INTRODUCCION
Code
Requirements
for
Environmental
Engineering
Concrete Structures(ACI 350M-01) And Commentary (ACI
350RM-01), Reported By ACI Committee 350.
(ACI
Restricciones :
Empotrado o fijo
Libre
Existe continuidad estructural en el vrtice comn a dos muros ortogonales
2.768 m
usar
4.10 m
8.30 m
usar
5.54 m
usar
Relacion b/a
2.00
Relacion c/a
1.00
tg ( 45 - /2 )
Ps =
=
f = tg
1.90 T/m3
32.00
(Vaciado in-situ)
f=
0.625
f=
f < 0.60
0.60
Ka =
0.31
m=
Ps' =
1.10 T/m3
Ws = Ka Ps =
W agua =
0.34 T/m3
1.00 T/m3
1.34 T/m3
C/A
B/A
B/A
1.00
2.00
0.32
0.45
0.24
0.27
0.23
0.26
V7(z)=
5.85
Ton
Tablero corto, borde lateral punto medio
5.17
Ton
FUERZAS CORTANTES EN MUROS
6.07
5.40 Ton
Ton
23
5.40
Ton
10.12
5.17 Ton
Ton
67
7.20
Ton
7.20 Ton
10
9
10.12 Ton
a=altura
1.00a
4.10
0.90a
3.69
0.80a
3.28
0.70a
2.87
0.60a
2.46
0.50a
2.05
0.40a
1.64
0.30a
1.23
0.20a
0.82
0.10a
0.41
0.00a
0.00
Lado Largo
0.3b & 0.7b
Coef.
0
3
7
10
12
12
8
-2
-18
-43
-79
0.5b
Mx
0.00
0.28
0.65
0.92
1.11
1.11
0.74
-0.18
-1.66
-3.96
-7.28
Coef.
0
5
10
13
15
14
8
-5
-24
-54
-95
Mx
0.00
0.46
0.92
1.20
1.38
1.29
0.74
-0.46
-2.21
-4.98
-8.76
4.50
4.00
3.50
3.00
2.50
0.5b
1.50
1.00
0.50
0.00
-10.00
-8.00
-6.00
-4.00
-2.00
0.00
2.00
Coef.
0
-5
-6
-5
-4
-3
-1
0
1
1
-2
Mz
0.00
-0.46
-0.55
-0.46
-0.37
-0.28
-0.09
0.00
0.09
0.09
-0.18
Lado Corto
0.3c & 0.7c
Coef.
0
-2
-2
0
3
5
8
9
7
-1
-17
0.5c
Mz
0.00
-0.18
-0.18
0.00
0.28
0.46
0.74
0.83
0.65
-0.09
-1.57
Coef.
0
-1
0
2
5
8
11
11
8
-2
-23
Mz
0.00
-0.09
0.00
0.18
0.46
0.74
1.01
1.01
0.74
-0.18
-2.12
4.50
4.00
3.50
3.00
2.50
0.5c
1.50
1.00
0.50
0.00
-2.50
-2.00
-1.50
-1.00
-0.50
0.00
0.50
1.00
1.50
2.05
0.00a
0.00
M
Coef.
My
Coef.
My
Coef.
My
b=
-42
-3.87
-39
-3.60
0
0.00
0.00
0.4b
0.6b
25
2.30
16
1.48
-18
-1.66
2.96
0.5b
27
2.49
16
1.48
-19
-1.75
3.70
3.00
2.00
1.00
0.00
0.00
-1.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
borde superior
mitad inferior
-3.00
-4.00
-5.00
Esquina
a=altura
0.90a
3.69
0.50a
2.05
0.00a
0.00
M
Coef.
My
Coef.
My
Coef.
