CUADRO DE INVERSIONES / FLUJO DE CAJA

PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY


Moneda: Dlares Americanos
ITEM

Descripcin / MESES

10

11

12

13

1.

MOVIMIENTO DE TIERRAS

1.1.

DESBROCE, DESBOSQUE, DESTRONQUE Y LIMPIEZA

0.00

0.00

0.00

0.00

28,317.17

94,390.56

91,244.21

0.00

0.00

0.00

0.00

0.00

0.00

1.2.

EXCAVACION COMUN 1 CAT.

0.00

0.00

0.00

0.00

0.00

460,236.90

1,585,260.43

1,534,123.00

1,585,260.43

1,585,260.43

1,534,123.00

1,585,260.43

204,549.73

1.3.

EXCAVACION ROCA BLANDA 2 CAT.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

583,644.41

952,261.93

952,261.93

921,543.81

952,261.93

122,872.51

1.4.

EXCAVACION EN ROCA DURA 3 CAT.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

240,530.59

1,491,289.64

1,491,289.64

1,443,183.53

1,491,289.64

192,424.47

1.5.

SOBREACARREO PARA D>300 M

0.00

0.00

0.00

0.00

0.00

113,628.96

391,388.65

378,763.20

391,388.65

391,388.65

378,763.20

391,388.65

378,763.20

1.6.

CONFORMACION DE TERRAPLEN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

316,522.66

392,488.09

379,827.19

1.7.

REMOCION DE DERRUMBES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

535,133.56

668,916.95

691,214.18

668,916.95

SUBTOTAL MOVIMIENTO DE TIERRAS

0.00

0.00

0.00

0.00

28,317.17

668,256.42

2,067,893.28

2,737,061.20

4,420,200.65

4,955,334.21

5,263,053.14

5,503,902.92

1,947,354.05

2.

PAVIMENTO

2.1.

MEJORAMIENTO DE SUBRASANTE - INCLUYE TRANSPORTE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.2.

CAPA SUBBASE - INCLUYE TRANSPORTE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.3.

CAPA BASE - INCLUYE TRANSPORTE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.4.

IMPRIMACION BITUMINOSA - EJECUCION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.5.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.6.

RIEGO LIGA - EJECUCION


PREPARACION Y COLOCACION CARPETA CON CONCRETO ASFALTICO
NORMAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.7.

CONTRO DEFLECTOMETRO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.8.

PROVISIN DE ASFALTO DILUIDO/EMULSION P/IMPRIMACIN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.9.

PROVISIN DE ASFALTO DILUIDO/EMULSION P/RIEGO DE LIGA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.10.

PROVISIN DE CEMENTO ASFLTICO (CONVENCIONAL)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL PAVIMENTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
77,424.39

3.

DRENAJE

3.1.

EXCAVACION PARA OBRAS DE DRENAJE

0.00

0.00

0.00

0.00

0.00

23,227.32

80,005.21

77,424.39

80,005.21

80,005.21

77,424.39

80,005.21

3.2.

EXCAVACION PARA ENCAUCES Y CANALIZACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.3.

RELLENO Y COMPACTADO PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

61,091.98

166,614.49

172,168.30

166,614.49

3.4.

RECUPERACIN DE ALCANTARILLAS METLICAS EXISTENTES

0.00

0.00

0.00

0.00

0.00

0.00

10,493.44

0.00

0.00

0.00

0.00

0.00

0.00

3.5.

DEMOLICION DE ESTRUCTURAS DE H EXISTENTE

0.00

0.00

0.00

0.00

0.00

5,037.92

17,352.83

16,793.07

4,478.15

0.00

0.00

0.00

0.00

3.6.

HORMIGON TIPO "A" R = 21 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

230,295.80

713,916.97

713,916.97

690,887.39

713,916.97

690,887.39

3.7.

HORMIGON TIPO "E" R = 11 MPA

0.00

0.00

0.00

0.00

0.00

0.00

22,476.08

26,971.30

27,870.34

27,870.34

26,971.30

27,870.34

26,971.30

3.8.

HORMIGON CICLOPEO (40 % DE PIEDRA DESPLAZADORA)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

74,216.04

92,027.89

92,027.89

89,059.25

92,027.89

89,059.25

3.9.

ACERO DE REFUERZO FY = 420 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

111,622.40

346,029.44

346,029.44

334,867.20

346,029.44

334,867.20

3.10.

ALCANTARILLA SIMPLE CON TUBO DE H A, D = 1.00 M

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

238,046.94

259,687.57

0.00

0.00

0.00

3.11.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

419,507.13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

134,115.84

236,675.01

244,564.17

236,675.01

3.13.

ALCANTARILLA SIMPLE DE TUBO DE H A, D = 1.50 M


CUNETA EN CORTE O PIE DE TERRAPLEN TRAPEZOIDAL, REVESTIDA
INCLUYE EXCAVACION
CUNETA DE BANQUINA EN CORTE O TERRAPLEN REVESTIDA INCLUYE
EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

47,280.97

83,437.01

86,218.24

83,437.01

3.14.

ZANJAS DE CORONAMIENTO REVESTIDAS INCLUYE EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.15.

GAVION TIPO CAJON

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

102,811.20

181,431.53

187,479.24

181,431.53

3.16.

GAVIONES TIPO COLCHONETA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

53,010.21

90,429.19

0.00

0.00

3.17.

ZAMPEADO DE PIEDRA CON MORTERO DE CEMENTO E = 0.25 M

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6,164.14

10,877.90

11,240.49

10,877.90

3.18.

SUBDREN LONGITUDINAL CON TUBERIA DE 6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.19.

BORDILLO TIPO CUNETA CON HORMIGON TIPO "B" (0.10 X 0.30 M)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.20.

MANTA GEOTEXTIL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.21.

MATERIAL GRANULAR TIPO FILTRO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.22.

TUBERIA PERFORADA PVC D = 6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.23.

ESCOLLERADO TIPO ENROCADO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.24.

CUNETA DE CORTE DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.12.

CUADRO DE INVERSIONES / FLUJO DE CAJA


PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY
Moneda: Dlares Americanos
ITEM

Descripcin / MESES

10

11

12

13

3.25.

ZANJAS DE CORONAMIENTO DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.26.

CUNETA DE BANQUINA DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.27.

SUBDREN LONGITUDINAL DE BANQUINA CON TUBERIA DE 6" FLEXIBLE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.28.

DREN FRANCES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL DRENAJE

0.00

0.00

0.00

0.00

0.00

28,265.24

130,327.56

537,323.00

1,502,374.94

2,343,518.88

1,988,674.64

1,961,520.30

1,898,245.46

4.1.

INFRAESTRUCTURA

4.1.1.

HORMIGON TIPO "A" R = 21 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.2.

HORMIGON TIPO "P" 35 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.3.

HORMIGON TIPO "E" R = 11 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.4.

ACERO DE REFUERZO FY = 420 MPA


TENDONES DE ACERO PARA PRETENSADO 12 CABLES DE 1/2" G-270 KSI
ASTM 416

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.7.

VAINAS PARA CABLES D = 7 CM (INCLUYE LECHADA DE CEMENTO)


TESADO DE CABLES DE UN SOLO EXTREMO INCLUYE LOS DOS ANCLAJES Y
PLACAS DE ANCAJE POR CABLE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.8.

LANZAMIENTO DE OBRA FALSA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.9.

APOYOS DE NEOPRENO COMPUESTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.10.

APOYO DE CARTON ASFALTICO DE 3 MM

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.11.

PILOTE A CIELO ABIERTO D = 1.20 M INCLUYE EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

84,244.88

522,318.27

522,318.27

505,469.30

522,318.27

505,469.30

4.1.12.

PILOTE A CIELO ABIERTO D = 1.40 M INCLUYE EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.13.

EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.14.

EXCAVACION EN ROCA PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.15.

MATERIAL DRENANTE (INCLUYE MANTA GEOTEXTIL)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.16.

TUBERIA DRENANTE PVC D = 4"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.17.

RELLENO Y COMPACTADO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.18.

DEMOLICION DE ESTRUCTURAS DE H EXISTENTE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL INFRAESTRUCTURA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

84,244.88

522,318.27

522,318.27

505,469.30

522,318.27

505,469.30

4.1.5.
4.1.6.

4.2.

SUPERESTRUCTURA

4.2.1.

HORMIGON TIPO "A" 25 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.2.

HORMIGON TIPO "P" 35 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.3.

ACERO DE REFUERZO FLUENCIA DE 420 MPA


TENDONES DE ACERO PARA PRETENSADO 12 CABLES DE 1/2" G-270 KSI
ASTM 416

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.6.

VAINAS PARA CABLES D = 7 CM (INCLUYE LECHADA DE CEMENTO)


JUNTAS DE DILATACION CON PERFIL -JENEE JJ2540VV EPDM CON LABIOS
POLIMERICOS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.7.

CAPA DE RODADURA DE HORMIGN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.8.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.9.

DRENAJE TUBO PVC D = 4"


TESADO DE CABLES DE UN SOLO EXTREMO INCLUYE LOS DOS ANCLAJES Y
PLACAS DE ANCAJE POR CABLE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.10.

LANZAMIENTO DE OBRA FALSA PARA VIGA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.11.

BARANDADO TIPO P3

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL SUPERESTRUCTURA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.4.
4.2.5.

5.

OBRAS COMPLEMENTARIAS

5.1.

EXCAVACION PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.2.

RELLENO Y COMPACTADO PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CUADRO DE INVERSIONES / FLUJO DE CAJA


PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY
Moneda: Dlares Americanos
ITEM

Descripcin / MESES

10

11

12

13

5.3.

HORMIGON TIPO "A" R- 21 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.4.

ACERO DE REFUERZO FY = 420 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.5.

HORMIGON CICLOPEO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.6.

DRENAJE LATERAL TUBERIA PVC DE 6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.7.

ZAMPEADO DE PIEDRA CON MORTERO DE CEMENTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.8.

HORMIGON TIPO "E" R = 11 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.9.

BORDILLO TIPO CUNETA CON HORMIGON TIPO "B" (0.10 X 0.30 M)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.10.

MANTA GEOTEXTIL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.11.

MATERIAL GRANULAR TIPO FILTRO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.12.

TUBERIA PERFORADA PVC DE 6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL OBRAS COMPLEMENTARIAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.

SEALIZACION

6.1.

SEALIZACION INFORMATIVA 180 X 120

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.2.

SEALIZACION INFORMATIVA ESPECIAL 268 X 148

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.3.

