1.75 875.00 43.75%
04.06.06.02 CAPACITACION DURANTE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 2.00 1,000.00 50.00% 0.25 125.00 6.25% 2.25 1,125.00 56.25% 1.75 875.00 43.75%
EFICIENTE GESTION TECNICA Y ADMINISTRATIVA DE LOS SERVICIOS DE
04.06.07 4,000.00 2,000.00 250.00 56.25% 2,250.00 56.25% 4,000.00 43.75%
AGUA Y SANEAMIENTO A TRAVES DEL LAS JASS 0.00
04.06.07.01 PROGRAMA DE FORTALECIMIENTO DE CAPACIDADES PARA LA POBLACI und 4.00 1,000.00 4,000.00 2.00 2,000.00 50.00% 0.25 250.00 6.25% 2.25 2,250.00 56.25% 1.75 4,000.00 43.75%

COSTO DIRECTO 1,755,448.38 604,425.42 292,315.45 16.65% 896,740.85 51.08% 860,957.53 49.04%

TOTAL PRESPUESTO 1,755,448.38 604,425.42 292,315.45 16.65% 896,740.85 51.08% 860,957.53 49.04%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05 COMUNIDAD DE HUANCARPUQUIO 1,705,958.72 258,693.46 0.00% 466,432.52 42.51% 725,125.97 42.51% 0.00 980,832.75 57.49%
05.01 LOCALIDAD DE TOCSAPUQUIO 559,707.00 83,576.47 0.00% 174,624.17 46.13% 258,200.64 46.13% 0.00 301,506.36
05.01.01 SISTEMA DE AGUA POTABLE 268,015.69 33,995.55 0.00% 168,698.73 75.63% 202,694.28 75.63% 0.00 65,321.41
05.01.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
05.01.01.01.01 OBRAS PROVISIONALES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
05.01.01.01.01.01 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 1,760.72 1,760.72 1.0 1,760.72 100.00% 0.00 0.00% 1.00 1,760.72 100.00% 0.00 0.00 0.00%
05.01.01.01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 797.66 797.66 1.0 797.66 100.00% 0.00 0.00% 1.00 797.66 100.00% 0.00 0.00 0.00%
05.01.01.02 CONSTRUCCION DE CAPTACION TIPO - 1 5,072.96 74.91 0.00 74.91 1.48% 0.00 4,998.05
05.01.01.02.01 TRABAJOS PRELIMINARES 74.91 74.91 0.00 74.91 100.00% 0.00 0.00
05.01.01.02.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 16.50 2.44 40.26 16.5 40.26 100.00% 0.00 0.00% 16.50 40.26 100.00% 0.00 0.00 0.00%
05.01.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 16.50 2.10 34.65 16.5 34.65 100.00% 0.00 0.00% 16.50 34.65 100.00% 0.00 0.00 0.00%
05.01.01.02.02 MOVIMIENTO DE TIERRAS 887.73 0.00 0.00 0.00 0.00% 0.00 887.73
05.01.01.02.02.01 EXCAVACION EN TERRENO NORMAL CAPTACION m3 8.25 39.64 327.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.25 327.03 100.00%
05.01.01.02.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 4.95 40.54 200.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.95 200.67 100.00%
05.01.01.02.02.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE (50 M ) m3 10.31 34.92 360.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.31 360.03 100.00%
05.01.01.02.03 CONCRETO SIMPLE 210.73 0.00 0.00 0.00 0.00% 0.00 210.73
05.01.01.02.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS m3 0.81 260.16 210.73 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.81 210.73 100.00%
05.01.01.02.04 CONCRETO ARMADO 1,416.99 0.00 0.00 0.00 0.00% 0.00 1,416.99
05.01.01.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 10.37 48.31 500.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.37 500.97 100.00%
05.01.01.02.04.02 ACERO FY=4200 KG/CM2 kg 61.78 6.66 411.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.78 411.45 100.00%
05.01.01.02.04.03 CONCRETO FC=210 KG/CM2 m3 1.22 413.58 504.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.22 504.57 100.00%
05.01.01.02.05 REVOQUES ENLUCIDOS Y MOLDURAS 212.46 0.00 0.00 0.00 0.00% 0.00 212.46
05.01.01.02.05.01 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 6.04 20.00 120.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 120.80 100.00%
05.01.01.02.05.02 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 3.29 27.86 91.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.29 91.66 100.00%
05.01.01.02.06 VALVULAS Y TAPAS Y ACCESORIOS 603.49 0.00 0.00 0.00 0.00% 0.00 603.49
05.01.01.02.06.01 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.60X0.60M und 0.36 352.51 126.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.36 126.90 100.00%
05.01.01.02.06.02 SUMINISTRO E INST. VALVULA COMPUERTA H. DUCTIL, Y ACCESORIOS und 1.00 429.91 429.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 429.91 100.00%
05.01.01.02.06.03 CODO FºDº DN 160X90º ISO ED und 4.00 11.67 46.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 46.68 100.00%
05.01.01.02.07 FILTROS 59.77 0.00 0.00 0.00 0.00% 0.00 59.77
05.01.01.02.07.01 FILTROS DE GRAVA m3 0.22 109.19 24.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.22 24.02 100.00%
05.01.01.02.07.02 FILTROS DE ARENA m3 0.29 123.26 35.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.29 35.75 100.00%
05.01.01.02.08 PINTURA 173.78 0.00 0.00 0.00 0.00% 0.00 173.78
05.01.01.02.08.01 PINTURA EN TAPAS METALICAS m2 1.04 22.08 22.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.04 22.96 100.00%
05.01.01.02.08.02 PINTURA EN MUROS EXTERIORES (CAPTACION) m2 6.04 24.97 150.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 150.82 100.00%
05.01.01.02.09 CERCO PERIMETRICO 1,433.10 0.00 0.00 0.00 0.00% 0.00 1,433.10
05.01.01.02.09.01 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 51.00 28.10 1,433.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.00 1,433.10 100.00%
05.01.01.03 LINEA DE CONDUCCION 94,470.73 9,668.90 78,374.20 88,043.10 93.20% 0.00 6,427.63
05.01.01.03.01 TENDIDO DE TUBERIA PVC SAP 92,257.24 9,661.26 78,374.20 88,035.46 95.42% 0.00 4,221.78
05.01.01.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 1,233.35 2.10 2,590.04 1,233.4 2,590.04 100.00% 0.00 0.00% 1,233.35 2,590.04 100.00% 0.00 0.00 0.00%
05.01.01.03.01.02 EXCAVACION MANUAL DE ZANJA DE TERRENO CONGLOMERADO m3 719.46 34.92 25,123.54 0.0 0.00 0.00% 719.46 25,123.54 100.00% 719.46 25,123.54 100.00% 0.00 0.00 0.00%
05.01.01.03.01.03 REFINE Y NIVELACION DE ZANJA m 2,055.59 4.08 8,386.81 0.0 0.00 0.00% 2,055.59 8,386.81 100.00% 2,055.59 8,386.81 100.00% 0.00 0.00 0.00%
05.01.01.03.01.04 CAMA DE APOYO E=10CM. m 2,055.59 1.66 3,412.28 0.0 0.00 0.00% 2,055.59 3,412.28 100.00% 2,055.59 3,412.28 100.00% 0.00 0.00 0.00%
05.01.01.03.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 345.34 23.80 8,219.09 0.0 0.00 0.00% 345.34 8,219.09 100.00% 345.34 8,219.09 100.00% 0.00 0.00 0.00%
05.01.01.03.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 518.01 57.17 29,614.63 0.0 0.00 0.00% 518.01 29,614.63 100.00% 518.01 29,614.63 100.00% 0.00 0.00 0.00%
05.01.01.03.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 518.01 8.15 4,221.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 518.01 4,221.78 100.00%
05.01.01.03.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 2,055.59 4.30 8,839.04 1,644.5 7,071.22 80.00% 411.12 1,767.82 20.00% 2,055.59 8,839.04 100.00% 0.00 0.00 0.00%
05.01.01.03.01.09 PRUEBA HIDRAULICA DE LA LINEA DE CONDUCCION m 2,055.59 0.90 1,850.03 0.0 0.00 0.00% 2,055.59 1,850.03 100.00% 2,055.59 1,850.03 100.00% 0.00 0.00 0.00%
05.01.01.03.02 CAMARA DE DISTRIBUCION DE CAUDALES 2,213.49 7.64 0.00 7.64 0.35% 0.00 2,205.85
05.01.01.03.02.01 LIMPIEZA DE TERRENO MANUAL m2 2.82 0.61 1.72 2.8 1.72 100.00% 0.00 0.00% 2.82 1.72 100.00% 0.00 0.00 0.00%
05.01.01.03.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.82 2.10 5.92 2.8 5.92 100.00% 0.00 0.00% 2.82 5.92 100.00% 0.00 0.00 0.00%
05.01.01.03.02.03 EXCAVACION DE TIERRA m3 1.15 34.92 40.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.15 40.16 100.00%
05.01.01.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 1.43 8.15 11.65 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.43 11.65 100.00%
05.01.01.03.02.05 CONCRETO F'C= 175 KG/CM2 m3 0.76 384.28 292.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.76 292.05 100.00%
05.01.01.03.02.06 ACERO FY=4200 KG/CM2 kg 38.13 6.66 253.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 38.13 253.95 100.00%
05.01.01.03.02.07 ENCOFRADO Y DESENCOFRADO DE MUROS m2 11.08 45.76 507.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.08 507.02 100.00%
05.01.01.03.02.08 TARRAJEO EXTERIOR E=1:5 CM MEZCLA 1:4 m2 5.76 22.96 132.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.76 132.25 100.00%
05.01.01.03.02.09 TARRAJEO INTERIOR C/IMPERMEABILIZANTE E=1.5 CM MEZCLA 1:2 m2 5.90 36.29 214.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.90 214.11 100.00%
05.01.01.03.02.10 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN CÁMARA GLB 1.00 258.56 258.56 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 258.56 100.00%
05.01.01.03.02.11 TAPA METALICA Y MARCO DE 0.60x0.60 m e=1/8" und 2.00 213.02 426.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 426.04 100.00%
05.01.01.03.02.12 PINTURA EN MUROS m2 5.56 9.55 53.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.56 53.10 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05.01.01.03.02.13 PINTURA TAPAS ANTICORROSIVO m2 1.00 16.96 16.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 16.96 100.00%
05.01.01.04 RESERVORIO (5 M3) 18,614.77 76.44 0.00 76.44 0.41% 0.00 18,538.33
05.01.01.04.01 RESERVORIO 14,539.47 49.03 0.00 49.03 0.34% 0.00 14,490.44
05.01.01.04.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 10.80 2.44 26.35 10.8 26.35 100.00% 0.00 0.00% 10.80 26.35 100.00% 0.00 0.00 0.00%
05.01.01.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 10.80 2.10 22.68 10.8 22.68 100.00% 0.00 0.00% 10.80 22.68 100.00% 0.00 0.00 0.00%
05.01.01.04.01.03 EXCAVACION EN TERRENO NORMAL RESERVORIO m3 5.40 34.92 188.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.40 188.57 100.00%
05.01.01.04.01.04 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 6.75 14.23 96.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.75 96.05 100.00%
05.01.01.04.01.05 SOLADO C:H 1:8 (h= 0.10 m) m2 0.96 189.58 182.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.96 182.00 100.00%
05.01.01.04.01.06 CONCRETO F'C= 210 KG/CM2 EN RESERVORIO m3 6.18 413.58 2,555.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.18 2,555.92 100.00%
05.01.01.04.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 48.75 48.31 2,355.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.75 2,355.11 100.00%
05.01.01.04.01.08 ACERO FY=4200 KG/CM2 kg 213.15 6.66 1,419.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 213.15 1,419.58 100.00%
05.01.01.04.01.09 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 61.28 27.86 1,707.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.28 1,707.26 100.00%
05.01.01.04.01.10 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 61.28 20.00 1,225.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.28 1,225.60 100.00%
05.01.01.04.01.11 TAPA SANITARIA METALICA DE 0.60x0.60 mts und 2.00 197.60 395.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 395.20 100.00%
05.01.01.04.01.12 INSTALACION DE ACCESORIOS TUB. VENTILACION 2" und 1.00 118.31 118.31 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 118.31 100.00%
05.01.01.04.01.13 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS DE 3/4" und 1.00 496.89 496.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 496.89 100.00%
05.01.01.04.01.14 INSTALACION DE ACCESORIOS EN RESERVORIO und 1.00 872.43 872.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 872.43 100.00%
05.01.01.04.01.15 PINTADO DE MURO EXTERIOR m2 60.40 15.54 938.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 60.40 938.62 100.00%
05.01.01.04.01.16 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 69.00 28.10 1,938.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 69.00 1,938.90 100.00%
05.01.01.04.02 CASETA DE CLORACION POR GOTEO 4,075.30 27.41 0.00 27.41 0.67% 0.00 4,047.89
05.01.01.04.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
05.01.01.04.02.02 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5X m2 11.54 71.15 821.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.54 821.07 100.00%
05.01.01.04.02.03 TARRAJEO EN INTERIORES Y EXTERIORES m2 20.50 28.40 582.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.50 582.20 100.00%
05.01.01.04.02.04 REJILLA METALICA SEGUN DISEÑO INC. COLOCADO und 1.00 421.12 421.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 421.12 100.00%
05.01.01.04.02.05 COBERTURA DE CALAMINA EN CASETA DE CLORACION m2 4.00 58.15 232.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 232.60 100.00%
05.01.01.04.02.06 INSTALACION DE PUERTA METÁLICA (SEGÚN DISEÑO) und 1.00 257.57 257.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 257.57 100.00%
05.01.01.04.02.07 INSTALACION DE ACCESORIOS EN CASETA DE CLORACION und 1.00 1,557.57 1,557.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,557.57 100.00%
05.01.01.04.02.08 PINTADO DE MURO EXTERIOR m2 11.31 15.54 175.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 175.76 100.00%
05.01.01.05 LINEA DE ADUCCION Y RED DE DISTRIBUCION 132,701.36 19,945.23 90,324.53 110,269.76 83.10% 0.00 22,431.60
05.01.01.05.01 TENDIDO DE TUBERIA DE ADUCCION Y DISTRIBUCION PVC SAP 113,903.29 19,866.35 90,324.53 110,190.88 96.74% 0.00 3,712.41
05.01.01.05.01.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 1,272.11 8.03 10,215.04 1,272.1 10,215.04 100.00% 0.00 0.00% 1,272.11 10,215.04 100.00% 0.00 0.00 0.00%
05.01.01.05.01.02 EXCAVACION MANUAL ZANJA EN TERRENO CONGLOMERADO m3 742.07 58.58 43,470.46 0.0 0.00 0.00% 742.07 43,470.46 100.00% 742.07 43,470.46 100.00% 0.00 0.00 0.00%
05.01.01.05.01.03 REFINE Y NIVELACION DE ZANJA m 2,120.19 2.04 4,325.19 0.0 0.00 0.00% 2,120.19 4,325.19 100.00% 2,120.19 4,325.19 100.00% 0.00 0.00 0.00%
05.01.01.05.01.04 CAMA DE APOYO E=10CM. m 2,120.19 1.66 3,519.52 0.0 0.00 0.00% 2,120.19 3,519.52 100.00% 2,120.19 3,519.52 100.00% 0.00 0.00 0.00%
05.01.01.05.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 356.19 23.80 8,477.32 0.0 0.00 0.00% 356.19 8,477.32 100.00% 356.19 8,477.32 100.00% 0.00 0.00 0.00%
05.01.01.05.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 455.51 57.17 26,041.51 0.0 0.00 0.00% 455.51 26,041.51 100.00% 455.51 26,041.51 100.00% 0.00 0.00 0.00%
05.01.01.05.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 455.51 8.15 3,712.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 455.51 3,712.41 100.00%
05.01.01.05.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1/2" m 436.92 12.29 5,369.75 349.5 4,295.85 80.00% 87.38 1,073.90 20.00% 436.92 5,369.75 100.00% 0.00 0.00 0.00%
05.01.01.05.01.09 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 617.07 4.30 2,653.40 493.7 2,122.74 80.00% 123.41 530.66 20.00% 617.07 2,653.40 100.00% 0.00 0.00 0.00%
05.01.01.05.01.10 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 3/4" m 1,066.20 3.79 4,040.90 853.0 3,232.72 80.00% 213.24 808.18 20.00% 1,066.20 4,040.90 100.00% 0.00 0.00 0.00%
05.01.01.05.01.11 PRUEBA HIDRAULICA m 2,120.19 0.98 2,077.79 0.0 0.00 0.00% 2,120.19 2,077.79 100.00% 2,120.19 2,077.79 100.00% 0.00 0.00 0.00%
05.01.01.05.02 VALVULA DE CONTROL 3,672.67 7.81 0.00 7.81 0.21% 0.00 3,664.86
05.01.01.05.02.01 LIMPIEZA DE TERRENO MANUAL m2 2.88 0.61 1.76 2.9 1.76 100.00% 0.00 0.00% 2.88 1.76 100.00% 0.00 0.00 0.00%
05.01.01.05.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.88 2.10 6.05 2.9 6.05 100.00% 0.00 0.00% 2.88 6.05 100.00% 0.00 0.00 0.00%
05.01.01.05.02.03 EXCAVACION DE ZANJA m3 1.15 34.92 40.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.15 40.16 100.00%
05.01.01.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 1.44 8.15 11.74 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.44 11.74 100.00%
05.01.01.05.02.05 CONCRETO F'C= 175 KG/CM2 m3 0.64 384.28 245.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.64 245.94 100.00%
05.01.01.05.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 12.80 48.31 618.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.80 618.37 100.00%
05.01.01.05.02.07 TARRAJEO CON IMPERMEABILIZANTE m2 12.80 29.19 373.63 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.80 373.63 100.00%
05.01.01.05.02.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 5.12 28.40 145.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.12 145.41 100.00%
05.01.01.05.02.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 1.00 512.25 512.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 512.25 100.00%
05.01.01.05.02.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 8.00 213.49 1,707.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 1,707.92 100.00%
05.01.01.05.02.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.13 72.62 9.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.13 9.44 100.00%
05.01.01.05.03 VALVULA DE PURGA 5,676.66 35.13 0.00 35.13 0.62% 0.00 5,641.53
05.01.01.05.03.01 LIMPIEZA DE TERRENO MANUAL m2 12.96 0.61 7.91 13.0 7.91 100.00% 0.00 0.00% 12.96 7.91 100.00% 0.00 0.00 0.00%
05.01.01.05.03.02 TRAZO Y REPLANTEO PRELIMINAR m2 12.96 2.10 27.22 13.0 27.22 100.00% 0.00 0.00% 12.96 27.22 100.00% 0.00 0.00 0.00%
05.01.01.05.03.03 EXCAVACION DE ZANJA m3 9.07 34.92 316.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.07 316.72 100.00%
05.01.01.05.03.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 11.34 8.15 92.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.34 92.42 100.00%
05.01.01.05.03.05 CONCRETO F'C= 175 KG/CM2 m3 1.37 384.28 526.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.37 526.46 100.00%
05.01.01.05.03.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 27.00 48.31 1,304.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.00 1,304.37 100.00%
05.01.01.05.03.07 TARRAJEO CON IMPERMEABILIZANTE m2 25.20 29.19 735.59 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.20 735.59 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05.01.01.05.03.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 10.08 28.40 286.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.08 286.27 100.00%
05.01.01.05.03.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN CAJA DE GLB 2.00 224.06 448.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 448.12 100.00%
05.01.01.05.03.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 9.00 213.49 1,921.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 1,921.41 100.00%
05.01.01.05.03.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.14 72.62 10.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.14 10.17 100.00%
05.01.01.05.04 CAMARA ROMPE PRESION T - VII 9,448.74 0.0 35.94 0.00 0.00 35.94 0.38% 0.00 9,412.80
05.01.01.05.04.01 LIMPIEZA DE TERRENO MANUAL m2 13.26 0.61 8.09 13.3 8.09 100.00% 0.00 0.00% 13.26 8.09 100.00% 0.00 0.00 0.00%
05.01.01.05.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 13.26 2.10 27.85 13.3 27.85 100.00% 0.00 0.00% 13.26 27.85 100.00% 0.00 0.00 0.00%
05.01.01.05.04.03 EXCAVACION DE ZANJA m3 11.95 34.92 417.29 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.95 417.29 100.00%
05.01.01.05.04.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 14.94 8.15 121.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.94 121.76 100.00%
05.01.01.05.04.05 CONCRETO F'C= 175 KG/CM2 m3 3.95 384.28 1,517.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.95 1,517.91 100.00%
05.01.01.05.04.06 ACERO FY=4200 KG/CM2 kg 121.28 6.66 807.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 121.28 807.72 100.00%
05.01.01.05.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 54.04 48.31 2,610.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.04 2,610.67 100.00%
05.01.01.05.04.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 19.74 46.31 914.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.74 914.16 100.00%
05.01.01.05.04.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C.R.P. TIPO GLB 6.00 205.99 1,235.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 1,235.94 100.00%
05.01.01.05.04.10 TAPA METALICA Y MARCO DE 0.60x0.60m y 0.30x0.30m e=1/8" EN C.R.P. TI und 6.00 278.02 1,668.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 1,668.12 100.00%
05.01.01.05.04.11 PINTURA EN TAPAS METALICAS m2 5.40 22.08 119.23 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.40 119.23 100.00%
05.01.01.06 CONEXIONES DOMICILIARIAS 14,597.49 1,671.69 0.00 1,671.69 11.45% 0.00 12,925.80
05.01.01.06.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 208.18 8.03 1,671.69 208.2 1,671.69 100.00% 0.00 0.00% 208.18 1,671.69 100.00% 0.00 0.00 0.00%
05.01.01.06.02 EXCAVACION MANUAL DE ZANJA EN TERRENO CONGLOMERADO m3 104.09 23.12 2,406.56 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 104.09 2,406.56 100.00%
05.01.01.06.03 REFINE Y NIVELACION DE ZANJA m 346.96 4.08 1,415.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 346.96 1,415.60 100.00%
05.01.01.06.04 CAMA DE APOYO E=10CM. m 346.96 1.66 575.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 346.96 575.95 100.00%
05.01.01.06.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 103.05 23.80 2,452.59 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 103.05 2,452.59 100.00%
05.01.01.06.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 11.45 57.17 654.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.45 654.60 100.00%
05.01.01.06.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 11.45 8.15 93.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.45 93.32 100.00%
05.01.01.06.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" m 346.96 3.46 1,200.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 346.96 1,200.48 100.00%
05.01.01.06.09 CONEXIÓN DOMICILIARIA INC. CAJA DE AGUA POTABLE MATRIZ Ø 1 1/2" @und 28.00 136.23 3,814.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 3,814.44 100.00%
05.01.01.06.10 PRUEBA HIDRAULICA EN TUBERIA INSTALADA m 346.96 0.90 312.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 346.96 312.26 100.00%
05.01.02 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO DOMICILIARIAS 249,022.35 26,514.38 0.00 10.65% 26,514.38 10.65% 0.00 222,507.97
05.01.02.01 CONSTRUCCION DE CASETA DE BAÑO 165,539.68 4,601.32 0.00 4,601.32 2.78% 0.00 160,938.36
05.01.02.01.01 OBRAS PROVISIONALES 3,518.51 3,518.51 0.00 3,518.51 100.00% 0.00 0.00
05.01.02.01.01.01 LETRINAS DE HOYO SECO VENTILADO (PARA PERSONAL OBRERO) 1,904.75 1,904.75 0.00 1,904.75 100.00% 0.00 0.00
05.01.02.01.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.38 0.61 2.06 3.4 2.06 100.00% 0.00 0.00% 3.38 2.06 100.00% 0.00 0.00 0.00%
05.01.02.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.38 2.10 7.10 3.4 7.10 100.00% 0.00 0.00% 3.38 7.10 100.00% 0.00 0.00 0.00%
05.01.02.01.01.01.03 EXCAVACION DE ZANJA m3 6.42 34.92 224.19 6.4 224.19 100.00% 0.00 0.00% 6.42 224.19 100.00% 0.00 0.00 0.00%
05.01.02.01.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.03 8.15 65.44 8.0 65.44 100.00% 0.00 0.00% 8.03 65.44 100.00% 0.00 0.00 0.00%
05.01.02.01.01.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.24 48.31 301.45 6.2 301.45 100.00% 0.00 0.00% 6.24 301.45 100.00% 0.00 0.00 0.00%
05.01.02.01.01.01.06 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.94 364.59 342.71 0.9 342.71 100.00% 0.00 0.00% 0.94 342.71 100.00% 0.00 0.00 0.00%
05.01.02.01.01.01.07 ACERO FY=4200 KG/CM2 kg 18.14 6.66 120.81 18.1 120.81 100.00% 0.00 0.00% 18.14 120.81 100.00% 0.00 0.00 0.00%
05.01.02.01.01.01.08 CONCRETO F'C= 175 KG/CM2 m3 0.17 384.28 65.33 0.2 65.33 100.00% 0.00 0.00% 0.17 65.33 100.00% 0.00 0.00 0.00%
05.01.02.01.01.01.09 CASETA PARA LETRINAS INC. PUERTA DE CALAMINA und 2.00 346.09 692.18 2.0 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
05.01.02.01.01.01.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.0 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
05.01.02.01.01.02 DUCHAS O VESTUARIOS (PARA PERSONAL OBRERO) 1,335.92 1,335.92 0.00 1,335.92 100.00% 0.00 0.00
05.01.02.01.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 4.00 0.61 2.44 4.0 2.44 100.00% 0.00 0.00% 4.00 2.44 100.00% 0.00 0.00 0.00%
05.01.02.01.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.10 8.40 4.0 8.40 100.00% 0.00 0.00% 4.00 8.40 100.00% 0.00 0.00 0.00%
05.01.02.01.01.02.03 EXCAVACION DE ZANJA m3 2.04 34.92 71.24 2.0 71.24 100.00% 0.00 0.00% 2.04 71.24 100.00% 0.00 0.00 0.00%
05.01.02.01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.55 8.15 20.78 2.6 20.78 100.00% 0.00 0.00% 2.55 20.78 100.00% 0.00 0.00 0.00%
05.01.02.01.01.02.05 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 2.00 72.62 145.24 2.0 145.24 100.00% 0.00 0.00% 2.00 145.24 100.00% 0.00 0.00 0.00%
05.01.02.01.01.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.40 48.31 115.94 2.4 115.94 100.00% 0.00 0.00% 2.40 115.94 100.00% 0.00 0.00 0.00%
05.01.02.01.01.02.07 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.27 364.59 98.44 0.3 98.44 100.00% 0.00 0.00% 0.27 98.44 100.00% 0.00 0.00 0.00%
05.01.02.01.01.02.08 CASETA PARA DUCHAS INC. PUERTA DE CALAMINA m2 2.00 346.09 692.18 2.0 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
05.01.02.01.01.02.09 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 2.00 48.89 97.78 2.0 97.78 100.00% 0.00 0.00% 2.00 97.78 100.00% 0.00 0.00 0.00%
05.01.02.01.01.02.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.0 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
05.01.02.01.01.03 LAVADERO DE GRANITO (PARA PERSONAL OBRERO) 277.84 0.0 277.84 0.00 0.00 277.84 100.00% 0.00 0.00
05.01.02.01.01.03.01 SUMINISTRO E INSTALACIÓN DE LAVADERO DE GRANITO und 2.00 138.92 277.84 2.0 277.84 100.00% 0.00 0.00% 2.00 277.84 100.00% 0.00 0.00 0.00%
05.01.02.01.02 TRABAJOS PRELIMINARES 583.90 0.0 583.90 0.00 0.00 583.90 100.00% 0.00 0.00
05.01.02.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 215.46 0.61 131.43 215.5 131.43 100.00% 0.00 0.00% 215.46 131.43 100.00% 0.00 0.00 0.00%
05.01.02.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 215.46 2.10 452.47 215.5 452.47 100.00% 0.00 0.00% 215.46 452.47 100.00% 0.00 0.00 0.00%
05.01.02.01.03 MOVIMIENTO DE TIERRAS 4,521.28 0.00 0.00 0.00 0.00% 0.00 4,521.28
05.01.02.01.03.01 EXCAVACION DE TERRENO NORMAL m3 52.78 34.92 1,843.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.78 1,843.08 100.00%
05.01.02.01.03.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 65.97 8.15 537.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 65.97 537.66 100.00%
05.01.02.01.03.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 22.40 95.56 2,140.54 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.40 2,140.54 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05.01.02.01.04 OBRAS DE CONCRETO SIMPLE 28,774.59 0.00 0.00 0.00 0.00% 0.00 28,774.59
05.01.02.01.04.01 CIMIENTOS CORRIDOS 6,692.03 0.00 0.00 0.00 0.00% 0.00 6,692.03
05.01.02.01.04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 28.84 232.04 6,692.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.84 6,692.03 100.00%
05.01.02.01.04.02 SOBRECIMIENTOS 9,031.37 0.00 0.00 0.00 0.00% 0.00 9,031.37
05.01.02.01.04.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 132.16 44.52 5,883.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 132.16 5,883.76 100.00%
05.01.02.01.04.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 9.91 317.62 3,147.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.91 3,147.61 100.00%
05.01.02.01.04.03 PISO INTERIOR 2,774.70 0.00 0.00 0.00 0.00% 0.00 2,774.70
05.01.02.01.04.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO CEMENTO PU m2 61.88 44.84 2,774.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.88 2,774.70 100.00%
05.01.02.01.04.04 SARDINEL DE DUCHA 534.76 0.00 0.00 0.00 0.00% 0.00 534.76
05.01.02.01.04.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 9.24 48.31 446.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.24 446.38 100.00%
05.01.02.01.04.04.02 CONCRETO F'C= 175 KG/CM2 m3 0.23 384.28 88.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.23 88.38 100.00%
05.01.02.01.04.05 VEREDA PERIMETRAL 9,741.73 0.00 0.00 0.00 0.00% 0.00 9,741.73
05.01.02.01.04.05.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 31.08 42.84 1,331.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 31.08 1,331.47 100.00%
05.01.02.01.04.05.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑADO m2 127.26 44.84 5,706.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 127.26 5,706.34 100.00%
05.01.02.01.04.05.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 7.42 364.41 2,703.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.42 2,703.92 100.00%
05.01.02.01.05 OBRAS DE CONCRETO ARMADO 26,783.34 0.00 0.00 0.00 0.00% 0.00 26,783.34
05.01.02.01.05.01 COLUMNAS 18,963.03 0.00 0.00 0.00 0.00% 0.00 18,963.03
05.01.02.01.05.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 8.40 384.28 3,227.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.40 3,227.95 100.00%
05.01.02.01.05.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 179.20 45.29 8,115.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 179.20 8,115.97 100.00%
05.01.02.01.05.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 1,144.01 6.66 7,619.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,144.01 7,619.11 100.00%
05.01.02.01.05.02 VIGAS 7,820.31 0.00 0.00 0.00 0.00% 0.00 7,820.31
05.01.02.01.05.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 4.79 384.28 1,840.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.79 1,840.70 100.00%
05.01.02.01.05.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 87.78 50.83 4,461.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 87.78 4,461.86 100.00%
05.01.02.01.05.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 227.89 6.66 1,517.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 227.89 1,517.75 100.00%
05.01.02.01.06 MUROS DE LADRILLO 16,971.70 0.00 0.00 0.00 0.00% 0.00 16,971.70
05.01.02.01.06.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5X m2 233.77 72.60 16,971.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 233.77 16,971.70 100.00%
05.01.02.01.07 REVOQUES Y ENLUCIDOS 17,816.55 0.00 0.00 0.00 0.00% 0.00 17,816.55
05.01.02.01.07.01 ZÓCALO: TARRAJEADO Y PULIDO CON IMPERMEABILIZANTE / MEZCLA 1 m2 179.20 38.45 6,890.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 179.20 6,890.24 100.00%
05.01.02.01.07.02 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 159.88 20.82 3,328.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 159.88 3,328.70 100.00%
05.01.02.01.07.03 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINA m2 200.06 24.59 4,919.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 200.06 4,919.48 100.00%
05.01.02.01.07.04 BRUÑA DE 1 CM m 189.00 14.17 2,678.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 189.00 2,678.13 100.00%
05.01.02.01.08 PINTURA 4,351.28 0.00 0.00 0.00 0.00% 0.00 4,351.28
05.01.02.01.08.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 159.88 11.37 1,817.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 159.88 1,817.84 100.00%
05.01.02.01.08.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINAS EXTER m2 182.00 13.92 2,533.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 182.00 2,533.44 100.00%
05.01.02.01.09 COBERTURA LIVIANA PARA TECHO 11,000.19 0.00 0.00 0.00 0.00% 0.00 11,000.19
05.01.02.01.09.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 84.00 38.28 3,215.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 84.00 3,215.52 100.00%
05.01.02.01.09.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 3.00 m und 112.00 25.91 2,901.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 112.00 2,901.92 100.00%
05.01.02.01.09.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.30 mm m2 201.60 24.22 4,882.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 201.60 4,882.75 100.00%
05.01.02.01.10 CARPINTERIA DE MADERA 11,087.72 0.00 0.00 0.00 0.00% 0.00 11,087.72
05.01.02.01.10.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/TRIPLAY DE und 28.00 304.49 8,525.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 8,525.72 100.00%
05.01.02.01.10.02 SUMIN. E INSTAL. DE VENTANA DE MADERA SEGUN DISEÑO und 28.00 91.50 2,562.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 2,562.00 100.00%
05.01.02.01.11 INSTALACIONES SANITARIAS 27,337.42 498.91 0.00 498.91 1.83% 0.00 26,838.51
05.01.02.01.11.01 TRABAJOS PRELIMINARES 498.91 498.91 0.00 498.91 100.00% 0.00 0.00
05.01.02.01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 184.10 0.61 112.30 184.1 112.30 100.00% 0.00 0.00% 184.10 112.30 100.00% 0.00 0.00 0.00%
05.01.02.01.11.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 184.10 2.10 386.61 184.1 386.61 100.00% 0.00 0.00% 184.10 386.61 100.00% 0.00 0.00 0.00%
05.01.02.01.11.02 MOVIMIENTO DE TIERRAS 6,556.06 0.00 0.00 0.00 0.00% 0.00 6,556.06
05.01.02.01.11.02.01 EXCAVACION DE TERRENO NORMAL m3 91.11 34.92 3,181.56 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 91.11 3,181.56 100.00%
05.01.02.01.11.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 80.74 40.54 3,273.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.74 3,273.20 100.00%
05.01.02.01.11.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 12.43 8.15 101.30 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.43 101.30 100.00%
05.01.02.01.11.03 TUBERIAS Y ACCESORIOS 9,469.83 0.00 0.00 0.00 0.00% 0.00 9,469.83
05.01.02.01.11.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 84.00 23.00 1,932.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 84.00 1,932.00 100.00%
05.01.02.01.11.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + ACCESORIOS und 28.00 63.39 1,774.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 1,774.92 100.00%
05.01.02.01.11.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 126.00 5.14 647.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 126.00 647.64 100.00%
05.01.02.01.11.03.04 TUBERIA PVC SAL Ø 2" m 274.40 7.99 2,192.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 274.40 2,192.46 100.00%
05.01.02.01.11.03.05 TUBERIA PVC SAL Ø 4" m 229.60 12.73 2,922.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 229.60 2,922.81 100.00%
05.01.02.01.11.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 10,812.62 0.00 0.00 0.00 0.00% 0.00 10,812.62
05.01.02.01.11.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 59.22 48.31 2,860.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 59.22 2,860.92 100.00%
05.01.02.01.11.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 5.48 265.70 1,456.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.48 1,456.04 100.00%
05.01.02.01.11.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 40.32 32.70 1,318.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.32 1,318.46 100.00%
05.01.02.01.11.04.04 SALIDA DE DESAGUE PVC-SAL 2" pto 56.00 41.74 2,337.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.00 2,337.44 100.00%
05.01.02.01.11.04.05 SALIDA DE DESAGUE PVC-SAL 4" pto 28.00 42.49 1,189.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 1,189.72 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05.01.02.01.11.04.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 28.00 58.93 1,650.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 1,650.04 100.00%
05.01.02.01.12 APARATOS Y ACCESORIOS SANITARIOS 7,606.48 0.00 0.00 0.00 0.00% 0.00 7,606.48
05.01.02.01.12.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0.74 M und 28.00 148.78 4,165.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 4,165.84 100.00%
05.01.02.01.12.02 SUMINISTRO E INSTALACION DE LAVATORIO und 28.00 73.99 2,071.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 2,071.72 100.00%
05.01.02.01.12.03 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 28.00 48.89 1,368.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 1,368.92 100.00%
05.01.02.01.13 INSTALACIONES ELECTRICAS 5,186.72 0.00 0.00 0.00 0.00% 0.00 5,186.72
05.01.02.01.13.01 SALIDA PARA INTERRUPTOR DOBLE und 28.00 22.42 627.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 627.76 100.00%
05.01.02.01.13.02 SALIDA PARA CENTRO DE LUZ und 56.00 65.44 3,664.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.00 3,664.64 100.00%
05.01.02.01.13.03 SALIDA PARA TOMACORRIENTES und 28.00 31.94 894.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 894.32 100.00%
05.01.02.02 INSTALACION DE BIODIGESTOR DE 600 LTS 43,384.29 21,730.54 0.00 21,730.54 50.09% 0.00 21,653.75
05.01.02.02.01 TRABAJOS PRELIMINARES 143.17 143.17 0.00 143.17 100.00% 0.00 0.00
05.01.02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 52.83 0.61 32.23 52.8 32.23 100.00% 0.00 0.00% 52.83 32.23 100.00% 0.00 0.00 0.00%
05.01.02.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 52.83 2.10 110.94 52.8 110.94 100.00% 0.00 0.00% 52.83 110.94 100.00% 0.00 0.00 0.00%
05.01.02.02.02 MOVIMIENTO DE TIERRAS 4,110.63 0.00 0.00 0.00 0.00% 0.00 4,110.63
05.01.02.02.02.01 EXCAVACION DE TERRENO NORMAL m3 75.24 34.92 2,627.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.24 2,627.38 100.00%
05.01.02.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 34.57 30.92 1,068.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 34.57 1,068.90 100.00%
05.01.02.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 50.84 8.15 414.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 50.84 414.35 100.00%
05.01.02.02.03 OBRAS DE CONCRETO SIMPLE 219.04 0.00 0.00 0.00 0.00% 0.00 219.04
05.01.02.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 0.57 384.28 219.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.57 219.04 100.00%
05.01.02.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 10,128.29 0.00 0.00 0.00 0.00% 0.00 10,128.29
05.01.02.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 92.96 48.31 4,490.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 92.96 4,490.90 100.00%
05.01.02.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODOS m3 9.13 364.74 3,330.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.13 3,330.08 100.00%
05.01.02.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 70.56 32.70 2,307.31 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 70.56 2,307.31 100.00%
05.01.02.02.05 BIODIGESTOR DE 600 Lts. 28,783.16 21,587.37 0.00 21,587.37 75.00% 0.00 7,195.79
05.01.02.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 Lts und 28.00 1,027.97 28,783.16 21.0 21,587.37 75.00% 0.00 0.00% 21.00 21,587.37 75.00% 7.00 7,195.79 25.00%
05.01.02.03 CONSTRUCCIÓN DE POZO PERCOLADOR 40,098.38 182.52 0.00 182.52 0.46% 0.00 39,915.86
05.01.02.03.01 TRABAJOS PRELIMINARES 182.52 182.52 0.00 182.52 100.00% 0.00 0.00
05.01.02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 67.35 0.61 41.08 67.4 41.08 100.00% 0.00 0.00% 67.35 41.08 100.00% 0.00 0.00 0.00%
05.01.02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 67.35 2.10 141.44 67.4 141.44 100.00% 0.00 0.00% 67.35 141.44 100.00% 0.00 0.00 0.00%
05.01.02.03.02 MOVIMIENTO DE TIERRAS 8,871.94 0.00 0.00 0.00 0.00% 0.00 8,871.94
05.01.02.03.02.01 EXCAVACION DE TERRENO NORMAL m3 147.25 34.92 5,141.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 147.25 5,141.97 100.00%
05.01.02.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 184.10 8.15 1,500.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 184.10 1,500.42 100.00%
05.01.02.03.02.03 RELLENO CON GRAVA 1" m3 23.23 64.85 1,506.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.23 1,506.47 100.00%
05.01.02.03.02.04 FILTRO DE GRAVA Ø 1" m3 11.15 64.85 723.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.15 723.08 100.00%
05.01.02.03.03 OBRAS DE CONCRETO SIMPLE 7,664.26 0.00 0.00 0.00 0.00% 0.00 7,664.26
05.01.02.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 39.41 48.31 1,903.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.41 1,903.90 100.00%
05.01.02.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 14.99 384.28 5,760.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.99 5,760.36 100.00%
05.01.02.03.04 OBRAS DE CONCRETO ARMADO 4,619.40 0.00 0.00 0.00 0.00% 0.00 4,619.40
05.01.02.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 5.28 384.28 2,029.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.28 2,029.00 100.00%
05.01.02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 13.63 48.31 658.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.63 658.47 100.00%
05.01.02.03.04.03 ACERO FY=4200 KG/CM2 kg 290.08 6.66 1,931.93 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 290.08 1,931.93 100.00%
05.01.02.03.05 MUROS DE LADRILLO 18,760.26 0.00 0.00 0.00 0.00% 0.00 18,760.26
05.01.02.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 CM m2 205.84 91.14 18,760.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 205.84 18,760.26 100.00%
05.01.03 ESTUDIOS COMPLEMENTARIOS 1,710.00 0.00 490.00 28.65% 490.00 28.65% 0.00 1,220.00
05.01.03.01 DISEÑO DE MEZCLA und 3.00 450.00 1,350.00 0.0 0.00 0.00% 1.00 450.00 33.33% 1.00 450.00 33.33% 2.00 900.00 66.67%
05.01.03.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 9.00 40.00 360.00 0.0 0.00 0.00% 1.00 40.00 11.11% 1.00 40.00 11.11% 8.00 320.00 88.89%
05.01.04 FLETE 28,833.18 23,066.54 2,883.32 90.00% 25,949.86 90.00% 0.00 2,883.32
05.01.04.01 FLETE TERRESTRE Y ACARREO TOCSAPUQUIO GLB 1.00 28,833.18 28,833.18 0.8 23,066.54 80.00% 0.10 2,883.32 10.00% 0.90 25,949.86 90.00% 0.10 2,883.32 10.00%
05.01.05 PROGRAMA DE MITIGACION E IMPACTO AMBIENTAL 4,125.78 0.00 52.12 1.26% 52.12 1.26% 0.00 4,073.66
05.01.05.01 PROGRAMA DE PREVENCION DE MITIGACION 708.92 0.00 52.12 52.12 7.35% 0.00 656.80
05.01.05.01.01 CARTELES PERMANENTES und 5.00 63.56 317.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 317.80 100.00%
05.01.05.01.02 CARTELES TEMPORALES und 5.00 67.80 339.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 339.00 100.00%
05.01.05.01.03 CINTAS DE SEÑAL DE TRABAJO rll 1.00 52.12 52.12 0.0 0.00 0.00% 1.00 52.12 100.00% 1.00 52.12 100.00% 0.00 0.00 0.00%
05.01.05.02 PROGRAMA DE ABANDONO DE OBRA 3,416.86 0.00 0.00 0.00 0.00% 0.00 3,416.86
05.01.05.02.01 REACONDICIONAMIENTO DE AREA OCUPADA (CAMPAMENTO Y MAQUINARm2 800.00 3.22 2,576.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 800.00 2,576.00 100.00%
05.01.05.02.02 REACONDICIONAMIENTO DE CANTERAS Y ACCESOS HA 0.50 157.27 78.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.50 78.64 100.00%
05.01.05.02.03 REFORESTACION EN CAPTACIONES Y RESERVORIO m2 27.30 27.92 762.22 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.30 762.22 100.00%
05.01.06 ADECUADO CONOCIMIENTO DE EDUCACION SANITARIA 4,000.00 0.00 2,500.00 62.50% 2,500.00 62.50% 0.00 1,500.00
05.01.06.01 CAPACITACION ANTES DE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 4.00 2,000.00 100.00% 4.00 2,000.00 100.00% 0.00 0.00 0.00%
05.01.06.02 CAPACITACION DURANTE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 1.00 500.00 25.00% 1.00 500.00 25.00% 3.00 1,500.00 75.00%
05.01.07 EFICIENTE GESTION TECNICA Y ADMINISTRATIVA DE LOS SERVICIOS DE AGUA Y SANEAMIENTO A TRAVES DEL L 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 4,000.00
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05.01.07.01 PROGRAMA DE FORTALECIMIENTO DE CAPACIDADES PARA LA POBLACION und 4.00 1,000.00 4,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 4,000.00 100.00%
05.02 LOCALIDAD DE PARARANI 194,670.78 21,043.71 49,058.89 25.20% 70,102.60 36.01% 0.00 124,568.18
05.02.01 SISTEMA DE AGUA POTABLE 114,984.85 13,963.05 44,812.37 38.97% 58,775.42 51.12% 0.00 56,209.43
05.02.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
05.02.01.01.01 OBRAS PROVISIONALES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
05.02.01.01.01.01 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 1,760.72 1,760.72 1.0 1,760.72 100.00% 0.00 0.00% 1.00 1,760.72 100.00% 0.00 0.00 0.00%
05.02.01.01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 797.66 797.66 1.0 797.66 100.00% 0.00 0.00% 1.00 797.66 100.00% 0.00 0.00 0.00%
05.02.01.02 LINEA DE CONDUCCION 44,334.67 2,829.70 27,377.07 30,206.77 68.13% 0.00 14,127.90
05.02.01.02.01 TENDIDO DE TUBERIA PVC SAP 39,341.96 2,824.50 27,377.07 30,201.57 76.77% 0.00 9,140.39
05.02.01.02.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 525.95 2.10 1,104.50 526.0 1,104.50 100.00% 0.00 0.00% 525.95 1,104.50 100.00% 0.00 0.00 0.00%
05.02.01.02.01.02 EXCAVACION MANUAL DE ZANJA DE TERRENO CONGLOMERADO m3 306.80 34.92 10,713.46 0.0 0.00 0.00% 245.00 8,555.40 79.86% 245.00 8,555.40 79.86% 61.80 2,158.06 20.14%
05.02.01.02.01.03 REFINE Y NIVELACION DE ZANJA m 876.58 4.08 3,576.45 0.0 0.00 0.00% 700.00 2,856.00 79.86% 700.00 2,856.00 79.86% 176.58 720.45 20.14%
05.02.01.02.01.04 CAMA DE APOYO E=10CM. m 876.58 1.66 1,455.12 0.0 0.00 0.00% 700.00 1,162.00 79.86% 700.00 1,162.00 79.86% 176.58 293.12 20.14%
05.02.01.02.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 147.27 23.80 3,505.03 0.0 0.00 0.00% 117.60 2,798.88 79.85% 117.60 2,798.88 79.85% 29.67 706.15 20.15%
05.02.01.02.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 220.90 57.17 12,628.85 0.0 0.00 0.00% 176.40 10,084.79 79.86% 176.40 10,084.79 79.86% 44.50 2,544.06 20.14%
05.02.01.02.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 220.90 8.15 1,800.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 220.90 1,800.34 100.00%
05.02.01.02.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 876.58 4.30 3,769.29 400.0 1,720.00 45.63% 300.00 1,290.00 34.22% 700.00 3,010.00 79.86% 176.58 759.29 20.14%
05.02.01.02.01.09 PRUEBA HIDRAULICA DE LA LINEA DE CONDUCCION m 876.58 0.90 788.92 0.0 0.00 0.00% 700.00 630.00 79.86% 700.00 630.00 79.86% 176.58 158.92 20.14%
05.02.01.02.02 CAMARA ROMPE PRESION T - VI 4,992.71 5.20 0.00 5.20 0.10% 0.00 4,987.51
05.02.01.02.02.01 LIMPIEZA DE TERRENO MANUAL m2 1.92 0.61 1.17 1.9 1.17 100.00% 0.00 0.00% 1.92 1.17 100.00% 0.00 0.00 0.00%
05.02.01.02.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.92 2.10 4.03 1.9 4.03 100.00% 0.00 0.00% 1.92 4.03 100.00% 0.00 0.00 0.00%
05.02.01.02.02.03 EXCAVACION DE ZANJA m3 1.92 34.92 67.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 67.05 100.00%
05.02.01.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.40 8.15 19.56 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.40 19.56 100.00%
05.02.01.02.02.05 CONCRETO F'C= 175 KG/CM2 m3 1.14 384.28 438.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.14 438.08 100.00%
05.02.01.02.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 18.90 48.31 913.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.90 913.06 100.00%
05.02.01.02.02.07 ACERO FY=4200 KG/CM2 kg 131.13 6.66 873.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 131.13 873.33 100.00%
05.02.01.02.02.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 18.90 46.31 875.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.90 875.26 100.00%
05.02.01.02.02.09 TARRAJEO EN INTERIORES Y EXTERIORES m2 18.90 28.40 536.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.90 536.76 100.00%
05.02.01.02.02.10 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C.R.P. TIP GLB 3.00 187.57 562.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 562.71 100.00%
05.02.01.02.02.11 TAPA METALICA Y MARCO DE 0.60x0.60 m e=1/8" EN C.R.P. TIPO VI und 3.00 213.02 639.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 639.06 100.00%
05.02.01.02.02.12 PINTADO DE MURO EXTERIOR C/LATEX ACRILICO (SUPERLATEX O SIM) m2 10.80 5.80 62.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.80 62.64 100.00%
05.02.01.03 RESERVORIO (4 M3) 17,610.05 72.81 0.00 72.81 0.41% 0.00 17,537.24
05.02.01.03.01 RESERVORIO 13,534.75 45.40 0.00 45.40 0.34% 0.00 13,489.35
05.02.01.03.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 10.00 2.44 24.40 10.0 24.40 100.00% 0.00 0.00% 10.00 24.40 100.00% 0.00 0.00 0.00%
05.02.01.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 10.00 2.10 21.00 10.0 21.00 100.00% 0.00 0.00% 10.00 21.00 100.00% 0.00 0.00 0.00%
05.02.01.03.01.03 EXCAVACION EN TERRENO NORMAL RESERVORIO m3 5.00 34.92 174.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 174.60 100.00%
05.02.01.03.01.04 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 6.25 14.23 88.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.25 88.94 100.00%
05.02.01.03.01.05 SOLADO C:H 1:8 (h= 0.10 m) m2 0.86 189.58 163.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.86 163.04 100.00%
05.02.01.03.01.06 CONCRETO F'C= 210 KG/CM2 EN RESERVORIO m3 5.42 413.58 2,241.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.42 2,241.60 100.00%
05.02.01.03.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 46.24 48.31 2,233.85 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 46.24 2,233.85 100.00%
05.02.01.03.01.08 ACERO FY=4200 KG/CM2 kg 200.66 6.66 1,336.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 200.66 1,336.40 100.00%
05.02.01.03.01.09 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 56.25 27.86 1,567.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.25 1,567.13 100.00%
05.02.01.03.01.10 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 56.25 20.00 1,125.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.25 1,125.00 100.00%
05.02.01.03.01.11 TAPA SANITARIA METALICA DE 0.60x0.60 mts und 2.00 197.60 395.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 395.20 100.00%
05.02.01.03.01.12 INSTALACION DE ACCESORIOS TUB. VENTILACION 2" und 1.00 118.31 118.31 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 118.31 100.00%
05.02.01.03.01.13 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS DE 3/4" und 1.00 496.89 496.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 496.89 100.00%
05.02.01.03.01.14 INSTALACION DE ACCESORIOS EN RESERVORIO und 1.00 872.43 872.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 872.43 100.00%
05.02.01.03.01.15 PINTADO DE MURO EXTERIOR m2 47.43 15.54 737.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 47.43 737.06 100.00%
05.02.01.03.01.16 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 69.00 28.10 1,938.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 69.00 1,938.90 100.00%
