AVANCE DE ALCANTARILLAS - SETIEMBRE 2017

FORMACIN DE LA ALCANTARILLA CUERPO CABEZAL

PROGRESIV
A REAL MCA - Solado TMC Concreto Losa Inf. y Encofrado Encofrado
Excavacin Acero Encofrado Concreto Losa superior Colocacin de Tubera Relleno Excavacin Vac. Zapata Vac. Elevacion Relleno
(REPLANTEO - C. Arena Muros Zapata Elevacin
)

KM IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ

A 43+693.00 100% 100% 100% 100% 100% 100% 100% 100% 0% 100% 0% 100% 0% 100% 0% 100% 0% 100% 0%
A 43+975.29 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 44+540.06 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 44+854.87 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 45+174.72 100% 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 100% 100% 100% 100% 0% 100% 0% 100% 0% 100% 0% 100% 0% 100% 0%
A 45+338.26 100% 100% 100% 100% 100% 100% 100% 100% 0% 100% 0% 100% 0% 100% 0% 100% 0% 100% 0%
A 45+740.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 45+902.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 100% 0% 100% 0% 100% 0% 100% 0% 100% 0%
A 46+225.44 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 46+817.45 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 47+585.76 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 47+923.30 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 48+659.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 48+992.13 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 49+256.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 49+600.45 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 49+761.88 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 49+865.98 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 50+230.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 50+293.92 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 50+447.37 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 50+993.13 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 51+298.12 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 51+540.59 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 51+605.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 51+900.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 52+093.02 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 52+360.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 52+630.00 100%
FORMACIN DE LA ALCANTARILLA CUERPO CABEZAL

PROGRESIV
A REAL MCA - Solado TMC Concreto Losa Inf. y Encofrado Encofrado
Excavacin Acero Encofrado Concreto Losa superior Colocacin de Tubera Relleno Excavacin Vac. Zapata Vac. Elevacion Relleno
(REPLANTEO - C. Arena Muros Zapata Elevacin
)

KM IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ

A 52+997.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 53+339.77 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 53+733.81 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 53+970.94 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 54+262.28 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 54+544.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 54+783.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 55+330.00 50% 100% 50% 100% 50% 100% 50% 100% 50% 100% 50% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 55+629.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 56+549.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 56+829.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 57+062.61 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 57+367.50 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 57+897.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 58+284.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 58+638.50 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 58+907.50 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 59+245.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 59+902.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 60+270.00 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 60+506.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 61+260.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 61+598.54 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 62+030.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 62+179.20 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 62+252.30 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 62+503.37 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 62+775.45 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 62+857.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 62+970.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 63+295.50 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 63+564.69 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 63+800.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 64+042.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 64+056.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
FORMACIN DE LA ALCANTARILLA CUERPO CABEZAL

PROGRESIV
A REAL MCA - Solado TMC Concreto Losa Inf. y Encofrado Encofrado
Excavacin Acero Encofrado Concreto Losa superior Colocacin de Tubera Relleno Excavacin Vac. Zapata Vac. Elevacion Relleno
(REPLANTEO - C. Arena Muros Zapata Elevacin
)

KM IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ

A 64+300.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 64+590.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 65+082.57 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 65+681.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 66+071.68 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 66+179.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 66+354.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 66+550.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 66+800.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 67+114.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 67+400.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 67+610.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 67+940.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 68+318.50 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 69+082.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 69+410.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 69+800.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 70+193.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 70+491.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 70+933.90 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 71+300.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 71+657.50 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 71+943.00 100% 100% 100% 100% 100% 100% 100% 100%
A 72+284.48 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 72+472.69 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 72+620.87 100% 100% 100% 100% 100% 100% 100% 100%
A 72+939.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 73+400.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 73+580.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 74+000.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 74+370.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 74+648.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 74+754.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 74+824.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 75+100.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
FORMACIN DE LA ALCANTARILLA CUERPO CABEZAL

PROGRESIV
A REAL MCA - Solado TMC Concreto Losa Inf. y Encofrado Encofrado
Excavacin Acero Encofrado Concreto Losa superior Colocacin de Tubera Relleno Excavacin Vac. Zapata Vac. Elevacion Relleno
(REPLANTEO - C. Arena Muros Zapata Elevacin
)

