12/18/2007 3:00 PM 5 ND ND ND 5 ND
12/18/2007 5:00 PM 5 ND ND ND ND 5
12/18/2007 8:00 PM 150 75 50 40 30 25
12/18/2007 10:00 PM 85 45 25 25 25 30
12/18/2007 12:00 PM 40 30 20 20 20 20
12/19/2007 2:00 AM 35 25 15 15 15 15
12/19/2007 8:00 AM 45 45 40 40 45 40
12/19/2007 10:00 AM 25 20 25 25 30 30
12/19/2007 2:00 PM 20 20 30 35 30 25
12/19/2007 4:00 PM 15 10 15 20 20 25
12/19/2007 6:00 PM 25 30 25 20 15 25
12/19/2007 9:00 PM 20 20 20 15 10 20
12/20/2007 11:00 PM ND ND ND ND ND ND
12/20/2007 1:00 AM 30 30 35 40 30 20
12/20/2007 3:00:00 AM 30 20 30 50 35 20
12/20/2007 5:00:00 AM 30 20 30 50 35 20
12/20/2007 7:00 AM 30 25 25 35 35 30
12/20/2007 10:00 AM 40 40 25 45 45 30
12/20/2007 11:00 AM 35 35 35 45 30 40
12/20/2007 2:00 PM 5 5 5 7.5 10 7.5
12/20/2007 4:00 PM 7.5 10 10 10 5 5
12/20/2007 6:00 PM ND 5 5 5 ND ND
12/20/2007 9:00 PM ND ND ND ND ND ND
12/20/2007 10:00 PM ND 5 5 5 ND ND
12/20/2007 11:00 PM ND ND ND ND ND ND
12/20/2007 12:00 PM 5 5 ND ND ND ND
Fecha Hora Muestra 1 Muestra 2 Muestra 3 Muestra 4 Muestra 5 Muestra 6
(ppm) (ppm) (ppm) (ppm) (ppm) (ppm)
12/21/2007 3:00 AM 10 5 10 15 5 10
12/21/2007 4:00 AM 5 5 10 15 5 10
12/21/2007 5:00 AM 30 10 10 15 5 5
12/21/2007 7:00 AM ND ND 5 5 7.5 5
12/21/2007 9:00 AM 5 7.5 7.5 7.5 7.5 5
12/21/2007 11:00 AM ND ND ND 5 5 ND
12/21/2007 12:00 PM ND ND ND 5 ND ND
12/21/2007 1:00 PM ND ND ND ND ND ND
12/21/2007 2:00 PM ND ND ND ND ND ND
12/21/2007 4:00 PM ND ND ND ND ND ND
12/21/2007 6:00 AM ND ND ND ND ND ND
12/28/2007 6:00 PM 20 20 25 30 15 20
12/28/2007 7:00 PM 15 15 20 25 10 15
12/28/2007 8:00 PM 15 20 20 20 15 20
12/28/2007 9:00 PM 15 20 20 15 5 15
12/28/2007 10:00 PM 10 15 15 10 5 10
12/29/2007 7:00 AM 5 10 10 5 10 5
12/29/2007 8:00 AM 5 10 15 10 10 10
12/29/2007 10:00:00 AM 5 10 15 10 10 10
12/29/2007 2:00:00 PM 10 10 5 5 5 5
12/29/2007 4:00:00 PM 30 15 30 20 20 15
12/29/2007 11:00:00 PM 5 5 10 5 10 5
12/31/2007 11:00:00 AM 5 5 ND 5 ND ND
12/31/2007 12:00:00 PM ND ND ND 5 ND ND
12/31/2007 3:00:00 PM ND ND ND ND ND ND
12/31/2007 6:00:00 PM ND ND0 5 ND ND 5
1/2/2008 6:00:00 AM ND ND 5 5 ND ND
1/2/2008 7:00:00 AM ND 5 ND ND 5 5
1/2/2008 8:00:00 AM ND 5 ND ND 5 ND
1/2/2008 10:50:00 AM ND ND 5 ND ND ND
1/2/2008 1:00:00 PM ND 5 ND ND ND ND
1/2/2008 2:40:00 PM ND 5 - - - ND
1/2/2008 4:00:00 PM ND ND ND ND ND ND
1/4/2008 4:00 AM ND ND ND ND ND ND
1/4/2008 6:00 AM 25 25 30 30 20 15
1/4/2008 8:30 AM 40 35 40 40 45 40
1/4/2008 10:30 AM 15 15 20 15 20 15
1/4/2008 12:00 PM 20 20 20 25 15 15
1/4/2008 2:00 PM 35 35 15 40 25 30
1/4/2008 4:00 PM 20 30 25 25 25 25
1/4/2008 6:00 PM 25 5 40 25 50 30
1/4/2008 9:00 PM 30 40 15 25 15 25
1/4/2008 11:00 PM 50 30 40 30 15 25
1/4/2008 12:00 AM 60 60 40 25 20 30
Fecha Hora Muestra 1 Muestra 2 Muestra 3 Muestra 4 Muestra 5 Muestra 6
(ppm) (ppm) (ppm) (ppm) (ppm) (ppm)
1/5/2008 7:00 AM 35 30 25 20 25 20
