CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

MES 1 MES 2 MES 3


% TOTAL
ITEM DESCRIPCIÓN UND METRADO P.UNITARIOS S/ PARCIAL S/ METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
01 OBRAS PRELIMINARES 15,885.12 10,717.56 67.47% 5,167.56 32.53% 0.00 0.00% 100.00%
01.01 TRAZO Y REPLANTEO INICAL m2 62.20 3.78 235.12 31.10 117.56 31.10 117.56

01.02 TRANSPORTE DE EQUIPO MATERIALES Y HERRAMIENTAS A OBRA glb 1.00 1,700.00 1,700.00 0.50 850.00 0.50 850.00

01.03 CASETA DE GUARDIANIA Y ALMACEN glb 1.00 500.00 500.00 1.00 500.00

01.04 OFICINA P/RESIDENCIA INSPECCION glb 1.00 250.00 250.00 1.00 250.00

01.05 CARTEL DE OBRA 4.80 x 2.40 MTS und 3.00 1,600.00 4,800.00 3.00 4,800.00

01.06 SERVICIOS HIGIENICOS PROVISIONALES día 60.00 20.00 1,200.00 30.00 600.00 30.00 600.00

01.07 GUARDIANIA día 60.00 120.00 7,200.00 30.00 3,600.00 30.00 3,600.00

02 POZO ESPERANZA 6 138,675.99 83,184.04 59.98% 0.00 0.00% 55,491.95 40.02% 100.00%
02.01 EQUIPO DE BOMBEO, ARBOL DE SALIDA Y COLUMNA 128,995.70 75,031.25 58.17% 0.00 0.00% 53,964.45 41.83%

02.01.01 ELECTROBOMBA SUMERGIBLE 60HP 380 VOLTIOS 60HZ Q=35 L/S Y HDT=60 eq 1 42700 42700 1 42700 1
MTS

02.01.02 INSTALACION DE ELECTROBOMBA SUMERGIBLE glb 1 5040 5040 1 32331.25 1 5040

02.01.03 SUMINISTRO, E INSTALACION DE TABLERO ELECTRICO DE CONTROL PARA 60 eq 1 32331.25 32331.25


HP 380 VOLTIOS

02.01.04 MEDIDOR DE FLUJO ELECTROMAGNETICO Ø 6" und 1 10500 10500 1 10500

02.01.05 SUMINISTRO E INSTALACION DE TUBERIA HD C40 D=6" X 3 MTS (PARA und 24 808.17 19396.08 24 19396.08
COLUMNA DE IMPULSION)

02.01.06 SUMINISTRO E INSTALACION DE TUBERIA PARA ARBOL ESPERANZA 6 und 1 3386.76 3386.76 1 3386.76

02.01.07 VALVULA COMPUERTA DE 6" BRIDADA und 3 1423.2 4269.6 3 4269.6

02.01.08 VALVULA CHECK 6" BRIDADA und 1 1174.78 1174.78 1 1174.78

02.01.09 VALVULA DE AIRE DE 2" und 1 1340 1340 1 1340

02.01.10 LLAVE ESFERICA 2" und 1 95 95 1 95

02.01.11 PERNO PASANTE COMPLETO DE 3/4" X 3 1/2" und 120 3.5 420 120 420

02.01.12 PLANCHA DE ACERO 1/2" X 4`X8` und 0.5 1750 875 0.5 875

02.01.13 CODO DE FIERRO DE 6" X 90º und 1 381.6 381.6 1 381.6

02.01.14 CODO DE FIERRO DE 6" X 45º und 1 385.62 385.62 1 385.62

02.01.15 TEE DE FIERRO 6" X 6" pza 1 486 486 1 486

02.01.16 INSTALACION DE ARBOL DE SALIDA Y EMPALME glb 1 2550 2550 1 2550

02.01.17 LIMPIEZA DE COLUMNA CON AIRE COMPRIMIDO glb 1 3500 3500 1 3500

02.01.18 BASE PARA TUBO DE CONCRETO ARMADO f´c=140 kg/cm2 und 1 164.01 164.01 1 164.01

02.02 OBRAS CIVILES - MEJORAMIENTO DE CASETA DE POZO TUBULAR 9,680.29 8,152.79 84.22% 0.00 0.00% 1,527.50 15.78%

02.02.01 ESTRUCTURAS 2,293.96 2,293.96 100.00%

02.02.01.01 MOVIMIENTO DE TIERRAS 464.48 464.48 100.00%

02.02.01.01.01 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS EN TERRENO NORMAL m3 1.70 36.91 62.75 1.70 62.75

