02 Servicios Higienicos
02 Servicios Higienicos
SISTEMA
DISTRITO
:
:
:
FECHA
LUGAR
#REF!
#REF!
#REF!
#REF!
#REF!
Especificaciones
Partda.
MEDIDAS
02.00
Largo
LINEA DE CONDUCCION (
02.01
TRABAJOS PRELIMINARES
02.01.01
02.02
MOVIMIENTO DE TIERRAS
02.02.01
1070.00
Ancho
Total
Altura
parcial
) ml
1,070.00
1,070.00
1,070.00
190.00
190.00
190.00
02.02.02
680.00
680.00
680.00
02.02.03
200.00
200.00
200.00
02.02.04
1,070.00
1,070.00
1,070.00
02.02.05
1,070.00
1,070.00
1,070.00
02.02.06
1,070.00
1,070.00
1,070.00
DETALLE DE LA ZANJA
Relleno compactado
en capas de 0.30mts.
0.8
Cubierta de tierra
0.40
Tuberia de agua
0.30
tamizada e=0.10-0.15m
0.10
Lecho de tierra
0.10
tamizada e=0.10-0.15m
0.5
02.03
02.03.01
1,070.00
02.03.02
1,070.00
#REF!
#REF!
#REF!
#REF!
#REF!
total
Und.
1,070.00
ml
190.00
ml
680.00
ml
200.00
ml
1,070.00
ml
1,070.00
ml
1,070.00
ml
1,070.00
m.l.
1,070.00
m.l.
ml
HOJA DE METRADOS
RED DE DISTRIBUCION L=15270m
1.- NOMBRE DEL
PROYECTO
2.- DISTRITO
3.- FECHA
#REF!
:
:
:
#REF!
#REF!
Especificaciones
Partida
N de
5
05.01
05.01.01
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
MEDIDAS
veces
Largo
TRABAJOS PRELIMINARES
Trazo Nivelacion y replanteo de zanjas
15,400
MOVIMIENTO DE TIERRAS
Excavacin de zanjaslen Terreno suelto 0.50 x0.90
Excavacion manual en roca suelta 0.50x0.90
Refine, nivelacin y Compactacin de fondos
Cama de apoyo para tuberas e=10cms
Relleno compactado de zanjas 0.50x0.80
1
1
1
1
1
9,870
5,400
15,400
15,400
15,400
Ancho
Parcial
Altura
Total
total
parcial
RED DE DISTRIBUCION
1.00
1.00
1.00
1.00
0.50
###
###
###
###
0.80
15,400
15,400
15,400
9,870
5,400
15,400
15,400
6,160
9,870
5,400
15,400
15,400
6,160
9,870
5,400
15,400
15,400
6,160
6,030
1,120
3,610
1,800
2,840
15,400
6,030
1,120
3,610
1,800
2,840
15,400
1
65
60
50
30
25
35
55
85
25
25
1
65
60
50
30
25
35
55
85
25
25
Relleno compactado
en capas de 0.30mts.
0.9
Cubierta de tierra
0.3
Tuberia de agua
0.3
tamizada e=0.10-0.15m
Lecho de tierra
tamizada e=0.10-0.15m
0.10
0.10
0.50
DETALLE DE LA ZANJA
05.03
05.03.01
05.03.02
05.03.03
05.03.04
05.03.05
05.03.06
1
1
1
1
1
1
05.04
05.04.01
VALVULAS Y ACCESORIOS
Suministro de Vlvulas y Accesorios - Red
Tee PVC SAP de 1"
Tee PVC SAP de 1/2"
Tee PVC SAP de 3/4"
Codo PVC de 3/4" x 90
Codo PVC de 1"x22.5
Codo PVC de 3/4"x22.5
Reduccin PVC SAP de 1 " a 1/2"
Reduccin PVC SAP de 3/4" a 1/2"
Cruz PVC SAP de 3/4"
Tapn PVC SAP de 3/4"
65.00
60.00
50.00
30.00
25.00
35.00
55.00
85.00
25.00
25.00
6,030.00
1,120.00
3,610.00
1,800.00
2,840.00
15,400.00
6,030
1,120
3,610
1,800
2,840
15,400
DE DISTRIBUCION L=15270m
#REF!
Und.
ml
ml
ml
ml
ml
ml
ml
ml
ml
ml
ml
ml
und
und
und
und
und
und
und
und
und
und
und
HOJA DE METRADOS
VALVULA DE PURGA
#REF!
2.- ENTIDAD
:
###
3.- FECHA
Part.
