Documentos de Académico
Documentos de Profesional
Documentos de Cultura
PVC
codo
CURVA REDUC. TAPN COPLA TEE
30
1 1
2 1
3 1
4 1
5 1
6 1
7 1
8 1
9 1
10 1
11 1
12 1 1
13 1 1
14 1
15 1
16 2
17 1
18 1 1
19 1
20 1
21 1
22 1 1
Cantidad 2 6 1 5 1 11 1 0
Termofusin BA
110 110 75
0 0 0 0 0 0 0 0 0 0 8
16.00
128.00
H.
FE FUNDIDO
DUCTIL
0,40 m 100
2 2 1 1 9 1 2 10
1 1
1 1
1 3
1 3
1 1
1 3
1 1
1 1
1 3
1 1
2 2 1 1 1 1 12 5 14
2 4
1 1
1 3
2 6
1 1
2 2 1 1 1 1 12 5 14
1 3
1 1
1 1
2 2 1 1 10 4 3 10
8 8 2 4 2 4 63 5 53 48
1
JUNTURAS ANGER
1
1
JUNTURAS BRIDA
1
1
JUNTURAS GIBAULT
1
1
JUNTURAS UNIV
1
2 1 1 1
1 C
2
MATERIAL
1
2 1 1 1
1 PVC
1
1 TOTAL
2 1 1
8 4 22 4 ENCAMISADO
400
UMEN P. ESP. RED ETAPA I
CANISMO (Kg)
CANISMO (Kg)
MECANISMO (Kg)
ALES DE PVC (Kg)
TOTAL (Kg)
110 mm 53
160 mm 5
100 mm 48
100 mm 8
100 mm 4
ENCAMISADO
400 ML
75MM TUBERIA 110 TUBERIA 160
493.5 4.7
9.75 29.8
10 13.7 1
25.07
26
28.15
36.85
37.6
38
38.4
41.15
44.4
47.75
55.8
57
58.85
68.4
69
73
80.5
94.7 43.5
945.07
ITEM UNID. CANTIDAD
MOVIMIENTOS DE TIERRA
Excavacion en zanja M3 1609
Cama de apoyo arena M3 135
Relleno Lateral M3 135
Relleno primera capa M3 368
Relleno superior medio M3 368
Relleno superior final M3 614
OBRAS DE HORMIGON
Machones de anclaje Hormigon 170 kg N 26
Grifos N 3
2092 ###
145 ###
145 ###
394 ###
394 ###
657 ###
ITEM ML total empalmes 2m EMP
34 1/2
CALLE 2
CALLE 3
calle 4
CALLE 5
PASAJE 1
PASAJE 2
PASAJE 3
PASAJE 4
SERVIDUMBRE
109.32 19 (20m)10
112.663 15 (22m)11
95.081 9 (16m)8
165.395 22 (32m)16
88.147 22 (28m)14
80.814 11 (16)8
69.613 7 (12m)6
67.69 10 (16m)8
71.56 16 (16m)8
30.641
88.655 10 (18m)9
507.886
(48m)6 1 1 1
(33m)3 1
1
(66M)6
(88m)8
(16m)2 1
(8m)1
(8m)1 1
(64m)8
(9,55m)1
1 tapon 46.57
3 TEE 47.99
1 grifo 40.5
1 grifo 70.45
37.55
matris
2 TEE
matris 21.3
1 tapon 20.71
1 tapon 21.89
1 codo 24.08
1 tapon 37.76
151.4
1 valv. Proyectada 22
1 tapon proyect 22
1 tapon proyectado 19
1 TAPON 16
1 tapon 10
1 valvula proyectada 7
10
1 tapon 15
11
9
878