Está en la página 1de 46

MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
01.00.00 OBRAS PROVISIONALES
01.01.00 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS 1.00 GBL
- - - - 1.00
01.02.00 OFICINA, ALMACEN Y CASETA DE GUARDIANIA 1.00 GBL
- - - - 1.00
01.03.00 GIGANTOGRAFIA DE 3.60X4.80 1.00 UND
- - - - 1.00
01.04.00 POZO ALM. AGUA PARA LA CONSTRUCCION 1.00 GBL
- - - - 1.00
01.05.00 CERCO PERIMETRICO DE ESTERAS 189.05 M
- - - - 189.05

02.00.00 OBRAS PRELIMINARES

02.01.00 LIMPIEZA DE TERRENO MANUAL 2,057.63 M2


AREA TOTAL SEGN CAD: 1.00 AREA 1 2,057.63 - 2057.63

02.02.00 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR 2,057.63 M2


AREA TOTAL SEGN CAD: 1.00 AREA 1 2,057.63 - 2057.63

02.03.00 DEMOLICIN DE ESTRUCTURA EXISTENTE 1.00 GLB


1.00 1.00 - - 1.00

03.00.00 MOVIMIENTO DE TIERRAS

03.01.00 EXCAVACION DE ZANJAS PARA CIMIENTO MATERIAL SUELTO HASTA H=1.50M 477.96 M3

MODULO A: EXCAVACIN DE CIMIENTOS


EJE: A-A: TRAMOS: 1-2 1.00 3.35 0.60 1.50 3.02
EJE: A-A: TRAMOS: 2-3 1.00 2.08 0.60 1.50 1.87
EJE: B-B: TRAMOS: 1-2 1.00 3.35 0.60 1.50 3.02
EJE: C-C: TRAMOS: 1-2 1.00 3.35 0.60 1.50 3.02
EJE: D-D: TRAMOS: 1-2 1.00 3.35 0.60 1.50 3.02
EJE: D-D: TRAMOS: 2-3 1.00 2.08 0.60 1.50 1.87
EJE: 1-1: TRAMOS: A-B 1.00 2.98 0.60 1.50 2.68
EJE: 1-1: TRAMOS: B-C 1.00 3.37 0.60 1.50 3.03
EJE: 1-1: TRAMOS: C-D 1.00 1.18 0.60 1.50 1.06
EJE: 2-2: TRAMOS: A-B 1.00 2.98 0.60 1.50 2.68
EJE: 2-2: TRAMOS: B-C 1.00 3.37 0.60 1.50 3.03
EJE: 2-2: TRAMOS: C-D 1.00 1.18 0.60 1.50 1.06
EJE: 3-3: TRAMOS: A-B 1.00 2.98 0.60 1.50 2.68
EJE: 3-3: TRAMOS: B-C 1.00 3.37 0.60 1.50 3.03
EJE: 3-3: TRAMOS: C-D 1.00 1.18 0.60 1.50 1.06
ENTRE EJES: 1-2, A-B 1.00 0.28 0.60 1.50 0.25
ENTRE EJES: 1-2, A-B 1.00 1.93 0.60 1.50 1.74
ENTRE EJES: 1-2, A-B 1.00 0.37 0.60 1.50 0.33
ENTRE EJES: 2-3, B-C 1.00 0.37 0.60 1.50 0.33
ENTRE EJES: 2-3, B-C 1.00 2.02 0.60 1.50 1.82
MODULO B: EXCAVACIN DE CIMIENTOS
EJE: A-A, TRAMOS: 3-4 1.00 2.25 0.60 1.50 2.03
EJE: A-A, TRAMOS: 4-5 1.00 2.75 0.60 1.50 2.48
EJE: A-A, TRAMOS: 5-6 1.00 3.75 0.60 1.50 3.38
EJE: B-B, TRAMOS: 1-2 1.00 3.75 0.60 1.50 3.38
EJE: B-B, TRAMOS: 3-4 1.00 2.25 0.60 1.50 2.03
EJE: B-B, TRAMOS: 4-5 1.00 2.75 0.60 1.50 2.48
EJE: C-C, TRAMOS: 1-2 1.00 3.75 0.60 1.50 3.38
EJE: C-C, TRAMOS: 3-4 1.00 2.57 0.60 1.50 2.31
EJE: C-C, TRAMOS: 4-5 1.00 2.75 0.60 1.50 2.48
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: C-C, TRAMOS: 5-6 1.00 3.75 0.60 1.50 3.38
EJE: D-D, TRAMOS: 1-2 1.00 3.75 0.60 1.50 3.38
EJE: E-E, TRAMOS: 1-2 1.00 3.75 0.60 1.50 3.38
EJE: 1-1, TRAMOS: B-C 1.00 4.78 0.60 1.50 4.30
EJE: 1-1, TRAMOS: C-D 1.00 2.75 0.60 1.50 2.48
EJE: 2-2, TRAMOS: B-C 1.00 4.78 0.60 1.50 4.30
EJE: 2-2, TRAMOS: C-D 1.00 2.75 0.60 1.50 2.48
EJE: 3-3, TRAMOS: A-B 1.00 3.95 0.60 1.50 3.56
EJE: 3-3, TRAMOS: B-C 1.00 3.10 0.60 1.50 2.79
EJE: 3-3, TRAMOS: C-D 1.00 2.75 0.60 1.50 2.48
EJE: 3-3, TRAMOS: D-E 1.00 1.87 0.60 1.50 1.68
EJE: 4-4, TRAMOS: A-B 1.00 2.40 0.60 1.50 2.16
EJE: 4-4, TRAMOS: B-C 1.00 2.40 0.60 1.50 2.16
EJE: 5-5, TRAMOS: A-B 1.00 3.95 0.60 1.50 3.56
EJE: 5-5, TRAMOS: B-C 1.00 5.10 0.60 1.50 4.59
EJE: 6-6, TRAMOS: A-B 1.00 3.95 0.60 1.50 3.56
EJE: 6-6, TRAMOS: B-C 1.00 5.10 0.60 1.50 4.59
ENTRE EJES: 5-6 y A-B 1.00 4.35 0.60 1.50 3.92
ENTRE EJES: 5-6 y B-C 1.00 4.35 0.60 1.50 3.92
ENTRE EJES: 5-6 y B-C 1.00 1.28 0.60 1.50 1.15
ENTRE EJES: 5-6 y B-C 1.00 2.10 0.60 1.50 1.89
ENTRE EJES: 5-6 y B-C 1.00 1.15 0.60 1.50 1.04
ENTRE EJES: 4-5 y A-B 1.00 3.15 0.60 1.50 2.84
ENTRE EJES: 4-5 y A-B 1.00 1.85 0.60 1.50 1.67
ENTRE EJES: 4-5 y A-B 1.00 0.60 0.60 1.50 0.54
ENTRE EJES: 4-5 y A-B 1.00 1.08 0.60 1.50 0.97
ENTRE EJES: 4-5 y B-C 1.00 2.95 0.60 1.50 2.66
ENTRE EJES: 3-4 y B-C 1.00 3.17 0.60 1.50 2.85
ENTRE EJES: 3-4 y B-C 1.00 1.25 0.60 1.50 1.13
ENTRE EJES: 1-2 y B-C 1.00 1.35 0.60 1.50 1.22
ENTRE EJES: 1-2 y B-C 1.00 0.52 0.60 1.50 0.47
ENTRE EJES: 1-2 y B-C 1.00 1.07 0.60 1.50 0.96
ENTRE EJES: 1-2 y B-C 1.00 1.20 0.60 1.50 1.08
ENTRE EJES: 1-2 y B-C 1.00 1.85 0.60 1.50 1.67
ENTRE EJES: 1-2 y B-C 1.00 4.15 0.60 1.50 3.74
ENTRE EJES: 1-2 y B-C 1.00 1.35 0.60 1.50 1.22
ENTRE EJES: 1-2 y D-E 1.00 0.40 0.60 1.50 0.36
ENTRE EJES: 1-2 y D-E 1.00 0.17 0.60 1.50 0.15
MODULO C: EXCAVACIN DE CIMIENTOS
EJE: A-A, TRAMOS: 7-8 1.00 2.55 0.60 1.50 2.30
EJE: B-B, TRAMOS: 7-8 1.00 2.55 0.60 1.50 2.30
EJE: C-C, TRAMOS: 7-8 1.00 2.55 0.60 1.50 2.30
EJE: D-D, TRAMOS: 7-8 1.00 2.55 0.60 1.50 2.30
EJE: E'-E', TRAMOS: 7-8 1.00 2.55 0.60 1.50 2.30
EJE: G'-G', TRAMOS: 7-8 1.00 2.55 0.60 1.50 2.30
EJE: 8-8, TRAMOS: A-B 1.00 3.90 0.60 1.50 3.51
EJE: 8-8, TRAMOS: B-C 1.00 4.97 0.60 1.50 4.47
EJE: 8-8, TRAMOS: C-D 1.00 2.87 0.60 1.50 2.58
EJE: 8-8, TRAMOS: D-E' 1.00 2.43 0.60 1.50 2.19
EJE: 8-8, TRAMOS: E'-F 1.00 2.23 0.60 1.50 2.01
EJE: 8-8, TRAMOS: F-G' 1.00 4.10 0.60 1.50 3.69
EJE: 7-7, TRAMOS: A-B 1.00 3.90 0.60 1.50 3.51
EJE: 7-7, TRAMOS: B-C 1.00 4.97 0.60 1.50 4.47
EJE: 7-7, TRAMOS: C-D 1.00 2.87 0.60 1.50 2.58
EJE: 7-7, TRAMOS: D-E' 1.00 2.43 0.60 1.50 2.19
EJE: 7-7, TRAMOS: E'-F 1.00 2.23 0.60 1.50 2.01
EJE: 7-7, TRAMOS: F-G' 1.00 4.10 0.60 1.50 3.69
ENTRE EJES: A-B y 7-8 1.00 3.15 0.60 1.50 2.84
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
ENTRE EJES: B-C y 7-8 1.00 2.48 0.60 1.50 2.23
ENTRE EJES: B-C y 7-8 1.00 1.45 0.60 1.50 1.31
ENTRE EJES: C-D y 7-8 1.00 2.70 0.60 1.50 2.43
ENTRE EJES: C-D y 7-8 1.00 1.42 0.60 1.50 1.28
EJE: E'-E', TRAMOS: 3-4 1.00 2.95 0.60 1.50 2.66
EJE: E'-E', TRAMOS: 4-5 1.00 2.75 0.60 1.50 2.48
EJE: E'-E', TRAMOS: 5-6 1.00 2.75 0.60 1.50 2.48
EJE: E'-E', TRAMOS: 6-7 1.00 3.05 0.60 1.50 2.75
EJE: F-F, TRAMNOS:3-4 1.00 2.95 0.60 1.50 2.66
EJE: F-F, TRAMNOS:5-6 1.00 2.75 0.60 1.50 2.48
EJE: G-G, TRAMNOS:3-4 1.00 2.95 0.60 1.50 2.66
EJE: G'-G', TRAMNOS:5-6 1.00 2.75 0.60 1.50 2.48
EJE: G'-G', TRAMNOS: 6-7 1.00 3.05 0.60 1.50 2.75
ENTRE EJES: E'-F-G' y 6-7 1.00 4.50 0.60 1.50 4.05
ENTRE EJES: E'-F-G' y 6-7 1.00 1.43 0.60 1.50 1.29
ENTRE EJES: E'-F-G' y 6-7 1.00 1.95 0.60 1.50 1.76
ENTRE EJES: E'-F-G' y 6-7 1.00 0.82 0.60 1.50 0.74
ENTRE EJES: E'-F-G' y 6-7 1.00 0.38 0.60 1.50 0.34
ENTRE EJES: E'-F-G' y 6-7 1.00 1.40 0.60 1.50 1.26
ENTRE EJES: E'-F-G' y 6-7 1.00 0.75 0.60 1.50 0.68
ENTRE EJES: E'-F-G' y 5-6 1.00 2.47 0.60 1.50 2.22
ENTRE EJES: E'-F-G' y 4-5 1.00 3.15 0.60 1.50 2.84
ENTRE EJES: E'-F-G' y 4-5 1.00 1.12 0.60 1.50 1.01
ENTRE EJES: E'-F-G' y 3-4 1.00 1.20 0.60 1.50 1.08
ENTRE EJES: E'-F-G' y 3-4 1.00 0.07 0.60 1.50 0.06
EJE: 1-1, TRAMOS: E-F 1.00 3.25 0.60 1.50 2.93
EJE: 1-1, TRAMOS: F-G 1.00 2.75 0.60 1.50 2.48
EJE: 1-1, TRAMOS: G-H 1.00 2.75 0.60 1.50 2.48
EJE: 1-1, TRAMOS: H-I 1.00 2.43 0.60 1.50 2.19
EJE: 2-2, TRAMOS: E-F 1.00 3.25 0.60 1.50 2.93
EJE: 2-2, TRAMOS: F-G 1.00 2.75 0.60 1.50 2.48
EJE: 2-2, TRAMOS: G-H 1.00 2.75 0.60 1.50 2.48
EJE: 2-2, TRAMOS: H-I 1.00 2.43 0.60 1.50 2.19
EJE: 3-3, TRAMOS: E-F 1.00 3.25 0.60 1.50 2.93
EJE: 3-3, TRAMOS: F-G 1.00 2.75 0.60 1.50 2.48
EJE: 3-3, TRAMOS: G-H 1.00 2.75 0.60 1.50 2.48
EJE: 3-3, TRAMOS: H-I 1.00 2.43 0.60 1.50 2.19
EJE: E-E, TRAMOS: 1-2 1.00 3.75 0.60 1.50 3.38
EJE: E-E, TRAMOS: 2-3 1.00 2.90 0.60 1.50 2.61
EJE: F-F, TRAMOS: 1-2 1.00 3.75 0.60 1.50 3.38
EJE: G-G, TRAMOS: 1-2 1.00 3.75 0.60 1.50 3.38
EJE: H-H, TRAMOS: 1-2 1.00 3.75 0.60 1.50 3.38
EJE: I-I, TRAMOS: 1-2 1.00 3.75 0.60 1.50 3.38
EJE: I-I, TRAMOS: 2-3 1.00 2.90 0.60 1.50 2.61
ENTRE EJES: F-G, y EJES: 2-3 1.00 0.27 0.60 1.50 0.24
MODULO D: EXCAVACIN DE CIMIENTOS
EJE: A-A, TRAMOS: 1-2 1.00 2.55 0.60 1.50 2.30
EJE: B-B, TRAMOS: 1-2 1.00 2.59 0.60 1.50 2.33
EJE: 1-1, TRAMOS: A-B 1.00 2.10 0.60 1.50 1.89
EJE: 2-2, TRAMOS: A-B 1.00 2.26 0.60 1.50 2.03
ENTRE EJES: A-B, y 1-2 1.00 2.75 0.60 1.50 2.48
ENTRE EJES: A-B, y 1-2 1.00 0.41 0.60 1.50 0.37
MODULO E: EXCAVACIN DE CIMIENTOS
EJE: A-A, TRAMOS: 1-2 1.00 2.04 0.60 1.50 1.84
EJE: B-B, TRAMOS: 1-2 1.00 2.00 0.60 1.50 1.80
EJE: C-C, TRAMOS: 1-2 1.00 1.96 0.60 1.50 1.76
EJE: D-D, TRAMOS: 1-2 1.00 1.92 0.60 1.50 1.73
EJE: 1-1, TRAMOS: A-B 1.00 1.28 0.60 1.50 1.15
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: 1-1, TRAMOS: B-C 1.00 2.60 0.60 1.50 2.34
EJE: 1-1, TRAMOS: C-D 1.00 1.33 0.60 1.50 1.20
EJE: 2-2, TRAMOS: A-B 1.00 1.28 0.60 1.50 1.15
EJE: 2-2, TRAMOS: B-C 1.00 2.60 0.60 1.50 2.34
EJE: 2-2, TRAMOS: C-D 1.00 1.33 0.60 1.50 1.20
ENTRE EJES: 1-2 y B-C 1.00 1.90 0.60 1.50 1.71
ENTRE EJES: 1-2 y B-C 1.00 0.27 0.60 1.50 0.24
EXCAVACION DE ZAPATAS:
EXCAVACIN ZAPATA N: 1 70.00 1.00 1.00 1.50 105.00
EXCAVACIN ZAPATA N: 2 12.00 0.90 0.90 1.50 14.58
EXCAVACIN ZAPATA N: 3 1.00 2.35 1.00 1.50 3.53
EXCAVACIN ZAPATA N: 4 1.00 2.00 1.00 1.50 3.00
EXCAVACIN ZAPATA N: 1 / DEL PORTICO EXTERIOR 5.00 1.00 1.00 1.50 7.50
EXCAVACIN CIMIENTOS CASETA:
CIMIENTOS DE CASETA 2.00 2.53 0.60 1.50 4.55
CIMIENTOS DE CASETA 2.00 0.55 0.60 1.50 0.99
CIMIENTOS DE CASETA 1.00 0.33 0.60 1.50 0.30

03.02.00 EXCAVACION MASIVA CISTERNA 19.50 M3

AREA CISTERNA DE 10M3 1.00 3.90 2.50 2.00 19.50

03.03.00 RELLENO MANUAL (MATERIAL PROPIO) PISON DE MANO 201.00 M3


MODULO A: RELLENOS CON MATERIAL PROPIO
EJE: A-A: TRAMOS: 1-2 2.00 3.35 0.225 0.80 1.21
EJE: A-A: TRAMOS: 2-3 2.00 2.08 0.225 0.80 0.75
EJE: B-B: TRAMOS: 1-2 2.00 3.35 0.225 0.80 1.21
EJE: C-C: TRAMOS: 1-2 2.00 3.35 0.225 0.80 1.21
EJE: D-D: TRAMOS: 1-2 1.00 3.35 0.450 0.80 1.21
EJE: D-D: TRAMOS: 2-3 1.00 2.08 0.450 0.80 0.75
EJE: 1-1: TRAMOS: A-B 2.00 2.98 0.225 0.80 1.07
EJE: 1-1: TRAMOS: B-C 2.00 3.37 0.225 0.80 1.21
EJE: 1-1: TRAMOS: C-D 2.00 1.18 0.225 0.80 0.42
EJE: 2-2: TRAMOS: A-B 2.00 2.98 0.225 0.80 1.07
EJE: 2-2: TRAMOS: B-C 2.00 3.37 0.225 0.80 1.21
EJE: 2-2: TRAMOS: C-D 2.00 1.18 0.225 0.80 0.42
EJE: 3-3: TRAMOS: A-B 1.00 2.98 0.450 0.80 1.07
EJE: 3-3: TRAMOS: B-C 1.00 3.37 0.450 0.80 1.21
EJE: 3-3: TRAMOS: C-D 1.00 1.18 0.450 0.80 0.42
ENTRE EJES: 1-2, A-B 2.00 0.28 0.225 0.80 0.10
ENTRE EJES: 1-2, A-B 2.00 1.93 0.225 0.80 0.69
ENTRE EJES: 1-2, A-B 2.00 0.37 0.225 0.80 0.13
ENTRE EJES: 2-3, B-C 2.00 0.37 0.225 0.80 0.13
ENTRE EJES: 2-3, B-C 2.00 2.02 0.225 0.80 0.73
MODULO B: RELLENOS CON MATERIAL PROPIO
EJE: A-A, TRAMOS: 3-4 2.00 2.25 0.225 0.80 0.81
EJE: A-A, TRAMOS: 4-5 2.00 2.75 0.225 0.80 0.99
EJE: A-A, TRAMOS: 5-6 2.00 3.75 0.225 0.80 1.35
EJE: B-B, TRAMOS: 1-2 1.00 3.75 0.450 0.80 1.35
EJE: B-B, TRAMOS: 3-4 2.00 2.25 0.225 0.80 0.81
EJE: B-B, TRAMOS: 4-5 2.00 2.75 0.225 0.80 0.99
EJE: C-C, TRAMOS: 1-2 2.00 3.75 0.225 0.80 1.35
EJE: C-C, TRAMOS: 3-4 2.00 2.57 0.225 0.80 0.93
EJE: C-C, TRAMOS: 4-5 2.00 2.75 0.225 0.80 0.99
EJE: C-C, TRAMOS: 5-6 2.00 3.75 0.225 0.80 1.35
EJE: D-D, TRAMOS: 1-2 2.00 3.75 0.225 0.80 1.35
EJE: E-E, TRAMOS: 1-2 1.00 3.75 0.450 0.80 1.35
EJE: 1-1, TRAMOS: B-C 2.00 4.78 0.225 0.80 1.72
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: 1-1, TRAMOS: C-D 2.00 2.75 0.225 0.80 0.99
EJE: 2-2, TRAMOS: B-C 2.00 4.78 0.225 0.80 1.72
EJE: 2-2, TRAMOS: C-D 2.00 2.75 0.225 0.80 0.99
EJE: 3-3, TRAMOS: A-B 1.00 3.95 0.450 0.80 1.42
EJE: 3-3, TRAMOS: B-C 2.00 3.10 0.225 0.80 1.12
EJE: 3-3, TRAMOS: C-D 2.00 2.75 0.225 0.80 0.99
EJE: 3-3, TRAMOS: D-E 2.00 1.87 0.225 0.80 0.67
EJE: 4-4, TRAMOS: A-B 2.00 2.40 0.225 0.80 0.86
EJE: 4-4, TRAMOS: B-C 2.00 2.40 0.225 0.80 0.86
EJE: 5-5, TRAMOS: A-B 2.00 3.95 0.225 0.80 1.42
EJE: 5-5, TRAMOS: B-C 2.00 5.10 0.225 0.80 1.84
EJE: 6-6, TRAMOS: A-B 2.00 3.95 0.225 0.80 1.42
EJE: 6-6, TRAMOS: B-C 2.00 5.10 0.225 0.80 1.84
ENTRE EJES: 5-6 y A-B 2.00 4.35 0.225 0.80 1.57
ENTRE EJES: 5-6 y B-C 2.00 4.35 0.225 0.80 1.57
ENTRE EJES: 5-6 y B-C 2.00 1.28 0.225 0.80 0.46
ENTRE EJES: 5-6 y B-C 2.00 2.10 0.225 0.80 0.76
ENTRE EJES: 5-6 y B-C 2.00 1.15 0.225 0.80 0.41
ENTRE EJES: 4-5 y A-B 2.00 3.15 0.225 0.80 1.13
ENTRE EJES: 4-5 y A-B 2.00 1.85 0.225 0.80 0.67
ENTRE EJES: 4-5 y A-B 2.00 0.60 0.225 0.80 0.22
ENTRE EJES: 4-5 y A-B 2.00 1.08 0.225 0.80 0.39
ENTRE EJES: 4-5 y B-C 2.00 2.95 0.225 0.80 1.06
ENTRE EJES: 3-4 y B-C 2.00 3.17 0.225 0.80 1.14
ENTRE EJES: 3-4 y B-C 2.00 1.25 0.225 0.80 0.45
ENTRE EJES: 1-2 y B-C 2.00 1.35 0.225 0.80 0.49
ENTRE EJES: 1-2 y B-C 2.00 0.52 0.225 0.80 0.19
ENTRE EJES: 1-2 y B-C 2.00 1.07 0.225 0.80 0.39
ENTRE EJES: 1-2 y B-C 2.00 1.20 0.225 0.80 0.43
ENTRE EJES: 1-2 y B-C 2.00 1.85 0.225 0.80 0.67
ENTRE EJES: 1-2 y B-C 2.00 4.15 0.225 0.80 1.49
ENTRE EJES: 1-2 y B-C 2.00 1.35 0.225 0.80 0.49
ENTRE EJES: 1-2 y D-E 2.00 0.40 0.225 0.80 0.14
ENTRE EJES: 1-2 y D-E 2.00 0.17 0.225 0.80 0.06
MODULO C:RELLENOS CON MATERIAL PROPIO
EJE: A-A, TRAMOS: 7-8 2.00 2.55 0.225 0.80 0.92
EJE: B-B, TRAMOS: 7-8 2.00 2.55 0.225 0.80 0.92
EJE: C-C, TRAMOS: 7-8 1.00 2.55 0.450 0.80 0.92
EJE: D-D, TRAMOS: 7-8 2.00 2.55 0.225 0.80 0.92
EJE: E'-E', TRAMOS: 7-8 2.00 2.55 0.450 0.80 1.84
EJE: G'-G', TRAMOS: 7-8 2.00 2.55 0.225 0.80 0.92
EJE: 8-8, TRAMOS: A-B 2.00 3.90 0.225 0.80 1.40
EJE: 8-8, TRAMOS: B-C 2.00 4.97 0.225 0.80 1.79
EJE: 8-8, TRAMOS: C-D 2.00 2.87 0.225 0.80 1.03
EJE: 8-8, TRAMOS: D-E' 2.00 2.43 0.225 0.80 0.87
EJE: 8-8, TRAMOS: E'-F 2.00 2.23 0.225 0.80 0.80
EJE: 8-8, TRAMOS: F-G' 2.00 4.10 0.225 0.80 1.48
EJE: 7-7, TRAMOS: A-B 2.00 3.90 0.225 0.80 1.40
EJE: 7-7, TRAMOS: B-C 2.00 4.97 0.225 0.80 1.79
EJE: 7-7, TRAMOS: C-D 2.00 2.87 0.225 0.80 1.03
EJE: 7-7, TRAMOS: D-E' 2.00 2.43 0.225 0.80 0.87
EJE: 7-7, TRAMOS: E'-F 2.00 2.23 0.225 0.80 0.80
EJE: 7-7, TRAMOS: F-G' 2.00 4.10 0.225 0.80 1.48
ENTRE EJES: A-B y 7-8 2.00 3.15 0.225 0.80 1.13
ENTRE EJES: B-C y 7-8 2.00 2.48 0.225 0.80 0.89
ENTRE EJES: B-C y 7-8 2.00 1.45 0.225 0.80 0.52
ENTRE EJES: C-D y 7-8 2.00 2.70 0.225 0.80 0.97
ENTRE EJES: C-D y 7-8 2.00 1.42 0.225 0.80 0.51
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: E'-E', TRAMOS: 3-4 1.00 2.95 0.450 0.80 1.06
EJE: E'-E', TRAMOS: 4-5 1.00 2.75 0.450 0.80 0.99
EJE: E'-E', TRAMOS: 5-6 1.00 2.75 0.450 0.80 0.99
EJE: E'-E', TRAMOS: 6-7 1.00 3.05 0.450 0.80 1.10
EJE: F-F, TRAMNOS:3-4 2.00 2.95 0.225 0.80 1.06
EJE: F-F, TRAMNOS:5-6 2.00 2.75 0.225 0.80 0.99
EJE: G-G, TRAMNOS:3-4 2.00 2.95 0.225 0.80 1.06
EJE: G'-G', TRAMNOS:5-6 2.00 2.75 0.225 0.80 0.99
EJE: G'-G', TRAMNOS: 6-7 2.00 3.05 0.225 0.80 1.10
ENTRE EJES: E'-F-G' y 6-7 2.00 4.50 0.225 0.80 1.62
ENTRE EJES: E'-F-G' y 6-7 2.00 1.43 0.225 0.80 0.51
ENTRE EJES: E'-F-G' y 6-7 2.00 1.95 0.225 0.80 0.70
ENTRE EJES: E'-F-G' y 6-7 2.00 0.82 0.225 0.80 0.30
ENTRE EJES: E'-F-G' y 6-7 2.00 0.38 0.225 0.80 0.14
ENTRE EJES: E'-F-G' y 6-7 2.00 1.40 0.225 0.80 0.50
ENTRE EJES: E'-F-G' y 6-7 2.00 0.75 0.225 0.80 0.27
ENTRE EJES: E'-F-G' y 5-6 2.00 2.47 0.225 0.80 0.89
ENTRE EJES: E'-F-G' y 4-5 2.00 3.15 0.225 0.80 1.13
ENTRE EJES: E'-F-G' y 4-5 2.00 1.12 0.225 0.80 0.40
ENTRE EJES: E'-F-G' y 3-4 2.00 1.20 0.225 0.80 0.43
ENTRE EJES: E'-F-G' y 3-4 2.00 0.07 0.225 0.80 0.03
EJE: 1-1, TRAMOS: E-F 2.00 3.25 0.225 0.80 1.17
EJE: 1-1, TRAMOS: F-G 2.00 2.75 0.225 0.80 0.99
EJE: 1-1, TRAMOS: G-H 2.00 2.75 0.225 0.80 0.99
EJE: 1-1, TRAMOS: H-I 2.00 2.43 0.225 0.80 0.87
EJE: 2-2, TRAMOS: E-F 2.00 3.25 0.225 0.80 1.17
EJE: 2-2, TRAMOS: F-G 2.00 2.75 0.225 0.80 0.99
EJE: 2-2, TRAMOS: G-H 2.00 2.75 0.225 0.80 0.99
EJE: 2-2, TRAMOS: H-I 2.00 2.43 0.225 0.80 0.87
EJE: 3-3, TRAMOS: E-F 2.00 3.25 0.225 0.80 1.17
EJE: 3-3, TRAMOS: F-G 2.00 2.75 0.225 0.80 0.99
EJE: 3-3, TRAMOS: G-H 2.00 2.75 0.225 0.80 0.99
EJE: 3-3, TRAMOS: H-I 2.00 2.43 0.225 0.80 0.87
EJE: E-E, TRAMOS: 1-2 1.00 3.75 0.450 0.80 1.35
EJE: E-E, TRAMOS: 2-3 1.00 2.90 0.450 0.80 1.04
EJE: F-F, TRAMOS: 1-2 2.00 3.75 0.225 0.80 1.35
EJE: G-G, TRAMOS: 1-2 2.00 3.75 0.225 0.80 1.35
EJE: H-H, TRAMOS: 1-2 2.00 3.75 0.225 0.80 1.35
EJE: I-I, TRAMOS: 1-2 1.00 3.75 0.450 0.80 1.35
EJE: I-I, TRAMOS: 2-3 1.00 2.90 0.450 0.80 1.04
ENTRE EJES: F-G, y EJES: 2-3 2.00 0.27 0.225 0.80 0.10
MODULO D: RELLENOS CON MATERIAL PROPIO
EJE: A-A, TRAMOS: 1-2 1.00 2.55 0.450 0.80 0.92
EJE: B-B, TRAMOS: 1-2 1.00 2.59 0.450 0.80 0.93
EJE: 1-1, TRAMOS: A-B 1.00 2.10 0.450 0.80 0.76
EJE: 2-2, TRAMOS: A-B 1.00 2.26 0.450 0.80 0.81
ENTRE EJES: A-B, y 1-2 2.00 2.75 0.225 0.80 0.99
ENTRE EJES: A-B, y 1-2 2.00 0.41 0.225 0.80 0.15
MODULO E: RELLENOS CON MATERIAL PROPIO
EJE: A-A, TRAMOS: 1-2 1.00 2.04 0.450 0.80 0.73
EJE: B-B, TRAMOS: 1-2 2.00 2.00 0.225 0.80 0.72
EJE: C-C, TRAMOS: 1-2 2.00 1.96 0.225 0.80 0.71
EJE: D-D, TRAMOS: 1-2 1.00 1.92 0.450 0.80 0.69
EJE: 1-1, TRAMOS: A-B 2.00 1.28 0.225 0.80 0.46
EJE: 1-1, TRAMOS: B-C 2.00 2.60 0.225 0.80 0.94
EJE: 1-1, TRAMOS: C-D 2.00 1.33 0.225 0.80 0.48
EJE: 2-2, TRAMOS: A-B 1.00 1.28 0.450 0.80 0.46
EJE: 2-2, TRAMOS: B-C 1.00 2.60 0.450 0.80 0.94
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: 2-2, TRAMOS: C-D 1.00 1.33 0.450 0.80 0.48
ENTRE EJES: 1-2 y B-C 2.00 1.90 0.225 0.80 0.68
ENTRE EJES: 1-2 y B-C 2.00 0.27 0.225 0.80 0.10
RELLENOS CON MATERIAL PROPIO DE ZAPATAS:
RELLENOS CON MATERIAL PROPIO ZAPATA N: 1 70.00 Area 0.88 0.80 49.14
RELLENOS CON MATERIAL PROPIO ZAPATA N: 2 12.00 Area 0.69 0.80 6.60
RELLENOS CON MATERIAL PROPIO ZAPATA N: 3 1.00 Area 2.11 0.80 1.68
RELLENOS CON MATERIAL PROPIO ZAPATA N: 4 1.00 Area 1.76 0.80 1.40
RELLENOS CON MATERIAL PROPIO ZAPATA N: 1 / PORTICO EXTERIOR 5.00 Area 0.88 0.80 3.51
RELLENOS CIMIENTOS CASETA:
CIMIENTOS DE CASETA 4.00 2.53 0.225 0.80 1.82
CIMIENTOS DE CASETA 4.00 0.55 0.225 0.80 0.40
CIMIENTOS DE CASETA 2.00 0.33 0.225 0.80 0.12

