01.02 TRANSPORTE DE EQUIPO MATERIALES Y HERRAMIENTAS A OBRA glb 1.00 1,700.00 1,700.00 0.50 850.00 0.50 850.00
01.03 CASETA DE GUARDIANIA Y ALMACEN glb 1.00 500.00 500.00 1.00 500.00
01.04 OFICINA P/RESIDENCIA INSPECCION glb 1.00 250.00 250.00 1.00 250.00
01.05 CARTEL DE OBRA 4.80 x 2.40 MTS und 3.00 1,600.00 4,800.00 3.00 4,800.00
01.06 SERVICIOS HIGIENICOS PROVISIONALES día 60.00 20.00 1,200.00 30.00 600.00 30.00 600.00
01.07 GUARDIANIA día 60.00 120.00 7,200.00 30.00 3,600.00 30.00 3,600.00
02 POZO ESPERANZA 6 138,675.99 83,184.04 59.98% 0.00 0.00% 55,491.95 40.02% 100.00%
02.01 EQUIPO DE BOMBEO, ARBOL DE SALIDA Y COLUMNA 128,995.70 75,031.25 58.17% 0.00 0.00% 53,964.45 41.83%
02.01.01 ELECTROBOMBA SUMERGIBLE 60HP 380 VOLTIOS 60HZ Q=35 L/S Y HDT=60 eq 1 42700 42700 1 42700 1
MTS
02.01.05 SUMINISTRO E INSTALACION DE TUBERIA HD C40 D=6" X 3 MTS (PARA und 24 808.17 19396.08 24 19396.08
COLUMNA DE IMPULSION)
02.01.06 SUMINISTRO E INSTALACION DE TUBERIA PARA ARBOL ESPERANZA 6 und 1 3386.76 3386.76 1 3386.76
02.01.11 PERNO PASANTE COMPLETO DE 3/4" X 3 1/2" und 120 3.5 420 120 420
02.01.12 PLANCHA DE ACERO 1/2" X 4`X8` und 0.5 1750 875 0.5 875
02.01.17 LIMPIEZA DE COLUMNA CON AIRE COMPRIMIDO glb 1 3500 3500 1 3500
02.01.18 BASE PARA TUBO DE CONCRETO ARMADO f´c=140 kg/cm2 und 1 164.01 164.01 1 164.01
02.02 OBRAS CIVILES - MEJORAMIENTO DE CASETA DE POZO TUBULAR 9,680.29 8,152.79 84.22% 0.00 0.00% 1,527.50 15.78%
02.02.01.01.01 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS EN TERRENO NORMAL m3 1.70 36.91 62.75 1.70 62.75
02.02.01.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 0.19 18.26 3.47 0.19 3.47
02.02.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE glb 1.00 350.00 350.00 1.00 350.00
02.02.01.02.01 CONCRETO CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% m3 1.50 176.10 264.15 1.50 264.15
PIEDRA
02.02.01.02.02 CONCRETO SOBRECIMIENTOS MEZCLA 1:8 + 25% P.M. m3 0.50 287.20 143.60 0.50 143.60
02.02.01.02.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 1.20 58.94 70.73 1.20 70.73
02.02.01.03.01.03ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 108.60 4.47 485.44 108.60 485.44
02.02.02.01.01 MURO DE LADRILLO KK ARTESANAL DE SOGA MEZCLA C.A. 1:5 m2 11.30 61.91 699.58 11.30 699.58
02.02.02.02.01 TARRAJEO MUROS DE INTERIORES, CEMENTO : ARENA, 1:4 m2 135.20 25.86 3,496.27 135.20 3,496.27
02.02.02.02.02 TARRAJEO MUROS EXTERIORES, CEMENTO : ARENA, 1:4 m2 19.70 38.73 762.98 19.70 762.98
02.02.02.03 PINTURAS 1,527.50 0.00 0.00% 1,527.50 100.00%
02.02.02.03.01 PINTURA LATEX EN MUROS INTERIORES m2 122.50 9.69 1,187.03 122.50 1,187.03
02.02.02.03.02 PINTURA LATEX EN MUROS EXTERIORES m2 17.30 11.14 192.72 17.30 192.72
