Está en la página 1de 43

METRADO DE ALBAILERIA

OBRA: Edificio residencial del GOLF - SAN ISIDRO


OBRA: Edificio residencial del GOLF - SAN ISIDRO
CLIENTE : J.E C.G
CLIENTE : J.E C.G
CONTRATISTA : TYHV
CONTRATISTA : TYHV
HECHO POR: Ing.Sifuentes Tapia W
HECHO POR: Ing.Sifuentes Tapia W
REBISADO POR: ing.Ervin De Olarte Fernandez
REBISADO POR: ing.Ervin De Olarte Fernandez

TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA

LADO ALTURA AREA PARC AREA TOT OBSERVACION


PRIMER PISO Tarrajeo rayado para ss-hh y cocinas
1.86 2.10 3.91 151.04 ss-hh-5
0.80 2.10 1.68 ss-hh-5
0.80 2.10 1.68 ss-hh-5
1.86 2.10 3.91 ss-hh-5
1.60 0.85 1.36 ss-hh-5
0.80 2.10 1.68 ss-hh-5
1.25 2.10 2.63 ss-hh-4
0.70 2.10 1.47 ss-hh-4
0.15 2.10 0.32 ss-hh-4
0.45 2.10 0.95 ss-hh-4
1.86 2.10 3.91 ss-hh-4
1.95 2.10 4.10 ss-hh-4
1.65 1.20 1.98 ss-hh-3
1.10 1.20 1.32 ss-hh-3
0.95 1.20 1.14 ss-hh-3
0.80 2.10 1.68 ss-hh-3
1.10 2.10 2.31 ss-hh-3
0.80 2.10 1.68 ss-hh-3
0.65 0.10 0.07 ss-hh-2
1.00 0.10 0.10 ss-hh-2
1.45 0.10 0.15 ss-hh-2
1.05 0.10 0.11 ss-hh-2
1.20 0.10 0.12 ss-hh-2
1.05 0.10 0.11 ss-hh-2
1.10 2.15 2.37 ss-hh-1
1.90 2.15 4.09 ss-hh-1
0.30 2.15 0.65 ss-hh-1
1.10 1.10 1.21 ss-hh-1
0.80 2.15 1.72 ss-hh-1
1.00 0.10 0.10 ss-hh-6
1.55 0.10 0.16 ss-hh-6
0.30 0.10 0.03 ss-hh-6
1.55 0.10 0.16 ss-hh-6
0.80 2.15 1.72 ss-hh-7
0.30 1.20 0.36 ss-hh-7
1.00 1.20 1.20 ss-hh-7
1.00 1.20 1.20 ss-hh-7
0.80 2.15 1.72 ss-hh-7
1.00 2.15 2.15 ss-hh-7
1.45 2.15 3.12 ss-hh-8
0.80 2.15 1.72 ss-hh-8
1.00 2.15 2.15 ss-hh-8
0.70 2.15 1.51 ss-hh-8
0.57 2.15 1.23 ss-hh-8
1.00 0.75 0.75 ss-hh-8
0.55 0.75 0.41 ss-hh-8
0.80 2.15 1.72 ss-hh-8
2.10 2.15 4.52 ss-hh-9
1.25 2.15 2.69 ss-hh-9
1.32 2.15 2.84 ss-hh-9
0.76 0.90 0.68 ss-hh-9
0.45 2.15 0.97 ss-hh-9
1.25 1.20 1.50 cocina 1
2.50 2.15 5.38 cocina 1
0.95 0.00 0.00 cocina 1
0.60 0.00 0.00 cocina 1
2.35 0.60 1.41 cocina 1
0.40 0.10 0.04 cocina 1
1.80 0.10 0.18 cocina 1-vent
1.55 0.10 0.16 cocina 1
0.30 0.10 0.03 cocina 1
0.55 0.10 0.06 cocina 1
3.15 0.10 0.32 cocina 2
1.05 1.00 1.05 cocina 2-patio
1.10 0.00 0.00 cocina 2
4.00 2.15 8.60 cocina 2
0.60 1.00 0.60 cocina 2

2DO AL 7MO NIVEL


Tarrajeo rayado para ss-hh y cocinas
LADO ALTURA AREA PARC AREA TOT OBSERVACION
1.45 2.15 3.12 130.54 ss-hh-8'
0.80 2.15 1.72 ss-hh-8'
1.00 2.15 2.15 ss-hh-8'
0.70 2.15 1.51 ss-hh-8'
0.57 2.15 1.23 ss-hh-8'
1.00 0.75 0.75 ss-hh-8'
0.55 0.75 0.41 ss-hh-8'
0.80 2.15 1.72 ss-hh-8'
2.10 2.15 4.52 ss-hh-9
1.25 2.15 2.69 ss-hh-9
1.32 2.15 2.84 ss-hh-9
0.76 0.90 0.68 ss-hh-9
0.45 2.15 0.97 ss-hh-9
1.45 2.15 3.12 ss-hh-8
0.80 2.15 1.72 ss-hh-8
1.00 2.15 2.15 ss-hh-8
0.70 2.15 1.51 ss-hh-8
0.57 2.15 1.23 ss-hh-8
1.00 0.75 0.75 ss-hh-8
0.55 0.75 0.41 ss-hh-8
0.80 2.15 1.72 ss-hh-8
2.10 2.15 4.52 ss-hh-9
1.25 2.15 2.69 ss-hh-9
1.32 2.15 2.84 ss-hh-9
0.76 0.90 0.68 ss-hh-9
0.45 2.15 0.97 ss-hh-9
0.80 2.15 1.72 ss-hh-7
0.30 1.20 0.36 ss-hh-7
1.00 1.20 1.20 ss-hh-7
1.00 1.20 1.20 ss-hh-7
0.80 2.15 1.72 ss-hh-7
1.00 2.15 2.15 ss-hh-7
1.00 0.10 0.10 ss-hh-16
1.80 0.10 0.18 ss-hh-16
1.00 0.10 0.10 ss-hh-16
1.00 0.10 0.10 ss-hh-16
1.65 2.15 3.55 ss-hh-10
0.75 2.15 1.61 ss-hh-10
1.00 2.15 2.15 ss-hh-10
0.70 2.15 1.51 ss-hh-10
0.60 2.15 1.29 ss-hh-10
1.00 0.95 0.95 ss-hh-10
0.45 2.15 0.97 ss-hh-10
0.75 2.15 1.61 ss-hh-10
1.25 2.15 2.69 ss-hh-11
0.70 2.15 1.51 ss-hh-11
1.50 2.15 3.23 ss-hh-11
1.25 2.15 2.69 ss-hh-11
0.70 2.15 1.51 ss-hh-11
0.70 2.15 1.51 ss-hh-11
1.00 2.15 2.15 ss-hh-12
0.80 2.15 1.72 ss-hh-12
1.45 1.20 1.74 ss-hh-12
0.90 1.20 1.08 ss-hh-12
0.75 1.20 0.90 ss-hh-12
0.80 2.15 1.72 ss-hh-12
1.90 0.10 0.19 ss-hh-13
1.10 0.10 0.11 ss-hh-13
1.90 0.10 0.19 ss-hh-13
0.30 0.10 0.03 ss-hh-13
1.90 0.10 0.19 ss-hh-14
0.30 0.10 0.03 ss-hh-14
1.90 0.10 0.19 ss-hh-14
1.10 0.10 0.11 ss-hh-14
0.95 1.20 1.14 ss-hh-15
1.30 0.10 0.13 ss-hh-15
0.70 0.10 0.07 ss-hh-15
1.10 2.15 2.37 ss-hh-15
0.70 2.15 1.51 ss-hh-15
0.60 1.20 0.72 ss-hh-15
3.15 0.10 0.32 Cocina 2
1.05 1.00 1.05 cocina 2-patio
1.10 0.00 0.00 Cocina 2
4.00 2.15 8.60 Cocina 2
0.60 1.00 0.60 Cocina 2
2.45 0.10 0.25 Cocina 3
1.35 0.10 0.14 Cocina 3
0.70 0.10 0.07 Cocina 3
1.55 1.20 1.86 Cocina 3
0.60 0.10 0.06 Cocina 3
0.72 0.10 0.07 Cocina 3
1.90 2.15 4.09 Cocina 3
0.50 0.10 0.05 Cocina 3
0.55 0.10 0.06 Cocina 3
1.05 0.10 0.11 Cocina 3
1.23 0.10 0.12 Cocina 3
1.50 1.20 1.80 patio
1.15 0.10 0.12 Cocina 4
0.35 2.15 0.75 Cocina 4
0.55 2.15 1.18 Cocina 4
2.80 2.15 6.02 Cocina 4
0.63 0.00 0.00 Cocina 4
2.80 0.10 0.28 Cocina 4
0.70 0.10 0.07 Cocina 4
1.60 0.10 0.16 Cocina 4
0.60 0.10 0.06 Cocina 4
0.80 0.10 0.08 Cocina 4
2.15 1.00 2.15 patio

RESUMEN DE TARRAJEO RAYADO EN SHH Y COCINAS

AREA M2 TOTAL
Zotano 0.00 934.28
1er Nivel 151.04
2doAL 7MO Nivel 783.24
Cto Maquinas 0.00
METRADO DE MURO KK DE CABEZA

1ER NIVEL
LONGITUD ALTURA AREA PARC TOTAL OBSERV
1.15 2.15 2.47 49.83 dorm-2
0.67 2.15 1.44 dorm-2
0.88 1.85 1.63 recibp
0.75 1.85 1.39 comedor
1.45 2.25 3.26 sh-2
0.55 2.25 1.24 cocina-1
1.80 1.00 1.80 cocina-1
0.25 2.00 0.50 lobby
0.40 2.00 0.80 lobby
1.08 2.25 2.43 dorm-serv
1.20 2.25 2.70 dorm-serv
1.25 2.00 2.50 esc-2
1.35 2.00 2.70 esc-2
2.41 2.00 4.82 estar
1.20 2.00 2.40 estar
0.50 2.00 1.00 estar
0.58 2.00 1.16 estar
0.90 2.00 1.80 estar
1.70 2.00 3.40 estar
0.55 2.35 1.29 dormit-1
3.87 2.35 9.09 dormit-1

2DO AL 7MO NIVEL MURO KK DE CABEZA

LONGITUD ALTURA AREA PARC SUB-TOTAL OBSERV TOTAL


1.03 2.20 2.27 32.50 sh-13 194.98
0.35 2.20 0.77 escritorio
1.01 2.20 2.22 dormit-2
1.00 2.20 2.20 estar
1.06 2.20 2.33 dorm-serv
1.20 2.20 2.64 dorm-serv
1.20 2.20 2.64 dormit-2
1.05 2.20 2.31 patio
1.36 2.20 2.99 cocina-3
1.40 2.20 3.08 cocina-3
1.36 2.20 2.99 esc-2
0.50 2.20 1.10 esc-2
1.15 2.20 2.53 patio
0.75 2.20 1.65 cocina-4
0.35 2.20 0.77 patio

RESUMEN DE METRADO DE MURO DE CABEZA

AREA M2 TOTAL
Zotano 0.00 244.80
1er Nivel 49.83
2do-7mo Nivel 194.98
Cto Maquinas 0.00

METRADO DE MURO KK DE SOGA

LADO ALTURA AREA PARC AREA TOT OBSERVACION


ZOTANO
3.25 3.00 9.75 206.86 dep1 3.25 dep1 1.23
3.35 3.00 10.05 sub est 3.35 sub est 0.80
1.85 3.00 5.55 dep2 1.85 dep2 1.73
0.77 3.00 2.31 dep4 0.77 dep4 1.60
1.23 3.00 3.69 dep4 1.23 dep4 2.15
1.23 2.45 3.01 cto basu 1.15
0.80 2.45 1.96 cto basu 3.85 dep4-5 3.05
1.73 2.45 4.24 dep 10 1.70 dep4 2.63
1.60 2.45 3.92 dep 11 1.40 dep5 2.93
2.15 2.45 5.27 dep 12 3.85 dep2-3 1.35
1.15 2.45 2.82 dep 6 3.15 dep2
3.05 2.45 7.47 dep 12 0.95 dep3 2.44
2.63 2.45 6.44 dep 10 4.00 sub est 0.84
2.93 2.45 7.18 tableros 3.30 sub est 1.64
1.35 2.20 2.97 tableros 0.45 dep1 0.69
1.33 2.20 2.93 dep-7 1.70
1.85 2.20 4.07 dep-8 3.79
1.70 2.20 3.74 dep-9 0.84
1.20
3.85 3.00 11.55 dep4-5 1.20
1.70 3.00 5.10 dep4 0.85
1.40 3.00 4.20 dep5
3.85 3.00 11.55 dep2-3
3.15 3.00 9.45 dep2
0.95 3.00 2.85 dep3
4.00 3.00 12.00 sub est
3.30 3.00 9.90 sub est
0.45 3.00 1.35 dep1
2.44 2.45 5.98 tableros
0.84 2.45 2.06 cto basu
1.64 2.45 4.02 cto basu
0.69 2.45 1.69 s-h
1.70 2.45 4.17 dep-10
3.79 2.45 9.29 dep-11
0.84 2.45 2.06 dep 6
1.20 2.45 2.94 dep 12
1.20 2.45 2.94 dep 6
0.85 2.45 2.08 cto basu
1.61 2.20 3.54 dep-7
1.35 2.20 2.97 dep-8
3.55 2.20 7.81 dep-9
0.00

