OBRA
ENTIDAD
UBICACIN
FECHA
=
=
=
=
ITEM
1.00.00
1.01.00
1.02.00
1.03.00
2.00.00
2.01.00
2.02.00
3.00.00
3.01.00
3.02.00
3.02.00
4.00.00
4.01.00
4.02.00
4.03.00
5.00.00
5.01.01
5.01.02
5.02.01
5.02.02
5.02.03
5.03.01
5.03.02
5.03.03
5.04.01
5.04.02
5.04.03
5.05.01
5.05.02
5.05.03
5.06.01
5.06.02
5.06.03
5.07.01
5.07.02
5.07.03
5.07.04
5.08.01
5.08.02
5.08.03
6.00.00
6.01.00
6.02.00
7.00.00
7.01.00
UNIDAD
OBRAS PROVISIONALES
Caseta para Oficinas y Almacen
Cartel de Obra (2.40m x 4.80m)
Agua para la Construccin
m2.
Und.
Global
TRABAJOS PRELIMINARES
Limpieza Manual del Terreno
m2.
m2.
MOVIMIENTO DE TIERRAS
Excavaciones Manuales Simples
m3.
m3.
m3.
m3.
m2.
m2.
m3.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
und.
m3.
m2.
kg.
m2.
m2.
LIMPIEZA, VARIOS
Limpieza Final de Obra
Global
PRESUPUESTO ESTRUC
III.
RUCTURAS
CANTIDAD
PRECIO
PRECIO
PRECIO
UNITARIO
PARCIAL
TOTAL
2,861.23
30.00
1.00
1.00
38.73
1,099.21
600.00
1,162.02
1,099.21
600.00
1,309.63
440.00
1.02
449.68
722.75
1.19
859.95
8,509.78
111.05
30.66
3,404.85
92.49
37.39
3,458.04
80.00
20.59
1,646.89
26,820.82
66.22
199.47
13,207.80
40.76
31.40
1,279.77
349.14
35.33
12,333.25
196,844.30
12.37
491.67
347.79
4.10
4,301.51
2,014.51
1.64
396.18
649.74
13.12
269.92
59.80
4.10
784.55
1,105.93
8.99
364.07
3,274.26
92.18
57.04
5,258.35
523.48
4.10
2,144.84
5.76
464.05
2,672.96
67.20
1,003.32
62.21
4.10
4,180.85
4,110.84
16.03
427.38
6,848.83
228.70
2,498.99
57.26
4.10
13,095.13
10,239.02
34.52
401.95
13,873.73
219.36
4,272.90
75.05
4.10
16,463.80
17,507.19
49.61
419.38
20,805.21
566.96
3,979.20
4,724.00
62.09
4.10
2.27
35,200.08
16,303.81
10,724.52
4.33
444.20
1,922.95
30.16
345.13
64.58
4.10
1,947.61
1,414.08
29,665.18
265.50
83.51
22,172.35
151.20
49.56
7,492.83
981.12
1.00
981.12
981.12
266,992.06
26,699.21
26,699.21
320,390.47
57,670.28
PUESTO ESTRUCTURAS
S/.
378,060.76
26,699.21
8,009.76
18,689.45
26,699.21
GENERAL ( 10% )
S/. =
GENERAL FIJO ( 3% )
S/. =
GENERAL VARIABLE ( 7% ) S/. =
O MAXIMO S/. =
O MINIMO S/. =
+ (10%)
- (10%)
415,866.83
340,254.68
RESUMEN DEL C
Obra
=
Entidad
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
Adelanto Directo ( = o
<
Adelanto Materiales ( = o
<
Valorizacin N 01 al =
Valorizacin N 02 al =
Valorizacin N 03 al =
DESCRIPCIN
MONTO
1.00.00
OBRAS PROVISIONALES
2,861.23
2.00.00
TRABAJOS PRELIMINARES
1,309.63
3.00.00
MOVIMIENTO DE TIERRAS
8,509.78
4.00.00
26,820.82
5.00.00
196,844.30
6.00.00
ALBAILERIA
29,665.18
7.00.00
LIMPIEZA, VARIOS
981.12
(18%)
S/.
266,992.06
26,699.21
26,699.21
320,390.47
57,670.28
378,060.76
AVANCE ACUMULADO =
III.
Valor Referencial =
Valor Referencial =
Monto Contractual =
Monto Contractual =
Factor de Relacin =
Plazo Contractual =
Inicio del Plazo Contractual =
Termino del Plazo Contractual =
(Sin IGV)
(Con IGV)
(Sin IGV)
(Con IGV)
S/. 29,475.92
Pagado el =
4 de mayo de 2015
S/. 58,951.85
Pagado el =
27 de mayo de 2015
STRUCTURAS
MES 1
MES 2
MES 3
Verficacin
30 Dias
30 Dias
20 Dias
2,461.23
200.00
200.00
2,861.23
1,309.63
0.00
0.00
1,309.63
7,686.33
0.00
823.45
8,509.78
26,820.82
0.00
0.00
26,820.82
66,105.53
109,503.68
21,235.09
196,844.30
16,064.39
13,600.79
0.00
29,665.18
245.28
245.28
490.56
981.12
120,693.21
12,069.32
12,069.32
144,831.85
123,549.75
12,354.98
12,354.98
148,259.70
22,749.10
2,274.91
2,274.91
27,298.92
266,992.06
26,699.21
26,699.21
320,390.47
26,069.73
26,686.75
4,913.81
57,670.28
170,901.58
174,946.45
32,212.73
378,060.76
45.20%
45.20%
46.27%
91.48%
8.52%
100.00%
S/. 320,390.47
S/. 378,060.76
S/. 294,759.23
S/. 347,815.90
0.92000
80
Dias Cal.
11 de mayo de 2015
29 de julio de 2015
S/. 26,699.21
S/. 8,009.76
S/. 18,689.44
1.00.00
DESCRIPCIN
MONTO
2.00.00
TRABAJOS PRELIMINARES
1,309.63
3.00.00
MOVIMIENTO DE TIERRAS
8,509.78
4.00.00
26,820.82
5.00.00
196,844.30
6.00.00
ALBAILERIA
29,665.18
7.00.00
LIMPIEZA, VARIOS
981.12
266,992.06
26,699.21
26,699.21
320,390.47
294,759.23
53,056.66
347,815.90
AVANCE ACUMULADO =
MADO - ESTRUCTURAS
30
30
20
11-May-15
31-May-15
1-Jun-15
30-Jun-15
1-Jul-15
29-Jul-15
21
30
29
1,722.86
878.37
260.00
2,861.23
916.74
392.89
0.00
1,309.63
5,380.43
2,305.90
823.45
8,509.78
18,774.57
8,046.25
0.00
26,820.82
46,273.87
96,484.23
54,086.20
196,844.30
11,245.07
14,339.87
4,080.24
29,665.18
171.70
245.28
564.14
981.12
Verficacin
80
84,485.24
8,448.52
8,448.52
101,382.29
93,271.71
16,788.91
122,692.79
12,269.28
12,269.28
147,231.34
135,452.84
24,381.51
59,814.03
5,981.40
5,981.40
71,776.83
66,034.69
11,886.24
266,992.06
26,699.21
26,699.21
320,390.47
294,759.23
53,056.66
110,060.62
159,834.35
77,920.93
347,815.90
31.64%
31.64%
45.95%
77.60%
22.40%
100.00%
Obra
=
Entidad
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
Monto Maximo =
Donde :
C.I. =
% =
Pres. =
Imo =
Ima =
SIMBOLO
ELEMENTO
Indice
Unificado
Mo
I
0.12
Ac
C-Af
Mn-Mqn-D
Mano de Obra
47
39
03
21
04
43
48
30
B-Al-Mqi
Bloque y Ladrillo
Acero de construccin liso
17
02
49
Ag-He-Ho
05
37
38
Agregado Grueso
Herramienta Manual
Hormign
SIMBOLO
SUMATORIA =
ELEMENTO
Indice
Unificado
Ac
03
21
43
Mn
Descripcion
Monto de Adelanto de
Materiales
Adelanto Otorgado
S/. 58,610.00
IGV
TOTAL
Otorgado
AMORTIZAC
Acero de construc. corrugado
Insumo =
03
Indice Unificado =
Adelanto Otorgado =
S/. 17,750.00
(Sin I.G.V)
VALORIZACIN
N
Fecha
1
2
3
31-May-15
30-Jun-15
29-Jul-15
MONTO
ADELANTO
VALORIZADO
OTORGADO
117,195.80
93,247.11
84,316.32
17,750.00
17,750.00
17,750.00
294,759.24
Insumo =
Indice Unificado =
21
Adelanto Otorgado =
S/. 16,810.00
VALORIZACIN
MONTO
ADELANTO
VALORIZADO
OTORGADO
117,195.80
93,247.11
84,316.32
16,810.00
16,810.00
16,810.00
Fecha
1
2
3
31-May-15
30-Jun-15
29-Jul-15
Sin I.G.V.
