OBRA MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BAR

QUILLISPATA Y LEBERTAD. DIATRITO DE HUAYUCACHI - HYO - JUNIN"


RESIDENTE ING. Carlos A.Condezo Surez
SUPERVISIN CONSORCIO SUPERVISION HUAYUCAHI
UBICACIN REGIN JUNIN
PROVINCIA HUANCAYO
DISTRITO HUAYUCAHI
LOCALIDAD ANEXOS
CONTRATISTA CONSORCIO SANEAMIENTO HUAYUCAHI
ENTIDAD MUNICIPALIDAD DISTRITAL DE HUAYUCAHI

MONTO CONTRATADO ###


FECHA DE INICIO 1/9/2016
PLAZO DE EJECUCIN 300 DAS CALENDARIO
FECHA DE TERMINO 11/4/2016
AMPLIACIN PLAZO N 01
NUEVA FECHA DE TERMINO
AMPLIACIN PLAZO N 02
NUEVA FECHA DE TERMINO

VALORIZACIN 01 ENERO 2016


02 FEBRERO 2016
03 MARZO 2016
04 ABRIL 2016
05 MAYO 2016
06 JUNIO 2016
07 JULIO 2016
08 AGOSTO 2016
09 SETIEMBRE 2016
10 OCTUBRE 2016
ADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
PRUEBA HIDRULICA DESAGE 001
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
Y BAJA), QUILLISPATA Y LIBERTAD.MUNICIPALIDAD DE HUAYUCACHI - HY
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo SureCONSORCIO SANEAMIENTO HUAYUCAHI
LOCALIDAD HUAYUCACHI
Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el
Volumen (Ve) siguiente:
Ve = 0.0047 Di x L (1)
Donde : Ve : Volumen exfiltrado (lts/da)
Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)
DATOS :
Tramo : BZ 347 - BZ 387 Calle Cemen :
Tubera : PVC UF Fecha de P : 2/20/2016
Dimetro : 200 mm Hora de Inic:
Longitud T : 70.84 m Hora de Te :
Altura de Bz: 1.50 m Tiempo Pru:
Altura de Bz: 1.50 m Lectura Un : 0.821
Dimetro B: 1.20 m Lectura Dos: 0.823
rea de Buz: 1.13 m2 Altura Desc: 0.002
RESULTAD:
Volumen Exfiltrado Permi: 66.59 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.002262 m3/hora
54.286721 lts / da (2)
CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado
lts/da (2) < Permisible lts/da (1) APROBADO
54.29 66.59
PRUEBA DE NIVELACION Fecha:

Bz. Bz.
BZ 347 BZ 387

L= 70.84 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD
RESIDENTE DE OBRA

SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 002
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
Y BAJA),QUILLISPATA Y LEBERTAD. MINICIPALIDAD DE HUAYUCACHI - HY
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo SureCONSORCI SANEAMIENTO DE HUAYUCAHI.
LOCALIDAD HUAYUCACHI
Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el
Volumen (Ve) siguiente:
Ve = 0.0047 Di x L (1)
Donde : Ve : Volumen exfiltrado (lts/da)
Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)
DATOS :
Tramo : BZ 387 - BZ 348 Calle Cemen :
Tubera : PVC UF Fecha de P : 2/26/2016
Dimetro : 200 mm Hora de Inic:
Longitud T : 70.44 m Hora de Te :
Altura de Bz: 1.60 m Tiempo Pru:
Altura de Bz: 1.40 m Lectura Un : 0.513
Dimetro B: 1.20 m Lectura Dos: 0.514
rea de Buz: 1.13 m2 Altura Desc: 0.001
RESULTAD:
Volumen Exfiltrado Permi: 66.21 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 66.21
PRUEBA DE NIVELACION Fecha:

Bz. Bz.
BZ 387 BZ 348

70.44 m
PRUEBA DE ALINEAMIENTO Fecha: 2/26/2016
SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 003
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
Y BAJA), QUILLLISPATA Y LIBERTAD. MUNICIPALIDAD DE HUAYUCAHI - HY
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo SureCONSORCI SANEAMIENTO DE HUAYUCAHI.
LOCALIDAD HUAYUCACHI
Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el
Volumen (Ve) siguiente:
Ve = 0.0047 Di x L (1)
Donde : Ve : Volumen exfiltrado (lts/da)
Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)
DATOS :
Tramo : BZ 348 - BZ 349 Calle Ceme:
Tubera : PVC UF Fecha de P : 2/26/2016
Dimetro : 160 mm Hora de Inic:
Longitud T : 60.29 m Hora de Te :
Altura de Bz: 1.40 m Tiempo Pru:
Altura de Bz: 1.40 m Lectura Un : 0.551
Dimetro B: 1.20 m Lectura Dos: 0.552
rea de Buz: 1.13 m2 Altura Desc: 0.001
RESULTAD:
Volumen Exfiltrado Permi: 45.34 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)
CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado
lts/da (2) < Permisible lts/da (1) APROBADO
27.14 45.34

PRUEBA DE NIVELACION Fecha:


Bz. Bz.
BZ 348 BZ 349

60.29 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 004


OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
QUILLLISPATA Y LIBERTAD. MUNICIPALIDAD DE HUAYUCAH
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo SureCONSORCIO SANEAMIENTO HUAYUCACHI
LOCALIDAD HUAYUCACHI

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : BZ 349 - BZ 249-A Calle Cemen :
Tubera : PVC UF Fecha de P : 2/26/2016
Dimetro : 160 mm Hora de Inic:
Longitud T : 38.64 m Hora de Te :
Altura de Bz: 1.40 m Tiempo Pru:
Altura de Bz: 1.40 m Lectura Un : 0.228
Dimetro B: 1.20 m Lectura Dos: 0.229
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 29.06 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 29.06

