Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Rab Hidroponik
Rab Hidroponik
Harga
No. DESKRIPSI UNIT Jml. %
unit total
I. Tenaga Kerja
1 Tenaga Kerja 2 P x 12 m PM 24 2,760,000 66,240,000
II. Material
1 Netpot (d atas = 6,15 cm, 290 Pcs/bln x 12 m Pcs 3,480 900 3,132,000
d bawah = 3 cm t = 5,4 cm)
2 Rockwool (Uk. 15 cm x 7,5 cm x 7 cm) 480 Pcs/bln x 12 m Pcs 5,760 3,100 17,856,000
3 Nutrisi (AB mix Uk. 2,25 Kg) 9 Pack/Bln x 12 m Pack 108 80,000 8,640,000
4 Peralatan Penunjang Lainya 1 Set/Bln x 12 m Set 12 110,000 1,320,000
5 Benih (Sawi, selada, bayam, kangkung) 45 Pack/Bln x 12 m Pack 540 14,000 7,560,000
Subtotal II .. 38,508,000 32.8%
IV SAFETY PROTECTOR
1 Safety Shoes 2 P x 1 set/yr Set 2 220,000 440,000
2 Uniform 2 P x 2 set/yr Set 4 266,200 1,064,800
3 Safety Helmet 2 P x 1 set/yr Set 2 74,400 148,800
4 Safety Gloves 2 P x 2 set/yr Set 4 27,588 110,352
Subtotal IV .. 1,763,952 1.5%
Staff JM Manager
Tanggal :
RENCANA ANGGARAN BIAYA
Pekerjaan Pembibitan serta Perawatan Tanaman dan Hidroponik
FY 2018
Harga
No. DESKRIPSI UNIT Jml.
unit
I. Tenaga Kerja
1 Tenaga Kerja 2 P x 12 m PM 24
Subtotal I ..
II. Material
1 Netpot (d atas = 6,15 cm, 290 Pcs/bln x 12 m Pcs 3,480
d bawah = 3 cm t = 5,4 cm)
2 Rockwool (Uk. 15 cm x 7,5 cm x 7 cm) 480 Pcs/bln x 12 m Pcs 5,760
3 Nutrisi (AB mix Uk. 2,25 Kg) 9 Pack/Bln x 12 m Pack 108
4 Peralatan Penunjang Lainya 1 Set/Bln x 12 m Set 12
5 Benih (Sawi, selada, bayam, kangkung) 45 Pack/Bln x 12 m Pack 540
Subtotal II ..
IV SAFETY PROTECTOR
1 Safety Shoes 2 P x 1 set/yr Set 2
2 Uniform 2 P x 2 set/yr Set 4
3 Safety Helmet 2 P x 1 set/yr Set 2
4 Safety Gloves 2 P x 2 set/yr Set 4
Subtotal IV ..
a TOTAL ( I+II+III+IV+V ) ..
b OVERHEAD 10% x a
d TELEPHONE 1 unit x 12 M U/M 12
e LUMPSUMP ( THR ) 1 L Lot 1
f TOTAL (a+b+c+d+e) ..
g Rounded rounded of f
H Jamsostek 11.70% % 11.74
I GRAND TOTAL G+H
J PPN 10% 0.1 x g
K GRAND TOTAL I+J
Staff JM
Tanggal :
onik
Harga
%
total
Manager
HARGA PERKIRAAN SENDIRI (HPS) / OWNER'S ESTIMATE
N Uni Harga
Nama Barang/ Jasa Qty Harga Total
o t Satuan
MATERIAL
Netpot pcs 3,480 900 3,132,000
Rockwool psc 5,760 3,100 17,856,000
Nutrisi Penunjang pack 108 80,000 8,640,000
Peralatan Penunjang set 12 110,000 1,320,000
Benih pack 540 14,000 7,560,000
TENAGA KERJA MP 24 2,760,000 66,240,000
SPECIAL ASISSTANT Hr 672 15,954 10,720,925
SAFETY PROTECTOR MP 2 881,976 1,763,952
JUMLAH IDR
Keuntungan & Over Head (10%) IDR
Lumsump IDR
Telephone IDR
Subtotal IDR
Jamsostek (11,74 %) IDR
Pajak Pertambahan Nilai (PPN) 10% IDR
GRAND TOTAL (Incl ppn, Rounded) IDR
Berdasarkan Data harga di atas, maka HPS ditetapkan sebesar IDR 156.383.200(Seratus lima puluh enam juta -
tiga ratus delapan puluh tiga ribu dua ratus rupiah) sesudah PPN.
Tanggal :
Dipersiapkan oleh: Disetujui oleh:
Tim HPS/Requester/ PIC Pengadaan **) Pejabat Berwenang
Herman Sikumbang Moh. Rozak H
Manager SAW General Manager SHR
Catatan
*) Diisi sumber referensi harga
**) Coret yang tidak perlu
Paraf
TE
Tanggal :
Referensi
117,232,877
11,723,288 Sbelum ppn
IDR 5,781,000
IDR 360,000
135,097,000 142,873,500
7,776,576
13,509,700
156,383,200
ggal :
etujui oleh:
bat Berwenang
CommitmFund Centre
###
###