CALZADA :
# de vías 4
Nº vigas 6
s= 2.40 (m)
a= 0.75 (m)
LOSA :
h losa= 0.18 (m)
calzada= 13.50 (m)
cap rod= 0.02 (m)
BORDILLO
b= 0.200 (m)
h= 0.250 (m)
ACERA:
L= 1.750 (m)
h1= 0.150 (m)
h2= 0.200 (m)
DIAFRAGMAS:
# diafrag 5
separacion 7.50 (m)
b 0.25 (m)
h 1.30 (m)
Lh 2.20 (m)
A diafrag 2.740 m2
Vdiafragma 3.425 m3
CABLES
Aps1 Ycg1 Aps2 Ycg2 Aps3 Ycg3 Aps4 Ycg4 Aps5 Ycg5 Aps Ycg I cables
1.18E-03 1.187 1.18E-03 0.833 1.18E-03 0.480 0.00E+00 0.001 0.00E+00 0.001 3.55E-03 0.833 0.000297
1.18E-03 1.052 1.18E-03 0.734 1.18E-03 0.427 0.00E+00 0.010 0.00E+00 0.010 3.55E-03 0.738 0.000232
1.18E-03 0.926 1.18E-03 0.643 1.18E-03 0.378 0.00E+00 0.018 0.00E+00 0.018 3.55E-03 0.649 0.000179
1.18E-03 0.810 1.18E-03 0.558 1.18E-03 0.332 0.00E+00 0.026 0.00E+00 0.026 3.55E-03 0.567 0.000136
1.18E-03 0.703 1.18E-03 0.480 1.18E-03 0.290 0.00E+00 0.033 0.00E+00 0.033 3.55E-03 0.491 0.000101
1.18E-03 0.605 1.18E-03 0.409 1.18E-03 0.252 0.00E+00 0.040 0.00E+00 0.040 3.55E-03 0.422 0.000075
1.18E-03 0.517 1.18E-03 0.345 1.18E-03 0.218 0.00E+00 0.045 0.00E+00 0.045 3.55E-03 0.360 0.000054
1.18E-03 0.438 1.18E-03 0.287 1.18E-03 0.187 0.00E+00 0.050 0.00E+00 0.050 3.55E-03 0.304 0.000038
1.18E-03 0.368 1.18E-03 0.236 1.18E-03 0.159 0.00E+00 0.055 0.00E+00 0.055 3.55E-03 0.254 0.000027
1.18E-03 0.308 1.18E-03 0.192 1.18E-03 0.136 0.00E+00 0.059 0.00E+00 0.059 3.55E-03 0.212 0.000019
1.18E-03 0.256 1.18E-03 0.155 1.18E-03 0.116 0.00E+00 0.062 0.00E+00 0.062 3.55E-03 0.176 0.000013
1.18E-03 0.214 1.18E-03 0.124 1.18E-03 0.099 0.00E+00 0.065 0.00E+00 0.065 3.55E-03 0.146 0.000009
1.18E-03 0.182 1.18E-03 0.101 1.18E-03 0.086 0.00E+00 0.067 0.00E+00 0.067 3.55E-03 0.123 0.000007
1.18E-03 0.159 1.18E-03 0.084 1.18E-03 0.077 0.00E+00 0.069 0.00E+00 0.069 3.55E-03 0.106 0.000005
1.18E-03 0.145 1.18E-03 0.073 1.18E-03 0.072 0.00E+00 0.070 0.00E+00 0.070 3.55E-03 0.097 0.000004
1.18E-03 0.140 1.18E-03 0.070 1.18E-03 0.070 0.00E+00 0.070 0.00E+00 0.070 3.55E-03 0.093 0.000004
1.18E-03 0.145 1.18E-03 0.073 1.18E-03 0.072 0.00E+00 0.070 0.00E+00 0.070 3.55E-03 0.097 0.000004
1.18E-03 0.159 1.18E-03 0.084 1.18E-03 0.077 0.00E+00 0.069 0.00E+00 0.069 3.55E-03 0.106 0.000005
1.18E-03 0.182 1.18E-03 0.101 1.18E-03 0.086 0.00E+00 0.067 0.00E+00 0.067 3.55E-03 0.123 0.000007
1.18E-03 0.214 1.18E-03 0.124 1.18E-03 0.099 0.00E+00 0.065 0.00E+00 0.065 3.55E-03 0.146 0.000009
1.18E-03 0.256 1.18E-03 0.155 1.18E-03 0.116 0.00E+00 0.062 0.00E+00 0.062 3.55E-03 0.176 0.000013
1.18E-03 0.308 1.18E-03 0.192 1.18E-03 0.136 0.00E+00 0.059 0.00E+00 0.059 3.55E-03 0.212 0.000019
