Proyecto:
Fecha
Region Prov. Dist.
02 ARQUITECTURA PISO 1
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS LONGITUD ANCHO ALTURA
02.01 ALBAÑILERIA
02.01.01 MUROS DE ALBAÑILERIA
02.01.01.01 MURO DE LADRILLO KING-KONG CON CEMENTO-CAL-ARENA M2
Primer Piso
Eje 1
Tramo A-B 1.00 1.00 6.00 3.10 18.60
V-4 1.00 1.00 1.80 1.00 1.80
Tramo C-D 1.00 1.00 2.64 3.10 8.18
Tramo D-E 1.00 1.00 2.20 3.10 6.82
Eje 2´
Tramo B-C 1.00 1.00 0.80 3.10 2.48
Tramo C-D 1.00 1.00 2.64 3.10 8.18
Tramo D-F 1.00 1.00 2.58 3.10 8.00
Eje 3
Tramo B-C 1.00 1.00 2.81 3.10 8.71
Eje 4
Tramo A-B 1.00 1.00 6.00 3.10 18.60
Tramo C-D 1.00 1.00 1.90 3.10 5.89
Tramo D-F 1.00 1.00 1.90 3.10 5.89
Eje 4´
Tramo C-D 1.00 1.00 2.64 3.10 8.18
Tramo D-F 1.00 1.00 2.58 3.10 8.00
Eje 5
Tramo A-B 1.00 1.00 3.24 3.10 10.04
Eje 6
Tramo A-B 1.00 1.00 6.00 3.10 18.60
Eje 9
Tramo C-D 1.00 1.00 6.00 3.10 18.60
Eje 10
V-4 1.00 1.00 3.45 1.30 4.49
P8 1.00 1.00 2.54 1.05 2.67
Eje 10
Tramo C-D 1.00 1.00 3.00 3.10 9.30
Eje 12
Tramo C-D 1.00 1.00 2.05 3.10 6.36
Eje 13´
Tramo A-B 1.00 1.00 1.60 3.10 4.96
Tramo B-C 1.00 1.00 2.80 0.90 2.52
Tramo C-D 1.00 1.00 1.60 3.10 4.96
Tramo C-D 1.00 1.00 3.00 3.10 9.30
Eje 15
Tramo A-B 1.00 1.00 6.00 3.10 18.60
Eje 16
Tramo A-B 1.00 1.00 6.00 3.10 18.60
Eje A
Tramo 13'-14 1.00 1.00 1.20 3.10 3.72
Tramo 14-15 1.00 1.00 3.00 3.10 9.30
Tramo 15-16 1.00 1.00 4.00 3.10 12.40
Eje B
Tramo 1-2 1.00 1.00 2.60 3.10 8.06
Tramo 2-2' 1.00 3.00 1.50 3.10 13.95
V-1 1.00 3.00 1.55 1.00 4.65
Tramo 3-4 1.00 1.00 1.69 3.10 5.24
Tramo 4-5 1.00 1.00 1.70 3.10 5.27
Tramo 5-6 1.00 1.00 1.70 3.10 5.27
Tramo 6-7 1.00 1.00 1.70 3.10 5.27
Tramo 7-8 1.00 1.00 1.90 3.10 5.89
V-3 1.00 2.00 1.00 0.80 1.60
Tramo 8-9 1.00 1.00 0.89 3.10 2.76
Tramo 9-10 1.00 1.00 1.70 3.10 5.27
Tramo 10-11 1.00 1.00 1.70 3.10 5.27
Tramo 11-12 1.00 1.00 2.70 3.10 8.37
Tramo 12-13 1.00 1.00 2.70 3.10 8.37
Tramo 13-14 1.00 1.00 1.45 3.10 4.50
Eje C
V-7 1.00 1.00 4.60 1.70 7.82
METRADO DETALLADO
Proyecto:
Fecha
Region Prov. Dist.