My
b=
-42
-3.87
-39
-3.60
0
0.00
0.00
0.4b
0.6b
-2
-0.18
7
0.65
-4
-0.37
2.96
1.00
0.00
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
-1.00
borde superior
-2.00
mitad inferior
fondo del depsito
-3.00
-4.00
-5.00
0.5b
0
0.00
8
0.74
-5
-0.46
3.70
Traccin
coeficiente de contraccin del concreto
acero para tensin directa
Calculo del As
Kg/cm2
Kg/cm2
Calculo de la constante n
OK <
0.10 f'c =
28.00 Kg/cm2
Es =
f'c =
Modulo de Elasticidad de Concreto Ec =
Esfuerzo admisible del acero fs =
Modulo de Elasticidad de Acero
Espesor de Muro H =
Recubrimiento
Diametro de fierro a flexion
Altura efectiva
r=
=
d=
Fy=
2,040,000.00 Kg/cm2
280.00 Kg/cm2
250,998.01 Kg/cm2
1,900.00 Kg/cm2
30.00 cm
5.00 cm
5/8 "
24.21 cm
4,200.00 Kg/cm2
Vu act =
Vu=1.7 x Vmax =
17,202.35 Kg
17,202.35 Kg
Vu act < Vc : OK
DISEO DE MUROS
Mu = T.m
K=Mu/b*d2 = Tn/cm2
f'c =
280.00
espesor muro h =
30.00
b=
100.00
fy =
4,200.00
Espesor de Muro H =
r=
Diametro de fierro a flexion =
Altura efectiva d =
mn =
fy=
cont. Y temp. =
As cont. Y temp. =
14/fy =
0.0033
4200
kg/cm2
0.0018 ACI-318
5.40 cm2
30.00
Recubrimiento
a=
kg/cm2
cm
cm
kg/cm2
5.00
5/8
24.21 cm
333.53
PUNTO
M HOR MY
1.7 x MHOR MY
FDS = 1.30
M HOR My t.m
M abs
As cm2
mxima
As min
Nu (Ton)
As xNu
As total
3.69 =(0.9a)
-3.872
2.489
-3.596
1.475
0.000
-1.752
-3.872
-0.184
-3.596
0.738
0.000
-0.461
-6.583
4.232
-6.113
2.508
0.000
-2.978
-6.583
-0.313
-6.113
1.254
0.000
-0.784
-8.558
5.501
-7.946
3.260
0.000
-3.871
-8.558
-0.408
-7.946
1.630
0.000
-1.019
-8.558
5.501
-7.946
3.260
0.000
-3.871
-8.558
-0.408
-7.946
1.630
0.000
-1.019
8.558
5.501
7.946
3.260
0.000
3.871
8.558
0.408
7.946
1.630
0.000
1.019
9.700
6.150
8.980
3.610
0.000
4.300
9.700
0.450
8.980
1.790
0.000
1.120
91499.6
91499.6
91499.6
91499.6
91499.6
91499.6
91499.6
91499.6
91499.6
91499.6
91499.6
91499.6
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
7.988
7.988
7.988
7.988
7.988
7.988
7.988
7.988
7.988
7.988
7.988
7.988
5.397
5.397
5.172
5.172
0.000
0.000
6.071
6.071
5.847
5.847
0.000
0.000
15.138
15.138
14.507
14.507
0.000
0.000
17.030
17.030
16.400
16.400
0.000
0.000
2.002
2.002
1.919
1.919
0.000
0.000
2.253
2.253
2.169
2.169
0.000
0.000
11.702
8.152
10.899
5.529
0.000
4.300
11.953
2.703
11.149
3.959
0.000
1.120
2.05 =(0.5a)
0.00 =(0.0a)
3.69 =(0.9a)
2.05 =(0.5a)
0.00 =(0.0a)
temp.
