2014
INDICE
I.
RESUMEN EJECUTIVO________________________________________________________________________________________4
A. INFORMACIN GENERAL.___________________________________________________________________________________________4
B. PLANTEAMIENTO DEL PROYECTO.____________________________________________________________________________________5
C. DETERMINACIN DE LA BRECHA OFERTA Y DEMANDA___________________________________________________________________7
D. ANLISIS TCNICO DEL PIP________________________________________________________________________________________8
E. COSTOS DEL PIP________________________________________________________________________________________________17
F. EVALUACIN SOCIAL_____________________________________________________________________________________________17
ANLISIS DE SENSIBILIDAD____________________________________________________________________________________________18
G. SOSTENIBILIDAD DEL PIP_________________________________________________________________________________________18
H. PLAN DE IMPLEMENTACIN________________________________________________________________________________________20
I.
IMPACTO AMBIENTAL_____________________________________________________________________________________________21
J.
GESTIN DEL PROYECTO._________________________________________________________________________________________24
K. MATRIZ DE MARCO LGICO._______________________________________________________________________________________24
L. CONCLUSIONES Y RECOMENDACIONES________________________________________________________________________26
II. ASPECTOS GENERALES_____________________________________________________________________________________ 27
2.1. NOMBRE DEL PROYECTO Y LOCALIZACIN____________________________________________________________________________27
2.2. INSTITUCIONALIDAD._____________________________________________________________________________________________28
2.2.1. UNIDAD FORMULADORA (UF)___________________________________________________________________________________28
2.2.2. UNIDAD EJECUTORA___________________________________________________________________________________________28
2.3. MARCO DE REFERENCIA___________________________________________________________________________________________28
2.3.1. ANTECEDENTES DEL PIP_______________________________________________________________________________________28
2.3.2. ANLISIS DE CONSISTENCIA CON LINEAMIENTOS DE POLTICA.________________________________________________________29
III. IDENTIFICACIN____________________________________________________________________________________________34
3.1. DIAGNOSTICO___________________________________________________________________________________________________34
3.1.1. REA DE ESTUDIO Y REA DE INFLUENCIA_________________________________________________________________________34
3.1.2. DIAGNOSTICO DE LA AGENCIA AGRARIA DE ALTO AMAZONAS.________________________________________________________46
3.1.3. LOS INVOLUCRADOS EN EL PROYECTO.___________________________________________________________________________66
3.1.3.1. PARTICIPACIN DE LAS ENTIDADES INVOLUCRADAS Y DE LOS BENEFICIARIOS.__________________________________________66
3.1.3.2. Poblacin de referencia__________________________________________________________________________________68
3.1.3.3. Poblacin demandante potencial_________________________________________________________________________69
3.1.3.4. Poblacin demandante efectiva__________________________________________________________________________69
3.1.3.5. Poblacin afectada_______________________________________________________________________________________70
3.2. DEFINICIN DEL PROBLEMA, CAUSAS Y EFECTOS.______________________________________________________________________70
3.2.1. DEFINICIN DEL PROBLEMA CENTRAL_____________________________________________________________________________70
3.2.2. ANLISIS DE CAUSAS__________________________________________________________________________________________70
3.2.3. ANLISIS DE EFECTOS_________________________________________________________________________________________71
3.3. PLANTEAMIENTO DEL PROYECTO.___________________________________________________________________________________73
3.3.1. OBJETIVO CENTRAL___________________________________________________________________________________________73
3.3.2. ANLISIS DE MEDIOS__________________________________________________________________________________________73
3.3.3. ANLISIS DE FINES____________________________________________________________________________________________73
3.3.4.DETERMINACIN DE LAS ALTERNATIVAS DE SOLUCIN________________________________________________________________75
3.3.4.1._______________________________________________________ANLISIS DE LA INTERRELACIN DE LOS MEDIOS FUNDAMENTALES
75
3.3.4.2._________________________________________________________________________________IDENTIFICACIN DE LAS ACCIONES
75
3.3.4.3._________________________________________________________________PLANTEAMIENTO DE LAS ALTERNATIVAS DE SOLUCIN
76
IV. FORMULACIN______________________________________________________________________________________________ 78
4.1. HORIZONTE DE EVALUACIN_______________________________________________________________________________________78
4.2. DETERMINACIN DE LA BRECHA OFERTA DEMANDA__________________________________________________________________80
4.2.1. ANALISIS DE LA DEMANDA._____________________________________________________________________________________80
4.2.1.1.____________________________________________________________________________DEMANDA POTENCIAL Y SU PROYECCIN
80
4.2.1.2._____________________________________________________________________________DEMANDA EFECTIVA Y SU PROYECCIN.
80
4.2.1.3.________________________________________________________________________________DEMANDA EFECTIVA SIN PROYECTO
80
4.2.1.4. Demanda Efectiva con proyecto__________________________________________________________________________81
4.2.2.ANALISIS DE LA OFERTA________________________________________________________________________________________82
4.2.3.DETERMINACIN DE LA BRECHA O - D____________________________________________________________________________86
4.3. ANALISIS TCNICO DE LAS ALTERNATIVAS____________________________________________________________________________87
4.3.1. ASPECTOS TCNICOS__________________________________________________________________________________________87
4.3.1.1.__________________________________________________________________________________________________LOCALIZACIN
87
4.3.1.2.___________________________________________________________________________________________________TECNOLOGA
87
4.3.1.3.______________________________________________________________________________________________________TAMAO
87
4.3.1.4.__________________________________________________________________________________________________EL MOMENTO
87
4.3.1.5._______________________________________________________________________________ANLISIS DE RIESGO DE DESASTRES
92
4.3.2.
Metas de Productos______________________________________________________________________________________93
4.3.3. REQUERIMIENTOS DE RECURSOS.________________________________________________________________________________93
4.4. COSTOS A PRECIOS DE MERCADO._________________________________________________________________________________104
4.4.1. COSTOS DE INVERSIN_______________________________________________________________________________________104
4.4.2. COSTOS DE REPOSICIN______________________________________________________________________________________105
4.4.3. COSTOS INCREMENTALES DE OPERACIN Y MANTENIMIENTO.________________________________________________________106
4.4.3.1. Costos en la situacin sin proyecto______________________________________________________________________106
4.4.3.2. Costos en la situacin con proyecto_____________________________________________________________________106
4.4.3.3. Costos incrementales.__________________________________________________________________________________109
V. EVALUACIN_______________________________________________________________________________________________111
5.1. EVALUACIN SOCIAL____________________________________________________________________________________________111
5.1.1.BENEFICIOS SOCIALES DE CADA ALTERNATIVA______________________________________________________________________111
5.1.2.COSTOS SOCIALES____________________________________________________________________________________________111
5.1.2.1._____________________________________________________________________________FLUJO DE COSTOS A PRECIOS SOCIALES
111
5.1.2.2. Costos de Inversin a precios sociales___________________________________________________________________111
5.1.2.3. Costos de Operacin y Mantenimiento a precios sociales._______________________________________________113
5.1.2.4. Costos Incrementales a precios sociales.________________________________________________________________114
5.1.2.5. Flujo de Costos Sociales_________________________________________________________________________________114
5.1.3. METODOLOGA COSTO EFECTIVIDAD__________________________________________________________________________115
5.1.4.ANLISIS DE SENSIBILIDAD_____________________________________________________________________________________116
5.2. ANLISIS DE SOSTENIBILIDAD____________________________________________________________________________________117
5.2.1. FINANCIAMIENTO DE LA INVERSIN Y DE LA OPERACIN Y MANTENIMIENTO___________________________________________117
5.2.2. ARREGLOS INSTITUCIONALES PARA LA EJECUCIN DEL PIP Y OPERACIN DEL SERVICIO.__________________________________117
5.2.3. ORGANIZACIN Y GESTIN____________________________________________________________________________________117
5.2.4. ADECUACIN DE LA OFERTA A LAS CARACTERSTICAS DE LA DEMANDA DEL SERVICIO AGRARIO.___________________________118
5.2.5. GESTIN DE RIESGOS DE DESASTRES.___________________________________________________________________________118
5.3. EVALUACIN DE IMPACTO AMBIENTAL______________________________________________________________________________118
5.4. SELECCIN DE ALTERNATIVA DE SOLUCIN__________________________________________________________________________121
5.5. PLAN DE IMPLEMENTACIN_______________________________________________________________________________________121
5.6. MATRIZ DE MARCO LGICO._____________________________________________________________________________________122
VI. CONCLUSIONES Y RECOMENDACIONES__________________________________________________________________124
ANEXOS________________________________________________________________________________________________________125
I.
RESUMEN EJECUTIVO
A. Informacin General.
Nombre del Proyecto
Mejoramiento de los Servicios de Gestin de la Agencia Agraria de la
Provincia de Alto Amazonas, Regin Loreto
Localizacin
Regin
Provincia
Distrito
Ciudad
Direccin
Zona
Regin Natural
:
:
:
:
:
:
:
Loreto
Alto Amazonas
Yurimaguas
Yurimaguas
Psje. Julio C. Ruiz N 342
Urbana
Selva
Institucionalidad.
Unidad Formuladora (UF)
E- mail
Unidad Formuladora
:
Regin Loreto Sub Regin
Alto Amazonas
Responsable
:
Ing. Javier Huamn Pizango
Cargo
:
Coordinador del rea de Pre
Inversin
Direccin
:
Sargento Lores N 100 Yurimaguas
Telfono
:
(065) 35-2045
jahuapi@hotmail.com
Unidad Ejecutora
Unidad Formuladora
Amazonas
Responsable
Cargo
Direccin
Telfono
E- mail
:
:
:
:
:
Problema Central:
Deficiente Servicio Pblico
Agrario en la Agencia Agraria
de Alto Amazonas.
Objetivo Central:
Eficiente Servicio Pblico
Agrario en la Agencia Agraria
de Alto Amazonas.
Proyectos Alternativos:
Alternativa 1:
Alternativa 2:
10
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
1,287
1,354
1,425
1,501
1,581
1,666
1,758
1,855
1,959
2,072
2,193
36,120
36,725
37,340
37,966
38,602
39,249
39,906
40,575
41,255
41,946
42,648
34,83
4
35,37
1
-35,915
36,46
5
-37,021
37,58
2
-38,149
38,72
0
39,29
5
39,87
4
40,456
DESCRIPCIN
OFERTA
CON
PROYECTO
(
SERVICIOS
AGRARIOS)
DEMANDA
EFECTIVA
CON
PROYECTO
( PRODUCTORES)
BALANCE O-D
En este cuadro se observa que para el ao 0 existe una brecha de 34,834 y para
el ao 10 es de 40,456.
D. Anlisis Tcnico del PIP
Localizacin
La Agencia Agraria de Alto Amazonas, se encuentra localizada en el Distrito de
Yurimaguas Provincia de Alto Amazonas Regin Loreto en la ciudad de
Yurimaguas, cuya principal va de acceso a la Agencia Agraria Alto Amazonas
es por el pasaje Julio C. Ruiz N 342.
Tecnologa
De acuerdo a las condiciones existentes del rea de estudio se ha realizado el
diseo de la Infraestructura considerando su ubicacin geogrfica referente a las
precipitaciones existentes por encontrarse en selva baja, tambin se considero
los materiales para este tipo de zona.
Tamao
El tamao es definido a partir de la brecha oferta-demanda, este anlisis se
realiza tomando en cuenta los servicios que brinda la Agencia Agraria para luego
definir los ambientes para la infraestructura nueva y su equipamiento.
El momento
El inicio de la ejecucin del proyecto debe ser el apropiado, por lo tanto el
momento est conformado por el cronograma de ejecucin, este es detallado a
continuacin para las dos alternativas.
1.1.2. Requerimientos de recursos.
Para la implementacin del proyecto se necesitara los siguientes requerimentos:
a) Requerimiento de Infraestructura
Programa Arquitectnico
Est conformado por la propuesta tcnica del proyecto, en donde se
considero el requerimiento de los ambientes administrativos, servicios y
exteriores; el siguiente cuadro se presenta estos datos:
Cuadro R- 02 : Requerimiento y reas de los ambientes.
ITEM
1.1.
AMBIENTES
AMBIENTES ADMINISTRATIVOS Y SS.HH
UNIDAD
m2
1 er Piso
REA
723.96
353.74
Secretaria
m2
18.17
Direccin + SS.HH
m2
26.86
1.2.
1.3.
Oficina de Tierras
m2
44.33
Oficina de PROCREA
m2
21.44
Almacen General
m2
20.87
Oficina de DISAFILPA
m2
68.47
Caja
m2
8.75
Almacen
m2
13.00
SS.HH de Hombres
m2
15.82
SS.HH de Mujeres
m2
17.38
Area de Mantenimiento
m2
3.53
Hall
m2
53.12
Pasadizo
m2
42.00
2 do Piso
m2
370.22
m2
21.74
m2
90.77
Archivo General
m2
43.70
m2
32.04
m2
34.01
SS.HH de Hombres
m2
15.82
SS.HH de Mujeres
m2
17.38
Area de Mantenimiento
m2
3.50
Hall
m2
56.18
Pasadizo
m2
39.96
Escalera
m2
15.12
AMBIENTES DE SERVICIOS
m2
365.38
m2
176.54
m2
25.86
m2
23.98
m2
30.29
m2
108.71
977.77
EXTERIORES
Caseta de Vigilancia + SS.HH
m2
9.07
m2
63.41
Estacionamiento de motos
m2
108.71
Caseta de Bombeo
m2
4.80
m2
2.50
Cerco Perimetrico
m2
36.78
Circulacin ( pavimento)
m2
336.37
Areas Verdes
m2
416.33
TOTAL
m2
2,067.31
:
:
:
3,012.52 M2.
2,067.31 M2.
138.15 M2.
DISTRIBUCIN DE AMBIENTES:
El acceso principal a la infraestructura se hace mediante la calle Julio C. Ruiz, por
ingreso vehicular e ingreso peatonal, encontrando una cesta de control de
ingreso y salida, luego a un rea de circulacin (pavimentacin) donde se tiene
acceso a una estacionamiento de motos y los diferentes mdulos como son:
cafetera y estacionamiento de camionetas y deposito de yates, modulo principal
donde se ubican las diferentes oficinas de la institucin, sala de conferencias,
caseta de bombeo la cual incluye tanque cisterna y tanque elevado, as mismo
se adiciona al proyecto el cerco perimtrico, la distribucin y caractersticas de
los mdulos son:
MODULO PRINCIPAL: Se accede desde rea de circulacin, la infraestructura
cuenta con dos pisos, las distribuciones por pisos son:
1 PISO: Hall principal, una escalera de concreto armado que comunica al
segundo piso, jardn central, pasadizos centrales que comunican a:
mantenimiento, dos bateras de Servicios Higinicos para damas y
caballeros conformados por inodoros tanque bajo, lavatorios de pared,
urinarios y un mdulo interior para discapacitados conformado por inodoro
y lavatorio de pared, caja, DISAFILPA incluye almacn, almacn general,
procrea, tierras, direccin y secretaria.
