Documentos de Académico
Documentos de Profesional
Documentos de Cultura
TR= 20min
Vs= 0.02m/s
198.3mg/L(0.016)
𝐶𝑢 =
0.07𝑚
𝐶𝑢 = 63.5mg/L
0.102(20)
𝐴=
0.016m
𝐴 = 128 m2
146.88m3/d(0.016 − 0.07)m
𝑄𝑜 =
0.0016
Qo = 4957m3 /d
4. VELOCIDAD DE SEDIMENTACION
3600s
𝑉𝑠 = 0.02m/s
1h
𝑉𝑠 = 72m/h
A = 2.87m2
AR= 128m2
7. FLUJO DE SOLIDOS
flujo de solidos = Co ∗ Q
29.13Kg
flujo de solidos =
dia
8. CARGA DE SOLIDOS
flujo solidos
carga de solidos =
area elegida
Kg
29.13 0.23kg
carga de solidos = dia =
128m2 m2 d
9. SE CALCULA LA CARGA HIDRAULICA
Q
CH=
A
Q 146.88m3 /dia m3
CH= = = 1.15
A 128m2 m2 dia
Qo(Cu − Co)
Qe =
Cu − Ce
4957(63.5 − 198.3)
Qe =
63.5 − 65
Qe = 445469
Donde Ce = Co ∗ 0.5
mg
Ce = 198.3 ∗ o. 5 = 99.15
L
Qo ∗ t u∗ CH
H=
Qe
4957m3 1.15m3
( ) (0.02dias)( 2
dia m dia
H= 3 = 0.26m
445469m
dia
4 ∗ 63.5 1
D=( )2 = 8.99m
π
D1 = D
D1 = 8.99m
h1 = H1 = 0.7m
h2 = H1 (0.25)
h2 = 0.26 ∗ (0.25)
h2 = 0.065m
π
Vc = cot 2 α (0.26m3 − 0.065m3 )
3
Vc = m3