SEALIZACION REGLAMENTARIA (60 X 90 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.4.

SEALIZACION REGLAMENTARIA (75 X 110 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.5.

SEALIZACION PREVENTIVA (60 X 60 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.6.

SEALIZACION PREVENTIVA (80 X 80 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.7.

SEALIZACION DE IDENTIFICACION VIAL 50 X 55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.8.

POSTES DE SEALIZACION - COLOCACIN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.9.

PINTADO DE LA SUPERFICIE DE RODADURA DE 0.12 M

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.10.

TACHAS REFLECTIVAS (OJOS DE GATO)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.11.

DELINEADORES DE CALZADA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.12.

SEAL HORIZONTAL TIPO SONORIZADOR

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.13.

MOJONES DE KILOMETRAJE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.14.

DEFENSAS METALICAS TIPO FLEX BEAM

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.15.

BARRERA LATERAL RIGIDA NEW JERSEY UNA CARA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL SEALIZACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.
7.1.

MANTENIMIENTO DURANTE LA CONSTRUCCION


MATENIMIENTO DURANTE LA CONSTRUCCION
MANTENIMIENTO VIAL

INFORME

SUBTOTAL MANTENIMIENTO DURANTE LA CONSTRUCCION

DE

8.

MEDIDAS DE MITIGACION AMBIENTAL

8.1.

SUMINISTRO Y COLOCACION DE CAPA SUPERFICIAL DE SUELO

0.00

0.00

0.00

0.00

10.93

36.44

37.66

36.44

37.66

37.66

36.44

37.66

36.44

8.2.

REVEGETACION

0.00

0.00

0.00

0.00

945.26

3,150.86

3,255.89

3,150.86

3,255.89

3,255.89

3,150.86

3,255.89

3,150.86

8.3.

ACONDICIONAMIENTO DE MATERIAL EXCEDENTE

0.00

0.00

0.00

0.00

2,395.75

7,985.85

8,252.04

7,985.85

8,252.04

8,252.04

7,985.85

8,252.04

7,985.85

8.4.

RESTAURACION AMBIENTAL

0.00

0.00

0.00

0.00

168.35

561.18

579.89

561.18

579.89

579.89

561.18

579.89

561.18

8.5.

REPLANTACION DE CACTUS

0.00

0.00

0.00

0.00

67.21

224.02

231.48

224.02

231.48

231.48

224.02

231.48

224.02

8.6.

SEALIZACIN VERTICAL AMBIENTAL (80 X 60 CM)

0.00

0.00

0.00

0.00

9,033.06

5,018.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.7.

POSTES DE SEALIZACION - COLOCACIN

0.00

0.00

0.00

0.00

8,703.81

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.8.

RESCATE Y MONITOREO ARQUELOGICO

0.00

0.00

0.00

0.00

343.40

1,144.67

1,182.83

1,144.67

1,182.83

1,182.83

1,144.67

1,182.83

1,144.67

SUBTOTAL MEDIDAS DE MITIGACION AMBIENTAL

0.00

0.00

0.00

0.00

21,667.77

18,121.38

13,539.79

13,103.02

13,539.79

13,539.79

13,103.02

13,539.79

13,103.02

9.

SERVICIOS PARA LA SUPERVISION

9.1.

SERVICIO PARA ALIMENTACION

0.00

0.00

0.00

0.00

2,338.70

7,795.66

8,055.52

7,795.66

8,055.52

8,055.52

7,795.66

8,055.52

7,795.66

9.2.

MANTENIMIENTO, LUBRICANTES Y COMBUSTIBLES

0.00

0.00

0.00

0.00

489.21

1,630.69

1,685.05

1,630.69

1,685.05

1,685.05

1,630.69

1,685.05

1,630.69

9.3.

ALQUILER VIVIENDA/OFICINA INGENIERO

0.00

0.00

0.00

0.00

1,372.37

4,574.58

4,727.07

4,574.58

4,727.07

4,727.07

4,574.58

4,727.07

4,574.58

9.4.

PROVISION DE GRUPO ELECTROGENO, 50 KVA

0.00

0.00

0.00

0.00

1,229.86

4,099.53

4,236.18

4,099.53

4,236.18

4,236.18

4,099.53

4,236.18

4,099.53

9.5.

PROVISION DE VAGONETA DOBLE TRACCION

0.00

0.00

0.00

0.00

1,940.88

6,469.59

6,685.25

6,469.59

6,685.25

6,685.25

6,469.59

6,685.25

6,469.59

9.6.

PROVISION DE CMTA DOBLE TRACCION; DOBLE CABINA

0.00

0.00

0.00

0.00

2,329.05

7,763.51

8,022.30

7,763.51

8,022.30

8,022.30

7,763.51

8,022.30

7,763.51

CUADRO DE INVERSIONES / FLUJO DE CAJA


PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY
Moneda: Dlares Americanos
ITEM

Descripcin / MESES
SUBTOTAL SERVICIOS PARA LA SUPERVISION

10

11

12

13

0.00

2
0.00

3
0.00

4
0.00

9,700.07

32,333.56

33,411.35

32,333.56

33,411.35

33,411.35

32,333.56

33,411.35

32,333.56

10.

ESTACION DE PESAJE Y PEAJE

10.1.

ESTACION DE PESAJE Y PEAJE

0.00

0.00

0.00

0.00

4,141.70

13,805.68

14,265.87

13,805.68

14,265.87

14,265.87

13,805.68

14,265.87

13,805.68

SUBTOTAL ESTACION DE PESAJE Y PEAJE

0.00

0.00

0.00

0.00

4,141.70

13,805.68

14,265.87

13,805.68

14,265.87

14,265.87

13,805.68

14,265.87

13,805.68
0.00

11.

SITIOS CRITICOS

11.1.

EXCAVACION PARA OBRAS DE DRENAJE

0.00

0.00

0.00

0.00

0.00

44,311.80

0.00

0.00

0.00

0.00

0.00

0.00

11.2.

EXCAVACION PARA ENCAUCES Y CANALIZACION

0.00

0.00

0.00

0.00

0.00

7,074.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.3.

RELLENO Y COMPACTADO PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

22,754.33

35,269.20

34,131.49

35,269.20

35,269.20

34,131.49

35,269.20

11,377.16

11.4.

HORMIGON TIPO "A" R = 21 MPA

0.00

0.00

0.00

0.00

0.00

0.00

91,417.66

130,596.66

134,949.88

134,949.88

130,596.66

134,949.88

130,596.66

11.5.

HORMIGON TIPO "E" R = 11 MPA

0.00

0.00

0.00

0.00

0.00

0.00

42,418.95

60,598.50

12,119.70

0.00

0.00

0.00

0.00

11.6.

HORMIGON CICLOPEO (40 % DE PIEDRA DESPLAZADORA)

0.00

0.00

0.00

0.00

0.00

0.00

13,228.72

18,898.17

19,528.11

19,528.11

18,898.17

19,528.11

18,898.17

11.7.

ACERO DE REFUERZO FY = 420 MPA

0.00

0.00

0.00

0.00

0.00

0.00

21,042.52

30,060.74

31,062.77

31,062.77

30,060.74

31,062.77

30,060.74

11.8.

CUNETA DE CORTE DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.9.

ZANJAS DE CORONAMIENTO DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.10.

CUNETA DE BANQUINA DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.11.

IMPRIMACION PARA PROTECCION DE BANQUINAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.12.

ZAMPEADO DE PIEDRA CON MORTERO DE CEMENTO E = 0.25 M

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.13.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.14.

SUBDREN LONGITUDINAL DE CUNETA DE CORTE


SUBDREN LONGITUDINAL DE BANQUINA CON TUBERIA DE 6" FLEXIBLE
INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.15.

SUBDREN LONGITUDINAL PROFUNDO (INC. EXCAVACION)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.16.

EXCAVACION PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

39,632.48

56,617.83

58,505.09

18,872.61

0.00

0.00

0.00

11.17.

MANTA GEOTEXTIL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

133,559.55

0.00

0.00

0.00

11.18.

GEOMEMBRANA IMPERMEABLE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

67,581.04

5,631.75

0.00

0.00

11.19.

MATERIAL GRANULAR TIPO FILTRO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11,127.21

5,563.60

0.00

0.00

11.20.

GAVION TIPO CAJON

0.00

0.00

0.00

0.00

0.00

0.00

49,568.05

70,811.50

73,171.88

73,171.88

70,811.50

18,883.07

0.00

11.21.

DRENAJE HORIZONTAL PROFUNDO (DHP)

0.00

0.00

0.00

0.00

0.00

0.00

9,604.75

13,721.07

14,178.43

14,178.43

13,721.07

14,178.43

13,721.07

11.22.

HORMIGON PROYECTADO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.23.

MALLA ELECTROSOLDADA

0.00

0.00

0.00

0.00

0.00

0.00

17,628.80

25,184.00

26,023.46

26,023.46

25,184.00

26,023.46

25,184.00

11.24.

ESCOLLERADO

0.00

0.00

0.00

0.00

0.00

0.00

7,971.74

11,388.21

11,767.81

11,767.81

11,388.21

11,767.81

11,388.21

11.25.

DESQUINCHE DE ROCAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.26.

MURO DE TIERRA ARMADA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.27.

IMPRIMACION PARA MURO DE TIERRA ARMADA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.28.

DREN FRANCES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.29.

TRINCHERA DRENANTE INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.30.

PROTECCION DE TALUDES (TRUMER)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL SITIOS CRITICOS

0.00

0.00

0.00

0.00

0.00

74,140.85

327,782.87

452,008.15

416,576.34

577,091.96

345,987.18

291,662.74

241,226.00

TOTAL DEL PERIODO

0.00

0.00

0.00

0.00

63,826.71

834,923.13

2,587,220.72

3,869,879.49

6,922,687.21

8,459,480.33

8,162,426.52

8,340,621.24

4,651,537.07

TOTAL

0.00

0.00

0.00

0.00

63,826.71

898,749.84

3,485,970.56

7,355,850.05

14,278,537.26

22,738,017.59

30,900,444.11

39,241,065.35

43,892,602.42

0.00%

0.00%

0.00%

0.00%

0.05%

0.67%

2.58%

5.45%

10.58%

16.85%

22.90%

29.08%

32.53%

0.00

0.00

0.00

63,826.71

834,923.13

2,587,220.72

3,869,879.49

6,922,687.21

8,459,480.33

8,162,426.52

8,340,621.24

4,651,537.07

0.00

0.00

0.00

12,765.34

166,984.63

517,444.14

773,975.90

1,384,537.44

1,691,896.07

1,632,485.30

1,668,124.25

930,307.41

0.00

0.00

0.00

6,382.67

83,492.31

258,722.07

386,987.95

692,268.72

845,948.03

816,242.65

834,062.12

465,153.71

26,983,843.46

0.00

0.00

0.00

44,678.70

584,446.19

1,811,054.50

2,708,915.64

4,845,881.04

5,921,636.23

5,713,698.56

5,838,434.87

3,256,075.95

26,983,843.46

26,983,843.46

26,983,843.46

26,983,843.46

27,028,522.16

27,612,968.35

29,424,022.85

32,132,938.50

36,978,819.54

42,900,455.77

48,614,154.33

54,452,589.20

57,708,665.15

PORCENTAJE DE AVANCE FINANCIERO

Certificado mensual
Restitucin anticipo
Garanta de Buena Ejecucin (10 %)
Monto real de pago
Monto acumulado
Devolicin de Anticipo

CUADRO DE INVERSIONES / FLUJO DE CAJA


PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY
Moneda: Dlares Americanos
ITEM

Descripcin / MESES

14

15

16

17

18

19

20

21

22

23

24

25

26

1.