03.04.00 NIVELACION INTERIOR C/COMPACTADORA PARA SUBRASANTE DE PISO 1,676.49 M2


MODULO A: NIVELACIN INTERIOR
AREA 1 1.00 Area 79.60 - 79.60
MODULO B: NIVELACIN INTERIOR
AREA 1 1.00 Area 19.35 - 19.35
AREA 2 1.00 Area 15.76 - 15.76
AREA 3 1.00 Area 14.81 - 14.81
AREA 4 1.00 Area 3.91 - 3.91
AREA 5 1.00 Area 8.46 - 8.46
AREA 6 1.00 Area 45.17 - 45.17
AREA 7 1.00 Area 20.42 - 20.42
AREA 8 2.00 Area 41.75 - 83.50
AREA 9 3.00 Area 15.23 - 45.69
AREA 10 4.00 Area 18.67 - 74.68
AREA 11 5.00 Area 23.08 - 115.40
AREA 12 6.00 Area 1.40 - 8.40
MODULO C: NIVELACIN INTERIOR
AREA 1 1.00 Area 8.69 - 8.69
AREA 2 1.00 Area 8.69 - 8.69
AREA 3 1.00 Area 19.27 - 19.27
AREA 4 1.00 Area 14.13 - 14.13
AREA 5 1.00 Area 10.31 - 10.31
AREA 6 1.00 Area 17.60 - 17.60
AREA 7 1.00 Area 14.13 - 14.13
AREA 8 1.00 Area 30.36 - 30.36
AREA 9 1.00 Area 13.03 - 13.03
AREA 10 1.00 Area 9.00 - 9.00
AREA 11 1.00 Area 8.97 - 8.97
AREA 12 1.00 Area 52.32 - 52.32
AREA 13 1.00 Area 131.13 - 131.13
MODULO D: NIVELACIN INTERIOR
AREA 1 1.00 Area 10.74 - 10.74
AREA 2 1.00 Area 2.03 - 2.03
AREA 3 1.00 Area 2.00 - 2.00
MODULO E: NIVELACIN INTERIOR
AREA 1 1.00 Area 7.70 - 7.70
AREA 2 1.00 Area 10.58 - 10.58
AREA 3 1.00 Area 7.69 - 7.69
NIVELACIN DE PISOS EXTERIORES:
AREA 1 1.00 Area 228.67 - 228.67
AREA 2 1.00 Area 245.09 - 245.09
AREA 3 1.00 Area 38.78 - 38.78
AREA 4 1.00 Area 58.95 - 58.95
AREA 5 1.00 Area 19.26 - 19.26
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
AREA 6 1.00 Area 15.43 - 15.43
AREA 7 1.00 Area 9.85 - 9.85
AREA 8 1.00 Area 9.60 - 9.60
AREA 9 1.00 Area 17.49 - 17.49
AREA 10 1.00 Area 10.52 - 10.52
AREA 11 1.00 Area 16.74 - 16.74
MAS AREAS DE ADOQUINES:
4.00 1.71 2.08 - 14.23
4.00 1.60 2.08 - 13.31
4.00 0.48 2.08 - 3.99
4.00 1.60 2.08 - 13.31
4.00 1.13 2.08 - 9.40
1.00 Area 9.92 - 9.92
1.00 Area 28.43 - 28.43

03.05.00 AFIRMADO COMPACTADO EN FONDOS E=4" 1,676.49 M2


MODULO A: AFIRMADO COMPACTADO
AREA 1 1.00 Area 79.60 - 79.60
MODULO B: AFIRMADO COMPACTADO
AREA 1 1.00 Area 19.35 - 19.35
AREA 2 1.00 Area 15.76 - 15.76
AREA 3 1.00 Area 14.81 - 14.81
AREA 4 1.00 Area 3.91 - 3.91
AREA 5 1.00 Area 8.46 - 8.46
AREA 6 1.00 Area 45.17 - 45.17
AREA 7 1.00 Area 20.42 - 20.42
AREA 8 2.00 Area 41.75 - 83.50
AREA 9 3.00 Area 15.23 - 45.69
AREA 10 4.00 Area 18.67 - 74.68
AREA 11 5.00 Area 23.08 - 115.40
AREA 12 6.00 Area 1.40 - 8.40
MODULO C: AFIRMADO COMPACTADO
AREA 1 1.00 Area 8.69 - 8.69
AREA 2 1.00 Area 8.69 - 8.69
AREA 3 1.00 Area 19.27 - 19.27
AREA 4 1.00 Area 14.13 - 14.13
AREA 5 1.00 Area 10.31 - 10.31
AREA 6 1.00 Area 17.60 - 17.60
AREA 7 1.00 Area 14.13 - 14.13
AREA 8 1.00 Area 30.36 - 30.36
AREA 9 1.00 Area 13.03 - 13.03
AREA 10 1.00 Area 9.00 - 9.00
AREA 11 1.00 Area 8.97 - 8.97
AREA 12 1.00 Area 52.32 - 52.32
AREA 13 1.00 Area 131.13 - 131.13
MODULO D: AFIRMADO COMPACTADO
AREA 1 1.00 Area 10.74 - 10.74
AREA 2 1.00 Area 2.03 - 2.03
AREA 3 1.00 Area 2.00 - 2.00
MODULO E: AFIRMADO COMPACTADO
AREA 1 1.00 Area 7.70 - 7.70
AREA 2 1.00 Area 10.58 - 10.58
AREA 3 1.00 Area 7.69 - 7.69
AFIRMADO COMPACTADO DE PISOS EXTERIORES:
AREA 1 1.00 Area 228.67 - 228.67
AREA 2 1.00 Area 245.09 - 245.09
AREA 3 1.00 Area 38.78 - 38.78
AREA 4 1.00 Area 58.95 - 58.95
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
AREA 5 1.00 Area 19.26 - 19.26
AREA 6 1.00 Area 15.43 - 15.43
AREA 7 1.00 Area 9.85 - 9.85
AREA 8 1.00 Area 9.60 - 9.60
AREA 9 1.00 Area 17.49 - 17.49
AREA 10 1.00 Area 10.52 - 10.52
AREA 11 1.00 Area 16.74 - 16.74
AFIRMADO COMPACTADO MAS AREAS DE ADOQUINES:
4.00 1.71 2.08 - 14.23
4.00 1.60 2.08 - 13.31
4.00 0.48 2.08 - 3.99
4.00 1.60 2.08 - 13.31
4.00 1.13 2.08 - 9.40
1.00 Area 9.92 - 9.92
1.00 Area 28.43 - 28.43

03.06.00 ELIM. MATERIAL EXCEDENTE C/MAQ D=10 KM 332.36 M3


E= (Vol Exc.)*1.20 Esponjamiento

04.00.00 OBRAS DE CONCRETO SIMPLE

04.01.00 SOLADO CONCRETO 1:12 E=4" 98.82 M2


SOLADOS EN ZAPATAS:
SOLADOS ZAPATA N: 1 70.00 1.00 1.00 - 70.00
SOLADOS ZAPATA N: 2 12.00 0.90 0.90 - 9.72
SOLADOS ZAPATA N: 3 1.00 2.35 1.00 - 2.35
SOLADOS ZAPATA N: 4 1.00 2.00 1.00 - 2.00
SOLADOS ZAPATA N: 1 / PORTICO EXTERIOR 5.00 1.00 1.00 - 5.00
SOLADOS FONDO DE CISTERNA 1.00 3.90 2.50 - 9.75

04.02.00 CIMIENTOS CORRIDOS MEZCLA 1:8 CEM 30% P.G 160.70 M3

MODULO A: CONCRETO EN CIMIENTOS


EJE: A-A: TRAMOS: 1-2 1.00 3.35 0.60 0.70 1.41
EJE: A-A: TRAMOS: 2-3 1.00 2.08 0.60 0.70 0.87
EJE: B-B: TRAMOS: 1-2 1.00 3.35 0.60 0.70 1.41
EJE: C-C: TRAMOS: 1-2 1.00 3.35 0.60 0.70 1.41
EJE: D-D: TRAMOS: 1-2 1.00 3.35 0.60 0.70 1.41
EJE: D-D: TRAMOS: 2-3 1.00 2.08 0.60 0.70 0.87
EJE: 1-1: TRAMOS: A-B 1.00 2.98 0.60 0.70 1.25
EJE: 1-1: TRAMOS: B-C 1.00 3.37 0.60 0.70 1.42
EJE: 1-1: TRAMOS: C-D 1.00 1.18 0.60 0.70 0.50
EJE: 2-2: TRAMOS: A-B 1.00 2.98 0.60 0.70 1.25
EJE: 2-2: TRAMOS: B-C 1.00 3.37 0.60 0.70 1.42
EJE: 2-2: TRAMOS: C-D 1.00 1.18 0.60 0.70 0.50
EJE: 3-3: TRAMOS: A-B 1.00 2.98 0.60 0.70 1.25
EJE: 3-3: TRAMOS: B-C 1.00 3.37 0.60 0.70 1.42
EJE: 3-3: TRAMOS: C-D 1.00 1.18 0.60 0.70 0.50
ENTRE EJES: 1-2, A-B 1.00 0.28 0.60 0.70 0.12
ENTRE EJES: 1-2, A-B 1.00 1.93 0.60 0.70 0.81
ENTRE EJES: 1-2, A-B 1.00 0.37 0.60 0.70 0.16
ENTRE EJES: 2-3, B-C 1.00 0.37 0.60 0.70 0.16
ENTRE EJES: 2-3, B-C 1.00 2.02 0.60 0.70 0.85
MODULO B: CONCRETO EN CIMIENTOS
EJE: A-A, TRAMOS: 3-4 1.00 2.25 0.60 0.70 0.95
EJE: A-A, TRAMOS: 4-5 1.00 2.75 0.60 0.70 1.16
EJE: A-A, TRAMOS: 5-6 1.00 3.75 0.60 0.70 1.58
EJE: B-B, TRAMOS: 1-2 1.00 3.75 0.60 0.70 1.58
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: B-B, TRAMOS: 3-4 1.00 2.25 0.60 0.70 0.95
EJE: B-B, TRAMOS: 4-5 1.00 2.75 0.60 0.70 1.16
EJE: C-C, TRAMOS: 1-2 1.00 3.75 0.60 0.70 1.58
EJE: C-C, TRAMOS: 3-4 1.00 2.57 0.60 0.70 1.08
EJE: C-C, TRAMOS: 4-5 1.00 2.75 0.60 0.70 1.16
EJE: C-C, TRAMOS: 5-6 1.00 3.75 0.60 0.70 1.58
EJE: D-D, TRAMOS: 1-2 1.00 3.75 0.60 0.70 1.58
EJE: E-E, TRAMOS: 1-2 1.00 3.75 0.60 0.70 1.58
EJE: 1-1, TRAMOS: B-C 1.00 4.78 0.60 0.70 2.01
EJE: 1-1, TRAMOS: C-D 1.00 2.75 0.60 0.70 1.16
EJE: 2-2, TRAMOS: B-C 1.00 4.78 0.60 0.70 2.01
EJE: 2-2, TRAMOS: C-D 1.00 2.75 0.60 0.70 1.16
EJE: 3-3, TRAMOS: A-B 1.00 3.95 0.60 0.70 1.66
EJE: 3-3, TRAMOS: B-C 1.00 3.10 0.60 0.70 1.30
EJE: 3-3, TRAMOS: C-D 1.00 2.75 0.60 0.70 1.16
EJE: 3-3, TRAMOS: D-E 1.00 1.87 0.60 0.70 0.79
EJE: 4-4, TRAMOS: A-B 1.00 2.40 0.60 0.70 1.01
EJE: 4-4, TRAMOS: B-C 1.00 2.40 0.60 0.70 1.01
EJE: 5-5, TRAMOS: A-B 1.00 3.95 0.60 0.70 1.66
EJE: 5-5, TRAMOS: B-C 1.00 5.10 0.60 0.70 2.14
EJE: 6-6, TRAMOS: A-B 1.00 3.95 0.60 0.70 1.66
EJE: 6-6, TRAMOS: B-C 1.00 5.10 0.60 0.70 2.14
ENTRE EJES: 5-6 y A-B 1.00 4.35 0.60 0.70 1.83
ENTRE EJES: 5-6 y B-C 1.00 4.35 0.60 0.70 1.83
ENTRE EJES: 5-6 y B-C 1.00 1.28 0.60 0.70 0.54
ENTRE EJES: 5-6 y B-C 1.00 2.10 0.60 0.70 0.88
ENTRE EJES: 5-6 y B-C 1.00 1.15 0.60 0.70 0.48
ENTRE EJES: 4-5 y A-B 1.00 3.15 0.60 0.70 1.32
ENTRE EJES: 4-5 y A-B 1.00 1.85 0.60 0.70 0.78
ENTRE EJES: 4-5 y A-B 1.00 0.60 0.60 0.70 0.25
ENTRE EJES: 4-5 y A-B 1.00 1.08 0.60 0.70 0.45
ENTRE EJES: 4-5 y B-C 1.00 2.95 0.60 0.70 1.24
ENTRE EJES: 3-4 y B-C 1.00 3.17 0.60 0.70 1.33
ENTRE EJES: 3-4 y B-C 1.00 1.25 0.60 0.70 0.53
ENTRE EJES: 1-2 y B-C 1.00 1.35 0.60 0.70 0.57
ENTRE EJES: 1-2 y B-C 1.00 0.52 0.60 0.70 0.22
ENTRE EJES: 1-2 y B-C 1.00 1.07 0.60 0.70 0.45
ENTRE EJES: 1-2 y B-C 1.00 1.20 0.60 0.70 0.50
ENTRE EJES: 1-2 y B-C 1.00 1.85 0.60 0.70 0.78
ENTRE EJES: 1-2 y B-C 1.00 4.15 0.60 0.70 1.74
ENTRE EJES: 1-2 y B-C 1.00 1.35 0.60 0.70 0.57
ENTRE EJES: 1-2 y D-E 1.00 0.40 0.60 0.70 0.17
ENTRE EJES: 1-2 y D-E 1.00 0.17 0.60 0.70 0.07
MODULO C: CONCRETO EN CIMIENTOS
EJE: A-A, TRAMOS: 7-8 1.00 2.55 0.60 0.70 1.07
EJE: B-B, TRAMOS: 7-8 1.00 2.55 0.60 0.70 1.07
EJE: C-C, TRAMOS: 7-8 1.00 2.55 0.60 0.70 1.07
EJE: D-D, TRAMOS: 7-8 1.00 2.55 0.60 0.70 1.07
EJE: E'-E', TRAMOS: 7-8 1.00 2.55 0.60 0.70 1.07
EJE: G'-G', TRAMOS: 7-8 1.00 2.55 0.60 0.70 1.07
EJE: 8-8, TRAMOS: A-B 1.00 3.90 0.60 0.70 1.64
EJE: 8-8, TRAMOS: B-C 1.00 4.97 0.60 0.70 2.09
EJE: 8-8, TRAMOS: C-D 1.00 2.87 0.60 0.70 1.21
EJE: 8-8, TRAMOS: D-E' 1.00 2.43 0.60 0.70 1.02
EJE: 8-8, TRAMOS: E'-F 1.00 2.23 0.60 0.70 0.94
EJE: 8-8, TRAMOS: F-G' 1.00 4.10 0.60 0.70 1.72
EJE: 7-7, TRAMOS: A-B 1.00 3.90 0.60 0.70 1.64
EJE: 7-7, TRAMOS: B-C 1.00 4.97 0.60 0.70 2.09
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: 7-7, TRAMOS: C-D 1.00 2.87 0.60 0.70 1.21
EJE: 7-7, TRAMOS: D-E' 1.00 2.43 0.60 0.70 1.02
EJE: 7-7, TRAMOS: E'-F 1.00 2.23 0.60 0.70 0.94
EJE: 7-7, TRAMOS: F-G' 1.00 4.10 0.60 0.70 1.72
ENTRE EJES: A-B y 7-8 1.00 3.15 0.60 0.70 1.32
ENTRE EJES: B-C y 7-8 1.00 2.48 0.60 0.70 1.04
ENTRE EJES: B-C y 7-8 1.00 1.45 0.60 0.70 0.61
ENTRE EJES: C-D y 7-8 1.00 2.70 0.60 0.70 1.13
ENTRE EJES: C-D y 7-8 1.00 1.42 0.60 0.70 0.60
EJE: E'-E', TRAMOS: 3-4 1.00 2.95 0.60 0.70 1.24
EJE: E'-E', TRAMOS: 4-5 1.00 2.75 0.60 0.70 1.16
EJE: E'-E', TRAMOS: 5-6 1.00 2.75 0.60 0.70 1.16
EJE: E'-E', TRAMOS: 6-7 1.00 3.05 0.60 0.70 1.28
EJE: F-F, TRAMNOS:3-4 1.00 2.95 0.60 0.70 1.24
EJE: F-F, TRAMNOS:5-6 1.00 2.75 0.60 0.70 1.16
EJE: G-G, TRAMNOS:3-4 1.00 2.95 0.60 0.70 1.24
EJE: G'-G', TRAMNOS:5-6 1.00 2.75 0.60 0.70 1.16
EJE: G'-G', TRAMNOS: 6-7 1.00 3.05 0.60 0.70 1.28
ENTRE EJES: E'-F-G' y 6-7 1.00 4.50 0.60 0.70 1.89
ENTRE EJES: E'-F-G' y 6-7 1.00 1.43 0.60 0.70 0.60
ENTRE EJES: E'-F-G' y 6-7 1.00 1.95 0.60 0.70 0.82
ENTRE EJES: E'-F-G' y 6-7 1.00 0.82 0.60 0.70 0.34
ENTRE EJES: E'-F-G' y 6-7 1.00 0.38 0.60 0.70 0.16
ENTRE EJES: E'-F-G' y 6-7 1.00 1.40 0.60 0.70 0.59
ENTRE EJES: E'-F-G' y 6-7 1.00 0.75 0.60 0.70 0.32
ENTRE EJES: E'-F-G' y 5-6 1.00 2.47 0.60 0.70 1.04
ENTRE EJES: E'-F-G' y 4-5 1.00 3.15 0.60 0.70 1.32
ENTRE EJES: E'-F-G' y 4-5 1.00 1.12 0.60 0.70 0.47
ENTRE EJES: E'-F-G' y 3-4 1.00 1.20 0.60 0.70 0.50
ENTRE EJES: E'-F-G' y 3-4 1.00 0.07 0.60 0.70 0.03
EJE: 1-1, TRAMOS: E-F 1.00 3.25 0.60 0.70 1.37
EJE: 1-1, TRAMOS: F-G 1.00 2.75 0.60 0.70 1.16
EJE: 1-1, TRAMOS: G-H 1.00 2.75 0.60 0.70 1.16
EJE: 1-1, TRAMOS: H-I 1.00 2.43 0.60 0.70 1.02
EJE: 2-2, TRAMOS: E-F 1.00 3.25 0.60 0.70 1.37
EJE: 2-2, TRAMOS: F-G 1.00 2.75 0.60 0.70 1.16
EJE: 2-2, TRAMOS: G-H 1.00 2.75 0.60 0.70 1.16
EJE: 2-2, TRAMOS: H-I 1.00 2.43 0.60 0.70 1.02
EJE: 3-3, TRAMOS: E-F 1.00 3.25 0.60 0.70 1.37
EJE: 3-3, TRAMOS: F-G 1.00 2.75 0.60 0.70 1.16
EJE: 3-3, TRAMOS: G-H 1.00 2.75 0.60 0.70 1.16
EJE: 3-3, TRAMOS: H-I 1.00 2.43 0.60 0.70 1.02
EJE: E-E, TRAMOS: 1-2 1.00 3.75 0.60 0.70 1.58
EJE: E-E, TRAMOS: 2-3 1.00 2.90 0.60 0.70 1.22
EJE: F-F, TRAMOS: 1-2 1.00 3.75 0.60 0.70 1.58
EJE: G-G, TRAMOS: 1-2 1.00 3.75 0.60 0.70 1.58
EJE: H-H, TRAMOS: 1-2 1.00 3.75 0.60 0.70 1.58
EJE: I-I, TRAMOS: 1-2 1.00 3.75 0.60 0.70 1.58
EJE: I-I, TRAMOS: 2-3 1.00 2.90 0.60 0.70 1.22
ENTRE EJES: F-G, y EJES: 2-3 1.00 0.27 0.60 0.70 0.11
MODULO D: CONCRETO EN CIMIENTOS
EJE: A-A, TRAMOS: 1-2 1.00 2.55 0.60 0.70 1.07
EJE: B-B, TRAMOS: 1-2 1.00 2.59 0.60 0.70 1.09
EJE: 1-1, TRAMOS: A-B 1.00 2.10 0.60 0.70 0.88
EJE: 2-2, TRAMOS: A-B 1.00 2.26 0.60 0.70 0.95
ENTRE EJES: A-B, y 1-2 1.00 2.75 0.60 0.70 1.16
ENTRE EJES: A-B, y 1-2 1.00 0.41 0.60 0.70 0.17
MODULO E: CONCRETO EN CIMIENTOS
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: A-A, TRAMOS: 1-2 1.00 2.04 0.60 0.70 0.86
EJE: B-B, TRAMOS: 1-2 1.00 2.00 0.60 0.70 0.84
EJE: C-C, TRAMOS: 1-2 1.00 1.96 0.60 0.70 0.82
EJE: D-D, TRAMOS: 1-2 1.00 1.92 0.60 0.70 0.81
EJE: 1-1, TRAMOS: A-B 1.00 1.28 0.60 0.70 0.54
EJE: 1-1, TRAMOS: B-C 1.00 2.60 0.60 0.70 1.09
EJE: 1-1, TRAMOS: C-D 1.00 1.33 0.60 0.70 0.56
EJE: 2-2, TRAMOS: A-B 1.00 1.28 0.60 0.70 0.54
EJE: 2-2, TRAMOS: B-C 1.00 2.60 0.60 0.70 1.09
EJE: 2-2, TRAMOS: C-D 1.00 1.33 0.60 0.70 0.56
ENTRE EJES: 1-2 y B-C 1.00 1.90 0.60 0.70 0.80
ENTRE EJES: 1-2 y B-C 1.00 0.27 0.60 0.70 0.11
CONCRETO CIMIENTOS CASETA:
CIMIENTOS DE CASETA 2.00 2.53 0.600 0.70 2.13
CIMIENTOS DE CASETA 2.00 0.55 0.600 0.70 0.46
CIMIENTOS DE CASETA 1.00 0.33 0.600 0.70 0.14

04.03.00 FALSO PISO DE MEZCLA 1:8 e=4" 1,676.49 M2

MODULO A: FALSO PISO


AREA 1 1.00 Area 79.60 - 79.60
MODULO B: FALSO PISO
AREA 1 1.00 Area 19.35 - 19.35
AREA 2 1.00 Area 15.76 - 15.76
AREA 3 1.00 Area 14.81 - 14.81
AREA 4 1.00 Area 3.91 - 3.91
AREA 5 1.00 Area 8.46 - 8.46
AREA 6 1.00 Area 45.17 - 45.17
AREA 7 1.00 Area 20.42 - 20.42
AREA 8 2.00 Area 41.75 - 83.50
AREA 9 3.00 Area 15.23 - 45.69
AREA 10 4.00 Area 18.67 - 74.68
AREA 11 5.00 Area 23.08 - 115.40
AREA 12 6.00 Area 1.40 - 8.40
MODULO C: FALSO PISO
AREA 1 1.00 Area 8.69 - 8.69
AREA 2 1.00 Area 8.69 - 8.69
AREA 3 1.00 Area 19.27 - 19.27
AREA 4 1.00 Area 14.13 - 14.13
AREA 5 1.00 Area 10.31 - 10.31
AREA 6 1.00 Area 17.60 - 17.60
AREA 7 1.00 Area 14.13 - 14.13
AREA 8 1.00 Area 30.36 - 30.36
AREA 9 1.00 Area 13.03 - 13.03
AREA 10 1.00 Area 9.00 - 9.00
AREA 11 1.00 Area 8.97 - 8.97
AREA 12 1.00 Area 52.32 - 52.32
AREA 13 1.00 Area 131.13 - 131.13
MODULO D: FALSO PISO
AREA 1 1.00 Area 10.74 - 10.74
AREA 2 1.00 Area 2.03 - 2.03
AREA 3 1.00 Area 2.00 - 2.00
MODULO E: FALSO PISO
AREA 1 1.00 Area 7.70 - 7.70
AREA 2 1.00 Area 10.58 - 10.58
AREA 3 1.00 Area 7.69 - 7.69
FALSO PISO DE PISOS EXTERIORES:
AREA 1 1.00 Area 228.67 - 228.67
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
AREA 2 1.00 Area 245.09 - 245.09
AREA 3 1.00 Area 38.78 - 38.78
AREA 4 1.00 Area 58.95 - 58.95
AREA 5 1.00 Area 19.26 - 19.26
AREA 6 1.00 Area 15.43 - 15.43
AREA 7 1.00 Area 9.85 - 9.85
AREA 8 1.00 Area 9.60 - 9.60
AREA 9 1.00 Area 17.49 - 17.49
AREA 10 1.00 Area 10.52 - 10.52
AREA 11 1.00 Area 16.74 - 16.74
FALSO PISO MAS AREAS DE ADOQUINES:
4.00 1.71 2.08 - 14.23
4.00 1.60 2.08 - 13.31
4.00 0.48 2.08 - 3.99
4.00 1.60 2.08 - 13.31
4.00 1.13 2.08 - 9.40
1.00 Area 9.92 - 9.92
1.00 Area 28.43 - 28.43