2 PISO: Ingresado desde una escalera de concreto armado desde el
primer piso a un hall principal, un ducto centra y pasadizo que comunican
a: mantenimiento, dos bateras de Servicios Higinicos para damas y
caballeros conformados por inodoros tanque bajo, lavatorios de pared,
urinarios y un mdulo interior para discapacitados conformado por inodoro
y lavatorio de pared, autoridad del agua incluye 1/2 SS.HH., SENASA
incluye deposito, archivo general, DPA Alto Amazonas, jefatura incluye 3/4
SS.HH.,
SALA DE CONFERENCIAS: Se accede desde rea de circulacin, hacia un hall
principal, atencin al pblico, dos bateras de Servicios Higinicos para damas y
caballeros conformados por inodoros tanque bajo, lavatorios de pared, urinarios y
un mdulo interior para discapacitados conformado por inodoro y lavatorio de
pared, sala de conferencia con dos puertas de salidas laterales, incluye
proscenio, en la parte del fondo cuenta con un ambiente de preparacin de
ponencias incluye 1/2 SS.HH.
CASETA DE CONTROL: Se accede desde la calle Julio C. Ruiz, cuenta con un
ambiente de vigilancia y 1/2 SS.HH.
ESPECIFICACIONES TCNICAS.
Obras preliminares: Desmontajes y demolicin general de la
infraestructura existente.
Movimiento de tierras: excavaciones de zanjas, zapatas aisladas, rellenos
con material de prstamo, eliminacin de material excedente y nivelacin
interior.
Concreto Simple: solado para zapatas con mortero 1:10 (c-a), cimiento
corrido concreto 1:8+30%P.G., solado para zapatas de 4" mezcla 1:10,
cemento-arena, cimientos corridos mezcla 1:8 + 30% de piedra mediana
concreto en rampa f'c=140 kg/cm2, encofrado y desencofrado en rampa
concreto f'c=140 kg/cm2 para sobrecimiento, encofrado y desencofrado
normal en sobrecimiento, falso piso de e=4" c:a 1:6.
Obras de Concreto Armado: se emplearan concreto armado de fc= 210
kg/cm2, en zapatas, muros, columnas, vigas, losa aligerada, concreto fc=
175 kg/cm2, en dinteles, con acero corrugado fy=4200 kg/cm2., de
1/2", 3/8 y 1/4".
Estructura de Madera y Cobertura: tijerales de madera y metlica en el
mdulo de sala de conferencia, cobertura de calamina fibraforte, sobre
tijerales de madera de 2x6.
Muros y Tabiques de Albailera: de ladrillo de arcilla tubular de 10x14x24
cm, mezcla 1:5 (c:a).
Revoques Enlucidos y Molduras: tarrajeos primarios, tarrajeo frotachado en
muros, columnas y vigas, vestiduras de derrames.
Cielorraso: cielorrasos de superboard y mortero con mezcla 1:4 (c:a).
Pisos y Pavimentos: contrapisos de 35 mm., mezcla 1:5 (c:a), pisos de
cermica de 45x45cm. antideslizante de alto trnsito, y cemento pulido
e= 2.
Zcalos y Contrazocalos: zcalos de maylica blanca de 20x30cm., y
contrazocalos de cemento pulido h=30 cm.
Carpintera de Madera: puertas de madera apanelada y machihembrada.
Carpintera Metlica: puertas de fierro galvanizado y fierro cuadrado, rejas
de proteccin en ventanas.
Carpintera de Aluminio: puertas y ventanas con marco de aluminio y
vidrio semidoble y doble.
Cerrajera: bisagras aluminizadas de 3 1/2" X 3 1/2", cerradura para puerta
principal tres golpes, bisagra aluminizadas pivotante, cerradura para
puerta interior de perilla llave ext. seguro interior.
Pintura: pintura ltex en muros, columnas, vigas y aligerados, esmalte en
carpintera metlica y barniz en carpintera de madera.
Instalaciones Sanitarias: aparatos sanitarios como inodoros tanque bajo,
lavatorios con pedestal, urinarios y lavatorios de acero inoxidable de una y
dos pozas, tuberas y accesorios PVC-SAP en sistema de agua y PVC-SAL
en desage, sistema de ventilacin y evacuacin de aguas pluviales.
Instalaciones Elctricas: tubera PVC-SAP, interruptores y tomacorrientes,
artefactos elctricos de 2x40W, tipo barras, y de 32W tipo circular, as
como focos ahorradores, cables tipo NYY y NH-70, tablero general y de
b) Requerimiento de equipamiento
El requeriemiento comprende los mobiliarios y equipos para cada una de las
areas a implementarse con el proyecto.
A continuacin se detalla los requerimientos de mobiliario y equipos en el
siguiente cuadro:
Cuadro R-03: Requerimiento de mobiliarios y equipos para la Agencia
Agraria de Alto Amazonas.
ITEM
1.1.
AMBIENTES
Cant.
Especificaciones
Tecnicas
Silla Giratoria
Sillas Plasticas
Ventilador de Pie
Direccin + SS.HH
Silla Giratoria
Sillas Plasticas
Ventilador de Pie
Area Tierras
Equipos de Computo
Impresora Multifuncional
Laptop
Camara Fotografica
0.30 x 3.60
0.30 x 3.60
Bancas
Ventiladores de Pie
Equipos de Computo
Impresora Multifuncional
Camara Fotografica
Sillas Plasticas
Ventiladores de Pie
Pizarra Acrilica
Area PROCREA
Almacen General
Estantes ( madera cedro o similar)
Escobas
Recogedor de basura
0.30 x 3.60
Area DISAFILPA
Escritorio (madera cedro o similar)
Equipos de Computo
Camara Fotografica
Impresora Multifuncional
Sillas Plasticas
Laptop
0.30 x 3.60
Caja
Escritorio (madera cedro o similar)
Silla Giratoria
0.30 x 3.60
Almacen
Estantes ( madera cedro o similar)
SS.HH de Hombres
Deposito plastico para basura.
SS.HH de Mujeres
Deposito plastico para basura.
Area de Mantenimiento
Estantes ( madera cedro o similar)
0.30 x 3.60
2 do Piso
Jefatura de la Direccin de Promocin
Agraria ( DPA) + SS.HH
Escritorio (madera cedro o similar)
Silla Giratoria
Sillas Plasticas
Ventilador de Pie
0.30 x 3.60
Equipos de Computo
Camara Fotografica
Impresora Multifuncional
Archivo General
Escritorio (madera cedro o similar)
0.30 x 3.60
Sillas Plasticas
Equipos de Computo
Camara Fotografica
Impresora Multifuncional
0.30 x 3.60
Sillas Plasticas
Equipos de Computo
Impresora Multifuncional
Camara Fotografica
SS.HH de Hombres
Deposito plastico para basura.
SS.HH de Mujeres
Deposito plastico para basura.
Area de Mantenimiento
1.2.
AMBIENTES DE SERVICIOS
Sala de Conferencia +area de
preparacin de ponencias + SS.HH
Mesa de madera de cedro o similar
1m x2m x 0.70m
60
Silla de Madera
Deposito plastico para basura.
0.30 x 3.60
Sillas de plastico
1.3.
1.4.
12
EXTERIORES
Caseta de Vigilancia + SS.HH
Mesa de madera de cedro o similar
Silla Plastica
OTROS
Deslizador con motor ( Chalupa para 8
pasajeros + motor EVIMRUDE de 85 HP)
Camioneta 4 x 4 Toyota Hilux
24
24
Tiendas de Campaa
24
Colchonetas
24
Linternas
24
4
1
1
Cantidad
01
Motorista
01
Chofer
01
Guardian
TOTAL
02
05
FECHA
19/01/2015
02/02/2015
10 Al 28/02/2015
AAAA
AAAA
AAAA
09 al 13/03/2015
06 al 09/04/2015
21 al 25/04/2015
AAAA
AAAA, CAMPO
AAAA
04
25
08
22
09/05/2015
31/05/2015
12/06/2015
27/06/2015
AAAA
TARAPOTO
AAAA, CAMPO
AAAA, CAMPO
06 al 11/07/2015
AAAA, CAMPO
al
al
al
al
23 al 25/11/2015
17 al 19/12/2015
LUGAR
Pucallpa, JuanJui,
Tocache, Cajamarca,
Nueva Cajamarca
AAAA
AAAA
E.
1.1.1.
ACTIVIDADES
Costo Directo
Gastos Generales
PRECIOS
PRIVADOS
S/
1,337,539.2
0
133,753.92
133,753.92
Utilidad
40,126.18
1,645,173.2
2
296,131.18
1,941,304.4
0
58,239.13
Imprevistos
Sub Total
IGV
Costo de la Obra
Elaboracin de Estudio Definitivo ( 3 % Costo total de la Obra)
Supervisin ( 5% Costo total de la Obra)
Costo Total de laObra de Infraestructura
Implementacin de un plan de mantenimiento para la
infraestructura.
Adquisicin de equipos y mobiliarios modernos.
Implementacin de un plan de mantenimiento para mobiliarios
y equipos
Fortalecimiento de capaciades a todo el Personal de la Agencia
Agraria de Alto Amazonas.
1.1.2.
2.1.1.
2.1.2.
3.1.1.
97,065.22
2,096,608.
75
2,000.00
585,964.40
2,000.00
119,000.00
9,900.00
2,815,473.
15
Mitigacin Ambiental
COSTO TOTAL DE LA ALTERNATIVA 1
10
345,4
93
345,4
93
345,4
93
345,4
93
345,4
93
345,4
93
345,4
93
345,4
93
345,4
93
345,4
93
Costos de Operacin
324,34
9
324,34
9
324,34
9
Costos de Mantenimiento
21,144
21,144
21,144
324,3
49
21,14
4
324,3
49
21,14
4
324,3
49
21,14
4
324,3
49
21,14
4
324,3
49
21,14
4
324,3
49
21,14
4
324,3
49
21,14
4
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
269,74
9
4,320
71,42
4
269,74
9
4,320
71,42
4
269,74
9
4,320
71,42
4
269,7
49
4,320
71,42
4
269,7
49
4,320
71,42
4
269,7
49
4,320
71,42
4
269,7
49
4,320
71,42
4
269,7
49
4,320
71,42
4
269,7
49
4,320
71,42
4
269,7
49
4,320
71,42
4
0
2,815,
473
2,815,4
73
Costos de Operacin y
Mantenimiento con
proyecto
Costos Operacin y
Mantenimiento sin
proyecto
Costos de Operacin
Costos de Mantenimiento
Flujo de Costos
incrementales
F.
2,815,
473
Evaluacin Social
Para la evaluacin se utilizo la metodologa Costo - Efectividad, obtenindose un
CE para la alternativa 1 menor que de la alternativa 2, es decir S/ 7.00 y S/ 7.15
respectivamente. Por lo tanto el perfil de este proyecto es socialmente rentable.
Alternativas
VACS ( S/, )
Nmero
de
Beneficiario
s
CE
Alternativa 1
Alternativa 2
2,774,447.40
2,832,099.70
Alternativas
Alternativa 1
Alternativa 2
396,212
396,212
M2
VACS ( S/, )
construidos
2,774,447.40
2,067
2,832,099.70
2,067
7.00
7.15
CE
1342.06
1369.94
Anlisis de Sensibilidad
Como existe la incertidumbre que rodea a muchos proyectos de inversin, se hace
indispensable llevar a cabo un anlisis de sensibilidad de la rentabilidad social del
proyecto ante diversos escenarios.
Se determina la sensibilidad del CE para cada alternativa, analizando los cambios
en los principales costos en el caso del proyecto nos referimos al total del costo
social de inversin de cada alternativa conformados por los costos obras civiles,
equipamiento y capacitaciones; se est considerando un rango de variacin de
-40% y 40% con intervalos de 10%. A continuacin se detalla esta informacin en
el siguiente cuadro:
Cuadro R 09: Anlisis de Sensibilidad de las alternativas.
%
Variacin
-40%
-30%
-20%
-10%
0%
10%
20%
30%
40%
Proyecto Alternativo 1
Costo
VACST
1,431,596.52
1,664,668.44
1,670,195.94
1,942,113.18
1,908,795.36
2,219,557.92
2,147,394.78
2,497,002.66
2,385,994.20
2,774,447.40
2,624,593.62
3,051,892.15
2,863,193.04
3,329,336.89
3,101,792.46
3,606,781.63
3,340,391.88
3,884,226.37
Proyecto Alternativo 2
CE
4.2
0
4.9
0
5.6
0
6.3
0
7.0
0
7.7
0
8.4
0
9.1
0
9.8
0
Costo
VACST
CE
1,464,393.13
1,699,259.82
4.29
1,708,458.65
1,982,469.79
5.00
1,952,524.17
2,265,679.76
5.72
2,196,589.69
2,548,889.73
6.43
2,440,655.22
2,832,099.70
7.15
2,684,720.74
3,115,309.67
7.86
2,928,786.26
3,398,519.64
8.58
3,172,851.78
3,681,729.61
9.29
3,416,917.30
3,964,939.58
10.01
Ingresos Propios
Costos de
Mantenimiento
37,707
Saldo
16,563
21,144
2
39,5
93
21,1
44
18,4
49
3
41,5
72
21,1
44
20,4
28
4
43,6
51
21,1
44
22,5
07
5
45,834
99,539
53,705
6
48,1
25
21,1
44
26,9
81
7
50,5
31
21,1
44
29,3
87
8
53,0
58
21,1
44
31,9
14
9
55,7
11
21,1
44
34,5
67
10
58,4
97
21,1
44
37,3
53
MESES
1
RESPONSABL
E
RECURS
OS
Oficina Sub
Regional
de
Infraestructura.
Profesion
ales con
experienc
ia para
elaborar
TDR.
Proceso de
licitacin y
contratacin
Oficina Sub
Regional de
Administracin.