02.02.02.03.03 PINTURA LATEX EN CIELO RASO m2 15.00 9.85 147.75 15.00 147.75
02.02.02.05.01 PUERTA METALICA A= 0.90, H= 2.10 INCL. FABRICACION E INSTALACION und 1.00 600.00 600.00 1.00 600.00
02.02.02.05.02 REJA METALICA PARA VENTANA ALTA A= 0.80 M, H= 0.40 M, INCLUYE und 1.00 300.00 300.00 1.00 300.00
FABRICACION E INSTALACION
03 POZO PIT 1 130,525.66 76,881.25 58.90% 0.00 0.00% 53,644.41 41.10% 100.00%
03.01 EQUIPO DE BOMBEO, ARBOL DE SALIDA Y COLUMNA 128,675.66 75,031.25 58.31% 0.00 0.00% 53,644.41 41.69%
03.01.01 ELECTROBOMBA SUMERGIBLE 60 HP 380 VOLTIOS 60HZ Q=33 L/S Y HDT=75 eq 1.00 42,700.00 42,700.00 1.00 42,700.00 1.00
MTS
03.01.02 INSTALACION DE ELECTROBOMBA SUMERGIBLE glb 1.00 5,040.00 5,040.00 1.00 5,040.00
03.01.03 SUMINISTRO, E INSTALACION DE TABLERO ELECTRICO DE CONTROL PARA 60 eq 1.00 32,331.25 32,331.25 1.00 32,331.25
HP 380 VOLTIOS
03.01.04 MEDIDOR DE FLUJO ELECTROMAGNETICO Ø 6" und 1.00 10,500.00 10,500.00 1.00 10,500.00
03.01.05 SUMINISTRO E INSTALACION DE TUBERIA HD C40 D=6" X 3 MTS (PARA und 21.00 808.17 16,971.57 21.00 16,971.57
COLUMNA DE IMPULSION)
03.01.06 SUMINISTRO DE TUBERIA HD C40 X 6 MTS (PARA ARBOL) und 1.00 2,493.83 2,493.83 1.00 2,493.83
03.01.07 VALVULA COMPUERTA TIPO MARIPOSA DE 6" BRIDADA und 2.00 1,423.20 2,846.40 2.00 2,846.40
03.01.08 YEE BRIDADA DE FE FDO DE 6" X 6" und 1.00 486.00 486.00 1.00 486.00
03.01.09 VALVULA CHECK 6" BRIDADA und 1.00 1,174.78 1,174.78 1.00 1,174.78
03.01.10 VALVULA DE AIRE 2" und 1.00 1,340.00 1,340.00 1.00 1,340.00
03.01.11 LLAVE ESFERICA 2" und 1.00 95.00 95.00 1.00 95.00
03.01.12 PERNO PASANTE 3/4" X 3 1/2" und 100.00 4.30 430.00 100.00 430.00
03.01.14 CODO DE FIERRO DE 6" X 90º und 1.00 381.60 381.60 1.00 381.60
03.01.15 CODO DE FIERRO DE 6" X 45º und 1.00 385.62 385.62 1.00 385.62
03.01.16 INSTALACION DE ARBOL DE SALIDA Y EMPALME glb 1.00 2,550.00 2,550.00 1.00 2,550.00
03.01.17 LIMPIEZA DE COLUMNA CON AIRE COMPRIMIDO glb 1.00 3,500.00 3,500.00 1.00 3,500.00
03.01.18 LIMPIEZA DE ACCESORIOS DE ARBOL DESALIDA CON AIRE COMPRIMIDO glb 1.00 800.00 800.00 1.00 800.00
03.01.19 PINTURA EN ACCESORIOS DE FIERRO und 3.00 41.61 124.83 3.00 124.83
03.01.20 SELLO SANITARIO DE CONCRETO ARMADO f´c=175 kg/cm2 und 1.00 3,649.78 3,649.78 1.00 3,649.78
03.02 OBRAS CIVILES - MEJORAMIENTO DE CASETA DE POZO TUBULAR 1,850.00 1,850.00 100.00% 0.00 0.00% 0.00 0.00%
03.02.01.03.01 PUERTA METALICA A= 1.70, H= 2.10 INCL. FABRICACION E INSTALACION und 1.00 1,200.00 1,200.00 1.00 1,200.00
03.02.01.03.02 SELLO SANITARIO PLANCHA ACERO 1/4" INCLUYE INSTALACION pza 1.00 650.00 650.00 1.00 650.00
04 POZO ARBOLEDA 1 97,272.66 41,990.00 43.17% 17,550.00 18.04% 37,732.66 38.79% 100.00%
