Está en la página 1de 19

*********** EMPOTRAMIENTO PERFECTO ASENTAMIENTOS DIFERENCIALES *

*********

COORD Xi = 1

COORD Yi = 3.5

Dx = -0.010

Dy = -0.015

Modulo Elast. = 2170000

Ancho b = 0.40

Largo h = 0.60

a = 2456.604

b = -21.359

c = 38.873

******* FUERZAS DE EMPOTAMIENTO PERFECTO ********

EN ASENTAMIENTOS DIFERENCIALES

-------------------------------------------------

F1 = 695.418

F2 = 2356.216
F3 = 38.873

F4 = -695.418

F5 = -2356.216

F6 = 38.873

Continuar(1) Salir(2) =

PROGAMA 02

*********** EMPOTRAMIENTO PERFECTO DE ESTRUCTURAS CURVAS *****

*****

DIAMETRO = 7

RADIO = 3.60

ANGULO = 152.9276

******************** INGRESE TIPO DE CARGA ********************

P HORIZ(1)/ P VERT.(2)/ P INCLIN.(3)/ W TANGENCIAL(4)/ W RADIAL(5) W REPARTIDA(


6)= 6

CARGA REPARTIDA= 6

EMPOTRAMIENTO PERFECTO GLOBALES

-------------------------------

FE[1]=19.74

FE[2]=28.83

FE[3]=-6.82

FE[4]=-19.74

FE[5]=28.83

FE[6]=6.82

Presione una tecla para continuar . . .

PROGRAMA CURVO DATA}

Modulo-Elasticidad

2170000

#Elem--#Nudos--#Curvos--#Empot--#Apoyos--Grad.Lib

8 8 1 2 1 17

Ingreso-Coordenadas

1 3.5

8 3.5

15 3.5
8 6

15 6

8 0

15 0

0 0

Radio--Diametro

3.6 7

Coordenadas--Curvas

11.5 5.16

Ancho--Largo

0.40 0.60

0.40 0.60

0.40 0.60

0.40 0.60

0.40 0.60

0.30 0.60

0.30 0.60

0.30 0.60

Numero-Elementos-Conectados

1 8

6 2

-6 1
2 6

7 3

4 4

-7 2

3 7

5 5

-4 2

8 5

-8 4

-5 3

-2 2

Fuerzas-Finales

-695.42 -2381.42 -68.27

0 -50.40 0

0 -25.20 29.40

-19.74 -28.83 6.82

19.74 -28.83 -6.82

0 0

CORRER PROGRAMA
-0.00 208320.00 -0.00

-14999.04 -0.00 24998.40

K12 de [2] a [4]

----------------

-11999.23 0.00 -14999.04

0.00 -208320.00 -0.00

14999.04 0.00 12499.20

K22 de [3] a [2]

----------------

55800.00 -0.00 -0.00

-0.00 409.96 -1434.86

-0.00 -1434.86 6696.00

K11 de [3] a [7]

----------------

4372.90 0.00 7652.57

0.00 148800.00 -0.00

7652.57 -0.00 17856.00

K11 de [3] a [5]

----------------

11999.23 -0.00 -14999.04

-0.00 208320.00 -0.00

-14999.04 -0.00 24998.40


K12 de [3] a [5]

----------------

-11999.23 0.00 -14999.04

0.00 -208320.00 -0.00

14999.04 0.00 12499.20

K22 de [4] a [2]

----------------

11999.23 -0.00 14999.04

-0.00 208320.00 0.00

14999.04 0.00 24998.40

d11

----------------

134.87 83.37 28.69

83.37 71.72 24.50

28.69 24.50 9.61

K 1-1 PARCIAL

-----------

308.98 -341.00 -53.20

-341.00 1643.29 -3171.74

-53.20 -3171.74 9465.55

K11 de [4] a [5]

----------------

1724.79 1.06 -3071.22

1.06 226.81 791.79


-3071.22 791.79 9465.55

K 2-1 PARCIAL

--------------

119.93 444.25 -1490.88

-444.25 1618.43 -2800.01

-1490.88 2800.01 -3906.90

K12 de [4] a [5]

----------------

-1724.79 1.38 3070.10

-1.38 -226.81 796.13

3070.10 -796.13 -3906.90

K 2-2 PARCIAL

-------------

308.98 341.00 -53.20

341.00 1643.29 3171.74

-53.20 3171.74 9465.55

K22 de [5] a [4]