Conforma
cn de
comit de
contrataci
ones.
Elaborar
expediente
tecnico
Empresa
contratista
seleccionada
en proceso
de licitacin GSRAA
METAS
9
10
11
12
Expediente
Tcnico
aprobado y
Ejecucin de
Obra:
Terminos de
Referencia
1.1.1. Construccin de
un nuevo local para la
Agencia Agraria de
Alto Amazonas.
Aprobacin de
Expediente
tecnico
Ejecucin de
obra y
supervisin
1.1.2. Implementacin
de
un
plan
de
mantenimiento
para
la infraestructura.
Elaborar plan de
manteniemiento
para la
infraestructura.
Oficina Sub
Regional
de
Infraestructura
Conforma
cin de
equipo
para
evaluar y
aprobar
ezxpedien
te
tecnico.
Empresa
contratista
seleccionada
en proceso
de licitacin GSRAA
Empresa
contratista
seleccionada
en proceso
de licitacin GSRAA
2.1.1. Adquisicin de
equipos y mobiliarios
modernos.
Adquisicin de
mobiliarios y
equipos
para la Agencia
Agraria de Alto
Amazonas.
Empresa
contratista
seleccionada
en proceso
de licitacin GSRAA
2.1.2. Implementacin
de
un
plan
de
mantenimiento
para
mobiliarios y equipos
Elaborar plan de
manteniemiento
para mobiliario y
equipos.
Empresa
contratista
seleccionada
en proceso
de licitacin GSRAA
3.1.1. Fortalecimiento
de capaciades a todo
el Personal de la
Agencia Agraria de
Alto Amazonas.
Contratacin de
especialistas
para elaborar el
Plan de
capacitacin
para todo el
personal de la
Agencia Agraria
en los temas
referidos en el
proyecto.
Empresa
contratista
seleccionada
en proceso
de licitacin GSRAA
I.
Impacto Ambiental
Movimiento de Tierras
Arquitectura
OPERACIN Y MANTENIMIENTO
CIERRE
CONSTRUCCION
Movimiento de Tierras
Arquitectura
OPERACIN Y MANTENIMIENTO
CIERRE
Unidad
Cantida
d
Costo
Unitario
800
1.1
Ingeniero de Seguridad
Charla
500
1.2
Millar
300
Costo S/.
500
300
4800
2.1
Tacho
50
100
2.2
Charla
800
1600
2.3
Movilidad
Glb.
350
700
2.3
Charla
500
1000
2.4
Refrigerio
Glb.
150
300
2.5
Materiales
Glb.
50
100
2.6
Glb.
500
500
Glb.
500
500
Monitore
o
200
Unidad
200
1600
800
2.7
3
3.1
4
Monitoreo de Ruidos
Servicio
200
2750
4.1
Plantones
4.2
Saco
10
80
4.3
Transporte y flete
Glb.
350
200
350
5.1
Glb.
500
500
5.2
Refrigerio
Glb
350
350
5.3
Glb
500
TOTAL
1350
500
9,900.00
Este costo fue incluido en el presupuesto del proyecto para las dos alternativas, en
cuanto al grado de impacto ambiental en la etapa de inversin es media y en la
operacin es nula debido a que se est implementadas medidas para disminuir
estos impactos en esta etapa del proyecto.
J.
Estrategia de
Inversin
FIN
PROPOSITO
Resumen de Objetivos
Indicadores
Verificables
objetivamente
Mejores
Niveles de
Desarrollo
Socio Economico de la Poblacin de
la Provincia de Alto Amazonas.
Al
ao
10
la
poblacin
de
la
Provincia
de
Alto
Amazonas tendra un
Mejor
Nivel
de
Desarrollo
Socio
Economico.
Al ao 10% del
proyecto se lograra
un
Desarrollo
Sostenible en toda la
Provincia
de
Alto
Amazonas ofertando
productos de buena
calidad al mercado
Nacional
e
Internacional debido
al eficiente servicio
agrario brindado por
la Agencia Agraria.
Medios de
Verificacin
Supuestos/
Riesgos
Encuestas Socio
Economico. INEI
, ONGs
Estabilidad de
la
Politica
Nacional.
Regional y
Local.
Estadistica del
sector agrario
Adecuada
Infraestructura
para
brindar un mejor servicio agrario.
COMPONENTE
S
Suficiente
y
adecuado
equipamiento
para brindar un
eficiente servicio agrario.
Al ao 1 el 100% los
beneficiarios acceden
a un mejor servicio
agrario.
Estadistica del
sector agrario
No
existan
cambios en la
Politica
de
desarrollo
Institucional.
ACTIVIDADES
58,239.13
Supervisin
S/
97,065.22
Costo
infraestructura
Total
2,096,608.75
Implementacin
mantenimiento
infraestructura.
de
un plan
para
Adquisicin
de
equipos
mobiliarios modernos.
de
la
Implementacin de un plan de
mantenimiento para mobiliarios y
equipos
Fortalecimiento de capaciades a
todo el Personal de la Agencia
Agraria de Alto Amazonas.
Mitigacin Ambiental
Costo Total de
Mobiliario y Equipos
S/
585,964.40
S/
119,000.00
de
de
y
y
de
de
de
de
de
S/
Costo de la
Capacitacin
Contrato
obra, acta
entrega
recepcin
liquidacin
obras.
Resolucin
aprobacin
Expediente
tcnico.
Contrato
supervisin
obra.
Se dispone de
los
recursos
econmicos
para
el
financiamiento
del proyecto.
Plan
de
Mantenimiento
de
infraestrcutura.
Informe
de
verificacin de
la
entrega
y
calidad
del
mobiliario
y
equipos para la
Agencia Agraria.
Plan
de
Mantenimiento
y reposicin de
mobiliario.
Capacitaciones
y Talleres
Talleres
TOTAL
S/
2,815,473.15
L.
CONCLUSIONES Y RECOMENDACIONES
En el presente estudio se concluye lo siguiente:
Con la implementacin del proyecto se solucionar el problema del Deficiente
Servicio Pblico Agrario en la Agencia Agraria de Alto Amazonas.
El costo de inversin del proyecto de la alternativa seleccionada a precios
privados asciende a S/
2,815,473.15 y a precios sociales es de S/
2,385,994.20
Se determin que la Alternativa 1, es la ms conveniente por mostrar un ratio CE
de S/. 7.00 por beneficiario, que es menos CE de la alternativa 2 que alcanza los
S/. 7.15 por beneficiario.
Con el presente proyecto se beneficiar a un total de 396,212 beneficiarios
(productores) en todo el horizonte del proyecto.
De acuerdo al anlisis de sensibilidad, an incrementando o disminuyendo en 40%
el costo de inversin, la alternativa 1 sigue siendo menos costosa que la
alternativa 2.
La sostenibilidad del proyecto est garantizada al asumir el Gobierno Regional de
Loreto el financiamiento del proyecto; el compromiso de la Agencia Agraria de Alto
Amazonas para los gastos de operacin y mantenimeinto.
El proyecto ocasionar impactos medios en el ambiente en la fase de ejecucin
por lo cual se implementara un plan de mitigacin ambiental.
Finalmente, se concluye que el proyecto es tcnica, socialmente viable.
II.
ASPECTOS GENERALES
Localizacin
Regin
Provincia
Distrito
Ciudad
Direccin
Zona
Regin Natural
:
:
:
:
:
:
:
Loreto
Alto Amazonas
Yurimaguas
Yurimaguas
Psje. Julio C. Ruiz N 342
Urbana
Selva
2.2.
2.2.1.
Institucionalidad.
E- mail
2.2.2.
Unidad Formuladora
:
Regin Loreto Sub Regin
Alto Amazonas
Responsable
:
Ing. Javier Huamn Pizango
Cargo
:
Coordinador del rea de Pre
Inversin
Direccin
:
Sargento Lores N 100 Yurimaguas
Telfono
:
(065) 35-2045
jahuapi@hotmail.com
Unidad Ejecutora
Unidad Formuladora
Amazonas
Responsable
Cargo
Direccin
Telfono
E- mail
:
:
:
:
:
Marco de referencia
( Ministerio de
GESTIN
POLITICAS ESPECIFICAS
ESTRATEGIAS
COMPETITIVIDAD
Desarrollar
y
mejorar
la
competitividad de los pequeos y
medianos productores agrario para
su acceso al mercado interno y
externo.
Promover el diseo y desarrollo
instrumentos y mecanismos
financiamiento adecuados a
necesidades de la organizacin
productores agrarios.
de
de
las
de
Promover
el
desarrollo
de
capacidades
en
gestin
y
organizacin de los pequeos
productores /as y poblador rural
agrario en mbitos de pobreza y
pobreza extrema.
INCLUSIN
Fortalecer
un
adecuado
posicionamiento
para
la
comercializacin
y
la
transformacin
de
productos
agrarios por parte de los pequeos
productores /as y poblador rural.
Incrementar la eficiencia en la
Gestin de los Recursos Hidricos.
ESTRATEGIAS
Promover el uso y produccin sostenible
de los recursos naturales con valor
agregado, en base a la ZEE y
ordenamiento territorial.
Promover la aplicacin y extensin de
tecnologas e investigaciones, realizadas
por los Centros de Investigacin existentes
en la regin.
Desarrollar cadenas productivas basadas
en los conceptos de competitividad para
los mercados nacionales e internacionales.
Promover la comercializacin de la
produccin regional con los mercados
nacionales, fronterizos e internacionales.
Desarrollar polticas para el saneamiento
fsico legal de las tierras en la Regin
Loreto.
III.
IDENTIFICACIN
3.1. Diagnostico
Yurimaguas cuenta con un aeropuerto, que hasta 1996 reciba vuelos nacionales,
pero ahora solo sirve para vuelos internos y regionales.
Superficie
El mbito territorial de la provincia de Alto Amazonas es de 18,483.98 Km2, que
representa el 5.01 % de la Regin Loreto. .A su vez, Yurimaguas representa el
14.52% de la provincia de Alto Amazonas, tal como se observa en el cuadro
siguiente:
Cuadro N 01: Extensin Territorial de los Distritos de la Provincia de
Alto Amazonas
DISTRITOS
Yurimaguas
Lagunas
Balsapuerto
Jeberos
Santa Cruz
Tnte. Csar Lopez
TOTAL
EXTENSIN
( KM2)
2,684.34
5,647.13
2,165.24
4,601.14
1,734.18
1,651.95
18,483.98
OCUPACIN
TERRITORIAL
(%)
14.52%
30.55%
11.71%
24.89%
9.38%
8.94%
100.00%
Clima
El clima es tropical, clido, hmedo y lluvioso, con una temperatura alta y
constante a lo largo del ao, presentando poca variabilidad trmica diaria.
Temperatura media mxima: 33 C
Temperatura media mnima: 22 C
Temperatura media anual: 27.5 C
La humedad relativa promedio anual es de 87% y presenta 80% entre julio y
agosto y 94% entre diciembre y enero. En la cuenca del Huallaga y Paranapura
se tiene dos pocas de lluvias-creciente: Entre los meses de octubre-diciembre,
febrero-abril y pocas de verano-vaciante entre los meses de mayo-septiembre.
Las precipitaciones pluviales anuales oscilan entre 1900 mm hasta 2800 mm.
La evaporacin media anual es de 1500 mm, con una variacin de ms o menos
20%. De la frecuencia de las lluvias depende el caudal de los ros y su expansin
horizontal en la Selva Baja (poca de creciente y vaciante). La fisiografa del
Suelo comprende colinas onduladas y disertadas a ligeramente onduladas,
terrazas altas y bajas, e inundables.
Temperatira Media Anual
Humendad Relativa Promedio
26 C
85%
Precipitacin Pluvial
( Maxima Oct- Abr, Minima May - Sep)
Presin Atmosfrica
2,200 mm
993.1 milibares
POBLACIN
HABITANTES
%
63,345
60.52%
13, 270
12.68%
13, 868
13.25%
4, 198
4.01%
4, 094
3.91%
5, 892
5.63%
100.00%
104,667
4% 6%
4%
13%
13%
Yurimaguas
Lagunas
61%
Balsapuerto
Jeberos
Santa Cruz
Tnte. Csar Lopez
La Provincia de Alto Amazonas esta conformada por 53, 459 habitantes del sexo
masculino que representa un 51.08 % de la poblacin total de la provincia y
51,208 habitantes del sexo femenino que vienbe a ser 48.92 % del total de la
provincia.
H
31,98
2
6,854
7,015
2,217
2,180
POBLACIN
M
TOTAL
%
H
31,363
63,345
59.83%
61.25%
6,416
6,853
1,981
1,914
13,270
13,868
4,198
4,094
12.82%
13.12%
4.15%
4.08%
12.53%
13.38%
3.87%
3.74%
3,211
2,681
5,892
6.01%
5.24%
53,4
59
51,208
104,667
100.00
%
100.00
%
70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
Economa
Actividades econmicas predominantemente agrcolas, extractivas (forestal, caza
y pesca) y comerciales con un desarrollo tradicional, marcado por bajos niveles
de produccin, productividad y rentabilidad. Las zonas aptas para la produccin
Perfil de Proyecto: Mejoramiento de los Servicios de Gestin de la Agencia Agraria de la
Provincia de Alto Amazonas, Regin Loreto.
37
Casos
33, 372
1,272
51,405
86, 049
%
39%
1%
60%
100%
Vivienda
El material predominante de las casas en toda la Provincia de Alto Amazonas es
de madera que representa un 71 % de las viviendas, de ladrillo o bloque de
cemento solo existe un 21 % de viviendas, un 2 % de adobe y quincha
respectivamente y un 4 % de otro material.
Segn el estudio desarrollado por las Naciones Unidas sobre el ndice de
Desarrollo Humano en el Per, el ndice alcanzado por la Provincia de Alto
Amazonas alcanza a 52.44% cifra inferior al estndar nacional que alcanza a
59.76%.En el cuadro N 05, se puede observar que el distrito de Yurimaguas
alcanza el 57.40% de IDH es el ms alto ndice de la provincia.
Finalmente el ingreso per cpita mensual promedio de la Provincia de Alto
Amazonas alcanza a S/ 190.54 por mes, dicho indicador en el distrito de
Yurimaguas es de S/ 230.30 por mes. En el siguiente cuadro se presenta el IDH
por Distritos durante el ao 2005.
Cuadro N 05: ndice de Desarrollo Humano Provincia de Alto Amazonas
-2005.