Especificaciones
veces
MEDIDAS
Largo
Ancho
Parcial
Altura
Total
parcial
8.0 ( Unid)
08.01.00
08.01.01
TRABAJOS PRELIMINARES
Limpieza del terreno
1.00
0.90
0.90
0.90
08.01.02
1.00
0.90
0.90
0.90
08.02.00
08.02.01
MOVIMIENTO DE TIERRAS
Excavacion manual en material Suelto
1.00
0.90
0.45
0.45
08.02.02
1.00
0.90
0.90
0.90
08.02.03
0.45
1.20
08.03.00
08.03.01
2.60
0.30
0.10
0.08
0.08
08.03.02
2.60
0.10
0.90
0.23
0.23
08.03.03
2.60
0.90
2.34
4.68
08.04.00
08.04.01
TARRAJEOS
Tarrajeo en interiores y exteriores (Mortero 1:5)
0.90
0.60
1.98
1.80
15.84
14.40
08.05.00
08.05.01
VALVULAS Y ACCESORIOS
Suministro y coloc. de Vlv. Y accesorios de 1"
Vlvula tipo Globo de 1"
Unin Universal PVC de 1"
Niples PVC SAP de 1" x 1"
Adaptadores PVC SAP 1"
Tee PVC SAP de 1"
4
1
2
2
2
1
4.00
1.00
2.00
2.00
2.00
1.00
08.05.02
4
2
4
4
4
2
4.00
2.00
4.00
4.00
4.00
2.00
08.06.00
08.06.01
OTROS
Tapa Metlica de 0.50 x0.60
Pintura Esmalte en Muros Exteriores
1
1
1.00
1.67
1
1
2.20
3.00
0.50
0.54
HOJA DE METRADOS
total
Und.
8.00
7.20
7.20
3.60
7.20
4.32
0.62
1.87
m3
37.44
m2
30.24
m2
4.00
1.00
2.00
2.00
2.00
1.00
glb.
und
und
und
und
und
4.00
2.00
4.00
4.00
4.00
2.00
glb
und
und
und
und
und
8.00
13.36
und
m2
HOJA DE METRADOS
CRUCE RIO
1.- NOMBRE DEL PROYECTO
#R
2.3.4.5.-
:
:
:
:
#R
#R
#R
#R
SISTEMA
LUGAR
DISTRITO
FECHA
Partida
N
Especificaciones
N de
veces
Largo
MEDIDAS
Ancho
9.00
CRUCE RIO,
9.01
09.01.01
09.01.01
TRABAJOS PRELIMINARES
Limpieza del terreno
Trazo y replanteo preliminar
2
2
10.00
10.00
1.00
1.00
9.02
09.02.01
MOVIMIENTO DE TIERRAS
Excavacion manual de terreno natural
10.00
0.70
9.03
.9.03.01
OBRAS DE C SIMPLE.
F'c=140 Kg/cm2; Dado CS(.50x0.40x.40)
12.00
0.60
Parcial
Total
parcial
Altura
2 Und
LT= 10 ml
10.00
10.00
20.00
20.00
1.20
8.40
16.80
1.20
8.64
17.28
17.28
Tuberia PEAD
PLANO EN PLANTA
Tuberia PVC
0.5
13.00
0.40
###
0.50
0.50
h >= 1.20
F'c=140Kg/cm2
14.00
PERFIL LONGITUDINAL
9.04
09.04.01
09.04.02
ACCESORIOS
Colocacion de accesorios
Suministro de accesorios cruce riachuelo
1 Tuberia PEAD d=63mm
2 Union PVC PEAD D=63mm
1
1
2
1
14.00
2.00
14.00
2.00
1.00
1.00
28.00
2.00
#REF!
#REF!
#REF!
#REF!
#REF!
total
Und.
20.00
20.00
ml
ml
16.80
m3
17.28
0.40
0.40
1.00 und
1.00 und
28.00
ml
2.00 und
HOJA DE METRADOS
CRUCE CARRETERA
#REF!
1.2.3.4.5.-
Partida
N
##
##
##
##
Especificaciones
N de
veces
Largo
MEDIDAS
Ancho
Parcial
Total
parcial
10.00
10.00
20.00
20.00
Altura
10.00
2 Und
LT= 10 ml
10.01
10.01.01
10.01.02
TRABAJOS PRELIMINARES
Limpieza del terreno
Trazo y replanteo preliminar
2
2
10.00
10.00
1.00
1.00
10.02
10.02.01
MOVIMIENTO DE TIERRAS
Excavacion manual de terreno natural
10.00
0.70
1.20
8.40
16.80
10.03
10.03.01
OBRAS DE C SIMPLE.
F'c=140 Kg/cm2; Dado CS(.50x0.40x.40)
12.00
0.40
0.40
1.92
3.84
3.84
Tuberia PEAD
PLANO EN PLANTA
Tuberia PVC
###
10.00
h=1.2
0.40
### 0.50
0.50
Dados de concreto simple
Tub. PEAD L=15ml
F'c=140Kg/cm2
10.00
PERFIL LONGITUDINAL
10.04
10.04.01
10.04.02
1
3
2
1
3
3
15.00
2.00
15.00
2.00
2.00
1.00
45.00
6.00
#REF!
total
Und.
20.00
20.00
ml
ml
16.80
m3
3.84
0.40
0.40
2.00 und
1.00 und
45.00
ml
6.00 und
HOJA DE METRADOS
PROYECTO
#REF!
LUGAR
AYUPALCA
DISTRITO
MAZOCRUZ
FECHA
#REF!
PARTIDA
14
14.01
14.01.01
65.00
1.00
DESCRIPCIN
UNID.