1ER NIVEL
LONGITUD ALTURA AREA PARC TOTAL OBSERV
0.82 2.55 2.09 673.60 dorm-1
1.08 0.60 0.65 v12
1.30 0.60 0.78 v13
1.60 2.55 4.08 escritorio
2.07 2.55 5.28 dorm-2 2.20
1.15 2.55 2.93 kitch
2.10 2.55 5.36 escritorio
0.60 2.55 1.53 wcl-2 2.15
1.50 2.55 3.83 sh5 2.80
1.65 2.55 4.21 sh5 2.15
0.60 2.55 1.53 sh-4
2.10 2.55 5.36 wcl-2
2.25 2.55 5.74 sh5
1.24 2.55 3.16 sh-4
0.30 2.55 0.77 v-7'
0.30 2.55 0.77 v-7'
0.60 2.55 1.53 estar
3.10 2.15 6.67 escalera
1.20 0.20 0.24 pasadizo,v23
1.25 2.15 2.69 salon
1.62 0.20 0.32 salon,v2
1.05 2.15 2.26 salon
5.00 2.55 12.75 esc-3
1.85 2.30 4.26 dorm-2
1.50 0.80 1.20 dorm-2,v-3
0.77 2.30 1.77 dorm-2
1.87 2.55 4.77 salon
2.20 0.20 0.44 salon,v-2
0.35 2.55 0.89 esc-3
0.75 2.55 1.91 dorm-ser
0.80 2.55 2.04 sh-7
0.30 2.55 0.77 sh-7
1.80 2.55 4.59 sh-7
1.60 2.15 3.44 sh-7 2.80
1.10 2.15 2.37 cocina-2 2.15
0.75 2.55 1.91 ducto,hall
0.60 2.55 1.53 ducto,hall
0.75 2.55 1.91 ducto,hall
2.09 2.55 5.33 sh-9
2.08 2.55 5.30 sh-9
2.08 2.15 4.47 ducto
0.50 2.55 1.28 sh-/8 2.25
0.57 2.55 1.45 sh-8
0.70 2.55 1.79 wcl-1
0.57 2.55 1.45 wcl-1
0.70 2.55 1.79 wcl-1
2.10 2.55 5.36 escritorio
0.45 2.55 1.15 sh-6
1.50 2.55 3.83 lobby
0.45 2.55 1.15 ducto
0.65 2.55 1.66 ducto
3.65 2.55 9.31 estar
0.80 2.55 2.04 recibp
0.80 2.55 2.04 sh-3
0.95 2.55 2.42 sh-3
1.05 2.55 2.68 sh-2
0.75 2.55 1.91 cocina-1
0.65 2.55 1.66 dorm-serv
0.70 2.55 1.79 dorm-serv
0.30 2.55 0.77 dorm-serv
0.55 2.55 1.40 cocina-1
0.85 2.00 1.70 sala
0.85 2.55 2.17 escritorio
0.88 2.55 2.24 dormit-1
1.60 0.55 0.88 dormit-1 v-14
1.60 0.55 0.88 escritorio
5.21 2.60 13.55 cerco 3.20
1.14 2.60 2.96 cerco
5.78 2.60 15.03 cerco
4.57 2.60 11.88 cerco
2.60 2.60 6.76 cerco
4.68 2.60 12.17 cerco
4.55 2.60 11.83 cerco
2.80 2.60 7.28 cerco
3.17 2.60 8.24 cerco
4.67 2.60 12.14 cerco
3.51 2.60 9.13 cerco
4.95 2.60 12.87 cerco
0.75 2.55 1.91 dormit-2
0.62 2.55 1.58 sh-9
0.75 2.55 1.91 ducto
0.65 2.55 1.66 cl-3
2.70 2.55 6.89 sh-8
2.90 2.55 7.40 escritorio
0.60 2.55 1.53 escritorio
2.90 2.55 7.40 escritorio
0.15 2.55 0.38 estar
1.80 2.25 4.05 comedor-v28
0.25 2.25 0.56 estar
8.61 2.60 22.39 jardin 0.40
2.05 2.15 4.41 patio 2.50
1.01 2.15 2.17 cocina-2 2.15
1.00 2.15 2.15 cocina-2
4.35 2.55 11.09 patio-cocina-2
0.30 2.25 0.68 esc-3
1.65 2.15 3.55 sh-7
1.70 2.55 4.34 sh-6
1.70 2.55 4.34 sh-6
3.30 2.15 7.10 sala
2.25 2.55 5.74 hall-ducto
1.06 2.15 2.28 dep-14
1.20 2.15 2.58 dep-14
3.15 2.55 8.03 dep-14
6.00 2.15 12.90 lobby
4.40 2.55 11.22 sh-1
2.20 2.55 5.61 sh-1
0.65 2.55 1.66 salon
2.35 2.55 5.99 recibo
2.45 2.55 6.25 recibo
2.50 2.55 6.38 sala
3.75 2.55 9.56 dorm-serv
2.26 2.55 5.76 estar
6.00 2.15 12.90 rampa
1.86 2.55 4.74 sh-4
1.86 2.55 4.74 sh-5
2.99 2.15 6.43 escritorio
4.29 2.55 10.94 escritorio
4.04 2.55 10.30 dornit-2
3.72 2.35 8.74 kitch
0.69 2.35 1.62 kitch
1.24 2.35 2.91 kitch
0.66 2.35 1.55 kitch
1.00 3.10 3.10 cerco
9.10 3.10 28.21 cerco
4.95 3.10 15.35 cerco
3.30 3.10 10.23 ing-veh
1.85 3.10 5.74 estacionam
2.90 3.10 8.99 estacionam
1.02 3.10 3.16 estacionam
1.02 3.15 3.21 estacionam
1.73 3.15 5.45 jardin
1.03 3.15 3.24 jardin
2.05 3.15 6.46 jardin
0.75 3.10 2.33 estacionam
1.54 3.10 4.77 estacionam
1.03 3.10 3.19 estacionam
1.03 3.15 3.24 estacionam
1.11 3.15 3.50 jardin
2.63 3.15 8.28 jardin
0.91 3.15 2.87 jardin
0.60 2.25 1.35 ducto
0.50 2.25 1.13 ducto
0.60 2.50 1.50 ducto

2DO NIVEL
LONGITUD ALTURA AREA PARC TOTAL OBSERV
0.84 2.55 2.14 485.59 dorm-2
1.50 0.80 1.20 dorm-2 v3
1.00 2.55 2.55 dorm-2
2.35 2.55 5.99 patio v16
0.40 2.55 1.02 cocina-1
1.10 1.00 1.10 cocina-1-v18
0.40 2.55 1.02 cocina-1
2.60 2.55 6.63 esc-2
1.60 2.55 4.08 esc-2
2.87 1.00 2.87 patio-v15
1.30 2.55 3.32 patio
1.50 0.80 1.20 dorm-2 v3
1.80 2.55 4.59 dorm-2
2.60 2.55 6.63 esc-3
0.53 2.55 1.35 patio
1.10 1.00 1.10 patio -v18
0.52 2.55 1.33 patio
1.55 1.00 1.55 patio -v4
1.85 2.55 4.72 dorm-2
1.50 0.80 1.20 dorm-2 v-3
0.68 2.55 1.73 dorm-2
2.19 2.55 5.58 dorm-2
0.40 2.55 1.02 dorm-serv
0.60 1.00 0.60 pv-01
1.10 2.55 2.81 sh
0.60 2.55 1.53 ducto-basura
0.95 2.55 2.42 esc-2
1.20 2.55 3.06 ducto
1.20 2.55 3.06 ducto
0.50 2.55 1.28 dorm-serv
1.05 2.55 2.68 dorm-serv
0.83 2.55 2.12 dorm-serv
1.55 2.55 3.95 dorm-2
0.60 2.55 1.53 dorm-2
1.70 2.55 4.34 ascensor
0.75 2.55 1.91 dorm-serv
0.80 2.55 2.04 dorm-serv
0.30 2.55 0.77 dorm-serv
2.21 2.55 5.64 dorm-2
1.08 1.00 1.08 pasadizo
2.18 2.55 5.56 sh-9 *-//
2.18 2.55 5.56 ducto
0.55 2.55 1.40 sh-8
0.50 2.55 1.28 wcl-1'
0.72 2.55 1.84 wcl-1'
0.55 2.55 1.40 wcl-1'
0.71 2.55 1.81 wcl-1'
0.95 2.55 2.42 sh-15
3.92 2.55 10.00 dorm-serv
2.25 2.55 5.74 escritorio
1.90 2.55 4.85 sh-14
1.02 2.55 2.60 sh-13
0.60 2.55 1.53 comedor
2.15 2.55 5.48 escritorio
0.60 2.55 1.53 ducto sh-11
1.55 2.55 3.95 sh-10
0.60 2.55 1.53 v-29'
0.45 2.55 1.15 sh-10
0.60 2.55 1.53 sh-10
0.70 2.55 1.79 sh-10
0.75 2.55 1.91 wcl-3
0.70 2.55 1.79 wcl-3
1.80 2.55 4.59 sh-7
1.60 2.55 4.08 comedor
1.30 2.55 3.32 estar
1.10 2.55 2.81 sala
2.10 2.55 5.36 escritorio
0.65 2.55 1.66 sh-9
0.60 1.75 1.05 sh-9,v6
0.84 2.55 2.14 sh-9
2.23 2.55 5.69 sh-8
0.65 2.55 1.66 sh-8
0.55 2.55 1.40 wcl-1
0.72 2.55 1.84 wcl-1
0.70 2.55 1.79 wcl-1
0.70 2.55 1.79 wcl-1
0.90 2.55 2.30 dormit-1
1.60 0.55 0.88 dormit-1
1.20 2.55 3.06 dormit-1
1.60 0.55 0.88 escritorio
0.95 2.55 2.42 escritorio
0.85 2.55 2.17 escritorio
1.60 0.55 0.88 escritorio
0.35 2.55 0.89 escritorio
0.60 2.55 1.53 escritorio
1.60 0.55 0.88 escritorio
0.85 2.55 2.17 escritorio
1.60 0.55 0.88 escritorio
1.60 0.55 0.88 dormit-1
0.88 2.55 2.24 dormit-1
0.64 0.90 0.58 terraza-jardin
3.30 0.90 2.97 terraza-jardin
3.26 0.90 2.93 terraza-jardin
4.40 0.90 3.96 terraza-jardin
10.38 0.90 9.34 terraza-jardin
8.83 0.90 7.95 terraza-jardin
2.05 2.55 5.23 dormit-2
0.60 2.55 1.53 dormit-2
0.60 2.55 1.53 sh-9
0.60 2.55 1.53 ducto-v8
0.65 2.55 1.66 cl-3
2.40 2.55 6.12 sh-8-wcl-1
2.90 2.55 7.40 dormit-1
2.90 2.55 7.40 escritorio
0.75 2.55 1.91 escritorio
4.35 2.55 11.09 cocina-2
0.30 2.55 0.77 dorm-serv
1.64 2.55 4.18 sh-7
1.95 2.55 4.97 sh-16
1.00 2.55 2.55 sh-16
2.26 2.55 5.76 dormit-2
6.00 2.55 15.30 sala
0.60 2.55 1.53 dormit-2
1.40 2.55 3.57 sh-10
0.65 2.55 1.66 sh-10
2.55 2.55 6.50 sh-10
2.90 2.55 7.40 dormit-1
2.20 2.55 5.61 sh-11
0.60 2.55 1.53 jardinera
0.66 2.55 1.68 dormit-2
0.80 2.55 2.04 patio
0.60 1.75 1.05 patio-v6
1.05 2.55 2.68 patio
2.45 2.55 6.25 dorm-serv
0.40 2.55 1.02 cocina-3
2.75 2.55 7.01 sala
0.60 2.55 1.53 escritorio
1.13 2.55 2.88 jardinera
1.10 1.00 1.10 v-18
0.80 2.55 2.04 cocina-3
3.05 2.55 7.78 cocina-3
1.55 2.55 3.95 sh-14
1.70 2.55 4.34 sh-13
3.40 2.55 8.67 sala
4.45 2.55 11.35 cocina-4
0.65 2.55 1.66 cocina-4
1.20 2.55 3.06 cocina-4
0.35 2.55 0.89 patio
0.95 2.55 2.42 dorm-serv
2.90 2.55 7.40 sala
5.85 2.55 14.92 dormitorio-2
0.60 2.55 1.53 dormitorio-2
0.45 2.55 1.15 sh-9'
0.65 2.55 1.66 sh-8'
2.40 2.55 6.12 estar
3.75 2.55 9.56 dormitorio-1
0.76 1.75 1.33 v-6
0.60 2.55 1.53 escritorio