DEPARTAMENTO
UBIGEO
Poblaci
n
Lore
to
Provincia
Alto Amazonas
PER
160201
Yurimaguas
habitant
es
26,207,97
0
61,968
ndice
de
Desarrol Esperanz
lo
a de vida
Humano al nacer
IDH
aos
Alfabetis
mo
Escolarid
ad
0.598
71.5
91.9
85.4
0.574
68.78
93.7
82.3
160202
160205
160206
160210
2
3
4
5
160211
Balsapuerto
Jeberos
Lagunas
Santa Cruz
Tnte. Cesar Lpez
Rojas
Total Provincia
12,730
3,917
12,827
4,447
0.452
0.508
0.538
0.54
66.49
65.72
65.95
64.82
56
75.8
90.7
93.1
69.8
79
75.6
79.2
6,107
0.535
66.05
89.9
73.1
101,996
0.524
66.3
83.19
76.5
Educacin
Con respecto a la educacin en la Provincia de Alto Amazonas existe 627
Instituciones Educativas estatales y 18 Particulares, de los cuales 363 IE son del
nivel primario de menores de los cuales 354 son estatales y 08 particulares, para
el nievle secundario de menores se tiene 57 IE de los caules 54 son estatales y
03 particulares, se cuenta con 02 tecnologicos estatales y 01 particular, 01
pedagogico, 01 IE tcnico productiva y 01 IE especial. Estos datos se detallan en
el sgte cuadro:
Cuadro N 06: Institucuiones Educactivas en la Provincia de Alto
Amazonas 2013.
TOTAL
INICIAL
DISTRIT
OS
PRIMARI
A
SECUNDA
RIA
MENORE
S
MENORE
S
SUPERIOR
E.B.A.
TECNOLOGI
CO
PEDA
G.
TECNICO
PRODUCT
IVA
ESPEC
IAL
EST.
EST.
EST.
ES
T.
PAR
T.
ES
T.
PAR
T.
ES
T.
PAR
T.
ES
T.
PAR
T.
ES
T.
PAR
T.
EST
.
PART.
Yurimagu
as
24
7
14
85
13
1
25
Santa
Cruz
60
16
39
Tnte .
Cesar
Lopez
46
15
27
Balsapuer
to
15
8
67
83
Lagunas
86
19
56
Jeberos
30
18
TOTAL
62
7
18
21
1
35
4
54
Salud
La Provincia de Alto Amazonas para la atencin de los servicios de salud, cuenta
con 01 Hopsital, 09 Centros de Salud I-3, 71 Puestos de Salud I-I y 02 Puestos de
salud I-2; haciendo un total de 85 Establecimientos de salud en toda la provincia.
Cuadro N 07: EE.SS en la Provincia de Alto Amazonas 2012.
Tambin se tine que mediante Resolucin Ejecutiva Regional N 1422-2008-GRLP, con fecha 18 Agosto 2008, se resuelve: Aprobar la modificacin de la
Delimitacin de Redes y Microrredes de Salud de la Regin Loreto.
Cuadro N 08: Redes y Microrredes de la Provincia de Alto Amazonas
2012.
ALTO AMAZONAS.
SEDE YURIMAGUAS.
DIRECCION
DE RED.
NOMBRE
PROVINCIA
DISTRITO/CAPITAL
POBLACIN 2012
ASIGNADA A LA RED
ALTO AMAZONAS.
(117,163)
YURIMAGUAS
ALTO AMAZONAS
YURIMAGUAS
70,575
SHUCUSHYACU
ALTO AMAZONAS
T.CESAR LOPEZ
ROJAS/SHUCUSHYACU
6,492
BALSAPUERTO
ALTO AMAZONAS
BALSAPUERTO
16,409
SANTA CRUZ
ALTO AMAZONAS
SANTA CRUZ
4,425
LAGUNAS
ALTO AMAZONAS
LAGUNAS
14,298
JEBEROS
ALTO AMAZONAS
JEBEROS
4,964
MICRORRED
C) Disponibilidad de Servicios
La Provincia de Alto Amazonas cuenta con los siguientes servicios:
D)Anlisis de Peligros
Si consideramos que el riesgo, se define oficialmente de acuerdo a la Direccin
de Programacin Multianual del MEF como La probabilidad de que la unidad
Perfil de Proyecto: Mejoramiento de los Servicios de Gestin de la Agencia Agraria de la
Provincia de Alto Amazonas, Regin Loreto.
45
3.1.2.
Diagnostico de la Agencia Agraria de Alto Amazonas.
3.1.2.1.
Area Libre
Perimetro
: 2,147.05 m2
: 256.50 ml
Caractersticas generales
Las caractersticas que a continuacin se detallan han sido identificadas por
medio de inspeccin visual; por lo tanto se describe la infraestructura
existente en 4 partes: Arquitectura, Estructuras, Instalaciones Sanitarias e
Instalaciones Elctricas
A) ARQUITECTURA
Dentro del rea de la Agencia Agraria Alto Amazonas, encontramos una
estructura compuesta por los siguientes ambientes:
GUARDIANIA
Tiene un rea 15.10 m2
Piso : Cemento pulido
Cielorraso: Triplay
Ventanas: De madera tipo persiana
Puertas: De madera apaneladas
Pared de ladrillo
AUDITORIO
Tiene un rea 68.20m2
Piso: Cemento pulido
Cielorraso: De madera machihembrada
Ventanas: De madera tipo persiana
Puertas: De madera apaneladas
Pared de ladrillo
SS.HH DE MUJERES
Tiene un rea 8.10 m2
Piso: De Cermico
Cielorraso: De triplay
Zcalo: De cermico, altura 1.5 m
Ventanas: Solo tiene rejas de fierro de proteccin
Puertas: De madera apaneladas
Pared de ladrillo
DIRECCION
Tiene un rea 26.70 m2 y ss.hh 3.84m2
Piso: De cermico
Cielorraso: De madera machihembrada
Ventanas: De madera tipo persiana
Puertas: De madera apaneladas
Pared de ladrillo, con acabado de madera machihembrada.
B) ESTRUCTURAS
Los ambientes de la Agencia Agraria estn construidos de material noble
(columnas y vigas de concreto armado), y las paredes son de albailera,
el techo es de tipo liviano en mal estado, su cobertura est apoyada
sobre correas de madera aserrada y estos apoyados sobre tijerales de
madera aserrada en mal estado.
Segn los planos se observa que la cimentacin no est reforzada con
acero.
VEREDAS
Las veredas son de acabado semipulido, en los paos presentan fisuras y
grietas, se aprecia el concreto desprendido, picado, deteriorado.
C) INSTALACIONES ELECTRICAS
Respecto a las instalaciones elctricas: los tomacorrientes e
interruptores se encuentran rotos con deficiente fijacin; al estar rotos
dichos elementos se observa los conductores elctricos y sus empalmes
muy precarios, lo mismo se aprecia en las salidas para luminarias, se ha
podido apreciar que los circuitos del alumbrado no contiene ductera
(entubado reglamentario).
Existe falta de tablero de proteccin en sistema de distribucin
elctrica, y falta de sealizacin donde se hace referencia a algn tipo
de riesgo al que se esta expuesto.
D) INSTALACIONES SANITARIAS
Segn lo que se pudo observar las instalaciones sanitarias se
encuentran en regular estado en cuanto a los servicios higinicos se
refiere.
El sistema de drenaje existente es insuficiente ya que la tubera de
desage pluvial es muy pequea y tiene pendiente inadecuada por lo
que no cumple con las normas actuales.
En el siguiente cuadro se detalla el estado actual de los ambientes del
Local de la la Agencia Agraria:
Cuadro N 10: Situacin Actual de la Infraestructura de la
Agencia Agraria de Alto Amazonas.
AMBIENTES
Guardiania
ESTADO DE
CONSERVACION
REGULAR
OBSERVACIONES
Piso, presenta desgaste, esta
deteriorado, presenta fisuras.
Cielorraso en regular estado, presenta
humedad en algunas zonas
Pared presenta fisuras y humedad
Auditorio
SS.HH MUJERES
DIRECCION
SECRETARIA,
ADMINISTRACION,
AREA DE TIERRAS,
ESTADISTICA, AREA
DE CONVENIOS Y
FORTALECIMIENTO ,
AREA PECUARIA
OFICINA PROCREAAA
PALMA ACEITERA
ARCHIVADORES
AUTORIDAD
NACIONAL DEL AGUA
(ALA)
REGULAR
REGULAR
REGULAR
MALO
MALO
MALO
REGULAR
REGULAR
SENASA
REGULAR
REGULAR
PROMOCION
AGRARIA
REGULAR
DISAFILPA
ALMACEN
REGULAR
REGULAR
3.1.2.1.2. Equipamiento.
El mobiliario con el que cuenta la Agencia Agraria de Alto Amazonas, se
describe en el siguiente cuadro:
Cuadro N 11:
MOBILIARIO DE
MADERA
ESTADO DE
CONSERVACIO
N
Escritorio de madera
15
Regular
silla de madera
69
Regular
banca de madera
Regular
mesa de madera
Regular
Estante de madera
Modulo de madera p/
comp.
Regular
Regular
Armario de madera
Regular
Archivador de madera
MOBILIARIO DE METAL
Regular
Escritorio de metal
Regular
17
Regular
Archivador de metal
Regular
Armario de metal
Regular
Mesa de melamine
Malo
Escritorio de melamine
Regular
Modulo de melamine
Regular
Estante de melamine
Regular
CPU
Regular
Monitor
Regular
Silla de metal
OTROS
Personal
Nombrado
Contratado
Trabajadores de la AA.
Director
01
Secretaria
03
Administrativo
01
Tecnicos
03
Guardian
01
Promotor de Cadenas Productivas
02
Coordinador PROCREA
01
Profesional de Campo
01
Tecnico de Campo
04
Recaudacin Microcreditos
01
Jefe de Brigada DISAFILPA
02
Tecnico de Campo DISAFILPA
01
Trabajadores Destacados de la
23
GSRAA
Otras oficinas ( Autoridad del
03
Agua y SENASA AA)
TOTAL DE PERSONAL
Fuente: Informe Tecnico de la Agencia Agraria 2013
3.1.2.2.
Total
01
03
01
03
01
02
01
01
04
01
02
01
23
03
47
Niveles de Produccin.
Cuadro N 13:
INDICADOR
ACTIVIDADES
UNIDAD DE
MEDIDA
OBJETIVOS ESPECIFICOS
I.
FORTALECER EL SISTEMA
INTEGRADO DE
ESTADISTICA AGRARIA
Eventos
realizados
1.1
Enc.
remitidas
1.2.
Informes
remitidos
META
ANUAL
1,161
4
0
6
4
9
1
6
5
6
7
9
2
6
0
6
6
9
0
320
2
6
2
6
2
8
2
6
2
7
2
7
2
6
2
7
2
7
Eventos de
Capacitacin
Informes
1.3.
Informes
12
Reportes
remit.
1.4.
Recopilacion de informacion
agroclimatica
Reportes/Info
rmes
252
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
2
1
Infor.
emitidos
1.5.
Informes
Infor.
emitidos
1.6.
Fichas
remitidas
1.7.
Encuestas
remitidas
Informe
remitido
1,8,
1.9.
II.
R.D. emitida
2.1.
Reconocimiento e inscripciones de
territorios comunales
R.Adm.
Emitida
2.2.
R.D.
emitida
2.3.
Doc.
otorgado
2.4.
Doc.
otorgado
2.5.
III.
SANEAMIENTO Y TITULACION DE
PREDIOS RURALES
Resolucin
3.1.
Resolucin
3.2.
Resolucin
3.3.
Demarcacion de territoris de
comunidades nativas D.L N 22175
3.4.
Prescripcio
n
Resolucin
3.5.
3.6.
IV.
Encuestas
12
Informes
12
Encuestas
12
Informes
12
152
1
2
1
2
1
3
1
3
1
3
1
4
1
2
1
2
1
3
Infor/exped
Informe
24
Informe
Constancia
120
Certificado
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
1
0
309
2
5
2
5
2
6
2
8
2
5
2
6
2
6
2
6
2
6
Titulos
240
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
Informe y
planos
60
Titulos
Titulos
Titulos
FORMULAR DOCUMENTOS DE
GESTION Y PROYECTOS DE
INVERSION PUBLICA EN
CONCORDANCIA CON LOS
LINEAMIENTOS DE POLITICA
AGRARIA REGIONAL Y NACIONAL
14
Doc.
remitido
4.1.
Documento
Inf. remitidos
4.2.
Informe
12
Doc.
presentado
s
4.3.
Perfil
13
Diagnostico
actualizado
Evento
realizado
Organiz.
Formalizadas
Plan de
Negocio
V.
PROMOVER LA FORMACION Y EL
FORTALECIMIENTO EMPRESARIAL DE
LAS ORGANIZACIONES DE
PRODUCTORES AGRARIOS
5.1.
Documento
N de
Productores
5.2.
5.4.
5.5.
Insc. RRPP
N de
Oranizacione
de Negocio
VI.
s Asesoradas
Beneficiarios
6.1.
Directorio
6.2.
Actas de
reunin
6.3.
Informes
remitidos
Documento
emitido
235
2
1
2
3
2
1
2
0
2
3
2
0
2
1
2
3
2
0
2
0
2
0
2
0
2
0
2
0
2
0
2
0
Servicios
realizados
220
Directorio
Actualizado
Acuerdos
suscritos
6.4.
Informe
6.5.
Formulacin de certificados de
marcas y seales de ganado
Certificado
VII.
FORTALECER LA ARTICULACION DE
LA PRODUCCION AGRARIA AL
MERCADO
Participacio
n de
productore
s
7.1.
Documento
otorgado
7.2.
Evento
Actas de
acuerdo
106
Feria
Emision de Constancias de
Productor
Constancia
s
100
7.3.
Productore
s
Capacitado
s
7.4.
Contrato
Suscrito
VIII.
PROMOVER LA PRODUCCION Y
PRODUCTIVIDAD DE LOS CULTIVOS
Y/O CRIANZAS PRIORIZADAS
Evento
realizado
8.1.
Capacitacion a productores en
temas de transformacion y
comercializacion de productos con
valor agregado
Eventos
Evento
realizado
8.2.
Capacitacion a productores en
temas de produccion y
productividad
Eventos
8.3
N de
organ.
