Item
Descripcin
10
OBRAS PRELIMINARES
Costo al
Und.
Metrado
Precio S/.
24/07/2015
Parcial S/.
41,931.40
10.01
m2
14,255.45
0.93
13,257.57
10.02
m2
675.91
13.07
8,834.14
10.03
m2
146.73
13.07
1,917.76
10.04
m3
33.58
69.49
2,333.47
10.05
m3
158.06
10.06
m3
380.93
24.43
9,306.12
10.07
m3
409.54
15.34
6,282.34
11
11.01
PAVIMENTOS
71,667.91
MOVIMIENTO DE TIERRAS
22,679.06
11.01.01
m3
855.19
4.17
3,566.14
11.01.02
m3
427.65
25.59
10,943.56
11.01.03
m3
478.30
17.08
11.02
PAVIMENTO FLEXIBLE
8,169.36
43,473.78
11.02.01
m2
3,010.65
2.73
8,219.07
11.02.02
m2
3,010.65
11.71
35,254.71
11.03
PAVIMENTO RIGIDO
5,515.07
11.03.01
m2
381.93
2.73
1,042.67
11.03.02
m2
381.93
11.71
4,472.40
12
12.01
MUROS DE CONTENCION
35,852.94
MOVIMIENTO DE TIERRAS
35,852.94
12.01.01
m3
905.75
14.87
13,468.50
12.01.02
m3
727.16
25.54
18,571.67
12.01.03
m3
223.23
17.08
3,812.77
13
GRADERIAS Y PISOS
60,376.12
13.01
m3
1,005.65
4.17
4,193.56
13.02
m3
753.97
25.54
19,256.39
13.03
m3
314.60
24.43
7,685.68
13.04
m3
314.60
17.08
5,373.37
13.05
m2
3,310.28
7.21
23,867.12
14
VEREDAS
32,342.01
14.01
m2
1,594.58
4.41
7,032.10
14.02
m3
298.98
17.08
5,106.58
m2
1,594.58
12.67
20,203.33
14.03
15
BERMAS Y RAMPAS
12,773.79
15.01
m2
629.79
4.41
2,777.37
15.02
m3
118.09
17.08
2,016.98
15.03
m2
629.79
12.67
7,979.44
16
JARDINERAS
217,792.75
16.01
m3
3,151.92
33.53
105,683.88
16.02
m3
1,952.25
25.54
49,860.47
16.03
m3
1,499.60
24.43
36,635.23
16.04
m3
1,499.60
17.08
25,613.17
17
OBRAS DE DRENAJE
62,988.32
17.01
m3
17.02
1,102.03
33.53
36,951.07
440.80
1.71
753.77
17.03
17.04
17.05
17.06
18
18.01
CAMA DE APOYO M/PROPIO ZARANDEADO E=0.10 M. P/TUBO D.N. 200 A 400 MM.
RELLENO PROTECTOR DE TUBERIA 0.30M. D.N. 200 A 400 MM M/PROPIO
ZARANDEADO
RELLENO DE ZANJA T.N. P/TUBO D.N. 200 A 400 MM.
ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO
440.80
8.20
3,614.56
440.80
23.42
10,323.54
m
m3
440.80
121.25
21.04
17.08
9,274.43
2,070.95
VARIOS
6,201.05
m2
2,441.36
2.54
Costo Directo
SON :
6,201.05
541,926.29
Fecha :