7.40
7.40
7.32
7.32
5.40
5.40
7.65
7.65
7.57
7.57
5.40
5.40
1/4 pulg
3/8 pulg
1/2 pulg
5/8 pulg
3/8" S (cm)
5/8" S (cm)
3.69 =(0.9a)
37
25
34
25
25
25
37
25
35
25
25
25
16.48
11.48
15.35
11.25
11.25
11.25
16.83
11.25
15.70
11.25
11.25
11.25
9.07
6.32
8.45
6.19
6.19
6.19
9.27
6.19
8.64
6.19
6.19
6.19
5.88
4.10
5.48
4.01
4.01
4.01
6.01
4.01
5.60
4.01
4.01
4.01
5.63
8.18
6.00
8.18
8.18
8.18
5.63
8.18
6.00
8.18
8.18
8.18
10.00
15.00
11.25
15.00
15.00
15.00
10.00
15.00
11.25
15.00
15.00
15.00
18.00
22.50
18.00
22.50
22.50
22.50
15.00
22.50
18.00
22.50
22.50
22.50
2.05 =(0.5a)
0.00 =(0.0a)
3.69 =(0.9a)
2.05 =(0.5a)
0.00 =(0.0a)
USAR
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
18.00 cm
22.50 cm
18.00 cm
22.50 cm
22.50 cm
22.50 cm
15.00 cm
22.50 cm
18.00 cm
22.50 cm
22.50 cm
22.50 cm
UBICACIN
1/4 pulg
3/8 pulg
1/2 pulg
5/8 pulg
3/8" S (cm)
5/8" S (cm)
3.69 =(0.9a)
23
23
23
23
17
17
24
24
24
24
17
17
10.43
10.43
10.31
10.31
7.61
7.61
10.78
10.78
10.66
10.66
7.61
7.61
5.74
5.74
5.67
5.67
4.19
4.19
5.93
5.93
5.87
5.87
4.19
4.19
3.72
3.72
3.68
3.68
2.71
2.71
3.85
3.85
3.80
3.80
2.71
2.71
9.00
9.00
9.00
9.00
12.86
12.86
9.00
9.00
9.00
9.00
12.86
12.86
18.00
18.00
18.00
18.00
22.50
22.50
18.00
18.00
18.00
18.00
22.50
22.50
30.00
30.00
30.00
30.00
45.00
45.00
30.00
30.00
30.00
30.00
45.00
45.00
2.05 =(0.5a)
0.00 =(0.0a)
3.69 =(0.9a)
2.05 =(0.5a)
0.00 =(0.0a)
USAR
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
18.00 cm
18.00 cm
18.00 cm
18.00 cm
22.50 cm
22.50 cm
18.00 cm
18.00 cm
18.00 cm
18.00 cm
22.50 cm
22.50 cm
UBICACIN
MOMENTOS VERTICALES
punto
Mo vert Mx
1.7 x Mo vert Mx
FDS = 1.30
Mo vert Mx
cuantia max
As min
1/4 pulg
3/4 pulg
3/8" S (cm)
5/8" S (cm)
3.28 m
0.00 m
3.28 m
0.00 m
2.46 m
0.00 m
0.92
-8.76
0.65
-7.28
0.46
-2.12
1.567325569
-14.8895929
1.097127898
-12.38187199
0.783662784
-3.604848808
2.03752324
-19.35647078
1.426266268
-16.09643359
1.01876162
-4.686303451
2.03752324
-19.35647078
1.426266268
-16.09643359
1.01876162
-4.686303451
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
7.988
7.988
7.988
7.988
7.988
7.988
24.963
72.188
24.963
59.031
24.963
24.963
2.813
8.134
2.813
6.651
2.813
2.813
8.18
2.81
8.18
3.46
8.18
8.18
15.00
5.29
15.00
6.43
15.00
15.00
22.50
8.18
22.50
10.00
22.50
22.50
5/8 " @
5/8 " @
5/8 " @
5/8 " @
5/8 " @
5/8 " @
22.50 cm
8.18 cm
22.50 cm
10.00 cm
22.50 cm
22.50 cm
2.05 m
0.00 m
0.46
-1.57
0.783662784
-2.664453467
1.01876162
-3.463789507
1.01876162
-3.463789507
0.0213
0.0213
7.988
7.988
24.963
24.963
2.813
2.813
8.18
8.18
15.00
15.00
22.50
22.50
5/8 " @
5/8 " @