Certificada
s
8.4
Pasantas
IX
PROMOVER LA IMPLEMENTACION DE
SISTEMAS INTEGRALES DE
PRODUCCION EN EL MARCO DEL
PLAN TSETA TANA AIPA
9.1.
Hectareas
Gestiones
realizadas
Inst.
Educativa
11
1
Parcelas
cosechadas
1
2
5
2
6
2
5
1
2
5
2
5
2
5
Esto indica que las oficinas y programas de la Agencia Agraria han desarrollado
un trabajo eficiente a favor de los productores de la Provincia de Alto Amazonas.
3.1.2.3.
Capacidades de Gestin.
pblico.
Realizar diagnstico y descarte de TBC y Brucelosis
Capacitacin y fortalecimiento a ganaderos
Asistencia tcnica en ganado vacuno
Capacitacin y fortalecimiento a ganaderos en manejo de pastura
Consolidacin del informe de los trabajos realizados durante el mes.
DISTRITOS
SECTOR DE INTERVENCION
Yurimaguas
Bajo Huallaga zapote
LOCALIDADES DE INFLUENCIA
Pampa Hermosa
Grau Km 40
Santo Tomas
Micaela Bastidas
Agua Blanca
Abelardo Quiones
San Pedro
Jeberillos
25 de Diciembre
Munichis
San Rafael
Santa Lucia
Campo Florida
Nuevo Iquitos
San Antonio
San Jos
Paraso
Triunfo
Yarina
San Francisco
Esperanza
Nuevo Horizonte
Santa Lucia
Porvenir
Bajo Huallaga
Santa Cruz
Shishinahua
Balsapuerto
Sector Armanayacu
Naranjillo
CCNN Paraso
San Isidro
CCNN Progreso
Cuadro N 15:
DISTRITOS
SECTOR DE INTERVENCION
Shanusi
LOCALIDADES DE INFLUENCIA
Pampa Hermosa
Grau Km 40
Santo tomas
Mariano Melgar
San Francisco
Micaela Bastidas
Quinayo
Puerto Per
Nuevo Barranquita
Cuadro N 16:
DISTRITOS
LOCALIDADES DE INFLUENCIA
Grau Km 40
Shanusi
Bajo Huallaga
Santo tomas
Mariano Melgar
San Francisco
Micaela Bastidas
Beln
Quinayo
Puerto Per
Tpac Amaru
Majambo
Centro Chambira
Tranca Yacu
Munichis
San Roque
Santa Teresa
Unin Campesina
Santa Rosa
La poblacin usuaria son los productores que acceden a los servicios brindados
por la Agencia Agraria de Alto Amazonas, estos actualmente estn satisfechos
con la atencin por parte del personal a travs de los programas existentes.
Perfil de Proyecto: Mejoramiento de los Servicios de Gestin de la Agencia Agraria de la
Provincia de Alto Amazonas, Regin Loreto.
61
Esta poblacin tambin esta conformada por las personas de toda la Provincia de
Alto Amazonas, las cuales acuden a la agencia a solicitar informacin de las
bases de datos o cuando desean tramitar algn documento que esta entidad
entrega.
Esta poblacin usuaria necesita:
Acceder al servicio que brinda la Agencia Agraria en forma gratuita.
Acceder a nuevos Crditos
Acceder a la titulacin de predios rurales gratuitos
Acceder a informacin agraria actualizada
Trmite documentario eficiente
Fortalecer capacidades en temas agrcola y pecuaria.
3.1.2.5.
Exposicin y Vulnerabilidad.
A.
Si
No
Comentarios
peligros?
legalmente
reconocida
autoridades
nacionales
por
y
las
locales
competentes.
condiciones
son
aptas
para
la
implementacin de infraestructura a
partir del proyecto.
CUADRO
Preguntas
Si
No
Comentarios
B. Anlisis de Vulnerabilidades por Fragilidad (tamao, tecnologa)
X
2.
el
Reglamento
Nacional
de
Edificaciones.
Diseo inadecuado, no se encuentra
ubicada
3. El diseo toma en cuenta las caractersticas
paisaje
adecuadamente
urbanstico
para
dentro
atenuar
del
la
actividades
administrativas,
agropecuarias, etc.
CUADRO
Preguntas
Si
No
Comentarios
2.
Agraria
Alto
Existenmecanismos
Amazonas.
tcnicos
(por
mientras
se lleva a cabo la
hacer
ocasionados
frente
por
la
los
daos
ocurrencia
de
peligros?
3.
de
contingencia)
para
hacer
cuentan
con
un
programa
de
atencin
de
ocurrencia de peligros?
que
presenta
identificaron
las
estructural,
consecuencias
zonas
tienen
si
la
de
su
institucin,
peligro
conciencia
institucin
a
de
dejara
nivel
las
de
Variable
Vulnerabilidad
A) Localizacin de la InstitucinAgraria respecto de la
Exposicin
Grado de Vulnerabilidad
Bajo
Medio
Alto
condicin de peligro.
B) Caractersticas del terreno.
C) Tipo de construccin.
Agraria.
E) Nivel de organizacin del personal de trabajo de la
Institucin Agraria.
I) Conocimiento sobre ocurrencia de desastres por parte del
Resiliencia
Problemas
Intereses
Acuerdos y
Compromisos
Productores
de
Provincia
de Alto Amazonas.
la
Existencia de productores
informales y a la vez
limitada
capacitacin
y
actualizacin en nuevas
tecnologias de produccin.
Organizaciones Agrarias
Constituidas.
( asociaciones)
Deficiente
capacidad
tecnico - productiva para el
desarrollo de la provinvcia.
Acceder a capacitaciones y
asistencia tecnica para lograr el
desarrollo
sostenible
de
la
Provincia.
Comunidades
Nativas
de
la Provincia de Alto
Amazonas.
Limitado
acceso
a
los
servicios brindados por la
agencia
agraria
de
Yurimaguas.
Contribuir
al
desarrollo
sostenible de la provincia, con
tecnologias y productos que sean
competetivos en el meracdo
nacional e internacional.
Logar
cumplir
con
las
expectativas del servicio que se
brinda a la poblacin agraria de
la provincia.
Direccin
Regional
Agraria- Loreto
Escasos
recursos
para
atender
las necesidades de todas las
Agencias en toda la Regin.
Asistir
a
las
capacitaciones
brindadas y recibir la
asistencia tecnica por la
Agencia
Agraria
para
mejorar la competitividad
de la Provincia.
Adminstrar
y
gestionar
desarrollo
sostenible
de
Regin Loreto.
el
la
el mantenieminto de la
infraestrcutura
a
implementarse
con este proyecto.
Elaborar el perfil de
proyecto para mejorar la
gestin
de
servicios
agrarios en la Provincia a
traves de contartacin de
servicios y luego buscar
su financiamiento para la
ejecucin de obra.
Gobierno
Loreto
Mejorar la gestin
servicios agrarios en
Regin Loreto.
Regional
de
de los
toda la
Provincia
1993
82,946
2007
104,667
TCI
1.68%
10
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Provincia de
Alto Amazonas
117,5
76
119,5
45
121,54
8
123,5
84
125,6
55
127,7
60
129,9
00
132,0
76
134,2
89
136,5
38
138,8
26
Area Urbana
70,52
5
71,70
6
72,908
74,12
9
75,37
1
76,63
4
77,91
7
79,22
3
80,55
0
81,89
9
83,27
1
Hombres
Mujeres
Area Rural
Hombres
Mujeres
36021
36624
37238
37862
38496
39141
39797
40463
41141
41830
42531
34504
35082
35670
36267
36875
37493
38121
38759
39409
40069
40740
47,05
1
47,83
9
48,640
49,45
5
50,28
4
51,12
6
51,98
3
52,85
3
53,73
9
54,63
9
55,55
4
24031
24434
24843
25259
25683
26113
26550
26995
27447
27907
28375
23019
23405
23797
24196
24601
25013
25432
25858
26292
26732
27180
10
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
47,0
51
2403
1
2301
9
47,8
39
2443
4
2340
5
49,4
55
2525
9
2419
6
50,2
84
2568
3
2460
1
51,9
83
2655
0
2543
2
52,8
53
2699
5
2585
8
53,7
39
2744
7
2629
2
54,6
39
2790
7
2673
2
48,640
24843
23797
51,126
26113
25013
55,554
28375
27180
10
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
35,58
6
36,18
3
36,789
37,40
5
38,03
2
38,669
39,31
7
39,97
5
40,64
5
41,32
6
42,018
1817
6
1741
1
1848
0
1770
2
1910
5
1830
0
1942
5
1860
7
2008
1
1923
5
2041
7
1955
8
2075
9
1988
5
2110
7
2021
9
18790
17999
19750
18919
21461
20557
Elaboracin Propia
Anlisis de Causas
Causas Directas:
1.- Inadecuada Infraestructura para brindar un mejor servicio agrario.
2.- Insuficiente e inadecuado equipamiento para brindar un eficiente servicio
agrario.
3.- Recursos Humanos con limitadas capacidades.
Causas Indirectas:
1.-Insuficiente e Inadecuada Infraestructura de la Agencia Agraria de Alto
Amazonas.
2.-Equipamiento obsoleto e inadeuado.
3.-Insuficientes capacitaciones al Personal de la Agencia Agraria de Alto
Amazonas.
3.2.3.
Anlisis de Efectos
Efecto Directo:
1.- Productores con limitados conocimientos tcnicos- productivos y gestin
empresarial.
2.- Uso inadecuado de las tierras en la Provincia de Alto Amazonas.
Efectos Indirectos:
1.- Escasa produccin y formacin de empresas agropecuarias y agroindustriales.
2.- Toma de decisiones inadecuadas respecto a las actividades productivas y
agropecuarias.
Perfil de Proyecto: Mejoramiento de los Servicios de Gestin de la Agencia Agraria de la
Provincia de Alto Amazonas, Regin Loreto.
69
Efecto Final :
Bajos Niveles de
Desarrollo Socio
Economico de la
Poblacin de la Provincia
de Alto Amazonas.
Efecto
Efecto
Indirecto :
Indirecto :
Escasa
Toma de
produccin
decisiones
y formacin
inadecuadas
de
respecto a
empresas
las
agropecuari
actividades
as y
productivas
agroindustri
y
al.
agropecuari
Efecto
Efecto
as. :
Directo :
Directo
Productores
Uso
con
inadecuado
limitados
de las
conocimient
tierras en la
os tecnicosProvincia de
productivos
Alto
y gestin
Amazonas.
empresarial.
Causa
Directa :
Inadecuada
Infraestruct
ura para
brindar un
mejor
Causa
servicio
Indirecta :
agrario.
Insuficiente
e
Inadecuada
Infraestruct
ura de la
Agencia
Agraria de
Alto
Amazonas.
Problema Central :
Deficiente Servicio
Pblico Agrario en la
Agencia Agraria de Alto
Amazonas.
Causa
Directa :
Insuficiente
e
inadecuado
equipamient
o para
brindar un
eficiente
servicio
agrario.
Causa
Indirecta :
Equipamient
o obsoleto e
inadecuado.
Causa
Directa :
Recursos
Humanos
con
limitadas
capacidades
.
Causa
Indirecta:
Insuficiente
s
capacitacion
es al
Personal de
la Agencia
Agraria de
Alto
Amazonas.
Objetivo Central
Problema Central:
Deficiente Servicio Pblico
Agrario en la Agencia Agraria
de Alto Amazonas.
Objetivo Central:
Eficiente Servicio Pblico
Agrario en la Agencia Agraria
de Alto Amazonas.
Fin Ultimo :
Mejores Niveles de
Desarrollo Socio
Economico de la
Poblacin de la Provincia
Fin
Fin
de Alto Amazonas.
Indirecto :
Indirecto :
Toma de
Suficiente
decisiones
produccin y
adecuadas
formacin
respecto a
de empresas
las
agropecuari
actividades
as y
productivas
agroindustri
y
Fin Directo
:
Fin
Directo
:
al.
agropecuari
Productores
Uso
as.
con
adecuado
de
sificientes
las tierras
conocimient
en la
os tecnicosProvincia de
productivos
Alto
y gestin
Amazonas.
empresarial.
Medio de
Primer Nivel
1:
Adecuada
Infraestruct
ura para
Medioun
brindar
Fundamenta
mejor
l 1.1 :
servicio
Suficiente
agrario. y
adecuada
Infraestruct
ura de la
Agencia
Agraria de
Alto
Amazonas.
3.3.4.
Objetivo Central :
Eficiente Servicio Pblico
Agrario en la Agencia
Agraria
dede
Alto
Medio
Amazonas.
Primer Nivel
2:
Suficiente y
adecuado
equipamient
o para
brindar un
eficiente
servicio
Medio
agrario.
Fundamenta
l 2.1 :
Equipamient
o moderno y
adecuado.
Medio de
Primer Nivel
3:
Recursos
Humanos
con
suficientes
Medio
capacidades
Fundamenta
.
l 3.1 :
Suficientes
capacitacion
es al
Personal de
la Agencia
Agraria de
Alto
Amazonas.
3.3.4.1.
Relacin de acciones:
-
3.3.4.3.
Proyectos Alternativos:
Alternativa 1:
Perfil de Proyecto: Mejoramiento de los Servicios de Gestin de la Agencia Agraria de la
Provincia de Alto Amazonas, Regin Loreto.
75
Alternativa 2:
Medio Fundamental
1.1 :
Suficiente y
adecuada
Infraestructura de
la Agencia Agraria
de Alto Amazonas.
Accin 1.1.1 :
Construccin de un
nuevo local para la
Agencia Agraria de
Alto Amazonas.
Accin 1.1.2 :
Implementacin de
un plan de
mantenimiento
para la
infraestructura.
Medio Fundamental
3.1 :
Suficientes
capacitaciones al
Personal de la
Agencia Agraria de
Alto Amazonas.
Accin 3.1.1 :.
Fortalecimiento de
capacidades a todo
el Personal de la
Accin
3.1.2 :de
Agencia
Agraria
Fortalecimiento
Alto Amazonas.de
capacidades al
Personal de la
Agencia Agraria
mas sus sedes
agrarias en la
Provincia de Alto
Amazonas por la
Direccin Regional
Agraria de Loreto.
Alternativa
1
Alternativa
2
Perfil de Proyecto: Mejoramiento de los Servicios de Gestin de la Agencia Agraria de la Provincia de Alto Amazonas, Regin Loreto.
77
IV.
FORMULACIN
Fases
Ao
8
1
0
1
1
1
2
Inversin
1.1.
1.
