Está en la página 1de 4

DATOS

CALCULO DE LA POTENCIA DEL EQ

G.DE DISEO
NIVEL DIN.
DESN. TOP.
ALT. TANQUE
L Fo.Go.
L PVC
LONG. COL.

l.p.s.
mts.
mts.
mts.
mts.
mts.
mts.

DIAMETRO
NOMINAL (d)
mts.
pulg.

[1]

[2]

AREA

(A)

GASTO (G)
A=3.1416(d)^2/4 MAX. DIAR.
m/seg.

[3]=3.1416[1]^2/4

[4]=G.M.D./1000

VELOCIDAD
(V) m/seg.
>0.6 <3.0

LONGITUD
DE LINEA
(L) mts.

[5]=[4]/[3]

[6]

CONSTANTE
DE MANNING (K)
PVC
Fo.Go.

[7]

PERDIDAS
EN LA LINEA
hf = LKQ = m.

[8]=[6]x[7]x[4]^2

CALC
PRS. TRAB.
TUBERIA
Kg./cm.

PORCENTAJES DE VOLUMEN DE ZANJAS


DIAM.
PULG.
2

VOLUMEN

PLANTILLA

RELL. VOLT.

RELL. COM. 1

RELL. COM. 2

M/ML.

M/ML.

M/ML.

M/ML.

M/ML.

0.3850

0.0390

0.13750

0.19032

0.32782

0.6000

0.0600

0.31500

0.22058

0.5355

4
6
8
10
12

0.6000
0.7700
0.6625
0.9600
1.0525

0.0600
0.0700
0.0750
0.0800
0.0850

0.02973
0.38500
0.41250
0.44000
0.46750

0.23210
0.30000
0.343558
0.39092
0.43977

0.53215
0.60253
0.75000
0.85092
0.90582

[15]

2
3
4
6
8
10
12

P.V.C METRICO
P.V.C. INGLES
C-5
C-7
C-10 RD-41 RD-32.5 RD-26

0.22
0.33
0.41
0.50
0.64

0.24
0.29
0.46
0.56
0.69
0.87

0.22
0.33
0.41
0.63
0.78
0.97
1.22

0.32
0.46
0.59
0.65

0.27
0.32
0.4
0.58
0.75

0.20
0.28
0.33
0.49
0.73
0.94
1.03

Fo.Go. Fo. No.


CED.40

ESP.

0.635
0.635
0.635
0.635
0.635
0.635
0.635

ASBESTO CEMENTO
C-5

1.05
1.00
1.05
1.1
1.65
1.7

C-7

1.20
1.10
1.20
1.35
1.90
2.00

[16]

[17]

C-10

1.35
1.30
1.50
1.70
2.15
2.60

EXCAVACION EN MATERIAL TIPO "B" EN SECO


EXCAVACION EN MATERIAL TIPO "B" EN AGUA
EXCAVACION EN MATERIAL TIPO "C"
PLANTILLA APISONADA
SUMINISTRO E INSTALACION DE TUBERIA
RELLENO COMPACTADO
RELLENO A VOLTEO
COSTO TOTAL
PRS. T.
TUB.
KG/cm

[24]

DIAMETRO ECONOMICO

MOD. ELAT.
DEL AGUA
Ea = 20,670

COSTO TOTAL DE LA CONDUCCION


CONCEPTO

ESPESORES DE TUBERIA (e) EN cm.


DIAM.
PULG.

ESPESOR DE
LA PARED (e)
cm.

%
%
%

DIAMETRO
NOMINAL (d)
MM.
PULG.

[25]

[26]

POTEN.
MOTOR
H.P.

[14]

PRECIOS DE SUMINISTRO E INSTALACION DE TUBERIAS [ 2006 ].


DIAM.
PULG.
2
3
4
6
8
10
12

P.V.C METRICO
C-5

C-7

P.V.C. INGLES

C-10 RD-41 RD32.5 RD-26

Fo.Go. Fo. No. ASBESTO CEMENTO


CED.40 ESP.

NOTA: TABLA DE CALCULO USANDO UN EQUIPO DE BOMBEO DE


CON UN GASTO DE Q medio =
l.p.s.