294,759.24
Insumo =
Indice Unificado =
43
Adelanto Otorgado =
S/. 24,050.00
VALORIZACIN
MONTO
ADELANTO
VALORIZADO
OTORGADO
117,195.80
93,247.11
84,316.32
24,050.00
24,050.00
24,050.00
1
2
3
Fecha
31-May-15
30-Jun-15
29-Jul-15
Sin I.G.V.
294,759.24
S/. 17,750.00
S/. 16,810.00
S/. 24,050.00
VALORIZACIN
ACERO CORR.
CEMENTO
Fecha
( 03 )
( 21 )
1
2
3
31-May-15
30-Jun-15
29-Jul-15
7,057.37
5,615.21
5,077.41
6,683.63
5,317.84
4,808.53
17,750.00
16,810.00
Imo
Imr
Insumo =
VALORIZACIN
Adelanto Utiliz.
(Sin I.G.V)
INDICE
Fecha
1
2
3
31-May-15
30-Jun-15
29-Jul-15
en la Valoriz. (A)
Imo
7,057.37
5,615.21
5,077.41
474.67
474.67
474.67
17,750.00
Insumo =
Indice Unificado =
Adelanto Otorgado =
21
S/. 16,810.00
VALORIZACIN
Adelanto Utiliz.
Fecha
1
2
3
31-May-15
30-Jun-15
29-Jul-15
(Sin I.G.V)
INDICE
en la Valoriz. (A)
Imo
6,683.63
5,317.84
4,808.53
460.44
460.44
460.44
16,810.00
Insumo =
VALORIZACIN
N
1
2
3
Fecha
31-May-15
30-Jun-15
29-Jul-15
(Sin I.G.V)
INDICE
Adelanto Utiliz.
en la Valoriz. (A)
Imo
9,562.24
7,608.22
6,879.54
646.07
646.07
646.07
24,050.00
ACERO CORR.
CEMENTO
Fecha
( 03 )
( 21 )
1
2
3
31-May-15
30-Jun-15
29-Jul-15
0.00
-89.79
-92.42
0.00
85.00
65.58
-182.21
150.59
x ( Ima/Imo )
ento Representativo
nto Representativo en el Monomio
o a la Fecha Base
Imo
Ima
Incidencia
Agrup.
(Enero/14)
(Mayo/15)
0.279
100.00
498.10
523.15
0.171
100.00
393.46
411.50
0.113
100.00
474.67
505.20
0.131
87.79
12.21
460.44
523.06
454.07
520.55
0.163
94.24
5.14
0.61
646.07
339.09
381.51
675.16
354.51
429.32
0.085
71.56
19.62
8.81
578.76
479.33
249.28
583.17
510.43
279.73
0.058
42.78
24.35
32.87
432.50
298.19
428.11
447.27
296.12
416.74
1.000
7193.16865614
MONTO
MONTO A
Precio a la
MAXIMO
Represent.
SOLICITAR
Fecha Actual
35,481.47
30.50%
17,982.92
2.50
33,428.36
28.74%
16,942.35
20.50
47,405.98
40.76%
24,026.57
6.50
116,315.81
100.00%
58,951.85
I.G.V.
( 18 % )
10,549.80
TOTAL
S/. 69,159.80
S/. 294,759.23
S/. 58,951.85
S/. 10,611.33
S/. 69,563.18
69,159.80
INDICES
COEFICIENTES
Coeficiente
Incid. (%)
Imo
Ima
0.113
0.113
0.113
100.00
100.00
100.00
474.67
474.67
474.67
505.20
505.20
505.20
INDICES
COEFICIENTES
Coeficiente
Incid. (%)
Imo
Ima
0.131
0.131
0.131
87.79
87.79
87.79
460.44
460.44
460.44
454.07
454.07
454.07
INDICES
COEFICIENTES
Coeficiente
Incid. (%)
Imo
Ima
0.163
0.163
0.163
94.24
94.24
94.24
646.07
646.07
646.07
675.16
675.16
675.16
ZACIONES DE MATERIALES
S/. 58,610.00
MADERA
AMORTIZACION
( 43 )
(A)
9,562.24
7,608.22
6,879.54
23,303.24
18,541.28
16,765.48
24,050.00
58,610.00
Sin I.G.V.
E QUE NO CORRESPONDE
O DE MATERIALES
del reajuste
INDICES
DEDUCCION
Ima
Imr
(D)
5=1x((4-3)/2)
505.20
505.20
505.20
505.20
497.61
496.56
0.00
-89.79
-92.42
-182.21
INDICES
DEDUCCION
Ima
Imr
(D)
5=1x((4-3)/2)
454.07
454.07
454.07
454.07
461.43
460.35
0.00
85.00
65.58
150.59
INDICES
DEDUCCION
Ima
Imr
(D)
5=1x((4-3)/2)
675.16
675.16
675.16
675.16
679.52
677.84
0.00
51.34
28.54
CTIVOS DE MATERIALES
79.88
S/. 58,610.00
MADERA
DEDUCCION
( 43 )
(D)
0.00
51.34
28.54
0.00
46.56
1.70
79.88
48.26
Sin I.G.V.
III.
RA MATERIALES
O MAXIMO A SOLITAR
Referencial =
Referencial =
Contractual =
Contractual =
de Relacin =
Contractual =
del Plazo Contractual =
no del Plazo Contractual =
eografica =
Mx. a Solicitar (A.M.) =
Mx. a Solicitar (A.M.) =
(Sin IGV)
(Con IGV)
(Sin IGV)
(Con IGV)
320,390.47
378,060.76
294,759.23
347,815.90
0.92000
80
Dias Calendario
11 de mayo de 2015
29 de julio de 2015
1
S/. 58,951.85
S/. 69,563.18
to de Materiales Otrogado =
Ima / Imo
S/.
S/.
S/.
S/.
(Sin IGV)
(Con IGV)
27 de mayo de 2015
MONTO
MONTO
MONTO
MAXIMO
SOLICITADO
OTORGADO
1.050
S/. 86,497.49
S/. 0.00
S/. 0.00
1.046
S/. 52,684.00
S/. 0.00
S/. 0.00
1.064
S/. 35,481.47
S/. 35,481.47
S/. 17,750.00
0.986
0.995
S/. 33,428.36
S/. 4,693.52
S/. 33,428.36
S/. 4,693.52
S/. 16,810.00
S/. 0.00
1.045
1.045
1.125
S/. 47,405.98
S/. 2,588.57
S/. 331.70
S/. 47,405.98
S/. 0.00
S/. 0.00
S/. 24,050.00
S/. 0.00
S/. 0.00
1.008
1.065
1.122
S/. 18,087.62
S/. 5,241.86
S/. 2,480.73
S/. 18,087.62
S/. 5,241.86
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
1.034
0.993
0.973
S/. 7,498.70
S/. 4,097.98
S/. 5,422.99
S/. 7,498.70
S/. 0.00
S/. 5,422.99
S/. 0.00
S/. 0.00
S/. 0.00
S/. 305,940.98
S/. 157,260.50
S/. 58,610.00
MONTO
% REAL
OTORGADO
OTORGADO
17,750.00
50.03%
16,810.00
50.29%
24,050.00
50.73%
58,610.00
RA MATERIALES
SI CUMPLE
CES
Adelanto - Fecha
MONTO
Amortiz. Utiliz.
Imr
UTILIZADO
8 = 2 x (5/6)
9=1x3x 4
10 = 9 x (6/5)
505.20
497.61
496.56
16,677.34
16,677.34
16,677.34
6,630.88
5,275.88
4,770.58
7,057.37
5,615.21
5,077.41
16,677.34
17,750.00
Adelanto - Fecha
MONTO
Amortiz. Utiliz.
Imr
UTILIZADO
8 = 2 x (5/6)
9=1x3x 4
10 = 9 x (6/5)
454.07
461.43
460.35
17,045.82
17,045.82
17,045.82
6,777.39
5,392.45
4,875.98
6,683.63
5,317.84
4,808.53
17,045.82
16,810.00
Adelanto - Fecha
MONTO
Amortiz. Utiliz.
Imr
UTILIZADO
8 = 2 x (5/6)
9=1x3x 4
10 = 9 x (6/5)
675.16
679.52
677.84
23,013.78
23,013.78
23,013.78
9,150.24
7,280.41
6,583.13
9,562.24
7,608.22
6,879.54
CES
CES
23,013.78
24,050.00
I.G.V.