04.04.00 CONCRETO F'C=140 KG/CM2. P/GRADA Y/O PISO SIMPLE 7.03 M3

GRADAS COSTADO DE RAMPA AL COSTADO DE CONSULTORIOS: PEDIATRIA, DENTAL, MEDICINA / 4.00 1.40 1.90 0.10 1.06
GRADAS COSTADO DE RAMPA AL COSTADO DE CONSULTORIOS: PEDIATRIA, DENTAL, MEDICINA / 24.00 1.40 0.28 0.07 0.66
GRADAS COSTADO DE ALMACENES 3.00 1.20 1.90 0.10 0.68
GRADAS COSTADO DE ALMACENES 18.00 1.20 0.28 0.07 0.42
GRADAS COSTADO DE LA CALLE 1.00 3.40 1.90 0.10 0.65
GRADAS COSTADO DE LA CALLE 6.00 3.40 0.28 0.07 0.40
GRADAS DE INGRESO AL HALL 1.00 3.85 1.90 0.10 0.73
GRADAS DE INGRESO AL HALL 6.00 3.85 0.28 0.07 0.45
GRADAS COSTADO DE AREA DE ESPERA 1.00 1.40 1.90 0.10 0.27
GRADAS COSTADO DE AREA DE ESPERA 6.00 1.40 0.28 0.07 0.16
GRADAS COSTADO DE ADMINISTRACIN 1.00 1.20 1.90 0.10 0.23
GRADAS COSTADO DE ADMINISTRACIN 6.00 1.20 0.28 0.07 0.14
GRADAS COSTADO DE DEPOSITO 1.00 0.90 1.90 0.10 0.17
GRADAS COSTADO DE DEPOSITO 6.00 0.90 0.28 0.07 0.11
GRADAS COSTADO DE SALA DE PARTOS 2.00 1.00 1.90 0.10 0.38
GRADAS COSTADO DE SALA DE PARTOS 12.00 1.00 0.28 0.07 0.24
GRADAS SUBE A STAR, COMEDOR 1.00 0.90 1.90 0.10 0.17
GRADAS SUBE A STAR, COMEDOR 6.00 0.90 0.28 0.07 0.11

04.05.00 ENCOFRADO Y DESENCOFRADO PARA GRADAS (APOYADAS SOBRE TERRENO) 32.58 M2

GRADAS COSTADO DE RAMPA AL COSTADO DE CONSULTORIOS: PEDIATRIA, DENTAL, MEDICINA / 8.00 0.25 1.90 - 3.80
GRADAS COSTADO DE RAMPA AL COSTADO DE CONSULTORIOS: PEDIATRIA, DENTAL, MEDICINA / 48.00 1.40 0.07 - 4.70
GRADAS COSTADO DE ALMACENES 6.00 0.25 1.90 - 2.85
GRADAS COSTADO DE ALMACENES 36.00 1.20 0.07 - 3.02
GRADAS COSTADO DE LA CALLE 2.00 0.25 1.90 - 0.95
GRADAS COSTADO DE LA CALLE 12.00 3.40 0.07 - 2.86
GRADAS DE INGRESO AL HALL 2.00 0.25 1.90 - 0.95
GRADAS DE INGRESO AL HALL 12.00 3.85 0.07 - 3.23
GRADAS COSTADO DE AREA DE ESPERA 2.00 0.25 1.90 - 0.95
GRADAS COSTADO DE AREA DE ESPERA 12.00 1.40 0.07 - 1.18
GRADAS COSTADO DE ADMINISTRACIN 2.00 0.25 1.90 - 0.95
GRADAS COSTADO DE ADMINISTRACIN 6.20 1.20 0.07 - 0.52
GRADAS COSTADO DE DEPOSITO 2.00 0.25 1.90 - 0.95
GRADAS COSTADO DE DEPOSITO 12.00 0.90 0.07 - 0.76
GRADAS COSTADO DE SALA DE PARTOS 4.00 0.25 1.90 - 1.90
GRADAS COSTADO DE SALA DE PARTOS 24.00 1.00 0.07 - 1.68
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
GRADAS SUBE A STAR, COMEDOR 2.00 0.25 1.90 - 0.95
GRADAS SUBE A STAR, COMEDOR 6.00 0.90 0.07 - 0.38

05.06.00 CONCRETO EN RAMPAS F'C=140 KG/CM2, E=4" 82.25 M2

RAMPA DE INGRESO ENTRE PISOS DE ADOQUIN 1.00 AREA 52.81 - 52.81


RAMPA COSTADO DE AREA DE ESPERA 1.00 AREA 3.94 - 3.94
RAMPA DE INGRESO AL HALL 1.00 AREA 8.26 - 8.26
RAMPA AL COSTADO DE CONSULTORIOS: PEDIATRIA, DENTAL, MEDICINA / TOPICO 1.00 AREA 17.24 - 17.24

05.00.00 OBRAS DE CONCRETO ARMADO

05.01.00 ZAPATAS
05.01.01 ZAPATAS CONCRETO F'c=210 KG/CM2 53.44 M3

ZAPATAS:
ZAPATA N: 1 70.00 1.00 1.00 0.60 42.00
ZAPATA N: 2 12.00 0.90 0.90 0.60 5.83
ZAPATA N: 3 1.00 2.35 1.00 0.60 1.41
ZAPATA N: 4 1.00 2.00 1.00 0.60 1.20
ZAPATA N: 1 / PORTICO EXTERIOR 5.00 1.00 1.00 0.60 3.00

05.01.02 ACERO ESTRUCTURAL PARA ZAPATAS 1,201.71 KG

05.02.00 VIGAS DE CIMENTACIN


05.02.01 CONCRETO EN VIGAS DE CIMENTACION - F'C=210 KG/CM2 36.89 M3

MODULO A: CONCRETO EN CIMIENTOS


EJE: A-A: TRAMOS: 1-2 1.00 4.05 0.25 0.40 0.41
EJE: A-A: TRAMOS: 2-3 1.00 3.20 0.25 0.40 0.32
EJE: B-B: TRAMOS: 1-2 1.00 4.05 0.25 0.40 0.41
EJE: C-C: TRAMOS: 1-2 1.00 4.05 0.25 0.40 0.41
EJE: D-D: TRAMOS: 1-2 1.00 4.05 0.25 0.40 0.41
EJE: D-D: TRAMOS: 2-3 1.00 3.20 0.25 0.40 0.32
EJE: 1-1: TRAMOS: A-B 1.00 3.73 0.25 0.40 0.37
EJE: 1-1: TRAMOS: B-C 1.00 4.12 0.25 0.40 0.41
EJE: 1-1: TRAMOS: C-D 1.00 2.30 0.25 0.40 0.23
EJE: 2-2: TRAMOS: A-B 1.00 3.73 0.25 0.40 0.37
EJE: 2-2: TRAMOS: B-C 1.00 4.12 0.25 0.40 0.41
EJE: 2-2: TRAMOS: C-D 1.00 2.30 0.25 0.40 0.23
EJE: 3-3: TRAMOS: A-B 1.00 3.73 0.25 0.40 0.37
EJE: 3-3: TRAMOS: B-C 1.00 4.12 0.25 0.40 0.41
EJE: 3-3: TRAMOS: C-D 1.00 2.30 0.25 0.40 0.23
MODULO B: CONCRETO EN CIMIENTOS
EJE: A-A, TRAMOS: 3-4 1.00 3.23 0.25 0.40 0.32
EJE: A-A, TRAMOS: 4-5 1.00 3.40 0.25 0.40 0.34
EJE: A-A, TRAMOS: 5-6 1.00 4.40 0.25 0.40 0.44
EJE: B-B, TRAMOS: 1-2 1.00 4.40 0.25 0.40 0.44
EJE: B-B, TRAMOS: 3-4 1.00 3.23 0.25 0.40 0.32
EJE: B-B, TRAMOS: 4-5 1.00 3.40 0.25 0.40 0.34
EJE: C-C, TRAMOS: 1-2 1.00 4.40 0.25 0.40 0.44
EJE: C-C, TRAMOS: 3-4 1.00 3.22 0.25 0.40 0.32
EJE: C-C, TRAMOS: 4-5 1.00 3.40 0.25 0.40 0.34
EJE: C-C, TRAMOS: 5-6 1.00 4.40 0.25 0.40 0.44
EJE: D-D, TRAMOS: 1-2 1.00 4.40 0.25 0.40 0.44
EJE: E-E, TRAMOS: 1-2 1.00 4.40 0.25 0.40 0.44
EJE: 1-1, TRAMOS: B-C 1.00 5.75 0.25 0.40 0.58
EJE: 1-1, TRAMOS: C-D 1.00 3.40 0.25 0.40 0.34
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: 2-2, TRAMOS: B-C 1.00 5.75 0.25 0.40 0.58
EJE: 2-2, TRAMOS: C-D 1.00 3.40 0.25 0.40 0.34
EJE: 3-3, TRAMOS: A-B 1.00 4.60 0.25 0.40 0.46
EJE: 3-3, TRAMOS: B-C 1.00 5.75 0.25 0.40 0.58
EJE: 3-3, TRAMOS: C-D 1.00 3.40 0.25 0.40 0.34
EJE: 3-3, TRAMOS: D-E 1.00 2.85 0.25 0.40 0.29
EJE: 5-5, TRAMOS: A-B 1.00 4.60 0.25 0.40 0.46
EJE: 5-5, TRAMOS: B-C 1.00 5.75 0.25 0.40 0.58
EJE: 6-6, TRAMOS: A-B 1.00 4.60 0.25 0.40 0.46
EJE: 6-6, TRAMOS: B-C 1.00 5.75 0.25 0.40 0.58
MODULO C: CONCRETO EN CIMIENTOS
EJE: A-A, TRAMOS: 7-8 1.00 3.20 0.25 0.40 0.32
EJE: B-B, TRAMOS: 7-8 1.00 3.20 0.25 0.40 0.32
EJE: C-C, TRAMOS: 7-8 1.00 3.20 0.25 0.40 0.32
EJE: D-D, TRAMOS: 7-8 1.00 3.20 0.25 0.40 0.32
EJE: E'-E', TRAMOS: 7-8 1.00 3.20 0.25 0.40 0.32
EJE: G'-G', TRAMOS: 7-8 1.00 3.20 0.25 0.40 0.32
EJE: 8-8, TRAMOS: A-B 1.00 4.55 0.25 0.40 0.46
EJE: 8-8, TRAMOS: B-C 1.00 5.30 0.25 0.40 0.53
EJE: 8-8, TRAMOS: C-D 1.00 3.85 0.25 0.40 0.39
EJE: 8-8, TRAMOS: D-E' 1.00 2.75 0.25 0.40 0.28
EJE: 8-8, TRAMOS: E'-F 1.00 3.20 0.25 0.40 0.32
EJE: 8-8, TRAMOS: F-G' 1.00 4.75 0.25 0.40 0.48
EJE: 7-7, TRAMOS: A-B 1.00 4.55 0.25 0.40 0.46
EJE: 7-7, TRAMOS: B-C 1.00 5.30 0.25 0.40 0.53
EJE: 7-7, TRAMOS: C-D 1.00 3.85 0.25 0.40 0.39
EJE: 7-7, TRAMOS: D-E' 1.00 2.75 0.25 0.40 0.28
EJE: 7-7, TRAMOS: E'-F 1.00 3.20 0.25 0.40 0.32
EJE: 7-7, TRAMOS: F-G' 1.00 4.75 0.25 0.40 0.48
EJE: E'-E', TRAMOS: 3-4 1.00 3.60 0.25 0.40 0.36
EJE: E'-E', TRAMOS: 4-5 1.00 3.40 0.25 0.40 0.34
EJE: E'-E', TRAMOS: 5-6 1.00 3.40 0.25 0.40 0.34
EJE: E'-E', TRAMOS: 6-7 1.00 3.70 0.25 0.40 0.37
EJE: F-F, TRAMNOS:3-4 1.00 3.60 0.25 0.40 0.36
EJE: F-F, TRAMNOS:5-6 1.00 3.40 0.25 0.40 0.34
EJE: G-G, TRAMNOS:3-4 1.00 3.60 0.25 0.40 0.36
EJE: G'-G', TRAMNOS:5-6 1.00 3.40 0.25 0.40 0.34
EJE: G'-G', TRAMNOS: 6-7 1.00 3.70 0.25 0.40 0.37
EJE: 1-1, TRAMOS: E-F 1.00 4.22 0.25 0.40 0.42
EJE: 1-1, TRAMOS: F-G 1.00 3.40 0.25 0.40 0.34
EJE: 1-1, TRAMOS: G-H 1.00 3.40 0.25 0.40 0.34
EJE: 1-1, TRAMOS: H-I 1.00 3.40 0.25 0.40 0.34
EJE: 2-2, TRAMOS: E-F 1.00 4.22 0.25 0.40 0.42
EJE: 2-2, TRAMOS: F-G 1.00 3.40 0.25 0.40 0.34
EJE: 2-2, TRAMOS: G-H 1.00 3.40 0.25 0.40 0.34
EJE: 2-2, TRAMOS: H-I 1.00 3.40 0.25 0.40 0.34
EJE: 3-3, TRAMOS: E-F 1.00 3.87 0.25 0.40 0.39
EJE: 3-3, TRAMOS: F-G 1.00 3.40 0.25 0.40 0.34
EJE: 3-3, TRAMOS: G-H 1.00 3.40 0.25 0.40 0.34
EJE: 3-3, TRAMOS: H-I 1.00 3.40 0.25 0.40 0.34
EJE: E-E, TRAMOS: 1-2 1.00 4.40 0.25 0.40 0.44
EJE: E-E, TRAMOS: 2-3 1.00 3.55 0.25 0.40 0.36
EJE: F-F, TRAMOS: 1-2 1.00 4.40 0.25 0.40 0.44
EJE: G-G, TRAMOS: 1-2 1.00 4.40 0.25 0.40 0.44
EJE: H-H, TRAMOS: 1-2 1.00 4.40 0.25 0.40 0.44
EJE: I-I, TRAMOS: 1-2 1.00 4.40 0.25 0.40 0.44
EJE: I-I, TRAMOS: 2-3 1.00 3.55 0.25 0.40 0.36
MODULO D: CONCRETO EN CIMIENTOS
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: A-A, TRAMOS: 1-2 1.00 3.85 0.25 0.40 0.39
EJE: B-B, TRAMOS: 1-2 1.00 3.89 0.25 0.40 0.39
EJE: 1-1, TRAMOS: A-B 1.00 3.40 0.25 0.40 0.34
EJE: 2-2, TRAMOS: A-B 1.00 3.56 0.25 0.40 0.36
MODULO E: CONCRETO EN CIMIENTOS
EJE: A-A, TRAMOS: 1-2 1.00 3.01 0.25 0.40 0.30
EJE: B-B, TRAMOS: 1-2 1.00 2.98 0.25 0.40 0.30
EJE: C-C, TRAMOS: 1-2 1.00 2.93 0.25 0.40 0.29
EJE: D-D, TRAMOS: 1-2 1.00 2.90 0.25 0.40 0.29
EJE: 1-1, TRAMOS: A-B 1.00 2.25 0.25 0.40 0.23
EJE: 1-1, TRAMOS: B-C 1.00 3.25 0.25 0.40 0.33
EJE: 1-1, TRAMOS: C-D 1.00 2.30 0.25 0.40 0.23
EJE: 2-2, TRAMOS: A-B 1.00 2.25 0.25 0.40 0.23
EJE: 2-2, TRAMOS: B-C 1.00 3.25 0.25 0.40 0.33
EJE: 2-2, TRAMOS: C-D 1.00 2.30 0.25 0.40 0.23

05.02.02 ENCOFRADO NORMAL EN VIGAS DE CIMENTACION 295.09 M2


MODULO A: CONCRETO EN CIMIENTOS
EJE: A-A: TRAMOS: 1-2 2.00 4.05 - 0.40 3.24
EJE: A-A: TRAMOS: 2-3 2.00 3.20 - 0.40 2.56
EJE: B-B: TRAMOS: 1-2 2.00 4.05 - 0.40 3.24
EJE: C-C: TRAMOS: 1-2 2.00 4.05 - 0.40 3.24
EJE: D-D: TRAMOS: 1-2 2.00 4.05 - 0.40 3.24
EJE: D-D: TRAMOS: 2-3 2.00 3.20 - 0.40 2.56
EJE: 1-1: TRAMOS: A-B 2.00 3.73 - 0.40 2.98
EJE: 1-1: TRAMOS: B-C 2.00 4.12 - 0.40 3.30
EJE: 1-1: TRAMOS: C-D 2.00 2.30 - 0.40 1.84
EJE: 2-2: TRAMOS: A-B 2.00 3.73 - 0.40 2.98
EJE: 2-2: TRAMOS: B-C 2.00 4.12 - 0.40 3.30
EJE: 2-2: TRAMOS: C-D 2.00 2.30 - 0.40 1.84
EJE: 3-3: TRAMOS: A-B 2.00 3.73 - 0.40 2.98
EJE: 3-3: TRAMOS: B-C 2.00 4.12 - 0.40 3.30
EJE: 3-3: TRAMOS: C-D 2.00 2.30 - 0.40 1.84
MODULO B: CONCRETO EN CIMIENTOS
EJE: A-A, TRAMOS: 3-4 2.00 3.23 - 0.40 2.58
EJE: A-A, TRAMOS: 4-5 2.00 3.40 - 0.40 2.72
EJE: A-A, TRAMOS: 5-6 2.00 4.40 - 0.40 3.52
EJE: B-B, TRAMOS: 1-2 2.00 4.40 - 0.40 3.52
EJE: B-B, TRAMOS: 3-4 2.00 3.23 - 0.40 2.58
EJE: B-B, TRAMOS: 4-5 2.00 3.40 - 0.40 2.72
EJE: C-C, TRAMOS: 1-2 2.00 4.40 - 0.40 3.52
EJE: C-C, TRAMOS: 3-4 2.00 3.22 - 0.40 2.58
EJE: C-C, TRAMOS: 4-5 2.00 3.40 - 0.40 2.72
EJE: C-C, TRAMOS: 5-6 2.00 4.40 - 0.40 3.52
EJE: D-D, TRAMOS: 1-2 2.00 4.40 - 0.40 3.52
EJE: E-E, TRAMOS: 1-2 2.00 4.40 - 0.40 3.52
EJE: 1-1, TRAMOS: B-C 2.00 5.75 - 0.40 4.60
EJE: 1-1, TRAMOS: C-D 2.00 3.40 - 0.40 2.72
EJE: 2-2, TRAMOS: B-C 2.00 5.75 - 0.40 4.60
EJE: 2-2, TRAMOS: C-D 2.00 3.40 - 0.40 2.72
EJE: 3-3, TRAMOS: A-B 2.00 4.60 - 0.40 3.68
EJE: 3-3, TRAMOS: B-C 2.00 5.75 - 0.40 4.60
EJE: 3-3, TRAMOS: C-D 2.00 3.40 - 0.40 2.72
EJE: 3-3, TRAMOS: D-E 2.00 2.85 - 0.40 2.28
EJE: 5-5, TRAMOS: A-B 2.00 4.60 - 0.40 3.68
EJE: 5-5, TRAMOS: B-C 2.00 5.75 - 0.40 4.60
EJE: 6-6, TRAMOS: A-B 2.00 4.60 - 0.40 3.68
EJE: 6-6, TRAMOS: B-C 2.00 5.75 - 0.40 4.60
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
MODULO C: CONCRETO EN CIMIENTOS
EJE: A-A, TRAMOS: 7-8 2.00 3.20 - 0.40 2.56
EJE: B-B, TRAMOS: 7-8 2.00 3.20 - 0.40 2.56
EJE: C-C, TRAMOS: 7-8 2.00 3.20 - 0.40 2.56
EJE: D-D, TRAMOS: 7-8 2.00 3.20 - 0.40 2.56
EJE: E'-E', TRAMOS: 7-8 2.00 3.20 - 0.40 2.56
EJE: G'-G', TRAMOS: 7-8 2.00 3.20 - 0.40 2.56
EJE: 8-8, TRAMOS: A-B 2.00 4.55 - 0.40 3.64
EJE: 8-8, TRAMOS: B-C 2.00 5.30 - 0.40 4.24
EJE: 8-8, TRAMOS: C-D 2.00 3.85 - 0.40 3.08
EJE: 8-8, TRAMOS: D-E' 2.00 2.75 - 0.40 2.20
EJE: 8-8, TRAMOS: E'-F 2.00 3.20 - 0.40 2.56
EJE: 8-8, TRAMOS: F-G' 2.00 4.75 - 0.40 3.80
EJE: 7-7, TRAMOS: A-B 2.00 4.55 - 0.40 3.64
EJE: 7-7, TRAMOS: B-C 2.00 5.30 - 0.40 4.24
EJE: 7-7, TRAMOS: C-D 2.00 3.85 - 0.40 3.08
EJE: 7-7, TRAMOS: D-E' 2.00 2.75 - 0.40 2.20
EJE: 7-7, TRAMOS: E'-F 2.00 3.20 - 0.40 2.56
EJE: 7-7, TRAMOS: F-G' 2.00 4.75 - 0.40 3.80
EJE: E'-E', TRAMOS: 3-4 2.00 3.60 - 0.40 2.88
EJE: E'-E', TRAMOS: 4-5 2.00 3.40 - 0.40 2.72
EJE: E'-E', TRAMOS: 5-6 2.00 3.40 - 0.40 2.72
EJE: E'-E', TRAMOS: 6-7 2.00 3.70 - 0.40 2.96
EJE: F-F, TRAMNOS:3-4 2.00 3.60 - 0.40 2.88
EJE: F-F, TRAMNOS:5-6 2.00 3.40 - 0.40 2.72
EJE: G-G, TRAMNOS:3-4 2.00 3.60 - 0.40 2.88
EJE: G'-G', TRAMNOS:5-6 2.00 3.40 - 0.40 2.72
EJE: G'-G', TRAMNOS: 6-7 2.00 3.70 - 0.40 2.96
EJE: 1-1, TRAMOS: E-F 2.00 4.22 - 0.40 3.38
EJE: 1-1, TRAMOS: F-G 2.00 3.40 - 0.40 2.72
EJE: 1-1, TRAMOS: G-H 2.00 3.40 - 0.40 2.72
EJE: 1-1, TRAMOS: H-I 2.00 3.40 - 0.40 2.72
EJE: 2-2, TRAMOS: E-F 2.00 4.22 - 0.40 3.38
EJE: 2-2, TRAMOS: F-G 2.00 3.40 - 0.40 2.72
EJE: 2-2, TRAMOS: G-H 2.00 3.40 - 0.40 2.72
EJE: 2-2, TRAMOS: H-I 2.00 3.40 - 0.40 2.72
EJE: 3-3, TRAMOS: E-F 2.00 3.87 - 0.40 3.10
EJE: 3-3, TRAMOS: F-G 2.00 3.40 - 0.40 2.72
EJE: 3-3, TRAMOS: G-H 2.00 3.40 - 0.40 2.72
EJE: 3-3, TRAMOS: H-I 2.00 3.40 - 0.40 2.72
EJE: E-E, TRAMOS: 1-2 2.00 4.40 - 0.40 3.52
EJE: E-E, TRAMOS: 2-3 2.00 3.55 - 0.40 2.84
EJE: F-F, TRAMOS: 1-2 2.00 4.40 - 0.40 3.52
EJE: G-G, TRAMOS: 1-2 2.00 4.40 - 0.40 3.52
EJE: H-H, TRAMOS: 1-2 2.00 4.40 - 0.40 3.52
EJE: I-I, TRAMOS: 1-2 2.00 4.40 - 0.40 3.52
EJE: I-I, TRAMOS: 2-3 2.00 3.55 - 0.40 2.84
MODULO D: CONCRETO EN CIMIENTOS
EJE: A-A, TRAMOS: 1-2 2.00 3.85 - 0.40 3.08
EJE: B-B, TRAMOS: 1-2 2.00 3.89 - 0.40 3.11
EJE: 1-1, TRAMOS: A-B 2.00 3.40 - 0.40 2.72
EJE: 2-2, TRAMOS: A-B 2.00 3.56 - 0.40 2.85
MODULO E: CONCRETO EN CIMIENTOS
EJE: A-A, TRAMOS: 1-2 2.00 3.01 - 0.40 2.41
EJE: B-B, TRAMOS: 1-2 2.00 2.98 - 0.40 2.38
EJE: C-C, TRAMOS: 1-2 2.00 2.93 - 0.40 2.34
EJE: D-D, TRAMOS: 1-2 2.00 2.90 - 0.40 2.32
EJE: 1-1, TRAMOS: A-B 2.00 2.25 - 0.40 1.80
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: 1-1, TRAMOS: B-C 2.00 3.25 - 0.40 2.60
EJE: 1-1, TRAMOS: C-D 2.00 2.30 - 0.40 1.84
EJE: 2-2, TRAMOS: A-B 2.00 2.25 - 0.40 1.80
EJE: 2-2, TRAMOS: B-C 2.00 3.25 - 0.40 2.60
EJE: 2-2, TRAMOS: C-D 2.00 2.30 - 0.40 1.84

