PROCUCTO: TARRAJEO LISTO
EMPRESA: HERMANOS JP. SAC
UBICACION: EL HUARANGAL MZ-B LT-15
DEPARTAMENTO: ICA
PROVINCIA: ICA
DISTRITO: LOS AQUIJES

BLS. X MURO SOLES


1M2. M. E=0.015 0.63 COSTO UNIT. DE LA BLS. 9.9
XXX MTR2 20 COSTO TOTAL 124.626
CANT. DE BOLSAS 12.59

BOLSAS DESP. 5% 1 tolvada de mezcla


1 M2 DE MURO DE e=0.015 0.60 0.63
1 M2 DE MURO DE e=0.02 0.80 0.84

CEMENTO ARENA A/C


RELACION DE VOLUMENES 1 5 0.67

1M3 DE TARRAJEO REND. EN BLS.


MATERIALES
1M3 KG/M3 BALDES BLS. C./M3 44.36
CEMENTO INKA 0.185 386.9 9.74 9.10
ARENA FINA 0.925 1387.5 48.68
TOTAL 1.110 1774.4 58.42
AGUA RECOMENDADA 0.259 259.2 13.64

1 BOLSA DE 40KG REND. EN BLS.


MATERIALES
1M3 KG/M3 BALDES BLS. C./M3 1.00
CEMENTO INKA 0.004 8.72 0.22 0.21
ARENA FINA 0.021 31.28 1.10
TOTAL 0.025 40.00 1.32
AGUA RECOMENDADA 0.006 5.84 0.31
1 TOLVADA DE 12 PIE3 PARA EMBOLSAR REND. EN BLS.
MATERIALES
1M3 KG/M3 BALDES BLS. C./M3 13.58
CEMENTO INKA 0.057 118.43 3.0 2.8
ARENA FINA 0.283 424.75 14.9
TOTAL 0.340 543.18 17.9
AGUA RECOMENDADA 0.079 79.35 4.2
N° DE BLS.
MATERIALES POR CANTIDAD DE BLS. 20
MATERIALES
1M3 KG/M3 BALDES BLS. C./M3
CEMENTO INKA 0.083 174.43 4.4 4.10 TOLVADAS
ARENA FINA 0.417 625.57 21.9
TOTAL 0.500 800.00 26.3
AGUA RECOMENDADA 0.117 116.87 6.2

TOLVADAS
HERMANOS JP. SAC
PRODUCTO: TARRAJEO LISTO
EMPRESA: HERMANOS JP SAC
UBICACIÓN: EL HUARNGAL MZ-B LT-15
DEPARTAMENTO: ICA
PROVINCIA: ICA
DISTRITO: LOS AQUIJES

BOLSAS
CANTIDAD DE BOLSAS 20 COSTO UNIT. DE LA BLS.
CANT. DE M2 DE MURO 33.36 COSTO TOTAL

rendimiento
1 tolvada de mezcla 21.6 M2 DE TARRAJEO
EQUIVALE
13.58 BOLSAS DE 40KG

PRECIO DE LOS MATER. Y HERR.


SOLES.
CEMENTO INKA 20.20
DATOS A UTILIZAR EN EL DISEÑO DE MEZCLA ARENA FINA 25.00
MATERIALES KG/M3 1BLS. C./M3 BOLSA 2.00
CEMENTO INKA 2091.19 42.5 MAQUINARIA 0.074
ARENA FINA 1500 LOGO 0.50
AGUA 1000 SELLADO X BLS. 0.50
TRABAJADOR 0.15
BALDES M3 KG/BALDE
1 BALDE NORMAL 0.019
1 BALDE DE CEMENTO 39.73261 M3
1 BALDE DE ARENA FINA 28.5 1 BLS. DE 40 KG = 0.025
1 BALDE DE AGUA 19 M3/M2 DE M.
1 M2 DE MURO DE e=0.015 0.015
PIE3 1 M2 DE MURO DE e=0.020 0.02
1M3 35.3147
PIE3 M3
1 TOLVA 12 0.340

XXX. CANTIDAD
DE BOLSAS MAT. FALTANTESPOR TOLVA
MATERIALES
1 TOLVADA DE MEZCLA M3 KG/M3 BALDES
1 1.47279743 CEMENTO INKA 0.05249938 109.786187 2.76312548
ARENA FINA 0.26249692 393.745381 13.8156274
TOLVADA POR TOTAL 0.3149963 503.531568 16.5787529
M3 DE MURO AGUA RECOMENDADA 0.07355675 73.5567453 3.87140765
1 TOLVADA TARRAJEADO
0.07363987 0.92701088
SOLES
9.9
198

COSTO DE LOS MATER. POR BLS.


COSTO TOTAL POR BOLSA
SOLES %
CEMENTO INKA 4.15 UTILIDAD 30
ARENA FINA 0.52 IGV 18

TOTAL DE COSTO 4.67 PRECIO DE VENTA SUGERIDO

PRECIO NORMAL POR METRADO TENIENDO EN


10 A 12 SOLES

M2 / BL.
BLS /M2
0.6 1.67
0.8 1.25
CANT. FALTANTE
0.927
BLS. C./ M3
2.5832044
SOLES
7.89

10.2576397
12.1040149

12.1040149

AL POR METRADO TENIENDO EN CUENTA EL RENDIMEINTO