02.02.01.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 0.19 18.26 3.47 0.19 3.47

02.02.01.01.03 ACARREO DE MATERIAL EXCEDENTE m3 2.22 21.74 48.26 2.22 48.26

02.02.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE glb 1.00 350.00 350.00 1.00 350.00

02.02.01.02 CONCRETO SIMPLE 678.48 678.48 100.00%

02.02.01.02.01 CONCRETO CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% m3 1.50 176.10 264.15 1.50 264.15
PIEDRA

02.02.01.02.02 CONCRETO SOBRECIMIENTOS MEZCLA 1:8 + 25% P.M. m3 0.50 287.20 143.60 0.50 143.60

02.02.01.02.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 1.20 58.94 70.73 1.20 70.73

02.02.01.02.04 DADO DE CONCRETO glb 1.00 200.00 200.00 1.00 200.00

02.02.01.03 CONCRETO ARMADO 1,151.00 1,151.00 100.00%

02.02.01.03.01 COLUMNAS 1,151.00 1,151.00 100.00%

02.02.01.03.01.01CONCRETO COLUMNAS f'c=175 kg/cm2 m3 0.50 446.06 223.03 0.50 223.03

02.02.01.03.01.02ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 6.60 67.05 442.53 6.60 442.53

02.02.01.03.01.03ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 108.60 4.47 485.44 108.60 485.44

02.02.02 ARQUITECTURA 7,386.33 5,858.83 79.32% 1,527.50 20.68%

02.02.02.01 MUROS Y TABIQUES 699.58 699.58 100.00%

02.02.02.01.01 MURO DE LADRILLO KK ARTESANAL DE SOGA MEZCLA C.A. 1:5 m2 11.30 61.91 699.58 11.30 699.58

02.02.02.02 REVOQUES Y ENLUCIDOS 4,259.25 4,259.25 100.00%

02.02.02.02.01 TARRAJEO MUROS DE INTERIORES, CEMENTO : ARENA, 1:4 m2 135.20 25.86 3,496.27 135.20 3,496.27

02.02.02.02.02 TARRAJEO MUROS EXTERIORES, CEMENTO : ARENA, 1:4 m2 19.70 38.73 762.98 19.70 762.98
02.02.02.03 PINTURAS 1,527.50 0.00 0.00% 1,527.50 100.00%

02.02.02.03.01 PINTURA LATEX EN MUROS INTERIORES m2 122.50 9.69 1,187.03 122.50 1,187.03

02.02.02.03.02 PINTURA LATEX EN MUROS EXTERIORES m2 17.30 11.14 192.72 17.30 192.72

02.02.02.03.03 PINTURA LATEX EN CIELO RASO m2 15.00 9.85 147.75 15.00 147.75

02.02.02.05 CARPINTERIA METALICA 900.00 900.00 100.00%

02.02.02.05.01 PUERTA METALICA A= 0.90, H= 2.10 INCL. FABRICACION E INSTALACION und 1.00 600.00 600.00 1.00 600.00

02.02.02.05.02 REJA METALICA PARA VENTANA ALTA A= 0.80 M, H= 0.40 M, INCLUYE und 1.00 300.00 300.00 1.00 300.00
FABRICACION E INSTALACION

03 POZO PIT 1 130,525.66 76,881.25 58.90% 0.00 0.00% 53,644.41 41.10% 100.00%
03.01 EQUIPO DE BOMBEO, ARBOL DE SALIDA Y COLUMNA 128,675.66 75,031.25 58.31% 0.00 0.00% 53,644.41 41.69%