KM IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ

A 75+335.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 75+630.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 75+962.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 76+271.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 76+623.67
A 76+880.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 77+215.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 77+596.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 77+893.00 100% 100% 100% 100% 100%
A 78+300.00 100% 100% 100% 100% 100%
A 78+608.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 79+080.00
A 79+491.50
A 79+780.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 80+039.00 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 80+293.98 100% 100% 100% 100% 100%
A 80+600.00 100% 100% 100% 100% 100%
A 80+900.00
A 81+200.00 100% 100% 100% 100% 100%
A 81+453.07 100% 100% 100% 100% 100%
A 81+792.66 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 82+060.00 100%

A 82+308.49 100% 100% 100% 100% 100%


A 82+479.20
A 82+700.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 82+997.50 30%

A 83+312.63 100%

A 83+560.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 83+896.25 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 84+885.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 85+647.25 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 85+900.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 86+160.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 86+406.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 86+650.52 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 86+939.57 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
FORMACIN DE LA ALCANTARILLA CUERPO CABEZAL

PROGRESIV
A REAL MCA - Solado TMC Concreto Losa Inf. y Encofrado Encofrado
Excavacin Acero Encofrado Concreto Losa superior Colocacin de Tubera Relleno Excavacin Vac. Zapata Vac. Elevacion Relleno
(REPLANTEO - C. Arena Muros Zapata Elevacin
)

KM IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ DER IZQ

A 87+200.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 87+456.00 100% 75% 100% 75% 100% 75% 100% 75% 100% 75% 100% 75% 100% 100% 100% 100% 100% 100% 100%
A 87+529.68 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 87+900.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 88+244.76 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 88+381.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 88+700.05 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 88+920.28 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 89+780.47 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 90+138.50 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 90+609.50 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 90+800.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 91+104.31 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 91+500.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
A 91+695.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 92+000.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 92+200.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 92+813.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 93+050.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 93+249.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 93+505.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 93+872.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 94+100.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 94+332.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 94+735.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 94+897.00 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

A 95+595.50 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
501.E 208.A 502.A 503.D1 503.E 503.H 503.J 515.A 504 507.A1 507.A2 507.A3 507.D 507.E 623.C

EXCAVACIN ENCAUZAMIEN
CONCRETO
NO TO RELLENO CONCRETO CONCRETO CONCRETO ENCOFRADO Y ACERO DE TUBERIA HDPE
CLASE J
Relleno Emboquillado % AVANCE CLASIFICADA PARA PARA CLASE D CLASE E CLASE H DESENCOFRA REFUERZO TMC 0.60 m TMC 0.90 m TMC 1.20 m TMC 1.50 m TMC 1.80 m CORRUGADA
(f'c=175 k/cm2
PARA ALCANTARILLA ESTRUCTURAS (f'c=210 k/cm 2) (f'c=175 k/cm 2) (f'c=100 k/cm 2) DO fy=4200 kg/cm 2 18"
+ 30%P.G.)
ESTRUCTURAS S

DER IZQ DER (m 3) (m 3) (m 3) (m 3) (m 3) (m 3) (m 3) (m 2) (kg) (m) (m) (m) (m) (m) (m)

100% 73.77% 100.00% 66.67% 100.00% 100.00% 100.00% 100.00%


100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 86.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
6.87% 25.00% 0.00% 0.00% 0.00% 0.00%
501.E 208.A 502.A 503.D1 503.E 503.H 503.J 515.A 504 507.A1 507.A2 507.A3 507.D 507.E 623.C

EXCAVACIN ENCAUZAMIEN
CONCRETO
NO TO RELLENO CONCRETO CONCRETO CONCRETO ENCOFRADO Y ACERO DE TUBERIA HDPE
CLASE J
Relleno Emboquillado % AVANCE CLASIFICADA PARA PARA CLASE D CLASE E CLASE H DESENCOFRA REFUERZO TMC 0.60 m TMC 0.90 m TMC 1.20 m TMC 1.50 m TMC 1.80 m CORRUGADA
(f'c=175 k/cm2
PARA ALCANTARILLA ESTRUCTURAS (f'c=210 k/cm 2) (f'c=175 k/cm 2) (f'c=100 k/cm 2) DO fy=4200 kg/cm 2 18"
+ 30%P.G.)
ESTRUCTURAS S