LETRINAS ECOLOGIAS
TRABAJOS PRELIMINARES
Limpieza de terreno manual
MOVIMIENTO DE TIERRAS
Excavacin de Zanjas caseta
14.02.03
m
Pozo de percolacion
Centro Educativo
Pozo de percolacion
14.02.04
14.03
14.03.01
ALTO
PARCIAL
1.00
1.70
2.00
1.80
1.00
3.06
2.00
1.00
3.50
2.80
4.80
1.80
16.80
5.04
1.00
1.70
2.00
1.80
1.00
3.06
2.00
1.00
3.50
2.80
4.80
1.80
16.80
5.04
1.00
1.00
1.00
5.10
6.00
1.00
0.40
0.40
2.00
0.60
1.00
1.80
1.22
2.40
3.60
2.00
2.00
1.00
1.00
1.00
3.50
4.10
4.50
6.00
2.80
0.40
0.40
0.40
0.40
1.80
0.40
0.40
0.40
1.00
1.90
1.12
1.31
0.72
2.40
9.58
1.25
6.00
0.40
1.00
3.00
1.25
7.50
0.40
1.00
3.75
1.00
2.00
1.00
0.60
1.20
1.00
2.80
1.80
0.60
3.02
1.25
1.25
274.30
12.11
1.00
5.10
0.40
0.60
1.22
2.00
2.00
1.00
3.50
4.10
4.50
0.40
0.40
0.40
0.40
0.40
0.40
1.12
1.31
0.72
1.00
1.00
6.00
1.10
0.0518
0.0959
1.10
0.08
0.08
0.10
0.004
0.575
1.00
1.00
6.00
1.10
4.800
1.100
1.10
0.10
1.10
1.21
0.48
7.26
1.00
2.00
2.50
1.85
m
Cimentacin caseta
Excavacin conducto percolacin
Excavacin pozo percolacin
Centro Educativo
Cimentacin caseta
14.02.02
MEDIDAS
ANCHO
m
Caseta
Pozo Precolacin
Centro Educativo
Caseta
Pozo Precolacin
14.02
14.02.01
LARGO
m
Caseta
Pozo Precolacin
Centro Educativo
Caseta
Pozo Precolacin
14.01.02
CANT.
m
342.88
15.14
m
Centro Educativo
14.04
14.04.01
14.04.01.01
14.04.01.02
14.04.01.03
Kg
Centro Educativo
14.05
14.05.01
2.50
4.80
6.25
17.76
14.05.02
und
4.00
16.00
1.00
1.00
4.00
16.00
und
4.00
12.00
1.00
1.00
4.00
12.00
und
4.00
20.00
1.00
1.00
4.00
20.00
und
20.00
46.00
1.00
20.00
46.00
und
1.00
6.00
1.00
1.00
1.00
6.00
und
1.00
4.00
Centro Educativo
14.05.03
14.05.04
14.05.05
14.05.06
Puerta Tipo I
Centro Educativo
14.05.07
Ventana tipo I
Centro Educativo
14.06
14.06.01
MUROS DE ADOBE
Muro de Adobe de 30x40x12cm
m2
puerta (-)
Centro Educativo
14.07
14.07.01
1.00
4.00
2.00
2.00
-1.00
1.80
1.20
0.90
2.05
2.20
1.70
7.38
5.28
-1.53
4.00
12.00
1.00
3.10
0.30
4.50
2.05
1.90
2.35
25.42
6.84
10.58
2.00
2.00
-1.00
1.80
1.20
0.90
2.05
2.20
1.70
7.38
5.28
-1.53
4.00
12.00
2.00
3.10
0.30
4.50
2.05
1.90
2.35
25.42
6.84
21.15
2.00
2.00
-1.00
1.20
1.20
0.90
2.05
2.20
1.70
4.92
5.28
-1.53
4.00
12.00
2.00
3.10
0.30
4.50
2.05
1.90
2.35
25.42
6.84
21.15
2.00
2.00
-1.00
1.20
1.20
0.90
2.40
2.40
-0.90
4.00
12.00
2.00
3.10
0.30
4.50
12.40
3.60
9.00
puerta (-)
Centro Educativo
14.07.02
puerta (-)
Centro Educativo
14.08
14.08.01
ZOCALOS
Zocalo minimo H=30m
puerta (-)
Centro Educativo
14.10
3.09.01
PINTURA
Pintura en calaminas de letrina (Esmalte y Ant.)
Centro Educativo
14.11
14.11.01
SISTEMA DESAGE
Ventilacin para letrina ecologica D=4"
406.25
17.76
406.25
17.76
und
1.00
6.00
1.00
6.00
12.00
6.00
12.00
6.00
Centro Educativo
14.11.02
m
Centro Educativo
SUB TOTAL
328.90
TOTAL
350.74
21.84
328.90
350.74
21.84
469.30
484.43
15.13
195.00
198.75
3.75
78.00
81.02
3.02
358.02
358.02
79.30
82.45
3.15
6.23
6.81
109.85
117.11
7.26
#REF!
#REF!
#REF!
406.25
17.76
424.01
260.00
16.00
276.00
260.00
12.00
272.00
260.00
20.00
280.00
1300.00
46.00
1346.00
65.00
6.00
71.00
65.00
4.00
69.00
723.45
766.29
42.84
723.45
776.86
53.41
563.55
616.96
53.41
253.50
278.50
25.00
406.25
17.76
424.01
65.00
6.00
71.00
780.00
6.00
786.00
HOJA DE METRADOS
1.- NOMBRE DEL PROYECTO : ""
2.- DISTRITO : CABANILLA.