03.01.01 ELECTROBOMBA SUMERGIBLE 60 HP 380 VOLTIOS 60HZ Q=33 L/S Y HDT=75 eq 1.00 42,700.00 42,700.00 1.00 42,700.00 1.00
MTS

03.01.02 INSTALACION DE ELECTROBOMBA SUMERGIBLE glb 1.00 5,040.00 5,040.00 1.00 5,040.00

03.01.03 SUMINISTRO, E INSTALACION DE TABLERO ELECTRICO DE CONTROL PARA 60 eq 1.00 32,331.25 32,331.25 1.00 32,331.25
HP 380 VOLTIOS

03.01.04 MEDIDOR DE FLUJO ELECTROMAGNETICO Ø 6" und 1.00 10,500.00 10,500.00 1.00 10,500.00

03.01.05 SUMINISTRO E INSTALACION DE TUBERIA HD C40 D=6" X 3 MTS (PARA und 21.00 808.17 16,971.57 21.00 16,971.57
COLUMNA DE IMPULSION)

03.01.06 SUMINISTRO DE TUBERIA HD C40 X 6 MTS (PARA ARBOL) und 1.00 2,493.83 2,493.83 1.00 2,493.83

03.01.07 VALVULA COMPUERTA TIPO MARIPOSA DE 6" BRIDADA und 2.00 1,423.20 2,846.40 2.00 2,846.40

03.01.08 YEE BRIDADA DE FE FDO DE 6" X 6" und 1.00 486.00 486.00 1.00 486.00

03.01.09 VALVULA CHECK 6" BRIDADA und 1.00 1,174.78 1,174.78 1.00 1,174.78

03.01.10 VALVULA DE AIRE 2" und 1.00 1,340.00 1,340.00 1.00 1,340.00

03.01.11 LLAVE ESFERICA 2" und 1.00 95.00 95.00 1.00 95.00

03.01.12 PERNO PASANTE 3/4" X 3 1/2" und 100.00 4.30 430.00 100.00 430.00

03.01.13 PLLANCHA DE 1/2" X 4´ X 8´ und 0.50 1,750.00 875.00 0.50 875.00

03.01.14 CODO DE FIERRO DE 6" X 90º und 1.00 381.60 381.60 1.00 381.60

03.01.15 CODO DE FIERRO DE 6" X 45º und 1.00 385.62 385.62 1.00 385.62

03.01.16 INSTALACION DE ARBOL DE SALIDA Y EMPALME glb 1.00 2,550.00 2,550.00 1.00 2,550.00

03.01.17 LIMPIEZA DE COLUMNA CON AIRE COMPRIMIDO glb 1.00 3,500.00 3,500.00 1.00 3,500.00

03.01.18 LIMPIEZA DE ACCESORIOS DE ARBOL DESALIDA CON AIRE COMPRIMIDO glb 1.00 800.00 800.00 1.00 800.00

03.01.19 PINTURA EN ACCESORIOS DE FIERRO und 3.00 41.61 124.83 3.00 124.83

03.01.20 SELLO SANITARIO DE CONCRETO ARMADO f´c=175 kg/cm2 und 1.00 3,649.78 3,649.78 1.00 3,649.78

03.02 OBRAS CIVILES - MEJORAMIENTO DE CASETA DE POZO TUBULAR 1,850.00 1,850.00 100.00% 0.00 0.00% 0.00 0.00%

03.02.01 ARQUITECTURA 1,850.00 1,850.00 100.00%

03.02.01.03 CARPINTERIA METALICA 1,850.00 1,850.00 100.00%

03.02.01.03.01 PUERTA METALICA A= 1.70, H= 2.10 INCL. FABRICACION E INSTALACION und 1.00 1,200.00 1,200.00 1.00 1,200.00

03.02.01.03.02 SELLO SANITARIO PLANCHA ACERO 1/4" INCLUYE INSTALACION pza 1.00 650.00 650.00 1.00 650.00

04 POZO ARBOLEDA 1 97,272.66 41,990.00 43.17% 17,550.00 18.04% 37,732.66 38.79% 100.00%