Tramo 10 -11 1.00 1.00 2.40 3.10 7.44
Tramo 11-12 1.00 1.00 2.40 3.10 7.44
Tramo 12-13 1.00 1.00 3.90 3.10 12.09
Tramo 13-14 1.00 1.00 3.70 3.10 11.47
Tramo 15-16 1.00 1.00 3.97 3.10 12.31
Eje D
Tramo 3-4 1.00 1.00 3.22 3.10 9.98
Tramo 14-15 1.00 1.00 3.70 3.10 11.47
Tramo 15-16 1.00 1.00 3.97 3.10 12.31
Tramo 15-16 1.00 1.00 1.30 4.10 5.33
Tramo 16-17 1.00 1.00 2.30 5.10 11.73
Tramo 17-18 1.00 1.00 1.30 6.10 7.93
Eje E
Tramo 1-12 1.00 4.00 1.00 1.00 4.00
Eje F
Tramo 2-3 1.00 1.00 4.60 1.70 7.82
Tramo 3-4 1.00 1.00 1.30 1.70 2.21
Cerco Perimétrico
Tramo F 1.00 23.00 2.50 3.10 178.25
Tramo 23 1.00 3.00 2.50 3.10 23.25
Tramo C 1.00 7.00 2.50 3.10 54.25
SegundoPiso
Eje 1
Tramo A-B 1.00 1.00 6.28 3.10 19.47
1.00 1.00 2.23 3.10 6.91
1.00 1.00 7.95 0.25 1.99
Eje 2'
1.00 1.00 3.11 3.10 9.64
1.00 1.00 2.20 3.10 6.82
Eje 3
1.00 1.00 6.28 3.10 19.47
Eje 4
1.00 1.00 6.28 3.10 19.47
1.00 1.00 2.80 3.10 8.68
Eje 4'
1.00 1.00 2.58 3.10 8.00
1.00 1.00 2.63 3.10 8.15
Eje 5
1.00 1.00 6.28 3.10 19.47
Eje 7
1.00 1.00 5.28 3.10 16.37
Eje 9
1.00 1.00 2.00 3.10 6.20
Eje 11
1.00 1.00 3.03 3.10 9.39
Eje 12
1.00 1.00 2.05 3.10 6.36
Eje 13
1.00 1.00 3.02 3.10 9.36
1.00 1.00 6.28 3.10 19.47
Eje 15
1.00 1.00 4.05 3.10 12.56
Eje 16 1.00 1.00 3.70 3.10 11.47
Eje A
Tramo 1-2 1.00 24.00 0.15 1.20 4.32
1.00 1.00 3.00 3.10 9.30
1.00 1.00 4.00 3.10 12.40
Eje A'
Tramo 1-2 1.00 1.00 2.30 3.10 7.13
1.00 1.00 2.85 3.10 8.84
1.00 1.00 3.05 3.10 9.46
Eje B
Tramo 1-2 1.00 1.00 2.65 3.10 8.22
1.00 1.00 1.73 3.10 5.36
1.00 1.00 1.70 3.10 5.27
1.00 1.00 1.70 3.10 5.27
1.00 1.00 2.70 3.10 8.37
1.00 1.00 1.70 3.10 5.27
1.00 1.00 2.70 3.10 8.37
1.00 1.00 1.70 1.00 1.70
METRADO DETALLADO
Proyecto:
Fecha
Region Prov. Dist.
1.00 1.00 2.70 3.10 8.37
1.00 1.00 2.70 3.10 8.37
1.00 1.00 2.70 3.10 8.37
1.00 1.00 1.43 3.10 4.43
Eje C
Tramo 1-2 1.00 1.00 4.00 1.70 6.80
1.00 1.00 0.60 3.10 1.86
1.00 1.00 2.40 3.10 7.44
1.00 1.00 2.40 3.10 7.44
1.00 1.00 3.95 3.10 12.25
1.00 1.00 3.70 3.10 11.47
Eje D
Tramo 1-2 1.00 1.00 4.33 3.10 13.42
1.00 1.00 2.80 3.10 8.68
1.00 1.00 1.30 3.10 4.03
1.00 1.00 2.30 3.10 7.13
1.00 1.00 1.30 3.10 4.03
Eje F
Tramo 1-2 1.00 4.00 0.85 1.00 3.40
1.00 1.00 4.60 1.70 7.82
1.00 1.00 1.30 1.70 2.21
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS LONGITUD ANCHO ALTURA
02.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO PRIMARIO Y RAYADO M2
Eje 2'
Tramo 1-2 2.00 1.00 2.85 3.10 17.67
2.00 1.00 2.63 3.10 16.31
2.00 1.00 2.81 3.10 17.42
2.00 2.00 1.90 3.10 23.56
2.00 1.00 2.58 3.10 16.00
2.00 1.00 2.63 3.10 16.31
2.00 1.00 4.60 1.70 15.64
2.00 1.00 3.22 3.10 19.96
2.00 1.00 4.60 1.70 15.64
2.00 1.00 1.30 1.70 4.42
298.62
Proyecto:
Fecha
Region Prov. Dist.