1.18E-03 0.368 1.18E-03 0.236 1.18E-03 0.159 0.00E+00 0.055 0.00E+00 0.055 3.55E-03 0.254 0.000027
1.18E-03 0.438 1.18E-03 0.287 1.18E-03 0.187 0.00E+00 0.050 0.00E+00 0.050 3.55E-03 0.304 0.000038
1.18E-03 0.517 1.18E-03 0.345 1.18E-03 0.218 0.00E+00 0.045 0.00E+00 0.045 3.55E-03 0.360 0.000054
1.18E-03 0.605 1.18E-03 0.409 1.18E-03 0.252 0.00E+00 0.040 0.00E+00 0.040 3.55E-03 0.422 0.000075
1.18E-03 0.703 1.18E-03 0.480 1.18E-03 0.290 0.00E+00 0.033 0.00E+00 0.033 3.55E-03 0.491 0.000101
1.18E-03 0.810 1.18E-03 0.558 1.18E-03 0.332 0.00E+00 0.026 0.00E+00 0.026 3.55E-03 0.567 0.000136
1.18E-03 0.926 1.18E-03 0.643 1.18E-03 0.378 0.00E+00 0.018 0.00E+00 0.018 3.55E-03 0.649 0.000179
1.18E-03 1.052 1.18E-03 0.734 1.18E-03 0.427 0.00E+00 0.010 0.00E+00 0.010 3.55E-03 0.738 0.000232
1.18E-03 1.187 1.18E-03 0.833 1.18E-03 0.480 0.00E+00 0.001 0.00E+00 0.001 3.55E-03 0.833 0.000297
VICTOR CASTRO VIGA DE PUENTE HORMIGON PRETENSADO
1.800
1.600
1.400
1.200
h viga
1.000
ycg cables
0.800 e_simple
e_comp
0.600
0.400
0.200
0.000
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00
VICTOR CASTRO VIGA DE PUENTE HORMIGON PRETENSADO
BORDILLOS Y ACERAS:
q bordillos/viga = 0.417 (KN/m)
q aceras /viga = 2.260 (KN/m)
BARANDADO:
q barand= 1.310 (KN/m)
DIAGRAMA DE CORTANTES
x VIGA LOSA RODADURA DIAFRAG BOR+ACERA BARAND CV+I CM
0.00 223.13 162.00 18.00 42.81 40.16 6.55 316.48 492.64
1.00 208.25 151.20 16.80 39.96 37.48 6.11 304.82 459.80
2.00 193.38 140.40 15.60 37.10 34.80 5.68 293.15 426.96
3.00 178.50 129.60 14.40 34.25 32.13 5.24 281.49 394.12
4.00 163.63 118.80 13.20 31.40 29.45 4.80 269.82 361.27
5.00 148.75 108.00 12.00 28.54 26.77 4.37 258.16 328.43
6.00 133.88 97.20 10.80 25.69 24.09 3.93 246.50 295.59
7.00 119.00 86.40 9.60 22.83 21.42 3.49 234.83 262.74
8.00 104.13 75.60 8.40 19.98 18.74 3.06 223.17 229.90
9.00 89.25 64.80 7.20 17.13 16.06 2.62 211.50 197.06
10.00 74.38 54.00 6.00 14.27 13.39 2.18 199.84 164.21
11.00 59.50 43.20 4.80 11.42 10.71 1.75 188.18 131.37
12.00 44.63 32.40 3.60 8.56 8.03 1.31 176.51 98.53
13.00 29.75 21.60 2.40 5.71 5.35 0.87 164.85 65.69
14.00 14.88 10.80 1.20 2.85 2.68 0.44 153.19 32.84
CENTRO 15.00 0.00 0.00 0.00 0.00 0.00 0.00 141.52 0.00
16.00 -14.88 -10.80 -1.20 -2.85 -2.68 -0.44 -153.19 -32.84
17.00 -29.75 -21.60 -2.40 -5.71 -5.35 -0.87 -164.85 -65.69
18.00 -44.63 -32.40 -3.60 -8.56 -8.03 -1.31 -176.51 -98.53
19.00 -59.50 -43.20 -4.80 -11.42 -10.71 -1.75 -188.18 -131.37
20.00 -74.38 -54.00 -6.00 -14.27 -13.39 -2.18 -199.84 -164.21
21.00 -89.25 -64.80 -7.20 -17.13 -16.06 -2.62 -211.50 -197.06
22.00 -104.13 -75.60 -8.40 -19.98 -18.74 -3.06 -223.17 -229.90