3.- FECHA :
SS.HH.
Partida N
03
03.01
03.01.01
Especificaciones
Unid.
03.01.01.02
TRAZO Y REPLANTEO
m2
03.02.01.03
03.02.01.04
03.02.01.05
03.02.01.06
03.02.02
03.02.02.01
03.02.02.02
03.02.02.02
03.02.02.03
03.02.02.04
Parcial
1.00
8.70
6.05
52.64
1.00
8.70
6.05
52.64
9.00
1.00
1.00
1.50
13.50
3.00
2.35
0.50
1.10
3.88
3.00
1.70
0.50
1.10
2.81
3.00
1.05
0.50
1.10
1.73
2.00
0.35
0.50
1.10
0.39
Entre Eje B-B y C-C entre Ejes 1-1 y 2-2 y Ejes 2-2 y3-3
2.00
0.86
0.50
1.10
0.94
Entre Eje A-A y B-B entre Ejes 1-1 y 2-2 y Ejes 2-2 y3-3
2.00
1.05
0.50
1.10
1.16
ESTRUCTURAS
MOVIMIENTOS DE TIERRAS
EXCAVACION DE ZANJAS PARA ZAPATAS
m3
Z-3
03.02.01.02
Altura
TRABAJOS PRELIMINARES
m2
03.02.01.01
Ancho
OBRAS PROVISIONALES
03.02.01
MEDIDAS
Largo
AMBIENTES ADMINISTRATIVOS
03.01.01.01
03.02
N
Vec.
m3
m3
Sobre Zapatas
9.00
1.44
0.06
0.90
11.16
sobre Cimientos
1.00
19.81
0.35
0.30
2.08
Bao alumnos
2.00
3.20
1.90
12.16
Bao profesores
2.00
1.45
1.30
3.77
deposito
1.00
2.80
1.30
3.64
Eje Vertical
2.00
6.05
1.20
14.52
Eje horizonal
2.00
8.70
1.20
20.88
1.25
11.16
9.00
1.00
1.00
3.00
2.35
0.50
0.90
3.17
3.00
1.70
0.50
0.90
2.30
3.00
1.05
0.50
0.90
1.42
2.00
0.35
0.50
0.90
0.32
Entre Eje B-B y C-C entre Ejes 1-1 y 2-2 y Ejes 2-2 y3-3
2.00
0.86
0.50
0.90
0.77
Entre Eje A-A y B-B entre Ejes 1-1 y 2-2 y Ejes 2-2 y3-3
2.00
1.05
0.50
0.90
0.95
3.00
3.10
0.15
0.60
0.84
3.00
2.45
0.15
0.60
0.66
3.00
1.80
0.15
0.60
0.49
2.00
1.10
0.15
0.60
0.20
Entre Eje B-B y C-C entre Ejes 1-1 y 2-2 y Ejes 2-2 y3-3
2.00
1.30
0.15
0.60
0.23
Entre Eje A-A y B-B entre Ejes 1-1 y 2-2 y Ejes 2-2 y3-3
2.00
1.40
0.15
0.60
0.25
m2
m2
m3
13.95
m2
Z-2
9.00
m3
m3
m2
HOJA DE METRADOS
1.- NOMBRE DEL PROYECTO : ""
2.- DISTRITO : CABANILLA.
3.- FECHA :
SS.HH.
Partida N
03.02.02.05
Especificaciones
Unid.
03.02.03
03.02.03.01
03.02.03.01.01
03.02.03.02
03.02.03.02.01
Parcial
3.10
0.60
11.16
6.00
2.45
0.60
8.82
6.00
1.80
0.60
6.48
4.00
1.10
0.60
2.64
Entre Eje B-B y C-C entre Ejes 1-1 y 2-2 y Ejes 2-2 y3-3
4.00
1.30
0.60
3.12
Entre Eje A-A y B-B entre Ejes 1-1 y 2-2 y Ejes 2-2 y3-3
4.00
1.40
1.60
8.96
1.00
29.50
perimetro
1.00
29.50
0.15
4.43
base
1.00
29.50
0.30
8.85
1.00
29.50
0.10
2.95
9.00
1.00
1.00
0.50
29.50
m2
m3
4.50
kg
NElm
NVar
P Kg/m
1/2
9.00
0.90
7.00
0.99
56.36
1/2
9.00
0.90
7.00
0.99
56.36
9.00
0.25
0.25
4.40
2.48
18.00
0.25
COLUMNAS
CONCRETO PARA COLUMNAS f'c=210 kg/cm2
m3
m2
C-3
18.00
03.02.03.02.03
Altura
6.00
C-3
03.02.03.02.02
Ancho
Z-3
03.02.03.01.02
MEDIDAS
Largo
perimetro
03.02.02.06
N
Vec.
