8500

TONELAJE ROTO ACUMULADOS TALADROS REALIZADOS METROS PERFORADOS


Programado Ejecutado Prog. Acum. Ejec. Acum. Programado Ejecutado Programado
1 124000.00 171564 124000.00 171564 248 591 1692.07
2 124000.00 80741 248000.00 252305.00 248 236 1692.07
3 124000.00 132074 372000.00 384379.00 248 515 1692.07
4 124000.00 58113 496000.00 442492.00 248 166 1692.07
5 124000.00 181740 620000.00 624232.00 248 641 1692.07
6 124000.00 60752 744000.00 684984.00 248 278 1692.07
7 124000.00 97854 868000.00 782838.00 248 296 1692.07
8 124000.00 153015 992000.00 935853.00 248 395 1692.07
9 124000.00 138649 1116000.00 1074502.00 248 359 1692.07
10 124000.00 95107 1240000.00 1169609.00 248 309 1692.07
11 124000.00 0 1364000.00 1169609.00 248 1692.07
12 124000.00 289999 1488000.00 1459608.00 248 799 1692.07
13 124000.00 11842 1612000.00 1471450.00 248 57 1692.07
14 124000.00 169778 1736000.00 1641228.00 248 488 1692.07
15 124000.00 42430 1860000.00 1683658.00 248 142 1692.07
16 124000.00 123401 1984000.00 1807059.00 248 321 1692.07
17 124000.00 47058 2108000.00 1854117.00 248 124 1692.07
18 124000.00 92010 2232000.00 1946127.00 248 240 1692.07
19 124000.00 148960 2356000.00 2095087.00 248 342 1692.07
20 124000.00 0 2480000.00 2095087.00 248 1692.07
21 124000.00 0 2604000.00 2095087.00 248 1692.07
22 124000.00 0 2728000.00 2095087.00 248 1692.07
23 124000.00 0 2852000.00 2095087.00 248 1692.07
24 124000.00 0 2976000.00 2095087.00 248 1692.07
25 124000.00 0 3100000.00 2095087.00 248 1692.07
26 124000.00 0 3224000.00 2095087.00 248 1692.07
27 124000.00 0 3348000.00 2095087.00 248 1692.07
28 124000.00 0 3472000.00 2095087.00 248 1692.07
29 124000.00 0 3596000.00 2095087.00 248 1692.07
30 124000.00 0 3720000.00 2095087.00 248 1692.07
124000.00 0 3844000.00 2095087.00 248 1692.07

ROTO POR TALADRO

Ejec utado Polynomial (Ejec utado) Programado

600.00

500.00

400.00
Ejec utado Polynomial (Ejec utado) Programado

600.00

500.00

400.00
TM

300.00

200.00

100.00

0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Julio

2500000

2000000
TM

1500000

1000000

500000

0
1 2
5134.32
METROS PERFORADOS ROTO POR TALADRO EXPLOSIVO CONSUMIDO FACTOR DE POTENCIA
Ejecutado Programado Ejecutado Programado Ejecutado Programado Ejecutado
3841.5 500.2 290.29 19833.81 53040 0.160 0.309
1534 500.2 342.12 19833.81 15035 0.160 0.186
3347.5 500.2 256.45 19833.81 29910 0.160 0.226
1079 500.2 350.08 19833.81 12170 0.160 0.209
4166.5 500.2 283.53 19833.81 41592 0.160 0.229
1807 500.2 218.53 19833.81 21390 0.160 0.352
1924 500.2 330.59 19833.81 22200 0.160 0.227
2567.5 500.2 387.38 19833.81 33295 0.160 0.218
2333.5 500.2 386.21 19833.81 28282 0.160 0.204
2008.5 500.2 307.79 19833.81 22451 0.160 0.236
#VALUE! 500.2 19833.81 0 0.160 #DIV/0!
5193.5 500.2 362.95 19833.81 62,694.0 0.160 0.216
370.5 500.2 207.75 19833.81 3840 0.160 0.32426955
3172 500.2 347.91 19833.81 34034 0.160 0.20046178
923 500.2 298.80 19833.81 8637 0.160 0.2035588
2086.5 500.2 384.43 19833.81 22562 0.160 0.18283482
806 500.2 379.50 19833.81 13100 0.160 0.27837987
1560 500.2 383.38 19833.81 16614 0.160 0.18056733
2223 500.2 435.56 19833.81 21184 0.160 0.14221267
0 500.2 #DIV/0! 19833.81 0.160 #DIV/0!
0 500.2 #DIV/0! 19833.81 0.160 #DIV/0!
0 500.2 #DIV/0! 19833.81 0.160 #DIV/0!
0 500.2 #DIV/0! 19833.81 0.160 #DIV/0!
0 500.2 #DIV/0! 19833.81 0.160 #DIV/0!
0 500.2 #DIV/0! 19833.81 0.160 #DIV/0!
0 500.2 #DIV/0! 19833.81 0.160 #DIV/0!
0 500.2 #DIV/0! 19833.81 0.160 #DIV/0!
0 500.2 #DIV/0! 19833.81 0.160 #DIV/0!
0 500.2 #DIV/0! 19833.81 0.160 #DIV/0!
0 500.2 #DIV/0! 19833.81 0.160 #DIV/0!
0 500.2 #DIV/0! 19833.81 0.160 #DIV/0!

