ANALISIS ESTRUCTURAL MPL-18 METROS

TORRE PERFILADA
REACCION 1 (KG) =
REACCION 2 (KG) =
REACCION 3 (KG) =
REACCION 4 (KG) =
REACCION 5 (KG) =
REACCION 6 (KG) =
REACCION 7 (KG) =
REACCION 8 (KG) =
PT (KG) =
MX =
-4.48 KG-M
MZ =
30473.18 KG-M
COMPRESION POSITIVA
TENSION NEGATIVA
Ptotal =
4625.41 Kg
F horizontal ( kg)
548.6
548.6
302.85
303.87
264.1
263.09
494.56
495.58
3221.25 Kg

Z
10785
10758
4761.03
4737.57
-3574.1
-3611.8
-9598.5
-9632.2
4625.41 KG
Momento Total =

2
0.3107

X
6

30473 Kg.m

1.5

CARGAS SOBRE EL BLOQUE


P (Kg)=
4625.41
M (Kg.m)= 30473.18
V (Kg)=
3221.25
F.S. =
1.4

DIMENSIONES DEL BLOQUE


H (m) =
2.5
A (m) =
2.9
B (m) =
2.9
D (m) =
0.2

M
B
V

H
HF

A
CARACTERISTICAS DEL SUELO
Rs (kg/cm2) =
6
Pe. Unit. Suelo (kg/m3) =
Coeficiente de friccion =

F = HF / A =
F = HF / B =

0.793103 < 5
0.793103 < 5

2900
0.3

CARACTERISTICAS DEL CONCRETO


Pe. Unit. Co (kg/m3) =
2500
f'c (kg/cm2) =
250
REVISION DE ESFUERZO
Peso Bloque de concreto (Kg) =
56767.5
Peso del volumen de concreto desplazado =
56095 Kg
Ptotal (Kg) =
Peso Bloque de Concreto + P = 61392.91
Momento actuante =
39814.8 Kg.m
exc =
0.65
m
exc / (A,B) =
0.22
m
exc limite =
0.48
m>
0.22
m
OK
Esf =
1.71
Kg.cm2 <
6
Kg.cm2
OK
Esf min =
-0.25
Kg.cm2 > 0
SE PRODUCEN ESFUERZOS NEGATIVOS
% A Traccion =
13% < 25 %
OK
REVISION DE CORTE
Esf. Corte actuante =
Esf. Corte resisten =

0.04 kg/cm2
8.38 kg/cm2 >

0.04

kg/cm2

OK

REVISION A LA COMPRESION DEL CONCRETO (APLASTAMIENTO)


Pmx = 0,7 * (0,85 * f'c * A * B ) > P
(Normativo)
Pmx =
12509875
Kg >
85950.07 Kg
OK
EXCENTRICIDAD
Ea =
6.588211 cm <
Ea =
6.588211 cm <

A/6=
B/6=

48.33 cm
48.33 cm

REVISION DEL VOLCAMIENTO


Momento estabilizante = M + P * (A;B) / 2 =
Momento estabilizante =
82312.88 Kg.m
Momento actuante =
39814.8 Kg.m
Volcamiento =
2.07
> 1,5
REVISION POR DESLIZAMIENTO
Fuerza estabilizante = 17030.25 Kg

OK

OK
OK

OK
OK

Fuerza actuante =
Delizamiento =

3221.25 Kg
5.29
> 1,5

ACERO DE REFUERZO
Por temperatura
As = 0,18 % Ac
As = 0,18 % * 100 * 100 cm =
As =
18 cm2
Cab. 5/8"
As.cab =
1.98 cm2
Numero cabillas =
10
Separacion =
10
Cab. 5/8" @ 10 cms

OK

cab
cm
Rec = 7,5 cm

1 Cab. D=5/8 "' 6.65 m @ 10 cms


2.75
1.95

1.95

2.9

(B)

1.95

1.95
2.75

Rec = 7,5 cm

1 Cab. D=5/8 "' 6.65 m @ 10 cms


APOYO TORRE
A

2.9
Rec = 7,5 cm

PLANTA

Rec = 2,5 cm

2 Cab. D=5/8 "' 6.25 m @ 10 cms

0.2

2.75
1.75

1.75

3
2

2.3

1.75

1.75
2.75

Rec = 7,5 cm

2 Cab. D=5/8 "' 6.25 m @ 10 cms

2.9
Rec = 7,5 cm
SECCION A-A

Rec = 2,5 cm

3 Cab. D=5/8 "' 6.25 m @ 10 cms

0.2

2.75
1.75

1.75

2
3

2.3

1.75

1.75
2.75

Rec = 7,5 cm

3 Cab. D=5/8 "' 6.25 m @ 10 cms

2.9
Rec = 7,5 cm
SECCION B-B

COMPUTOS
CONCRETO =
EXCAVACION =
CONCRETO POB =
ACERO =
ENCOFRADO =

21.03
19.76
0.42
1814.47
2.32

M3
M3
M3
KG
M2

NOTA:
EN EL PLANO DE FUNDACIONES APARECEN INCREMENTADAS LAS DIMENSIONES
Y LOS ACEROS, LUEGO DEBER HACERSE TAL CUAL APARECE EN EL MISMO.
ESTE CLCULO ES REFERENCIAL.

También podría gustarte