TOTAL
( 18% )
OTORGADO
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 3,195.00
S/. 20,945.00
S/. 3,025.80
S/. 0.00
S/. 19,835.80
S/. 0.00
S/. 4,329.00
S/. 0.00
S/. 0.00
S/. 28,379.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 10,549.80
S/. 69,159.80
Amortiz. Acumul.
Saldo Amortiz.
11
12
7,057.37
12,672.59
17,750.00
24,807.37
5,077.41
0.00
Amortiz. Acumul.
Saldo Amortiz.
11
12
6,683.63
12,001.47
16,810.00
10,126.37
4,808.53
0.00
Amortiz. Acumul.
Saldo Amortiz.
11
12
9,562.24
17,170.46
24,050.00
33,612.24
6,879.54
0.00
CALCU
Obra
=
Entidad
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
Monto Maximo =
Descripcion
Monto de Adelanto
Directo
Adelanto Solicitado
S/. 29,475.92
Adelanto Otorgado =
29,475.92
(Sin IGV)
VALORIZACIN
MONTO
Fecha
VALORIZADO (Sin/IGV)
1
2
3
31-May-15
30-Jun-15
29-Jul-15
S/. 117,195.80
S/. 93,247.11
S/. 84,316.32
SUMATORIA
S/. 294,759.23
D = ( V * (A/C) ) * ( (Kr/Ka) - 1)
Donde:
D
Kr
Ka
VALORIZACIN
MONTO
Fecha
VALORIZADO (Sin/IGV)
1
2
3
31-May-15
30-Jun-15
29-Jul-15
S/. 117,195.80
S/. 93,247.11
S/. 84,316.32
SUMATORIA
S/. 294,759.23
ADELANTO DIRECTO
CALCULO DEL MONTO MAXIMO A SOLITAR
Valor Referencial =
Valor Referencial =
Monto Contractual =
Monto Contractual =
Factor de Relacin =
Plazo Contractual =
Inicio del Plazo Contractual =
Termino del Plazo Contractual =
Area Geografica =
Monto Mx. a Solicitar (A.D.) =
Monto Mx. a Solicitar (A.D.) =
el Monto Contratado
I.G.V.
( 18 % )
5,305.67
TOTAL
S/. 34,781.59
4 de mayo de 2015
Amort. = ( V * (A/C) )
Otorg. ) * Valoriz.
Amortizacin
Amortiz.
Saldo a
Acumulada
Amortizar
11,719.58
21,044.29
29,475.92
17,756.34
8,431.63
(0.00)
11,719.58
9,324.71
8,431.63
29,475.92
DEDUCCIONES DE REAJUSTES
NDEN POR EL ADELANTO DIRECTO
to en Efectivo:
Amortizacin
Kr
Ka
Valoriz.
Adelanto
Deduccin
1.037
1.039
1.039
1.037
1.037
1.037
S/. 0.00
S/. 13.63
S/. 10.71
11,719.58
9,324.71
8,431.63
29,475.92
S/. 29,475.92
S/. 24.34
III.
(Sin IGV)
(Con IGV)
(Sin IGV)
(Con IGV)
S/. 320,390.47
S/. 378,060.76
S/. 294,759.23
S/. 347,815.90
0.92000
80
Dias Calendario
11 de mayo de 2015
29 de julio de 2015
1
S/. 29,475.92
S/. 34,781.59
SI CUMPLE
(Sin IGV)
(Con IGV)
SIMBOLO
ELEMENTO
Indice
Unificado
Mo
I
Ac
C-Af
Mn-Mqn-D
Mano de Obra
47
39
03
21
04
43
48
30
B-Al-Mqi
Bloque y Ladrillo
Acero de construccin liso
Maquinaria y equipo importado
Ag-He-Ho
Agregado Grueso
Herramienta Manual
Hormign
SUMATORIA =
17
02
49
05
37
38
III.
IIIIII IIIII
IIIIIIIII
GUEL - PIURA.
Valor Referencial =
Valor Referencial =
Monto Contractual =
Monto Contractual =
Factor de Relacin =
Plazo Contractual =
Inicio del Plazo Contractual =
Termino del Plazo Contractual =
Area Geografica =
(Sin IGV)
(Con IGV)
(Sin IGV)
(Con IGV)
Coefic. de
Imo
Incidencia
Agrup.
(Enero/14)
Ima
Ima
0.279
100.00
498.10
523.15
0.293
523.15
0.171
100.00
393.46
411.50
0.179
413.82
0.113
100.00
474.67
505.20
0.120
497.61
0.131
87.79
12.21
460.44
523.06
454.07
520.55
0.129
461.43
520.47
0.163
94.24
5.14
0.61
646.07
339.09
381.51
675.16
354.51
429.32
0.171
679.52
355.41
434.47
0.085
71.56
19.62
8.81
578.76
479.33
249.28
583.17
510.43
279.73
0.087
581.18
503.88
282.51
0.058
42.78
24.35
32.87
432.50
298.19
428.11
447.27
296.12
416.74
0.058
443.68
297.38
414.61
1.000
Apr-15
May-15
1.037
Apr-15
May-15
III.
S/.
S/.
S/.
S/.
0.92
80
320,390.47
378,060.76
294,759.23
347,815.90
Dias Calendario
11 de mayo de 2015
29 de julio de 2015
May-15
Jun-15
K
Ima
0.293
523.15
0.293
0.180
415.20
0.180
0.119
496.56
0.118
0.131
460.35
521.08
0.131
0.172
677.84
356.20
438.07
0.171
0.087
580.34
502.54
283.41
0.087
0.058
444.72
299.68
414.95
0.058
1.039
May-15
1.039
Jun-15
RESUMEN DE METRADOS
(Del 01/Jun/15
Obra
=
Entidad
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
ITEM
1.00.00
1.01.00
1.02.00
1.03.00
2.00.00
2.01.00
2.02.00
3.00.00
3.01.00
3.02.00
3.02.00
4.00.00
4.01.00
4.02.00
4.03.00
5.00.00
5.01.01
5.01.02
5.02.01
5.02.02
5.02.03
5.03.01
5.03.02
5.03.03
5.04.01
5.04.02
5.04.03
5.05.01
5.05.02
5.05.03
5.06.01
5.06.02
5.06.03
5.07.01
5.07.02
5.07.03
5.07.04
5.08.01
5.08.02
5.08.03
6.00.00
6.01.00
6.02.00
7.00.00
7.01.00
VALORIZACIN DE AVA
(Del 01/Jun/15
Obra
=
Entidad
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
ITEM
1.00.00
1.01.00
1.02.00
1.03.00
2.00.00
2.01.00
2.02.00
3.00.00
3.01.00
3.02.00
3.02.00
4.00.00
4.01.00
4.02.00
4.03.00
5.00.00
5.01.01
5.01.02
5.02.01
5.02.02
5.02.03
5.03.01
5.03.02
5.03.03
5.04.01
5.04.02
5.04.03
5.05.01
5.05.02
5.05.03
5.06.01
5.06.02
5.06.03
5.07.01
5.07.02
5.07.03
5.07.04
5.08.01
5.08.02
5.08.03
6.00.00
6.01.00
6.02.00
7.00.00
7.01.00
Obra
Entidad
=
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
ITEM
1.00
1.1
2.00
2.1
3.00
3.1
3.2
4.00
4.1
4.1.1
4.2
4.2.1
SON =
al
28/Jun/15)
METRADOS - Val. 01
UNIDAD
OBRAS PROVISIONALES
Caseta para Oficinas y Almacen
Cartel de Obra (2.40m x 4.80m)
Agua para la Construccin
m2.
Und.
Global
OBRAS PRELIMINARES
Limpieza Manual del Terreno
Trazo, Nivel y Replanteo
m2.
m2.
MOVIMIENTO DE TIERRAS
Excavaciones Manuales Simples
Relleno Compactado con Material Propio
Eliminacion de Material Excedente, Distancia Prom. 10 Km.
m3.
m3.
m3.
m3.
m2.
m2.
m3.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
und.
m3.
m2.
kg.
m2.
m2.
Global
al
28/Jun/15)
OBRAS PROVISIONALES
Caseta para Oficinas y Almacen
Cartel de Obra (2.40m x 4.80m)
Agua para la Construccin
m2.
Und.
Global
OBRAS PRELIMINARES
Limpieza Manual del Terreno
Trazo, Nivel y Replanteo
m2.
m2.
MOVIMIENTO DE TIERRAS
Excavaciones Manuales Simples
Relleno Compactado con Material Propio
Eliminacion de Material Excedente, Distancia Prom. 10 Km.
m3.
m3.
m3.
m3.
m2.
m2.
m3.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
und.
m3.
m2.
kg.
ALBAILERIA
Muros de Cabeza, con Ladrillo Maquinado, Mortero 1:4 (c-a)
Muros de Soga, con Ladrillo Maquinado, Mortero 1:5 (c-a)
m2.
m2.
