RENCANA ANGGARAN BIAYA

Pekerjaan Pembibitan serta Perawatan Tanaman dan Hidroponik


FY 2018

Harga
No. DESKRIPSI UNIT Jml. %
unit total
I. Tenaga Kerja
1 Tenaga Kerja 2 P x 12 m PM 24 2,760,000 66,240,000

Subtotal I .. 66,240,000 56.5%

II. Material
1 Netpot (d atas = 6,15 cm, 290 Pcs/bln x 12 m Pcs 3,480 900 3,132,000
d bawah = 3 cm t = 5,4 cm)
2 Rockwool (Uk. 15 cm x 7,5 cm x 7 cm) 480 Pcs/bln x 12 m Pcs 5,760 3,100 17,856,000
3 Nutrisi (AB mix Uk. 2,25 Kg) 9 Pack/Bln x 12 m Pack 108 80,000 8,640,000
4 Peralatan Penunjang Lainya 1 Set/Bln x 12 m Set 12 110,000 1,320,000
5 Benih (Sawi, selada, bayam, kangkung) 45 Pack/Bln x 12 m Pack 540 14,000 7,560,000
Subtotal II .. 38,508,000 32.8%

III. Special Assistant


1 Overtime
Tenaga Kerja 1 P x 56 Hr/mP x 12 m Hr 672 15,954 10,720,925
Subtotal III .. 10,720,925 9.1%

IV SAFETY PROTECTOR
1 Safety Shoes 2 P x 1 set/yr Set 2 220,000 440,000
2 Uniform 2 P x 2 set/yr Set 4 266,200 1,064,800
3 Safety Helmet 2 P x 1 set/yr Set 2 74,400 148,800
4 Safety Gloves 2 P x 2 set/yr Set 4 27,588 110,352
Subtotal IV .. 1,763,952 1.5%

a TOTAL ( I+II+III+IV+V ) .. 117,232,877


b OVERHEAD 10% x a 11,723,288
d TELEPHONE 1 unit x 12 M U/M 12 30,000 360,000
e LUMPSUMP ( THR ) 1 L Lot 1 5,781,000 5,781,000
f TOTAL (a+b+c+d+e) .. 135,097,165
g Rounded rounded of f 135,097,000
H Jamsostek 11.70% % 11.74 66,240,000 7,776,576
I GRAND TOTAL G+H 142,873,576
J PPN 10% 0.1 x g 13,509,700
K GRAND TOTAL I+J 156,383,300 100.0%

Seksi Administrasi & Kesejahteraan


Dibuat Diperiksa Disetujui

Staff JM Manager
Tanggal :
RENCANA ANGGARAN BIAYA
Pekerjaan Pembibitan serta Perawatan Tanaman dan Hidroponik
FY 2018

Harga
No. DESKRIPSI UNIT Jml.
unit
I. Tenaga Kerja
1 Tenaga Kerja 2 P x 12 m PM 24

Subtotal I ..

II. Material
1 Netpot (d atas = 6,15 cm, 290 Pcs/bln x 12 m Pcs 3,480
d bawah = 3 cm t = 5,4 cm)
2 Rockwool (Uk. 15 cm x 7,5 cm x 7 cm) 480 Pcs/bln x 12 m Pcs 5,760
3 Nutrisi (AB mix Uk. 2,25 Kg) 9 Pack/Bln x 12 m Pack 108
4 Peralatan Penunjang Lainya 1 Set/Bln x 12 m Set 12
5 Benih (Sawi, selada, bayam, kangkung) 45 Pack/Bln x 12 m Pack 540
Subtotal II ..

III. Special Assistant


1 Overtime
Tenaga Kerja 1 P x 56 Hr/mP x 12 m Hr 672
Subtotal III ..

IV SAFETY PROTECTOR
1 Safety Shoes 2 P x 1 set/yr Set 2
2 Uniform 2 P x 2 set/yr Set 4
3 Safety Helmet 2 P x 1 set/yr Set 2
4 Safety Gloves 2 P x 2 set/yr Set 4
Subtotal IV ..

a TOTAL ( I+II+III+IV+V ) ..
b OVERHEAD 10% x a
d TELEPHONE 1 unit x 12 M U/M 12
e LUMPSUMP ( THR ) 1 L Lot 1
f TOTAL (a+b+c+d+e) ..
g Rounded rounded of f
H Jamsostek 11.70% % 11.74
I GRAND TOTAL G+H
J PPN 10% 0.1 x g
K GRAND TOTAL I+J

Seksi Administrasi & Kesejahteraan


Dibuat Diperiksa

Staff JM
Tanggal :
onik

Harga
%
total

istrasi & Kesejahteraan


Disetujui

Manager
HARGA PERKIRAAN SENDIRI (HPS) / OWNER'S ESTIMATE

Pengadaan : Pekerjaan Pembibitan serta Perawatan Tanaman dan Hidroponik


Nomor : Tanggal
Seksi/Dept yang mengusulkan : SAW/ SHR

N Uni Harga
Nama Barang/ Jasa Qty Harga Total
o t Satuan
MATERIAL
Netpot pcs 3,480 900 3,132,000
Rockwool psc 5,760 3,100 17,856,000
Nutrisi Penunjang pack 108 80,000 8,640,000
Peralatan Penunjang set 12 110,000 1,320,000
Benih pack 540 14,000 7,560,000
TENAGA KERJA MP 24 2,760,000 66,240,000
SPECIAL ASISSTANT Hr 672 15,954 10,720,925
SAFETY PROTECTOR MP 2 881,976 1,763,952
JUMLAH IDR
Keuntungan & Over Head (10%) IDR
Lumsump IDR
Telephone IDR
Subtotal IDR
Jamsostek (11,74 %) IDR
Pajak Pertambahan Nilai (PPN) 10% IDR
GRAND TOTAL (Incl ppn, Rounded) IDR

Dasar Penyusunan HPS *) :


Harga dari PO/Kontrak/ Perjanjian sebelumnya
Harga pasar setempat/harga pabrikan/analisa pasar
Harga dari Price List
Analisa harga pasar satuan pekerjaan
Perhitungan harga yang disusun oleh konsultan (engineers estimate)
Harga/tarif resmi instansi berwenang
Lainnya (sebutkan)Internet
UMK(bukalapak,
Kab. Batubara
tokopedia)
tahun 2017

Berdasarkan Data harga di atas, maka HPS ditetapkan sebesar IDR 156.383.200(Seratus lima puluh enam juta -
tiga ratus delapan puluh tiga ribu dua ratus rupiah) sesudah PPN.
Tanggal :
Dipersiapkan oleh: Disetujui oleh:
Tim HPS/Requester/ PIC Pengadaan **) Pejabat Berwenang
Herman Sikumbang Moh. Rozak H
Manager SAW General Manager SHR
Catatan
*) Diisi sumber referensi harga
**) Coret yang tidak perlu

Paraf
TE

Tanggal :

Referensi

117,232,877
11,723,288 Sbelum ppn
IDR 5,781,000
IDR 360,000
135,097,000 142,873,500
7,776,576
13,509,700
156,383,200

ma puluh enam juta -

ggal :
etujui oleh:
bat Berwenang

CommitmFund Centre

1211610 CR231023 Carry over


h. Rozak H
eral Manager SHR Budget 19,900.00 262,680,000
13,200
RFP #VALUE! IDR