05.02.03 ACERO ESTRUCTURAL PARA VIGAS DE CIMENTACION 3,203.04 KG

05.03.00 SOBRECIMIENTO ARMADO

05.03.01 CONCRETO EN SOBRECIMIENTO ARMADO - F'C= 175 KG/CM2 57.55 M3


MODULO A: CONCRETO EN SOBRECIMIENTOS
EJE: A-A: TRAMOS: 1-2 1.00 4.05 0.15 0.75 0.46
EJE: A-A: TRAMOS: 2-3 1.00 3.20 0.15 0.75 0.36
EJE: B-B: TRAMOS: 1-2 1.00 4.05 0.15 0.75 0.46
EJE: C-C: TRAMOS: 1-2 1.00 4.05 0.15 0.75 0.46
EJE: D-D: TRAMOS: 1-2 1.00 4.05 0.15 0.75 0.46
EJE: D-D: TRAMOS: 2-3 1.00 2.30 0.15 0.75 0.26
EJE: D-D: TRAMOS: 2-3 1.00 0.90 0.15 0.50 0.07
EJE: 1-1: TRAMOS: A-B 1.00 0.50 0.15 0.75 0.06
EJE: 1-1: TRAMOS: A-B 1.00 0.85 0.15 0.50 0.06
EJE: 1-1: TRAMOS: A-B 1.00 2.38 0.15 0.75 0.27
EJE: 1-1: TRAMOS: B-C 1.00 1.35 0.15 0.75 0.15
EJE: 1-1: TRAMOS: B-C 1.00 0.85 0.15 0.50 0.06
EJE: 1-1: TRAMOS: B-C 1.00 1.92 0.15 0.75 0.22
EJE: 1-1: TRAMOS: C-D 1.00 1.15 0.15 0.75 0.13
EJE: 1-1: TRAMOS: C-D 1.00 0.90 0.15 0.50 0.07
EJE: 1-1: TRAMOS: C-D 1.00 0.25 0.15 0.75 0.03
EJE: 2-2: TRAMOS: A-B 1.00 0.98 0.15 0.75 0.11
EJE: 2-2: TRAMOS: A-B 1.00 0.85 0.15 0.50 0.06
EJE: 2-2: TRAMOS: A-B 1.00 1.90 0.15 0.75 0.21
EJE: 2-2: TRAMOS: B-C 1.00 1.38 0.15 0.75 0.16
EJE: 2-2: TRAMOS: B-C 1.00 0.85 0.15 0.50 0.06
EJE: 2-2: TRAMOS: B-C 1.00 1.90 0.15 0.75 0.21
EJE: 2-2: TRAMOS: C-D 1.00 1.40 0.15 0.75 0.16
EJE: 2-2: TRAMOS: C-D 1.00 0.90 0.15 0.50 0.07
EJE: 3-3: TRAMOS: A-B 1.00 3.73 0.15 0.75 0.42
EJE: 3-3: TRAMOS: B-C 1.00 1.15 0.15 0.75 0.13
EJE: 3-3: TRAMOS: B-C 1.00 0.85 0.15 0.50 0.06
EJE: 3-3: TRAMOS: B-C 1.00 2.12 0.15 0.75 0.24
EJE: 3-3: TRAMOS: C-D 1.00 2.30 0.15 0.75 0.26
ENTRE EJES: 1-2, A-B 1.00 0.60 0.15 1.15 0.10
ENTRE EJES: 1-2, A-B 1.00 2.15 0.15 1.15 0.37
ENTRE EJES: 1-2, A-B 1.00 0.50 0.15 1.15 0.09
ENTRE EJES: 2-3, B-C 1.00 0.60 0.15 1.15 0.10
ENTRE EJES: 2-3, B-C 1.00 2.25 0.15 1.15 0.39
MODULO B: CONCRETO EN SOBRECIMIENTOS
EJE: A-A, TRAMOS: 3-4 1.00 3.23 0.15 0.75 0.36
EJE: A-A, TRAMOS: 4-5 1.00 3.40 0.15 0.75 0.38
EJE: A-A, TRAMOS: 5-6 1.00 4.40 0.15 0.75 0.50
EJE: B-B, TRAMOS: 1-2 1.00 4.40 0.15 0.75 0.50
EJE: B-B, TRAMOS: 3-4 1.00 1.82 0.15 0.75 0.20
EJE: B-B, TRAMOS: 3-4 1.00 1.00 0.15 0.50 0.08
EJE: B-B, TRAMOS: 3-4 1.00 0.40 0.15 0.75 0.05
EJE: B-B, TRAMOS: 4-5 1.00 0.90 0.15 0.50 0.07
EJE: B-B, TRAMOS: 4-5 1.00 2.50 0.15 0.75 0.28
EJE: C-C, TRAMOS: 1-2 1.00 0.35 0.15 0.75 0.04
EJE: C-C, TRAMOS: 1-2 1.00 0.70 0.15 0.50 0.05
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: C-C, TRAMOS: 1-2 1.00 3.35 0.15 0.75 0.38
EJE: C-C, TRAMOS: 3-4 1.00 3.22 0.15 0.75 0.36
EJE: C-C, TRAMOS: 4-5 1.00 3.40 0.15 0.75 0.38
EJE: C-C, TRAMOS: 5-6 1.00 4.40 0.15 0.75 0.50
EJE: D-D, TRAMOS: 1-2 1.00 4.40 0.15 0.75 0.50
EJE: E-E, TRAMOS: 1-2 1.00 4.40 0.15 0.75 0.50
EJE: 1-1, TRAMOS: B-C 1.00 5.75 0.15 0.75 0.65
EJE: 1-1, TRAMOS: C-D 1.00 3.40 0.15 0.75 0.38
EJE: 2-2, TRAMOS: B-C 1.00 0.30 0.15 0.75 0.03
EJE: 2-2, TRAMOS: B-C 1.00 0.70 0.15 0.50 0.05
EJE: 2-2, TRAMOS: B-C 1.00 1.30 0.15 0.75 0.15
EJE: 2-2, TRAMOS: B-C 1.00 1.70 0.15 0.50 0.13
EJE: 2-2, TRAMOS: B-C 1.00 1.75 0.15 0.75 0.20
EJE: 2-2, TRAMOS: C-D 1.00 2.40 0.15 0.75 0.27
EJE: 2-2, TRAMOS: C-D 1.00 1.00 0.15 0.50 0.08
EJE: 3-3, TRAMOS: A-B 1.00 4.60 0.15 0.75 0.52
EJE: 3-3, TRAMOS: B-C 1.00 0.52 0.15 0.75 0.06
EJE: 3-3, TRAMOS: B-C 1.00 1.80 0.15 0.50 0.14
EJE: 3-3, TRAMOS: B-C 1.00 3.43 0.15 0.75 0.39
EJE: 3-3, TRAMOS: C-D 1.00 3.40 0.15 0.75 0.38
EJE: 3-3, TRAMOS: D-E 1.00 0.62 0.15 0.75 0.07
EJE: 3-3, TRAMOS: D-E 1.00 1.80 0.15 0.50 0.14
EJE: 3-3, TRAMOS: D-E 1.00 0.43 0.15 0.75 0.05
EJE: 4-4, TRAMOS: A-B 1.00 2.50 0.15 0.75 0.28
EJE: 4-4, TRAMOS: B-C 1.00 2.50 0.15 0.75 0.28
EJE: 5-5, TRAMOS: A-B 1.00 1.50 0.15 0.50 0.11
EJE: 5-5, TRAMOS: A-B 1.00 3.10 0.15 0.75 0.35
EJE: 5-5, TRAMOS: B-C 1.00 1.80 0.15 0.50 0.14
EJE: 5-5, TRAMOS: B-C 1.00 0.55 0.15 0.75 0.06
EJE: 5-5, TRAMOS: B-C 1.00 0.90 0.15 0.50 0.07
EJE: 5-5, TRAMOS: B-C 1.00 1.50 0.15 0.75 0.17
EJE: 5-5, TRAMOS: B-C 1.00 0.70 0.15 0.50 0.05
EJE: 5-5, TRAMOS: B-C 1.00 0.30 0.15 0.75 0.03
EJE: 6-6, TRAMOS: A-B 1.00 4.60 0.15 0.75 0.52
EJE: 6-6, TRAMOS: B-C 1.00 5.75 0.15 0.75 0.65
ENTRE EJES: 5-6 y A-B 1.00 1.50 0.15 1.15 0.26
ENTRE EJES: 5-6 y A-B 1.00 1.80 0.15 0.95 0.26
ENTRE EJES: 5-6 y A-B 1.00 1.50 0.15 1.15 0.26
ENTRE EJES: 5-6 y B-C 1.00 0.90 0.15 0.95 0.13
ENTRE EJES: 5-6 y B-C 1.00 3.90 0.15 1.15 0.67
ENTRE EJES: 5-6 y B-C 1.00 1.05 0.15 1.15 0.18
ENTRE EJES: 5-6 y B-C 1.00 2.55 0.15 1.15 0.44
ENTRE EJES: 5-6 y B-C 1.00 1.60 0.15 1.15 0.28
ENTRE EJES: 4-5 y A-B 1.00 2.30 0.15 1.15 0.40
ENTRE EJES: 4-5 y A-B 1.00 3.75 0.15 1.15 0.65
ENTRE EJES: 4-5 y A-B 1.00 1.05 0.15 1.15 0.18
ENTRE EJES: 4-5 y A-B 1.00 0.85 0.15 1.15 0.15
ENTRE EJES: 4-5 y B-C 1.00 0.90 0.15 0.95 0.13
ENTRE EJES: 4-5 y B-C 1.00 2.50 0.15 1.15 0.43
ENTRE EJES: 3-4 y B-C 1.00 1.85 0.15 1.15 0.32
ENTRE EJES: 3-4 y B-C 1.00 0.83 0.15 1.15 0.14
ENTRE EJES: 3-4 y B-C 1.00 0.85 0.15 1.15 0.15
ENTRE EJES: 3-4 y B-C 1.00 0.90 0.15 0.95 0.13
ENTRE EJES: 3-4 y B-C 1.00 0.90 0.15 0.95 0.13
ENTRE EJES: 1-2 y B-C 1.00 1.35 0.15 1.15 0.23
ENTRE EJES: 1-2 y B-C 1.00 1.20 0.15 1.15 0.21
ENTRE EJES: 1-2 y B-C 1.00 1.65 0.15 1.15 0.28
ENTRE EJES: 1-2 y B-C 1.00 0.70 0.15 1.15 0.12
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
ENTRE EJES: 1-2 y B-C 1.00 1.70 0.15 1.15 0.29
ENTRE EJES: 1-2 y B-C 1.00 3.60 0.15 1.15 0.62
ENTRE EJES: 1-2 y B-C 1.00 1.80 0.15 1.15 0.31
ENTRE EJES: 1-2 y B-C 1.00 1.00 0.15 0.95 0.14
ENTRE EJES: 1-2 y D-E 1.00 0.62 0.15 1.15 0.11
ENTRE EJES: 1-2 y D-E 1.00 0.62 0.15 1.15 0.11
MODULO C: CONCRETO EN SOBRECIMIENTOS
EJE: A-A, TRAMOS: 7-8 1.00 3.20 0.15 0.75 0.36
EJE: B-B, TRAMOS: 7-8 1.00 3.20 0.15 0.75 0.36
EJE: C-C, TRAMOS: 7-8 1.00 2.50 0.15 0.75 0.28
EJE: C-C, TRAMOS: 7-8 1.00 0.70 0.15 0.50 0.05
EJE: D-D, TRAMOS: 7-8 1.00 2.50 0.15 0.75 0.28
EJE: D-D, TRAMOS: 7-8 1.00 0.70 0.15 0.50 0.05
EJE: E'-E', TRAMOS: 7-8 1.00 3.20 0.15 0.75 0.36
EJE: G'-G', TRAMOS: 7-8 1.00 3.20 0.15 0.75 0.36
EJE: 8-8, TRAMOS: A-B 1.00 0.90 0.15 0.50 0.07
EJE: 8-8, TRAMOS: A-B 1.00 1.45 0.15 0.75 0.16
EJE: 8-8, TRAMOS: A-B 1.00 0.90 0.15 0.50 0.07
EJE: 8-8, TRAMOS: A-B 1.00 1.30 0.15 0.75 0.15
EJE: 8-8, TRAMOS: B-C 1.00 5.30 0.15 0.75 0.60
EJE: 8-8, TRAMOS: C-D 1.00 3.85 0.15 0.75 0.43
EJE: 8-8, TRAMOS: D-E' 1.00 2.75 0.15 0.75 0.31
EJE: 8-8, TRAMOS: E'-F 1.00 1.40 0.15 0.75 0.16
EJE: 8-8, TRAMOS: E'-F 1.00 1.80 0.15 0.50 0.14
EJE: 8-8, TRAMOS: F-G' 1.00 4.75 0.15 0.75 0.53
EJE: 7-7, TRAMOS: A-B 1.00 4.55 0.15 0.75 0.51
EJE: 7-7, TRAMOS: B-C 1.00 5.30 0.15 0.75 0.60
EJE: 7-7, TRAMOS: C-D 1.00 3.85 0.15 0.75 0.43
EJE: 7-7, TRAMOS: D-E' 1.00 2.75 0.15 0.50 0.21
EJE: 7-7, TRAMOS: E'-F 1.00 1.40 0.15 0.75 0.16
EJE: 7-7, TRAMOS: E'-F 1.00 1.80 0.15 0.50 0.14
EJE: 7-7, TRAMOS: F-G' 1.00 1.20 0.15 0.75 0.14
EJE: 7-7, TRAMOS: F-G' 1.00 0.90 0.15 0.50 0.07
EJE: 7-7, TRAMOS: F-G' 1.00 1.65 0.15 0.75 0.19
EJE: 7-7, TRAMOS: F-G' 1.00 1.00 0.15 0.50 0.08
ENTRE EJES: A-B y 7-8 1.00 3.60 0.15 1.15 0.62
ENTRE EJES: B-C y 7-8 1.00 0.60 0.15 1.15 0.10
ENTRE EJES: B-C y 7-8 1.00 0.90 0.15 0.95 0.13
ENTRE EJES: B-C y 7-8 1.00 1.20 0.15 1.15 0.21
ENTRE EJES: B-C y 7-8 1.00 1.45 0.15 1.15 0.25
ENTRE EJES: C-D y 7-8 1.00 2.55 0.15 1.15 0.44
ENTRE EJES: C-D y 7-8 1.00 1.65 0.15 1.15 0.28
EJE: E'-E', TRAMOS: 3-4 1.00 3.60 0.15 0.75 0.41
EJE: E'-E', TRAMOS: 4-5 1.00 3.40 0.15 0.75 0.38
EJE: E'-E', TRAMOS: 5-6 1.00 3.40 0.15 0.75 0.38
EJE: E'-E', TRAMOS: 6-7 1.00 2.50 0.15 0.75 0.28
EJE: E'-E', TRAMOS: 6-7 1.00 1.20 0.15 0.50 0.09
EJE: F-F, TRAMNOS:3-4 1.00 0.90 0.15 0.50 0.07
EJE: F-F, TRAMNOS:3-4 1.00 2.70 0.15 0.75 0.30
EJE: F-F, TRAMNOS:5-6 1.00 2.40 0.15 0.75 0.27
EJE: F-F, TRAMNOS:5-6 1.00 1.00 0.15 0.50 0.08
EJE: G-G, TRAMNOS:3-4 1.00 3.60 0.15 0.75 0.41
EJE: G'-G', TRAMNOS:5-6 1.00 3.40 0.15 0.75 0.38
EJE: G'-G', TRAMNOS: 6-7 1.00 0.90 0.15 0.50 0.07
EJE: G'-G', TRAMNOS: 6-7 1.00 2.80 0.15 0.75 0.32
ENTRE EJES: E'-F-G' y 6-7 1.00 4.95 0.15 1.15 0.85
ENTRE EJES: E'-F-G' y 6-7 1.00 1.65 0.15 1.15 0.28
ENTRE EJES: E'-F-G' y 6-7 1.00 0.45 0.15 1.15 0.08
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
ENTRE EJES: E'-F-G' y 6-7 1.00 2.40 0.15 1.15 0.41
ENTRE EJES: E'-F-G' y 6-7 1.00 0.60 0.15 1.15 0.10
ENTRE EJES: E'-F-G' y 6-7 1.00 1.55 0.15 1.15 0.27
ENTRE EJES: E'-F-G' y 6-7 1.00 1.20 0.15 1.15 0.21
ENTRE EJES: E'-F-G' y 5-6 1.00 0.85 0.15 1.15 0.15
ENTRE EJES: E'-F-G' y 5-6 1.00 1.00 0.15 0.95 0.14
ENTRE EJES: E'-F-G' y 5-6 1.00 0.85 0.15 1.15 0.15
ENTRE EJES: E'-F-G' y 4-5 1.00 0.77 0.15 1.15 0.13
ENTRE EJES: E'-F-G' y 4-5 1.00 0.70 0.15 0.95 0.10
ENTRE EJES: E'-F-G' y 4-5 1.00 1.42 0.15 1.15 0.24
ENTRE EJES: E'-F-G' y 4-5 1.00 1.80 0.15 1.15 0.31
ENTRE EJES: E'-F-G' y 4-5 1.00 0.70 0.15 0.95 0.10
ENTRE EJES: E'-F-G' y 3-4 1.00 1.05 0.15 1.15 0.18
ENTRE EJES: E'-F-G' y 3-4 1.00 0.45 0.15 1.15 0.08
EJE: 1-1, TRAMOS: E-F 1.00 4.22 0.15 0.75 0.47
EJE: 1-1, TRAMOS: F-G 1.00 3.40 0.15 0.75 0.38
EJE: 1-1, TRAMOS: G-H 1.00 3.40 0.15 0.75 0.38
EJE: 1-1, TRAMOS: H-I 1.00 3.40 0.15 0.75 0.38
EJE: 2-2, TRAMOS: E-F 1.00 3.23 0.15 0.75 0.36
EJE: 2-2, TRAMOS: E-F 1.00 1.00 0.15 0.50 0.08
EJE: 2-2, TRAMOS: F-G 1.00 1.00 0.15 0.50 0.08
EJE: 2-2, TRAMOS: F-G 1.00 2.40 0.15 0.75 0.27
EJE: 2-2, TRAMOS: G-H 1.00 1.00 0.15 0.50 0.08
EJE: 2-2, TRAMOS: G-H 1.00 2.40 0.15 0.75 0.27
EJE: 2-2, TRAMOS: H-I 1.00 1.00 0.15 0.50 0.08
EJE: 2-2, TRAMOS: H-I 1.00 2.40 0.15 0.75 0.27
EJE: 3-3, TRAMOS: E-F 1.00 0.67 0.15 0.75 0.08
EJE: 3-3, TRAMOS: E-F 1.00 3.20 0.15 0.75 0.36
EJE: 3-3, TRAMOS: F-G 1.00 2.40 0.15 0.50 0.18
EJE: 3-3, TRAMOS: F-G 1.00 1.00 0.15 0.75 0.11
EJE: 3-3, TRAMOS: G-H 1.00 3.40 0.15 0.75 0.38
EJE: 3-3, TRAMOS: H-I 1.00 3.40 0.15 0.75 0.38
EJE: E-E, TRAMOS: 1-2 1.00 4.40 0.15 0.75 0.50
EJE: E-E, TRAMOS: 2-3 1.00 2.45 0.15 0.50 0.18
EJE: E-E, TRAMOS: 2-3 1.00 1.10 0.15 0.75 0.12
EJE: F-F, TRAMOS: 1-2 1.00 4.40 0.15 0.75 0.50
EJE: G-G, TRAMOS: 1-2 1.00 4.40 0.15 0.75 0.50
EJE: H-H, TRAMOS: 1-2 1.00 4.40 0.15 0.75 0.50
EJE: I-I, TRAMOS: 1-2 1.00 4.40 0.15 0.75 0.50
EJE: I-I, TRAMOS: 2-3 1.00 4.40 0.15 0.75 0.50
ENTRE EJES: F-G, y EJES: 2-3 1.00 3.55 0.15 0.75 0.40
MODULO D: CONCRETO EN SOBRECIMIENTOS
EJE: A-A, TRAMOS: 1-2 1.00 3.85 0.15 0.75 0.43
EJE: B-B, TRAMOS: 1-2 1.00 2.10 0.15 0.75 0.24
EJE: B-B, TRAMOS: 1-2 1.00 1.80 0.15 0.50 0.14
EJE: 1-1, TRAMOS: A-B 1.00 3.56 0.15 0.75 0.40
EJE: 2-2, TRAMOS: A-B 1.00 0.31 0.15 0.75 0.03
EJE: 2-2, TRAMOS: A-B 1.00 0.90 0.15 0.50 0.07
EJE: 2-2, TRAMOS: A-B 1.00 0.98 0.15 0.75 0.11
EJE: 2-2, TRAMOS: A-B 1.00 0.90 0.15 0.50 0.07
EJE: 2-2, TRAMOS: A-B 1.00 0.31 0.15 0.75 0.03
ENTRE EJES: A-B, y 1-2 1.00 3.65 0.15 1.15 0.63
ENTRE EJES: A-B, y 1-2 1.00 1.09 0.15 1.15 0.19
MODULO E: CONCRETO EN SOBRECIMIENTOS
EJE: A-A, TRAMOS: 1-2 1.00 3.01 0.15 0.75 0.34
EJE: B-B, TRAMOS: 1-2 1.00 2.98 0.15 0.75 0.34
EJE: C-C, TRAMOS: 1-2 1.00 2.93 0.15 0.75 0.33
EJE: D-D, TRAMOS: 1-2 1.00 2.90 0.15 0.75 0.33
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: 1-1, TRAMOS: A-B 1.00 0.38 0.15 0.75 0.04
EJE: 1-1, TRAMOS: A-B 1.00 1.50 0.15 0.50 0.11
EJE: 1-1, TRAMOS: A-B 1.00 0.38 0.15 0.75 0.04
EJE: 1-1, TRAMOS: B-C 1.00 2.15 0.15 0.75 0.24
EJE: 1-1, TRAMOS: B-C 1.00 1.10 0.15 0.50 0.08
EJE: 1-1, TRAMOS: C-D 1.00 0.53 0.15 0.75 0.06
EJE: 1-1, TRAMOS: C-D 1.00 1.50 0.15 0.50 0.11
EJE: 1-1, TRAMOS: C-D 1.00 0.27 0.15 0.75 0.03
EJE: 2-2, TRAMOS: A-B 1.00 2.25 0.15 0.75 0.25
EJE: 2-2, TRAMOS: B-C 1.00 3.25 0.15 0.75 0.37
EJE: 2-2, TRAMOS: C-D 1.00 2.30 0.15 0.75 0.26
ENTRE EJES: 1-2 y B-C 1.00 2.35 0.15 1.15 0.41
ENTRE EJES: 1-2 y B-C 1.00 0.50 0.15 1.15 0.09
CONCRETO SOBRECIMIENTOS CASETA:
CIMIENTOS DE CASETA 2.00 2.53 0.150 1.15 0.87
CIMIENTOS DE CASETA 2.00 0.55 0.150 1.15 0.19
CIMIENTOS DE CASETA 1.00 0.33 0.150 1.15 0.06

05.03.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO REFORZADO 767.38 M2

MODULO A: CONCRETO EN SOBRECIMIENTOS


EJE: A-A: TRAMOS: 1-2 2.00 4.05 - 0.75 6.08
EJE: A-A: TRAMOS: 2-3 2.00 3.20 - 0.75 4.80
EJE: B-B: TRAMOS: 1-2 2.00 4.05 - 0.75 6.08
EJE: C-C: TRAMOS: 1-2 2.00 4.05 - 0.75 6.08
EJE: D-D: TRAMOS: 1-2 2.00 4.05 - 0.75 6.08
EJE: D-D: TRAMOS: 2-3 2.00 2.30 - 0.75 3.45
EJE: D-D: TRAMOS: 2-3 2.00 0.90 - 0.50 0.90
EJE: 1-1: TRAMOS: A-B 2.00 0.50 - 0.75 0.75
EJE: 1-1: TRAMOS: A-B 2.00 0.85 - 0.50 0.85
EJE: 1-1: TRAMOS: A-B 2.00 2.38 - 0.75 3.57
EJE: 1-1: TRAMOS: B-C 2.00 1.35 - 0.75 2.03
EJE: 1-1: TRAMOS: B-C 2.00 0.85 - 0.50 0.85
EJE: 1-1: TRAMOS: B-C 2.00 1.92 - 0.75 2.88
EJE: 1-1: TRAMOS: C-D 2.00 1.15 - 0.75 1.73
EJE: 1-1: TRAMOS: C-D 2.00 0.90 - 0.50 0.90
EJE: 1-1: TRAMOS: C-D 2.00 0.25 - 0.75 0.38
EJE: 2-2: TRAMOS: A-B 2.00 0.98 - 0.75 1.47
EJE: 2-2: TRAMOS: A-B 2.00 0.85 - 0.50 0.85
EJE: 2-2: TRAMOS: A-B 2.00 1.90 - 0.75 2.85
EJE: 2-2: TRAMOS: B-C 2.00 1.38 - 0.75 2.07
EJE: 2-2: TRAMOS: B-C 2.00 0.85 - 0.50 0.85
EJE: 2-2: TRAMOS: B-C 2.00 1.90 - 0.75 2.85
EJE: 2-2: TRAMOS: C-D 2.00 1.40 - 0.75 2.10
EJE: 2-2: TRAMOS: C-D 2.00 0.90 - 0.50 0.90
EJE: 3-3: TRAMOS: A-B 2.00 3.73 - 0.75 5.60
EJE: 3-3: TRAMOS: B-C 2.00 1.15 - 0.75 1.73
EJE: 3-3: TRAMOS: B-C 2.00 0.85 - 0.50 0.85
EJE: 3-3: TRAMOS: B-C 2.00 2.12 - 0.75 3.18
EJE: 3-3: TRAMOS: C-D 2.00 2.30 - 0.75 3.45
ENTRE EJES: 1-2, A-B 2.00 0.60 - 1.15 1.38
ENTRE EJES: 1-2, A-B 2.00 2.15 - 1.15 4.95
ENTRE EJES: 1-2, A-B 2.00 0.50 - 1.15 1.15
ENTRE EJES: 2-3, B-C 2.00 0.60 - 1.15 1.38
ENTRE EJES: 2-3, B-C 2.00 2.25 - 1.15 5.18
MODULO B: CONCRETO EN SOBRECIMIENTOS
EJE: A-A, TRAMOS: 3-4 2.00 3.23 - 0.75 4.85
EJE: A-A, TRAMOS: 4-5 2.00 3.40 - 0.75 5.10
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: A-A, TRAMOS: 5-6 2.00 4.40 - 0.75 6.60
EJE: B-B, TRAMOS: 1-2 2.00 4.40 - 0.75 6.60
EJE: B-B, TRAMOS: 3-4 2.00 1.82 - 0.75 2.73
EJE: B-B, TRAMOS: 3-4 2.00 1.00 - 0.50 1.00
EJE: B-B, TRAMOS: 3-4 2.00 0.40 - 0.75 0.60
EJE: B-B, TRAMOS: 4-5 2.00 0.90 - 0.50 0.90
EJE: B-B, TRAMOS: 4-5 2.00 2.50 - 0.75 3.75
EJE: C-C, TRAMOS: 1-2 2.00 0.35 - 0.75 0.53
EJE: C-C, TRAMOS: 1-2 2.00 0.70 - 0.50 0.70
EJE: C-C, TRAMOS: 1-2 2.00 3.35 - 0.75 5.03
EJE: C-C, TRAMOS: 3-4 2.00 3.22 - 0.75 4.83
EJE: C-C, TRAMOS: 4-5 2.00 3.40 - 0.75 5.10
EJE: C-C, TRAMOS: 5-6 2.00 4.40 - 0.75 6.60
EJE: D-D, TRAMOS: 1-2 2.00 4.40 - 0.75 6.60
EJE: E-E, TRAMOS: 1-2 2.00 4.40 - 0.75 6.60
EJE: 1-1, TRAMOS: B-C 2.00 5.75 - 0.75 8.63
EJE: 1-1, TRAMOS: C-D 2.00 3.40 - 0.75 5.10
EJE: 2-2, TRAMOS: B-C 2.00 0.30 - 0.75 0.45
EJE: 2-2, TRAMOS: B-C 2.00 0.70 - 0.50 0.70
EJE: 2-2, TRAMOS: B-C 2.00 1.30 - 0.75 1.95
EJE: 2-2, TRAMOS: B-C 2.00 1.70 - 0.50 1.70
EJE: 2-2, TRAMOS: B-C 2.00 1.75 - 0.75 2.63
EJE: 2-2, TRAMOS: C-D 2.00 2.40 - 0.75 3.60
EJE: 2-2, TRAMOS: C-D 2.00 1.00 - 0.50 1.00
EJE: 3-3, TRAMOS: A-B 2.00 4.60 - 0.75 6.90
EJE: 3-3, TRAMOS: B-C 2.00 0.52 - 0.75 0.78
EJE: 3-3, TRAMOS: B-C 2.00 1.80 - 0.50 1.80
EJE: 3-3, TRAMOS: B-C 2.00 3.43 - 0.75 5.15
EJE: 3-3, TRAMOS: C-D 2.00 3.40 - 0.75 5.10
EJE: 3-3, TRAMOS: D-E 2.00 0.62 - 0.75 0.93
EJE: 3-3, TRAMOS: D-E 2.00 1.80 - 0.50 1.80
EJE: 3-3, TRAMOS: D-E 2.00 0.43 - 0.75 0.65
EJE: 4-4, TRAMOS: A-B 2.00 2.50 - 0.75 3.75
EJE: 4-4, TRAMOS: B-C 2.00 2.50 - 0.75 3.75
EJE: 5-5, TRAMOS: A-B 2.00 1.50 - 0.50 1.50
EJE: 5-5, TRAMOS: A-B 2.00 3.10 - 0.75 4.65
EJE: 5-5, TRAMOS: B-C 2.00 1.80 - 0.50 1.80
EJE: 5-5, TRAMOS: B-C 2.00 0.55 - 0.75 0.83
EJE: 5-5, TRAMOS: B-C 2.00 0.90 - 0.50 0.90
EJE: 5-5, TRAMOS: B-C 2.00 1.50 - 0.75 2.25
EJE: 5-5, TRAMOS: B-C 2.00 0.70 - 0.50 0.70
EJE: 5-5, TRAMOS: B-C 2.00 0.30 - 0.75 0.45
EJE: 6-6, TRAMOS: A-B 2.00 4.60 - 0.75 6.90
EJE: 6-6, TRAMOS: B-C 2.00 5.75 - 0.75 8.63
ENTRE EJES: 5-6 y A-B 2.00 1.50 - 1.15 3.45
ENTRE EJES: 5-6 y A-B 2.00 1.80 - 0.95 3.42
ENTRE EJES: 5-6 y A-B 2.00 1.50 - 1.15 3.45
ENTRE EJES: 5-6 y B-C 2.00 0.90 - 0.95 1.71
ENTRE EJES: 5-6 y B-C 2.00 3.90 - 1.15 8.97
ENTRE EJES: 5-6 y B-C 2.00 1.05 - 1.15 2.42
ENTRE EJES: 5-6 y B-C 2.00 2.55 - 1.15 5.87
ENTRE EJES: 5-6 y B-C 2.00 1.60 - 1.15 3.68
ENTRE EJES: 4-5 y A-B 2.00 2.30 - 1.15 5.29
ENTRE EJES: 4-5 y A-B 2.00 3.75 - 1.15 8.63
ENTRE EJES: 4-5 y A-B 2.00 1.05 - 1.15 2.42
ENTRE EJES: 4-5 y A-B 2.00 0.85 - 1.15 1.96
ENTRE EJES: 4-5 y B-C 2.00 0.90 - 0.95 1.71
ENTRE EJES: 4-5 y B-C 2.00 2.50 - 1.15 5.75
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
ENTRE EJES: 3-4 y B-C 2.00 1.85 - 1.15 4.26
ENTRE EJES: 3-4 y B-C 2.00 0.83 - 1.15 1.91
ENTRE EJES: 3-4 y B-C 2.00 0.85 - 1.15 1.96
ENTRE EJES: 3-4 y B-C 2.00 0.90 - 0.95 1.71
ENTRE EJES: 3-4 y B-C 2.00 0.90 - 0.95 1.71
ENTRE EJES: 1-2 y B-C 2.00 1.35 - 1.15 3.11
ENTRE EJES: 1-2 y B-C 2.00 1.20 - 1.15 2.76
ENTRE EJES: 1-2 y B-C 2.00 1.65 - 1.15 3.80
ENTRE EJES: 1-2 y B-C 2.00 0.70 - 1.15 1.61
ENTRE EJES: 1-2 y B-C 2.00 1.70 - 1.15 3.91
ENTRE EJES: 1-2 y B-C 2.00 3.60 - 1.15 8.28
ENTRE EJES: 1-2 y B-C 2.00 1.80 - 1.15 4.14
ENTRE EJES: 1-2 y B-C 2.00 1.00 - 0.95 1.90
ENTRE EJES: 1-2 y D-E 2.00 0.62 - 1.15 1.43
ENTRE EJES: 1-2 y D-E 2.00 0.62 - 1.15 1.43
MODULO C: CONCRETO EN SOBRECIMIENTOS
EJE: A-A, TRAMOS: 7-8 2.00 3.20 - 0.75 4.80
EJE: B-B, TRAMOS: 7-8 2.00 3.20 - 0.75 4.80
EJE: C-C, TRAMOS: 7-8 2.00 2.50 - 0.75 3.75
EJE: C-C, TRAMOS: 7-8 2.00 0.70 - 0.50 0.70
EJE: D-D, TRAMOS: 7-8 2.00 2.50 - 0.75 3.75
EJE: D-D, TRAMOS: 7-8 2.00 0.70 - 0.50 0.70
EJE: E'-E', TRAMOS: 7-8 2.00 3.20 - 0.75 4.80
EJE: G'-G', TRAMOS: 7-8 2.00 3.20 - 0.75 4.80
EJE: 8-8, TRAMOS: A-B 2.00 0.90 - 0.50 0.90
EJE: 8-8, TRAMOS: A-B 2.00 1.45 - 0.75 2.18
EJE: 8-8, TRAMOS: A-B 2.00 0.90 - 0.50 0.90
EJE: 8-8, TRAMOS: A-B 2.00 1.30 - 0.75 1.95
EJE: 8-8, TRAMOS: B-C 2.00 5.30 - 0.75 7.95
EJE: 8-8, TRAMOS: C-D 2.00 3.85 - 0.75 5.78
EJE: 8-8, TRAMOS: D-E' 2.00 2.75 - 0.75 4.13
EJE: 8-8, TRAMOS: E'-F 2.00 1.40 - 0.75 2.10
EJE: 8-8, TRAMOS: E'-F 2.00 1.80 - 0.50 1.80
EJE: 8-8, TRAMOS: F-G' 2.00 4.75 - 0.75 7.13
EJE: 7-7, TRAMOS: A-B 2.00 4.55 - 0.75 6.83
EJE: 7-7, TRAMOS: B-C 2.00 5.30 - 0.75 7.95
EJE: 7-7, TRAMOS: C-D 2.00 3.85 - 0.75 5.78
EJE: 7-7, TRAMOS: D-E' 2.00 2.75 - 0.50 2.75
EJE: 7-7, TRAMOS: E'-F 2.00 1.40 - 0.75 2.10
EJE: 7-7, TRAMOS: E'-F 2.00 1.80 - 0.50 1.80
EJE: 7-7, TRAMOS: F-G' 2.00 1.20 - 0.75 1.80
EJE: 7-7, TRAMOS: F-G' 2.00 0.90 - 0.50 0.90
EJE: 7-7, TRAMOS: F-G' 2.00 1.65 - 0.75 2.48
EJE: 7-7, TRAMOS: F-G' 2.00 1.00 - 0.50 1.00
ENTRE EJES: A-B y 7-8 2.00 3.60 - 1.15 8.28
ENTRE EJES: B-C y 7-8 2.00 0.60 - 1.15 1.38
ENTRE EJES: B-C y 7-8 2.00 0.90 - 0.95 1.71
ENTRE EJES: B-C y 7-8 2.00 1.20 - 1.15 2.76
ENTRE EJES: B-C y 7-8 2.00 1.45 - 1.15 3.34
ENTRE EJES: C-D y 7-8 2.00 2.55 - 1.15 5.87
ENTRE EJES: C-D y 7-8 2.00 1.65 - 1.15 3.80
EJE: E'-E', TRAMOS: 3-4 2.00 3.60 - 0.75 5.40
EJE: E'-E', TRAMOS: 4-5 2.00 3.40 - 0.75 5.10
EJE: E'-E', TRAMOS: 5-6 2.00 3.40 - 0.75 5.10
EJE: E'-E', TRAMOS: 6-7 2.00 2.50 - 0.75 3.75
EJE: E'-E', TRAMOS: 6-7 2.00 1.20 - 0.50 1.20
EJE: F-F, TRAMNOS:3-4 2.00 0.90 - 0.50 0.90
EJE: F-F, TRAMNOS:3-4 2.00 2.70 - 0.75 4.05
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: F-F, TRAMNOS:5-6 2.00 2.40 - 0.75 3.60
EJE: F-F, TRAMNOS:5-6 2.00 1.00 - 0.50 1.00
EJE: G-G, TRAMNOS:3-4 2.00 3.60 - 0.75 5.40
EJE: G'-G', TRAMNOS:5-6 2.00 3.40 - 0.75 5.10
EJE: G'-G', TRAMNOS: 6-7 2.00 0.90 - 0.50 0.90
EJE: G'-G', TRAMNOS: 6-7 2.00 2.80 - 0.75 4.20
ENTRE EJES: E'-F-G' y 6-7 2.00 4.95 - 1.15 11.39
ENTRE EJES: E'-F-G' y 6-7 2.00 1.65 - 1.15 3.80
ENTRE EJES: E'-F-G' y 6-7 2.00 0.45 - 1.15 1.04
ENTRE EJES: E'-F-G' y 6-7 2.00 2.40 - 1.15 5.52
ENTRE EJES: E'-F-G' y 6-7 2.00 0.60 - 1.15 1.38
ENTRE EJES: E'-F-G' y 6-7 2.00 1.55 - 1.15 3.57
ENTRE EJES: E'-F-G' y 6-7 2.00 1.20 - 1.15 2.76
ENTRE EJES: E'-F-G' y 5-6 2.00 0.85 - 1.15 1.96
ENTRE EJES: E'-F-G' y 5-6 2.00 1.00 - 0.95 1.90
ENTRE EJES: E'-F-G' y 5-6 2.00 0.85 - 1.15 1.96
ENTRE EJES: E'-F-G' y 4-5 2.00 0.77 - 1.15 1.77
ENTRE EJES: E'-F-G' y 4-5 2.00 0.70 - 0.95 1.33
ENTRE EJES: E'-F-G' y 4-5 2.00 1.42 - 1.15 3.27
ENTRE EJES: E'-F-G' y 4-5 2.00 1.80 - 1.15 4.14
ENTRE EJES: E'-F-G' y 4-5 2.00 0.70 - 0.95 1.33
ENTRE EJES: E'-F-G' y 3-4 2.00 1.05 - 1.15 2.42
ENTRE EJES: E'-F-G' y 3-4 2.00 0.45 - 1.15 1.04
EJE: 1-1, TRAMOS: E-F 2.00 4.22 - 0.75 6.33
EJE: 1-1, TRAMOS: F-G 2.00 3.40 - 0.75 5.10
EJE: 1-1, TRAMOS: G-H 2.00 3.40 - 0.75 5.10
EJE: 1-1, TRAMOS: H-I 2.00 3.40 - 0.75 5.10
EJE: 2-2, TRAMOS: E-F 2.00 3.23 - 0.75 4.85
EJE: 2-2, TRAMOS: E-F 2.00 1.00 - 0.50 1.00
EJE: 2-2, TRAMOS: F-G 2.00 1.00 - 0.50 1.00
EJE: 2-2, TRAMOS: F-G 2.00 2.40 - 0.75 3.60
EJE: 2-2, TRAMOS: G-H 2.00 1.00 - 0.50 1.00
EJE: 2-2, TRAMOS: G-H 2.00 2.40 - 0.75 3.60
EJE: 2-2, TRAMOS: H-I 2.00 1.00 - 0.50 1.00
EJE: 2-2, TRAMOS: H-I 2.00 2.40 - 0.75 3.60
EJE: 3-3, TRAMOS: E-F 2.00 0.67 - 0.75 1.01
EJE: 3-3, TRAMOS: E-F 2.00 3.20 - 0.75 4.80
EJE: 3-3, TRAMOS: F-G 2.00 2.40 - 0.50 2.40
EJE: 3-3, TRAMOS: F-G 2.00 1.00 - 0.75 1.50
EJE: 3-3, TRAMOS: G-H 2.00 3.40 - 0.75 5.10
EJE: 3-3, TRAMOS: H-I 2.00 3.40 - 0.75 5.10
EJE: E-E, TRAMOS: 1-2 2.00 4.40 - 0.75 6.60
EJE: E-E, TRAMOS: 2-3 2.00 2.45 - 0.50 2.45
EJE: E-E, TRAMOS: 2-3 2.00 1.10 - 0.75 1.65
EJE: F-F, TRAMOS: 1-2 2.00 4.40 - 0.75 6.60
EJE: G-G, TRAMOS: 1-2 2.00 4.40 - 0.75 6.60
EJE: H-H, TRAMOS: 1-2 2.00 4.40 - 0.75 6.60
EJE: I-I, TRAMOS: 1-2 2.00 4.40 - 0.75 6.60
EJE: I-I, TRAMOS: 2-3 2.00 4.40 - 0.75 6.60
ENTRE EJES: F-G, y EJES: 2-3 2.00 3.55 - 0.75 5.33
MODULO D: CONCRETO EN SOBRECIMIENTOS
EJE: A-A, TRAMOS: 1-2 2.00 3.85 - 0.75 5.78
EJE: B-B, TRAMOS: 1-2 2.00 2.10 - 0.75 3.15
EJE: B-B, TRAMOS: 1-2 2.00 1.80 - 0.50 1.80
EJE: 1-1, TRAMOS: A-B 2.00 3.56 - 0.75 5.34
EJE: 2-2, TRAMOS: A-B 2.00 0.31 - 0.75 0.47
EJE: 2-2, TRAMOS: A-B 2.00 0.90 - 0.50 0.90
EJE: 2-2, TRAMOS: A-B 2.00 0.98 - 0.75 1.47
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: 2-2, TRAMOS: A-B 2.00 0.90 - 0.50 0.90
EJE: 2-2, TRAMOS: A-B 2.00 0.31 - 0.75 0.47
ENTRE EJES: A-B, y 1-2 2.00 3.65 - 1.15 8.40
ENTRE EJES: A-B, y 1-2 2.00 1.09 - 1.15 2.51
MODULO E: CONCRETO EN SOBRECIMIENTOS
EJE: A-A, TRAMOS: 1-2 2.00 3.01 - 0.75 4.52
EJE: B-B, TRAMOS: 1-2 2.00 2.98 - 0.75 4.47
EJE: C-C, TRAMOS: 1-2 2.00 2.93 - 0.75 4.40
EJE: D-D, TRAMOS: 1-2 2.00 2.90 - 0.75 4.35
EJE: 1-1, TRAMOS: A-B 2.00 0.38 - 0.75 0.57
EJE: 1-1, TRAMOS: A-B 2.00 1.50 - 0.50 1.50
EJE: 1-1, TRAMOS: A-B 2.00 0.38 - 0.75 0.57
EJE: 1-1, TRAMOS: B-C 2.00 2.15 - 0.75 3.23
EJE: 1-1, TRAMOS: B-C 2.00 1.10 - 0.50 1.10
EJE: 1-1, TRAMOS: C-D 2.00 0.53 - 0.75 0.80
EJE: 1-1, TRAMOS: C-D 2.00 1.50 - 0.50 1.50
EJE: 1-1, TRAMOS: C-D 2.00 0.27 - 0.75 0.41
EJE: 2-2, TRAMOS: A-B 2.00 2.25 - 0.75 3.38
EJE: 2-2, TRAMOS: B-C 2.00 3.25 - 0.75 4.88
EJE: 2-2, TRAMOS: C-D 2.00 2.30 - 0.75 3.45
ENTRE EJES: 1-2 y B-C 2.00 2.35 - 1.15 5.41
ENTRE EJES: 1-2 y B-C 2.00 0.50 - 1.15 1.15
CONCRETO SOBRECIMIENTOS CASETA:
CIMIENTOS DE CASETA 4.00 2.53 - 1.15 11.64
CIMIENTOS DE CASETA 4.00 0.55 - 1.15 2.53
CIMIENTOS DE CASETA 2.00 0.33 - 1.15 0.76

