1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD PESO UNIT. (kg) CANTIDAD PARCIAL (KG)
CEMENTO PORTLAND TIPO I BL. 42.50 5,879.00 249,857.50
ACERO DE REFUERZO FY=4200 KG 1.00 41,263.00 41,263.00
ALAMBRE NEGRO N 08 KG 1.00 1,123.00 1,123.00
ALAMBRE NEGRO N 16 KG 1.00 2,142.00 2,142.00
CLAVOS VARIOS KG 1.00 877.00 877.00
COBERTURA PLN 3.80 486.00 1,846.80
MADERA PIE2 1.68 9,129.00 15,336.72
LADRILLO UND 8.00 21,612.00 172,896.00
PINTURA GLN 5.00 250.00 1,250.00
VARIOS GLB 1.00 10,000.00 10,000.00
PESO TOTAL 496,592.02
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
COSTO POR VIAJE AGREGADOS S/.
COSTO POR VIAJE MATERIALES S/. 500.00
FUSO-CAPAC. 7TN (KG) 7,000.00
VOLQUETE CAP. 16 TN (KG) 16,000.00
FLETE POR KG (AGREGADOS) 0.000
FLETE POR KG (MATERIALES) 0.071
1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD PESO UNIT. (kg) CANTIDAD PARCIAL (KG)
CEMENTO PORTLAND TIPO I BL. 42.50 4,781.00 203,192.50
ACERO DE REFUERZO FY=4200 KG 1.00 31,264.00 31,264.00
ALAMBRE NEGRO N 08 KG 1.00 826.00 826.00
ALAMBRE NEGRO N 16 KG 1.00 1,623.00 1,623.00
CLAVOS VARIOS KG 1.00 659.00 659.00
COBERTURA PLN 3.80 408.00 1,550.40
MADERA PIE2 1.68 6,830.00 11,474.40
LADRILLO UND 8.00 14,989.00 119,912.00
PINTURA GLN 5.00 192.00 960.00
VARIOS GLB 1.00 10,000.00 10,000.00
PESO TOTAL 381,461.30
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
COSTO POR VIAJE AGREGADOS S/.
COSTO POR VIAJE MATERIALES S/. 500.00
FUSO-CAPAC. 7TN (KG) 7,000.00
VOLQUETE CAP. 16 TN (KG) 16,000.00
FLETE POR KG (AGREGADOS) 0.000
FLETE POR KG (MATERIALES) 0.071
1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD PESO UNIT. (kg) CANTIDAD PARCIAL (KG)
CEMENTO PORTLAND TIPO I BL. 42.50 4,067.00 172,847.50
ACERO DE REFUERZO FY=4200 KG 1.00 28,739.00 28,739.00
ALAMBRE NEGRO N 08 KG 1.00 739.00 739.00
ALAMBRE NEGRO N 16 KG 1.00 1,492.00 1,492.00
CLAVOS VARIOS KG 1.00 628.00 628.00
COBERTURA PLN 3.80 408.00 1,550.40
MADERA PIE2 1.68 6,281.00 10,552.08
LADRILLO UND 8.00 17,181.00 137,448.00
PINTURA GLN 5.00 212.00 1,060.00
VARIOS GLB 1.00 10,000.00 10,000.00
PESO TOTAL 365,055.98
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
COSTO POR VIAJE AGREGADOS S/.
COSTO POR VIAJE MATERIALES S/. 500.00
FUSO-CAPAC. 7TN (KG) 7,000.00
VOLQUETE CAP. 16 TN (KG) 16,000.00
FLETE POR KG (AGREGADOS) 0.000
FLETE POR KG (MATERIALES) 0.071
1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD PESO UNIT. (kg) CANTIDAD PARCIAL (KG)
CEMENTO PORTLAND TIPO I BL. 42.50 3,940.00 167,450.00
ACERO DE REFUERZO FY=4200 KG 1.00 26,771.00 26,771.00
ALAMBRE NEGRO N 08 KG 1.00 720.00 720.00
ALAMBRE NEGRO N 16 KG 1.00 1,412.00 1,412.00
CLAVOS VARIOS KG 1.00 596.00 596.00
COBERTURA PLN 3.80 408.00 1,550.40
MADERA PIE2 1.68 12,316.00 20,690.88
LADRILLO UND 8.00 15,787.00 126,296.00
PINTURA GLN 5.00 283.00 1,415.00
VARIOS GLB 1.00 10,000.00 10,000.00
PESO TOTAL 356,901.28
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
COSTO POR VIAJE AGREGADOS S/.