23.00 -119.00 -86.40 -9.60 -22.83 -21.42 -3.49 -234.83 -262.74
24.00 -133.88 -97.20 -10.80 -25.69 -24.09 -3.93 -246.50 -295.59
25.00 -148.75 -108.00 -12.00 -28.54 -26.77 -4.37 -258.16 -328.43
26.00 -163.63 -118.80 -13.20 -31.40 -29.45 -4.80 -269.82 -361.27
27.00 -178.50 -129.60 -14.40 -34.25 -32.13 -5.24 -281.49 -394.12
28.00 -193.38 -140.40 -15.60 -37.10 -34.80 -5.68 -293.15 -426.96
29.00 -208.25 -151.20 -16.80 -39.96 -37.48 -6.11 -304.82 -459.80
30.00 -223.13 -162.00 -18.00 -42.81 -40.16 -6.55 -316.48 -492.64
VICTOR CASTRO VIGA DE PUENTE HORMIGON PRETENSADO
LOSA
500.00
RODADUR
A
1000.00
DIAFRAG
BOR+ACER
A
1500.00
BARAND
2000.00 CV+I
RODADUR
A
2500.00
400.00
300.00
200.00
VIGA
LOSA
100.00
DIAFRAG
0.00
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00 BOR+ACERA
-100.00
BARAND
-200.00 CV+I
RODADURA
-300.00
-400.00
VICTOR CASTRO VIGA DE PUENTE HORMIGON PRETENSADO
RESUMEN:
cable 1 cable 2 cable 3 cable 4 cable 5 PROMEDIO observ.
X1 -0.150 -0.150 -0.150 -0.150 -0.150 -0.150
X2 10.926 11.415 12.133 13.381 13.381 12.247
X3 30.150 30.150 30.150 30.150 30.150 30.150
f1 1407.672 1407.672 1407.672 1407.672 1407.672 1407.672
f2 1300.647 1305.165 1311.158 1320.063 1320.063 1311.419
f3 1114.902 1139.097 1169.581 1211.493 1211.493 1169.313
(f-h)1 1193.623 1202.658 1214.643 1232.455 1232.455 1215.167
(f-h)2 1300.647 1305.165 1311.158 1320.063 1320.063 1311.419
(f-h)3 1114.902 1139.097 1169.581 1211.493 1211.493 1169.313
f final 1 971.564 980.599 992.585 1010.396 1010.396 993.108
f final 2 1078.589 1083.106 1089.099 1098.005 1098.005 1089.361
f final 3 892.843 917.038 947.522 989.434 989.434 947.254
VICTOR CASTRO VIGA DE PUENTE HORMIGON PRETENSADO
CABLE1 CABLE2
x f f - hund cono f final x f f - hund cono f final
-0.150 1407.67 1193.62 971.564 -0.150 1407.67 1202.66 980.60
10.93 1300.65 1300.65 1078.59 11.41 1305.17 1305.17 1083.11
30.15 1114.90 1114.902 892.843 30.15 1139.10 1139.10 917.04
1200.0
1200.0
1000.0
1000.0
800.0 800.0
600.0 600.0
400.0 400.0
200.0 200.0
0.0 0.0
-5.000 0.000 5.000 10.000 15.000 20.000 25.000 30.000 35.000 -5.000 0.000 5.000 10.000 15.000 20.000 25.000 30.000 35.000
CABLE3 CABLE4
x f f - hund cono f final x f f - hund cono f final
-0.150 1407.672 1214.64 992.58 -0.150 1407.67 1232.45 1010.40
12.13 1311.16 1311.16 1089.10 13.38 1320.06 1320.06 1098.00
30.15 1169.58 1169.58 947.52 30.15 1211.49 1211.49 989.43
1400.0 1400.0
1200.0 1200.0
1000.0 1000.0
800.0
800.0
600.0
600.0
400.0
400.0
200.0
200.0
0.0
0.0
-5.000 0.000 5.000 10.000 15.000 20.000 25.000 30.000 35.000
-5.000 0.000 5.000 10.000 15.000 20.000 25.000 30.000 35.000
CABLE5
x f f - hund cono f final
