REPORTE DE PRODUCTIVIDAD TAJO SAN GERARDO - PEVOEX CONTRATISTAS S.A.C.

PRODUCCIN TAJO SAN GERARDO EN (BCM) PORCENTAJE DE CARGUO POR EXCAVADORA PORCENTAJE DE MATERIAL MINADO
FECHA FASE 0 FASE 2 SUR FASE 2 CENTRO FASE 3E FASE 3N ADELAS & PRESA Desmonte Mineral Total Z3 0% 0%
17%
03 may 3,647 - 1,614.49 - - - 4,933.38 1,027.46 5,960.84 - EXC-336DL
Desmonte
33% EXC-374F
StockPile Mineral
67% CARG 83%
- Stock Pile

# VOLQUETES IDEAL PRODUCTIVIDAD


HR HR % Utilizacin TARGET DISTANCIA
EQUIPO DE CARGUIO PROYECTO NIVEL MATERIAL Horas Horometro BCM/Hr. PROM. BCM/Hr PRODUCCIN
EFECTIVAS DISPONIBLES Excavadora BCM/Hr. ACARREO 20 m3 15 m3 20 m3 Target 20 m3 15 m3 Target 15 m3
-
- D 9.3 - -
CAT-336DL -
EXC-001 TRABAJO AUXILIAR 4055 Topsoild 6.50 -
6.5 N 9.3 70% - -
-
FASE 2 CENTRO 4270 Mineral 0.90 148 200 133.1 - 6.2 23.8 23.7
FASE 2 CENTRO 4270 Mineral 2.10 63 200 133.1 - 2.7 23.4 23.7
7.8 D FASE 2 CENTRO 4264 Mineral 9.3 84% 3.40 83 84 200 283.8 - 3.4 24.5 23.7
FASE 2 CENTRO 4270 Desmonte 1.40 76 200 106.4 - 1.8 42.4 22.9
CAT 366DL -
EXC-002 FASE 0 4276 Mineral 0.80 133 200 106.4 - 3.6 37.0 23.7
FASE 2 CETRO 4270 Mineral 1.70 160 200 271.2 - 6.0 0.2 25.6 31.0 22.2 23.7
8.9 N FASE 2 CETRO 4264 Mineral 9.3 96% 1.10 68 120 200 74.9 - 1.0 65.7 31.0
FASE 2 CETRO 4270 Desmonte 5.30 115 200 612.0 - 1.4 84.9 30.5
-
Trabajo Auxiliar 4065 Desmonte 5.30 200 -
5.3 D 9.3 57% -
CAT 336DL -
EX-003 -
- N 9.3 -
-
FASE 0 4276 Desmonte 7.00 159 350 1111.6 - 3.1 52.0 30.5
7.0 D 9.3 75% 159
CAT 374F -
EXC-005 FASE 0 4276 Desmonte 9.00 270 350 2428.9 4.3 0.7 56.8 30.5 38.4 22.9
9.0 N 9.3 97% 270
-

REPORTE DE PRODUCCIN PERFORACIN_TSG Resumen de Produccin Rendimiento Equipos de Carguo (BCM/HR) Rendimiento Flota de Volquetes (BCM/HR)
Z3 HT m/Hr BCM/Hr BCM Desmonte 367 8% 124%
DIA - - Mineral 4,320 108% BCMMineral
/Hr Promedio Meta BCM /Hr Mineral Promedio Meta
DX-800 RENDIMIENTO BCM/Hr DX-800
NOCHE 8.7 11.5 136.6 1,189.9 TOTAL 4,687 61% 61% 400.0 60.0
350.0
DP-1500i DIA - - 160.0 136.6 40.0
NOCHE - - 140.0 200.0 200.0 200 200.0 31.0
45.7

RENDIMIENTO BCM/HR
20.0
FLEXI-ROCK DIA - - 120.0 26.1 23.7
- 100 - - 0.0
NOCHE - - 200.0 -
100.0 VOLQUETE 15 m3 VOLQUETE 20 m3
TOTAL BCM PERFORADO DIA 1,189.9 200.0 EXC-001 EXC-002 EXC-003 EXC-005
80.0
VOLQUETE VQ-15 m3 VQ-20 m3 60.0 EXC-001 EXC-002 EXC-003 EXC-005 VOLQUETE
BCM/Hr VOLQUETE VOLQUETE
Desmonte 15 m3 20 m3 Desmonte Promedio Meta
Promedio Meta
DIA - 6.35 5.34 Promedio
40.0 0 107 - 221 - 400 40.4 40.4 80.0
NOCHE - 9.28 8.34 Meta 200.0 200 200.0 350.0 22.9 30.5 350.0
20.0
TOTAL HORAS % 54% 63% 200177% 133%
PROMEDIO Hrs/ - 15.6 13.7 40.0
Kpis de Acarreo - 200.0 200 200.0 30.5
Equipo Promedio 100
NOCHE - - - 26.1 45.7 221 40.422.9 40.4
META 19.5 19.5 19.5 Meta 200.0 200 200.0 350.0 200 23.7 - 31.0 107 -
TURNO - 0.0
UTILIZACIN - 80.2% 70.2% % 50% 110% EXC-001
147% VOLQUETE 15 m3 VOLQUETE 20 m3
EXC-002 EXC-003 EXC-005