04.01 EQUIPO DE BOMBEO, ARBOL DE SALIDA Y COLUMNA 79,722.66 41,990.00 52.67% 0.00 0.00% 37,732.66 47.33%
04.01.01 ELECTROBOMBA SUMERGIBLE 25 HP 380 VOLTIOS 60HZ Q=20 L/S Y HDT=50 eq 1.00 23,300.00 23,300.00 1.00 23,300.00 1.00
MTS
04.01.02 INSTALACION DE ELECTROBOMBA SUMERGIBLE glb 1.00 5,040.00 5,040.00 1.00 5,040.00
04.01.03 SUMINISTRO E INSTALACION DE TABLERO DE CONTROL PARA 25 HP 380 eq 1.00 18,690.00 18,690.00 1.00 18,690.00
VOLTIOS
04.01.04 SUMINISTRO E INSTALACION DE POZO A TIERRA glb 1.00 3,000.00 3,000.00 1.00 3,000.00
04.01.05 MEDIDOR DE FLUJO ELECTROMAGNETICO Ø 6" und 1.00 10,500.00 10,500.00 1.00 10,500.00
04.01.06 SUMINISTRO E INSTALACION DE TUBERIA HD C40 D=6" X 3 MTS (PARA und 6.00 808.17 4,849.02 6.00 4,849.02
COLUMNA DE IMPULSION)
04.01.07 SUMINISTRO DE TUBERIA HD C40 X 6MTS PAREA ARBOL ARBOLEDA und 1.00 1,831.54 1,831.54 1.00 1,831.54

04.01.08 VALVULA COMPUERTA DE 6" BRIDADA und 1.00 1,423.20 1,423.20 1.00 1,423.20
04.01.09 VALVULA DE ALIVIO DE 2" BRIDADA und 1.00 3,638.91 3,638.91 1.00 3,638.91
04.01.10 VALVULA CHECK 6" BRIDADA und 1.00 1,174.78 1,174.78 1.00 1,174.78
04.01.11 VALVULA DE AIRE 2" und 1.00 1,340.00 1,340.00 1.00 1,340.00
04.01.12 LLAVE ESFERICA 2" und 1.00 95.00 95.00 1.00 95.00
04.01.13 PERNO PASANTE 3/4" X 3 1/2" und 72.00 4.30 309.60 72.00 309.60
04.01.14 PLLANCHA DE 1/2" X 4´ X 8´ und 0.50 1,750.00 875.00 0.50 875.00
04.01.15 CODO DE FIERRO DE 6" X 90º und 1.00 381.60 381.60 1.00 381.60
04.01.16 CODO DE FIERRO DE 8" X 90º und 1.00 560.00 560.00 1.00 560.00
04.01.17 BASE PARA TUBO DE CONCRETO ARMADO f´c=140 kg/cm2 und 1.00 164.01 164.01 1.00 164.01
04.01.18 INSTALACION DE ARBOL DE SALIDA Y EMPALME glb 1.00 2,550.00 2,550.00 1.00 2,550.00
04.02 EQUIPO DE CLORACION 17,550.00 0.00 0.00% 17,550.00 100.00% 0.00 0.00%

04.02.01 ELECTROBOMBA BOOSTER DE 3.4 HP 220/440 VOLTIOS eq 1.00 2,000.00 2,000.00 1.00 2,000.00

04.02.02 EQUIPO CLORINADOR CON INYECTOR PARA Q=60 L/S eq 1.00 7,500.00 7,500.00 1.00 7,500.00

04.02.03 ACCESORIOS PARA MONTAJE DE EQUIPO CLORO-GAS eq 1.00 3,000.00 3,000.00 1.00 3,000.00

04.02.04 BALANZA DE PLATAFORMA PARA 2 BOTELLAS DE CLOROGAS DE 68 KGS. C/U eq 1.00 1,550.00 1,550.00 1.00 1,550.00

04.02.05 INSTALACION DE EQUIPO DE CLORO eq 1.00 3,500.00 3,500.00 1.00 3,500.00

05 POZO HUAMAN 100,912.88 57,025.00 56.51% 1,815.67 1.80% 42,072.21 41.69% 100.00%
05.01 EQUIPO DE BOMBEO, ARBOL DE SALIDA Y COLUMNA 98,412.91 57,025.00 57.94% 0.00 0.00% 41,387.91 42.06%

