SUB PARTIDA
: TRANSPORTE DE MATERIAL ROCA DE 1 M DIAMETRO. Prom=1.5 km.
3
RENDIMIENTO PROMEDIO:
530.00
M / DIA
DESCRIPCION
MANO DE OBRA
PEON
UND.
1
CANT.
h-h
0.0151
P.UNIT.
PARCIAL
12.52
TOTAL
0.19
0.19
1
2
h-m
h-m
COSTO POR
0.0151
0.0365
M3
182.23
266.18
S/.
2.75
9.73
12.48
12.67
15.00 m3
1.50
15.00
25.00
15.00
5.00
6.00
3.60
29.60
66.25
529.98
432.00
14.59
218.92
2
530.00
km
km/hr
km/hr
min
min
min
min
min
m3/hr
m3/da
min
Viajes
m3
m3/dia
66.248
529.984