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
BZ 349 BZ 249-A

38.64 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 005
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
QUILLLISPATA Y LIBERTAD. MUNICIPALIDAD DE HUAYUCAH
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo SureCONSORCIO SANEAMIENTO HUAYUCACHI
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : BZ 349-A - BZ 350 Calle Cemen
:
Tubera : PVC UF Fecha de P : 2/27/2016
Dimetro : 160 mm Hora de Inic:
Longitud T : 40.10 m Hora de Te :
Altura de Bz: 1.40 m Tiempo Pru:
Altura de Bz: 1.40 m Lectura Un : 0.661
Dimetro B: 1.20 m Lectura Dos: 0.662
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 30.16 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)
CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado
lts/da (2) < Permisible lts/da (1) APROBADO
27.14 30.16

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
BZ 349-A BZ 350

40.10 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 006
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
QUILLLISPATA Y LIBERTAD. MUNICIPALIDAD DE HUAYUCAH
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo SureCONSORCIO SANEAMIENTO HUAYUCACHI
LOCALIDAD ANEXOS
Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el
Volumen (Ve) siguiente:
Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)
DATOS :
Tramo : BZ 350 - BZ 351 Calle Cemen :
Tubera : PVC UF Fecha de P : 2/27/2016
Dimetro : 160 mm Hora de Inic:
Longitud T : 53.30 m Hora de Te :
Altura de Bz: 1.40 m Tiempo Pru:
Altura de Bz: 2.85 m Lectura Un : 0.815
Dimetro B: 1.20 m Lectura Dos: 0.816
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 40.08 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)
CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado
lts/da (2) < Permisible lts/da (1) APROBADO
27.14 40.08

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
BZ 350 BZ 351

53.30 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 007
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
QUILLLISPATA Y LIBERTAD. MUNICIPALIDAD DE HUAYUCAH
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo SureCONSORCIO SANEAMIENTO HUAYUCACHI
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : BZ 475 - BZ 476 Calle, Misti :
Tubera : PVC UF Fecha de P : 3/1/2016
Dimetro : 160 mm Hora de Inic:
Longitud T : 62.09 m Hora de Te :
Altura de Bz: 1.90 m Tiempo Pru:
Altura de Bz: 1.37 m Lectura Un : 0.656
Dimetro B: 1.20 m Lectura Dos: 0.657
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 46.69 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)
CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado
lts/da (2) < Permisible lts/da (1) APROBADO
27.14 46.69

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
BZ 475 BZ 476

62.09 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA
SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 008
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
QUILLLISPATA Y LIBERTAD. MUNICIPALIDAD DE HUAYUCAH
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo SureCONSORCIO SANEAMIENTO HUAYUCACHI
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:
Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : BZ476 - BZ 435 Calle, Misti :
Tubera : PVC UF Fecha de P : 3/1/2016
Dimetro : 160 mm Hora de Inic:
Longitud T : 56.34 m Hora de Te :
Altura de Bz: 1.37 m Tiempo Pru:
Altura de Bz: 1.21 m Lectura Un : 0.567
Dimetro B: 1.20 m Lectura Dos: 0.568
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 42.37 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 42.37
PRUEBA DE NIVELACION Fecha:

Bz. Bz.
BZ476 BZ 435

56.34 m
PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013
SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 009
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
QUILLLISPATA Y LIBERTAD. MUNICIPALIDAD DE HUAYUCAH
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo SureCONSORCIO SANEAMIENTO HUAYUCACHI
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : BZ 435 - BZ 477 Calle, Misti :
Tubera : PVC UF Fecha de P : 3/2/2016
Dimetro : 160 mm Hora de Inic:
Longitud T : 66.98 m Hora de Te :
Altura de Bz: 1.21 m Tiempo Pru:
Altura de Bz: 2.15 m Lectura Un : 0.352
Dimetro B: 1.20 m Lectura Dos: 0.353
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 50.37 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da APROBADO
27.14 50.37

PRUEBA DE NIVELACION Fecha:


Bz. Bz.
BZ 435 BZ 477

66.98 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 010

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 5A - 6 Calle, Aveni: Calle 01
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 54.50 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.57 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 40.98 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 40.98

PRUEBA DE NIVELACION Fecha:


Bz. Bz.
5A 6

54.50 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 011

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 6 - 6A Calle, Aveni: Calle 01
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 53.40 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.80 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 40.16 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 40.16

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
6 6A

53.40 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 012

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS
Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el
Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 6A - 7 Calle, Aveni: Calle 01
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 53.40 m Hora de Te :
Altura de Bz: 1.80 m Tiempo Pru:
Altura de Bz: 2.34 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 40.16 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 40.16

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
6A 7

53.40 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA
SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 013

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 7 - 7A Calle, Aveni: Pasaje 03
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 48.00 m Hora de Te :
Altura de Bz: 2.34 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 36.10 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 36.10

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
7 7A
48.00 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 014

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 7A - 13 Calle, Aveni: Pasaje 03
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 60.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.40 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001
RESULTAD:
Volumen Exfiltrado Permi: 45.12 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 45.12

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
7A 13

60.00 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 015

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:
Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 10 - 10A Calle, Aveni: Calle 02
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 61.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 45.87 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 45.87

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
10 10A

61.00 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA
SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 016

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 10A - 11 Calle, Aveni: Calle 02
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 53.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 39.86 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 39.86

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
10A 11
53.00 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 017