22.50 cm
22.50 cm
As cont. Y temp. =
5/8 " @
5/8 " @
5.40 cm2
36.85 cm
30.00 cm
USAR
UBICACIN
8.759 Ton-m
23.100 cm2
24.21 cm
8.13
0.0095
0.32
0.89
1,756 Kg/cm2
5.79 cm
16,900 Kg/cm
s max =
13.28 cm
8.18 cm
0.22 mm
ACI 350-01
M = 7.283 Ton-m
As = 18.890 cm2
d=
24.21 cm
n=
8.13
=
0.0078
K=
0.30
j=
0.90
fs = 1,769 Kg/cm2
dc =
5.79 cm
factor z= 16,900 Kg/cm lmite de la distribucin del reuerzo a flexin para una grieta de 0.22 mm (ACI 350-01)
s max =
12.99 cm
> OK
10.00 cm
DISTRIBUCION DEL ACERO CON EMPUJE HIDRAULICO Y FILTRO INTERIOR(1 ESTADO DE CARGA)
5/8 " @
b/4 =
1.850 m
b/4 =
1.850 m
22.50 cm
1/2" @
18.00 cm
c/4=
1.000 m
c/4 =
1.000 m
1/2" @ 18.00 cm
22.50 cm
1/2" @
18.00 cm
1/2" @ 18.00 cm
30.00 cm
18.00 cm
5/8" @ 22.50 cm
5/8 " @
b/4 =
1.850 m
b/4 =
1.850 m
22.50 cm
1/2" @
18.00 cm
c/4=
1.000 m
c/4 =
1.000 m
1/2" @ 18.00 cm
22.50 cm
1/2" @ 18.00 cm
30.00 cm
18.00 cm
5/8" @ 22.50 cm
tg ( 45 - /2 )
1.80 T/m3
Ps =
=
f = tg
(Vaciado in-situ)
f=
f=
Ka =
W = Ka Ps =
32.00
0.625
f < 0.60
0.60
0.31
0.5526 Ton/m3
-0.55 T/m3
C/A
B/A
B/A
2.00
0.32
0.24
0.23
0.45
0.27
0.26
V7(z)=
-2.42
Ton
Tablero corto, borde lateral punto medio
-2.14
Ton
FUERZAS CORTANTES EN MUROS
-2.51
-2.23 Ton
Ton
23
-2.23
Ton
-4.18
-2.14 Ton
Ton
67
-2.97
Ton
-2.97 Ton
10
9
-4.18 Ton
a=altura
1.00a
4.10
0.90a
3.69
0.80a
3.28
0.70a
2.87
0.60a
2.46
0.50a
2.05
0.40a
1.64
0.30a
1.23
0.20a
0.82
0.10a
0.41
0.00a
0.00
Lado Largo
0.3b & 0.7b
Coef.
0
3
7
10
12
12
8
-2
-18
-43
-79
0.5b
Mx
0.00
-0.11
-0.27
-0.38
-0.46
-0.46
-0.30
0.08
0.69
1.64
3.01
Coef.
0
5
10
13
15
14
8
-5
-24
-54
-95
Mx
0.00
-0.19
-0.38
-0.50
-0.57
-0.53
-0.30
0.19
0.91
2.06
3.62
4.50
4.00
3.50
3.00
2.50
0.5b
1.50
1.00
0.50
0.00
-1.00
0.00
1.00
2.00
3.00
4.00
a=altura
1.00a
4.10
0.90a
3.69
0.80a
3.28
0.70a
2.87
0.60a
2.46
0.50a
2.05
0.40a
1.64
0.30a
1.23
0.20a
0.82
0.10a
0.41
0.00a
0.00
Lado Corto
0.3b & 0.7b
Coef.
0
-2
-2
0
3
5
8
9
7
-1
-17
0.5b
Mz
0.00
0.08
0.08
0.00
-0.11
-0.19
-0.30
-0.34
-0.27
0.04
0.65
Coef.
0
-1
0
2
5
8
11
11
8
-2
-23
Mz
0.00
0.04
0.00
-0.08
-0.19
-0.30
-0.42
-0.42
-0.30
0.08
0.88
4.50
4.00
3.50
3.00
2.50
0.5b
0.3b & 0.7b
2.00
1.50
1.00
0.50
0.00
-0.60
-0.40
-0.20
0.00
0.20
0.40
0.60
0.80
1.00
2.05
0.00a
0.00
M
Coef.
My
Coef.
My
Coef.
My
b=
-42
1.60
-39
1.49
0
0.00
0.00
0.4b
0.6b
25
-0.95
16
-0.61
-18
0.69
2.96
0.5b
27
-1.03
16
-0.61
-19
0.72
3.70
2.00
1.50
1.00
0.50
borde superior
mitad inferior
fondo del depsito
0.00
0.00
-0.50
-1.00
-1.50
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
Esquina
a=altura
0.90a
3.69
0.50a
2.05
0.00a
0.00
M
Coef.
My
Coef.
My
Coef.