LIMPIEZA, VARIOS
Limpieza Final de Obra
Global
COSTO DIRECTO DE OB
GASTO GENERAL ( 10%
UTILIDAD
( 10%
SUB TOTAL DE OBRA
PRESUPUESTO ESTR
RESUMEN DE VA
(Del 01
CONSTRUCCION DE 8 AULAS - I.E. SAN MIGUEL - PIURA.
GOBIERNO REGIONAL - PIURA.
MONTO
CONTRATADO
VALORIZACION CONTRACTUAL ( V )
Valorizacin Contractual (Sin I.G.V.)
Total Contractual
% de Avance a la Fecha
Err:509
Err:509
REAJUSTE ( R )
Reajuste de Valorizacion Contractual
DEDUCCIONES ( D )
Deduccin Adelanto Directo
Deduccin Adelanto para Materiales
Total de Reajustes
VALORIZACION BRUTA ( VB = V + R)
AMORTIZACIONES ( A )
Adelanto Directo
Monto de Adelanto Directo Otorgado (Sin I.G.V.)
Adelanto Materiales
Monto de Adelanto Materiales Otorgado (Sin I.G.V.)
TOTAL DE AMORTIZACIONES ( A )
S/. 29,475.92
S/. 29,475.92
S/. 69,159.80
S/. 69,159.80
S/. 98,635.72
S/. 0.00
III.
ALORIZACIN N 01
28/Jun/15)
Valor Referencial =
Valor Referencial =
Monto Contractual =
Monto Contractual =
Factor de Relacin =
Plazo Contractual =
Inicio del Plazo Contractual =
Termino del Plazo Contractual =
METRADOS - Val. 01
(Sin IGV)
(Con IGV)
(Sin IGV)
(Con IGV)
S/. 320,390.47
S/. 378,060.76
S/. 294,759.23
S/. 347,815.90
0.92000
80
Dias Cal.
11 de mayo de 2015
29 de julio de 2015
RESUMEN DE METRADOS
CANTIDAD
ANTERIOR
EJECUTADO
ACUMULADO
SALDO
30.00
1.00
0.33
0.00
0.00
0.00
30.00
1.00
0.33
30.00
1.00
0.33
0.00
0.00
0.67
440.00
722.75
0.00
0.00
440.00
722.75
440.00
722.75
0.00
0.00
111.05
92.49
0.00
0.00
0.00
0.00
111.05
92.49
0.00
111.05
92.49
0.00
0.00
0.00
80.00
66.22
40.76
349.14
0.00
0.00
0.00
66.22
40.76
349.14
66.22
40.76
349.14
0.00
0.00
0.00
12.37
491.67
1.64
0.00
0.00
0.00
12.37
491.67
1.64
12.37
491.67
1.64
0.00
0.00
0.00
13.12
269.92
8.99
92.18
523.48
1.44
16.80
250.83
4.01
57.18
624.75
0.00
54.84
1,068.23
0.00
141.74
994.80
1,181.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13.12
269.92
8.99
92.18
523.48
1.44
16.80
250.83
4.01
57.18
624.75
0.00
54.84
1,068.23
0.00
141.74
994.80
1,181.00
0.00
0.00
0.00
13.12
269.92
8.99
92.18
523.48
1.44
16.80
250.83
4.01
57.18
624.75
0.00
54.84
1,068.23
0.00
141.74
994.80
1,181.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.32
50.40
752.49
12.02
171.53
1,874.25
34.52
164.52
3,204.68
49.61
425.22
2,984.40
3,543.00
4.33
30.16
345.13
132.75
75.60
0.00
0.00
132.75
75.60
132.75
75.60
132.75
75.60
0.00
0.00
0.00
0.00
1.00
III.
DE OBRA - N 01
28/Jun/15)
Valor Referencial =
Valor Referencial =
Monto Contractual =
(Sin IGV)
(Con IGV)
(Sin IGV)
S/. 320,390.47
S/. 378,060.76
S/. 294,759.23
Monto Contractual =
(Con IGV)
Factor de Relacin =
Plazo Contractual =
(Dias Cal.)
Inicio del Plazo Contractual =
Termino del Plazo Contractual =
S/. 347,815.90
0.92000
80
Dias Cal.
1 de junio de 2015
18 de agosto de 2015
ANTERIOR
PRESUPUESTO INICIAL
CANTIDAD
P. UNIT.
P. PARCIAL
P. TOTAL
METRADO
P. PARCIAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,861.23
30.00
1.00
1.00
38.73
1,099.21
600.00
1,162.02
1,099.21
600.00
1,309.63
440.00
722.75
1.02
1.19
449.68
859.95
8,509.79
111.05
92.49
80.00
30.66
37.39
20.59
3,404.85
3,458.04
1,646.89
26,820.83
66.22
40.76
349.14
199.47
31.40
35.33
13,207.80
1,279.77
12,333.25
196,844.29
12.37
491.67
1.64
13.12
269.92
8.99
92.18
523.48
5.76
67.20
1,003.32
16.03
228.70
347.79
4.10
396.18
59.80
4.10
364.07
57.04
4.10
464.05
62.21
4.10
427.38
57.26
4,301.51
2,014.51
649.74
784.55
1,105.93
3,274.26
5,258.35
2,144.84
2,672.96
4,180.85
4,110.84
6,848.83
13,095.13
2,498.99
34.52
219.36
4,272.90
49.61
566.96
3,979.20
4,724.00
4.33
30.16
345.13
4.10
401.95
75.05
4.10
419.38
62.09
4.10
2.27
444.20
64.58
4.10
10,239.02
13,873.73
16,463.80
17,507.19
20,805.21
35,200.08
16,303.81
10,724.52
1,922.95
1,947.61
1,414.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
29,665.18
265.50
151.20
83.51
49.56
22,172.35
7,492.83
981.12
1.00
981.12
981.12
S/. =
S/. =
S/.
=
S/. =
266,992.06
26,699.21
26,699.21
320,390.47
0.00
0.00
0.00
0.00
294,759.23
53,056.66
0.00
0.00
347,815.90
0.00
ESUPUESTO ESTRUCTURAS
S/.
AVANCE PROGRAMADO =
AVANCE EJECUTADO =
0.00%
0.00%
al
28/May/15)
Amortizacin del Adelanto Directo =
Amortizacin del Adelanto Materiales =
11,719.58
23,439.16
MONTO
VALORIZ. ACUM.
VALORIZACION
VALORIZ. ACUM.
CONTRATADO
ANTERIOR
ACTUAL
ACTUAL
Err:509
S/. 0.00
S/. 117,195.80
S/. 117,195.80
Err:509
S/. 0.00
0.00%
S/. 117,195.80
Err:509
S/. 117,195.80
Err:509
S/. 0.00
S/. 0.00
S/. 4,387.25
S/. 4,387.25
S/. 4,387.25
S/. 4,387.25
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 4,387.25
S/. 121,583.05
S/. 4,387.25
S/. 121,583.05
S/. 29,475.92
S/. 29,475.92
S/. 0.00
S/. 0.00
S/. 11,719.58
S/. 11,719.58
S/. 11,719.58
S/. 11,719.58
S/. 69,159.80
S/. 69,159.80
S/. 0.00
S/. 0.00
S/. 23,439.16
S/. 23,439.16
S/. 23,439.16
S/. 23,439.16
S/. 98,635.72
S/. 0.00
S/. 35,158.74
S/. 35,158.74
S/. 0.00
RESENTE VALORIZACION
S/. 0.00
S/. 86,424.31
S/. 86,424.31
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 86,424.31
S/. 15,556.38
S/. 86,424.31
S/. 15,556.38
S/. 0.00
S/. 101,980.68
S/. 101,980.68
S/. 101,980.68
ACTUAL
ACUMULADO
SALD
METRADO
P. PARCIAL
METRADO
P. PARCIAL
METRADO
30.00
1.00
0.33
1,162.02
1,099.21
198.00
30.00
1.00
0.33
1,162.02
1,099.21
198.00
100.00%
100.00%
33.00%
0.00
0.00
0.67
440.00
722.75
449.68
859.95
440.00
722.75
449.68
859.95
100.00%
100.00%
0.00
0.00
111.05
92.49
0.00
3,404.85
3,458.04
0.00
111.05
92.49
0.00
3,404.85
3,458.04
0.00
100.00%
100.00%
0.00%
0.00
0.00
80.00
66.22
40.76
349.14
13,207.80
1,279.77
12,333.25
66.22
40.76
349.14
13,207.80
1,279.77
12,333.25
100.00%
100.00%
100.00%
0.00
0.00
0.00
12.37
491.67
1.64
13.12
269.92
8.99
92.18
523.48
1.44
16.80
250.83
4.01
57.18
4,301.51
2,014.51
649.74
784.55
1,105.93
3,274.26
5,258.35
2,144.84
668.24
1,045.21
1,027.71
1,712.21
3,273.78
12.37
491.67
1.64
13.12
269.92
8.99
92.18
523.48
1.44
16.80
250.83
4.01
57.18
4,301.51
2,014.51
649.74
784.55
1,105.93
3,274.26
5,258.35
2,144.84
668.24
1,045.21
1,027.71
1,712.21
3,273.78
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
25.00%
25.00%
25.00%
25.00%
25.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.32
50.40
752.49
12.02
171.53
624.75
0.00
54.84
1,068.23
0.00
141.74
994.80
1,181.00
0.00
0.00
0.00
2,559.75
0.00
4,115.95
4,376.80
0.00
8,800.02
4,075.95
2,681.13
0.00
0.00
0.00
624.75
0.00
54.84
1,068.23
0.00
141.74
994.80
1,181.00
0.00
0.00
0.00
2,559.75
0.00
4,115.95
4,376.80
0.00
8,800.02
4,075.95
2,681.13
0.00
0.00
0.00
25.00%
0.00%
25.00%
25.00%
0.00%
25.00%
25.00%
25.00%
0.00%
0.00%
0.00%
1,874.25
34.52
164.52
3,204.68
49.61
425.22
2,984.40
3,543.00
4.33
30.16
345.13
132.75
75.60
11,086.18
3,746.41
132.75
75.60
11,086.18
3,746.41
50.00%
50.00%
132.75
75.60
0.00
0.00
0.00
0.00
0.00%
1.00
106,155.62
10,615.56
10,615.56
127,386.74
106,155.62
10,615.56
10,615.56
127,386.74
117,195.80
21,095.24
117,195.80
21,095.24
138,291.05
138,291.05
31.64%
39.76%
31.64%
39.76%
VALORIZ. ACUM.
