Está en la página 1de 3

COSTO DE MATERIALES: NOTAS:

CEMENTO ARENA GRAVA AGUA 1 ESTA TABLA ES TIL PARA OBRAS PEQUE
PRECIO x TON: PRECIO x CAMIN PRECIO x CAMIN PRECIO x PIPA 2 LLENAR SLO LOS CAMPOS EN COLOR AM
20 Bultos de 50 Kg. DE 7M3 DE 7M3 DE 4000 LTS 3 LOS COSTOS OBTENIDOS SON SLO DE M
$0.00 $0.00 $0.00 $0.00 4 CADA QUIEN DEBER AGREGAR SUS COST
PRECIO x BULTO: 5 ESTA TABLA DE COSTOS PUEDE USARSE P
DE 50 KG PRECIO x M3: PRECIO x M3: PRECIO x M3: 6 LAS PROPORCIONES DE LA TABLA FUERON
$0.00 $0.00 $0.00 $0.00 "COSTO Y TIEMPO EN EDIFICA
DESPERDICIO: DESPERDICIO: DESPERDICIO: DESPERDICIO: CARLOS SUREZ SALAZAR
3% 8% 8% 30% LIMUSA - NORIEGA EDITORES
1.03 1.08 1.08 1.30 TERCERA EDICIN
COSTO CON DESP. COSTO CON DESP. COSTO CON DESP. COSTO CON DESP.
$0.00 $0.00 $0.00 $0.00 ELABOR: Arq. Alfonso Placeres Y Aguirre a

CLASIFICACIN AGREGADO CEMENTO BULTOS ARENA GRAVA


FC= REVENIMIENTO MXIMO TONELADA DE 50 KG M3 M3
100 kg/cm2 8 A 10 CM 3/4" 0.260 5.20 0.500 0.680
1 1/2" 0.254 5.08 0.470 0.700
FIRMES Y 12 A 15 CM 3/4" 0.286 5.72 0.500 0.680
PLANTILLAS 1 1/2" 0.280 5.60 0.470 0.700

150 kg/cm2 8 A 10 CM 3/4" 0.323 6.46 0.480 0.670


1 1/2" 0.308 6.16 0.450 0.700
FIRMES, DALAS 12 A 15 CM 3/4" 0.354 7.08 0.480 0.670
Y CASTILLOS 1 1/2" 0.338 6.76 0.450 0.700

200 kg/cm2 8 A 10 CM 3/4" 0.355 7.10 0.470 0.650


1 1/2" 0.337 6.74 0.440 0.680
LOSAS DE 12 A 15 CM 3/4" 0.391 7.82 0.470 0.650
ENTREPISO 1 1/2" 0.373 7.46 0.440 0.680

250 kg/cm2 8 A 10 CM 3/4" 0.423 8.46 0.465 0.640


PISOS ESTRUCTURALES, 1 1/2" 0.400 8.00 0.435 0.670
COLUMNAS, DADOS, 12 A 15 CM 3/4" 0.467 9.34 0.465 0.640
ZAPATAS Y TRABES 1 1/2" 0.445 8.90 0.435 0.670
A ES TIL PARA OBRAS PEQUEAS DONDE HAY QUE ELABORAR EL CONCRETO EN OBRA
LO LOS CAMPOS EN COLOR AMARILLO
OS OBTENIDOS SON SLO DE MATERIALES
EN DEBER AGREGAR SUS COSTOS DE OPERACIN E INDIRECTOS
A DE COSTOS PUEDE USARSE PARA FINES DE PLANEACIN DE COMPRA DE MATERIALES Y ANLISIS
ORCIONES DE LA TABLA FUERON TOMADAS DE:
"COSTO Y TIEMPO EN EDIFICACIN"
CARLOS SUREZ SALAZAR
LIMUSA - NORIEGA EDITORES MXICO 1997
TERCERA EDICIN

Arq. Alfonso Placeres Y Aguirre alfonso_p@arquired.net

AGUA $$$ x M3 CON M3 CONCRETO COSTO AL CANTIDAD DE CANTIDAD DE CEM CANTIDAD DE


M3 DESPERDICIO REQUERIDOS: CONSTRUCTOR CEMENTO TON. BULTOS DE 50 KG ARENA EN M3

0.195 $0.00 0.00 $0.00 0.00 0.00 0.00


0.190 $0.00 0.00 $0.00 0.00 0.00 0.00
0.215 $0.00 0.00 $0.00 0.00 0.00 0.00
0.210 $0.00 0.00 $0.00 0.00 0.00 0.00

0.210 $0.00 0.00 $0.00 0.00 0.00 0.00


0.200 $0.00 0.00 $0.00 0.00 0.00 0.00
0.230 $0.00 0.00 $0.00 0.00 0.00 0.00
0.220 $0.00 0.00 $0.00 0.00 0.00 0.00

0.195 $0.00 0.00 $0.00 0.00 0.00 0.00


0.185 $0.00 0.00 $0.00 0.00 0.00 0.00
0.215 $0.00 0.00 $0.00 0.00 0.00 0.00
0.205 $0.00 0.00 $0.00 0.00 0.00 0.00

0.190 $0.00 0.00 $0.00 0.00 0.00 0.00


0.180 $0.00 0.00 $0.00 0.00 0.00 0.00
0.210 $0.00 0.00 $0.00 0.00 0.00 0.00
0.200 $0.00 0.00 $0.00 0.00 0.00 0.00
CANTIDAD DE CANTIDAD DE
GRAVA EN M3 AGUA EN M3

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00