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 11 - 11A Calle, Aveni: Calle 02
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 60.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001
RESULTAD:
Volumen Exfiltrado Permi: 45.12 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 45.12

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
11 11A

60.00 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 018

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)
Donde : Ve : Volumen exfiltrado (lts/da)
Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 11A - 12 Calle, Aveni: Calle 02
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 49.60 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 37.30 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 37.30

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
11A 12

49.60 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 019

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 12A - 12 Calle, Aveni: Pasaje 04
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 50.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 37.60 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 37.60

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
12A 12

50.00 m
PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013
SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 020

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 13 - 13A Calle, Aveni: Calle 02
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 61.00 m Hora de Te :
Altura de Bz: 1.40 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 45.87 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)
CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado
lts/da (2) < Permisible lts/da (1) APROBADO
27.14 45.87

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
13 13A

61.00 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 021

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)
DATOS :
Tramo : 13A - 12 Calle, Aveni: Calle 02
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 54.25 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 40.80 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 40.80

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
13A 12

54.25 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 022

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 12 - 12B Calle, Aveni: Pasaje 04
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 66.20 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 49.78 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 49.78

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
12 12B

66.20 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD
RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 023

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 12B - 18 Calle, Aveni: Pasaje 04
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 54.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.68 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 40.61 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 40.61
PRUEBA DE NIVELACION Fecha:

Bz. Bz.
12B 18

54.00 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 024

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 13 - 13B Calle, Aveni: Pasaje 03
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 60.00 m Hora de Te :
Altura de Bz: 1.40 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 45.12 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 45.12

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
13 13B

60.00 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 025

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 13B - 19 Calle, Aveni: Pasaje 03
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 59.50 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 44.74 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 44.74

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
13B 19

59.50 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA
SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 026

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 19 - 19A Calle, Aveni: Calle 03
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 54.75 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 41.17 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 41.17

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
19 19A
54.75 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 027

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 19A - 18 Calle, Aveni: Pasaje 27
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 54.75 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.68 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001
RESULTAD:
Volumen Exfiltrado Permi: 41.17 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 41.17

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
19A 18

54.75 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 028

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:
Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 11 - 11B Calle, Aveni: Pasaje 05
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 60.25 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 45.31 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 45.31

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
11 11B

60.25 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 029

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 11B - 17 Calle, Aveni: Pasaje 05
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 60.25 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 45.31 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 45.31

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
11B 17
60.25 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 030

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 17 - 17A Calle, Aveni: Calle 03
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 51.50 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.96 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 38.73 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 38.73

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
17 17A

51.50 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 031

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 17A - 18 Calle, Aveni: Calle 03
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 61.00 m Hora de Te :
Altura de Bz: 1.96 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 45.87 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 45.87

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
17A 18

61.00 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 032


OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 18 - 18A Calle, Aveni: Pasaje 04
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 99.40 m Hora de Te :
Altura de Bz: 1.68 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 74.75 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 74.75

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
18 18A

99.40 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD
RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 033

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 18A - 29 Calle, Aveni: Pasaje 04
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 72.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 54.14 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
< APROBADO
27.14 54.14

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
18A 29

72.00 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 034

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 24 - 24A Calle, Aveni: Calle 04
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 54.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 40.61 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 40.61

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
24 24A

54.00 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 035

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 24A - 29 Calle, Aveni: Calle 04
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 53.40 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 40.16 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 40.16

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
24A 29

53.40 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD
RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 036

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 29 - 32 Calle, Aveni: Calle 04
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 63.40 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 47.68 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 47.68

PRUEBA DE NIVELACION Fecha:


Bz. Bz.
29 32

63.40 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 037

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 32 - 30 Calle, Aveni: Calle 04
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 64.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 48.13 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 48.13

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
32 30

64.00 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 038

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YACUS
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 30 - 28 Calle, Aveni: Calle 04
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 65.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un : 0.132
Dimetro B: 1.20 m Lectura Dos: 0.133
rea de Buz: 1.13 m2 Altura Desc: 0.001

RESULTAD:
Volumen Exfiltrado Permi: 48.88 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.001131 m3/hora
27.143361 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
27.14 48.88

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
30 28

65.00 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA
SUPERVISOR DE OBRA
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
DE HUAYUCACHI - HYO - JUNIN.

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
DE HUAYUCACHI - HYO - JUNIN.

UCAHI

CAHI.
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
DE HUAYUCAHI - HYO - JUNIN.

UCAHI

CAHI.
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
LIDAD DE HUAYUCAHI - HYO - JUNIN.

UCAHI

ACHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
LIDAD DE HUAYUCAHI - HYO - JUNIN.

UCAHI

ACHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
LIDAD DE HUAYUCAHI - HYO - JUNIN.

UCAHI

ACHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
LIDAD DE HUAYUCAHI - HYO - JUNIN.

UCAHI

ACHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
LIDAD DE HUAYUCAHI - HYO - JUNIN.

UCAHI

ACHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
LIDAD DE HUAYUCAHI - HYO - JUNIN.

UCAHI

ACHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
IOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

UCAHI
PRUEBA HIDRAULICA AGUA POTABLE
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE HUAYUCAHCONTRATISTA:
UBICACIN: Dec-99
REGION : JUNIN SUPERVISOR:
PROVINCIA : HUANCAYO CONSORCIO SUPERVISION HUAYUCAHI
DISTRITO : HUAYUCAHI RESIDENTE:
LOCALIDAD : ANEXOS ING. Carlos A.Condezo Surez

Prdida de agua en la Tubera Instalada no deber exceder el Volumen (F)


siguiente:

F =n x d P (1)
410 x 25
Donde : Vp : Volumen de perdida admisible (lts/h)
n : Sumatoria de uniones, accesorios y conexiones
d : Dametro de tubera (mm)
P : Presion aplicada en prueba (m.c.a.)

