Metrado de Carga de La Zapata
Metrado de Carga de La Zapata
14.0m
3.3 3.7
0.075
3.90
6.75
5.35
ESTACIONAMIENTO
5.48
35.0m
4.40
4.40
2.20
3.15
3.3 3.7
IONAMIENTO
A
INGERSO
5m
3.7 3.3
DEL SEMISOTANO
DISEO DE LA ZA
14.0m
TERRAZA
SALA
6.75
6.85m
B
5.35
10.65m
TERRAZA
18.85m
DORMITORIO
4.70
12.0m
4.40
DORMITORIO SALA
2.20
2m
3.15
3.30 3.70
0.15 0.2
TERRAZA
INGERSO AL
SIGUIENTE
NIVEL
TERRAZA
5.3
A
SALA DORMITORIO
3.70 3.30
6.85m
B
10.65m
COC. SERVICIOS
COC. SERVICIOS
18.85m
12.0m
2m
0m
INGERSO AL
SIGUIENTE
NIVEL
COC. SERVICIOS
COC. SERVICIOS
1.-PREDIMENSIONAMIENTO
1.2.-PREDIMENSIONAMIENTO DE LA LOSA
ALTURA DE LA LOSA
0.148 0.15m
1.4.- COLUMNAS
COLUMNA CENTRALES
1.7 0.35m 1.7m
2.57m
2.6m
2.74m
0.35 cm
0.35m
0.35m
C-1 vs(0.30 x 0.30)
0.35 cm
2.20m
2.03m
2.03m
DIMENSIONES
AREA DE LA P servicio = 233721.57 Kg
= =
COLUMNA 0.45 F`c 157.5
30 30 =
0.35m
35 35 =
COLUMNA
40 40 =
50 50 =
0.35m
METRADO DE CARGAS DE LA
METRADO DE UNA CIMENTACIO
DIMENSIONES
LOSA 20m PESO 300 Kg/m2
VIGA P = 0.35m x 0.7m
VIGA S = 0.35m x 0.35m
0.35
7 pisos
COLUMNA = x 0.35
PESO
P.E. LOSA 300 Kg/m2
PESO DE CONCRETO 2400 Kg/m3 AREA TRIBUTARIA TOTAL
PESO DEL PISO TERMINADO 100 Kg/m2 AREA T .LOSA
S/C 350 Kg/m2
NIVEL
DEL
EDIFIC
IO CARGA MUERTA
TIPO DE CARGA
PESO DE LA LOSA de: 300 Kg/m2 x 300 Kg/m2
PESO DE PISO TERMINADO 100 Kg/m2 x 100 Kg/m2
PESO DE VIGA PRINCIPAL 2400 Kg/m3 x 0.35
AZOTEA
PESO DE LA VIGA SEGUND 2400 Kg/m3 x 0.35
CARGA MUERTA DE LA AZOTEA
C.M. TOTAL
METRADO DE UNA CIMENTACION EXCE
DIMENSIONES
LOSA 20m PESO 300 Kg/m2
VIGA P = 0.35m x 0.7m
VIGA S = 0.35m x 0.35m
0.35
7 pisos
COLUMNA = x 0.35m
PESO
P.E. LOSA 300 Kg/m2
PESO DE CONCRETO 2400 Kg/m3 AREA TRIBUTARIA TOTAL
PESO DEL PISO TERMINADO 100 Kg/m2 AREA T .LOSA
S/C 350 Kg/m2
C.M. TOTAL
DIMENSIONES
LOSA 20m PESO 300 Kg/m2
VIGA P = 0.35m x 0.7m
VIGA S = 0.35m x 0.35m
0.35
7 pisos
COLUMNA = x 0.35m
PESO
P.E. LOSA 300 Kg/m2
PESO DE CONCRETO 2400 Kg/m3 AREA TRIBUTARIA TOTAL
PESO DEL PISO TERMINADO 100 Kg/m2 AREA T .LOSA
S/C 350 Kg/m2
C.M. TOTAL
METRADO DE CARGAS
ESQUINA LATERAL
CARGA MUERTA 23.83 Tn 45.76
CARGA VIVA 5.43 Tn 13.67
PESO DE SERVICIO 29.26 Tn 59.43
S/C
Df
ZAPATA
A
0.35
B
ADO DE CARGAS
350 Kg/m2
1700 Kg/m3
1.15 Kg/cm2
350 Kg/cm2
4200 Kg/cm2
210 Kg/cm2
4200 Kg/cm2
7 pisos
0.4
0.34m
DIMENSIONES CONSIDERADAS POR
PROCESO CONSTRUCTIVO
V.S. 0.3m
ALTO 0.35m
ANCHO 0.35m
0.2m 0.35
900 cm2
1225 cm2 > 1484 cm2 OK
1600 cm2
2500 cm2
ARGAS DE LA CIMENTACION
UNA CIMENTACION CENTRAL 2.57
2.74
ZAPATA ZAPATA
0.35
0.35
0.35
2.20
ZAPATA ZAPATA
2.03
TARIA TOTAL 18 m2
T .LOSA 15 m2 1.68 0.35m 1.68
### 1.85m
C.V. TOTAL
93709.89 39210.08
MENTACION EXCENTRICA O LATERAL
35
VS
0.35m VS
1.95
ZAPATA ZAPATA
1.60
VP
TARIA TOTAL 8 m2
T .LOSA 5 m2
1.68 0.35m 1.68
1.85 1.85
5 Kg/m2 = 1608
5 Kg/m2 = 536 USO = 350 Kg/m2
5 Kg/m2 = 536 AREA TRIB. = 5 m2
0.68 x 1.60 = 907.2 TAB. MOVIL = 100 Kg/m2
0.35 x 3.35 = 984.9 1876.00
0.68 x 2.45 = 1389.15
2.5 5961.25 Numero de niveles 7 pisos
7 pisos
41728.75 CARGA VIVA DE LOS 7 13132.00
C.V. TOTAL
45764.85 13668.00
1.65
0.35m VS
ZAPATA
1.99
1.64
VP
TARIA TOTAL 3 m2
1.9
1.64
VP
T .LOSA 2 m2
0.35m 1.30
1.65
RTA CARGA VIVA
CARGA CARGA
TIPO DE CARGA
2 Kg/m2 = 638.625
2 Kg/m2 = 212.875 USO = 100 Kg/m2
0.68 x 1.64 = 928.4625 AREA TRIB. = 2 m2
0.35 x 1.30 = 382.2 212.88
EA 2162.1625
2 Kg/m2 = 638.625
2 Kg/m2 = 212.875 USO = 350 Kg/m2
2 Kg/m2 = 212.875 AREA TRIB. = 2 m2
0.68 x 1.64 = 928.4625 TAB. MOVIL = 100 Kg/m2
0.35 x 1.30 = 382.2 745.06
0.35 x 2.5 = 720.3
2.5 3095.3375 Numero de niveles 7 pisos
7 pisos
21667.363 CARGA VIVA DE LOS 7 5215.44
C.V. TOTAL
23829.525 5428.31
LATERAL CENTRAL
Tn 93.71 Tn
Tn 39.21 Tn
Tn 132.92 Tn
PESO DE SERVICIO
S/C
ZAPATA Hz
B
COLUMNA
CENTRAL
0.35