COMPUTOS MÉTRICOS

CONTRATISTA: WALTER CHAVEZ 08/01/2018 a 20/01/2018

BOVEDA DE DRENAJE PLUVIAL

ITEM: EXCAVACION MANUAL

L1 L2 A1 A2 V1 V2 VT
[m] [m] [m2] [m2] [m3] [m3] [m3]
M3
39.00 39.00 2.80 5.25 109.20 204.75 313.95 313.95

Figura 1. Sección transversal – Excavación manual

A3

A1 A2
3,50 m

AB

0,80 m 1,20 m 1,50 m

Fuente. Elaboración propia

ITEM: RELLENO Y COMPACTADO MANUAL

L1 L2 L3 A1 A2 A3 V1 V2 V3 VT
[m] [m] [m] [m2] [m2] [m2] [m3] [m3] [m3] [m3]
M3
21.00 21.00 21.00 2.80 5.25 1.95 58.80 110.25 40.95 210.00 210.00
Figura 2. Sección transversal – Relleno y compactado manual

A3

A1 A2

3,50 m
AB

0,80 m 1,20 m 1,50 m

Fuente. Elaboración propia


COMPUTOS MÉTRICOS
CONTRATISTA: WALTER CHAVEZ 22/01/2018 a 03/02/2018
BOVEDA DE DRENAJE PLUVIAL
ITEM: RELLENO Y COMPACTADO MANUAL

L1 L2 L3 A1 A2 A3 V1 V2 V3 VT
[m] [m] [m] [m2] [m2] [m2] [m3] [m3] [m3] [m3]
M3
18.00 18.00 18.00 2.80 5.25 1.95 50.40 94.50 35.10 180.00 180.00

Figura 3. Sección transversal – Relleno y compactado manual

A3

A1 A2
3,50 m
AB

0,80 m 1,20 m 1,50 m

Fuente. Elaboración propia


ALCANTARILLADO Av. PRINCIPAL
ITEM: TENDIDO DE TUBO PVC 8" SANITARIO

L
[m]
M
41.50 41.50

ITEM: RELLENO Y COMPACTADO CON TIERRA CERNIDA

L A V
[m] [m2] [m3]
M3
41.50 0.33 13.70 13.70
ITEM: CAMARA DE HORMIGON CICLOPEO

V1 V2 V3 VT
[m3] [m3] [m3] [m3]
M3
4.25 4.79 4.79 13.83 13.83

MATRIZ AGUA POTABLE


ITEM: TENDIDO DE CAÑERIA 3"

L
[m]
M
79.00 79.00

ITEM: RELLENO Y COMPACTADO CON TIERRA CERNIDA

L A V
[m] [m2] [m3]
M3
79.00 0.085 6.72 6.72
COMPUTOS MÉTRICOS
CONTRATISTA: WALTER CHAVEZ 05/02/2018 a 17/02/2018
BOVEDA DE DRENAJE PLUVIAL
ITEM: EXCAVACION MANUAL

L B H VT
[m] [m] [m] [m3]
M3
34.00 4.60 2.90 453.56 453.56

ITEM: RELLENO Y COMPACTADO MANUAL

L1 L2 B1 B2 H1 H2 V1 V2 VT
[m] [m] [m] [m] [m] [m] [m3] [m3] [m3]
M3
21.00 21.00 2.80 5.25 1.95 58.80 110.25 40.95 210.00 210.00

ALCANTARILLADO Av. PRINCIPAL


ITEM: TENDIDO DE TUBO PVC 6" SANITARIO

L
[m]
M
24.00 24.00

ITEM: RELLENO Y COMPACTADO CON TIERRA CERNIDA

L A V
[m] [m2] [m3]
M3
24.00 0.33 13.70 13.70

MATRIZ AGUA POTABLE


ITEM: TENDIDO DE CAÑERIA 3"

L
[m]
M
79.00 79.00

ITEM: RELLENO Y COMPACTADO CON TIERRA CERNIDA


L A V
[m] [m2] [m3]
M3
79.00 0.085 6.72 6.72

COMPUTOS MÉTRICOS
CONTRATISTA: WALTER CHAVEZ 19/02/2018 a 03/03/2018