05.03.03 ACERO ESTRUCTURAL PARA SOBRECIMIENTO REFORZADO 3,537.13 KG

05.04.00 SARDINELES PERALTADOS

05.04.01 CONCRETO EN SARDINELES PERALTADOS F'C=140Kg/cm2 55.52 M3

SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 5.28 0.15 1.45 1.15


SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 8.45 0.15 1.45 1.84
SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 4.73 0.15 1.45 1.03
SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 24.88 0.15 1.45 5.41
SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 8.44 0.15 1.45 1.84
SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 10.24 0.15 1.45 2.23
SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 8.39 0.15 1.45 1.82
SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 4.85 0.15 1.45 1.05
SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 7.09 0.15 1.45 1.54
SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 14.07 0.15 1.45 3.06
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA 2.00 5.32 0.15 1.45 2.31
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA 1.00 9.62 0.15 1.45 2.09
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA 1.00 11.90 0.15 1.45 2.59
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA 1.00 8.27 0.15 1.45 1.80
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA 1.00 26.32 0.15 1.45 5.72
SARDINELES PERIMETRICOS DE AREAS VERDES CIRCULAR 1.00 3.76 0.15 1.45 0.82
SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 21.50 0.15 1.45 4.68
SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 22.90 0.15 1.45 4.98
SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 11.90 0.15 1.45 2.59
SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 15.76 0.15 1.45 3.43
SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 10.67 0.15 1.45 2.32
SARDINELES PERIMETRICOS DE AREAS VERDES 1.00 5.60 0.15 1.45 1.22

05.04.02 ENCOFRADO Y DESENCOFRADO DE SARDINELES PERALTADOS 724.83 M2


MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 5.28 - 1.45 15.31
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 8.45 - 1.45 24.51
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 4.73 - 1.45 13.72
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 24.88 - 1.45 72.15
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 8.44 - 1.45 24.48
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 10.24 - 1.45 29.70
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 8.39 - 1.45 24.33
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 4.85 - 1.45 14.07
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 7.09 - 1.45 20.56
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 14.07 - 1.45 40.80
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA 2.00 5.32 - 1.45 15.43
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA 2.00 9.62 - 1.45 27.90
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA 2.00 11.90 - 1.45 34.51
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA 2.00 8.27 - 1.45 23.98
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA 2.00 26.32 - 1.45 76.33
SARDINELES PERIMETRICOS DE AREAS VERDES CIRCULAR 2.00 3.76 - 1.45 10.90
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 21.50 - 1.45 62.35
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 22.90 - 1.45 66.41
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 11.90 - 1.45 34.51
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 15.76 - 1.45 45.70
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 10.67 - 1.45 30.94
SARDINELES PERIMETRICOS DE AREAS VERDES 2.00 5.60 - 1.45 16.24

05.04.03 ACERO ESTRUCTURAL PARA SARDINELES PERALTADOS 1,356.33 KG

05.05.00 COLUMNAS
05.05.01 CONCRETO EN COLUMNAS F'C=210Kg/Cm2 46.69 M3
MODULO A: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-02 1.00 Area 0.0875 6.02 0.53
COLUMNA - TIPO: C-03 2.00 Area 0.0625 6.02 0.75
COLUMNA - TIPO: C-02 1.00 Area 0.0875 6.24 0.55
COLUMNA - TIPO: C-03 2.00 Area 0.0625 6.24 0.78
COLUMNA - TIPO: C-02 1.00 Area 0.0875 6.35 0.56
COLUMNA - TIPO: C-03 2.00 Area 0.0625 6.35 0.79
COLUMNA - TIPO: C-02 1.00 Area 0.0875 6.95 0.61
COLUMNA - TIPO: C-03 2.00 Area 0.0625 6.95 0.87
MODULO B: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-01 4.00 Area 0.1225 3.75 1.84
COLUMNA - TIPO: C-01 4.00 Area 0.1225 5.10 2.50
COLUMNA - TIPO: C-01 4.00 Area 0.1225 4.30 2.11
COLUMNA - TIPO: C-01 4.00 Area 0.1225 6.02 2.95
COLUMNA - TIPO: C-01 4.00 Area 0.1225 4.20 2.06
COLUMNA - TIPO: C-01 2.00 Area 0.1225 3.90 0.96
MODULO C: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-01 7.00 Area 0.1225 4.47 3.83
COLUMNA - TIPO: C-01 7.00 Area 0.1225 3.73 3.20
COLUMNA - TIPO: C-01 5.00 Area 0.1225 4.70 2.88
COLUMNA - TIPO: C-01 4.00 Area 0.1225 4.24 2.08
COLUMNA - TIPO: C-01 5.00 Area 0.1225 3.72 2.28
COLUMNA - TIPO: C-01 2.00 Area 0.1225 3.95 0.97
COLUMNA - TIPO: C-01 5.00 Area 0.1225 4.05 2.48
COLUMNA - TIPO: C-01 5.00 Area 0.1225 4.72 2.89
MODULO D: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-03 2.00 Area 0.0625 4.57 0.57
COLUMNA - TIPO: C-03 2.00 Area 0.0625 3.75 0.47
MODULO E: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-03 4.00 Area 0.0625 3.47 0.87
COLUMNA - TIPO: C-03 4.00 Area 0.0625 4.17 1.04
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
COLUMNAS DE PORTICO EXTERIOR:
1.00 Area 0.1250 6.65 0.83
1.00 Area 0.1250 6.85 0.86
2.00 Area 0.1250 7.15 1.79
2.00 Area 0.1250 7.30 1.83

05.05.02 ENCOFRADO Y DESENCOFRADO DE COLUMNAS 564.48 M2


COLUMNA - TIPO: C-02 1.00 Perimetro 1.2000 6.02 7.22
COLUMNA - TIPO: C-03 2.00 Perimetro 1.0000 6.02 12.04
COLUMNA - TIPO: C-02 1.00 Perimetro 1.2000 6.24 7.49
COLUMNA - TIPO: C-03 2.00 Perimetro 1.0000 6.24 12.48
COLUMNA - TIPO: C-02 1.00 Perimetro 1.2000 6.35 7.62
COLUMNA - TIPO: C-03 2.00 Perimetro 1.0000 6.35 12.70
COLUMNA - TIPO: C-02 1.00 Perimetro 1.2000 6.95 8.34
COLUMNA - TIPO: C-03 2.00 Perimetro 1.0000 6.95 13.90
MODULO B: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-01 4.00 Perimetro 1.4000 3.75 21.00
COLUMNA - TIPO: C-01 4.00 Perimetro 1.4000 5.10 28.56
COLUMNA - TIPO: C-01 4.00 Perimetro 1.4000 4.30 24.08
COLUMNA - TIPO: C-01 4.00 Perimetro 1.4000 6.02 33.71
COLUMNA - TIPO: C-01 4.00 Perimetro 1.4000 4.20 23.52
COLUMNA - TIPO: C-01 2.00 Perimetro 1.4000 3.90 10.92
MODULO C: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-01 7.00 Perimetro 1.4000 4.47 43.81
COLUMNA - TIPO: C-01 7.00 Perimetro 1.4000 3.73 36.55
COLUMNA - TIPO: C-01 5.00 Perimetro 1.4000 4.70 32.90
COLUMNA - TIPO: C-01 4.00 Perimetro 1.4000 4.24 23.74
COLUMNA - TIPO: C-01 5.00 Perimetro 1.4000 3.72 26.04
COLUMNA - TIPO: C-01 2.00 Perimetro 1.4000 3.95 11.06
COLUMNA - TIPO: C-01 5.00 Perimetro 1.4000 4.05 28.35
COLUMNA - TIPO: C-01 5.00 Perimetro 1.4000 4.72 33.04
MODULO D: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-03 2.00 Perimetro 1.0000 4.57 9.14
COLUMNA - TIPO: C-03 2.00 Perimetro 1.0000 3.75 7.50
MODULO E: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-03 4.00 Perimetro 1.0000 3.47 13.88
COLUMNA - TIPO: C-03 4.00 Perimetro 1.0000 4.17 16.68
COLUMNAS DE PORTICO EXTERIOR:
1.00 Perimetro 1.5000 6.05 9.08
1.00 Perimetro 1.5000 6.25 9.38
2.00 Perimetro 1.5000 6.55 19.65
2.00 Perimetro 1.5000 6.70 20.10

05.05.03 ACERO ESTRUCTURAL PARA COLUMNAS 6,279.80 KG

05.06.00 COLUMNAS DE CONFINAMIENTO


05.06.01 CONCRETO F'C=175 KG/CM2 PARA COLUMNAS DE CONFINAMIENTO 0.54 M3
COLUMNA - TIPO: C-04 / COLUMNAS DE CASETA 2.00 Area 0.0375 3.77 0.28
COLUMNA - TIPO: C-04 / COLUMNAS DE CASETA 2.00 Area 0.0375 3.45 0.26

05.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS DE CONFINAMIENTO 11.55 M2


COLUMNA - TIPO: C-04 / COLUMNAS DE CASETA 2.00 Permetro 0.8000 3.77 6.03
COLUMNA - TIPO: C-04 / COLUMNAS DE CASETA 2.00 Permetro 0.8000 3.45 5.52

05.06.03 ACERO ESTRUCTURAL PARA COLUMNAS CONFINAM. 109.29 KG

05.07.00 VIGAS
05.07.01 CONCRETO EN VIGAS - F'C=210Kg/Cm2 58.98 M3
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
MODULO A: CONCRETO EN VIGAS
EJE: A-A, TRAMOS: 1-2-3 1.00 8.10 0.250 0.50 1.01
EJE: B-B, TRAMOS: 1-2-3 1.00 8.10 0.250 0.50 1.01
EJE: C-C, TRAMOS: 1-2-3 1.00 8.10 0.250 0.50 1.01
EJE: D-D, TRAMOS: 1-2-3 1.00 8.10 0.250 0.50 1.01
EJE: 1-1, TRAMOS: A-B-C-D 1.00 11.15 0.250 0.20 0.56
EJE: 2-2, TRAMOS: A-B-C-D 1.00 11.15 0.250 0.20 0.56
EJE: 3-3, TRAMOS: A-B-C-D 1.00 11.15 0.250 0.20 0.56
MODULO B: CONCRETO EN VIGAS
EJE: 6-6, TRAMOS A-B-C 1.00 11.40 0.350 0.50 2.00
EJE: 5-5 TRAMOS A-B-C 1.00 11.40 0.350 0.50 2.00
EJE: 4-4 TRAMOS A-B-C 1.00 11.40 0.350 0.50 2.00
EJE: 3-3 TRAMOS A-B-C 1.00 11.40 0.350 0.50 2.00
EJE: 3-3 TRAMOS B-C-D-E 1.00 13.40 0.350 0.20 0.94
EJE: 2-2 TRAMOS B-C-D-E 1.00 13.40 0.350 0.20 0.94
EJE: 1-1 TRAMOS B-C-D-E 1.00 13.40 0.350 0.20 0.94
EJE: A-A, TRAMOS: 3-4-5-6 1.00 12.43 0.350 0.20 0.87
EJE: B-B, TRAMOS: 3-4-5-6 1.00 12.43 0.350 0.20 0.87
EJE: C-C, TRAMOS: 3-4-5-6 1.00 12.43 0.350 0.20 0.87
EJE: B-B, TRAMOS: 1-2-3 1.00 8.48 0.350 0.50 1.48
EJE: C-C, TRAMOS: 1-2-3 1.00 8.48 0.350 0.50 1.48
EJE: D-D, TRAMOS: 1-2-3 1.00 8.48 0.350 0.50 1.48
EJE: E-E, TRAMOS: 1-2-3 1.00 8.48 0.350 0.50 1.48
MODULO C: CONCRETO EN VIGAS
EJE: A-A, TRAMOS:: 7-8 1.00 3.90 0.350 0.50 0.68
EJE: B-B, TRAMOS:: 7-8 1.00 3.90 0.350 0.50 0.68
EJE: C-C, TRAMOS:: 7-8 1.00 3.90 0.350 0.50 0.68
EJE: D-D, TRAMOS:: 7-8 1.00 3.90 0.350 0.50 0.68
EJE: E'-E', TRAMOS:: 7-8 1.00 3.90 0.350 0.50 0.68
EJE: F-F, TRAMOS:: 7-8 1.00 3.90 0.350 0.50 0.68
EJE: G'-G', TRAMOS:: 7-8 1.00 3.90 0.350 0.50 0.68
EJE: 7-7, TRAMOS: A-B-C-D-E'-F-G' 1.00 26.86 0.350 0.20 1.88
EJE: 8-8, TRAMOS: A-B-C-D-E'-F-G' 1.00 26.86 0.350 0.20 1.88
EJE: 3-3, TRAMOS: E'-F-G 1.00 7.65 0.350 0.50 1.34
EJE: 4-4, TRAMOS: E'-F-G 1.00 7.65 0.350 0.50 1.34
EJE: 5-5, TRAMOS: E'-F-G-G' 1.00 9.00 0.350 0.50 1.58
EJE: 6-6, TRAMOS: E'-F-G' 1.00 9.00 0.350 0.50 1.58
EJE: 7-7, TRAMOS: E'-F-G' 1.00 9.00 0.350 0.50 1.58
EJE: E'-E', TRAMOS:: 3-4-5-6-7 1.00 15.15 0.350 0.20 1.06
EJE: F-F, TRAMOS:: 3-4-5-6-7 1.00 15.15 0.350 0.20 1.06
EJE: G-G, TRAMOS:: 3-4-5 1.00 8.05 0.350 0.20 0.56
EJE: G'-G', TRAMOS: 5-6-7 1.00 8.15 0.350 0.20 0.57
EJE: E-E, TRAMOS: 1-2-3 1.00 9.00 0.350 0.50 1.58
EJE: F-F, TRAMOS: 1-2-3 1.00 9.00 0.350 0.50 1.58
EJE: G-G, TRAMOS: 1-2-3 1.00 9.00 0.350 0.50 1.58
EJE: H-H, TRAMOS: 1-2-3 1.00 9.00 0.350 0.50 1.58
EJE: I-I, TRAMOS: 1-2-3 1.00 9.00 0.350 0.50 1.58
EJE: 1-1, TRAMOS E-F-G-H-I 1.00 16.18 0.350 0.20 1.13
EJE: 2-2, TRAMOS E-F-G-H-I 1.00 16.18 0.350 0.20 1.13
EJE: 3-3, TRAMOS E-F-G-H-I 1.00 16.18 0.350 0.20 1.13
MODULO D: CONCRETO EN VIGAS 0.00
EJE: 1-1, TRAMOS A-B 1.00 3.90 0.250 0.40 0.39
EJE: 2-2, TRAMOS A-B 1.00 4.06 0.250 0.40 0.41
EJE: A-A, TRAMOS: 1-2 1.00 3.85 0.250 0.20 0.19
EJE: B-B, TRAMOS: 1-2 1.00 3.89 0.250 0.20 0.19
MODULO E: CONCRETO EN VIGAS 0.00
EJE: 1-1, TRAMOS: A-B-C-D 1.00 8.80 0.250 0.20 0.44
EJE: 2-2, TRAMOS: A-B-C-D 1.00 8.80 0.250 0.20 0.44
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: A-A, TRAMOS: 1-2 1.00 3.51 0.250 0.40 0.35
EJE: B-B, TRAMOS: 1-2 1.00 3.48 0.250 0.40 0.35
EJE: C-C, TRAMOS: 1-2 1.00 3.43 0.250 0.40 0.34
EJE: D-D, TRAMOS: 1-2 1.00 3.40 0.250 0.40 0.34