DER IZQ DER (m 3) (m 3) (m 3) (m 3) (m 3) (m 3) (m 3) (m 2) (kg) (m) (m) (m) (m) (m) (m)

100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%


100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 86.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 84.00% 87.50% 100.00% 83.33% 100.00% 75.00% 100.00% 75.00% 0.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
52.13% 100.00% 66.67% 0.00% 0.00% 100.00%
56.71% 100.00% 50.00% 0.00% 0.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
501.E 208.A 502.A 503.D1 503.E 503.H 503.J 515.A 504 507.A1 507.A2 507.A3 507.D 507.E 623.C

EXCAVACIN ENCAUZAMIEN
CONCRETO
NO TO RELLENO CONCRETO CONCRETO CONCRETO ENCOFRADO Y ACERO DE TUBERIA HDPE
CLASE J
Relleno Emboquillado % AVANCE CLASIFICADA PARA PARA CLASE D CLASE E CLASE H DESENCOFRA REFUERZO TMC 0.60 m TMC 0.90 m TMC 1.20 m TMC 1.50 m TMC 1.80 m CORRUGADA
(f'c=175 k/cm2
PARA ALCANTARILLA ESTRUCTURAS (f'c=210 k/cm 2) (f'c=175 k/cm 2) (f'c=100 k/cm 2) DO fy=4200 kg/cm 2 18"
+ 30%P.G.)
ESTRUCTURAS S

DER IZQ DER (m 3) (m 3) (m 3) (m 3) (m 3) (m 3) (m 3) (m 2) (kg) (m) (m) (m) (m) (m) (m)

100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%


100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 70.00% 100.00% 66.67% 66.67% 100.00% 100.00% 100.00% 100.00% 0.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
86.00% 100.00% 100.00% 66.67% 100.00% 100.00% 100.00% 100.00% 0.00%
61.86% 100.00% 66.67% 50.00% 50.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
47.55% 50.00% 50.00% 0.00% 0.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
47.55% 50.00% 50.00% 0.00% 0.00% 100.00%
100% 76.00% 100.00% 100.00% 66.67% 100.00% 100.00% 100.00% 50.00% 0.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00%
100% 76.00% 100.00% 100.00% 66.67% 100.00% 100.00% 100.00% 50.00% 0.00%
67.00% 100.00% 50.00% 50.00% 75.00% 100.00% 75.00% 50.00% 0.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
501.E 208.A 502.A 503.D1 503.E 503.H 503.J 515.A 504 507.A1 507.A2 507.A3 507.D 507.E 623.C

EXCAVACIN ENCAUZAMIEN
CONCRETO
NO TO RELLENO CONCRETO CONCRETO CONCRETO ENCOFRADO Y ACERO DE TUBERIA HDPE
CLASE J
Relleno Emboquillado % AVANCE CLASIFICADA PARA PARA CLASE D CLASE E CLASE H DESENCOFRA REFUERZO TMC 0.60 m TMC 0.90 m TMC 1.20 m TMC 1.50 m TMC 1.80 m CORRUGADA
(f'c=175 k/cm2
PARA ALCANTARILLA ESTRUCTURAS (f'c=210 k/cm 2) (f'c=175 k/cm 2) (f'c=100 k/cm 2) DO fy=4200 kg/cm 2 18"
+ 30%P.G.)
ESTRUCTURAS S

DER IZQ DER (m 3) (m 3) (m 3) (m 3) (m 3) (m 3) (m 3) (m 2) (kg) (m) (m) (m) (m) (m) (m)