MOVIMIENTO DE TIERRAS

1.1.

DESBROCE, DESBOSQUE, DESTRONQUE Y LIMPIEZA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.2.

EXCAVACION COMUN 1 CAT.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.3.

EXCAVACION ROCA BLANDA 2 CAT.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.4.

EXCAVACION EN ROCA DURA 3 CAT.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.5.

SOBREACARREO PARA D>300 M

391,388.65

202,007.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.6.

CONFORMACION DE TERRAPLEN

392,488.09

63,304.53

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.7.

REMOCION DE DERRUMBES

691,214.18

312,161.24

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,475,090.92

577,472.82

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL MOVIMIENTO DE TIERRAS


2.

PAVIMENTO

2.1.

MEJORAMIENTO DE SUBRASANTE - INCLUYE TRANSPORTE

0.00

300,409.20

254,192.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.2.

CAPA SUBBASE - INCLUYE TRANSPORTE

0.00

0.00

209,114.65

1,080,425.68

1,045,573.23

1,080,425.68

313,671.97

0.00

0.00

0.00

0.00

0.00

0.00

2.3.

CAPA BASE - INCLUYE TRANSPORTE

0.00

0.00

0.00

0.00

1,001,002.36

1,551,553.66

1,501,503.54

1,551,553.66

250,250.59

0.00

0.00

0.00

0.00

2.4.

IMPRIMACION BITUMINOSA - EJECUCION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

72,353.91

33,394.11

0.00

0.00

0.00

2.5.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

24,548.81

0.00

0.00

0.00

2.6.

RIEGO LIGA - EJECUCION


PREPARACION Y COLOCACION CARPETA CON CONCRETO ASFALTICO
NORMAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,005,673.90

2,226,849.35

1,077,507.75

0.00

2.7.

CONTRO DEFLECTOMETRO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13,534.08

26,222.28

25,376.40

26,222.28

22,838.76

0.00

2.8.

PROVISIN DE ASFALTO DILUIDO/EMULSION P/IMPRIMACIN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,731,250.74

0.00

0.00

0.00

0.00

2.9.

PROVISIN DE ASFALTO DILUIDO/EMULSION P/RIEGO DE LIGA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.10.

PROVISIN DE CEMENTO ASFLTICO (CONVENCIONAL)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10,634,615.04

0.00

0.00

0.00

SUBTOTAL PAVIMENTO

0.00

300,409.20

463,307.05

1,080,425.68

2,046,575.59

2,631,979.33

1,815,175.51

1,565,087.74

2,080,077.52

11,723,608.26

2,253,071.63

1,100,346.51

0.00

3.

DRENAJE

3.1.

EXCAVACION PARA OBRAS DE DRENAJE

56,777.89

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.2.

EXCAVACION PARA ENCAUCES Y CANALIZACION

53,029.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.3.

RELLENO Y COMPACTADO PARA ESTRUCTURAS

172,168.30

72,199.61

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.4.

RECUPERACIN DE ALCANTARILLAS METLICAS EXISTENTES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.5.

DEMOLICION DE ESTRUCTURAS DE H EXISTENTE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.6.

HORMIGON TIPO "A" R = 21 MPA

713,916.97

552,709.92

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.7.

HORMIGON TIPO "E" R = 11 MPA

27,870.34

4,495.22

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.8.

HORMIGON CICLOPEO (40 % DE PIEDRA DESPLAZADORA)

92,027.89

92,027.89

83,121.96

92,027.89

11,874.57

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.9.

ACERO DE REFUERZO FY = 420 MPA

346,029.44

346,029.44

189,758.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.10.

ALCANTARILLA SIMPLE CON TUBO DE H A, D = 1.00 M

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.11.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

244,564.17

244,564.17

220,896.67

244,564.17

236,675.01

244,564.17

236,675.01

244,564.17

244,564.17

31,556.67

0.00

0.00

0.00

3.13.

ALCANTARILLA SIMPLE DE TUBO DE H A, D = 1.50 M


CUNETA EN CORTE O PIE DE TERRAPLEN TRAPEZOIDAL, REVESTIDA
INCLUYE EXCAVACION
CUNETA DE BANQUINA EN CORTE O TERRAPLEN REVESTIDA INCLUYE
EXCAVACION

86,218.24

86,218.24

77,874.54

86,218.24

83,437.01

86,218.24

83,437.01

86,218.24

86,218.24

80,655.77

0.00

0.00

0.00

3.14.

ZANJAS DE CORONAMIENTO REVESTIDAS INCLUYE EXCAVACION

0.00

0.00

0.00

0.00

5,434.29

168,463.09

163,028.80

168,463.09

168,463.09

157,594.51

0.00

0.00

0.00

3.15.

GAVION TIPO CAJON

30,238.59

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.16.

GAVIONES TIPO COLCHONETA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.17.

ZAMPEADO DE PIEDRA CON MORTERO DE CEMENTO E = 0.25 M

11,240.49

11,240.49

10,152.71

11,240.49

10,877.90

11,240.49

10,877.90

11,240.49

11,240.49

10,877.90

11,240.49

10,877.90

7,251.93

3.18.

SUBDREN LONGITUDINAL CON TUBERIA DE 6"

0.00

0.00

144,160.67

248,276.71

240,267.78

248,276.71

240,267.78

120,133.89

0.00

0.00

0.00

0.00

0.00

3.19.

BORDILLO TIPO CUNETA CON HORMIGON TIPO "B" (0.10 X 0.30 M)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

73,048.95

141,532.33

136,966.77

141,532.33

136,966.77

141,532.33

3.20.

MANTA GEOTEXTIL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4,866.44

9,428.72

9,124.57

6,995.50

0.00

0.00

3.21.

MATERIAL GRANULAR TIPO FILTRO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.22.

TUBERIA PERFORADA PVC D = 6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.23.

ESCOLLERADO TIPO ENROCADO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8,897.65

25,580.75

0.00

3.24.

CUNETA DE CORTE DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.12.

CUADRO DE INVERSIONES / FLUJO DE CAJA


PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY
Moneda: Dlares Americanos
ITEM

Descripcin / MESES

14

15

16

17

18

19

20

21

22

23

24

25

26

3.25.

ZANJAS DE CORONAMIENTO DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.26.

CUNETA DE BANQUINA DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.27.

SUBDREN LONGITUDINAL DE BANQUINA CON TUBERIA DE 6" FLEXIBLE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.28.

DREN FRANCES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1,834,082.13

1,409,484.98

725,964.63

682,327.51

588,566.55

758,762.71

734,286.49

708,535.27

661,447.05

426,776.19

168,665.98

173,425.42

148,784.26

SUBTOTAL DRENAJE
4.1.

INFRAESTRUCTURA

4.1.1.

HORMIGON TIPO "A" R = 21 MPA

0.00

0.00

0.00

0.00

3,917,799.16

391,779.92

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.2.

HORMIGON TIPO "P" 35 MPA

0.00

0.00

0.00

0.00

0.00

201,474.24

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.3.

HORMIGON TIPO "E" R = 11 MPA

0.00

0.00

0.00

0.00

0.00

243,201.98

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.4.

ACERO DE REFUERZO FY = 420 MPA


TENDONES DE ACERO PARA PRETENSADO 12 CABLES DE 1/2" G-270 KSI
ASTM 416

0.00

0.00

0.00

0.00

3,685,989.63

737,197.93

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3,322.88

3,437.47

3,552.05

3,552.05

3,437.47

3,552.05

3,437.47

3,552.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.7.

VAINAS PARA CABLES D = 7 CM (INCLUYE LECHADA DE CEMENTO)


TESADO DE CABLES DE UN SOLO EXTREMO INCLUYE LOS DOS ANCLAJES Y
PLACAS DE ANCAJE POR CABLE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.8.

LANZAMIENTO DE OBRA FALSA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.9.

APOYOS DE NEOPRENO COMPUESTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.10.

APOYO DE CARTON ASFALTICO DE 3 MM

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.11.

PILOTE A CIELO ABIERTO D = 1.20 M INCLUYE EXCAVACION

522,318.27

522,318.27

471,771.34

522,318.27

505,469.30

522,318.27

505,469.30

522,318.27

522,318.27

505,469.30

286,432.60

0.00

0.00

4.1.12.

PILOTE A CIELO ABIERTO D = 1.40 M INCLUYE EXCAVACION

0.00

0.00

0.00

215,570.20

646,710.60

668,267.62

646,710.60

668,267.62

668,267.62

646,710.60

495,811.46

0.00

0.00

4.1.13.

EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS

0.00

0.00

0.00

165,258.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.14.

EXCAVACION EN ROCA PARA ESTRUCTURAS

0.00

0.00

0.00

42,538.37

23,632.43

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.15.

MATERIAL DRENANTE (INCLUYE MANTA GEOTEXTIL)

0.00

0.00

0.00

77,933.04

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.16.

TUBERIA DRENANTE PVC D = 4"

0.00

0.00

0.00

0.00

11,730.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.17.

RELLENO Y COMPACTADO

0.00

0.00

0.00

0.00

106,171.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.18.

DEMOLICION DE ESTRUCTURAS DE H EXISTENTE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

522,318.27

522,318.27

471,771.34

1,023,618.48

8,897,502.24

2,767,562.84

1,155,617.36

1,194,137.94

1,194,137.94

1,155,617.36

785,796.11

3,437.47

3,552.05

4.1.5.
4.1.6.