3ER AL 7MO NIVEL


LONGITUD ALTURA PARC SUB-TOTAL OBSERV TOTAL
0.84 2.55 2.14 454.22 dorm-2 2,271.10
1.50 0.80 1.20 dorm-2 v3
1.00 2.55 2.55 dorm-2
2.35 1.00 2.35 patio v16
0.40 2.55 1.02 cocina-1
1.10 1.00 1.10 cocina-1-v18
0.40 2.55 1.02 cocina-1
2.60 2.55 6.63 esc-2
1.60 2.55 4.08 esc-2
2.87 1.00 2.87 patio-v15
1.30 2.55 3.32 patio
1.50 0.80 1.20 dorm-2 v3
1.80 2.55 4.59 dorm-2
2.60 2.55 6.63 esc-3
0.53 2.55 1.35 patio
1.10 1.00 1.10 patio -v18
0.52 2.55 1.33 patio
1.55 1.00 1.55 patio -v4
1.85 2.55 4.72 dorm-2
1.50 0.80 1.20 dorm-2 v-3
0.68 2.55 1.73 dorm-2
2.19 2.55 5.58 dorm-2
0.40 2.55 1.02 dorm-serv
0.60 1.00 0.60 pv-01
1.10 2.55 2.81 sh
0.60 2.55 1.53 ducto-basura
0.95 2.55 2.42 esc-2
1.20 2.55 3.06 ducto
1.20 2.55 3.06 ducto
0.50 2.55 1.28 dorm-serv
1.05 2.55 2.68 dorm-serv
0.83 2.55 2.12 dorm-serv
1.55 2.55 3.95 dorm-2
0.60 2.55 1.53 dorm-2
1.70 2.55 4.34 ascensor
0.75 2.55 1.91 dorm-serv
0.80 2.55 2.04 dorm-serv
0.30 2.55 0.77 dorm-serv
2.21 2.55 5.64 dorm-2
1.08 1.00 1.08 pasadizo
2.18 2.55 5.56 sh-9
2.18 2.55 5.56 ducto
0.55 2.55 1.40 sh-8
0.50 2.55 1.28 wcl-1'
0.72 2.55 1.84 wcl-1'
0.55 2.55 1.40 wcl-1'
0.71 2.55 1.81 wcl-1'
0.95 2.55 2.42 sh-15
3.92 2.55 10.00 dorm-serv
2.25 2.55 5.74 escritorio
1.90 2.55 4.85 sh-14
1.02 2.55 2.60 sh-13
0.60 2.55 1.53 comedor
2.15 2.55 5.48 escritorio
0.60 2.55 1.53 ducto sh-11
1.55 2.55 3.95 sh-10
0.60 2.55 1.53 v-29'
0.45 2.55 1.15 sh-10
0.60 2.55 1.53 sh-10
0.70 2.55 1.79 sh-10
0.75 2.55 1.91 wcl-3
0.70 2.55 1.79 wcl-3
1.80 2.55 4.59 sh-7
1.60 2.55 4.08 comedor
1.30 2.55 3.32 estar
1.10 2.55 2.81 sala
2.10 2.55 5.36 escritorio
0.65 2.55 1.66 sh-9
0.60 1.75 1.05 sh-9,v6
0.84 2.55 2.14 sh-9
2.23 2.55 5.69 sh-8
0.65 2.55 1.66 sh-8
0.55 2.55 1.40 wcl-1
0.72 2.55 1.84 wcl-1
0.70 2.55 1.79 wcl-1
0.70 2.55 1.79 wcl-1
0.90 2.55 2.30 dormit-1
1.60 0.55 0.88 dormit-1
1.20 2.55 3.06 dormit-1
1.60 0.55 0.88 escritorio
0.95 2.55 2.42 escritorio
0.85 2.55 2.17 escritorio
1.60 0.55 0.88 escritorio
0.35 2.55 0.89 escritorio
0.60 2.55 1.53 escritorio
1.60 0.55 0.88 escritorio
0.85 2.55 2.17 escritorio
1.60 0.55 0.88 escritorio
1.60 0.55 0.88 dormit-1
0.88 2.55 2.24 dormit-1
2.05 2.55 5.23 dormit-2
0.60 2.55 1.53 dormit-2
0.60 2.55 1.53 sh-9
0.60 2.55 1.53 ducto-v8
0.65 2.55 1.66 cl-3
2.40 2.55 6.12 sh-8-wcl-1
2.90 2.55 7.40 dormit-1
2.90 2.55 7.40 escritorio
0.75 2.55 1.91 escritorio
4.35 2.55 11.09 cocina-2
0.30 2.55 0.77 dorm-serv
1.64 2.55 4.18 sh-7
1.95 2.55 4.97 sh-16
1.00 2.55 2.55 sh-16
2.26 2.55 5.76 dormit-2
6.00 2.55 15.30 sala
0.60 2.55 1.53 dormit-2
1.40 2.55 3.57 sh-10
0.65 2.55 1.66 sh-10
2.55 2.55 6.50 sh-10
2.90 2.55 7.40 dormit-1
2.20 2.55 5.61 sh-11
0.60 2.55 1.53 jardinera
0.66 2.55 1.68 dormit-2
0.80 2.55 2.04 patio
0.60 1.75 1.05 patio-v6
1.05 2.55 2.68 patio
2.45 2.55 6.25 dorm-serv
0.40 2.55 1.02 cocina-3
2.75 2.55 7.01 sala
0.60 2.55 1.53 escritorio
1.13 2.55 2.88 jardinera
1.10 1.00 1.10 v-18
0.80 2.55 2.04 cocina-3
3.05 2.55 7.78 cocina-3
1.55 2.55 3.95 sh-14
1.70 2.55 4.34 sh-13
3.40 2.55 8.67 sala
4.45 2.55 11.35 cocina-4
0.65 2.55 1.66 cocina-4
1.20 2.55 3.06 cocina-4
0.35 2.55 0.89 patio
0.95 2.55 2.42 dorm-serv
2.90 2.55 7.40 sala
5.85 2.55 14.92 dormitorio-2
0.60 2.55 1.53 dormitorio-2
0.45 2.55 1.15 sh-9'
0.65 2.55 1.66 sh-8'
2.40 2.55 6.12 estar
3.75 2.55 9.56 dormitorio-1
0.76 1.75 1.33 v-6
0.60 2.55 1.53 escritorio

CUARTO DE MAQUINAS y AZOTEA


LONGITUD ALTURA AREA PARC TOTAL OBSERV
7.51 0.75 5.63 271.27 parapeto
4.20 0.75 3.15 parapeto
2.42 0.75 1.82 parapeto
0.75 0.75 0.56 parapeto
2.12 0.75 1.59 parapeto
7.25 0.75 5.44 parapeto
6.30 0.75 4.73 parapeto
2.00 0.75 1.50 parapeto
7.70 0.75 5.78 parapeto
1.85 0.75 1.39 parapeto
6.30 0.75 4.73 parapeto
2.00 0.75 1.50 parapeto
3.90 0.75 2.93 parapeto
1.85 0.75 1.39 parapeto
6.43 0.75 4.82 parapeto
7.10 0.75 5.33 parapeto
2.28 0.75 1.71 parapeto
0.60 0.75 0.45 parapeto
2.29 0.75 1.72 parapeto
4.50 0.75 3.38 parapeto
5.51 0.75 4.13 parapeto
5.68 0.75 4.26 parapeto
0.95 0.75 0.71 parapeto
0.90 0.75 0.68 parapeto
0.95 0.75 0.71 parapeto
0.90 0.75 0.68 parapeto
0.85 0.75 0.64 parapeto
0.80 0.75 0.60 parapeto
0.85 0.75 0.64 parapeto
1.90 3.40 6.46 esc-2
1.45 3.40 4.93 esc-2
2.60 2.55 6.63 esc-2 v-17
1.60 3.40 5.44 esc-2
3.55 3.40 12.07 esc-2
3.70 3.40 12.58 cto maq
1.80 3.40 6.12 esc-3
2.60 3.40 8.84 esc-3
2.15 3.40 7.31 esc-3
3.10 3.40 10.54 esc-3
3.40 3.40 11.56 cto maq
3.55 3.40 12.07 esc-2
0.80 2.55 2.04 cto maq-v21
1.10 3.40 3.74 cto maq
3.25 3.40 11.05 esc-3
0.80 2.55 2.04 cto maq-v21
2.00 3.40 6.80 cto maq
1.90 3.40 6.46 esc-3
5.40 3.40 18.36 esc-3
0.80 2.55 2.04 cto maq-v21
3.25 3.40 11.05 esc-3
1.75 3.40 5.95 azotea
0.80 2.55 2.04 cto maq-v21
1.15 3.40 3.91 cto maq
1.90 3.40 6.46 azotea
3.25 1.88 6.11 baranda
3.25 1.88 6.11 baranda

RESUMEN DE METRADO DE MURO DE SOGA

AREA M2 TOTAL
Zotano 206.86 3,908.40
1er Nivel 673.60
2do Nivel 485.59
3er-7mo Nivel 2,271.10
Cto Maquinas 271.27

TARRAJEO EN INTERIORES ACABADO CON C:A


SOTANO
LONGITUD ALTURA NLADOS AREA PARC TOTAL OBSERV
3.10 3.30 2.00 20.46 332.70
0.35 3.30 2.00 2.31
3.10 3.30 2.00 20.46
3.50 3.30 2.00 23.10
3.90 3.30 2.00 25.74
3.05 3.30 2.00 20.13
1.85 3.30 2.00 12.21
3.85 3.30 2.00 25.41
0.95 3.30 2.00 6.27
3.85 2.50 2.00 19.25
1.70 2.50 2.00 8.50
1.40 2.50 2.00 7.00
1.20 2.50 2.00 6.00
0.75 2.50 2.00 3.75
1.33 2.15 2.00 5.72
1.85 2.15 2.00 7.96
1.45 2.15 2.00 6.24
1.35 2.15 2.00 5.81
2.60 2.15 2.00 11.18
2.25 2.15 2.00 9.68

0.84 2.40 2.00 4.03


1.64 2.40 2.00 7.87
0.84 2.40 2.00 4.03
0.36 2.40 2.00 1.73
3.54 2.40 2.00 16.99
0.84 2.40 2.00 4.03
1.20 2.40 2.00 5.76
1.33 2.40 2.00 6.38
2.93 2.40 2.00 14.06
0.45 2.40 2.00 2.16
2.15 2.40 2.00 10.32
1.15 2.40 2.00 5.52
0.55 2.40 2.00 2.64

1ER NIVEL
LONGITUD ALTURA NLADOS AREA PARC TOTAL OBSERV
0.82 2.15 2.00 3.53 1,176.40 dorm-1
1.08 0.60 2.00 1.30 parapeto
1.30 0.60 2.00 1.56 escritorio
1.60 2.15 2.00 6.88 escritorio
1.15 2.40 2.00 5.52 kitch
2.25 2.50 2.00 11.25 kitch
2.10 2.50 2.00 10.50 escritorio
0.60 2.50 2.00 3.00 wcl-2
1.50 2.50 1.00 3.75 sh5
1.65 2.50 1.00 4.13 sh5
0.60 2.50 1.00 1.50 sh-4
0.60 2.50 2.00 3.00 estar
3.10 1.85 2.00 11.47 escalera
1.20 1.85 2.00 4.44 pasadizo
1.25 1.85 2.00 4.63 salon
1.62 2.00 2.00 6.48 salon
1.05 2.00 2.00 4.20 salon
5.00 2.00 2.00 20.00 lobby
1.85 2.00 2.00 7.40 esc-3
1.50 0.80 2.00 2.40 patio
0.77 2.00 2.00 3.08 dorm-2
1.87 2.25 2.00 8.42 salon
2.20 2.25 2.00 9.90 salon
0.35 2.25 2.00 1.58 esc-3
0.75 2.25 2.00 3.38 dorm-ser
0.80 2.25 1.00 1.80 sh-7
0.30 2.25 1.00 0.68 sh-7
1.80 2.25 1.00 4.05 sh-7
1.60 1.85 1.00 2.96 sh-7
1.10 1.85 2.00 4.07 cocina-2
0.75 2.25 2.00 3.38 ducto
0.60 2.25 2.00 2.70 ducto
0.75 1.85 2.00 2.78 ducto
2.09 2.25 2.00 9.41 dorm-2
2.08 2.25 2.00 9.36 dorm-2
2.08 1.85 2.00 7.70 ducto
0.50 2.25 1.00 1.13 sh-/8
0.57 2.25 1.00 1.28 sh-8
0.70 2.25 2.00 3.15 wcl-1
0.57 2.25 2.00 2.57 wcl-1
0.70 2.25 2.00 3.15 wcl-1
2.10 2.25 2.00 9.45 escritprio
0.45 2.25 1.00 1.01 sh-6
1.50 2.25 2.00 6.75 lobby
0.45 2.25 2.00 2.03 ducto
0.65 2.25 2.00 2.93 ducto
3.65 2.25 2.00 16.43 estar
0.80 2.25 2.00 3.60 recibp
0.80 2.25 1.00 1.80 sh-3
0.95 2.25 1.00 2.14 sh-3
1.05 2.25 1.00 2.36 sh-2
0.75 2.25 2.00 3.38 cocina-1
0.65 2.25 2.00 2.93 dorm-serv
0.70 2.25 2.00 3.15 dorm-serv
0.30 2.25 2.00 1.35 dorm-serv
0.55 2.25 2.00 2.48 cocina-1
0.85 2.00 2.00 3.40 sala
0.85 2.25 2.00 3.83 escritorio
0.88 2.25 2.00 3.96 dormit-1
1.60 0.55 2.00 1.76 dormit-1
1.60 0.55 2.00 1.76 escritorio
5.21 2.60 2.00 27.09 cerco
1.14 2.60 2.00 5.93 cerco
5.78 2.60 2.00 30.06 cerco
4.57 2.60 2.00 23.76 cerco
2.60 2.60 2.00 13.52 cerco
4.68 2.60 2.00 24.34 cerco
4.55 2.60 2.00 23.66 cerco
2.80 2.60 2.00 14.56 cerco
3.17 2.60 2.00 16.48 cerco
4.67 2.60 2.00 24.28 cerco
3.51 2.60 2.00 18.25 cerco
4.95 2.60 2.00 25.74 cerco
0.75 2.25 2.00 3.38 dormit-2
0.82 2.25 1.00 1.85 sh-9
0.75 2.25 2.00 3.38 ducto
0.65 2.25 2.00 2.93 cl-3
2.70 2.25 1.00 6.08 sh-8
2.90 2.25 2.00 13.05 escritorio
0.60 2.25 2.00 2.70 escritorio
2.90 2.25 2.00 13.05 escritorio
0.15 2.25 2.00 0.68 estar
1.80 2.25 2.00 8.10 comedor-v28
0.25 2.25 2.00 1.13 estar
8.61 2.60 2.00 44.77 jardin
2.05 1.85 2.00 7.59 patio
1.01 1.85 2.00 3.74 cocina-2
1.00 1.85 2.00 3.70 cocina-2
4.35 2.25 2.00 19.58 patio-cocina-2
0.30 2.25 2.00 1.35 esc
1.65 2.00 1.00 3.30 sh-7
1.70 2.00 1.00 3.40 sh-6
1.70 2.00 1.00 3.40 sh-6
3.30 2.00 2.00 13.20 hall
2.25 2.00 2.00 9.00 sala
1.05 2.00 2.00 4.20 dep-14
1.20 2.00 2.00 4.80 dep-14
3.15 2.00 2.00 12.60 dep-14
6.00 2.00 2.00 24.00 lobby
4.40 2.00 1.00 8.80 sh-1
2.20 2.00 1.00 4.40 sh-1
0.65 2.00 1.00 1.30 sh-1
2.35 2.00 2.00 9.40 recibo
2.45 2.00 2.00 9.80 recibo
2.50 2.00 2.00 10.00 sala
3.75 2.00 2.00 15.00 dorm-serv
2.26 2.00 2.00 9.04 estar
6.00 2.00 2.00 24.00 rampa
1.86 2.35 1.00 4.37 sh-4
1.86 2.35 1.00 4.37 sh-5
2.99 2.35 2.00 14.05 escritorio
4.29 2.35 2.00 20.16 escritorio
4.04 2.35 2.00 18.99 dornit-2
3.72 2.35 2.00 17.48 kitch
0.69 2.35 2.00 3.24 kitch
1.24 2.35 2.00 5.83 kitch
0.66 2.35 2.00 3.10 kitch
1.00 3.10 2.00 6.20 cerco
9.10 3.10 2.00 56.42 cerco
4.95 3.10 2.00 30.69 cerco
3.30 3.10 2.00 20.46 ing-veh
1.85 3.10 2.00 11.47 estacionam
2.90 3.10 2.00 17.98 estacionam
1.02 3.10 2.00 6.32 estacionam
1.02 3.15 2.00 6.43 estacionam
1.73 3.15 2.00 10.90 jardin
1.03 3.15 2.00 6.49 jardin
2.05 3.15 2.00 12.92 jardin
0.75 3.10 2.00 4.65 estacionam
1.54 3.10 2.00 9.55 estacionam
1.03 3.10 2.00 6.39 estacionam
1.03 3.15 2.00 6.49 estacionam
1.11 3.15 2.00 6.99 jardin
2.63 3.15 2.00 16.57 jardin
0.91 3.15 2.00 5.73 jardin
0.60 2.25 2.00 2.70 ducto
0.50 2.25 2.00 2.25 ducto
0.60 2.50 2.00 3.00 ducto