ado
ado

14 15 16 17 18 19

TONELAJE ROTO

Ejecutado Programado Prog. Acum. Ejec. Acum.

2500000

2000000
TM

1500000

1000000

500000

0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Julio
FACTOR DE POTENCIA

Ejecutado Programado

0.400

0.350
Kg/TM

0.300

0.250

0.200

0.150 0.160

0.100

0.050

0.000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Julio
ec. Acum.

14 15 16 17 18 19
OTENCIA

Programado

0.160

10 11 12 13 14 15 16 17 18 19
Julio
Fecha Perforacion Carguio Amarre Evacuacion Detonacion
9-Jul-08 11:00 12:00 12:35 12:20 12:41
10-Jul-08 10:30 12:00 12:30 12:15 12:35
11-Jul-08 11:00 11:40 11:50 No No
12-Jul-08 11:00 11:30 12:00 13:15 13:20
13-Jul-08 9:00 10:00 10:30 12:25 12:30
14-Jul-08 12:00 13:50 14:02 13:10 14:10
15-Jul-08
Observaciones:
PROGRAMA Y CUMPLIMIENTO DIARIO

PROGRAMADO EJECUTADO
Material a romper TM 104,299.00 343,607.16
taladros a realizar tal 208.5 687
Metros a perforar: m 1355.4641596829 4465.5
Carga explosiva por taladro Kg 75 76
Carga explosiva por dia kg 15640.0 52212

Factor de potencia del dia Kg/TM 0.1499532217 0.151952598


IENTO DIARIO

150

193143
95107

288250
Patro de perforacion:

Burde B m 5.4
Espaciamiento S m 6.2
Longitud de taladro l m 6.5
Altura de banco h m 6.0

Tonelaje roto por taladro TM 500.2


Propiedades de la roca

Densidad 2.5
Taladros Eplosivo Toneladas rotas
Enero 6637 422357 833044 125.5
Febrero 5870 154766 1095859 186.7
Marzo 5736 393371 2397451 418.0
Abril 7036 505547 0.0
Mayo 9360 625272 0.0
Junio 0 0 #DIV/0!
Nitrato de Amonio:
Emulsion Matriz:
Booster:
19 de Julio ACUMULADO
Plan Ejecutado Cumplimiento Plan Ejecutado Cumplimiento
TM TM TM TM
124000 148960 120% 2,356,000.00 2,095,087.00 89%

19 de Julio
Plan Ejecutado Cumplimiento
TM TM
500 435.56 87%

19 de Julio
Plan Ejecutado Cumplimiento
TM TM
0.16 0.14 89%
Observaciones
Se ralizo combio total de mallas a B=5.3
S=6

Observaciones
Se amplia malla en desmonte a B=6.0

Se bajo la carga especifica en desmonte


PARA ALUMBRE, Fase 2 y Fase 1C

MINERAL DESMONTE
Burden: B m 5.5 5.9
Espaciamiento: S m 6.3 6.8
Patron: Triangular Cuadrada Promedio
Tonelaje roto por taladro TM 525.9 612.7 569.3

PARA SURO SUR

MINERAL DESMONTE
Burden: B m 5.0 5.5
Espaciamiento: S m 5.8 6.3
Patron: Triangular Cuadrada Promedio
Tonelaje roto por taladro TM 445.7 525.9 485.8