COSTO POR VIAJE MATERIALES S/. 1,000.00
FUSO-CAPAC. 7TN (KG) 7,000.00
VOLQUETE CAP. 16 TN (KG) 16,000.00
FLETE POR KG (AGREGADOS) 0.000
FLETE POR KG (MATERIALES) 0.143
1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD PESO UNIT. (kg) CANTIDAD PARCIAL (KG)
CEMENTO PORTLAND TIPO I BL. 42.50 4,645.00 197,412.50
ACERO DE REFUERZO FY=4200 KG 1.00 29,224.00 29,224.00
ALAMBRE NEGRO N 08 KG 1.00 831.00 831.00
ALAMBRE NEGRO N 16 KG 1.00 1,540.00 1,540.00
CLAVOS VARIOS KG 1.00 660.00 660.00
COBERTURA PLN 3.80 408.00 1,550.40
MADERA PIE2 1.68 13,178.00 22,139.04
LADRILLO UND 8.00 16,227.00 129,816.00
PINTURA GLN 5.00 255.00 1,275.00
VARIOS GLB 1.00 10,000.00 10,000.00
PESO TOTAL 394,447.94
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
COSTO POR VIAJE AGREGADOS S/.
COSTO POR VIAJE MATERIALES S/. 1,000.00
FUSO-CAPAC. 7TN (KG) 7,000.00
VOLQUETE CAP. 16 TN (KG) 16,000.00
FLETE POR KG (AGREGADOS) 0.000
FLETE POR KG (MATERIALES) 0.143
1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD PESO UNIT. (kg) CANTIDAD PARCIAL (KG)
CEMENTO PORTLAND TIPO I BL. 42.50 4,826.00 205,105.00
ACERO DE REFUERZO FY=4200 KG 1.00 35,076.00 35,076.00
ALAMBRE NEGRO N 08 KG 1.00 881.00 881.00
ALAMBRE NEGRO N 16 KG 1.00 1,821.00 1,821.00
CLAVOS VARIOS KG 1.00 750.00 750.00
COBERTURA PLN 3.80 486.00 1,846.80
MADERA PIE2 1.68 7,453.00 12,521.04
LADRILLO UND 8.00 21,234.00 169,872.00
PINTURA GLN 5.00 261.00 1,305.00
VARIOS GLB 1.00 10,000.00 10,000.00
PESO TOTAL 439,177.84
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
COSTO POR VIAJE AGREGADOS S/.
COSTO POR VIAJE MATERIALES S/. 500.00
FUSO-CAPAC. 7TN (KG) 7,000.00
VOLQUETE CAP. 16 TN (KG) 16,000.00
FLETE POR KG (AGREGADOS) 0.000
FLETE POR KG (MATERIALES) 0.071
1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD PESO UNIT. (kg) CANTIDAD PARCIAL (KG)
CEMENTO PORTLAND TIPO I BL. 42.50 6,331.00 269,067.50
ACERO DE REFUERZO FY=4200 KG 1.00 38,593.00 38,593.00
ALAMBRE NEGRO N 08 KG 1.00 1,144.00 1,144.00
ALAMBRE NEGRO N 16 KG 1.00 2,038.00 2,038.00
CLAVOS VARIOS KG 1.00 886.00 886.00
COBERTURA PLN 3.80 486.00 1,846.80
MADERA PIE2 1.68 17,224.00 28,936.32
LADRILLO UND 8.00 20,790.00 166,320.00
PINTURA GLN 5.00 305.00 1,525.00
VARIOS GLB 1.00 10,000.00 10,000.00
PESO TOTAL 520,356.62
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
COSTO POR VIAJE AGREGADOS S/.