1/5/2008 10:00 AM 30 20 15 20 20 15
1/5/2008 2:00 PM 10 5 10 5 5 5
1/5/2008 6:00 PM ND ND ND ND 5 ND
1/5/2008 6:30 PM ND ND ND ND ND ND
1/6/2008 6:00 PM ND ND ND ND ND ND
1/6/2008 7:00 PM ND ND ND ND ND ND
1/7/2008 8:30 AM ND ND ND ND ND ND
1/7/2008 10:00 AM ND ND ND ND ND ND
1/7/2008 12:00 PM ND ND ND ND ND ND
1/7/2008 2:00 PM ND ND ND ND ND ND
1/7/2008 7:00 PM ND 5 5 ND 5 ND
1/11/2008 8:00 AM ND ND ND ND ND ND
1/11/2008 10:00 AM ND ND ND ND ND ND
1/13/2008 8:40 AM 15 28 24 22 18 18
1/28/2008 3:30 PM
1/28/2008 5:30 PM
1/29/2008 9:00 AM
1/29/2008 4:00 PM
1/30/2008 4:00 AM 8.75 8.75 12.5 11.25 12.5 10
1/30/2008 6:00 AM 5 5 7.5 10 8.75 8.75
1/30/2008 8:00 AM 15 6.25 6.25 17.5 17.5 18.75
1/30/2008 10.00 am 15 11.25 7.5 12.5 13.75 11.25
e Contingencia
Muestra 7 Promedio
CONSUMO CONSUMO
(ppm) TOTAL X DIA TOTAL X DIA Sulfato
Peroxido de Cobre PH
10 11.3 400 15 8.5
7.5 6.9 8.5
7.5 6.3 15 8.5
7.5 9.8 300 8.5
10 11.8 260 8.5
7.5 12.6 10 8.5
7.5 7.6 250 8.5
5 4.0 8.5
1.25 2.5 225 8.5
0.125 1.3 8.5
TOTAL 1435 40 8.5
Muestra 7 Promedio
CONSUMO
(ppm) CONSUMO X DIA Sulfato de
X DIA Peroxido Cobre PH Stock de peroxido de 1800 litros
20
8.5
11.25 10.7 20
10 7.9
7.5 12.7 200
8.75 11.4 377 litros queda hasta el momento
,
TOTAL 1500 40
Planta DIM:
10 kilos de sulfato de
cobre en 100 litros de
solucion y 150 litros de
peroxido
Planta DIM:
10 kilos de sulfato de
cobre en 100 litros de
solucion y 150 litros de
peroxido
nta DIM:
empezo a evacuar de
barren a la
tingencia a las 11:50
a una altura de 1,40
dia 21 de enero.
Monitoreo de la Poza de Contingencia Monitoreo de la Poza de Contingencia
Evacuacion (Rio) Evacuacion (B - C)
Total m Total m
evacuados evacuados
1,40 m 0,20 cm
Total m3 Total m3
evacuados 1785.75 evacuados 236.352
Total m Total m
evacuados evacuados
1,30 m 1,30 m
Total m3 Total m3
evacuados 1532.42 evacuados 1708.488
Total m3 Total m3
evacuados 1379.75 287.418 evacuados 1267.25
Total m3
evacuados 1867.576
Total m
evacuados
0,95 cm
Total m
evacuados Total m3
0,95 cm evacuados 1244.92
Total m3
evacuados 1244.92
Monitoreo de la Poza de Contingencia Monitoreo de la Poza de Contingencia
Evacuacion (Rio) Evacuacion (B - C)
Total m Total m
evacuados evacuados
2,05 m 2.05
Total m3 Total m3
evacuados 2549.016 evacuados 2549.016
Total m3 Total m3
evacuados evacuados
Flujo Fuerza CN-
116 m3/h 117
Flujo Fuerza CN-
136 m3/h 125 ppm
Flujo Fuerza CN-
126,47 m3/h 118 ppm
Planta DIM:
se paro la evacuacion Barren-
Conting. por motivo q la poza
barren se estaba vaciando y
debido a eso se paro y se espero
evacuar de la poza maximo
eventos a la barren, continuando
la evacuacion de la barren-
conting a las 3: 00 am hasta las
5:20 am del 19/01/2008,
Evacuacion m3
942.69
202.24
416.71
1785.75
1532.42
1379.75
506.00
1867.58
1244.92
2549.02
12427.07
COSTOS DE INSUMOS