My
b=
-42
1.60
-39
1.49
0
0.00
0.00
0.4b
0.6b
-2
0.076
7
-0.27
-4
0.15
2.96
2.00
1.50
1.00
borde superior
mitad inferior
0.50
0.00
0.00
-0.50
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
0.5b
0
0.00
8
-0.30
-5
0.19
3.70
Es =
f'c =
Modulo de Elasticidad de Concreto Ec =
Esfuerzo admisible del acero fs =
Modulo de Elasticidad de Acero
2,040,000.00 Kg/cm2
280.00 Kg/cm2
250,998.01 Kg/cm2
1,900.00 Kg/cm2
30.00 cm
Espesor de Muro H =
Recubrimiento
Diametro de fierro a flexion
Altura efectiva
r=
=
d=
5.00 cm
5/8 "
24.21 cm
4,200.00 Kg/cm2
Fy=
REVISION DEL CORTANTE
a) Cortante lado largo borde inferior punto central
cortante max V = 2,136.52 Kg
Vc = 0.85 x 0.53 x raiz f'c x b x d
Vc= 18,247.41 Kg
Vu act =
Vu=1.7 x Vmax =
3,632.08 Kg
3,632.08 Kg
Vc > Vact
ok
DISEO DE MUROS
Mu = T.m
K=Mu/b*d2 = Tn/cm2
f'c =
280.00
espesor muro h =
30.00
b=
100.00
fy =
4,200.00
Espesor de Muro H =
r=
Diametro de fierro a flexion =
Altura efectiva d =
mn =
fy=
cont. Y temp. =
As cont. Y temp. =
14/fy =
0.0033
4200
kg/cm2
0.0018 ACI-318
5.40 cm2
30.00
Recubrimiento
a=
kg/cm2
cm
cm
kg/cm2
5.00
5/8
24.21 cm
333.53
PUNTO
M HOR MY
1.7 x MHOR MY
FDS = 1.30
M HOR My t.m
M abs
As cm2
mxima
As min
Nu (Ton)
As xNu
As total
3.69 =(0.9a)
1.600
-1.028
1.485
-0.609
0.000
0.724
1.600
0.076
1.485
-0.305
0.000
0.190
2.719
-1.748
2.525
-1.036
0.000
1.230
2.719
0.129
2.525
-0.518
0.000
0.324
3.535
-2.273
3.283
-1.347
0.000
1.599
3.535
0.168
3.283
-0.673
0.000
0.421
3.535
-2.273
3.283
-1.347
0.000
1.599
3.535
0.168
3.283
-0.673
0.000
0.421
3.535
2.273
3.283
1.347
0.000
1.599
3.535
0.168
3.283
0.673
0.000
0.421
3.920
2.510
3.640
1.480
0.000
1.760
3.920
0.180
3.640
0.740
0.000
0.460
91499.6
91499.6
91499.6
91499.6
91499.6
91499.6
91499.6
91499.6
91499.6
91499.6
91499.6
91499.6
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
7.988
7.988
7.988
7.988
7.988
7.988
7.988
7.988
7.988
7.988
7.988
7.988
2.229
2.229
2.137
2.137
0.000
0.000
2.508
2.508
2.415
2.415
0.000
0.000
6.253
6.253
5.993
5.993
0.000
0.000
7.035
7.035
6.775
6.775
0.000
0.000
0.827
0.827
0.793
0.793
0.000
0.000
0.931
0.931
0.896
0.896
0.000
0.000
4.747
3.337
4.433
2.273
0.000
1.760
4.851
1.111
4.536
1.636
0.000
0.460
2.05 =(0.5a)
0.00 =(0.0a)
3.69 =(0.9a)
2.05 =(0.5a)
0.00 =(0.0a)
temp.