-0.150 1407.67 1232.45 1010.40
13.38 1320.06 1320.06 1098.00
30.15 1211.49 1211.49 989.43
CALCULO DE PERDIDAS DIFERIDAS.-
1600.0 TENSIONES DE PRETENSADO CABLE 4
x α cables Pret ini N pret ini Pret perd1 N pret perd1 Pret perd2 N pret perd2 Pret fin N pret fin
0.00 5.447 4.2815 4.2621 0.1973 0.1964 0.5918 0.5891 3.4924 3.4767
1.00 5.074 4.3127 4.2958 0.1973 0.1965 0.5918 0.5894 3.5237 3.5099
2.00 4.700 4.3440 4.3294 0.1973 0.1966 0.5918 0.5898 3.5549 3.5430
3.00 4.325 4.3752 4.3628 0.1973 0.1967 0.5918 0.5901 3.5862 3.5760
4.00 3.950 4.4065 4.3960 0.1973 0.1968 0.5918 0.5904 3.6174 3.6088
5.00 3.575 4.4377 4.4291 0.1973 0.1969 0.5918 0.5906 3.6487 3.6416
6.00 3.200 4.4690 4.4620 0.1973 0.1969 0.5918 0.5908 3.6799 3.6742
7.00 2.824 4.5002 4.4947 0.1973 0.1970 0.5918 0.5910 3.7112 3.7067
8.00 2.448 4.5315 4.5273 0.1973 0.1971 0.5918 0.5912 3.7424 3.7390
9.00 2.072 4.5627 4.5597 0.1973 0.1971 0.5918 0.5914 3.7737 3.7712
10.00 1.695 4.5940 4.5919 0.1973 0.1972 0.5918 0.5915 3.8049 3.8033
11.00 1.319 4.6235 4.6223 0.1973 0.1972 0.5918 0.5916 3.8345 3.8335
12.00 0.942 4.6196 4.6190 0.1973 0.1972 0.5918 0.5917 3.8306 3.8301
13.00 0.565 4.5908 4.5906 0.1973 0.1972 0.5918 0.5917 3.8018 3.8016
14.00 0.188 4.5596 4.5595 0.1973 0.1973 0.5918 0.5918 3.7705 3.7705
15.00 0.000 4.5283 4.5283 0.1973 0.1973 0.5918 0.5918 3.7393 3.7393
16.00 -0.188 4.4971 4.4970 0.1973 0.1973 0.5918 0.5918 3.7080 3.7080
17.00 -0.565 4.4658 4.4656 0.1973 0.1972 0.5918 0.5917 3.6768 3.6766
18.00 -0.942 4.4346 4.4340 0.1973 0.1972 0.5918 0.5917 3.6455 3.6451
19.00 -1.319 4.4033 4.4022 0.1973 0.1972 0.5918 0.5916 3.6143 3.6133
20.00 -1.695 4.3721 4.3702 0.1973 0.1972 0.5918 0.5915 3.5830 3.5815
21.00 -2.072 4.3408 4.3380 0.1973 0.1971 0.5918 0.5914 3.5518 3.5495
22.00 -2.448 4.3096 4.3056 0.1973 0.1971 0.5918 0.5912 3.5205 3.5173
23.00 -2.824 4.2783 4.2731 0.1973 0.1970 0.5918 0.5910 3.4893 3.4851
24.00 -3.200 4.2471 4.2404 0.1973 0.1969 0.5918 0.5908 3.4581 3.4527
25.00 -3.575 4.2158 4.2076 0.1973 0.1969 0.5918 0.5906 3.4268 3.4201
26.00 -3.950 4.1846 4.1746 0.1973 0.1968 0.5918 0.5904 3.3956 3.3875
27.00 -4.325 4.1533 4.1415 0.1973 0.1967 0.5918 0.5901 3.3643 3.3547
28.00 -4.700 4.1221 4.1082 0.1973 0.1966 0.5918 0.5898 3.3331 3.3218
29.00 -5.074 4.0908 4.0748 0.1973 0.1965 0.5918 0.5894 3.3018 3.2889
30.00 -5.447 4.0596 4.0412 0.1973 0.1964 0.5918 0.5891 3.2706 3.2558
3500.000
PRET INICIAL
3000.000
1000.000
PRET FINAL
500.000
0.000
400.000
PRET INICIAL
300.000
200.000
PRET perd1
100.000
0.000 PRET perd2
-300.000
-400.000
-500.000
VICTOR CASTRO VIGA DE PUENTE HORMIGON PRETENSADO