DATOS :
Tubera PVC: 1.5 "
Dimetro Tu: 48 mm
Clase : 10
Presin Pru: 150 m.c.a.
Tramo :
Calle, Aveni: AV. OLAYA - HUANOPAMACRAQUIA
Longitud : 706.5
n : 149
uniones : 144
accesorios : 5
conexiones: 0
Fecha de P : ###
Hora de Inic: 16:43:00
Hora de T : 17:43:00
RESULTAD:
Vol. Permisi: Matriz Conexiones
8.56 0.00
Vol. Perdido:
Balde : 0.355 m
Tirante per : 0.075 m
Vol. Perdido: 0.0074235 m
Vol. Perdido: 7.4235026 lt/h
CONCLUSI: Matriz Conexiones
OK

RESIDENTE SUPERVISOR
1
PRUEBA HIDRAULICA AGUA POTABLE
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE HUAYUCAHCONTRATISTA:
UBICACIN: 0
REGION : JUNIN SUPERVISOR:
PROVINCIA : HUANCAYO CONSORCIO SUPERVISION HUAYUCAHI
DISTRITO : HUAYUCAHI RESIDENTE:
LOCALIDAD : ANEXOS ING. Carlos A.Condezo Surez

Prdida de agua en la Tubera Instalada no deber exceder el Volumen (F)


siguiente:

F =n x d P (1)
410 x 25
Donde : Vp : Volumen de perdida admisible (lts/h)
n : Sumatoria de uniones, accesorios y conexiones
d : Dametro de tubera (mm)
P : Presion aplicada en prueba (m.c.a.)

DATOS :
Tubera PVC: 2"
Dimetro Tu: 63 mm
Clase : 10
Presin Pru: 150 m.c.a.
Tramo :
Calle, Aveni: CAR. ANTA - ACRAQUIA
Longitud : 241
n : 53
uniones : 49
accesorios : 4
conexiones: 0
Fecha de P : ###
Hora de Inic: 16:43:00
Hora de T : 17:43:00
RESULTAD:
Vol. Permisi: Matriz Conexiones
4.00 0.00
Vol. Perdido:
Balde : 0.355 m
Tirante per : 0.02 m
Vol. Perdido: 0.0019796 m
Vol. Perdido: 1.9796007 lt/h
CONCLUSI: Matriz Conexiones
OK

RESIDENTE SUPERVISOR
2
PRUEBA HIDRAULICA AGUA POTABLE
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE HUAYUCAHCONTRATISTA:
UBICACIN: Err:509
REGION : JUNIN SUPERVISOR:
PROVINCIA : HUANCAYO CONSORCIO SUPERVISION HUAYUCAHI
DISTRITO : HUAYUCAHI RESIDENTE:
LOCALIDAD : ANEXOS ING. Carlos A.Condezo Surez

Prdida de agua en la Tubera Instalada no deber exceder el Volumen (F)


siguiente:

F =n x d P (1)
410 x 25
Donde : Vp : Volumen de perdida admisible (lts/h)
n : Sumatoria de uniones, accesorios y conexiones
d : Dametro de tubera (mm)
P : Presion aplicada en prueba (m.c.a.)

DATOS :
Tubera PVC: 1.5 "
Dimetro Tu: 48 mm
Clase : 10
Presin Pru: 150 m.c.a.
Tramo :
Calle, Aveni: AV. OLAYA - HUANOPAMACRAQUIA
Longitud : 706.5
n : 149
uniones : 144
accesorios : 5
conexiones: 0
Fecha de P : ###
Hora de Inic: 16:43:00
Hora de T : 17:43:00
RESULTAD:
Vol. Permisi: Matriz Conexiones
8.56 8.56
Vol. Perdido:
Balde : 0.355 m
Tirante per : 0.075 m
Vol. Perdido: 0.0074235 m
Vol. Perdido: 7.4235026 lt/h
CONCLUSI: Matriz Conexiones
OK OK

RESIDENTE SUPERVISOR
1
PRUEBA HIDRAULICA AGUA POTABLE
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE HUAYUCAHCONTRATISTA:
UBICACIN: Err:509
REGION : JUNIN SUPERVISOR:
PROVINCIA : HUANCAYO CONSORCIO SUPERVISION HUAYUCAHI
DISTRITO : HUAYUCAHI RESIDENTE:
LOCALIDAD : ANEXOS ING. Carlos A.Condezo Surez

Prdida de agua en la Tubera Instalada no deber exceder el Volumen (F)


siguiente:

F =n x d P (1)
410 x 25
Donde : Vp : Volumen de perdida admisible (lts/h)
n : Sumatoria de uniones, accesorios y conexiones
d : Dametro de tubera (mm)
P : Presion aplicada en prueba (m.c.a.)

