G.DE DISEO
NIVEL DIN.
DESN. TOP.
ALT. TANQUE
L Fo.Go.
L PVC
LONG. COL.
l.p.s.
mts.
mts.
mts.
mts.
mts.
mts.
DIAMETRO
NOMINAL (d)
mts.
pulg.
[1]
[2]
AREA
(A)
GASTO (G)
A=3.1416(d)^2/4 MAX. DIAR.
m/seg.
[3]=3.1416[1]^2/4
[4]=G.M.D./1000
VELOCIDAD
(V) m/seg.
>0.6 <3.0
LONGITUD
DE LINEA
(L) mts.
[5]=[4]/[3]
[6]
CONSTANTE
DE MANNING (K)
PVC
Fo.Go.
[7]
PERDIDAS
EN LA LINEA
hf = LKQ = m.
[8]=[6]x[7]x[4]^2
CALC
PRS. TRAB.
TUBERIA
Kg./cm.
VOLUMEN
PLANTILLA
RELL. VOLT.
RELL. COM. 1
RELL. COM. 2
M/ML.
M/ML.
M/ML.
M/ML.
M/ML.
0.3850
0.0390
0.13750
0.19032
0.32782
0.6000
0.0600
0.31500
0.22058
0.5355
4
6
8
10
12
0.6000
0.7700
0.6625
0.9600
1.0525
0.0600
0.0700
0.0750
0.0800
0.0850
0.02973
0.38500
0.41250
0.44000
0.46750
0.23210
0.30000
0.343558
0.39092
0.43977
0.53215
0.60253
0.75000
0.85092
0.90582
[15]
2
3
4
6
8
10
12
P.V.C METRICO
P.V.C. INGLES
C-5
C-7
C-10 RD-41 RD-32.5 RD-26
0.22
0.33
0.41
0.50
0.64
0.24
0.29
0.46
0.56
0.69
0.87
0.22
0.33
0.41
0.63
0.78
0.97
1.22
0.32
0.46
0.59
0.65
0.27
0.32
0.4
0.58
0.75
0.20
0.28
0.33
0.49
0.73
0.94
1.03
ESP.
0.635
0.635
0.635
0.635
0.635
0.635
0.635
ASBESTO CEMENTO
C-5
1.05
1.00
1.05
1.1
1.65
1.7
C-7
1.20
1.10
1.20
1.35
1.90
2.00
[16]
[17]
C-10
1.35
1.30
1.50
1.70
2.15
2.60
[24]
DIAMETRO ECONOMICO
MOD. ELAT.
DEL AGUA
Ea = 20,670
ESPESOR DE
LA PARED (e)
cm.
%
%
%
DIAMETRO
NOMINAL (d)
MM.
PULG.
[25]
[26]
POTEN.
MOTOR
H.P.
[14]
P.V.C METRICO
C-5
C-7
P.V.C. INGLES
DIAMETRO ECONOMICO
[k]
C-5
0.0
C-7
C-10
CONSTANTE MANNING
P.V.C. ASB.C. Fo.Go. Ac.
6515.13 8048.88
16781.26
779.44 962.62
1887.85
161.63 199.62
391.47
19.26
23.69
48.65
4.11
5.07
9.95
1.24
1.54
3.0
0.4585 0.5884
1.15
TABLA DE C
PROYECTO DE:
MUNICIPIO :
CALCUL:
H.P.
" .
ALTURA
TANQUE
(mts.)
LONGITUD
COLUMNA
(mts.)
[9]
[10]
[11]
PERDIDAS
COLUMNA
hf col. = LKQ
12=[11]x[7]x[4]^2
TOT. PERD.
hft = hf+10%hf+DT
+AT+LC+hf col.
POT. MOTOR
H.P.= Qhft/76n
(mts.)
[13]=8+8X.1+12
[14]=[4]x[13]/76x0.70
CARGA NORM.
DE OPERACION
(mts.)
PRESION
TOTAL
PT = RT+CNO
[18]
DE LA CONDUCCION
EPTO
SOBRE PRES.
h= 145V/[( 1+Ead
/Ete)^]
SOBRE PRES.
ABS. POR VALV.
RP = 80 % h
SOBRE PRES.
ABS. POR TUB.
RT = 20 % h
[19]=145[3]/(1+[17][16]/[18][16]^1/ [20]=19x.8
DIAM. 50 mm.
UNID.
70 M3
0 M3
30 M3
M3
ML
M3
M3
CANT.
[21]=[19]x0.20
CED. 40
DIAM. 75 mm.
P.UNIT.
17.00
77.70
CED. 40
[23]=[21]+[22]
IMPORTE
19.00
250.00
33.30
250.00
8,325.00
47.25
250.00
11,812.50
24.50
11.10
24.50
271.95
15.75
24.50
385.88
150.00
185.00
40.00
7,400.00
225.00
89.34
20,101.50
35.00
40.70
35.00
1,424.50
67.50
45.00
3,037.50
15.00
58.28
15.00
874.13
86.63
15.00
1,299.38
19.00
IMPORTE
CED. 40
P.UNIT.
45.00
CANT.
[22]=[8]+[8]x0.1+[9]+[10]
1,320.90
CANT.
P.UNIT.
17.00
110.25
19,616.48
IMPORTE
1,874.25
19.00
38,511.00
RESUMEN
CONSUMO
DE ENERGIA
C=0.7457xHP
COSTO BOMBEO
POR HORA
C.B. = Cx0.3111
CARGO ANUAL
DE BOMBEO
C.A. = C.B.x8760
COSTO TOTAL
DE CONDUCCION.
(C.C.)
AMORTIZACION
DE CONDC.
A a. = C.C.x.5088
DE BOMBEO +AMOTIZACION
[27]=0.7457x[14]
[28]=[27]x0.3111
[29]=[28]x8760
[30]
[31]=[30]x0.5088
[32]=[29]+[31]
DIAMETRO ECONOMICO
COSTO ANUAL
C.T.=C.A.+A.a.
DIAMETRO ECONOMICO