04.01 EQUIPO DE BOMBEO, ARBOL DE SALIDA Y COLUMNA 79,722.66 41,990.00 52.67% 0.00 0.00% 37,732.66 47.33%
04.01.01 ELECTROBOMBA SUMERGIBLE 25 HP 380 VOLTIOS 60HZ Q=20 L/S Y HDT=50 eq 1.00 23,300.00 23,300.00 1.00 23,300.00 1.00
MTS
04.01.02 INSTALACION DE ELECTROBOMBA SUMERGIBLE glb 1.00 5,040.00 5,040.00 1.00 5,040.00
04.01.03 SUMINISTRO E INSTALACION DE TABLERO DE CONTROL PARA 25 HP 380 eq 1.00 18,690.00 18,690.00 1.00 18,690.00
VOLTIOS
04.01.04 SUMINISTRO E INSTALACION DE POZO A TIERRA glb 1.00 3,000.00 3,000.00 1.00 3,000.00
04.01.05 MEDIDOR DE FLUJO ELECTROMAGNETICO Ø 6" und 1.00 10,500.00 10,500.00 1.00 10,500.00
04.01.06 SUMINISTRO E INSTALACION DE TUBERIA HD C40 D=6" X 3 MTS (PARA und 6.00 808.17 4,849.02 6.00 4,849.02
COLUMNA DE IMPULSION)
04.01.07 SUMINISTRO DE TUBERIA HD C40 X 6MTS PAREA ARBOL ARBOLEDA und 1.00 1,831.54 1,831.54 1.00 1,831.54
04.01.08 VALVULA COMPUERTA DE 6" BRIDADA und 1.00 1,423.20 1,423.20 1.00 1,423.20
04.01.09 VALVULA DE ALIVIO DE 2" BRIDADA und 1.00 3,638.91 3,638.91 1.00 3,638.91
04.01.10 VALVULA CHECK 6" BRIDADA und 1.00 1,174.78 1,174.78 1.00 1,174.78
04.01.11 VALVULA DE AIRE 2" und 1.00 1,340.00 1,340.00 1.00 1,340.00
04.01.12 LLAVE ESFERICA 2" und 1.00 95.00 95.00 1.00 95.00
04.01.13 PERNO PASANTE 3/4" X 3 1/2" und 72.00 4.30 309.60 72.00 309.60
04.01.14 PLLANCHA DE 1/2" X 4´ X 8´ und 0.50 1,750.00 875.00 0.50 875.00
04.01.15 CODO DE FIERRO DE 6" X 90º und 1.00 381.60 381.60 1.00 381.60
04.01.16 CODO DE FIERRO DE 8" X 90º und 1.00 560.00 560.00 1.00 560.00
04.01.17 BASE PARA TUBO DE CONCRETO ARMADO f´c=140 kg/cm2 und 1.00 164.01 164.01 1.00 164.01
04.01.18 INSTALACION DE ARBOL DE SALIDA Y EMPALME glb 1.00 2,550.00 2,550.00 1.00 2,550.00
04.02 EQUIPO DE CLORACION 17,550.00 0.00 0.00% 17,550.00 100.00% 0.00 0.00%
04.02.01 ELECTROBOMBA BOOSTER DE 3.4 HP 220/440 VOLTIOS eq 1.00 2,000.00 2,000.00 1.00 2,000.00
04.02.02 EQUIPO CLORINADOR CON INYECTOR PARA Q=60 L/S eq 1.00 7,500.00 7,500.00 1.00 7,500.00
04.02.03 ACCESORIOS PARA MONTAJE DE EQUIPO CLORO-GAS eq 1.00 3,000.00 3,000.00 1.00 3,000.00
04.02.04 BALANZA DE PLATAFORMA PARA 2 BOTELLAS DE CLOROGAS DE 68 KGS. C/U eq 1.00 1,550.00 1,550.00 1.00 1,550.00
05 POZO HUAMAN 100,912.88 57,025.00 56.51% 1,815.67 1.80% 42,072.21 41.69% 100.00%
05.01 EQUIPO DE BOMBEO, ARBOL DE SALIDA Y COLUMNA 98,412.91 57,025.00 57.94% 0.00 0.00% 41,387.91 42.06%
05.01.01 ELECTROBOMBA SUMERGIBLE 35 HP 380 VOLTIOS 60HZ Q=31 L/S Y HDT=50 eq 1.00 30,600.00 30,600.00 1.00 30,600.00 1.00
MTS
05.01.02 INSTALACION DE ELECTROBOMBA SUMERGIBLE glb 1.00 5,040.00 5,040.00 1.00 5,040.00
05.01.03 SUMINISTRO, E INSTALACION DE TABLERO ELECTRICO DE CONTROL PARA 35 eq 1.00 26,425.00 26,425.00 1.00 26,425.00