100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%


100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
56.71% 100.00% 50.00% 0.00% 0.00% 100.00%
66.73% 100.00% 50.00% 0.00% 50.00% 100.00%
28.35% 50.00% 25.00% 0.00% 0.00% 50.00%
28.35% 50.00% 25.00% 0.00% 0.00% 50.00%
76.17% 100.00% 50.00% 50.00% 50.00% 100.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
66.73% 100.00% 50.00% 0.00% 50.00% 100.00%
30.00% 100.00% 0.00% 33.33% 100.00% 100.00% 100.00% 0.00% 0.00%
28.35% 50.00% 25.00% 0.00% 0.00% 50.00%
28.35% 50.00% 25.00% 0.00% 0.00% 50.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
28.35% 50.00% 25.00% 0.00% 0.00% 50.00%
28.35% 50.00% 25.00% 0.00% 0.00% 50.00%
56.71% 100.00% 50.00% 0.00% 0.00% 100.00%
6.87% 25.00% 0.00% 0.00% 0.00% 0.00%
28.35% 50.00% 25.00% 0.00% 0.00% 50.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
56.71% 100.00% 50.00% 0.00% 0.00% 100.00%
2.06% 7.50% 0.00% 0.00% 0.00% 0.00%
6.87% 33.33% 0.00% 0.00% 0.00% 0.00%
56.71% 100.00% 50.00% 0.00% 0.00% 100.00%
52.13% 100.00% 66.67% 0.00% 0.00% 100.00%
73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
501.E 208.A 502.A 503.D1 503.E 503.H 503.J 515.A 504 507.A1 507.A2 507.A3 507.D 507.E 623.C

EXCAVACIN ENCAUZAMIEN
CONCRETO
NO TO RELLENO CONCRETO CONCRETO CONCRETO ENCOFRADO Y ACERO DE TUBERIA HDPE
CLASE J
Relleno Emboquillado % AVANCE CLASIFICADA PARA PARA CLASE D CLASE E CLASE H DESENCOFRA REFUERZO TMC 0.60 m TMC 0.90 m TMC 1.20 m TMC 1.50 m TMC 1.80 m CORRUGADA
(f'c=175 k/cm2
PARA ALCANTARILLA ESTRUCTURAS (f'c=210 k/cm 2) (f'c=175 k/cm 2) (f'c=100 k/cm 2) DO fy=4200 kg/cm 2 18"
+ 30%P.G.)
ESTRUCTURAS S

DER IZQ DER (m 3) (m 3) (m 3) (m 3) (m 3) (m 3) (m 3) (m 2) (kg) (m) (m) (m) (m) (m) (m)

100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%


100% 78.00% 91.67% 100.00% 91.67% 100.00% 100.00% 0.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 73.77% 75.00% 75.00% 50.00% 100.00% 100.00%
100% 73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
73.77% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
100% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
521.A 521.C 521.D 602.A 602.B 602.C

EMBOQUILLAD EMBOQUILLAD EMBOQUILLAD


GAVION TIPO GAVION TIPO
O O O GAVION
COLCHON COLCHON
DE PIEDRA DE PIEDRA DE PIEDRA TIPO CAJA
H= 0.30M H= 0.50M
E=0.10m E=0.20m E=0.30m

(m 2) (m 2) (m 2) (m 3) (m 2) (m 2)

50.00% 75.00% 50.00%


INFORMACIN DE LA ALCANTARILLA
PROGRESIVA REAL
MCA - Solado TMC - C. Arena
Item (REPLANTEO)
KM SECCIN B x H SECCIN B x H IZQ DER

0.5% 0.5%
3.0% 3.0%
01 43+693.00 60" 60" 100% 100%
02 43+975.29 36" 36" 100% 12%
03 44+540.06 36" 36" 25% 100%
04 44+854.87 36" 36" 100% 100%
05 45+174.72 48" 48" 100%
06 45+338.26 36" 36" 100% 100%

nombre pedro
telefono 666666
507.A2 507.A3 507.D 507.E

TMC 0.90 m TMC 1.20 m TMC 1.50 m TMC 1.80 m

(m) (m) (m) (m)