SALDO POR
ACTUAL
DE AVANCE
VALORIZAR
S/. 117,195.80
Err:509
Err:509
S/. 117,195.80
Err:509
Err:509
Err:509
S/. 4,387.25
S/. 4,387.25
S/. 0.00
S/. 0.00
S/. 0.00
S/. 4,387.25
S/. 121,583.05
S/. 11,719.58
S/. 11,719.58
S/. 17,756.34
S/. 17,756.34
S/. 23,439.16
S/. 23,439.16
S/. 45,720.64
S/. 45,720.64
S/. 35,158.74
S/. 63,476.98
S/. 86,424.31
S/. 0.00
S/. 86,424.31
S/. 15,556.38
S/. 101,980.68
S/. 0.00
SALDO
P. PARCIAL
0.00
0.00
402.00
0.00%
0.00%
67.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
1,646.89
0.00%
0.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2,004.72
3,135.64
3,083.13
5,136.63
9,821.35
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
75.00%
75.00%
75.00%
75.00%
75.00%
7,679.26
13,873.73
12,347.85
13,130.39
20,805.21
26,400.06
12,227.86
8,043.39
1,922.95
1,947.61
1,414.08
75.00%
100.00%
75.00%
75.00%
100.00%
75.00%
75.00%
75.00%
100.00%
100.00%
100.00%
11,086.18
3,746.41
50.00%
50.00%
981.12
100.00%
160,836.45
16,083.65
16,083.65
193,003.74
177,563.44
31,961.42
209,524.86
68.36%
60.24%
347,815.91
RESUMEN DE METRAD
(Del 01/Jul/15
Obra
=
Entidad
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
ITEM
1.00.00
1.01.00
1.02.00
1.03.00
2.00.00
2.01.00
2.02.00
3.00.00
3.01.00
3.02.00
3.02.00
4.00.00
4.01.00
4.02.00
4.03.00
5.00.00
5.01.01
5.01.02
5.02.01
5.02.02
5.02.03
5.03.01
5.03.02
5.03.03
5.04.01
5.04.02
5.04.03
5.05.01
5.05.02
5.05.03
5.06.01
5.06.02
5.06.03
5.07.01
5.07.02
5.07.03
5.07.04
5.08.01
5.08.02
5.08.03
6.00.00
6.01.00
6.02.00
7.00.00
7.01.00
VALORIZACIN DE A
(Del 01/Jul/15
Obra
=
Entidad
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
ITEM
1.00.00
1.01.00
1.02.00
1.03.00
2.00.00
2.01.00
2.02.00
3.00.00
3.01.00
3.02.00
3.02.00
4.00.00
4.01.00
4.02.00
4.03.00
5.00.00
5.01.01
5.01.02
5.02.01
5.02.02
5.02.03
5.03.01
5.03.02
5.03.03
5.04.01
5.04.02
5.04.03
5.05.01
5.05.02
5.05.03
5.06.01
5.06.02
5.06.03
5.07.01
5.07.02
5.07.03
5.07.04
5.08.01
5.08.02
5.08.03
6.00.00
6.01.00
6.02.00
7.00.00
7.01.00
al
28/Jul/15)
METRADOS - Val. 01
UNIDAD
OBRAS PROVISIONALES
Caseta para Oficinas y Almacen
Cartel de Obra (2.40m x 4.80m)
Agua para la Construccin
m2.
Und.
Global
OBRAS PRELIMINARES
Limpieza Manual del Terreno
Trazo, Nivel y Replanteo
m2.
m2.
MOVIMIENTO DE TIERRAS
Excavaciones Manuales Simples
Relleno Compactado con Material Propio
Eliminacion de Material Excedente, Distancia Prom. 10 Km.
m3.
m3.
m3.
m3.
m2.
m2.
m3.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
und.
m3.
m2.
kg.
m2.
m2.
Global
al
28/Jul/15)
OBRAS PROVISIONALES
Caseta para Oficinas y Almacen
Cartel de Obra (2.40m x 4.80m)
Agua para la Construccin
m2.
Und.
Global
OBRAS PRELIMINARES
Limpieza Manual del Terreno
Trazo, Nivel y Replanteo
m2.
m2.
MOVIMIENTO DE TIERRAS
Excavaciones Manuales Simples
Relleno Compactado con Material Propio
Eliminacion de Material Excedente, Distancia Prom. 10 Km.
m3.
m3.
m3.
m3.
m2.
m2.
m3.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
und.
m3.
m2.
kg.
ALBAILERIA
Muros de Cabeza, con Ladrillo Maquinado, Mortero 1:4 (c-a)
Muros de Soga, con Ladrillo Maquinado, Mortero 1:5 (c-a)
m2.
m2.
LIMPIEZA, VARIOS
Limpieza Final de Obra
Global
PRESUPUESTO ESTRU
III.
VALORIZACIN N 02
28/Jul/15)
Valor Referencial =
Valor Referencial =
Monto Contractual =
Monto Contractual =
Factor de Relacin =
Plazo Contractual =
Inicio del Plazo Contractual =
Termino del Plazo Contractual =
METRADOS - Val. 01
(Sin IGV)
(Con IGV)
(Sin IGV)
(Con IGV)
S/.
S/.
S/.
S/.
0.92000
80
320,390.47
378,060.76
294,759.23
347,815.90
1 de junio de 2015
18 de agosto de 2015
RESUMEN DE METRADOS
CANTIDAD
ANTERIOR
EJECUTADO
ACUMULADO
SALDO
0.00
0.00
0.33
30.00
1.00
0.33
0.00
0.00
0.33
30.00
1.00
0.66
0.00
0.00
0.34
0.00
0.00
440.00
722.75
0.00
0.00
440.00
722.75
0.00
0.00
0.00
0.00
30.00
111.05
92.49
0.00
0.00
0.00
30.00
111.05
92.49
30.00
0.00
0.00
50.00
0.00
0.00
0.00
66.22
40.76
349.14
0.00
0.00
0.00
66.22
40.76
349.14
0.00
0.00
0.00
0.00
0.00
0.00
12.37
491.67
1.64
0.00
0.00
0.00
12.37
491.67
1.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.88
33.60
501.66
8.01
114.35
1,249.50
17.26
109.68
2,136.45
24.80
141.74
994.80
1,181.00
4.33
30.16
345.13
13.12
269.92
8.99
92.18
523.48
1.44
16.80
250.83
4.01
57.18
624.75
0.00
54.84
1,068.23
0.00
141.74
994.80
1,181.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.88
33.60
501.66
8.01
114.35
1,249.50
17.26
109.68
2,136.45
24.80
141.74
994.80
1,181.00
4.33
30.16
345.13
13.12
269.92
8.99
92.18
523.48
4.32
50.40
752.49
12.02
171.53
1,874.25
17.26
164.52
3,204.68
24.80
283.48
1,989.60
2,362.00
4.33
30.16
345.13
0.00
0.00
0.00
0.00
0.00
1.44
16.80
250.83
4.01
57.18
624.75
17.26
54.84
1,068.23
24.80
283.48
1,989.60
2,362.00
0.00
0.00
0.00
66.38
37.80
132.75
75.60
66.38
37.80
199.13
113.40
66.38
37.80
0.50
0.00
0.50
0.50
0.50
III.