4.40
19.80
0.25
4.40
19.80
kg
NElm
NVar
P Kg/m
9.00
5.50
4.00
0.99
196.81
9.00
1.10
32.00
0.56
177.41
3.00
6.30
0.25
0.35
1.65
3.00
2.90
0.25
0.25
0.54
aleros
4.00
0.80
0.25
0.25
0.20
6.00
6.30
0.35
13.23
3.00
6.30
6.00
2.90
3.00
2.90
8.00
0.80
4.00
0.80
0.25
1/2
estribos
3/8
03.02.03.03
03.02.03.03.01
03.02.03.03.02
VIGAS
CONCRETO PARA VIGAS f'c=210 kg/cm2
m3
m2
Aleros
03.02.03.03.03
0.25
4.73
0.25
4.35
2.18
0.25
0.25
1.60
0.80
kg
NElm
NVar
P Kg/m
1/2
3.00
6.80
4.00
0.99
3/8
3.00
3.20
1.00
0.56
5.38
3/8
3.00
1.30
42.00
0.56
91.73
VP
81.11
HOJA DE METRADOS
1.- NOMBRE DEL PROYECTO : ""
2.- DISTRITO : CABANILLA.
3.- FECHA :
SS.HH.
Partida N
Especificaciones
Unid.
N
Vec.
MEDIDAS
Largo
Ancho
Altura
Parcial
VS
03.02.03.04
03.02.03.04.01
1/2
1.00
3.40
4.00
0.99
13.52
3/8
1.00
1.10
26.00
0.56
16.02
1/2
2.00
5.00
4.00
0.99
39.76
3/8
2.00
1.10
38.00
0.56
46.82
2.00
6.50
0.25
0.20
0.65
4.00
6.50
0.20
5.20
2.00
6.50
0.25
NElm
NVar
P Kg/m
2.00
7.00
4.00
0.56
31.36
2.00
1.00
52.00
0.25
26.00
VIGAS DE MOJINETE
CONCRETO PARA VIGAS f'c=210 kg/cm2
m3
03.02.03.04.02
m2
03.02.03.04.03
3.25
kg
3/8
estribos
1/4
03.02.03.05
03.02.03.05.01
u
5.00
03.02.03.05.02
03.02.03.05.03
03.02.03.05.04
03.02.03.05.05
03.03
03.03.01
03.03.01.01
m
10.00
6.30
63.00
2.00
6.50
13.00
1.00
6.30
1.00
6.30
3.00
3.10
2.70
25.11
3.00
2.45
2.70
19.85
3.00
1.80
2.90
15.66
2.00
1.10
2.90
6.38
Entre Eje B-B y C-C entre Ejes 1-1 y 2-2 y Ejes 2-2 y3-3
2.00
1.30
2.90
7.54
Entre Eje A-A y B-B entre Ejes 1-1 y 2-2 y Ejes 2-2 y3-3
2.00
1.40
2.90
8.12
2.00
area
Area de puertas
-5.00
1.10
3.00
-16.50
-4.00
0.70
3.00
-8.40
-2.00
1.80
1.20
-4.32
-2.00
1.35
0.70
-1.89
6.00
3.10
2.70
50.22
6.00
2.45
2.70
39.69
6.00
1.80
2.90
31.32
4.00
1.10
2.90
12.76
m2
03.03.01.02.01
5.25
33.08
m
6.30
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
m2
area de Ventanas
03.03.01.02
5.00
4.64
2.32
REVOQUES Y REVESTIMIENTO
TARRAJEO EN MUROS INTERIOR Y EXTERIOR CON MORTERO CEMENTO :1:
m2
HOJA DE METRADOS
1.- NOMBRE DEL PROYECTO : ""
2.- DISTRITO : CABANILLA.
3.- FECHA :
SS.HH.
Partida N
Especificaciones
Unid.
1.30
2.90
15.08
1.40
2.90
16.24
4.00
area
-10.00
1.10
3.00
-33.00
-8.00
0.70
3.00
-16.80
-4.00
1.80
1.20
-8.64
-4.00
1.35
0.70
-3.78
03.03.01.03.02
6.00
0.83
3.20
15.84
3.00
0.50
3.20
4.80
m2
12.00
6.30
0.35
26.46
9.00
2.90
0.25
6.53
aleros
4.00
0.80
0.25
0.80
BRUA DE 1.0 CM
4.00
7.10
28.40
4.00
6.70
26.80
2.00
6.00
12.00
2.00
4.10
8.20
1.00
14.00
14.00
adelante
03.03.01.03.01
9.28
2.32
m2
ventana
03.03.01.03
Parcial
4.00
puerta
03.03.01.02.05
Altura
4.00
C-3
03.03.01.02.04
Ancho
Entre Eje A-A y B-B entre Ejes 1-1 y 2-2 y Ejes 2-2 y3-3
area de Ventanas
03.03.01.02.03
MEDIDAS
Largo
Entre Eje B-B y C-C entre Ejes 1-1 y 2-2 y Ejes 2-2 y3-3
Area de puertas
03.03.01.02.02
N
Vec.
