EJECUTA
MODALIDAD
ADMAINISTRACION DIRECTA
PRESUPUESTO
:
:
S/.
190,587.83
02 MESES
DURACION
MES 01
Item
Descripcin
01
CONSTRUCCION DE INFRAESTRUCTERA
01.01.00
OBRAS PROVISIONALES
01.01.01
01.01.00
OBRAS PROVISIONALES
01.01.02
S-1
MONTO
S-2
MONTO
MES 02
S-3
MONTO
S-4
MONTO
S-1
MONTO
155,581.90
800.00
p
glb
800.00 s/.
800.00
100%
671.77
100%
148.50
50%
2,265.30
100%
968.77
p
m2
671.77 s/.
p
01.01.03
TRAZO Y REPLANTEO
m2
297.00 s/.
01.02.00
MOVIMIENTO DE TIERRAS
01.02.01
m2
2,265.30 s/.
01.02.04
m3
469.89 s/.
01.02.00
CONCRETO
01.02.01
148.50
50%
469.89
100%
1,908.02
100%
1,426.26
100%
2,735.19
p
p
3,334.28
p
m3
1,908.02 s/.
p
01.02.02
01.06.00
01.06.01
01.06.00
01.06.01
01.08.00
01.08.01
m3
1,426.26 s/.
8,255.97
p
m2
8,255.97 s/.
8,255.97
100%
340.10
p
und
340.10 s/.
340.10
100%
75,589.03
p
und
1,027.32 s/.
1,027.32
100%
5,133.59
100%
420.84
100%
42,478.13
100%
3,695.16
100%
2,486.30
100%
20,347.69
100%
p
01.08.02
und
5,133.59 s/.
p
01.08.03
MONTAJE DE TIJERALES
und
420.84 s/.
p
01.08.04
m2
42,478.13 s/.
p
01.08.05
3,695.16 s/.
p
01.08.03
und
2,486.30 s/.
p
01.08.04
und
20,347.69 s/.
S-2
MONTO
S-3
MONTO
EJECUTA
MODALIDAD
ADMAINISTRACION DIRECTA
PRESUPUESTO
:
:
S/.
190,587.83
02 MESES
DURACION
MES 01
Item
Descripcin
01.09.00
01.09.01.
S-1
MONTO
S-2
MONTO
MES 02
S-3
MONTO
S-4
MONTO
S-1
MONTO
S-2
MONTO
8,174.75
p
m2
6,731.23 s/.
6,731.23
100%
460.76
100%
982.76
100%
10,288.09
100%
67.13
100%
12,424.97
100%
12,260.78
100%
3,601.44
100%
265.60
100%
1,115.10
100%
490.00
100%
50.00
100%
200.00
100%
150.00
100%
p
01.09.02
m2
460.76 s/.
p
01.09.02
TARRAJEO PRIMARIO RAYADO CON CEMENTO ARENA 1:4 (MALLA METALICA) FACHADA
m2
982.76 s/.
01.10.00
CIELORRASOS
01.10.01
01.09.00
PISOS Y VEREDAS
01.09.01.
m2
67.13 s/.
01.09.02
m3
12,424.97 s/.
10,288.09
p
m2
10,288.09 s/.
28,354.32
p
p
p
01.09.02
m2
12,260.78 s/.
p
01.09.02
01.09.00
ZOCALOS Y CONTRAZOCALOS
01.09.01.
m3
3,601.44 s/.
1,380.70
p
m2
265.60 s/.
p
01.09.02
01.09.00
CARPINTERIA DE MADERA
01.09.01.
1,115.10 s/.
890.00
p
und
490.00 s/.
p
01.09.02
und
50.00 s/.
p
01.09.01.
und
200.00 s/.
p
01.09.02
01.10.00
CARPINTERIA METALICA
01.10.01
und
150.00 s/.
1,656.00
p
glb
1,656.00 s/.
S-3
MONTO
EJECUTA
MODALIDAD
ADMAINISTRACION DIRECTA
PRESUPUESTO
:
:
S/.
190,587.83
02 MESES
DURACION
MES 01
Item
Descripcin
S-1
MONTO
01.10.00
CERRAJERIA
01.10.01
und
116.04 s/.
01.10.01
und
306.04 s/.
01.09.00
VIDRIOS Y CRISTALES
01.09.01.
01.11.00
PINTURAS
01.11.01
m2
1,897.72 s/.
01.11.02
m2
3,522.93 s/.
01.11.03
m2
289.78 s/.
S-2
MONTO
MES 02
S-3
MONTO
S-4
MONTO
S-1
MONTO
S-2
MONTO
S-3
MONTO
422.08
p
p
299.68
p
p2
299.68 s/.
299.68
100%
3,522.93
100%
289.78
100%
3,291.66
100%
458.43
100%
595.09
100%
9,460.52
p
p
p
p
01.11.04
m2
3,291.66 s/.
p
01.11.05
01.12.00
INSTALACIONES ELECTRICAS
01.12.01
458.43 s/.