Tramo C-D 1.00 1.00 2.64 3.10 8.18
Tramo D-F 1.00 1.00 2.58 3.10 8.00
Eje 5
Tramo A-B 2.00 1.00 3.24 3.10 20.09
Eje 6
Tramo A-B 2.00 1.00 6.00 3.10 37.20
Eje 9
Tramo C-D 2.00 1.00 6.00 3.10 37.20
Eje 10
V-4 2.00 1.00 3.45 1.30 8.97
P8 2.00 1.00 2.54 1.05 5.33
Eje 10
Tramo C-D 1.00 1.00 3.00 3.10 9.30
Eje 12
Tramo C-D 2.00 1.00 2.05 3.10 6.36
Eje 13´
Tramo A-B 1.00 1.00 1.60 3.10 4.96
Tramo B-C 1.00 1.00 2.80 0.90 2.52
Tramo C-D 1.00 1.00 1.60 3.10 4.96
Tramo C-D 1.00 1.00 3.00 3.10 9.30
Eje 15
Tramo A-B 1.00 1.00 6.00 3.10 18.60
Eje 16
Tramo A-B 1.00 1.00 6.00 3.10 18.60
Eje A
Tramo 13'-14 1.00 1.00 1.20 3.10 3.72
Tramo 14-15 1.00 1.00 3.00 3.10 9.30
Tramo 15-16 1.00 1.00 4.00 3.10 12.40
Eje B
Tramo 1-2 2.00 1.00 2.60 3.10 16.12
Tramo 2-2' 2.00 3.00 1.50 3.10 27.90
V-1 2.00 3.00 1.55 1.00 9.30
Tramo 3-4 2.00 1.00 1.69 3.10 10.48
Tramo 4-5 2.00 1.00 1.70 3.10 10.54
Tramo 5-6 2.00 1.00 1.70 3.10 10.54
Tramo 6-7 2.00 1.00 1.70 3.10 10.54
Tramo 7-8 2.00 1.00 1.90 3.10 11.78
V-3 2.00 2.00 1.00 0.80 3.20
Tramo 8-9 2.00 1.00 0.89 3.10 5.52
Tramo 9-10 2.00 1.00 1.70 3.10 10.54
Tramo 10-11 2.00 1.00 1.70 3.10 10.54
Tramo 11-12 2.00 1.00 2.70 3.10 16.74
Tramo 12-13 2.00 1.00 2.70 3.10 16.74
Tramo 13-14 2.00 1.00 1.45 3.10 8.99
Eje C
V-7 2.00 1.00 4.60 1.70 15.64
Tramo 10 -11 2.00 1.00 2.40 3.10 14.88
Tramo 11-12 2.00 1.00 2.40 3.10 14.88
Tramo 12-13 2.00 1.00 3.90 3.10 24.18
Tramo 13-14 2.00 1.00 3.70 3.10 22.94
Tramo 15-16 2.00 1.00 3.97 3.10 24.61
Eje D
Tramo 3-4 2.00 1.00 3.22 3.10 19.96
Tramo 14-15 2.00 1.00 3.70 3.10 22.94
Tramo 15-16 2.00 1.00 3.97 3.10 24.61
Tramo 15-16 2.00 1.00 1.30 4.10 10.66
Tramo 16-17 2.00 1.00 2.30 5.10 23.46
Tramo 17-18 2.00 1.00 1.30 6.10 15.86
Eje E
Tramo 1-12 2.00 4.00 1.00 1.00 8.00
Eje F
Tramo 2-3 1.00 1.00 4.60 1.70 7.82
Tramo 3-4 1.00 1.00 1.30 1.70 2.21
SegundoPiso
Eje 1
Tramo A-B 1.00 1.00 6.28 3.10 19.47
1.00 1.00 2.23 3.10 6.91
1.00 1.00 7.95 0.25 1.99
Eje 2'
2.00 1.00 3.11 3.10 19.28
2.00 1.00 2.20 3.10 13.64
METRADO DETALLADO
Proyecto:
Fecha
Region Prov. Dist.