CIELORRASOS
CIELORRASOS CON TRIPLAY
m2
Bao alumnos
2.00
3.20
1.90
12.16
Bao profesores
2.00
1.45
1.30
3.77
deposito
1.00
2.80
1.30
3.64
m2
03.03.01.04
Eje Vertical
2.00
6.05
1.20
14.52
03.03.01.05
Eje horizonal
2.00
8.70
1.20
20.88
Bao alumnos
2.00
3.20
1.90
12.16
Bao profesores
2.00
1.45
1.30
3.77
deposito
1.00
2.80
1.30
3.64
Bao alumnos
2.00
3.20
1.90
12.16
Bao profesores
2.00
1.45
1.30
3.77
deposito
1.00
2.80
1.30
3.64
03.03.01.06
03.03.01.06.01
03.03.01.06.02
03.03.01.07
03.03.01.07.01
03.03.01.07.01.01
03.03.01.07.01.02
03.03.01.08
03.03.01.08.01
03.03.01.08.01.01
PISOS Y PAVIMENTOS
FALSO PISO 4"
m2
m2
CARPINTERIA DE MADERA
PUERTA DE MADERA AGUANO
PUERTA DE MADERA AGUANO TABLERO REBAJADO TIPO I
u
5.00
4.00
4.00
CARPINTERIA METALICA
VENTANA METALICA
VENTANA METALICA TIPO I
5.00
HOJA DE METRADOS
1.- NOMBRE DEL PROYECTO : ""
2.- DISTRITO : CABANILLA.
3.- FECHA :
SS.HH.
Partida N
Especificaciones
03.03.01.08.01.02
03.03.01.09
03.03.01.09.01
Unid.
N
Vec.
Ancho
Altura
2.00
2.00
2.00
CERRAJERIA
BISAGRA CAPUCHINAS ALUMINIZADA DE 3" X 3"
pza
36.00
9.00
u
9.00
03.03.01.10
03.03.01.10.01
03.03.01.11
03.03.01.11.01
VIDRIO TRASPARENTE DE 6 mm
p2
2.00
1.80
1.20
10.76
46.48
VENTANA II
2.00
1.35
0.70
10.76
20.34
6.00
3.10
2.70
50.22
6.00
2.45
2.70
39.69
6.00
1.80
2.90
31.32
4.00
1.10
2.90
12.76
Entre Eje B-B y C-C entre Ejes 1-1 y 2-2 y Ejes 2-2 y3-3
4.00
1.30
2.90
15.08
Entre Eje A-A y B-B entre Ejes 1-1 y 2-2 y Ejes 2-2 y3-3
4.00
1.40
2.90
16.24
4.00
area
-10.00
1.10
3.00
-33.00
-8.00
0.70
3.00
-16.80
-4.00
1.80
1.20
-8.64
-4.00
1.35
0.70
-3.78
PINTURAS
PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES 2 MANOS
p2
03.03.02.00.04
03.03.02.00.07.01
3.20
15.84
0.50
3.20
4.80
12.00
6.30
0.35
26.46
9.00
2.90
0.25
6.53
4.00
0.80
0.25
0.80
aleros
m2
ventana
03.03.02.00.07
0.83
3.00
m2
01.02.02
03.03.02.00.06
6.00
puerta
03.03.02.00.05
9.28
2.32
m2
C-3
03.03.02
FACTOR
VENTANA I
area de Ventanas
03.03.01.11.03
9.00
Area de puertas
03.03.01.11.02
Parcial
2.00
4.00
03.03.01.09.02
MEDIDAS
Largo
4.00
7.10
0.15
4.26
4.00
6.70
0.15
4.02
2.00
6.00
0.15
1.80
2.00
4.10
0.15
1.23
m2
Bao alumnos
2.00
3.20
1.90
12.16
Bao profesores
2.00
1.45
1.30
3.77
deposito
1.00
2.80
1.30
3.64
Eje Vertical
2.00
6.05
1.20
14.52
Eje horizonal
2.00
8.70
1.20
20.88
24.00
4.00
m2
VARIOS
JUNTAS DE DILATACION RELLENO CON TECNOPORT E=1"
m
96.00
HOJA DE METRADOS
1.- NOMBRE DEL PROYECTO : ""
2.- DISTRITO : CABANILLA.
3.- FECHA :
SS.HH.
Partida N
03.04
03.04.01
03.04.01.01
03.04.01.01.01
03.04.01.01.02
03.04.01.02
03.04.01.02.01
03.04.01.02.02
03.04.01.02.03
03.04.01.02.04
03.04.01.03
03.04.01.03.01
03.05
03.05.01
03.05.01.01
03.05.01.02
03.05.01.03
03.05.01.04
03.05.02
03.05.02.01
03.05.02.01.01
03.05.02.01.02
03.05.02.01.03
03.05.02.02
03.05.02.02.01
03.05.02.02.02
Especificaciones
Unid.
N
Vec.
MEDIDAS
Largo
Ancho
Altura
Parcial
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS INTERIORES
CANALIZACIONES Y/O TUBERIA
ALIMENTADOR 2-1X2.5MM2 TW - 20MM PVC-P ALUMBRADO
m
1.00
25.00
25.00
1.00
15.00
15.00
pto
3.00
3.00
2.00
2.00
5.00
5.00
3.00
3.00
1.00
1.00
6.00
6.00
2.00
2.00
8.00
8.00
4.00
4.00
10.00
10.00
17.00
17.00
5.00
5.00
pto
pto
pto
TABLEROS ELECTRICOS
TABLERO GENERAL
pza
pza
pto
pza
REDES EXTERIORES
EXCAVACION DE ZANJAS PARA RED
m3
1.00
80.00
1.00
80.00
0.30
0.40
9.60
m
80.00
HOJA DE METRADOS
1.- NOMBRE DEL PROYECTO : ""
2.- DISTRITO : CABANILLA.
3.- FECHA :
SS.HH.