05.07.02 ENCOFRADO NORMAL EN VIGAS 624.15 M2


MODULO A: ENCOFRADO EN VIGAS
EJE: A-A, TRAMOS: 1-2-3 2.00 8.10 - 0.50 8.10
EJE: B-B, TRAMOS: 1-2-3 2.00 8.10 - 0.50 8.10
EJE: C-C, TRAMOS: 1-2-3 2.00 8.10 - 0.50 8.10
EJE: D-D, TRAMOS: 1-2-3 2.00 8.10 - 0.50 8.10
EJE: 1-1, TRAMOS: A-B-C-D 2.00 11.15 - 0.20 4.46
EJE: 2-2, TRAMOS: A-B-C-D 2.00 11.15 - 0.20 4.46
EJE: 3-3, TRAMOS: A-B-C-D 2.00 11.15 - 0.20 4.46
EJE: A-A, TRAMOS: 1-2-3 1.00 8.10 - 0.25 2.03
EJE: B-B, TRAMOS: 1-2-3 1.00 8.10 - 0.25 2.03
EJE: C-C, TRAMOS: 1-2-3 1.00 8.10 - 0.25 2.03
EJE: D-D, TRAMOS: 1-2-3 1.00 8.10 - 0.25 2.03
EJE: 1-1, TRAMOS: A-B-C-D 1.00 11.15 - 0.25 2.79
EJE: 2-2, TRAMOS: A-B-C-D 1.00 11.15 - 0.25 2.79
EJE: 3-3, TRAMOS: A-B-C-D 1.00 11.15 - 0.25 2.79
MODULO B: ENCOFRADO EN VIGAS
EJE: 6-6, TRAMOS A-B-C 2.00 11.40 - 0.50 11.40
EJE: 5-5 TRAMOS A-B-C 2.00 11.40 - 0.50 11.40
EJE: 4-4 TRAMOS A-B-C 2.00 11.40 - 0.50 11.40
EJE: 3-3 TRAMOS A-B-C 2.00 11.40 - 0.50 11.40
EJE: 3-3 TRAMOS B-C-D-E 2.00 13.40 - 0.20 5.36
EJE: 2-2 TRAMOS B-C-D-E 2.00 13.40 - 0.20 5.36
EJE: 1-1 TRAMOS B-C-D-E 2.00 13.40 - 0.20 5.36
EJE: A-A, TRAMOS: 3-4-5-6 2.00 12.43 - 0.20 4.97
EJE: B-B, TRAMOS: 3-4-5-6 2.00 12.43 - 0.20 4.97
EJE: C-C, TRAMOS: 3-4-5-6 2.00 12.43 - 0.20 4.97
EJE: B-B, TRAMOS: 1-2-3 2.00 8.48 - 0.50 8.48
EJE: C-C, TRAMOS: 1-2-3 2.00 8.48 - 0.50 8.48
EJE: D-D, TRAMOS: 1-2-3 2.00 8.48 - 0.50 8.48
EJE: E-E, TRAMOS: 1-2-3 2.00 8.48 - 0.50 8.48
EJE: 6-6, TRAMOS A-B-C 1.00 11.40 - 0.35 3.99
EJE: 5-5 TRAMOS A-B-C 1.00 11.40 - 0.35 3.99
EJE: 4-4 TRAMOS A-B-C 1.00 11.40 - 0.35 3.99
EJE: 3-3 TRAMOS A-B-C 1.00 11.40 - 0.35 3.99
EJE: 3-3 TRAMOS B-C-D-E 1.00 13.40 - 0.35 4.69
EJE: 2-2 TRAMOS B-C-D-E 1.00 13.40 - 0.35 4.69
EJE: 1-1 TRAMOS B-C-D-E 1.00 13.40 - 0.35 4.69
EJE: A-A, TRAMOS: 3-4-5-6 1.00 12.43 - 0.35 4.35
EJE: B-B, TRAMOS: 3-4-5-6 1.00 12.43 - 0.35 4.35
EJE: C-C, TRAMOS: 3-4-5-6 1.00 12.43 - 0.35 4.35
EJE: B-B, TRAMOS: 1-2-3 1.00 8.48 - 0.35 2.97
EJE: C-C, TRAMOS: 1-2-3 1.00 8.48 - 0.35 2.97
EJE: D-D, TRAMOS: 1-2-3 1.00 8.48 - 0.35 2.97
EJE: E-E, TRAMOS: 1-2-3 1.00 8.48 - 0.35 2.97
MODULO C: ENCOFRADO EN VIGAS
EJE: A-A, TRAMOS:: 7-8 2.00 3.90 - 0.50 3.90
EJE: B-B, TRAMOS:: 7-8 2.00 3.90 - 0.50 3.90
EJE: C-C, TRAMOS:: 7-8 2.00 3.90 - 0.50 3.90
EJE: D-D, TRAMOS:: 7-8 2.00 3.90 - 0.50 3.90
EJE: E'-E', TRAMOS:: 7-8 2.00 3.90 - 0.50 3.90
EJE: F-F, TRAMOS:: 7-8 2.00 3.90 - 0.50 3.90
EJE: G'-G', TRAMOS:: 7-8 2.00 3.90 - 0.50 3.90
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: 7-7, TRAMOS: A-B-C-D-E'-F-G' 2.00 26.86 - 0.20 10.74
EJE: 8-8, TRAMOS: A-B-C-D-E'-F-G' 2.00 26.86 - 0.20 10.74
EJE: 3-3, TRAMOS: E'-F-G 2.00 7.65 - 0.50 7.65
EJE: 4-4, TRAMOS: E'-F-G 2.00 7.65 - 0.50 7.65
EJE: 5-5, TRAMOS: E'-F-G-G' 2.00 9.00 - 0.50 9.00
EJE: 6-6, TRAMOS: E'-F-G' 2.00 9.00 - 0.50 9.00
EJE: 7-7, TRAMOS: E'-F-G' 2.00 9.00 - 0.50 9.00
EJE: E'-E', TRAMOS:: 3-4-5-6-7 2.00 15.15 - 0.20 6.06
EJE: F-F, TRAMOS:: 3-4-5-6-7 2.00 15.15 - 0.20 6.06
EJE: G-G, TRAMOS:: 3-4-5 2.00 8.05 - 0.20 3.22
EJE: G'-G', TRAMOS: 5-6-7 2.00 8.15 - 0.20 3.26
EJE: E-E, TRAMOS: 1-2-3 2.00 9.00 - 0.50 9.00
EJE: F-F, TRAMOS: 1-2-3 2.00 9.00 - 0.50 9.00
EJE: G-G, TRAMOS: 1-2-3 2.00 9.00 - 0.50 9.00
EJE: H-H, TRAMOS: 1-2-3 2.00 9.00 - 0.50 9.00
EJE: I-I, TRAMOS: 1-2-3 2.00 9.00 - 0.50 9.00
EJE: 1-1, TRAMOS E-F-G-H-I 2.00 16.18 - 0.20 6.47
EJE: 2-2, TRAMOS E-F-G-H-I 2.00 16.18 - 0.20 6.47
EJE: 3-3, TRAMOS E-F-G-H-I 2.00 16.18 - 0.20 6.47
EJE: A-A, TRAMOS:: 7-8 1.00 3.90 - 0.35 1.37
EJE: B-B, TRAMOS:: 7-8 2.00 3.90 - 0.35 2.73
EJE: C-C, TRAMOS:: 7-8 2.00 3.90 - 0.35 2.73
EJE: D-D, TRAMOS:: 7-8 2.00 3.90 - 0.35 2.73
EJE: E'-E', TRAMOS:: 7-8 2.00 3.90 - 0.35 2.73
EJE: F-F, TRAMOS:: 7-8 2.00 3.90 - 0.35 2.73
EJE: G'-G', TRAMOS:: 7-8 2.00 3.90 - 0.35 2.73
EJE: 7-7, TRAMOS: A-B-C-D-E'-F-G' 2.00 26.86 - 0.35 18.80
EJE: 8-8, TRAMOS: A-B-C-D-E'-F-G' 2.00 26.86 - 0.35 18.80
EJE: 3-3, TRAMOS: E'-F-G 2.00 7.65 - 0.35 5.36
EJE: 4-4, TRAMOS: E'-F-G 2.00 7.65 - 0.35 5.36
EJE: 5-5, TRAMOS: E'-F-G-G' 2.00 9.00 - 0.35 6.30
EJE: 6-6, TRAMOS: E'-F-G' 2.00 9.00 - 0.35 6.30
EJE: 7-7, TRAMOS: E'-F-G' 2.00 9.00 - 0.35 6.30
EJE: E'-E', TRAMOS:: 3-4-5-6-7 2.00 15.15 - 0.35 10.61
EJE: F-F, TRAMOS:: 3-4-5-6-7 2.00 15.15 - 0.35 10.61
EJE: G-G, TRAMOS:: 3-4-5 2.00 8.05 - 0.35 5.64
EJE: G'-G', TRAMOS: 5-6-7 2.00 8.15 - 0.35 5.71
EJE: E-E, TRAMOS: 1-2-3 2.00 9.00 - 0.35 6.30
EJE: F-F, TRAMOS: 1-2-3 2.00 9.00 - 0.35 6.30
EJE: G-G, TRAMOS: 1-2-3 2.00 9.00 - 0.35 6.30
EJE: H-H, TRAMOS: 1-2-3 2.00 9.00 - 0.35 6.30
EJE: I-I, TRAMOS: 1-2-3 2.00 9.00 - 0.35 6.30
EJE: 1-1, TRAMOS E-F-G-H-I 2.00 16.18 - 0.35 11.33
EJE: 2-2, TRAMOS E-F-G-H-I 2.00 16.18 - 0.35 11.33
EJE: 3-3, TRAMOS E-F-G-H-I 2.00 16.18 - 0.35 11.33
MODULO D: ENCOFRADO EN VIGAS
EJE: 1-1, TRAMOS A-B 2.00 3.90 - 0.40 3.12
EJE: 2-2, TRAMOS A-B 2.00 4.06 - 0.40 3.25
EJE: A-A, TRAMOS: 1-2 2.00 3.85 - 0.20 1.54
EJE: B-B, TRAMOS: 1-2 2.00 3.89 - 0.20 1.56
EJE: 1-1, TRAMOS A-B 1.00 3.90 - 0.25 0.98
EJE: 2-2, TRAMOS A-B 1.00 4.06 - 0.25 1.02
EJE: A-A, TRAMOS: 1-2 1.00 3.85 - 0.25 0.96
EJE: B-B, TRAMOS: 1-2 1.00 3.89 - 0.25 0.97
MODULO E: ENCOFRADO EN VIGAS
EJE: 1-1, TRAMOS: A-B-C-D 2.00 8.80 - 0.20 3.52
EJE: 2-2, TRAMOS: A-B-C-D 2.00 8.80 - 0.20 3.52
EJE: A-A, TRAMOS: 1-2 2.00 3.51 - 0.40 2.81
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
EJE: B-B, TRAMOS: 1-2 2.00 3.48 - 0.40 2.78
EJE: C-C, TRAMOS: 1-2 2.00 3.43 - 0.40 2.74
EJE: D-D, TRAMOS: 1-2 2.00 3.40 - 0.40 2.72
EJE: 1-1, TRAMOS: A-B-C-D 1.00 8.80 - 0.25 2.20
EJE: 2-2, TRAMOS: A-B-C-D 1.00 8.80 - 0.25 2.20
EJE: A-A, TRAMOS: 1-2 1.00 3.51 - 0.25 0.88
EJE: B-B, TRAMOS: 1-2 1.00 3.48 - 0.25 0.87
EJE: C-C, TRAMOS: 1-2 1.00 3.43 - 0.25 0.86
EJE: D-D, TRAMOS: 1-2 1.00 3.40 - 0.25 0.85

05.07.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELES 6,139.83 KG

05.08.00 VIGAS CONFINAMIENTO

05.08.01 CONCRETO F'C=175 KG/CM2 PARA VIGAS DE CONFINAMIENTO 5.15 M3


CASETA DE CONTROL:
2.00 1.30 0.250 0.20 0.13
2.00 2.30 0.150 0.40 0.28
PORTICO EXTERIOR / ENTRADA CENTRO DE SALUD: 0.00
1.00 17.50 0.250 0.50 2.19
1.00 17.50 0.250 0.53 2.30
3.00 1.25 0.350 0.20 0.26

05.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS DE CONFINAMIENTO 53.50 M2


CASETA DE CONTROL:
4.00 1.30 - 0.20 1.04
4.00 2.30 - 0.40 3.68
2.00 1.30 - 0.25 0.65
2.00 2.30 - 0.15 0.69
PORTICO EXTERIOR / ENTRADA CENTRO DE SALUD:
2.00 17.50 - 0.50 17.50
2.00 17.50 - 0.53 18.38
6.00 1.25 - 0.20 1.50
1.00 17.50 - 0.25 4.38
1.00 17.50 - 0.25 4.38
3.00 1.25 - 0.35 1.31

05.08.03 ACERO ESTRUCTURAL PARA COLUMNAS CONFINAM. 584.38 KG

05.09.00 LOSA ALIGERADA E=0.20M

05.09.01 LOSA ALIGERADA E=20 CM -CONCRETO F'C=210 KG/CM2 81.59 M3

MODULO A: CONCRETO EN LOSAS ALIGERADAS


1.00 11.20 9.15 0.08m3/m2 8.20
MODULO B: CONCRETO EN LOSAS ALIGERADAS
1.00 7.65 13.20 0.08m3/m2 8.08
1.00 6.55 13.20 0.08m3/m2 6.92
1.00 9.71 13.65 0.08m3/m2 10.60
MODULO C: CONCRETO EN LOSAS ALIGERADAS
1.00 6.85 10.10 0.08m3/m2 5.53
1.00 7.30 11.35 0.08m3/m2 6.63
1.00 9.15 16.43 0.08m3/m2 12.03
1.00 6.10 12.35 0.08m3/m2 6.03
1.00 6.10 7.35 0.08m3/m2 3.59
1.00 6.10 10.00 0.08m3/m2 4.88
MODULO D: CONCRETO EN LOSAS ALIGERADAS
1.00 6.15 4.95 0.08m3/m2 2.44
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
MODULO E: CONCRETO EN LOSAS ALIGERADAS
1.00 4.91 9.20 0.08m3/m2 3.61
1.00 7.65 4.240 0.08m3/m2 2.59
MODULO DE CASETA: CONCRETO EN LOSAS ALIGERADAS
1.00 2.30 2.55 0.08m3/m2 0.47

05.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS 1,019.92 M2

MODULO A: ENCOFRADO EN LOSAS ALIGERADAS


1.00 11.20 9.15 - 102.48
MODULO B: ENCOFRADO EN LOSAS ALIGERADAS
1.00 7.65 13.20 - 100.98
1.00 6.55 13.20 - 86.46
1.00 9.71 13.65 - 132.54
MODULO C: ENCOFRADO EN LOSAS ALIGERADAS
1.00 6.85 10.10 - 69.19
1.00 7.30 11.35 - 82.86
1.00 9.15 16.43 - 150.33
1.00 6.10 12.35 - 75.34
1.00 6.10 7.35 - 44.84
1.00 6.10 10.00 - 61.00
MODULO D: ENCOFRADO EN LOSAS ALIGERADAS
1.00 6.15 4.95 - 30.44
MODULO E: ENCOFRADO EN LOSAS ALIGERADAS
1.00 4.91 9.20 - 45.17
1.00 7.65 4.240 - 32.44
MODULO DE CASETA: ENCOFRADO EN LOSAS ALIGERADAS
1.00 2.30 2.55 - 5.87

05.09.03 ACERO ESTRUCTURAL PARA LOSA ALIGERADA E=20CM 4,809.80 KG

05.09.04 LADRILLO DE ARCILLA HUECO DE 15X30X30 PROV.Y COLOCADO 8,495.95 UND

MODULO A: LADRILLO DE TECHO


1.00 11.20 9.15 8.33und/m2 853.66
MODULO B: LADRILLO DE TECHO
1.00 7.65 13.20 8.33und/m2 841.16
1.00 6.55 13.20 8.33und/m2 720.21
1.00 9.71 13.65 8.33und/m2 1104.07
MODULO C: LADRILLO DE TECHO
1.00 6.85 10.10 8.33und/m2 576.31
1.00 7.30 11.35 8.33und/m2 690.18
1.00 9.15 16.43 8.33und/m2 1252.29
1.00 6.10 12.35 8.33und/m2 627.54
1.00 6.10 7.35 8.33und/m2 373.48
1.00 6.10 10.00 8.33und/m2 508.13
MODULO D: LADRILLO DE TECHO
1.00 6.15 4.95 8.33und/m2 253.59
MODULO E: LADRILLO DE TECHO
1.00 4.91 9.20 8.33und/m2 376.28
1.00 7.65 4.240 8.33und/m2 270.19
MODULO DE CASETA: LADRILLO DE TECHO
1.00 2.30 2.55 8.33und/m2 48.86

05.11.00 CISTERNA

05.11.01 CONCRETO EN CISTERNA SUBTERRANEA F'C=210 KG/CM2 5.76 M3


CONCRETO EN PAREDES DE CISTERNA 2.00 2.30 0.15 1.60 1.10
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
CONCRETO EN PAREDES DE CISTERNA 2.00 3.60 0.15 1.60 1.73
CONCRETO EN LOSA FONDO CISTERNA 1.00 3.90 0.15 2.50 1.46
CONCRETO EN LOSA TECHO CISTERNA 1.00 3.90 0.15 2.50 1.46

05.11.02 ENCOFRADO Y DESENCOFRADO INTERIOR EN CISTERNA SUBTERRANEA 49.43 M2


ENCOFRADO EN PAREDES DE CISTERNA 4.00 2.30 - 1.60 14.72
ENCOFRADO EN PAREDES DE CISTERNA 4.00 3.60 - 1.60 23.04
ENCOFRADO EN LOSA TECHO CISTERNA 1.00 3.90 - 2.50 9.75
PERIMETRO DE LOSA TECHO 2.00 3.90 - 0.15 1.17
PERIMETRO DE LOSA TECHO 2.00 2.50 - 0.15 0.75

05.11.03 ACERO GRADO 60 EN CISTERNA SUBTERRANEA 826.36 KG

05.11.04 ALAMBRE N: 08 REFUERZO HORIZONTAL EN MUROS 319.45 KG


- - - - 319.45
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

Long x D
N de pza. 1/4 3/8 1/2 5/8 3/4 1
Diseo del Canti- Long. Por 0.25 0.58 1.02 1.58 2.2 4.02
N Descripcin f por elemen- Total Unid.
fierro dad pza
tos 5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04

05.01.02 ACERO ESTRUCTURAL PARA ZAPATAS

ZAPATAS:
ZAPATA N: 1 Malla Longitu. 1/2 70 7 0.95 465.5
ZAPATA N: 1 Malla Longitu. 1/2 70 7 0.95 465.5
ZAPATA N: 2 Malla Longitu. 1/2 12 6 0.85 61.2
ZAPATA N: 2 Malla Longitu. 1/2 12 6 0.85 61.2
ZAPATA N: 3 Malla Longitu. 1/2 1 16 0.95 15.2
ZAPATA N: 3 Malla Longitu. 1/2 1 7 2.30 16.1
ZAPATA N: 4 Malla Longitu. 1/2 1 14 0.95 13.3
ZAPATA N: 4 Malla Longitu. 1/2 1 7 1.95 13.65
ZAPATA N: 1 / PORTICO EXTERIOR Malla Longitu. 1/2 5 7 0.95 33.25
ZAPATA N: 1 / PORTICO EXTERIOR Malla Longitu. 1/2 5 7 0.95 33.25

Suma 0 0 1178.15 0 0 0
Peso 0.00 0.00 1201.713 0.00 0.00 0 1201.71 KG

05.02.03 ACERO ESTRUCTURAL PARA VIGAS DE CIMENTACION

MODULO A:
EJE: A-A , TRAMOS: 1-2-3 Longitudinal 1/2 1 4 9.01 36.04
EJE: B-B , TRAMOS: 1-2 Longitudinal 1/2 1 4 5.29 21.16
EJE: C-C , TRAMOS: 1-2 Longitudinal 1/2 1 4 5.29 21.16
EJE: D-D , TRAMOS: 1-2-3 Longitudinal 1/2 1 4 9.01 36.04
EJE: A-A , TRAMOS: 1-2-3 Estribos 3/8 1 36 1.13 40.68
EJE: B-B , TRAMOS: 1-2 Estribos 3/8 1 22 1.13 24.86
EJE: C-C , TRAMOS: 1-2 Estribos 3/8 1 22 1.13 24.86
EJE: D-D , TRAMOS: 1-2-3 Estribos 3/8 1 36 1.13 40.68
EJE: 1-1, TRAMOS: A-B-C-D Longitudinal 1/2 1 4 12.16 48.646667
EJE: 2-2, TRAMOS: A-B-C-D Longitudinal 1/2 1 4 12.16 48.646667
EJE: 3-3, TRAMOS: A-B-C-D Longitudinal 1/2 1 4 12.16 48.646667
EJE: 1-1, TRAMOS: A-B-C-D Estribos 3/8 1 48 1.13 54.24
EJE: 2-2, TRAMOS: A-B-C-D Estribos 3/8 1 48 1.13 54.24
EJE: 3-3, TRAMOS: A-B-C-D Estribos 3/8 1 48 1.13 54.24
MODULO B:
EJE: A-A, TRAMOS: 3-4-5-6 Longitudinal 1/2 1 4 13.48 53.937333
EJE: B-B, TRAMOS: 1-2 Longitudinal 1/2 1 4 5.74 22.96
EJE: B-B, TRAMOS: 3-4-5 Longitudinal 1/2 1 4 8.32 33.28
EJE: C-C, TRAMOS: 1-2 Longitudinal 1/2 1 4 5.74 22.96
EJE: C-C, TRAMOS: 3-4-5-6 Longitudinal 1/2 1 4 13.47 53.896
EJE: D-D, TRAMOS: 1-2 Longitudinal 1/2 1 4 5.74 22.96
EJE: E-E, TRAMOS: 1-2 Longitudinal 1/2 1 4 5.74 22.96
EJE: A-A, TRAMOS: 3-4-5-6 Estribos 3/8 1 53 1.13 59.89
EJE: B-B, TRAMOS: 1-2 Estribos 3/8 1 24 1.13 27.12
EJE: B-B, TRAMOS: 3-4-5 Estribos 3/8 1 34 1.13 38.42
EJE: C-C, TRAMOS: 1-2 Estribos 3/8 1 24 1.13 27.12
EJE: C-C, TRAMOS: 3-4-5-6 Estribos 3/8 1 53 1.13 59.89
EJE: D-D, TRAMOS: 1-2 Estribos 3/8 1 24 1.13 27.12
EJE: E-E, TRAMOS: 1-2 Estribos 3/8 1 24 1.13 27.12
EJE: 1-1, TRAMOS: B-C-D Longitudinal 1/2 1 4 11.18 44.72
EJE: 2-2, TRAMOS: B-C-D Longitudinal 1/2 1 4 11.18 44.72
EJE: 3-3, TRAMOS: A-B-C-D-E Longitudinal 1/2 1 4 19.60 78.406667
EJE: 5-5, TRAMOS: B-C-D Longitudinal 1/2 1 4 12.42 49.68
EJE: 6-6, TRAMOS: B-C-D Longitudinal 1/2 1 4 12.42 49.68
EJE: 1-1, TRAMOS: B-C-D Estribos 3/8 1 44 1.13 49.72
EJE: 2-2, TRAMOS: B-C-D Estribos 3/8 1 44 1.13 49.72
EJE: 3-3, TRAMOS: A-B-C-D-E Estribos 3/8 1 77 1.13 87.01
EJE: 5-5, TRAMOS: B-C-D Estribos 3/8 1 49 1.13 55.37
EJE: 6-6, TRAMOS: B-C-D Estribos 3/8 1 49 1.13 55.37
MODULO C:
EJE: A-A, TRAMOS: 7-8 Longitudinal 1/2 1 4 4.54 18.16
EJE: B-B, TRAMOS: 7-8 Longitudinal 1/2 1 4 4.54 18.16
EJE: C-C, TRAMOS: 7-8 Longitudinal 1/2 1 4 4.54 18.16
EJE: D-D, TRAMOS: 7-8 Longitudinal 1/2 1 4 4.54 18.16
EJE: E-E, TRAMOS: 8-7-6-5-4-3 Longitudinal 1/2 1 4 20.69 82.746667
EJE: F-F, TRAMOS: 6-5 Longitudinal 1/2 1 4 4.74 18.96
EJE: F-F, TRAMOS: 4-3 Longitudinal 1/2 1 4 4.94 19.76
EJE: F-F, TRAMOS: 2-1 Longitudinal 1/2 1 4 5.74 22.96
EJE: G'-G', TRAMOS: 8-7-6-5 Longitudinal 1/2 1 4 12.73 50.92
EJE: E'-E', TRAMOS: 1-2-3 Longitudinal 1/2 1 4 9.64 38.56
EJE: G-G, TRAMOS: 1-2 Longitudinal 1/2 1 4 5.74 22.96
EJE: G-G, TRAMOS: 3-4 Longitudinal 1/2 1 4 4.94 19.76
EJE: H-H, TRAMOS: 1-2 Longitudinal 1/2 1 4 5.74 22.96
EJE: H-H, TRAMOS: 1-2-3 Longitudinal 1/2 1 4 9.64 38.56
EJE: A-A, TRAMOS: 7-8 Estribos 3/8 1 19 1.13 21.47
EJE: B-B, TRAMOS: 7-8 Estribos 3/8 1 19 1.13 21.47
EJE: C-C, TRAMOS: 7-8 Estribos 3/8 1 19 1.13 21.47
EJE: D-D, TRAMOS: 7-8 Estribos 3/8 1 19 1.13 21.47
EJE: E-E, TRAMOS: 8-7-6-5-4-3 Estribos 3/8 1 81 1.13 91.53
EJE: F-F, TRAMOS: 6-5 Estribos 3/8 1 19 1.13 21.47
EJE: F-F, TRAMOS: 4-3 Estribos 3/8 1 20 1.13 22.6
EJE: F-F, TRAMOS: 2-1 Estribos 3/8 1 24 1.13 27.12
EJE: G'-G', TRAMOS: 8-7-6-5 Estribos 3/8 1 50 1.13 56.5
EJE: E'-E', TRAMOS: 1-2-3 Estribos 3/8 1 39 1.13 44.07
EJE: G-G, TRAMOS: 1-2 Estribos 3/8 1 24 1.13 27.12
EJE: G-G, TRAMOS: 3-4 Estribos 3/8 1 20 1.13 22.6
EJE: H-H, TRAMOS: 1-2 Estribos 3/8 1 24 1.13 27.12
EJE: H-H, TRAMOS: 1-2-3 Estribos 3/8 1 39 1.13 44.07
EJE: 8-8, TRAMOS: A-B-C-D-E'-F-G' Longitudinal 1/2 1 4 28.39 113.54
EJE: 7-7, TRAMOS: A-B-C-D-E'-F-G' Longitudinal 1/2 1 4 28.39 113.54
EJE: 6-6, TRAMOS: E'-F-G' Longitudinal 1/2 1 4 9.64 38.56
EJE: 5-5, TRAMOS: E'-F Longitudinal 1/2 1 4 4.54 18.16
EJE: 5-5, TRAMOS: G-G' Longitudinal 1/2 1 4 2.34 9.36
EJE: 4-4, TRAMOS: E'-F Longitudinal 1/2 1 4 4.54 18.16
EJE: 3-3, TRAMOS: E-E'-F-G-H-I Longitudinal 1/2 1 4 17.35 69.396
EJE: 2-2, TRAMOS: E-F-G-H-I Longitudinal 1/2 1 4 17.35 69.396
EJE: 1-1, TRAMOS: E-F-G-H-I Longitudinal 1/2 1 4 17.35 69.396
EJE: 8-8, TRAMOS: A-B-C-D-E'-F-G' Estribos 3/8 1 111 1.13 125.43
EJE: 7-7, TRAMOS: A-B-C-D-E'-F-G' Estribos 3/8 1 111 1.13 125.43
EJE: 6-6, TRAMOS: E'-F-G' Estribos 3/8 1 39 1.13 44.07
EJE: 5-5, TRAMOS: E'-F Estribos 3/8 1 19 1.13 21.47
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

EJE: 5-5, TRAMOS: G-G' Estribos 3/8 1 10 1.13 11.3


EJE: 4-4, TRAMOS: E'-F Estribos 3/8 1 19 1.13 21.47
EJE: 3-3, TRAMOS: E-E'-F-G-H-I Estribos 3/8 1 68 1.13 76.84
EJE: 2-2, TRAMOS: E-F-G-H-I Estribos 3/8 1 68 1.13 76.84
EJE: 1-1, TRAMOS: E-F-G-H-I Estribos 3/8 1 68 1.13 76.84
MODULO D:
EJE: A-A, TRAMOS: 1-2 Longitudinal 1/2 1 4 4.99 19.96
EJE: B-B, TRAMOS: 1-2 Longitudinal 1/2 1 4 4.99 19.96
EJE: 1-1, TRAMOS: A-B Longitudinal 1/2 1 4 4.74 18.96
EJE: 2-2, TRAMOS: A-B Longitudinal 1/2 1 4 4.74 18.96
EJE: A-A, TRAMOS: 1-2 Estribos 3/8 1 21 1.13 23.73
EJE: B-B, TRAMOS: 1-2 Estribos 3/8 1 21 1.13 23.73
EJE: 1-1, TRAMOS: A-B Estribos 3/8 1 20 1.13 22.6
EJE: 2-2, TRAMOS: A-B Estribos 3/8 1 20 1.13 22.6
MODULO E:
EJE: A-A, TRAMOS: 1-2 Longitudinal 1/2 1 4 4.14 16.56
EJE: B-B, TRAMOS: 1-2 Longitudinal 1/2 1 4 4.14 16.56
EJE: C-C, TRAMOS: 1-2 Longitudinal 1/2 1 4 4.14 16.56
EJE: D-D, TRAMOS: 1-2 Longitudinal 1/2 1 4 4.14 16.56
EJE: A-A, TRAMOS: 1-2 Estribos 3/8 1 17 1.13 19.21
EJE: B-B, TRAMOS: 1-2 Estribos 3/8 1 17 1.13 19.21
EJE: C-C, TRAMOS: 1-2 Estribos 3/8 1 17 1.13 19.21
EJE: D-D, TRAMOS: 1-2 Estribos 3/8 1 17 1.13 19.21
EJE: 1-1, TRAMOS: A-B-C-D Longitudinal 1/2 1 4 9.44 37.76
EJE: 2-2, TRAMOS: A-B-C-D Longitudinal 1/2 1 4 9.44 37.76
EJE: 1-1, TRAMOS: A-B-C-D Estribos 3/8 1 38 1.13 42.94
EJE: 2-2, TRAMOS: A-B-C-D Estribos 3/8 1 38 1.13 42.94