05.02.01.03.02 CASETA DE CLORACION POR GOTEO 4,075.30 27.41 0.00 27.41 0.67% 0.00 4,047.89
05.02.01.03.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
05.02.01.03.02.02 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5X m2 11.54 71.15 821.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.54 821.07 100.00%
05.02.01.03.02.03 TARRAJEO EN INTERIORES Y EXTERIORES m2 20.50 28.40 582.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.50 582.20 100.00%
05.02.01.03.02.04 REJILLA METALICA SEGUN DISEÑO INC. COLOCADO und 1.00 421.12 421.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 421.12 100.00%
05.02.01.03.02.05 COBERTURA DE CALAMINA EN CASETA DE CLORACION m2 4.00 58.15 232.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 232.60 100.00%
05.02.01.03.02.06 INSTALACION DE PUERTA METÁLICA (SEGÚN DISEÑO) und 1.00 257.57 257.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 257.57 100.00%
05.02.01.03.02.07 INSTALACION DE ACCESORIOS EN CASETA DE CLORACION und 1.00 1,557.57 1,557.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,557.57 100.00%
05.02.01.03.02.08 PINTADO DE MURO EXTERIOR m2 11.31 15.54 175.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 175.76 100.00%
05.02.01.04 LINEA DE ADUCCION Y RED DE DISTRIBUCION 47,990.63 8,253.63 17,435.30 25,688.93 53.53% 0.00 22,301.70
05.02.01.04.01 TENDIDO DE TUBERIA DE ADUCCION Y DISTRIBUCION PVC SAP 41,599.18 8,230.79 17,435.30 25,666.09 61.70% 0.00 15,933.09
05.02.01.04.01.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 422.76 8.03 3,394.76 422.8 3,394.76 100.00% 0.00 0.00% 422.76 3,394.76 100.00% 0.00 0.00 0.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05.02.01.04.01.02 EXCAVACION MANUAL ZANJA EN TERRENO CONGLOMERADO m3 246.61 58.58 14,446.41 0.0 0.00 0.00% 140.00 8,201.20 56.77% 140.00 8,201.20 56.77% 106.61 6,245.21 43.23%
05.02.01.04.01.03 REFINE Y NIVELACION DE ZANJA m 704.60 2.04 1,437.38 0.0 0.00 0.00% 400.00 816.00 56.77% 400.00 816.00 56.77% 304.60 621.38 43.23%
05.02.01.04.01.04 CAMA DE APOYO E=10CM. m 704.60 1.66 1,169.64 0.0 0.00 0.00% 400.00 664.00 56.77% 400.00 664.00 56.77% 304.60 505.64 43.23%
05.02.01.04.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 118.37 23.80 2,817.21 0.0 0.00 0.00% 67.20 1,599.36 56.77% 67.20 1,599.36 56.77% 51.17 1,217.85 43.23%
05.02.01.04.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 177.56 57.17 10,151.11 0.0 0.00 0.00% 100.80 5,762.74 56.77% 100.80 5,762.74 56.77% 76.76 4,388.37 43.23%
05.02.01.04.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 177.56 8.15 1,447.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 177.56 1,447.11 100.00%
05.02.01.04.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1/2" m 388.79 12.29 4,778.23 311.0 3,822.56 80.00% 0.00 0.00% 311.03 3,822.56 80.00% 77.76 955.67 20.00%
05.02.01.04.01.09 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 294.61 4.30 1,266.82 235.7 1,013.47 80.00% 0.00 0.00% 235.69 1,013.47 80.00% 58.92 253.35 20.00%
05.02.01.04.01.10 PRUEBA HIDRAULICA m 704.60 0.98 690.51 0.0 0.00 0.00% 400.00 392.00 56.77% 400.00 392.00 56.77% 304.60 298.51 43.23%
05.02.01.04.02 VALVULA DE CONTROL 919.13 0.98 0.00 0.98 0.11% 0.00 918.15
05.02.01.04.02.01 LIMPIEZA DE TERRENO MANUAL m2 0.36 0.61 0.22 0.4 0.22 100.00% 0.00 0.00% 0.36 0.22 100.00% 0.00 0.00 0.00%
05.02.01.04.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 0.36 2.10 0.76 0.4 0.76 100.00% 0.00 0.00% 0.36 0.76 100.00% 0.00 0.00 0.00%
05.02.01.04.02.03 EXCAVACION DE ZANJA m3 0.14 34.92 4.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.14 4.89 100.00%
05.02.01.04.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 0.18 8.15 1.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.18 1.47 100.00%
05.02.01.04.02.05 CONCRETO F'C= 175 KG/CM2 m3 0.08 384.28 30.74 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.08 30.74 100.00%
05.02.01.04.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 1.60 48.31 77.30 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.60 77.30 100.00%
05.02.01.04.02.07 TARRAJEO CON IMPERMEABILIZANTE m2 2.00 29.19 58.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 58.38 100.00%
05.02.01.04.02.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 0.64 28.40 18.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.64 18.18 100.00%
05.02.01.04.02.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 1.00 512.25 512.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 512.25 100.00%
05.02.01.04.02.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 1.00 213.49 213.49 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 213.49 100.00%
05.02.01.04.02.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.02 72.62 1.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.02 1.45 100.00%
05.02.01.04.03 VALVULA DE PURGA 807.69 3.90 0.00 3.90 0.48% 0.00 803.79
05.02.01.04.03.01 LIMPIEZA DE TERRENO MANUAL m2 1.44 0.61 0.88 1.4 0.88 100.00% 0.00 0.00% 1.44 0.88 100.00% 0.00 0.00 0.00%
05.02.01.04.03.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.44 2.10 3.02 1.4 3.02 100.00% 0.00 0.00% 1.44 3.02 100.00% 0.00 0.00 0.00%
05.02.01.04.03.03 EXCAVACION DE ZANJA m3 1.10 34.92 38.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.10 38.41 100.00%
05.02.01.04.03.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 1.26 8.15 10.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.26 10.27 100.00%
05.02.01.04.03.05 CONCRETO F'C= 175 KG/CM2 m3 0.15 384.28 57.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.15 57.64 100.00%
05.02.01.04.03.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 3.00 48.31 144.93 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 144.93 100.00%
05.02.01.04.03.07 TARRAJEO CON IMPERMEABILIZANTE m2 2.80 29.19 81.73 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.80 81.73 100.00%
05.02.01.04.03.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 1.12 28.40 31.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.12 31.81 100.00%
05.02.01.04.03.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN CAJA DE GLB 1.00 224.06 224.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 224.06 100.00%
05.02.01.04.03.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 1.00 213.49 213.49 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 213.49 100.00%
05.02.01.04.03.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.02 72.62 1.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.02 1.45 100.00%
05.02.01.04.04 CAMARA ROMPE PRESION T - VII 4,664.63 17.96 0.00 17.96 0.39% 0.00 4,646.67
05.02.01.04.04.01 LIMPIEZA DE TERRENO MANUAL m2 6.63 0.61 4.04 6.6 4.04 100.00% 0.00 0.00% 6.63 4.04 100.00% 0.00 0.00 0.00%
05.02.01.04.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 6.63 2.10 13.92 6.6 13.92 100.00% 0.00 0.00% 6.63 13.92 100.00% 0.00 0.00 0.00%
05.02.01.04.04.03 EXCAVACION DE ZANJA m3 5.97 34.92 208.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.97 208.47 100.00%
05.02.01.04.04.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 7.47 8.15 60.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.47 60.88 100.00%
05.02.01.04.04.05 CONCRETO F'C= 175 KG/CM2 m3 1.82 384.28 699.39 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.82 699.39 100.00%
05.02.01.04.04.06 ACERO FY=4200 KG/CM2 kg 60.64 6.66 403.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 60.64 403.86 100.00%
05.02.01.04.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 27.02 48.31 1,305.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.02 1,305.34 100.00%
05.02.01.04.04.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 9.87 46.31 457.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.87 457.08 100.00%
05.02.01.04.04.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C.R.P. TIPO GLB 3.00 205.99 617.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 617.97 100.00%
05.02.01.04.04.10 TAPA METALICA Y MARCO DE 0.60x0.60m y 0.30x0.30m e=1/8" EN C.R.P. TI und 3.00 278.02 834.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 834.06 100.00%
05.02.01.04.04.11 PINTURA EN TAPAS METALICAS m2 2.70 22.08 59.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.70 59.62 100.00%
05.02.01.05 CONEXIONES DOMICILIARIAS 2,491.12 248.53 0.00 248.53 9.98% 0.00 2,242.59
05.02.01.05.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 30.95 8.03 248.53 31.0 248.53 100.00% 0.00 0.00% 30.95 248.53 100.00% 0.00 0.00 0.00%
05.02.01.05.02 EXCAVACION MANUAL DE ZANJA EN TERRENO CONGLOMERADO m3 15.48 23.12 357.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.48 357.90 100.00%
05.02.01.05.03 REFINE Y NIVELACION DE ZANJA m 51.59 4.08 210.49 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.59 210.49 100.00%
05.02.01.05.04 CAMA DE APOYO E=10CM. m 51.59 1.66 85.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.59 85.64 100.00%
05.02.01.05.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 13.62 23.80 324.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.62 324.16 100.00%
05.02.01.05.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 3.40 57.17 194.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.40 194.38 100.00%
05.02.01.05.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 3.40 8.15 27.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.40 27.71 100.00%
05.02.01.05.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" m 51.59 3.46 178.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.59 178.50 100.00%
05.02.01.05.09 CONEXIÓN DOMICILIARIA INC. CAJA DE AGUA POTABLE MATRIZ Ø 1 1/2" @und 6.00 136.23 817.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 817.38 100.00%
05.02.01.05.10 PRUEBA HIDRAULICA EN TUBERIA INSTALADA m 51.59 0.90 46.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.59 46.43 100.00%
05.02.02 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO DOMICILIARIAS 56,151.80 5,876.26 0.00 10.46% 5,876.26 10.46% 0.00 50,275.54
05.02.02.01 CONSTRUCCION DE CASETA DE BAÑO 38,236.27 3,750.54 0.00 3,750.54 9.81% 0.00 34,485.73
05.02.02.01.01 OBRAS PROVISIONALES 3,518.51 3,518.51 0.00 3,518.51 100.00% 0.00 0.00
05.02.02.01.01.01 LETRINAS DE HOYO SECO VENTILADO (PARA PERSONAL OBRERO) 1,904.75 1,904.75 0.00 1,904.75 100.00% 0.00 0.00
05.02.02.01.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.38 0.61 2.06 3.4 2.06 100.00% 0.00 0.00% 3.38 2.06 100.00% 0.00 0.00 0.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05.02.02.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.38 2.10 7.10 3.4 7.10 100.00% 0.00 0.00% 3.38 7.10 100.00% 0.00 0.00 0.00%
05.02.02.01.01.01.03 EXCAVACION DE ZANJA m3 6.42 34.92 224.19 6.4 224.19 100.00% 0.00 0.00% 6.42 224.19 100.00% 0.00 0.00 0.00%
05.02.02.01.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.03 8.15 65.44 8.0 65.44 100.00% 0.00 0.00% 8.03 65.44 100.00% 0.00 0.00 0.00%
05.02.02.01.01.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.24 48.31 301.45 6.2 301.45 100.00% 0.00 0.00% 6.24 301.45 100.00% 0.00 0.00 0.00%
05.02.02.01.01.01.06 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.94 364.59 342.71 0.9 342.71 100.00% 0.00 0.00% 0.94 342.71 100.00% 0.00 0.00 0.00%
05.02.02.01.01.01.07 ACERO FY=4200 KG/CM2 kg 18.14 6.66 120.81 18.1 120.81 100.00% 0.00 0.00% 18.14 120.81 100.00% 0.00 0.00 0.00%
05.02.02.01.01.01.08 CONCRETO F'C= 175 KG/CM2 m3 0.17 384.28 65.33 0.2 65.33 100.00% 0.00 0.00% 0.17 65.33 100.00% 0.00 0.00 0.00%
05.02.02.01.01.01.09 CASETA PARA LETRINAS INC. PUERTA DE CALAMINA und 2.00 346.09 692.18 2.0 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
05.02.02.01.01.01.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.0 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
05.02.02.01.01.02 DUCHAS O VESTUARIOS (PARA PERSONAL OBRERO) 1,335.92 1,335.92 0.00 1,335.92 100.00% 0.00 0.00
05.02.02.01.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 4.00 0.61 2.44 4.0 2.44 100.00% 0.00 0.00% 4.00 2.44 100.00% 0.00 0.00 0.00%
05.02.02.01.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.10 8.40 4.0 8.40 100.00% 0.00 0.00% 4.00 8.40 100.00% 0.00 0.00 0.00%
05.02.02.01.01.02.03 EXCAVACION DE ZANJA m3 2.04 34.92 71.24 2.0 71.24 100.00% 0.00 0.00% 2.04 71.24 100.00% 0.00 0.00 0.00%
05.02.02.01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.55 8.15 20.78 2.6 20.78 100.00% 0.00 0.00% 2.55 20.78 100.00% 0.00 0.00 0.00%
05.02.02.01.01.02.05 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 2.00 72.62 145.24 2.0 145.24 100.00% 0.00 0.00% 2.00 145.24 100.00% 0.00 0.00 0.00%
05.02.02.01.01.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.40 48.31 115.94 2.4 115.94 100.00% 0.00 0.00% 2.40 115.94 100.00% 0.00 0.00 0.00%
05.02.02.01.01.02.07 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.27 364.59 98.44 0.3 98.44 100.00% 0.00 0.00% 0.27 98.44 100.00% 0.00 0.00 0.00%
05.02.02.01.01.02.08 CASETA PARA DUCHAS INC. PUERTA DE CALAMINA m2 2.00 346.09 692.18 2.0 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
05.02.02.01.01.02.09 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 2.00 48.89 97.78 2.0 97.78 100.00% 0.00 0.00% 2.00 97.78 100.00% 0.00 0.00 0.00%
05.02.02.01.01.02.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.0 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
05.02.02.01.01.03 LAVADERO DE GRANITO (PARA PERSONAL OBRERO) 277.84 277.84 0.00 277.84 100.00% 0.00 0.00
05.02.02.01.01.03.01 SUMINISTRO E INSTALACIÓN DE LAVADERO DE GRANITO und 2.00 138.92 277.84 2.0 277.84 100.00% 0.00 0.00% 2.00 277.84 100.00% 0.00 0.00 0.00%
05.02.02.01.02 TRABAJOS PRELIMINARES 125.12 125.12 0.00 125.12 100.00% 0.00 0.00
05.02.02.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 46.17 0.61 28.16 46.2 28.16 100.00% 0.00 0.00% 46.17 28.16 100.00% 0.00 0.00 0.00%
05.02.02.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 46.17 2.10 96.96 46.2 96.96 100.00% 0.00 0.00% 46.17 96.96 100.00% 0.00 0.00 0.00%
05.02.02.01.03 MOVIMIENTO DE TIERRAS 968.88 0.00 0.00 0.00 0.00% 0.00 968.88
05.02.02.01.03.01 EXCAVACION DE TERRENO NORMAL m3 11.31 34.92 394.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 394.95 100.00%
05.02.02.01.03.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 14.14 8.15 115.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.14 115.24 100.00%
05.02.02.01.03.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 4.80 95.56 458.69 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.80 458.69 100.00%
05.02.02.01.04 OBRAS DE CONCRETO SIMPLE 6,165.12 0.00 0.00 0.00 0.00% 0.00 6,165.12
05.02.02.01.04.01 CIMIENTOS CORRIDOS 1,434.01 0.00 0.00 0.00 0.00% 0.00 1,434.01
05.02.02.01.04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 6.18 232.04 1,434.01 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.18 1,434.01 100.00%
05.02.02.01.04.02 SOBRECIMIENTOS 1,934.16 0.00 0.00 0.00 0.00% 0.00 1,934.16 100.00%
05.02.02.01.04.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 28.32 44.52 1,260.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.32 1,260.81 100.00%
05.02.02.01.04.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 2.12 317.62 673.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.12 673.35 100.00%
05.02.02.01.04.03 PISO INTERIOR 594.58 0.00 0.00 0.00 0.00% 0.00 594.58
05.02.02.01.04.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO CEMENTO PU m2 13.26 44.84 594.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.26 594.58 100.00%
05.02.02.01.04.04 SARDINEL DE DUCHA 114.86 0.00 0.00 0.00 0.00% 0.00 114.86
05.02.02.01.04.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 1.98 48.31 95.65 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.98 95.65 100.00%
05.02.02.01.04.04.02 CONCRETO F'C= 175 KG/CM2 m3 0.05 384.28 19.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.05 19.21 100.00%
05.02.02.01.04.05 VEREDA PERIMETRAL 2,087.51 0.00 0.00 0.00 0.00% 0.00 2,087.51
05.02.02.01.04.05.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 6.66 42.84 285.31 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.66 285.31 100.00%
05.02.02.01.04.05.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑADO m2 27.27 44.84 1,222.79 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.27 1,222.79 100.00%
05.02.02.01.04.05.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 1.59 364.41 579.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.59 579.41 100.00%
05.02.02.01.05 OBRAS DE CONCRETO ARMADO 5,740.67 0.00 0.00 0.00 0.00% 0.00 5,740.67
05.02.02.01.05.01 COLUMNAS 4,063.54 0.00 0.00 0.00 0.00% 0.00 4,063.54
05.02.02.01.05.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 1.80 384.28 691.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.80 691.70 100.00%
05.02.02.01.05.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 38.40 45.29 1,739.14 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 38.40 1,739.14 100.00%
05.02.02.01.05.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 245.15 6.66 1,632.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 245.15 1,632.70 100.00%
05.02.02.01.05.02 VIGAS 1,677.13 0.00 0.00 0.00 0.00% 0.00 1,677.13
05.02.02.01.05.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 1.03 384.28 395.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.03 395.81 100.00%
05.02.02.01.05.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 18.81 50.83 956.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.81 956.11 100.00%
05.02.02.01.05.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 48.83 6.66 325.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.83 325.21 100.00%
05.02.02.01.06 MUROS DE LADRILLO 3,636.53 0.00 0.00 0.00 0.00% 0.00 3,636.53
05.02.02.01.06.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5X m2 50.09 72.60 3,636.53 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 50.09 3,636.53 100.00%
05.02.02.01.07 REVOQUES Y ENLUCIDOS 3,817.83 0.00 0.00 0.00 0.00% 0.00 3,817.83
05.02.02.01.07.01 ZÓCALO: TARRAJEADO Y PULIDO CON IMPERMEABILIZANTE / MEZCLA 1 m2 38.40 38.45 1,476.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 38.40 1,476.48 100.00%
05.02.02.01.07.02 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 34.26 20.82 713.29 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 34.26 713.29 100.00%
05.02.02.01.07.03 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINA m2 42.87 24.59 1,054.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 42.87 1,054.17 100.00%
05.02.02.01.07.04 BRUÑA DE 1 CM m 40.50 14.17 573.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.50 573.89 100.00%
05.02.02.01.08 PINTURA 932.42 0.00 0.00 0.00 0.00% 0.00 932.42
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05.02.02.01.08.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 34.26 11.37 389.54 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 34.26 389.54 100.00%
05.02.02.01.08.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINAS EXTER m2 39.00 13.92 542.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 542.88 100.00%
05.02.02.01.09 COBERTURA LIVIANA PARA TECHO 2,357.18 0.00 0.00 0.00 0.00% 0.00 2,357.18
05.02.02.01.09.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 18.00 38.28 689.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 689.04 100.00%
05.02.02.01.09.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 3.00 m und 24.00 25.91 621.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.00 621.84 100.00%
05.02.02.01.09.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.30 mm m2 43.20 24.22 1,046.30 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 43.20 1,046.30 100.00%
05.02.02.01.10 CARPINTERIA DE MADERA 2,375.94 0.00 0.00 0.00 0.00% 0.00 2,375.94
05.02.02.01.10.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/TRIPLAY DE und 6.00 304.49 1,826.94 0.0 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 1,826.94 100.00%
05.02.02.01.10.02 SUMIN. E INSTAL. DE VENTANA DE MADERA SEGUN DISEÑO und 6.00 91.50 549.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 549.00 100.00%
05.02.02.01.11 INSTALACIONES SANITARIAS 5,856.67 106.91 0.00 106.91 1.83% 0.00 5,749.76
05.02.02.01.11.01 TRABAJOS PRELIMINARES 106.91 106.91 0.00 106.91 100.00% 0.00 0.00
05.02.02.01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 39.45 0.61 24.06 39.5 24.06 100.00% 0.00 0.00% 39.45 24.06 100.00% 0.00 0.00 0.00%
05.02.02.01.11.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 39.45 2.10 82.85 39.5 82.85 100.00% 0.00 0.00% 39.45 82.85 100.00% 0.00 0.00 0.00%
05.02.02.01.11.02 MOVIMIENTO DE TIERRAS 1,404.66 0.00 0.00 0.00 0.00% 0.00 1,404.66
05.02.02.01.11.02.01 EXCAVACION DE TERRENO NORMAL m3 19.52 34.92 681.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.52 681.64 100.00%
05.02.02.01.11.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 17.30 40.54 701.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.30 701.34 100.00%
05.02.02.01.11.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.66 8.15 21.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.66 21.68 100.00%
05.02.02.01.11.03 TUBERIAS Y ACCESORIOS 2,029.25 0.00 0.00 0.00 0.00% 0.00 2,029.25
05.02.02.01.11.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 18.00 23.00 414.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 414.00 100.00%
05.02.02.01.11.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + ACCESORIOS und 6.00 63.39 380.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 380.34 100.00%
05.02.02.01.11.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 27.00 5.14 138.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.00 138.78 100.00%
05.02.02.01.11.03.04 TUBERIA PVC SAL Ø 2" m 58.80 7.99 469.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 58.80 469.81 100.00%
05.02.02.01.11.03.05 TUBERIA PVC SAL Ø 4" m 49.20 12.73 626.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.20 626.32 100.00%
05.02.02.01.11.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 2,315.85 0.00 0.00 0.00 0.00% 0.00 2,315.85
05.02.02.01.11.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 12.69 48.31 613.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.69 613.05 100.00%
05.02.02.01.11.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 1.17 265.70 310.87 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.17 310.87 100.00%
05.02.02.01.11.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 8.64 32.70 282.53 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.64 282.53 100.00%
05.02.02.01.11.04.04 SALIDA DE DESAGUE PVC-SAL 2" pto 12.00 41.74 500.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 500.88 100.00%
05.02.02.01.11.04.05 SALIDA DE DESAGUE PVC-SAL 4" pto 6.00 42.49 254.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 254.94 100.00%
05.02.02.01.11.04.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 6.00 58.93 353.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 353.58 100.00%
05.02.02.01.12 APARATOS Y ACCESORIOS SANITARIOS 1,629.96 0.00 0.00 0.00 0.00% 0.00 1,629.96
05.02.02.01.12.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0.74 M und 6.00 148.78 892.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 892.68 100.00%
05.02.02.01.12.02 SUMINISTRO E INSTALACION DE LAVATORIO und 6.00 73.99 443.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 443.94 100.00%
05.02.02.01.12.03 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 6.00 48.89 293.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 293.34 100.00%
05.02.02.01.13 INSTALACIONES ELECTRICAS 1,111.44 0.00 0.00 0.00 0.00% 0.00 1,111.44
05.02.02.01.13.01 SALIDA PARA INTERRUPTOR DOBLE und 6.00 22.42 134.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 134.52 100.00%
05.02.02.01.13.02 SALIDA PARA CENTRO DE LUZ und 12.00 65.44 785.28 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 785.28 100.00%
05.02.02.01.13.03 SALIDA PARA TOMACORRIENTES und 6.00 31.94 191.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 191.64 100.00%
05.02.02.02 INSTALACION DE BIODIGESTOR DE 600 LTS 9,297.13 2,086.62 0.00 2,086.62 22.44% 0.00 7,210.51
05.02.02.02.01 TRABAJOS PRELIMINARES 30.68 30.68 0.00 30.68 100.00% 0.00 0.00
05.02.02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 11.32 0.61 6.91 11.3 6.91 100.00% 0.00 0.00% 11.32 6.91 100.00% 0.00 0.00
05.02.02.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 11.32 2.10 23.77 11.3 23.77 100.00% 0.00 0.00% 11.32 23.77 100.00% 0.00 0.00 0.00%
05.02.02.02.02 MOVIMIENTO DE TIERRAS 880.87 0.00 0.00 0.00 0.00% 0.00 880.87
05.02.02.02.02.01 EXCAVACION DE TERRENO NORMAL m3 16.12 34.92 562.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.12 562.91 100.00%
05.02.02.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 7.41 30.92 229.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.41 229.12 100.00%
05.02.02.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 10.90 8.15 88.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.90 88.84 100.00%
05.02.02.02.03 OBRAS DE CONCRETO SIMPLE 46.11 0.00 0.00 0.00 0.00% 0.00 46.11 100.00%
05.02.02.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 0.12 384.28 46.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.12 46.11 100.00%
05.02.02.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 2,171.65 0.00 0.00 0.00 0.00% 0.00 2,171.65
05.02.02.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 19.92 48.31 962.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.92 962.34 100.00%
05.02.02.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODOS m3 1.96 364.74 714.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.96 714.89 100.00%
05.02.02.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 15.12 32.70 494.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.12 494.42 100.00%
05.02.02.02.05 BIODIGESTOR DE 600 Lts. 6,167.82 2,055.94 0.00 2,055.94 33.33% 0.00 4,111.88
05.02.02.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 Lts und 6.00 1,027.97 6,167.82 2.0 2,055.94 33.33% 0.00 0.00% 2.00 2,055.94 33.33% 4.00 4,111.88 66.67%
05.02.02.03 CONSTRUCCIÓN DE POZO PERCOLADOR 8,618.40 39.10 0.00 39.10 0.45% 0.00 8,579.30
05.02.02.03.01 TRABAJOS PRELIMINARES 39.10 39.10 0.00 39.10 100.00% 0.00 0.00
05.02.02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 14.43 0.61 8.80 14.4 8.80 100.00% 0.00 0.00% 14.43 8.80 100.00% 0.00 0.00 0.00%
05.02.02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 14.43 2.10 30.30 14.4 30.30 100.00% 0.00 0.00% 14.43 30.30 100.00% 0.00 0.00 0.00%
05.02.02.03.02 MOVIMIENTO DE TIERRAS 1,901.19 0.00 0.00 0.00 0.00% 0.00 1,901.19
05.02.02.03.02.01 EXCAVACION DE TERRENO NORMAL m3 31.55 34.92 1,101.73 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 31.55 1,101.73 100.00%
05.02.02.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 39.45 8.15 321.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.45 321.52 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05.02.02.03.02.03 RELLENO CON GRAVA 1" m3 4.98 64.85 322.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.98 322.95 100.00%
05.02.02.03.02.04 FILTRO DE GRAVA Ø 1" m3 2.39 64.85 154.99 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.39 154.99 100.00%
05.02.02.03.03 OBRAS DE CONCRETO SIMPLE 1,641.28 0.00 0.00 0.00 0.00% 0.00 1,641.28
05.02.02.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 8.44 48.31 407.74 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.44 407.74 100.00%
05.02.02.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 3.21 384.28 1,233.54 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.21 1,233.54 100.00%
05.02.02.03.04 OBRAS DE CONCRETO ARMADO 989.30 0.00 0.00 0.00 0.00% 0.00 989.30
05.02.02.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 1.13 384.28 434.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.13 434.24 100.00%
05.02.02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.92 48.31 141.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.92 141.07 100.00%
05.02.02.03.04.03 ACERO FY=4200 KG/CM2 kg 62.16 6.66 413.99 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 62.16 413.99 100.00%
05.02.02.03.05 MUROS DE LADRILLO 4,047.53 0.00 0.00 0.00 0.00% 0.00 4,047.53
05.02.02.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 CM m2 44.41 91.14 4,047.53 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 44.41 4,047.53 100.00%
05.02.03 ESTUDIOS COMPLEMENTARIOS 1,710.00 0.00 490.00 28.65% 490.00 28.65% 0.00 1,220.00
05.02.03.01 DISEÑO DE MEZCLA und 3.00 450.00 1,350.00 0.0 0.00 0.00% 1.00 450.00 33.33% 1.00 450.00 33.33% 2.00 900.00 66.67%
05.02.03.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 9.00 40.00 360.00 0.0 0.00 0.00% 1.00 40.00 11.11% 1.00 40.00 11.11% 8.00 320.00 88.89%
05.02.04 FLETE 12,043.98 1,204.40 1,204.40 20.00% 2,408.80 20.00% 0.00 9,635.18
05.02.04.01 FLETE TERRESTRE Y ACARREO PARARANI GLB 1.00 12,043.98 12,043.98 0.1 1,204.40 10.00% 0.10 1,204.40 10.00% 0.20 2,408.80 20.00% 0.80 9,635.18 80.00%
05.02.05 PROGRAMA DE MITIGACION E IMPACTO AMBIENTAL 1,780.15 0.00 52.12 2.93% 52.12 2.93% 0.00 1,728.03
05.02.05.01 PROGRAMA DE PREVENCION DE MITIGACION 797.84 0.00 52.12 52.12 6.53% 0.00 745.72
05.02.05.01.01 CARTELES PERMANENTES und 2.00 63.56 127.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 127.12 100.00%
05.02.05.01.02 CARTELES TEMPORALES und 2.00 67.80 135.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 135.60 100.00%
05.02.05.01.03 CINTAS DE SEÑAL DE TRABAJO rll 1.00 52.12 52.12 0.0 0.00 0.00% 1.00 52.12 100.00% 1.00 52.12 100.00% 0.00 0.00 0.00%
05.02.05.01.04 REACONDICIONAMIENTO DE AREA OCUPADA (CAMPAMENTO Y MAQUINARm2 150.00 3.22 483.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 150.00 483.00 100.00%
05.02.05.02 PROGRAMA DE ABANDONO DE OBRA 982.31 0.00 0.00 0.00 0.00% 0.00 982.31
05.02.05.02.01 REACONDICIONAMIENTO DE CANTERAS Y ACCESOS HA 1.00 157.27 157.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 157.27 100.00%
05.02.05.02.02 REFORESTACION EN CAPTACIONES Y RESERVORIO m2 29.55 27.92 825.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.55 825.04 100.00%
05.02.06 ADECUADO CONOCIMIENTO DE EDUCACION SANITARIA 4,000.00 0.00 2,500.00 62.50% 2,500.00 62.50% 0.00 1,500.00
05.02.06.01 CAPACITACION ANTES DE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 4.00 2,000.00 100.00% 4.00 2,000.00 100.00% 0.00 0.00 0.00%
05.02.06.02 CAPACITACION DURANTE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 1.00 500.00 25.00% 1.00 500.00 25.00% 3.00 1,500.00 75.00%
05.02.07 EFICIENTE GESTION TECNICA Y ADMINISTRATIVA DE LOS SERVICIOS DE AGUA Y SANEAMIENTO A TRAVES DEL L 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 4,000.00
05.02.07.01 PROGRAMA DE FORTALECIMIENTO DE CAPACIDADES PARA LA POBLACION und 4.00 1,000.00 4,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 4,000.00 100.00%
05.03 LOCALIDAD DE HUANCARPUQUIO 951,580.94 154,073.28 242,749.46 25.51% 396,822.73 41.70% 0.00 554,758.21
05.03.01 SISTEMA DE AGUA POTABLE 372,154.67 62,776.14 180,085.91 48.39% 242,862.05 65.26% 0.00 129,292.62
05.03.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
05.03.01.01.01 OBRAS PROVISIONALES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
05.03.01.01.01.01 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 1,760.72 1,760.72 1.0 1,760.72 100.00% 0.00 0.00% 1.00 1,760.72 100.00% 0.00 0.00 0.00%
05.03.01.01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 797.66 797.66 1.0 797.66 100.00% 0.00 0.00% 1.00 797.66 100.00% 0.00 0.00 0.00%
05.03.01.02 CONSTRUCCION DE CAPTACION TIPO - 1 5,072.96 74.91 2,427.65 2,502.56 49.33% 0.00 2,570.40
05.03.01.02.01 TRABAJOS PRELIMINARES 74.91 74.91 0.00 74.91 100.00% 0.00 0.00
05.03.01.02.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 16.50 2.44 40.26 16.5 40.26 100.00% 0.00 0.00% 16.50 40.26 100.00% 0.00 0.00 0.00%
05.03.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 16.50 2.10 34.65 16.5 34.65 100.00% 0.00 0.00% 16.50 34.65 100.00% 0.00 0.00 0.00%
05.03.01.02.02 MOVIMIENTO DE TIERRAS 887.73 0.00 527.70 527.70 59.44% 0.00 360.03
05.03.01.02.02.01 EXCAVACION EN TERRENO NORMAL CAPTACION m3 8.25 39.64 327.03 0.0 0.00 0.00% 8.25 327.03 100.00% 8.25 327.03 100.00% 0.00 0.00 0.00%
05.03.01.02.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 4.95 40.54 200.67 0.0 0.00 0.00% 4.95 200.67 100.00% 4.95 200.67 100.00% 0.00 0.00 0.00%
05.03.01.02.02.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE (50 M ) m3 10.31 34.92 360.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.31 360.03 100.00%
05.03.01.02.03 CONCRETO SIMPLE 210.73 0.00 210.73 210.73 100.00% 0.00 0.00
05.03.01.02.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS m3 0.81 260.16 210.73 0.0 0.00 0.00% 0.81 210.73 100.00% 0.81 210.73 100.00% 0.00 0.00 0.00%
05.03.01.02.04 CONCRETO ARMADO 1,416.99 0.00 1,416.99 1,416.99 100.00% 0.00 0.00
05.03.01.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 10.37 48.31 500.97 0.0 0.00 0.00% 10.37 500.97 100.00% 10.37 500.97 100.00% 0.00 0.00 0.00%
05.03.01.02.04.02 ACERO FY=4200 KG/CM2 kg 61.78 6.66 411.45 0.0 0.00 0.00% 61.78 411.45 100.00% 61.78 411.45 100.00% 0.00 0.00 0.00%
05.03.01.02.04.03 CONCRETO FC=210 KG/CM2 m3 1.22 413.58 504.57 0.0 0.00 0.00% 1.22 504.57 100.00% 1.22 504.57 100.00% 0.00 0.00 0.00%
05.03.01.02.05 REVOQUES ENLUCIDOS Y MOLDURAS 212.46 0.00 212.46 212.46 100.00% 0.00 0.00
05.03.01.02.05.01 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 6.04 20.00 120.80 0.0 0.00 0.00% 6.04 120.80 100.00% 6.04 120.80 100.00% 0.00 0.00 0.00%
05.03.01.02.05.02 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 3.29 27.86 91.66 0.0 0.00 0.00% 3.29 91.66 100.00% 3.29 91.66 100.00% 0.00 0.00 0.00%
05.03.01.02.06 VALVULAS Y TAPAS Y ACCESORIOS 603.49 0.00 0.00 0.00 0.00% 0.00 603.49
05.03.01.02.06.01 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.60X0.60M und 0.36 352.51 126.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.36 126.90 100.00%
05.03.01.02.06.02 SUMINISTRO E INST. VALVULA COMPUERTA H. DUCTIL, Y ACCESORIOS und 1.00 429.91 429.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 429.91 100.00%
05.03.01.02.06.03 CODO FºDº DN 160X90º ISO ED und 4.00 11.67 46.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 46.68 100.00%
05.03.01.02.07 FILTROS 59.77 0.00 59.77 59.77 100.00% 0.00 0.00
05.03.01.02.07.01 FILTROS DE GRAVA m3 0.22 109.19 24.02 0.0 0.00 0.00% 0.22 24.02 100.00% 0.22 24.02 100.00% 0.00 0.00 0.00%
05.03.01.02.07.02 FILTROS DE ARENA m3 0.29 123.26 35.75 0.0 0.00 0.00% 0.29 35.75 100.00% 0.29 35.75 100.00% 0.00 0.00 0.00%
05.03.01.02.08 PINTURA 173.78 0.00 0.00 0.00 0.00% 0.00 173.78
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05.03.01.02.08.01 PINTURA EN TAPAS METALICAS m2 1.04 22.08 22.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.04 22.96 100.00%
05.03.01.02.08.02 PINTURA EN MUROS EXTERIORES (CAPTACION) m2 6.04 24.97 150.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 150.82 100.00%
05.03.01.02.09 CERCO PERIMETRICO 1,433.10 0.00 0.00 0.00 0.00% 0.00 1,433.10
05.03.01.02.09.01 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 51.00 28.10 1,433.10 0.0 0.00 0.00% 0.00 0.00 0.00 0.00% 51.00 1,433.10 100.00%
05.03.01.03 LINEA DE CONDUCCION 51,138.64 10,728.59 38,423.57 49,152.16 96.12% 0.00 1,986.48
05.03.01.03.01 TENDIDO DE TUBERIA PVC SAP 51,138.64 10,728.59 38,423.57 49,152.16 96.12% 0.00 1,986.48
05.03.01.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 580.34 2.10 1,218.71 580.3 1,218.71 100.00% 0.00 0.00% 580.34 1,218.71 100.00% 0.00 0.00 0.00%
05.03.01.03.01.02 EXCAVACION MANUAL DE ZANJA DE TERRENO CONGLOMERADO m3 338.53 34.92 11,821.47 0.0 0.00 0.00% 338.53 11,821.47 100.00% 338.53 11,821.47 100.00% 0.00 0.00 0.00%
05.03.01.03.01.03 REFINE Y NIVELACION DE ZANJA m 967.24 4.08 3,946.34 0.0 0.00 0.00% 967.24 3,946.34 100.00% 967.24 3,946.34 100.00% 0.00 0.00 0.00%
05.03.01.03.01.04 CAMA DE APOYO E=10CM. m 967.24 1.66 1,605.62 0.0 0.00 0.00% 967.24 1,605.62 100.00% 967.24 1,605.62 100.00% 0.00 0.00 0.00%
05.03.01.03.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 162.50 23.80 3,867.50 0.0 0.00 0.00% 162.50 3,867.50 100.00% 162.50 3,867.50 100.00% 0.00 0.00 0.00%
05.03.01.03.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 243.74 57.17 13,934.62 0.0 0.00 0.00% 243.74 13,934.62 100.00% 243.74 13,934.62 100.00% 0.00 0.00 0.00%
05.03.01.03.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 243.74 8.15 1,986.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 243.74 1,986.48 100.00%
05.03.01.03.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1/2" m 967.24 12.29 11,887.38 773.8 9,509.88 80.00% 193.45 2,377.50 20.00% 967.24 11,887.38 100.00% 0.00 0.00 0.00%
05.03.01.03.01.09 PRUEBA HIDRAULICA DE LA LINEA DE CONDUCCION m 967.24 0.90 870.52 0.0 0.00 0.00% 967.24 870.52 100.00% 967.24 870.52 100.00% 0.00 0.00 0.00%
05.03.01.04 RESERVORIO (8 M3) 21,354.15 86.66 6,194.58 6,281.24 29.41% 0.00 15,072.91
05.03.01.04.01 RESERVORIO 17,278.85 59.25 6,194.58 6,253.83 36.19% 0.00 11,025.02
05.03.01.04.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 13.05 2.44 31.84 13.1 31.84 100.00% 0.00 0.00% 13.05 31.84 100.00% 0.00 0.00 0.00%
05.03.01.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
05.03.01.04.01.03 EXCAVACION EN TERRENO NORMAL RESERVORIO m3 6.53 34.92 228.03 0.0 0.00 0.00% 6.53 228.03 100.00% 6.53 228.03 100.00% 0.00 0.00 0.00%
05.03.01.04.01.04 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 8.16 14.23 116.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.16 116.12 100.00%
05.03.01.04.01.05 SOLADO C:H 1:8 (h= 0.10 m) m2 1.13 189.58 214.23 0.0 0.00 0.00% 1.13 214.23 100.00% 1.13 214.23 100.00% 0.00 0.00 0.00%
05.03.01.04.01.06 CONCRETO F'C= 210 KG/CM2 EN RESERVORIO m3 6.38 413.58 2,638.64 0.0 0.00 0.00% 5.96 2,464.94 93.42% 5.96 2,464.94 93.42% 0.42 173.70 6.58%
05.03.01.04.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 55.40 48.31 2,676.37 0.0 0.00 0.00% 42.13 2,035.30 76.05% 42.13 2,035.30 76.05% 13.27 641.07 23.95%
05.03.01.04.01.08 ACERO FY=4200 KG/CM2 kg 272.32 6.66 1,813.65 0.0 0.00 0.00% 188.00 1,252.08 69.04% 188.00 1,252.08 69.04% 84.32 561.57 30.96%
05.03.01.04.01.09 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 71.79 27.86 2,000.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 2,000.07 100.00%
05.03.01.04.01.10 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 71.79 20.00 1,435.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 1,435.80 100.00%
05.03.01.04.01.11 TAPA SANITARIA METALICA DE 0.60x0.60 mts und 2.00 197.60 395.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 395.20 100.00%
05.03.01.04.01.12 INSTALACION DE ACCESORIOS TUB. VENTILACION 2" und 2.00 118.31 236.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 236.62 100.00%
05.03.01.04.01.13 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS DE 3/4" und 1.00 496.89 496.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 496.89 100.00%
05.03.01.04.01.14 INSTALACION DE ACCESORIOS EN RESERVORIO und 2.00 872.43 1,744.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1,744.86 100.00%
05.03.01.04.01.15 PINTADO DE MURO EXTERIOR m2 71.79 15.54 1,115.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 1,115.62 100.00%
05.03.01.04.01.16 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 75.00 28.10 2,107.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.00 2,107.50 100.00%
05.03.01.04.02 CASETA DE CLORACION POR GOTEO 4,075.30 27.41 0.00 27.41 0.67% 0.00 4,047.89
05.03.01.04.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
05.03.01.04.02.02 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5X m2 11.54 71.15 821.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.54 821.07 100.00%
05.03.01.04.02.03 TARRAJEO EN INTERIORES Y EXTERIORES m2 20.50 28.40 582.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.50 582.20 100.00%
05.03.01.04.02.04 REJILLA METALICA SEGUN DISEÑO INC. COLOCADO und 1.00 421.12 421.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 421.12 100.00%
05.03.01.04.02.05 COBERTURA DE CALAMINA EN CASETA DE CLORACION m2 4.00 58.15 232.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 232.60 100.00%
05.03.01.04.02.06 INSTALACION DE PUERTA METÁLICA (SEGÚN DISEÑO) und 1.00 257.57 257.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 257.57 100.00%
05.03.01.04.02.07 INSTALACION DE ACCESORIOS EN CASETA DE CLORACION und 1.00 1,557.57 1,557.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,557.57 100.00%
05.03.01.04.02.08 PINTADO DE MURO EXTERIOR m2 11.31 15.54 175.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 175.76 100.00%
05.03.01.05 LINEA DE ADUCCION Y RED DE DISTRIBUCION 262,176.31 45,592.61 133,040.11 178,632.72 68.13% 0.00 83,543.59
05.03.01.05.01 TENDIDO DE TUBERIA DE ADUCCION Y DISTRIBUCION PVC SAP 241,153.22 45,509.16 133,040.11 178,549.27 74.04% 0.00 62,603.95
05.03.01.05.01.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 2,930.95 8.03 23,535.53 2,931.0 23,535.53 100.00% 0.00 0.00% 2,930.95 23,535.53 100.00% 0.00 0.00 0.00%
05.03.01.05.01.02 EXCAVACION MANUAL ZANJA EN TERRENO CONGLOMERADO m3 1,709.72 58.58 100,155.40 0.0 0.00 0.00% 1,237.86 72,513.84 72.40% 1,237.86 72,513.84 72.40% 471.86 27,641.56 27.60%
05.03.01.05.01.03 REFINE Y NIVELACION DE ZANJA m 4,884.92 2.04 9,965.24 0.0 0.00 0.00% 3,536.74 7,214.95 72.40% 3,536.74 7,214.95 72.40% 1,348.18 2,750.29 27.60%
05.03.01.05.01.04 CAMA DE APOYO E=10CM. m 4,884.92 1.66 8,108.97 0.0 0.00 0.00% 3,536.74 5,870.99 72.40% 3,536.74 5,870.99 72.40% 1,348.18 2,237.98 27.60%
05.03.01.05.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 820.67 23.80 19,531.95 0.0 0.00 0.00% 594.17 14,141.25 72.40% 594.17 14,141.25 72.40% 226.50 5,390.70 27.60%
05.03.01.05.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 730.74 57.17 41,776.41 0.0 0.00 0.00% 513.26 29,343.07 70.24% 513.26 29,343.07 70.24% 217.48 12,433.34 29.76%
05.03.01.05.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 730.74 8.15 5,955.53 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 730.74 5,955.53 100.00%
05.03.01.05.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-5 Ø 2" m 36.74 14.16 520.24 36.7 520.24 100.00% 0.00 0.00% 36.74 520.24 100.00% 0.00 0.00 0.00%
05.03.01.05.01.09 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1/2" m 873.66 12.29 10,737.28 698.9 8,589.85 80.00% 0.00 0.00% 698.93 8,589.85 80.00% 174.73 2,147.43 20.00%
05.03.01.05.01.10 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 1,992.19 4.30 8,566.42 1,593.8 6,853.13 80.00% 0.00 0.00% 1,593.75 6,853.13 80.00% 398.44 1,713.29 20.00%
05.03.01.05.01.11 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 3/4" m 1,982.33 3.79 7,513.03 1,585.9 6,010.41 80.00% 0.00 0.00% 1,585.86 6,010.41 80.00% 396.47 1,502.62 20.00%
05.03.01.05.01.12 PRUEBA HIDRAULICA m 4,884.92 0.98 4,787.22 0.0 0.00 0.00% 4,036.74 3,956.01 82.64% 4,036.74 3,956.01 82.64% 848.18 831.21 17.36%
05.03.01.05.02 VALVULA DE CONTROL 7,740.12 16.58 0.00 16.58 0.21% 0.00 7,723.54
05.03.01.05.02.01 LIMPIEZA DE TERRENO MANUAL m2 6.12 0.61 3.73 6.1 3.73 100.00% 0.00 0.00% 6.12 3.73 100.00% 0.00 0.00 0.00%
05.03.01.05.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 6.12 2.10 12.85 6.1 12.85 100.00% 0.00 0.00% 6.12 12.85 100.00% 0.00 0.00 0.00%
05.03.01.05.02.03 EXCAVACION DE ZANJA m3 2.45 34.92 85.55 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.45 85.55 100.00%
05.03.01.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 3.06 8.15 24.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.06 24.94 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05.03.01.05.02.05 CONCRETO F'C= 175 KG/CM2 m3 1.36 384.28 522.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.36 522.62 100.00%
05.03.01.05.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 27.20 48.31 1,314.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.20 1,314.03 100.00%
05.03.01.05.02.07 TARRAJEO CON IMPERMEABILIZANTE m2 27.20 29.19 793.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.20 793.97 100.00%
05.03.01.05.02.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 10.88 28.40 308.99 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.88 308.99 100.00%
05.03.01.05.02.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 2.00 512.25 1,024.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1,024.50 100.00%
05.03.01.05.02.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 17.00 213.49 3,629.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.00 3,629.33 100.00%
05.03.01.05.02.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.27 72.62 19.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.27 19.61 100.00%
05.03.01.05.03 VALVULA DE PURGA 7,061.70 42.92 0.00 42.92 0.61% 0.00 7,018.78
05.03.01.05.03.01 LIMPIEZA DE TERRENO MANUAL m2 15.84 0.61 9.66 15.8 9.66 100.00% 0.00 0.00% 15.84 9.66 100.00% 0.00 0.00 0.00%
05.03.01.05.03.02 TRAZO Y REPLANTEO PRELIMINAR m2 15.84 2.10 33.26 15.8 33.26 100.00% 0.00 0.00% 15.84 33.26 100.00% 0.00 0.00 0.00%
05.03.01.05.03.03 EXCAVACION DE ZANJA m3 11.09 34.92 387.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.09 387.26 100.00%
05.03.01.05.03.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 13.86 8.15 112.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.86 112.96 100.00%
05.03.01.05.03.05 CONCRETO F'C= 175 KG/CM2 m3 1.67 384.28 641.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.67 641.75 100.00%
05.03.01.05.03.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 33.00 48.31 1,594.23 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 33.00 1,594.23 100.00%
05.03.01.05.03.07 TARRAJEO CON IMPERMEABILIZANTE m2 30.80 29.19 899.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.80 899.05 100.00%
05.03.01.05.03.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 12.32 28.40 349.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.32 349.89 100.00%
05.03.01.05.03.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN CAJA DE GLB 3.00 224.06 672.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 672.18 100.00%
05.03.01.05.03.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 11.00 213.49 2,348.39 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.00 2,348.39 100.00%
05.03.01.05.03.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.18 72.62 13.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.18 13.07 100.00%
05.03.01.05.04 CAMARA ROMPE PRESION T - VII 6,221.27 23.95 0.00 23.95 0.38% 0.00 6,197.32
05.03.01.05.04.01 LIMPIEZA DE TERRENO MANUAL m2 8.84 0.61 5.39 8.8 5.39 100.00% 0.00 0.00% 8.84 5.39 100.00% 0.00 0.00 0.00%
05.03.01.05.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 8.84 2.10 18.56 8.8 18.56 100.00% 0.00 0.00% 8.84 18.56 100.00% 0.00 0.00 0.00%
05.03.01.05.04.03 EXCAVACION DE ZANJA m3 7.97 34.92 278.31 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.97 278.31 100.00%
05.03.01.05.04.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 9.96 8.15 81.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.96 81.17 100.00%
05.03.01.05.04.05 CONCRETO F'C= 175 KG/CM2 m3 2.43 384.28 933.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.43 933.80 100.00%
05.03.01.05.04.06 ACERO FY=4200 KG/CM2 kg 80.85 6.66 538.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.85 538.46 100.00%
05.03.01.05.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 36.03 48.31 1,740.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 36.03 1,740.61 100.00%
05.03.01.05.04.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 13.16 46.31 609.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.16 609.44 100.00%
05.03.01.05.04.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C.R.P. TIPO GLB 4.00 205.99 823.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 823.96 100.00%
05.03.01.05.04.10 TAPA METALICA Y MARCO DE 0.60x0.60m y 0.30x0.30m e=1/8" EN C.R.P. TI und 4.00 278.02 1,112.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 1,112.08 100.00%
05.03.01.05.04.11 PINTURA EN TAPAS METALICAS m2 3.60 22.08 79.49 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.60 79.49 100.00%
05.03.01.06 CONEXIONES DOMICILIARIAS 29,854.23 3,734.99 0.00 3,734.99 12.51% 0.00 26,119.24
05.03.01.06.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 465.13 8.03 3,734.99 465.1 3,734.99 100.00% 0.00 0.00% 465.13 3,734.99 100.00% 0.00 0.00 0.00%
05.03.01.06.02 EXCAVACION MANUAL DE ZANJA EN TERRENO CONGLOMERADO m3 209.31 23.12 4,839.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 209.31 4,839.25 100.00%
05.03.01.06.03 REFINE Y NIVELACION DE ZANJA m 775.22 4.08 3,162.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 775.22 3,162.90 100.00%
05.03.01.06.04 CAMA DE APOYO E=10CM. m 775.22 1.66 1,286.87 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 775.22 1,286.87 100.00%
05.03.01.06.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 218.73 23.80 5,205.77 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 218.73 5,205.77 100.00%
05.03.01.06.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 11.51 57.17 658.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.51 658.03 100.00%
05.03.01.06.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 11.51 8.15 93.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.51 93.81 100.00%
05.03.01.06.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" m 775.22 3.46 2,682.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 775.22 2,682.26 100.00%
05.03.01.06.09 CONEXIÓN DOMICILIARIA INC. CAJA DE AGUA POTABLE MATRIZ Ø 1 1/2" @und 55.00 136.23 7,492.65 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.00 7,492.65 100.00%
05.03.01.06.10 PRUEBA HIDRAULICA EN TUBERIA INSTALADA m 775.22 0.90 697.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 775.22 697.70 100.00%