05.01.01 ELECTROBOMBA SUMERGIBLE 35 HP 380 VOLTIOS 60HZ Q=31 L/S Y HDT=50 eq 1.00 30,600.00 30,600.00 1.00 30,600.00 1.00
MTS

05.01.02 INSTALACION DE ELECTROBOMBA SUMERGIBLE glb 1.00 5,040.00 5,040.00 1.00 5,040.00

05.01.03 SUMINISTRO, E INSTALACION DE TABLERO ELECTRICO DE CONTROL PARA 35 eq 1.00 26,425.00 26,425.00 1.00 26,425.00
HP 380 VOLTIOS

05.01.04 SUMINISTRO E INSTALACION DE POZO A TIERRA glb 1.00 3,000.00 3,000.00 1.00 3,000.00

05.01.05 MEDIDOR DE FLUJO ELECTROMAGNETICO Ø 6" und 1.00 10,500.00 10,500.00 1.00 10,500.00

05.01.06 SUMINISTRO E INSTALACION DE TUBERIA HD C40 D=6" X 3 MTS (PARA und 8.00 808.17 6,465.36 8.00 6,465.36
COLUMNA DE IMPULSION)

05.01.07 SUMINISTRO DE TUBERIA HD C40 X 6 MTS PARA ARBOL HUAMAN und 1.00 1,406.65 1,406.65 1.00 1,406.65

05.01.08 VALVULA COMPUERTA DE 6" BRIDADA und 1.00 1,423.20 1,423.20 1.00 1,423.20

05.01.09 VALVULA CHECK 6" BRIDADA und 1.00 1,174.78 1,174.78 1.00 1,174.78

05.01.10 VALVULA DE AIRE DE 2" und 1.00 1,340.00 1,340.00 1.00 1,340.00

05.01.11 LLAVE ESFERICA 2" und 1.00 95.00 95.00 1.00 95.00

05.01.12 VALVULA DE ALIVIO DE 2" BRIDADA und 1.00 3,638.91 3,638.91 1.00 3,638.91

05.01.13 LIMPIEZA DE COLUMNA CON AIRE COMPRIMIDO glb 1.00 3,500.00 3,500.00 1.00 3,500.00

05.01.14 PERNO PASANTE COMPLETO DE 3/4" X 3 1/2" und 50.00 4.30 215.00 50.00 215.00

05.01.15 PLLANCHA DE 1/2" X 4´ X 8´ und 0.50 1,750.00 875.00 0.50 875.00

05.01.16 INSTALACION DE ARBOL DE SALIDA Y EMPALME glb 1.00 2,550.00 2,550.00 1.00 2,550.00

05.01.17 BASE PARA TUBO DE CONCRETO ARMADO f´c=140 kg/cm2 und 1.00 164.01 164.01 1.00 164.01

05.02 OBRAS CIVILES - MEJORAMIENTO DE CASETA DE POZO TUBULAR 2,499.97 0.00 0.00% 1,815.67 72.63% 684.30 27.37%

05.02.01 ESTRUCTURAS 767.81 767.81 100.00%

05.02.01.01 MOVIMIENTO DE TIERRAS 171.19 171.19 100.00%

05.02.01.01.01 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS EN TERRENO NORMAL m3 0.30 36.91 11.07 0.30 11.07

05.02.01.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 0.03 18.26 0.55 0.03 0.55

05.02.01.01.03 ACARREO DE MATERIAL EXCEDENTE m3 0.44 21.74 9.57 0.44 9.57

05.02.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE. glb 1.00 150.00 150.00 1.00 150.00