Construccin de un nuevo
local
para
la
Agencia
Agraria de Alto Amazonas.
1.1.
2.
Implementacin de un plan
de mantenimiento para la
infraestructura.
2.1.
1.
Adquisicin de equipos y
mobiliarios modernos.
2.1.
2.
Implementacin de un plan
de mantenimiento para
mobiliarios y equipos
3.1.
1.
Fortalecimiento
de
capacidades a todo el
Personal de la Agencia
Agraria
de
Alto
Amazonas.
1
0
Fases
Ao
8
1
0
1
1
1
2
Inversin
1.1.
1.
Construccin de un nuevo
local para la Agencia
Agraria de Alto Amazonas.
1.1.
2.
Implementacin de un plan
de mantenimiento para la
infraestructura.
2.1.
1.
Adquisicin de equipos y
mobiliarios modernos.
2.1.
2.
Implementacin de un plan
de mantenimiento para
mobiliarios y equipos
3.1.
2.
Fortalecimiento
de
capacidades al Personal
de la Agencia Agraria
mas sus sedes agrarias
en la Provincia de Alto
Amazonas
por
la
Direccin
Regional
Agraria de Loreto.
1
0
4.2.
10
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
47,0
51
2403
1
2301
9
47,8
39
2443
4
2340
5
48,6
40
2484
3
2379
7
49,4
55
2525
9
2419
6
50,2
84
2568
3
2460
1
51,1
26
2611
3
2501
3
51,9
83
2655
0
2543
2
52,8
53
2699
5
2585
8
53,7
39
2744
7
2629
2
54,6
39
2790
7
2673
2
55,5
54
2837
5
2718
0
4.2.1.2.
Demanda
Efectiva /
Aos
Productores
de Alto
Amazonas
Hombres
Mujeres
10
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
35,5
86
36,1
83
36,7
89
37,4
05
38,0
32
38,6
69
39,3
17
39,9
75
40,6
45
41,3
26
42,0
18
18,17
6
17,41
1
18,48
0
17,70
2
18,79
0
17,99
9
19,10
5
18,30
0
19,42
5
18,60
7
19,75
0
18,91
9
20,08
1
19,23
5
20,41
7
19,55
8
20,75
9
19,88
5
21,10
7
20,21
9
21,46
1
20,55
7
representa un 76 % de los
10
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
36,1
20
18,44
8
17,67
2
36,7
25
18,75
8
17,96
8
37,3
40
19,07
2
18,26
9
37,9
66
19,39
1
18,57
5
38,6
02
19,71
6
18,88
6
39,2
49
20,04
6
19,20
2
39,9
06
20,38
2
19,52
4
40,5
75
20,72
4
19,85
1
41,2
55
21,07
1
20,18
4
41,9
46
21,42
4
20,52
2
42,6
48
21,78
3
20,86
6
4.2.2.
Analisis de la Oferta
La Oferta para el caso del proyecto esta conformada por los servicios brindados
Perfil de Proyecto: Mejoramiento de los Servicios de Gestin de la Agencia Agraria de la
Provincia de Alto Amazonas, Regin Loreto.
81
por la Agencia Agraria de Alto Amazonas; es decir la actual oferta del servicio
agrario en el mbito de la provincia Alto Amazonas, para ello se utilizo la
referencia de los ltimos 5 aos de los servicios de la Agencia y con ello se
obtuvo la proyeccin de la Oferta en la situacin sin proyecto y con proyecto
en el segundo caso se incremento en un 5 % los servicios a brindarse ; estos
datos se detallan en los siguientes cuadros :
Cuadro N 31: Proyeccin de la oferta de los servicios de la Agencia Agraria de
Alto Amazonas en la situacin sin proyecto.
SERVICIOS
PROGRAMADOS.
AGRARIOS
TOTAL
FORTALECER EL SISTEMA
INTEGRADO
DE
ESTADISTICA AGRARIA
Eventos
para
capacitar
profesionales y tcnicos en temas
del SIEA y productores en
informacin agraria.
Ejecucin de encuestas sobre
intenciones de siembra
Recopilacion de informacion para
la estadistica contina de la
Produccion Agropecuaria por
distritos.
Recopilacion
de
informacion
agroclimatica
Ejecucion de monitoreo de la
estadistica agropecuaria continua
Recopilacion de precios de
mercado
Ejecucion
Evaluacin
y
actualizacion
de
empresas
agroindustriales
Ejecucion,
Evaluacion
y
actualizacion de encuestas a
Unidades
Especializadas
de
Produccion Pecuaria Intensiva
(UEPPI)
Registro
de
informacin
relevante en el Portal Agrario
MEJORAR EL ORDENAMIENTO
DEL USO RACIONAL DE LAS
TIERRAS
Reconocimiento
e
inscripciones de territorios
comunales
Concertacion y manejo de
conflictos
Reversion de tierras Ley 28259
Emision de Constancias de
Posesion
Emision
de
certificado
de
Usufructo Temporal de Barreal
SANEAMIENTO Y TITULACION
DE PREDIOS RURALES
Titulacion de predios rurales
Rectificacin de rea, linderos y
medidas perimetricas
Demarcacion
de
territoris
de
comunidades nativas D.L N 22175
Adjudicacion de predios rurales en
atencion al D.L N 653 - Titulacion
Onerosa
Formulacion de prdedios rurales en
propiedad privada
Deslinde y titulacion del territorio de
las comunidades campesinas Ley N
24657
FORMULAR DOCUMENTOS DE
GESTION Y PROYECTOS DE
INVERSION
PUBLICA
EN
CONCORDANCIA CON LOS
2009
2010
2011
1,147
1,748
1,004
2012
1,54
2
2013
2015
2016
1,271
1,296
2021
1,45
0
2022
1,48
8
2023
1,53
0
31
113
335
318
320
325
331
336
342
348
354
359
365
372
378
384
12
12
12
12
12
12
13
13
13
13
13
14
14
14
14
12
12
252
252
252
256
261
265
269
274
278
283
288
293
298
303
48
48
13
12
12
12
13
13
13
13
13
14
14
14
14
12
13
12
12
12
12
13
13
13
13
13
14
14
14
14
12
12
12
12
12
13
13
13
13
13
14
14
14
14
11
12
12
12
12
12
13
13
13
13
13
14
14
14
14
353
153
248
291
152
155
157
160
162
165
168
171
174
177
179
182
23
41
47
53
24
24
25
25
26
26
27
27
27
28
28
29
324
103
196
233
120
122
124
126
128
130
133
135
137
139
142
144
407
369
375
381
388
394
401
408
415
421
429
436
443
230
300
305
310
315
321
326
331
337
343
348
354
360
177
60
61
62
63
64
65
66
67
69
70
71
72
13
26
14
15
14
17
21
25
31
38
46
56
69
84
102
125
1,223
2014
1,24
6
2017
1,32
3
2018
1,352
2019
1,38
2
2020
1,414
2024
1,576
LINEAMIENTOS DE POLITICA
AGRARIA
REGIONAL
Y
NACIONAL
Elaboracin de la memoria anual
de la agencia agraria
Apoyo a los proyectos que por
encargo y/o convenio conduce la
DRA-Loreto
Elaboracin de perfiles de
inversin
a
traves
del
presupuesto participativo
PROMOVER LA FORMACION Y
EL
FORTALECIMIENTO
EMPRESARIAL
DE
LAS
ORGANIZACIONES
DE
PRODUCTORES AGRARIOS
Diagnostico actualizado sobre el
nivel de organizacin de los
productores
Capacitacion en temas de
asociatividad
y
gestion
empresarial
a
productores
agrarios
Orientacion y asesoramiento para
la
formalizacion
de
organizaciones agrarias
Asesoramiento a Organizaciones
de
Productores
para
la
Formulacion del Plan de Negocio
FACILITAR
A
LOS
PRODUCTORES EL ACCESO A
BIENES
Y
SERVICIOS
PUBLICOS Y/O PRIVADOS
Facilitar el acceso a bienes y
servicios agrarios
Directorio de la oferta local de
servicios agrarios y organizacin
de productores
Mesa de dialogo para la
concertacion
de
acuerdos
suscritos entre productores y
provedores publicos y privados
de bienes y servicios
Seguimiento sobre el uso de
maquinarias
cedidas
en
afectacin en uso y semovientes
va FFRR.
Formulacin de certificados de
marcas y seales de ganado
FORTALECER
LA
ARTICULACION
DE
LA
PRODUCCION AGRARIA AL
MERCADO
Orgnizacion
de
ferias
agropecuarias
para
la
participacion de los agentes
economicos
Emision de Constancias de
Productor
Facilitar
la
capacitacion
a
productores
en
temas
de
transformacion y comercializacion
con valor agregado
Fortalecer la mesa de dialogo
para la concertacion de acuerdos
de compra - venta suscritos
PROMOVER LA PRODUCCION
Y PRODUCTIVIDAD DE LOS
CULTIVOS
Y/O
CRIANZAS
PRIORIZADAS
Capacitacion a productores en
temas de transformacion y
comercializacion de productos
con valor agregado
Capacitacion a productores en
temas
de
produccion
y
productividad
Promover
la
certificacion
organiga
de
cultivos
priorizados
Gestionar la capacitacin de
productores
calificados
y
profesionales
para
la
transferencia
de
tecnologia
12
24
12
12
12
12
12
13
13
13
13
13
14
14
14
14
18
14
13
13
15
15
16
16
16
16
17
17
17
17
18
18
10
15
10
10
237
307
312
317
235
239
243
247
251
255
260
264
268
273
277
282
219
285
289
310
220
224
227
231
235
239
243
247
251
255
260
264
12
12
490
1014
65
170
106
108
110
111
113
115
117
119
121
123
125
127
439
583
56
163
100
102
103
105
107
109
110
112
114
116
118
120
50
424
121
17
10
11
11
11
12
12
12
12
12
13
13
13
13
42
76
10
atravs de pasantias.
PROMOVER
LA
IMPLEMENTACION
DE
SISTEMAS INTEGRALES DE
PRODUCCION EN EL MARCO
DEL PLAN TSETA TANA AIPA
Promocion
de
actividades
productivas
en
instituciones
educativas
AGRARIOS
TOTAL
FORTALECER EL SISTEMA
INTEGRADO
DE
ESTADISTICA AGRARIA
Eventos
para
capacitar
profesionales y tcnicos en temas
del SIEA y productores en
informacin agraria.
Ejecucin de encuestas sobre
intenciones de siembra
Recopilacion de informacion para
la estadistica continua de la
Produccion Agropecuaria por
distritos.
Recopilacion
de
informacion
agroclimatica
Ejecucion de monitoreo de la
estadistica agropecuaria continua
Recopilacion de precios de
mercado
Ejecucion
Evaluacin
y
actualizacion
de
empresas
agroindustriales
Ejecucion,
Evaluacion
y
actualizacion de encuestas a
Unidades
Especializadas
de
Produccion Pecuaria Intensiva
(UEPPI)
Registro
de
informacin
relevante en el Portal Agrario
MEJORAR EL ORDENAMIENTO
DEL USO RACIONAL DE LAS
TIERRAS
Reconocimiento
e
inscripciones de territorios
comunales
Concertacion y manejo de
conflictos
Reversion de tierras Ley 28259
Emision de Constancias de
Posesion
Emision
de
certificado
de
Usufructo Temporal de Barreal
SANEAMIENTO Y TITULACION
DE PREDIOS RURALES
Titulacion de predios rurales
Rectificacin de rea, linderos y
medidas perimetricas
Demarcacion
de
territoris
de
comunidades nativas D.L N 22175
Adjudicacion de predios rurales en
atencion al D.L N 653 - Titulacion
Onerosa
Formulacion de prdedios rurales en
propiedad privada
Deslinde y titulacion del territorio de
las comunidades campesinas Ley N
24657
2009
2010
2011
2012
1,147
1,748
1,004
1,542
31
113
335
318
2013
1,22
3
2014
2015
2016
2017
1,287
1,354
1,425
1,501
2018
1,58
1
2019
2023
2024
2,072
2,193
320
336
353
370
389
408
429
450
473
496
521
547
12
12
12
12
13
13
14
15
15
16
17
18
19
20
21
12
12
252
252
252
265
278
292
306
322
338
355
372
391
410
431
48
48
13
12
13
13
14
15
15
16
17
18
19
20
21
12
13
12
12
13
13
14
15
15
16
17
18
19
20
21
12
12
12
13
13
14
15
15
16
17
18
19
20
21
11
12
12
12
13
13
14
15
15
16
17
18
19
20
21
353
153
248
291
152
160
168
176
185
194
204
214
225
236
248
260
23
41
47
53
24
25
26
28
29
31
32
34
35
37
39
41
324
103
196
233
120
126
132
139
146
153
161
169
177
186
195
205
407
369
387
407
427
449
471
494
519
545
572
601
631
230
300
315
331
347
365
383
402
422
443
465
489
513
177
60
63
66
69
73
77
80
84
89
93
98
103
1,666
2020
1,75
8
2021
1,855
2022
1,95
9
FORMULAR DOCUMENTOS DE
GESTION Y PROYECTOS DE
INVERSION
PUBLICA
EN
CONCORDANCIA CON LOS
LINEAMIENTOS DE POLITICA
AGRARIA
REGIONAL
Y
NACIONAL
Elaboracin de la memoria anual
de la agencia agraria
Apoyo a los proyectos que por
encargo y/o convenio conduce la
DRA-Loreto
Elaboracin de perfiles de
inversin
a
traves
del
presupuesto participativo
PROMOVER LA FORMACION Y
EL
FORTALECIMIENTO
EMPRESARIAL
DE
LAS
ORGANIZACIONES
DE
PRODUCTORES AGRARIOS
Diagnostico actualizado sobre el
nivel de organizacin de los
productores
Capacitacion en temas de
asociatividad
y
gestion
empresarial
a
productores
agrarios
Orientacion y asesoramiento para
la
formalizacion
de
organizaciones agrarias
Asesoramiento a Organizaciones
de
Productores
para
la
Formulacion del Plan de Negocio
FACILITAR
A
LOS
PRODUCTORES EL ACCESO A
BIENES
Y
SERVICIOS
PUBLICOS Y/O PRIVADOS
Facilitar el acceso a bienes y
servicios agrarios
Directorio de la oferta local de
servicios agrarios y organizacin
de productores
Mesa de dialogo para la
concertacion
de
acuerdos
suscritos entre productores y
provedores publicos y privados
de bienes y servicios
Seguimiento sobre el uso de
maquinarias
cedidas
en
afectacin en uso y semovientes
va FFRR.