DATOS :
Tubera PVC: 1.5 "
Dimetro Tu: 48 mm
Clase : 10
Presin Pru: 150 m.c.a.
Tramo :
Calle, Aveni: AV. OLAYA - HUANOPAMACRAQUIA
Longitud : 706.5
n : 149
uniones : 144
accesorios : 5
conexiones: 0
Fecha de P : ###
Hora de Inic: 16:43:00
Hora de T : 17:43:00
RESULTAD:
Vol. Permisi: Matriz Conexiones
8.56 8.56
Vol. Perdido:
Balde : 0.355 m
Tirante per : 0.075 m
Vol. Perdido: 0.0074235 m
Vol. Perdido: 7.4235026 lt/h
CONCLUSI: Matriz Conexiones
OK OK

RESIDENTE SUPERVISOR
1
PRUEBA HIDRAULICA AGUA POTABLE
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE HUAYUCAHCONTRATISTA:
UBICACIN: Err:509
REGION : JUNIN SUPERVISOR:
PROVINCIA : HUANCAYO CONSORCIO SUPERVISION HUAYUCAHI
DISTRITO : HUAYUCAHI RESIDENTE:
LOCALIDAD : ANEXOS ING. Carlos A.Condezo Surez

Prdida de agua en la Tubera Instalada no deber exceder el Volumen (F)


siguiente:
Prdida de agua en la Tubera Instalada no deber exceder el Volumen (F)
siguiente:

F =n x d P (1)
410 x 25
Donde : Vp : Volumen de perdida admisible (lts/h)
n : Sumatoria de uniones, accesorios y conexiones
d : Dametro de tubera (mm)
P : Presion aplicada en prueba (m.c.a.)

DATOS :
Tubera PVC: 1.5 "
Dimetro Tu: 48 mm
Clase : 10
Presin Pru: 150 m.c.a.
Tramo :
Calle, Aveni: AV. OLAYA - HUANOPAMACRAQUIA
Longitud : 706.5
n : 149
uniones : 144
accesorios : 5
conexiones: 0
Fecha de P : ###
Hora de Inic: 16:43:00
Hora de T : 17:43:00
RESULTAD:
Vol. Permisi: Matriz Conexiones
8.56 8.56
Vol. Perdido:
Balde : 0.355 m
Tirante per : 0.075 m
Vol. Perdido: 0.0074235 m
Vol. Perdido: 7.4235026 lt/h
CONCLUSI: Matriz Conexiones
OK OK

RESIDENTE SUPERVISOR
1
PRUEBA HIDRAULICA AGUA POTABLE
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE HUAYUCAHCONTRATISTA:
UBICACIN: Err:509
REGION : JUNIN SUPERVISOR:
PROVINCIA : HUANCAYO CONSORCIO SUPERVISION HUAYUCAHI
DISTRITO : HUAYUCAHI RESIDENTE:
LOCALIDAD : ANEXOS ING. Carlos A.Condezo Surez

Prdida de agua en la Tubera Instalada no deber exceder el Volumen (F)


siguiente:

F =n x d P (1)
410 x 25
Donde : Vp : Volumen de perdida admisible (lts/h)
n : Sumatoria de uniones, accesorios y conexiones
d : Dametro de tubera (mm)
P : Presion aplicada en prueba (m.c.a.)

DATOS :
Tubera PVC: 1.5 "
Dimetro Tu: 48 mm
Clase : 10
Presin Pru: 150 m.c.a.
Tramo :
Calle, Aveni: AV. OLAYA - HUANOPAMACRAQUIA
Longitud : 706.5
n : 149
uniones : 144
accesorios : 5
conexiones: 0
Fecha de P : ###
Hora de Inic: 16:43:00
Hora de T : 17:43:00
RESULTAD:
Vol. Permisi: Matriz Conexiones
8.56 8.56
Vol. Perdido:
Balde : 0.355 m
Tirante per : 0.075 m
Vol. Perdido: 0.0074235 m
Vol. Perdido: 7.4235026 lt/h
CONCLUSI: Matriz Conexiones
OK OK
RESIDENTE SUPERVISOR
1
PRUEBA HIDRAULICA AGUA POTABLE
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE HUAYUCAHCONTRATISTA:
UBICACIN: Err:509
REGION : JUNIN SUPERVISOR:
PROVINCIA : HUANCAYO CONSORCIO SUPERVISION HUAYUCAHI
DISTRITO : HUAYUCAHI RESIDENTE:
LOCALIDAD : ANEXOS ING. Carlos A.Condezo Surez

Prdida de agua en la Tubera Instalada no deber exceder el Volumen (F)


siguiente:

F =n x d P (1)
410 x 25
Donde : Vp : Volumen de perdida admisible (lts/h)
n : Sumatoria de uniones, accesorios y conexiones
d : Dametro de tubera (mm)
P : Presion aplicada en prueba (m.c.a.)

DATOS :
Tubera PVC: 1.5 "
Dimetro Tu: 48 mm
Clase : 10
Presin Pru: 150 m.c.a.
Tramo :
Calle, Aveni: AV. OLAYA - HUANOPAMACRAQUIA
Longitud : 706.5
n : 149
uniones : 144
accesorios : 5
conexiones: 0
Fecha de P : ###
Hora de Inic: 16:43:00
Hora de T : 17:43:00
RESULTAD:
Vol. Permisi: Matriz Conexiones
8.56 8.56
Vol. Perdido:
Balde : 0.355 m
Tirante per : 0.075 m
Vol. Perdido: 0.0074235 m
Vol. Perdido: 7.4235026 lt/h
CONCLUSI: Matriz Conexiones
OK OK

RESIDENTE SUPERVISOR
1
PRUEBA HIDRAULICA AGUA POTABLE
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE HUAYUCAHCONTRATISTA:
UBICACIN: Err:509
REGION : JUNIN SUPERVISOR:
PROVINCIA : HUANCAYO CONSORCIO SUPERVISION HUAYUCAHI
DISTRITO : HUAYUCAHI RESIDENTE:
LOCALIDAD : ANEXOS ING. Carlos A.Condezo Surez

Prdida de agua en la Tubera Instalada no deber exceder el Volumen (F)


siguiente:

F =n x d P (1)
410 x 25
Donde : Vp : Volumen de perdida admisible (lts/h)
n : Sumatoria de uniones, accesorios y conexiones
d : Dametro de tubera (mm)
P : Presion aplicada en prueba (m.c.a.)