SUBTOTAL INFRAESTRUCTURA
4.2.

SUPERESTRUCTURA

4.2.1.

HORMIGON TIPO "A" 25 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.2.

HORMIGON TIPO "P" 35 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.3.

ACERO DE REFUERZO FLUENCIA DE 420 MPA


TENDONES DE ACERO PARA PRETENSADO 12 CABLES DE 1/2" G-270 KSI
ASTM 416

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.6.

VAINAS PARA CABLES D = 7 CM (INCLUYE LECHADA DE CEMENTO)


JUNTAS DE DILATACION CON PERFIL -JENEE JJ2540VV EPDM CON LABIOS
POLIMERICOS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.7.

CAPA DE RODADURA DE HORMIGN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.8.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.9.

DRENAJE TUBO PVC D = 4"


TESADO DE CABLES DE UN SOLO EXTREMO INCLUYE LOS DOS ANCLAJES Y
PLACAS DE ANCAJE POR CABLE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.10.

LANZAMIENTO DE OBRA FALSA PARA VIGA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.11.

BARANDADO TIPO P3

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL SUPERESTRUCTURA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.4.
4.2.5.

5.

OBRAS COMPLEMENTARIAS

5.1.

EXCAVACION PARA ESTRUCTURAS

0.00

71,661.35

133,767.86

38,219.39

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.2.

RELLENO Y COMPACTADO PARA ESTRUCTURAS

0.00

0.00

0.00

73,222.71

95,507.88

98,691.47

95,507.88

92,324.28

0.00

0.00

0.00

0.00

0.00

CUADRO DE INVERSIONES / FLUJO DE CAJA


PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY
Moneda: Dlares Americanos
ITEM

Descripcin / MESES

14

15

16

17

18

19

20

21

22

23

24

25

26

5.3.

HORMIGON TIPO "A" R- 21 MPA

0.00

0.00

0.00

791,328.40

1,032,167.48

1,066,573.06

1,032,167.48

1,066,573.06

1,066,573.06

825,733.98

0.00

0.00

0.00

5.4.

ACERO DE REFUERZO FY = 420 MPA

0.00

0.00

0.00

813,871.75

1,061,571.85

106,157.19

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.5.

HORMIGON CICLOPEO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.6.

DRENAJE LATERAL TUBERIA PVC DE 6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

116,904.10

0.00

0.00

0.00

0.00

5.7.

ZAMPEADO DE PIEDRA CON MORTERO DE CEMENTO

0.00

0.00

0.00

8,439.35

11,007.84

11,374.77

11,007.84

11,374.77

11,374.77

11,007.84

10,273.99

0.00

0.00

5.8.

HORMIGON TIPO "E" R = 11 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.9.

BORDILLO TIPO CUNETA CON HORMIGON TIPO "B" (0.10 X 0.30 M)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.10.

MANTA GEOTEXTIL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.11.

MATERIAL GRANULAR TIPO FILTRO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

114,621.34

5.12.

TUBERIA PERFORADA PVC DE 6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL OBRAS COMPLEMENTARIAS

0.00

71,661.35

133,767.86

1,725,081.59

2,200,255.04

1,282,796.49

1,138,683.19

1,170,272.11

1,194,851.93

836,741.82

10,273.99

0.00

114,621.34

6.

SEALIZACION

6.1.

SEALIZACION INFORMATIVA 180 X 120

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.2.

SEALIZACION INFORMATIVA ESPECIAL 268 X 148

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.3.

SEALIZACION REGLAMENTARIA (60 X 90 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.4.

SEALIZACION REGLAMENTARIA (75 X 110 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.5.

SEALIZACION PREVENTIVA (60 X 60 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.6.

SEALIZACION PREVENTIVA (80 X 80 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.7.

SEALIZACION DE IDENTIFICACION VIAL 50 X 55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.8.

POSTES DE SEALIZACION - COLOCACIN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.9.

PINTADO DE LA SUPERFICIE DE RODADURA DE 0.12 M

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.10.

TACHAS REFLECTIVAS (OJOS DE GATO)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.11.

DELINEADORES DE CALZADA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.12.

SEAL HORIZONTAL TIPO SONORIZADOR

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.13.

MOJONES DE KILOMETRAJE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.14.

DEFENSAS METALICAS TIPO FLEX BEAM

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.15.

BARRERA LATERAL RIGIDA NEW JERSEY UNA CARA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL SEALIZACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.
7.1.

MANTENIMIENTO DURANTE LA CONSTRUCCION


MATENIMIENTO DURANTE LA CONSTRUCCION
MANTENIMIENTO VIAL

INFORME

SUBTOTAL MANTENIMIENTO DURANTE LA CONSTRUCCION

DE

8.

MEDIDAS DE MITIGACION AMBIENTAL

8.1.

SUMINISTRO Y COLOCACION DE CAPA SUPERFICIAL DE SUELO

37.66

37.66

34.01

37.66

36.44

37.66

36.44

37.66

37.66

36.44

37.66

36.44

37.66

8.2.

REVEGETACION

3,255.89

3,255.89

2,940.80

3,255.89

3,150.86

3,255.89

3,150.86

3,255.89

3,255.89

3,150.86

3,255.89

3,150.86

3,255.89

8.3.

ACONDICIONAMIENTO DE MATERIAL EXCEDENTE

8,252.04

8,252.04

7,453.46

8,252.04

7,985.85

8,252.04

7,985.85

8,252.04

8,252.04

7,985.85

8,252.04

7,985.85

8,252.04

8.4.

RESTAURACION AMBIENTAL

579.89

579.89

523.77

579.89

561.18

579.89

561.18

579.89

579.89

561.18

579.89

561.18

579.89

8.5.

REPLANTACION DE CACTUS

231.48

231.48

209.08

231.48

224.02

231.48

224.02

231.48

231.48

224.02

231.48

224.02

231.48

8.6.

SEALIZACIN VERTICAL AMBIENTAL (80 X 60 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.7.

POSTES DE SEALIZACION - COLOCACIN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.8.

RESCATE Y MONITOREO ARQUELOGICO

1,182.83

1,182.83

1,068.36

1,182.83

1,144.67

1,182.83

1,144.67

1,182.83

1,182.83

1,144.67

1,182.83

1,144.67

1,182.83

13,539.79

13,539.79

12,229.48

13,539.79

13,103.02

13,539.79

13,103.02

13,539.79

13,539.79

13,103.02

13,539.79

13,103.02

13,539.79

SUBTOTAL MEDIDAS DE MITIGACION AMBIENTAL


9.

SERVICIOS PARA LA SUPERVISION

9.1.

SERVICIO PARA ALIMENTACION

8,055.52

8,055.52

7,275.95

8,055.52

7,795.66

8,055.52

7,795.66

8,055.52

8,055.52

7,795.66

8,055.52

7,795.66

8,055.52

9.2.

MANTENIMIENTO, LUBRICANTES Y COMBUSTIBLES

1,685.05

1,685.05

1,521.98

1,685.05

1,630.69

1,685.05

1,630.69

1,685.05

1,685.05

1,630.69

1,685.05

1,630.69

1,685.05

9.3.

ALQUILER VIVIENDA/OFICINA INGENIERO

4,727.07

4,727.07

4,269.61

4,727.07

4,574.58

4,727.07

4,574.58

4,727.07

4,727.07

4,574.58

4,727.07

4,574.58

4,727.07

9.4.

PROVISION DE GRUPO ELECTROGENO, 50 KVA

4,236.18

4,236.18

3,826.23

4,236.18

4,099.53

4,236.18

4,099.53

4,236.18

4,236.18

4,099.53

4,236.18

4,099.53

4,236.18

9.5.

PROVISION DE VAGONETA DOBLE TRACCION

6,685.25

6,685.25

6,038.29

6,685.25

6,469.59

6,685.25

6,469.59

6,685.25

6,685.25

6,469.59

6,685.25

6,469.59

6,685.25

9.6.

PROVISION DE CMTA DOBLE TRACCION; DOBLE CABINA

8,022.30

8,022.30

7,245.95

8,022.30

7,763.51

8,022.30

7,763.51

8,022.30

8,022.30

7,763.51

8,022.30

7,763.51

8,022.30

CUADRO DE INVERSIONES / FLUJO DE CAJA


PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY
Moneda: Dlares Americanos
ITEM

Descripcin / MESES
SUBTOTAL SERVICIOS PARA LA SUPERVISION

14

15

16

17

18

19

20

21

22

23

24

25

26

33,411.35

33,411.35

30,177.99

33,411.35

32,333.56

33,411.35

32,333.56

33,411.35

33,411.35

32,333.56

33,411.35

32,333.56

33,411.35

10.

ESTACION DE PESAJE Y PEAJE

10.1.

ESTACION DE PESAJE Y PEAJE

14,265.87

14,265.87

12,885.30

14,265.87

13,805.68

14,265.87

13,805.68

14,265.87

14,265.87

13,805.68

14,265.87

13,805.68

14,265.87

SUBTOTAL ESTACION DE PESAJE Y PEAJE

14,265.87

14,265.87

12,885.30

14,265.87

13,805.68

14,265.87

13,805.68

14,265.87

14,265.87

13,805.68

14,265.87

13,805.68

14,265.87

11.

SITIOS CRITICOS

11.1.

EXCAVACION PARA OBRAS DE DRENAJE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.2.

EXCAVACION PARA ENCAUCES Y CANALIZACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.3.

RELLENO Y COMPACTADO PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.4.

HORMIGON TIPO "A" R = 21 MPA

134,949.88

134,949.88

121,890.21

134,949.88

130,596.66

134,949.88

130,596.66

134,949.88

134,949.88

130,596.66

134,949.88

130,596.66

134,949.88

11.5.

HORMIGON TIPO "E" R = 11 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.6.

HORMIGON CICLOPEO (40 % DE PIEDRA DESPLAZADORA)

19,528.11

19,528.11

6,299.39

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.7.

ACERO DE REFUERZO FY = 420 MPA

31,062.77

31,062.77

28,056.69

31,062.77

30,060.74

31,062.77

30,060.74

31,062.77

31,062.77

30,060.74

31,062.77

13,026.32

0.00

11.8.

CUNETA DE CORTE DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.9.

ZANJAS DE CORONAMIENTO DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.10.

CUNETA DE BANQUINA DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.11.

IMPRIMACION PARA PROTECCION DE BANQUINAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.12.

ZAMPEADO DE PIEDRA CON MORTERO DE CEMENTO E = 0.25 M

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.13.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.14.