Formulacin de certificados de
marcas y seales de ganado
FORTALECER
LA
ARTICULACION
DE
LA
PRODUCCION AGRARIA AL
MERCADO
Orgnizacion
de
ferias
agropecuarias
para
la
participacion de los agentes
economicos
Emision de Constancias de
Productor
Facilitar
la
capacitacion
a
productores
en
temas
de
transformacion y comercializacion
con valor agregado
Fortalecer la mesa de dialogo
para la concertacion de acuerdos
de compra - venta suscritos
PROMOVER LA PRODUCCION
Y PRODUCTIVIDAD DE LOS
CULTIVOS
Y/O
CRIANZAS
PRIORIZADAS
Capacitacion a productores en
temas de transformacion y
comercializacion de productos
con valor agregado
Capacitacion a productores en
temas
de
produccion
y
productividad
Promover
la
certificacion
organiga
de
cultivos
priorizados
13
26
14
15
14
17
21
25
31
38
46
56
69
84
102
125
12
24
12
12
12
13
13
14
15
15
16
17
18
19
20
21
18
14
13
13
15
16
17
17
18
19
20
21
22
23
24
26
10
10
11
11
12
12
13
14
15
10
10
237
307
312
317
235
247
259
272
286
300
315
331
347
365
383
402
219
285
289
310
220
231
243
255
267
281
295
310
325
341
358
376
12
12
490
1014
65
170
106
111
117
123
129
135
142
149
157
164
173
181
439
583
56
163
100
105
110
116
122
128
134
141
148
155
163
171
50
424
121
17
10
11
12
12
13
13
14
15
15
16
17
18
19
42
76
10
10
10
Gestionar la capacitacin de
productores
calificados
y
profesionales
para
la
transferencia
de
tecnologia
atravs de pasantias.
PROMOVER
LA
IMPLEMENTACION
DE
SISTEMAS INTEGRALES DE
PRODUCCION EN EL MARCO
DEL PLAN TSETA TANA AIPA
Promocion
de
actividades
productivas
en
instituciones
educativas
4.2.3.
Determinacin de la Brecha O - D
10
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
1,287
1,354
1,425
1,501
1,581
1,666
1,758
1,855
1,959
2,072
2,193
36,120
36,725
37,340
37,966
38,602
39,249
39,906
40,575
41,255
41,946
42,648
34,83
4
35,37
1
-35,915
36,46
5
-37,021
37,58
2
-38,149
38,72
0
39,29
5
39,87
4
40,456
DESCRIPCIN
OFERTA
CON
PROYECTO
(
SERVICIOS
AGRARIOS)
DEMANDA
EFECTIVA
CON
PROYECTO
( PRODUCTORES)
BALANCE O-D
En este cuadro se observa que para el ao 0 existe una brecha de 34,834 y para
el ao 10 es de 40,456.
4.3.
4.3.1.1.
Localizacin
Tecnologa
Tamao
Ao 0
Fase
Inversin
Mes
Ao 1
Ao 2
Ao 3
Ao 4
Ao 5
Ao 6
Ao 7
Ao 8
Ao 9
Pos Inversin
8
1
0
1
1
1
2
Perfil de Proyecto: Mejoramiento de los Servicios de Gestin de la Agencia Agraria de la Provincia de Alto Amazonas, Regin Loreto.
88
Ao
10
Perfil de Proyecto: Mejoramiento de los Servicios de Gestin de la Agencia Agraria de la Provincia de Alto Amazonas, Regin Loreto.
89
Ao 0
Fase
Inversin
Mes
Ao 1
Ao 2
Ao 3
Ao 4
Ao 5
Ao 6
Ao 7
Ao 8
Ao 9
Pos Inversin
8
1
0
1
1
1
2
Perfil de Proyecto: Mejoramiento de los Servicios de Gestin de la Agencia Agraria de la Provincia de Alto Amazonas, Regin Loreto.
90
Ao
10
1.Elaboracin
del
Plan
de
Mantenimeintopara mobiliario y equipos
de la Agencia Agraria.
2.Implementacin
del
Plan
de
Mantenimeintopara mobiliario y equipos
de la Agencia Agraria.
3.1.2.
Fortalecimiento
de
capacidades al Personal de la
Agencia Agraria mas sus sedes
agrarias en la Provincia de Alto
Amazonas por la Direccin Regional
Agraria de Loreto.
1.
Estructuracin
del
plan
de
capacitacin.
2. Adquisicin de materiales y tiles de
escritorio para las capacitaciones.
3. Desarrollo de las Capacitaciones.
4. Evaluacin
5. Seguimiento de la aplicacin de la
capacitacin.
Perfil de Proyecto: Mejoramiento de los Servicios de Gestin de la Agencia Agraria de la Provincia de Alto Amazonas, Regin Loreto.
91
4.3.1.5.
ALTA
Fuente: Manual
de
adecuadamente
equipada
considerando
las
AMBIENTES
AMBIENTES ADMINISTRATIVOS Y SS.HH
UNIDAD
m2
1 er Piso
REA
723.96
353.74
Secretaria
m2
18.17
Direccin + SS.HH
m2
26.86
Oficina de Tierras
m2
44.33
Oficina de PROCREA
m2
21.44
Almacen General
m2
20.87
Oficina de DISAFILPA
m2
68.47
Caja
m2
8.75
Almacen
m2
13.00
SS.HH de Hombres
m2
15.82
SS.HH de Mujeres
m2
17.38
Area de Mantenimiento
m2
3.53
Hall
m2
53.12
Pasadizo
m2
42.00
2 do Piso
m2
370.22
m2
21.74
m2
90.77
Archivo General
m2
43.70
m2
32.04
m2
34.01
SS.HH de Hombres
m2
15.82
SS.HH de Mujeres
m2
17.38
Area de Mantenimiento
m2
3.50
Hall
m2
56.18
Pasadizo
m2
39.96
1.2.
1.3.
Escalera
m2
15.12
AMBIENTES DE SERVICIOS
m2
365.38
m2
176.54
m2
25.86
m2
23.98
m2
30.29
m2
108.71
977.77
EXTERIORES
Caseta de Vigilancia + SS.HH
m2
9.07
m2
63.41
Estacionamiento de motos
m2
108.71
Caseta de Bombeo
m2
4.80
m2
2.50
Cerco Perimetrico
m2
36.78
Circulacin ( pavimento)
m2
336.37
Areas Verdes
m2
416.33
TOTAL
m2
2,067.31
:
:
:
3,012.52 M2.
2,067.31 M2.
138.15 M2.
DISTRIBUCIN DE AMBIENTES:
El acceso principal a la infraestructura se hace mediante la calle Julio C. Ruiz, por
ingreso vehicular e ingreso peatonal, encontrando una cesta de control de
ingreso y salida, luego a un rea de circulacin (pavimentacin) donde se tiene
acceso a una estacionamiento de motos y los diferentes mdulos como son:
cafetera y estacionamiento de camionetas y deposito de yates, modulo principal
donde se ubican las diferentes oficinas de la institucin, sala de conferencias,
caseta de bombeo la cual incluye tanque cisterna y tanque elevado, as mismo
se adiciona al proyecto el cerco perimtrico, la distribucin y caractersticas de
los mdulos son:
MODULO PRINCIPAL: Se accede desde rea de circulacin, la infraestructura
cuenta con dos pisos, las distribuciones por pisos son:
1 PISO: Hall principal, una escalera de concreto armado que comunica al
segundo piso, jardn central, pasadizos centrales que comunican a:
Perfil de Proyecto: Mejoramiento de los Servicios de Gestin de la Agencia Agraria de la
Provincia de Alto Amazonas, Regin Loreto.
94
f) Requerimiento de equipamiento
El requeriemiento comprende los mobiliarios y equipos para cada una de las
areas a implementarse con el proyecto.
A continuacin se detalla los requerimientos de mobiliario y equipos en el
siguiente cuadro:
Cuadro N 36: Requerimiento de mobiliarios y equipos para la Agencia
Agraria de Alto Amazonas.
ITEM
1.1.
AMBIENTES
Cant.
Especificaciones
Tecnicas
Silla Giratoria
Sillas Plasticas
Ventilador de Pie
Direccin + SS.HH
Silla Giratoria
Sillas Plasticas
Ventilador de Pie
Area Tierras
Equipos de Computo
Impresora Multifuncional
Laptop
0.30 x 3.60
0.30 x 3.60
Camara Fotografica
Bancas
Ventiladores de Pie
Equipos de Computo
Impresora Multifuncional
Area PROCREA
Camara Fotografica
Sillas Plasticas
Ventiladores de Pie
Pizarra Acrilica
Almacen General
Estantes ( madera cedro o similar)
Escobas
Recogedor de basura
0.30 x 3.60
Area DISAFILPA
Escritorio (madera cedro o similar)
Equipos de Computo
Camara Fotografica
Impresora Multifuncional
Sillas Plasticas
Laptop
0.30 x 3.60
Caja
Escritorio (madera cedro o similar)
Silla Giratoria
0.30 x 3.60
Almacen
Estantes ( madera cedro o similar)
SS.HH de Hombres
Deposito plastico para basura.
SS.HH de Mujeres
Deposito plastico para basura.
Area de Mantenimiento
Estantes ( madera cedro o similar)
0.30 x 3.60
2 do Piso
Jefatura de la Direccin de Promocin
Agraria ( DPA) + SS.HH
Escritorio (madera cedro o similar)
Silla Giratoria
Sillas Plasticas
Ventilador de Pie
0.30 x 3.60
Equipos de Computo
Camara Fotografica
Impresora Multifuncional
Archivo General
Escritorio (madera cedro o similar)
0.30 x 3.60
Sillas Plasticas
Equipos de Computo
Camara Fotografica
Impresora Multifuncional
0.30 x 3.60
Sillas Plasticas
Equipos de Computo
Impresora Multifuncional
Camara Fotografica
SS.HH de Hombres
Deposito plastico para basura.
SS.HH de Mujeres
Deposito plastico para basura.
Area de Mantenimiento
1.2.
AMBIENTES DE SERVICIOS
Sala de Conferencia +area de
preparacin de ponencias + SS.HH
Mesa de madera de cedro o similar
1m x2m x 0.70m
60
Silla de Madera
Deposito plastico para basura.
0.30 x 3.60
1.3.
1.4.
Mesas de plastico
Sillas de plastico
12
EXTERIORES
Caseta de Vigilancia + SS.HH
Mesa de madera de cedro o similar
Silla Plastica
OTROS
Deslizador con motor ( Chalupa para 8
pasajeros + motor EVIMRUDE de 85 HP)
Camioneta 4 x 4 Toyota Hilux
24
24
Tiendas de Campaa
24
Colchonetas
24
Linternas
24
4
1
1
Cantidad
01
Motorista
01
Chofer
01
Guardian
02
TOTAL
05
FECHA
19/01/2015
02/02/2015
10 Al 28/02/2015
LUGAR
AAAA
AAAA
AAAA
09 al 13/03/2015
06 al 09/04/2015
21 al 25/04/2015
AAAA
AAAA, CAMPO
AAAA
04
25
08
22
09/05/2015
31/05/2015
12/06/2015
27/06/2015
AAAA
TARAPOTO
AAAA, CAMPO
AAAA, CAMPO
06 al 11/07/2015
AAAA, CAMPO
al
al
al
al
23 al 25/11/2015
17 al 19/12/2015
Pucallpa, JuanJui,
Tocache, Cajamarca,
Nueva Cajamarca
AAAA
AAAA
4.4.
1.1.1.
Costo Directo
Utilidad
133,753.92
296,131.18
Costo de la Obra
1,941,304.40
58,239.13
97,065.22
3.1.1.
40,126.18
1,645,173.22
IGV
2.1.2.
1,337,539.20
133,753.92
Sub Total
2.1.1.
PRIVADOS S/
Gastos Generales
Imprevistos
1.1.2.
PRECIOS
Mitigacin Ambiental
COSTO TOTAL DE LA ALTERNATIVA 1
2,096,608.75
2,000.00
585,964.40
2,000.00
119,000.00
9,900.00
2,815,473.15
1.1.1.
133,753.92
IGV
Costo de la Obra
2.1.2.
3.1.2.
1,337,539.20
133,753.92
Sub Total
2.1.1.
PRIVADOS S/
Gastos Generales
Imprevistos
1.1.2.
PRECIOS
40,126.18
1,645,173.22
296,131.18
1,941,304.40
58,239.13
97,065.22
2,096,608.75
2,000.00
585,964.40
2,000.00
183,500.00
9,900.00
2,879,973.15
Cantidad
15
46
12
8
P.U
450
95
600
650
P.T
6,750
4,370
6,900
4,875
18
6
3,000
500
52,500
3,000
78,395
Costo Mensual
Rubros
Director
Nombrados
CANT
1
Nomb.
1
Contr.
Destacado
Total
Remun.
Costo
Anual
Total
Remun
.
1,791.55
21,499
6,788
81,451
Contratados
38
Total
47
12
26
13,900
12
26
22,479
166,800
269,74
9
Unidad de Medida
Cantidad
P.U
6.00
6.00
20.00
20.00
15.00
5.00
1.00
1.00
Total
Mensual
Limpieza
Und
und.
bolsa
Bolsa
Escoba ( unidad)
Recogedor ( unidad)
Detergente
Legia
Total
90.00
30.00
20.00
20.00
160.00
4.4.3.2.
1
269,74
9
269,74
9
4,320
2,400
1,920
2
269,74
9
269,74
9
4,320
2,400
1,920
3
269,7
49
269,74
9
4,320
2,400
1,920
4
269,7
49
269,74
9
4,320
2,400
1,920
5
269,7
49
269,74
9
4,320
2,400
1,920
6
269,7
49
269,74
9
4,320
2,400
1,920
7
269,7
49
269,74
9
4,320
2,400
1,920
8
269,7
49
269,74
9
4,320
2,400
1,920
9
269,7
49
269,74
9
4,320
2,400
1,920
10
269,7
49
269,74
9
4,320
2,400
1,920
274,06
9
274,06
9
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
Total
Remun.
1,792
6,788
Costo
Anual
Total
Remun.
21,499
81,451
18,450
27,029
221,400
324,349
Costo Mensual
Rubros
Director
Nombrados
CANT
1
8
Nomb.
1
8
Contr.