DATOS :
Tubera PVC: 1.5 "
Dimetro Tu: 48 mm
Clase : 10
Presin Pru: 150 m.c.a.
Tramo :
Calle, Aveni: AV. OLAYA - HUANOPAMACRAQUIA
Longitud : 706.5
n : 149
uniones : 144
accesorios : 5
conexiones: 0
Fecha de P : ###
Hora de Inic: 16:43:00
Hora de T : 17:43:00
RESULTAD:
Vol. Permisi: Matriz Conexiones
8.56 8.56
Vol. Perdido:
Balde : 0.355 m
Tirante per : 0.075 m
Vol. Perdido: 0.0074235 m
Vol. Perdido: 7.4235026 lt/h
CONCLUSI: Matriz Conexiones
OK OK

RESIDENTE SUPERVISOR
1
PRUEBA HIDRAULICA AGUA POTABLE
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE HUAYUCAHCONTRATISTA:
UBICACIN: Err:509
REGION : JUNIN SUPERVISOR:
PROVINCIA : HUANCAYO CONSORCIO SUPERVISION HUAYUCAHI
DISTRITO : HUAYUCAHI RESIDENTE:
LOCALIDAD : ANEXOS ING. Carlos A.Condezo Surez

Prdida de agua en la Tubera Instalada no deber exceder el Volumen (F)


siguiente:

F =n x d P (1)
410 x 25
Donde : Vp : Volumen de perdida admisible (lts/h)
n : Sumatoria de uniones, accesorios y conexiones
d : Dametro de tubera (mm)
P : Presion aplicada en prueba (m.c.a.)

DATOS :
Tubera PVC: 1.5 "
Dimetro Tu: 48 mm
Clase : 10
Presin Pru: 150 m.c.a.
Tramo :
Calle, Aveni: AV. OLAYA - HUANOPAMACRAQUIA
Longitud : 706.5
n : 149
uniones : 144
accesorios : 5
conexiones: 0
Fecha de P : ###
Hora de Inic: 16:43:00
Hora de T : 17:43:00
RESULTAD:
Vol. Permisi: Matriz Conexiones
8.56 8.56
Vol. Perdido:
Balde : 0.355 m
Tirante per : 0.075 m
Vol. Perdido: 0.0074235 m
Vol. Perdido: 7.4235026 lt/h
CONCLUSI: Matriz Conexiones
OK OK

RESIDENTE SUPERVISOR
1
PRUEBA HIDRAULICA AGUA POTABLE
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE HUAYUCAHCONTRATISTA:
UBICACIN: Err:509
REGION : JUNIN SUPERVISOR:
PROVINCIA : HUANCAYO CONSORCIO SUPERVISION HUAYUCAHI
DISTRITO : HUAYUCAHI RESIDENTE:
LOCALIDAD : ANEXOS ING. Carlos A.Condezo Surez

Prdida de agua en la Tubera Instalada no deber exceder el Volumen (F)


siguiente:

F =n x d P (1)
410 x 25
Donde : Vp : Volumen de perdida admisible (lts/h)
n : Sumatoria de uniones, accesorios y conexiones
d : Dametro de tubera (mm)
P : Presion aplicada en prueba (m.c.a.)

DATOS :
Tubera PVC: 1.5 "
Dimetro Tu: 48 mm
Clase : 10
Presin Pru: 150 m.c.a.
Tramo :
Calle, Aveni: AV. OLAYA - HUANOPAMACRAQUIA
Longitud : 706.5
n : 149
uniones : 144
accesorios : 5
conexiones: 0
Fecha de P : ###
Hora de Inic: 16:43:00
Hora de T : 17:43:00
RESULTAD:
Vol. Permisi: Matriz Conexiones
8.56 8.56
Vol. Perdido:
Balde : 0.355 m
Tirante per : 0.075 m
Vol. Perdido: 0.0074235 m
Vol. Perdido: 7.4235026 lt/h
CONCLUSI: Matriz Conexiones
OK OK

RESIDENTE SUPERVISOR
1
DE LOS BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
OK

DE LOS BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA


OK

DE LOS BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA


DE LOS BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
DE LOS BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
DE LOS BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
DE LOS BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
DE LOS BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
DE LOS BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
DE LOS BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
N TRAMO DIAMETRO DISTANCIA D. PLANO FECHA LUGAR
BZ INICIO BZ FINAL
1 BZ 347 - BZ 387 200 70.84 2/20/2016 0
2 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
3 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
4 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
6 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
7 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
8 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
9 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
10 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
11 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
12 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
13 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
14 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
15 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
16 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
17 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
17A Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
18 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
19 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
20 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
21 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
22 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
23 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
24 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
25 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
26 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
27 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
28 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
29 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
30 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
31 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
32 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
33 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
34 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
35 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
36 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
37 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
38 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
39 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
40 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
41 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
42 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
43 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
44 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
45 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
46 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
47 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
48 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
49 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
50 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
51 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
52 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
53 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
54 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
55 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
56 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
57 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
58 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
59 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
60 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
61 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
62 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
63 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
64 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
65 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
66 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
67 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
68 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
69 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
70 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
71 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
72 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
73 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
74 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
75 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
76 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
77 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
78 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
79 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
80 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
81 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
82 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
83 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 12/30/1899 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
1 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
2 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
3 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
4 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
5 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
6 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
7 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
8 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
9 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
10 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
11 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
12 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
13 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
14 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
VOL. PERMISIBLE VOL. REAL CONCLUSION OBSERVACION