100.00% 100.00% 200.00% 0


56.00% 56.00% 200.00% 128.00%
62.50% 62.50% 200.00% 131.25%
100.00% 100.00% 200.00% 150.00%
50.00% 50.00% 200.00% 125.00%
100.00% 100.00% 200.00% 150.00%

nombre lugar telefono


jose aqp 9856666
luis tac 66666
pedro lim 666666

luis #NAME?
60
100 100
CONTROL DE MUROS C.A. Y C.C - AGOSTO 2017

DATOS DE REPLANTEO GEOMETRIA

N ESTRUCTURA Zapata Elevacin

KM ( Inicio) KM (Fin) Longitud Excavacin Solado Encofrado Acero Concreto Encofrado Acero Concreto Relleno

1 MCA 43+656.64 43+715.26 35.00 100% 100% 100% 100% 100% 100% 100% 100% 100%
MCCBS 46+475.00 46+492.63 20.00
2 MCA 45+153.15 45+162.52 13.00 100% 100% 100% 100% 100% 100% 100% 100% 100%
3 MCCBS 46+695.00 46+719.17 24.17 100% 100% 100% 100% 100% 100%
4 MCCBS 46+994.64 47+015.00 20.36 100% 100% 100% 100% 100% 100%
5 MCCBS 48+230.00 48+264.38 34.38 100% 100% 100% 100% 100% 100%
6 MCCBS 48+825.00 48+841.83 16.83 100% 100% 100% 100% 100% 100%
7 MCA 49+595.57 49+601.47 5.90 100% 100% 100% 100% 100% 100% 100% 100% 100%
8 MCCBS 49+863.78 49+911.03 47.25 100% 100% 100% 100% 100% 100%
9 MCCBS 49+995.00 50+015.00 20.00 100% 100% 100% 100% 100% 100%
10 MCA 51+289.29 51+301.10 11.81 100% 100% 100% 100% 100% 100% 100% 100% 100%
11 MCCBS 52+080.97 52+109.91 28.94 100% 100% 100% 100% 100% 100%
12 MCC 53+332.34 53+352.09 15.00 100% 100% 100% 100% 100% 100%
13 MCCBS 53+825.00 53+839.64 14.64 100% 100% 100% 100% 100% 100%
14 MCABS 53+948.05 53+980.65 32.60 100% 100% 100% 100% 100% 100% 100% 100% 100%
15 MCA 54+537.57 54+550.99 13.42 100% 100% 100% 100% 100% 100% 100% 100% 100%
16 MCA 54+776.74 54+782.19 5.45 100% 100% 100% 100% 100% 100% 100% 100% 100%
17 MCA 54+960.00 55+029.18 69.18 100% 100% 100% 100% 100% 100% 100% 100% 100%
18 MCC 55+450.00 55+490.19 40.19 100% 100% 100% 100% 100% 100%
19 MCC 55+902.48 55+932.68 30.20 100% 100% 100% 100% 100% 100%
20 MCA 56+824.25 56+829.73 5.48 100% 100% 100% 100% 100% 100% 100% 100% 100%
MCCBS 57+780.00 57+804.10 25.00 100% 100% 100% 100% 100%
MCC 58+000.00 58+009.47 10.00 100% 100% 100% 100% 100%
21 MCA 58+281.85 58+286.00 4.15 100% 100% 100% 100% 100% 100% 100% 100% 100%
DATOS DE REPLANTEO GEOMETRIA

N ESTRUCTURA Zapata Elevacin

KM ( Inicio) KM (Fin) Longitud Excavacin Solado Encofrado Acero Concreto Encofrado Acero Concreto Relleno