CE DE OBRA - N 02
28/Jul/15)
Valor Referencial =
Valor Referencial =
Monto Contractual =
(Sin IGV)
(Con IGV)
(Sin IGV)
S/. 320,390.47
S/. 378,060.76
S/. 294,759.23
Monto Contractual =
Factor de Relacin =
Plazo Contractual =
Inicio del Plazo Contractual =
Termino del Plazo Contractual =
(Con IGV)
(Dias Cal.)
S/. 347,815.90
0.92000
80
11 de mayo de 2015
29 de julio de 2015
ANTERIOR
PRESUPUESTO INICIAL
CANTIDAD
P. UNIT.
P. PARCIAL
P. TOTAL
METRADO
2,861.23
30.00
1.00
1.00
38.73
1,099.21
600.00
1,162.02
1,099.21
600.00
30.00
1.00
0.33
1,309.63
440.00
722.75
1.02
1.19
449.68
859.95
440.00
722.75
8,509.79
111.05
92.49
80.00
30.66
37.39
20.59
3,404.85
3,458.04
1,646.89
111.05
92.49
0.00
26,820.83
66.22
40.76
349.14
199.47
31.40
35.33
13,207.80
1,279.77
12,333.25
66.22
40.76
349.14
196,844.29
12.37
491.67
1.64
13.12
269.92
8.99
92.18
523.48
5.76
67.20
1,003.32
16.03
228.70
347.79
4.10
396.18
59.80
4.10
364.07
57.04
4.10
464.05
62.21
4.10
427.38
57.26
4,301.51
2,014.51
649.74
784.55
1,105.93
3,274.26
5,258.35
2,144.84
2,672.96
4,180.85
4,110.84
6,848.83
13,095.13
12.37
491.67
1.64
13.12
269.92
8.99
92.18
523.48
1.44
16.80
250.83
4.01
57.18
2,498.99
34.52
219.36
4,272.90
49.61
566.96
3,979.20
4,724.00
4.33
30.16
345.13
4.10
401.95
75.05
4.10
419.38
62.09
4.10
2.27
444.20
64.58
4.10
10,239.02
13,873.73
16,463.80
17,507.19
20,805.21
35,200.08
16,303.81
10,724.52
1,922.95
1,947.61
1,414.08
624.75
0.00
54.84
1,068.23
0.00
141.74
994.80
1,181.00
0.00
0.00
0.00
29,665.18
265.50
151.20
83.51
49.56
22,172.35
7,492.83
132.75
75.60
981.12
1.00
981.12
981.12
0.00
S/. =
S/. =
S/.
=
S/. =
266,992.06
26,699.21
26,699.21
320,390.47
294,759.23
ESUPUESTO ESTRUCTURAS
S/.
53,056.66
AVANCE PROGRAMADO =
AVANCE EJECUTADO =
347,815.90
S/.
S/.
S/.
S/.
320,390.47
378,060.76
294,759.23
347,815.90
Dias Cal.
1 de junio de 2015
18 de agosto de 2015
S/. 320,390.47
S/. 378,060.76
S/. 294,759.23
S/. 347,815.90
Dias Cal.
11 de mayo de 2015
29 de julio de 2015
ANTERIOR
ACTUAL
ACUMULADO
P. PARCIAL
METRADO
P. PARCIAL
METRADO
P. PARCIAL
1,162.02
1,099.21
198.00
0.00
0.00
0.33
0.00
0.00
198.00
30.00
1.00
0.66
1,162.02
1,099.21
396.00
449.68
859.95
0.00
0.00
0.00
0.00
440.00
722.75
449.68
859.95
3,404.85
3,458.04
0.00
0.00
0.00
30.00
0.00
0.00
617.58
111.05
92.49
30.00
3,404.85
3,458.04
617.58
13,207.80
1,279.77
12,333.25
0.00
0.00
0.00
0.00
0.00
0.00
66.22
40.76
349.14
13,207.80
1,279.77
12,333.25
4,301.51
2,014.51
649.74
784.55
1,105.93
3,274.26
5,258.35
2,144.84
668.24
1,045.21
1,027.71
1,712.21
3,273.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.88
33.60
501.66
8.01
114.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,336.48
2,090.42
2,055.42
3,424.42
6,547.57
12.37
491.67
1.64
13.12
269.92
8.99
92.18
523.48
4.32
50.40
752.49
12.02
171.53
4,301.51
2,014.51
649.74
784.55
1,105.93
3,274.26
5,258.35
2,144.84
2,004.72
3,135.64
3,083.13
5,136.63
9,821.35
2,559.75
0.00
4,115.95
4,376.80
0.00
8,800.02
4,075.95
2,681.13
0.00
0.00
0.00
1,249.50
17.26
109.68
2,136.45
24.80
141.74
994.80
1,181.00
4.33
30.16
345.13
5,119.51
6,936.87
8,231.90
8,753.59
10,402.60
8,800.02
4,075.95
2,681.13
1,922.95
1,947.61
1,414.08
1,874.25
17.26
164.52
3,204.68
24.80
283.48
1,989.60
2,362.00
4.33
30.16
345.13
7,679.26
6,936.87
12,347.85
13,130.39
10,402.60
17,600.04
8,151.90
5,362.26
1,922.95
1,947.61
1,414.08
11,086.18
3,746.41
66.38
37.80
5,543.09
1,873.21
199.13
113.40
16,629.27
5,619.62
0.00
0.50
490.56
0.50
490.56
106,155.62
10,615.56
10,615.56
127,386.74
84,462.96
8,446.30
8,446.30
101,355.55
190,618.58
19,061.86
19,061.86
228,742.30
117,195.80
93,247.11
210,442.91
21,095.24
16,784.48
37,879.72
138,291.05
110,031.59
248,322.64
31.64%
39.76%
45.95%
31.64%
77.60%
71.39%
ULADO
SALDO
METRADO
P. PARCIAL
100.00%
100.00%
66.00%
0.00
0.00
0.34
0.00
0.00
204.00
0.00%
0.00%
34.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
100.00%
100.00%
37.50%
0.00
0.00
50.00
0.00
0.00
1,029.31
0.00%
0.00%
62.50%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
75.00%
75.00%
75.00%
75.00%
75.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.44
16.80
250.83
4.01
57.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
668.24
1,045.21
1,027.71
1,712.21
3,273.78
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
25.00%
25.00%
25.00%
25.00%
25.00%
75.00%
50.00%
75.00%
75.00%
50.00%
50.00%
50.00%
50.00%
100.00%
100.00%
100.00%
624.75
17.26
54.84
1,068.23
24.80
283.48
1,989.60
2,362.00
0.00
0.00
0.00
2,559.75
6,936.87
4,115.95
4,376.80
10,402.60
17,600.04
8,151.90
5,362.26
0.00
0.00
0.00
25.00%
50.00%
25.00%
25.00%
50.00%
50.00%
50.00%
50.00%
0.00%
0.00%
0.00%
75.00%
75.00%
66.38
37.80
5,543.09
1,873.21
25.00%
25.00%
50.00%
0.50
490.56
50.00%
76,373.49
7,637.35
7,637.35
91,648.19
84,316.33
15,176.94
99,493.27
22.40%
28.61%
347,815.91
RESUMEN DE METRADOS
(Del 01/Agost./15
Obra
=
Entidad
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
ITEM
1.00.00
1.01.00
1.02.00
1.03.00
2.00.00
2.01.00
2.02.00
3.00.00
3.01.00
3.02.00
3.02.00
4.00.00
4.01.00
4.02.00
4.03.00
5.00.00
5.01.01
5.01.02
5.02.01
5.02.02
5.02.03
5.03.01
5.03.02
5.03.03
5.04.01
5.04.02
5.04.03
5.05.01
5.05.02
5.05.03
5.06.01
5.06.02
5.06.03
5.07.01
5.07.02
5.07.03
5.07.04
5.08.01
5.08.02
5.08.03
6.00.00
6.01.00
6.02.00
7.00.00
7.01.00
VALORIZACIN DE AVA
(Del 01/Agost./15
Obra
=
Entidad
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
ITEM
1.00.00
1.01.00
1.02.00
1.03.00
2.00.00
2.01.00
2.02.00
3.00.00
3.01.00
3.02.00
3.02.00
4.00.00
4.01.00
4.02.00
4.03.00
5.00.00
5.01.01
5.01.02
5.02.01
5.02.02
5.02.03
5.03.01
5.03.02
5.03.03
5.04.01
5.04.02
5.04.03
5.05.01
5.05.02
5.05.03
5.06.01
5.06.02
5.06.03
5.07.01
5.07.02
5.07.03
5.07.04
5.08.01
5.08.02
5.08.03
6.00.00
6.01.00
6.02.00
7.00.00
7.01.00
al
18/Agost/15)
METRADOS - Val. 01
UNIDAD
OBRAS PROVISIONALES
Caseta para Oficinas y Almacen
Cartel de Obra (2.40m x 4.80m)
Agua para la Construccin
m2.