HP 380 VOLTIOS
05.01.04 SUMINISTRO E INSTALACION DE POZO A TIERRA glb 1.00 3,000.00 3,000.00 1.00 3,000.00
05.01.05 MEDIDOR DE FLUJO ELECTROMAGNETICO Ø 6" und 1.00 10,500.00 10,500.00 1.00 10,500.00
05.01.06 SUMINISTRO E INSTALACION DE TUBERIA HD C40 D=6" X 3 MTS (PARA und 8.00 808.17 6,465.36 8.00 6,465.36
COLUMNA DE IMPULSION)
05.01.07 SUMINISTRO DE TUBERIA HD C40 X 6 MTS PARA ARBOL HUAMAN und 1.00 1,406.65 1,406.65 1.00 1,406.65
05.01.08 VALVULA COMPUERTA DE 6" BRIDADA und 1.00 1,423.20 1,423.20 1.00 1,423.20
05.01.09 VALVULA CHECK 6" BRIDADA und 1.00 1,174.78 1,174.78 1.00 1,174.78
05.01.10 VALVULA DE AIRE DE 2" und 1.00 1,340.00 1,340.00 1.00 1,340.00
05.01.11 LLAVE ESFERICA 2" und 1.00 95.00 95.00 1.00 95.00
05.01.12 VALVULA DE ALIVIO DE 2" BRIDADA und 1.00 3,638.91 3,638.91 1.00 3,638.91
05.01.13 LIMPIEZA DE COLUMNA CON AIRE COMPRIMIDO glb 1.00 3,500.00 3,500.00 1.00 3,500.00
05.01.14 PERNO PASANTE COMPLETO DE 3/4" X 3 1/2" und 50.00 4.30 215.00 50.00 215.00
05.01.16 INSTALACION DE ARBOL DE SALIDA Y EMPALME glb 1.00 2,550.00 2,550.00 1.00 2,550.00
05.01.17 BASE PARA TUBO DE CONCRETO ARMADO f´c=140 kg/cm2 und 1.00 164.01 164.01 1.00 164.01
05.02 OBRAS CIVILES - MEJORAMIENTO DE CASETA DE POZO TUBULAR 2,499.97 0.00 0.00% 1,815.67 72.63% 684.30 27.37%
05.02.01.01.01 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS EN TERRENO NORMAL m3 0.30 36.91 11.07 0.30 11.07
05.02.01.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 0.03 18.26 0.55 0.03 0.55
05.02.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE. glb 1.00 150.00 150.00 1.00 150.00
05.02.01.03.01.02ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4.90 4.47 21.90 4.90 21.90
05.02.01.03.02.03ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 22.80 4.47 101.92 22.80 101.92
05.02.02.01.01 MURO DE LADRILLO KK ARTESANAL DE SOGA MEZCLA C.A. 1:5 m2 3.60 61.91 222.88 3.60 222.88
05.02.02.02.01 TARRAJEO MUROS DE INTERIORES, CEMENTO : ARENA, 1:4 m2 8.70 25.86 224.98 8.70 224.98
05.02.02.03.01 PINTURA LATEX EN MUROS INTERIORES m2 8.70 9.69 84.30 8.70 84.30
05.02.02.04.01 PUERTA METALICA A= 0.90, H= 2.10 INCL. FABRICACION E INSTALACION und 1.00 600.00 600.00 1.00 600.00
05.02.02.05.01 EMPOTRADO DE TUBERIAS DE LUZ glb 1.00 350.00 350.00 1.00 350.00
06 POZO CALIFORNIA 67,177.49 25,300.00 37.66% 38,412.96 57.18% 3,464.53 5.16% 100.00%
06.01 EQUIPO DE BOMBEO, ARBOL DE SALIDA Y COLUMNA 61,909.42 25,300.00 40.87% 36,609.42 59.13% 0.00 0.00%
06.01.01 SUMINISTRO, E INSTALACION DE TABLERO ELECTRICO DE CONTROL PARA 30 eq 1 25300 25300 1 25300 1
HP 380 VOLTIOS
06.01.02 SUMINISTRO E INSTALACION DE POZO A TIERRA glb 1 3000 3000 1 3000