2DO NIVEL
LONGITUD ALTURA NLADOS AREA PARC TOTAL OBSERV
0.84 2.55 2.00 4.28 872.44 dorm-2
1.50 0.80 2.00 2.40 dorm-2 v3
1.00 2.55 2.00 5.10 dorm-2
2.35 2.55 2.00 11.99 patio v16
0.40 2.55 2.00 2.04 cocina-1
1.10 1.00 2.00 2.20 cocina-1-v18
0.40 2.55 2.00 2.04 cocina-1
2.60 2.55 2.00 13.26 esc-2
1.60 2.55 2.00 8.16 esc-2
2.87 1.00 2.00 5.74 patio-v15
1.30 2.55 2.00 6.63 patio
1.50 0.80 2.00 2.40 dorm-2 v3
1.80 2.55 2.00 9.18 dorm-2
2.60 2.55 2.00 13.26 esc-3
0.53 2.55 2.00 2.70 patio
1.10 1.00 2.00 2.20 patio -v18
0.52 2.55 2.00 2.65 patio
1.55 1.00 2.00 3.10 patio -v4
1.85 2.55 2.00 9.44 dorm-2
1.50 0.80 2.00 2.40 dorm-2 v-3
0.68 2.55 2.00 3.47 dorm-2
2.19 2.55 2.00 11.17 dorm-2
0.40 2.55 2.00 2.04 dorm-serv
0.60 1.00 2.00 1.20 pv-01
1.10 2.55 1.00 2.81 sh
0.60 2.55 2.00 3.06 ducto-basura
0.95 2.55 2.00 4.85 esc-2
1.20 2.55 2.00 6.12 ducto
1.20 2.55 2.00 6.12 ducto
0.50 2.55 2.00 2.55 dorm-serv
1.05 2.55 2.00 5.36 dorm-serv
0.83 2.55 2.00 4.23 dorm-serv
1.55 2.55 2.00 7.91 dorm-2
0.60 2.55 2.00 3.06 dorm-2
1.70 2.55 2.00 8.67 ascensor
0.75 2.55 2.00 3.83 dorm-serv
0.80 2.55 2.00 4.08 dorm-serv
0.30 2.55 2.00 1.53 dorm-serv
2.21 2.55 2.00 11.27 dorm-2
1.08 1.00 2.00 2.16 pasadizo
2.18 2.55 1.00 5.56 sh-9
2.18 2.55 2.00 11.12 ducto
0.55 2.55 1.00 1.40 sh-8
0.50 2.55 2.00 2.55 wcl-1'
0.72 2.55 2.00 3.67 wcl-1'
0.55 2.55 2.00 2.81 wcl-1'
0.71 2.55 2.00 3.62 wcl-1'
0.95 2.55 1.00 2.42 sh-15
3.92 2.55 2.00 19.99 dorm-serv
2.25 2.55 2.00 11.48 escritorio
1.90 2.55 1.00 4.85 sh-14
1.02 2.55 1.00 2.60 sh-13
0.60 2.55 2.00 3.06 comedor
2.15 2.55 2.00 10.97 escritorio
0.60 2.55 1.00 1.53 ducto sh-11
1.55 2.55 1.00 3.95 sh-10
0.60 2.55 2.00 3.06 v-29'
0.45 2.55 1.00 1.15 sh-10
0.60 2.55 1.00 1.53 sh-10
0.70 2.55 1.00 1.79 sh-10
0.75 2.55 2.00 3.83 wcl-3
0.70 2.55 2.00 3.57 wcl-3
1.80 2.55 0.00 0.00 sh-7
1.60 2.55 2.00 8.16 comedor
1.30 2.55 2.00 6.63 estar
1.10 2.55 2.00 5.61 sala
2.10 2.55 2.00 10.71 escritorio
0.65 2.55 1.00 1.66 sh-9
0.60 1.75 1.00 1.05 sh-9,v6
0.84 2.55 1.00 2.14 sh-9
2.23 2.55 1.00 5.69 sh-8
0.65 2.55 1.00 1.66 sh-8
0.55 2.55 2.00 2.81 wcl-1
0.72 2.55 2.00 3.67 wcl-1
0.70 2.55 2.00 3.57 wcl-1
0.70 2.55 2.00 3.57 wcl-1
0.90 2.55 2.00 4.59 dormit-1
1.60 0.55 2.00 1.76 dormit-1
1.20 2.55 2.00 6.12 dormit-1
1.60 0.55 2.00 1.76 escritorio
0.95 2.55 2.00 4.85 escritorio
0.85 2.55 2.00 4.34 escritorio
1.60 0.55 2.00 1.76 escritorio
0.35 2.55 2.00 1.79 escritorio
0.60 2.55 2.00 3.06 escritorio
1.60 0.55 2.00 1.76 escritorio
0.85 2.55 2.00 4.34 escritorio
1.60 0.55 2.00 1.76 escritorio
1.60 0.55 2.00 1.76 dormit-1
0.88 2.55 2.00 4.49 dormit-1
0.64 0.90 2.00 1.15 terraza-jardin
3.30 0.90 2.00 5.94 terraza-jardin
3.26 0.90 2.00 5.87 terraza-jardin
4.40 0.90 2.00 7.92 terraza-jardin
10.38 0.90 2.00 18.68 terraza-jardin
8.83 0.90 2.00 15.89 terraza-jardin
2.05 2.55 2.00 10.46 dormit-2
0.60 2.55 2.00 3.06 dormit-2
0.60 2.55 1.00 1.53 sh-9
0.60 2.55 2.00 3.06 ducto-v8
0.65 2.55 2.00 3.32 cl-3
2.40 2.55 1.00 6.12 sh-8-wcl-1
2.90 2.55 2.00 14.79 dormit-1
2.90 2.55 2.00 14.79 escritorio
0.75 2.55 2.00 3.83 escritorio
4.35 2.55 2.00 22.19 cocina-2
0.30 2.55 2.00 1.53 dorm-serv
1.64 2.55 1.00 4.18 sh-7
1.95 2.55 1.00 4.97 sh-16
1.00 2.55 1.00 2.55 sh-16
2.26 2.55 2.00 11.53 dormit-2
6.00 2.55 2.00 30.60 sala
0.60 2.55 2.00 3.06 dormit-2
1.40 2.55 1.00 3.57 sh-10
0.65 2.55 1.00 1.66 sh-10
2.55 2.55 1.00 6.50 sh-10
2.90 2.55 2.00 14.79 dormit-1
2.20 2.55 1.00 5.61 sh-11
0.60 2.55 2.00 3.06 jardinera
0.66 2.55 2.00 3.37 dormit-2
0.80 2.55 2.00 4.08 patio
0.60 1.75 2.00 2.10 patio-v6
1.05 2.55 2.00 5.36 patio
2.45 2.55 2.00 12.50 dorm-serv
0.40 2.55 2.00 2.04 cocina-3
2.75 2.55 2.00 14.03 sala
0.60 2.55 2.00 3.06 escritorio
1.13 2.55 2.00 5.76 jardinera
1.10 1.00 2.00 2.20 v-18
0.80 2.55 2.00 4.08 cocina-3
3.05 2.55 2.00 15.56 cocina-3
1.55 2.55 1.00 3.95 sh-14
1.70 2.55 1.00 4.34 sh-13
3.40 2.55 2.00 17.34 sala
4.45 2.55 2.00 22.70 cocina-4
0.65 2.55 2.00 3.32 cocina-4
1.20 2.55 2.00 6.12 cocina-4
0.35 2.55 2.00 1.79 patio
0.95 2.55 2.00 4.85 dorm-serv
2.90 2.55 2.00 14.79 sala
5.85 2.55 2.00 29.84 dormitorio-2
0.60 2.55 2.00 3.06 dormitorio-2
0.45 2.55 1.00 1.15 sh-9'
0.65 2.55 1.00 1.66 sh-8'
2.40 2.55 2.00 12.24 estar
3.75 2.55 2.00 19.13 dormitorio-1
0.76 1.75 2.00 2.66 v-6
0.60 2.55 2.00 3.06 escritorio