Eje 3
2.00 1.00 6.28 3.10 38.94
Eje 4
2.00 1.00 6.28 3.10 38.94
2.00 1.00 2.80 3.10 17.36
Eje 4'
2.00 1.00 2.58 3.10 16.00
2.00 1.00 2.63 3.10 16.31
Eje 5
2.00 1.00 6.28 3.10 38.94
Eje 7
2.00 1.00 5.28 3.10 32.74
Eje 9
2.00 1.00 2.00 3.10 12.40
Eje 11
2.00 1.00 3.03 3.10 18.79
Eje 12
2.00 1.00 2.05 3.10 12.71
Eje 13
2.00 1.00 3.02 3.10 18.72
2.00 1.00 6.28 3.10 38.94
Eje 15
1.00 1.00 4.05 3.10 12.56
Eje 16 1.00 1.00 3.70 3.10 11.47
Eje A
Tramo 1-2 1.00 24.00 0.15 1.20 4.32
1.00 1.00 3.00 3.10 9.30
1.00 1.00 4.00 3.10 12.40
Eje A'
Tramo 1-2 2.00 1.00 2.30 3.10 14.26
2.00 1.00 2.85 3.10 17.67
2.00 1.00 3.05 3.10 18.91
Eje B
Tramo 1-2 2.00 1.00 2.65 3.10 16.43
2.00 1.00 1.73 3.10 10.73
2.00 1.00 1.70 3.10 10.54
2.00 1.00 1.70 3.10 10.54
2.00 1.00 2.70 3.10 16.74
2.00 1.00 1.70 3.10 10.54
2.00 1.00 2.70 3.10 16.74
2.00 1.00 1.70 1.00 3.40
2.00 1.00 2.70 3.10 16.74
2.00 1.00 2.70 3.10 16.74
2.00 1.00 2.70 3.10 16.74
2.00 1.00 1.43 3.10 8.87
Eje C
Tramo 1-2 2.00 1.00 4.00 1.70 13.60
2.00 1.00 0.60 3.10 3.72
2.00 1.00 2.40 3.10 14.88
2.00 1.00 2.40 3.10 14.88
2.00 1.00 3.95 3.10 24.49
2.00 1.00 3.70 3.10 22.94
Eje D
Tramo 1-2 2.00 1.00 4.33 3.10 26.85
2.00 1.00 2.80 3.10 17.36
2.00 1.00 1.30 3.10 8.06
2.00 1.00 2.30 3.10 14.26
2.00 1.00 1.30 3.10 8.06
Eje F
Tramo 1-2 1.00 4.00 0.85 1.00 3.40
1.00 1.00 4.60 1.70 7.82
1.00 1.00 1.30 1.70 2.21
1608.23
TARRAJEO DE MUROS EXTERIORES
Primer Piso
Eje 1
Tramo A-B 1.00 1.00 6.00 3.10 18.60
V-4 1.00 1.00 1.80 1.00 1.80
Tramo C-D 1.00 1.00 2.64 3.10 8.18
Tramo D-E 1.00 1.00 2.20 3.10 6.82
Eje 4´
METRADO DETALLADO
Proyecto:
Fecha
Region Prov. Dist.