06.01.04 SUMINISTRO E INSTALACION DE TUBERIA HD C40 D=6" X 3 MTS (PARA und 8 808.17 6465.36 8 6465.36
COLUMNA DE IMPULSION)
06.01.05 SUMINISTRO DE TUBERIA HD C40 X 6 TMS PARA ARBOL CALIFORNIA und 1 1789.17 1789.17 1 1789.17
06.01.11 LIMPIEZA DE COLUMNA CON AIRE COMPRIMIDO glb 1 3500 3500 1 3500
06.01.12 PERNO PASANTE COMPLETO DE 3/4" X 3 1/2" und 60 4.3 258 60 258
06.02 OBRAS CIVILES - MEJORAMIENTO DE CASETA DE POZO TUBULAR 5,268.07 0.00 0.00% 1,803.54 34.24% 3,464.53 65.76%
06.02.01.01.01.02ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 57.27 4.47 256.00 57.27 256.00
06.02.01.01.02.01CONCRETO LOSAS ALIGERADAS f'c=175 kg/cm2 m3 0.32 321.06 102.74 0.32 102.74
06.02.01.01.02.03ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 18.91 4.47 84.53 18.91 84.53
06.02.01.01.02.04LADRILLO PARA TECHO DE h=0.08 m und 42.00 3.16 132.72 42.00 132.72
06.02.02.01.01 MURO DE LADRILLO KK ARTESANAL DE SOGA MEZCLA C.A. 1:5 m2 3.90 61.91 241.45 3.90 241.45
06.02.02.02.01 TARRAJEO MUROS DE INTERIORES, CEMENTO : ARENA, 1:4 m2 7.80 25.86 201.71 7.80 201.71
06.02.02.03.01 PINTURA LATEX EN MUROS INTERIORES m2 63.91 9.69 619.29 63.91 619.29
06.02.02.03.02 PINTURA LATEX EN MUROS EXTERIORES m2 246.38 11.14 2,744.67 246.38 2,744.67
06.02.02.03.03 PINTURA LATEX EN CIELO RASO m2 10.21 9.85 100.57 10.21 100.57
06.02.02.04.01 DESMONTAJE Y MONTAJE DE PUERTA METALICA und 1.00 150.00 150.00 1.00 150.00
07 POZO MOCHE SALAVERRY 87,700.13 42,700.00 48.69% 42,963.92 48.99% 2,036.21 2.32% 100.00%
07.01 EQUIPO DE BOMBEO, ARBOL DE SALIDA Y COLUMNA 80,457.51 42,700.00 53.07% 37,757.51 46.93% 0.00 0.00%
07.01.01 ELECTROBOMBA SUMERGIBLE 50 HP 380 VOLTIOS 60HZ Q=40 L/S Y HDT=50 eq 1 42700 42700 1 42700 1
MTS
07.01.04 SUMINISTRO E INSTALACION DE TUBERIA HD C40 D=6" X 3 MTS (PARA und 6 808.17 4849.02 6 4849.02
COLUMNA DE IMPULSION)
07.01.05 SUMINISTRO DE TUBERIA HD C40 X6 MTS PARA ARBOL M-S und 1 1700.9 1700.9 1 1700.9
07.01.11 LIMPIEZA DE COLUMNA CON AIRE COMPRIMIDO glb 1 3500 3500 1 3500
07.01.15 BASE PARA TUBO DE CONCRETO ARMADO f´c=140 kg/cm2 und 1 164.01 164.01 1 164.01
07.02 OBRAS CIVILES - MEJORAMIENTO DE CASETA DE POZO TUBULAR 7,242.62 0.00 0.00% 5,206.41 71.89% 2,036.21 28.11%
07.02.01.01.01 PINTURA LATEX EN MUROS INTERIORES m2 115.90 9.69 1,123.07 115.90 1,123.07
07.02.01.01.02 PINTURA LATEX EN MUROS EXTERIORES m2 40.50 11.14 451.17 40.50 451.17
07.02.01.01.03 PINTURA LATEX EN CIELO RASO m2 46.90 9.85 461.97 46.90 461.97
07.02.01.02.01 PISO DE CONCRETO DE 4" f´c= 175 KG/CM2 X 9 CM + SEMIPULIDO 1:2 X 1 CM m2 35.10 45.26 1,588.63 35.10 1,588.63
BRUÑADO
07.02.01.04.02 CAMBIO DE TAPA DE BUZÓN und 1.00 160.00 160.00 1.00 160.00