Suma 0 2162.82 1910.3947 0 0 0


Peso 0.00 1254.44 1948.60 0.00 0.00 0 3203.04 KG

05.03.03 ACERO ESTRUCTURAL PARA SOBRECIMIENTO REFORZADO

MODULO A:
EJE: A-A , TRAMOS: 1-2-3 Longitudinal 3/8 1 3 8.02 24.06
EJE: B-B , TRAMOS: 1-2 Longitudinal 3/8 1 3 4.57 13.71
EJE: C-C , TRAMOS: 1-2 Longitudinal 3/8 1 3 4.57 13.71
EJE: D-D , TRAMOS: 1-2-3 Longitudinal 3/8 1 3 8.02 24.06
EJE: A-A , TRAMOS: 1-2-3 Vertical 1/2 1 32 1.06 33.92
EJE: B-B , TRAMOS: 1-2 Vertical 1/2 1 19 1.06 20.14
EJE: C-C , TRAMOS: 1-2 Vertical 1/2 1 19 1.06 20.14
EJE: D-D , TRAMOS: 1-2-3 Vertical 1/2 1 32 1.06 33.92
EJE: 1-1, TRAMOS: A-B-C-D Longitudinal 3/8 1 3 11.07 33.21
EJE: 2-2, TRAMOS: A-B-C-D Longitudinal 3/8 1 3 11.07 33.21
EJE: 3-3, TRAMOS: A-B-C-D Longitudinal 3/8 1 3 11.07 33.21
EJE: 1-1, TRAMOS: A-B-C-D Vertical 1/2 1 45 1.06 47.7
EJE: 2-2, TRAMOS: A-B-C-D Vertical 1/2 1 45 1.06 47.7
EJE: 3-3, TRAMOS: A-B-C-D Vertical 1/2 1 45 1.06 47.7
ENTRE EJES: A-B y 1-2 Longitudinal 3/8 1 5 0.57 2.85
ENTRE EJES: A-B y 1-2 Longitudinal 3/8 1 5 2.22 11.1
ENTRE EJES: A-B y 1-2 Vertical 1/2 1 3 1.51 4.53
ENTRE EJES: A-B y 1-2 Vertical 1/2 1 9 1.51 13.59
MODULO B:
EJE: A-A, TRAMOS: 3-4-5-6 Longitudinal 3/8 1 3 12.35 37.05
EJE: B-B, TRAMOS: 1-2 Longitudinal 3/8 1 3 5.02 15.06
EJE: B-B, TRAMOS: 3-4-5 Longitudinal 3/8 1 3 7.60 22.8
EJE: C-C, TRAMOS: 1-2 Longitudinal 3/8 1 3 5.02 15.06
EJE: C-C, TRAMOS: 3-4-5-6 Longitudinal 3/8 1 3 12.34 37.02
EJE: D-D, TRAMOS: 1-2 Longitudinal 3/8 1 3 5.02 15.06
EJE: E-E, TRAMOS: 1-2 Longitudinal 3/8 1 3 5.02 15.06
EJE: A-A, TRAMOS: 3-4-5-6 Vertical 1/2 1 50 1.06 53
EJE: B-B, TRAMOS: 1-2 Vertical 1/2 1 20 1.06 21.2
EJE: B-B, TRAMOS: 3-4-5 Vertical 1/2 1 31 1.06 32.86
EJE: C-C, TRAMOS: 1-2 Vertical 1/2 1 20 1.06 21.2
EJE: C-C, TRAMOS: 3-4-5-6 Vertical 1/2 1 50 1.06 53
EJE: D-D, TRAMOS: 1-2 Vertical 1/2 1 20 1.06 21.2
EJE: E-E, TRAMOS: 1-2 Vertical 1/2 1 20 1.06 21.2
EJE: 1-1, TRAMOS: B-C-D Longitudinal 3/8 1 3 10.12 30.36
EJE: 2-2, TRAMOS: B-C-D Longitudinal 3/8 1 3 10.12 30.36
EJE: 3-3, TRAMOS: A-B-C-D-E Longitudinal 3/8 1 3 18.27 54.81
EJE: 5-5, TRAMOS: B-C-D Longitudinal 3/8 1 3 11.32 33.96
EJE: 6-6, TRAMOS: B-C-D Longitudinal 3/8 1 3 11.32 33.96
EJE: 1-1, TRAMOS: B-C-D Vertical 1/2 1 41 1.06 43.46
EJE: 2-2, TRAMOS: B-C-D Vertical 1/2 1 41 1.06 43.46
EJE: 3-3, TRAMOS: A-B-C-D-E Vertical 1/2 1 73 1.06 77.38
EJE: 5-5, TRAMOS: B-C-D Vertical 1/2 1 46 1.06 48.76
EJE: 6-6, TRAMOS: B-C-D Vertical 1/2 1 46 1.06 48.76
ENTRE EJES:A-B, Y 5-6 Longitudinal 3/8 1 5 4.87 24.35
ENTRE EJES:A-B, Y 5-6 Vertical 1/2 1 20 1.51 30.2
ENTRE EJES:B-C, Y 5-6 Longitudinal 3/8 1 5 4.87 24.35
ENTRE EJES:B-C, Y 5-6 Vertical 1/2 1 20 1.51 30.2
ENTRE EJES:B-C, Y 5-6 Longitudinal 3/8 1 5 2.62 13.1
ENTRE EJES:B-C, Y 5-6 Vertical 1/2 1 11 1.51 16.61
ENTRE EJES:B-C, Y 5-6 Longitudinal 3/8 1 5 0.97 4.85
ENTRE EJES:B-C, Y 5-6 Vertical 1/2 1 4 1.51 6.04
ENTRE EJES:B-C, Y 5-6 Longitudinal 3/8 1 5 1.67 8.35
ENTRE EJES:B-C, Y 5-6 Vertical 1/2 1 7 1.51 10.57
ENTRE EJES:A-B-C, Y 4-5 / SUMATORIAS Longitudinal 3/8 1 5 16.39 81.95
ENTRE EJES:A-B-C, Y 4-5 / SUMATORIAS Vertical 1/2 1 68 1.51 102.68
ENTRE EJES:A-B-C, Y 3-4 / SUMATORIAS Longitudinal 3/8 1 5 5.76 28.8
ENTRE EJES:A-B-C, Y 3-4 / SUMATORIAS Vertical 1/2 1 24 1.51 36.24
ENTRE EJES: B-C, Y 1-2 / SUMATORIAS Longitudinal 3/8 1 5 13.09 65.45
ENTRE EJES: B-C, Y 1-2 / SUMATORIAS Vertical 1/2 1 55 1.51 83.05
MODULO C:
EJE: A-A, TRAMOS: 7-8 Longitudinal 3/8 1 3 3.82 11.46
EJE: B-B, TRAMOS: 7-8 Longitudinal 3/8 1 3 3.82 11.46
EJE: C-C, TRAMOS: 7-8 Longitudinal 3/8 1 3 3.82 11.46
EJE: D-D, TRAMOS: 7-8 Longitudinal 3/8 1 3 3.82 11.46
EJE: E-E, TRAMOS: 8-7-6-5-4-3 Longitudinal 3/8 1 3 19.32 57.96
EJE: F-F, TRAMOS: 6-5 Longitudinal 3/8 1 3 4.02 12.06
EJE: F-F, TRAMOS: 4-3 Longitudinal 3/8 1 3 4.22 12.66
EJE: F-F, TRAMOS: 2-1 Longitudinal 3/8 1 3 5.02 15.06
EJE: G'-G', TRAMOS: 8-7-6-5 Longitudinal 3/8 1 3 11.62 34.86
EJE: E'-E', TRAMOS: 1-2-3 Longitudinal 3/8 1 3 8.92 26.76
EJE: G-G, TRAMOS: 1-2 Longitudinal 3/8 1 3 5.02 15.06
EJE: G-G, TRAMOS: 3-4 Longitudinal 3/8 1 3 4.22 12.66
EJE: H-H, TRAMOS: 1-2 Longitudinal 3/8 1 3 5.02 15.06
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

EJE: H-H, TRAMOS: 1-2-3 Longitudinal 3/8 1 3 8.92 26.76


EJE: A-A, TRAMOS: 7-8 Vertical 1/2 1 16 1.06 16.96
EJE: B-B, TRAMOS: 7-8 Vertical 1/2 1 16 1.06 16.96
EJE: C-C, TRAMOS: 7-8 Vertical 1/2 1 16 1.06 16.96
EJE: D-D, TRAMOS: 7-8 Vertical 1/2 1 16 1.06 16.96
EJE: E-E, TRAMOS: 8-7-6-5-4-3 Vertical 1/2 1 78 1.06 82.68
EJE: F-F, TRAMOS: 6-5 Vertical 1/2 1 16 1.06 16.96
EJE: F-F, TRAMOS: 4-3 Vertical 1/2 1 17 1.06 18.02
EJE: F-F, TRAMOS: 2-1 Vertical 1/2 1 20 1.06 21.2
EJE: G'-G', TRAMOS: 8-7-6-5 Vertical 1/2 1 47 1.06 49.82
EJE: E'-E', TRAMOS: 1-2-3 Vertical 1/2 1 36 1.06 38.16
EJE: G-G, TRAMOS: 1-2 Vertical 1/2 1 20 1.06 21.2
EJE: G-G, TRAMOS: 3-4 Vertical 1/2 1 17 1.06 18.02
EJE: H-H, TRAMOS: 1-2 Vertical 1/2 1 20 1.06 21.2
EJE: H-H, TRAMOS: 1-2-3 Vertical 1/2 1 36 1.06 38.16
EJE: 8-8, TRAMOS: A-B-C-D-E'-F-G' Longitudinal 3/8 1 3 26.77 80.31
EJE: 7-7, TRAMOS: A-B-C-D-E'-F-G' Longitudinal 3/8 1 3 26.77 80.31
EJE: 6-6, TRAMOS: E'-F-G' Longitudinal 3/8 1 3 8.92 26.76
EJE: 5-5, TRAMOS: E'-F Longitudinal 3/8 1 3 3.82 11.46
EJE: 5-5, TRAMOS: G-G' Longitudinal 3/8 1 3 1.62 4.86
EJE: 4-4, TRAMOS: E'-F Longitudinal 3/8 1 3 3.82 11.46
EJE: 3-3, TRAMOS: E-E'-F-G-H-I Longitudinal 3/8 1 3 16.09 48.27
EJE: 2-2, TRAMOS: E-F-G-H-I Longitudinal 3/8 1 3 16.09 48.27
EJE: 1-1, TRAMOS: E-F-G-H-I Longitudinal 3/8 1 3 16.09 48.27
EJE: 8-8, TRAMOS: A-B-C-D-E'-F-G' Vertical 1/2 1 107 1.06 113.42
EJE: 7-7, TRAMOS: A-B-C-D-E'-F-G' Vertical 1/2 1 107 1.06 113.42
EJE: 6-6, TRAMOS: E'-F-G' Vertical 1/2 1 36 1.06 38.16
EJE: 5-5, TRAMOS: E'-F Vertical 1/2 1 16 1.06 16.96
EJE: 5-5, TRAMOS: G-G' Vertical 1/2 1 7 1.06 7.42
EJE: 4-4, TRAMOS: E'-F Vertical 1/2 1 16 1.06 16.96
EJE: 3-3, TRAMOS: E-E'-F-G-H-I Vertical 1/2 1 65 1.06 68.9
EJE: 2-2, TRAMOS: E-F-G-H-I Vertical 1/2 1 65 1.06 68.9
EJE: 1-1, TRAMOS: E-F-G-H-I Vertical 1/2 1 65 1.06 68.9
ENTRE EJES:7-8, Y A-B / SUMATORIAS Longitudinal 3/8 1 5 3.82 19.1
ENTRE EJES:7-8, Y A-B / SUMATORIAS Vertical 1/2 1 16 1.51 24.16
ENTRE EJES:7-8, Y B-C / SUMATORIAS Longitudinal 3/8 1 5 2.77 13.85
ENTRE EJES:7-8, Y B-C / SUMATORIAS Vertical 1/2 1 11 1.51 16.61
ENTRE EJES:7-8, Y B-C / SUMATORIAS Longitudinal 3/8 1 5 1.52 7.6
ENTRE EJES:7-8, Y B-C / SUMATORIAS Vertical 1/2 1 6 1.51 9.06
ENTRE EJES:7-8, Y C-D / SUMATORIAS Longitudinal 3/8 1 5 5.01 25.05
ENTRE EJES:7-8, Y C-D / SUMATORIAS Vertical 1/2 1 21 1.51 31.71
ENTRE EJES:E'-F-G', Y 5-6-7 / SUMATORIAS Longitudinal 3/8 1 5 16.21 81.05
ENTRE EJES:E'-F-G', Y 5-6-7 / SUMATORIAS Vertical 1/2 1 67 1.51 101.17
ENTRE EJES:E'-F-G, Y 3-4-5 / SUMATORIAS Longitudinal 3/8 1 5 6.42 32.1
ENTRE EJES:E'-F-G, Y 3-4-5 / SUMATORIAS Vertical 1/2 1 28 1.51 42.28
MODULO D:
EJE: A-A, TRAMOS: 1-2 Longitudinal 3/8 1 3 4.27 12.81
EJE: B-B, TRAMOS: 1-2 Longitudinal 3/8 1 3 4.27 12.81
EJE: 1-1, TRAMOS: A-B Longitudinal 3/8 1 3 4.02 12.06
EJE: 2-2, TRAMOS: A-B Longitudinal 3/8 1 3 4.02 12.06
EJE: A-A, TRAMOS: 1-2 Vertical 1/2 1 17 1.06 18.02
EJE: B-B, TRAMOS: 1-2 Vertical 1/2 1 17 1.06 18.02
EJE: 1-1, TRAMOS: A-B Vertical 1/2 1 16 1.06 16.96
EJE: 2-2, TRAMOS: A-B Vertical 1/2 1 16 1.06 16.96
ENTRE EJES: A-B y 1-2 Longitudinal 3/8 1 5 5.19 25.95
ENTRE EJES: A-B y 1-2 Vertical 1/2 1 21 1.51 31.71
MODULO E:
EJE: A-A, TRAMOS: 1-2 Longitudinal 3/8 1 3 3.42 10.26
EJE: B-B, TRAMOS: 1-2 Longitudinal 3/8 1 3 3.42 10.26
EJE: C-C, TRAMOS: 1-2 Longitudinal 3/8 1 3 3.42 10.26
EJE: D-D, TRAMOS: 1-2 Longitudinal 3/8 1 3 3.42 10.26
EJE: A-A, TRAMOS: 1-2 Vertical 1/2 1 14 1.06 14.84
EJE: B-B, TRAMOS: 1-2 Vertical 1/2 1 14 1.06 14.84
EJE: C-C, TRAMOS: 1-2 Vertical 1/2 1 14 1.06 14.84
EJE: D-D, TRAMOS: 1-2 Vertical 1/2 1 14 1.06 14.84
EJE: 1-1, TRAMOS: A-B-C-D Longitudinal 3/8 1 3 8.72 26.16
EJE: 2-2, TRAMOS: A-B-C-D Longitudinal 3/8 1 3 8.72 26.16
EJE: 1-1, TRAMOS: A-B-C-D Vertical 1/2 1 35 1.06 37.1
EJE: 2-2, TRAMOS: A-B-C-D Vertical 1/2 1 35 1.06 37.1
ENTRE EJES: B-C y 1-2 Longitudinal 3/8 1 5 2.99 14.95
ENTRE EJES: B-C y 1-2 Vertical 1/2 1 13 1.51 19.63

Suma 0 1778.34 2456.56 0 0 0


Peso 0.00 1031.44 2505.69 0.00 0.00 0 3537.13 KG

05.04.03 ACERO ESTRUCTURAL PARA SARDINELES PERALTADOS

SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 5.28 21.12


SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 8.45 33.8
SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 4.73 18.92
SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 24.88 99.52
SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 8.44 33.76
SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 10.24 40.96
SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 8.39 33.56
SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 4.85 19.4
SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 7.09 28.36
SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 14.07
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA Longitudinal 3/8 1 4 5.32 21.28
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRA Longitudinal 3/8 1 4 9.62
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA Longitudinal 3/8 1 4 11.90 47.6
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA Longitudinal 3/8 1 4 8.27 33.08
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA Longitudinal 3/8 1 4 26.32 105.28
SARDINELES PERIMETRICOS DE AREAS VERDES CIRCULAR Longitudinal 3/8 1 4 3.76 15.04
SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 21.50 86
SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 22.90 91.6
SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 11.90 47.6
SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 15.76 63.04
SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 10.67 42.68
SARDINELES PERIMETRICOS DE AREAS VERDES Longitudinal 3/8 1 4 5.6
SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 13 1.42 18.46
SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 21 1.42 29.82
SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 12 1.42
SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 62 1.42 88.04
SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 21 1.42 29.82
SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 26 1.42 36.92
SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 21 1.42 29.82
SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 12 1.42 17.04
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 18 1.42 25.56


SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 35 1.42 49.7
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA Vertical 1/2 1 13 1.42 18.46
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRA Vertical 1/2 1 24 1.42 34.08
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA Vertical 1/2 1 30 1.42
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA Vertical 1/2 1 21 1.42 29.82
SARDINELES PERIMETRICOS DE AREAS VERDES ENTRADA Vertical 1/2 1 66 1.42 93.72
SARDINELES PERIMETRICOS DE AREAS VERDES CIRCULAR Vertical 1/2 1 9 1.42 12.78
SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 54 1.42 76.68
SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 57 1.42 80.94
SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 30 1.42 42.6
SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 39 1.42 55.38
SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 27 1.42 38.34
SARDINELES PERIMETRICOS DE AREAS VERDES Vertical 1/2 1 14 1.42 19.88

Suma 0 882.6 827.86 0 0 0


Peso 0.00 511.91 844.4172 0.00 0.00 0 1356.33 KG
05.05.03 ACERO ESTRUCTURAL PARA COLUMNAS

MODULO A: CONCRETO EN COLUMNAS


COLUMNA - TIPO: C-02 Longitudinal 5/8 1 6 6.84 41.04
COLUMNA - TIPO: C-03 Longitudinal 5/8 2 4 6.84 54.72
COLUMNA - TIPO: C-02 Longitudinal 5/8 1 6 7.06 42.36
COLUMNA - TIPO: C-03 Longitudinal 5/8 2 4 7.06 56.48
COLUMNA - TIPO: C-02 Longitudinal 5/8 1 6 7.17 43.02
COLUMNA - TIPO: C-03 Longitudinal 5/8 2 4 7.17 57.36
COLUMNA - TIPO: C-02 Longitudinal 5/8 1 6 7.77 46.62
COLUMNA - TIPO: C-03 Longitudinal 5/8 2 4 7.77 62.16
MODULO B: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-01 Longitudinal 5/8 4 6 4.57 109.68
COLUMNA - TIPO: C-01 Longitudinal 5/8 4 6 5.92 142.08
COLUMNA - TIPO: C-01 Longitudinal 5/8 4 6 5.12 122.88
COLUMNA - TIPO: C-01 Longitudinal 5/8 4 6 6.84 164.16
COLUMNA - TIPO: C-01 Longitudinal 5/8 4 6 5.02 120.48
COLUMNA - TIPO: C-01 Longitudinal 5/8 2 6 4.72 56.64
MODULO C: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-01 Longitudinal 5/8 7 6 5.29 222.18
COLUMNA - TIPO: C-01 Longitudinal 5/8 7 6 4.55 191.1
COLUMNA - TIPO: C-01 Longitudinal 5/8 5 6 5.52 165.6
COLUMNA - TIPO: C-01 Longitudinal 5/8 4 6 5.06 121.44
COLUMNA - TIPO: C-01 Longitudinal 5/8 5 6 4.54 136.2
COLUMNA - TIPO: C-01 Longitudinal 5/8 2 6 4.77 57.24
COLUMNA - TIPO: C-01 Longitudinal 5/8 5 6 4.87 146.1
COLUMNA - TIPO: C-01 Longitudinal 5/8 5 6 5.54 166.2
MODULO D: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-03 Longitudinal 5/8 2 4 5.39 43.12
COLUMNA - TIPO: C-03 Longitudinal 5/8 2 4 4.57 36.56
MODULO E: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-03 Longitudinal 5/8 4 4 4.29 68.64
COLUMNA - TIPO: C-03 Longitudinal 5/8 4 4 4.99 79.84
MODULO A: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-02 Estribos 3/8 1 37 1.03 38.11
COLUMNA - TIPO: C-03 Estribos 3/8 2 37 0.83 61.42
COLUMNA - TIPO: C-02 Estribos 3/8 1 38 1.03 39.14
COLUMNA - TIPO: C-03 Estribos 3/8 2 38 0.83 63.08
COLUMNA - TIPO: C-02 Estribos 3/8 1 38 1.03 39.14
COLUMNA - TIPO: C-03 Estribos 3/8 2 38 0.83 63.08
COLUMNA - TIPO: C-02 Estribos 3/8 1 41 1.03 42.23
COLUMNA - TIPO: C-03 Estribos 3/8 2 41 0.83 68.06
MODULO B: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-01 Estribos 3/8 4 28 1.23 137.76
COLUMNA - TIPO: C-01 Estribos 3/8 4 33 1.23 162.36
COLUMNA - TIPO: C-01 Estribos 3/8 4 30 1.23 147.6
COLUMNA - TIPO: C-01 Estribos 3/8 4 37 1.23 182.04
COLUMNA - TIPO: C-01 Estribos 3/8 4 30 1.23 147.6
COLUMNA - TIPO: C-01 Estribos 3/8 2 28 1.23 68.88
MODULO C: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-01 Estribos 3/8 7 31 1.23 266.91
COLUMNA - TIPO: C-01 Estribos 3/8 7 28 1.23 241.08
COLUMNA - TIPO: C-01 Estribos 3/8 5 32 1.23 196.8
COLUMNA - TIPO: C-01 Estribos 3/8 4 30 1.23 147.6
COLUMNA - TIPO: C-01 Estribos 3/8 5 28 1.23 172.2
COLUMNA - TIPO: C-01 Estribos 3/8 2 29 1.23 71.34
COLUMNA - TIPO: C-01 Estribos 3/8 5 29 1.23 178.35
COLUMNA - TIPO: C-01 Estribos 3/8 5 32 1.23 196.8
MODULO D: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-03 Estribos 3/8 2 31 0.83 51.46
COLUMNA - TIPO: C-03 Estribos 3/8 2 28 0.83 46.48
MODULO E: CONCRETO EN COLUMNAS
COLUMNA - TIPO: C-03 Estribos 3/8 4 27 0.83 89.64
COLUMNA - TIPO: C-03 Estribos 3/8 4 30 0.83 99.6
COLUMNAS DE PORTICO EXTERIOR:
Longitudinal 1/2 1 6 6.87 41.22
Longitudinal 1/2 1 6 7.07 42.42
Longitudinal 1/2 2 6 7.37 88.44
Longitudinal 1/2 2 6 7.52 90.24
Estribos 3/8 1 36 1.33 47.88
Estribos 3/8 1 37 1.33 49.21
Estribos 3/8 2 38 1.33 101.08
Estribos 3/8 2 39 1.33 103.74

Suma 0 3320.67 262.32 2553.9 0 0


Peso 0.00 1925.99 267.5664 4086.24 0.00 0 6279.80 KG

05.06.03 ACERO ESTRUCTURAL PARA COLUMNAS CONFINAM.

COLUMNA - TIPO: C-04 / COLUMNAS DE CASETA Longitudinal 1/2 2 4 4.69 37.52


COLUMNA - TIPO: C-04 / COLUMNAS DE CASETA Longitudinal 1/2 2 4 4.37 34.96
COLUMNA - TIPO: C-04 / COLUMNAS DE CASETA Estribo 3/8 2 24 0.64 30.48
COLUMNA - TIPO: C-04 / COLUMNAS DE CASETA Estribo 3/8 2 24 0.64 30.48

Suma 0 60.96 72.48 0 0 0


Peso 0 35.3568 73.9296 0 0 0 109.2864 kg
05.07.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS Y DINTELES

MODULO A:
EJE: A-A, TRAMOS: 1-2-3 Longitudinal 5/8 1 4 8.66 34.64
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

EJE: A-A, TRAMOS: 1-2-3 Longitudinal 1/2 1 2 8.02 16.04


EJE: B-B, TRAMOS: 1-2-3 Longitudinal 5/8 1 4 8.66 34.64
EJE: B-B, TRAMOS: 1-2-3 Longitudinal 1/2 1 2 8.02
EJE: C-C, TRAMOS: 1-2-3 Longitudinal 5/8 1 4 8.66 34.64
EJE: C-C, TRAMOS: 1-2-3 Longitudinal 1/2 1 2 8.02 16.04
EJE: D-D, TRAMOS: 1-2-3 Longitudinal 5/8 1 4 8.66 34.64
EJE: D-D, TRAMOS: 1-2-3 Longitudinal 1/2 1 2 8.02 16.04
EJE: 1-1, TRAMOS: A-B-C-D Longitudinal 1/2 1 4 11.31 45.24
EJE: 2-2, TRAMOS: A-B-C-D Longitudinal 1/2 1 4 11.31 45.24
EJE: 3-3, TRAMOS: A-B-C-D Longitudinal 1/2 1 4 11.31 45.24
EJE: A-A, TRAMOS: 1-2-3 Estribos 3/8 1 44 1.33 58.52
EJE: B-B, TRAMOS: 1-2-3 Estribos 3/8 1 44 1.33 58.52
EJE: C-C, TRAMOS: 1-2-3 Estribos 3/8 1 44 1.33 58.52
EJE: D-D, TRAMOS: 1-2-3 Estribos 3/8 1 44 1.33 58.52
EJE: 1-1, TRAMOS: A-B-C-D Estribos 3/8 1 57 0.66 37.335
EJE: 2-2, TRAMOS: A-B-C-D Estribos 3/8 1 57 0.66 37.335
EJE: 3-3, TRAMOS: A-B-C-D Estribos 3/8 1 57 0.66 37.335
MODULO B:
EJE: 6-6, TRAMOS A-B-C Longitudinal 5/8 1 6 12.16 72.96
EJE: 5-5 TRAMOS A-B-C Longitudinal 5/8 1 6 12.16 72.96
EJE: 4-4 TRAMOS A-B-C Longitudinal 5/8 1 6 12.16 72.96
EJE: 3-3 TRAMOS A-B-C Longitudinal 5/8 1 6 12.16 72.96
EJE: 6-6, TRAMOS A-B-C Longitudinal 1/2 1 2 11.32 22.64
EJE: 5-5 TRAMOS A-B-C Longitudinal 1/2 1 2 11.32 22.64
EJE: 4-4 TRAMOS A-B-C Longitudinal 1/2 1 2 11.32 22.64
EJE: 3-3 TRAMOS A-B-C Longitudinal 1/2 1 2 11.32 22.64
EJE: 6-6, TRAMOS A-B-C Estribos 3/8 1 58 1.53 88.74
EJE: 5-5 TRAMOS A-B-C Estribos 3/8 1 58 1.53 88.74
EJE: 4-4 TRAMOS A-B-C Estribos 3/8 1 58 1.53 88.74
EJE: 3-3 TRAMOS A-B-C Estribos 3/8 1 58 1.53 88.74
EJE: 3-3 TRAMOS B-C-D-E Longitudinal 1/2 1 6 13.56 81.36
EJE: 2-2 TRAMOS B-C-D-E Longitudinal 1/2 1 6 13.56 81.36
EJE: 1-1 TRAMOS B-C-D-E Longitudinal 1/2 1 6 13.56 81.36
EJE: 3-3 TRAMOS B-C-D-E Estribos 3/8 1 66 0.86 56.43
EJE: 2-2 TRAMOS B-C-D-E Estribos 3/8 1 66 0.86 56.43
EJE: 1-1 TRAMOS B-C-D-E Estribos 3/8 1 66 0.86 56.43
EJE: A-A, TRAMOS: 3-4-5-6 Longitudinal 1/2 1 6 12.59 75.54
EJE: B-B, TRAMOS: 3-4-5-6 Longitudinal 1/2 1 6 12.59
EJE: C-C, TRAMOS: 3-4-5-6 Longitudinal 1/2 1 6 12.59 75.54
EJE: A-A, TRAMOS: 3-4-5-6 Estribos 3/8 1 62 0.86 53.01
EJE: B-B, TRAMOS: 3-4-5-6 Estribos 3/8 1 62 0.86 53.01
EJE: C-C, TRAMOS: 3-4-5-6 Estribos 3/8 1 62 0.86 53.01
EJE: B-B, TRAMOS: 1-2-3 Longitudinal 5/8 1 6 9.24 55.44
EJE: C-C, TRAMOS: 1-2-3 Longitudinal 5/8 1 6 9.24 55.44
EJE: D-D, TRAMOS: 1-2-3 Longitudinal 5/8 1 6 9.24 55.44
EJE: E-E, TRAMOS: 1-2-3 Longitudinal 5/8 1 6 9.24 55.44
EJE: B-B, TRAMOS: 1-2-3 Longitudinal 1/2 1 2 8.40 16.8
EJE: C-C, TRAMOS: 1-2-3 Longitudinal 1/2 1 2 8.40 16.8
EJE: D-D, TRAMOS: 1-2-3 Longitudinal 1/2 1 2 8.40
EJE: E-E, TRAMOS: 1-2-3 Longitudinal 1/2 1 2 8.40 16.8
EJE: B-B, TRAMOS: 1-2-3 Estribos 3/8 1 46 1.53 70.38
EJE: C-C, TRAMOS: 1-2-3 Estribos 3/8 1 46 1.53 70.38
EJE: D-D, TRAMOS: 1-2-3 Estribos 3/8 1 46 1.53 70.38
EJE: E-E, TRAMOS: 1-2-3 Estribos 3/8 1 46 1.53 70.38
MODULO C:
EJE: A-A, TRAMOS:: 7-8 Longitudinal 5/8 1 6 4.66 27.96
EJE: B-B, TRAMOS:: 7-8 Longitudinal 5/8 1 6 4.66 27.96
EJE: C-C, TRAMOS:: 7-8 Longitudinal 5/8 1 6 4.66 27.96
EJE: D-D, TRAMOS:: 7-8 Longitudinal 5/8 1 6 4.66 27.96
EJE: E'-E', TRAMOS:: 7-8 Longitudinal 5/8 1 6 4.66 27.96
EJE: F-F, TRAMOS:: 7-8 Longitudinal 5/8 1 6 4.66 27.96
EJE: G'-G', TRAMOS:: 7-8 Longitudinal 5/8 1 6 4.66 27.96
EJE: A-A, TRAMOS:: 7-8 Longitudinal 1/2 1 2 3.82 7.64
EJE: B-B, TRAMOS:: 7-8 Longitudinal 1/2 1 2 3.82 7.64
EJE: C-C, TRAMOS:: 7-8 Longitudinal 1/2 1 2 3.82 7.64
EJE: D-D, TRAMOS:: 7-8 Longitudinal 1/2 1 2 3.82 7.64
EJE: E'-E', TRAMOS:: 7-8 Longitudinal 1/2 1 2 3.82 7.64
EJE: F-F, TRAMOS:: 7-8 Longitudinal 1/2 1 2 3.82
EJE: G'-G', TRAMOS:: 7-8 Longitudinal 1/2 1 2 3.82 7.64
EJE: B-B, TRAMOS:: 7-8 Estribos 3/8 1 28 1.53 42.84
EJE: C-C, TRAMOS:: 7-8 Estribos 3/8 1 28 1.53 42.84
EJE: D-D, TRAMOS:: 7-8 Estribos 3/8 1 28 1.53 42.84
EJE: E'-E', TRAMOS:: 7-8 Estribos 3/8 1 28 1.53 42.84
EJE: F-F, TRAMOS:: 7-8 Estribos 3/8 1 28 1.53 42.84
EJE: G'-G', TRAMOS:: 7-8 Estribos 3/8 1 28 1.53 42.84
EJE: 7-7, TRAMOS: A-B-C-D-E'-F-G' Longitudinal 1/2 1 6 27.02 162.12
EJE: 8-8, TRAMOS: A-B-C-D-E'-F-G' Longitudinal 1/2 1 6 27.02 162.12
EJE: 7-7, TRAMOS: A-B-C-D-E'-F-G' Estribos 3/8 1 119 0.86 101.745
EJE: 8-8, TRAMOS: A-B-C-D-E'-F-G' Estribos 3/8 1 119 0.86 101.745
EJE: 3-3, TRAMOS: E'-F-G Longitudinal 1/2 1 6 7.81
EJE: 4-4, TRAMOS: E'-F-G Longitudinal 1/2 1 6 7.81 46.86
EJE: 5-5, TRAMOS: E'-F-G-G' Longitudinal 1/2 1 6 9.16 54.96
EJE: 6-6, TRAMOS: E'-F-G' Longitudinal 1/2 1 6 9.16 54.96
EJE: 7-7, TRAMOS: E'-F-G' Longitudinal 1/2 1 6 9.16
EJE: 3-3, TRAMOS: E'-F-G Estribos 3/8 1 43 0.86 36.765
EJE: 4-4, TRAMOS: E'-F-G Estribos 3/8 1 43 0.86 36.765
EJE: 5-5, TRAMOS: E'-F-G-G' Estribos 3/8 1 48 0.86 41.04
EJE: 6-6, TRAMOS: E'-F-G' Estribos 3/8 1 48 0.86 41.04
EJE: 7-7, TRAMOS: E'-F-G' Estribos 3/8 1 48 0.86 41.04
EJE: E'-E', TRAMOS:: 3-4-5-6-7 Longitudinal 5/8 1 6 15.91 95.46
EJE: F-F, TRAMOS:: 3-4-5-6-7 Longitudinal 5/8 1 6 15.91 95.46
EJE: G-G, TRAMOS:: 3-4-5 Longitudinal 5/8 1 6 8.81 52.86
EJE: G'-G', TRAMOS: 5-6-7 Longitudinal 5/8 1 6 8.91 53.46
EJE: E'-E', TRAMOS:: 3-4-5-6-7 Longitudinal 1/2 1 2 15.07 30.14
EJE: F-F, TRAMOS:: 3-4-5-6-7 Longitudinal 1/2 1 2 15.07 30.14
EJE: G-G, TRAMOS:: 3-4-5 Longitudinal 1/2 1 2 7.97 15.94
EJE: G'-G', TRAMOS: 5-6-7 Longitudinal 1/2 1 2 8.07 16.14
EJE: E'-E', TRAMOS:: 3-4-5-6-7 Estribos 3/8 1 73 1.53 111.69
EJE: F-F, TRAMOS:: 3-4-5-6-7 Estribos 3/8 1 73 1.53 111.69
EJE: G-G, TRAMOS:: 3-4-5 Estribos 3/8 1 44 1.53 67.32
EJE: G'-G', TRAMOS: 5-6-7 Estribos 3/8 1 45 1.53 68.85
EJE: E-E, TRAMOS: 1-2-3 Longitudinal 5/8 1 6 9.76 58.56
EJE: F-F, TRAMOS: 1-2-3 Longitudinal 5/8 1 6 9.76 58.56
EJE: G-G, TRAMOS: 1-2-3 Longitudinal 5/8 1 6 9.76 58.56
EJE: H-H, TRAMOS: 1-2-3 Longitudinal 5/8 1 6 9.76 58.56
EJE: I-I, TRAMOS: 1-2-3 Longitudinal 5/8 1 6 9.76 58.56
EJE: E-E, TRAMOS: 1-2-3 Longitudinal 1/2 1 2 8.92 17.84
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ACERO