COSTO POR VIAJE MATERIALES S/. 800.00
FUSO-CAPAC. 7TN (KG) 7,000.00
VOLQUETE CAP. 16 TN (KG) 16,000.00
FLETE POR KG (AGREGADOS) 0.000
FLETE POR KG (MATERIALES) 0.114
B.- ENTIDAD : GOBIERNO REGIONAL DE SAN MARTIN - SUB REGION BAJO MAYO
1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD PESO UNIT. (kg) CANTIDAD PARCIAL (KG)
CEMENTO PORTLAND TIPO I BL. 42.50 4448.28 189,051.90
ACERO DE REFUERZO FY=4200 KG 1.00 27810.75 27,810.75
ALAMBRE NEGRO N 08 KG 1.00 709.68 709.68
ALAMBRE NEGRO N 16 KG 1.00 441.01 441.01
CLAVOS VARIOS KG 1.00 732.11 732.11
COBERTURA PLN 3.80 602.92 2,291.10
MADERA PIE2 1.68 16591.22 27,873.25
LADRILLO UND 8.00 25557.31 204,458.48
PINTURA GLN 5.00 650.24 3,251.20
VARIOS GLB 1.00 8500.00 8,500.00
PESO TOTAL 465,119.48
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
COSTO POR VIAJE AGREGADOS S/.
COSTO POR VIAJE MATERIALES S/. 150.00
FUSO-CAPAC. 7TN (KG) 7,000.00
VOLQUETE CAP. 8 TN (KG) 14,400.00 14,400.00
FLETE POR KG (AGREGADOS) 0.000
FLETE POR KG (MATERIALES) 0.0215
B.- ENTIDAD : GOBIERNO REGIONAL DE SAN MARTIN - SUB REGION BAJO MAYO
1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD PESO UNIT. (kg) CANTIDAD PARCIAL (KG)
CEMENTO PORTLAND TIPO I BL. 42.50 4739.16 201,414.30
ACERO DE REFUERZO FY=4200 KG 1.00 29601.05 29,601.05
ALAMBRE NEGRO N 08 KG 1.00 813.11 813.11
ALAMBRE NEGRO N 16 KG 1.00 486.28 486.28
CLAVOS VARIOS KG 1.00 877.44 877.44
COBERTURA PLN 3.80 801.22 3,044.64
MADERA PIE2 1.68 35383.76 59,444.72
LADRILLO UND 8.00 23852.36 190,818.88
PINTURA GLN 5.00 896.62 4,483.10
VARIOS GLB 1.00 9,000.00 9,000.00
PESO TOTAL 499,983.52
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
COSTO POR VIAJE AGREGADOS S/.
COSTO POR VIAJE MATERIALES S/. 200.00
FUSO-CAPAC. 10TN (KG) 10,000.00
VOLQUETE CAP. 16 TN (KG) 14,400.00
FLETE POR KG (AGREGADOS) 0.000
FLETE POR KG (MATERIALES) 0.0200
B.- ENTIDAD : GOBIERNO REGIONAL DE SAN MARTIN - SUB REGION BAJO MAYO
1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD PESO UNIT. (kg) CANTIDAD PARCIAL (KG)
CEMENTO PORTLAND TIPO I BL. 42.50 6327.02 268,898.35
ACERO DE REFUERZO FY=4200 KG 1.00 37218.04 37,218.04
ALAMBRE NEGRO N 08 KG 1.00 1076.66 1,076.66
ALAMBRE NEGRO N 16 KG 1.00 606.84 606.84
CLAVOS VARIOS KG 1.00 1280.30 1,280.30
COBERTURA PLN 3.80 353.95 1,345.01
MADERA PIE2 1.68 17690.38 29,719.84
LADRILLO UND 8.00 18434.27 147,474.16
PINTURA GLN 5.00 875.35 4,376.75
VARIOS GLB 1.00 8000.00 8,000.00
PESO TOTAL 499,995.95
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
COSTO POR VIAJE AGREGADOS S/.
COSTO POR VIAJE MATERIALES S/. 200.00
FUSO-CAPAC. 10TN (KG) 10,000.00
VOLQUETE CAP. 16 TN (KG) 14,400.00
FLETE POR KG (AGREGADOS) 0.000
FLETE POR KG (MATERIALES) 0.020
B.- ENTIDAD : GOBIERNO REGIONAL DE SAN MARTIN - SUB REGION BAJO MAYO
1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD PESO UNIT. (kg) CANTIDAD PARCIAL (KG)
CEMENTO PORTLAND TIPO I BL. 42.50 4409.30 187,395.25
ACERO DE REFUERZO FY=4200 KG 1.00 27916.04 27,916.04
ALAMBRE NEGRO N 08 KG 1.00 717.46 717.46
ALAMBRE NEGRO N 16 KG 1.00 401.01 401.01
CLAVOS VARIOS KG 1.00 728.32 728.32
COBERTURA PLN 3.80 389.69 1,480.82
MADERA PIE2 1.68 20991.26 35,265.32
LADRILLO UND 8.00 18941.37 151,530.96
PINTURA GLN 5.00 649.09 3,245.45
VARIOS GLB 1.00 8000.00 8,000.00
PESO TOTAL 416,680.63
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
COSTO POR VIAJE AGREGADOS S/.