05.02.01.02 CONCRETO SIMPLE 200.00 200.00 100.00%

05.02.01.02.01 DADO DE CONCRETO glb 1.00 200.00 200.00 1.00 200.00

05.02.01.03 CONCRETO ARMADO 396.62 396.62 100.00%

05.02.01.03.01 ZAPATAS 109.28 109.28 100.00%

05.02.01.03.01.01CONCRETO ZAPATAS f'c=175 kg/cm2 m3 0.30 291.26 87.38 0.30 87.38

05.02.01.03.01.02ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4.90 4.47 21.90 4.90 21.90

05.02.01.03.02 COLUMNAS 287.34 287.34 100.00%

05.02.01.03.02.01CONCRETO COLUMNAS f'c=175 kg/cm2 m3 0.10 446.06 44.61 0.10 44.61

05.02.01.03.02.02ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 2.10 67.05 140.81 2.10 140.81

05.02.01.03.02.03ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 22.80 4.47 101.92 22.80 101.92

05.02.02 ARQUITECTURA 1,732.16 1,047.86 60.49% 684.30 39.51%

05.02.02.01 MUROS Y TABIQUES 222.88 222.88 100.00%

05.02.02.01.01 MURO DE LADRILLO KK ARTESANAL DE SOGA MEZCLA C.A. 1:5 m2 3.60 61.91 222.88 3.60 222.88

05.02.02.02 REVOQUES Y ENLUCIDOS 224.98 224.98 100.00%

05.02.02.02.01 TARRAJEO MUROS DE INTERIORES, CEMENTO : ARENA, 1:4 m2 8.70 25.86 224.98 8.70 224.98

05.02.02.03 PINTURAS 84.30 84.30 100.00%

05.02.02.03.01 PINTURA LATEX EN MUROS INTERIORES m2 8.70 9.69 84.30 8.70 84.30

05.02.02.04 CARPINTERIA METALICA 600.00 600.00 100.00%

05.02.02.04.01 PUERTA METALICA A= 0.90, H= 2.10 INCL. FABRICACION E INSTALACION und 1.00 600.00 600.00 1.00 600.00

05.02.02.05 VARIOS 600.00 0.00 0.00% 600.00 100.00%

05.02.02.05.01 EMPOTRADO DE TUBERIAS DE LUZ glb 1.00 350.00 350.00 1.00 350.00

05.02.02.05.02 RESANADO DE PISOS glb 1.00 250.00 250.00 1.00 250.00

06 POZO CALIFORNIA 67,177.49 25,300.00 37.66% 38,412.96 57.18% 3,464.53 5.16% 100.00%
06.01 EQUIPO DE BOMBEO, ARBOL DE SALIDA Y COLUMNA 61,909.42 25,300.00 40.87% 36,609.42 59.13% 0.00 0.00%

06.01.01 SUMINISTRO, E INSTALACION DE TABLERO ELECTRICO DE CONTROL PARA 30 eq 1 25300 25300 1 25300 1
HP 380 VOLTIOS
06.01.02 SUMINISTRO E INSTALACION DE POZO A TIERRA glb 1 3000 3000 1 3000

06.01.03 MEDIDOR DE FLUJO ELECTROMAGNETICO Ø 6" und 1 10500 10500 1 10500

06.01.04 SUMINISTRO E INSTALACION DE TUBERIA HD C40 D=6" X 3 MTS (PARA und 8 808.17 6465.36 8 6465.36
COLUMNA DE IMPULSION)