SUBDREN LONGITUDINAL DE CUNETA DE CORTE


SUBDREN LONGITUDINAL DE BANQUINA CON TUBERIA DE 6" FLEXIBLE
INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.15.

SUBDREN LONGITUDINAL PROFUNDO (INC. EXCAVACION)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.16.

EXCAVACION PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.17.

MANTA GEOTEXTIL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.18.

GEOMEMBRANA IMPERMEABLE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.19.

MATERIAL GRANULAR TIPO FILTRO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.20.

GAVION TIPO CAJON

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.21.

DRENAJE HORIZONTAL PROFUNDO (DHP)

14,178.43

14,178.43

12,806.33

14,178.43

13,721.07

14,178.43

13,721.07

14,178.43

14,178.43

13,721.07

14,178.43

13,721.07

14,178.43

11.22.

HORMIGON PROYECTADO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.23.

MALLA ELECTROSOLDADA

26,023.46

26,023.46

23,505.06

26,023.46

25,184.00

26,023.46

25,184.00

26,023.46

26,023.46

25,184.00

26,023.46

25,184.00

26,023.46

11.24.

ESCOLLERADO

11,767.81

11,767.81

10,628.99

11,767.81

11,388.21

11,767.81

11,388.21

11,767.81

11,767.81

11,388.21

11,767.81

11,388.21

11,767.81

11.25.

DESQUINCHE DE ROCAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.26.

MURO DE TIERRA ARMADA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.27.

IMPRIMACION PARA MURO DE TIERRA ARMADA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.28.

DREN FRANCES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.29.

TRINCHERA DRENANTE INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.30.

PROTECCION DE TALUDES (TRUMER)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

237,510.47

237,510.47

203,186.68

217,982.36

210,950.67

217,982.36

210,950.67

217,982.36

217,982.36

210,950.67

217,982.36

193,916.25

186,919.59

SUBTOTAL SITIOS CRITICOS


TOTAL DEL PERIODO
TOTAL
PORCENTAJE DE AVANCE FINANCIERO

Certificado mensual
Restitucin anticipo
Garanta de Buena Ejecucin (10 %)
Monto real de pago
Monto acumulado
Devolicin de Anticipo

4,130,218.79

3,180,074.09

2,053,290.34

4,790,652.60

14,003,092.35

7,720,300.73

5,113,955.49

4,917,232.42

5,409,713.80

14,412,936.56

3,497,007.07

1,530,367.90

515,094.24

48,022,821.21

51,202,895.30

53,256,185.64

58,046,838.24

72,049,930.59

79,770,231.32

84,884,186.81

89,801,419.23

95,211,133.03

109,624,069.59

113,121,076.66

114,651,444.56

115,166,538.80

35.59%

37.95%

39.47%

43.02%

53.40%

59.12%

62.91%

66.56%

70.57%

81.25%

83.84%

84.98%

85.36%

4,130,218.79

3,180,074.09

2,053,290.34

4,790,652.60

14,003,092.35

7,720,300.73

5,113,955.49

4,917,232.42

5,409,713.80

14,412,936.56

3,497,007.07

1,530,367.90

515,094.24

826,043.76

636,014.82

410,658.07

958,130.52

2,800,618.47

1,544,060.15

1,022,791.10

983,446.48

1,081,942.76

2,882,587.31

699,401.41

306,073.58

103,018.85

413,021.88

318,007.41

205,329.03

479,065.26

1,400,309.24

772,030.07

511,395.55

491,723.24

540,971.38

1,441,293.66

349,700.71

153,036.79

51,509.42

2,891,153.16

2,226,051.87

1,437,303.24

3,353,456.82

9,802,164.65

5,404,210.51

3,579,768.84

3,442,062.69

3,786,799.66

10,089,055.59

2,447,904.95

1,071,257.53

360,565.97

60,599,818.30

62,825,870.17

64,263,173.41

67,616,630.23

77,418,794.88

82,823,005.38

86,402,774.22

89,844,836.92

93,631,636.58

103,720,692.17

106,168,597.12

107,239,854.65

107,600,420.62

CUADRO DE INVERSIONES / FLUJO DE CAJA


PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY
Moneda: Dlares Americanos
ITEM

Descripcin / MESES

27

28

29

30

31

32

33

34

35

36

1.

MOVIMIENTO DE TIERRAS

1.1.

DESBROCE, DESBOSQUE, DESTRONQUE Y LIMPIEZA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.2.

EXCAVACION COMUN 1 CAT.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.3.

EXCAVACION ROCA BLANDA 2 CAT.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.4.

EXCAVACION EN ROCA DURA 3 CAT.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.5.

SOBREACARREO PARA D>300 M

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.6.

CONFORMACION DE TERRAPLEN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.7.

REMOCION DE DERRUMBES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL MOVIMIENTO DE TIERRAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.

PAVIMENTO

2.1.

MEJORAMIENTO DE SUBRASANTE - INCLUYE TRANSPORTE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.2.

CAPA SUBBASE - INCLUYE TRANSPORTE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.3.

CAPA BASE - INCLUYE TRANSPORTE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.4.

IMPRIMACION BITUMINOSA - EJECUCION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.5.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.6.

RIEGO LIGA - EJECUCION


PREPARACION Y COLOCACION CARPETA CON CONCRETO ASFALTICO
NORMAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.7.

CONTRO DEFLECTOMETRO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.8.

PROVISIN DE ASFALTO DILUIDO/EMULSION P/IMPRIMACIN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.9.

PROVISIN DE ASFALTO DILUIDO/EMULSION P/RIEGO DE LIGA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

288,545.61

0.00

2.10.

PROVISIN DE CEMENTO ASFLTICO (CONVENCIONAL)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL PAVIMENTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

288,545.61

0.00

3.

DRENAJE

3.1.

EXCAVACION PARA OBRAS DE DRENAJE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.2.

EXCAVACION PARA ENCAUCES Y CANALIZACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.3.

RELLENO Y COMPACTADO PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.4.

RECUPERACIN DE ALCANTARILLAS METLICAS EXISTENTES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.5.

DEMOLICION DE ESTRUCTURAS DE H EXISTENTE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.6.

HORMIGON TIPO "A" R = 21 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.7.

HORMIGON TIPO "E" R = 11 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.8.

HORMIGON CICLOPEO (40 % DE PIEDRA DESPLAZADORA)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.9.

ACERO DE REFUERZO FY = 420 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.10.

ALCANTARILLA SIMPLE CON TUBO DE H A, D = 1.00 M

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.11.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.13.

ALCANTARILLA SIMPLE DE TUBO DE H A, D = 1.50 M


CUNETA EN CORTE O PIE DE TERRAPLEN TRAPEZOIDAL, REVESTIDA
INCLUYE EXCAVACION
CUNETA DE BANQUINA EN CORTE O TERRAPLEN REVESTIDA INCLUYE
EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.14.

ZANJAS DE CORONAMIENTO REVESTIDAS INCLUYE EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.15.

GAVION TIPO CAJON

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.16.

GAVIONES TIPO COLCHONETA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.17.

ZAMPEADO DE PIEDRA CON MORTERO DE CEMENTO E = 0.25 M

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.18.

SUBDREN LONGITUDINAL CON TUBERIA DE 6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.19.

BORDILLO TIPO CUNETA CON HORMIGON TIPO "B" (0.10 X 0.30 M)

141,532.33

127,835.65

141,532.33

91,311.18

0.00

0.00

0.00

0.00

0.00

0.00

3.20.

MANTA GEOTEXTIL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.21.

MATERIAL GRANULAR TIPO FILTRO

0.00

0.00

0.00

31,762.54

0.00

0.00

0.00

0.00

0.00

0.00

3.22.

TUBERIA PERFORADA PVC D = 6"

0.00

3,574.11

7,386.49

7,148.21

953.10

0.00

0.00

0.00

0.00

0.00

3.23.

ESCOLLERADO TIPO ENROCADO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.24.

CUNETA DE CORTE DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.12.

CUADRO DE INVERSIONES / FLUJO DE CAJA


PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY
Moneda: Dlares Americanos
ITEM

Descripcin / MESES

27

28

29

30

31

32

33

34

35

36

3.25.

ZANJAS DE CORONAMIENTO DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.26.

CUNETA DE BANQUINA DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.27.

SUBDREN LONGITUDINAL DE BANQUINA CON TUBERIA DE 6" FLEXIBLE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.28.

DREN FRANCES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

141,532.33

131,409.76

148,918.82

130,221.93

953.10

0.00

0.00

0.00

0.00

0.00

SUBTOTAL DRENAJE
4.1.

INFRAESTRUCTURA

4.1.1.

HORMIGON TIPO "A" R = 21 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.2.

HORMIGON TIPO "P" 35 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.3.

HORMIGON TIPO "E" R = 11 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.4.

ACERO DE REFUERZO FY = 420 MPA


TENDONES DE ACERO PARA PRETENSADO 12 CABLES DE 1/2" G-270 KSI
ASTM 416

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5,796.98

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.7.

VAINAS PARA CABLES D = 7 CM (INCLUYE LECHADA DE CEMENTO)


TESADO DE CABLES DE UN SOLO EXTREMO INCLUYE LOS DOS ANCLAJES Y
PLACAS DE ANCAJE POR CABLE

27,907.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.8.

LANZAMIENTO DE OBRA FALSA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.9.

APOYOS DE NEOPRENO COMPUESTO

485,721.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.10.

APOYO DE CARTON ASFALTICO DE 3 MM

8,329.30

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.11.

PILOTE A CIELO ABIERTO D = 1.20 M INCLUYE EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.12.

PILOTE A CIELO ABIERTO D = 1.40 M INCLUYE EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.13.

EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.14.

EXCAVACION EN ROCA PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.15.

MATERIAL DRENANTE (INCLUYE MANTA GEOTEXTIL)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.16.

TUBERIA DRENANTE PVC D = 4"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.17.

RELLENO Y COMPACTADO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.18.

DEMOLICION DE ESTRUCTURAS DE H EXISTENTE

0.00

0.00

0.00

2,025.81

0.00

0.00

0.00

0.00

0.00

0.00

527,755.08

0.00

0.00

2,025.81

0.00

0.00

0.00

0.00

0.00

0.00

4.1.5.
4.1.6.

SUBTOTAL INFRAESTRUCTURA
4.2.

SUPERESTRUCTURA

4.2.1.

HORMIGON TIPO "A" 25 MPA

0.00

0.00

0.00

1,513,700.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.2.

HORMIGON TIPO "P" 35 MPA

0.00

0.00

0.00

1,077,742.59

628,683.18

0.00

0.00

0.00

0.00

0.00

4.2.3.