momentos totales ELU en cada fase (sin cortantes totales ELU en cada fase (sin pretensado
pretensado)
-1500.000
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00
0.000
-1000.000
2000.000
-500.000
4000.000
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00
0.000
6000.000
500.000
8000.000
10000.000 1000.000
12000.000 1500.000
FASE3 FASE4
VICTOR CASTRO VIGA DE PUENTE HORMIGON PRETENSADO
-6.15
AASHTO STD ejemp.o hºpº
FASE 1 (peso propio + pretensado inicial) FASE 2 (losa+ diaf + rodadura + perd_diferidas_1)
MOMENTO NORMAL σ1 σ2 σ3 σ4 MOMENTO NORMAL σ1 σ2 σ3 σ4
-70.29 4281.47 0.000 0.000 7.003 7.496 0.024 -197.255 0.000 0.000 6.687 7.180
-274.43 4312.72 0.000 0.000 6.341 8.267 233.901 -197.255 0.000 0.000 6.854 7.157
-470.40 4343.96 0.000 0.000 5.710 9.014 451.649 -197.255 0.000 0.000 6.996 7.168
-657.56 4375.21 0.000 0.000 5.109 9.734 653.268 -197.255 0.000 0.000 7.109 7.214
-835.29 4406.46 0.000 0.000 4.540 10.426 838.757 -197.255 0.000 0.000 7.193 7.294
-1002.95 4437.71 0.000 0.000 4.005 11.088 1008.117 -197.255 0.000 0.000 7.247 7.406
-1159.93 4468.96 0.000 0.000 3.504 11.716 1161.347 -197.255 0.000 0.000 7.274 7.545
-1305.58 4500.21 0.000 0.000 3.040 12.308 1298.447 -197.255 0.000 0.000 7.277 7.706
-1439.29 4531.46 0.000 0.000 2.617 12.861 1419.418 -197.255 0.000 0.000 7.261 7.885
-1560.42 4562.71 0.000 0.000 2.236 13.370 1524.260 -197.255 0.000 0.000 7.228 8.075
-1668.34 4593.96 0.000 0.000 1.901 13.832 1612.972 -197.255 0.000 0.000 7.184 8.272
-1761.23 4623.52 0.000 0.000 1.616 14.236 1685.555 -197.255 0.000 0.000 7.135 8.461
-1814.76 4619.59 0.000 0.000 1.414 14.438 1742.008 -197.255 0.000 0.000 7.114 8.498
-1833.22 4590.81 0.000 0.000 1.295 14.467 1782.332 -197.255 0.000 0.000 7.124 8.410
-1833.10 4559.56 0.000 0.000 1.239 14.420 1806.526 -197.255 0.000 0.000 7.145 8.294
-1816.86 4528.31 0.000 0.000 1.242 14.310 1814.591 -197.255 0.000 0.000 7.174 8.160
-1785.14 4497.06 0.000 0.000 1.303 14.139 1806.526 -197.255 0.000 0.000 7.209 8.013
-1738.55 4465.81 0.000 0.000 1.417 13.909 1782.332 -197.255 0.000 0.000 7.247 7.853
-1677.73 4434.57 0.000 0.000 1.584 13.625 1742.008 -197.255 0.000 0.000 7.285 7.685
-1603.31 4403.32 0.000 0.000 1.800 13.288 1685.555 -197.255 0.000 0.000 7.319 7.514
-1515.92 4372.07 0.000 0.000 2.062 12.903 1612.972 -197.255 0.000 0.000 7.345 7.343
-1416.17 4340.82 0.000 0.000 2.368 12.472 1524.260 -197.255 0.000 0.000 7.360 7.178
-1304.71 4309.57 0.000 0.000 2.714 12.000 1419.418 -197.255 0.000 0.000 7.358 7.024
-1182.17 4278.32 0.000 0.000 3.098 11.489 1298.447 -197.255 0.000 0.000 7.335 6.887
-1049.16 4247.07 0.000 0.000 3.516 10.944 1161.347 -197.255 0.000 0.000 7.286 6.773