1,982.42
p
pto
243.36 s/.
243.36
100%
31.21
100%
265.68
100%
145.00
100%
300.00
100%
26.00
100%
376.08
100%
p
01.12.02
pto
31.21 s/.
p
01.12.03
und
265.68 s/.
p
01.12.04
und
145.00 s/.
p
01.12.05
und
300.00 s/.
p
01.12.03
THERMOMAGNETICOS DE 2x30 A
und
26.00 s/.
p
01.12.04
und
376.08 s/.
p
01.12.06
POZO DE TIERRA
und
595.09 s/.
EJECUTA
MODALIDAD
ADMAINISTRACION DIRECTA
PRESUPUESTO
:
:
S/.
190,587.83
02 MESES
DURACION
MES 01
Item
Descripcin
01.13.00
VARIOS
01.12.06
TRANSPORTE TERRESTRE
S-1
MONTO
S-2
MONTO
MES 02
S-3
MONTO
S-4
MONTO
S-1
MONTO
S-2
MONTO
S-3
MONTO
50,475.19
32.44%
650.00
p
glb
150.00 s/.
150.00
100%
p
01.13.01
und
COSTO DIRECTO
500.00 s/.
155,581.90
SUB TOTAL POR MES
4,035.57
2.59%
3,952.67
2.54%
8,255.97
16,584.31
PORSENTAJE DE AVANCE
5.31%
340.10
0.22%
75,589.03
48.58%
8,457.57
138,997.59
10.66%
89.34%
18,669.83
1990.12
16679.71
SUPERVISION (5 %)
7,779.10
829.22
6949.88
5,445.37
580.45
4864.92
LIQUIDACION (2%)
3,111.64
331.69
2779.95
PRESUPUESTO TOTAL
190,587.83
20315.89
170272.94
5.44%
MES 02
S-4
MONTO
MES 02
S-4
MONTO
1,656.00
100%
MES 02
S-4
MONTO
116.04
100%
306.04
100%
1,897.72
100%
MES 02
S-4
MONTO
500.00
4,475.80
138,997.59
89.34%
16679.71
6949.88
4864.92
2779.95
170272.94
100%
2.88%
MANTENIMIENTO DE LA RED DE BAJA TENSION ACCESO AL NUEVO TERMINAL TERRESTRE DEL DISTRITO DE SICUANI, PROVINCIA DE CANCHIS - CUSCO
EJECUTA
MODALIDAD
ADMINISTRACION DIRECTA
PRESUPUESTO
DURACION
:
:
S/.
109,183.09
35 DIAS
MES 01
Item
Descripcin
Unidad
01
OBRAS PRELIMINARES
01.01.01
02
POSTES DE C.A.C.
02.01.01
und
1377.04
02.01.02
und
12484.16
03
RETENIDAS
03.01.01
und
03.01.02
Instalacion de Retenida
und
04
ARMADOS
04.01.01
05
CONDUCTOR
05.01.01
06
PUESTA A TIERRA
06.01.01
07
ALUMBRADO PUBLICO
07.01.01
08
CODIFICACION
08.01.01
Codificacion de Estructuras
09
09.01.01
10
DISPOSICION DE RESIDUOS
10.01.01
Disposicion de Residuos
S-1
MONTO
MES 02
S-3
MONTO
S-4
MONTO
S-1
MONTO
S-2
MONTO
S-3
MONTO
Gb
545.61
545.61
100.00%
S-4
MONTO
459.01
33.33%
13861.20
918.03
66.67%
6,242.08
50.00%
6242.08
50.00%
512.06
512.06
100.00%
1246.60
1,246.60
100.00%
3,289.27
100.00%
30,914.96
100.00%
2,234.00
100.00%
1758.66
3289.27
Jgo
3289.27
30914.96
KM
30914.96
2234.00
JGO
2234.00
10596.72
JGO
10596.72
10,596.72
100.00%
460.04
100.00%
610.10
100.00%
205.75
28.57%
514.37
71.43%
5424.64
21.43%
3616.43
14.29%
460.04
UND
460.04
610.10
GB
610.10
720.12
GB
720.12
25315.00
GB
21.43%
5424.64
21.43%
5424.64
21.43%
25315.00
90,305.68
6,429.26
7.12%
12,584.75
13.94%
49,863.61
55.22%
17,297.25
19.15%
4,130.80
4.57%
0.00%
GASTO GENERALES(8.54%)
7,716.56
6,614.19
1,102.37
GASTOS DE SUPERVISION(3.47%)
3,138.35
2,690.01
448.34
GASTOS DE LIQUIDACION(2.24%)
2,022.50
1,733.57
288.93
6,000.00
5,142.86
857.14
109,183.09
93,585.51
15,597.58
TOTAL PRESUPUESTO
545.61
5424.64
1.01 Incluye conductores y accesorios complementarios reconeccciones domicialirias
S-2
MONTO
0.00%
MES 02
S-4
%
0.00%
1,102.37
448.34
288.93