Tramo C-D 1.00 1.00 2.64 3.10 8.18
Tramo D-F 1.00 1.00 2.58 3.10 8.00
Eje 10
V-4 1.00 1.00 3.45 1.30 4.49
P8 1.00 1.00 2.54 1.05 2.67
Eje 10
Tramo C-D 1.00 1.00 3.00 3.10 9.30
Eje 13´
Tramo A-B 1.00 1.00 1.60 3.10 4.96
Tramo B-C 1.00 1.00 2.80 0.90 2.52
Tramo C-D 1.00 1.00 1.60 3.10 4.96
Tramo C-D 1.00 1.00 3.00 3.10 9.30
Eje 16
Tramo A-B 1.00 1.00 6.00 3.10 18.60
Eje A
Tramo 13'-14 1.00 1.00 1.20 3.10 3.72
Tramo 14-15 1.00 1.00 3.00 3.10 9.30
Tramo 15-16 1.00 1.00 4.00 3.10 12.40
Eje C
V-7 1.00 1.00 4.60 1.70 7.82
Tramo 10 -11 1.00 1.00 2.40 3.10 7.44
Tramo 11-12 1.00 1.00 2.40 3.10 7.44
Tramo 12-13 1.00 1.00 3.90 3.10 12.09
Tramo 13-14 1.00 1.00 3.70 3.10 11.47
Tramo 15-16 1.00 1.00 3.97 3.10 12.31
Eje D
Tramo 3-4 1.00 1.00 3.22 3.10 9.98
Tramo 14-15 1.00 1.00 3.70 3.10 11.47
Tramo 15-16 1.00 1.00 3.97 3.10 12.31
Tramo 15-16 1.00 1.00 1.30 4.10 5.33
Tramo 16-17 1.00 1.00 2.30 5.10 11.73
Tramo 17-18 1.00 1.00 1.30 6.10 7.93
Eje E
Tramo 1-12 1.00 4.00 1.00 1.00 4.00
Eje F
Tramo 2-3 1.00 1.00 4.60 1.70 7.82
Tramo 3-4 1.00 1.00 1.30 1.70 2.21
Cerco Perimétrico
Tramo F 2.00 23.00 2.50 3.10 356.50
Tramo 23 2.00 3.00 2.50 3.10 46.50
Tramo C 2.00 7.00 2.50 3.10 108.50
SegundoPiso
Eje 1
Tramo A-B 1.00 1.00 6.28 3.10 19.47
1.00 1.00 2.23 3.10 6.91
1.00 1.00 7.95 0.25 1.99
Eje 11
1.00 1.00 3.03 3.10 9.39
Eje 12
1.00 1.00 2.05 3.10 6.36
Eje 13
1.00 1.00 3.02 3.10 9.36
1.00 1.00 6.28 3.10 19.47
Eje 15
1.00 1.00 4.05 3.10 12.56
Eje 16 1.00 1.00 3.70 3.10 11.47
Eje A
Tramo 1-2 1.00 24.00 0.15 1.20 4.32
1.00 1.00 3.00 3.10 9.30
1.00 1.00 4.00 3.10 12.40
Eje C
Tramo 1-2 1.00 1.00 4.00 1.70 6.80
1.00 1.00 0.60 3.10 1.86
1.00 1.00 2.40 3.10 7.44
1.00 1.00 2.40 3.10 7.44
1.00 1.00 3.95 3.10 12.25
1.00 1.00 3.70 3.10 11.47
Eje D
Tramo 1-2 1.00 1.00 4.33 3.10 13.42
METRADO DETALLADO
Proyecto:
Fecha
Region Prov. Dist.