3ER AL 7MO NIVEL


LONGITUD ALTURA NLADOS AREA PARC TOTAL OBSERV
0.84 2.55 2.00 4.28 806.64 dorm-2 4033.1925
1.50 0.80 2.00 2.40 dorm-2 v3
1.00 2.55 2.00 5.10 dorm-2
2.35 1.00 2.00 4.70 patio v16
0.40 2.55 2.00 2.04 cocina-1
1.10 1.00 2.00 2.20 cocina-1-v18
0.40 2.55 2.00 2.04 cocina-1
2.60 2.55 2.00 13.26 esc-2
1.60 2.55 2.00 8.16 esc-2
2.87 1.00 2.00 5.74 patio-v15
1.30 2.55 2.00 6.63 patio
1.50 0.80 2.00 2.40 dorm-2 v3
1.80 2.55 2.00 9.18 dorm-2
2.60 2.55 2.00 13.26 esc-3
0.53 2.55 2.00 2.70 patio
1.10 1.00 2.00 2.20 patio -v18
0.52 2.55 2.00 2.65 patio
1.55 1.00 2.00 3.10 patio -v4
1.85 2.55 2.00 9.44 dorm-2
1.50 0.80 2.00 2.40 dorm-2 v-3
0.68 2.55 2.00 3.47 dorm-2
2.19 2.55 2.00 11.17 dorm-2
0.40 2.55 2.00 2.04 dorm-serv
0.60 1.00 2.00 1.20 pv-01
1.10 2.55 1.00 2.81 sh
0.60 2.55 2.00 3.06 ducto-basura
0.95 2.55 2.00 4.85 esc-2
1.20 2.55 2.00 6.12 ducto
1.20 2.55 2.00 6.12 ducto
0.50 2.55 2.00 2.55 dorm-serv
1.05 2.55 2.00 5.36 dorm-serv
0.83 2.55 2.00 4.23 dorm-serv
1.55 2.55 2.00 7.91 dorm-2
0.60 2.55 2.00 3.06 dorm-2
1.70 2.55 2.00 8.67 ascensor
0.75 2.55 2.00 3.83 dorm-serv
0.80 2.55 2.00 4.08 dorm-serv
0.30 2.55 2.00 1.53 dorm-serv
2.21 2.55 2.00 11.27 dorm-2
1.08 1.00 2.00 2.16 pasadizo
2.18 2.55 1.00 5.56 sh-9
2.18 2.55 2.00 11.12 ducto
0.55 2.55 1.00 1.40 sh-8
0.50 2.55 2.00 2.55 wcl-1'
0.72 2.55 2.00 3.67 wcl-1'
0.55 2.55 2.00 2.81 wcl-1'
0.71 2.55 2.00 3.62 wcl-1'
0.95 2.55 1.00 2.42 sh-15
3.92 2.55 2.00 19.99 dorm-serv
2.25 2.55 2.00 11.48 escritorio
1.90 2.55 1.00 4.85 sh-14
1.02 2.55 1.00 2.60 sh-13
0.60 2.55 2.00 3.06 comedor
2.15 2.55 2.00 10.97 escritorio
0.60 2.55 2.00 3.06 ducto sh-11
1.55 2.55 1.00 3.95 sh-10
0.60 2.55 2.00 3.06 v-29'
0.45 2.55 1.00 1.15 sh-10
0.60 2.55 1.00 1.53 sh-10
0.70 2.55 1.00 1.79 sh-10
0.75 2.55 2.00 3.83 wcl-3
0.70 2.55 2.00 3.57 wcl-3
1.80 2.55 1.00 4.59 sh-7
1.60 2.55 2.00 8.16 comedor
1.30 2.55 2.00 6.63 estar
1.10 2.55 2.00 5.61 sala
2.10 2.55 2.00 10.71 escritorio
0.65 2.55 1.00 1.66 sh-9
0.60 1.75 1.00 1.05 sh-9,v6
0.84 2.55 1.00 2.14 sh-9
2.23 2.55 1.00 5.69 sh-8
0.65 2.55 1.00 1.66 sh-8
0.55 2.55 2.00 2.81 wcl-1
0.72 2.55 2.00 3.67 wcl-1
0.70 2.55 2.00 3.57 wcl-1
0.70 2.55 2.00 3.57 wcl-1
0.90 2.55 2.00 4.59 dormit-1
1.60 0.55 2.00 1.76 dormit-1
1.20 2.55 2.00 6.12 dormit-1
1.60 0.55 2.00 1.76 escritorio
0.95 2.55 2.00 4.85 escritorio
0.85 2.55 2.00 4.34 escritorio
1.60 0.55 2.00 1.76 escritorio
0.35 2.55 2.00 1.79 escritorio
0.60 2.55 2.00 3.06 escritorio
1.60 0.55 2.00 1.76 escritorio
0.85 2.55 2.00 4.34 escritorio
1.60 0.55 2.00 1.76 escritorio
1.60 0.55 2.00 1.76 dormit-1
0.88 2.55 2.00 4.49 dormit-1
2.05 2.55 2.00 10.46 dormit-2
0.60 2.55 2.00 3.06 dormit-2
0.60 2.55 1.00 1.53 sh-9
0.60 2.55 2.00 3.06 ducto-v8
0.65 2.55 2.00 3.32 cl-3
2.40 2.55 1.00 6.12 sh-8-wcl-1
2.90 2.55 2.00 14.79 dormit-1
2.90 2.55 2.00 14.79 escritorio
0.75 2.55 2.00 3.83 escritorio
4.35 2.55 2.00 22.19 cocina-2
0.30 2.55 2.00 1.53 dorm-serv
1.64 2.55 1.00 4.18 sh-7
1.95 2.55 1.00 4.97 sh-16
1.00 2.55 1.00 2.55 sh-16
2.26 2.55 2.00 11.53 dormit-2
6.00 2.55 2.00 30.60 sala
0.60 2.55 2.00 3.06 dormit-2
2.55 2.55 1.00 6.50 sh-10
2.90 2.55 2.00 14.79 dormit-1
2.20 2.55 1.00 5.61 sh-11
0.60 2.55 2.00 3.06 jardinera
0.66 2.55 2.00 3.37 dormit-2
0.80 2.55 2.00 4.08 patio
0.60 1.75 2.00 2.10 patio-v6
1.05 2.55 2.00 5.36 patio
2.45 2.55 2.00 12.50 dorm-serv
0.40 2.55 2.00 2.04 cocina-3
2.75 2.55 2.00 14.03 sala
0.60 2.55 2.00 3.06 escritorio
1.13 2.55 2.00 5.76 jardinera
1.10 1.00 2.00 2.20 v-18
0.80 2.55 2.00 4.08 cocina-3
3.05 2.55 2.00 15.56 cocina-3
1.70 2.55 1.00 4.34 sh-13
3.40 2.55 2.00 17.34 sala
4.45 2.55 2.00 22.70 cocina-4
0.65 2.55 2.00 3.32 cocina-4
1.20 2.55 2.00 6.12 cocina-4
0.35 2.55 2.00 1.79 patio
0.95 2.55 2.00 4.85 dorm-serv
2.90 2.55 2.00 14.79 sala
5.85 2.55 2.00 29.84 dormitorio-2
0.60 2.55 2.00 3.06 dormitorio-2
0.45 2.55 1.00 1.15 sh-9'
0.65 2.55 1.00 1.66 sh-8'
2.40 2.55 2.00 12.24 estar
3.75 2.55 2.00 19.13 dormitorio-1
0.76 1.75 2.00 2.66 v-6
0.60 2.55 2.00 3.06 escritorio

CUARTO DE MAQUINAS y AZOTEA


LONGITUD ALTURA NLADOS AREA PARC TOTAL OBSERV
7.51 0.75 2.00 11.27 532.19 parapeto
4.20 0.75 2.00 6.30 parapeto
2.42 0.75 2.00 3.63 parapeto
0.75 0.75 2.00 1.13 parapeto
2.12 0.75 2.00 3.18 parapeto
7.25 0.75 2.00 10.88 parapeto
6.30 0.75 2.00 9.45 parapeto
2.00 0.75 2.00 3.00 parapeto
7.70 0.75 2.00 11.55 parapeto
1.85 0.75 2.00 2.78 parapeto
6.30 0.75 2.00 9.45 parapeto
2.00 0.75 2.00 3.00 parapeto
3.90 0.75 2.00 5.85 parapeto
1.85 0.75 2.00 2.78 parapeto
6.43 0.75 2.00 9.65 parapeto
7.10 0.75 2.00 10.65 parapeto
2.28 0.75 2.00 3.42 parapeto
0.60 0.75 2.00 0.90 parapeto
2.29 0.75 2.00 3.44 parapeto
4.50 0.75 2.00 6.75 parapeto
5.51 0.75 2.00 8.27 parapeto
5.68 0.75 2.00 8.52 parapeto
0.95 0.75 2.00 1.43 parapeto
0.90 0.75 2.00 1.35 parapeto
0.95 0.75 2.00 1.43 parapeto
0.90 0.75 2.00 1.35 parapeto
0.85 0.75 2.00 1.28 parapeto
0.80 0.75 2.00 1.20 parapeto
0.85 0.75 2.00 1.28 parapeto
1.90 3.40 2.00 12.92 esc-2
1.45 3.40 2.00 9.86 esc-2
2.60 2.55 2.00 13.26 esc-2 v-17
1.60 3.40 2.00 10.88 esc-2
3.55 3.40 2.00 24.14 esc-2
3.70 3.40 2.00 25.16 cto maq
1.80 3.40 2.00 12.24 esc-3
2.60 3.40 2.00 17.68 esc-3
2.15 3.40 2.00 14.62 esc-3
3.10 3.40 2.00 21.08 esc-3
3.40 3.40 2.00 23.12 cto maq
3.55 3.40 2.00 24.14 esc-2
0.80 2.55 2.00 4.08 cto maq-v21
1.10 3.40 2.00 7.48 cto maq
3.25 3.40 2.00 22.10 esc-3
0.80 2.55 2.00 4.08 cto maq-v21
2.00 3.40 2.00 13.60 cto maq
1.90 3.40 2.00 12.92 esc-3
5.40 3.40 2.00 36.72 esc-3
0.80 2.55 2.00 4.08 cto maq-v21
3.25 3.40 2.00 22.10 esc-3
1.75 3.40 2.00 11.90 azotea
0.80 2.55 2.00 4.08 cto maq-v21
1.15 3.40 2.00 7.82 cto maq
1.90 3.40 2.00 12.92 azotea
3.25 1.88 2.00 12.22 baranda
3.25 1.88 2.00 1.88 baranda
RESUMEN DE METRADO TARRAJEO DE MUROS INTERIORES

AREA M2 TOTAL
Zotano 332.70 6,946.92
1er Nivel 1,176.40
2do Nivel 872.44
3er-7mo Nivel 4,033.19
Cto Maquinas 532.19

TARRAJEO EN EXTERIORES ACABADO CON C:A


1ER NIVEL ELEVACION POSTERIOR
AREA PAO ALTURA NLADOS AREA PARC TOTAL OBSERV
10.93 1.00 1.00 10.93 77.11
-1.99 1.00 1.00 -1.99
14.66 1.00 1.00 14.66
10.00 1.00 1.00 10.00
-3.16 1.00 1.00 -3.16
-0.24 1.00 1.00 -0.24
7.05 1.00 1.00 7.05
-2.34 1.00 1.00 -2.34
30.53 1.00 1.00 30.53
-1.61 1.00 1.00 -1.61
-1.95 1.00 1.00 -1.95
4.29 3.55 1.00 15.23

2DO NIVEL ELEVACION POSTERIOR


AREA PAO ALTURA NLADOS AREA PARC TOTAL OBSERV
14.15 1.00 1.00 14.15 51.70
-1.99 1.00 1.00 -1.99
16.21 1.00 1.00 16.21
-1.24 1.00 1.00 -1.24
1.04 1.00 1.00 1.04
9.30 1.00 1.00 9.30
6.60 1.00 1.00 6.60
2.23 1.00 1.00 2.23
9.82 1.00 1.00 9.82
-2.70 1.00 1.00 -2.70
-1.72 1.00 1.00 -1.72

3ER NIVEL AL 7MO NIVEL ELEVACION POSTERIOR


AREA PAO ALTURA NLADOS AREA PARC SUB TOTAL OBSERV TOTAL
14.12 1.00 1.00 14.12 64.93 324.65
-2.02 1.00 1.00 -2.02
18.66 1.00 1.00 18.66
-1.26 1.00 1.00 -1.26
-2.99 1.00 1.00 -2.99
51.98 1.00 1.00 51.98
-3.30 1.00 1.00 -3.30
-2.99 1.00 1.00 -2.99
-1.26 1.00 1.00 -1.26
-1.29 1.00 1.00 -1.29
-2.70 1.00 1.00 -2.70
-2.02 1.00 1.00 -2.02

AZOTEA ELEVACION POSTERIOR


AREA PAO ALTURA NLADOS AREA PARC SUB TOTAL OBSERV
27.83 1.00 1.00 27.83 47.77
25.92 1.00 1.00 25.92
-2.99 1.00 1.00 -2.99
-2.99 1.00 1.00 -2.99

1-7MO NIVEL ELEVACION LATERAL


AREA PAO ALTURA NLADOS AREA PARC SUB TOTAL OBSERV
13.15 21.70 1.00 285.36 700.81 LADO IZQ
13.35 21.70 1.00 289.70 LADO DER
7.39 3.20 1.00 23.65 fachada
1.03 3.20 1.00 3.30 entrada
1.03 3.20 1.00 3.30 entrada
1.02 3.20 1.00 3.26 entrada
1.02 3.20 1.00 3.26 entrada
2.90 3.20 1.00 9.28 entrada
1.73 3.20 1.00 5.54 entrada
1.03 3.20 1.00 3.30 entrada
1.90 3.20 1.00 6.08 entrada
1.11 3.20 1.00 3.55 entrada
2.63 3.20 1.00 8.42 entrada
6.61 3.20 1.00 21.15 entrada
4.95 3.20 2.00 31.68 izq-der lateral

1-7MO NIVEL ELEVACION PRINCIPAL SIN CONSIDERAR VANOS


Longitud Altura NVeces Area Parc Sub Total OBSERV
30.95 21.70 1.00 671.62 671.62

RESUMEN DE TARRAJEO DE MUROS EXTERIORES

DESCRIPCION AREA M2 sub-TOTAL TOTAL


ELEVACION PSTERIOR 501.23 1,873.65
1er Nivel 77.11
2do Nivel 51.70
3er-7mo Nivel 324.65
Cto Maquinas 47.77
ELEVACION LATERAL 700.81
ELEVACION PRINCIPAL 671.62
Friontal con vanos 671.62

WILLY:
RESUMEN DE TARRAJEO DE MUROS EXTERIORES ESTE METRADO CORRESPONDE A
TODO LA CARA SIN CONSIDERAR
AVERTURA POR VANOS

AREA M2 sub-TOTAL TOTAL


ELEVACION PSTERIOR 689.59 2,062.03
posterior con vanos 641.82
Cto Maquinas 47.77
ELEVACION LATERAL 700.81
ELEVACION PRINCIPAL 671.63
Friontal con vanos 671.63

