FECHA :
UBICACIN: PUERTO PICHANAKI - PICHANAKI - CHANCHAMAYO - JUNN.
UNIDAD
--l/s
m/s
m/s
----Kg/m2
m
DOTACION
N LOTES
N HAB/LOTE
POBLACION
CAUDAL PROMEDIO
K1
K2
CAUDAL MAXIMO DIARIO
CAUDAL MAXIMO HORARIO
CONTRIBUCION AL DESAGUE
CAUDAL DE CONTRIBUCION
CAUDAL DE APORTACION DE LLUVIA
AREA TRIBUTARIA
CAUDAL DE INFILTRACION
CAUDAL TOTAL DE CONTRIBUCION
LONGITUD TOTAL
CAUDAL UNITARIO
200
80
5
400
0.93
1.30
2.50
1.20
2.31
80.00
1.85
0.2
8.350
1.670
3.522
835.000
0.0042
VALOR
0.009
0.30
0.60
3.00
0.05
0.75
0.12
0.60
SUGERIDO (*)
---1.50
0.45
4.00
0.20
0.80
0.12
1.20
DESCARGAS
DESCARGA EX' - 1
DESCARGA TOTAL
L
834.95
834.95
L/Hab/d
Hab.
LPS
LPS
LPS
%
LPS
LPS/Ha
Ha.
LPS
LPS
ML
LPS/ML
N BUZONES
16.00
CALLE
CALLE
CALLE
CALLE
CALLE
03
03
03
03
03
LONGITUD
ARRIBA
ABAJO
(m)
BE
1
2
3
4
1
2
3
4
6
12.00
54.00
28.00
32.00
83.45
CAUDAL
PENDIENTE (m/m)
(l/s)
0.2500
0.4800
0.6000
0.7300
1.0800
MIN.ACEPT.
MAX.ACEPT.
PROPUESTA
0.0195
0.0126
0.0109
0.0096
0.0074
1.4277
0.9242
0.7965
0.6988
0.5382
0.0100
0.0128
0.0926
0.0117
0.0040
DIAMETRO
VELOCIDAD
mm
m/s
200
200
200
200
200
0.47
0.60
1.34
0.65
0.48
0.02
0.03
0.01
0.04
0.07
CALLE 03
CALLE 03
4
5
5
6
32.00
59.70
0.3300
0.5900
0.0162
0.0110
1.1865
0.8054
0.0094
0.0040
*
*
200
200
0.49
0.41
*
*
0.02
0.05
CALLE 03
CALLE 03
6
7
7
9
23.00
76.30
1.7700
2.0900
0.0053
0.0047
0.3872
0.3466
0.0040
0.0040
*
*
200
200
0.54
0.56
*
*
0.10
0.12
CALLE 03
8A
36.00
0.3500
0.0156
1.1408
0.0682
200
1.04
CALLE 03
CALLE 03
7
8
8
9
42.50
62.00
0.3800
0.9700
0.0148
0.0079
1.0800
0.5782
0.0067
0.0040
200
200
0.45
0.46
9
10
11
12
13
14
14A
10
11
12
13
14
14A
CF RIO.
36.00
54.00
50.00
50.00
50.00
46.00
8.00
3.2100
3.4400
3.6500
3.8600
4.0700
4.2600
4.2900
0.0036
0.0034
0.0033
0.0031
0.0030
0.0029
0.0029
0.2604
0.2486
0.2390
0.2303
0.2223
0.2156
0.2146
0.0040
0.0040
0.0040
0.0040
0.0040
0.0087
0.0040
200
200
200
200
200
200
200
0.63
0.64
0.65
0.66
0.66
0.90
0.67
CALLE
CALLE
CALLE
CALLE
CALLE
CALLE
CALLE
03
03
03
03
03
03
03
*
*
0.01
*
*
0.03
0.07
0.16
0.17
0.18
0.19
0.19
0.15
0.20
LPS
3.52
3.52
0.05
0.07
0.05 *
0.08
0.12
F. TRACCION
Kg/m2
0.06
0.10
0.46
0.12
0.06
COTAS DE FONDO Bz
ARRIBA
ABAJO
ARRIBA
ABAJO
509.976
510.130
509.218
506.624
506.250
510.130
509.218
506.624
506.250
505.916
508.828
508.708
508.018
505.424
505.050
508.708
508.018
505.424
505.050
504.716
CORTES (m)
ARRIBA
1.15
1.42
1.20
1.20
1.20
###
ABAJO
*
*
*
*
*
1.42
1.20
1.20
1.20
1.20
0.06
0.09
0.06
0.05
506.250
506.150
506.150
505.916
505.250
504.950
504.950
504.716
0.16
0.18
0.08
0.09
505.916
505.850
505.850
506.400
504.716
504.624
504.624
504.318
0.04 *
0.27
508.220
506.373
507.020
504.566
0.07
0.12
0.05
0.06
505.850
506.373
506.373
506.400
504.850
504.566
504.566
504.318
0.22
0.23
0.24
0.24
0.25
0.21
0.26
0.10
0.11
0.11
0.11
0.12
0.22
0.12
506.400
505.481
505.286
505.150
504.950
504.811
504.159
505.481
505.286
505.150
504.950
504.811
504.159
502.679
504.318
504.174
503.958
503.758
503.558
503.358
502.959
504.174
503.958
503.758
503.558
503.358
502.959
502.579
1.00
1.20
###
1.20
1.23
###
1.20
###
1.00
1.81
###
2.08
1.31
1.33
1.39
1.39
1.45
1.20
*
*
1.20
1.20
*
*
1.23
2.08
1.81
*
*
1.81
2.08
*
*
*
*
*
*
*
1.31
1.33
1.39
1.39
1.45
1.20
0.10