1.00 1.00 2.80 3.10 8.68
1.00 1.00 1.30 3.10 4.03
1.00 1.00 2.30 3.10 7.13
1.00 1.00 1.30 3.10 4.03
Eje F
Tramo 1-2 1.00 4.00 0.85 1.00 3.40
1.00 1.00 4.60 1.70 7.82
1.00 1.00 1.30 1.70 2.21
997.61
ENLUCIDO DE CIELORRASOS
PRIMER PISO
1.00 1.00 6.00 8.09 48.54
1.00 1.00 4.00 1.83 7.32
1.00 1.00 4.00 3.20 12.80
1.00 1.00 4.00 2.56 10.24
1.00 1.00 6.00 6.50 39.00
1.00 1.00 6.00 5.90 35.40
1.00 1.00 6.00 6.23 37.38
1.00 1.00 6.00 13.35 80.10
1.00 1.00 6.00 3.55 21.30
1.00 1.00 3.00 7.80 23.40
SEGUNDO PISO
1.00 1.00 6.00 5.80 34.80
1.00 9.00 6.00 3.00 162.00
1.00 1.00 6.00 1.50 9.00
606.26
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS LONGITUD ANCHO ALTURA
02.02.02 VESTIDURA DE DERRAMES M2
PRIMER PISO
V-1 1.00 47.00 8.40 0.15 59.22
V-2 1.00 1.00 6.10 0.25 1.53
V-3 1.00 2.00 4.60 0.25 2.30
V-4 1.00 1.00 6.60 0.25 1.65
V-4 1.00 1.00 10.50 0.25 2.63
V-5 1.00 3.00 4.60 0.25 3.45
V-6 1.00 2.00 5.00 0.25 2.50
V-7 1.00 2.00 10.20 0.25 5.10
V-8 1.00 2.00 4.40 0.25 2.20
V-9 1.00 5.00 3.20 0.25 4.00
V-10
V-11 1.00 1.00 20.70 0.25 5.18
V-12 1.00 1.00 13.00 0.25 3.25
V-13 1.00 2.00 6.30 0.25 3.15
V-14 1.00 1.00 6.00 0.25 1.50
V-15
V-16 1.00 1.00 9.00 0.25 2.25
V-17 1.00 1.00 18.40 0.25 4.60
V-18 1.00 1.00 6.40 0.25 1.60
V-19 1.00 1.00 16.50 0.25 4.13
Proyecto:
Fecha
Region Prov. Dist.
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS AREA LARGO ANCHO
02.03 TARRAJEO
02.03.01 TARRAJEO DE COLUMNAS M2
3.00 53.00 3.10 0.30 147.87
3.00 15.00 3.10 0.30 41.85
3.00 22.00 3.10 0.40 81.84
3.00 16.00 3.10 0.60 89.28
3.00 19.00 3.10 0.25 44.18
405.02
TARRAJEO DE VIGAS M2
3.00 52.00 3.00 0.25 117.00
3.00 4.00 4.00 0.25 12.00
3.00 38.00 6.00 0.25 171.00
3.00 15.00 4.00 0.25 45.00
3.00 17.00 5.00 0.25 63.75
408.75
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS AREA ANCHO ALTURA
02.04 PISOS Y PAVIMENTOS
02.04.01 PISO DE CERAMICO DE 0.60m X 0.60m M2
primer piso 346.87 346.87
METRADO TOTAL (M2) 346.87
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS LONGITUD ANCHO ALTURA
02.04.02 PISO DE CEMENTO PULIDO M2
primer piso 311.22 311.22
METRADO TOTAL (M2) 311.22
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS LONGITUD ANCHO ALTURA
2.05 CARPINTERIA DE MADERA
02.05.01 PUERTA CONTRAPLACADA DE TRIPLAY M2
PRIMER PISO
P-1 1.00 15.00 0.90 2.10 28.35
P-2 1.00 3.00 1.00 2.10 6.30
P-3 1.00 13.00 0.70 2.10 19.11
P-5 1.00 1.00 2.00 2.10 4.20
METRADO TOTAL (M2) 38.85
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS LONGITUD ANCHO ALTURA
2.06 CARPINTERIA METALICA
02.06.01 BISAGRAS CAPUCHINAS DE 3" X 3" PZA
primer piso 3.00 40.00 120.00
METRADO TOTAL (PZA) 120.00
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS LONGITUD ANCHO ALTURA
02.06.02 CERROJO DE 3" ALUMINIZADA PARA PUERTA PZA
primer piso 1.00 40.00 40.00
METRADO TOTAL (PZA) 40.00
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS LONGITUD ANCHO ALTURA
02.07.03 MANIJA PARA PUERTAS PZA
primer piso 1.00 40.00 40.00
METRADO TOTAL (PZA) 40.00
METRADO DETALLADO
Proyecto:
Fecha
Region Prov. Dist.