66.59 54.29 APROBADO 0 Err:509


Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 VERIFICAR
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 OBSERVADO
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 CORREGIR
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 OBSERVADO
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 OBSERVADO
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 0.00 Err:509 Err:509 Err:509
70.84
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
PIHUAS
C2 1 3 92
C4 3 8 37.3
C10 8 8A 52.6
C10A 8A 14 52.6
C5 8 8B 52.45
C5A 8B 7 52.45
C7 5 5A 53.7
C7A 5A 6 53.7
C6 6 6A 52.8
C6A 6A 7 52.8
C11 7 7A 53.5
C11A 7A 13 53.5
C16 14 14A 52.2
C16A 14A 13 52.2
C17 13 13 A 54.2
C17A 13A 12 54.2
C18 11 11A 59.5
C18A 11A 12 50
C12A 12A 12 55
C24 12 12B 61
C24A 12B 18 59.35
C19 10 10A 56.4
C19A 10A 11 56.4
C25 11 11B 60.45
C25A 11B 17 60.45
C22 13 13B 58.9
C22A 13B 19 58.9
C28 19 19A 53.33
C28A 19A 18 53.33
C28B 18 18A 99.8
C29 17 17A 55.45
C29A 17A 18 55.45
C29B 18A 29 71.4
C34 24 24A 52.7
C35 24A 29 52.7
C36 29 32 64.5
C37 32 30 64.5
C37A 30 28 63.5
PRUEBA HIDRULICA DESAGE 001
OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS
Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el
Volumen (Ve) siguiente:
Ve = 0.0047 Di x L (1)
Donde : Ve : Volumen exfiltrado (lts/da)
Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 1- 3 Calle, Aveni: Pasaje 01
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 92.20 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 69.33 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)
CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado
lts/da (2) < Permisible lts/da (1) APROBADO
0.00 69.33
PRUEBA DE NIVELACION Fecha:

Bz. Bz.
1 3

92.20 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD


RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 002

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 3- 8 Calle, Aveni: Calle 01
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 37.50 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.50 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 28.20 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 28.20

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
3 8

37.50 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 003

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS
Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el
Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 8 - 8A Calle, Aveni: Calle 01
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 53.25 m Hora de Te :
Altura de Bz: 1.50 m Tiempo Pru:
Altura de Bz: 1.70 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 40.04 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 40.04

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
8 8A

53.25 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA
SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 004

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 8 - 8B Calle, Aveni: Pasaje 02
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 53.30 m Hora de Te :
Altura de Bz: 1.50 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 40.08 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 40.08
PRUEBA DE NIVELACION Fecha:

Bz. Bz.
8 8B

53.30 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 005

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)
DATOS :
Tramo : 8B - 14 Calle, Aveni: Pasaje 02
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 53.30 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 40.08 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 40.08

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
8B 14

53.30 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 006

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 14 - 14A Calle, Aveni: Calle 02
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 53.30 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.30 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 40.08 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 40.08

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
14 14A
53.30 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 007

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 14A - 13 Calle, Aveni: Calle 02
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 53.60 m Hora de Te :
Altura de Bz: 1.30 m Tiempo Pru:
Altura de Bz: 1.40 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 40.31 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 40.31

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
14A 13

53.60 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 008

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 8A - 7 Calle, Aveni: Calle 01
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 53.25 m Hora de Te :
Altura de Bz: 1.70 m Tiempo Pru:
Altura de Bz: 1.70 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 40.04 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 40.04

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
8A 7

53.25 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD


RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 009

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 5 - 5A Calle, Aveni: Calle 01
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 54.50 m Hora de Te :
Altura de Bz: 1.40 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 40.98 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da APROBADO
0.00 40.98

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
5 5A

54.50 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 010

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:
Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 5A - 6 Calle, Aveni: Calle 01
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 54.50 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.57 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 40.98 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 40.98

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
5A 6

54.50 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA
SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 011

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 6 - 6A Calle, Aveni: Calle 01
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 53.40 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.80 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 40.16 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 40.16

PRUEBA DE NIVELACION Fecha:


Bz. Bz.
6 6A

53.40 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 012

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 6A - 7 Calle, Aveni: Calle 01
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 53.40 m Hora de Te :
Altura de Bz: 1.80 m Tiempo Pru:
Altura de Bz: 2.34 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 40.16 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 40.16

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
6A 7

53.40 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 013


OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 7 - 7A Calle, Aveni: Pasaje 03
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 48.00 m Hora de Te :
Altura de Bz: 2.34 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 36.10 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 36.10

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
7 7A

48.00 m
PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 014

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 7A - 13 Calle, Aveni: Pasaje 03
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 60.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.40 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 45.12 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 45.12

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
7A 13

60.00 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 015

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS
Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el
Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 10 - 10A Calle, Aveni: Calle 02
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 61.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 45.87 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 45.87

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
10 10A

61.00 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA
SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 016

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 10A - 11 Calle, Aveni: Calle 02
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 53.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 39.86 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 39.86
PRUEBA DE NIVELACION Fecha:

Bz. Bz.
10A 11

53.00 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 017

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 11 - 11A Calle, Aveni: Calle 02
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 60.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 45.12 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 45.12

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
11 11A

60.00 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 018

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 11A - 12 Calle, Aveni: Calle 02
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 49.60 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 37.30 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 37.30

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
11A 12
49.60 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 019

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 12A - 12 Calle, Aveni: Pasaje 04
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 50.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 37.60 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 37.60

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
12A 12

50.00 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 020

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 13 - 13A Calle, Aveni: Calle 02
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 61.00 m Hora de Te :
Altura de Bz: 1.40 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 45.87 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 45.87