6.23
6.23
6.19
6.19
5.40
5.40
6.33
6.33
6.30
6.30
5.40
5.40
1/4 pulg
3/8 pulg
1/2 pulg
5/8 pulg
3/8" S (cm)
5/8" S (cm)
3.69 =(0.9a)
25
25
25
25
25
25
25
25
25
25
25
25
11.25
11.25
11.25
11.25
11.25
11.25
11.25
11.25
11.25
11.25
11.25
11.25
6.19
6.19
6.19
6.19
6.19
6.19
6.19
6.19
6.19
6.19
6.19
6.19
4.01
4.01
4.01
4.01
4.01
4.01
4.01
4.01
4.01
4.01
4.01
4.01
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
8.18
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
2.05 =(0.5a)
0.00 =(0.0a)
3.69 =(0.9a)
2.05 =(0.5a)
0.00 =(0.0a)
USAR
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
5/8" @
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
UBICACIN
1/4 pulg
3/8 pulg
1/2 pulg
5/8 pulg
3/8" S (cm)
5/8" S (cm)
3.69 =(0.9a)
19
19
19
19
17
17
20
20
20
20
17
17
8.77
8.77
8.72
8.72
7.61
7.61
8.92
8.92
8.87
8.87
7.61
7.61
4.83
4.83
4.80
4.80
4.19
4.19
4.91
4.91
4.88
4.88
4.19
4.19
3.13
3.13
3.11
3.11
2.71
2.71
3.18
3.18
3.16
3.16
2.71
2.71
11.25
11.25
11.25
11.25
12.86
12.86
11.25
11.25
11.25
11.25
12.86
12.86
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
22.50
30.00
30.00
30.00
30.00
45.00
45.00
30.00
30.00
30.00
30.00
45.00
45.00
2.05 =(0.5a)
0.00 =(0.0a)
3.69 =(0.9a)
2.05 =(0.5a)
0.00 =(0.0a)
USAR
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
1/2" @
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
UBICACIN
MOMENTOS VERTICALES
punto
Mo vert Mx
1.7 x Mo vert Mx
FDS = 1.30
Mo vert Mx
cuantia max
As min
1/4 pulg
3/8" S (cm)
5/8" S (cm)
2.87 m
0.00 m
2.46 m
0.00 m
1.64 m
0.00 m
-0.50
3.62
-0.46
3.01
-0.42
0.88
-0.841694956
6.150847753
-0.77694919
5.1149155
-0.712203424
1.489152614
-1.094203442
7.996102079
-1.010033947
6.64939015
-0.925864451
1.935898398
-1.094203442
7.996102079
-1.010033947
6.64939015
-0.925864451
1.935898398
0.0213
0.0213
0.0213
0.0213
0.0213
0.0213
7.988
7.988
7.988
7.988
7.988
7.988
24.963
28.250
24.963
24.963
24.963
24.963
8.18
7.50
8.18
8.18
8.18
8.18
15.00
12.86
15.00
15.00
15.00
15.00
22.50
22.50
22.50
22.50
22.50
22.50
5/8 " @
5/8 " @
5/8 " @
5/8 " @
5/8 " @
5/8 " @
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
22.50 cm
1.23 m
0.00 m
-0.34
0.65
-0.582711892
1.100678019
-0.75752546
1.430881425
-0.75752546
1.430881425
0.0213
0.0213
7.988
7.988
24.963
24.963
8.18
8.18
15.00
15.00
22.50
22.50
5/8 " @
5/8 " @
22.50 cm
22.50 cm
As cont. Y temp. =
5/8 " @
5/8 " @
5.40 cm2
36.85 cm
30.00 cm
USAR
UBICACIN
5/8 " @
b/4 =
1.850 m
b/4 =
1.850 m
22.50 cm
5/8" @
22.50 cm
c/4=
1.000 m
c/4 =
1.000 m
1/2" @ 22.50 cm
22.50 cm
5/8" @
22.50 cm
5/8" @ 22.50 cm
30.00 cm
22.50 cm
5/8" @ 22.50 cm
5/8 " @
b/4 =
1.850 m
b/4 =
1.850 m
22.50 cm
5/8" @
22.50 cm
c/4=
1.000 m
c/4 =
1.000 m
5/8" @ 22.50 cm
22.50 cm
5/8" @ 22.50 cm
30.00 cm
22.50 cm
1/2" @ 22.50 cm
30.00 cm
5/8 " @
2.200 m
b/4 =
2.200 m
22.50 cm
5/8" @
c/4=
1.350 m
c/4 =
1.350 m
1/2" @ 18.00 cm
20.00 cm
22.50 cm
5/8" @
20.00 cm