05.03.02 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO DOMICILIARIAS 485,760.68 48,287.09 54,547.62 21.17% 102,834.71 21.17% 382,925.97
0.00
05.03.02.01 CONSTRUCCION DE CASETA DE BAÑO 321,781.10 5,500.54 36,822.51 42,323.05 13.15% 0.00 279,458.05
05.03.02.01.01 OBRAS PROVISIONALES 3,518.51 3,373.58 144.93 3,518.51 100.00% 0.00 0.00
05.03.02.01.01.01 LETRINAS DE HOYO SECO VENTILADO (PARA PERSONAL OBRERO) 1,904.75 1,759.82 144.93 1,904.75 100.00% 0.00 0.00
05.03.02.01.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.38 0.61 2.06 3.4 2.06 100.00% 0.00 0.00% 3.38 2.06 100.00% 0.00 0.00 0.00%
05.03.02.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.38 2.10 7.10 3.4 7.10 100.00% 0.00 0.00% 3.38 7.10 100.00% 0.00 0.00 0.00%
05.03.02.01.01.01.03 EXCAVACION DE ZANJA m3 6.42 34.92 224.19 6.4 224.19 100.00% 0.00 0.00% 6.42 224.19 100.00% 0.00 0.00 0.00%
05.03.02.01.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.03 8.15 65.44 8.0 65.44 100.00% 0.00 0.00% 8.03 65.44 100.00% 0.00 0.00 0.00%
05.03.02.01.01.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.24 48.31 301.45 3.2 156.52 51.92% 3.00 144.93 48.08% 6.24 301.45 100.00% 0.00 0.00 0.00%
05.03.02.01.01.01.06 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.94 364.59 342.71 0.9 342.71 100.00% 0.00 0.00% 0.94 342.71 100.00% 0.00 0.00 0.00%
05.03.02.01.01.01.07 ACERO FY=4200 KG/CM2 kg 18.14 6.66 120.81 18.1 120.81 100.00% 0.00 0.00% 18.14 120.81 100.00% 0.00 0.00 0.00%
05.03.02.01.01.01.08 CONCRETO F'C= 175 KG/CM2 m3 0.17 384.28 65.33 0.2 65.33 100.00% 0.00 0.00% 0.17 65.33 100.00% 0.00 0.00 0.00%
05.03.02.01.01.01.09 CASETA PARA LETRINAS INC. PUERTA DE CALAMINA und 2.00 346.09 692.18 2.0 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
05.03.02.01.01.01.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.0 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
05.03.02.01.01.02 DUCHAS O VESTUARIOS (PARA PERSONAL OBRERO) 1,335.92 1,335.92 0.00 1,335.92 100.00% 0.00 0.00
05.03.02.01.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 4.00 0.61 2.44 4.0 2.44 100.00% 0.00 0.00% 4.00 2.44 100.00% 0.00 0.00 0.00%
05.03.02.01.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.10 8.40 4.0 8.40 100.00% 0.00 0.00% 4.00 8.40 100.00% 0.00 0.00 0.00%
05.03.02.01.01.02.03 EXCAVACION DE ZANJA m3 2.04 34.92 71.24 2.0 71.24 100.00% 0.00 0.00% 2.04 71.24 100.00% 0.00 0.00 0.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05.03.02.01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.55 8.15 20.78 2.6 20.78 100.00% 0.00 0.00% 2.55 20.78 100.00% 0.00 0.00 0.00%
05.03.02.01.01.02.05 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 2.00 72.62 145.24 2.0 145.24 100.00% 0.00 0.00% 2.00 145.24 100.00% 0.00 0.00 0.00%
05.03.02.01.01.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.40 48.31 115.94 2.4 115.94 100.00% 0.00 0.00% 2.40 115.94 100.00% 0.00 0.00 0.00%
05.03.02.01.01.02.07 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.27 364.59 98.44 0.3 98.44 100.00% 0.00 0.00% 0.27 98.44 100.00% 0.00 0.00 0.00%
05.03.02.01.01.02.08 CASETA PARA DUCHAS INC. PUERTA DE CALAMINA m2 2.00 346.09 692.18 2.0 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
05.03.02.01.01.02.09 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 2.00 48.89 97.78 2.0 97.78 100.00% 0.00 0.00% 2.00 97.78 100.00% 0.00 0.00 0.00%
05.03.02.01.01.02.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.0 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
05.03.02.01.01.03 LAVADERO DE GRANITO (PARA PERSONAL OBRERO) 277.84 277.84 0.00 277.84 100.00% 0.00 0.00
05.03.02.01.01.03.01 SUMINISTRO E INSTALACIÓN DE LAVADERO DE GRANITO und 2.00 138.92 277.84 2.0 277.84 100.00% 0.00 0.00% 2.00 277.84 100.00% 0.00 0.00 0.00%
05.03.02.01.02 TRABAJOS PRELIMINARES 1,146.95 1,146.95 0.00 1,146.95 100.00% 0.00 0.00
05.03.02.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 423.23 0.61 258.17 423.2 258.17 100.00% 0.00 0.00% 423.23 258.17 100.00% 0.00 0.00 0.00%
05.03.02.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 423.23 2.10 888.78 423.2 888.78 100.00% 0.00 0.00% 423.23 888.78 100.00% 0.00 0.00 0.00%
05.03.02.01.03 MOVIMIENTO DE TIERRAS 8,881.92 0.00 3,804.93 3,804.93 42.84% 0.00 5,076.99
05.03.02.01.03.01 EXCAVACION DE TERRENO NORMAL m3 103.67 34.92 3,620.16 0.0 0.00 0.00% 51.33 1,792.44 49.51% 51.33 1,792.44 49.51% 52.34 1,827.72 50.49%
05.03.02.01.03.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 129.59 8.15 1,056.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 129.59 1,056.16 100.00%
05.03.02.01.03.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 44.01 95.56 4,205.60 0.0 0.00 0.00% 21.06 2,012.49 47.85% 21.06 2,012.49 47.85% 22.95 2,193.11 52.15%
05.03.02.01.04 OBRAS DE CONCRETO SIMPLE 56,524.16 0.00 13,621.48 13,621.48 24.10% 0.00 42,902.68
05.03.02.01.04.01 CIMIENTOS CORRIDOS 13,145.07 0.00 7,170.04 7,170.04 54.55% 0.00 5,975.03
05.03.02.01.04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 56.65 232.04 13,145.07 0.0 0.00 0.00% 30.90 7,170.04 54.55% 30.90 7,170.04 54.55% 25.75 5,975.03 45.45%
05.03.02.01.04.02 SOBRECIMIENTOS 17,741.45 0.00 6,451.44 6,451.44 36.36% 0.00 11,290.01
05.03.02.01.04.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 259.60 44.52 11,557.39 0.0 0.00 0.00% 94.40 4,202.69 36.36% 94.40 4,202.69 36.36% 165.20 7,354.70 63.64%
05.03.02.01.04.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 19.47 317.62 6,184.06 0.0 0.00 0.00% 7.08 2,248.75 36.36% 7.08 2,248.75 36.36% 12.39 3,935.31 63.64%
05.03.02.01.04.03 PISO INTERIOR 5,450.30 0.00 0.00 0.00 0.00% 0.00 5,450.30
05.03.02.01.04.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO CEMENTO PU m2 121.55 44.84 5,450.30 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 121.55 5,450.30 100.00%
05.03.02.01.04.04 SARDINEL DE DUCHA 1,049.76 0.00 0.00 0.00 0.00% 0.00 1,049.76
05.03.02.01.04.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 18.15 48.31 876.83 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.15 876.83 100.00%
05.03.02.01.04.04.02 CONCRETO F'C= 175 KG/CM2 m3 0.45 384.28 172.93 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.45 172.93 100.00%
05.03.02.01.04.05 VEREDA PERIMETRAL 19,137.58 0.00 0.00 0.00 0.00% 0.00 19,137.58 100.00%
05.03.02.01.04.05.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 61.05 42.84 2,615.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.05 2,615.38 100.00%
05.03.02.01.04.05.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑADO m2 249.98 44.84 11,209.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 249.98 11,209.10 100.00%
05.03.02.01.04.05.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 14.58 364.41 5,313.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.58 5,313.10 100.00%
05.03.02.01.05 OBRAS DE CONCRETO ARMADO 52,610.89 0.00 10,158.75 10,158.75 19.31% 0.00 42,452.14
05.03.02.01.05.01 COLUMNAS 37,248.85 0.00 10,158.75 10,158.75 27.27% 0.00 27,090.10
05.03.02.01.05.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 16.50 384.28 6,340.62 0.0 0.00 0.00% 4.50 1,729.26 27.27% 4.50 1,729.26 27.27% 12.00 4,611.36 72.73%
05.03.02.01.05.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 352.00 45.29 15,942.08 0.0 0.00 0.00% 96.00 4,347.84 27.27% 96.00 4,347.84 27.27% 256.00 11,594.24 72.73%
05.03.02.01.05.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 2,247.17 6.66 14,966.15 0.0 0.00 0.00% 612.86 4,081.65 27.27% 612.86 4,081.65 27.27% 1,634.31 10,884.50 72.73%
05.03.02.01.05.02 VIGAS 15,362.04 0.00 0.00 0.00 0.00% 0.00 15,362.04
05.03.02.01.05.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 9.41 384.28 3,616.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.41 3,616.07 100.00%
05.03.02.01.05.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 172.43 50.83 8,764.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 172.43 8,764.62 100.00%
05.03.02.01.05.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 447.65 6.66 2,981.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 447.65 2,981.35 100.00%
05.03.02.01.06 MUROS DE LADRILLO 33,337.92 0.00 9,092.42 9,092.42 27.27% 0.00 24,245.50
05.03.02.01.06.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5X m2 459.20 72.60 33,337.92 0.0 0.00 0.00% 125.24 9,092.42 27.27% 125.24 9,092.42 27.27% 333.96 24,245.50 72.73%
05.03.02.01.07 REVOQUES Y ENLUCIDOS 34,996.91 0.00 0.00 0.00 0.00% 0.00 34,996.91
05.03.02.01.07.01 ZÓCALO: TARRAJEADO Y PULIDO CON IMPERMEABILIZANTE / MEZCLA 1 m2 352.00 38.45 13,534.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 352.00 13,534.40 100.00%
05.03.02.01.07.02 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 314.05 20.82 6,538.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 314.05 6,538.52 100.00%
05.03.02.01.07.03 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINA m2 392.98 24.59 9,663.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 392.98 9,663.38 100.00%
05.03.02.01.07.04 BRUÑA DE 1 CM m 371.25 14.17 5,260.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 371.25 5,260.61 100.00%
05.03.02.01.08 PINTURA 8,547.15 0.00 0.00 0.00 0.00% 0.00 8,547.15
05.03.02.01.08.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 314.05 11.37 3,570.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 314.05 3,570.75 100.00%
05.03.02.01.08.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINAS EXTER m2 357.50 13.92 4,976.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 357.50 4,976.40 100.00%
05.03.02.01.09 COBERTURA LIVIANA PARA TECHO 21,607.52 0.00 0.00 0.00 0.00% 0.00 21,607.52
05.03.02.01.09.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 165.00 38.28 6,316.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 165.00 6,316.20 100.00%
05.03.02.01.09.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 3.00 m und 220.00 25.91 5,700.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 220.00 5,700.20 100.00%
05.03.02.01.09.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.30 mm m2 396.00 24.22 9,591.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 396.00 9,591.12 100.00%
05.03.02.01.10 CARPINTERIA DE MADERA 21,779.45 0.00 0.00 0.00 0.00% 0.00 21,779.45
05.03.02.01.10.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/TRIPLAY DE und 55.00 304.49 16,746.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.00 16,746.95 100.00%
05.03.02.01.10.02 SUMIN. E INSTAL. DE VENTANA DE MADERA SEGUN DISEÑO und 55.00 91.50 5,032.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.00 5,032.50 100.00%
05.03.02.01.11 INSTALACIONES SANITARIAS 53,700.22 980.01 0.00 980.01 1.82% 0.00 52,720.21
05.03.02.01.11.01 TRABAJOS PRELIMINARES 980.01 980.01 0.00 980.01 100.00% 0.00 0.00
05.03.02.01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 361.63 0.61 220.59 361.6 220.59 100.00% 0.00 0.00% 361.63 220.59 100.00% 0.00 0.00 0.00%
05.03.02.01.11.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 361.63 2.10 759.42 361.6 759.42 100.00% 0.00 0.00% 361.63 759.42 100.00% 0.00 0.00 0.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05.03.02.01.11.02 MOVIMIENTO DE TIERRAS 12,877.94 0.00 0.00 0.00 0.00% 0.00 12,877.94
05.03.02.01.11.02.01 EXCAVACION DE TERRENO NORMAL m3 178.96 34.92 6,249.28 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 178.96 6,249.28 100.00%
05.03.02.01.11.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 158.60 40.54 6,429.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 158.60 6,429.64 100.00%
05.03.02.01.11.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 24.42 8.15 199.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.42 199.02 100.00%
05.03.02.01.11.03 TUBERIAS Y ACCESORIOS 18,601.44 0.00 0.00 0.00 0.00% 0.00 18,601.44
05.03.02.01.11.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 165.00 23.00 3,795.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 165.00 3,795.00 100.00%
05.03.02.01.11.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + ACCESORIOS und 55.00 63.39 3,486.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.00 3,486.45 100.00%
05.03.02.01.11.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 247.50 5.14 1,272.15 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 247.50 1,272.15 100.00%
05.03.02.01.11.03.04 TUBERIA PVC SAL Ø 2" m 539.00 7.99 4,306.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 539.00 4,306.61 100.00%
05.03.02.01.11.03.05 TUBERIA PVC SAL Ø 4" m 451.00 12.73 5,741.23 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 451.00 5,741.23 100.00%
05.03.02.01.11.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 21,240.83 0.00 0.00 0.00 0.00% 0.00 21,240.83
05.03.02.01.11.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 116.33 48.31 5,619.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 116.33 5,619.90 100.00%
05.03.02.01.11.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 10.77 265.70 2,861.59 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.77 2,861.59 100.00%
05.03.02.01.11.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 79.20 32.70 2,589.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 79.20 2,589.84 100.00%
05.03.02.01.11.04.04 SALIDA DE DESAGUE PVC-SAL 2" pto 110.00 41.74 4,591.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 110.00 4,591.40 100.00%
05.03.02.01.11.04.05 SALIDA DE DESAGUE PVC-SAL 4" pto 55.00 42.49 2,336.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.00 2,336.95 100.00%
05.03.02.01.11.04.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 55.00 58.93 3,241.15 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.00 3,241.15 100.00%
05.03.02.01.12 APARATOS Y ACCESORIOS SANITARIOS 14,941.30 0.00 0.00 0.00 0.00% 0.00 14,941.30
05.03.02.01.12.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0.74 M und 55.00 148.78 8,182.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.00 8,182.90 100.00%
05.03.02.01.12.02 SUMINISTRO E INSTALACION DE LAVATORIO und 55.00 73.99 4,069.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.00 4,069.45 100.00%
05.03.02.01.12.03 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 55.00 48.89 2,688.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.00 2,688.95 100.00%
05.03.02.01.13 INSTALACIONES ELECTRICAS 10,188.20 0.00 0.00 0.00 0.00% 0.00 10,188.20
05.03.02.01.13.01 SALIDA PARA INTERRUPTOR DOBLE und 55.00 22.42 1,233.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.00 1,233.10 100.00%
05.03.02.01.13.02 SALIDA PARA CENTRO DE LUZ und 110.00 65.44 7,198.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 110.00 7,198.40 100.00%
05.03.02.01.13.03 SALIDA PARA TOMACORRIENTES und 55.00 31.94 1,756.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.00 1,756.70 100.00%
05.03.02.02 INSTALACION DE BIODIGESTOR DE 600 LT 85,214.16 42,428.04 1,876.95 44,304.99 51.99% 0.00 40,909.17
05.03.02.02.01 TRABAJOS PRELIMINARES 281.25 281.27 0.00 281.27 100.01% 0.00 -0.02
05.03.02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 103.79 0.61 63.31 103.8 63.31 100.00% 0.00 0.00% 103.79 63.31 100.00% 0.00 0.00 0.00%
05.03.02.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 103.79 2.10 217.94 103.8 217.96 100.00% 0.00 0.00% 103.79 217.96 100.00% 0.00 -0.02 0.00%
05.03.02.02.02 MOVIMIENTO DE TIERRAS 8,074.59 0.00 1,876.95 1,876.95 23.25% 0.00 6,197.64
05.03.02.02.02.01 EXCAVACION DE TERRENO NORMAL m3 147.80 34.92 5,161.18 0.0 0.00 0.00% 53.75 1,876.95 36.37% 53.75 1,876.95 36.37% 94.05 3,284.23 63.63%
05.03.02.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 67.90 30.92 2,099.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 67.90 2,099.47 100.00%
05.03.02.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 99.87 8.15 813.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 99.87 813.94 100.00%
05.03.02.02.03 OBRAS DE CONCRETO SIMPLE 426.55 0.00 0.00 0.00 0.00% 0.00 426.55
05.03.02.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 1.11 384.28 426.55 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.11 426.55 100.00%
05.03.02.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 19,893.42 0.00 0.00 0.00 0.00% 0.00 19,893.42
05.03.02.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 182.60 48.31 8,821.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 182.60 8,821.41 100.00%
05.03.02.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODOS m3 17.93 364.74 6,539.79 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.93 6,539.79 100.00%
05.03.02.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 138.60 32.70 4,532.22 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 138.60 4,532.22 100.00%
05.03.02.02.05 BIODIGESTOR DE 600 Lts. 56,538.35 42,146.77 0.00 42,146.77 74.55% 0.00 14,391.58
05.03.02.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 Lts und 55.00 1,027.97 56,538.35 41.0 42,146.77 74.55% 0.00 0.00% 41.00 42,146.77 74.55% 14.00 14,391.58 25.45%
05.03.02.03 CONSTRUCCIÓN DE POZO PERCOLADOR 78,765.42 358.51 15,848.16 16,206.67 20.58% 0.00 62,558.75
05.03.02.03.01 TRABAJOS PRELIMINARES 358.51 358.51 0.00 358.51 100.00% 0.00 0.00
05.03.02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 132.29 0.61 80.70 132.3 80.70 100.00% 0.00 0.00% 132.29 80.70 100.00% 0.00 0.00 0.00%
05.03.02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 132.29 2.10 277.81 132.3 277.81 100.00% 0.00 0.00% 132.29 277.81 100.00% 0.00 0.00 0.00%
05.03.02.03.02 MOVIMIENTO DE TIERRAS 17,426.87 0.00 3,672.89 3,672.89 21.08% 0.00 13,753.98
05.03.02.03.02.01 EXCAVACION DE TERRENO NORMAL m3 289.24 34.92 10,100.26 0.0 0.00 0.00% 105.18 3,672.89 36.36% 105.18 3,672.89 36.36% 184.06 6,427.37 63.64%
05.03.02.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 361.63 8.15 2,947.28 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 361.63 2,947.28 100.00%
05.03.02.03.02.03 RELLENO CON GRAVA 1" m3 45.63 64.85 2,959.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 45.63 2,959.11 100.00%
05.03.02.03.02.04 FILTRO DE GRAVA Ø 1" m3 21.90 64.85 1,420.22 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.90 1,420.22 100.00%
05.03.02.03.03 OBRAS DE CONCRETO SIMPLE 15,052.88 0.00 5,475.57 5,475.57 36.38% 0.00 9,577.31
05.03.02.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 77.41 48.31 3,739.68 0.0 0.00 0.00% 28.15 1,359.93 36.36% 28.15 1,359.93 36.36% 49.26 2,379.75 63.64%
05.03.02.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 29.44 384.28 11,313.20 0.0 0.00 0.00% 10.71 4,115.64 36.38% 10.71 4,115.64 36.38% 18.73 7,197.56 63.62%
05.03.02.03.04 OBRAS DE CONCRETO ARMADO 9,077.44 0.00 0.00 0.00 0.00% 0.00 9,077.44
05.03.02.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 10.38 384.28 3,988.83 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.38 3,988.83 100.00%
05.03.02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 26.78 48.31 1,293.74 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.78 1,293.74 100.00%
05.03.02.03.04.03 ACERO FY=4200 KG/CM2 kg 569.80 6.66 3,794.87 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 569.80 3,794.87 100.00%
05.03.02.03.05 MUROS DE LADRILLO 36,849.72 0.00 6,699.70 6,699.70 18.18% 0.00 30,150.02
05.03.02.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 CM m2 404.32 91.14 36,849.72 0.0 0.00 0.00% 73.51 6,699.70 18.18% 73.51 6,699.70 18.18% 330.81 30,150.02 81.82%
05.03.03 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO INSTITUCIONALES 28,084.11 2,419.60 0.00 8.62% 2,419.60 8.62% 0.00 25,664.51
05.03.03.01 CONSTRUCCION DE CASETA DE BAÑO 21,713.72 116.84 0.00 116.84 0.54% 0.00 21,596.88
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05.03.03.01.01 TRABAJOS PRELIMINARES 81.20 81.20 0.00 81.20 100.00% 0.00 0.00
05.03.03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 29.96 0.61 18.28 30.0 18.28 100.00% 0.00 0.00% 29.96 18.28 100.00% 0.00 0.00 0.00%
05.03.03.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 29.96 2.10 62.92 30.0 62.92 100.00% 0.00 0.00% 29.96 62.92 100.00% 0.00 0.00 0.00%
05.03.03.01.02 MOVIMIENTO DE TIERRAS 603.79 0.00 0.00 0.00 0.00% 0.00 603.79
05.03.03.01.02.01 EXCAVACION DE TERRENO NORMAL m3 7.22 34.92 252.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.22 252.12 100.00%
05.03.03.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 9.03 8.15 73.59 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.03 73.59 100.00%
05.03.03.01.02.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 2.91 95.56 278.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.91 278.08 100.00%
05.03.03.01.03 OBRAS DE CONCRETO SIMPLE 3,943.76 0.00 0.00 0.00 0.00% 0.00 3,943.76
05.03.03.01.03.01 CIMIENTOS CORRIDOS 972.25 0.00 0.00 0.00 0.00% 0.00 972.25
05.03.03.01.03.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 4.19 232.04 972.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.19 972.25 100.00%
05.03.03.01.03.02 SOBRECIMIENTOS 1,346.23 0.00 0.00 0.00 0.00% 0.00 1,346.23
05.03.03.01.03.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 19.68 44.52 876.15 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.68 876.15 100.00%
05.03.03.01.03.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 1.48 317.62 470.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.48 470.08 100.00%
05.03.03.01.03.03 PISO INTERIOR 473.51 0.00 0.00 0.00 0.00% 0.00 473.51
05.03.03.01.03.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO CEMENTO PU m2 10.56 44.84 473.51 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.56 473.51 100.00%
05.03.03.01.03.04 VEREDA PERIMETRAL 1,151.77 0.00 0.00 0.00 0.00% 0.00 1,151.77
05.03.03.01.03.04.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 3.26 42.84 139.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.26 139.66 100.00%
05.03.03.01.03.04.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑADO m2 16.07 44.84 720.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.07 720.58 100.00%
05.03.03.01.03.04.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.80 364.41 291.53 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.80 291.53 100.00%
05.03.03.01.04 OBRAS DE CONCRETO ARMADO 3,059.13 0.00 0.00 0.00 0.00% 0.00 3,059.13
05.03.03.01.04.01 COLUMNAS 2,031.74 0.00 0.00 0.00 0.00% 0.00 2,031.74
05.03.03.01.04.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 0.90 384.28 345.85 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.90 345.85 100.00%
05.03.03.01.04.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 19.20 45.29 869.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.20 869.57 100.00%
05.03.03.01.04.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 122.57 6.66 816.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 122.57 816.32 100.00%
05.03.03.01.04.02 VIGAS 1,027.39 0.00 0.00 0.00 0.00% 0.00 1,027.39
05.03.03.01.04.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 0.63 384.28 242.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.63 242.10 100.00%
05.03.03.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 11.55 50.83 587.09 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.55 587.09 100.00%
05.03.03.01.04.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 29.76 6.66 198.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.76 198.20 100.00%
05.03.03.01.05 MUROS DE LADRILLO 2,772.59 0.00 0.00 0.00 0.00% 0.00 2,772.59
05.03.03.01.05.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12.5X m2 38.19 72.60 2,772.59 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 38.19 2,772.59 100.00%
05.03.03.01.06 REVOQUES Y ENLUCIDOS 1,816.25 0.00 0.00 0.00 0.00% 0.00 1,816.25
05.03.03.01.06.01 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 66.26 20.82 1,379.53 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 66.26 1,379.53 100.00%
05.03.03.01.06.02 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINA m2 17.76 24.59 436.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.76 436.72 100.00%
05.03.03.01.07 PINTURA 1,000.60 0.00 0.00 0.00 0.00% 0.00 1,000.60
05.03.03.01.07.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 66.26 11.37 753.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 66.26 753.38 100.00%
05.03.03.01.07.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINAS EXTER m2 17.76 13.92 247.22 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.76 247.22 100.00%
05.03.03.01.08 COBERTURA LIVIANA PARA TECHO 1,385.19 0.00 0.00 0.00 0.00% 0.00 1,385.19
05.03.03.01.08.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 10.00 38.28 382.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 382.80 100.00%
05.03.03.01.08.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 5.60 m und 8.00 43.92 351.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 351.36 100.00%
05.03.03.01.08.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.30 mm m2 26.88 24.22 651.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.88 651.03 100.00%
05.03.03.01.09 CARPINTERIA DE MADERA 2,435.92 0.00 0.00 0.00 0.00% 0.00 2,435.92
05.03.03.01.09.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/TRIPLAY DE und 8.00 304.49 2,435.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 2,435.92 100.00%
05.03.03.01.10 INSTALACIONES SANITARIAS 2,466.65 35.64 0.00 35.64 1.44% 0.00 2,431.01
05.03.03.01.10.01 TRABAJOS PRELIMINARES 35.64 35.64 0.00 35.64 100.00% 0.00 0.00
05.03.03.01.10.01.01 LIMPIEZA DE TERRENO MANUAL m2 13.15 0.61 8.02 13.2 8.02 100.00% 0.00 0.00% 13.15 8.02 100.00% 0.00 0.00 0.00%
05.03.03.01.10.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 13.15 2.10 27.62 13.2 27.62 100.00% 0.00 0.00% 13.15 27.62 100.00% 0.00 0.00 0.00%
05.03.03.01.10.02 MOVIMIENTO DE TIERRAS 468.83 0.00 0.00 0.00 0.00% 0.00 468.83
05.03.03.01.10.02.01 EXCAVACION DE TERRENO NORMAL m3 6.51 34.92 227.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.51 227.33 100.00%
05.03.03.01.10.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 5.77 40.54 233.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.77 233.92 100.00%
05.03.03.01.10.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 0.93 8.15 7.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.93 7.58 100.00%
05.03.03.01.10.03 TUBERIAS Y ACCESORIOS 748.67 0.00 0.00 0.00 0.00% 0.00 748.67
05.03.03.01.10.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 8.00 23.00 184.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 184.00 100.00%
05.03.03.01.10.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + ACCESORIOS und 2.00 63.39 126.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 126.78 100.00%
05.03.03.01.10.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 11.00 5.14 56.54 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.00 56.54 100.00%
05.03.03.01.10.03.04 TUBERIA PVC SAL Ø 2" m 21.60 7.99 172.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.60 172.58 100.00%
05.03.03.01.10.03.05 TUBERIA PVC SAL Ø 4" m 16.40 12.73 208.77 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.40 208.77 100.00%
05.03.03.01.10.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 402.15 0.0 0.00 0.00 0.00 0.00 0.00% 0.00 402.15
05.03.03.01.10.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 4.23 48.31 204.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.23 204.35 100.00%
05.03.03.01.10.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 0.39 265.70 103.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.39 103.62 100.00%
05.03.03.01.10.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 2.88 32.70 94.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.88 94.18 100.00%
05.03.03.01.10.05 SALIDA DE DESAGUE PVC-SAL 4" pto 8.00 42.49 339.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 339.92 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
05.03.03.01.10.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 8.00 58.93 471.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 471.44 100.00%
05.03.03.01.11 APARATOS Y ACCESORIOS SANITARIOS 1,190.24 0.00 0.00 0.00 0.00% 0.00 1,190.24
05.03.03.01.11.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0.74 M und 8.00 148.78 1,190.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 1,190.24 100.00%
05.03.03.01.12 INSTALACIONES ELECTRICAS 958.40 0.00 0.00 0.00 0.00% 0.00 958.40
05.03.03.01.12.01 SALIDA PARA INTERRUPTOR DOBLE und 8.00 22.42 179.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 179.36 100.00%
05.03.03.01.12.02 SALIDA PARA CENTRO DE LUZ und 8.00 65.44 523.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 523.52 100.00%
05.03.03.01.12.03 SALIDA PARA TOMACORRIENTES und 8.00 31.94 255.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 255.52 100.00%
05.03.03.02 INSTALACION DE BIODIGESTOR DE 1,300 LTS 3,505.72 2,289.73 0.00 2,289.73 65.31% 0.00 1,215.99
05.03.03.02.01 TRABAJOS PRELIMINARES 13.69 13.69 0.00 13.69 100.00% 0.00 0.00
05.03.03.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 5.05 0.61 3.08 5.1 3.08 100.00% 0.00 0.00% 5.05 3.08 100.00% 0.00 0.00 0.00%
05.03.03.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 5.05 2.10 10.61 5.1 10.61 100.00% 0.00 0.00% 5.05 10.61 100.00% 0.00 0.00 0.00%
05.03.03.02.02 MOVIMIENTO DE TIERRAS 477.95 0.00 0.00 0.00 0.00% 0.00 477.95
05.03.03.02.02.01 EXCAVACION DE TERRENO NORMAL m3 8.67 34.92 302.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.67 302.76 100.00%
05.03.03.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 4.19 30.92 129.55 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.19 129.55 100.00%
05.03.03.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 5.60 8.15 45.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.60 45.64 100.00%
05.03.03.02.03 OBRAS DE CONCRETO SIMPLE 15.37 0.00 0.00 0.00 0.00% 0.00 15.37
05.03.03.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 0.04 384.28 15.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.04 15.37 100.00%
05.03.03.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 722.67 0.00 0.00 0.00 0.00% 0.00 722.67
05.03.03.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.64 48.31 320.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.64 320.78 100.00%
05.03.03.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODOS m3 0.65 364.74 237.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.65 237.08 100.00%
05.03.03.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 5.04 32.70 164.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.04 164.81 100.00%
05.03.03.02.05 BIODIGESTOR DE 1,300 Lts. 2,276.04 2,276.04 0.00 2,276.04 100.00% 0.00 0.00
05.03.03.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 1,300 Lts und 2.00 1,138.02 2,276.04 2.0 2,276.04 100.00% 0.00 0.00% 2.00 2,276.04 100.00% 0.00 0.00 0.00%
05.03.03.03 CONSTRUCCIÓN DE POZO PERCOLADOR 2,864.67 13.03 0.00 13.03 0.45% 0.00 2,851.64
05.03.03.03.01 TRABAJOS PRELIMINARES 13.03 13.03 0.00 13.03 100.00% 0.00 0.00
05.03.03.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 4.81 0.61 2.93 4.8 2.93 100.00% 0.00 0.00% 4.81 2.93 100.00% 0.00 0.00 0.00%
05.03.03.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.81 2.10 10.10 4.8 10.10 100.00% 0.00 0.00% 4.81 10.10 100.00% 0.00 0.00 0.00%
05.03.03.03.02 MOVIMIENTO DE TIERRAS 634.06 0.00 0.00 0.00 0.00% 0.00 634.06
05.03.03.03.02.01 EXCAVACION DE TERRENO NORMAL m3 10.52 34.92 367.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.52 367.36 100.00%
05.03.03.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 13.15 8.15 107.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.15 107.17 100.00%
05.03.03.03.02.03 RELLENO CON GRAVA 1" m3 1.66 64.85 107.65 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.66 107.65 100.00%
05.03.03.03.02.04 FILTRO DE GRAVA Ø 1" m3 0.80 64.85 51.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.80 51.88 100.00%
05.03.03.03.03 OBRAS DE CONCRETO SIMPLE 546.93 0.00 0.00 0.00 0.00% 0.00 546.93
05.03.03.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.81 48.31 135.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.81 135.75 100.00%
05.03.03.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 1.07 384.28 411.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.07 411.18 100.00%
05.03.03.03.04 OBRAS DE CONCRETO ARMADO 330.89 0.00 0.00 0.00 0.00% 0.00 330.89
05.03.03.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 0.38 384.28 146.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.38 146.03 100.00%
05.03.03.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 0.97 48.31 46.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.97 46.86 100.00%
05.03.03.03.04.03 ACERO FY=4200 KG/CM2 kg 20.72 6.66 138.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.72 138.00 100.00%
05.03.03.03.05 MUROS DE LADRILLO 1,339.76 0.00 0.00 0.00 0.00% 0.00 1,339.76
05.03.03.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 CM m2 14.70 91.14 1,339.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.70 1,339.76 100.00%
05.03.04 ESTUDIOS COMPLEMENTARIOS 1,710.00 0.00 490.00 28.65% 490.00 28.65% 0.00 1,220.00
05.03.04.01 DISEÑO DE MEZCLA und 3.00 450.00 1,350.00 0.0 0.00 0.00% 1.00 450.00 33.33% 1.00 450.00 33.33% 2.00 900.00 66.67%
05.03.04.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 9.00 40.00 360.00 0.0 0.00 0.00% 1.00 40.00 11.11% 1.00 40.00 11.11% 8.00 320.00 88.89%
05.03.05 FLETE 50,738.06 40,590.45 5,073.81 90.00% 45,664.25 90.00% 0.00 5,073.81
05.03.05.01 FLETE TERRESTRE Y ACARREO HUANCARPUQUIO GLB 1.00 50,738.06 50,738.06 0.8 40,590.45 80.00% 0.10 5,073.81 10.00% 0.90 45,664.25 90.00% 0.10 5,073.81 10.00%
05.03.06 PROGRAMA DE MITIGACION E IMPACTO AMBIENTAL 5,133.42 0.00 52.12 1.02% 52.12 1.02% 0.00 5,081.30
05.03.06.01 PROGRAMA DE PREVENCION DE MITIGACION 1,417.84 0.00 52.12 52.12 3.68% 0.00 1,365.72
05.03.06.01.01 CARTELES PERMANENTES und 10.00 63.56 635.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 635.60 100.00%
05.03.06.01.02 CARTELES TEMPORALES und 10.00 67.80 678.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 678.00 100.00%
05.03.06.01.03 CINTAS DE SEÑAL DE TRABAJO rll 2.00 52.12 104.24 0.0 0.00 0.00% 1.00 52.12 50.00% 1.00 52.12 50.00% 1.00 52.12 50.00%
05.03.06.02 PROGRAMA DE ABANDONO DE OBRA 3,715.58 0.00 0.00 0.00 0.00% 0.00 3,715.58
05.03.06.02.01 REACONDICIONAMIENTO DE AREA OCUPADA (CAMPAMENTO Y MAQUINARm2 800.00 3.22 2,576.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 800.00 2,576.00 100.00%
05.03.06.02.02 REACONDICIONAMIENTO DE CANTERAS Y ACCESOS HA 2.00 157.27 314.54 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 314.54 100.00%
05.03.06.02.03 REFORESTACION EN CAPTACIONES Y RESERVORIO m2 29.55 27.92 825.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.55 825.04 100.00%
05.03.07 ADECUADO CONOCIMIENTO DE EDUCACION SANITARIA 4,000.00 0.00 2,500.00 62.50% 2,500.00 62.50% 0.00 1,500.00
05.03.07.01 CAPACITACION ANTES DE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 4.00 2,000.00 100.00% 4.00 2,000.00 100.00% 0.00 0.00 0.00%
05.03.07.02 CAPACITACION DURANTE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 1.00 500.00 25.00% 1.00 500.00 25.00% 3.00 1,500.00 75.00%
EFICIENTE GESTION TECNICA Y ADMINISTRATIVA DE LOS SERVICIOS DE
05.03.08 4,000.00 0.00 0.00 0.00% 0.00 0.00% 4,000.00
AGUA Y SANEAMIENTO A TRAVES DEL LAS JASS 0.00
05.03.08.01 PROGRAMA DE FORTALECIMIENTO DE CAPACIDADES PARA LA POBLACION und 4.00 1,000.00 4,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 4,000.00 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %

COSTO DIRECTO 1,705,958.72 258,693.46 466,432.52 27.34% 725,125.97 42.51% 980,832.75 57.49%

TOTAL PRESPUESTO 1,705,958.72 258,693.46 466,432.52 27.34% 725,125.97 42.51% 980,832.75 57.49%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06 COMUNIDAD DE TAQUEBAMBA 3,251,582.43 138,463.95 0.00% 265,412.04 12.42% 403,876.00 12.42% 0.00 2,847,706.43 87.58%
06.01 LOCALIDAD DE CRUZPATA 257,484.09 12,517.36 0.00% 52,964.79 25.43% 65,482.16 25.43% 0.00 192,001.93 74.57%
06.01.01 SISTEMA DE AGUA POTABLE 110,529.82 8,507.03 0.00% 32,600.90 37.19% 41,107.93 37.19% 0.00 69,421.89 62.81%
06.01.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00 0.00%
06.01.01.01.01 OBRAS PROVISIONALES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
06.01.01.01.01.01 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 1,760.72 1,760.72 1.0 1,760.72 100.00% 0.00 0.00% 1.00 1,760.72 100.00% 0.00 0.00 0.00%
06.01.01.01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 797.66 797.66 1.0 797.66 100.00% 0.00 0.00% 1.00 797.66 100.00% 0.00 0.00 0.00%
06.01.01.02 CONSTRUCCION DE CAPTACION TIPO - 1 7,544.48 74.91 0.00 74.91 0.99% 0.00 7,469.57
06.01.01.02.01 TRABAJOS PRELIMINARES 74.91 74.91 0.00 74.91 100.00% 0.00 0.00
06.01.01.02.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 16.50 2.44 40.26 16.5 40.26 100.00% 0.00 0.00% 16.50 40.26 100.00% 0.00 0.00 0.00%
06.01.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 16.50 2.10 34.65 16.5 34.65 100.00% 0.00 0.00% 16.50 34.65 100.00% 0.00 0.00 0.00%
06.01.01.02.02 MOVIMIENTO DE TIERRAS 887.73 0.00 0.00 0.00 0.00% 0.00 887.73
06.01.01.02.02.01 EXCAVACION EN TERRENO NORMAL CAPTACION m3 8.25 39.64 327.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.25 327.03 100.00%
06.01.01.02.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 4.95 40.54 200.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.95 200.67 100.00%
06.01.01.02.02.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE (50 M ) m3 10.31 34.92 360.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.31 360.03 100.00%
06.01.01.02.03 CONCRETO SIMPLE 2,682.25 0.00 0.00 0.00 0.00% 0.00 2,682.25
06.01.01.02.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS m3 10.31 260.16 2,682.25 0.0 0.00 0.00 0.00% 0.00 0.00 0.00% 10.31 2,682.25 100.00%
06.01.01.02.04 CONCRETO ARMADO 1,416.99 0.00 0.00 0.00 0.00% 0.00 1,416.99
06.01.01.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 10.37 48.31 500.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.37 500.97 100.00%
06.01.01.02.04.02 ACERO FY=4200 KG/CM2 kg 61.78 6.66 411.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.78 411.45 100.00%
06.01.01.02.04.03 CONCRETO FC=210 KG/CM2 m3 1.22 413.58 504.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.22 504.57 100.00%
06.01.01.02.05 REVOQUES ENLUCIDOS Y MOLDURAS 212.46 0.00 0.00 0.00 0.00% 0.00 212.46
06.01.01.02.05.01 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 6.04 20.00 120.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 120.80 100.00%
06.01.01.02.05.02 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 3.29 27.86 91.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.29 91.66 100.00%
06.01.01.02.06 VALVULAS Y TAPAS Y ACCESORIOS 603.49 0.00 0.00 0.00 0.00% 0.00 603.49
06.01.01.02.06.01 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.60X0.6 und 0.36 352.51 126.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.36 126.90 100.00%
06.01.01.02.06.02 SUMINISTRO E INST. VALVULA COMPUERTA H. DUCTIL, Y A und 1.00 429.91 429.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 429.91 100.00%
06.01.01.02.06.03 CODO FºDº DN 160X90º ISO ED und 4.00 11.67 46.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 46.68 100.00%
06.01.01.02.07 FILTROS 59.77 0.00 0.00 0.00 0.00% 0.00 59.77
06.01.01.02.07.01 FILTROS DE GRAVA m3 0.22 109.19 24.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.22 24.02 100.00%
06.01.01.02.07.02 FILTROS DE ARENA m3 0.29 123.26 35.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.29 35.75 100.00%
06.01.01.02.08 PINTURA 173.78 0.00 0.00 0.00 0.00% 0.00 173.78
06.01.01.02.08.01 PINTURA EN TAPAS METALICAS m2 1.04 22.08 22.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.04 22.96 100.00%
06.01.01.02.08.02 PINTURA EN MUROS EXTERIORES (CAPTACION) m2 6.04 24.97 150.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 150.82 100.00%
06.01.01.02.09 CERCO PERIMETRICO 1,433.10 0.00 0.00 0.00 0.00% 0.00 1,433.10
06.01.01.02.09.01 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 51.00 28.10 1,433.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.00 1,433.10 100.00%
06.01.01.03 LINEA DE CONDUCCION 24,443.26 641.22 12,770.39 13,411.61 54.87% 0.00 11,031.65
06.01.01.03.01 TENDIDO DE TUBERIA PVC SAP 22,779.03 639.49 12,770.39 13,409.88 58.87% 0.00 9,369.15
06.01.01.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 304.52 2.10 639.49 304.5 639.49 100.00% 0.00 0.00% 304.52 639.49 100.00% 0.00 0.00 0.00%
06.01.01.03.01.02 EXCAVACION MANUAL DE ZANJA DE TERRENO CONGLOMER m3 177.64 34.92 6,203.19 0.0 0.00 0.00% 177.64 6,203.19 100.00% 177.64 6,203.19 100.00% 0.00 0.00 0.00%
06.01.01.03.01.03 REFINE Y NIVELACION DE ZANJA m 507.54 4.08 2,070.76 0.0 0.00 0.00% 507.54 2,070.76 100.00% 507.54 2,070.76 100.00% 0.00 0.00 0.00%
06.01.01.03.01.04 CAMA DE APOYO E=10CM. m 507.54 1.66 842.52 0.0 0.00 0.00% 507.54 842.52 100.00% 507.54 842.52 100.00% 0.00 0.00 0.00%
06.01.01.03.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELEC m3 85.27 23.80 2,029.43 0.0 0.00 0.00% 42.64 1,014.71 50.00% 42.64 1,014.71 50.00% 42.64 1,014.72 50.00%
06.01.01.03.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 127.90 57.17 7,312.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 127.90 7,312.04 100.00%
06.01.01.03.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 127.90 8.15 1,042.39 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 127.90 1,042.39 100.00%
06.01.01.03.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 507.54 4.30 2,182.42 0.0 0.00 0.00% 507.54 2,182.42 100.00% 507.54 2,182.42 100.00% 0.00 0.00 0.00%
06.01.01.03.01.09 PRUEBA HIDRAULICA DE LA LINEA DE CONDUCCION m 507.54 0.90 456.79 0.0 0.00 0.00% 507.54 456.79 100.00% 507.54 456.79 100.00% 0.00 0.00 0.00%
06.01.01.03.02 CAMARA ROMPE PRESION T - VI 1,664.23 1.73 0.00 1.73 0.10% 0.00 1,662.50
06.01.01.03.02.01 LIMPIEZA DE TERRENO MANUAL m2 0.64 0.61 0.39 0.6 0.39 100.00% 0.00 0.00% 0.64 0.39 100.00% 0.00 0.00 0.00%
06.01.01.03.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 0.64 2.10 1.34 0.6 1.34 100.00% 0.00 0.00% 0.64 1.34 100.00% 0.00 0.00 0.00%
06.01.01.03.02.03 EXCAVACION DE ZANJA m3 0.64 34.92 22.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.64 22.35 100.00%
06.01.01.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 0.80 8.15 6.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.80 6.52 100.00%
06.01.01.03.02.05 CONCRETO F'C= 175 KG/CM2 m3 0.38 384.28 146.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.38 146.03 100.00%
06.01.01.03.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.30 48.31 304.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.30 304.35 100.00%
06.01.01.03.02.07 ACERO FY=4200 KG/CM2 kg 43.71 6.66 291.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 43.71 291.11 100.00%
06.01.01.03.02.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 6.30 46.31 291.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.30 291.75 100.00%
06.01.01.03.02.09 TARRAJEO EN INTERIORES Y EXTERIORES m2 6.30 28.40 178.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.30 178.92 100.00%
06.01.01.03.02.10 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C GLB 1.00 187.57 187.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 187.57 100.00%
06.01.01.03.02.11 TAPA METALICA Y MARCO DE 0.60x0.60 m e=1/8" EN C.R.P. TIPOund 1.00 213.02 213.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 213.02 100.00%
06.01.01.03.02.12 PINTADO DE MURO EXTERIOR C/LATEX ACRILICO (SUPERLAT m2 3.60 5.80 20.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.60 20.88 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.01.01.04 RESERVORIO (4 M3) 17,747.12 72.81 0.00 72.81 0.41% 0.00 17,674.31
06.01.01.04.01 RESERVORIO 13,671.82 45.40 0.00 45.40 0.33% 0.00 13,626.42
06.01.01.04.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 10.00 2.44 24.40 10.0 24.40 100.00% 0.00 0.00% 10.00 24.40 100.00% 0.00 0.00 0.00%
06.01.01.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 10.00 2.10 21.00 10.0 21.00 100.00% 0.00 0.00% 10.00 21.00 100.00% 0.00 0.00 0.00%
06.01.01.04.01.03 EXCAVACION EN TERRENO NORMAL RESERVORIO m3 5.00 34.92 174.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 174.60 100.00%
06.01.01.04.01.04 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 6.25 14.23 88.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.25 88.94 100.00%
06.01.01.04.01.05 SOLADO C:H 1:8 (h= 0.10 m) m2 0.86 189.58 163.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.86 163.04 100.00%
06.01.01.04.01.06 CONCRETO F'C= 210 KG/CM2 EN RESERVORIO m3 5.42 413.58 2,241.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.42 2,241.60 100.00%
06.01.01.04.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 46.24 48.31 2,233.85 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 46.24 2,233.85 100.00%
06.01.01.04.01.08 ACERO FY=4200 KG/CM2 kg 200.66 6.66 1,336.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 200.66 1,336.40 100.00%
06.01.01.04.01.09 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 56.25 27.86 1,567.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.25 1,567.13 100.00%
06.01.01.04.01.10 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 56.25 20.00 1,125.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.25 1,125.00 100.00%
06.01.01.04.01.11 TAPA SANITARIA METALICA DE 0.60x0.60 mts und 2.00 197.60 395.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 395.20 100.00%
06.01.01.04.01.12 INSTALACION DE ACCESORIOS TUB. VENTILACION 2" und 1.00 118.31 118.31 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 118.31 100.00%
06.01.01.04.01.13 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS und 1.00 496.89 496.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 496.89 100.00%
06.01.01.04.01.14 INSTALACION DE ACCESORIOS EN RESERVORIO und 1.00 872.43 872.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 872.43 100.00%
06.01.01.04.01.15 PINTADO DE MURO EXTERIOR m2 56.25 15.54 874.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.25 874.13 100.00%
06.01.01.04.01.16 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 69.00 28.10 1,938.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 69.00 1,938.90 100.00%
06.01.01.04.02 CASETA DE CLORACION POR GOTEO 4,075.30 27.41 0.00 27.41 0.67% 0.00 4,047.89
06.01.01.04.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
06.01.01.04.02.02 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS m2 11.54 71.15 821.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.54 821.07 100.00%
06.01.01.04.02.03 TARRAJEO EN INTERIORES Y EXTERIORES m2 20.50 28.40 582.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.50 582.20 100.00%
06.01.01.04.02.04 REJILLA METALICA SEGUN DISEÑO INC. COLOCADO und 1.00 421.12 421.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 421.12 100.00%
06.01.01.04.02.05 COBERTURA DE CALAMINA EN CASETA DE CLORACION m2 4.00 58.15 232.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 232.60 100.00%
06.01.01.04.02.06 INSTALACION DE PUERTA METÁLICA (SEGÚN DISEÑO) und 1.00 257.57 257.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 257.57 100.00%
06.01.01.04.02.07 INSTALACION DE ACCESORIOS EN CASETA DE CLORACION und 1.00 1,557.57 1,557.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,557.57 100.00%
06.01.01.04.02.08 PINTADO DE MURO EXTERIOR m2 11.31 15.54 175.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 175.76 100.00%
06.01.01.05 LINEA DE ADUCCION Y RED DE DISTRIBUCION 52,995.29 4,129.10 19,830.51 23,959.61 45.21% 0.00 29,035.68
06.01.01.05.01 TENDIDO DE TUBERIA DE ADUCCION Y DISTRIBUCION PVC SAP 47,217.18 4,108.47 19,830.51 23,938.98 50.70% 0.00 23,278.20
06.01.01.05.01.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 511.64 8.03 4,108.47 511.6 4,108.47 100.00% 0.00 0.00% 511.64 4,108.47 100.00% 0.00 0.00 0.00%
06.01.01.05.01.02 EXCAVACION MANUAL ZANJA EN TERRENO CONGLOMERADO m3 298.46 58.58 17,483.79 0.0 0.00 0.00% 179.09 10,491.09 60.00% 179.09 10,491.09 60.00% 119.37 6,992.70 40.00%
06.01.01.05.01.03 REFINE Y NIVELACION DE ZANJA m 852.74 2.04 1,739.59 0.0 0.00 0.00% 852.74 1,739.59 100.00% 852.74 1,739.59 100.00% 0.00 0.00 0.00%
06.01.01.05.01.04 CAMA DE APOYO E=10CM. m 852.74 1.66 1,415.55 0.0 0.00 0.00% 852.74 1,415.55 100.00% 852.74 1,415.55 100.00% 0.00 0.00 0.00%
06.01.01.05.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELEC m3 143.26 23.80 3,409.59 0.0 0.00 0.00% 71.63 1,704.79 50.00% 71.63 1,704.79 50.00% 71.63 1,704.80 50.00%
06.01.01.05.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 214.89 57.17 12,285.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 214.89 12,285.26 100.00%
06.01.01.05.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 214.89 8.15 1,751.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 214.89 1,751.35 100.00%
06.01.01.05.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1m 72.28 12.29 888.32 0.0 0.00 0.00% 65.05 799.46 90.00% 65.05 799.46 90.00% 7.23 88.86 10.00%
06.01.01.05.01.09 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 669.86 4.30 2,880.40 0.0 0.00 0.00% 602.90 2,592.47 90.00% 602.90 2,592.47 90.00% 66.96 287.93 10.00%
06.01.01.05.01.10 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 3/4 m 110.60 3.79 419.17 0.0 0.00 0.00% 99.54 377.26 90.00% 99.54 377.26 90.00% 11.06 41.91 10.00%
06.01.01.05.01.11 PRUEBA HIDRAULICA m 852.74 0.98 835.69 0.0 0.00 0.00% 724.80 710.30 85.00% 724.80 710.30 85.00% 127.94 125.39 15.00%
06.01.01.05.02 VALVULA DE CONTROL 1,697.46 2.93 0.00 2.93 0.17% 0.00 1,694.53
06.01.01.05.02.01 LIMPIEZA DE TERRENO MANUAL m2 1.08 0.61 0.66 1.1 0.66 100.00% 0.00 0.00% 1.08 0.66 100.00% 0.00 0.00 0.00%
06.01.01.05.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.08 2.10 2.27 1.1 2.27 100.00% 0.00 0.00% 1.08 2.27 100.00% 0.00 0.00 0.00%
06.01.01.05.02.03 EXCAVACION DE ZANJA m3 0.43 34.92 15.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.43 15.02 100.00%
06.01.01.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 0.54 8.15 4.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.54 4.40 100.00%
06.01.01.05.02.05 CONCRETO F'C= 175 KG/CM2 m3 0.24 384.28 92.23 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.24 92.23 100.00%
06.01.01.05.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 4.80 48.31 231.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.80 231.89 100.00%
06.01.01.05.02.07 TARRAJEO CON IMPERMEABILIZANTE m2 4.80 29.19 140.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.80 140.11 100.00%
06.01.01.05.02.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 1.92 28.40 54.53 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 54.53 100.00%
06.01.01.05.02.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 1.00 512.25 512.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 512.25 100.00%
06.01.01.05.02.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 3.00 213.49 640.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 640.47 100.00%
06.01.01.05.02.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.05 72.62 3.63 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.05 3.63 100.00%
06.01.01.05.03 VALVULA DE PURGA 1,968.32 11.71 0.00 11.71 0.59% 0.00 1,956.61
06.01.01.05.03.01 LIMPIEZA DE TERRENO MANUAL m2 4.32 0.61 2.64 4.3 2.64 100.00% 0.00 0.00% 4.32 2.64 100.00% 0.00 0.00 0.00%
06.01.01.05.03.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.32 2.10 9.07 4.3 9.07 100.00% 0.00 0.00% 4.32 9.07 100.00% 0.00 0.00 0.00%
06.01.01.05.03.03 EXCAVACION DE ZANJA m3 3.02 34.92 105.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.02 105.46 100.00%
06.01.01.05.03.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 3.78 8.15 30.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.78 30.81 100.00%
06.01.01.05.03.05 CONCRETO F'C= 175 KG/CM2 m3 0.46 384.28 176.77 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.46 176.77 100.00%
06.01.01.05.03.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 9.00 48.31 434.79 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 434.79 100.00%
06.01.01.05.03.07 TARRAJEO CON IMPERMEABILIZANTE m2 8.40 29.19 245.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.40 245.20 100.00%
06.01.01.05.03.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 3.36 28.40 95.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.36 95.42 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.01.01.05.03.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES E GLB 1.00 224.06 224.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 224.06 100.00%
06.01.01.05.03.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 3.00 213.49 640.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 640.47 100.00%
06.01.01.05.03.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.05 72.62 3.63 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.05 3.63 100.00%
06.01.01.05.04 CAMARA ROMPE PRESION T - VII 2,112.33 5.99 0.00 5.99 0.28% 0.00 2,106.34
06.01.01.05.04.01 LIMPIEZA DE TERRENO MANUAL m2 2.21 0.61 1.35 2.2 1.35 100.00% 0.00 0.00% 2.21 1.35 100.00% 0.00 0.00 0.00%
06.01.01.05.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.21 2.10 4.64 2.2 4.64 100.00% 0.00 0.00% 2.21 4.64 100.00% 0.00 0.00 0.00%
06.01.01.05.04.03 EXCAVACION DE ZANJA m3 1.99 34.92 69.49 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.99 69.49 100.00%
06.01.01.05.04.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.49 8.15 20.29 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.49 20.29 100.00%
06.01.01.05.04.05 CONCRETO F'C= 175 KG/CM2 m3 0.61 384.28 234.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.61 234.41 100.00%
06.01.01.05.04.06 ACERO FY=4200 KG/CM2 kg 20.21 6.66 134.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.21 134.60 100.00%
06.01.01.05.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 9.01 48.31 435.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.01 435.27 100.00%
06.01.01.05.04.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 3.29 46.31 152.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.29 152.36 100.00%
06.01.01.05.04.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C GLB 1.00 205.99 205.99 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 205.99 100.00%
06.01.01.05.04.10 TAPA METALICA Y MARCO DE 0.60x0.60m y 0.30x0.30m e=1/8" ENund 3.00 278.02 834.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 834.06 100.00%
06.01.01.05.04.11 PINTURA EN TAPAS METALICAS m2 0.90 22.08 19.87 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.90 19.87 100.00%
06.01.01.06 CONEXIONES DOMICILIARIAS 5,241.29 1,030.61 0.00 1,030.61 19.66% 0.00 4,210.68
06.01.01.06.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 47.90 8.03 384.64 47.9 384.64 100.00% 0.00 0.00% 47.90 384.64 100.00% 0.00 0.00 0.00%
06.01.01.06.02 EXCAVACION MANUAL DE ZANJA EN TERRENO CONGLOMERAD m3 27.94 23.12 645.97 27.9 645.97 100.00% 0.00 0.00% 27.94 645.97 100.00% 0.00 0.00 0.00%
06.01.01.06.03 REFINE Y NIVELACION DE ZANJA m 79.83 4.08 325.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 79.83 325.71 100.00%
06.01.01.06.04 CAMA DE APOYO E=10CM. m 79.83 1.66 132.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 79.83 132.52 100.00%
06.01.01.06.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCI m3 13.41 23.80 319.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.41 319.16 100.00%
06.01.01.06.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 20.12 57.17 1,150.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.12 1,150.26 100.00%
06.01.01.06.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 20.12 8.15 163.98 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.12 163.98 100.00%
06.01.01.06.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" m 79.83 3.46 276.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 79.83 276.21 100.00%
06.01.01.06.09 CONEXIÓN DOMICILIARIA INC. CAJA DE AGUA POTABLE MATRIZ Ø und 13.00 136.23 1,770.99 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 1,770.99 100.00%
06.01.01.06.10 PRUEBA HIDRAULICA EN TUBERIA INSTALADA m 79.83 0.90 71.85 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 79.83 71.85 100.00%
06.01.02 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO DOMICILIARIAS 117,502.12 663.12 16,964.56 15.00% 17,627.68 15.00% 0.00 99,874.44
06.01.02.01 CONSTRUCCION DE CASETA DE BAÑO 78,743.82 511.91 7,196.07 7,707.98 9.79% 0.00 71,035.84
06.01.02.01.01 OBRAS PROVISIONALES 3,518.51 9.16 0.00 9.16 0.26% 0.00 3,509.35
06.01.02.01.01.01 LETRINAS DE HOYO SECO VENTILADO (PARA PERSONAL OBRERO) 1,904.75 9.16 0.00 9.16 0.48% 0.00 1,895.59
06.01.02.01.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.38 0.61 2.06 3.4 2.06 100.00% 0.00 0.00% 3.38 2.06 100.00% 0.00 0.00 0.00%
06.01.02.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.38 2.10 7.10 3.4 7.10 100.00% 0.00 0.00% 3.38 7.10 100.00% 0.00 0.00 0.00%
06.01.02.01.01.01.03 EXCAVACION DE ZANJA m3 6.42 34.92 224.19 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.42 224.19 100.00%
06.01.02.01.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.03 8.15 65.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.03 65.44 100.00%
06.01.02.01.01.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.24 48.31 301.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.24 301.45 100.00%
06.01.02.01.01.01.06 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.94 364.59 342.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.94 342.71 100.00%
06.01.02.01.01.01.07 ACERO FY=4200 KG/CM2 kg 18.14 6.66 120.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.14 120.81 100.00%
06.01.02.01.01.01.08 CONCRETO F'C= 175 KG/CM2 m3 0.17 384.28 65.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.17 65.33 100.00%
06.01.02.01.01.01.09 CASETA PARA LETRINAS INC. PUERTA DE CALAMINA und 2.00 346.09 692.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 692.18 100.00%
06.01.02.01.01.01.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 83.48 100.00%
06.01.02.01.01.02 DUCHAS O VESTUARIOS (PARA PERSONAL OBRERO) 1,335.92 0.00 0.00 0.00 0.00% 0.00 1,335.92
06.01.02.01.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 4.00 0.61 2.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2.44 100.00%
06.01.02.01.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.10 8.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 8.40 100.00%
06.01.02.01.01.02.03 EXCAVACION DE ZANJA m3 2.04 34.92 71.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.04 71.24 100.00%
06.01.02.01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.55 8.15 20.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.55 20.78 100.00%
06.01.02.01.01.02.05 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 2.00 72.62 145.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 145.24 100.00%
06.01.02.01.01.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.40 48.31 115.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.40 115.94 100.00%
06.01.02.01.01.02.07 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.27 364.59 98.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.27 98.44 100.00%
06.01.02.01.01.02.08 CASETA PARA DUCHAS INC. PUERTA DE CALAMINA m2 2.00 346.09 692.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 692.18 100.00%
06.01.02.01.01.02.09 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 2.00 48.89 97.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 97.78 100.00%
06.01.02.01.01.02.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 83.48
06.01.02.01.01.03 LAVADERO DE GRANITO (PARA PERSONAL OBRERO) 277.84 0.00 0.00 0.00 0.00% 0.00 277.84
06.01.02.01.01.03.01 SUMINISTRO E INSTALACIÓN DE LAVADERO DE GRANITO und 2.00 138.92 277.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 277.84 100.00%
06.01.02.01.02 TRABAJOS PRELIMINARES 271.10 271.10 0.00 271.10 100.00% 0.00 0.00
06.01.02.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 100.04 0.61 61.02 100.0 61.02 100.00% 0.00 0.00% 100.04 61.02 100.00% 0.00 0.00 0.00%
06.01.02.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 100.04 2.10 210.08 100.0 210.08 100.00% 0.00 0.00% 100.04 210.08 100.00% 0.00 0.00 0.00%
06.01.02.01.03 MOVIMIENTO DE TIERRAS 2,098.99 0.00 526.59 526.59 25.09% 0.00 1,572.40
06.01.02.01.03.01 EXCAVACION DE TERRENO NORMAL m3 24.50 34.92 855.54 0.0 0.00 0.00% 15.08 526.59 61.55% 15.08 526.59 61.55% 9.42 328.95 38.45%
06.01.02.01.03.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 30.63 8.15 249.63 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.63 249.63 100.00%
06.01.02.01.03.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 10.40 95.56 993.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.40 993.82 100.00%
06.01.02.01.04 OBRAS DE CONCRETO SIMPLE 13,362.58 0.00 4,492.59 4,492.59 33.62% 0.00 8,869.99
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.01.02.01.04.01 CIMIENTOS CORRIDOS 3,107.02 0.00 1,912.01 1,912.01 61.54% 0.00 1,195.01
06.01.02.01.04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 13.39 232.04 3,107.02 0.0 0.00 0.00% 8.24 1,912.01 61.54% 8.24 1,912.01 61.54% 5.15 1,195.01 38.46%
06.01.02.01.04.02 SOBRECIMIENTOS 4,192.80 0.00 2,580.58 2,580.58 61.55% 0.00 1,612.22
06.01.02.01.04.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 61.36 44.52 2,731.75 0.0 0.00 0.00% 37.76 1,681.08 61.54% 37.76 1,681.08 61.54% 23.60 1,050.67 38.46%
06.01.02.01.04.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 4.60 317.62 1,461.05 0.0 0.00 0.00% 2.83 899.50 61.57% 2.83 899.50 61.57% 1.77 561.55 38.43%
06.01.02.01.04.03 PISO INTERIOR 1,288.25 0.00 0.00 0.00 0.00% 0.00 1,288.25
06.01.02.01.04.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO C m2 28.73 44.84 1,288.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.73 1,288.25 100.00%
06.01.02.01.04.04 SARDINEL DE DUCHA 249.52 0.00 0.00 0.00 0.00% 0.00 249.52
06.01.02.01.04.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 4.29 48.31 207.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.29 207.25 100.00%
06.01.02.01.04.04.02 CONCRETO F'C= 175 KG/CM2 m3 0.11 384.28 42.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.11 42.27 100.00%
06.01.02.01.04.05 VEREDA PERIMETRAL 4,524.99 0.00 0.00 0.00 0.00% 0.00 4,524.99
06.01.02.01.04.05.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 14.43 42.84 618.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.43 618.18 100.00%
06.01.02.01.04.05.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑAD m2 59.09 44.84 2,649.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 59.09 2,649.60 100.00%
06.01.02.01.04.05.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 3.45 364.41 1,257.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.45 1,257.21 100.00%
06.01.02.01.05 OBRAS DE CONCRETO ARMADO 12,433.90 0.00 2,176.89 2,176.89 17.51% 0.00 10,257.01
06.01.02.01.05.01 COLUMNAS 8,804.28 0.00 2,176.89 2,176.89 24.73% 0.00 6,627.39
06.01.02.01.05.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 3.90 384.28 1,498.69 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.90 1,498.69 100.00%
06.01.02.01.05.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 83.20 45.29 3,768.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 83.20 3,768.13 100.00%
06.01.02.01.05.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 531.15 6.66 3,537.46 0.0 0.00 0.00% 326.86 2,176.89 61.54% 326.86 2,176.89 61.54% 204.29 1,360.57 38.46%
06.01.02.01.05.02 VIGAS 3,629.62 0.00 0.00 0.00 0.00% 0.00 3,629.62
06.01.02.01.05.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 2.22 384.28 853.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.22 853.10 100.00%
06.01.02.01.05.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 40.76 50.83 2,071.83 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.76 2,071.83 100.00%
06.01.02.01.05.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 105.81 6.66 704.69 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 105.81 704.69 100.00%
06.01.02.01.06 MUROS DE LADRILLO 7,880.00 0.00 0.00 0.00 0.00% 0.00 7,880.00
06.01.02.01.06.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS m2 108.54 72.60 7,880.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 108.54 7,880.00 100.00%
06.01.02.01.07 REVOQUES Y ENLUCIDOS 8,272.10 0.00 0.00 0.00 0.00% 0.00 8,272.10
06.01.02.01.07.01 ZÓCALO: TARRAJEADO Y PULIDO CON IMPERMEABILIZANTE / m2 83.20 38.45 3,199.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 83.20 3,199.04 100.00%
06.01.02.01.07.02 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 74.23 20.82 1,545.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 74.23 1,545.47 100.00%
06.01.02.01.07.03 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS m2 92.89 24.59 2,284.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 92.89 2,284.17 100.00%
06.01.02.01.07.04 BRUÑA DE 1 CM m 87.75 14.17 1,243.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 87.75 1,243.42 100.00%
06.01.02.01.08 PINTURA 2,020.24 0.00 0.00 0.00 0.00% 0.00 2,020.24
06.01.02.01.08.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 74.23 11.37 844.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 74.23 844.00 100.00%
06.01.02.01.08.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUI m2 84.50 13.92 1,176.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 84.50 1,176.24 100.00%
06.01.02.01.09 COBERTURA LIVIANA PARA TECHO 5,107.23 0.00 0.00 0.00 0.00% 0.00 5,107.23
06.01.02.01.09.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 39.00 38.28 1,492.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 1,492.92 100.00%
06.01.02.01.09.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 3.00 und 52.00 25.91 1,347.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.00 1,347.32 100.00%
06.01.02.01.09.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.3 m2 93.60 24.22 2,266.99 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 93.60 2,266.99 100.00%
06.01.02.01.10 CARPINTERIA DE MADERA 5,147.87 0.00 0.00 0.00 0.00% 0.00 5,147.87
06.01.02.01.10.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/T und 13.00 304.49 3,958.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 3,958.37 100.00%
06.01.02.01.10.02 SUMIN. E INSTAL. DE VENTANA DE MADERA SEGUN DISEÑO und 13.00 91.50 1,189.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 1,189.50 100.00%
06.01.02.01.11 INSTALACIONES SANITARIAS 12,691.60 231.65 0.00 231.65 1.83% 0.00 12,459.95
06.01.02.01.11.01 TRABAJOS PRELIMINARES 231.65 231.65 0.00 231.65 100.00% 0.00 0.00
06.01.02.01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 85.48 0.61 52.14 85.5 52.14 100.00% 0.00 0.00% 85.48 52.14 100.00% 0.00 0.00 0.00%
06.01.02.01.11.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 85.48 2.10 179.51 85.5 179.51 100.00% 0.00 0.00% 85.48 179.51 100.00% 0.00 0.00 0.00%
06.01.02.01.11.02 MOVIMIENTO DE TIERRAS 3,043.99 0.00 0.00 0.00 0.00% 0.00 3,043.99
06.01.02.01.11.02.01 EXCAVACION DE TERRENO NORMAL m3 42.30 34.92 1,477.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 42.30 1,477.12 100.00%
06.01.02.01.11.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 37.49 40.54 1,519.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.49 1,519.84 100.00%
06.01.02.01.11.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 5.77 8.15 47.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.77 47.03 100.00%
06.01.02.01.11.03 TUBERIAS Y ACCESORIOS 4,396.71 0.00 0.00 0.00 0.00% 0.00 4,396.71
06.01.02.01.11.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 39.00 23.00 897.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 897.00 100.00%
06.01.02.01.11.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + A und 13.00 63.39 824.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 824.07 100.00%
06.01.02.01.11.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 58.50 5.14 300.69 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 58.50 300.69 100.00%
06.01.02.01.11.03.04 TUBERIA PVC SAL Ø 2" m 127.40 7.99 1,017.93 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 127.40 1,017.93 100.00%
06.01.02.01.11.03.05 TUBERIA PVC SAL Ø 4" m 106.60 12.73 1,357.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 106.60 1,357.02 100.00%
06.01.02.01.11.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 5,019.25 0.00 0.00 0.00 0.00% 0.00 5,019.25
06.01.02.01.11.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 27.50 48.31 1,328.53 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.50 1,328.53 100.00%
06.01.02.01.11.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 2.54 265.70 674.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.54 674.88 100.00%
06.01.02.01.11.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 18.72 32.70 612.14 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.72 612.14 100.00%
06.01.02.01.11.04.04 SALIDA DE DESAGUE PVC-SAL 2" pto 26.00 41.74 1,085.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.00 1,085.24 100.00%
06.01.02.01.11.04.05 SALIDA DE DESAGUE PVC-SAL 4" pto 13.00 42.49 552.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 552.37 100.00%
06.01.02.01.11.04.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 13.00 58.93 766.09 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 766.09 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.01.02.01.12 APARATOS Y ACCESORIOS SANITARIOS 3,531.58 0.00 0.00 0.00 0.00% 0.00 3,531.58
06.01.02.01.12.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0. und 13.00 148.78 1,934.14 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 1,934.14 100.00%
06.01.02.01.12.02 SUMINISTRO E INSTALACION DE LAVATORIO und 13.00 73.99 961.87 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 961.87 100.00%
06.01.02.01.12.03 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 13.00 48.89 635.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 635.57 100.00%
06.01.02.01.13 INSTALACIONES ELECTRICAS 2,408.12 0.00 0.00 0.00 0.00% 0.00 2,408.12
06.01.02.01.13.01 SALIDA PARA INTERRUPTOR DOBLE und 13.00 22.42 291.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 291.46 100.00%
06.01.02.01.13.02 SALIDA PARA CENTRO DE LUZ und 26.00 65.44 1,701.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.00 1,701.44 100.00%
06.01.02.01.13.03 SALIDA PARA TOMACORRIENTES und 13.00 31.94 415.22 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 415.22 100.00%
06.01.02.02 INSTALACION DE BIODIGESTOR DE 600 LTS 20,141.25 66.47 750.78 817.25 4.06% 0.00 19,324.00
06.01.02.02.01 TRABAJOS PRELIMINARES 66.47 66.47 0.00 66.47 100.00% 0.00 0.00
06.01.02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 24.53 0.61 14.96 24.5 14.96 100.00% 0.00 0.00% 24.53 14.96 100.00% 0.00 0.00 0.00%
06.01.02.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 24.53 2.10 51.51 24.5 51.51 100.00% 0.00 0.00% 24.53 51.51 100.00% 0.00 0.00 0.00%
06.01.02.02.02 MOVIMIENTO DE TIERRAS 1,908.45 0.00 750.78 750.78 39.34% 0.00 1,157.67
06.01.02.02.02.01 EXCAVACION DE TERRENO NORMAL m3 34.93 34.92 1,219.76 0.0 0.00 0.00% 21.50 750.78 61.55% 21.50 750.78 61.55% 13.43 468.98 38.45%
06.01.02.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 16.05 30.92 496.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.05 496.27 100.00%
06.01.02.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 23.61 8.15 192.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.61 192.42 100.00%
06.01.02.02.03 OBRAS DE CONCRETO SIMPLE 99.91 0.00 0.00 0.00 0.00% 0.00 99.91
06.01.02.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 0.26 384.28 99.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.26 99.91 100.00%
06.01.02.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 4,702.81 0.00 0.00 0.00 0.00% 0.00 4,702.81
06.01.02.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 43.16 48.31 2,085.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 43.16 2,085.06 100.00%
06.01.02.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODO m3 4.24 364.74 1,546.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.24 1,546.50 100.00%
06.01.02.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 32.76 32.70 1,071.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 32.76 1,071.25 100.00%
06.01.02.02.05 BIODIGESTOR DE 600 Lts. 13,363.61 0.00 0.00 0.00 0.00% 0.00 13,363.61
06.01.02.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 Lts und 13.00 1,027.97 13,363.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 13,363.61 100.00%
06.01.02.03 CONSTRUCCIÓN DE POZO PERCOLADOR 18,617.05 84.74 9,017.71 9,102.45 48.89% 0.00 9,514.60
06.01.02.03.01 TRABAJOS PRELIMINARES 84.74 84.74 0.00 84.74 100.00% 0.00 0.00
06.01.02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 31.27 0.61 19.07 31.3 19.07 100.00% 0.00 0.00% 31.27 19.07 100.00% 0.00 0.00 0.00%
06.01.02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 31.27 2.10 65.67 31.3 65.67 100.00% 0.00 0.00% 31.27 65.67 100.00% 0.00 0.00 0.00%
06.01.02.03.02 MOVIMIENTO DE TIERRAS 4,119.14 0.00 1,469.08 1,469.08 35.66% 0.00 2,650.06
06.01.02.03.02.01 EXCAVACION DE TERRENO NORMAL m3 68.37 34.92 2,387.48 0.0 0.00 0.00% 42.07 1,469.08 61.53% 42.07 1,469.08 61.53% 26.30 918.40 38.47%
06.01.02.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 85.48 8.15 696.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 85.48 696.66 100.00%
06.01.02.03.02.03 RELLENO CON GRAVA 1" m3 10.78 64.85 699.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.78 699.08 100.00%
06.01.02.03.02.04 FILTRO DE GRAVA Ø 1" m3 5.18 64.85 335.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.18 335.92 100.00%
06.01.02.03.03 OBRAS DE CONCRETO SIMPLE 3,558.66 0.00 2,188.69 2,188.69 61.50% 0.00 1,369.97
06.01.02.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 18.30 48.31 884.07 0.0 0.00 0.00% 11.26 543.97 61.53% 11.26 543.97 61.53% 7.04 340.10 38.47%
06.01.02.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 6.96 384.28 2,674.59 0.0 0.00 0.00% 4.28 1,644.72 61.49% 4.28 1,644.72 61.49% 2.68 1,029.87 38.51%
06.01.02.03.04 OBRAS DE CONCRETO ARMADO 2,144.26 0.00 0.00 0.00 0.00% 0.00 2,144.26
06.01.02.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 2.45 384.28 941.49 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.45 941.49 100.00%
06.01.02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.33 48.31 305.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.33 305.80 100.00%
06.01.02.03.04.03 ACERO FY=4200 KG/CM2 kg 134.68 6.66 896.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 134.68 896.97 100.00%
06.01.02.03.05 MUROS DE LADRILLO 8,710.25 0.00 5,359.94 5,359.94 61.54% 0.00 3,350.31
06.01.02.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 m2 95.57 91.14 8,710.25 0.0 0.00 0.00% 58.81 5,359.94 61.54% 58.81 5,359.94 61.54% 36.76 3,350.31 38.46%
06.01.03 ESTUDIOS COMPLEMENTARIOS 1,710.00 0.00 0.00 0.00% 0.00 0.00% 0.00 1,710.00
06.01.03.01 DISEÑO DE MEZCLA und 3.00 450.00 1,350.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 1,350.00 100.00%
06.01.03.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIO und 9.00 40.00 360.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 360.00 100.00%
06.01.04 FLETE 16,736.07 3,347.21 3,347.21 40.00% 6,694.43 40.00% 0.00 10,041.64
06.01.04.01 FLETE TERRESTRE Y ACARREO CRUZPATA GLB 1.00 16,736.07 16,736.07 0.2 3,347.21 20.00% 0.20 3,347.21 20.00% 0.40 6,694.43 40.00% 0.60 10,041.64 60.00%
06.01.05 PROGRAMA DE MITIGACION E IMPACTO AMBIENTAL 3,006.08 0.00 52.12 1.73% 52.12 1.73% 0.00 2,953.96
06.01.05.01 PROGRAMA DE PREVENCION DE MITIGACION 577.56 0.00 52.12 52.12 9.02% 0.00 525.44
06.01.05.01.01 CARTELES PERMANENTES und 4.00 63.56 254.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 254.24 100.00%
06.01.05.01.02 CARTELES TEMPORALES und 4.00 67.80 271.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 271.20 100.00%
06.01.05.01.03 CINTAS DE SEÑAL DE TRABAJO rll 1.00 52.12 52.12 0.0 0.00 0.00% 1.00 52.12 100.00% 1.00 52.12 100.00% 0.00 0.00 0.00%
06.01.05.02 PROGRAMA DE ABANDONO DE OBRA 2,428.52 0.00 0.00 0.00 0.00% 0.00 2,428.52
06.01.05.02.01 REACONDICIONAMIENTO DE AREA OCUPADA (CAMPAMENTO Y m2 500.00 3.22 1,610.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 500.00 1,610.00 100.00%
06.01.05.02.02 REACONDICIONAMIENTO DE CANTERAS Y ACCESOS HA 0.50 157.27 78.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.50 78.64 100.00%
06.01.05.02.03 REFORESTACION EN CAPTACIONES Y RESERVORIO m2 26.50 27.92 739.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.50 739.88 100.00%
06.01.06 ADECUADO CONOCIMIENTO DE EDUCACION SANITARIA 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 4,000.00
06.01.06.01 CAPACITACION ANTES DE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2,000.00 100.00%
06.01.06.02 CAPACITACION DURANTE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2,000.00 100.00%
06.01.07 EFICIENTE GESTION TECNICA Y ADMINISTRATIVA DE LOS SERVICIOS DE AGUA Y SANEAMIENTO 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 4,000.00
06.01.07.01 PROGRAMA DE FORTALECIMIENTO DE CAPACIDADES PARA LA P und 4.00 1,000.00 4,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 4,000.00 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.02 LOCALIDAD DE TAQUEBAMBA 1,088,614.70 20,599.94 1,000.00 1.98% 21,599.94 1.98% 0.00 1,067,014.76
06.02.01 SISTEMA DE AGUA POTABLE 257,338.93 16,360.31 0.00 6.36% 16,360.31 6.36% 0.00 240,978.62
06.02.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
06.02.01.01.01 OBRAS PROVISIONALES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
06.02.01.01.01.01 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 1,760.72 1,760.72 1.0 1,760.72 100.00% 0.00 0.00% 1.00 1,760.72 100.00% 0.00 0.00 0.00%
06.02.01.01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 797.66 797.66 1.0 797.66 100.00% 0.00 0.00% 1.00 797.66 100.00% 0.00 0.00 0.00%
06.02.01.02 CONSTRUCCION DE CAPTACION TIPO - 1 10,141.29 149.82 0.00 149.82 1.48% 0.00 9,991.47
06.02.01.02.01 TRABAJOS PRELIMINARES 149.82 149.82 0.00 149.82 100.00% 0.00 0.00
06.02.01.02.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 33.00 2.44 80.52 33.0 80.52 100.00% 0.00 0.00% 33.00 80.52 100.00% 0.00 0.00 0.00%
06.02.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 33.00 2.10 69.30 33.0 69.30 100.00% 0.00 0.00% 33.00 69.30 100.00% 0.00 0.00 0.00%
06.02.01.02.02 MOVIMIENTO DE TIERRAS 1,775.81 0.00 0.00 0.00 0.00% 0.00 1,775.81
06.02.01.02.02.01 EXCAVACION EN TERRENO NORMAL CAPTACION m3 16.50 39.64 654.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.50 654.06 100.00%
06.02.01.02.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 9.90 40.54 401.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.90 401.35 100.00%
06.02.01.02.02.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE (50 M ) m3 20.63 34.92 720.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.63 720.40 100.00%
06.02.01.02.03 CONCRETO SIMPLE 421.46 0.00 0.00 0.00 0.00% 0.00 421.46
06.02.01.02.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS m3 1.62 260.16 421.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.62 421.46 100.00%
06.02.01.02.04 CONCRETO ARMADO 2,829.86 0.00 0.00 0.00 0.00% 0.00 2,829.86
06.02.01.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 20.74 48.31 1,001.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.74 1,001.95 100.00%
06.02.01.02.04.02 ACERO FY=4200 KG/CM2 kg 123.56 6.66 822.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 123.56 822.91 100.00%
06.02.01.02.04.03 CONCRETO FC=210 KG/CM2 m3 2.43 413.58 1,005.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.43 1,005.00 100.00%
06.02.01.02.05 REVOQUES ENLUCIDOS Y MOLDURAS 424.92 0.00 0.00 0.00 0.00% 0.00 424.92
06.02.01.02.05.01 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 12.08 20.00 241.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.08 241.60 100.00%
06.02.01.02.05.02 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 6.58 27.86 183.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.58 183.32 100.00%
06.02.01.02.06 VALVULAS Y TAPAS Y ACCESORIOS 1,206.99 0.00 0.00 0.00 0.00% 0.00 1,206.99
06.02.01.02.06.01 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.60X0.6 und 0.72 352.51 253.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.72 253.81 100.00%
06.02.01.02.06.02 SUMINISTRO E INST. VALVULA COMPUERTA H. DUCTIL, Y A und 2.00 429.91 859.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 859.82 100.00%
06.02.01.02.06.03 CODO FºDº DN 160X90º ISO ED und 8.00 11.67 93.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 93.36 100.00%
06.02.01.02.07 FILTROS 118.44 0.00 0.00 0.00 0.00% 0.00 118.44
06.02.01.02.07.01 FILTROS DE GRAVA m3 0.43 109.19 46.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.43 46.95 100.00%
06.02.01.02.07.02 FILTROS DE ARENA m3 0.58 123.26 71.49 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.58 71.49 100.00%
06.02.01.02.08 PINTURA 347.79 0.00 0.00 0.00 0.00% 0.00 347.79
06.02.01.02.08.01 PINTURA EN TAPAS METALICAS m2 2.09 22.08 46.15 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.09 46.15 100.00%
06.02.01.02.08.02 PINTURA EN MUROS EXTERIORES (CAPTACION) m2 12.08 24.97 301.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.08 301.64 100.00%
06.02.01.02.09 CERCO PERIMETRICO 2,866.20 0.00 0.00 0.00 0.00% 0.00 2,866.20
06.02.01.02.09.01 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 102.00 28.10 2,866.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 102.00 2,866.20 100.00%
06.02.01.03 LINEA DE CONDUCCION 51,899.63 1,123.07 0.00 1,123.07 2.16% 0.00 50,776.56
06.02.01.03.01 TENDIDO DE TUBERIA PVC SAP 46,906.92 1,117.87 0.00 1,117.87 2.38% 0.00 45,789.05
06.02.01.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 532.32 2.10 1,117.87 532.3 1,117.87 100.00% 0.00 0.00% 532.32 1,117.87 100.00% 0.00 0.00 0.00%
06.02.01.03.01.02 EXCAVACION MANUAL DE ZANJA DE TERRENO CONGLOMER m3 310.52 34.92 10,843.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 310.52 10,843.36 100.00%
06.02.01.03.01.03 REFINE Y NIVELACION DE ZANJA m 887.20 4.08 3,619.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 887.20 3,619.78 100.00%
06.02.01.03.01.04 CAMA DE APOYO E=10CM. m 887.20 1.66 1,472.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 887.20 1,472.75 100.00%
06.02.01.03.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELEC m3 149.05 23.80 3,547.39 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 149.05 3,547.39 100.00%
06.02.01.03.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 223.57 57.17 12,781.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 223.57 12,781.50 100.00%
06.02.01.03.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 223.57 8.15 1,822.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 223.57 1,822.10 100.00%
06.02.01.03.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1m 887.20 12.29 10,903.69 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 887.20 10,903.69 100.00%
06.02.01.03.01.09 PRUEBA HIDRAULICA DE LA LINEA DE CONDUCCION m 887.20 0.90 798.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 887.20 798.48 100.00%
06.02.01.03.02 CAMARA ROMPE PRESION T - VI 4,992.71 0.0 5.20 0.00 0.00 5.20 0.10% 0.00 4,987.51
06.02.01.03.02.01 LIMPIEZA DE TERRENO MANUAL m2 1.92 0.61 1.17 1.9 1.17 100.00% 0.00 0.00% 1.92 1.17 100.00% 0.00 0.00 0.00%
06.02.01.03.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.92 2.10 4.03 1.9 4.03 100.00% 0.00 0.00% 1.92 4.03 100.00% 0.00 0.00 0.00%
06.02.01.03.02.03 EXCAVACION DE ZANJA m3 1.92 34.92 67.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 67.05 100.00%
06.02.01.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.40 8.15 19.56 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.40 19.56 100.00%
06.02.01.03.02.05 CONCRETO F'C= 175 KG/CM2 m3 1.14 384.28 438.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.14 438.08 100.00%
06.02.01.03.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 18.90 48.31 913.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.90 913.06 100.00%
06.02.01.03.02.07 ACERO FY=4200 KG/CM2 kg 131.13 6.66 873.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 131.13 873.33 100.00%
06.02.01.03.02.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 18.90 46.31 875.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.90 875.26 100.00%
06.02.01.03.02.09 TARRAJEO EN INTERIORES Y EXTERIORES m2 18.90 28.40 536.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.90 536.76 100.00%
06.02.01.03.02.10 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C GLB 3.00 187.57 562.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 562.71 100.00%
06.02.01.03.02.11 TAPA METALICA Y MARCO DE 0.60x0.60 m e=1/8" EN C.R.P. TIPOund 3.00 213.02 639.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 639.06 100.00%
06.02.01.03.02.12 PINTADO DE MURO EXTERIOR C/LATEX ACRILICO (SUPERLAT m2 10.80 5.80 62.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.80 62.64 100.00%
06.02.01.04 RESERVORIO (15 M3) 20,894.05 100.05 0.00 100.05 0.48% 0.00 20,794.00
06.02.01.04.01 RESERVORIO 16,818.75 72.64 0.00 72.64 0.43% 0.00 16,746.11
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.02.01.04.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 16.00 2.44 39.04 16.0 39.04 100.00% 0.00 0.00% 16.00 39.04 100.00% 0.00 0.00 0.00%
06.02.01.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 16.00 2.10 33.60 16.0 33.60 100.00% 0.00 0.00% 16.00 33.60 100.00% 0.00 0.00 0.00%
06.02.01.04.01.03 EXCAVACION EN TERRENO NORMAL RESERVORIO m3 8.00 34.92 279.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 279.36 100.00%
06.02.01.04.01.04 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 10.00 14.23 142.30 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 142.30 100.00%
06.02.01.04.01.05 SOLADO C:H 1:8 (h= 0.10 m) m2 1.66 189.58 314.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.66 314.70 100.00%
06.02.01.04.01.06 CONCRETO F'C= 210 KG/CM2 EN RESERVORIO m3 7.52 413.58 3,110.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.52 3,110.12 100.00%
06.02.01.04.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 54.77 48.31 2,645.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.77 2,645.94 100.00%
06.02.01.04.01.08 ACERO FY=4200 KG/CM2 kg 359.76 6.66 2,396.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 359.76 2,396.00 100.00%
06.02.01.04.01.09 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 52.61 27.86 1,465.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.61 1,465.71 100.00%
06.02.01.04.01.10 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 52.61 20.00 1,052.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.61 1,052.20 100.00%
06.02.01.04.01.11 TAPA SANITARIA METALICA DE 0.60x0.60 mts und 2.00 197.60 395.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 395.20 100.00%
06.02.01.04.01.12 INSTALACION DE ACCESORIOS TUB. VENTILACION 2" und 1.00 118.31 118.31 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 118.31 100.00%
06.02.01.04.01.13 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS und 1.00 496.89 496.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 496.89 100.00%
06.02.01.04.01.14 INSTALACION DE ACCESORIOS EN RESERVORIO und 1.00 872.43 872.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 872.43 100.00%
06.02.01.04.01.15 PINTADO DE MURO EXTERIOR m2 32.59 15.54 506.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 32.59 506.45 100.00%
06.02.01.04.01.16 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 105.00 28.10 2,950.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 105.00 2,950.50 100.00%
06.02.01.04.02 CASETA DE CLORACION POR GOTEO 4,075.30 27.41 0.00 27.41 0.67% 0.00 4,047.89
06.02.01.04.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
06.02.01.04.02.02 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS m2 11.54 71.15 821.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.54 821.07 100.00%
06.02.01.04.02.03 TARRAJEO EN INTERIORES Y EXTERIORES m2 20.50 28.40 582.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.50 582.20 100.00%
06.02.01.04.02.04 REJILLA METALICA SEGUN DISEÑO INC. COLOCADO und 1.00 421.12 421.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 421.12 100.00%
06.02.01.04.02.05 COBERTURA DE CALAMINA EN CASETA DE CLORACION m2 4.00 58.15 232.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 232.60 100.00%
06.02.01.04.02.06 INSTALACION DE PUERTA METÁLICA (SEGÚN DISEÑO) und 1.00 257.57 257.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 257.57 100.00%
06.02.01.04.02.07 INSTALACION DE ACCESORIOS EN CASETA DE CLORACION und 1.00 1,557.57 1,557.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,557.57 100.00%
06.02.01.04.02.08 PINTADO DE MURO EXTERIOR m2 11.31 15.54 175.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 175.76 100.00%
06.02.01.05 LINEA DE ADUCCION Y RED DE DISTRIBUCION 143,480.79 10,493.04 0.00 10,493.04 7.31% 0.00 132,987.75
06.02.01.05.01 TENDIDO DE TUBERIA DE ADUCCION Y DISTRIBUCION PVC SAP 124,278.17 10,421.01 0.00 10,421.01 8.39% 0.00 113,857.16
06.02.01.05.01.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 1,297.76 8.03 10,421.01 1,297.8 10,421.01 100.00% 0.00 0.00% 1,297.76 10,421.01 100.00% 0.00 0.00 0.00%
06.02.01.05.01.02 EXCAVACION MANUAL ZANJA EN TERRENO CONGLOMERADO m3 757.03 58.58 44,346.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 757.03 44,346.82 100.00%
06.02.01.05.01.03 REFINE Y NIVELACION DE ZANJA m 2,162.94 2.04 4,412.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,162.94 4,412.40 100.00%
06.02.01.05.01.04 CAMA DE APOYO E=10CM. m 2,162.94 1.66 3,590.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,162.94 3,590.48 100.00%
06.02.01.05.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELEC m3 363.37 23.80 8,648.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 363.37 8,648.21 100.00%
06.02.01.05.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 545.06 57.17 31,161.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 545.06 31,161.08 100.00%
06.02.01.05.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 545.06 8.15 4,442.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 545.06 4,442.24 100.00%
06.02.01.05.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-5 Ø 2" m 405.75 14.16 5,745.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 405.75 5,745.42 100.00%
06.02.01.05.01.09 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1m 250.80 12.29 3,082.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 250.80 3,082.33 100.00%
06.02.01.05.01.10 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 1,175.07 4.30 5,052.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,175.07 5,052.80 100.00%
06.02.01.05.01.11 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 3/4 m 331.32 3.79 1,255.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 331.32 1,255.70 100.00%
06.02.01.05.01.12 PRUEBA HIDRAULICA m 2,162.94 0.98 2,119.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,162.94 2,119.68 100.00%
06.02.01.05.02 VALVULA DE CONTROL 6,160.11 12.68 0.00 12.68 0.21% 0.00 6,147.43
06.02.01.05.02.01 LIMPIEZA DE TERRENO MANUAL m2 4.68 0.61 2.85 4.7 2.85 100.00% 0.00 0.00% 4.68 2.85 100.00% 0.00 0.00 0.00%
06.02.01.05.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.68 2.10 9.83 4.7 9.83 100.00% 0.00 0.00% 4.68 9.83 100.00% 0.00 0.00 0.00%
06.02.01.05.02.03 EXCAVACION DE ZANJA m3 1.87 34.92 65.30 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.87 65.30 100.00%
06.02.01.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.34 8.15 19.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.34 19.07 100.00%
06.02.01.05.02.05 CONCRETO F'C= 175 KG/CM2 m3 1.04 384.28 399.65 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.04 399.65 100.00%
06.02.01.05.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 20.80 48.31 1,004.85 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.80 1,004.85 100.00%
06.02.01.05.02.07 TARRAJEO CON IMPERMEABILIZANTE m2 20.80 29.19 607.15 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.80 607.15 100.00%
06.02.01.05.02.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 8.32 28.40 236.29 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.32 236.29 100.00%
06.02.01.05.02.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 2.00 512.25 1,024.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1,024.50 100.00%
06.02.01.05.02.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 13.00 213.49 2,775.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 2,775.37 100.00%
06.02.01.05.02.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.21 72.62 15.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.21 15.25 100.00%
06.02.01.05.03 VALVULA DE PURGA 3,709.06 23.41 0.00 23.41 0.63% 0.00 3,685.65
06.02.01.05.03.01 LIMPIEZA DE TERRENO MANUAL m2 8.64 0.61 5.27 8.6 5.27 100.00% 0.00 0.00% 8.64 5.27 100.00% 0.00 0.00 0.00%
06.02.01.05.03.02 TRAZO Y REPLANTEO PRELIMINAR m2 8.64 2.10 18.14 8.6 18.14 100.00% 0.00 0.00% 8.64 18.14 100.00% 0.00 0.00 0.00%
06.02.01.05.03.03 EXCAVACION DE ZANJA m3 6.05 34.92 211.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.05 211.27 100.00%
06.02.01.05.03.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 7.56 8.15 61.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.56 61.61 100.00%
06.02.01.05.03.05 CONCRETO F'C= 175 KG/CM2 m3 0.91 384.28 349.69 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.91 349.69 100.00%
06.02.01.05.03.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 18.00 48.31 869.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 869.58 100.00%
06.02.01.05.03.07 TARRAJEO CON IMPERMEABILIZANTE m2 16.80 29.19 490.39 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.80 490.39 100.00%
06.02.01.05.03.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 6.72 28.40 190.85 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.72 190.85 100.00%
06.02.01.05.03.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES E GLB 1.00 224.06 224.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 224.06 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.02.01.05.03.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 6.00 213.49 1,280.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 1,280.94 100.00%
06.02.01.05.03.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.10 72.62 7.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.10 7.26 100.00%
06.02.01.05.04 CAMARA ROMPE PRESION T - VII 9,333.45 35.94 0.00 35.94 0.39% 0.00 9,297.51
06.02.01.05.04.01 LIMPIEZA DE TERRENO MANUAL m2 13.26 0.61 8.09 13.3 8.09 100.00% 0.00 0.00% 13.26 8.09 100.00% 0.00 0.00 0.00%
06.02.01.05.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 13.26 2.10 27.85 13.3 27.85 100.00% 0.00 0.00% 13.26 27.85 100.00% 0.00 0.00 0.00%
06.02.01.05.04.03 EXCAVACION DE ZANJA m3 11.95 34.92 417.29 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.95 417.29 100.00%
06.02.01.05.04.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 14.94 8.15 121.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.94 121.76 100.00%
06.02.01.05.04.05 CONCRETO F'C= 175 KG/CM2 m3 3.65 384.28 1,402.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.65 1,402.62 100.00%
06.02.01.05.04.06 ACERO FY=4200 KG/CM2 kg 121.28 6.66 807.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 121.28 807.72 100.00%
06.02.01.05.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 54.04 48.31 2,610.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.04 2,610.67 100.00%
06.02.01.05.04.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 19.74 46.31 914.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.74 914.16 100.00%
06.02.01.05.04.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C GLB 6.00 205.99 1,235.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 1,235.94 100.00%
06.02.01.05.04.10 TAPA METALICA Y MARCO DE 0.60x0.60m y 0.30x0.30m e=1/8" ENund 6.00 278.02 1,668.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 1,668.12 100.00%
06.02.01.05.04.11 PINTURA EN TAPAS METALICAS m2 5.40 22.08 119.23 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.40 119.23 100.00%
06.02.01.06 CONEXIONES DOMICILIARIAS 28,364.79 1,935.95 0.00 1,935.95 6.83% 0.00 26,428.84
06.02.01.06.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 241.09 8.03 1,935.95 241.1 1,935.95 100.00% 0.00 0.00% 241.09 1,935.95 100.00% 0.00 0.00 0.00%
06.02.01.06.02 EXCAVACION MANUAL DE ZANJA EN TERRENO CONGLOMERAD m3 140.63 23.12 3,251.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 140.63 3,251.37 100.00%
06.02.01.06.03 REFINE Y NIVELACION DE ZANJA m 401.81 4.08 1,639.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 401.81 1,639.38 100.00%
06.02.01.06.04 CAMA DE APOYO E=10CM. m 401.81 1.66 667.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 401.81 667.00 100.00%
06.02.01.06.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCI m3 67.50 23.80 1,606.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 67.50 1,606.50 100.00%
06.02.01.06.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 101.26 57.17 5,789.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 101.26 5,789.03 100.00%
06.02.01.06.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 101.26 8.15 825.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 101.26 825.27 100.00%
06.02.01.06.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" m 401.81 3.46 1,390.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 401.81 1,390.26 100.00%
06.02.01.06.09 CONEXIÓN DOMICILIARIA INC. CAJA DE AGUA POTABLE MATRIZ Ø und 80.00 136.23 10,898.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.00 10,898.40 100.00%
06.02.01.06.10 PRUEBA HIDRAULICA EN TUBERIA INSTALADA m 401.81 0.90 361.63 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 401.81 361.63 100.00%
06.02.02 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO DOMICILIARIAS 704,965.29 4,024.28 0.00 0.57% 4,024.28 0.57% 0.00 700,941.01
06.02.02.01 CONSTRUCCION DE CASETA DE BAÑO 466,442.54 3,093.74 0.00 3,093.74 0.66% 0.00 463,348.80
06.02.02.01.01 OBRAS PROVISIONALES 3,518.51 0.00 0.00 0.00 0.00% 0.00 3,518.51
06.02.02.01.01.01 LETRINAS DE HOYO SECO VENTILADO (PARA PERSONAL OBRERO) 1,904.75 0.00 0.00 0.00 0.00% 0.00 1,904.75
06.02.02.01.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.38 0.61 2.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.38 2.06 100.00%
06.02.02.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.38 2.10 7.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.38 7.10 100.00%
06.02.02.01.01.01.03 EXCAVACION DE ZANJA m3 6.42 34.92 224.19 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.42 224.19 100.00%
06.02.02.01.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.03 8.15 65.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.03 65.44 100.00%
06.02.02.01.01.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.24 48.31 301.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.24 301.45 100.00%
06.02.02.01.01.01.06 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.94 364.59 342.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.94 342.71 100.00%
06.02.02.01.01.01.07 ACERO FY=4200 KG/CM2 kg 18.14 6.66 120.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.14 120.81 100.00%
06.02.02.01.01.01.08 CONCRETO F'C= 175 KG/CM2 m3 0.17 384.28 65.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.17 65.33 100.00%
06.02.02.01.01.01.09 CASETA PARA LETRINAS INC. PUERTA DE CALAMINA und 2.00 346.09 692.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 692.18 100.00%
06.02.02.01.01.01.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 83.48 100.00%