Und.
Global
OBRAS PRELIMINARES
Limpieza Manual del Terreno
Trazo, Nivel y Replanteo
m2.
m2.
MOVIMIENTO DE TIERRAS
Excavaciones Manuales Simples
Relleno Compactado con Material Propio
Eliminacion de Material Excedente, Distancia Prom. 10 Km.
m3.
m3.
m3.
m3.
m2.
m2.
m3.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
und.
m3.
m2.
kg.
m2.
m2.
Global
al
18/Agost/15)
OBRAS PROVISIONALES
Caseta para Oficinas y Almacen
Cartel de Obra (2.40m x 4.80m)
Agua para la Construccin
m2.
Und.
Global
OBRAS PRELIMINARES
Limpieza Manual del Terreno
Trazo, Nivel y Replanteo
m2.
m2.
MOVIMIENTO DE TIERRAS
Excavaciones Manuales Simples
Relleno Compactado con Material Propio
Eliminacion de Material Excedente, Distancia Prom. 10 Km.
m3.
m3.
m3.
m3.
m2.
m2.
m3.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
m3.
m2.
kg.
und.
m3.
m2.
kg.
ALBAILERIA
Muros de Cabeza, con Ladrillo Maquinado, Mortero 1:4 (c-a)
Muros de Soga, con Ladrillo Maquinado, Mortero 1:5 (c-a)
m2.
m2.
LIMPIEZA, VARIOS
Limpieza Final de Obra
Global
COSTO DIRECTO DE OB
GASTO GENERAL ( 10%
UTILIDAD
( 10%
SUB TOTAL DE OBRA
PRESUPUESTO ESTR
III.
LORIZACIN N 03
8/Agost/15)
Valor Referencial =
(Sin IGV)
Valor Referencial =
(Con IGV)
Monto Contractual =
(Sin IGV)
Monto Contractual =
(Con IGV)
Factor de Relacin =
Plazo Contractual =
Inicio del Plazo Contractual =
Termino del Plazo Contractual =
METRADOS - Val. 01
S/.
S/.
S/.
S/.
0.92000
80
320,390.47
378,060.76
294,759.23
347,815.90
1 de junio de 2015
18 de agosto de 2015
RESUMEN DE METRADOS
CANTIDAD
ANTERIOR
EJECUTADO
ACUMULADO
SALDO
0.00
0.00
0.34
30.00
1.00
0.66
0.00
0.00
0.34
30.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
440.00
722.75
0.00
0.00
440.00
722.75
0.00
0.00
0.00
0.00
50.00
111.05
92.49
30.00
0.00
0.00
50.00
111.05
92.49
80.00
0.00
0.00
0.00
0.00
0.00
0.00
66.22
40.76
349.14
0.00
0.00
0.00
66.22
40.76
349.14
0.00
0.00
0.00
0.00
0.00
0.00
12.37
491.67
1.64
0.00
0.00
0.00
12.37
491.67
1.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.44
16.80
250.83
4.01
57.18
624.75
17.26
54.84
1,068.23
24.80
283.48
1,989.60
2,362.00
0.00
0.00
0.00
13.12
269.92
8.99
92.18
523.48
4.32
50.40
752.48
12.02
171.53
1,874.25
17.26
164.52
3,204.68
24.80
283.48
1,989.60
2,362.00
4.33
30.16
345.13
0.00
0.00
0.00
0.00
0.00
1.44
16.80
250.83
4.01
57.18
624.75
17.26
54.84
1,068.23
24.80
283.48
1,989.60
2,362.00
0.00
0.00
0.00
13.12
269.92
8.99
92.18
523.48
5.76
67.20
1,003.31
16.03
228.70
2,498.99
34.52
219.36
4,272.90
49.61
566.96
3,979.20
4,724.00
4.33
30.16
345.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
66.38
37.80
199.13
113.40
66.38
37.80
265.50
151.20
0.00
0.00
0.50
0.50
0.50
1.00
0.00
III.
DE OBRA - N 03
8/Agost/15)
Valor Referencial =
Valor Referencial =
Monto Contractual =
(Sin IGV)
(Con IGV)
(Sin IGV)
S/. 320,390.47
S/. 378,060.76
S/. 294,759.23
Monto Contractual =
(Con IGV)
Factor de Relacin =
Plazo Contractual =
(Dias Cal.)
Inicio del Plazo Contractual =
Termino del Plazo Contractual =
S/. 347,815.90
0.92000
80
11 de mayo de 2015
29 de julio de 2015
ANTERIOR
PRESUPUESTO INICIAL
CANTIDAD
P. UNIT.
P. PARCIAL
P. TOTAL
METRADO
2,861.23
30.00
1.00
1.00
38.73
1,099.21
600.00
1,162.02
1,099.21
600.00
30.00
1.00
0.66
1,309.63
440.00
722.75
1.02
1.19
449.68
859.95
440.00
722.75
8,509.79
111.05
92.49
80.00
30.66
37.39
20.59
3,404.85
3,458.04
1,646.89
111.05
92.49
30.00
26,820.83
66.22
40.76
349.14
199.47
31.40
35.33
13,207.80
1,279.77
12,333.25
66.22
40.76
349.14
196,844.29
12.37
491.67
1.64
13.12
269.92
8.99
92.18
523.48
5.76
67.20
1,003.32
16.03
228.70
347.79
4.10
396.18
59.80
4.10
364.07
57.04
4.10
464.05
62.21
4.10
427.38
57.26
4,301.51
2,014.51
649.74
784.55
1,105.93
3,274.26
5,258.35
2,144.84
2,672.96
4,180.85
4,110.84
6,848.83
13,095.13
12.37
491.67
1.64
13.12
269.92
8.99
92.18
523.48
4.32
50.40
752.49
12.02
171.53
2,498.99
34.52
219.36
4,272.90
49.61
566.96
3,979.20
4,724.00
4.33
30.16
345.13
4.10
401.95
75.05
4.10
419.38
62.09
4.10
2.27
444.20
64.58
4.10
10,239.02
13,873.73
16,463.80
17,507.19
20,805.21
35,200.08
16,303.81
10,724.52
1,922.95
1,947.61
1,414.08
1,874.25
17.26
164.52
3,204.68
24.80
283.48
1,989.60
2,362.00
4.33
30.16
345.13
29,665.18
265.50
151.20
83.51
49.56
22,172.35
7,492.83
199.13
113.40
981.12
1.00
981.12
981.12
0.50
S/. =
S/. =
S/.
=
S/. =
266,992.06
26,699.21
26,699.21
320,390.47
294,759.23
ESUPUESTO ESTRUCTURAS
S/.
53,056.66
347,815.90
AVANCE PROGRAMADO =
AVANCE EJECUTADO =
S/.
S/.
S/.
S/.
320,390.47
378,060.76
294,759.23
347,815.90
Dias Cal.
1 de junio de 2015
18 de agosto de 2015
34.52
219.36
4,272.90
49.61
566.96
3,979.20
4,724.00
4.33
30.16
345.13
265.50
151.20
1.00
S/. 320,390.47
S/. 378,060.76
S/. 294,759.23
S/. 347,815.90
Dias Cal.