ACERO DE REFUERZO FLUENCIA DE 420 MPA


TENDONES DE ACERO PARA PRETENSADO 12 CABLES DE 1/2" G-270 KSI
ASTM 416

0.00

274,262.06

500,124.94

467,858.82

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

27,699.61

42,934.40

41,549.42

42,934.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.6.

VAINAS PARA CABLES D = 7 CM (INCLUYE LECHADA DE CEMENTO)


JUNTAS DE DILATACION CON PERFIL -JENEE JJ2540VV EPDM CON LABIOS
POLIMERICOS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.7.

CAPA DE RODADURA DE HORMIGN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.8.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.9.

DRENAJE TUBO PVC D = 4"


TESADO DE CABLES DE UN SOLO EXTREMO INCLUYE LOS DOS ANCLAJES Y
PLACAS DE ANCAJE POR CABLE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.10.

LANZAMIENTO DE OBRA FALSA PARA VIGA

0.00

0.00

0.00

0.00

0.00

0.00

52,855.68

81,926.30

79,283.52

81,926.30

4.2.11.

BARANDADO TIPO P3

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL SUPERESTRUCTURA

0.00

274,262.06

500,124.94

3,059,301.40

628,683.18

0.00

80,555.29

124,860.70

120,832.94

124,860.70

4.2.4.
4.2.5.

5.

OBRAS COMPLEMENTARIAS

5.1.

EXCAVACION PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.2.

RELLENO Y COMPACTADO PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CUADRO DE INVERSIONES / FLUJO DE CAJA


PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY
Moneda: Dlares Americanos
ITEM

Descripcin / MESES

27

28

29

30

31

32

33

34

35

36

5.3.

HORMIGON TIPO "A" R- 21 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.4.

ACERO DE REFUERZO FY = 420 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.5.

HORMIGON CICLOPEO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.6.

DRENAJE LATERAL TUBERIA PVC DE 6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.7.

ZAMPEADO DE PIEDRA CON MORTERO DE CEMENTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.8.

HORMIGON TIPO "E" R = 11 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.9.

BORDILLO TIPO CUNETA CON HORMIGON TIPO "B" (0.10 X 0.30 M)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.10.

MANTA GEOTEXTIL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.11.

MATERIAL GRANULAR TIPO FILTRO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.12.

TUBERIA PERFORADA PVC DE 6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL OBRAS COMPLEMENTARIAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.

SEALIZACION

6.1.

SEALIZACION INFORMATIVA 180 X 120

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.2.

SEALIZACION INFORMATIVA ESPECIAL 268 X 148

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.3.

SEALIZACION REGLAMENTARIA (60 X 90 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.4.

SEALIZACION REGLAMENTARIA (75 X 110 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.5.

SEALIZACION PREVENTIVA (60 X 60 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.6.

SEALIZACION PREVENTIVA (80 X 80 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.7.

SEALIZACION DE IDENTIFICACION VIAL 50 X 55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.8.

POSTES DE SEALIZACION - COLOCACIN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.9.

PINTADO DE LA SUPERFICIE DE RODADURA DE 0.12 M

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9,456.29

29,314.49

6.10.

TACHAS REFLECTIVAS (OJOS DE GATO)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.11.

DELINEADORES DE CALZADA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.12.

SEAL HORIZONTAL TIPO SONORIZADOR

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.13.

MOJONES DE KILOMETRAJE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.14.

DEFENSAS METALICAS TIPO FLEX BEAM

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.15.

BARRERA LATERAL RIGIDA NEW JERSEY UNA CARA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL SEALIZACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9,456.29

29,314.49

20,236.38

43,586.05

48,255.99

46,699.34

48,255.99

46,699.34

48,255.99

48,255.99

46,699.34

48,255.99

20,236.38

43,586.05

48,255.99

46,699.34

48,255.99

46,699.34

48,255.99

48,255.99

46,699.34

48,255.99

7.
7.1.

MANTENIMIENTO DURANTE LA CONSTRUCCION


MATENIMIENTO DURANTE LA CONSTRUCCION
MANTENIMIENTO VIAL

INFORME

SUBTOTAL MANTENIMIENTO DURANTE LA CONSTRUCCION

DE

8.

MEDIDAS DE MITIGACION AMBIENTAL

8.1.

SUMINISTRO Y COLOCACION DE CAPA SUPERFICIAL DE SUELO

37.66

34.01

37.66

36.44

37.66

36.44

37.66

37.66

36.44

37.66

8.2.

REVEGETACION

3,255.89

2,940.80

3,255.89

3,150.86

3,255.89

3,150.86

3,255.89

3,255.89

3,150.86

3,255.89

8.3.

ACONDICIONAMIENTO DE MATERIAL EXCEDENTE

8,252.04

7,453.46

8,252.04

7,985.85

8,252.04

7,985.85

8,252.04

8,252.04

7,985.85

8,252.04

8.4.

RESTAURACION AMBIENTAL

579.89

523.77

579.89

561.18

579.89

561.18

579.89

579.89

561.18

579.89

8.5.

REPLANTACION DE CACTUS

231.48

209.08

231.48

224.02

231.48

224.02

231.48

231.48

224.02

231.48

8.6.

SEALIZACIN VERTICAL AMBIENTAL (80 X 60 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.7.

POSTES DE SEALIZACION - COLOCACIN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.8.

RESCATE Y MONITOREO ARQUELOGICO

1,182.83

1,068.36

1,182.83

1,144.67

1,182.83

1,144.67

1,182.83

1,182.83

1,144.67

1,182.83

13,539.79

12,229.48

13,539.79

13,103.02

13,539.79

13,103.02

13,539.79

13,539.79

13,103.02

13,539.79

SUBTOTAL MEDIDAS DE MITIGACION AMBIENTAL


9.

SERVICIOS PARA LA SUPERVISION

9.1.

SERVICIO PARA ALIMENTACION

8,055.52

7,275.95

8,055.52

7,795.66

8,055.52

7,795.66

8,055.52

8,055.52

7,795.66

8,055.52

9.2.

MANTENIMIENTO, LUBRICANTES Y COMBUSTIBLES

1,685.05

1,521.98

1,685.05

1,630.69

1,685.05

1,630.69

1,685.05

1,685.05

1,630.69

1,685.05

9.3.

ALQUILER VIVIENDA/OFICINA INGENIERO

4,727.07

4,269.61

4,727.07

4,574.58

4,727.07

4,574.58

4,727.07

4,727.07

4,574.58

4,727.07

9.4.

PROVISION DE GRUPO ELECTROGENO, 50 KVA

4,236.18

3,826.23

4,236.18

4,099.53

4,236.18

4,099.53

4,236.18

4,236.18

4,099.53

4,236.18

9.5.

PROVISION DE VAGONETA DOBLE TRACCION

6,685.25

6,038.29

6,685.25

6,469.59

6,685.25

6,469.59

6,685.25

6,685.25

6,469.59

6,685.25

9.6.

PROVISION DE CMTA DOBLE TRACCION; DOBLE CABINA

8,022.30

7,245.95

8,022.30

7,763.51

8,022.30

7,763.51

8,022.30

8,022.30

7,763.51

8,022.30

CUADRO DE INVERSIONES / FLUJO DE CAJA


PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY
Moneda: Dlares Americanos
ITEM

Descripcin / MESES
SUBTOTAL SERVICIOS PARA LA SUPERVISION

27

28

29

30

31

32

33

34

35

36

33,411.35

30,177.99

33,411.35

32,333.56

33,411.35

32,333.56

33,411.35

33,411.35

32,333.56

33,411.35

10.

ESTACION DE PESAJE Y PEAJE

10.1.

ESTACION DE PESAJE Y PEAJE

14,265.87

12,885.30

14,265.87

13,805.68

14,265.87

13,805.68

14,265.87

14,265.87

13,805.68

14,265.87

SUBTOTAL ESTACION DE PESAJE Y PEAJE

14,265.87

12,885.30

14,265.87

13,805.68

14,265.87

13,805.68

14,265.87

14,265.87

13,805.68

14,265.87

11.

SITIOS CRITICOS

11.1.

EXCAVACION PARA OBRAS DE DRENAJE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.2.

EXCAVACION PARA ENCAUCES Y CANALIZACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.3.

RELLENO Y COMPACTADO PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.4.

HORMIGON TIPO "A" R = 21 MPA

134,949.88

60,945.11

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.5.

HORMIGON TIPO "E" R = 11 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.6.

HORMIGON CICLOPEO (40 % DE PIEDRA DESPLAZADORA)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.7.

ACERO DE REFUERZO FY = 420 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.8.

CUNETA DE CORTE DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

241,205.65

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.9.

ZANJAS DE CORONAMIENTO DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

192,957.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.10.

CUNETA DE BANQUINA DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

486,988.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.11.

IMPRIMACION PARA PROTECCION DE BANQUINAS

0.00

30,975.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.12.

ZAMPEADO DE PIEDRA CON MORTERO DE CEMENTO E = 0.25 M

0.00

16,890.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.13.

0.00

0.00

226,499.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.14.

SUBDREN LONGITUDINAL DE CUNETA DE CORTE


SUBDREN LONGITUDINAL DE BANQUINA CON TUBERIA DE 6" FLEXIBLE
INC. EXCAVACION

0.00

204,118.31

340,197.19

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.15.

SUBDREN LONGITUDINAL PROFUNDO (INC. EXCAVACION)

0.00

416,265.12

416,265.12

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.16.

EXCAVACION PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.17.

MANTA GEOTEXTIL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.18.

GEOMEMBRANA IMPERMEABLE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.19.

MATERIAL GRANULAR TIPO FILTRO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.20.

GAVION TIPO CAJON

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.21.

DRENAJE HORIZONTAL PROFUNDO (DHP)

14,178.43

12,806.33

14,178.43

13,721.07

14,178.43

13,721.07

14,178.43

14,178.43

13,721.07

13,263.70

11.22.

HORMIGON PROYECTADO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

463,181.22

790,132.66

11.23.

MALLA ELECTROSOLDADA

26,023.46

23,505.06

26,023.46

25,184.00

26,023.46

25,184.00

26,023.46

26,023.46

25,184.00

26,023.46

11.24.

ESCOLLERADO

11,767.81

10,628.99

11,767.81

11,388.21

11,767.81

11,388.21

11,767.81

11,767.81

11,388.21

11,767.81

11.25.

DESQUINCHE DE ROCAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.26.

MURO DE TIERRA ARMADA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.27.