RESUMEN GENERAL DE PRODUCCIN POR FRENTES HORAS TRABAJADAS DE VOLQUETES


UTILIZACIN VOLQUETE 15 m3 UTILIZACIN VOLQUETE 20 m3
FRENTE MATERIAL BCM TONELADAS

DESMONTE 4,933 12,925 HT -Dia Mtto-Dia HT-Noche Mtto-Noche Meta


TAJO SAN GERARDO
MINERAL 1,027 2,856 24.0

ADELAS DESMONTE 20.0


18.7 18.7 18.7
16.0
PRESA DE RELAVE DESMONTE
12.0 9.3
9.5
TOTAL PRODUCCIN DIA 5,961 15,782
8.0
8.4
-
- -
4.0 6.8 8.5 8.7 7.4 7.1
6.4 5.6 6.6 5.4 5.0
PRODUCCIN DE MATERIAL TAJO SAN GERARDO - - - - - - - - - -
ABZ-718
ADX-704

ANT-720

AKI-905

AMF-804
AEW-719

AKH-848

AKH-922
D9J-933

ARA-711

ARA-805

AMH-749

AMA-782

AMA-728
FGZ-714
ACUMULADO SEMANAL DE MINADO DE MATERIAL EN (TN)
18000

16000 RENDIMIENTO DE EQUIPOS ACUMULADO SEMANAL


14000
Desmonte - Noche
12000 RENDIMIENTO DE VOLQUETES 15 m3 RENDIMIENTO DE VOLQUETES 20 m3 RENDIMIENTO DE EXCAVADORAS
Desmonte - Noche
Desmonte - Noche
10000 Desmonte - Noche Tn/Hr TARGET (Tn/Hr) Tn/Hr TARGET (Tn/Hr)
TN PROMEDIO SEMANAL (Tn/Hr) TARGET
Total material prog. 8,000 Tn
120.00 160.00
8000 142.83 800.00
Desmonte - Noche 89.32 134.70 700.00
96.12 140.00 700.00
100.00 122.08 105.00
6000 Desmonte - Dia 88.27 117.92
Desmonte - Dia
Rendimiento Tn/Hr

78.79 120.00
Rendimiento Tn/Hr

600.00

Rendimiento Tn/Hr
Mineral prog. 4,000 76.60
Desmonte - Dia Desmonte - Dia Tn 80.00
4000 Desmonte - Dia 100.00 89.68 500.00
60.81 400.00 400.00 400.00
Mineral - Noche Mineral - Noche 60.00 80.00
2000 Mineral - Noche Mineral - Noche 400.00
Mineral - Noche 707.51
Mineral - Dia Mineral - Dia Mineral - Dia 40.00 60.00 300.00
Mineral - Dia Mineral - Dia
0
29/04/2017 30/04/2017 01/05/2017 02/05/2017 03/05/2017 40.00 200.00 403.32 428.50
20.00
Desmonte - Noche 6198.5532 5856.1716 4804.7394 9915.4686 9341.479 20.00
- - 100.00
Desmonte - Dia 4613.165 5011.5098 2247.0692 4025.0798 3583.9766 - 0.00 0.00 114.50
- -
Mineral - Noche 1006.9438 2222.2208 1145.8326 2047.609 1327.5056 29/04/2017 30/04/2017 01/05/2017 02/05/2017 03/05/2017 04/05/2017 05/05/2017 29/04/2017 30/04/2017 01/05/2017 02/05/2017 03/05/2017 04/05/2017 05/05/2017
FECHA AT-PVX EXC-1 AT-PVX EXC-2 AT-PVX EXC-3 AT-PVX EXC-5
Mineral - Dia 1122.703 1363.7568 1672.726 1685.3194 1528.8332 FECHA EQUIPO