-906.32 4215.82 0.000 0.000 3.967 10.368 1008.117 -197.255 0.000 0.000 7.209 6.686
-754.27 4184.57 0.000 0.000 4.448 9.763 838.757 -197.255 0.000 0.000 7.100 6.631
-593.66 4153.32 0.000 0.000 4.957 9.132 653.268 -197.255 0.000 0.000 6.957 6.613
-425.09 4122.07 0.000 0.000 5.493 8.478 451.649 -197.255 0.000 0.000 6.779 6.633
-249.21 4090.82 0.000 0.000 6.054 7.803 233.901 -197.255 0.000 0.000 6.567 6.693
-66.65 4059.57 0.000 0.000 6.640 7.108 0.024 -197.255 0.000 0.000 6.324 6.792
σ1 σ2
x FASE1 FASE2 FASE3 FASE4 x FASE1 FASE2 FASE3 FASE4
0.00 0.000 0.000 -0.226 -0.226 0.00 0.000 0.000 -0.290 -0.290
1.00 0.000 0.000 -0.101 0.244 1.00 0.000 0.000 -0.197 0.060
2.00 0.000 0.000 0.014 0.679 2.00 0.000 0.000 -0.111 0.385
3.00 0.000 0.000 0.121 1.078 3.00 0.000 0.000 -0.031 0.683
4.00 0.000 0.000 0.218 1.441 4.00 0.000 0.000 0.042 0.955
5.00 0.000 0.000 0.306 1.795 5.00 0.000 0.000 0.108 1.220
6.00 0.000 0.000 0.385 2.122 6.00 0.000 0.000 0.167 1.466
7.00 0.000 0.000 0.455 2.410 7.00 0.000 0.000 0.220 1.683
8.00 0.000 0.000 0.516 2.660 8.00 0.000 0.000 0.266 1.871
9.00 0.000 0.000 0.568 2.872 9.00 0.000 0.000 0.306 2.031
10.00 0.000 0.000 0.613 3.047 10.00 0.000 0.000 0.339 2.163
11.00 0.000 0.000 0.648 3.186 11.00 0.000 0.000 0.366 2.268
12.00 0.000 0.000 0.676 3.289 12.00 0.000 0.000 0.387 2.346
13.00 0.000 0.000 0.696 3.356 13.00 0.000 0.000 0.402 2.397
14.00 0.000 0.000 0.708 3.388 14.00 0.000 0.000 0.411 2.421
15.00 0.000 0.000 0.711 3.385 15.00 0.000 0.000 0.414 2.419
16.00 0.000 0.000 0.708 3.388 16.00 0.000 0.000 0.411 2.421
17.00 0.000 0.000 0.696 3.356 17.00 0.000 0.000 0.402 2.397
18.00 0.000 0.000 0.676 3.289 18.00 0.000 0.000 0.387 2.346
19.00 0.000 0.000 0.648 3.186 19.00 0.000 0.000 0.366 2.268
20.00 0.000 0.000 0.613 3.047 20.00 0.000 0.000 0.339 2.163
21.00 0.000 0.000 0.568 2.872 21.00 0.000 0.000 0.306 2.031
22.00 0.000 0.000 0.516 2.660 22.00 0.000 0.000 0.266 1.871
23.00 0.000 0.000 0.455 2.410 23.00 0.000 0.000 0.220 1.683
24.00 0.000 0.000 0.385 2.122 24.00 0.000 0.000 0.167 1.466
25.00 0.000 0.000 0.306 1.795 25.00 0.000 0.000 0.108 1.220
26.00 0.000 0.000 0.218 1.441 26.00 0.000 0.000 0.042 0.955
27.00 0.000 0.000 0.121 1.078 27.00 0.000 0.000 -0.031 0.683
28.00 0.000 0.000 0.014 0.679 28.00 0.000 0.000 -0.111 0.385
29.00 0.000 0.000 -0.101 0.244 29.00 0.000 0.000 -0.197 0.060
30.00 0.000 0.000 -0.226 -0.226 30.00 0.000 0.000 -0.290 -0.290
VICTOR CASTRO VIGA DE PUENTE HORMIGON PRETENSADO
TENSIONES S3
4.000
3.500 FASE1
3.000 FASE2
FASE3
2.500
FASE4
2.000
(MPa)
1.500
1.000
0.500
0.000
-0.5000.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00
