N Progresiva rea (Km2)
quebrada (0/00) estructura
1 0+100 10 1,41 Pontn
2 0+210 5 0,02 Tajea
3 0+610 15 0,06 Tajea
4 0+920 20 0,04 Alcantarilla
5 1+020 12 0,02 Tajea
6 1+800 15 0,28 Pontn
7 5+900 10 0,41 Alcantarilla
8 5+940 8 0,20 Alcantarilla
9 6+100 15 0,14 Tajea
10 7+360 18 0,04 Alcantarilla
CUADRO 2: PRECIPITACION MAXIMA DEL MES EN 24 Hrs.
ESTACION PROGRESO CODIGO 012110
AO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL
1964 17.5 15.0 31.7 14.0 14.7 0.0 0.0 0.5 6.5 10.5 21.9 11.5
1965 21.8 21.7 20.7 16.0 1.6 0.0 0.0 0.0 8.4 5.6 24.6 28.4 148.8
1966 11.0 20.6 12.0 0.3 15.9 0.0 0.0 0.0 22.5 14.6 19.3 19.6 135.8
1967 12.2 18.7 28.5 10.6 5.3 0.0 5.1 5.9 7.1 18.0 17.1 19.3 147.8
1968 11.2 22.1 22.4 13.4 0.8 0.0 13.4 9.7 14.8 6.3 12.2 11.7 138.0
1969 18.3 14.8 8.5 12.6 0.0 1.4 10.6 0.2 4.9 11.1 25.8 14.5 122.7
1970 17.2 12.8 17.1 26.8 5.2 0.5 0.8 0.0 26.1 13.9 23.0 27.1 170.5
1971 35.4 42.5 4.6 13.8 5.9 0.1 0.0 1.8 0.8 15.2 17.6 20.5 158.2
1972 34.1 27.9 20.8 7.9 0.4 0.0 2.7 4.0 9.6 5.9 12.6 23.1 149.0
1973 28.9 19.6 17.2 21.4 7.5 0.0 3.3 2.5 15.2 37.2 38.3 33.9 225.0
1974 11.2 16.4 14.1 9.2 12.3 5.1 0.2 5.8 9.5 8.4 17.0 17.4 126.6
1975 19.0 12.8 19.8 14.0 3.2 0.0 0.0 0.0 14.3 10.1 9.4 14.7 117.3
1976 34.9 17.4 21.9 13.4 14.2 4.2 2.8 4.2 28.2 7.3 18.9 19.5 186.9
1977 13.0 14.7 30.0 9.0 2.7 0.0 0.0 0.0 5.9 11.7 24.8 20.4 132.2
1978 21.2 14.9 17.3 26.1 2.3 0.0 0.0 0.0 22.6 4.7 20.8 37.0 166.9
1979 20.2 12.1 11.2 19.0 6.5 0.0 5.0 4.6 6.4 8.1 9.0 14.6 116.7
1980 17.8 17.0 15.7 3.5 5.2 0.2 2.3 0.0 3.5 21.6 2.9 22.0 111.7
1981 22.4 20.1 17.0 26.4 1.4 0.0 0.0 2.8 19.4 16.7 12.9 27.5 166.6
1982 20.0 27.2 15.6 9.1 0.0 0.0 0.0 0.8 5.0 19.8 23.6 22.6 143.7
1983 16.3 14.9 19.1 9.2 5.0 0.0 0.0 0.0 0.0 6.6 16.3 14.9 102.3
1984 17.9 11.1 20.2 14.6 5.1 1.0 2.5 2.9 9.5 13.7 18.0 20.3 136.8
1985 20.8 19.3 20.2 14.6 5.1 1.0 0.0 0.0 11.5 5.2 20.6 21.7 139.9
1986 26.2 22.0 28.5 20.6 8.6 0.0 2.5 4.0 11.1 13.7 10.5 14.8 162.5
1987 14.1 14.3 20.5 14.0 1.0 1.0 12.2 0.0 6.0 30.2 24.5 44.6 182.4
1988 21.5 20.0 15.0 19.0 6.6 0.0 0.0 0.0 9.0 7.7 7.0 12.8 118.6
1989 22.5 19.9 38.1 16.4 3.5 2.2 0.0 7.5 11.5 13.0 12.0 13.0 159.6
1990 14.0 25.0 18.0 10.0 0.0 7.4 0.0 5.4 12.0 10.9 12.0 10.0 124.7
1991 22.4 23.4 20.6 19.4 0.0 0.0 0.0 0.0 6.0 13.9 7.6 24.8 138.1
1992 20.8 19.3 17.0 9.8 0.0 3.2 0.0 20.3 9.9 10.4 19.7 14.1 144.5
1993 19.5 19.4 21.4 12.5 5.2 3.7 10.2 8.8 5.9 17.2 22.7 15.5 162.0
1994 16.5 23.2 30.2 17.8 4.8 0.5 0.0 3.2 7.4 24.4 18.4 22.8 169.2
1995 21.2 22.2 34.2 14.8 0.0 0.0 2.5 0.0 6.2 10.4 27.8 24.4 163.7
1996 30.0 10.0 16.6 8.8 10.8 0.0 1.4 3.0 2.8 11.8 11.0 23.6 129.8
1997 37.4 34.2 23.4 18.8 11.4 0.0 0.0 8.2 0.8 13.8 18.0 20.4 186.4
1998 17.6 10.4 14.6 5.7 0.0 4.0 0.0 1.2 2.2 15.8 28.0 8.0 107.5
1999 26.2 15.8 23.6 15.4 1.0 0.0 0.0 0.0 4.0 15.0 14.8 11.9 127.7
2000 14.4 19.2 16.2 5.4 1.4 1.2 1.6 2.4 8.2 16.4 8.6 22.4 117.4
2001 18.6 26.4 25.2 16.2 14.2 0.0 5.5 0.0 6.4 11.0 30.5 15.2 169.2
2002 24.2 14.6 17.6 41.2 8.8 1.8 12.6 4.4 10.8 26.4 21.4 32.2 216.0
MTODO MAC MATH
INTENSIDAD MAXIMA
Para el caso de alcantarillas y/o tajeas
Periodo de Intensidad
Coeficiente Pmax. 24 Coeficiente
Retorno mxima
C hr (mm) n
(aos) (mm/h)
10 0.4602 37.56 0.875 10.98
25 0.4602 42.7 0.875 12.29
Intensidad Caudal de
oeficiente Pendiente.
rea (Has) mxima diseo
Escorrenta ()
(mm/h) (m3/s)
13.26 4.21
0.42 141 10
14.22 4.52
10.98 0.1
0.42 2 5
12.29 0.11
10.98 0.3
0.42 6 15
12.29 0.34
10.98 0.23
0.42 4 20
12.29 0.26
10.98 0.12
0.42 2 12
12.29 0.13
13.26 1.25
0.42 28 15
14.22 1.34
10.98 1.3
0.42 41 10
12.29 1.45
10.98 0.7
0.42 20 8
12.29 0.78
10.98 0.6
0.42 14 15
12.29 0.67
10.98 0.23
0.42 4 18
12.29 0.25
MTODO RACIONAL
1. DETERMINACIN DE LA INTENSIDAD DE LLUVIA.
Factor Precipitacin
Periodo Retorno Probabilidad de
frecuencia mxima en 24
T aos Excedencia P
K horas
10 0,100 1.31 37.56
25 0,040 2.04 42.7
INTENSIDAD MAXIMA
Para el caso de alcantarillas y/o tajeas