COSTO POR VIAJE MATERIALES S/. 240.00
FUSO-CAPAC. 10TN (KG) 10,000.00
VOLQUETE CAP. 16 TN (KG) 14,400.00
FLETE POR KG (AGREGADOS) 0.000
FLETE POR KG (MATERIALES) 0.024
1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD PESO UNIT. (kg) CANTIDAD PARCIAL (KG)
CEMENTO PORTLAND TIPO I BL. 42.50 3,341.00 141,992.50
ACERO DE REFUERZO FY=4200 KG 1.00 23,528.00 23,528.00
ALAMBRE NEGRO N 08 KG 1.00 568.00 568.00
ALAMBRE NEGRO N 16 KG 1.00 1,244.00 1,244.00
CLAVOS VARIOS KG 1.00 508.00 508.00
COBERTURA PLN 3.80 408.00 1,550.40
MADERA PIE2 1.68 10,570.00 17,757.60
LADRILLO UND 8.00 16,934.00 135,472.00
PINTURA GLN 5.00 262.00 1,310.00
VARIOS GLB 1.00 10,000.00 10,000.00
PESO TOTAL 333,930.50
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
COSTO POR VIAJE AGREGADOS S/.
COSTO POR VIAJE MATERIALES S/. 1,200.00
FUSO-CAPAC. 7TN (KG) 7,000.00
VOLQUETE CAP. 16 TN (KG) 16,000.00
FLETE POR KG (AGREGADOS) 0.000
FLETE POR KG (MATERIALES) 0.171
1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD PESO UNIT. (kg) CANTIDAD PARCIAL (KG)
CEMENTO PORTLAND TIPO I BL. 42.50 3,857.00 163,922.50
ACERO DE REFUERZO FY=4200 KG 1.00 25,660.00 25,660.00
ALAMBRE NEGRO N 08 KG 1.00 673.00 673.00
ALAMBRE NEGRO N 16 KG 1.00 1,351.00 1,351.00
CLAVOS VARIOS KG 1.00 566.00 566.00
COBERTURA PLN 3.80 408.00 1,550.40
MADERA PIE2 1.68 11,357.00 19,079.76
LADRILLO UND 8.00 16,535.00 132,280.00
PINTURA GLN 5.00 239.00 1,195.00
VARIOS GLB 1.00 10,000.00 10,000.00
PESO TOTAL 356,277.66
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
COSTO POR VIAJE AGREGADOS S/.
COSTO POR VIAJE MATERIALES S/. 1,200.00
FUSO-CAPAC. 7TN (KG) 7,000.00
VOLQUETE CAP. 16 TN (KG) 16,000.00
FLETE POR KG (AGREGADOS) 0.000
FLETE POR KG (MATERIALES) 0.171
1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD PESO UNIT. (kg) CANTIDAD PARCIAL (KG)
CEMENTO PORTLAND TIPO I BL. 42.50 3,899.00 165,707.50
ACERO DE REFUERZO FY=4200 KG 1.00 26,454.00 26,454.00
ALAMBRE NEGRO N 08 KG 1.00 692.00 692.00
ALAMBRE NEGRO N 16 KG 1.00 1,393.00 1,393.00
CLAVOS VARIOS KG 1.00 581.00 581.00
COBERTURA PLN 3.80 408.00 1,550.40
MADERA PIE2 1.68 11,960.00 20,092.80
LADRILLO UND 8.00 16,977.00 135,816.00
PINTURA GLN 5.00 265.00 1,325.00
VARIOS GLB 1.00 10,000.00 10,000.00
PESO TOTAL 363,611.70
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
COSTO POR VIAJE AGREGADOS S/.