06.01.05 SUMINISTRO DE TUBERIA HD C40 X 6 TMS PARA ARBOL CALIFORNIA und 1 1789.17 1789.17 1 1789.17

06.01.06 VALVULA COMPUERTA DE 6" BRIDADA und 1 1423.2 1423.2 1 1423.2

06.01.07 VALVULA CHECK 6" BRIDADA und 1 1174.78 1174.78 1 1174.78

06.01.08 VALVULA DE AIRE 2" und 1 1340 1340 1 1340

06.01.09 LLAVE ESFERICA 2" und 1 95 95 1 95

06.01.10 VALVULA DE ALIVIO DE 4" BRIDADA und 1 3638.91 3638.91 1 3638.91

06.01.11 LIMPIEZA DE COLUMNA CON AIRE COMPRIMIDO glb 1 3500 3500 1 3500

06.01.12 PERNO PASANTE COMPLETO DE 3/4" X 3 1/2" und 60 4.3 258 60 258

06.01.13 PLLANCHA DE 1/2" X 4´ X 8´ und 0.5 1750 875 0.5 875

06.01.14 INSTALACION DE ARBOL DE SALIDA Y EMPALME glb 1 2550 2550 1 2550

06.02 OBRAS CIVILES - MEJORAMIENTO DE CASETA DE POZO TUBULAR 5,268.07 0.00 0.00% 1,803.54 34.24% 3,464.53 65.76%

06.02.01 ESTRUCTURAS 1,210.38 1,210.38 100.00%

06.02.01.01 CONCRETO ARMADO 1,210.38 1,210.38 100.00%

06.02.01.01.01 VIGAS 537.28 537.28 100.00%

06.02.01.01.01.01CONCRETO VIGAS f'c=175 kg/cm2 m3 0.84 334.86 281.28 0.84 281.28

06.02.01.01.01.02ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 57.27 4.47 256.00 57.27 256.00

06.02.01.01.02 LOSAS ALIGERADAS 673.10 673.10 100.00%

06.02.01.01.02.01CONCRETO LOSAS ALIGERADAS f'c=175 kg/cm2 m3 0.32 321.06 102.74 0.32 102.74

06.02.01.01.02.02ENCOFRADO NORMAL DE LOSAS ALIGERADAS m2 5.99 58.95 353.11 5.99 353.11

06.02.01.01.02.03ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 18.91 4.47 84.53 18.91 84.53

06.02.01.01.02.04LADRILLO PARA TECHO DE h=0.08 m und 42.00 3.16 132.72 42.00 132.72

06.02.02 ARQUITECTURA 4,057.69 593.16 14.62% 3,464.53 85.38%

06.02.02.01 MUROS Y TABIQUES 241.45 241.45 100.00%

06.02.02.01.01 MURO DE LADRILLO KK ARTESANAL DE SOGA MEZCLA C.A. 1:5 m2 3.90 61.91 241.45 3.90 241.45

06.02.02.02 REVOQUES Y ENLUCIDOS 201.71 201.71 100.00%

06.02.02.02.01 TARRAJEO MUROS DE INTERIORES, CEMENTO : ARENA, 1:4 m2 7.80 25.86 201.71 7.80 201.71

06.02.02.03 PINTURAS 3,464.53 3,464.53 100.00%

06.02.02.03.01 PINTURA LATEX EN MUROS INTERIORES m2 63.91 9.69 619.29 63.91 619.29

06.02.02.03.02 PINTURA LATEX EN MUROS EXTERIORES m2 246.38 11.14 2,744.67 246.38 2,744.67

06.02.02.03.03 PINTURA LATEX EN CIELO RASO m2 10.21 9.85 100.57 10.21 100.57

06.02.02.04 CARPINTERIA METALICA 150.00 150.00

06.02.02.04.01 DESMONTAJE Y MONTAJE DE PUERTA METALICA und 1.00 150.00 150.00 1.00 150.00

07 POZO MOCHE SALAVERRY 87,700.13 42,700.00 48.69% 42,963.92 48.99% 2,036.21 2.32% 100.00%
07.01 EQUIPO DE BOMBEO, ARBOL DE SALIDA Y COLUMNA 80,457.51 42,700.00 53.07% 37,757.51 46.93% 0.00 0.00%