METRADO SIN CONSIDERAR LAS ABERTURAS POR VANOS

TARRAJEO DE VIGAS PERALTADAS


1ER NIVEL
LADO 1 LADO 2 LADO 3 PERIMETRO LONGITUD AREA PARC TOTAL OBSERV
0.65 0.25 0.35 1.25 3.07 3.84 114.76 M6
0.00 0.10 0.35 0.45 0.82 0.37
0.65 0.25 0.35 1.25 1.08 1.35 V12
0.65 0.25 0.35 1.25 1.30 1.63 V13
0.00 0.10 0.35 0.45 1.60 0.72
0.65 0.25 0.35 1.25 1.20 1.50 V23
0.50 0.25 0.25 1.00 0.60 0.60 V6
0.50 0.25 0.25 1.00 1.62 1.62 V2
0.50 0.25 0.25 1.00 3.05 3.05 M2
0.50 0.15 0.25 0.90 1.10 0.99 PATIO
0.50 0.15 0.25 0.90 1.55 1.40 PATIO
0.50 0.15 0.25 0.90 1.50 1.35 V3
0.00 0.10 0.40 0.50 6.15 3.08 RAMPA
0.40 0.25 0.40 1.05 1.91 2.01 ESTAR
0.00 0.10 0.40 0.50 2.60 1.30 ESC-2
0.40 0.25 0.40 1.05 1.05 1.10 SALON
0.40 0.25 0.40 1.05 3.93 4.13 SALON
0.15 0.25 0.15 0.55 0.60 0.33 DUCTO
0.65 0.20 0.40 1.25 2.08 2.60 SH9
0.40 0.35 0.40 1.15 0.90 1.04 SH9
0.40 0.35 0.40 1.15 4.25 4.89 COMEDOR
0.00 0.15 0.40 0.55 0.98 0.54 SH6
0.40 0.50 0.40 1.30 4.50 5.85 LOBBY
0.00 0.15 0.40 0.55 3.70 2.04 COMEDOR
0.40 0.50 0.40 1.30 1.00 1.30 RECIBO
0.00 0.15 0.40 0.55 3.08 1.69 RECIBO
0.40 0.50 0.40 1.30 2.67 3.47
0.40 0.35 0.40 1.15 6.17 7.10
0.25 0.25 0.25 0.75 3.25 2.44 SALA
0.25 0.25 0.25 0.75 0.65 0.49 COCINA 1
0.25 0.25 0.25 0.75 1.80 1.35 COCINA 1
0.25 0.25 0.25 0.75 3.00 2.25 PATIO+
0.50 0.25 0.25 1.00 6.15 6.15
0.50 0.25 0.25 1.00 2.15 2.15 TERRAZA
0.10 0.10 0.25 0.45 0.65 0.29 TERRAZA
0.25 0.25 0.25 0.75 2.30 1.73 LOBBY
0.25 0.25 0.25 0.75 1.60 1.20 ESCRITORIO
0.50 0.25 0.25 1.00 1.60 1.60 DORMITORIO-1
0.00 0.10 0.25 0.35 0.88 0.31 DORMITORIO-1
VERT
0.00 0.15 0.40 0.55 0.88 0.48 COCINA-2
0.40 0.30 0.40 1.10 2.88 3.17 ESTAR
0.00 0.15 0.40 0.55 2.68 1.47 ESCRITORIO
0.40 0.25 0.40 1.05 0.85 0.89 ESC-3
0.00 0.10 0.40 0.50 1.65 0.83 ESC-3
0.00 0.10 0.40 0.50 3.31 1.66 LOBBY
0.40 0.25 0.40 1.05 2.55 2.68 LOBBY
0.00 0.10 0.40 0.50 1.20 0.60 DEP 14
0.40 0.25 0.40 1.05 1.20 1.26 ESC-4
0.40 0.25 0.40 1.05 1.66 1.74 SALON
0.40 0.25 0.40 1.05 1.80 1.89 HALL
0.00 0.10 0.40 0.50 5.00 2.50 COMEDOR
0.40 0.25 0.40 1.05 0.90 0.95 ESC-2
0.40 0.25 0.40 1.05 2.35 2.47 RECIBO
0.40 0.25 0.40 1.05 3.30 3.47 COCINA-1
0.00 0.10 0.40 0.50 5.05 2.53 DORR-SERV
0.40 0.25 0.40 1.05 0.95 1.00 ESTAR
0.00 0.10 0.40 0.50 0.60 0.30 ESC-3
0.40 0.25 0.40 1.05 3.89 4.08 ESCRITORIO

2DO AL 7MO NIVEL


LADO 1 LADO 2 LADO 3 PERIMETRO LONGITUD AREA PARC SUB- TOTAL OBSERV AREA TOT
0.50 0.15 0.25 0.90 1.51 1.36 104.24 DORMITORIO-2 625.46
0.40 0.15 0.40 0.95 2.23 2.12 COCINA-1
1.05 1.05 0.00 2.10 2.60 5.46 ESC-2
0.40 0.25 0.40 1.05 1.07 1.12 patio
0.40 0.25 0.40 1.05 2.50 2.63 patio
1.05 0.00 1.05 2.10 2.60 5.46 ESCALERA
0.50 0.15 0.25 0.90 1.10 0.99 PATIO
0.50 0.15 0.25 0.90 1.50 1.35 DORMITORIO-2
0.40 0.35 0.40 1.15 3.13 3.60 ESTAR
0.40 0.35 0.40 1.15 1.10 1.27 COMEDOR
0.40 0.50 0.40 1.30 0.90 1.17 COMEDOR
0.40 0.35 0.40 1.15 2.25 2.59 COMEDOR
0.40 0.15 0.40 0.95 0.97 0.92 SH
0.60 0.50 0.60 1.70 1.20 2.04 SALA
0.40 0.35 0.40 1.15 2.15 2.47 SH
0.40 0.50 0.40 1.30 0.90 1.17 ESTAR
0.40 0.15 0.40 0.95 3.05 2.90 COMEDOR
0.40 0.50 0.40 1.30 2.67 3.47 COMEDOR
0.40 0.15 0.40 0.95 2.05 1.95 COMEDOR
0.40 0.50 0.40 1.30 2.05 2.67 COMEDOR
0.40 0.35 0.40 1.15 0.63 0.72 COMEDOR
0.40 0.20 0.40 1.00 3.05 3.05 COMEDOR
0.40 0.35 0.40 1.15 0.90 1.04 ESTAR
0.40 0.20 0.40 1.00 2.22 2.22 SH
0.25 0.25 0.25 0.75 3.25 2.44 SALA
0.25 0.25 0.25 0.75 3.00 2.25 SALA
0.25 0.25 0.25 0.75 3.00 2.25 SALA
0.50 0.25 0.25 1.00 1.60 1.60 DORMITORIO-1
0.50 0.25 0.25 1.00 1.60 1.60 ESCRITORIO
0.50 0.25 0.25 1.00 1.60 1.60 ESCRITORIO
0.50 0.25 0.25 1.00 1.60 1.60 DORMITORIO-1
0.50 0.25 0.25 1.00 1.60 1.60 ESCRITORIO
0.50 0.25 0.25 1.00 1.60 1.60 DORMITORIO-1
0.50 0.10 0.25 0.85 0.88 0.75 DORMITORIO-1
VERT
0.00 0.15 0.40 0.55 2.90 1.60 DORMITORIO-1
0.40 0.30 0.40 1.10 2.95 3.25 ESTAR
0.00 0.15 0.40 0.55 2.05 1.13 PATIO
0.40 0.25 0.40 1.05 1.15 1.21
0.00 0.10 0.40 0.50 1.65 0.83 DUCTO
0.00 0.10 0.40 0.50 6.00 3.00 DORM1-WCL-SH-10

0.00 0.10 0.40 0.50 2.26 1.13 DORMITORIO-2


0.00 0.10 0.40 0.50 1.66 0.83 SH-12
0.40 0.25 0.40 1.05 2.95 3.10 ESTAR
0.00 0.10 0.40 0.50 2.75 1.38 ESCRITORIO
0.40 0.25 0.40 1.05 0.90 0.95 ESC-2
0.60 0.25 0.60 1.45 1.20 1.74 ASCENSOR
0.40 0.25 0.40 1.05 0.95 1.00 SH-14
0.40 0.25 0.40 1.05 1.10 1.16 SH-13
0.40 0.10 0.40 0.90 3.40 3.06 SALA
0.40 0.25 0.40 1.05 2.75 2.89 COMEDOR
0.40 0.10 0.40 0.90 2.95 2.66 ESCRITORIO
0.40 0.25 0.40 1.05 2.25 2.36 COCINA-1

CTO DE MAQUINAS
LADO 1 LADO 2 LADO 3 PERIMETRO LONGITUD AREA PARC SUB- TOTAL OBSERV
0.30 0.20 0.30 0.80 1.70 1.36 20.61
0.30 0.20 0.30 0.80 1.70 1.36
0.30 0.20 0.30 0.80 0.85 0.68
0.30 0.20 0.30 0.80 0.85 0.68
0.30 0.20 0.30 0.80 1.00 0.80
0.00 0.10 0.45 0.55 1.20 0.66
0.00 0.10 0.45 0.55 1.36 0.75
0.45 0.25 0.45 1.15 0.90 1.04
0.00 0.10 0.45 0.55 1.36 0.75
0.45 0.25 0.45 1.15 0.90 1.04
0.45 0.10 0.45 1.00 1.20 1.20

0.30 0.20 0.30 0.80 1.70 1.36


0.30 0.20 0.30 0.80 1.70 1.36
0.30 0.20 0.30 0.80 0.85 0.68
0.30 0.20 0.30 0.80 0.85 0.68
0.30 0.20 0.30 0.80 1.00 0.80
0.00 0.10 0.45 0.55 1.20 0.66
0.00 0.10 0.45 0.55 1.36 0.75
0.45 0.25 0.45 1.15 0.90 1.04
0.00 0.10 0.45 0.55 1.36 0.75
0.45 0.25 0.45 1.15 0.90 1.04
0.45 0.10 0.45 1.00 1.20 1.20
RESUMEN DE METRADO TARRAJEO DE VIGAS PERALTADAS

AREA M2 TOTAL
Zotano 0.00 760.83
1er Nivel 114.76
2do al 7mo Nivel 625.46
Cto Maquinas 20.61

Sole:
DERRAMES EN VANOS METRADO DE DERRAMES SIN
CONSIDERAR LOS DERRAMES EN
1ER NIVEL VANOS DE FACHADA

LADO-1 LADO-2 LADO-3 PERIMETRO CARAS PARCIAL TOTAL OBSERV

2.15 0.00 0.00 2.15 0.00 0.00 294.10 M6


1.08 1.50 1.50 4.08 0.00 0.00 vanos de fachada V12
1.30 1.50 1.50 4.30 0.00 0.00 vanos de fachada V13
0.80 2.10 0.00 2.90 2.00 5.80 P15
0.90 2.10 0.00 3.00 2.00 6.00 P13'
0.90 2.10 2.10 5.10 2.00 10.20 P13
0.90 2.10 0.00 3.00 2.00 6.00 P13
0.90 2.10 2.10 5.10 2.00 10.20 P13
0.80 2.10 2.10 5.00 2.00 10.00 P15
0.80 2.10 2.10 5.00 2.00 10.00 P15
0.80 2.10 2.10 5.00 2.00 10.00 P15
0.30 0.30 0.30 0.90 2.00 1.80 V7
0.30 0.30 0.30 0.90 2.00 1.80 V7
0.60 0.00 0.00 0.60 2.00 1.20 V11
2.15 0.00 0.00 2.15 2.00 4.30 P2
1.95 0.00 0.00 1.95 0.00 0.00 vanos de fachada V23
0.60 0.40 0.00 1.00 0.00 0.00 vanos de fachada V6
1.62 1.95 0.00 3.57 0.00 0.00 vanos de fachada V2
2.15 0.00 0.00 2.15 2.00 4.30 M3
1.95 0.00 0.00 1.95 2.00 3.90 V1
2.15 2.15 0.00 4.30 2.00 8.60 M2
2.15 0.00 0.00 2.15 2.00 4.30 P2
2.15 0.00 0.00 2.15 2.00 4.30 P5'
2.10 2.10 0.80 5.00 2.00 10.00 P15
2.15 2.15 0.00 4.30 2.00 8.60 PV2
1.15 1.15 0.00 2.30 2.00 4.60 PV3
2.15 2.15 0.80 5.10 2.00 10.20 P8
0.30 0.30 0.30 0.90 2.00 1.80 V7
2.15 0.70 2.15 5.00 2.00 10.00 P8
2.15 2.15 0.00 4.30 2.00 8.60 P4
1.35 0.00 1.35 2.70 0.00 0.00 vanos de fachada V3
2.15 0.00 0.00 2.15 2.00 4.30 P3
2.15 0.00 0.00 2.15 2.00 4.30 P7
0.60 0.40 0.60 1.60 2.00 3.20 V6
0.15 0.15 0.15 0.45 2.00 0.90 V8
0.60 0.40 0.60 1.60 2.00 3.20 V6
2.15 0.00 2.15 4.30 2.00 8.60 P7
2.15 0.00 2.15 4.30 2.00 8.60 P3
2.15 0.00 0.00 2.15 2.00 4.30 P3
2.15 0.00 2.15 4.30 2.00 8.60 WCL-1
1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14
1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14
2.15 0.00 0.00 2.15 2.00 4.30 M4
2.15 0.70 0.00 2.85 2.00 5.70 P8
2.50 0.00 2.50 5.00 2.00 10.00 M1
2.15 0.00 2.15 4.30 2.00 8.60 P1
2.15 0.00 0.00 2.15 2.00 4.30 M5
1.15 1.80 0.00 2.95 0.00 0.00 vanos de fachada V5
1.85 0.65 1.85 4.35 0.00 0.00 vanos de fachada V9
2.15 0.00 0.00 2.15 2.00 4.30 P3
2.15 0.00 2.15 4.30 2.00 8.60 P4
2.15 0.80 2.15 5.10 2.00 10.20 P7
2.15 0.80 2.15 5.10 2.00 10.20 P8
2.15 0.00 2.15 4.30 2.00 8.60 P7
2.15 1.00 2.15 5.30 2.00 10.60 P1
0.15 0.15 0.15 0.45 2.00 0.90 V8
1.15 0.35 1.15 2.65 2.00 5.30 P10

Sole:
2do NIVEL METRADO DE DERRAMES SIN
CONSIDERAR LOS DERRAMES EN
LADO-1 LADO-2 LADO-3 PERIMETRO CARAS PARCIAL TOTAL OBSERV VANOS DE FACHADA