11 de mayo de 2015
29 de julio de 2015
ANTERIOR
ACTUAL
ACUMULADO
P. PARCIAL
METRADO
P. PARCIAL
METRADO
P. PARCIAL
1,162.02
1,099.21
396.00
0.00
0.00
0.34
0.00
0.00
204.00
30.00
1.00
1.00
1,162.02
1,099.21
600.00
449.68
859.95
0.00
0.00
0.00
0.00
440.00
722.75
449.68
859.95
3,404.85
3,458.04
617.58
0.00
0.00
50.00
0.00
0.00
1,029.31
111.05
92.49
80.00
3,404.85
3,458.04
1,646.89
13,207.80
1,279.77
12,333.25
0.00
0.00
0.00
0.00
0.00
0.00
66.22
40.76
349.14
13,207.80
1,279.77
12,333.25
4,301.51
2,014.51
649.74
784.55
1,105.93
3,274.26
5,258.35
2,144.84
2,004.72
3,135.64
3,083.13
5,136.63
9,821.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.44
16.80
250.83
4.01
57.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
668.24
1,045.21
1,027.71
1,712.21
3,273.78
12.37
491.67
1.64
13.12
269.92
8.99
92.18
523.48
5.76
67.20
1,003.32
16.03
228.70
4,301.51
2,014.51
649.74
784.55
1,105.93
3,274.26
5,258.35
2,144.84
2,672.96
4,180.85
4,110.84
6,848.83
13,095.13
7,679.26
6,936.87
12,347.85
13,130.39
10,402.60
17,600.04
8,151.90
5,362.26
1,922.95
1,947.61
1,414.08
624.75
17.26
54.84
1,068.23
24.80
283.48
1,989.60
2,362.00
0.00
0.00
0.00
2,559.75
6,936.87
4,115.95
4,376.80
10,402.60
17,600.04
8,151.90
5,362.26
0.00
0.00
0.00
2,498.99
34.52
219.36
4,272.90
49.61
566.96
3,979.20
4,724.00
4.33
30.16
345.13
10,239.02
13,873.73
16,463.80
17,507.19
20,805.21
35,200.08
16,303.81
10,724.52
1,922.95
1,947.61
1,414.08
16,629.27
5,619.62
66.38
37.80
5,543.09
1,873.21
265.50
151.20
22,172.35
7,492.83
490.56
0.50
490.56
1.00
981.12
190,618.58
19,061.86
19,061.86
228,742.30
76,373.49
7,637.35
7,637.35
91,648.18
266,992.07
26,699.21
26,699.21
320,390.48
210,442.91
84,316.32
294,759.23
37,879.72
15,176.94
53,056.66
248,322.64
99,493.26
347,815.90
77.60%
71.39%
22.40%
28.61%
100.00%
100.00%
ULADO
SALDO
METRADO
P. PARCIAL
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
100.00%
0.00
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
347,815.90
CALCULO DEL R
Obra
=
Entidad
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
PROGRAMADO
VALORIZACIN
Fecha
31-May-15
30-Jun-15
29-Jul-15
93,271.71
93,271.71
135,452.84
228,724.55
66,034.69
294,759.23
K
1.037
1.039
1.039
<
III.
GUEL - PIURA.
Valor Referencial =
Valor Referencial =
Monto Contractual =
Monto Contractual =
Factor de Relacin =
Plazo Contractual =
Inicio del Plazo Contractual =
Termino del Plazo Contractual =
AMADO
EJECUTADO
R=V*(K-1)
3,491.64
3,491.64
5,276.10
8,767.74
2,559.02
11,326.76
V
117,195.80
117,195.80
93,247.11
210,442.91
84,316.32
294,759.23
K
1.037
1.039
1.039
R=V*(K-1)
4,387.25
4,387.25
3,632.12
8,019.36
3,267.48
11,286.85
ESTADO DE
OBRA
Adelantada
Atrasada
Culmino
Programados
el Avance
minado
(Sin IGV)
(Con IGV)
(Sin IGV)
(Con IGV)
S/.
S/.
S/.
S/.
0.92000
80
320,390.47
378,060.76
294,759.23
347,815.90
Dias Cal.
11 de mayo de 2015
29 de julio de 2015
Reajuste Bruto
Autorizado
4,387.25
4,387.25
3,632.12
8,019.36
3,267.48
11,286.85
DEDUCCIONES
DIRECTO
MATERIALES
13.63
13.63
10.71
24.34
eajuste Reconocido
Reajustes Ejecutados
nce Real Acumulado esta por encima del Avance
ramado Acumulado, a un Periodo Determinado
46.56
46.56
1.70
48.26
REAJUSTE
AUTORIZADO
4,387.25
4,387.25
3,571.93
7,959.18
3,255.07
11,214.25
III.
RESUMEN DE VALORIZACIN N 01
( MAYO 2015 )
Obra
=
Entidad
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
S/. 4,387.25
S/. 0.00
S/. 0.00
S/. 0.00
S/. 35,022.82
S/. 11,719.58
S/. 23,303.24
S/. 15,580.84
III.
RESUMEN DE VALORIZACIN N 02
( JUNIO 2015 )
Obra
=
Entidad
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
S/. 3,632.12
S/. 60.19
S/. 13.63
S/. 46.56
S/. 27,865.99
S/. 9,324.71
S/. 18,541.28
S/. 12,411.55
III.
RESUMEN DE VALORIZACIN N 03
( JULIO 2015 )
Obra
=
Entidad
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
S/. 3,267.48
S/. 12.41
S/. 10.71
S/. 1.70
S/. 25,197.11
S/. 8,431.63
S/. 16,765.48
S/. 11,227.37
RIZACIN N 01
15 )
IGUEL - PIURA.
S/. 117,195.80
S/. 4,387.25
S/. 0.00
S/. 0.00
S/. 0.00
S/. 121,583.05
S/. 35,022.82
S/. 11,719.58
S/. 23,303.24
S/. 86,560.23
S/. 15,580.84
S/. 102,141.07
RIZACIN N 02
15 )
IGUEL - PIURA.
S/. 93,247.11
S/. 3,632.12
S/. 60.19
S/. 13.63
S/. 46.56
S/. 96,819.04
S/. 27,865.99
S/. 9,324.71
S/. 18,541.28
S/. 68,953.05
S/. 12,411.55
S/. 81,364.60
RIZACIN N 03
15 )
IGUEL - PIURA.
S/. 84,316.32
S/. 3,267.48
S/. 12.41
S/. 10.71
S/. 1.70
S/. 87,571.39
S/. 25,197.11
S/. 8,431.63
S/. 16,765.48
S/. 62,374.28
S/. 11,227.37
S/. 73,601.65
S/. 102,141.07
S/. 81,364.60
S/. 73,601.65
CONTROL DE VALORIZACIONES
( MAYO 2015 )
Obra
=
Entidad
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
Formulas Polinomicas
Adel. Directo
OBRAS DE ESTRUCTURAS
29,475.92
Fecha
Monto
Valorizado
Reajustes
del Mes
1
2
3
31-May-15
30-Jun-15
29-Jul-15
117,195.80
93,247.11
84,316.32
4,387.25
3,632.12
3,267.48
294,759.23
11,286.84
VALORIZACIN
SUMATORIA
Montos sin
III.
III
RESUMEN DE PAGOS EN
( MAYO - JULIO
Obra
=
Entidad
=
Ubicacin =
Fecha
=
Proceso
=
Modalidad =
Contratista =
Residente =
Supervisor =
RESUMEN DE PAGOS EN
1.- MONTO DE LAS VALORIZACIONES PAGADAS =
(Con IGV)
Valorizacin N 01
Valorizacin N 02
Valorizacin N 03
=
=
=
S/. 102,141.07
S/. 81,364.60
S/. 73,601.65
S/. 34,781.59
S/. 69,159.80
ORIZACIONES
015 )
Valor Referencial =
Valor Referencial =
Monto Contractual =
Monto Contractual =
Factor de Relacin =
Plazo Contractual =
Inicio del Plazo Contractual =
Termino del Plazo Contractual =
Area Geografica =
58,610.00
Del Contrato
294,759.23
Adel. Directo
Adel. Mater.
Valorizacin
BRUTA
Adel. Directo
0.00
13.63
10.71
0.00
46.56
1.70
121,583.05
96,819.04
87,571.39
11,719.58
9,324.71
8,431.63
24.34
48.26
305,973.48
29,475.92
DEDUCCIONES
III.
AMORTOZACIONES
N DE PAGOS EN VALORIZACINES
( MAYO - JULIO, 2015 )
IN - PIURA.
S/. 294,759.23
S/. 11,286.84
S/. 72.60
S/. 24.34
S/. 48.26
S/. 305,973.48
S/. 88,085.92
S/. 29,475.92
S/. 58,610.00
S/. 217,887.55
S/. 39,219.76
S/. 257,107.32
N DE PAGOS EN VALORIZACINES
S/. 257,107.32
S/. 102,141.07
S/. 81,364.60
S/. 73,601.65
S/. 103,941.40
S/. 34,781.59
S/. 69,159.80
S/. 361,048.71
S/. 347,815.90
III.
ntractual =
ntractual =
Relacin =
tractual =
Plazo Contractual =
el Plazo Contractual =
(Sin IGV)
(Con IGV)
(Sin IGV)
(Con IGV)
S/.
S/.
S/.
S/.
80
320,390.47
378,060.76
294,759.23
347,815.90
0.92000
Dias Calendario
11 de mayo de 2015
29 de julio de 2015
Adel. Mater.
Valorizacin
NETA
I.G.V.
( 18% )
Valorizacin
LIQUIDA
23,303.24
18,541.28
16,765.48
86,560.23
68,953.05
62,374.28
15,580.84
12,411.55
11,227.37
102,141.07
81,364.60
73,601.65
58,610.00
217,887.55
39,219.76
257,107.31
AMORTOZACIONES