5/8" @ 22.50 cm
30.00 cm
18.00 cm
5/8" @ 22.50 cm
5/8 " @
b/4 =
2.200 m
b/4 =
2.200 m
22.50 cm
5/8" @
18.00 cm
c/4=
1.350 m
c/4 =
1.350 m
5/8" @ 22.50 cm
22.50 cm
5/8" @ 22.50 cm
30.00 cm
18.00 cm
5/8" @ 22.50 cm
70.85 Ton
2.80 Ton
21.31 Ton
Peso de suelo =
106.57 Ton
201.53 Ton
1.50 m
Presin el fondo Pa x h =
1.50 Ton/m2
44.40 Ton
FS =
OK
4.54
9.20 m
c=
5.80 m
P total =
322.89 Ton
act =
6.05 Ton/m2
OK
10.00 Ton/m2
P= (2*h*a*(b+c))*2.4/(b*c)
t/m2
Impermeabilizacion de MUROS =
Pim= 2*0.02*a*(b+c)*1.5/(b*c)
t/m2
Losa Superior =
h*2.4
Impem
1,500.00 kg/m3
H imper
0.020 m
t/m2
0.30 m
h=
0.30 m
espesor de la losa
r=
0.05 m
1/2
d=
0.244 m
a=
4.10 m
"
P=
2.39351 t/m2
b=
7.40 m
lado largo
Pim =
0.09474 t/m2
c=
4.00 m
lado corto
0.5100 t/m2
zapata ext. =
0.60 m
Losa super
Total Muerta=
2.998256757 Tn/m2
"Para el diseo de la losa de fondo se considera el tanque vacio y no se tine en cuenta el peso de la losa de fondo"
Carga Viva=
Es fuer Wtotal actuante=
h=
0.200 Tn/m2
3.198256757 Tn/m2
1.28 Tn.m
0.47 Tn.m
Losa de fondo
As cont. Y
Momento en claro Corto
Momento en claro largo
PUNTO
Momento
1.7 x M
FDS = 1.30
M t.m
M abs
As cm2
4/3 As
mxima
As min
Nu (Ton)
As xNu
As total
1
2
1.279
0.473
2.175
0.805
2.827
1.046
2.827
1.046
2.827
1.046
3.100
1.140
4.13
1.52
92099.7
92099.7
0.0213
0.0213
8.040
8.040
10.119
7.196
28.384
20.184
3.754
2.670
7.89
4.19
As cont. Y temp. =
5.40 cm2
1/2 " @
25.00 cm
en ambos sentidos lecho inferior
1/2 " @
1/2 " @
1/2 " @
1/2 " @
16.04
15.00
16.04
15.00
cm
cm
cm
cm
temp.
9.15
8.07
DISEO DE LA ZAPATA
1.- DIMENSIONAMIENTO EN PLANTA DE LA ZAPATA
A.- CARGA MUERTA
a (m)
b (m)
Impermeabilzante en muros
4.10
22.80
Muro
4.10
22.80
Peso de la zapata
1.00
3.00
h (m)
0.02
0.30
Pe (Kg/m3)
1,500.00
2,400.00
total Peso =
Peso por ml. =
0.50
2,400.00
Peso (Kg)
2,804.40
67,305.60
70,110.00
3,075.00
3,600.00
1.20
4.15
3.00
1.70
1.00
200.00
1,350.00
1,800.00
240.00
9,524.25
5,400.00
PD =
PL =
Pz =
Pa =
Psuelo =
Presin del agua =
MD =
ML =
MS =
M=
R=
X=
e=
3.08 Ton/m
0.24 Ton/m
3.60 Ton/m
9.52 Ton/m
5.40 Ton/m
5.60 Ton/m2
0.00 Ton-m
5.14 Ton-m
0.00 Ton-m
5.00 Ton-m
21.84 Ton/m
1.25 m
0.25 m
5.60 Ton/m2
1.00 m
0.30 m
1.70 m
3.00 m
2=
3.70 Ton/m2
X
R
ESFUERZOS EN EL TERRENO
s act (kg/cm2)
s t (kg/cm2)
OBS.
0.998
1.00
OK
9.98 Ton/m2
Carga ltima
P
FCD =
1.40
FCL =
1.70
Pu = 1.4 PD + 1.7 PL
Pu = 35.12 Ton/m
Mu = 8.74 Ton-m
X=
1.19 m
e=
0.31 m
1=
4.42 Ton/m2
2=
19.00 Ton/m2
5.60 Ton/m2
0.50 m
1.00 m
1.70 m
0.30 m
3.00 m
1=
2=
4.42 Ton/m2
2=
10.74 Ton/m2
19.00 Ton/m2
X
R
M x-x =
7.28 Ton-m
Reservorio lleno
0.794
cm
Recub rimiento =
7.500
cm
d=
41.71
cm
b=
100.00
cm
fc =
280.00 Kg/cm2
0.9
Mu =
7.28
a=
As =
T-m/m
0.82 cm
4.66
cm 2 /m
fy=
5/8 ''
4200.00
Kg/cm2
REFUERZO TRANSVERSAL
r min
Asmin (cm2)
0.003
45.00
(ref. cada/cara)
1.99
s (cm)
s (cm)
8.84
15
REFUERZO LONGITUDINAL
r min
Asmin (cm2)
0.003
45.00
# total varillas
usar #
1.99
22.613
14