22 MCCBS 58+575.00 58+585.15 10.15 100% 100% 100% 100% 100% 100%
23 MCCBS 59+070.00 59+070.00 20.00 100% 100% 100% 100% 100% 100%
24 MCCBS 59+480.00 59+533.38 53.38 100% 100% 100% 100% 100% 100%
MCC 60+140.00 60+165.22 25.00 100% 100% 100% 100% 100%
25 MCA 60+267.50 60+272.50 5.00 100% 100% 100% 100% 100% 100% 100% 100%
MCC 60+476.00 60+513.50 37.50 100% 100% 100% 50% 50%
MCA 60+503.50 60+508.50 5.00 100% 100% 100% 100% 100% 100%
MCC 60+602.00 60+648.54 45.00 100% 100% 100%
MCC 60+670.00 60+719.26 50.00 100%
26 MCA 61+595.08 61+600.28 5.20 100% 100% 100% 100% 100% 100% 100% 100% 100%
27 MCCBS 62+385.00 62+415.00 30.00 100% 100% 100% 100% 100% 100%
MCC 62+879.00 62+889.72 10.00 100%
28 MCA 62+971.86 62+975.56 3.70 100% 100% 100% 100% 100% 100% 100% 100% 100%
MCC 63+742.35 63+769.73 30.00 100%
29 MCCBS 64+550.32 64+592.56 42.24 100% 100% 100% 100% 100% 100%
30 MCABS 64+587.52 64+592.48 4.96 100% 100% 100% 100% 100% 100% 100% 100% 100%
31 MCA 64+768.00 64+816.35 48.35 100% 100% 80% 80% 80% 80% 80% 80%
32 MCCBS 65+100.00 65+129.99 29.99 100% 100% 100% 100% 100% 100%
33 MCCBS 66+460.00 66+488.89 28.89 100% 100% 100% 100% 100% 100%
34 MCC 66+805.00 66+844.55 39.55 100% 100% 100% 100% 100% 100%
35 MCCBS 67+305.00 67+359.47 54.47 100% 100% 100% 100% 100% 100%
36 MCA 67+604.98 67+609.06 4.08 100% 100% 100% 100% 100% 100% 100% 100% 100%
37 MCCBS 73+425.00 73+484.39 59.39 100% 100% 100% 100% 100% 100%
38 MCCBS 73+665.00 73+680.00 15.00 100% 100% 100% 100% 100% 100%
39 MCA 75+627.56 75+632.44 4.88 100% 100% 100% 100% 100% 100% 100% 100% 100%
40 MCCBS 76+611.71 76+627.04 15.33 100%
MCA 76+619.37 76+624.48 5.00
DATOS DE REPLANTEO GEOMETRIA

N ESTRUCTURA Zapata Elevacin

KM ( Inicio) KM (Fin) Longitud Excavacin Solado Encofrado Acero Concreto Encofrado Acero Concreto Relleno

MCC 76+652.50 76+660.00 7.50


41 MCCBS 76+660.00 76+690.00 30.00 100% 100% 100% 100% 100% 100%
MCC 76+690.00 76+699.93 10.00
42 MCCBS 76+805.00 76+900.00 95.00 100% 100% 100% 100% 100% 100%
43 MCCBS 77+085.00 77+111.70 26.70 100% 100% 100% 100% 100% 100%
44 MCCBS 79+815.00 79+825.00 10.00 100%
45 MCC 80+024.33 80+065.36 41.03 100% 100% 100% 50% 50%
46 MCCBS 82+325.00 82+355.00 30.00 100% 100% 100% 50% 50%
47 MCCBS 82+380.00 82+412.50 32.50 100%
48 MCCBS 82+450.00 82+490.00 40.00 100% 100% 100% 50% 50%
49 MCCBS 82+585.00 82+680.00 95.00 100% 100% 100% 100% 100%
50 MCCBS 82+795.00 82+895.03 100.03 100% 50% 50%
51 MCCBS 82+927.50 82+952.50 25.00 100% 100% 100% 100% 100%
52 MCCBS 83+180.17 83+211.30 31.13 0%
53 MCCBS 83+400.00 83+415.00 15.00 0%
54 MCCBS 84+305.00 84+341.06 36.06 100% 100% 100% 100% 100% 100%
55 MCCBS 84+745.00 84+760.00 15.00 100%
56 MCA 84+883.14 84+888.86 5.72 100% 100% 100% 100% 100% 100% 100% 100%
57 MCA 85+897.50 85+902.50 5.00 100% 100% 100% 100% 100% 100% 100% 100% 100%
58 MCCBS 86+100.00 86+125.00 25.00 100% 100% 100% 100% 100% 100%
59 MCA 87+197.50 87+202.50 5.00 100% 100% 100% 100% 100% 100% 100% 100% 100%
60 MCABS 87+853.88 87+936.64 82.76 100% 100% 100% 100% 100% 100% 100% 100% 100%
61 MCA 88+230.25 88+251.35 21.10 100% 100% 100% 100% 100% 100% 100% 100% 100%
62 MCA 88+378.32 88+383.68 5.36 100% 100% 100% 100% 100% 100% 100% 100% 100%
63 MCCBS 88+710.00 88+734.23 24.23 100% 100% 100% 100% 100% 100%
64 MCCBS 89+515.00 89+594.61 79.61 100% 100% 100% 100% 100% 100%
65 MCCBS 89+674.07 89+726.41 52.34 100% 100% 100% 100% 100% 100%
DATOS DE REPLANTEO GEOMETRIA