1.35 1.50 1.35 4.20 0.00 0.00 334.55 V3


1.15 2.35 1.15 4.65 0.00 0.00 vanos de fachada V16
0.40 0.40 0.40 1.20 2.00 2.40 V19
2.15 0.90 2.15 5.20 2.00 10.40 P3
2.15 0.00 2.15 4.30 2.00 8.60 M8
2.15 0.00 2.15 4.30 2.00 8.60 P3
2.15 0.00 2.15 4.30 2.00 8.60 P5
2.15 0.00 2.15 4.30 2.00 8.60 P5
1.10 1.15 1.10 3.35 2.00 6.70 V18
1.15 1.08 1.15 3.38 2.00 6.75 V24
1.80 1.15 1.80 4.75 2.00 9.50 V15
2.15 0.70 2.15 5.00 2.00 10.00 P8
0.32 0.62 0.32 1.26 2.00 2.52 V29
2.15 0.90 2.15 5.20 2.00 10.40 P3
2.15 0.80 2.15 5.10 2.00 10.20 PV2
2.15 0.00 0.00 2.15 2.00 4.30 P4
0.00 0.70 0.00 0.70 2.00 1.40 P10
1.31 0.60 0.00 1.91 2.00 3.82 P19
0.15 0.15 0.00 0.30 2.00 0.60 V8
2.15 0.80 0.00 2.95 2.00 5.90 P7
2.15 0.80 0.00 2.95 2.00 5.90 P7
2.15 0.70 0.00 2.85 2.00 5.70 P8
2.15 0.90 0.00 3.05 2.00 6.10 P4
2.15 1.40 0.00 3.55 2.00 7.10 PV1
2.15 0.70 0.00 2.85 2.00 5.70 P8
2.15 0.80 0.00 2.95 2.00 5.90 P7
0.62 0.32 0.62 1.56 2.00 3.12 V29
0.62 0.32 0.00 0.94 2.00 1.88 V29
0.60 0.40 0.00 1.00 2.00 2.00 V6
2.15 0.80 2.15 5.10 2.00 10.20 P7
2.15 0.90 0.00 3.05 2.00 6.10 P3
2.15 0.90 0.00 3.05 2.00 6.10 P3
1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14
1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14
1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14
1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14
1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14
1.60 1.60 1.60 4.80 0.00 0.00 vanos de fachada V14
2.15 0.90 2.15 5.20 2.00 10.40 P3
0.00 0.90 0.00 0.90 2.00 1.80 P3
2.15 0.00 2.15 4.30 2.00 8.60 WCL-1
2.15 0.80 2.15 5.10 2.00 10.20 P7
0.60 0.40 0.00 1.00 2.00 2.00 V6
0.00 0.15 0.00 0.15 2.00 0.30 V8
0.32 0.62 0.32 1.26 2.00 2.52 V29
0.32 0.62 0.00 0.94 2.00 1.88 V29
2.15 0.90 0.00 3.05 2.00 6.10 P3
2.15 0.80 0.00 2.95 2.00 5.90 P7
2.15 0.90 0.00 3.05 2.00 6.10 P4
2.15 0.70 0.00 2.85 2.00 5.70 P8
0.30 0.30 0.00 0.60 2.00 1.20 V7
2.15 0.70 2.15 5.00 2.00 10.00 P8
2.15 0.90 2.15 5.20 2.00 10.40 P5
2.15 0.80 0.00 2.95 2.00 5.90 PV2
1.14 0.65 0.00 1.79 2.00 3.58 P11
0.30 0.30 0.30 0.90 2.00 1.80 V7
2.15 0.80 2.15 5.10 2.00 10.20 P7
2.15 0.80 2.15 5.10 2.00 10.20 P7
0.32 0.62 0.00 0.94 2.00 1.88 V29
0.00 0.90 0.00 0.90 2.00 1.80 P3
1.35 1.50 0.00 2.85 0.00 0.00 vanos de fachada V3
2.15 0.80 2.15 5.10 2.00 10.20 P7
2.15 0.90 2.15 5.20 2.00 10.40 P3
0.00 0.90 0.00 0.90 2.00 1.80 P3
2.15 0.00 2.15 4.30 2.00 8.60 WCL-1
1.35 2.60 0.00 3.95 0.00 0.00 vanos de fachada V17
1.15 1.10 1.15 3.40 0.00 0.00 vanos de fachada V18
1.15 1.55 1.15 3.85 0.00 0.00 vanos de fachada V4
1.35 1.50 1.35 4.20 0.00 0.00 vanos de fachada V3

RESUMEN DE METRADO DERRAMES EN VANOS

LONG ML TOTAL
Zotano 0.00 2,301.40
1er Nivel 294.10
2do al 7mo Nivel 2,007.30
Cto Maquinas 0.00

Willy:
TARRAJEO DE COLUMNAS Y PLACAS No se ha considerado en el
metrado las columnas y placa
1ER NIVEL empotradas en muros, ya q e
LADO-1 LADO-2 LADO-3 LADO-4 PERIMETRO ALTURA PARCIAL TOTAL son metradas en muros
OBSERV

1.00 1.00 0.10 1.00 3.10 2.55 7.91 69.56 P1


1.55 2.50 1.20 0.00 5.25 2.55 13.39 P2
1.00 1.00 0.10 0.00 2.10 2.55 5.36 P3
0.10 0.83 1.00 1.00 2.93 2.55 7.47 P1
0.85 0.50 0.25 0.75 2.35 2.55 5.99 P4
0.75 0.50 0.75 0.95 2.95 2.55 7.52 P5
0.90 0.42 1.20 0.68 3.20 2.55 8.16 P6
0.10 0.70 0.10 0.00 0.90 2.55 2.30 P7
0.25 2.00 0.25 2.00 4.50 2.55 11.48 PLACA-3

2DO NIVEL
LADO-1 LADO-2 LADO-3 LADO-4 PERIMETRO ALTURA PARCIAL TOTAL OBSERV

1.40 0.50 1.20 2.35 5.45 2.55 13.90 131.55 P2


0.10 1.00 0.25 1.00 2.35 2.55 5.99 P1
0.10 1.00 0.25 0.00 1.35 2.55 3.44 P3
0.10 0.75 0.85 0.25 1.95 2.55 4.97 P4
0.10 1.00 0.25 1.00 2.35 2.55 5.99 P1
0.60 0.75 0.75 1.25 3.35 2.55 8.54 P5
0.90 0.32 1.20 0.20 2.62 2.55 6.68 P6
0.10 0.70 0.00 0.00 0.80 2.55 2.04 P7
7.46 6.46 0.35 0.10 14.37 2.55 36.64 PLACA-3
2.20 0.35 2.20 0.35 5.10 2.55 13.01 PLACA-2
2.65 0.20 2.65 0.00 5.50 2.55 14.03 PLACA-2
2.95 0.25 2.95 0.25 6.40 2.55 16.32 PLACA-1

AZOTEA Y CUARTO DE MAQUINAS


LADO-1 LADO-2 LADO-3 LADO-4 PERIMETRO ALTURA PARCIAL TOTAL OBSERV

2.20 0.35 2.20 0.35 5.10 1.25 6.38 53.82 PLACA-2


0.05 2.20 0.05 0.00 2.30 1.25 2.88 PLACA-2
0.10 0.70 0.10 0.00 0.90 3.70 3.33
0.10 0.70 0.10 0.00 0.90 3.70 3.33

0.05 2.20 0.05 0.00 2.30 2.20 5.06 PLACA-2


0.25 0.20 0.25 0.20 0.90 2.20 1.98 columnetas
0.25 0.20 0.25 0.20 0.90 2.20 1.98 columnetas
0.25 0.20 0.25 0.20 0.90 2.20 1.98 columnetas

2.20 0.35 2.20 0.35 5.10 1.25 6.38 PLACA-2


0.05 2.20 0.05 0.00 2.30 1.25 2.88 PLACA-2
0.10 0.70 0.10 0.00 0.90 3.70 3.33
0.10 0.70 0.10 0.00 0.90 3.70 3.33

0.05 2.20 0.05 0.00 2.30 2.20 5.06 PLACA-2


0.25 0.20 0.25 0.20 0.90 2.20 1.98 columnetas
0.25 0.20 0.25 0.20 0.90 2.20 1.98 columnetas
0.25 0.20 0.25 0.20 0.90 2.20 1.98 columnetas

RESUMEN DE METRADO TARRAJEO DE COLUMNAS Y PLACAS

AREA TOTAL
Zotano SON SOLAQUEADAS 0.00 912.71
1er Nivel 69.56
2do al 7mo Nivel 789.33
Cto Maquinas 53.82

CIELORRASOS CON MEZCLA C:A


1ER NIVEL
PAO AREA PARC NVECES AREA TOTAL OBSERV

1.00 4.25 1.00 4.25 390.54


2.00 66.94 1.00 66.94
3.00 20.38 1.00 20.38
4.00 8.64 1.00 8.64
5.00 2.86 1.00 2.86
6.00 1.73 1.00 1.73
7.00 3.08 1.00 3.08
8.00 21.50 1.00 21.50
9.00 17.07 1.00 17.07
10.00 3.12 1.00 3.12
11.00 23.72 1.00 23.72
12.00 17.40 1.00 17.40
13.00 20.97 1.00 20.97
14.00 41.55 1.00 41.55
15.00 20.13 1.00 20.13
16.00 41.29 1.00 41.29
17.00 21.35 1.00 21.35
18.00 41.58 1.00 41.58
19.00 3.60 1.00 3.60
20.00 3.60 1.00 3.60
21.00 1.10 1.00 1.10
22.00 4.68 1.00 4.68

2do al 7mo NIVEL


PAO AREA PARC NVECES AREA TOTAL OBSERV

1.00 31.16 6.00 186.96 2,048.46


2.00 10.85 6.00 65.10
3.00 10.08 6.00 60.48
4.00 3.12 6.00 18.72
5.00 2.26 6.00 13.56
6.00 3.10 6.00 18.60
7.00 21.43 6.00 128.58
8.00 15.38 6.00 92.28
9.00 0.77 6.00 4.62
10.00 3.12 6.00 18.72
11.00 21.92 6.00 131.52
12.00 17.40 6.00 104.40
13.00 20.97 6.00 125.82
14.00 41.55 6.00 249.30
15.00 20.13 6.00 120.78
16.00 41.29 6.00 247.74
17.00 21.35 6.00 128.10
18.00 41.58 6.00 249.48
19.00 3.63 6.00 21.78
20.00 3.63 6.00 21.78
21.00 1.10 6.00 6.60
22.00 4.68 6.00 28.08
23.00 0.91 6.00 5.46

Cto de Maquinas
PAO AREA PARC NVECES AREA TOTAL OBSERV

1.00 3.60 2.00 7.20 53.72


2.00 0.81 2.00 1.62
3.00 1.35 2.00 2.70
4.00 1.53 2.00 3.06
5.00 0.89 2.00 1.78
6.00 10.78 2.00 21.56
7.00 5.60 2.00 11.20
8.00 2.30 2.00 4.60

RESUMEN DE METRADO TARRAJEO DE CIELORRASO

AREA TOTAL
Zotano SON SOLAQUEADAS 0.00 2,492.72
1er Nivel 390.54
2do al 7mo Nivel 2,048.46
Cto Maquinas 53.72

CONTRAPISO
1ER NIVEL
PAO AREA N VECES AREA PARC AREA TOT AREA TOT OBSERV
PRIMER NIVEL
1.00 51.32 0.00 0.00 0.00 423.86 JARDIN FROTACHADO
2.00 13.25 0.00 0.00 JARDIN FROTACHADO
3.00 8.33 0.00 0.00 JARDIN FROTACHADO
4.00 5.16 0.00 0.00 JARDIN FROTACHADO
5.00 46.54 0.00 0.00 JARDIN FROTACHADO
6.00 61.62 0.00 0.00 JARDIN FROTACHADO
7.00 12.27 1.00 12.27 41.08 TERRAZA PISO
PISO GRANITO
GRANITO
8.00 6.21 1.00 6.21 TERRAZA LAVADO.
LAVADO.

9.00 3.00 1.00 3.00 TERRAZA


10.00 8.25 1.00 8.25 TERRAZA
11.00 11.35 1.00 11.35 RAMPA
12.00 21.83 1.00 21.83 85.92 DORMITORIO-2 PISO
PISO DE
DE
13.00 3.74 1.00 3.74 WCL ALFOMBRA
ALFOMBRA DE
DE 77

8 MM ++
8 MM
14.00 11.74 1.00 11.74 DORMITORIO-2
GFIELTRO
GFIELTRO
15.00 11.86 1.00 11.86 ESCRITORIO NACIONAL.
NACIONAL.
16.00 12.10 1.00 12.10 DORMITORIO-2
17.00 13.95 1.00 13.95 DORMIT-1+WCL DONDE
DONDE SESE
18.00 10.70 1.00 10.70 ESCRITORIO COLOCARA
COLOCARA
CONTRAPISO
CONTRAPISO
19.00 54.32 1.00 54.32 88.00 ESTAR-COMEDR PISO
PISO
20.00 33.68 1.00 33.68 ESTAR-COMEDR LAMINADO DE
LAMINADO DE
MADERA
MADERA
21.00 5.51 1.00 5.51 10.29 DORM-SERV PISO
PISO VINILICO
VINILICO
22.00 4.78 1.00 4.78 DORM-SERV DE
DE 1.6MM
1.6MM
23.00 2.80 1.00 2.80 38.62 SH-3 PISO
PISO CERAMICO
CERAMICO
24.00 1.86 1.00 1.86 SH-7 CELIMA
CELIMA 30x30
30x30
O
O SIMILAR
SIMILAR
25.00 6.10 1.00 6.10 PATIO
PISO
PISO CERAMICO
CERAMICO
CELIMA
CELIMA 30x30
30x30
O
O SIMILAR
SIMILAR

26.00 7.09 1.00 7.09 PATIO


27.00 9.12 1.00 9.12 COCINA-2
28.00 11.65 1.00 11.65 COCINA-1
29.00 60.02 1.00 60.02 84.99 LOBBY PISO
PISO
30.00 11.70 1.00 11.70 PORCELANATO.
PORCELANATO.
SALON
31.00 2.21 1.00 2.21 SH-1
32.00 11.06 1.00 11.06 ENTRADA
33.00 3.17 1.00 3.17 15.58 SH-4 PISO
PISO CERAMICO
CERAMICO
34.00 2.95 1.00 2.95 CELIMA
CELIMA 30x30
30x30
SH-5
O
O SIMILAR
SIMILAR
35.00 2.83 1.00 2.83 SH-2
36.00 1.65 1.00 1.65 SH-6
37.00 2.73 1.00 2.73 SH-9
38.00 2.25 1.00 2.25 SH-8
39.00 29.44 1.00 29.44 59.38 ESTACIONAMIENTO PULIDO
40.00 29.94 1.00 29.94 ESTACIONAMIENTO PULIDO