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS LONGITUD ANCHO ALTURA
02.07.04 CHAPAS PARA PUERTAS PZA
primer piso 1.00 40.00 40.00
METRADO TOTAL (PZA) 40.00
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS LONGITUD ANCHO ALTURA
2.08 VIDRIOS, CRISTALES Y SIMILARES
02.08.01 VENTANAS SISTEMA DIRECTO M2
V1 4.00 0.80 0.70 2.24
V2 7.00 1.00 7.00 49.00
V3 23.00 1.30 7.00 209.30
V4 4.00 0.90 7.00 25.20
M1 2.00 2.10 5.25 22.05
METRADO TOTAL (M2) 307.79
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS LONGITUD ANCHO ALTURA
2.09 PINTURA
02.09.01 PINTURA LATEX EN MUROS EXTERIORES E INTERIORES M2
primer piso 8404.54 8404.54
METRADO TOTAL (M2) 8404.54
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS LONGITUD ANCHO ALTURA
02.09.02 PINTURA LATEX EN COLUMNAS M2
primer piso 550 550.00
METRADO TOTAL (M2) 550.00
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS LONGITUD ANCHO ALTURA
02.09.03 PINTURA LATEX EN CIELO RASO M2
pintura metrado general 1697.53 1697.53
METRADO TOTAL (M2) 1697.53
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS AREA LARGO ANCHO
02.03 PISOS Y CONTRAPISOS
02.03.01 CONTRAPISOS e= 40mm M2
2.00 1.00 6.10 6.00 73.20
2.00 1.00 7.60 3.00 45.60
1.00 1.00 1.20 2.15 2.58
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS AREA LARGO ANCHO
02.03 PISOS Y CONTRAPISOS
02.03.01 PISO PORCELANATO 0.60m x 0.60m M2
PRIMER PISO
1.00 1.00 6.00 8.09 48.54
1.00 1.00 4.00 1.83 7.32
1.00 1.00 4.00 3.20 12.80
1.00 1.00 4.00 2.56 10.24
1.00 1.00 6.00 5.90 35.40
1.00 1.00 6.00 6.23 37.38
1.00 1.00 6.00 13.35 80.10
1.00 1.00 6.00 3.55 21.30
SEGUNDO PISO
1.00 1.00 6.00 5.80 34.80
1.00 9.00 6.00 3.00 162.00
1.00 1.00 6.00 1.50 9.00
1.00 1.00 4.20 5.80 24.36
METRADO DETALLADO
Proyecto:
Fecha
Region Prov. Dist.
METRADO TOTAL (M2) 483.24
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS AREA LARGO ANCHO
02.03 PISOS Y CONTRAPISOS
02.03.01 ZOCALO CERAMICO 0.45 x 0.45 m M2
2.00 1.00 6.10 1.2 14.64
2.00 1.00 7.60 1.2 18.24
2.00 1.00 1.20 1.2 2.88
2.00 1.00 6.00 1.2 14.40
2.00 1.00 3.00 1.2 7.20
2.00 1.00 2.15 1.2 5.16
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS AREA LARGO ANCHO
02.03 PISOS Y CONTRAPISOS
02.03.01 52.10 M2
2.00 1.00 6.10 12.20
2.00 1.00 7.60 15.20
2.00 1.00 1.20 2.40
2.00 1.00 6.00 12.00
2.00 1.00 3.00 6.00
2.00 1.00 2.15 4.30
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS AREA ANCHO ALTURA
02.04 PISOS Y PAVIMENTOS
02.04.01 CONTRAZOCALO CERAMICO 0.60 X 0.10 m M2
104.061 104.061
METRADO TOTAL (M2) 104.06
PARTIDA N° DE N° DE MEDIDAS
DESCRIPCIÓN UND PARCIAL
N° VECES ELEMENTOS LONGITUD ANCHO ALTURA
02.04.02 PISOS Y PAVIMENTOS M2
CONTRAZOCALO DE CEMENTO PULIDO h= 0.10m 93.366 93.37
METRADO TOTAL (M2) 93.37