N ESTRUCTURA Zapata Elevacin

KM ( Inicio) KM (Fin) Longitud Excavacin Solado Encofrado Acero Concreto Encofrado Acero Concreto Relleno

66 MCCBS 89+945.00 89+978.95 33.95 100% 100% 100% 100% 100% 100%
67 MCA 90+136.00 90+141.00 5.00 100% 100% 100% 100% 100% 100% 100% 100% 100%
68 MCCBS 90+920.00 90+939.97 19.97 100% 100% 100% 100% 100% 100%
69 MCCBS 91+094.35 91+150.53 56.18 100% 100% 100% 100% 100% 100%
70 MCCBS 91+290.00 91+305.56 15.56 100% 100% 100% 100% 100% 100%
71 MCCBS 91+339.75 91+376.24 36.49 100% 100% 100% 100% 100% 100%
72 MCCBS 91+530.00 91+549.98 19.98 100% 100% 100% 100% 100% 100%
MCC 91+684.52 91+713.34 22.50 100% 100% 100% 100% 100% 100%
73 MCA 91+692.50 91+697.50 5.00 100% 100% 100% 100% 100% 100% 100% 100% 100%
74 MCA 93+246.55 93+251.45 4.90 100% 100% 100% 100% 100% 100% 100% 100% 100%

= EJECUTADAS DURANTE EL MES


= EN EJECUCION
= NO CUENTAN CON DICHAS PARTIDAS = ESTRUCTURAS ADICIONALES
= EJECUTADAS MES ANTERIOR
ROS C.A. Y C.C - AGOSTO 2017

GEOMETRIA

Tuberia HDPE Tubo de Geocompuesto Junta para


corrugada 4" pvc-sap, d=2" de drenaje muros

100% 100% 100% 100%

100% 100% 100% 100%


100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%

100% 100% 100% 100%


GEOMETRIA

Tuberia HDPE Tubo de Geocompuesto Junta para


corrugada 4" pvc-sap, d=2" de drenaje muros
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%

100% 100% 100% 100%


100% 100% 100% 100%

100% 100% 100% 100%

100% 100% 100% 100%


100% 100% 100% 100%

100% 100% 100% 100%


100% 100% 100% 100%
100% 100% 100% 100%

100% 100% 100% 100%


100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
GEOMETRIA

Tuberia HDPE Tubo de Geocompuesto Junta para


corrugada 4" pvc-sap, d=2" de drenaje muros

100% 100% 100% 100%

100% 100% 100% 100%


100% 100% 100% 100%

100%

100% 100% 100% 100%

100%
100% 100% 100% 100%
100% 100% 100% 100%

100% 100% 100% 100%


100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%
GEOMETRIA

Tuberia HDPE Tubo de Geocompuesto Junta para


corrugada 4" pvc-sap, d=2" de drenaje muros
100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%

100% 100% 100% 100%


100% 100% 100% 100%
100% 100% 100% 100%
100% 100% 100% 100%

100% 100% 100% 100%


100% 100% 100% 100%
100% 100% 100% 100%

ESTRUCTURAS ADICIONALES
CONTROL DE AVANCE MURO DE SUELO REFORZADO - AGOSTO 2017
DATOS DE REPLANTEO GEOMETRIA
Zapata Elevacin