----------------

1724.79 -1.06 -3071.22

-1.06 226.81 -791.79

-3071.22 -791.79 9465.55

K22 de [5] a [3]


----------------

11999.23 -0.00 14999.04

-0.00 208320.00 0.00

14999.04 0.00 24998.40

K22 de [6] a [2]

----------------

4372.90 0.00 -7652.57

0.00 148800.00 0.00

-7652.57 0.00 17856.00

GRADOS DE LIBERTAD EN APOYOS

----------------------------

GRAD. LIBER.[16]=16

GRAD. LIBER.[17]=0

GRAD. LIBER.[18]=17

MATRIZ DE RIGIDEZ DE LA ESTRUCTURA

----------------------------------

70192.03 36766.50 6802.80 -55800.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

36766.50 132980.01 -508.80 0.00 -409.96 1434.86 0.00 0.00 0.00 0.00 0.

00 0.00 0.00 0.00 0.00 0.00 0.00


6802.80 -508.80 23864.97 0.00 -1434.86 3348.00 0.00 0.00 0.00 0.00 0.0

0 0.00 0.00 0.00 0.00 0.00 0.00

-55800.00 0.00 0.00 127972.13 0.00 -7346.47 -55800.00 0.00 0.00 -11999.

23 0.00 -14999.04 0.00 0.00 0.00 -4372.90 7652.57

0.00 -409.96 -1434.86 0.00 357939.92 0.00 0.00 -409.96 1434.86 0.00 -2

08320.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 1434.86 3348.00 -7346.47 0.00 56246.40 0.00 -1434.86 3348.00 14999

.04 0.00 12499.20 0.00 0.00 0.00 -7652.57 8928.00

0.00 0.00 0.00 -55800.00 0.00 0.00 72172.13 0.00 -7346.47 0.00 0.00 0

.00 -11999.23 0.00 -14999.04 0.00 0.00

0.00 0.00 0.00 0.00 -409.96 -1434.86 0.00 357529.96 -1434.86 0.00 0.00

0.00 0.00 -208320.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 1434.86 3348.00 -7346.47 -1434.86 49550.40 0.00 0.

00 0.00 14999.04 0.00 12499.20 0.00 0.00

0.00 0.00 0.00 -11999.23 0.00 14999.04 0.00 0.00 0.00 13724.03 1.06 1

1927.82 -1724.79 1.38 3070.10 0.00 0.00

0.00 0.00 0.00 0.00 -208320.00 0.00 0.00 0.00 0.00 1.06 208546.81 791

.79 -1.38 -226.81 796.13 0.00 0.00

0.00 0.00 0.00 -14999.04 0.00 12499.20 0.00 0.00 0.00 11927.82 791.79
34463.95 3070.10 -796.13 -3906.90 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 -11999.23 0.00 14999.04 -1724.79 -1.38

3070.10 13724.03 -1.06 11927.82 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 -208320.00 0.00 1.38 -226.81 -796.

13 -1.06 208546.81 -791.79 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 -14999.04 0.00 12499.20 3070.10 796.13

-3906.90 11927.82 -791.79 34463.95 0.00 0.00

0.00 0.00 0.00 -4372.90 0.00 -7652.57 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 4372.90 -7652.57

0.00 0.00 0.00 7652.57 0.00 8928.00 0.00 0.00 0.00 0.00 0.00 0.00 0.