Partida N
03.05.02.02.03
Especificaciones
Unid.
N
Vec.
03.05.03.01
03.05.03.01.01
03.05.03.01.02
03.05.03.01.03
03.05.03.01.04
03.05.03.01.05
03.05.03.01.06
03.05.03.01.07
03.05.03.01.08
03.05.03.01.09
03.05.03.01.10
03.05.03.01.11
03.05.03.01.12
03.05.03.01.13
03.05.03.01.14
03.05.03.02
03.05.03.02.01
80.00
0.30
Parcial
0.40
9.60
INSTALACIONES INTERIORES
SALIDAS DE PVC SAL PARA DESAGUE DE 2"
SUMIDEROS DE 2"
REGISTRO DE 2"
pto
11.00
11.00
6.00
6.00
8.00
8.00
18.00
18.00
4.00
4.00
6.00
6.00
5.00
5.00
2.00
2.00
4.00
4.00
1.00
1.00
1.00
1.00
2.00
2.00
9.00
9.00
2.00
2.00
pto
pza
pto
und
INSTALACIONES EXTERIORES
EXCAVACION MANUAL DE ZANJAS
m3
0.40
0.40
12.80
m
80.00
03.05.03.02.03
Altura
SISTEMA DE DESAGUE
80.00
03.05.03.02.02
Ancho
m
1.00
03.05.03
MEDIDAS
Largo
80.00
m3
80.00
0.40
0.40
12.80
HOJA DE METRADOS
1.- NOMBRE DEL PROYECTO : ""
2.- DISTRITO : CABANILLA.
3.- FECHA :
SS.HH.
Partida N
03.05.03.02.04
Especificaciones
CAJA DE REGISTRO DE DESAGUE 12" X 24"
Unid.
N
Vec.
MEDIDAS
Largo
Ancho
Altura
pza
2.00
03.05.04
03.05.04.01
03.05.04.02
03.05.04.03
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.06.01.05
03.06.01.06
03.06.02
03.06.02.01
03.06.02.02
03.06.02.03
03.06.02.04
Parcial
2.00
m
2.00
6.30
12.60
4.00
3.00
12.00
4.00
0.25
0.25
1.20
0.30
2.00
8.70
1.20
0.15
3.13
2.00
3.65
1.20
0.15
1.31
2.00
8.70
1.20
0.20
4.18
2.00
3.65
1.20
0.20
1.75
4.00
8.70
0.20
6.96
4.00
3.65
0.20
2.92
2.00
8.70
17.40
2.00
3.65
7.30
2.00
8.70
1.20
20.88
2.00
3.65
1.20
8.76
2.00
4.00
1.20
9.60
2.00
2.00
1.20
4.80
1.00
1.40
0.50
0.10
0.07
2.00
0.50
0.75
0.10
0.08
1.00
1.20
0.75
0.10
0.09
1.00
1.20
0.15
0.10
0.02
1.00
1..2
0.30
0.10
0.03
1.00
1.20
0.30
0.10
0.04
4.00
0.50
0.75
1.50
2.00
1.20
0.75
1.80
2.00
1.20
0.15
0.36
2.00
1..2
0.30
0.60
1.00
1.20
0.30
0.36
m3
OBRAS COMPLEMENTARIAS
VEREDAS PERIMETRALES
EXCAVACION MANUAL DE ZANJAS PARA VEREDAS
m3
m3
m2
m2
LAVADERO MULTIUSOS
EXCAVACION MANUAL DE ZANJAS
ENCOFRADO Y DESENCOFRADO
m3
m3
m2
kg
HOJA DE METRADOS
1.- NOMBRE DEL PROYECTO : ""
2.- DISTRITO : CABANILLA.
3.- FECHA :
SS.HH.
Partida N
Especificaciones
Unid.
MEDIDAS
Largo
Ancho
Altura
Parcial
NElm
NVar
P Kg/m
3/8
2.00
0.45
5.00
0.56
2.52
3/8
2.00
0.70
3.00
0.56
2.35
3/8
1.00
1.10
5.00
0.56
3.08
3/8
1.00
0.70
7.00
0.56
2.74
3/8
1.00
1.10
1.00
0.56
0.62
3/8
1.00
1.10
2.00
0.56
1.23
3/8
1.00
0.25
7.00
0.56
0.98
3/8
1.00
1.10
2.00
0.56
1.23
3/8
1.00
0.25
7.00
0.56
0.98
4.00
0.50
0.75
1.50
2.00
1.20
0.75
1.80
2.00
1.20
0.15
0.36
2.00
1..2
0.30
0.60
1.00
1.20
0.30
0.36
VP
03.06.02.05
N
Vec.
TARRAJEO EN LAVADERO
m2
HOJA DE METRADOS
1.- NOMBRE DEL PROYECTO : ""
2.- DISTRITO : CABANILLA.
3.- FECHA :
SS.HH.