(m)
TENSIONES S4
3.000
FASE1
2.500
FASE2
2.000 FASE3
1.500 FASE4
(MPa)
1.000
0.500
0.000
(m)
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00
-0.500
TENSIONES S3
12.000
10.000
8.000
6.000
(MPa)
FASE1
FASE2
4.000
FASE3
FASE4
2.000
0.000
0.00 5.00 10.00 15.00 (m) 20.00 25.00 30.00 35.00
TENSIONES S4
16.000
FASE1
14.000
FASE2
12.000
FASE3
10.000
FASE4
8.000
(MPa)
6.000
4.000
2.000
0.000 (m)
-2.000 0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00
VICTOR CASTRO VIGA DE PUENTE HORMIGON PRETENSADO
(MPa)
14 1.239 10.271 -0.368 14.420 21.000 -2.74
15 1.242 10.298 -0.495 14.310 21.000 -2.74 5.000
16 1.303 10.335 -0.650 14.139 21.000 -2.74
17 1.417 10.341 -0.746 13.909 21.000 -2.74
18 1.584 10.313 -0.781 13.625 21.000 -2.74
0.000
19 1.800 10.247 -0.748 13.288 21.000 -2.74
0 5 10 15 20 25 30 35
20 2.062 10.138 -0.641 12.903 21.000 -2.74
21 2.368 9.982 -0.453 12.472 21.000 -2.74
22 2.714 9.773 -0.177 12.000 21.000 -2.74 -5.000
23 3.098 9.507 0.194 11.489 21.000 -2.74
24 3.516 9.179 0.670 10.944 21.000 -2.74 MIN S3 MAX S3
25 3.967 8.785 1.258 10.368 21.000 -2.74
26 4.448 8.333 1.939 9.763 21.000 -2.74 MIN S4 MAX S4
27 4.957 7.839 2.677 9.132 21.000 -2.74 LIMITE+ LIMITE-
28 5.493 7.275 3.537 8.478 21.000 -2.74
29 6.054 6.644 4.521 7.803 21.000 -2.74 (m)
30 5.949 6.640 5.628 7.108 21.000 -2.74
FLECHAS: θ
x M cv ∆θ 0.003018 x ∆ flecha flecha
0.00 0.00 0.0000 0.00300 0 0.00000 0.00000
1.00 278.38 0.0001 0.00295 0.5 0.00300 0.00300 flecha
2.00 536.02 0.0001 0.00286 1.5 0.00295 0.00595
3.00 772.92 0.0001 0.00275 2.5 0.00286 0.00881
0.00 5.00 10.00 15.00 20.00 25.00 30.00 35.00
4.00 989.09 0.0001 0.00261 3.5 0.00275 0.01156
0.00000
5.00 1207.21 0.0002 0.00244 4.5 0.00261 0.01416
6.00 1412.10 0.0002 0.00224 5.5 0.00244 0.01660
7.00 1593.67 0.0002 0.00202 6.5 0.00224 0.01884 0.00500
8.00 1751.91 0.0002 0.00179 7.5 0.00202 0.02086
9.00 1886.82 0.0003 0.00154 8.5 0.00179 0.02265
10.00 1998.41 0.0003 0.00127 9.5 0.00154 0.02419 0.01000
11.00 2086.66 0.0003 0.00100 10.5 0.00127 0.02546
flecha
TENSIONES EN EL HORMIGON
X analisis= 20.100 (m)
N pret ini= 4.370 (MN) N pret fin= 3.581 (MN) N ∆ Pret= -0.789 (MN)
seccion simple hueca + Aº pasivo seccion simple llena + pretensado seccion compuesta
ex SSA-vainas= 0.6870 (m) ex SHAP= 0.6467 (m) ex SHAP= 0.9865 (m)
Area_SSA-vainas= 0.5906 (m2) Area_SHAP= 0.6243 (m2) Area_SHAP= 0.9589 (m2)
I_SSA-vainas= 0.2377 (m4) I_SHAP= 0.2529 (m4) I_SHAP= 0.4565 (m4)
yi_SSA-vainas= 0.862 (m) yi_SHAP= 0.822 (m) yi_SHAP= 1.162 (m)
ys_SSA-vainas= 0.838 (m) ys_SHAP= 0.878 (m) ys_SHAP= 0.718 (m)
h losa= 0.180 (m)
n= Ec losa/Ecviga = 0.775 (m)