COSTO POR VIAJE MATERIALES S/. 1,200.00
FUSO-CAPAC. 7TN (KG) 7,000.00
VOLQUETE CAP. 16 TN (KG) 16,000.00
FLETE POR KG (AGREGADOS) 0.000
FLETE POR KG (MATERIALES) 0.171
1- DATOS GENERALES
A-POR PESO
MATERIALES UNIDAD PESO UNIT. (kg) CANTIDAD PARCIAL (KG)
CEMENTO PORTLAND TIPO I BL. 42.50 4,034.00 171,445.00
ACERO DE REFUERZO FY=4200 KG 1.00 29,217.00 29,217.00
ALAMBRE NEGRO N 08 KG 1.00 658.00 658.00
ALAMBRE NEGRO N 16 KG 1.00 1,551.00 1,551.00
CLAVOS VARIOS KG 1.00 594.00 594.00
COBERTURA PLN 3.80 486.00 1,846.80
MADERA PIE2 1.68 12,028.00 20,207.04
LADRILLO UND 8.00 21,809.00 174,472.00
PINTURA GLN 5.00 292.00 1,460.00
VARIOS GLB 1.00 10,000.00 10,000.00
PESO TOTAL 411,450.84
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE
COSTO POR VIAJE AGREGADOS S/.
COSTO POR VIAJE MATERIALES S/. 1,000.00
FUSO-CAPAC. 7TN (KG) 7,000.00
VOLQUETE CAP. 16 TN (KG) 16,000.00
FLETE POR KG (AGREGADOS) 0.000
FLETE POR KG (MATERIALES) 0.143
A.- NOMBRE DEL PROYECTO : "RECONSTRUCCION, MEJORAMIENTO DEL I.E. NRO 0025 - MIGUEL A. PINEDO VASQUEZ
- PISCOYACU, PROVINCIA DE HUALLAGA - SAN MARTIN"
B.- SUB PRESUPUESTO : MODULO ADMINISTRATIVO
C.- ENTIDAD : GOBIERNO REGIONAL DE SAN MARTIN
D.- NOMBRE DEL PROYECTISTA : ING. REGNER EDUARDO ANGULO FLORES
E.- FECHA : MARZO - 2,009
1- DATOS GENERALES
A-POR PESO
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTE
COSTO POR VIAJE S/. 140.00 COSTO POR VIAJE S/.
CAPACIDAD DEL CAMIN (KG) 4,000.00 CAPACIDAD DEL CAMION (KG)
FLETE POR KG 0.035 FLETE POR KG
A.- NOMBRE DEL PROYECTO : "RECONSTRUCCION, MEJORAMIENTO DEL I.E. NRO 0025 - MIGUEL A. PINEDO VASQUEZ
- PISCOYACU, PROVINCIA DE HUALLAGA - SAN MARTIN"
B.- SUB PRESUPUESTO : MODULO SS.HH.
C.- ENTIDAD : GOBIERNO REGIONAL DE SAN MARTIN
D.- NOMBRE DEL PROYECTISTA : ING. REGNER EDUARDO ANGULO FLORES
E.- FECHA : MARZO - 2,009
1- DATOS GENERALES
A-POR PESO
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTE
COSTO POR VIAJE S/. 140.00 COSTO POR VIAJE S/.
CAPACIDAD DEL CAMIN (KG) 4,000.00 CAPACIDAD DEL CAMION (KG)
FLETE POR KG 0.035 FLETE POR KG
A.- NOMBRE DEL PROYECTO : "RECONSTRUCCION, MEJORAMIENTO DEL I.E. NRO 0025 - MIGUEL A. PINEDO VASQUEZ
- PISCOYACU, PROVINCIA DE HUALLAGA - SAN MARTIN"
B.- SUB PRESUPUESTO : OBRAS EXTERIORES
C.- ENTIDAD : GOBIERNO REGIONAL DE SAN MARTIN
D.- NOMBRE DEL PROYECTISTA : ING. REGNER EDUARDO ANGULO FLORES
E.- FECHA : MARZO - 2,009
1- DATOS GENERALES
A-POR PESO
UNIDAD DE TRANSPORTE
UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTE
COSTO POR VIAJE S/. 70.00 COSTO POR VIAJE S/.
CAPACIDAD DEL CAMIN (KG) 1,000.00 CAPACIDAD DEL CAMION (KG)
FLETE POR KG 0.070 FLETE POR KG