EL DIAMETRO MAS ECONOMICO RESULTO DE

DIAMETRO ECONOMICO

[k]

C-5

0.0

C-7

C-10

CONSTANTE MANNING
P.V.C. ASB.C. Fo.Go. Ac.
6515.13 8048.88
16781.26
779.44 962.62
1887.85
161.63 199.62
391.47
19.26
23.69
48.65
4.11
5.07
9.95
1.24
1.54
3.0
0.4585 0.5884
1.15

TABLA DE C
PROYECTO DE:
MUNICIPIO :
CALCUL:

H.P.

EN RESUMEN SE ELIGE UN EQUIPO DE BOMBEO DE 5 HP (BOMBA PARA LODOS)

" .

LO DE LA POTENCIA DEL EQUIPO DE BOMBEO


DESNIVEL
DEL TERR.
(mts.)

ALTURA
TANQUE
(mts.)

LONGITUD
COLUMNA
(mts.)

[9]

[10]

[11]

PERDIDAS
COLUMNA
hf col. = LKQ

12=[11]x[7]x[4]^2

TOT. PERD.
hft = hf+10%hf+DT
+AT+LC+hf col.

POT. MOTOR
H.P.= Qhft/76n
(mts.)

[13]=8+8X.1+12

[14]=[4]x[13]/76x0.70

CARGA NORM.
DE OPERACION
(mts.)

PRESION
TOTAL
PT = RT+CNO

CALCULO DE LA PRESION POR GOLPE DE ARIETE.


MOD. ELAT.
DEL TUBO

[18]

DE LA CONDUCCION
EPTO

SOBRE PRES.
h= 145V/[( 1+Ead
/Ete)^]

SOBRE PRES.
ABS. POR VALV.
RP = 80 % h

SOBRE PRES.
ABS. POR TUB.
RT = 20 % h

[19]=145[3]/(1+[17][16]/[18][16]^1/ [20]=19x.8

DIAM. 50 mm.
UNID.
70 M3
0 M3
30 M3
M3
ML
M3
M3

CANT.

[21]=[19]x0.20

CED. 40

DIAM. 75 mm.
P.UNIT.
17.00
77.70

CED. 40

[23]=[21]+[22]

DIAM. 100 mm.

IMPORTE

19.00

250.00

33.30

250.00

8,325.00

47.25

250.00

11,812.50

24.50

11.10

24.50

271.95

15.75

24.50

385.88

150.00

185.00

40.00

7,400.00

225.00

89.34

20,101.50

35.00

40.70

35.00

1,424.50

67.50

45.00

3,037.50

15.00

58.28

15.00

874.13

86.63

15.00

1,299.38

19.00

IMPORTE

CED. 40

P.UNIT.
45.00

CANT.

[22]=[8]+[8]x0.1+[9]+[10]

1,320.90

CANT.

P.UNIT.
17.00
110.25

19,616.48

IMPORTE
1,874.25

19.00

38,511.00

RESUMEN
CONSUMO
DE ENERGIA
C=0.7457xHP

COSTO BOMBEO
POR HORA
C.B. = Cx0.3111

CARGO ANUAL
DE BOMBEO
C.A. = C.B.x8760

COSTO TOTAL
DE CONDUCCION.
(C.C.)

AMORTIZACION
DE CONDC.
A a. = C.C.x.5088

DE BOMBEO +AMOTIZACION

[27]=0.7457x[14]

[28]=[27]x0.3111

[29]=[28]x8760

[30]

[31]=[30]x0.5088

[32]=[29]+[31]

DIAMETRO ECONOMICO

COSTO ANUAL
C.T.=C.A.+A.a.

INSTITUTO TECNOLGICO DE TEPIC


INGENIERA CIVIL
ABASTECIMIENTO DE AGUA POTABLE
TABLA DE CLCULO DEL DIMETRO ECONNICO EN LNEAS DE CONDUCCIN POR BOMBEO
LOCALIDAD:
FECHA:
REVISO:

E 5 HP (BOMBA PARA LODOS)

DIAMETRO ECONOMICO

También podría gustarte