PRODUCCIN TAJO SAN GERARDO EN (BCM) PORCENTAJE DE CARGUO POR EXCAVADORA PORCENTAJE DE MATERIAL MINADO
FECHA FASE 0 FASE 2 SUR FASE 2 CENTRO FASE 3E FASE 3N ADELAS & PRESA Desmonte Mineral Total Z3 0% 0%
17%
03 may 3,647 - 1,614.49 - - - 4,933.38 1,027.46 5,960.84 - EXC-336DL
Desmonte
33% EXC-374F
StockPile Mineral
67% CARG 83%
- Stock Pile
REPORTE DE PRODUCCIN PERFORACIN_TSG Resumen de Produccin Rendimiento Equipos de Carguo (BCM/HR) Rendimiento Flota de Volquetes (BCM/HR)
Z3 HT m/Hr BCM/Hr BCM Desmonte 367 8% 124%
DIA - - Mineral 4,320 108% BCMMineral
/Hr Promedio Meta BCM /Hr Mineral Promedio Meta
DX-800 RENDIMIENTO BCM/Hr DX-800
NOCHE 8.7 11.5 136.6 1,189.9 TOTAL 4,687 61% 61% 400.0 60.0
350.0
DP-1500i DIA - - 160.0 136.6 40.0
NOCHE - - 140.0 200.0 200.0 200 200.0 31.0
45.7
RENDIMIENTO BCM/HR
20.0
FLEXI-ROCK DIA - - 120.0 26.1 23.7
- 100 - - 0.0
NOCHE - - 200.0 -
100.0 VOLQUETE 15 m3 VOLQUETE 20 m3
TOTAL BCM PERFORADO DIA 1,189.9 200.0 EXC-001 EXC-002 EXC-003 EXC-005
80.0
VOLQUETE VQ-15 m3 VQ-20 m3 60.0 EXC-001 EXC-002 EXC-003 EXC-005 VOLQUETE
BCM/Hr VOLQUETE VOLQUETE
Desmonte 15 m3 20 m3 Desmonte Promedio Meta
Promedio Meta
DIA - 6.35 5.34 Promedio
40.0 0 107 - 221 - 400 40.4 40.4 80.0
NOCHE - 9.28 8.34 Meta 200.0 200 200.0 350.0 22.9 30.5 350.0
20.0
TOTAL HORAS % 54% 63% 200177% 133%
PROMEDIO Hrs/ - 15.6 13.7 40.0
Kpis de Acarreo - 200.0 200 200.0 30.5
Equipo Promedio 100
NOCHE - - - 26.1 45.7 221 40.422.9 40.4
META 19.5 19.5 19.5 Meta 200.0 200 200.0 350.0 200 23.7 - 31.0 107 -
TURNO - 0.0
UTILIZACIN - 80.2% 70.2% % 50% 110% EXC-001
147% VOLQUETE 15 m3 VOLQUETE 20 m3
EXC-002 EXC-003 EXC-005
ANT-720
AKI-905
AMF-804
AEW-719
AKH-848
AKH-922
D9J-933
ARA-711
ARA-805
AMH-749
AMA-782
AMA-728
FGZ-714
ACUMULADO SEMANAL DE MINADO DE MATERIAL EN (TN)
18000
78.79 120.00
Rendimiento Tn/Hr
600.00
Rendimiento Tn/Hr
Mineral prog. 4,000 76.60
Desmonte - Dia Desmonte - Dia Tn 80.00
4000 Desmonte - Dia 100.00 89.68 500.00
60.81 400.00 400.00 400.00
Mineral - Noche Mineral - Noche 60.00 80.00
2000 Mineral - Noche Mineral - Noche 400.00
Mineral - Noche 707.51
Mineral - Dia Mineral - Dia Mineral - Dia 40.00 60.00 300.00
Mineral - Dia Mineral - Dia
0
29/04/2017 30/04/2017 01/05/2017 02/05/2017 03/05/2017 40.00 200.00 403.32 428.50
20.00
Desmonte - Noche 6198.5532 5856.1716 4804.7394 9915.4686 9341.479 20.00
- - 100.00
Desmonte - Dia 4613.165 5011.5098 2247.0692 4025.0798 3583.9766 - 0.00 0.00 114.50
- -
Mineral - Noche 1006.9438 2222.2208 1145.8326 2047.609 1327.5056 29/04/2017 30/04/2017 01/05/2017 02/05/2017 03/05/2017 04/05/2017 05/05/2017 29/04/2017 30/04/2017 01/05/2017 02/05/2017 03/05/2017 04/05/2017 05/05/2017
FECHA AT-PVX EXC-1 AT-PVX EXC-2 AT-PVX EXC-3 AT-PVX EXC-5
Mineral - Dia 1122.703 1363.7568 1672.726 1685.3194 1528.8332 FECHA EQUIPO