06.02.02.01.01.02 DUCHAS O VESTUARIOS (PARA PERSONAL OBRERO) 1,335.92 0.00 0.00 0.00 0.00% 0.00 1,335.92
06.02.02.01.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 4.00 0.61 2.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2.44 100.00%
06.02.02.01.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.10 8.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 8.40 100.00%
06.02.02.01.01.02.03 EXCAVACION DE ZANJA m3 2.04 34.92 71.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.04 71.24 100.00%
06.02.02.01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.55 8.15 20.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.55 20.78 100.00%
06.02.02.01.01.02.05 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 2.00 72.62 145.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 145.24 100.00%
06.02.02.01.01.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.40 48.31 115.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.40 115.94 100.00%
06.02.02.01.01.02.07 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.27 364.59 98.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.27 98.44 100.00%
06.02.02.01.01.02.08 CASETA PARA DUCHAS INC. PUERTA DE CALAMINA m2 2.00 346.09 692.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 692.18 100.00%
06.02.02.01.01.02.09 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 2.00 48.89 97.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 97.78 100.00%
06.02.02.01.01.02.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 83.48 100.00%
06.02.02.01.01.03 LAVADERO DE GRANITO (PARA PERSONAL OBRERO) 277.84 0.00 0.00 0.00 0.00% 0.00 277.84
06.02.02.01.01.03.01 SUMINISTRO E INSTALACIÓN DE LAVADERO DE GRANITO und 2.00 138.92 277.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 277.84 100.00%
06.02.02.01.02 TRABAJOS PRELIMINARES 1,668.28 1,668.28 0.00 1,668.28 100.00% 0.00 0.00
06.02.02.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 615.60 0.61 375.52 615.6 375.52 100.00% 0.00 0.00% 615.60 375.52 100.00% 0.00 0.00 0.00%
06.02.02.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 615.60 2.10 1,292.76 615.6 1,292.76 100.00% 0.00 0.00% 615.60 1,292.76 100.00% 0.00 0.00 0.00%
06.02.02.01.03 MOVIMIENTO DE TIERRAS 12,918.58 0.00 0.00 0.00 0.00% 0.00 12,918.58
06.02.02.01.03.01 EXCAVACION DE TERRENO NORMAL m3 150.79 34.92 5,265.59 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 150.79 5,265.59 100.00%
06.02.02.01.03.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 188.49 8.15 1,536.19 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 188.49 1,536.19 100.00%
06.02.02.01.03.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 64.01 95.56 6,116.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 64.01 6,116.80 100.00%
06.02.02.01.04 OBRAS DE CONCRETO SIMPLE 82,219.71 0.00 0.00 0.00 0.00% 0.00 82,219.71
06.02.02.01.04.01 CIMIENTOS CORRIDOS 19,120.10 0.00 0.00 0.00 0.00% 0.00 19,120.10
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.02.02.01.04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 82.40 232.04 19,120.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 82.40 19,120.10 100.00%
06.02.02.01.04.02 SOBRECIMIENTOS 25,805.75 0.00 0.00 0.00 0.00% 0.00 25,805.75
06.02.02.01.04.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 377.60 44.52 16,810.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 377.60 16,810.75 100.00%
06.02.02.01.04.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 28.32 317.62 8,995.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.32 8,995.00 100.00%
06.02.02.01.04.03 PISO INTERIOR 7,927.71 0.00 0.00 0.00 0.00% 0.00 7,927.71
06.02.02.01.04.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO C m2 176.80 44.84 7,927.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 176.80 7,927.71 100.00%
06.02.02.01.04.04 SARDINEL DE DUCHA 1,529.00 0.00 0.00 0.00 0.00% 0.00 1,529.00
06.02.02.01.04.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 26.40 48.31 1,275.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.40 1,275.38 100.00%
06.02.02.01.04.04.02 CONCRETO F'C= 175 KG/CM2 m3 0.66 384.28 253.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.66 253.62 100.00%
06.02.02.01.04.05 VEREDA PERIMETRAL 27,837.15 0.00 0.00 0.00 0.00% 0.00 27,837.15
06.02.02.01.04.05.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 88.80 42.84 3,804.19 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 88.80 3,804.19 100.00%
06.02.02.01.04.05.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑAD m2 363.60 44.84 16,303.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 363.60 16,303.82 100.00%
06.02.02.01.04.05.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 21.21 364.41 7,729.14 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.21 7,729.14 100.00%
06.02.02.01.05 OBRAS DE CONCRETO ARMADO 76,521.71 0.00 0.00 0.00 0.00% 0.00 76,521.71
06.02.02.01.05.01 COLUMNAS 54,180.14 0.00 0.00 0.00 0.00% 0.00 54,180.14
06.02.02.01.05.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 24.00 384.28 9,222.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.00 9,222.72 100.00%
06.02.02.01.05.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 512.00 45.29 23,188.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 512.00 23,188.48 100.00%
06.02.02.01.05.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 3,268.61 6.66 21,768.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3,268.61 21,768.94 100.00%
06.02.02.01.05.02 VIGAS 22,341.57 0.00 0.00 0.00 0.00% 0.00 22,341.57
06.02.02.01.05.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 13.68 384.28 5,256.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.68 5,256.95 100.00%
06.02.02.01.05.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 250.80 50.83 12,748.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 250.80 12,748.16 100.00%
06.02.02.01.05.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 651.12 6.66 4,336.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 651.12 4,336.46 100.00%
06.02.02.01.06 MUROS DE LADRILLO 48,490.99 0.00 0.00 0.00 0.00% 0.00 48,490.99
06.02.02.01.06.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS m2 667.92 72.60 48,490.99 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 667.92 48,490.99 100.00%
06.02.02.01.07 REVOQUES Y ENLUCIDOS 50,904.42 0.00 0.00 0.00 0.00% 0.00 50,904.42
06.02.02.01.07.01 ZÓCALO: TARRAJEADO Y PULIDO CON IMPERMEABILIZANTE / m2 512.00 38.45 19,686.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 512.00 19,686.40 100.00%
06.02.02.01.07.02 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 456.80 20.82 9,510.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 456.80 9,510.58 100.00%
06.02.02.01.07.03 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS m2 571.60 24.59 14,055.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 571.60 14,055.64 100.00%
06.02.02.01.07.04 BRUÑA DE 1 CM m 540.00 14.17 7,651.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 540.00 7,651.80 100.00%
06.02.02.01.08 PINTURA 12,432.22 0.00 0.00 0.00 0.00% 0.00 12,432.22
06.02.02.01.08.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 456.80 11.37 5,193.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 456.80 5,193.82 100.00%
06.02.02.01.08.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUI m2 520.00 13.92 7,238.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 520.00 7,238.40 100.00%
06.02.02.01.09 COBERTURA LIVIANA PARA TECHO 31,429.12 0.00 0.00 0.00 0.00% 0.00 31,429.12
06.02.02.01.09.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 240.00 38.28 9,187.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 240.00 9,187.20 100.00%
06.02.02.01.09.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 3.00 und 320.00 25.91 8,291.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 320.00 8,291.20 100.00%
06.02.02.01.09.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.3 m2 576.00 24.22 13,950.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 576.00 13,950.72 100.00%
06.02.02.01.10 CARPINTERIA DE MADERA 31,679.20 0.00 0.00 0.00 0.00% 0.00 31,679.20
06.02.02.01.10.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/T und 80.00 304.49 24,359.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.00 24,359.20 100.00%
06.02.02.01.10.02 SUMIN. E INSTAL. DE VENTANA DE MADERA SEGUN DISEÑO und 80.00 91.50 7,320.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.00 7,320.00 100.00%
06.02.02.01.11 INSTALACIONES SANITARIAS 78,107.80 1,425.46 0.00 1,425.46 1.82% 0.00 76,682.34
06.02.02.01.11.01 TRABAJOS PRELIMINARES 1,425.46 1,425.46 0.00 1,425.46 100.00% 0.00 0.00
06.02.02.01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 526.00 0.61 320.86 526.0 320.86 100.00% 0.00 0.00% 526.00 320.86 100.00% 0.00 0.00 0.00%
06.02.02.01.11.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 526.00 2.10 1,104.60 526.0 1,104.60 100.00% 0.00 0.00% 526.00 1,104.60 100.00% 0.00 0.00 0.00%
06.02.02.01.11.02 MOVIMIENTO DE TIERRAS 18,731.75 0.00 0.00 0.00 0.00% 0.00 18,731.75
06.02.02.01.11.02.01 EXCAVACION DE TERRENO NORMAL m3 260.30 34.92 9,089.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 260.30 9,089.68 100.00%
06.02.02.01.11.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 230.70 40.54 9,352.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 230.70 9,352.58 100.00%
06.02.02.01.11.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 35.52 8.15 289.49 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 35.52 289.49 100.00%
06.02.02.01.11.03 TUBERIAS Y ACCESORIOS 27,056.64 0.00 0.00 0.00 0.00% 0.00 27,056.64
06.02.02.01.11.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 240.00 23.00 5,520.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 240.00 5,520.00 100.00%
06.02.02.01.11.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + A und 80.00 63.39 5,071.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.00 5,071.20 100.00%
06.02.02.01.11.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 360.00 5.14 1,850.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 360.00 1,850.40 100.00%
06.02.02.01.11.03.04 TUBERIA PVC SAL Ø 2" m 784.00 7.99 6,264.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 784.00 6,264.16 100.00%
06.02.02.01.11.03.05 TUBERIA PVC SAL Ø 4" m 656.00 12.73 8,350.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 656.00 8,350.88 100.00%
06.02.02.01.11.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 30,893.95 0.00 0.00 0.00 0.00% 0.00 30,893.95
06.02.02.01.11.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 169.20 48.31 8,174.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 169.20 8,174.05 100.00%
06.02.02.01.11.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 15.66 265.70 4,160.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.66 4,160.86 100.00%
06.02.02.01.11.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 115.20 32.70 3,767.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 115.20 3,767.04 100.00%
06.02.02.01.11.04.04 SALIDA DE DESAGUE PVC-SAL 2" pto 160.00 41.74 6,678.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 160.00 6,678.40 100.00%
06.02.02.01.11.04.05 SALIDA DE DESAGUE PVC-SAL 4" pto 80.00 42.49 3,399.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.00 3,399.20 100.00%
06.02.02.01.11.04.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 80.00 58.93 4,714.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.00 4,714.40 100.00%
06.02.02.01.12 APARATOS Y ACCESORIOS SANITARIOS 21,732.80 0.00 0.00 0.00 0.00% 0.00 21,732.80
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.02.02.01.12.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0. und 80.00 148.78 11,902.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.00 11,902.40 100.00%
06.02.02.01.12.02 SUMINISTRO E INSTALACION DE LAVATORIO und 80.00 73.99 5,919.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.00 5,919.20 100.00%
06.02.02.01.12.03 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 80.00 48.89 3,911.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.00 3,911.20 100.00%
06.02.02.01.13 INSTALACIONES ELECTRICAS 14,819.20 0.00 0.00 0.00 0.00% 0.00 14,819.20
06.02.02.01.13.01 SALIDA PARA INTERRUPTOR DOBLE und 80.00 22.42 1,793.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.00 1,793.60 100.00%
06.02.02.01.13.02 SALIDA PARA CENTRO DE LUZ und 160.00 65.44 10,470.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 160.00 10,470.40 100.00%
06.02.02.01.13.03 SALIDA PARA TOMACORRIENTES und 80.00 31.94 2,555.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.00 2,555.20 100.00%
06.02.02.02 INSTALACION DE BIODIGESTOR DE 600 LTS 123,950.11 409.08 0.00 409.08 0.33% 0.00 123,541.03
06.02.02.02.01 TRABAJOS PRELIMINARES 409.08 409.08 0.00 409.08 100.00% 0.00 0.00
06.02.02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 150.95 0.61 92.08 151.0 92.08 100.00% 0.00 0.00% 150.95 92.08 100.00% 0.00 0.00 0.00%
06.02.02.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 150.95 2.10 317.00 151.0 317.00 100.00% 0.00 0.00% 150.95 317.00 100.00% 0.00 0.00 0.00%
06.02.02.02.02 MOVIMIENTO DE TIERRAS 11,745.02 0.00 0.00 0.00 0.00% 0.00 11,745.02
06.02.02.02.02.01 EXCAVACION DE TERRENO NORMAL m3 214.98 34.92 7,507.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 214.98 7,507.10 100.00%
06.02.02.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 98.77 30.92 3,053.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.77 3,053.97 100.00%
06.02.02.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 145.27 8.15 1,183.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 145.27 1,183.95 100.00%
06.02.02.02.03 OBRAS DE CONCRETO SIMPLE 622.53 0.00 0.00 0.00 0.00% 0.00 622.53
06.02.02.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 1.62 384.28 622.53 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.62 622.53 100.00%
06.02.02.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 28,935.88 0.00 0.00 0.00 0.00% 0.00 28,935.88
06.02.02.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 265.60 48.31 12,831.14 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 265.60 12,831.14 100.00%
06.02.02.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODO m3 26.08 364.74 9,512.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.08 9,512.42 100.00%
06.02.02.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 201.60 32.70 6,592.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 201.60 6,592.32 100.00%
06.02.02.02.05 BIODIGESTOR DE 600 Lts. 82,237.60 0.00 0.00 0.00 0.00% 0.00 82,237.60
06.02.02.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 Lts und 80.00 1,027.97 82,237.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.00 82,237.60 100.00%
06.02.02.03 CONSTRUCCIÓN DE POZO PERCOLADOR 114,572.64 521.46 0.00 521.46 0.46% 0.00 114,051.18
06.02.02.03.01 TRABAJOS PRELIMINARES 521.46 521.46 0.00 521.46 100.00% 0.00 0.00
06.02.02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 192.42 0.61 117.38 192.4 117.38 100.00% 0.00 0.00% 192.42 117.38 100.00% 0.00 0.00 0.00%
06.02.02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 192.42 2.10 404.08 192.4 404.08 100.00% 0.00 0.00% 192.42 404.08 100.00% 0.00 0.00 0.00%
06.02.02.03.02 MOVIMIENTO DE TIERRAS 25,348.30 0.00 0.00 0.00 0.00% 0.00 25,348.30
06.02.02.03.02.01 EXCAVACION DE TERRENO NORMAL m3 420.71 34.92 14,691.19 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 420.71 14,691.19 100.00%
06.02.02.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 526.00 8.15 4,286.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 526.00 4,286.90 100.00%
06.02.02.03.02.03 RELLENO CON GRAVA 1" m3 66.37 64.85 4,304.09 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 66.37 4,304.09 100.00%
06.02.02.03.02.04 FILTRO DE GRAVA Ø 1" m3 31.86 64.85 2,066.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 31.86 2,066.12 100.00%
06.02.02.03.03 OBRAS DE CONCRETO SIMPLE 21,897.93 0.00 0.00 0.00 0.00% 0.00 21,897.93
06.02.02.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 112.59 48.31 5,439.22 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 112.59 5,439.22 100.00%
06.02.02.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 42.83 384.28 16,458.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 42.83 16,458.71 100.00%
06.02.02.03.04 OBRAS DE CONCRETO ARMADO 13,204.60 0.00 0.00 0.00 0.00% 0.00 13,204.60
06.02.02.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 15.10 384.28 5,802.63 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.10 5,802.63 100.00%
06.02.02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 38.96 48.31 1,882.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 38.96 1,882.16 100.00%
06.02.02.03.04.03 ACERO FY=4200 KG/CM2 kg 828.80 6.66 5,519.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 828.80 5,519.81 100.00%
06.02.02.03.05 MUROS DE LADRILLO 53,600.35 0.00 0.00 0.00 0.00% 0.00 53,600.35
06.02.02.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 m2 588.11 91.14 53,600.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 588.11 53,600.35 100.00%
06.02.03 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO INSTITUCIONALES 42,132.29 215.35 0.00 0.51% 215.35 0.51% 0.00 41,916.94
06.02.03.01 CONSTRUCCION DE CASETA DE BAÑO 32,573.47 175.25 0.00 175.25 0.54% 0.00 32,398.22
06.02.03.01.01 TRABAJOS PRELIMINARES 121.78 121.78 0.00 121.78 100.00% 0.00 0.00
06.02.03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 44.94 0.61 27.41 44.9 27.41 100.00% 0.00 0.00% 44.94 27.41 100.00% 0.00 0.00 0.00%
06.02.03.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 44.94 2.10 94.37 44.9 94.37 100.00% 0.00 0.00% 44.94 94.37 100.00% 0.00 0.00 0.00%
06.02.03.01.02 MOVIMIENTO DE TIERRAS 906.13 0.00 0.00 0.00 0.00% 0.00 906.13
06.02.03.01.02.01 EXCAVACION DE TERRENO NORMAL m3 10.83 34.92 378.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.83 378.18 100.00%
06.02.03.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 13.54 8.15 110.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.54 110.35 100.00%
06.02.03.01.02.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 4.37 95.56 417.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.37 417.60 100.00%
06.02.03.01.03 OBRAS DE CONCRETO SIMPLE 5,915.18 0.00 0.00 0.00 0.00% 0.00 5,915.18
06.02.03.01.03.01 CIMIENTOS CORRIDOS 1,459.53 0.00 0.00 0.00 0.00% 0.00 1,459.53
06.02.03.01.03.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 6.29 232.04 1,459.53 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.29 1,459.53 100.00%
06.02.03.01.03.02 SOBRECIMIENTOS 2,017.51 0.00 0.00 0.00 0.00% 0.00 2,017.51
06.02.03.01.03.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 29.55 44.52 1,315.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.55 1,315.57 100.00%
06.02.03.01.03.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 2.21 317.62 701.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.21 701.94 100.00%
06.02.03.01.03.03 PISO INTERIOR 710.27 0.00 0.00 0.00 0.00% 0.00 710.27
06.02.03.01.03.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO C m2 15.84 44.84 710.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.84 710.27 100.00%
06.02.03.01.03.04 VEREDA PERIMETRAL 1,727.87 0.00 0.00 0.00 0.00% 0.00 1,727.87
06.02.03.01.03.04.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 4.89 42.84 209.49 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.89 209.49 100.00%
06.02.03.01.03.04.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑAD m2 24.11 44.84 1,081.09 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.11 1,081.09 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.02.03.01.03.04.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 1.20 364.41 437.29 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.20 437.29 100.00%
06.02.03.01.04 OBRAS DE CONCRETO ARMADO 4,590.89 0.00 0.00 0.00 0.00% 0.00 4,590.89
06.02.03.01.04.01 COLUMNAS 3,047.64 0.00 0.00 0.00 0.00% 0.00 3,047.64
06.02.03.01.04.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 1.35 384.28 518.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.35 518.78 100.00%
06.02.03.01.04.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 28.80 45.29 1,304.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.80 1,304.35 100.00%
06.02.03.01.04.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 183.86 6.66 1,224.51 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 183.86 1,224.51 100.00%
06.02.03.01.04.02 VIGAS 1,543.25 0.00 0.00 0.00 0.00% 0.00 1,543.25
06.02.03.01.04.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 0.95 384.28 365.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.95 365.07 100.00%
06.02.03.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 17.33 50.83 880.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.33 880.88 100.00%
06.02.03.01.04.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 44.64 6.66 297.30 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 44.64 297.30 100.00%
06.02.03.01.05 MUROS DE LADRILLO 4,158.53 0.00 0.00 0.00 0.00% 0.00 4,158.53
06.02.03.01.05.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS m2 57.28 72.60 4,158.53 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 57.28 4,158.53 100.00%
06.02.03.01.06 REVOQUES Y ENLUCIDOS 2,724.38 0.00 0.00 0.00 0.00% 0.00 2,724.38
06.02.03.01.06.01 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 99.39 20.82 2,069.30 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 99.39 2,069.30 100.00%
06.02.03.01.06.02 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS m2 26.64 24.59 655.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.64 655.08 100.00%
06.02.03.01.07 PINTURA 1,500.89 0.00 0.00 0.00 0.00% 0.00 1,500.89
06.02.03.01.07.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 99.39 11.37 1,130.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 99.39 1,130.06 100.00%
06.02.03.01.07.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUI m2 26.64 13.92 370.83 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.64 370.83 100.00%
06.02.03.01.08 COBERTURA LIVIANA PARA TECHO 2,077.79 0.00 0.00 0.00 0.00% 0.00 2,077.79
06.02.03.01.08.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 15.00 38.28 574.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.00 574.20 100.00%
06.02.03.01.08.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 5.60 und 12.00 43.92 527.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 527.04 100.00%
06.02.03.01.08.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.3 m2 40.32 24.22 976.55 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.32 976.55 100.00%
06.02.03.01.09 CARPINTERIA DE MADERA 3,653.88 0.00 0.00 0.00 0.00% 0.00 3,653.88
06.02.03.01.09.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/T und 12.00 304.49 3,653.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 3,653.88 100.00%
06.02.03.01.10 INSTALACIONES SANITARIAS 3,701.06 53.47 0.00 53.47 1.44% 0.00 3,647.59
06.02.03.01.10.01 TRABAJOS PRELIMINARES 53.47 53.47 0.00 53.47 100.00% 0.00 0.00
06.02.03.01.10.01.01 LIMPIEZA DE TERRENO MANUAL m2 19.73 0.61 12.04 19.7 12.04 100.00% 0.00 0.00% 19.73 12.04 100.00% 0.00 0.00 0.00%
06.02.03.01.10.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 19.73 2.10 41.43 19.7 41.43 100.00% 0.00 0.00% 19.73 41.43 100.00% 0.00 0.00 0.00%
06.02.03.01.10.02 MOVIMIENTO DE TIERRAS 702.74 0.00 0.00 0.00 0.00% 0.00 702.74
06.02.03.01.10.02.01 EXCAVACION DE TERRENO NORMAL m3 9.76 34.92 340.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.76 340.82 100.00%
06.02.03.01.10.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 8.65 40.54 350.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.65 350.67 100.00%
06.02.03.01.10.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 1.38 8.15 11.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.38 11.25 100.00%
06.02.03.01.10.03 TUBERIAS Y ACCESORIOS 1,123.02 0.00 0.00 0.00 0.00% 0.00 1,123.02
06.02.03.01.10.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 12.00 23.00 276.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 276.00 100.00%
06.02.03.01.10.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + A und 3.00 63.39 190.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 190.17 100.00%
06.02.03.01.10.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 16.50 5.14 84.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.50 84.81 100.00%
06.02.03.01.10.03.04 TUBERIA PVC SAL Ø 2" m 32.40 7.99 258.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 32.40 258.88 100.00%
06.02.03.01.10.03.05 TUBERIA PVC SAL Ø 4" m 24.60 12.73 313.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.60 313.16 100.00%
06.02.03.01.10.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 1,821.83 0.00 0.00 0.00 0.00% 0.00 1,821.83
06.02.03.01.10.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.35 48.31 306.77 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.35 306.77 100.00%
06.02.03.01.10.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 0.59 265.70 156.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.59 156.76 100.00%
06.02.03.01.10.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 4.32 32.70 141.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.32 141.26 100.00%
06.02.03.01.10.05 SALIDA DE DESAGUE PVC-SAL 4" pto 12.00 42.49 509.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 509.88 100.00%
06.02.03.01.10.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 12.00 58.93 707.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 707.16 100.00%
06.02.03.01.11 APARATOS Y ACCESORIOS SANITARIOS 1,785.36 0.00 0.00 0.00 0.00% 0.00 1,785.36
06.02.03.01.11.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0. und 12.00 148.78 1,785.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 1,785.36 100.00%
06.02.03.01.12 INSTALACIONES ELECTRICAS 1,437.60 0.00 0.00 0.00 0.00% 0.00 1,437.60
06.02.03.01.12.01 SALIDA PARA INTERRUPTOR DOBLE und 12.00 22.42 269.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 269.04 100.00%
06.02.03.01.12.02 SALIDA PARA CENTRO DE LUZ und 12.00 65.44 785.28 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 785.28 100.00%
06.02.03.01.12.03 SALIDA PARA TOMACORRIENTES und 12.00 31.94 383.28 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 383.28 100.00%
06.02.03.02 INSTALACION DE BIODIGESTOR DE 1,300 LTS 5,260.09 20.54 0.00 20.54 0.39% 0.00 5,239.55
06.02.03.02.01 TRABAJOS PRELIMINARES 20.54 20.54 0.00 20.54 100.00% 0.00 0.00
06.02.03.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 7.58 0.61 4.62 7.6 4.62 100.00% 0.00 0.00% 7.58 4.62 100.00% 0.00 0.00 0.00%
06.02.03.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 7.58 2.10 15.92 7.6 15.92 100.00% 0.00 0.00% 7.58 15.92 100.00% 0.00 0.00 0.00%
06.02.03.02.02 MOVIMIENTO DE TIERRAS 716.60 0.00 0.00 0.00 0.00% 0.00 716.60
06.02.03.02.02.01 EXCAVACION DE TERRENO NORMAL m3 13.00 34.92 453.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.00 453.96 100.00%
06.02.03.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 6.28 30.92 194.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.28 194.18 100.00%
06.02.03.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.40 8.15 68.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.40 68.46 100.00%
06.02.03.02.03 OBRAS DE CONCRETO SIMPLE 23.06 0.00 0.00 0.00 0.00% 0.00 23.06
06.02.03.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 0.06 384.28 23.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.06 23.06 100.00%
06.02.03.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 1,085.83 0.00 0.00 0.00 0.00% 0.00 1,085.83
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.02.03.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 9.96 48.31 481.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.96 481.17 100.00%
06.02.03.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODO m3 0.98 364.74 357.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.98 357.45 100.00%
06.02.03.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 7.56 32.70 247.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.56 247.21 100.00%
06.02.03.02.05 BIODIGESTOR DE 1,300 Lts. 3,414.06 0.0 0.00 0.00 0.00 0.00 0.00% 0.00 3,414.06
06.02.03.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 1,300 Lts und 3.00 1,138.02 3,414.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 3,414.06 100.00%
06.02.03.03 CONSTRUCCIÓN DE POZO PERCOLADOR 4,298.73 19.56 0.00 19.56 0.46% 0.00 4,279.17
06.02.03.03.01 TRABAJOS PRELIMINARES 19.56 19.56 0.00 19.56 100.00% 0.00 0.00
06.02.03.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 7.22 0.61 4.40 7.2 4.40 100.00% 0.00 0.00% 7.22 4.40 100.00% 0.00 0.00 0.00%
06.02.03.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 7.22 2.10 15.16 7.2 15.16 100.00% 0.00 0.00% 7.22 15.16 100.00% 0.00 0.00 0.00%
06.02.03.03.02 MOVIMIENTO DE TIERRAS 950.41 0.00 0.00 0.00 0.00% 0.00 950.41
06.02.03.03.02.01 EXCAVACION DE TERRENO NORMAL m3 15.78 34.92 551.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.78 551.04 100.00%
06.02.03.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 19.72 8.15 160.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.72 160.72 100.00%
06.02.03.03.02.03 RELLENO CON GRAVA 1" m3 2.49 64.85 161.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.49 161.48 100.00%
06.02.03.03.02.04 FILTRO DE GRAVA Ø 1" m3 1.19 64.85 77.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.19 77.17 100.00%
06.02.03.03.03 OBRAS DE CONCRETO SIMPLE 822.56 0.00 0.00 0.00 0.00% 0.00 822.56
06.02.03.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 4.22 48.31 203.87 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.22 203.87 100.00%
06.02.03.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 1.61 384.28 618.69 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.61 618.69 100.00%
06.02.03.03.04 OBRAS DE CONCRETO ARMADO 496.56 0.00 0.00 0.00 0.00% 0.00 496.56
06.02.03.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 0.57 384.28 219.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.57 219.04 100.00%
06.02.03.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 1.46 48.31 70.53 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.46 70.53 100.00%
06.02.03.03.04.03 ACERO FY=4200 KG/CM2 kg 31.08 6.66 206.99 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 31.08 206.99 100.00%
06.02.03.03.05 MUROS DE LADRILLO 2,009.64 0.00 0.00 0.00 0.00% 0.00 2,009.64
06.02.03.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 m2 22.05 91.14 2,009.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.05 2,009.64 100.00%
06.02.04 ESTUDIOS COMPLEMENTARIOS 1,710.00 0.00 0.00 0.00% 0.00 0.00% 0.00 1,710.00
06.02.04.01 DISEÑO DE MEZCLA und 3.00 450.00 1,350.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 1,350.00 100.00%
06.02.04.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIO und 9.00 40.00 360.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 360.00 100.00%
06.02.05 FLETE 65,374.45 0.00 0.00 0.00% 0.00 0.00% 0.00 65,374.45
06.02.05.01 FLETE TERRESTRE Y ACARREO TAQUEBAMBA GLB 1.00 65,374.45 65,374.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 65,374.45 100.00%
06.02.06 PROGRAMA DE MITIGACION E IMPACTO AMBIENTAL 9,093.74 0.00 0.00 0.00% 0.00 0.00% 0.00 9,093.74
06.02.06.01 PROGRAMA DE PREVENCION DE MITIGACION 1,417.84 0.00 0.00 0.00 0.00% 0.00 1,417.84
06.02.06.01.01 CARTELES PERMANENTES und 10.00 63.56 635.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 635.60 100.00%
06.02.06.01.02 CARTELES TEMPORALES und 10.00 67.80 678.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 678.00 100.00%
06.02.06.01.03 CINTAS DE SEÑAL DE TRABAJO rll 2.00 52.12 104.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 104.24 100.00%
06.02.06.02 PROGRAMA DE ABANDONO DE OBRA 7,675.90 0.00 0.00 0.00 0.00% 0.00 7,675.90
06.02.06.02.01 REACONDICIONAMIENTO DE AREA OCUPADA (CAMPAMENTO Y m2 2,000.00 3.22 6,440.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,000.00 6,440.00 100.00%
06.02.06.02.02 REACONDICIONAMIENTO DE CANTERAS Y ACCESOS HA 2.00 157.27 314.54 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 314.54 100.00%
06.02.06.02.03 REFORESTACION EN CAPTACIONES Y RESERVORIO m2 33.00 27.92 921.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 33.00 921.36 100.00%
06.02.07 ADECUADO CONOCIMIENTO DE EDUCACION SANITARIA 4,000.00 0.00 1,000.00 25.00% 1,000.00 25.00% 0.00 3,000.00
06.02.07.01 CAPACITACION ANTES DE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2,000.00 100.00%
06.02.07.02 CAPACITACION DURANTE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 2.00 1,000.00 50.00% 2.00 1,000.00 50.00% 2.00 1,000.00 50.00%
06.02.08 EFICIENTE GESTION TECNICA Y ADMINISTRATIVA DE LOS SERVICIOS DE AGUA Y SANEAMIENTO 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 4,000.00
06.02.08.01 PROGRAMA DE FORTALECIMIENTO DE CAPACIDADES PARA LA P und 4.00 1,000.00 4,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 4,000.00 100.00%
06.03 LOCALIDAD DE CCULLO 578,218.42 23,630.96 5,676.44 0.98% 29,307.41 5.07% 0.00 548,911.01
06.03.01 SISTEMA DE AGUA POTABLE 202,076.35 14,963.80 3,974.97 1.97% 18,938.77 9.37% 0.00 183,137.58
06.03.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
06.03.01.01.01 OBRAS PROVISIONALES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
06.03.01.01.01.01 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 1,760.72 1,760.72 1.0 1,760.72 100.00% 0.00 0.00% 1.00 1,760.72 100.00% 0.00 0.00 0.00%
06.03.01.01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 797.66 797.66 1.0 797.66 100.00% 0.00 0.00% 1.00 797.66 100.00% 0.00 0.00 0.00%
06.03.01.02 CONSTRUCCION DE CAPTACION TIPO - 1 5,072.96 74.91 0.00 74.91 1.48% 0.00 4,998.05
06.03.01.02.01 TRABAJOS PRELIMINARES 74.91 74.91 0.00 74.91 100.00% 0.00 0.00
06.03.01.02.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 16.50 2.44 40.26 16.5 40.26 100.00% 0.00 0.00% 16.50 40.26 100.00% 0.00 0.00 0.00%
06.03.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 16.50 2.10 34.65 16.5 34.65 100.00% 0.00 0.00% 16.50 34.65 100.00% 0.00 0.00 0.00%
06.03.01.02.02 MOVIMIENTO DE TIERRAS 887.73 0.00 0.00 0.00 0.00% 0.00 887.73
06.03.01.02.02.01 EXCAVACION EN TERRENO NORMAL CAPTACION m3 8.25 39.64 327.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.25 327.03 100.00%
06.03.01.02.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 4.95 40.54 200.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.95 200.67 100.00%
06.03.01.02.02.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE (50 M ) m3 10.31 34.92 360.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.31 360.03 100.00%
06.03.01.02.03 CONCRETO SIMPLE 210.73 0.0 0.00 0.00 0.00 0.00 0.00% 0.00 210.73
06.03.01.02.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS m3 0.81 260.16 210.73 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.81 210.73 100.00%
06.03.01.02.04 CONCRETO ARMADO 1,416.99 0.0 0.00 0.00 0.00 0.00 0.00% 0.00 1,416.99
06.03.01.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 10.37 48.31 500.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.37 500.97 100.00%
06.03.01.02.04.02 ACERO FY=4200 KG/CM2 kg 61.78 6.66 411.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.78 411.45 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.03.01.02.04.03 CONCRETO FC=210 KG/CM2 m3 1.22 413.58 504.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.22 504.57 100.00%
06.03.01.02.05 REVOQUES ENLUCIDOS Y MOLDURAS 212.46 0.0 0.00 0.00 0.00 0.00 0.00% 0.00 212.46
06.03.01.02.05.01 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 6.04 20.00 120.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 120.80 100.00%
06.03.01.02.05.02 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 3.29 27.86 91.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.29 91.66 100.00%
06.03.01.02.06 VALVULAS Y TAPAS Y ACCESORIOS 603.49 0.0 0.00 0.00 0.00 0.00 0.00% 0.00 603.49
06.03.01.02.06.01 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.60X0.6 und 0.36 352.51 126.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.36 126.90 100.00%
06.03.01.02.06.02 SUMINISTRO E INST. VALVULA COMPUERTA H. DUCTIL, Y A und 1.00 429.91 429.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 429.91 100.00%
06.03.01.02.06.03 CODO FºDº DN 160X90º ISO ED und 4.00 11.67 46.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 46.68 100.00%
06.03.01.02.07 FILTROS 59.77 0.0 0.00 0.00 0.00 0.00 0.00% 0.00 59.77
06.03.01.02.07.01 FILTROS DE GRAVA m3 0.22 109.19 24.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.22 24.02 100.00%
06.03.01.02.07.02 FILTROS DE ARENA m3 0.29 123.26 35.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.29 35.75 100.00%
06.03.01.02.08 PINTURA 173.78 0.0 0.00 0.00 0.00 0.00 0.00% 0.00 173.78
06.03.01.02.08.01 PINTURA EN TAPAS METALICAS m2 1.04 22.08 22.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.04 22.96 100.00%
06.03.01.02.08.02 PINTURA EN MUROS EXTERIORES (CAPTACION) m2 6.04 24.97 150.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 150.82 100.00%
06.03.01.02.09 CERCO PERIMETRICO 1,433.10 0.0 0.00 0.00 0.00 0.00 0.00% 0.00 1,433.10
06.03.01.02.09.01 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 51.00 28.10 1,433.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.00 1,433.10 100.00%
06.03.01.03 LINEA DE CONDUCCION 7,219.65 0.0 202.69 3,974.97 0.00 4,177.66 57.87% 0.00 3,041.99
06.03.01.03.01 TENDIDO DE TUBERIA PVC SAP 7,219.65 0.0 202.69 3,974.97 0.00 4,177.66 57.87% 0.00 3,041.99
06.03.01.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 96.52 2.10 202.69 96.5 202.69 100.00% 0.00 0.00% 96.52 202.69 100.00% 0.00 0.00 0.00%
06.03.01.03.01.02 EXCAVACION MANUAL DE ZANJA DE TERRENO CONGLOMER m3 56.30 34.92 1,966.00 0.0 0.00 0.00% 56.30 1,966.00 100.00% 56.30 1,966.00 100.00% 0.00 0.00 0.00%
06.03.01.03.01.03 REFINE Y NIVELACION DE ZANJA m 160.86 4.08 656.31 0.0 0.00 0.00% 160.86 656.31 100.00% 160.86 656.31 100.00% 0.00 0.00 0.00%
06.03.01.03.01.04 CAMA DE APOYO E=10CM. m 160.86 1.66 267.03 0.0 0.00 0.00% 160.86 267.03 100.00% 160.86 267.03 100.00% 0.00 0.00 0.00%
06.03.01.03.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELEC m3 27.02 23.80 643.08 0.0 0.00 0.00% 13.51 321.54 50.00% 13.51 321.54 50.00% 13.51 321.54 50.00%
06.03.01.03.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 40.54 57.17 2,317.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.54 2,317.67 100.00%
06.03.01.03.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 40.54 8.15 330.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.54 330.40 100.00%
06.03.01.03.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 160.86 4.30 691.70 0.0 0.00 0.00% 160.86 691.70 100.00% 160.86 691.70 100.00% 0.00 0.00 0.00%
06.03.01.03.01.09 PRUEBA HIDRAULICA DE LA LINEA DE CONDUCCION m 160.86 0.90 144.77 0.0 0.00 0.00% 80.43 72.39 50.00% 80.43 72.39 50.00% 80.43 72.38 50.00%
06.03.01.04 RESERVORIO (7 M3) 21,166.47 0.0 86.66 0.00 0.00 86.66 0.41% 0.00 21,079.81
06.03.01.04.01 RESERVORIO 17,091.17 0.0 59.25 0.00 0.00 59.25 0.35% 0.00 17,031.92
06.03.01.04.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 13.05 2.44 31.84 13.1 31.84 100.00% 0.00 0.00% 13.05 31.84 100.00% 0.00 0.00 0.00%
06.03.01.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
06.03.01.04.01.03 EXCAVACION EN TERRENO NORMAL RESERVORIO m3 6.53 34.92 228.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.53 228.03 100.00%
06.03.01.04.01.04 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 8.16 14.23 116.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.16 116.12 100.00%
06.03.01.04.01.05 SOLADO C:H 1:8 (h= 0.10 m) m2 1.13 189.58 214.23 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.13 214.23 100.00%
06.03.01.04.01.06 CONCRETO F'C= 210 KG/CM2 EN RESERVORIO m3 6.38 413.58 2,638.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.38 2,638.64 100.00%
06.03.01.04.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 55.40 48.31 2,676.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.40 2,676.37 100.00%
06.03.01.04.01.08 ACERO FY=4200 KG/CM2 kg 244.14 6.66 1,625.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 244.14 1,625.97 100.00%
06.03.01.04.01.09 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 71.79 27.86 2,000.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 2,000.07 100.00%
06.03.01.04.01.10 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 71.79 20.00 1,435.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 1,435.80 100.00%
06.03.01.04.01.11 TAPA SANITARIA METALICA DE 0.60x0.60 mts und 2.00 197.60 395.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 395.20 100.00%
06.03.01.04.01.12 INSTALACION DE ACCESORIOS TUB. VENTILACION 2" und 2.00 118.31 236.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 236.62 100.00%
06.03.01.04.01.13 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS und 1.00 496.89 496.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 496.89 100.00%
06.03.01.04.01.14 INSTALACION DE ACCESORIOS EN RESERVORIO und 2.00 872.43 1,744.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1,744.86 100.00%
06.03.01.04.01.15 PINTADO DE MURO EXTERIOR m2 71.79 15.54 1,115.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 1,115.62 100.00%
06.03.01.04.01.16 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 75.00 28.10 2,107.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.00 2,107.50 100.00%
06.03.01.04.02 CASETA DE CLORACION POR GOTEO 4,075.30 27.41 0.00 27.41 0.67% 0.00 4,047.89
06.03.01.04.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
06.03.01.04.02.02 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS m2 11.54 71.15 821.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.54 821.07 100.00%
06.03.01.04.02.03 TARRAJEO EN INTERIORES Y EXTERIORES m2 20.50 28.40 582.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.50 582.20 100.00%
06.03.01.04.02.04 REJILLA METALICA SEGUN DISEÑO INC. COLOCADO und 1.00 421.12 421.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 421.12 100.00%
06.03.01.04.02.05 COBERTURA DE CALAMINA EN CASETA DE CLORACION m2 4.00 58.15 232.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 232.60 100.00%
06.03.01.04.02.06 INSTALACION DE PUERTA METÁLICA (SEGÚN DISEÑO) und 1.00 257.57 257.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 257.57 100.00%
06.03.01.04.02.07 INSTALACION DE ACCESORIOS EN CASETA DE CLORACION und 1.00 1,557.57 1,557.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,557.57 100.00%
06.03.01.04.02.08 PINTADO DE MURO EXTERIOR m2 11.31 15.54 175.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 175.76 100.00%
06.03.01.05 LINEA DE ADUCCION Y RED DE DISTRIBUCION 150,436.91 10,868.30 0.00 10,868.30 7.22% 0.00 139,568.61
06.03.01.05.01 TENDIDO DE TUBERIA DE ADUCCION Y DISTRIBUCION PVC SAP 129,408.33 10,781.48 0.00 10,781.48 8.33% 0.00 118,626.85
06.03.01.05.01.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 1,342.65 8.03 10,781.48 1,342.7 10,781.48 100.00% 0.00 0.00% 1,342.65 10,781.48 100.00% 0.00 0.00 0.00%
06.03.01.05.01.02 EXCAVACION MANUAL ZANJA EN TERRENO CONGLOMERADO m3 783.21 58.58 45,880.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 783.21 45,880.44 100.00%
06.03.01.05.01.03 REFINE Y NIVELACION DE ZANJA m 2,237.75 2.04 4,565.01 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,237.75 4,565.01 100.00%
06.03.01.05.01.04 CAMA DE APOYO E=10CM. m 2,237.75 1.66 3,714.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,237.75 3,714.67 100.00%
06.03.01.05.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELEC m3 375.94 23.80 8,947.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 375.94 8,947.37 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.03.01.05.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 563.91 57.17 32,238.73 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 563.91 32,238.73 100.00%
06.03.01.05.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 563.91 8.15 4,595.87 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 563.91 4,595.87 100.00%
06.03.01.05.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-5 Ø 2" m 73.39 14.16 1,039.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 73.39 1,039.20 100.00%
06.03.01.05.01.09 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1m 822.10 12.29 10,103.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 822.10 10,103.61 100.00%
06.03.01.05.01.10 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 513.31 4.30 2,207.23 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 513.31 2,207.23 100.00%
06.03.01.05.01.11 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 3/4 m 828.95 3.79 3,141.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 828.95 3,141.72 100.00%
06.03.01.05.01.12 PRUEBA HIDRAULICA m 2,237.75 0.98 2,193.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,237.75 2,193.00 100.00%
06.03.01.05.02 VALVULA DE CONTROL 4,462.66 9.76 0.00 9.76 0.22% 0.00 4,452.90
06.03.01.05.02.01 LIMPIEZA DE TERRENO MANUAL m2 3.60 0.61 2.20 3.6 2.20 100.00% 0.00 0.00% 3.60 2.20 100.00% 0.00 0.00 0.00%
06.03.01.05.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.60 2.10 7.56 3.6 7.56 100.00% 0.00 0.00% 3.60 7.56 100.00% 0.00 0.00 0.00%
06.03.01.05.02.03 EXCAVACION DE ZANJA m3 1.44 34.92 50.28 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.44 50.28 100.00%
06.03.01.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 1.80 8.15 14.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.80 14.67 100.00%
06.03.01.05.02.05 CONCRETO F'C= 175 KG/CM2 m3 0.80 384.28 307.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.80 307.42 100.00%
06.03.01.05.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 16.00 48.31 772.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.00 772.96 100.00%
06.03.01.05.02.07 TARRAJEO CON IMPERMEABILIZANTE m2 16.00 29.19 467.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.00 467.04 100.00%
06.03.01.05.02.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 6.40 28.40 181.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.40 181.76 100.00%
06.03.01.05.02.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 1.00 512.25 512.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 512.25 100.00%
06.03.01.05.02.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 10.00 213.49 2,134.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 2,134.90 100.00%
06.03.01.05.02.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.16 72.62 11.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.16 11.62 100.00%
06.03.01.05.03 VALVULA DE PURGA 5,676.66 35.13 0.00 35.13 0.62% 0.00 5,641.53
06.03.01.05.03.01 LIMPIEZA DE TERRENO MANUAL m2 12.96 0.61 7.91 13.0 7.91 100.00% 0.00 0.00% 12.96 7.91 100.00% 0.00 0.00 0.00%
06.03.01.05.03.02 TRAZO Y REPLANTEO PRELIMINAR m2 12.96 2.10 27.22 13.0 27.22 100.00% 0.00 0.00% 12.96 27.22 100.00% 0.00 0.00 0.00%
06.03.01.05.03.03 EXCAVACION DE ZANJA m3 9.07 34.92 316.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.07 316.72 100.00%
06.03.01.05.03.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 11.34 8.15 92.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.34 92.42 100.00%
06.03.01.05.03.05 CONCRETO F'C= 175 KG/CM2 m3 1.37 384.28 526.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.37 526.46 100.00%
06.03.01.05.03.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 27.00 48.31 1,304.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.00 1,304.37 100.00%
06.03.01.05.03.07 TARRAJEO CON IMPERMEABILIZANTE m2 25.20 29.19 735.59 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.20 735.59 100.00%
06.03.01.05.03.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 10.08 28.40 286.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.08 286.27 100.00%
06.03.01.05.03.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES E GLB 2.00 224.06 448.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 448.12 100.00%
06.03.01.05.03.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 9.00 213.49 1,921.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 1,921.41 100.00%
06.03.01.05.03.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.14 72.62 10.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.14 10.17 100.00%
06.03.01.05.04 CAMARA ROMPE PRESION T - VII 10,889.26 41.93 0.00 41.93 0.39% 0.00 10,847.33
06.03.01.05.04.01 LIMPIEZA DE TERRENO MANUAL m2 15.47 0.61 9.44 15.5 9.44 100.00% 0.00 0.00% 15.47 9.44 100.00% 0.00 0.00 0.00%
06.03.01.05.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 15.47 2.10 32.49 15.5 32.49 100.00% 0.00 0.00% 15.47 32.49 100.00% 0.00 0.00 0.00%
06.03.01.05.04.03 EXCAVACION DE ZANJA m3 13.94 34.92 486.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.94 486.78 100.00%
06.03.01.05.04.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 17.43 8.15 142.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.43 142.05 100.00%
06.03.01.05.04.05 CONCRETO F'C= 175 KG/CM2 m3 4.26 384.28 1,637.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.26 1,637.03 100.00%
06.03.01.05.04.06 ACERO FY=4200 KG/CM2 kg 141.49 6.66 942.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 141.49 942.32 100.00%
06.03.01.05.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 63.04 48.31 3,045.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 63.04 3,045.46 100.00%
06.03.01.05.04.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 23.03 46.31 1,066.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.03 1,066.52 100.00%
06.03.01.05.04.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C GLB 7.00 205.99 1,441.93 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 1,441.93 100.00%
06.03.01.05.04.10 TAPA METALICA Y MARCO DE 0.60x0.60m y 0.30x0.30m e=1/8" ENund 7.00 278.02 1,946.14 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 1,946.14 100.00%
06.03.01.05.04.11 PINTURA EN TAPAS METALICAS m2 6.30 22.08 139.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.30 139.10 100.00%
06.03.01.06 CONEXIONES DOMICILIARIAS 15,621.98 1,172.86 0.00 1,172.86 7.51% 0.00 14,449.12
06.03.01.06.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 146.06 8.03 1,172.86 146.1 1,172.86 100.00% 0.00 0.00% 146.06 1,172.86 100.00% 0.00 0.00 0.00%
06.03.01.06.02 EXCAVACION MANUAL DE ZANJA EN TERRENO CONGLOMERAD m3 85.20 23.12 1,969.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 85.20 1,969.82 100.00%
06.03.01.06.03 REFINE Y NIVELACION DE ZANJA m 243.43 4.08 993.19 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 243.43 993.19 100.00%
06.03.01.06.04 CAMA DE APOYO E=10CM. m 243.43 1.66 404.09 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 243.43 404.09 100.00%
06.03.01.06.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCI m3 40.90 23.80 973.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.90 973.42 100.00%
06.03.01.06.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 61.34 57.17 3,506.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.34 3,506.81 100.00%
06.03.01.06.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 61.34 8.15 499.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.34 499.92 100.00%
06.03.01.06.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" m 243.43 3.46 842.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 243.43 842.27 100.00%
06.03.01.06.09 CONEXIÓN DOMICILIARIA INC. CAJA DE AGUA POTABLE MATRIZ Ø und 37.00 136.23 5,040.51 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.00 5,040.51 100.00%
06.03.01.06.10 PRUEBA HIDRAULICA EN TUBERIA INSTALADA m 243.43 0.90 219.09 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 243.43 219.09 100.00%
06.03.02 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO DOMICILIARIAS 327,952.24 0.0 1,861.28 0.00 0.57% 0.00 1,861.28 0.57% 0.00 326,090.96
06.03.02.01 CONSTRUCCION DE CASETA DE BAÑO 217,624.20 0.0 1,430.88 0.00 0.00 1,430.88 0.66% 0.00 216,193.32
06.03.02.01.01 OBRAS PROVISIONALES 3,518.51 0.0 0.00 0.00 0.00 0.00 0.00% 0.00 3,518.51
06.03.02.01.01.01 LETRINAS DE HOYO SECO VENTILADO (PARA PERSONAL OBRERO) 1,904.75 0.0 0.00 0.00 0.00 0.00 0.00% 0.00 1,904.75
06.03.02.01.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.38 0.61 2.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.38 2.06 100.00%
06.03.02.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.38 2.10 7.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.38 7.10 100.00%
06.03.02.01.01.01.03 EXCAVACION DE ZANJA m3 6.42 34.92 224.19 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.42 224.19 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.03.02.01.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.03 8.15 65.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.03 65.44 100.00%
06.03.02.01.01.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.24 48.31 301.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.24 301.45 100.00%
06.03.02.01.01.01.06 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.94 364.59 342.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.94 342.71 100.00%
06.03.02.01.01.01.07 ACERO FY=4200 KG/CM2 kg 18.14 6.66 120.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.14 120.81 100.00%
06.03.02.01.01.01.08 CONCRETO F'C= 175 KG/CM2 m3 0.17 384.28 65.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.17 65.33 100.00%
06.03.02.01.01.01.09 CASETA PARA LETRINAS INC. PUERTA DE CALAMINA und 2.00 346.09 692.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 692.18 100.00%
06.03.02.01.01.01.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 83.48 100.00%
06.03.02.01.01.02 DUCHAS O VESTUARIOS (PARA PERSONAL OBRERO) 1,335.92 0.00 0.00 0.00 0.00% 0.00 1,335.92
06.03.02.01.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 4.00 0.61 2.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2.44 100.00%
06.03.02.01.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.10 8.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 8.40 100.00%
06.03.02.01.01.02.03 EXCAVACION DE ZANJA m3 2.04 34.92 71.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.04 71.24 100.00%
06.03.02.01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.55 8.15 20.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.55 20.78 100.00%
06.03.02.01.01.02.05 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 2.00 72.62 145.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 145.24 100.00%
06.03.02.01.01.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.40 48.31 115.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.40 115.94 100.00%
06.03.02.01.01.02.07 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.27 364.59 98.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.27 98.44 100.00%
06.03.02.01.01.02.08 CASETA PARA DUCHAS INC. PUERTA DE CALAMINA m2 2.00 346.09 692.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 692.18 100.00%
06.03.02.01.01.02.09 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 2.00 48.89 97.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 97.78 100.00%
06.03.02.01.01.02.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 83.48 100.00%
06.03.02.01.01.03 LAVADERO DE GRANITO (PARA PERSONAL OBRERO) 277.84 0.00 0.00 0.00 0.00% 0.00 277.84
06.03.02.01.01.03.01 SUMINISTRO E INSTALACIÓN DE LAVADERO DE GRANITO und 2.00 138.92 277.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 277.84 100.00%
06.03.02.01.02 TRABAJOS PRELIMINARES 771.59 771.59 0.00 771.59 100.00% 0.00 0.00
06.03.02.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 284.72 0.61 173.68 284.7 173.68 100.00% 0.00 0.00% 284.72 173.68 100.00% 0.00 0.00 0.00%
06.03.02.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 284.72 2.10 597.91 284.7 597.91 100.00% 0.00 0.00% 284.72 597.91 100.00% 0.00 0.00 0.00%
06.03.02.01.03 MOVIMIENTO DE TIERRAS 5,974.42 0.00 0.00 0.00 0.00% 0.00 5,974.42
06.03.02.01.03.01 EXCAVACION DE TERRENO NORMAL m3 69.74 34.92 2,435.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 69.74 2,435.32 100.00%
06.03.02.01.03.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 87.18 8.15 710.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 87.18 710.52 100.00%
06.03.02.01.03.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 29.60 95.56 2,828.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.60 2,828.58 100.00%
06.03.02.01.04 OBRAS DE CONCRETO SIMPLE 38,029.44 0.00 0.00 0.00 0.00% 0.00 38,029.44
06.03.02.01.04.01 CIMIENTOS CORRIDOS 8,843.04 0.00 0.00 0.00 0.00% 0.00 8,843.04
06.03.02.01.04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 38.11 232.04 8,843.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 38.11 8,843.04 100.00%
06.03.02.01.04.02 SOBRECIMIENTOS 11,935.79 0.00 0.00 0.00 0.00% 0.00 11,935.79
06.03.02.01.04.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 174.64 44.52 7,774.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 174.64 7,774.97 100.00%
06.03.02.01.04.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 13.10 317.62 4,160.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.10 4,160.82 100.00%
06.03.02.01.04.03 PISO INTERIOR 3,666.57 0.00 0.00 0.00 0.00% 0.00 3,666.57
06.03.02.01.04.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO C m2 81.77 44.84 3,666.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 81.77 3,666.57 100.00%
06.03.02.01.04.04 SARDINEL DE DUCHA 709.00 0.00 0.00 0.00 0.00% 0.00 709.00
06.03.02.01.04.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 12.21 48.31 589.87 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.21 589.87 100.00%
06.03.02.01.04.04.02 CONCRETO F'C= 175 KG/CM2 m3 0.31 384.28 119.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.31 119.13 100.00%
06.03.02.01.04.05 VEREDA PERIMETRAL 12,875.04 0.00 0.00 0.00 0.00% 0.00 12,875.04
06.03.02.01.04.05.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 41.07 42.84 1,759.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 41.07 1,759.44 100.00%
06.03.02.01.04.05.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑAD m2 168.17 44.84 7,540.74 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 168.17 7,540.74 100.00%
06.03.02.01.04.05.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 9.81 364.41 3,574.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.81 3,574.86 100.00%
06.03.02.01.05 OBRAS DE CONCRETO ARMADO 35,392.66 0.00 0.00 0.00 0.00% 0.00 35,392.66
06.03.02.01.05.01 COLUMNAS 25,058.30 0.00 0.00 0.00 0.00% 0.00 25,058.30
06.03.02.01.05.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 11.10 384.28 4,265.51 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.10 4,265.51 100.00%
06.03.02.01.05.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 236.80 45.29 10,724.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 236.80 10,724.67 100.00%
06.03.02.01.05.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 1,511.73 6.66 10,068.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,511.73 10,068.12 100.00%
06.03.02.01.05.02 VIGAS 10,334.36 0.00 0.00 0.00 0.00% 0.00 10,334.36
06.03.02.01.05.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 6.33 384.28 2,432.49 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.33 2,432.49 100.00%
06.03.02.01.05.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 116.00 50.83 5,896.28 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 116.00 5,896.28 100.00%
06.03.02.01.05.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 301.14 6.66 2,005.59 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 301.14 2,005.59 100.00%
06.03.02.01.06 MUROS DE LADRILLO 22,426.87 0.00 0.00 0.00 0.00% 0.00 22,426.87
06.03.02.01.06.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS m2 308.91 72.60 22,426.87 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 308.91 22,426.87 100.00%
06.03.02.01.07 REVOQUES Y ENLUCIDOS 23,543.42 0.00 0.00 0.00 0.00% 0.00 23,543.42
06.03.02.01.07.01 ZÓCALO: TARRAJEADO Y PULIDO CON IMPERMEABILIZANTE / m2 236.80 38.45 9,104.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 236.80 9,104.96 100.00%
06.03.02.01.07.02 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 211.27 20.82 4,398.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 211.27 4,398.64 100.00%
06.03.02.01.07.03 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS m2 264.37 24.59 6,500.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 264.37 6,500.86 100.00%
06.03.02.01.07.04 BRUÑA DE 1 CM m 249.75 14.17 3,538.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 249.75 3,538.96 100.00%
06.03.02.01.08 PINTURA 5,749.90 0.00 0.00 0.00 0.00% 0.00 5,749.90
06.03.02.01.08.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 211.27 11.37 2,402.14 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 211.27 2,402.14 100.00%
06.03.02.01.08.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUI m2 240.50 13.92 3,347.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 240.50 3,347.76 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.03.02.01.09 COBERTURA LIVIANA PARA TECHO 14,535.97 0.00 0.00 0.00 0.00% 0.00 14,535.97
06.03.02.01.09.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 111.00 38.28 4,249.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 111.00 4,249.08 100.00%
06.03.02.01.09.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 3.00 und 148.00 25.91 3,834.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 148.00 3,834.68 100.00%
06.03.02.01.09.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.3 m2 266.40 24.22 6,452.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 266.40 6,452.21 100.00%
06.03.02.01.10 CARPINTERIA DE MADERA 14,651.63 0.00 0.00 0.00 0.00% 0.00 14,651.63
06.03.02.01.10.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/T und 37.00 304.49 11,266.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.00 11,266.13 100.00%
06.03.02.01.10.02 SUMIN. E INSTAL. DE VENTANA DE MADERA SEGUN DISEÑO und 37.00 91.50 3,385.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.00 3,385.50 100.00%
06.03.02.01.11 INSTALACIONES SANITARIAS 36,124.49 659.29 0.00 659.29 1.83% 0.00 35,465.20
06.03.02.01.11.01 TRABAJOS PRELIMINARES 659.29 659.29 0.00 659.29 100.00% 0.00 0.00
06.03.02.01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 243.28 0.61 148.40 243.3 148.40 100.00% 0.00 0.00% 243.28 148.40 100.00% 0.00 0.00 0.00%
06.03.02.01.11.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 243.28 2.10 510.89 243.3 510.89 100.00% 0.00 0.00% 243.28 510.89 100.00% 0.00 0.00 0.00%
06.03.02.01.11.02 MOVIMIENTO DE TIERRAS 8,663.54 0.00 0.00 0.00 0.00% 0.00 8,663.54
06.03.02.01.11.02.01 EXCAVACION DE TERRENO NORMAL m3 120.39 34.92 4,204.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 120.39 4,204.02 100.00%
06.03.02.01.11.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 106.70 40.54 4,325.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 106.70 4,325.62 100.00%
06.03.02.01.11.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 16.43 8.15 133.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.43 133.90 100.00%
06.03.02.01.11.03 TUBERIAS Y ACCESORIOS 12,513.69 0.00 0.00 0.00 0.00% 0.00 12,513.69
06.03.02.01.11.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 111.00 23.00 2,553.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 111.00 2,553.00 100.00%
06.03.02.01.11.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + A und 37.00 63.39 2,345.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.00 2,345.43 100.00%
06.03.02.01.11.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 166.50 5.14 855.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 166.50 855.81 100.00%
06.03.02.01.11.03.04 TUBERIA PVC SAL Ø 2" m 362.60 7.99 2,897.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 362.60 2,897.17 100.00%
06.03.02.01.11.03.05 TUBERIA PVC SAL Ø 4" m 303.40 12.73 3,862.28 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 303.40 3,862.28 100.00%
06.03.02.01.11.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 14,287.97 0.00 0.00 0.00 0.00% 0.00 14,287.97