07.01.01 ELECTROBOMBA SUMERGIBLE 50 HP 380 VOLTIOS 60HZ Q=40 L/S Y HDT=50 eq 1 42700 42700 1 42700 1
MTS

07.01.02 INSTALACION DE ELECTROBOMBA SUMERGIBLE glb 1 5040 5040 1 5040

07.01.03 MEDIDOR DE FLUJO ELECTROMAGNETICO Ø 6" und 1 10500 10500 1 10500

07.01.04 SUMINISTRO E INSTALACION DE TUBERIA HD C40 D=6" X 3 MTS (PARA und 6 808.17 4849.02 6 4849.02
COLUMNA DE IMPULSION)

07.01.05 SUMINISTRO DE TUBERIA HD C40 X6 MTS PARA ARBOL M-S und 1 1700.9 1700.9 1 1700.9

07.01.06 VALVULA COMPUERTA DE 6" BRIDADA und 1 1423.2 1423.2 1 1423.2

07.01.07 VALVULA CHECK 6" BRIDADA und 1 1174.78 1174.78 1 1174.78

07.01.08 VALVULA DE AIRE DE 2" und 1 1340 1340 1 1340

07.01.09 LLAVE ESFERICA 2" und 1 95 95 1 95

07.01.10 SUMINISTRO DE MANOMETRO A 10 KG/CM2 und 1 3954 3954 1 3954

07.01.11 LIMPIEZA DE COLUMNA CON AIRE COMPRIMIDO glb 1 3500 3500 1 3500

07.01.12 PERNO PASANTE DE 3/4" und 60 3.5 210 60 210

07.01.13 PLLANCHA DE 1/2" X 4´ X 8´ und 0.5 1750 875 0.5 875

07.01.14 CODO DE FIERRO DE 6" X 90º und 1 381.6 381.6 1 381.6

07.01.15 BASE PARA TUBO DE CONCRETO ARMADO f´c=140 kg/cm2 und 1 164.01 164.01 1 164.01

07.01.16 INSTALACION DE ARBOL DE SALIDA Y EMPALME glb 1 2550 2550 1 2550

07.02 OBRAS CIVILES - MEJORAMIENTO DE CASETA DE POZO TUBULAR 7,242.62 0.00 0.00% 5,206.41 71.89% 2,036.21 28.11%

07.02.01 ARQUITECTURA 7,242.62 5,206.41 71.89% 2,036.21 28.11%

07.02.01.01 PINTURAS 2,036.21 2,036.21 100.00%

07.02.01.01.01 PINTURA LATEX EN MUROS INTERIORES m2 115.90 9.69 1,123.07 115.90 1,123.07

07.02.01.01.02 PINTURA LATEX EN MUROS EXTERIORES m2 40.50 11.14 451.17 40.50 451.17
07.02.01.01.03 PINTURA LATEX EN CIELO RASO m2 46.90 9.85 461.97 46.90 461.97

07.02.01.02 PISOS Y PAVIMENTOS 1,588.63 1,588.63 100.00%

07.02.01.02.01 PISO DE CONCRETO DE 4" f´c= 175 KG/CM2 X 9 CM + SEMIPULIDO 1:2 X 1 CM m2 35.10 45.26 1,588.63 35.10 1,588.63
BRUÑADO

07.02.01.03 VIDRIOS CRISTALES Y SIMILARES 3,207.78 3,207.78 100.00%

07.02.01.04 VARIOS 410.00 410.00 100.00%

07.02.01.04.01 RESANADO DE PISOS glb 1.00 250.00 250.00 1.00 250.00

07.02.01.04.02 CAMBIO DE TAPA DE BUZÓN und 1.00 160.00 160.00 1.00 160.00

COSTO DIRECTO S/ 638,149.93 337,797.85 105,910.11 194,441.97


GASTOS GENERALES
10% 63,814.99 33,779.78 10,591.01 19,444.20
UTILIDAD
10% 63814.993 33779.7848 10591.0108 19444.197
SUB-TOTAL
765,779.92 405,357.42 127,092.13 233,330.36
IMPUESTOS GENERALES A LAS VENTAS
18% 137840.3849 72964.33517 22876.58333 41999.46552
TOTAL FINAL S/ 903,620.30 S/ 478,321.75 52.93% S/ 149,968.71 16.60% S/ 275,329.83 30.47% 100.00%