N ESTRUCTURA Elemento de
Tuberia HDPE Geocompuesto Geotextil no Geomalla de
KM ( Inicio) KM (Fin) Longitud Excavacin Relleno Suelo reforzado
corrugada 4" de drenaje tejido clase 2 poliestes tipo I
tipo II

1 MSR 45+891.53 45+949.49 35.00 100% 100% 100% 100% 100% 100% 100%
2 MSR 64+022.67 64+074.31 13.00 100% 100% 100% 100% 100% 100% 100%
3 MSR 64+668.00 64+829.91 161.91 100% 100% 100% 100% 100% 100% 100%
4 MSR 70+463.55 70+543.88 80.33 100% 100% 100% 100% 100% 100% 100%
5 MSR 70+821.07 70+966.24 145.17 100% 100% 100% 100% 100% 100% 100%
6 MSR 79+472.99 79+510.54 37.55 100%
7 MSR 83+275.03 83+323.77 48.74 100%
8 MSR 83+888.52 83+917.66 29.14 100%

= EJECUTADAS DURANTE EL MES


= EJECUTADAS MES ANTERIOR
CONTROL DE EJECUCIN DE SUBDRENES - AGOSTO 2017

INFORMACIN DE LOS SUBDRENES

PROGRESIVA REPLANTEO PROGRESIVA PROYECTO


Longitud de
Item LONG. LADO LONG. LADO N Descargas
Descarga

De Km A Km De Km A Km

1 71+665.00 71+790.00 125.00 LI 71+665 71+790 125.00 LI 4 53.56


2 82+710.00 82+760.00 50.00 LD 82+710 82+760 50.00 LD 2 25.8
3 83+370.00 83+420.00 50.00 LD 83+370 83+420 50.00 LD 2 25.91

4 83+900.00 83+905.00 5.00 LD ADICIONAL 08 1 7.3

5 83+905.00 84+000.00 95.00 LD 83+905 84+000 95.00 LD 2 28.01


6 84+720.00 84+800.00 80.00 LI 84+720 84+800 80.00 LI 3 38.73

7 84+800.00 84+838.00 38.00 LI ADICIONAL 08 1 12.46

8 84+838.00 84+880.00 42.00 LI 84+838 84+880 42.00 LI 2 27.89


9 84+905.00 84+940.00 35.00 LI 84+905 84+940 35.00 LI 1 13.92

10 84+940.00 84+980.00 40.00 LI ADICIONAL 08 1 12.36

11 85+530.00 85+590.00 60.00 LD ADICIONAL 08 2 27.23

12 86+425.00 86+560.00 135.00 LD 86+425 86+560 135.00 LD 5 69.31

13 86+560.00 86+850.00 290.00 LD ADICIONAL 08 10 140.04

14 86+945.00 87+120.00 175.00 LD 86+945 87+120 175.00 LD 6 77.62

15 87+380.00 87+430.00 50.00 LD ADICIONAL 08 2 26.14

16 87+500.00 87+540.00 40.00 LD ADICIONAL 08 2 31.32

17 87+540.00 87+600.00 60.00 LD 87+540 87+600 60.00 LD 2 27.03


18 87+800.00 87+895.00 95.00 LD 87+800 87+895 95.00 LD 3 43.99
19 87+910.00 88+220.00 310.00 LD 87+910 88+220 310.00 LD 10 125.66

20 88+500.00 88+600.00 100.00 LD ADICIONAL 08 3 38.88

21 88+640.00 88+690.00 50.00 LD 88+640 88+690 50.00 LD 2 27.03

22 92+980.00 93+300.00 320.00 LI ADICIONAL 08 10 137.16

23 93+540.00 93+640.00 100.00 LI ADICIONAL 08 3 41.53

24 93+875.00 94+096.80 221.80 LD ADICIONAL 08 7 105.86

25 94+380.00 94+600.00 220.00 LD ADICIONAL 08 7 91.74

26 95+370.00 95+440.00 70.00 LD ADICIONAL 08 2 29.19

27 95+620.00 95+835.00 215.00 LD ADICIONAL 08 7 93.42