06.03.02.01.11.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 78.26 48.31 3,780.74 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 78.26 3,780.74 100.00%
06.03.02.01.11.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 7.24 265.70 1,923.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.24 1,923.67 100.00%
06.03.02.01.11.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 53.28 32.70 1,742.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 53.28 1,742.26 100.00%
06.03.02.01.11.04.04 SALIDA DE DESAGUE PVC-SAL 2" pto 74.00 41.74 3,088.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 74.00 3,088.76 100.00%
06.03.02.01.11.04.05 SALIDA DE DESAGUE PVC-SAL 4" pto 37.00 42.49 1,572.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.00 1,572.13 100.00%
06.03.02.01.11.04.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 37.00 58.93 2,180.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.00 2,180.41 100.00%
06.03.02.01.12 APARATOS Y ACCESORIOS SANITARIOS 10,051.42 0.00 0.00 0.00 0.00% 0.00 10,051.42
06.03.02.01.12.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0. und 37.00 148.78 5,504.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.00 5,504.86 100.00%
06.03.02.01.12.02 SUMINISTRO E INSTALACION DE LAVATORIO und 37.00 73.99 2,737.63 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.00 2,737.63 100.00%
06.03.02.01.12.03 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 37.00 48.89 1,808.93 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.00 1,808.93 100.00%
06.03.02.01.13 INSTALACIONES ELECTRICAS 6,853.88 0.00 0.00 0.00 0.00% 0.00 6,853.88
06.03.02.01.13.01 SALIDA PARA INTERRUPTOR DOBLE und 37.00 22.42 829.54 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.00 829.54 100.00%
06.03.02.01.13.02 SALIDA PARA CENTRO DE LUZ und 74.00 65.44 4,842.56 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 74.00 4,842.56 100.00%
06.03.02.01.13.03 SALIDA PARA TOMACORRIENTES und 37.00 31.94 1,181.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.00 1,181.78 100.00%
06.03.02.02 INSTALACION DE BIODIGESTOR DE 600 LTS 57,326.55 189.21 0.00 189.21 0.33% 0.00 57,137.34
06.03.02.02.01 TRABAJOS PRELIMINARES 189.21 189.21 0.00 189.21 100.00% 0.00 0.00
06.03.02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 69.82 0.61 42.59 69.8 42.59 100.00% 0.00 0.00% 69.82 42.59 100.00% 0.00 0.00 0.00%
06.03.02.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 69.82 2.10 146.62 69.8 146.62 100.00% 0.00 0.00% 69.82 146.62 100.00% 0.00 0.00 0.00%
06.03.02.02.02 MOVIMIENTO DE TIERRAS 5,432.13 0.00 0.00 0.00 0.00% 0.00 5,432.13
06.03.02.02.02.01 EXCAVACION DE TERRENO NORMAL m3 99.43 34.92 3,472.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 99.43 3,472.10 100.00%
06.03.02.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 45.68 30.92 1,412.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 45.68 1,412.43 100.00%
06.03.02.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 67.19 8.15 547.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 67.19 547.60 100.00%
06.03.02.02.03 OBRAS DE CONCRETO SIMPLE 288.21 0.00 0.00 0.00 0.00% 0.00 288.21
06.03.02.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 0.75 384.28 288.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.75 288.21 100.00%
06.03.02.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 13,382.11 0.00 0.00 0.00 0.00% 0.00 13,382.11
06.03.02.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 122.84 48.31 5,934.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 122.84 5,934.40 100.00%
06.03.02.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODO m3 12.06 364.74 4,398.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.06 4,398.76 100.00%
06.03.02.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 93.24 32.70 3,048.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 93.24 3,048.95 100.00%
06.03.02.02.05 BIODIGESTOR DE 600 Lts. 38,034.89 0.00 0.00 0.00 0.00% 0.00 38,034.89
06.03.02.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 Lts und 37.00 1,027.97 38,034.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.00 38,034.89 100.00%
06.03.02.03 CONSTRUCCIÓN DE POZO PERCOLADOR 53,001.49 241.19 0.00 241.19 0.46% 0.00 52,760.30
06.03.02.03.01 TRABAJOS PRELIMINARES 241.19 241.19 0.00 241.19 100.00% 0.00 0.00
06.03.02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 89.00 0.61 54.29 89.0 54.29 100.00% 0.00 0.00% 89.00 54.29 100.00% 0.00 0.00 0.00%
06.03.02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 89.00 2.10 186.90 89.0 186.90 100.00% 0.00 0.00% 89.00 186.90 100.00% 0.00 0.00 0.00%
06.03.02.03.02 MOVIMIENTO DE TIERRAS 11,735.92 0.00 0.00 0.00 0.00% 0.00 11,735.92
06.03.02.03.02.01 EXCAVACION DE TERRENO NORMAL m3 194.58 34.92 6,794.73 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 194.58 6,794.73 100.00%
06.03.02.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 243.28 8.15 1,982.73 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 243.28 1,982.73 100.00%
06.03.02.03.02.03 RELLENO CON GRAVA 1" m3 30.69 64.85 1,990.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.69 1,990.25 100.00%
06.03.02.03.02.04 FILTRO DE GRAVA Ø 1" m3 14.93 64.85 968.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.93 968.21 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.03.02.03.03 OBRAS DE CONCRETO SIMPLE 10,128.57 0.00 0.00 0.00 0.00% 0.00 10,128.57
06.03.02.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 52.08 48.31 2,515.98 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 52.08 2,515.98 100.00%
06.03.02.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 19.81 384.28 7,612.59 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.81 7,612.59 100.00%
06.03.02.03.04 OBRAS DE CONCRETO ARMADO 6,105.73 0.00 0.00 0.00 0.00% 0.00 6,105.73
06.03.02.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 6.98 384.28 2,682.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.98 2,682.27 100.00%
06.03.02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 18.02 48.31 870.55 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.02 870.55 100.00%
06.03.02.03.04.03 ACERO FY=4200 KG/CM2 kg 383.32 6.66 2,552.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 383.32 2,552.91 100.00%
06.03.02.03.05 MUROS DE LADRILLO 24,790.08 0.00 0.00 0.00 0.00% 0.00 24,790.08
06.03.02.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 m2 272.00 91.14 24,790.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 272.00 24,790.08 100.00%
06.03.03 ESTUDIOS COMPLEMENTARIOS 1,710.00 0.00 0.00 0.00% 0.00 0.00% 0.00 1,710.00
06.03.03.01 DISEÑO DE MEZCLA und 3.00 450.00 1,350.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 1,350.00 100.00%
06.03.03.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIO und 9.00 40.00 360.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 360.00 100.00%
06.03.04 FLETE 34,029.42 6,805.88 1,701.47 25.00% 8,507.36 25.00% 0.00 25,522.06
06.03.04.01 FLETE TERRESTRE Y ACARREO JULLO GLB 1.00 34,029.42 34,029.42 0.2 6,805.88 20.00% 0.05 1,701.47 5.00% 0.25 8,507.36 25.00% 0.75 25,522.06 75.00%
06.03.05 PROGRAMA DE MITIGACION E IMPACTO AMBIENTAL 4,450.41 0.00 0.00 0.00% 0.00 0.00% 0.00 4,450.41
06.03.05.01 PROGRAMA DE PREVENCION DE MITIGACION 577.56 0.00 0.00 0.00% 0.00 0.00% 0.00 577.56
06.03.05.01.01 CARTELES PERMANENTES und 4.00 63.56 254.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 254.24 100.00%
06.03.05.01.02 CARTELES TEMPORALES und 4.00 67.80 271.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 271.20 100.00%
06.03.05.01.03 CINTAS DE SEÑAL DE TRABAJO rll 1.00 52.12 52.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 52.12 100.00%
06.03.05.02 PROGRAMA DE ABANDONO DE OBRA 3,872.85 0.00 0.00 0.00 0.00% 0.00 3,872.85
06.03.05.02.01 REACONDICIONAMIENTO DE AREA OCUPADA (CAMPAMENTO Y m2 800.00 3.22 2,576.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 800.00 2,576.00 100.00%
06.03.05.02.02 REACONDICIONAMIENTO DE CANTERAS Y ACCESOS HA 3.00 157.27 471.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 471.81 100.00%
06.03.05.02.03 REFORESTACION EN CAPTACIONES Y RESERVORIO m2 29.55 27.92 825.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.55 825.04 100.00%
06.03.06 ADECUADO CONOCIMIENTO DE EDUCACION SANITARIA 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 4,000.00
06.03.06.01 CAPACITACION ANTES DE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2,000.00 100.00%
06.03.06.02 CAPACITACION DURANTE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2,000.00 100.00%
06.03.07 EFICIENTE GESTION TECNICA Y ADMINISTRATIVA DE LOS SERVICIOS DE AGUA Y SANEAMIENTO 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 4,000.00
06.03.07.01 PROGRAMA DE FORTALECIMIENTO DE CAPACIDADES PARA LA P und 4.00 1,000.00 4,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 4,000.00 100.00%
06.04 LOCALIDAD DE PANTIPATA - A 381,515.77 48,928.46 108,213.88 41.19% 157,142.33 41.19% 0.00 224,373.44
06.04.01 SISTEMA DE AGUA POTABLE 185,360.94 48,022.99 32,394.19 43.38% 80,417.17 43.38% 0.00 104,943.77
06.04.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
06.04.01.01.01 OBRAS PROVISIONALES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
06.04.01.01.01.01 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 1,760.72 1,760.72 1.0 1,760.72 100.00% 0.00 0.00% 1.00 1,760.72 100.00% 0.00 0.00 0.00%
06.04.01.01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 797.66 797.66 1.0 797.66 100.00% 0.00 0.00% 1.00 797.66 100.00% 0.00 0.00 0.00%
06.04.01.02 CONSTRUCCION DE CAPTACION TIPO - 1 5,072.96 74.91 0.00 74.91 1.48% 0.00 4,998.05
06.04.01.02.01 TRABAJOS PRELIMINARES 74.91 74.91 0.00 74.91 100.00% 0.00 0.00
06.04.01.02.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 16.50 2.44 40.26 16.5 40.26 100.00% 0.00 0.00% 16.50 40.26 100.00% 0.00 0.00 0.00%
06.04.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 16.50 2.10 34.65 16.5 34.65 100.00% 0.00 0.00% 16.50 34.65 100.00% 0.00 0.00 0.00%
06.04.01.02.02 MOVIMIENTO DE TIERRAS 887.73 0.00 0.00 0.00 0.00% 0.00 887.73
06.04.01.02.02.01 EXCAVACION EN TERRENO NORMAL CAPTACION m3 8.25 39.64 327.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.25 327.03 100.00%
06.04.01.02.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 4.95 40.54 200.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.95 200.67 100.00%
06.04.01.02.02.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE (50 M ) m3 10.31 34.92 360.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.31 360.03 100.00%
06.04.01.02.03 CONCRETO SIMPLE 210.73 0.00 0.00 0.00 0.00% 0.00 210.73
06.04.01.02.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS m3 0.81 260.16 210.73 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.81 210.73 100.00%
06.04.01.02.04 CONCRETO ARMADO 1,416.99 0.00 0.00 0.00 0.00% 0.00 1,416.99
06.04.01.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 10.37 48.31 500.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.37 500.97 100.00%
06.04.01.02.04.02 ACERO FY=4200 KG/CM2 kg 61.78 6.66 411.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.78 411.45 100.00%
06.04.01.02.04.03 CONCRETO FC=210 KG/CM2 m3 1.22 413.58 504.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.22 504.57 100.00%
06.04.01.02.05 REVOQUES ENLUCIDOS Y MOLDURAS 212.46 0.00 0.00 0.00 0.00% 0.00 212.46
06.04.01.02.05.01 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 6.04 20.00 120.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 120.80 100.00%
06.04.01.02.05.02 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 3.29 27.86 91.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.29 91.66 100.00%
06.04.01.02.06 VALVULAS Y TAPAS Y ACCESORIOS 603.49 0.00 0.00 0.00 0.00% 0.00 603.49
06.04.01.02.06.01 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.60X0.6 und 0.36 352.51 126.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.36 126.90 100.00%
06.04.01.02.06.02 SUMINISTRO E INST. VALVULA COMPUERTA H. DUCTIL, Y A und 1.00 429.91 429.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 429.91 100.00%
06.04.01.02.06.03 CODO FºDº DN 160X90º ISO ED und 4.00 11.67 46.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 46.68 100.00%
06.04.01.02.07 FILTROS 59.77 0.00 0.00 0.00 0.00% 0.00 59.77
06.04.01.02.07.01 FILTROS DE GRAVA m3 0.22 109.19 24.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.22 24.02 100.00%
06.04.01.02.07.02 FILTROS DE ARENA m3 0.29 123.26 35.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.29 35.75 100.00%
06.04.01.02.08 PINTURA 173.78 0.00 0.00 0.00 0.00% 0.00 173.78
06.04.01.02.08.01 PINTURA EN TAPAS METALICAS m2 1.04 22.08 22.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.04 22.96 100.00%
06.04.01.02.08.02 PINTURA EN MUROS EXTERIORES (CAPTACION) m2 6.04 24.97 150.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 150.82 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.04.01.02.09 CERCO PERIMETRICO 1,433.10 0.00 0.00 0.00 0.00% 0.00 1,433.10
06.04.01.02.09.01 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 51.00 28.10 1,433.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.00 1,433.10 100.00%
06.04.01.03 LINEA DE CONDUCCION 13,614.72 10,874.14 -4,166.26 6,707.88 49.27% 0.00 6,906.84
06.04.01.03.01 TENDIDO DE TUBERIA PVC SAP 11,381.13 10,866.50 -4,166.26 6,700.24 58.87% 0.00 4,680.89
06.04.01.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 152.15 2.10 319.52 152.2 319.52 100.00% 0.00 0.00% 152.15 319.52 100.00% 0.00 0.00 0.00%
06.04.01.03.01.02 EXCAVACION MANUAL DE ZANJA DE TERRENO CONGLOMER m3 88.76 34.92 3,099.50 88.8 3,099.50 100.00% 0.00 0.00% 88.76 3,099.50 100.00% 0.00 0.00 0.00%
06.04.01.03.01.03 REFINE Y NIVELACION DE ZANJA m 253.59 4.08 1,034.65 253.6 1,034.65 100.00% 0.00 0.00% 253.59 1,034.65 100.00% 0.00 0.00 0.00%
06.04.01.03.01.04 CAMA DE APOYO E=10CM. m 253.59 1.66 420.96 253.6 420.96 100.00% 0.00 0.00% 253.59 420.96 100.00% 0.00 0.00 0.00%
06.04.01.03.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELEC m3 42.60 23.80 1,013.88 42.6 1,013.88 100.00% -21.30 -506.94 -50.00% 21.30 506.94 50.00% 21.30 506.94 50.00%
06.04.01.03.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 63.90 57.17 3,653.16 63.9 3,653.16 100.00% -63.90 -3,653.16 -100.00% 0.00 0.00 0.00% 63.90 3,653.16 100.00%
06.04.01.03.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 63.90 8.15 520.79 28.8 234.39 45.01% -28.76 -234.39 -45.01% 0.00 0.00 0.00% 63.90 520.79 100.00%
06.04.01.03.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 253.59 4.30 1,090.44 253.6 1,090.44 100.00% 0.00 0.00% 253.59 1,090.44 100.00% 0.00 0.00 0.00%
06.04.01.03.01.09 PRUEBA HIDRAULICA DE LA LINEA DE CONDUCCION m 253.59 0.90 228.23 0.0 0.00 0.00% 253.59 228.23 100.00% 253.59 228.23 100.00% 0.00 0.00 0.00%
06.04.01.03.02 CAMARA DE DISTRIBUCION DE CAUDALES 2,233.59 7.64 0.00 7.64 0.34% 0.00 2,225.95
06.04.01.03.02.01 LIMPIEZA DE TERRENO MANUAL m2 2.82 0.61 1.72 2.8 1.72 100.00% 0.00 0.00% 2.82 1.72 100.00% 0.00 0.00 0.00%
06.04.01.03.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.82 2.10 5.92 2.8 5.92 100.00% 0.00 0.00% 2.82 5.92 100.00% 0.00 0.00 0.00%
06.04.01.03.02.03 EXCAVACION DE TIERRA m3 1.15 34.92 40.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.15 40.16 100.00%
06.04.01.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.98 8.15 24.29 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.98 24.29 100.00%
06.04.01.03.02.05 CONCRETO F'C= 175 KG/CM2 m3 0.76 384.28 292.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.76 292.05 100.00%
06.04.01.03.02.06 ACERO FY=4200 KG/CM2 kg 38.13 6.66 253.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 38.13 253.95 100.00%
06.04.01.03.02.07 ENCOFRADO Y DESENCOFRADO DE MUROS m2 11.08 45.76 507.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.08 507.02 100.00%
06.04.01.03.02.08 TARRAJEO EXTERIOR E=1:5 CM MEZCLA 1:4 m2 5.76 22.96 132.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.76 132.25 100.00%
06.04.01.03.02.09 TARRAJEO INTERIOR C/IMPERMEABILIZANTE E=1.5 CM MEZCLm2 5.90 36.29 214.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.90 214.11 100.00%
06.04.01.03.02.10 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 1.00 258.56 258.56 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 258.56 100.00%
06.04.01.03.02.11 TAPA METALICA Y MARCO DE 0.60x0.60 m e=1/8" und 2.00 213.02 426.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 426.04 100.00%
06.04.01.03.02.12 PINTURA EN MUROS m2 5.56 9.55 53.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.56 53.10 100.00%
06.04.01.03.02.13 PINTURA TAPAS ANTICORROSIVO m2 1.44 16.96 24.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.44 24.42 100.00%
06.04.01.04 RESERVORIO (4 M3) 17,747.12 72.81 0.00 72.81 0.41% 0.00 17,674.31
06.04.01.04.01 RESERVORIO 13,671.82 45.40 0.00 45.40 0.33% 0.00 13,626.42
06.04.01.04.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 10.00 2.44 24.40 10.0 24.40 100.00% 0.00 0.00% 10.00 24.40 100.00% 0.00 0.00 0.00%
06.04.01.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 10.00 2.10 21.00 10.0 21.00 100.00% 0.00 0.00% 10.00 21.00 100.00% 0.00 0.00 0.00%
06.04.01.04.01.03 EXCAVACION EN TERRENO NORMAL RESERVORIO m3 5.00 34.92 174.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 174.60 100.00%
06.04.01.04.01.04 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 6.25 14.23 88.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.25 88.94 100.00%
06.04.01.04.01.05 SOLADO C:H 1:8 (h= 0.10 m) m2 0.86 189.58 163.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.86 163.04 100.00%
06.04.01.04.01.06 CONCRETO F'C= 210 KG/CM2 EN RESERVORIO m3 5.42 413.58 2,241.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.42 2,241.60 100.00%
06.04.01.04.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 46.24 48.31 2,233.85 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 46.24 2,233.85 100.00%
06.04.01.04.01.08 ACERO FY=4200 KG/CM2 kg 200.66 6.66 1,336.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 200.66 1,336.40 100.00%
06.04.01.04.01.09 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 56.25 27.86 1,567.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.25 1,567.13 100.00%
06.04.01.04.01.10 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 56.25 20.00 1,125.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.25 1,125.00 100.00%
06.04.01.04.01.11 TAPA SANITARIA METALICA DE 0.60x0.60 mts und 2.00 197.60 395.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 395.20 100.00%
06.04.01.04.01.12 INSTALACION DE ACCESORIOS TUB. VENTILACION 2" und 1.00 118.31 118.31 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 118.31 100.00%
06.04.01.04.01.13 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS und 1.00 496.89 496.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 496.89 100.00%
06.04.01.04.01.14 INSTALACION DE ACCESORIOS EN RESERVORIO und 1.00 872.43 872.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 872.43 100.00%
06.04.01.04.01.15 PINTADO DE MURO EXTERIOR m2 56.25 15.54 874.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.25 874.13 100.00%
06.04.01.04.01.16 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 69.00 28.10 1,938.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 69.00 1,938.90 100.00%
06.04.01.04.02 CASETA DE CLORACION POR GOTEO 4,075.30 27.41 0.00 27.41 0.67% 0.00 4,047.89
06.04.01.04.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
06.04.01.04.02.02 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS m2 11.54 71.15 821.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.54 821.07 100.00%
06.04.01.04.02.03 TARRAJEO EN INTERIORES Y EXTERIORES m2 20.50 28.40 582.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.50 582.20 100.00%
06.04.01.04.02.04 REJILLA METALICA SEGUN DISEÑO INC. COLOCADO und 1.00 421.12 421.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 421.12 100.00%
06.04.01.04.02.05 COBERTURA DE CALAMINA EN CASETA DE CLORACION m2 4.00 58.15 232.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 232.60 100.00%
06.04.01.04.02.06 INSTALACION DE PUERTA METÁLICA (SEGÚN DISEÑO) und 1.00 257.57 257.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 257.57 100.00%
06.04.01.04.02.07 INSTALACION DE ACCESORIOS EN CASETA DE CLORACION und 1.00 1,557.57 1,557.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,557.57 100.00%
06.04.01.04.02.08 PINTADO DE MURO EXTERIOR m2 11.31 15.54 175.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 175.76 100.00%
06.04.01.05 LINEA DE ADUCCION Y RED DE DISTRIBUCION 137,763.04 33,690.26 36,560.45 70,250.70 50.99% 0.00 67,512.34
06.04.01.05.01 TENDIDO DE TUBERIA DE ADUCCION Y DISTRIBUCION PVC SAP 123,480.42 33,633.97 36,560.45 70,194.41 56.85% 0.00 53,286.01
06.04.01.05.01.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 1,231.69 8.03 9,890.47 1,231.7 9,890.47 100.00% 0.00 0.00% 1,231.69 9,890.47 100.00% 0.00 0.00 0.00%
06.04.01.05.01.02 EXCAVACION MANUAL ZANJA EN TERRENO CONGLOMERADO m3 718.48 58.58 42,088.56 156.5 9,168.36 21.78% 287.40 16,835.89 40.00% 443.91 26,004.25 61.78% 274.57 16,084.31 38.22%
06.04.01.05.01.03 REFINE Y NIVELACION DE ZANJA m 2,052.81 2.04 4,187.73 447.2 912.25 21.78% 1,605.63 3,275.49 78.22% 2,052.81 4,187.73 100.00% 0.00 0.00 0.00%
06.04.01.05.01.04 CAMA DE APOYO E=10CM. m 2,052.81 1.66 3,407.66 447.2 742.32 21.78% 1,605.63 2,665.35 78.22% 2,052.81 3,407.66 100.00% 0.00 0.00 0.00%
06.04.01.05.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 344.87 23.80 8,207.91 75.1 1,788.09 21.79% 134.87 3,209.91 39.11% 210.00 4,998.00 60.89% 134.87 3,209.91 39.11%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.04.01.05.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 517.31 57.17 29,574.61 62.3 3,561.12 12.04% -62.29 -3,561.12 -12.04% 0.00 0.00 0.00% 517.31 29,574.61 100.00%
06.04.01.05.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 517.31 8.15 4,216.08 62.3 507.66 12.04% -62.29 -507.66 -12.04% 0.00 0.00 0.00% 517.31 4,216.08 100.00%
06.04.01.05.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-5 Ø 2" m 47.18 14.16 668.07 23.6 334.03 50.00% 23.59 334.03 50.00% 47.18 668.07 100.00% 0.00 0.00 0.00%
06.04.01.05.01.09 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1/2" m 1,327.08 12.29 16,309.81 464.5 5,708.46 35.00% 862.60 10,601.35 65.00% 1,327.08 16,309.81 100.00% 0.00 0.00 0.00%
06.04.01.05.01.10 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 678.55 4.30 2,917.77 237.5 1,021.21 35.00% 441.06 1,896.56 65.00% 678.55 2,917.77 100.00% 0.00 0.00 0.00%
06.04.01.05.01.11 PRUEBA HIDRAULICA m 2,052.81 0.98 2,011.75 0.0 0.00 0.00% 1,847.60 1,810.65 90.00% 1,847.60 1,810.65 90.00% 205.21 201.10 10.00%
06.04.01.05.02 VALVULA DE CONTROL 3,152.88 6.83 0.00 6.83 0.22% 0.00 3,146.05
06.04.01.05.02.01 LIMPIEZA DE TERRENO MANUAL m2 2.52 0.61 1.54 2.5 1.54 100.00% 0.00 0.00% 2.52 1.54 100.00% 0.00 0.00 0.00%
06.04.01.05.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.52 2.10 5.29 2.5 5.29 100.00% 0.00 0.00% 2.52 5.29 100.00% 0.00 0.00 0.00%
06.04.01.05.02.03 EXCAVACION DE ZANJA m3 1.01 34.92 35.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.01 35.27 100.00%
06.04.01.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 1.26 8.15 10.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.26 10.27 100.00%
06.04.01.05.02.05 CONCRETO F'C= 175 KG/CM2 m3 0.56 384.28 215.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.56 215.20 100.00%
06.04.01.05.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 11.20 48.31 541.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.20 541.07 100.00%
06.04.01.05.02.07 TARRAJEO CON IMPERMEABILIZANTE m2 4.48 29.19 130.77 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.48 130.77 100.00%
06.04.01.05.02.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 7.00 28.40 198.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 198.80 100.00%
06.04.01.05.02.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 1.00 512.25 512.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 512.25 100.00%
06.04.01.05.02.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 7.00 213.49 1,494.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 1,494.43 100.00%
06.04.01.05.02.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.11 72.62 7.99 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.11 7.99 100.00%
06.04.01.05.03 VALVULA DE PURGA 3,352.64 19.51 0.00 19.51 0.58% 0.00 3,333.13
06.04.01.05.03.01 LIMPIEZA DE TERRENO MANUAL m2 7.20 0.61 4.39 7.2 4.39 100.00% 0.00 0.00% 7.20 4.39 100.00% 0.00 0.00 0.00%
06.04.01.05.03.02 TRAZO Y REPLANTEO PRELIMINAR m2 7.20 2.10 15.12 7.2 15.12 100.00% 0.00 0.00% 7.20 15.12 100.00% 0.00 0.00 0.00%
06.04.01.05.03.03 EXCAVACION DE ZANJA m3 5.04 34.92 176.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.04 176.00 100.00%
06.04.01.05.03.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 6.30 8.15 51.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.30 51.35 100.00%
06.04.01.05.03.05 CONCRETO F'C= 175 KG/CM2 m3 0.76 384.28 292.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.76 292.05 100.00%
06.04.01.05.03.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 15.00 48.31 724.65 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.00 724.65 100.00%
06.04.01.05.03.07 TARRAJEO CON IMPERMEABILIZANTE m2 14.00 29.19 408.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 408.66 100.00%
06.04.01.05.03.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 5.60 28.40 159.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.60 159.04 100.00%
06.04.01.05.03.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES E GLB 2.00 224.06 448.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 448.12 100.00%
06.04.01.05.03.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 5.00 213.49 1,067.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 1,067.45 100.00%
06.04.01.05.03.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.08 72.62 5.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.08 5.81 100.00%
06.04.01.05.04 CAMARA ROMPE PRESION T - VII 7,777.10 29.95 0.00 29.95 0.39% 0.00 7,747.15
06.04.01.05.04.01 LIMPIEZA DE TERRENO MANUAL m2 11.05 0.61 6.74 11.1 6.74 100.00% 0.00 0.00% 11.05 6.74 100.00% 0.00 0.00 0.00%
06.04.01.05.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 11.05 2.10 23.21 11.1 23.21 100.00% 0.00 0.00% 11.05 23.21 100.00% 0.00 0.00 0.00%
06.04.01.05.04.03 EXCAVACION DE ZANJA m3 9.96 34.92 347.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.96 347.80 100.00%
06.04.01.05.04.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 12.45 8.15 101.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.45 101.47 100.00%
06.04.01.05.04.05 CONCRETO F'C= 175 KG/CM2 m3 3.04 384.28 1,168.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.04 1,168.21 100.00%
06.04.01.05.04.06 ACERO FY=4200 KG/CM2 kg 101.06 6.66 673.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 101.06 673.06 100.00%
06.04.01.05.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 45.03 48.31 2,175.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 45.03 2,175.40 100.00%
06.04.01.05.04.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 16.45 46.31 761.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.45 761.80 100.00%
06.04.01.05.04.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C GLB 5.00 205.99 1,029.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 1,029.95 100.00%
06.04.01.05.04.10 TAPA METALICA Y MARCO DE 0.60x0.60m y 0.30x0.30m e=1/8" ENund 5.00 278.02 1,390.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 1,390.10 100.00%
06.04.01.05.04.11 PINTURA EN TAPAS METALICAS m2 4.50 22.08 99.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.50 99.36 100.00%
06.04.01.06 CONEXIONES DOMICILIARIAS 8,604.72 752.49 0.00 752.49 8.75% 0.00 7,852.23
06.04.01.06.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 93.71 8.03 752.49 93.7 752.49 100.00% 0.00 0.00% 93.71 752.49 100.00% 0.00 0.00 0.00%
06.04.01.06.02 EXCAVACION MANUAL DE ZANJA EN TERRENO CONGLOMERAD m3 46.86 23.12 1,083.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 46.86 1,083.40 100.00%
06.04.01.06.03 REFINE Y NIVELACION DE ZANJA m 156.19 4.08 637.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 156.19 637.26 100.00%
06.04.01.06.04 CAMA DE APOYO E=10CM. m 156.19 1.66 259.28 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 156.19 259.28 100.00%
06.04.01.06.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCI m3 22.49 23.80 535.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.49 535.26 100.00%
06.04.01.06.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 33.74 57.17 1,928.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 33.74 1,928.92 100.00%
06.04.01.06.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 33.74 8.15 274.98 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 33.74 274.98 100.00%
06.04.01.06.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" m 156.19 3.46 540.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 156.19 540.42 100.00%
06.04.01.06.09 CONEXIÓN DOMICILIARIA INC. CAJA DE AGUA POTABLE MATRIZ Ø und 18.00 136.23 2,452.14 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 2,452.14 100.00%
06.04.01.06.10 PRUEBA HIDRAULICA EN TUBERIA INSTALADA m 156.19 0.90 140.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 156.19 140.57 100.00%
06.04.02 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO DOMICILIARIAS 161,345.73 905.47 62,191.36 39.11% 63,096.83 39.11% 0.00 98,248.90
06.04.02.01 CONSTRUCCION DE CASETA DE BAÑO 107,675.27 696.09 30,838.42 31,534.51 29.29% 0.00 76,140.76
06.04.02.01.01 OBRAS PROVISIONALES 3,518.51 0.00 267.40 267.40 7.60% 0.00 3,251.11
06.04.02.01.01.01 LETRINAS DE HOYO SECO VENTILADO (PARA PERSONAL OBRERO) 1,904.75 0.00 267.40 267.40 14.04% 0.00 1,637.35
06.04.02.01.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.38 0.61 2.06 0.0 0.00 0.00% 1.69 1.03 50.00% 1.69 1.03 50.00% 1.69 1.03 50.00%
06.04.02.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.38 2.10 7.10 0.0 0.00 0.00% 1.69 3.55 50.00% 1.69 3.55 50.00% 1.69 3.55 50.00%
06.04.02.01.01.01.03 EXCAVACION DE ZANJA m3 6.42 34.92 224.19 0.0 0.00 0.00% 3.21 112.09 50.00% 3.21 112.09 50.00% 3.21 112.10 50.00%
06.04.02.01.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.03 8.15 65.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.03 65.44 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.04.02.01.01.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.24 48.31 301.45 0.0 0.00 0.00% 3.12 150.73 50.00% 3.12 150.73 50.00% 3.12 150.72 50.00%
06.04.02.01.01.01.06 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.94 364.59 342.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.94 342.71 100.00%
06.04.02.01.01.01.07 ACERO FY=4200 KG/CM2 kg 18.14 6.66 120.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.14 120.81 100.00%
06.04.02.01.01.01.08 CONCRETO F'C= 175 KG/CM2 m3 0.17 384.28 65.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.17 65.33 100.00%
06.04.02.01.01.01.09 CASETA PARA LETRINAS INC. PUERTA DE CALAMINA und 2.00 346.09 692.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 692.18 100.00%
06.04.02.01.01.01.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 83.48 100.00%
06.04.02.01.01.02 DUCHAS O VESTUARIOS (PARA PERSONAL OBRERO) 1,335.92 0.00 0.00 0.00 0.00% 0.00 1,335.92
06.04.02.01.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 4.00 0.61 2.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2.44 100.00%
06.04.02.01.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.10 8.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 8.40 100.00%
06.04.02.01.01.02.03 EXCAVACION DE ZANJA m3 2.04 34.92 71.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.04 71.24 100.00%
06.04.02.01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.55 8.15 20.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.55 20.78 100.00%
06.04.02.01.01.02.05 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 2.00 72.62 145.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 145.24 100.00%
06.04.02.01.01.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.40 48.31 115.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.40 115.94 100.00%
06.04.02.01.01.02.07 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.27 364.59 98.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.27 98.44 100.00%
06.04.02.01.01.02.08 CASETA PARA DUCHAS INC. PUERTA DE CALAMINA m2 2.00 346.09 692.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 692.18 100.00%
06.04.02.01.01.02.09 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 2.00 48.89 97.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 97.78 100.00%
06.04.02.01.01.02.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 83.48 100.00%
06.04.02.01.01.03 LAVADERO DE GRANITO (PARA PERSONAL OBRERO) 277.84 0.00 0.00 0.00 0.00% 0.00 277.84
06.04.02.01.01.03.01 SUMINISTRO E INSTALACIÓN DE LAVADERO DE GRANITO und 2.00 138.92 277.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 277.84 100.00%
06.04.02.01.02 TRABAJOS PRELIMINARES 375.36 375.36 0.00 375.36 100.00% 0.00 0.00
06.04.02.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 138.51 0.61 84.49 138.5 84.49 100.00% 0.00 0.00% 138.51 84.49 100.00% 0.00 0.00 0.00%
06.04.02.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 138.51 2.10 290.87 138.5 290.87 100.00% 0.00 0.00% 138.51 290.87 100.00% 0.00 0.00 0.00%
06.04.02.01.03 MOVIMIENTO DE TIERRAS 2,906.54 0.00 1,053.19 1,053.19 36.24% 0.00 1,853.35
06.04.02.01.03.01 EXCAVACION DE TERRENO NORMAL m3 33.93 34.92 1,184.84 0.0 0.00 0.00% 30.16 1,053.19 88.89% 30.16 1,053.19 88.89% 3.77 131.65 11.11%
06.04.02.01.03.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 42.41 8.15 345.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 42.41 345.64 100.00%
06.04.02.01.03.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 14.40 95.56 1,376.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.40 1,376.06 100.00%
06.04.02.01.04 OBRAS DE CONCRETO SIMPLE 18,498.56 0.00 8,983.90 8,983.90 48.57% 0.00 9,514.66
06.04.02.01.04.01 CIMIENTOS CORRIDOS 4,302.02 0.00 3,824.02 3,824.02 88.89% 0.00 478.00
06.04.02.01.04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 18.54 232.04 4,302.02 0.0 0.00 0.00% 16.48 3,824.02 88.89% 16.48 3,824.02 88.89% 2.06 478.00 11.11%
06.04.02.01.04.02 SOBRECIMIENTOS 5,805.66 0.00 5,159.88 5,159.88 88.88% 0.00 645.78
06.04.02.01.04.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 84.96 44.52 3,782.42 0.0 0.00 0.00% 75.52 3,362.15 88.89% 75.52 3,362.15 88.89% 9.44 420.27 11.11%
06.04.02.01.04.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 6.37 317.62 2,023.24 0.0 0.00 0.00% 5.66 1,797.73 88.85% 5.66 1,797.73 88.85% 0.71 225.51 11.15%
06.04.02.01.04.03 PISO INTERIOR 1,783.74 0.00 0.00 0.00 0.00% 0.00 1,783.74
06.04.02.01.04.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO C m2 39.78 44.84 1,783.74 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.78 1,783.74 100.00%
06.04.02.01.04.04 SARDINEL DE DUCHA 344.60 0.00 0.00 0.00 0.00% 0.00 344.60
06.04.02.01.04.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 5.94 48.31 286.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.94 286.96 100.00%
06.04.02.01.04.04.02 CONCRETO F'C= 175 KG/CM2 m3 0.15 384.28 57.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.15 57.64 100.00%
06.04.02.01.04.05 VEREDA PERIMETRAL 6,262.54 0.00 0.00 0.00 0.00% 0.00 6,262.54
06.04.02.01.04.05.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 19.98 42.84 855.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.98 855.94 100.00%
06.04.02.01.04.05.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑAD m2 81.81 44.84 3,668.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 81.81 3,668.36 100.00%
06.04.02.01.04.05.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 4.77 364.41 1,738.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.77 1,738.24 100.00%
06.04.02.01.05 OBRAS DE CONCRETO ARMADO 17,218.16 0.00 10,836.02 10,836.02 62.93% 0.00 6,382.14
06.04.02.01.05.01 COLUMNAS 12,190.55 0.00 10,836.02 10,836.02 88.89% 0.00 1,354.53
06.04.02.01.05.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 5.40 384.28 2,075.11 0.0 0.00 0.00% 4.80 1,844.54 88.89% 4.80 1,844.54 88.89% 0.60 230.57 11.11%
06.04.02.01.05.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 115.20 45.29 5,217.41 0.0 0.00 0.00% 102.40 4,637.70 88.89% 102.40 4,637.70 88.89% 12.80 579.71 11.11%
06.04.02.01.05.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 735.44 6.66 4,898.03 0.0 0.00 0.00% 653.72 4,353.78 88.89% 653.72 4,353.78 88.89% 81.72 544.25 11.11%
06.04.02.01.05.02 VIGAS 5,027.61 0.00 0.00 0.00 0.00% 0.00 5,027.61
06.04.02.01.05.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 3.08 384.28 1,183.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.08 1,183.58 100.00%
06.04.02.01.05.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 56.43 50.83 2,868.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.43 2,868.34 100.00%
06.04.02.01.05.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 146.50 6.66 975.69 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 146.50 975.69 100.00%
06.04.02.01.06 MUROS DE LADRILLO 10,910.33 0.00 9,697.91 9,697.91 88.89% 0.00 1,212.42
06.04.02.01.06.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS m2 150.28 72.60 10,910.33 0.0 0.00 0.00% 133.58 9,697.91 88.89% 133.58 9,697.91 88.89% 16.70 1,212.42 11.11%
06.04.02.01.07 REVOQUES Y ENLUCIDOS 11,453.50 0.00 0.00 0.00 0.00% 0.00 11,453.50
06.04.02.01.07.01 ZÓCALO: TARRAJEADO Y PULIDO CON IMPERMEABILIZANTE / m2 115.20 38.45 4,429.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 115.20 4,429.44 100.00%
06.04.02.01.07.02 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 102.78 20.82 2,139.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 102.78 2,139.88 100.00%
06.04.02.01.07.03 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS m2 128.61 24.59 3,162.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 128.61 3,162.52 100.00%
06.04.02.01.07.04 BRUÑA DE 1 CM m 121.50 14.17 1,721.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 121.50 1,721.66 100.00%
06.04.02.01.08 PINTURA 2,797.25 0.00 0.00 0.00 0.00% 0.00 2,797.25
06.04.02.01.08.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 102.78 11.37 1,168.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 102.78 1,168.61 100.00%
06.04.02.01.08.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUI m2 117.00 13.92 1,628.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 117.00 1,628.64 100.00%
06.04.02.01.09 COBERTURA LIVIANA PARA TECHO 7,071.55 0.00 0.00 0.00 0.00% 0.00 7,071.55
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.04.02.01.09.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 54.00 38.28 2,067.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.00 2,067.12 100.00%
06.04.02.01.09.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 3.00 und 72.00 25.91 1,865.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 72.00 1,865.52 100.00%
06.04.02.01.09.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.3 m2 129.60 24.22 3,138.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 129.60 3,138.91 100.00%
06.04.02.01.10 CARPINTERIA DE MADERA 7,127.82 0.00 0.00 0.00 0.00% 0.00 7,127.82
06.04.02.01.10.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/T und 18.00 304.49 5,480.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 5,480.82 100.00%
06.04.02.01.10.02 SUMIN. E INSTAL. DE VENTANA DE MADERA SEGUN DISEÑO und 18.00 91.50 1,647.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 1,647.00 100.00%
06.04.02.01.11 INSTALACIONES SANITARIAS 17,573.49 320.73 0.00 320.73 1.83% 0.00 17,252.76
06.04.02.01.11.01 TRABAJOS PRELIMINARES 320.73 320.73 0.00 320.73 100.00% 0.00 0.00
06.04.02.01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 118.35 0.61 72.19 118.4 72.19 100.00% 0.00 0.00% 118.35 72.19 100.00% 0.00 0.00 0.00%
06.04.02.01.11.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 118.35 2.10 248.54 118.4 248.54 100.00% 0.00 0.00% 118.35 248.54 100.00% 0.00 0.00 0.00%
06.04.02.01.11.02 MOVIMIENTO DE TIERRAS 4,214.81 0.00 0.00 0.00 0.00% 0.00 4,214.81
06.04.02.01.11.02.01 EXCAVACION DE TERRENO NORMAL m3 58.57 34.92 2,045.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 58.57 2,045.26 100.00%
06.04.02.01.11.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 51.91 40.54 2,104.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.91 2,104.43 100.00%
06.04.02.01.11.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 7.99 8.15 65.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.99 65.12 100.00%
06.04.02.01.11.03 TUBERIAS Y ACCESORIOS 6,087.75 0.00 0.00 0.00 0.00% 0.00 6,087.75
06.04.02.01.11.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 54.00 23.00 1,242.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.00 1,242.00 100.00%
06.04.02.01.11.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + A und 18.00 63.39 1,141.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 1,141.02 100.00%
06.04.02.01.11.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 81.00 5.14 416.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 81.00 416.34 100.00%
06.04.02.01.11.03.04 TUBERIA PVC SAL Ø 2" m 176.40 7.99 1,409.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 176.40 1,409.44 100.00%
06.04.02.01.11.03.05 TUBERIA PVC SAL Ø 4" m 147.60 12.73 1,878.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 147.60 1,878.95 100.00%
06.04.02.01.11.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 6,950.20 0.00 0.00 0.00 0.00% 0.00 6,950.20
06.04.02.01.11.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 38.07 48.31 1,839.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 38.07 1,839.16 100.00%
06.04.02.01.11.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 3.52 265.70 935.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.52 935.26 100.00%
06.04.02.01.11.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 25.92 32.70 847.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.92 847.58 100.00%
06.04.02.01.11.04.04 SALIDA DE DESAGUE PVC-SAL 2" pto 36.00 41.74 1,502.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 36.00 1,502.64 100.00%
06.04.02.01.11.04.05 SALIDA DE DESAGUE PVC-SAL 4" pto 18.00 42.49 764.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 764.82 100.00%
06.04.02.01.11.04.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 18.00 58.93 1,060.74 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 1,060.74 100.00%
06.04.02.01.12 APARATOS Y ACCESORIOS SANITARIOS 4,889.88 0.00 0.00 0.00 0.00% 0.00 4,889.88
06.04.02.01.12.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0. und 18.00 148.78 2,678.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 2,678.04 100.00%
06.04.02.01.12.02 SUMINISTRO E INSTALACION DE LAVATORIO und 18.00 73.99 1,331.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 1,331.82 100.00%
06.04.02.01.12.03 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 18.00 48.89 880.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 880.02 100.00%
06.04.02.01.13 INSTALACIONES ELECTRICAS 3,334.32 0.0 0.00 0.00 0.00 0.00 0.00% 0.00 3,334.32
06.04.02.01.13.01 SALIDA PARA INTERRUPTOR DOBLE und 18.00 22.42 403.56 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 403.56 100.00%
06.04.02.01.13.02 SALIDA PARA CENTRO DE LUZ und 36.00 65.44 2,355.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 36.00 2,355.84 100.00%
06.04.02.01.13.03 SALIDA PARA TOMACORRIENTES und 18.00 31.94 574.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 574.92 100.00%
06.04.02.02 INSTALACION DE BIODIGESTOR DE 600 LTS 27,889.88 92.04 13,313.66 13,405.70 48.07% 0.00 14,484.18
06.04.02.02.01 TRABAJOS PRELIMINARES 92.04 92.04 0.00 92.04 100.00% 0.00 0.00
06.04.02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 33.96 0.61 20.72 34.0 20.72 100.00% 0.00 0.00% 33.96 20.72 100.00% 0.00 0.00 0.00%
06.04.02.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 33.96 2.10 71.32 34.0 71.32 100.00% 0.00 0.00% 33.96 71.32 100.00% 0.00 0.00 0.00%
06.04.02.02.02 MOVIMIENTO DE TIERRAS 2,644.74 0.00 1,921.45 1,921.45 72.65% 0.00 723.29
06.04.02.02.02.01 EXCAVACION DE TERRENO NORMAL m3 48.37 34.92 1,689.08 0.0 0.00 0.00% 43.00 1,501.56 88.90% 43.00 1,501.56 88.90% 5.37 187.52 11.10%
06.04.02.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 22.22 30.92 687.04 0.0 0.00 0.00% 13.58 419.89 61.12% 13.58 419.89 61.12% 8.64 267.15 38.88%
06.04.02.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 32.96 8.15 268.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 32.96 268.62 100.00%
06.04.02.02.03 OBRAS DE CONCRETO SIMPLE 138.34 0.00 84.54 84.54 61.11% 0.00 53.80
06.04.02.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 0.36 384.28 138.34 0.0 0.00 0.00% 0.22 84.54 61.11% 0.22 84.54 61.11% 0.14 53.80 38.89%
06.04.02.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 6,511.30 0.00 0.00 0.00 0.00% 0.00 6,511.30
06.04.02.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 59.76 48.31 2,887.01 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 59.76 2,887.01 100.00%
06.04.02.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODO m3 5.87 364.74 2,141.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.87 2,141.02 100.00%
06.04.02.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 45.36 32.70 1,483.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 45.36 1,483.27 100.00%
06.04.02.02.05 BIODIGESTOR DE 600 Lts. 18,503.46 0.00 11,307.67 11,307.67 61.11% 0.00 7,195.79
06.04.02.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 Lts und 18.00 1,027.97 18,503.46 0.0 0.00 0.00% 11.00 11,307.67 61.11% 11.00 11,307.67 61.11% 7.00 7,195.79 38.89%
06.04.02.03 CONSTRUCCIÓN DE POZO PERCOLADOR 25,780.58 117.34 18,039.28 18,156.62 70.43% 0.00 7,623.96
06.04.02.03.01 TRABAJOS PRELIMINARES 117.34 117.34 0.00 117.34 100.00% 0.00 0.00
06.04.02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 43.30 0.61 26.41 43.3 26.41 100.00% 0.00 0.00% 43.30 26.41 100.00% 0.00 0.00 0.00%
06.04.02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 43.30 2.10 90.93 43.3 90.93 100.00% 0.00 0.00% 43.30 90.93 100.00% 0.00 0.00 0.00%
06.04.02.03.02 MOVIMIENTO DE TIERRAS 5,703.26 0.00 2,938.17 2,938.17 51.52% 0.00 2,765.09
06.04.02.03.02.01 EXCAVACION DE TERRENO NORMAL m3 94.66 34.92 3,305.53 0.0 0.00 0.00% 84.14 2,938.17 88.89% 84.14 2,938.17 88.89% 10.52 367.36 11.11%
06.04.02.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 118.35 8.15 964.55 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 118.35 964.55 100.00%
06.04.02.03.02.03 RELLENO CON GRAVA 1" m3 14.93 64.85 968.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.93 968.21 100.00%
06.04.02.03.02.04 FILTRO DE GRAVA Ø 1" m3 7.17 64.85 464.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.17 464.97 100.00%
06.04.02.03.03 OBRAS DE CONCRETO SIMPLE 4,928.15 0.00 4,381.22 4,381.22 88.90% 0.00 546.93
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.04.02.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 25.33 48.31 1,223.69 0.0 0.00 0.00% 22.52 1,087.94 88.91% 22.52 1,087.94 88.91% 2.81 135.75 11.09%
06.04.02.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 9.64 384.28 3,704.46 0.0 0.00 0.00% 8.57 3,293.28 88.90% 8.57 3,293.28 88.90% 1.07 411.18 11.10%
06.04.02.03.04 OBRAS DE CONCRETO ARMADO 2,972.19 0.00 0.00 0.00 0.00% 0.00 2,972.19
06.04.02.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 3.40 384.28 1,306.55 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.40 1,306.55 100.00%
06.04.02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 8.77 48.31 423.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.77 423.68 100.00%
06.04.02.03.04.03 ACERO FY=4200 KG/CM2 kg 186.48 6.66 1,241.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 186.48 1,241.96 100.00%
06.04.02.03.05 MUROS DE LADRILLO 12,059.64 0.00 10,719.89 10,719.89 88.89% 0.00 1,339.75
06.04.02.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 m2 132.32 91.14 12,059.64 0.0 0.00 0.00% 117.62 10,719.89 88.89% 117.62 10,719.89 88.89% 14.70 1,339.75 11.11%
06.04.03 ESTUDIOS COMPLEMENTARIOS 1,710.00 0.00 900.00 52.63% 900.00 52.63% 0.00 810.00
06.04.03.01 DISEÑO DE MEZCLA und 3.00 450.00 1,350.00 0.0 0.00 0.00% 2.00 900.00 66.67% 2.00 900.00 66.67% 1.00 450.00 33.33%
06.04.03.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIO und 9.00 40.00 360.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 360.00 100.00%
06.04.04 FLETE 21,127.02 0.00 12,676.21 60.00% 12,676.21 60.00% 0.00 8,450.81
06.04.04.01 FLETE TERRESTRE Y ACARREO PANTIPATA - A GLB 1.00 21,127.02 21,127.02 0.0 0.00 0.00% 0.60 12,676.21 60.00% 0.60 12,676.21 60.00% 0.40 8,450.81 40.00%
06.04.05 PROGRAMA DE MITIGACION E IMPACTO AMBIENTAL 3,972.08 0.00 52.12 1.31% 52.12 1.31% 0.00 3,919.96
06.04.05.01 PROGRAMA DE PREVENCION DE MITIGACION 577.56 0.00 52.12 52.12 9.02% 0.00 525.44
06.04.05.01.01 CARTELES PERMANENTES und 4.00 63.56 254.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 254.24 100.00%
06.04.05.01.02 CARTELES TEMPORALES und 4.00 67.80 271.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 271.20 100.00%
06.04.05.01.03 CINTAS DE SEÑAL DE TRABAJO rll 1.00 52.12 52.12 0.0 0.00 0.00% 1.00 52.12 100.00% 1.00 52.12 100.00% 0.00 0.00 0.00%
06.04.05.02 PROGRAMA DE ABANDONO DE OBRA 3,394.52 0.00 0.00 0.00 0.00% 0.00 3,394.52
06.04.05.02.01 REACONDICIONAMIENTO DE AREA OCUPADA (CAMPAMENTO Y m2 800.00 3.22 2,576.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 800.00 2,576.00 100.00%
06.04.05.02.02 REACONDICIONAMIENTO DE CANTERAS Y ACCESOS HA 0.50 157.27 78.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.50 78.64 100.00%
06.04.05.02.03 REFORESTACION EN CAPTACIONES Y RESERVORIO m2 26.50 27.92 739.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.50 739.88 100.00%
06.04.06 ADECUADO CONOCIMIENTO DE EDUCACION SANITARIA 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 4,000.00
06.04.06.01 CAPACITACION ANTES DE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2,000.00 100.00%
06.04.06.02 CAPACITACION DURANTE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2,000.00 100.00%
EFICIENTE GESTION TECNICA Y ADMINISTRATIVA DE LOS
06.04.07 4,000.00 0.00 0.00 0.00% 0.00 0.00% 4,000.00
SERVICIOS DE AGUA Y SANEAMIENTO A TRAVES DEL LAS JASS 0.00
06.04.07.01 PROGRAMA DE FORTALECIMIENTO DE CAPACIDADES PARA LA P und 4.00 1,000.00 4,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 4,000.00 100.00%
06.05 LOCALIDAD DE PANTIPATA - B 316,961.45 17,459.11 65,181.40 20.56% 82,640.51 26.07% 0.00 234,320.94
06.05.01 SISTEMA DE AGUA POTABLE 159,780.14 16,754.85 47,611.83 29.80% 64,366.68 40.28% 0.00 95,413.46
06.05.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,558.38 1,760.72 797.66 2,558.38 100.00% 0.00 0.00
06.05.01.01.01 OBRAS PROVISIONALES 2,558.38 1,760.72 797.66 2,558.38 100.00% 0.00 0.00
06.05.01.01.01.01 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 1,760.72 1,760.72 1.0 1,760.72 100.00% 0.00 0.00% 1.00 1,760.72 100.00% 0.00 0.00 0.00%
06.05.01.01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 797.66 797.66 0.0 0.00 0.00% 1.00 797.66 100.00% 1.00 797.66 100.00% 0.00 0.00 0.00%
06.05.01.02 CONSTRUCCION DE CAPTACION TIPO - 1 5,072.96 74.91 0.00 74.91 1.48% 0.00 4,998.05
06.05.01.02.01 TRABAJOS PRELIMINARES 74.91 74.91 0.00 74.91 100.00% 0.00 0.00
06.05.01.02.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 16.50 2.44 40.26 16.5 40.26 100.00% 0.00 0.00% 16.50 40.26 100.00% 0.00 0.00 0.00%
06.05.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 16.50 2.10 34.65 16.5 34.65 100.00% 0.00 0.00% 16.50 34.65 100.00% 0.00 0.00 0.00%
06.05.01.02.02 MOVIMIENTO DE TIERRAS 887.73 0.00 0.00 0.00 0.00% 0.00 887.73
06.05.01.02.02.01 EXCAVACION EN TERRENO NORMAL CAPTACION m3 8.25 39.64 327.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.25 327.03 100.00%
06.05.01.02.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 4.95 40.54 200.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.95 200.67 100.00%
06.05.01.02.02.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE (50 M ) m3 10.31 34.92 360.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.31 360.03 100.00%
06.05.01.02.03 CONCRETO SIMPLE 210.73 0.00 0.00 0.00 0.00% 0.00 210.73
06.05.01.02.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS m3 0.81 260.16 210.73 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.81 210.73 100.00%
06.05.01.02.04 CONCRETO ARMADO 1,416.99 0.00 0.00 0.00 0.00% 0.00 1,416.99
06.05.01.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 10.37 48.31 500.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.37 500.97 100.00%
06.05.01.02.04.02 ACERO FY=4200 KG/CM2 kg 61.78 6.66 411.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.78 411.45 100.00%
06.05.01.02.04.03 CONCRETO FC=210 KG/CM2 m3 1.22 413.58 504.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.22 504.57 100.00%
06.05.01.02.05 REVOQUES ENLUCIDOS Y MOLDURAS 212.46 0.00 0.00 0.00 0.00% 0.00 212.46
06.05.01.02.05.01 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 6.04 20.00 120.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 120.80 100.00%
06.05.01.02.05.02 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 3.29 27.86 91.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.29 91.66 100.00%
06.05.01.02.06 VALVULAS Y TAPAS Y ACCESORIOS 603.49 0.00 0.00 0.00 0.00% 0.00 603.49
06.05.01.02.06.01 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.60X0.6 und 0.36 352.51 126.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.36 126.90 100.00%
06.05.01.02.06.02 SUMINISTRO E INST. VALVULA COMPUERTA H. DUCTIL, Y A und 1.00 429.91 429.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 429.91 100.00%
06.05.01.02.06.03 CODO FºDº DN 160X90º ISO ED und 4.00 11.67 46.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 46.68 100.00%
06.05.01.02.07 FILTROS 59.77 0.00 0.00 0.00 0.00% 0.00 59.77
06.05.01.02.07.01 FILTROS DE GRAVA m3 0.22 109.19 24.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.22 24.02 100.00%
06.05.01.02.07.02 FILTROS DE ARENA m3 0.29 123.26 35.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.29 35.75 100.00%
06.05.01.02.08 PINTURA 173.78 0.00 0.00 0.00 0.00% 0.00 173.78
06.05.01.02.08.01 PINTURA EN TAPAS METALICAS m2 1.04 22.08 22.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.04 22.96 100.00%
06.05.01.02.08.02 PINTURA EN MUROS EXTERIORES (CAPTACION) m2 6.04 24.97 150.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.04 150.82 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.05.01.02.09 CERCO PERIMETRICO 1,433.10 0.00 0.00 0.00 0.00% 0.00 1,433.10
06.05.01.02.09.01 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 51.00 28.10 1,433.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 51.00 1,433.10 100.00%
06.05.01.03 LINEA DE CONDUCCION 11,381.80 5,976.83 657.20 6,634.03 58.29% 0.00 4,747.77
06.05.01.03.01 TENDIDO DE TUBERIA PVC SAP 11,381.80 5,976.83 657.20 6,634.03 58.29% 0.00 4,747.77
06.05.01.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 152.16 2.10 319.54 152.2 319.54 100.00% 0.00 0.00% 152.16 319.54 100.00% 0.00 0.00 0.00%
06.05.01.03.01.02 EXCAVACION MANUAL DE ZANJA DE TERRENO CONGLOMER m3 88.76 34.92 3,099.50 88.8 3,099.50 100.00% 0.00 0.00% 88.76 3,099.50 100.00% 0.00 0.00 0.00%
06.05.01.03.01.03 REFINE Y NIVELACION DE ZANJA m 253.59 4.08 1,034.65 253.6 1,034.65 100.00% 0.00 0.00% 253.59 1,034.65 100.00% 0.00 0.00 0.00%
06.05.01.03.01.04 CAMA DE APOYO E=10CM. m 253.59 1.66 420.96 126.8 210.49 50.00% 126.79 210.47 50.00% 253.59 420.96 100.00% 0.00 0.00 0.00%
06.05.01.03.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELEC m3 42.60 23.80 1,013.88 21.3 506.94 50.00% 0.00 0.00% 21.30 506.94 50.00% 21.30 506.94 50.00%
06.05.01.03.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 63.91 57.17 3,653.73 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 63.91 3,653.73 100.00%
06.05.01.03.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 63.91 8.15 520.87 32.0 260.47 50.01% -31.96 -260.47 -50.01% 0.00 0.00 0.00% 63.91 520.87 100.00%
06.05.01.03.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 253.59 4.30 1,090.44 126.8 545.24 50.00% 126.79 545.20 50.00% 253.59 1,090.44 100.00% 0.00 0.00 0.00%
06.05.01.03.01.09 PRUEBA HIDRAULICA DE LA LINEA DE CONDUCCION m 253.59 0.90 228.23 0.0 0.00 0.00% 180.00 162.00 70.98% 180.00 162.00 70.98% 73.59 66.23 29.02%
06.05.01.04 RESERVORIO (4 M3) 17,747.12 72.81 0.00 72.81 0.41% 0.00 17,674.31
06.05.01.04.01 RESERVORIO 13,671.82 45.40 0.00 45.40 0.33% 0.00 13,626.42
06.05.01.04.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 10.00 2.44 24.40 10.0 24.40 100.00% 0.00 0.00% 10.00 24.40 100.00% 0.00 0.00 0.00%
06.05.01.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 10.00 2.10 21.00 10.0 21.00 100.00% 0.00 0.00% 10.00 21.00 100.00% 0.00 0.00 0.00%
06.05.01.04.01.03 EXCAVACION EN TERRENO NORMAL RESERVORIO m3 5.00 34.92 174.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 174.60 100.00%
06.05.01.04.01.04 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 6.25 14.23 88.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.25 88.94 100.00%
06.05.01.04.01.05 SOLADO C:H 1:8 (h= 0.10 m) m2 0.86 189.58 163.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.86 163.04 100.00%
06.05.01.04.01.06 CONCRETO F'C= 210 KG/CM2 EN RESERVORIO m3 5.42 413.58 2,241.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.42 2,241.60 100.00%
06.05.01.04.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 46.24 48.31 2,233.85 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 46.24 2,233.85 100.00%
06.05.01.04.01.08 ACERO FY=4200 KG/CM2 kg 200.66 6.66 1,336.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 200.66 1,336.40 100.00%
06.05.01.04.01.09 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 56.25 27.86 1,567.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.25 1,567.13 100.00%
06.05.01.04.01.10 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 56.25 20.00 1,125.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.25 1,125.00 100.00%
06.05.01.04.01.11 TAPA SANITARIA METALICA DE 0.60x0.60 mts und 2.00 197.60 395.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 395.20 100.00%
06.05.01.04.01.12 INSTALACION DE ACCESORIOS TUB. VENTILACION 2" und 1.00 118.31 118.31 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 118.31 100.00%
06.05.01.04.01.13 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS und 1.00 496.89 496.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 496.89 100.00%
06.05.01.04.01.14 INSTALACION DE ACCESORIOS EN RESERVORIO und 1.00 872.43 872.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 872.43 100.00%
06.05.01.04.01.15 PINTADO DE MURO EXTERIOR m2 56.25 15.54 874.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.25 874.13 100.00%
06.05.01.04.01.16 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 69.00 28.10 1,938.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 69.00 1,938.90 100.00%
06.05.01.04.02 CASETA DE CLORACION POR GOTEO 4,075.30 27.41 0.00 27.41 0.67% 0.00 4,047.89
06.05.01.04.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
06.05.01.04.02.02 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS m2 11.54 71.15 821.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.54 821.07 100.00%
06.05.01.04.02.03 TARRAJEO EN INTERIORES Y EXTERIORES m2 20.50 28.40 582.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.50 582.20 100.00%
06.05.01.04.02.04 REJILLA METALICA SEGUN DISEÑO INC. COLOCADO und 1.00 421.12 421.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 421.12 100.00%
06.05.01.04.02.05 COBERTURA DE CALAMINA EN CASETA DE CLORACION m2 4.00 58.15 232.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 232.60 100.00%
06.05.01.04.02.06 INSTALACION DE PUERTA METÁLICA (SEGÚN DISEÑO) und 1.00 257.57 257.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 257.57 100.00%
06.05.01.04.02.07 INSTALACION DE ACCESORIOS EN CASETA DE CLORACION und 1.00 1,557.57 1,557.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,557.57 100.00%
06.05.01.04.02.08 PINTADO DE MURO EXTERIOR m2 11.31 15.54 175.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 175.76 100.00%
06.05.01.05 LINEA DE ADUCCION Y RED DE DISTRIBUCION 116,198.02 8,139.89 46,156.97 54,296.86 46.73% 0.00 61,901.16
06.05.01.05.01 TENDIDO DE TUBERIA DE ADUCCION Y DISTRIBUCION PVC SAP 100,775.22 8,073.52 46,156.97 54,230.49 53.81% 0.00 46,544.73
06.05.01.05.01.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 1,005.42 8.03 8,073.52 1,005.4 8,073.52 100.00% 0.00 0.00% 1,005.42 8,073.52 100.00% 0.00 0.00 0.00%
06.05.01.05.01.02 EXCAVACION MANUAL ZANJA EN TERRENO CONGLOMERADO m3 586.50 58.58 34,357.17 0.0 0.00 0.00% 351.90 20,614.30 60.00% 351.90 20,614.30 60.00% 234.60 13,742.87 40.00%
06.05.01.05.01.03 REFINE Y NIVELACION DE ZANJA m 1,675.70 2.04 3,418.43 0.0 0.00 0.00% 1,675.70 3,418.43 100.00% 1,675.70 3,418.43 100.00% 0.00 0.00 0.00%
06.05.01.05.01.04 CAMA DE APOYO E=10CM. m 1,675.70 1.66 2,781.66 0.0 0.00 0.00% 1,675.70 2,781.66 100.00% 1,675.70 2,781.66 100.00% 0.00 0.00 0.00%
06.05.01.05.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELEC m3 281.52 23.80 6,700.18 0.0 0.00 0.00% 140.76 3,350.06 50.00% 140.76 3,350.06 50.00% 140.76 3,350.12 50.00%
06.05.01.05.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 422.28 57.17 24,141.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 422.28 24,141.75 100.00%
06.05.01.05.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 422.28 8.15 3,441.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 422.28 3,441.58 100.00%
06.05.01.05.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-5 Ø 2" m 107.65 14.16 1,524.32 0.0 0.00 0.00% 96.88 1,371.82 90.00% 96.88 1,371.82 90.00% 10.77 152.50 10.00%
06.05.01.05.01.09 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1m 995.22 12.29 12,231.25 0.0 0.00 0.00% 895.70 11,008.15 90.00% 895.70 11,008.15 90.00% 99.52 1,223.10 10.00%
06.05.01.05.01.10 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 572.83 4.30 2,463.17 0.0 0.00 0.00% 515.52 2,216.74 90.00% 515.52 2,216.74 90.00% 57.31 246.43 10.00%
06.05.01.05.01.11 PRUEBA HIDRAULICA m 1,675.70 0.98 1,642.19 0.0 0.00 0.00% 1,424.30 1,395.81 85.00% 1,424.30 1,395.81 85.00% 251.40 246.38 15.00%
06.05.01.05.02 VALVULA DE CONTROL 3,712.58 13.01 0.00 13.01 0.35% 0.00 3,699.57
06.05.01.05.02.01 LIMPIEZA DE TERRENO MANUAL m2 4.80 0.61 2.93 4.8 2.93 100.00% 0.00 0.00% 4.80 2.93 100.00% 0.00 0.00 0.00%
06.05.01.05.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.80 2.10 10.08 4.8 10.08 100.00% 0.00 0.00% 4.80 10.08 100.00% 0.00 0.00 0.00%
06.05.01.05.02.03 EXCAVACION DE ZANJA m3 1.92 34.92 67.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.92 67.05 100.00%
06.05.01.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.40 8.15 19.56 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.40 19.56 100.00%
06.05.01.05.02.05 CONCRETO F'C= 175 KG/CM2 m3 0.64 384.28 245.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.64 245.94 100.00%
06.05.01.05.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 12.80 48.31 618.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.80 618.37 100.00%
06.05.01.05.02.07 TARRAJEO CON IMPERMEABILIZANTE m2 12.80 29.19 373.63 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.80 373.63 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.05.01.05.02.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 5.12 28.40 145.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.12 145.41 100.00%
06.05.01.05.02.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 1.00 512.25 512.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 512.25 100.00%
06.05.01.05.02.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 8.00 213.49 1,707.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 1,707.92 100.00%
06.05.01.05.02.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.13 72.62 9.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.13 9.44 100.00%