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
13 13A

61.00 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD


RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 021

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 13A - 12 Calle, Aveni: Calle 02
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 54.25 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 40.80 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
< APROBADO
0.00 40.80

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
13A 12

54.25 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 022

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 12 - 12B Calle, Aveni: Pasaje 04
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 66.20 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 49.78 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 49.78

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
12 12B

66.20 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 023

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 12B - 18 Calle, Aveni: Pasaje 04
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 54.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.68 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 40.61 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 40.61

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
12B 18
54.00 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 024

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 13 - 13B Calle, Aveni: Pasaje 03
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 60.00 m Hora de Te :
Altura de Bz: 1.40 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 45.12 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 45.12

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
13 13B

60.00 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 025

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 13B - 19 Calle, Aveni: Pasaje 03
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 59.50 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 44.74 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 44.74

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
13B 19

59.50 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD


RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 026

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 19 - 19A Calle, Aveni: Calle 03
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 54.75 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 41.17 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 41.17
PRUEBA DE NIVELACION Fecha:

Bz. Bz.
19 19A

54.75 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 027

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)
DATOS :
Tramo : 19A - 18 Calle, Aveni: Pasaje 27
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 54.75 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.68 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 41.17 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 41.17

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
19A 18

54.75 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 028

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 11 - 11B Calle, Aveni: Pasaje 05
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 60.25 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 45.31 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 45.31

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
11 11B
60.25 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 029

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 11B - 17 Calle, Aveni: Pasaje 05
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 60.25 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:
RESULTAD:
Volumen Exfiltrado Permi: 45.31 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 45.31

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
11B 17

60.25 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 030

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 17 - 17A Calle, Aveni: Calle 03
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 51.50 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.96 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 38.73 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 38.73

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
17 17A

51.50 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD


RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 031

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 17A - 18 Calle, Aveni: Calle 03
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 61.00 m Hora de Te :
Altura de Bz: 1.96 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 45.87 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 45.87
PRUEBA DE NIVELACION Fecha:

Bz. Bz.
17A 18

61.00 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 032

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)
DATOS :
Tramo : 18 - 18A Calle, Aveni: Pasaje 04
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 99.40 m Hora de Te :
Altura de Bz: 1.68 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 74.75 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 74.75

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
18 18A

99.40 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 033

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 18A - 29 Calle, Aveni: Pasaje 04
Tubera : PVC UF Fecha de P : 6/3/2013
Dimetro : 160 mm Hora de Inic:
Longitud T : 72.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 54.14 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 54.14

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
18A 29
72.00 m

PRUEBA DE ALINEAMIENTO Fecha: 7/23/2013


SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 034

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 24 - 24A Calle, Aveni: Calle 04
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 54.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:
RESULTAD:
Volumen Exfiltrado Permi: 40.61 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 40.61

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
24 24A

54.00 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 035

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 24A - 29 Calle, Aveni: Calle 04
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 53.40 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 40.16 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 40.16

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
24A 29

53.40 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD


RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 036

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 29 - 32 Calle, Aveni: Calle 04
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 63.40 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 47.68 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
< APROBADO
0.00 47.68

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
29 32

63.40 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA

PRUEBA HIDRULICA DESAGE 037

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 32 - 30 Calle, Aveni: Calle 04
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 64.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 48.13 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 48.13

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
32 30

64.00 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA
PRUEBA HIDRULICA DESAGE 038

OBRA:
MEJORAMIENTO DELSITEMA DE AGUA POTABLE Y ALCANTARILLADO SANITARIO DE LOS BARRIOS: CENTRO, YAC
UBICACIN: SUPERVISOR: ENTIDAD:
REGION JUNIN CONSORCIO SUPERVISION HMUNICIPALIDAD DISTRITAL DE HUAYUCAHI
PROVINCIA HUANCAYO RESIDENTE: CONTRATISTA:
DISTRITO HUAYUCAHI ING. Carlos A.Condezo Surez
LOCALIDAD ANEXOS

Prdida de agua en la Tubera Instalada (Incluye Buzones) no deber exceder el


Volumen (Ve) siguiente:

Ve = 0.0047 Di x L (1)

Donde : Ve : Volumen exfiltrado (lts/da)


Di : Dimetro interior de la Tubera (mm)
L : Longitud de tramo (m)

DATOS :
Tramo : 30 - 28 Calle, Aveni: Calle 04
Tubera : PVC UF Fecha de P :
Dimetro : 160 mm Hora de Inic:
Longitud T : 65.00 m Hora de Te :
Altura de Bz: 1.20 m Tiempo Pru:
Altura de Bz: 1.20 m Lectura Un :
Dimetro B: 1.20 m Lectura Dos:
rea de Buz: 1.13 m2 Altura Desc:

RESULTAD:
Volumen Exfiltrado Permi: 48.88 lts / da segn formula (1)
Volumen Exfiltrado Real : 0.000000 m3/hora
0.000000 lts / da (2)

CONCLUSI Volumen Exfiltrado Real Volumen Exfiltrado


lts/da (2) < Permisible lts/da (1) APROBADO
0.00 48.88

PRUEBA DE NIVELACION Fecha:

Bz. Bz.
30 28
65.00 m

PRUEBA DE ALINEAMIENTO Fecha: SUSCRIBEN EN SEAL DE CONFORMIDAD

RESIDENTE DE OBRA

SUPERVISOR DE OBRA
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA
HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI
BARRIOS: CENTRO, YACUS, MANYA, MIRAFLORES, MANTARO, COLPA(ALTA

HUAYUCAHI

También podría gustarte