EJE: F-F, TRAMOS: 1-2-3 Longitudinal 1/2 1 2 8.92 17.84


EJE: G-G, TRAMOS: 1-2-3 Longitudinal 1/2 1 2 8.92
EJE: H-H, TRAMOS: 1-2-3 Longitudinal 1/2 1 2 8.92 17.84
EJE: I-I, TRAMOS: 1-2-3 Longitudinal 1/2 1 2 8.92 17.84
EJE: E-E, TRAMOS: 1-2-3 Estribos 3/8 1 48 1.53 73.44
EJE: F-F, TRAMOS: 1-2-3 Estribos 3/8 1 48 1.53 73.44
EJE: G-G, TRAMOS: 1-2-3 Estribos 3/8 1 48 1.53 73.44
EJE: H-H, TRAMOS: 1-2-3 Estribos 3/8 1 48 1.53 73.44
EJE: I-I, TRAMOS: 1-2-3 Estribos 3/8 1 48 1.53 73.44
EJE: 1-1, TRAMOS E-F-G-H-I Longitudinal 1/2 1 6 16.34 98.04
EJE: 2-2, TRAMOS E-F-G-H-I Longitudinal 1/2 1 6 16.34 98.04
EJE: 3-3, TRAMOS E-F-G-H-I Longitudinal 1/2 1 6 16.34 98.04
EJE: 1-1, TRAMOS E-F-G-H-I Estribos 3/8 1 77 0.86 65.835
EJE: 2-2, TRAMOS E-F-G-H-I Estribos 3/8 1 77 0.86 65.835
EJE: 3-3, TRAMOS E-F-G-H-I Estribos 3/8 1 77 0.86 65.835
MODULO D:
EJE: 1-1, TRAMOS A-B Longitudinal 5/8 1 4 4.06 16.24
EJE: 2-2, TRAMOS A-B Longitudinal 5/8 1 4 4.22 16.88
EJE: 1-1, TRAMOS A-B Estribos 3/8 1 28 1.13 31.64
EJE: 2-2, TRAMOS A-B Estribos 3/8 1 28 1.13 31.64
EJE: A-A, TRAMOS: 1-2 Longitudinal 1/2 1 4 4.01 16.04
EJE: B-B, TRAMOS: 1-2 Longitudinal 1/2 1 4 4.05 16.2
EJE: A-A, TRAMOS: 1-2 Estribos 3/8 1 27 0.66 17.685
EJE: B-B, TRAMOS: 1-2 Estribos 3/8 1 27 0.66 17.685
MODULO E:
EJE: 1-1, TRAMOS: A-B-C-D Longitudinal 1/2 1 4 8.96 35.84
EJE: 2-2, TRAMOS: A-B-C-D Longitudinal 1/2 1 4 8.96 35.84
EJE: 1-1, TRAMOS: A-B-C-D Estribos 3/8 1 47 0.66 30.785
EJE: 2-2, TRAMOS: A-B-C-D Estribos 3/8 1 47 0.66 30.785
EJE: A-A, TRAMOS: 1-2 Longitudinal 5/8 1 4 4.07 16.28
EJE: B-B, TRAMOS: 1-2 Longitudinal 5/8 1 4 4.04 16.16
EJE: C-C, TRAMOS: 1-2 Longitudinal 5/8 1 4 3.99 15.96
EJE: D-D, TRAMOS: 1-2 Longitudinal 5/8 1 4 3.96 15.84
EJE: A-A, TRAMOS: 1-2 Estribos 3/8 1 26 1.13 29.38
EJE: B-B, TRAMOS: 1-2 Estribos 3/8 1 26 1.13 29.38
EJE: C-C, TRAMOS: 1-2 Estribos 3/8 1 26 1.13 29.38
EJE: D-D, TRAMOS: 1-2 Estribos 3/8 1 26 1.13 29.38

Suma 0 3170.06 1808.58 1535.28 0 0


Peso 0.00 1838.63 1844.7516 2456.45 0.00 0 6139.83 KG

05.08.03 ACERO ESTRUCTURAL PARA COLUMNAS CONFINAM.

CASETA DE CONTROL:
Longitudinal 5/8 2 4 2.86 22.88
Estribos 3/8 2 21 0.86 35.91
Longitudinal 1/2 2 4 1.30 10.4
Estribos 3/8 2 15 0.66 19.65
PORTICO EXTERIOR / ENTRADA CENTRO DE SALUD:
SECCION: .25 x .50 / SECCION RECTANGULAR Longitudinal 1/2 1 8 18.41 147.28
SECCION: .25 x .50 / SECCION RECTANGULAR Estribos 3/8 1 82 1.18 96.76
SECCION TRIANGULAR Longitudinal 1/2 1 10 18.41 184.1
Estribos 3/8 1 82 2.33 191.06
Suma 0 343.38 341.78 22.88 0 0
Peso 0.00 199.16 348.6156 36.61 0.00 0 584.38 KG
05.09.03 ACERO ESTRUCTURAL PARA LOSA ALIGERADA E=20CM

MODULO A:
PAO: A Longitudinal 1/2 29 2 11.11 644.38
PAO: A Traslapes 1/2 29 1 5.30
PAO: A Traslapes 3/8 29 1 2.31 66.99
PAO: A Temperatura 1/4 1 45 7.96 358.2
MODULO B:
PAO: B1 Longitudinal 1/2 27 2 12.39 669.06
PAO: B1 Traslapes 1/2 27 1 5.60
PAO: B1 Traslapes 3/8 27 1 2.86 77.22
PAO: B1 Temperatura 1/4 1 50 11.36 568
PAO: B2 Longitudinal 1/2 19 2 13.35 507.3
PAO: B2 Traslapes 1/2 19 1 5.90 112.1
PAO: B2 Traslapes 3/8 19 1 3.16 60.04
PAO: B2 Temperatura 1/4 1 54 8.44 455.76
MODULO C:
PAO C1 Longitudinal 1/2 8 2 26.81 428.96
PAO C1 Traslapes 1/2 8 1 13.95 111.6
PAO C1 Traslapes 3/8 8 1 10.31 82.48
PAO C1 Temperatura 1/4 1 107 3.86 413.02
PAO C2 Longitudinal 1/2 20 2 15.81
PAO C2 Traslapes 1/2 20 1 8.10 162
PAO C2 Traslapes 3/8 20 1 2.81 56.2
PAO C2 Temperatura 1/4 1 63 8.96 564.48
PAO C3 Longitudinal 1/2 20 2 16.14 645.4
PAO C3 Traslapes 1/2 20 1 8.25 165
PAO C3 Traslapes 3/8 20 1 2.91 58.2
PAO C3 Temperatura 1/4 1 63 8.96 564.48
MODULO D:
PAO: D Longitudinal 1/2 9 2 4.35 78.3
PAO: D Traslapes 3/8 9 1 3.36 30.24
PAO: D Temperatura 1/4 1 18 3.91 70.38
MODULO E:
PAO: E Longitudinal 1/2 8 2 8.75 140
PAO C3 Traslapes 1/2 8 1 4.20 33.6
PAO: E Traslapes 3/8 8 1 1.96 15.68
PAO: E Temperatura 1/4 1 35 3.46 121.1

Suma 3115.42 447.05 3697.7 0 0 0


Peso 778.86 259.29 3771.654 0.00 0.00 0 4809.80 KG
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS DEL CERCO PERIMTRICO

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
02.00.00 OBRAS PRELIMINARES
02.04.00 DEMOLICIN DE ESTRUCTURA EXISTENTE 1.00 GLB
DEMOLICIN DE CERCO PERIMTRICO DE ADOBE 1.00 1.00 - - 1.00

03.00.00 MOVIMIENTO DE TIERRAS

03.01.00 EXCAVACION DE ZANJAS PARA CIMIENTO MATERIAL SUELTO HASTA H=1.50M 138.05 M3
EXCAVACIN DEL CERCO PERIMTRICO:
SEGN CORTE: 1-1, TPICO 1.00 29.80 0.60 1.50 26.82
SEGN CORTE: 1-1, TPICO 1.00 33.93 0.60 1.50 30.54
SEGN CORTE: 1-1, TPICO 1.00 12.38 0.60 1.50 11.14
SEGN CORTE: 1-1, TPICO 1.00 26.51 0.60 1.50 23.86
SEGN CORTE: 1-1, TPICO 1.00 10.07 0.60 1.50 9.06
SEGN CORTE: 1-1, TPICO 1.00 11.88 0.60 1.50 10.69
SEGN CORTE: 1-1, TPICO 1.00 4.27 0.60 1.50 3.84
SEGN CORTE: 1-1, TPICO 1.00 4.27 0.60 1.50 3.84
SEGN CORTE: 1-1, TPICO 1.00 12.65 0.60 1.50 11.39
SEGN CORTE: 1-1, TPICO 1.00 7.63 0.60 1.50 6.87

03.03.00 RELLENO MANUAL (MATERIAL PROPIO) PISON DE MANO 55.22 M3


RELLENOS CON MATERIAL PROPIO CERCO PERIMTRICO:
SEGN CORTE: 1-1, TPICO 1.00 29.80 0.45 0.80 10.73
SEGN CORTE: 1-1, TPICO 1.00 33.93 0.45 0.80 12.21
SEGN CORTE: 1-1, TPICO 1.00 12.38 0.45 0.80 4.46
SEGN CORTE: 1-1, TPICO 1.00 26.51 0.45 0.80 9.54
SEGN CORTE: 1-1, TPICO 1.00 10.07 0.45 0.80 3.63
SEGN CORTE: 1-1, TPICO 1.00 11.88 0.45 0.80 4.28
SEGN CORTE: 1-1, TPICO 1.00 4.27 0.45 0.80 1.54
SEGN CORTE: 1-1, TPICO 1.00 4.27 0.45 0.80 1.54
SEGN CORTE: 1-1, TPICO 1.00 12.65 0.45 0.80 4.55
SEGN CORTE: 1-1, TPICO 1.00 7.63 0.45 0.80 2.75

03.04.00 NIVELACION INTERIOR C/COMPACTADORA PARA SUBRASANTE DE PISO 69.03 M2


NIVELACIN CERCO PERIMTRICO:
SEGN CORTE: 1-1, TPICO 1.00 29.80 0.45 - 13.41
SEGN CORTE: 1-1, TPICO 1.00 33.93 0.45 - 15.27
SEGN CORTE: 1-1, TPICO 1.00 12.38 0.45 - 5.57
SEGN CORTE: 1-1, TPICO 1.00 26.51 0.45 - 11.93
SEGN CORTE: 1-1, TPICO 1.00 10.07 0.45 - 4.53
SEGN CORTE: 1-1, TPICO 1.00 11.88 0.45 - 5.35
SEGN CORTE: 1-1, TPICO 1.00 4.27 0.45 - 1.92
SEGN CORTE: 1-1, TPICO 1.00 4.27 0.45 - 1.92
SEGN CORTE: 1-1, TPICO 1.00 12.65 0.45 - 5.69
SEGN CORTE: 1-1, TPICO 1.00 7.63 0.45 - 3.43

03.05.00 AFIRMADO COMPACTADO EN FONDOS E=4" 69.03 M2


AFIRMADO CERCO PERIMTRICO:
SEGN CORTE: 1-1, TPICO 1.00 29.80 0.45 - 13.41
SEGN CORTE: 1-1, TPICO 1.00 33.93 0.45 - 15.27
SEGN CORTE: 1-1, TPICO 1.00 12.38 0.45 - 5.57
SEGN CORTE: 1-1, TPICO 1.00 26.51 0.45 - 11.93
SEGN CORTE: 1-1, TPICO 1.00 10.07 0.45 - 4.53
SEGN CORTE: 1-1, TPICO 1.00 11.88 0.45 - 5.35
SEGN CORTE: 1-1, TPICO 1.00 4.27 0.45 - 1.92
SEGN CORTE: 1-1, TPICO 1.00 4.27 0.45 - 1.92
SEGN CORTE: 1-1, TPICO 1.00 12.65 0.45 - 5.69
SEGN CORTE: 1-1, TPICO 1.00 7.63 0.45 - 3.43
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS DEL CERCO PERIMTRICO

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto

03.06.00 ELIM. MATERIAL EXCEDENTE C/MAQ D=10 KM 99.40 M3


E= (Vol Exc.)*1.20 Esponjamiento

04.00.00 OBRAS DE CONCRETO SIMPLE


04.02.00 CIMIENTOS CORRIDOS MEZCLA 1:8 CEM 30% P.G 64.42 M3
CIMIENTO DEL CERCO PERIMTRICO:
SEGN CORTE: 1-1, TPICO 1.00 29.80 0.60 0.70 12.52
SEGN CORTE: 1-1, TPICO 1.00 33.93 0.60 0.70 14.25
SEGN CORTE: 1-1, TPICO 1.00 12.38 0.60 0.70 5.20
SEGN CORTE: 1-1, TPICO 1.00 26.51 0.60 0.70 11.13
SEGN CORTE: 1-1, TPICO 1.00 10.07 0.60 0.70 4.23
SEGN CORTE: 1-1, TPICO 1.00 11.88 0.60 0.70 4.99
SEGN CORTE: 1-1, TPICO 1.00 4.27 0.60 0.70 1.79
SEGN CORTE: 1-1, TPICO 1.00 4.27 0.60 0.70 1.79
SEGN CORTE: 1-1, TPICO 1.00 12.65 0.60 0.70 5.31
SEGN CORTE: 1-1, TPICO 1.00 7.63 0.60 0.70 3.20

05.00.00 OBRAS DE CONCRETO ARMADO

05.02.00 VIGAS DE CIMENTACIN


05.02.01 CONCRETO EN VIGAS DE CIMENTACION - F'C=210 KG/CM2 15.34 M3
CIMIENTO DEL CERCO PERIMTRICO:
SEGN CORTE: 1-1, TPICO 1.00 29.80 0.25 0.40 2.98
SEGN CORTE: 1-1, TPICO 1.00 33.93 0.25 0.40 3.39
SEGN CORTE: 1-1, TPICO 1.00 12.38 0.25 0.40 1.24
SEGN CORTE: 1-1, TPICO 1.00 26.51 0.25 0.40 2.65
SEGN CORTE: 1-1, TPICO 1.00 10.07 0.25 0.40 1.01
SEGN CORTE: 1-1, TPICO 1.00 11.88 0.25 0.40 1.19
SEGN CORTE: 1-1, TPICO 1.00 4.27 0.25 0.40 0.43
SEGN CORTE: 1-1, TPICO 1.00 4.27 0.25 0.40 0.43
SEGN CORTE: 1-1, TPICO 1.00 12.65 0.25 0.40 1.27
SEGN CORTE: 1-1, TPICO 1.00 7.63 0.25 0.40 0.76

05.02.02 ENCOFRADO NORMAL EN VIGAS DE CIMENTACION 122.71 M2


CIMIENTO DEL CERCO PERIMTRICO:
SEGN CORTE: 1-1, TPICO 2.00 29.80 - 0.40 23.84
SEGN CORTE: 1-1, TPICO 2.00 33.93 - 0.40 27.14
SEGN CORTE: 1-1, TPICO 2.00 12.38 - 0.40 9.90
SEGN CORTE: 1-1, TPICO 2.00 26.51 - 0.40 21.21
SEGN CORTE: 1-1, TPICO 2.00 10.07 - 0.40 8.06
SEGN CORTE: 1-1, TPICO 2.00 11.88 - 0.40 9.50
SEGN CORTE: 1-1, TPICO 2.00 4.27 - 0.40 3.42
SEGN CORTE: 1-1, TPICO 2.00 4.27 - 0.40 3.42
SEGN CORTE: 1-1, TPICO 2.00 12.65 - 0.40 10.12
SEGN CORTE: 1-1, TPICO 2.00 7.63 - 0.40 6.10

05.02.03 ACERO ESTRUCTURAL PARA VIGAS DE CIMENTACION 1,093.00 KG

05.03.00 SOBRECIMIENTO ARMADO

05.03.01 CONCRETO EN SOBRECIMIENTO ARMADO - F'C= 175 KG/CM2 17.26 M3


SOBRECIMIETNO DEL CERCO PERIMTRICO:
SEGN CORTE: 1-1, TPICO 1.00 29.80 0.15 0.75 3.35
SEGN CORTE: 1-1, TPICO 1.00 33.93 0.15 0.75 3.82
SEGN CORTE: 1-1, TPICO 1.00 12.38 0.15 0.75 1.39
SEGN CORTE: 1-1, TPICO 1.00 26.51 0.15 0.75 2.98
SEGN CORTE: 1-1, TPICO 1.00 10.07 0.15 0.75 1.13
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS DEL CERCO PERIMTRICO

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
SEGN CORTE: 1-1, TPICO 1.00 11.88 0.15 0.75 1.34
SEGN CORTE: 1-1, TPICO 1.00 4.27 0.15 0.75 0.48
SEGN CORTE: 1-1, TPICO 1.00 4.27 0.15 0.75 0.48
SEGN CORTE: 1-1, TPICO 1.00 12.65 0.15 0.75 1.42
SEGN CORTE: 1-1, TPICO 1.00 7.63 0.15 0.75 0.86

05.03.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO REFORZADO 115.04 M2


SOBRECIMIENTO DEL CERCO PERIMTRICO:
SEGN CORTE: 1-1, TPICO 1.00 29.80 - 0.75 22.35
SEGN CORTE: 1-1, TPICO 1.00 33.93 - 0.75 25.45
SEGN CORTE: 1-1, TPICO 1.00 12.38 - 0.75 9.29
SEGN CORTE: 1-1, TPICO 1.00 26.51 - 0.75 19.88
SEGN CORTE: 1-1, TPICO 1.00 10.07 - 0.75 7.55
SEGN CORTE: 1-1, TPICO 1.00 11.88 - 0.75 8.91
SEGN CORTE: 1-1, TPICO 1.00 4.27 - 0.75 3.20
SEGN CORTE: 1-1, TPICO 1.00 4.27 - 0.75 3.20
SEGN CORTE: 1-1, TPICO 1.00 12.65 - 0.75 9.49
SEGN CORTE: 1-1, TPICO 1.00 7.63 - 0.75 5.72

05.03.03 ACERO ESTRUCTURAL PARA SOBRECIMIENTO REFORZADO 824.73 KG

05.06.00 COLUMNAS DE CONFINAMIENTO


05.06.01 CONCRETO F'C=175 KG/CM2 PARA COLUMNAS DE CONFINAMIENTO 6.20 M3
COLUMNA TIPO 4 43.00 Area 0.0375 3.60 5.81
COLUMNA TIPO 4A 1.00 Area 0.0550 3.60 0.20
COLUMNA TIPO 4B 1.00 Area 0.0560 3.60 0.20

05.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS DE CONFINAMIENTO 131.33 M2


COLUMNA TIPO 4 43.00 Permetro 0.8000 3.60 123.84
COLUMNA TIPO 4A 1.00 Permetro 1.0400 3.60 3.74
COLUMNA TIPO 4B 1.00 Permetro 1.0400 3.60 3.74

05.06.03 ACERO ESTRUCTURAL PARA COLUMNAS CONFINAM. 1,286.14 KG

05.08.00 VIGAS DE CONFINAMIENTO

05.08.01 CONCRETO F'C=175 KG/CM2 PARA VIGAS DE CONFINAMIENTO 4.60 M3


1.00 29.80 0.15 0.20 0.89
1.00 33.93 0.15 0.20 1.02
1.00 12.38 0.15 0.20 0.37
1.00 26.51 0.15 0.20 0.80
1.00 10.07 0.15 0.20 0.30
1.00 11.88 0.15 0.20 0.36
1.00 4.27 0.15 0.20 0.13
1.00 4.27 0.15 0.20 0.13
1.00 12.65 0.15 0.20 0.38
1.00 7.63 0.15 0.20 0.23

05.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS 30.68 M2


1.00 29.80 - 0.20 5.96
1.00 33.93 - 0.20 6.79
1.00 12.38 - 0.20 2.48
1.00 26.51 - 0.20 5.30
1.00 10.07 - 0.20 2.01
1.00 11.88 - 0.20 2.38
1.00 4.27 - 0.20 0.85
1.00 4.27 - 0.20 0.85
1.00 12.65 - 0.20 2.53
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ESTRUCTURAS DEL CERCO PERIMTRICO

N DE MEDIDAS
ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES Largo Ancho Alto
1.00 7.63 - 0.20 1.53

05.08.03 ACERO ESTRUCTURAL - VIGAS DE CONFINAMIENTO 855.72 KG

05.10.00 LOSAS MACIZAS

05.10.01 CONCRETO EN LOSAS MACIZAS F'C=210 KG/CM2 3.94 M3


CONCRETO LOSA MACIZA DE LA ENTRADA, ESPESOR= 20CMTS 1.00 Area 7.50 0.20 1.50
CONCRETO LOSA MACIZA DE LA ENTRADA, ESPESOR= 20CMTS 1.00 Area 7.50 0.20 1.50
CONCRETO LOSA MACIZA DE LA ENTRADA, ESPESOR= 20CMTS 1.00 Area 4.68 0.20 0.94

05.10.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS MACIZAS 19.68 M2


ENCOFRADO LOSA MACIZA DE LA ENTRADA, ESPESOR= 20CMTS 1.00 Area 7.50 - 7.50
ENCOFRADO LOSA MACIZA DE LA ENTRADA, ESPESOR= 20CMTS 1.00 Area 7.50 - 7.50
ENCOFRADO LOSA MACIZA DE LA ENTRADA, ESPESOR= 20CMTS 1.00 Area 4.68 - 4.68

05.10.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS MACIZAS 196.51 KG

05.11.04 ALAMBRE N: 08 REFUERZO HORIZONTAL EN MUROS 107.09 KG


- - - - 107.09
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ACERO DEL CERCO PERIMTRICO

Long x D
N de pza. 1/4 3/8 1/2 5/8 3/4 1
Diseo del Canti- Long. Por 0.25 0.58 1.02 1.58 2.2 4.02
N Descripcin f por elemen- Total Unid.
fierro dad pza
tos 5% 6% 7% 8% 9% 10%
0.25 0.58 1.02 1.6 2.26 4.04

05.02.03 ACERO ESTRUCTURAL PARA VIGAS DE CIMENTACION

SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 31.43 125.73333


SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 35.70 142.804
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 13.43 53.730667
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 28.03 112.13467
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 11.05 44.182667
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 12.83 51.333333
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 4.91 19.64
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 4.91 19.64
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 13.71 54.846667
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 8.27 33.08
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 122 1.13 137.86
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 139 1.13 157.07
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 53 1.13 59.89
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 109 1.13 123.17
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 43 1.13 48.59
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 51 1.13 57.63
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 20 1.13 22.6
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 20 1.13 22.6
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 54 1.13 61.02
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 34 1.13 38.42

Suma 0 728.85 657.12533 0 0 0


Peso 0.00 422.73 670.26784 0.00 0.00 0 1093.00 KG

05.03.03 ACERO ESTRUCTURAL PARA SOBRECIMIENTO REFORZADO

SEGN CORTE: 1-1, TPICO Longitudinal 3/8 1 3 30.71 92.14


SEGN CORTE: 1-1, TPICO Longitudinal 3/8 1 3 34.98 104.943
SEGN CORTE: 1-1, TPICO Longitudinal 3/8 1 3 12.71 38.138
SEGN CORTE: 1-1, TPICO Longitudinal 3/8 1 3 27.31 81.941
SEGN CORTE: 1-1, TPICO Longitudinal 3/8 1 3 10.33 30.977
SEGN CORTE: 1-1, TPICO Longitudinal 3/8 1 3 12.11 36.34
SEGN CORTE: 1-1, TPICO Longitudinal 3/8 1 3 4.19 12.57
SEGN CORTE: 1-1, TPICO Longitudinal 3/8 1 3 4.19 12.57
SEGN CORTE: 1-1, TPICO Longitudinal 3/8 1 3 12.99 38.975
SEGN CORTE: 1-1, TPICO Longitudinal 3/8 1 3 7.55 22.65
SEGN CORTE: 1-1, TPICO Vertical 1/2 1 99.00 1.06 104.94
SEGN CORTE: 1-1, TPICO Vertical 1/2 1 113.00 1.06 119.78
SEGN CORTE: 1-1, TPICO Vertical 1/2 1 41.00 1.06 43.46
SEGN CORTE: 1-1, TPICO Vertical 1/2 1 88.00 1.06 93.28
SEGN CORTE: 1-1, TPICO Vertical 1/2 1 34.00 1.06 36.04
SEGN CORTE: 1-1, TPICO Vertical 1/2 1 40.00 1.06 42.4
SEGN CORTE: 1-1, TPICO Vertical 1/2 1 14.00 1.06 14.84
SEGN CORTE: 1-1, TPICO Vertical 1/2 1 14.00 1.06 14.84
SEGN CORTE: 1-1, TPICO Vertical 1/2 1 42.00 1.06 44.52
SEGN CORTE: 1-1, TPICO Vertical 1/2 1 25.00 1.06 26.5

Suma 0 471.244 540.6 0 0 0


Peso 0.00 273.32 551.41 0.00 0.00 0 824.73 KG

05.06.03 ACERO ESTRUCTURAL PARA COLUMNAS CONFINAM.

COLUMNA TIPO 4 Longitudinal 1/2 43 4 4.36 749.92


COLUMNA TIPO 4A Longitudinal 1/2 1 8 4.36 34.88
COLUMNA TIPO 4B Longitudinal 1/2 1 8 4.36 34.88
COLUMNA TIPO 4 Estribos 3/8 43 26 0.64 709.93
COLUMNA TIPO 4A , C/DOBLE ESTRIBO Estribos 3/8 1 52 0.64 33.02
COLUMNA TIPO 4B, C/DOBRE ESTRIBO Estribos 3/8 1 52 0.64 33.02

Suma 0 775.97 819.68 0 0 0


Peso 0.00 450.06 836.07 0.00 0.00 0 1286.14 KG

05.08.03 ACERO ESTRUCTURAL - VIGAS DE CONFINAMIENTO

SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 31.07 124.29333


SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 35.34 141.364
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 13.07 52.290667
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 27.67 110.69467
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 10.69 42.742667
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 12.47 49.893333
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 4.55 18.2
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 4.55 18.2
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 13.35 53.406667
SEGN CORTE: 1-1, TPICO Longitudinal 1/2 1 4 7.91 31.64
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 122 0.54 65.27
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 139 0.54 74.365
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 53 0.54 28.355
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 109 0.54 58.315
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 43 0.54 23.005
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 51 0.54 27.285
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 20 0.54 10.7
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 20 0.54 10.7
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 54 0.54 28.89
SEGN CORTE: 1-1, TPICO Estribos 3/8 1 34 0.54 18.19

Suma 0 345.075 642.72533 0 0 0


Peso 0.00 200.14 655.57984 0.00 0.00 0 855.72 KG
05.10.00 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS MACIZAS

Longitudinal 1/2 1 5 11.25 56.25


Vertical 1/2 1 30 0.61 18.3
Longitudinal 1/2 1 5 11.25 56.25
Vertical 1/2 1 30 0.61 18.3
Longitudinal 1/2 1 8 3.85 30.8
MUNICIPALIDAD DISTRITAL DE CAJAY

CONSTRUCCIN DEL CENTRO DE SALUD DE CAJAY


-------------------------------------------------------------------------------------------------------------
METRADO DE ACERO DEL CERCO PERIMTRICO

Vertical 1/2 1 11 1.16 12.76

Suma 0 0 192.66 0 0 0
Peso 0.00 0.00 196.5132 0.00 0.00 0 196.51 KG