06.05.01.05.03 VALVULA DE PURGA 3,933.12 23.41 0.00 23.41 0.60% 0.00 3,909.71
06.05.01.05.03.01 LIMPIEZA DE TERRENO MANUAL m2 8.64 0.61 5.27 8.6 5.27 100.00% 0.00 0.00% 8.64 5.27 100.00% 0.00 0.00 0.00%
06.05.01.05.03.02 TRAZO Y REPLANTEO PRELIMINAR m2 8.64 2.10 18.14 8.6 18.14 100.00% 0.00 0.00% 8.64 18.14 100.00% 0.00 0.00 0.00%
06.05.01.05.03.03 EXCAVACION DE ZANJA m3 6.05 34.92 211.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.05 211.27 100.00%
06.05.01.05.03.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 7.56 8.15 61.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.56 61.61 100.00%
06.05.01.05.03.05 CONCRETO F'C= 175 KG/CM2 m3 0.91 384.28 349.69 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.91 349.69 100.00%
06.05.01.05.03.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 18.00 48.31 869.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 869.58 100.00%
06.05.01.05.03.07 TARRAJEO CON IMPERMEABILIZANTE m2 16.80 29.19 490.39 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.80 490.39 100.00%
06.05.01.05.03.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 6.72 28.40 190.85 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.72 190.85 100.00%
06.05.01.05.03.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES E GLB 2.00 224.06 448.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 448.12 100.00%
06.05.01.05.03.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 6.00 213.49 1,280.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 1,280.94 100.00%
06.05.01.05.03.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.10 72.62 7.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.10 7.26 100.00%
06.05.01.05.04 CAMARA ROMPE PRESION T - VII 7,777.10 29.95 0.00 29.95 0.39% 0.00 7,747.15
06.05.01.05.04.01 LIMPIEZA DE TERRENO MANUAL m2 11.05 0.61 6.74 11.1 6.74 100.00% 0.00 0.00% 11.05 6.74 100.00% 0.00 0.00 0.00%
06.05.01.05.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 11.05 2.10 23.21 11.1 23.21 100.00% 0.00 0.00% 11.05 23.21 100.00% 0.00 0.00 0.00%
06.05.01.05.04.03 EXCAVACION DE ZANJA m3 9.96 34.92 347.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.96 347.80 100.00%
06.05.01.05.04.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 12.45 8.15 101.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.45 101.47 100.00%
06.05.01.05.04.05 CONCRETO F'C= 175 KG/CM2 m3 3.04 384.28 1,168.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.04 1,168.21 100.00%
06.05.01.05.04.06 ACERO FY=4200 KG/CM2 kg 101.06 6.66 673.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 101.06 673.06 100.00%
06.05.01.05.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 45.03 48.31 2,175.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 45.03 2,175.40 100.00%
06.05.01.05.04.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 16.45 46.31 761.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.45 761.80 100.00%
06.05.01.05.04.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C GLB 5.00 205.99 1,029.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 1,029.95 100.00%
06.05.01.05.04.10 TAPA METALICA Y MARCO DE 0.60x0.60m y 0.30x0.30m e=1/8" ENund 5.00 278.02 1,390.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 1,390.10 100.00%
06.05.01.05.04.11 PINTURA EN TAPAS METALICAS m2 4.50 22.08 99.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.50 99.36 100.00%
06.05.01.06 CONEXIONES DOMICILIARIAS 6,821.86 729.69 0.00 729.69 10.70% 0.00 6,092.17
06.05.01.06.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 90.87 8.03 729.69 90.9 729.69 100.00% 0.00 0.00% 90.87 729.69 100.00% 0.00 0.00 0.00%
06.05.01.06.02 EXCAVACION MANUAL DE ZANJA EN TERRENO CONGLOMERAD m3 45.44 23.12 1,050.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 45.44 1,050.57 100.00%
06.05.01.06.03 REFINE Y NIVELACION DE ZANJA m 151.45 4.08 617.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 151.45 617.92 100.00%
06.05.01.06.04 CAMA DE APOYO E=10CM. m 151.45 1.66 251.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 151.45 251.41 100.00%
06.05.01.06.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCI m3 39.98 23.80 951.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.98 951.52 100.00%
06.05.01.06.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 10.00 57.17 571.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 571.70 100.00%
06.05.01.06.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 10.00 8.15 81.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 81.50 100.00%
06.05.01.06.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" m 151.45 3.46 524.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 151.45 524.02 100.00%
06.05.01.06.09 CONEXIÓN DOMICILIARIA INC. CAJA DE AGUA POTABLE MATRIZ Ø und 14.00 136.23 1,907.22 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 1,907.22 100.00%
06.05.01.06.10 PRUEBA HIDRAULICA EN TUBERIA INSTALADA m 151.45 0.90 136.31 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 151.45 136.31 100.00%
06.05.02 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO DOMICILIARIAS 126,265.73 704.26 12,154.20 10.18% 12,858.46 10.18% 0.00 113,407.27
06.05.02.01 CONSTRUCCION DE CASETA DE BAÑO 84,531.04 541.41 7,644.70 8,186.11 9.68% 0.00 76,344.93
06.05.02.01.01 OBRAS PROVISIONALES 3,518.51 0.00 0.00 0.00 0.00% 0.00 3,518.51
06.05.02.01.01.01 LETRINAS DE HOYO SECO VENTILADO (PARA PERSONAL OBRERO) 1,904.75 0.00 0.00 0.00 0.00% 0.00 1,904.75
06.05.02.01.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.38 0.61 2.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.38 2.06 100.00%
06.05.02.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.38 2.10 7.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.38 7.10 100.00%
06.05.02.01.01.01.03 EXCAVACION DE ZANJA m3 6.42 34.92 224.19 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.42 224.19 100.00%
06.05.02.01.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.03 8.15 65.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.03 65.44 100.00%
06.05.02.01.01.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.24 48.31 301.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.24 301.45 100.00%
06.05.02.01.01.01.06 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.94 364.59 342.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.94 342.71 100.00%
06.05.02.01.01.01.07 ACERO FY=4200 KG/CM2 kg 18.14 6.66 120.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.14 120.81 100.00%
06.05.02.01.01.01.08 CONCRETO F'C= 175 KG/CM2 m3 0.17 384.28 65.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.17 65.33 100.00%
06.05.02.01.01.01.09 CASETA PARA LETRINAS INC. PUERTA DE CALAMINA und 2.00 346.09 692.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 692.18 100.00%
06.05.02.01.01.01.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 83.48 100.00%
06.05.02.01.01.02 DUCHAS O VESTUARIOS (PARA PERSONAL OBRERO) 1,335.92 0.00 0.00 0.00 0.00% 0.00 1,335.92
06.05.02.01.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 4.00 0.61 2.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2.44 100.00%
06.05.02.01.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.10 8.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 8.40 100.00%
06.05.02.01.01.02.03 EXCAVACION DE ZANJA m3 2.04 34.92 71.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.04 71.24 100.00%
06.05.02.01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.55 8.15 20.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.55 20.78 100.00%
06.05.02.01.01.02.05 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 2.00 72.62 145.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 145.24 100.00%
06.05.02.01.01.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.40 48.31 115.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.40 115.94 100.00%
06.05.02.01.01.02.07 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.27 364.59 98.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.27 98.44 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.05.02.01.01.02.08 CASETA PARA DUCHAS INC. PUERTA DE CALAMINA m2 2.00 346.09 692.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 692.18 100.00%
06.05.02.01.01.02.09 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 2.00 48.89 97.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 97.78 100.00%
06.05.02.01.01.02.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 83.48 100.00%
06.05.02.01.01.03 LAVADERO DE GRANITO (PARA PERSONAL OBRERO) 277.84 0.00 0.00 0.00 0.00% 0.00 277.84
06.05.02.01.01.03.01 SUMINISTRO E INSTALACIÓN DE LAVADERO DE GRANITO und 2.00 138.92 277.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 277.84 100.00%
06.05.02.01.02 TRABAJOS PRELIMINARES 291.95 291.95 0.00 291.95 100.00% 0.00 0.00
06.05.02.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 107.73 0.61 65.72 107.7 65.72 100.00% 0.00 0.00% 107.73 65.72 100.00% 0.00 0.00 0.00%
06.05.02.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 107.73 2.10 226.23 107.7 226.23 100.00% 0.00 0.00% 107.73 226.23 100.00% 0.00 0.00 0.00%
06.05.02.01.03 MOVIMIENTO DE TIERRAS 2,260.68 0.00 263.30 263.30 11.65% 0.00 1,997.38
06.05.02.01.03.01 EXCAVACION DE TERRENO NORMAL m3 26.39 34.92 921.54 0.0 0.00 0.00% 7.54 263.30 28.57% 7.54 263.30 28.57% 18.85 658.24 71.43%
06.05.02.01.03.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 32.99 8.15 268.87 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 32.99 268.87 100.00%
06.05.02.01.03.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 11.20 95.56 1,070.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.20 1,070.27 100.00%
06.05.02.01.04 OBRAS DE CONCRETO SIMPLE 14,390.81 0.00 2,247.56 2,247.56 15.62% 0.00 12,143.25
06.05.02.01.04.01 CIMIENTOS CORRIDOS 3,346.02 0.00 956.00 956.00 28.57% 0.00 2,390.02
06.05.02.01.04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 14.42 232.04 3,346.02 0.0 0.00 0.00% 4.12 956.00 28.57% 4.12 956.00 28.57% 10.30 2,390.02 71.43%
06.05.02.01.04.02 SOBRECIMIENTOS 4,517.28 0.00 1,291.56 1,291.56 28.59% 0.00 3,225.72
06.05.02.01.04.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 66.08 44.52 2,941.88 0.0 0.00 0.00% 18.88 840.54 28.57% 18.88 840.54 28.57% 47.20 2,101.34 71.43%
06.05.02.01.04.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 4.96 317.62 1,575.40 0.0 0.00 0.00% 1.42 451.02 28.63% 1.42 451.02 28.63% 3.54 1,124.38 71.37%
06.05.02.01.04.03 PISO INTERIOR 1,387.35 0.00 0.00 0.00 0.00% 0.00 1,387.35
06.05.02.01.04.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO C m2 30.94 44.84 1,387.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.94 1,387.35 100.00%
06.05.02.01.04.04 SARDINEL DE DUCHA 269.30 0.00 0.00 0.00 0.00% 0.00 269.30
06.05.02.01.04.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 4.62 48.31 223.19 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.62 223.19 100.00%
06.05.02.01.04.04.02 CONCRETO F'C= 175 KG/CM2 m3 0.12 384.28 46.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.12 46.11 100.00%
06.05.02.01.04.05 VEREDA PERIMETRAL 4,870.86 0.00 0.00 0.00 0.00% 0.00 4,870.86
06.05.02.01.04.05.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 15.54 42.84 665.73 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.54 665.73 100.00%
06.05.02.01.04.05.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑAD m2 63.63 44.84 2,853.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 63.63 2,853.17 100.00%
06.05.02.01.04.05.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 3.71 364.41 1,351.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.71 1,351.96 100.00%
06.05.02.01.05 OBRAS DE CONCRETO ARMADO 13,389.82 0.00 2,709.00 2,709.00 20.23% 0.00 10,680.82
06.05.02.01.05.01 COLUMNAS 9,481.55 0.00 2,709.00 2,709.00 28.57% 0.00 6,772.55
06.05.02.01.05.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 4.20 384.28 1,613.98 0.0 0.00 0.00% 1.20 461.14 28.57% 1.20 461.14 28.57% 3.00 1,152.84 71.43%
06.05.02.01.05.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 89.60 45.29 4,057.98 0.0 0.00 0.00% 25.60 1,159.42 28.57% 25.60 1,159.42 28.57% 64.00 2,898.56 71.43%
06.05.02.01.05.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 572.01 6.66 3,809.59 0.0 0.00 0.00% 163.43 1,088.44 28.57% 163.43 1,088.44 28.57% 408.58 2,721.15 71.43%
06.05.02.01.05.02 VIGAS 3,908.27 0.00 0.00 0.00 0.00% 0.00 3,908.27
06.05.02.01.05.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 2.39 384.28 918.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.39 918.43 100.00%
06.05.02.01.05.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 43.89 50.83 2,230.93 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 43.89 2,230.93 100.00%
06.05.02.01.05.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 113.95 6.66 758.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 113.95 758.91 100.00%
06.05.02.01.06 MUROS DE LADRILLO 8,486.21 0.00 2,424.84 2,424.84 28.57% 0.00 6,061.37
06.05.02.01.06.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS m2 116.89 72.60 8,486.21 0.0 0.00 0.00% 33.40 2,424.84 28.57% 33.40 2,424.84 28.57% 83.49 6,061.37 71.43%
06.05.02.01.07 REVOQUES Y ENLUCIDOS 8,908.28 0.00 0.00 0.00 0.00% 0.00 8,908.28
06.05.02.01.07.01 ZÓCALO: TARRAJEADO Y PULIDO CON IMPERMEABILIZANTE / m2 89.60 38.45 3,445.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 89.60 3,445.12 100.00%
06.05.02.01.07.02 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 79.94 20.82 1,664.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 79.94 1,664.35 100.00%
06.05.02.01.07.03 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS m2 100.03 24.59 2,459.74 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 100.03 2,459.74 100.00%
06.05.02.01.07.04 BRUÑA DE 1 CM m 94.50 14.17 1,339.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 94.50 1,339.07 100.00%
06.05.02.01.08 PINTURA 2,175.64 0.00 0.00 0.00 0.00% 0.00 2,175.64
06.05.02.01.08.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 79.94 11.37 908.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 79.94 908.92 100.00%
06.05.02.01.08.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUI m2 91.00 13.92 1,266.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 91.00 1,266.72 100.00%
06.05.02.01.09 COBERTURA LIVIANA PARA TECHO 5,500.10 0.00 0.00 0.00 0.00% 0.00 5,500.10
06.05.02.01.09.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 42.00 38.28 1,607.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 42.00 1,607.76 100.00%
06.05.02.01.09.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 3.00 und 56.00 25.91 1,450.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.00 1,450.96 100.00%
06.05.02.01.09.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.3 m2 100.80 24.22 2,441.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 100.80 2,441.38 100.00%
06.05.02.01.10 CARPINTERIA DE MADERA 5,543.86 0.00 0.00 0.00 0.00% 0.00 5,543.86
06.05.02.01.10.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/T und 14.00 304.49 4,262.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 4,262.86 100.00%
06.05.02.01.10.02 SUMIN. E INSTAL. DE VENTANA DE MADERA SEGUN DISEÑO und 14.00 91.50 1,281.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 1,281.00 100.00%
06.05.02.01.11 INSTALACIONES SANITARIAS 13,668.58 249.46 0.00 249.46 1.83% 0.00 13,419.12
06.05.02.01.11.01 TRABAJOS PRELIMINARES 249.46 249.46 0.00 249.46 100.00% 0.00 0.00
06.05.02.01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 92.05 0.61 56.15 92.1 56.15 100.00% 0.00 0.00% 92.05 56.15 100.00% 0.00 0.00 0.00%
06.05.02.01.11.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 92.05 2.10 193.31 92.1 193.31 100.00% 0.00 0.00% 92.05 193.31 100.00% 0.00 0.00 0.00%
06.05.02.01.11.02 MOVIMIENTO DE TIERRAS 3,277.90 0.00 0.00 0.00 0.00% 0.00 3,277.90
06.05.02.01.11.02.01 EXCAVACION DE TERRENO NORMAL m3 45.55 34.92 1,590.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 45.55 1,590.61 100.00%
06.05.02.01.11.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 40.37 40.54 1,636.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.37 1,636.60 100.00%
06.05.02.01.11.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 6.22 8.15 50.69 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.22 50.69 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.05.02.01.11.03 TUBERIAS Y ACCESORIOS 4,734.91 0.00 0.00 0.00 0.00% 0.00 4,734.91
06.05.02.01.11.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 42.00 23.00 966.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 42.00 966.00 100.00%
06.05.02.01.11.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + A und 14.00 63.39 887.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 887.46 100.00%
06.05.02.01.11.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 63.00 5.14 323.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 63.00 323.82 100.00%
06.05.02.01.11.03.04 TUBERIA PVC SAL Ø 2" m 137.20 7.99 1,096.23 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 137.20 1,096.23 100.00%
06.05.02.01.11.03.05 TUBERIA PVC SAL Ø 4" m 114.80 12.73 1,461.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 114.80 1,461.40 100.00%
06.05.02.01.11.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 5,406.31 0.00 0.00 0.00 0.00% 0.00 5,406.31
06.05.02.01.11.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 29.61 48.31 1,430.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.61 1,430.46 100.00%
06.05.02.01.11.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 2.74 265.70 728.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.74 728.02 100.00%
06.05.02.01.11.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 20.16 32.70 659.23 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.16 659.23 100.00%
06.05.02.01.11.04.04 SALIDA DE DESAGUE PVC-SAL 2" pto 28.00 41.74 1,168.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 1,168.72 100.00%
06.05.02.01.11.04.05 SALIDA DE DESAGUE PVC-SAL 4" pto 14.00 42.49 594.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 594.86 100.00%
06.05.02.01.11.04.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 14.00 58.93 825.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 825.02 100.00%
06.05.02.01.12 APARATOS Y ACCESORIOS SANITARIOS 3,803.24 0.00 0.00 0.00 0.00% 0.00 3,803.24
06.05.02.01.12.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0. und 14.00 148.78 2,082.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 2,082.92 100.00%
06.05.02.01.12.02 SUMINISTRO E INSTALACION DE LAVATORIO und 14.00 73.99 1,035.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 1,035.86 100.00%
06.05.02.01.12.03 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 14.00 48.89 684.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 684.46 100.00%
06.05.02.01.13 INSTALACIONES ELECTRICAS 2,593.36 0.00 0.00 0.00 0.00% 0.00 2,593.36
06.05.02.01.13.01 SALIDA PARA INTERRUPTOR DOBLE und 14.00 22.42 313.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 313.88 100.00%
06.05.02.01.13.02 SALIDA PARA CENTRO DE LUZ und 28.00 65.44 1,832.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 28.00 1,832.32 100.00%
06.05.02.01.13.03 SALIDA PARA TOMACORRIENTES und 14.00 31.94 447.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 447.16 100.00%
06.05.02.02 INSTALACION DE BIODIGESTOR DE 600 LTS O 700 LTS 21,688.26 71.60 0.00 71.60 0.33% 0.00 21,616.66
06.05.02.02.01 TRABAJOS PRELIMINARES 71.60 71.60 0.00 71.60 100.00% 0.00 0.00
06.05.02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 26.42 0.61 16.12 26.4 16.12 100.00% 0.00 0.00% 26.42 16.12 100.00% 0.00 0.00 0.00%
06.05.02.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 26.42 2.10 55.48 26.4 55.48 100.00% 0.00 0.00% 26.42 55.48 100.00% 0.00 0.00 0.00%
06.05.02.02.02 MOVIMIENTO DE TIERRAS 2,055.16 0.00 0.00 0.00 0.00% 0.00 2,055.16
06.05.02.02.02.01 EXCAVACION DE TERRENO NORMAL m3 37.62 34.92 1,313.69 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.62 1,313.69 100.00%
06.05.02.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 17.28 30.92 534.30 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.28 534.30 100.00%
06.05.02.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 25.42 8.15 207.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.42 207.17 100.00%
06.05.02.02.03 OBRAS DE CONCRETO SIMPLE 107.60 0.00 0.00 0.00 0.00% 0.00 107.60
06.05.02.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 0.28 384.28 107.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.28 107.60 100.00%
06.05.02.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 5,062.32 0.00 0.00 0.00 0.00% 0.00 5,062.32
06.05.02.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 46.48 48.31 2,245.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 46.48 2,245.45 100.00%
06.05.02.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODO m3 4.56 364.74 1,663.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.56 1,663.21 100.00%
06.05.02.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 35.28 32.70 1,153.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 35.28 1,153.66 100.00%
06.05.02.02.05 BIODIGESTOR DE 600 O 700 Lts. 14,391.58 0.00 0.00 0.00 0.00% 0.00 14,391.58
06.05.02.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 Lts und 14.00 1,027.97 14,391.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 14,391.58 100.00%
06.05.02.03 CONSTRUCCIÓN DE POZO PERCOLADOR 20,046.43 91.25 4,509.50 4,600.75 22.95% 0.00 15,445.68
06.05.02.03.01 TRABAJOS PRELIMINARES 91.25 91.25 0.00 91.25 100.00% 0.00 0.00
06.05.02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 33.67 0.61 20.54 33.7 20.54 100.00% 0.00 0.00% 33.67 20.54 100.00% 0.00 0.00 0.00%
06.05.02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 33.67 2.10 70.71 33.7 70.71 100.00% 0.00 0.00% 33.67 70.71 100.00% 0.00 0.00 0.00%
06.05.02.03.02 MOVIMIENTO DE TIERRAS 4,435.14 0.00 734.72 734.72 16.57% 0.00 3,700.42
06.05.02.03.02.01 EXCAVACION DE TERRENO NORMAL m3 73.62 34.92 2,570.81 0.0 0.00 0.00% 21.04 734.72 28.58% 21.04 734.72 28.58% 52.58 1,836.09 71.42%
06.05.02.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 92.05 8.15 750.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 92.05 750.21 100.00%
06.05.02.03.02.03 RELLENO CON GRAVA 1" m3 11.61 64.85 752.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.61 752.91 100.00%
06.05.02.03.02.04 FILTRO DE GRAVA Ø 1" m3 5.57 64.85 361.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.57 361.21 100.00%
06.05.02.03.03 OBRAS DE CONCRETO SIMPLE 3,829.97 0.00 1,094.35 1,094.35 28.57% 0.00 2,735.62
06.05.02.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 19.70 48.31 951.71 0.0 0.00 0.00% 5.63 271.99 28.58% 5.63 271.99 28.58% 14.07 679.72 71.42%
06.05.02.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 7.49 384.28 2,878.26 0.0 0.00 0.00% 2.14 822.36 28.57% 2.14 822.36 28.57% 5.35 2,055.90 71.43%
06.05.02.03.04 OBRAS DE CONCRETO ARMADO 2,309.94 0.00 0.00 0.00 0.00% 0.00 2,309.94
06.05.02.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 2.64 384.28 1,014.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.64 1,014.50 100.00%
06.05.02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.82 48.31 329.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.82 329.47 100.00%
06.05.02.03.04.03 ACERO FY=4200 KG/CM2 kg 145.04 6.66 965.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 145.04 965.97 100.00%
06.05.02.03.05 MUROS DE LADRILLO 9,380.13 0.00 2,680.43 2,680.43 28.58% 0.00 6,699.70
06.05.02.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 m2 102.92 91.14 9,380.13 0.0 0.00 0.00% 29.41 2,680.43 28.58% 29.41 2,680.43 28.58% 73.51 6,699.70 71.42%
06.05.03 ESTUDIOS COMPLEMENTARIOS 1,710.00 0.00 0.00 0.00% 0.00 0.00% 0.00 1,710.00
06.05.03.01 DISEÑO DE MEZCLA und 3.00 450.00 1,350.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 1,350.00 100.00%
06.05.03.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIO und 9.00 40.00 360.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 360.00 100.00%
06.05.04 FLETE 17,877.50 0.00 5,363.25 30.00% 5,363.25 30.00% 0.00 12,514.25
06.05.04.01 FLETE TERRESTRE Y ACARREO PANTIPATA - B GLB 1.00 17,877.50 17,877.50 0.0 0.00 0.00% 0.30 5,363.25 30.00% 0.30 5,363.25 30.00% 0.70 12,514.25 70.00%
06.05.05 PROGRAMA DE MITIGACION E IMPACTO AMBIENTAL 3,328.08 0.00 52.12 1.57% 52.12 1.57% 0.00 3,275.96
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.05.05.01 PROGRAMA DE PREVENCION DE MITIGACION 577.56 0.00 52.12 52.12 9.02% 0.00 525.44
06.05.05.01.01 CARTELES PERMANENTES und 4.00 63.56 254.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 254.24 100.00%
06.05.05.01.02 CARTELES TEMPORALES und 4.00 67.80 271.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 271.20 100.00%
06.05.05.01.03 CINTAS DE SEÑAL DE TRABAJO rll 1.00 52.12 52.12 0.0 0.00 0.00% 1.00 52.12 100.00% 1.00 52.12 100.00% 0.00 0.00 0.00%
06.05.05.02 PROGRAMA DE ABANDONO DE OBRA 2,750.52 0.00 0.00 0.00 0.00% 0.00 2,750.52
06.05.05.02.01 REACONDICIONAMIENTO DE AREA OCUPADA (CAMPAMENTO Y m2 600.00 3.22 1,932.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 600.00 1,932.00 100.00%
06.05.05.02.02 REACONDICIONAMIENTO DE CANTERAS Y ACCESOS HA 0.50 157.27 78.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.50 78.64 100.00%
06.05.05.02.03 REFORESTACION EN CAPTACIONES Y RESERVORIO m2 26.50 27.92 739.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.50 739.88 100.00%
06.05.06 ADECUADO CONOCIMIENTO DE EDUCACION SANITARIA 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 4,000.00
06.05.06.01 CAPACITACION ANTES DE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2,000.00 100.00%
06.05.06.02 CAPACITACION DURANTE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2,000.00 100.00%
06.05.07 EFICIENTE GESTION TECNICA Y ADMINISTRATIVA DE LOS SERVICIOS DE AGUA Y SANEAMIENTO 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 4,000.00
06.05.07.01 PROGRAMA DE FORTALECIMIENTO DE CAPACIDADES PARA LA P und 4.00 1,000.00 4,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 4,000.00 100.00%
06.06 LOCALIDAD DE TIVAYO 628,788.00 15,328.12 32,375.53 7.59% 47,703.65 7.59% 0.00 581,084.35
06.06.01 SISTEMA DE AGUA POTABLE 233,652.19 13,366.25 0.00 5.72% 13,366.25 5.72% 0.00 220,285.94
06.06.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
06.06.01.01.01 OBRAS PROVISIONALES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
06.06.01.01.01.01 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 1,760.72 1,760.72 1.0 1,760.72 100.00% 0.00 0.00% 1.00 1,760.72 100.00% 0.00 0.00 0.00%
06.06.01.01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 797.66 797.66 1.0 797.66 100.00% 0.00 0.00% 1.00 797.66 100.00% 0.00 0.00 0.00%
06.06.01.02 LINEA DE CONDUCCION 114,195.75 2,567.89 0.00 2,567.89 2.25% 0.00 111,627.86
06.06.01.02.01 TENDIDO DE TUBERIA PVC SAP 107,460.57 2,560.95 0.00 2,560.95 2.38% 0.00 104,899.62
06.06.01.02.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 1,219.50 2.10 2,560.95 1,219.5 2,560.95 100.00% 0.00 0.00% 1,219.50 2,560.95 100.00% 0.00 0.00 0.00%
06.06.01.02.01.02 EXCAVACION MANUAL DE ZANJA DE TERRENO CONGLOMER m3 711.38 34.92 24,841.39 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 711.38 24,841.39 100.00%
06.06.01.02.01.03 REFINE Y NIVELACION DE ZANJA m 2,032.50 4.08 8,292.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,032.50 8,292.60 100.00%
06.06.01.02.01.04 CAMA DE APOYO E=10CM. m 2,032.50 1.66 3,373.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,032.50 3,373.95 100.00%
06.06.01.02.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELEC m3 341.46 23.80 8,126.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 341.46 8,126.75 100.00%
06.06.01.02.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 512.19 57.17 29,281.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 512.19 29,281.90 100.00%
06.06.01.02.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 512.19 8.15 4,174.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 512.19 4,174.35 100.00%
06.06.01.02.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1m 2,032.50 12.29 24,979.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,032.50 24,979.43 100.00%
06.06.01.02.01.09 PRUEBA HIDRAULICA DE LA LINEA DE CONDUCCION m 2,032.50 0.90 1,829.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,032.50 1,829.25 100.00%
06.06.01.02.02 CAMARA ROMPE PRESION T - VI 6,735.18 6.94 0.00 6.94 0.10% 0.00 6,728.24
06.06.01.02.02.01 LIMPIEZA DE TERRENO MANUAL m2 2.56 0.61 1.56 2.6 1.56 100.00% 0.00 0.00% 2.56 1.56 100.00% 0.00 0.00 0.00%
06.06.01.02.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.56 2.10 5.38 2.6 5.38 100.00% 0.00 0.00% 2.56 5.38 100.00% 0.00 0.00 0.00%
06.06.01.02.02.03 EXCAVACION DE ZANJA m3 2.56 34.92 89.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.56 89.40 100.00%
06.06.01.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 12.80 8.15 104.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.80 104.32 100.00%
06.06.01.02.02.05 CONCRETO F'C= 175 KG/CM2 m3 1.52 384.28 584.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.52 584.11 100.00%
06.06.01.02.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 25.20 48.31 1,217.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.20 1,217.41 100.00%
06.06.01.02.02.07 ACERO FY=4200 KG/CM2 kg 174.84 6.66 1,164.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 174.84 1,164.43 100.00%
06.06.01.02.02.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 25.20 46.31 1,167.01 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.20 1,167.01 100.00%
06.06.01.02.02.09 TARRAJEO EN INTERIORES Y EXTERIORES m2 25.20 28.40 715.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.20 715.68 100.00%
06.06.01.02.02.10 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C GLB 4.00 187.57 750.28 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 750.28 100.00%
06.06.01.02.02.11 TAPA METALICA Y MARCO DE 0.60x0.60 m e=1/8" EN C.R.P. TIPOund 4.00 213.02 852.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 852.08 100.00%
06.06.01.02.02.12 PINTADO DE MURO EXTERIOR C/LATEX ACRILICO (SUPERLAT m2 14.40 5.80 83.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.40 83.52 100.00%
06.06.01.03 RESERVORIO (7 M3) 21,166.47 86.66 0.00 86.66 0.41% 0.00 21,079.81
06.06.01.03.01 RESERVORIO 17,091.17 59.25 0.00 59.25 0.35% 0.00 17,031.92
06.06.01.03.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 13.05 2.44 31.84 13.1 31.84 100.00% 0.00 0.00% 13.05 31.84 100.00% 0.00 0.00 0.00%
06.06.01.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
06.06.01.03.01.03 EXCAVACION EN TERRENO NORMAL RESERVORIO m3 6.53 34.92 228.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.53 228.03 100.00%
06.06.01.03.01.04 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 8.16 14.23 116.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.16 116.12 100.00%
06.06.01.03.01.05 SOLADO C:H 1:8 (h= 0.10 m) m2 1.13 189.58 214.23 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.13 214.23 100.00%
06.06.01.03.01.06 CONCRETO F'C= 210 KG/CM2 EN RESERVORIO m3 6.38 413.58 2,638.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.38 2,638.64 100.00%
06.06.01.03.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 55.40 48.31 2,676.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.40 2,676.37 100.00%
06.06.01.03.01.08 ACERO FY=4200 KG/CM2 kg 244.14 6.66 1,625.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 244.14 1,625.97 100.00%
06.06.01.03.01.09 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 71.79 27.86 2,000.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 2,000.07 100.00%
06.06.01.03.01.10 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 71.79 20.00 1,435.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 1,435.80 100.00%
06.06.01.03.01.11 TAPA SANITARIA METALICA DE 0.60x0.60 mts und 2.00 197.60 395.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 395.20 100.00%
06.06.01.03.01.12 INSTALACION DE ACCESORIOS TUB. VENTILACION 2" und 2.00 118.31 236.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 236.62 100.00%
06.06.01.03.01.13 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS und 1.00 496.89 496.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 496.89 100.00%
06.06.01.03.01.14 INSTALACION DE ACCESORIOS EN RESERVORIO und 2.00 872.43 1,744.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1,744.86 100.00%
06.06.01.03.01.15 PINTADO DE MURO EXTERIOR m2 71.79 15.54 1,115.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 1,115.62 100.00%
06.06.01.03.01.16 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 75.00 28.10 2,107.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.00 2,107.50 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.06.01.03.02 CASETA DE CLORACION POR GOTEO 4,075.30 27.41 0.00 27.41 0.67% 0.00 4,047.89
06.06.01.03.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
06.06.01.03.02.02 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS m2 11.54 71.15 821.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.54 821.07 100.00%
06.06.01.03.02.03 TARRAJEO EN INTERIORES Y EXTERIORES m2 20.50 28.40 582.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.50 582.20 100.00%
06.06.01.03.02.04 REJILLA METALICA SEGUN DISEÑO INC. COLOCADO und 1.00 421.12 421.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 421.12 100.00%
06.06.01.03.02.05 COBERTURA DE CALAMINA EN CASETA DE CLORACION m2 4.00 58.15 232.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 232.60 100.00%
06.06.01.03.02.06 INSTALACION DE PUERTA METÁLICA (SEGÚN DISEÑO) und 1.00 257.57 257.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 257.57 100.00%
06.06.01.03.02.07 INSTALACION DE ACCESORIOS EN CASETA DE CLORACION und 1.00 1,557.57 1,557.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,557.57 100.00%
06.06.01.03.02.08 PINTADO DE MURO EXTERIOR m2 11.31 15.54 175.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 175.76 100.00%
06.06.01.04 LINEA DE ADUCCION Y RED DE DISTRIBUCION 77,964.85 6,304.49 0.00 6,304.49 8.09% 0.00 71,660.36
06.06.01.04.01 TENDIDO DE TUBERIA DE ADUCCION Y DISTRIBUCION PVC SAP 71,373.01 6,278.01 0.00 6,278.01 8.80% 0.00 65,095.00
06.06.01.04.01.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 781.82 8.03 6,278.01 781.8 6,278.01 100.00% 0.00 0.00% 781.82 6,278.01 100.00% 0.00 0.00 0.00%
06.06.01.04.01.02 EXCAVACION MANUAL ZANJA EN TERRENO CONGLOMERADO m3 456.06 58.58 26,715.99 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 456.06 26,715.99 100.00%
06.06.01.04.01.03 REFINE Y NIVELACION DE ZANJA m 1,303.03 2.04 2,658.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,303.03 2,658.18 100.00%
06.06.01.04.01.04 CAMA DE APOYO E=10CM. m 1,303.03 1.66 2,163.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,303.03 2,163.03 100.00%
06.06.01.04.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELEC m3 218.91 23.80 5,210.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 218.91 5,210.06 100.00%
06.06.01.04.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 328.36 57.17 18,772.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 328.36 18,772.34 100.00%
06.06.01.04.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 328.36 8.15 2,676.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 328.36 2,676.13 100.00%
06.06.01.04.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-7.5 Ø 1 1m 35.34 12.29 434.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 35.34 434.33 100.00%
06.06.01.04.01.09 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 756.26 4.30 3,251.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 756.26 3,251.92 100.00%
06.06.01.04.01.10 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 3/4 m 510.83 3.79 1,936.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 510.83 1,936.05 100.00%
06.06.01.04.01.11 PRUEBA HIDRAULICA m 1,303.03 0.98 1,276.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,303.03 1,276.97 100.00%
06.06.01.04.02 VALVULA DE CONTROL 2,487.46 4.88 0.00 4.88 0.20% 0.00 2,482.58
06.06.01.04.02.01 LIMPIEZA DE TERRENO MANUAL m2 1.80 0.61 1.10 1.8 1.10 100.00% 0.00 0.00% 1.80 1.10 100.00% 0.00 0.00 0.00%
06.06.01.04.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 1.80 2.10 3.78 1.8 3.78 100.00% 0.00 0.00% 1.80 3.78 100.00% 0.00 0.00 0.00%
06.06.01.04.02.03 EXCAVACION DE ZANJA m3 0.72 34.92 25.14 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.72 25.14 100.00%
06.06.01.04.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 0.90 8.15 7.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.90 7.34 100.00%
06.06.01.04.02.05 CONCRETO F'C= 175 KG/CM2 m3 0.40 384.28 153.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.40 153.71 100.00%
06.06.01.04.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 8.00 48.31 386.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 386.48 100.00%
06.06.01.04.02.07 TARRAJEO CON IMPERMEABILIZANTE m2 8.00 29.19 233.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 233.52 100.00%
06.06.01.04.02.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 3.20 28.40 90.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.20 90.88 100.00%
06.06.01.04.02.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 1.00 512.25 512.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 512.25 100.00%
06.06.01.04.02.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 5.00 213.49 1,067.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 1,067.45 100.00%
06.06.01.04.02.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.08 72.62 5.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.08 5.81 100.00%
06.06.01.04.03 VALVULA DE PURGA 2,548.09 15.61 0.00 15.61 0.61% 0.00 2,532.48
06.06.01.04.03.01 LIMPIEZA DE TERRENO MANUAL m2 5.76 0.61 3.51 5.8 3.51 100.00% 0.00 0.00% 5.76 3.51 100.00% 0.00 0.00 0.00%
06.06.01.04.03.02 TRAZO Y REPLANTEO PRELIMINAR m2 5.76 2.10 12.10 5.8 12.10 100.00% 0.00 0.00% 5.76 12.10 100.00% 0.00 0.00 0.00%
06.06.01.04.03.03 EXCAVACION DE ZANJA m3 4.03 34.92 140.73 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.03 140.73 100.00%
06.06.01.04.03.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 5.04 8.15 41.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.04 41.08 100.00%
06.06.01.04.03.05 CONCRETO F'C= 175 KG/CM2 m3 0.61 384.28 234.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.61 234.41 100.00%
06.06.01.04.03.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 12.00 48.31 579.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 579.72 100.00%
06.06.01.04.03.07 TARRAJEO CON IMPERMEABILIZANTE m2 11.20 29.19 326.93 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.20 326.93 100.00%
06.06.01.04.03.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 4.48 28.40 127.23 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.48 127.23 100.00%
06.06.01.04.03.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES E GLB 1.00 224.06 224.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 224.06 100.00%
06.06.01.04.03.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 4.00 213.49 853.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 853.96 100.00%
06.06.01.04.03.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.06 72.62 4.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.06 4.36 100.00%
06.06.01.04.04 CAMARA ROMPE PRESION T - VII 1,556.29 5.99 0.00 5.99 0.38% 0.00 1,550.30
06.06.01.04.04.01 LIMPIEZA DE TERRENO MANUAL m2 2.21 0.61 1.35 2.2 1.35 100.00% 0.00 0.00% 2.21 1.35 100.00% 0.00 0.00 0.00%
06.06.01.04.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 2.21 2.10 4.64 2.2 4.64 100.00% 0.00 0.00% 2.21 4.64 100.00% 0.00 0.00 0.00%
06.06.01.04.04.03 EXCAVACION DE ZANJA m3 1.99 34.92 69.49 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.99 69.49 100.00%
06.06.01.04.04.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.49 8.15 20.29 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.49 20.29 100.00%
06.06.01.04.04.05 CONCRETO F'C= 175 KG/CM2 m3 0.61 384.28 234.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.61 234.41 100.00%
06.06.01.04.04.06 ACERO FY=4200 KG/CM2 kg 20.21 6.66 134.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.21 134.60 100.00%
06.06.01.04.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 9.01 48.31 435.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.01 435.27 100.00%
06.06.01.04.04.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 3.29 46.31 152.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.29 152.36 100.00%
06.06.01.04.04.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C GLB 1.00 205.99 205.99 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 205.99 100.00%
06.06.01.04.04.10 TAPA METALICA Y MARCO DE 0.60x0.60m y 0.30x0.30m e=1/8" ENund 1.00 278.02 278.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 278.02 100.00%
06.06.01.04.04.11 PINTURA EN TAPAS METALICAS m2 0.90 22.08 19.87 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.90 19.87 100.00%
06.06.01.05 CONEXIONES DOMICILIARIAS 17,766.74 1,848.83 0.00 1,848.83 10.41% 0.00 15,917.91
06.06.01.05.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 230.24 8.03 1,848.83 230.2 1,848.83 100.00% 0.00 0.00% 230.24 1,848.83 100.00% 0.00 0.00 0.00%
06.06.01.05.02 EXCAVACION MANUAL DE ZANJA EN TERRENO CONGLOMERAD m3 115.20 23.12 2,663.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 115.20 2,663.42 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.06.01.05.03 REFINE Y NIVELACION DE ZANJA m 383.74 4.08 1,565.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 383.74 1,565.66 100.00%
06.06.01.05.04 CAMA DE APOYO E=10CM. m 383.74 1.66 637.01 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 383.74 637.01 100.00%
06.06.01.05.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCI m3 101.31 23.80 2,411.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 101.31 2,411.18 100.00%
06.06.01.05.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 25.33 57.17 1,448.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.33 1,448.12 100.00%
06.06.01.05.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 25.33 8.15 206.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 25.33 206.44 100.00%
06.06.01.05.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" m 383.74 3.46 1,327.74 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 383.74 1,327.74 100.00%
06.06.01.05.09 CONEXIÓN DOMICILIARIA INC. CAJA DE AGUA POTABLE MATRIZ Ø
und 39.00 136.23 5,312.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 5,312.97 100.00%
06.06.01.05.10 PRUEBA HIDRAULICA EN TUBERIA INSTALADA m 383.74 0.90 345.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 383.74 345.37 100.00%
06.06.02 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO DOMICILIARIAS 344,672.57 1,961.87 25,321.19 7.92% 27,283.06 7.92% 0.00 317,389.51
06.06.02.01 CONSTRUCCION DE CASETA DE BAÑO 228,395.14 1,508.22 11,463.19 12,971.41 100.00% 0.00 215,423.73
06.06.02.01.01 OBRAS PROVISIONALES 3,518.51 0.00 0.00 0.00 0.00% 0.00 3,518.51
06.06.02.01.01.01 LETRINAS DE HOYO SECO VENTILADO (PARA PERSONAL OBRERO) 1,904.75 0.00 0.00 0.00 0.00% 0.00 1,904.75
06.06.02.01.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.38 0.61 2.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.38 2.06 100.00%
06.06.02.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.38 2.10 7.10 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.38 7.10 100.00%
06.06.02.01.01.01.03 EXCAVACION DE ZANJA m3 6.42 34.92 224.19 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.42 224.19 100.00%
06.06.02.01.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.03 8.15 65.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.03 65.44 100.00%
06.06.02.01.01.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.24 48.31 301.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.24 301.45 100.00%
06.06.02.01.01.01.06 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.94 364.59 342.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.94 342.71 100.00%
06.06.02.01.01.01.07 ACERO FY=4200 KG/CM2 kg 18.14 6.66 120.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.14 120.81 100.00%
06.06.02.01.01.01.08 CONCRETO F'C= 175 KG/CM2 m3 0.17 384.28 65.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.17 65.33 100.00%
06.06.02.01.01.01.09 CASETA PARA LETRINAS INC. PUERTA DE CALAMINA und 2.00 346.09 692.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 692.18 100.00%
06.06.02.01.01.01.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 83.48 100.00%
06.06.02.01.01.02 DUCHAS O VESTUARIOS (PARA PERSONAL OBRERO) 1,335.92 0.00 0.00 0.00 0.00% 0.00 1,335.92
06.06.02.01.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 4.00 0.61 2.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2.44 100.00%
06.06.02.01.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.10 8.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 8.40 100.00%
06.06.02.01.01.02.03 EXCAVACION DE ZANJA m3 2.04 34.92 71.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.04 71.24 100.00%
06.06.02.01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.55 8.15 20.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.55 20.78 100.00%
06.06.02.01.01.02.05 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 2.00 72.62 145.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 145.24 100.00%
06.06.02.01.01.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.40 48.31 115.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.40 115.94 100.00%
06.06.02.01.01.02.07 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.27 364.59 98.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.27 98.44 100.00%
06.06.02.01.01.02.08 CASETA PARA DUCHAS INC. PUERTA DE CALAMINA m2 2.00 346.09 692.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 692.18 100.00%
06.06.02.01.01.02.09 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 2.00 48.89 97.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 97.78 100.00%
06.06.02.01.01.02.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 83.48 100.00%
06.06.02.01.01.03 LAVADERO DE GRANITO (PARA PERSONAL OBRERO) 277.84 0.00 0.00 0.00 0.00% 0.00 277.84
06.06.02.01.01.03.01 SUMINISTRO E INSTALACIÓN DE LAVADERO DE GRANITO und 2.00 138.92 277.84 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 277.84 100.00%
06.06.02.01.02 TRABAJOS PRELIMINARES 813.30 813.30 0.00 813.30 100.00% 0.00 0.00
06.06.02.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 300.11 0.61 183.07 300.1 183.07 100.00% 0.00 0.00% 300.11 183.07 100.00% 0.00 0.00 0.00%
06.06.02.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 300.11 2.10 630.23 300.1 630.23 100.00% 0.00 0.00% 300.11 630.23 100.00% 0.00 0.00 0.00%
06.06.02.01.03 MOVIMIENTO DE TIERRAS 6,297.34 0.00 394.95 394.95 6.27% 0.00 5,902.39
06.06.02.01.03.01 EXCAVACION DE TERRENO NORMAL m3 73.51 34.92 2,566.97 0.0 0.00 0.00% 11.31 394.95 15.39% 11.31 394.95 15.39% 62.20 2,172.02 84.61%
06.06.02.01.03.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 91.89 8.15 748.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 91.89 748.90 100.00%
06.06.02.01.03.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 31.20 95.56 2,981.47 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 31.20 2,981.47 100.00%
06.06.02.01.04 OBRAS DE CONCRETO SIMPLE 40,082.98 0.00 3,368.17 3,368.17 8.40% 0.00 36,714.81
06.06.02.01.04.01 CIMIENTOS CORRIDOS 9,321.05 0.00 1,434.01 1,434.01 15.38% 0.00 7,887.04
06.06.02.01.04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 40.17 232.04 9,321.05 0.0 0.00 0.00% 6.18 1,434.01 15.38% 6.18 1,434.01 15.38% 33.99 7,887.04 84.62%
06.06.02.01.04.02 SOBRECIMIENTOS 12,581.57 0.00 1,934.16 1,934.16 15.37% 0.00 10,647.41
06.06.02.01.04.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 184.08 44.52 8,195.24 0.0 0.00 0.00% 28.32 1,260.81 15.38% 28.32 1,260.81 15.38% 155.76 6,934.43 84.62%
06.06.02.01.04.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 13.81 317.62 4,386.33 0.0 0.00 0.00% 2.12 673.35 15.35% 2.12 673.35 15.35% 11.69 3,712.98 84.65%
06.06.02.01.04.03 PISO INTERIOR 3,864.76 0.00 0.00 0.00 0.00% 0.00 3,864.76
06.06.02.01.04.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO C m2 86.19 44.84 3,864.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 86.19 3,864.76 100.00%
06.06.02.01.04.04 SARDINEL DE DUCHA 744.72 0.00 0.00 0.00 0.00% 0.00 744.72
06.06.02.01.04.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 12.87 48.31 621.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.87 621.75 100.00%
06.06.02.01.04.04.02 CONCRETO F'C= 175 KG/CM2 m3 0.32 384.28 122.97 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.32 122.97 100.00%
06.06.02.01.04.05 VEREDA PERIMETRAL 13,570.88 0.00 0.00 0.00 0.00% 0.00 13,570.88
06.06.02.01.04.05.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 43.29 42.84 1,854.54 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 43.29 1,854.54 100.00%
06.06.02.01.04.05.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑAD m2 177.26 44.84 7,948.34 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 177.26 7,948.34 100.00%
06.06.02.01.04.05.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 10.34 364.41 3,768.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.34 3,768.00 100.00%
06.06.02.01.05 OBRAS DE CONCRETO ARMADO 37,304.99 0.00 4,063.54 4,063.54 10.89% 0.00 33,241.45
06.06.02.01.05.01 COLUMNAS 26,412.84 0.00 4,063.54 4,063.54 15.38% 0.00 22,349.30
06.06.02.01.05.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 11.70 384.28 4,496.08 0.0 0.00 0.00% 1.80 691.70 15.38% 1.80 691.70 15.38% 9.90 3,804.38 84.62%
06.06.02.01.05.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 249.60 45.29 11,304.38 0.0 0.00 0.00% 38.40 1,739.14 15.38% 38.40 1,739.14 15.38% 211.20 9,565.24 84.62%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.06.02.01.05.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 1,593.45 6.66 10,612.38 0.0 0.00 0.00% 245.15 1,632.70 15.38% 245.15 1,632.70 15.38% 1,348.30 8,979.68 84.62%
06.06.02.01.05.02 VIGAS 10,892.15 0.00 0.00 0.00 0.00% 0.00 10,892.15
06.06.02.01.05.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 6.67 384.28 2,563.15 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.67 2,563.15 100.00%
06.06.02.01.05.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 122.27 50.83 6,214.98 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 122.27 6,214.98 100.00%
06.06.02.01.05.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 317.42 6.66 2,114.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 317.42 2,114.02 100.00%
06.06.02.01.06 MUROS DE LADRILLO 23,639.29 0.00 3,636.53 3,636.53 15.38% 0.00 20,002.76
06.06.02.01.06.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS m2 325.61 72.60 23,639.29 0.0 0.00 0.00% 50.09 3,636.53 15.38% 50.09 3,636.53 15.38% 275.52 20,002.76 84.62%
06.06.02.01.07 REVOQUES Y ENLUCIDOS 24,816.03 0.00 0.00 0.00 0.00% 0.00 24,816.03
06.06.02.01.07.01 ZÓCALO: TARRAJEADO Y PULIDO CON IMPERMEABILIZANTE / m2 249.60 38.45 9,597.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 249.60 9,597.12 100.00%
06.06.02.01.07.02 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 222.69 20.82 4,636.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 222.69 4,636.41 100.00%
06.06.02.01.07.03 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS m2 278.66 24.59 6,852.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 278.66 6,852.25 100.00%
06.06.02.01.07.04 BRUÑA DE 1 CM m 263.25 14.17 3,730.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 263.25 3,730.25 100.00%
06.06.02.01.08 PINTURA 6,060.71 0.00 0.00 0.00 0.00% 0.00 6,060.71
06.06.02.01.08.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 222.69 11.37 2,531.99 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 222.69 2,531.99 100.00%
06.06.02.01.08.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUI m2 253.50 13.92 3,528.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 253.50 3,528.72 100.00%
06.06.02.01.09 COBERTURA LIVIANA PARA TECHO 15,321.70 0.00 0.00 0.00 0.00% 0.00 15,321.70
06.06.02.01.09.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 117.00 38.28 4,478.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 117.00 4,478.76 100.00%
06.06.02.01.09.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 3.00 und 156.00 25.91 4,041.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 156.00 4,041.96 100.00%
06.06.02.01.09.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.3 m2 280.80 24.22 6,800.98 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 280.80 6,800.98 100.00%
06.06.02.01.10 CARPINTERIA DE MADERA 15,443.61 0.00 0.00 0.00 0.00% 0.00 15,443.61
06.06.02.01.10.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/T und 39.00 304.49 11,875.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 11,875.11 100.00%
06.06.02.01.10.02 SUMIN. E INSTAL. DE VENTANA DE MADERA SEGUN DISEÑO und 39.00 91.50 3,568.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 3,568.50 100.00%
06.06.02.01.11 INSTALACIONES SANITARIAS 37,277.58 694.92 0.00 694.92 1.86% 0.00 36,582.66
06.06.02.01.11.01 TRABAJOS PRELIMINARES 694.92 694.92 0.00 694.92 100.00% 0.00 0.00
06.06.02.01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 256.43 0.61 156.42 256.4 156.42 100.00% 0.00 0.00% 256.43 156.42 100.00% 0.00 0.00 0.00%
06.06.02.01.11.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 256.43 2.10 538.50 256.4 538.50 100.00% 0.00 0.00% 256.43 538.50 100.00% 0.00 0.00 0.00%
06.06.02.01.11.02 MOVIMIENTO DE TIERRAS 9,131.64 0.00 0.00 0.00 0.00% 0.00 9,131.64
06.06.02.01.11.02.01 EXCAVACION DE TERRENO NORMAL m3 126.90 34.92 4,431.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 126.90 4,431.35 100.00%
06.06.02.01.11.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 112.46 40.54 4,559.13 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 112.46 4,559.13 100.00%
06.06.02.01.11.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 17.32 8.15 141.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.32 141.16 100.00%
06.06.02.01.11.03 TUBERIAS Y ACCESORIOS 12,391.11 0.00 0.00 0.00 0.00% 0.00 12,391.11
06.06.02.01.11.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 117.00 23.00 2,691.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 117.00 2,691.00 100.00%
06.06.02.01.11.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + A und 39.00 63.39 2,472.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 2,472.21 100.00%
06.06.02.01.11.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 175.50 5.14 902.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 175.50 902.07 100.00%
06.06.02.01.11.03.04 TUBERIA PVC SAL Ø 2" m 282.20 7.99 2,254.78 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 282.20 2,254.78 100.00%
06.06.02.01.11.03.05 TUBERIA PVC SAL Ø 4" m 319.80 12.73 4,071.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 319.80 4,071.05 100.00%
06.06.02.01.11.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 15,059.91 0.00 0.00 0.00 0.00% 0.00 15,059.91
06.06.02.01.11.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 82.49 48.31 3,985.09 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 82.49 3,985.09 100.00%
06.06.02.01.11.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 7.63 265.70 2,027.29 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.63 2,027.29 100.00%
06.06.02.01.11.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 56.16 32.70 1,836.43 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 56.16 1,836.43 100.00%
06.06.02.01.11.04.04 SALIDA DE DESAGUE PVC-SAL 2" pto 78.00 41.74 3,255.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 78.00 3,255.72 100.00%
06.06.02.01.11.04.05 SALIDA DE DESAGUE PVC-SAL 4" pto 39.00 42.49 1,657.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 1,657.11 100.00%
06.06.02.01.11.04.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 39.00 58.93 2,298.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 2,298.27 100.00%
06.06.02.01.12 APARATOS Y ACCESORIOS SANITARIOS 10,594.74 0.00 0.00 0.00 0.00% 0.00 10,594.74
06.06.02.01.12.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0. und 39.00 148.78 5,802.42 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 5,802.42 100.00%
06.06.02.01.12.02 SUMINISTRO E INSTALACION DE LAVATORIO und 39.00 73.99 2,885.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 2,885.61 100.00%
06.06.02.01.12.03 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 39.00 48.89 1,906.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 1,906.71 100.00%
06.06.02.01.13 INSTALACIONES ELECTRICAS 7,224.36 0.00 0.00 0.00 0.00% 0.00 7,224.36
06.06.02.01.13.01 SALIDA PARA INTERRUPTOR DOBLE und 39.00 22.42 874.38 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 874.38 100.00%
06.06.02.01.13.02 SALIDA PARA CENTRO DE LUZ und 78.00 65.44 5,104.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 78.00 5,104.32 100.00%
06.06.02.01.13.03 SALIDA PARA TOMACORRIENTES und 39.00 31.94 1,245.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 39.00 1,245.66 100.00%
06.06.02.02 INSTALACION DE BIODIGESTOR DE 600 LTS 60,424.23 199.43 7,094.80 7,294.23 12.07% 0.00 53,130.00
06.06.02.02.01 TRABAJOS PRELIMINARES 199.43 199.43 0.00 199.43 100.00% 0.00 0.00
06.06.02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 73.59 0.61 44.89 73.6 44.89 100.00% 0.00 0.00% 73.59 44.89 100.00% 0.00 0.00 0.00%
06.06.02.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 73.59 2.10 154.54 73.6 154.54 100.00% 0.00 0.00% 73.59 154.54 100.00% 0.00 0.00 0.00%
06.06.02.02.02 MOVIMIENTO DE TIERRAS 5,725.60 0.00 880.87 880.87 15.38% 0.00 4,844.73
06.06.02.02.02.01 EXCAVACION DE TERRENO NORMAL m3 104.80 34.92 3,659.62 0.0 0.00 0.00% 16.12 562.91 15.38% 16.12 562.91 15.38% 88.68 3,096.71 84.62%
06.06.02.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 48.15 30.92 1,488.80 0.0 0.00 0.00% 7.41 229.12 15.39% 7.41 229.12 15.39% 40.74 1,259.68 84.61%
06.06.02.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 70.82 8.15 577.18 0.0 0.00 0.00% 10.90 88.84 15.39% 10.90 88.84 15.39% 59.92 488.34 84.61%
06.06.02.02.03 OBRAS DE CONCRETO SIMPLE 303.58 0.00 46.11 46.11 15.19% 0.00 257.47
06.06.02.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 0.79 384.28 303.58 0.0 0.00 0.00% 0.12 46.11 15.19% 0.12 46.11 15.19% 0.67 257.47 84.81%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
06.06.02.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 14,104.79 0.00 0.00 0.00 0.00% 0.00 14,104.79
06.06.02.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 129.48 48.31 6,255.18 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 129.48 6,255.18 100.00%
06.06.02.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODO m3 12.71 364.74 4,635.85 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.71 4,635.85 100.00%
06.06.02.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 98.28 32.70 3,213.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.28 3,213.76 100.00%
06.06.02.02.05 BIODIGESTOR DE 600 Lts. 40,090.83 0.00 6,167.82 6,167.82 15.38% 0.00 33,923.01
06.06.02.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 Lts und 39.00 1,027.97 40,090.83 0.0 0.00 0.00% 6.00 6,167.82 15.38% 6.00 6,167.82 15.38% 33.00 33,923.01 84.62%
06.06.02.03 CONSTRUCCIÓN DE POZO PERCOLADOR 55,853.20 254.22 6,763.20 7,017.42 12.56% 0.00 48,835.78
06.06.02.03.01 TRABAJOS PRELIMINARES 254.22 254.22 0.00 254.22 100.00% 0.00 0.00
06.06.02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 93.81 0.61 57.22 93.8 57.22 100.00% 0.00 0.00% 93.81 57.22 100.00% 0.00 0.00 0.00%
06.06.02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 93.81 2.10 197.00 93.8 197.00 100.00% 0.00 0.00% 93.81 197.00 100.00% 0.00 0.00 0.00%
06.06.02.03.02 MOVIMIENTO DE TIERRAS 12,357.01 0.00 1,101.73 1,101.73 8.92% 0.00 11,255.28
06.06.02.03.02.01 EXCAVACION DE TERRENO NORMAL m3 205.10 34.92 7,162.09 0.0 0.00 0.00% 31.55 1,101.73 15.38% 31.55 1,101.73 15.38% 173.55 6,060.36 84.62%
06.06.02.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 256.43 8.15 2,089.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 256.43 2,089.90 100.00%
06.06.02.03.02.03 RELLENO CON GRAVA 1" m3 32.35 64.85 2,097.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 32.35 2,097.90 100.00%
06.06.02.03.02.04 FILTRO DE GRAVA Ø 1" m3 15.53 64.85 1,007.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.53 1,007.12 100.00%
06.06.02.03.03 OBRAS DE CONCRETO SIMPLE 10,675.51 0.00 1,641.28 1,641.28 15.37% 0.00 9,034.23
06.06.02.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 54.89 48.31 2,651.74 0.0 0.00 0.00% 8.44 407.74 15.38% 8.44 407.74 15.38% 46.45 2,244.00 84.62%
06.06.02.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 20.88 384.28 8,023.77 0.0 0.00 0.00% 3.21 1,233.54 15.37% 3.21 1,233.54 15.37% 17.67 6,790.23 84.63%
06.06.02.03.04 OBRAS DE CONCRETO ARMADO 6,436.62 0.00 0.00 0.00 0.00% 0.00 6,436.62
06.06.02.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 7.36 384.28 2,828.30 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.36 2,828.30 100.00%
06.06.02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 18.99 48.31 917.41 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.99 917.41 100.00%
06.06.02.03.04.03 ACERO FY=4200 KG/CM2 kg 404.04 6.66 2,690.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 404.04 2,690.91 100.00%
06.06.02.03.05 MUROS DE LADRILLO 26,129.84 0.00 4,020.19 4,020.19 15.39% 0.00 22,109.65
06.06.02.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 m2 286.70 91.14 26,129.84 0.0 0.00 0.00% 44.11 4,020.19 15.39% 44.11 4,020.19 15.39% 242.59 22,109.65 84.61%
06.06.03 ESTUDIOS COMPLEMENTARIOS 1,710.00 0.00 0.00 0.00% 0.00 0.00% 0.00 1,710.00
06.06.03.01 DISEÑO DE MEZCLA und 3.00 450.00 1,350.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 1,350.00 100.00%
06.06.03.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESIO und 9.00 40.00 360.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 360.00 100.00%
06.06.04 FLETE 35,011.10 0.00 7,002.22 20.00% 7,002.22 20.00% 0.00 28,008.88
06.06.04.01 FLETE TERRESTRE Y ACARREO TIVAYO GLB 1.00 35,011.10 35,011.10 0.0 0.00 0.00% 0.20 7,002.22 20.00% 0.20 7,002.22 20.00% 0.80 28,008.88 80.00%
06.06.05 PROGRAMA DE MITIGACION E IMPACTO AMBIENTAL 5,742.14 0.00 52.12 0.91% 52.12 0.91% 0.00 5,690.02
06.06.05.01 PROGRAMA DE PREVENCION DE MITIGACION 577.56 0.00 52.12 52.12 9.02% 0.00 525.44
06.06.05.01.01 CARTELES PERMANENTES und 4.00 63.56 254.24 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 254.24 100.00%
06.06.05.01.02 CARTELES TEMPORALES und 4.00 67.80 271.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 271.20 100.00%
06.06.05.01.03 CINTAS DE SEÑAL DE TRABAJO rll 1.00 52.12 52.12 0.0 0.00 0.00% 1.00 52.12 100.00% 1.00 52.12 100.00% 0.00 0.00 0.00%
06.06.05.02 PROGRAMA DE ABANDONO DE OBRA 5,164.58 0.00 0.00 0.00 0.00% 0.00 5,164.58
06.06.05.02.01 REACONDICIONAMIENTO DE AREA OCUPADA (CAMPAMENTO Y m2 1,250.00 3.22 4,025.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,250.00 4,025.00 100.00%
06.06.05.02.02 REACONDICIONAMIENTO DE CANTERAS Y ACCESOS HA 2.00 157.27 314.54 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 314.54 100.00%
06.06.05.02.03 REFORESTACION EN CAPTACIONES Y RESERVORIO m2 29.55 27.92 825.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.55 825.04 100.00%
06.06.06 ADECUADO CONOCIMIENTO DE EDUCACION SANITARIA 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 4,000.00
06.06.06.01 CAPACITACION ANTES DE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2,000.00 100.00%
06.06.06.02 CAPACITACION DURANTE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 2,000.00 100.00%
06.06.07 EFICIENTE GESTION TECNICA Y ADMINISTRATIVA DE LOS SERVICIOS DE AGUA Y SANEAMIENTO 4,000.00 0.00 0.00 0.00% 0.00 0.00% 0.00 4,000.00
06.06.07.01 PROGRAMA DE FORTALECIMIENTO DE CAPACIDADES PARA LA P und 4.00 1,000.00 4,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 4,000.00 100.00%