IMPRIMACION PARA MURO DE TIERRA ARMADA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.28.

DREN FRANCES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.29.

TRINCHERA DRENANTE INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.30.

PROTECCION DE TALUDES (TRUMER)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

186,919.59

1,697,286.01

1,034,931.12

50,293.27

51,969.71

50,293.27

51,969.71

51,969.71

513,474.48

841,187.63

SUBTOTAL SITIOS CRITICOS


TOTAL DEL PERIODO
TOTAL
PORCENTAJE DE AVANCE FINANCIERO

Certificado mensual
Restitucin anticipo
Garanta de Buena Ejecucin (10 %)
Monto real de pago
Monto acumulado
Devolicin de Anticipo

937,660.38

2,201,836.66

1,793,447.87

3,347,784.01

791,078.97

156,234.87

241,997.99

286,303.40

1,038,250.92

1,104,835.81

116,104,199.18

118,306,035.84

120,099,483.71

123,447,267.72

124,238,346.69

124,394,581.56

124,636,579.55

124,922,882.95

125,961,133.87

127,065,969.68

86.05%

87.69%

89.02%

91.50%

92.08%

92.20%

92.38%

92.59%

93.36%

94.18%

937,660.38

2,201,836.66

1,793,447.87

3,347,784.01

791,078.97

156,234.87

241,997.99

286,303.40

1,038,250.92

1,104,835.81

187,532.08

440,367.33

358,689.57

669,556.80

158,215.79

31,246.97

48,399.60

57,260.68

207,650.18

220,967.16

93,766.04

220,183.67

179,344.79

334,778.40

79,107.90

15,623.49

24,199.80

28,630.34

103,825.09

110,483.58

656,362.27

1,541,285.66

1,255,413.51

2,343,448.81

553,755.28

109,364.41

169,398.59

200,412.38

726,775.64

773,385.07

108,256,782.89

109,798,068.55

111,053,482.06

113,396,930.87

113,950,686.15

114,060,050.55

114,229,449.15

114,429,861.53

115,156,637.17

115,930,022.24

CUADRO DE INVERSIONES / FLUJO DE CAJA


PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY
Moneda: Dlares Americanos
ITEM

Descripcin / MESES

37

38

39

40

41

42

43

44

45

46

47

1.

MOVIMIENTO DE TIERRAS

1.1.

DESBROCE, DESBOSQUE, DESTRONQUE Y LIMPIEZA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.2.

EXCAVACION COMUN 1 CAT.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.3.

EXCAVACION ROCA BLANDA 2 CAT.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.4.

EXCAVACION EN ROCA DURA 3 CAT.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.5.

SOBREACARREO PARA D>300 M

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.6.

CONFORMACION DE TERRAPLEN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.7.

REMOCION DE DERRUMBES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL MOVIMIENTO DE TIERRAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.

PAVIMENTO

2.1.

MEJORAMIENTO DE SUBRASANTE - INCLUYE TRANSPORTE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.2.

CAPA SUBBASE - INCLUYE TRANSPORTE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.3.

CAPA BASE - INCLUYE TRANSPORTE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.4.

IMPRIMACION BITUMINOSA - EJECUCION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.5.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.6.

RIEGO LIGA - EJECUCION


PREPARACION Y COLOCACION CARPETA CON CONCRETO ASFALTICO
NORMAL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.7.

CONTRO DEFLECTOMETRO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.8.

PROVISIN DE ASFALTO DILUIDO/EMULSION P/IMPRIMACIN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.9.

PROVISIN DE ASFALTO DILUIDO/EMULSION P/RIEGO DE LIGA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.10.

PROVISIN DE CEMENTO ASFLTICO (CONVENCIONAL)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL PAVIMENTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.

DRENAJE

3.1.

EXCAVACION PARA OBRAS DE DRENAJE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.2.

EXCAVACION PARA ENCAUCES Y CANALIZACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.3.

RELLENO Y COMPACTADO PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.4.

RECUPERACIN DE ALCANTARILLAS METLICAS EXISTENTES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.5.

DEMOLICION DE ESTRUCTURAS DE H EXISTENTE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.6.

HORMIGON TIPO "A" R = 21 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.7.

HORMIGON TIPO "E" R = 11 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.8.

HORMIGON CICLOPEO (40 % DE PIEDRA DESPLAZADORA)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.9.

ACERO DE REFUERZO FY = 420 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.10.

ALCANTARILLA SIMPLE CON TUBO DE H A, D = 1.00 M

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.11.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.13.

ALCANTARILLA SIMPLE DE TUBO DE H A, D = 1.50 M


CUNETA EN CORTE O PIE DE TERRAPLEN TRAPEZOIDAL, REVESTIDA
INCLUYE EXCAVACION
CUNETA DE BANQUINA EN CORTE O TERRAPLEN REVESTIDA INCLUYE
EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.14.

ZANJAS DE CORONAMIENTO REVESTIDAS INCLUYE EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.15.

GAVION TIPO CAJON

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.16.

GAVIONES TIPO COLCHONETA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.17.

ZAMPEADO DE PIEDRA CON MORTERO DE CEMENTO E = 0.25 M

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.18.

SUBDREN LONGITUDINAL CON TUBERIA DE 6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.19.

BORDILLO TIPO CUNETA CON HORMIGON TIPO "B" (0.10 X 0.30 M)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.20.

MANTA GEOTEXTIL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.21.

MATERIAL GRANULAR TIPO FILTRO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.22.

TUBERIA PERFORADA PVC D = 6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.23.

ESCOLLERADO TIPO ENROCADO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.24.

CUNETA DE CORTE DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.12.

CUADRO DE INVERSIONES / FLUJO DE CAJA


PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY
Moneda: Dlares Americanos
ITEM

Descripcin / MESES

37

38

39

40

41

42

43

44

45

46

47

3.25.

ZANJAS DE CORONAMIENTO DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.26.

CUNETA DE BANQUINA DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.27.

SUBDREN LONGITUDINAL DE BANQUINA CON TUBERIA DE 6" FLEXIBLE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.28.

DREN FRANCES

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL DRENAJE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.

INFRAESTRUCTURA

4.1.1.

HORMIGON TIPO "A" R = 21 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.2.

HORMIGON TIPO "P" 35 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.3.

HORMIGON TIPO "E" R = 11 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.4.

ACERO DE REFUERZO FY = 420 MPA


TENDONES DE ACERO PARA PRETENSADO 12 CABLES DE 1/2" G-270 KSI
ASTM 416

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.7.

VAINAS PARA CABLES D = 7 CM (INCLUYE LECHADA DE CEMENTO)


TESADO DE CABLES DE UN SOLO EXTREMO INCLUYE LOS DOS ANCLAJES Y
PLACAS DE ANCAJE POR CABLE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.8.

LANZAMIENTO DE OBRA FALSA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.9.

APOYOS DE NEOPRENO COMPUESTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.10.

APOYO DE CARTON ASFALTICO DE 3 MM

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.11.

PILOTE A CIELO ABIERTO D = 1.20 M INCLUYE EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.12.

PILOTE A CIELO ABIERTO D = 1.40 M INCLUYE EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.13.

EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.14.

EXCAVACION EN ROCA PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.15.

MATERIAL DRENANTE (INCLUYE MANTA GEOTEXTIL)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.16.

TUBERIA DRENANTE PVC D = 4"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.17.

RELLENO Y COMPACTADO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.18.

DEMOLICION DE ESTRUCTURAS DE H EXISTENTE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL INFRAESTRUCTURA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.1.5.
4.1.6.

4.2.

SUPERESTRUCTURA

4.2.1.

HORMIGON TIPO "A" 25 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.2.

HORMIGON TIPO "P" 35 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.2.3.

ACERO DE REFUERZO FLUENCIA DE 420 MPA


TENDONES DE ACERO PARA PRETENSADO 12 CABLES DE 1/2" G-270 KSI
ASTM 416

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

41,549.42

42,934.40

42,934.40

38,779.45

42,934.40

41,549.42

42,934.40

37,394.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15,637.58

33,509.09

34,626.06

30,158.19

0.00

0.00

0.00

4.2.6.

VAINAS PARA CABLES D = 7 CM (INCLUYE LECHADA DE CEMENTO)


JUNTAS DE DILATACION CON PERFIL -JENEE JJ2540VV EPDM CON LABIOS
POLIMERICOS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

150,637.60

0.00

0.00

0.00

4.2.7.

CAPA DE RODADURA DE HORMIGN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

105,959.00

0.00

0.00

0.00

4.2.8.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7,038.00

0.00

0.00

0.00

4.2.9.

DRENAJE TUBO PVC D = 4"


TESADO DE CABLES DE UN SOLO EXTREMO INCLUYE LOS DOS ANCLAJES Y
PLACAS DE ANCAJE POR CABLE

4.2.10.

LANZAMIENTO DE OBRA FALSA PARA VIGA

4.2.11.

BARANDADO TIPO P3

4.2.4.
4.2.5.

SUBTOTAL SUPERESTRUCTURA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

182,855.59

76,681.38

0.00

79,283.52

81,926.30

81,926.30

73,997.95

81,926.30

79,283.52

81,926.30

79,283.52

81,926.30

39,641.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

280,470.15

0.00

120,832.94

124,860.70

124,860.70

112,777.41

140,498.28

154,342.03

159,486.76

410,470.78

264,781.89

396,793.29

0.00

5.

OBRAS COMPLEMENTARIAS

5.1.

EXCAVACION PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.2.

RELLENO Y COMPACTADO PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CUADRO DE INVERSIONES / FLUJO DE CAJA


PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY
Moneda: Dlares Americanos
ITEM

Descripcin / MESES

37

38

39

40

41

42

43

44

45

46

47

5.3.

HORMIGON TIPO "A" R- 21 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.4.

ACERO DE REFUERZO FY = 420 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.5.

HORMIGON CICLOPEO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.6.

DRENAJE LATERAL TUBERIA PVC DE 6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.7.

ZAMPEADO DE PIEDRA CON MORTERO DE CEMENTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.8.

HORMIGON TIPO "E" R = 11 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.9.

BORDILLO TIPO CUNETA CON HORMIGON TIPO "B" (0.10 X 0.30 M)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.10.

MANTA GEOTEXTIL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.11.

MATERIAL GRANULAR TIPO FILTRO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.12.

TUBERIA PERFORADA PVC DE 6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL OBRAS COMPLEMENTARIAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.

SEALIZACION

6.1.

SEALIZACION INFORMATIVA 180 X 120

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

35,542.94

0.00

6.2.