Partida N
03.06.03
03.06.03.01
03.06.03.01.01
03.06.03.01.02
03.06.03.02
03.06.03.02.01
03.06.03.02.02
Especificaciones
03.06.03.03.01
Parcial
m2
1
A=
1.15
1.15
0.80
0.80
0.64
POZO PERCOLADOR
A=
8.04
8.04
TRAZO Y REPLANTEO
m2
BIODIGESTOR
A=
1.15
1.15
0.80
0.80
0.64
POZO PERCOLADOR
A=
8.04
8.04
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL
m3
BIODIGESTOR
A=
1.15
1.96
0.80
0.80
0.60
0.38
POZO PERCOLADOR
A=
8.04
3.15
25.33
A=
8.04
0.35
2.81
1.25
25.15
0.80
0.10
0.60
0.10
0.60
0.10
0.60
0.07
0.80
0.80
0.10
0.13
A=
4.52
0.20
0.90
A=
4.52
0.15
0.68
A=
-2.54
0.15
-0.38
A=
8.04
0.20
1.61
A=
-2.54
0.20
-0.51
A=
3.94
A=
2.66
5.78
0.35
7.04
0.35
A=
4.30
2.25
m3
1
m3
31.44
m3
03.06.03.04.01
POZO PERCOLADOR
03.06.03.04.01.01
03.06.03.04.01.03
Altura
Fondo y Tapa
03.06.03.04.01.02
Ancho
BIODIGESTOR
Lados
03.06.03.04
MEDIDAS
Largo
TRABAJOS PRELIMINARES
03.06.03.03
N
Vec.
POZO PERCOLADOR
03.06.03.02.03
Unid.
m3
m2
3.94
2.66
2.02
2.46
10.86
5.43
0.86
0.20
kg
NElm
NVar
P Kg/m
3/8
2.00
0.79
2.00
0.56
1.77
3/8
2.00
1.44
2.00
0.56
3.23
3/8
2.00
1.78
2.00
0.56
3.99
3/8
2.00
2.00
2.00
0.56
4.48
3/8
2.00
2.11
2.00
0.56
4.73
3/8
2.00
2.20
2.00
0.56
4.93
3/8
1.00
1.07
2.00
0.56
1.20
3/8
1.00
1.72
2.00
0.56
1.93
HOJA DE METRADOS
1.- NOMBRE DEL PROYECTO : ""
2.- DISTRITO : CABANILLA.
3.- FECHA :
SS.HH.
Partida N
03.06.03.05
03.06.03.05.01
03.06.03.05.02
Especificaciones
Unid.
03.06.03.05.04
Ancho
Altura
Parcial
1.00
2.06
2.00
0.56
2.31
3/8
1.00
2.28
2.00
0.56
2.55
3/8
1.00
2.39
2.00
0.56
2.68
3/8
1.00
2.48
2.00
0.56
2.78
3/8
1.00
1.84
2.00
0.56
2.06
3/8
1.00
2.49
2.00
0.56
2.79
3/8
1.00
2.83
2.00
0.56
3.17
3/8
1.00
3.05
2.00
0.56
3.42
3/8
1.00
3.16
2.00
0.56
3.54
3/8
1.00
3.25
2.00
0.56
3.64
3/8
1.00
7.07
1.00
0.56
3.96
3/8
1.00
7.70
1.00
0.56
4.31
3/8
1.00
8.33
1.00
0.56
4.66
3/8
1.00
8.95
1.00
0.56
5.01
3/8
1.00
9.58
1.00
0.56
5.37
VARIOS
MATERIAL FILTRANTE EN POZO PERCOLADOR
m3
base
A=
2.54
0.30
0.76
bordes laterales
A=
3.52
2.30
8.09
A=
1.98
2.30
4.55
m2
2.00
2.00
80
0.40
32.00
glb
1
03.06.03.05.05
MEDIDAS
Largo
3/8
03.06.03.05.03
N
Vec.
1.00
glb
1
1.00
JA DE METRADOS
SS.HH.
Total
52.64
52.64
13.50
10.90
13.24
19.57
35.40
13.95
9.00
8.91
2.67
41.18
JA DE METRADOS
SS.HH.
Total
29.50
16.23
4.50
112.72
2.48
39.60
374.22
2.40
26.88
294.32
JA DE METRADOS
SS.HH.
Total
0.65
8.45
57.36
5.00
63.00
13.00
33.08
6.30
56.19
112.37
JA DE METRADOS
SS.HH.
Total
20.64
33.79
75.40
14.00
19.57
35.40
19.57
19.57
5.00
4.00
2.00
JA DE METRADOS
SS.HH.
Total
2.00
36.00
9.00
66.82
112.37
20.64
33.79
11.31
19.57
35.40
96.00
JA DE METRADOS
SS.HH.
Total
25.00
15.00
3.00
2.00
5.00
3.00
1.00
6.00
2.00
8.00
4.00
10.00
17.00
5.00
9.60
80.00
JA DE METRADOS
SS.HH.
Total
9.60
11.00
6.00
8.00
18.00
4.00
6.00
5.00
2.00
4.00
1.00
1.00
2.00
9.00
2.00
12.80
80.00
12.80
JA DE METRADOS
SS.HH.
Total
2.00
12.60
12.00
0.30
4.45
5.93
9.88
24.70
29.64
14.40
0.07
0.25
4.62
15.74
JA DE METRADOS
SS.HH.
Total
4.62
JA DE METRADOS
SS.HH.
Total
9.83
9.83
27.96
2.81
31.44
0.30
2.30
22.81
78.48
JA DE METRADOS
SS.HH.
Total
8.86
4.55
34.00
1.00
1.00