COSTO DIRECTO 3,251,582.43 138,463.95 265,412.04 8.16% 403,876.00 12.42% 2,847,706.43 87.58%

TOTAL PRESPUESTO 3,251,582.43 138,463.95 265,412.04 8.16% 403,876.00 12.42% 2,847,706.43 87.58%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018
Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
07 COMUNIDAD DE MINUNE 764,850.02 147,267.23 0.00% 56,508.97 26.64% 203,776.19 26.64% 0.00 561,073.83 73.36%
07.01 LOCALIDAD DE MINUNE 764,850.02 147,267.23 56,508.97 26.64% 203,776.19 26.64% 0.00 561,073.83 73.36%
07.01.01 SISTEMA DE AGUA POTABLE 269,892.66 34,599.97 0.00 12.82% 34,599.97 12.82% 0.00 235,292.69 87.18%
07.01.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00 0.00%
07.01.01.01.01 OBRAS PROVISIONALES 2,558.38 2,558.38 0.00 2,558.38 100.00% 0.00 0.00
07.01.01.01.01.01 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 1.00 1,760.72 1,760.72 1.0 1,760.72 100.00% 0.00 0.00% 1.00 1,760.72 100.00% 0.00 0.00 0.00%
07.01.01.01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 797.66 797.66 1.0 797.66 100.00% 0.00 0.00% 1.00 797.66 100.00% 0.00 0.00 0.00%
07.01.01.02 CONSTRUCCION DE CAPTACION TIPO - 1 10,141.29 149.82 0.00 149.82 1.48% 0.00 9,991.47
07.01.01.02.01 TRABAJOS PRELIMINARES 149.82 149.82 0.00 149.82 100.00% 0.00 0.00
07.01.01.02.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 33.00 2.44 80.52 33.0 80.52 100.00% 0.00 0.00% 33.00 80.52 100.00% 0.00 0.00 0.00%
07.01.01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 33.00 2.10 69.30 33.0 69.30 100.00% 0.00 0.00% 33.00 69.30 100.00% 0.00 0.00 0.00%
07.01.01.02.02 MOVIMIENTO DE TIERRAS 1,775.81 0.00 0.00 0.00 0.00% 0.00 1,775.81
07.01.01.02.02.01 EXCAVACION EN TERRENO NORMAL CAPTACION m3 16.50 39.64 654.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.50 654.06 100.00%
07.01.01.02.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 9.90 40.54 401.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.90 401.35 100.00%
07.01.01.02.02.03 ELIMINACION MANUAL DE MATERIAL EXCEDENTE (50 M ) m3 20.63 34.92 720.40 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.63 720.40 100.00%
07.01.01.02.03 CONCRETO SIMPLE 421.46 0.00 0.00 0.00 0.00% 0.00 421.46
07.01.01.02.03.01 CONCRETO F'C=100 KG/CM2.PARA SOLADOS m3 1.62 260.16 421.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.62 421.46 100.00%
07.01.01.02.04 CONCRETO ARMADO 2,829.86 0.00 0.00 0.00 0.00% 0.00 2,829.86
07.01.01.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 20.74 48.31 1,001.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.74 1,001.95 100.00%
07.01.01.02.04.02 ACERO FY=4200 KG/CM2 kg 123.56 6.66 822.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 123.56 822.91 100.00%
07.01.01.02.04.03 CONCRETO FC=210 KG/CM2 m3 2.43 413.58 1,005.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.43 1,005.00 100.00%
07.01.01.02.05 REVOQUES ENLUCIDOS Y MOLDURAS 424.92 0.00 0.00 0.00 0.00% 0.00 424.92
07.01.01.02.05.01 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 12.08 20.00 241.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.08 241.60 100.00%
07.01.01.02.05.02 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 6.58 27.86 183.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.58 183.32 100.00%
07.01.01.02.06 VALVULAS Y TAPAS Y ACCESORIOS 1,206.99 0.00 0.00 0.00 0.00% 0.00 1,206.99
07.01.01.02.06.01 SUMINISTRO Y COLOCACION DE TAPA METALICA DE 0.60X0.60M und 0.72 352.51 253.81 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.72 253.81 100.00%
07.01.01.02.06.02 SUMINISTRO E INST. VALVULA COMPUERTA H. DUCTIL, Y ACCESORI und 2.00 429.91 859.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 859.82 100.00%
07.01.01.02.06.03 CODO FºDº DN 160X90º ISO ED und 8.00 11.67 93.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 93.36 100.00%
07.01.01.02.07 FILTROS 118.44 0.00 0.00 0.00 0.00% 0.00 118.44
07.01.01.02.07.01 FILTROS DE GRAVA m3 0.43 109.19 46.95 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.43 46.95 100.00%
07.01.01.02.07.02 FILTROS DE ARENA m3 0.58 123.26 71.49 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.58 71.49 100.00%
07.01.01.02.08 PINTURA 347.79 0.00 0.00 0.00 0.00% 0.00 347.79
07.01.01.02.08.01 PINTURA EN TAPAS METALICAS m2 2.09 22.08 46.15 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.09 46.15 100.00%
07.01.01.02.08.02 PINTURA EN MUROS EXTERIORES (CAPTACION) m2 12.08 24.97 301.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.08 301.64 100.00%
07.01.01.02.09 CERCO PERIMETRICO 2,866.20 0.00 0.00 0.00 0.00% 0.00 2,866.20
07.01.01.02.09.01 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 102.00 28.10 2,866.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 102.00 2,866.20 100.00%
07.01.01.03 LINEA DE CONDUCCION 26,650.99 2,798.35 0.00 2,798.35 10.50% 0.00 23,852.64
07.01.01.03.01 TENDIDO DE TUBERIA PVC SAP 24,986.76 2,796.62 0.00 2,796.62 11.19% 0.00 22,190.14
07.01.01.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 273.77 2.10 574.92 273.8 574.92 100.00% 0.00 0.00% 273.77 574.92 100.00% 0.00 0.00 0.00%
07.01.01.03.01.02 EXCAVACION MANUAL DE ZANJA DE TERRENO CONGLOMERADO m3 159.70 34.92 5,576.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 159.70 5,576.72 100.00%
07.01.01.03.01.03 REFINE Y NIVELACION DE ZANJA m 456.29 4.08 1,861.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 456.29 1,861.66 100.00%
07.01.01.03.01.04 CAMA DE APOYO E=10CM. m 456.29 1.66 757.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 456.29 757.44 100.00%
07.01.01.03.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONAD m3 76.66 23.80 1,824.51 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 76.66 1,824.51 100.00%
07.01.01.03.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 114.99 57.17 6,573.98 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 114.99 6,573.98 100.00%
07.01.01.03.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 114.99 8.15 937.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 114.99 937.17 100.00%
07.01.01.03.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-5 Ø 2" m 456.90 14.16 6,469.70 156.9 2,221.70 34.34% 0.00 0.00% 156.90 2,221.70 34.34% 300.00 4,248.00 65.66%
07.01.01.03.01.09 PRUEBA HIDRAULICA DE LA LINEA DE CONDUCCION m 456.29 0.90 410.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 456.29 410.66 100.00%
07.01.01.03.02 CAMARA ROMPE PRESION T - VI 1,664.23 1.73 0.00 1.73 0.10% 0.00 1,662.50
07.01.01.03.02.01 LIMPIEZA DE TERRENO MANUAL m2 0.64 0.61 0.39 0.6 0.39 100.00% 0.00 0.00% 0.64 0.39 100.00% 0.00 0.00 0.00%
07.01.01.03.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 0.64 2.10 1.34 0.6 1.34 100.00% 0.00 0.00% 0.64 1.34 100.00% 0.00 0.00 0.00%
07.01.01.03.02.03 EXCAVACION DE ZANJA m3 0.64 34.92 22.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.64 22.35 100.00%
07.01.01.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 0.80 8.15 6.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.80 6.52 100.00%
07.01.01.03.02.05 CONCRETO F'C= 175 KG/CM2 m3 0.38 384.28 146.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.38 146.03 100.00%
07.01.01.03.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.30 48.31 304.35 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.30 304.35 100.00%
07.01.01.03.02.07 ACERO FY=4200 KG/CM2 kg 43.71 6.66 291.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 43.71 291.11 100.00%
07.01.01.03.02.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 6.30 46.31 291.75 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.30 291.75 100.00%
07.01.01.03.02.09 TARRAJEO EN INTERIORES Y EXTERIORES m2 6.30 28.40 178.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.30 178.92 100.00%
07.01.01.03.02.10 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C.R.P. GLB 1.00 187.57 187.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 187.57 100.00%
07.01.01.03.02.11 TAPA METALICA Y MARCO DE 0.60x0.60 m e=1/8" EN C.R.P. TIPO VI und 1.00 213.02 213.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 213.02 100.00%
07.01.01.03.02.12 PINTADO DE MURO EXTERIOR C/LATEX ACRILICO (SUPERLATEX O SI m2 3.60 5.80 20.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.60 20.88 100.00%
07.01.01.04 RESERVORIO (8 M3) 21,354.15 86.66 0.00 86.66 0.41% 0.00 21,267.49
07.01.01.04.01 RESERVORIO 17,278.85 59.25 0.00 59.25 0.34% 0.00 17,219.60
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018
Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
07.01.01.04.01.01 DESBROCE Y LIMPIEZA DE TERRENO MANUAL m2 13.05 2.44 31.84 13.1 31.84 100.00% 0.00 0.00% 13.05 31.84 100.00% 0.00 0.00 0.00%
07.01.01.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
07.01.01.04.01.03 EXCAVACION EN TERRENO NORMAL RESERVORIO m3 6.53 34.92 228.03 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.53 228.03 100.00%
07.01.01.04.01.04 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE m3 8.16 14.23 116.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.16 116.12 100.00%
07.01.01.04.01.05 SOLADO C:H 1:8 (h= 0.10 m) m2 1.13 189.58 214.23 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.13 214.23 100.00%
07.01.01.04.01.06 CONCRETO F'C= 210 KG/CM2 EN RESERVORIO m3 6.38 413.58 2,638.64 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.38 2,638.64 100.00%
07.01.01.04.01.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 55.40 48.31 2,676.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 55.40 2,676.37 100.00%
07.01.01.04.01.08 ACERO FY=4200 KG/CM2 kg 272.32 6.66 1,813.65 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 272.32 1,813.65 100.00%
07.01.01.04.01.09 TARRAJEO CON IMPERMEABILIZANTE 1:3 E=2 cm m2 71.79 27.86 2,000.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 2,000.07 100.00%
07.01.01.04.01.10 TARRAJEO EXTERIOR E INTERIOR MEZCLA 1:1 e= 1 cm m2 71.79 20.00 1,435.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 1,435.80 100.00%
07.01.01.04.01.11 TAPA SANITARIA METALICA DE 0.60x0.60 mts und 2.00 197.60 395.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 395.20 100.00%
07.01.01.04.01.12 INSTALACION DE ACCESORIOS TUB. VENTILACION 2" und 2.00 118.31 236.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 236.62 100.00%
07.01.01.04.01.13 ESCALERA TUB F.GVZDO.C/PARANTES DE 1 1/2" X PELDAÑOS DE 3/4"und 1.00 496.89 496.89 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 496.89 100.00%
07.01.01.04.01.14 INSTALACION DE ACCESORIOS EN RESERVORIO und 2.00 872.43 1,744.86 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1,744.86 100.00%
07.01.01.04.01.15 PINTADO DE MURO EXTERIOR m2 71.79 15.54 1,115.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 71.79 1,115.62 100.00%
07.01.01.04.01.16 INSTALACION Y SUMINSTRO DE CERCO PERIMETRICO m 75.00 28.10 2,107.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.00 2,107.50 100.00%
07.01.01.04.02 CASETA DE CLORACION POR GOTEO 4,075.30 27.41 0.00 27.41 0.67% 0.00 4,047.89
07.01.01.04.02.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.05 2.10 27.41 13.1 27.41 100.00% 0.00 0.00% 13.05 27.41 100.00% 0.00 0.00 0.00%
07.01.01.04.02.02 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12 m2 11.54 71.15 821.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.54 821.07 100.00%
07.01.01.04.02.03 TARRAJEO EN INTERIORES Y EXTERIORES m2 20.50 28.40 582.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 20.50 582.20 100.00%
07.01.01.04.02.04 REJILLA METALICA SEGUN DISEÑO INC. COLOCADO und 1.00 421.12 421.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 421.12 100.00%
07.01.01.04.02.05 COBERTURA DE CALAMINA EN CASETA DE CLORACION m2 4.00 58.15 232.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 232.60 100.00%
07.01.01.04.02.06 INSTALACION DE PUERTA METÁLICA (SEGÚN DISEÑO) und 1.00 257.57 257.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 257.57 100.00%
07.01.01.04.02.07 INSTALACION DE ACCESORIOS EN CASETA DE CLORACION und 1.00 1,557.57 1,557.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,557.57 100.00%
07.01.01.04.02.08 PINTADO DE MURO EXTERIOR m2 11.31 15.54 175.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.31 175.76 100.00%
07.01.01.05 LINEA DE ADUCCION Y RED DE DISTRIBUCION 181,868.83 25,941.55 0.00 25,941.55 14.26% 0.00 155,927.28
07.01.01.05.01 TENDIDO DE TUBERIA DE ADUCCION Y DISTRIBUCION PVC SAP 167,598.81 25,884.43 0.00 25,884.43 15.44% 0.00 141,714.38
07.01.01.05.01.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 1,880.72 8.03 15,102.18 1,880.7 15,102.18 100.00% 0.00 0.00% 1,880.72 15,102.18 100.00% 0.00 0.00 0.00%
07.01.01.05.01.02 EXCAVACION MANUAL ZANJA EN TERRENO CONGLOMERADO m3 1,097.03 58.58 64,264.02 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,097.03 64,264.02 100.00%
07.01.01.05.01.03 REFINE Y NIVELACION DE ZANJA m 3,134.37 2.04 6,394.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3,134.37 6,394.11 100.00%
07.01.01.05.01.04 CAMA DE APOYO E=10CM. m 3,134.37 1.66 5,203.05 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3,134.37 5,203.05 100.00%
07.01.01.05.01.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONAD m3 526.57 23.80 12,532.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 526.57 12,532.37 100.00%
07.01.01.05.01.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 728.01 57.17 41,620.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 728.01 41,620.33 100.00%
07.01.01.05.01.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 728.01 8.15 5,933.28 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 728.01 5,933.28 100.00%
07.01.01.05.01.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP C-10 Ø 1" m 3,134.37 4.30 13,477.79 2,507.5 10,782.25 80.00% 0.00 0.00% 2,507.50 10,782.25 80.00% 626.87 2,695.54 20.00%
07.01.01.05.01.09 PRUEBA HIDRAULICA m 3,134.37 0.98 3,071.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3,134.37 3,071.68 100.00%
07.01.01.05.02 VALVULA DE CONTROL 4,339.69 9.76 0.00 9.76 0.22% 0.00 4,329.93
07.01.01.05.02.01 LIMPIEZA DE TERRENO MANUAL m2 3.60 0.61 2.20 3.6 2.20 100.00% 0.00 0.00% 3.60 2.20 100.00% 0.00 0.00 0.00%
07.01.01.05.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.60 2.10 7.56 3.6 7.56 100.00% 0.00 0.00% 3.60 7.56 100.00% 0.00 0.00 0.00%
07.01.01.05.02.03 EXCAVACION DE ZANJA m3 1.44 34.92 50.28 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.44 50.28 100.00%
07.01.01.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 1.80 8.15 14.67 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.80 14.67 100.00%
07.01.01.05.02.05 CONCRETO F'C= 175 KG/CM2 m3 0.48 384.28 184.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.48 184.45 100.00%
07.01.01.05.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 16.00 48.31 772.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.00 772.96 100.00%
07.01.01.05.02.07 TARRAJEO CON IMPERMEABILIZANTE m2 16.00 29.19 467.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.00 467.04 100.00%
07.01.01.05.02.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 6.40 28.40 181.76 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.40 181.76 100.00%
07.01.01.05.02.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES GLB 1.00 512.25 512.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 512.25 100.00%
07.01.01.05.02.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 10.00 213.49 2,134.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 2,134.90 100.00%
07.01.01.05.02.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.16 72.62 11.62 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.16 11.62 100.00%
07.01.01.05.03 VALVULA DE PURGA 3,709.06 23.41 0.00 23.41 0.63% 0.00 3,685.65
07.01.01.05.03.01 LIMPIEZA DE TERRENO MANUAL m2 8.64 0.61 5.27 8.6 5.27 100.00% 0.00 0.00% 8.64 5.27 100.00% 0.00 0.00 0.00%
07.01.01.05.03.02 TRAZO Y REPLANTEO PRELIMINAR m2 8.64 2.10 18.14 8.6 18.14 100.00% 0.00 0.00% 8.64 18.14 100.00% 0.00 0.00 0.00%
07.01.01.05.03.03 EXCAVACION DE ZANJA m3 6.05 34.92 211.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.05 211.27 100.00%
07.01.01.05.03.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 7.56 8.15 61.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.56 61.61 100.00%
07.01.01.05.03.05 CONCRETO F'C= 175 KG/CM2 m3 0.91 384.28 349.69 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.91 349.69 100.00%
07.01.01.05.03.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 18.00 48.31 869.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 869.58 100.00%
07.01.01.05.03.07 TARRAJEO CON IMPERMEABILIZANTE m2 16.80 29.19 490.39 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.80 490.39 100.00%
07.01.01.05.03.08 TARRAJEO EN INTERIORES Y EXTERIORES m2 6.72 28.40 190.85 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.72 190.85 100.00%
07.01.01.05.03.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN CAJA GLB 1.00 224.06 224.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 224.06 100.00%
07.01.01.05.03.10 TAPA METÁLICA, MARCO Y PINPURA 0.40X0.40M e=1/8" und 6.00 213.49 1,280.94 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 1,280.94 100.00%
07.01.01.05.03.11 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 0.10 72.62 7.26 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.10 7.26 100.00%
07.01.01.05.04 CAMARA ROMPE PRESION T - VII 6,221.27 23.95 0.00 23.95 0.38% 0.00 6,197.32
07.01.01.05.04.01 LIMPIEZA DE TERRENO MANUAL m2 8.84 0.61 5.39 8.8 5.39 100.00% 0.00 0.00% 8.84 5.39 100.00% 0.00 0.00 0.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018
Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
07.01.01.05.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 8.84 2.10 18.56 8.8 18.56 100.00% 0.00 0.00% 8.84 18.56 100.00% 0.00 0.00 0.00%
07.01.01.05.04.03 EXCAVACION DE ZANJA m3 7.97 34.92 278.31 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.97 278.31 100.00%
07.01.01.05.04.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 9.96 8.15 81.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.96 81.17 100.00%
07.01.01.05.04.05 CONCRETO F'C= 175 KG/CM2 m3 2.43 384.28 933.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.43 933.80 100.00%
07.01.01.05.04.06 ACERO FY=4200 KG/CM2 kg 80.85 6.66 538.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.85 538.46 100.00%
07.01.01.05.04.07 ENCOFRADO Y DESENCOFRADO NORMAL m2 36.03 48.31 1,740.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 36.03 1,740.61 100.00%
07.01.01.05.04.08 TARRAJEO CON IMPERMEABILIZANTE EN INTERIORES m2 13.16 46.31 609.44 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.16 609.44 100.00%
07.01.01.05.04.09 COLOCACION DE ACCESORIOS SANITARIOS CORRIENTES EN C.R.P. TGLB 4.00 205.99 823.96 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 823.96 100.00%
07.01.01.05.04.10 TAPA METALICA Y MARCO DE 0.60x0.60m y 0.30x0.30m e=1/8" EN C.R.P.und 4.00 278.02 1,112.08 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 1,112.08 100.00%
07.01.01.05.04.11 PINTURA EN TAPAS METALICAS m2 3.60 22.08 79.49 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.60 79.49 100.00%
07.01.01.06 CONEXIONES DOMICILIARIAS 27,319.02 3,065.21 0.00 3,065.21 11.22% 0.00 24,253.81
07.01.01.06.01 TRAZO NIVELACION Y REPLANTEO DE ZANJAS m2 381.72 8.03 3,065.21 381.7 3,065.21 100.00% 0.00 0.00% 381.72 3,065.21 100.00% 0.00 0.00 0.00%
07.01.01.06.02 EXCAVACION MANUAL DE ZANJA EN TERRENO CONGLOMERADO m3 190.86 23.12 4,412.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 190.86 4,412.68 100.00%
07.01.01.06.03 REFINE Y NIVELACION DE ZANJA m 636.20 4.08 2,595.70 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 636.20 2,595.70 100.00%
07.01.01.06.04 CAMA DE APOYO E=10CM. m 636.20 1.66 1,056.09 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 636.20 1,056.09 100.00%
07.01.01.06.05 RELLENO Y COMPACTACIÓN CON MATERIAL PROPIO SELECCIONADO m3 167.96 23.80 3,997.45 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 167.96 3,997.45 100.00%
07.01.01.06.06 RELLENO Y COMPACTACIÓN CON MATERIAL DE PRESTAMO m3 41.99 57.17 2,400.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 41.99 2,400.57 100.00%
07.01.01.06.07 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 41.99 8.15 342.22 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 41.99 342.22 100.00%
07.01.01.06.08 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 1/2" m 636.20 3.46 2,201.25 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 636.20 2,201.25 100.00%
07.01.01.06.09 CONEXIÓN DOMICILIARIA INC. CAJA DE AGUA POTABLE MATRIZ Ø 1 1/2 und 49.00 136.23 6,675.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.00 6,675.27 100.00%
07.01.01.06.10 PRUEBA HIDRAULICA EN TUBERIA INSTALADA m 636.20 0.90 572.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 636.20 572.58 100.00%
07.01.02 CONSTRUCCIÓN DE UNIDADES BÁSICAS DE SANEAMIENTO DOMICILIARIAS 433,147.08 78,184.97 49,196.56 29.41% 127,381.53 29.41% 0.00 305,765.55
07.01.02.01 CONSTRUCCION DE CASETA DE BAÑO 287,054.46 34,392.27 21,085.72 55,477.99 19.33% 0.00 231,576.47
07.01.02.01.01 OBRAS PROVISIONALES 3,518.51 3,518.51 0.00 3,518.51 100.00% 0.00 0.00
07.01.02.01.01.01 LETRINAS DE HOYO SECO VENTILADO (PARA PERSONAL OBRERO) 1,904.75 1,904.75 0.00 1,904.75 100.00% 0.00 0.00
07.01.02.01.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 3.38 0.61 2.06 3.4 2.06 100.00% 0.00 0.00% 3.38 2.06 100.00% 0.00 0.00 0.00%
07.01.02.01.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 3.38 2.10 7.10 3.4 7.10 100.00% 0.00 0.00% 3.38 7.10 100.00% 0.00 0.00 0.00%
07.01.02.01.01.01.03 EXCAVACION DE ZANJA m3 6.42 34.92 224.19 6.4 224.19 100.00% 0.00 0.00% 6.42 224.19 100.00% 0.00 0.00 0.00%
07.01.02.01.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 8.03 8.15 65.44 8.0 65.44 100.00% 0.00 0.00% 8.03 65.44 100.00% 0.00 0.00 0.00%
07.01.02.01.01.01.05 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.24 48.31 301.45 6.2 301.45 100.00% 0.00 0.00% 6.24 301.45 100.00% 0.00 0.00 0.00%
07.01.02.01.01.01.06 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.94 364.59 342.71 0.9 342.71 100.00% 0.00 0.00% 0.94 342.71 100.00% 0.00 0.00 0.00%
07.01.02.01.01.01.07 ACERO FY=4200 KG/CM2 kg 18.14 6.66 120.81 18.1 120.81 100.00% 0.00 0.00% 18.14 120.81 100.00% 0.00 0.00 0.00%
07.01.02.01.01.01.08 CONCRETO F'C= 175 KG/CM2 m3 0.17 384.28 65.33 0.2 65.33 100.00% 0.00 0.00% 0.17 65.33 100.00% 0.00 0.00 0.00%
07.01.02.01.01.01.09 CASETA PARA LETRINAS INC. PUERTA DE CALAMINA und 2.00 346.09 692.18 2.0 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
07.01.02.01.01.01.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.0 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
07.01.02.01.01.02 DUCHAS O VESTUARIOS (PARA PERSONAL OBRERO) 1,335.92 1,335.92 0.00 1,335.92 100.00% 0.00 0.00
07.01.02.01.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 4.00 0.61 2.44 4.0 2.44 100.00% 0.00 0.00% 4.00 2.44 100.00% 0.00 0.00 0.00%
07.01.02.01.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 4.00 2.10 8.40 4.0 8.40 100.00% 0.00 0.00% 4.00 8.40 100.00% 0.00 0.00 0.00%
07.01.02.01.01.02.03 EXCAVACION DE ZANJA m3 2.04 34.92 71.24 2.0 71.24 100.00% 0.00 0.00% 2.04 71.24 100.00% 0.00 0.00 0.00%
07.01.02.01.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 2.55 8.15 20.78 2.6 20.78 100.00% 0.00 0.00% 2.55 20.78 100.00% 0.00 0.00 0.00%
07.01.02.01.01.02.05 MATERIAL FILTRANTE DE GRAVA Ø 1/2" m3 2.00 72.62 145.24 2.0 145.24 100.00% 0.00 0.00% 2.00 145.24 100.00% 0.00 0.00 0.00%
07.01.02.01.01.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 2.40 48.31 115.94 2.4 115.94 100.00% 0.00 0.00% 2.40 115.94 100.00% 0.00 0.00 0.00%
07.01.02.01.01.02.07 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 0.27 364.59 98.44 0.3 98.44 100.00% 0.00 0.00% 0.27 98.44 100.00% 0.00 0.00 0.00%
07.01.02.01.01.02.08 CASETA PARA DUCHAS INC. PUERTA DE CALAMINA m2 2.00 346.09 692.18 2.0 692.18 100.00% 0.00 0.00% 2.00 692.18 100.00% 0.00 0.00 0.00%
07.01.02.01.01.02.09 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 2.00 48.89 97.78 2.0 97.78 100.00% 0.00 0.00% 2.00 97.78 100.00% 0.00 0.00 0.00%
07.01.02.01.01.02.10 SALIDA DE DESAGUE PVC-SAL 2" pto 2.00 41.74 83.48 2.0 83.48 100.00% 0.00 0.00% 2.00 83.48 100.00% 0.00 0.00 0.00%
07.01.02.01.01.03 LAVADERO DE GRANITO (PARA PERSONAL OBRERO) 277.84 277.84 0.00 277.84 100.00% 0.00 0.00
07.01.02.01.01.03.01 SUMINISTRO E INSTALACIÓN DE LAVADERO DE GRANITO und 2.00 138.92 277.84 2.0 277.84 100.00% 0.00 0.00% 2.00 277.84 100.00% 0.00 0.00 0.00%
07.01.02.01.02 TRABAJOS PRELIMINARES 1,021.84 1,021.84 0.00 1,021.84 100.00% 0.00 0.00
07.01.02.01.02.01 LIMPIEZA DE TERRENO MANUAL m2 377.06 0.61 230.01 377.1 230.01 100.00% 0.00 0.00% 377.06 230.01 100.00% 0.00 0.00 0.00%
07.01.02.01.02.02 TRAZO Y REPLANTEO PRELIMINAR m2 377.06 2.10 791.83 377.1 791.83 100.00% 0.00 0.00% 377.06 791.83 100.00% 0.00 0.00 0.00%
07.01.02.01.03 MOVIMIENTO DE TIERRAS 7,912.08 6,971.16 0.00 6,971.16 88.11% 0.00 940.92
07.01.02.01.03.01 EXCAVACION DE TERRENO NORMAL m3 92.36 34.92 3,225.21 92.4 3,225.21 100.00% 0.00 0.00% 92.36 3,225.21 100.00% 0.00 0.00 0.00%
07.01.02.01.03.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 115.45 8.15 940.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 115.45 940.92 100.00%
07.01.02.01.03.03 RELLENO Y APISONADO CON AFIRMADO E=0.10 M m3 39.20 95.56 3,745.95 39.2 3,745.95 100.00% 0.00 0.00% 39.20 3,745.95 100.00% 0.00 0.00 0.00%
07.01.02.01.04 OBRAS DE CONCRETO SIMPLE 50,359.04 22,007.65 -7,968.32 14,039.33 27.88% 0.00 36,319.71
07.01.02.01.04.01 CIMIENTOS CORRIDOS 11,711.06 11,711.06 -5,736.03 5,975.03 51.02% 0.00 5,736.03
07.01.02.01.04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 C:H + 30% P.G. m3 50.47 232.04 11,711.06 50.5 11,711.06 100.00% -24.72 -5,736.03 -48.98% 25.75 5,975.03 51.02% 24.72 5,736.03 48.98%
07.01.02.01.04.02 SOBRECIMIENTOS 15,807.30 10,296.59 -2,232.29 8,064.30 51.02% 0.00 7,743.00
07.01.02.01.04.02.01 ENCOFRADO Y DESENCOF. DE SOBRECIMIENTOS m2 231.28 44.52 10,296.59 231.3 10,296.59 100.00% -113.28 -5,043.23 -48.98% 118.00 5,253.36 51.02% 113.28 5,043.23 48.98%
07.01.02.01.04.02.02 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 17.35 317.62 5,510.71 0.0 0.00 0.00% 8.85 2,810.94 51.01% 8.85 2,810.94 51.01% 8.50 2,699.77 48.99%
07.01.02.01.04.03 PISO INTERIOR 4,855.72 0.00 0.00 0.00 0.00% 0.00 4,855.72
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018
Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
07.01.02.01.04.03.01 PISO INTERIOR, CONCRETO Fc' 140 KG/CM2, ACABADO CEMENTO m2 108.29 44.84 4,855.72 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 108.29 4,855.72 100.00%
07.01.02.01.04.04 SARDINEL DE DUCHA 934.88 0.00 0.00 0.00 0.00% 0.00 934.88
07.01.02.01.04.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 16.17 48.31 781.17 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.17 781.17 100.00%
07.01.02.01.04.04.02 CONCRETO F'C= 175 KG/CM2 m3 0.40 384.28 153.71 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.40 153.71 100.00%
07.01.02.01.04.05 VEREDA PERIMETRAL 17,050.08 0.00 0.00 0.00 0.00% 0.00 17,050.08
07.01.02.01.04.05.01 ENCOFRADO Y DESENCOF. DE VEREDAS m2 54.39 42.84 2,330.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.39 2,330.07 100.00%
07.01.02.01.04.05.02 VEREDA DE CONCRETO F'C=140 KG/CM2 E=4" INC. BRUÑADO m2 222.71 44.84 9,986.32 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 222.71 9,986.32 100.00%
07.01.02.01.04.05.03 CONCRETO FC=140 KG/CM2 UÑAS DE VEREDAS m3 12.99 364.41 4,733.69 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.99 4,733.69 100.00%
07.01.02.01.05 OBRAS DE CONCRETO ARMADO 46,870.15 0.00 16,931.29 16,931.29 36.12% 0.00 29,938.86
07.01.02.01.05.01 COLUMNAS 33,185.31 0.00 16,931.29 16,931.29 51.02% 0.00 16,254.02
07.01.02.01.05.01.01 CONCRETO EN COLUMNAS F'C=175 KG/CM2 m3 14.70 384.28 5,648.92 0.0 0.00 0.00% 7.50 2,882.10 51.02% 7.50 2,882.10 51.02% 7.20 2,766.82 48.98%
07.01.02.01.05.01.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 313.60 45.29 14,202.94 0.0 0.00 0.00% 160.00 7,246.40 51.02% 160.00 7,246.40 51.02% 153.60 6,956.54 48.98%
07.01.02.01.05.01.03 ACERO F'Y = 4200 KG/CM2 PARA COLUMNAS kg 2,002.02 6.66 13,333.45 0.0 0.00 0.00% 1,021.44 6,802.79 51.02% 1,021.44 6,802.79 51.02% 980.58 6,530.66 48.98%
07.01.02.01.05.02 VIGAS 13,684.84 0.00 0.00 0.00 0.00% 0.00 13,684.84
07.01.02.01.05.02.01 CONCRETO EN VIGAS F'C=175 KG/CM2 m3 8.38 384.28 3,220.27 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.38 3,220.27 100.00%
07.01.02.01.05.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 153.62 50.83 7,808.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 153.62 7,808.50 100.00%
07.01.02.01.05.02.03 ACERO FY=4200 KG/CM2 PARA VIGAS kg 398.81 6.66 2,656.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 398.81 2,656.07 100.00%
07.01.02.01.06 MUROS DE LADRILLO 29,700.66 0.00 12,122.75 12,122.75 40.82% 0.00 17,577.91
07.01.02.01.06.01 MURO DE SOGA CARAVISTA LADRILLO KK TIPO IV 18 HUECOS (9X12 m2 409.10 72.60 29,700.66 0.0 0.00 0.00% 166.98 12,122.75 40.82% 166.98 12,122.75 40.82% 242.12 17,577.91 59.18%
07.01.02.01.07 REVOQUES Y ENLUCIDOS 31,179.08 0.00 0.00 0.00 0.00% 0.00 31,179.08
07.01.02.01.07.01 ZÓCALO: TARRAJEADO Y PULIDO CON IMPERMEABILIZANTE / MEZCL m2 313.60 38.45 12,057.92 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 313.60 12,057.92 100.00%
07.01.02.01.07.02 TARRAJEO - FROTACHADO EN MUROS INTERIORES m2 279.79 20.82 5,825.23 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 279.79 5,825.23 100.00%
07.01.02.01.07.03 FROTACHADO EXT. DE DERRAMES EN PUERTAS, VENTANAS Y ESQU m2 350.11 24.59 8,609.20 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 350.11 8,609.20 100.00%
07.01.02.01.07.04 BRUÑA DE 1 CM m 330.75 14.17 4,686.73 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 330.75 4,686.73 100.00%
07.01.02.01.08 PINTURA 7,609.86 0.00 0.00 0.00 0.00% 0.00 7,609.86
07.01.02.01.08.01 PINTURA ESMALTE DOS MANOS EN MUROS INTERIORES m2 279.79 11.37 3,181.21 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 279.79 3,181.21 100.00%
07.01.02.01.08.02 PINTADO DE DERRAMES EN PUERTAS, VENTANAS Y ESQUINAS EX m2 318.15 13.92 4,428.65 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 318.15 4,428.65 100.00%
07.01.02.01.09 COBERTURA LIVIANA PARA TECHO 19,250.34 0.00 0.00 0.00 0.00% 0.00 19,250.34
07.01.02.01.09.01 SUMIN. E INSTAL. DE VIGAS DE MADERA DE 4"x2"x2.40 m und 147.00 38.28 5,627.16 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 147.00 5,627.16 100.00%
07.01.02.01.09.02 SUMIN. E INSTAL. DE CORREAS DE MADERA DE 2" x 2" x 3.00 m und 196.00 25.91 5,078.36 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 196.00 5,078.36 100.00%
07.01.02.01.09.03 COBERTURA CON PLANCHAS DE CALAMINA DE 2.40x0.83x0.30 mm m2 352.80 24.22 8,544.82 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 352.80 8,544.82 100.00%
07.01.02.01.10 CARPINTERIA DE MADERA 19,403.51 0.00 0.00 0.00 0.00% 0.00 19,403.51
07.01.02.01.10.01 SUMIN. E INSTAL. DE PUERTA CONTRAPLACADA E=45 mm C/TRIPLAY und 49.00 304.49 14,920.01 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.00 14,920.01 100.00%
07.01.02.01.10.02 SUMIN. E INSTAL. DE VENTANA DE MADERA SEGUN DISEÑO und 49.00 91.50 4,483.50 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.00 4,483.50 100.00%
07.01.02.01.11 INSTALACIONES SANITARIAS 47,841.29 873.11 0.00 873.11 1.83% 0.00 46,968.18
07.01.02.01.11.01 TRABAJOS PRELIMINARES 873.11 873.11 0.00 873.11 100.00% 0.00 0.00
07.01.02.01.11.01.01 LIMPIEZA DE TERRENO MANUAL m2 322.18 0.61 196.53 322.2 196.53 100.00% 0.00 0.00% 322.18 196.53 100.00% 0.00 0.00 0.00%
07.01.02.01.11.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 322.18 2.10 676.58 322.2 676.58 100.00% 0.00 0.00% 322.18 676.58 100.00% 0.00 0.00 0.00%
07.01.02.01.11.02 MOVIMIENTO DE TIERRAS 11,473.19 0.00 0.00 0.00 0.00% 0.00 11,473.19
07.01.02.01.11.02.01 EXCAVACION DE TERRENO NORMAL m3 159.43 34.92 5,567.30 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 159.43 5,567.30 100.00%
07.01.02.01.11.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 141.30 40.54 5,728.30 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 141.30 5,728.30 100.00%
07.01.02.01.11.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 21.79 8.15 177.59 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 21.79 177.59 100.00%
07.01.02.01.11.03 TUBERIAS Y ACCESORIOS 16,572.19 0.00 0.00 0.00 0.00% 0.00 16,572.19
07.01.02.01.11.03.01 SALIDA DE AGUA FRIA PVC 1/2¨ pto 147.00 23.00 3,381.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 147.00 3,381.00 100.00%
07.01.02.01.11.03.02 SUMIN. E INSTAL. VALVULA COMPUERTA BRONCE 1/2" + ACCESORI und 49.00 63.39 3,106.11 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.00 3,106.11 100.00%
07.01.02.01.11.03.03 TUBERIA PVC SAP CLASE 10 Ø 1/2" ML 220.50 5.14 1,133.37 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 220.50 1,133.37 100.00%
07.01.02.01.11.03.04 TUBERIA PVC SAL Ø 2" m 480.20 7.99 3,836.80 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 480.20 3,836.80 100.00%
07.01.02.01.11.03.05 TUBERIA PVC SAL Ø 4" m 401.80 12.73 5,114.91 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 401.80 5,114.91 100.00%
07.01.02.01.11.04 CAJA DE REGISTRO DE CONCRETO 30X60 INCL. TAPA DE CONCRETO 18,922.80 0.00 0.00 0.00 0.00% 0.00 18,922.80
07.01.02.01.11.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 103.65 48.31 5,007.33 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 103.65 5,007.33 100.00%
07.01.02.01.11.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO 30x60 m3 9.59 265.70 2,548.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.59 2,548.06 100.00%
07.01.02.01.11.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 70.56 32.70 2,307.31 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 70.56 2,307.31 100.00%
07.01.02.01.11.04.04 SALIDA DE DESAGUE PVC-SAL 2" pto 98.00 41.74 4,090.52 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 4,090.52 100.00%
07.01.02.01.11.04.05 SALIDA DE DESAGUE PVC-SAL 4" pto 49.00 42.49 2,082.01 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.00 2,082.01 100.00%
07.01.02.01.11.04.06 SALIDA DE TUBERÍA DE VENTILACION PVC-SAL 2" pto 49.00 58.93 2,887.57 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.00 2,887.57 100.00%
07.01.02.01.12 APARATOS Y ACCESORIOS SANITARIOS 13,311.34 0.00 0.00 0.00 0.00% 0.00 13,311.34
07.01.02.01.12.01 SUMINISTRO E INSTALACION DE INODORO SIFON JET 0.41X0.74 M und 49.00 148.78 7,290.22 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.00 7,290.22 100.00%
07.01.02.01.12.02 SUMINISTRO E INSTALACION DE LAVATORIO und 49.00 73.99 3,625.51 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.00 3,625.51 100.00%
07.01.02.01.12.03 SUMINISTRO E INSTALACION DE SIST. DE DUCHA und 49.00 48.89 2,395.61 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.00 2,395.61 100.00%
07.01.02.01.13 INSTALACIONES ELECTRICAS 9,076.76 0.00 0.00 0.00 0.00% 0.00 9,076.76
07.01.02.01.13.01 SALIDA PARA INTERRUPTOR DOBLE und 49.00 22.42 1,098.58 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.00 1,098.58 100.00%
07.01.02.01.13.02 SALIDA PARA CENTRO DE LUZ und 98.00 65.44 6,413.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.00 6,413.12 100.00%
VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018
Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
07.01.02.01.13.03 SALIDA PARA TOMACORRIENTES und 49.00 31.94 1,565.06 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.00 1,565.06 100.00%
07.01.02.02 INSTALACION DE BIODIGESTOR DE 600 LTS 75,917.75 34,474.69 14,710.53 49,185.22 64.79% 0.00 26,732.53
07.01.02.02.01 TRABAJOS PRELIMINARES 250.57 250.57 0.00 250.57 100.00% 0.00 0.00
07.01.02.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 92.46 0.61 56.40 92.5 56.40 100.00% 0.00 0.00% 92.46 56.40 100.00% 0.00 0.00 0.00%
07.01.02.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 92.46 2.10 194.17 92.5 194.17 100.00% 0.00 0.00% 92.46 194.17 100.00% 0.00 0.00 0.00%
07.01.02.02.02 MOVIMIENTO DE TIERRAS 7,194.12 6,468.93 0.00 6,468.93 89.92% 0.00 725.19
07.01.02.02.02.01 EXCAVACION DE TERRENO NORMAL m3 131.68 34.92 4,598.27 131.7 4,598.27 100.00% 0.00 0.00% 131.68 4,598.27 100.00% 0.00 0.00 0.00%
07.01.02.02.02.02 RELLENO Y APISONADO CON MATERIAL ZARANDEADO m3 60.50 30.92 1,870.66 60.5 1,870.66 100.00% 0.00 0.00% 60.50 1,870.66 100.00% 0.00 0.00 0.00%
07.01.02.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 88.98 8.15 725.19 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 88.98 725.19 100.00%
07.01.02.02.03 OBRAS DE CONCRETO SIMPLE 380.44 0.00 318.95 318.95 83.84% 0.00 61.49
07.01.02.02.03.01 CONCRETO F'C= 175 KG/CM2 m3 0.99 384.28 380.44 0.0 0.00 0.00% 0.83 318.95 83.84% 0.83 318.95 83.84% 0.16 61.49 16.16%
07.01.02.02.04 CAJA DE REGISTRO DE LODOS (0.80 m x 0.80 m) 17,722.09 0.00 0.00 0.00 0.00% 0.00 17,722.09
07.01.02.02.04.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 162.68 48.31 7,859.07 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 162.68 7,859.07 100.00%
07.01.02.02.04.02 CONCRETO F'c = 140 kg/cm2 EN CAJA DE REGISTRO DE LODOS m3 15.97 364.74 5,824.90 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.97 5,824.90 100.00%
07.01.02.02.04.03 TARRAJEO CON IMPERMEABILIZANTE m2 123.49 32.70 4,038.12 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 123.49 4,038.12 100.00%
07.01.02.02.05 BIODIGESTOR DE 600 Lts. 50,370.53 27,755.19 14,391.58 42,146.77 83.67% 0.00 8,223.76
07.01.02.02.05.01 SUMINISTRO E INSTALACION DE BIODIGESTOR DE 600 Lts und 49.00 1,027.97 50,370.53 27.0 27,755.19 55.10% 14.00 14,391.58 28.57% 41.00 42,146.77 83.67% 8.00 8,223.76 16.33%
07.01.02.03 CONSTRUCCIÓN DE POZO PERCOLADOR 70,174.87 9,318.01 13,400.31 22,718.32 32.37% 0.00 47,456.55
07.01.02.03.01 TRABAJOS PRELIMINARES 319.48 319.48 0.00 319.48 100.00% 0.00 0.00
07.01.02.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 117.89 0.61 71.91 117.9 71.91 100.00% 0.00 0.00% 117.89 71.91 100.00% 0.00 0.00 0.00%
07.01.02.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 117.89 2.10 247.57 117.9 247.57 100.00% 0.00 0.00% 117.89 247.57 100.00% 0.00 0.00 0.00%
07.01.02.03.02 MOVIMIENTO DE TIERRAS 15,525.67 8,998.53 0.00 8,998.53 57.96% 0.00 6,527.14
07.01.02.03.02.01 EXCAVACION DE TERRENO NORMAL m3 257.69 34.92 8,998.53 257.7 8,998.53 100.00% 0.00 0.00% 257.69 8,998.53 100.00% 0.00 0.00 0.00%
07.01.02.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE A DME m3 322.18 8.15 2,625.77 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 322.18 2,625.77 100.00%
07.01.02.03.02.03 RELLENO CON GRAVA 1" m3 40.65 64.85 2,636.15 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 40.65 2,636.15 100.00%
07.01.02.03.02.04 FILTRO DE GRAVA Ø 1" m3 19.51 64.85 1,265.22 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.51 1,265.22 100.00%
07.01.02.03.03 OBRAS DE CONCRETO SIMPLE 13,411.12 0.00 0.00 0.00 0.00% 0.00 13,411.12
07.01.02.03.03.01 ENCOFRADO Y DESENCOFRADO NORMAL m2 68.96 48.31 3,331.46 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 68.96 3,331.46 100.00%
07.01.02.03.03.02 CONCRETO F'C= 175 KG/CM2 m3 26.23 384.28 10,079.66 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.23 10,079.66 100.00%
07.01.02.03.04 OBRAS DE CONCRETO ARMADO 8,088.15 0.00 0.00 0.00 0.00% 0.00 8,088.15
07.01.02.03.04.01 CONCRETO F'C= 175 KG/CM2 m3 9.25 384.28 3,554.59 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.25 3,554.59 100.00%
07.01.02.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 23.86 48.31 1,152.68 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.86 1,152.68 100.00%
07.01.02.03.04.03 ACERO FY=4200 KG/CM2 kg 507.64 6.66 3,380.88 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 507.64 3,380.88 100.00%
07.01.02.03.05 MUROS DE LADRILLO 32,830.45 0.00 13,400.31 13,400.31 40.82% 0.00 19,430.14
07.01.02.03.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA DE 9x12.5x23 CM m2 360.22 91.14 32,830.45 0.0 0.00 0.00% 147.03 13,400.31 40.82% 147.03 13,400.31 40.82% 213.19 19,430.14 59.18%
07.01.03 ESTUDIOS COMPLEMENTARIOS 1,710.00 0.00 450.00 26.32% 450.00 26.32% 0.00 1,260.00
07.01.03.01 DISEÑO DE MEZCLA und 3.00 450.00 1,350.00 0.0 0.00 0.00% 1.00 450.00 33.33% 1.00 450.00 33.33% 2.00 900.00 66.67%
07.01.03.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und 9.00 40.00 360.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 360.00 100.00%
07.01.04 FLETE 43,102.86 34,482.29 4,310.29 90.00% 38,792.57 90.00% 0.00 4,310.29
07.01.04.01 FLETE TERRESTRE Y ACARREO MINUNE GLB 1.00 43,102.86 43,102.86 0.8 34,482.29 80.00% 0.10 4,310.29 10.00% 0.90 38,792.57 90.00% 0.10 4,310.29 10.00%
07.01.05 PROGRAMA DE MITIGACION E IMPACTO AMBIENTAL 8,997.42 0.00 52.12 0.58% 52.12 0.58% 0.00 8,945.30
07.01.05.01 PROGRAMA DE PREVENCION DE MITIGACION 1,417.84 0.00 52.12 52.12 3.68% 0.00 1,365.72
07.01.05.01.01 CARTELES PERMANENTES und 10.00 63.56 635.60 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 635.60 100.00%
07.01.05.01.02 CARTELES TEMPORALES und 10.00 67.80 678.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 678.00 100.00%
07.01.05.01.03 CINTAS DE SEÑAL DE TRABAJO rll 2.00 52.12 104.24 0.0 0.00 0.00% 1.00 52.12 50.00% 1.00 52.12 50.00% 1.00 52.12 50.00%
07.01.05.02 PROGRAMA DE ABANDONO DE OBRA 7,579.58 0.00 0.00 0.00 0.00% 0.00 7,579.58
07.01.05.02.01 REACONDICIONAMIENTO DE AREA OCUPADA (CAMPAMENTO Y MAQUI m2 2,000.00 3.22 6,440.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,000.00 6,440.00 100.00%
07.01.05.02.02 REACONDICIONAMIENTO DE CANTERAS Y ACCESOS HA 2.00 157.27 314.54 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 314.54 100.00%
07.01.05.02.03 REFORESTACION EN CAPTACIONES Y RESERVORIO m2 29.55 27.92 825.04 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.55 825.04 100.00%
07.01.06 ADECUADO CONOCIMIENTO DE EDUCACION SANITARIA 4,000.00 0.00 2,500.00 62.50% 2,500.00 62.50% 0.00 1,500.00
07.01.06.01 CAPACITACION ANTES DE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 4.00 2,000.00 100.00% 4.00 2,000.00 100.00% 0.00 0.00 0.00%
07.01.06.02 CAPACITACION DURANTE LA EJECUCION DE LA OBRA und 4.00 500.00 2,000.00 0.0 0.00 0.00% 1.00 500.00 25.00% 1.00 500.00 25.00% 3.00 1,500.00 75.00%
EFICIENTE GESTION TECNICA Y ADMINISTRATIVA DE LOS SERVICIOS DE
07.01.07 4,000.00 0.00 0.00 0.00% 0.00 0.00% 4,000.00
AGUA Y SANEAMIENTO A TRAVES DEL LAS JASS 0.00
07.01.07.01 PROGRAMA DE FORTALECIMIENTO DE CAPACIDADES PARA LA POBLAC und 4.00 1,000.00 4,000.00 0.0 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 4,000.00 100.00%

COSTO DIRECTO 764,850.02 147,267.23 56,508.97 7.39% 203,776.19 26.64% 561,073.83 73.36%

TOTAL PRESPUESTO 764,850.02 147,267.23 56,508.97 7.39% 203,776.19 26.64% 561,073.83 73.36%
RESUMEN GENERAL VALORIZACIÓN DE OBRA N° 02 : CORRESPONDIENTE AL MES : ENERO 2018
Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA,
CHIHUAPAMPA, PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación : TINTAY - AYMARAES - APURIMAC
Entidad : MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista : CONSORCIO SEÑOR DE ANIMAS
Supervision : CONSORCIO SUPERVISOR DE ANIMAS
Factor (Fr) : 1.0
RESUMEN GENERAL VALORIZACION No 02

ACUMULADO ANTERIOR VALORIZACION ACTUAL VALORIZACION ACUMULADA SALDO


ITEM DESCRIPCION PARCIAL S/.
METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
01 COMUNIDAD DE VISACOCHA 698,245.01 158,395.43 22.68% 46,985.43 6.73% 205,380.86 29.41% 492,864.15 70.59%
02 COMUNIDAD DE CHIHUAPAMPA 531,665.85 111,476.28 20.97% 61,077.20 11.49% 172,553.48 32.46% 359,112.37 67.54%
03 COMUNIDAD DE PAMPATAMA 895,978.04 143,208.63 15.98% 45,636.12 5.09% 188,844.75 21.08% 707,133.29 78.92%
04 COMUNIDAD DE SAN MATEO 4,387,846.95 604,425.42 13.77% 292,315.45 6.66% 896,740.87 20.44% 3,491,106.08 79.56%
05 COMUNIDAD DE HUANCARPUQUIO 1,705,958.72 258,693.46 15.16% 466,432.52 27.34% 725,125.98 42.51% 980,832.74 57.49%
06 COMUNIDAD DE TAQUEBAMBA 3,251,582.43 138,463.95 4.26% 265,412.04 8.16% 403,875.99 12.42% 2,847,706.44 87.58%
07 COMUNIDAD DE MINUNE 764,850.02 147,267.23 19.25% 56,508.97 7.39% 203,776.20 26.64% 561,073.82 73.36%

COSTO DIRECTO 12,236,127.02 1,561,930.40 12.76% 1,234,367.73 10.09% 2,796,298.13 22.85% 9,439,828.89 77.15%
GASTOS GENERALES (10.35%) 0.1035000 1,266,439.15 161,659.80 127,757.08 289,416.86 977,022.29
UTILIDAD (5%) 0.0500000 611,806.35 78,096.52 61,718.39 139,814.91 471,991.45
SUB TOTAL (Referencial) 14,114,372.52 1,801,686.72 1,423,843.20 10.09% 3,225,529.89 22.85% 10,888,842.63 77.15%
Factor de Relación fr 1.00000
SUB TOTAL (Ofertado) 14,114,372.52 1,801,686.72 1,423,843.20 3,225,529.89 10,888,842.63
I.G.V. (18,00%) 2,540,587.05 324,303.61 256,291.78 580,595.38 1,959,991.67

TOTAL PRESPUESTO 16,654,959.57 2,125,990.33 12.76% 1,680,134.98 10.09% 3,806,125.27 22.85% 12,848,834.30 77.15%
AMORTIZACIÓN DEL ADELANTO DIRECTO
Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA,
PAMPATAMA, MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación TINTAY - AYMARAES - APURIMAC
Entidad MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista CONSORCIO SEÑOR DE ANIMAS
Supervision CONSORCIO SUPERVISOR TINTAY
Factor (Fr) : 1.0

MONTO CONTRACTUAL DE OBRA

(SIN I.G.V.) : #REF!


(CON I.G.V.) : #REF!
TOTAL GENERAL #REF!

ADELANTO OTORGADO AMORTIZACION


VAL.MES Sin
VALORIZACION AMORTIZACION SALDO POR AMORTIZ.
Reaj.
SIN I.G.V. CON I.G.V. Amort=VB * 20.00% (SIN I.G.V)

(NO CORRESPONDE, PORQUE NO SE OTORGARON ADELANTOS)

TOTAL 0.00 0.00

AMORTIZACIÓN ACUMULADO ACTUAL 0.00


AMORTIZACIÓN ACUMULADA ANTERIOR 0.00
AMORTIZACIÓN DEL MES 0.00
CUADRO RESUMEN DE AMORTIZACION Y DEDUCCION POR MATERIALES

Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA, PAMPATAMA,
MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación TINTAY - AYMARAES - APURIMAC
Entidad MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista CONSORCIO SEÑOR DE ANIMAS
Supervision CONSORCIO SUPERVISOR TINTAY
Factor (Fr) : 1.0

(NO CORRESPONDE, PORQUE NO SE OTORGARON ADELANTOS)

FORMULA INDICE MATERIAL ADELANTO OTORGADO AMORTIZACION


ACUMULADA DEDUCCION ACUMULADA

ACUMULADO ACTUAL 0.00 0.00 0.00


ACUMULADO ANTERIOR 0.00 0.00
ACTUAL DEL MES 0.00 0.00
CÁLCULO DE REAJUSTE
Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA, PAMPATAMA,
MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación TINTAY - AYMARAES - APURIMAC
Entidad MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista CONSORCIO SEÑOR DE ANIMAS
Supervision CONSORCIO SUPERVISOR TINTAY
Factor (Fr) : 1.0

SUB PRESUPUESTO Nº 01 - VISACOCHA

Monto Mensual Monto Acumulado Mes Reajuste


Val K
Real Programado Real Programado Reajuste Real Programado Reconocido

noviembre noviembre
diciembre diciembre
enero enero
febrero febrero
marzo marzo
abril abril
mayo mayo
junio junio
julio julio
agosto agosto
septiembre septiembre

TOTAL 0.00 0.00 0.00 0.00 0.00

SUB PRESUPUESTO Nº 02 - CHIHUAPAMPA

Monto Mensual Monto Acumulado Mes Reajuste


Val K
Real Programado Real Programado Reajuste Real Programado Reconocido

noviembre noviembre
diciembre diciembre
enero enero
febrero febrero
marzo marzo
abril abril
mayo mayo
junio junio
julio julio
agosto agosto
septiembre septiembre

TOTAL 0.00 0.00 0.00 0.00 0.00

SUB PRESUPUESTO Nº 03 - PAMPATAMA

Monto Mensual Monto Acumulado Mes Reajuste


Val K
Real Programado Real Programado Reajuste Real Programado Reconocido

noviembre noviembre
diciembre diciembre
enero enero
febrero febrero
marzo marzo
abril abril
mayo mayo
junio junio
julio julio
agosto agosto
septiembre septiembre

TOTAL 0.00 0.00 0.00 0.00 0.00


Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA, PAMPATAMA,
MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación TINTAY - AYMARAES - APURIMAC
Entidad MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista CONSORCIO SEÑOR DE ANIMAS
Supervision CONSORCIO SUPERVISOR TINTAY
Factor (Fr) : 1.0

SUB PRESUPUESTO Nº 04 - SAN MATEO

Monto Mensual Monto Acumulado Mes Reajuste


Val K
Real Programado Real Programado Reajuste Real Programado Reconocido

noviembre noviembre
diciembre diciembre
enero enero
febrero febrero
marzo marzo
abril abril
mayo mayo
junio junio
julio julio
agosto agosto
septiembre septiembre

TOTAL 0.00 0.00 0.00 0.00 0.00

SUB PRESUPUESTO Nº 05 -HUANCARPUQUIO

Monto Mensual Monto Acumulado Mes Reajuste


Val K
Real Programado Real Programado Reajuste Real Programado Reconocido

noviembre noviembre
diciembre diciembre
enero enero
febrero febrero
marzo marzo
abril abril
mayo mayo
junio junio
julio julio
agosto agosto
septiembre septiembre

TOTAL 0.00 0.00 0.00 0.00 0.00

SUB PRESUPUESTO Nº 06 - TAQUEBAMBA

Monto Mensual Monto Acumulado Mes Reajuste


Val K
Real Programado Real Programado Reajuste Real Programado Reconocido

noviembre noviembre
diciembre diciembre
enero enero
febrero febrero
marzo marzo
abril abril
mayo mayo
junio junio
julio julio
agosto agosto
septiembre septiembre

TOTAL 0.00 0.00 0.00 0.00 0.00


Obra MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE AGUA POTABLE Y SANEAMIENTO BÁSICO RURAL, EN LAS COMUNIDADES DE VISACOCHA, CHIHUAPAMPA, PAMPATAMA,
MINUNE, SAN MATEO, HUANCARPUQUIO Y TAQUEBAMBA, DISTRITO DE TINTAY - AYMARAES - APURIMAC”,
Ubicación TINTAY - AYMARAES - APURIMAC
Entidad MUNICIPALIDAD DISTRITAL DE TINTAY
Contratista CONSORCIO SEÑOR DE ANIMAS
Supervision CONSORCIO SUPERVISOR TINTAY
Factor (Fr) : 1.0

SUB PRESUPUESTO Nº 07 - MINUNE

Monto Mensual Monto Acumulado Mes Reajuste


Val K
Real Programado Real Programado Reajuste Real Programado Reconocido

noviembre noviembre
diciembre diciembre
enero enero
febrero febrero
marzo marzo
abril abril
mayo mayo
junio junio
julio julio
agosto agosto
septiembre septiembre

TOTAL 0.00 0.00 0.00 0.00 0.00

REAJUSTE TOTAL ACUM. 0.00 0.00 0.00


REAJUSTE ANTERIOR ACUM. 0.00 0.00 0.00
REAJUSTE RECONOCIDO ACTUAL 0.00 0.00 0.00

Nota: Por disposición de la entidad, los reajustes se cancelaran al final de la obra. Po lo que no se calcularán los reajustes del mes, en esta valorización.