2 NIVEL
PAO AREA N VECES AREA PARC AREA TOT AREA TOT OBSERV

41 11.42 1.00 11.42 108.83 354.48 DORMITORIO-2 PISO


PISO DE
DE
ALFOMBRA
ALFOMBRA DEDE 77
42 14.05 1.00 14.05 DORMITORIO-1
88 MM
MM ++
41 10.75 1.00 10.75 ESCRITORIO GFIELTRO
GFIELTRO
NACIONAL.
NACIONAL.
42 10.67 1.00 10.67 ESCRITORIO

43 14.05 1.00 14.05 DORMITORIO-1


DONDE
DONDE SE
SE
44 10.60 1.00 10.60 ESCRITORIO COLOCARA
COLOCARA
CONTRAPISO
CONTRAPISO
45 13.93 1.00 13.93 DORMITORIO-1

46 12.00 1.00 12.00 DORMITORIO-2

47 11.36 1.00 11.36 DORMITORIO-2

48 4.95 1.00 4.95 65.10 PATIO PISO


PISO CERAMICO
CERAMICO
CELIMA
CELIMA 30x30
30x30
49 2.00 1.00 2.00 SH-15
O
O SIMILAR
SIMILAR
50 10.47 1.00 10.47 COCINA-1

51 9.75 1.00 9.75 COCINA-3

52 5.21 1.00 5.21 PATIO

53 2.19 1.00 2.19 SH-12

54 6.94 1.00 6.94 PATIO

55 6.31 1.00 6.31 COCINA-2

56 1.91 1.00 1.91 SH-7

57 5.18 1.00 5.18 PISO


PISO VINILICO
VINILICO
DORM-SERV
DE
DE 1.6MM
1.6MM
58 4.79 1.00 4.79 DORM-SERV

59 5.40 1.00 5.40 DORM-SERV

60 36.69 1.00 36.69 108.87 ESTAR-COMEDR PISO


PISO LAMINADO
LAMINADO
DE
DE MADERA
MADERA
61 36.26 1.00 36.26 ESTAR-COMEDR

62 35.92 1.00 35.92 ESTAR-COMEDR

63 2.71 1.00 2.71 21.21 SH-9' PISO


PISO
64 2.19 1.00 2.19 SH-8' CERAMICO
CERAMICO
CELIMA
CELIMA 30x30
30x30
65 2.21 1.00 2.21 SH-14 O
O SIMILAR
SIMILAR
66 2.21 1.00 2.21 SH-13

67 2.87 1.00 2.87 SH-11

68 2.22 1.00 2.22 SH-10

69 1.92 1.00 1.92 SH-16

70 2.19 1.00 2.19 SH-8'

71 2.69 1.00 2.69 SH-9'

72 39.16 1.00 39.16 50.47 TERRAZA PISO


PISO DE
DE
GRANITO
GRANITO
73 3.43 1.00 3.43 TERRAZA LAVADO
LAVADO

74 3.43 1.00 3.43 TERRAZA

75 4.45 1.00 4.45 TERRAZA

3ER AL 7MO NIVEL


PAO AREA N VECES AREA PARC AREA TOT AREA TOT OBSERV

76 11.42 5.00 57.10 544.15 1,576.60 DORMITORIO-2 PISO


PISO DE
DE
ALFOMBRA
ALFOMBRA DEDE 77
77 14.05 5.00 70.25 DORMITORIO-1
88 MM
MM ++
GFIELTRO
GFIELTRO
NACIONAL.
NACIONAL.

DONDE
DONDE SE
SE
COLOCARA
COLOCARA
CONTRAPISO
CONTRAPISO
PISO
PISO DE
DE
ALFOMBRA
ALFOMBRA DEDE 77

88 MM
MM ++
78 10.75 5.00 53.75 ESCRITORIO GFIELTRO
GFIELTRO
NACIONAL.
NACIONAL.
79 10.67 5.00 53.35 ESCRITORIO

80 14.05 5.00 70.25 DORMITORIO-1


DONDE
DONDE SE
SE
81 10.60 5.00 53.00 ESCRITORIO COLOCARA
COLOCARA
CONTRAPISO
CONTRAPISO
82 13.93 5.00 69.65 DORMITORIO-1

83 12.00 5.00 60.00 DORMITORIO-2

84 11.36 5.00 56.80 DORMITORIO-2

85 4.95 5.00 24.75 325.50 PATIO PISO


PISO CERAMICO
CERAMICO
CELIMA
CELIMA 30x30
30x30
86 2.00 5.00 10.00 SH-15
O
O SIMILAR
SIMILAR
87 10.47 5.00 52.35 COCINA-1

88 9.75 5.00 48.75 COCINA-3

89 5.21 5.00 26.05 PATIO

90 2.19 5.00 10.95 SH-12

91 6.94 5.00 34.70 PATIO

92 6.31 5.00 31.55 COCINA-2

93 1.91 5.00 9.55 SH-7

94 5.18 5.00 25.90 DORM-SERV PISO


PISO VINILICO
VINILICO
DE
DE 1.6MM
1.6MM
95 4.79 5.00 23.95 DORM-SERV

96 5.40 5.00 27.00 DORM-SERV

97 36.69 5.00 183.45 544.35 ESTAR-COMEDR PISO


PISO LAMINADO
LAMINADO
DE
DE MADERA
MADERA
98 36.26 5.00 181.30 ESTAR-COMEDR

99 35.92 5.00 179.60 ESTAR-COMEDR

100 2.71 5.00 13.55 106.05 SH-9' PISO


PISO CERAMICO
CERAMICO
101 2.19 5.00 10.95 SH-8' CELIMA
CELIMA 30x30
30x30
O
O SIMILAR
SIMILAR
102 2.21 5.00 11.05 SH-14

103 2.21 5.00 11.05 SH-13

104 2.87 5.00 14.35 SH-11

105 2.22 5.00 11.10 SH-10

106 1.92 5.00 9.60 SH-16

107 2.19 5.00 10.95 SH-8'

108 2.69 5.00 13.45 SH-9'

109 3.43 5.00 17.15 56.55 TERRAZA PISO


PISO DE
DE
GRANITO
GRANITO
110 3.43 5.00 17.15 TERRAZA LAVADO
LAVADO

111 4.45 5.00 22.25 TERRAZA

RESUMEN DE METRADO CONTRAPISO


Sole: Sole:
METRADO SIN CONSIDERAR METRADO CONSIDERANDO
JARDINES COMO AREA , JARDINES COMO AREA ,
AREA TOTAL VERIFICAR ESPEC-TEC
TOTAL VERIFICAR ESPEC-TEC
Zotano 0.00 2,354.94
1er Nivel 423.86 610.08
2do Nivel 354.48 354.48
3er al 7mo Nivel 1,576.60 1,576.60
Cto Maquinas 0.00
RESULTADO 2,541.16

TARRAJEO DE FONDO DE ESCALERA


1ER NIVEL
Longitud Ancho Area Parc AREA TOT Tramos OBSERV
1 nivel
5.24 1.20 6.29 21.61 1 Tramo ESC-1
2.85 1.20 3.42 2 Tramo ESC-1
2.44 1.20 2.93 1 Tramo ESC-2
1.20 2.60 3.12 Descanso ESC-2
2.44 1.20 2.93 3 Tramo ESC-2
2.44 1.20 2.93 1 Tramo ESC-2
1.20 2.60 3.12 Descanso ESC-2
2.44 1.20 2.93 3 Tramo ESC-2

2do al 7mo NIVEL


Longitud Ancho Area Parc SubTotal Total Tramos OBSERV
2 nivel 2 -7 nivel
2.44 1.20 2.93 15.02 90.14 1 Tramo ESC-2
1.20 2.60 3.12 Descanso ESC-2
2.44 1.20 2.93 3 Tramo ESC-2
2.44 1.20 2.93 1 Tramo ESC-2
1.20 2.60 3.12 Descanso ESC-2
2.44 1.20 2.93 3 Tramo ESC-2

Escalera de Cuarto de Maquinas


Longitud Ancho Area Parc SubTotal Tramos OBSERV

1.92 0.53 1.02 2.99 1 Tramo cto de maquinas


0.90 0.53 0.48 Descanso bloque 1
1.92 0.53 1.02 1 Tramo cto de maquinas
0.90 0.53 0.48 Descanso bloque 2

RESUMEN DE METRADO TARRAJEO DE FONDO DE ESCALERA

AREA TOTAL
Zotano 9.71 114.75
1er Nivel 11.90
2do-7mo Nivel 90.14
Cto Maquinas 2.99

TARRAJEO DE PASOS Y CONTRAPASOS CEMENTO PULIDO


Sotano y 1er Nivel
Longitud Ancho NPasos Area Parc AREA TOT Tramos OBSERV
1 nivel
1.20 0.25 14.00 4.20 30.66 pasos ESC-2
1.20 0.18 17.00 3.57 contrapaso ESC-2
1.30 1.20 1.00 1.56 descanso ESC-2
1.30 1.20 1.00 1.56 descanso ESC-2

1.20 0.25 14.00 4.20 pasos ESC-2


1.20 0.18 17.00 3.57 contrapaso ESC-2
1.30 1.20 1.00 1.56 descanso ESC-2
1.30 1.20 1.00 1.56 descanso ESC-2

1.20 0.25 17.00 5.10 pasos ESC-1


1.20 0.18 18.00 3.78 contrapaso ESC-1

2do y 7mo Nivel


Longitud Ancho NPasos Area Parc AREA TOT Tramos OBSERV
2Nivel
1.20 0.25 14.00 4.20 21.78 pasos ESC-2
1.20 0.18 17.00 3.57 contrapaso ESC-2
1.30 1.20 1.00 1.56 descanso ESC-2
1.30 1.20 1.00 1.56 descanso ESC-2

1.20 0.25 14.00 4.20 pasos ESC-2


1.20 0.18 17.00 3.57 contrapaso ESC-2
1.30 1.20 1.00 1.56 descanso ESC-2
1.30 1.20 1.00 1.56 descanso ESC-2

Cto De Maquinas
Longitud Ancho NPasos Area Parc AREA TOT Tramos OBSERV
Azotea
0.90 0.25 8.00 1.80 8.50 pasos cto de maquinas
0.90 0.18 9.00 1.46 contrapaso bloque 1
0.90 1.10 1.00 0.99 descanso
0.90 0.25 8.00 1.80 pasos cto de maquinas
0.90 0.18 9.00 1.46 contrapaso bloque 2
0.90 1.10 1.00 0.99 descanso

RESUMEN DE METRADO TARRAJEO DE PASOS Y CONTRAPASOS

AREA TOTAL
169.84
Sotano y 1er Nivel 30.66
2do-7mo Nivel 130.68
Cto Maquinas 8.50

TARRAJEO DE CON INPERMEABILIZANTE EN JARDINERAS


1ER NIVEL
Longitud Altura Area Parc AREA TOT OBSERV
1 nivel
1.84 1.35 2.48 63.15 int-jardin
0.95 1.35 1.28 int-jardin
1.81 1.35 2.44 int-jardin
0.84 1.35 1.13 int-jardin
2 nivel
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
3.15 0.35 1.10 fachada
0.35 0.35 0.12 fachada
3.15 0.35 1.10 fachada
0.35 0.35 0.12 fachada
1.60 0.35 0.56 dorm -2
0.45 0.35 0.16 dorm -2
1.60 0.35 0.56 dorm -2
0.45 0.35 0.16 dorm -2
1.15 0.35 0.40 patio
1.15 0.35 0.40 patio
1.08 0.35 0.38 patio
1.05 0.35 0.37 patio
10.23 0.95 9.72 x terraza
8.98 0.95 8.53 x terraza
1.25 0.95 1.19 x terraza
4.10 0.95 3.90 x terraza
3.41 0.95 3.24 x terraza
3 nivel
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
4 nivel
3.15 0.35 1.10 fachada
0.35 0.35 0.12 fachada
3.15 0.35 1.10 fachada
0.35 0.35 0.12 fachada
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
5 nivel
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
6 nivel
3.15 0.35 1.10 fachada
0.35 0.35 0.12 fachada
3.15 0.35 1.10 fachada
0.35 0.35 0.12 fachada
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
7 nivel
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
2.65 0.35 0.93 fachada
0.35 0.35 0.12 fachada
Atencion ing Ervin
de Olarte AQU
ESTAN los
metrados de las
partidas de
albaileria.

Espero que puedas


entenderlo, ya que
puse detalles en
observaciones para
su entendimiento y
revicion de la
misma..

Atte Un amigo:
WAST

Bueno comouun
dia dijistes, aqui
estoy
preparandome
para cuando nos
llegue el momento
de GOBERNAR
ESTE PAIS...

Aqui sigo con el


grupo que funde en
la universidad
aunque esta mejor
ordenanda meda
ORGULLO que mis
compaeros no lo
hayan abandonado
el tiempo de mi
estancia por Lima
cto basu 1.33 dep-7
cto basu 1.85 dep-8
dep 10 1.70 dep-9
dep 11
dep 12 1.61 dep-7
dep 6 1.35 dep-8
dep 12 3.55 dep-9
dep 10
tableros
tableros

tableros
cto basu
cto basu
s-h
dep-10
dep-11
dep 6
dep 12
dep 6
cto basu
Sole:
METRADO DE DERRAMES SIN
CONSIDERAR LOS DERRAMES EN
VANOS DE FACHADA
Sole:
METRADO DE DERRAMES SIN
CONSIDERAR LOS DERRAMES EN
VANOS DE FACHADA
Willy:
No se ha considerado en el
metrado las columnas y placas
empotradas en muros, ya q estas
son metradas en muros
Sole:
METRADO CONSIDERANDO
JARDINES COMO AREA ,
VERIFICAR ESPEC-TEC
2 10 20 7 140 420