SEALIZACION INFORMATIVA ESPECIAL 268 X 148

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25,940.67

0.00

6.3.

SEALIZACION REGLAMENTARIA (60 X 90 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

44,142.84

0.00

6.4.

SEALIZACION REGLAMENTARIA (75 X 110 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

19,994.72

0.00

6.5.

SEALIZACION PREVENTIVA (60 X 60 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

38,786.00

0.00

6.6.

SEALIZACION PREVENTIVA (80 X 80 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18,275.04

0.00

6.7.

SEALIZACION DE IDENTIFICACION VIAL 50 X 55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3,171.22

0.00

6.8.

POSTES DE SEALIZACION - COLOCACIN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

57,786.12

6.9.

PINTADO DE LA SUPERFICIE DE RODADURA DE 0.12 M

28,368.86

29,314.49

29,314.49

26,477.60

29,314.49

28,368.86

29,314.49

28,368.86

29,314.49

29,314.49

945.63

6.10.

TACHAS REFLECTIVAS (OJOS DE GATO)

0.00

0.00

0.00

0.00

0.00

0.00

4,158.93

41,589.25

42,975.56

42,975.56

1,386.31

6.11.

DELINEADORES DE CALZADA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.12.

SEAL HORIZONTAL TIPO SONORIZADOR

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

32,819.04

6.13.

MOJONES DE KILOMETRAJE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7,784.68

6.14.

DEFENSAS METALICAS TIPO FLEX BEAM

0.00

0.00

0.00

0.00

0.00

8,172.27

12,667.01

12,258.40

12,667.01

12,667.01

408.61

6.15.

BARRERA LATERAL RIGIDA NEW JERSEY UNA CARA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

808,225.60

28,368.86

29,314.49

29,314.49

26,477.60

29,314.49

36,541.13

46,140.43

82,216.51

84,957.06

270,810.49

909,355.99

46,699.34

48,255.99

48,255.99

43,586.05

48,255.99

46,699.34

48,255.99

46,699.34

48,255.99

48,255.99

1,556.65

46,699.34

48,255.99

48,255.99

43,586.05

48,255.99

46,699.34

48,255.99

46,699.34

48,255.99

48,255.99

1,556.65

SUBTOTAL SEALIZACION
7.
7.1.

MANTENIMIENTO DURANTE LA CONSTRUCCION


MATENIMIENTO DURANTE LA CONSTRUCCION
MANTENIMIENTO VIAL

INFORME

SUBTOTAL MANTENIMIENTO DURANTE LA CONSTRUCCION

DE

8.

MEDIDAS DE MITIGACION AMBIENTAL

8.1.

SUMINISTRO Y COLOCACION DE CAPA SUPERFICIAL DE SUELO

36.44

37.66

37.66

34.01

37.66

36.44

37.66

36.44

37.66

37.66

1.22

8.2.

REVEGETACION

3,150.86

3,255.89

3,255.89

2,940.80

3,255.89

3,150.86

3,255.89

3,150.86

3,255.89

3,255.89

105.03

8.3.

ACONDICIONAMIENTO DE MATERIAL EXCEDENTE

7,985.85

8,252.04

8,252.04

7,453.46

8,252.04

7,985.85

8,252.04

7,985.85

8,252.04

8,252.04

266.20

8.4.

RESTAURACION AMBIENTAL

561.18

579.89

579.89

523.77

579.89

561.18

579.89

561.18

579.89

579.89

18.71

8.5.

REPLANTACION DE CACTUS

224.02

231.48

231.48

209.08

231.48

224.02

231.48

224.02

231.48

231.48

7.47

8.6.

SEALIZACIN VERTICAL AMBIENTAL (80 X 60 CM)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.7.

POSTES DE SEALIZACION - COLOCACIN

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.8.

RESCATE Y MONITOREO ARQUELOGICO

1,144.67

1,182.83

1,182.83

1,068.36

1,182.83

1,144.67

1,182.83

1,144.67

1,182.83

1,182.83

38.16

13,103.02

13,539.79

13,539.79

12,229.48

13,539.79

13,103.02

13,539.79

13,103.02

13,539.79

13,539.79

436.77
259.86

SUBTOTAL MEDIDAS DE MITIGACION AMBIENTAL


9.

SERVICIOS PARA LA SUPERVISION

9.1.

SERVICIO PARA ALIMENTACION

7,795.66

8,055.52

8,055.52

7,275.95

8,055.52

7,795.66

8,055.52

7,795.66

8,055.52

8,055.52

9.2.

MANTENIMIENTO, LUBRICANTES Y COMBUSTIBLES

1,630.69

1,685.05

1,685.05

1,521.98

1,685.05

1,630.69

1,685.05

1,630.69

1,685.05

1,685.05

54.36

9.3.

ALQUILER VIVIENDA/OFICINA INGENIERO

4,574.58

4,727.07

4,727.07

4,269.61

4,727.07

4,574.58

4,727.07

4,574.58

4,727.07

4,727.07

152.49

9.4.

PROVISION DE GRUPO ELECTROGENO, 50 KVA

4,099.53

4,236.18

4,236.18

3,826.23

4,236.18

4,099.53

4,236.18

4,099.53

4,236.18

4,236.18

136.65

9.5.

PROVISION DE VAGONETA DOBLE TRACCION

6,469.59

6,685.25

6,685.25

6,038.29

6,685.25

6,469.59

6,685.25

6,469.59

6,685.25

6,685.25

215.65

9.6.

PROVISION DE CMTA DOBLE TRACCION; DOBLE CABINA

7,763.51

8,022.30

8,022.30

7,245.95

8,022.30

7,763.51

8,022.30

7,763.51

8,022.30

8,022.30

258.78

CUADRO DE INVERSIONES / FLUJO DE CAJA


PROYECTO: ESTUDIO TESA Y EI DE LA CARRETERA CARANAVI - GUANAY
Moneda: Dlares Americanos
ITEM

Descripcin / MESES
SUBTOTAL SERVICIOS PARA LA SUPERVISION

37

38

39

40

41

42

43

44

45

46

32,333.56

33,411.35

33,411.35

30,177.99

33,411.35

32,333.56

33,411.35

32,333.56

33,411.35

33,411.35

47
1,077.79

10.

ESTACION DE PESAJE Y PEAJE

10.1.

ESTACION DE PESAJE Y PEAJE

13,805.68

14,265.87

14,265.87

12,885.30

14,265.87

13,805.68

14,265.87

13,805.68

14,265.87

14,265.87

460.19

SUBTOTAL ESTACION DE PESAJE Y PEAJE

13,805.68

14,265.87

14,265.87

12,885.30

14,265.87

13,805.68

14,265.87

13,805.68

14,265.87

14,265.87

460.19

11.

SITIOS CRITICOS

11.1.

EXCAVACION PARA OBRAS DE DRENAJE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.2.

EXCAVACION PARA ENCAUCES Y CANALIZACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.3.

RELLENO Y COMPACTADO PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.4.

HORMIGON TIPO "A" R = 21 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.5.

HORMIGON TIPO "E" R = 11 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.6.

HORMIGON CICLOPEO (40 % DE PIEDRA DESPLAZADORA)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.7.

ACERO DE REFUERZO FY = 420 MPA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.8.

CUNETA DE CORTE DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.9.

ZANJAS DE CORONAMIENTO DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.10.

CUNETA DE BANQUINA DE HORMIGON Y GEOWEB INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.11.

IMPRIMACION PARA PROTECCION DE BANQUINAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.12.

ZAMPEADO DE PIEDRA CON MORTERO DE CEMENTO E = 0.25 M

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.13.

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.14.

SUBDREN LONGITUDINAL DE CUNETA DE CORTE


SUBDREN LONGITUDINAL DE BANQUINA CON TUBERIA DE 6" FLEXIBLE
INC. EXCAVACION

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.15.

SUBDREN LONGITUDINAL PROFUNDO (INC. EXCAVACION)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.16.

EXCAVACION PARA ESTRUCTURAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.17.

MANTA GEOTEXTIL

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.18.

GEOMEMBRANA IMPERMEABLE

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.19.

MATERIAL GRANULAR TIPO FILTRO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.20.

GAVION TIPO CAJON

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.21.

DRENAJE HORIZONTAL PROFUNDO (DHP)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.22.

HORMIGON PROYECTADO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.23.

MALLA ELECTROSOLDADA

20,986.66

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.24.

ESCOLLERADO

5,694.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.25.

DESQUINCHE DE ROCAS

2,917.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.26.

MURO DE TIERRA ARMADA

1,788,124.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.27.

IMPRIMACION PARA MURO DE TIERRA ARMADA

2,940.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.28.

DREN FRANCES

153,628.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.29.

TRINCHERA DRENANTE INC. EXCAVACION

264,911.85

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11.30.

PROTECCION DE TALUDES (TRUMER)

954,455.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SUBTOTAL SITIOS CRITICOS

3,193,658.38

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

TOTAL DEL PERIODO

3,448,801.77

263,648.18

263,648.18

238,133.84

279,285.76

296,824.76

315,100.18

598,628.89

459,211.94

777,076.76

912,887.38

130,514,771.45

130,778,419.63

131,042,067.81

131,280,201.65

131,559,487.41

131,856,312.17

132,171,412.35

132,770,041.24

133,229,253.18

134,006,329.94

134,919,217.32

96.74%

96.93%

97.13%

97.30%

97.51%

97.73%

97.96%

98.41%

98.75%

99.32%

100.00%

3,448,801.77

263,648.18

263,648.18

238,133.84

279,285.76

296,824.76

315,100.18

598,628.89

459,211.94

777,076.76

912,887.38

689,760.35

52,729.64

52,729.64

47,626.77

55,857.15

59,364.95

63,020.04

119,725.78

91,842.39

155,415.35

182,577.48

344,880.18

26,364.82

26,364.82

23,813.38

27,928.58

29,682.48

31,510.02

59,862.89

45,921.19

77,707.68

91,288.74

2,414,161.24

184,553.73

184,553.73

166,693.69

195,500.03

207,777.33

220,570.13

419,040.22

321,448.36

543,953.73

639,021.16

118,344,183.48

118,528,737.21

118,713,290.93

118,879,984.62

119,075,484.65

119,283,261.98

119,503,832.10

119,922,872.33

120,244,320.68

120,788,274.42

121,427,295.58

TOTAL
PORCENTAJE DE AVANCE FINANCIERO

Certificado mensual
Restitucin anticipo
Garanta de Buena Ejecucin (10 %)
Monto real de pago
Monto acumulado
Devolicin de Anticipo

134,919,217.31