00 0.00 0.00 -7652.57 17856.00

****** RESULTADO DE DESPLAZAMIENTOS ******

U[1]= -0.003152

U[2]= -0.017076

U[3]= -0.002719

U[4]= -0.003085

U[5]= -0.000624

U[6]= 0.002530

U[7]= -0.002854

U[8]= -0.000318
U[9]= 0.001144

U[10]= -0.008797

U[11]= -0.000770

U[12]= 0.001428

U[13]= -0.004217

U[14]= -0.000449

U[15]= 0.000558

U[16]= 0.005772

U[17]= 0.002530

CALCULO FUERZAS(1)/ SALIR(2): 1

************ CALCULO DE CORTANTES Y MOMENTOS DE LA ESTRUCTURA ************

No DEL ELEMENTO=1

INGRESE FUERZAS EMPOTRAMIENTO PERFECTO

FE[1]=695.42

FE[2]=2356.22

FE[3]=38.87

FE[4]=-695.42

FE[5]=-2356.22

FE[6]=38.87
INGRESE VECTOR DESPLAZAMIENTO

GL NUDO[1]=1

GL NUDO[2]=2

GL NUDO[3]=3

GL NUDO[4]=0

GL NUDO[5]=0

GL NUDO[6]=0

FUERZAS FINALES POR ELEMENTO

F[1]=3.73

F[2]=-18.18

F[3]=3.94

F[4]=-3.73

F[5]=18.18

F[6]=27.28

CONTINUAR(1)/ NUEVAS CARGAS(25)=1

No DEL ELEMENTO=2

INGRESE FUERZAS EMPOTRAMIENTO PERFECTO

FE[1]=0
FE[2]=0

FE[3]=0

FE[4]=0

FE[5]=0

FE[6]=0

INGRESE VECTOR DESPLAZAMIENTO

GL NUDO[1]=4

GL NUDO[2]=5

GL NUDO[3]=6

GL NUDO[4]=16

GL NUDO[5]=0

GL NUDO[6]=17

FUERZAS FINALES POR ELEMENTO

F[1]=-0.00

F[2]=-92.89

F[3]=-0.00

F[4]=0.00

F[5]=92.89

F[6]=-0.00

CONTINUAR(1)/ NUEVAS CARGAS(25)=1


No DEL ELEMENTO=3

INGRESE FUERZAS EMPOTRAMIENTO PERFECTO

FE[1]=0

FE[2]=0

FE[3]=0

FE[4]=0

FE[5]=0

FE[6]=0

INGRESE VECTOR DESPLAZAMIENTO

GL NUDO[1]=7

GL NUDO[2]=8

GL NUDO[3]=9

GL NUDO[4]=0

GL NUDO[5]=0

GL NUDO[6]=0

FUERZAS FINALES POR ELEMENTO

F[1]=-3.73

F[2]=-47.37

F[3]=-1.41

F[4]= 3.73

F[5]= 47.37

F[6]=-11.63
CONTINUAR(1)/ NUEVAS CARGAS(25)=1

No DEL ELEMENTO=7

INGRESE FUERZAS EMPOTRAMIENTO PERFECTO

FE[1]=0

FE[2]=25.2

FE[3]=29.4

FE[4]=0

FE[5]=25.2

FE[6]=-29.4

INGRESE VECTOR DESPLAZAMIENTO

GL NUDO[1]=4

GL NUDO[2]=5

GL NUDO[3]=6

GL NUDO[4]=7

GL NUDO[5]=8

GL NUDO[6]=9

FUERZAS FINALES POR ELEMENTO

F[1]=-12.89
F[2]=30.35

F[3]=49.73

F[4]=12.89

F[5]=20.05

F[6]=-13.71

CONTINUAR(1)/ NUEVAS CARGAS(25)=

ACERO EN VIGAS:

********* CALCULO DE ACERO EN VIGA (2018) ********

===============================

Momentos(En valor Absoluto)

==========================

Mto(-) 1:(Tnxm): = 49.73

Mto(-) 2:(Tnxm): = 13.71

Mto(+) :(Tnxm): = 14.24

FC(Kg/cm2) = 210

Carga dist.(Tn/m)= 7.2

Longitud (m) =7
H columna 1(m): = 0.60

H columna 2(m): = 0.60

Ancho Viga(m) = 0.30

Alto viga(m) = 0.60

ACERO PARCIAL EN LA VIGA

-------------------------

cuantia (-) = 0.015048 ==== > As1(-) = 24.38 cm2

cuantia (-) = 0.002498 ==== > As2(-) = 4.05 cm2

cuantia (+) = 0.004550 ==== > As (+) = 7.37 cm2

DIAMETRO DE ACERO A UTILIZAR

----------------------------

1 pul(01) : 3/4 pul(2) : 5/8 pul(3) = 2

ACERO TOTAL NEGATIVO EN LA VIGA

-------------------------------

Mc1(-)= 40.95 Tnxm Mc2(-)=8.02 Tnxm


D1(-) = 2.47 D2(-) = 1.04

As1(-) = 31.35 cm2 (11 Varillas) === > cuantia1(-) = 1.94

As2(-) = 11.40 cm2 (4 Varillas) === > cuantia1(-) = 0.70

ACERO TOTAL POSITIVO EN LA VIGA

-------------------------------

M(+) = 14.24 Tnxm

D3(+) = 1.39 D4(+) = 0.00

As(+) = 14.25 cm2 (5 Varillas)

cuantia(+) = 0.88

CONTINUAR(1)/ SALIR(50) =

También podría gustarte