0
0
Destacado
0
0
Contratados
Total
43
17
26
52
17
26
DESCRIPCIN
Costo Mensual
(S/.)
Meses
500
12
1000
12
MANTENIMIENTO Y REPOSICIN
Mantenimiento de Mobiliarios y equipos
INFRAESTRUCTURA
Mantenimiento de Infraestructura
TOTAL
P. PRIVADO
COSTOS/ AO
(S/.)
6,000.00
6,000.00
12,000.00
12,000.00
18,000.00
Unidad de Medida
Cantidad
C.U
Total Anual
Caja ( 12 und)
Caja ( 12 und)
Ciento
Millar
Unidad
Unidad
15
10
5
25
24
24
10.00
40.00
50.00
30.00
5.00
1.00
150.00
400.00
250.00
750.00
120.00
24.00
1694.00
Lapiceros
Plumones
Papelotes
Papel Bond
Goma
Cinta scoth
Total
324,34
9
324,34
9
324,34
9
324,34
9
324,34
9
324,34
9
324,3
49
324,34
9
19,69
4
324,3
49
324,34
9
19,69
4
324,3
49
324,34
9
19,69
4
324,3
49
324,34
9
19,69
4
324,3
49
324,34
9
19,69
4
324,3
49
324,34
9
19,69
4
324,3
49
324,34
9
19,69
4
19,694
19,694
19,694
6,000
6,000
6,000
6,000
6,000
6,000
6,000
6,000
6,000
6,000
12,000
12,000
12,000
12,000
12,000
12,000
12,000
12,000
12,000
12,000
1,694
1,694
1,694
1,694
1,694
1,694
1,694
1,694
1,694
1,694
344,04
3
344,04
3
344,04
3
344,0
43
344,0
43
344,0
43
344,0
43
344,0
43
344,0
43
344,0
43
1.1.2.
2.1.2.
3.1.1.
Fases
Inversin
Implementacin de un plan
mantenimiento
para
infraestructura.
de
la
Costos Operacin
Costos Mantenimiento
Implementacin de un plan de
mantenimiento para mobiliarios y
equipos
Fortalecimiento de capaciades a
todo el Personal de la Agencia
Agraria de Alto Amazonas.
TOTAL
10
344,04
3
344,04
3
344,04
3
344,043
344,04
3
344,04
3
344,04
3
344,0
43
344,0
43
344,0
43
324,34
9
19,694
324,34
9
19,694
324,34
9
19,694
324,349
19,694
324,34
9
19,694
324,349
19,694
324,349
19,694
324,34
9
19,694
324,34
9
19,694
324,34
9
19,694
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
450
450
450
450
450
450
450
450
450
450
345,49
3
345,49
3
345,49
3
345,493
345,49
3
345,49
3
345,49
3
345,4
93
345,4
93
345,4
93
1.1.2.
2.1.2.
3.1.2.
Fases
Inversin
Implementacin de un plan
mantenimiento
para
infraestructura.
de
la
Costos Operacin
Costos Mantenimiento
Implementacin de un plan de
mantenimiento para mobiliarios y
equipos
Fortalecimiento de capacidades al
Personal de la Agencia Agraria mas
sus sedes agrarias en la Provincia
de Alto Amazonas por la Direccin
Regional Agraria de Loreto.
TOTAL
10
344,04
3
344,04
3
344,04
3
344,043
344,04
3
344,04
3
344,0
43
344,04
3
344,04
3
344,04
3
324,34
9
19,694
324,34
9
19,694
324,34
9
19,694
324,349
19,694
324,34
9
19,694
324,349
19,694
324,34
9
19,694
324,349
19,694
324,349
19,694
324,349
19,694
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
1,000
346,04
3
346,04
3
346,04
3
346,043
346,04
3
346,04
3
346,0
43
346,04
3
346,04
3
346,04
3
Perfil de Proyecto: Mejoramiento de los Servicios de Gestin de la Agencia Agraria de la Provincia de Alto Amazonas, Regin Loreto.
10
4.4.3.3.
Costos incrementales.
10
345,4
93
345,4
93
345,4
93
345,4
93
345,4
93
345,4
93
345,4
93
345,4
93
345,4
93
345,4
93
324,34
9
324,34
9
324,34
9
324,34
9
324,34
9
324,34
9
324,34
9
324,34
9
324,34
9
324,34
9
21,144
21,144
21,144
21,144
21,144
21,144
21,144
21,144
21,144
21,144
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
269,74
9
269,74
9
269,74
9
269,74
9
269,74
9
269,74
9
269,74
9
269,74
9
269,74
9
269,74
9
2,815,4
73
2,815,47
3
2,815,4
73
4,320
4,320
4,320
4,320
4,320
4,320
4,320
4,320
4,320
4,320
71,42
4
71,42
4
71,42
4
71,42
4
71,42
4
71,42
4
71,42
4
71,42
4
71,42
4
71,42
4
0
2,879,9
73
10
346,0
43
346,0
43
346,0
43
346,0
43
346,0
43
346,0
43
346,0
43
346,0
43
346,0
43
346,0
43
324,34
9
324,34
9
324,34
9
324,34
9
324,34
9
324,34
9
324,34
9
324,34
9
324,34
9
324,34
9
21,694
21,694
21,694
21,694
21,694
21,694
21,694
21,694
21,694
21,694
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
274,0
69
269,74
9
269,74
9
269,74
9
269,74
9
269,74
9
269,74
9
269,74
9
269,74
9
269,74
9
269,74
9
4,320
4,320
4,320
4,320
4,320
4,320
4,320
4,320
4,320
4,320
71,97
4
71,97
4
71,97
4
71,97
4
71,97
4
71,97
4
71,97
4
71,97
4
71,97
4
71,97
4
2,879,97
3
Costos de
Operacin y
Mantenimiento
con proyecto
Costos de
Operacin
Costos de
Mantenimiento
Costos
Operacin y
Mantenimiento
sin proyecto
Costos de
Operacin
Costos de
Mantenimiento
Flujo de Costos
incrementales
2,879,9
73
Costos de Inversin
Costos de
Operacin y
Mantenimiento
incremental
Total
VAC
2,815,473
10
78,395
71,42
4
71,42
4
71,42
4
71,42
4
71,424
71,42
4
71,42
4
71,42
4
71,42
4
71,42
4
2,815,473
71,4
24
71,4
24
71,4
24
71,4
24
149,8
19
71,4
24
71,4
24
71,4
24
71,4
24
71,4
24
3,273,847
.94
Aos
Costos de Inversin
Costos de
Oprecain y
Mantenimiento
incremental
Total
VAC
0
2,879,973
71,97
4
71,97
4
71,97
4
71,97
4
2,879,973
71,9
74
71,9
74
71,9
74
71,9
74
5
78,395
10
71,974
71,97
4
71,97
4
71,97
4
71,97
4
71,97
4
150,3
69
71,9
74
71,9
74
71,9
74
71,9
74
71,9
74
3,341,877
.65
V. EVALUACIN
5.1.
Evaluacin Social
1.1.1.
PRECIOS
SOCIALES S/
1,133,507.80
Gastos Generales
113,350.78
Utilidad
113,350.78
Imprevistos
Sub Total
IGV
Costo de la Obra
Elaboracin de Estudio Definitivo ( 3 % Costo total de la Obra)
Supervisin ( 5% Costo total de la Obra)
Costo Total de laObra de Infraestructura
34,005.23
1,394,214.59
250,958.63
1,645,173.22
49,355.20
82,258.66
1,776,787.08
1.1.2.
2.1.1.
2.1.2.
3.1.1.
1,694.92
496,580.00
1,694.92
100,847.46
8,389.83
2,385,994.20
1.1.1.
113,350.78
Utilidad
113,350.78
34,005.23
Imprevistos
1,394,214.59
Sub Total
250,958.63
IGV
1,645,173.22
Costo de la Obra
2.1.1.
2.1.2.
3.1.2.
SOCIALES S/
1,133,507.80
Costo Directo
1.1.2.
PRECIOS
49,355.20
82,258.66
1,776,787.08
1,694.92
496,580.00
1,694.92
155,508.47
8,389.83
2,440,655.22
S/ 2, 385,994.20
S/ 2, 440,655.22
1.1.2.
Fases
Inversin
10
Implementacin de un plan
de mantenimiento para la
infraestructura.
291,5
62
291,5
62
291,5
62
291,5
62
291,56
2
291,5
62
291,5
62
291,5
62
291,5
62
291,5
62
Costos Operacin
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
Costos Mantenimiento
16,690
16,690
16,690
16,690
16,690
16,690
16,690
16,690
16,690
16,690
847
847
847
847
847
847
847
847
847
847
381
381
381
381
381
381
381
381
381
381
292,7
91
292,7
91
292,7
91
292,7
91
292,79
1
292,7
91
292,7
91
292,7
91
292,7
91
292,7
91
2.1.2.
Implementacin de un plan
de
mantenimiento
para
mobiliarios y equipos
3.1.1.
Fortalecimiento
de
capaciades
a
todo
el
Personal de
la Agencia
Agraria de Alto Amazonas.
TOTAL
tem
1.1.2.
Fases
Inversin
10
Implementacin de un plan de
mantenimiento
para
la
infraestructura.
291,5
62
291,5
62
291,5
62
291,5
62
291,56
2
291,5
62
291,5
62
291,5
62
291,5
62
291,5
62
Costos Operacin
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
Costos Mantenimiento
16,690
16,690
16,690
16,690
16,690
16,690
16,690
16,690
16,690
16,690
2.1.2.
Implementacin de un plan de
mantenimiento
para
mobiliarios y equipos
847
847
847
847
847
847
847
847
847
847
3.1.2.
Fortalecimiento
de
capacidades al Personal de la
Agencia Agraria mas sus sedes
agrarias en la Provincia de Alto
Amazonas por la Direccin
Regional Agraria de Loreto.
847
847
847
847
847
847
847
847
847
847
293,2
57
293,2
57
293,2
57
293,2
57
293,25
7
293,2
57
293,2
57
293,2
57
293,2
57
293,2
57
TOTAL
Costos de
Operacin y
Mantenimiento con
proyecto
292,79
1
292,7
91
292,7
91
Costos de Operacin
274,87
2
274,87
2
17,919
Inversin
0
2,385,9
94
2,385,9
94
Costos de
Mantenimiento
Costos Operacin y
Mantenimiento sin
proyecto
Costos de Operacin
Costos de
Mantenimiento
Flujo de Costos
incrementales
2,385,9
94
10
292,7
91
292,7
91
292,7
91
292,7
91
292,7
91
292,7
91
292,7
91
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
17,919
17,919
17,919
17,919
17,919
17,919
17,919
17,919
17,919
232,26
2
232,2
62
232,2
62
232,2
62
232,2
62
232,2
62
232,2
62
232,2
62
232,2
62
232,2
62
228,60
1
228,60
1
228,60
1
228,60
1
228,60
1
228,60
1
228,60
1
228,60
1
228,60
1
228,60
1
3,661
3,661
3,661
3,661
3,661
3,661
3,661
3,661
3,661
3,661
60,529
60,52
9
60,52
9
60,52
9
60,52
9
60,52
9
60,52
9
60,52
9
60,52
9
60,52
9
Costos con
proyecto
2,440,6
55
Inversin
2,440,6
55
Costos de
Operacin y
Mantenimiento
con proyecto
Costos de Operacin
Costos de
Mantenimiento
Costos Operacin
y Mantenimiento
sin proyecto
Costos de Operacin
Costos de
Mantenimiento
Flujo de Costos
incrementales
2,440,6
55
10
293,25
7
293,25
7
293,2
57
293,2
57
293,2
57
293,2
57
293,2
57
293,2
57
293,2
57
293,2
57
274,87
2
274,872
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
274,87
2
18,385
18,385
18,385
18,385
18,385
18,385
18,385
18,385
18,385
18,385
232,26
2
232,26
2
232,2
62
232,2
62
232,2
62
232,2
62
232,2
62
232,2
62
232,2
62
232,2
62
228,60
1
228,601
228,60
1
228,60
1
228,60
1
228,60
1
228,60
1
228,60
1
228,60
1
228,60
1
3,661
3,661
3,661
3,661
3,661
3,661
3,661
3,661
3,661
3,661
60,995
60,99
5
60,99
5
60,99
5
60,99
5
60,99
5
60,99
5
60,99
5
60,99
5
60,995
Costos de Inversin
Costos de
Oprecain y
Mantenimiento
incremental
2,385,994
Total
0
2,385,994
VACS
10
60,52
9
60,5
29
60,52
9
60,5
29
60,52
9
60,5
29
60,52
9
60,5
29
60,52
9
60,5
29
10
60,99
5
60,9
95
60,99
5
60,9
95
60,99
5
60,9
95
60,99
5
60,9
95
60,99
5
60,9
95
66,43
6
60,52
9
60,5
29
60,52
9
60,5
29
60,52
9
60,5
29
60,52
9
60,5
29
60,52
9
126,9
65
2,774,447
.40
Costos de Inversin
Costos de
Oprecain y
Mantenimiento
incremental
Total
2,440,655
0
2,440,655
VACS
5
66,436
60,99
5
60,9
95
60,99
5
60,9
95
60,99
5
60,9
95
60,99
5
60,9
95
60,995
127,4
31
2,832,099
.70
Donde:
CE
= es el ratio costo efectividad.
VACS = es el valor actual de los costos sociales netos.
IE
= es el indicador de efectividad.
Alternativas
Alternativa 1
Alternativa 2
Alternativas
Alternativa 1
Alternativa 2
VACS ( S/, )
2,774,447.40
2,832,099.70
VACS ( S/, )
2,774,447.40
2,832,099.70
Nmero
de
Beneficiari
os
396,212
396,212
M2
construido
s
2,067
2,067
CE
7.00
7.15
CE
1342.06
1369.94
%
Variacin
-40%
-30%
-20%
-10%
0%
10%
20%
30%
Proyecto Alternativo 1
Costo
VACST
1,431,596.52
1,664,668.44
1,670,195.94
1,942,113.18
1,908,795.36
2,219,557.92
2,147,394.78
2,497,002.66
2,385,994.20
2,774,447.40
2,624,593.62
3,051,892.15
2,863,193.04
3,101,792.46
3,329,336.89
3,606,781.63
Proyecto Alternativo 2
CE
4.2
0
4.9
0
5.6
0
6.3
0
7.0
0
7.7
0
8.4
0
9.1
Costo
VACST
CE
1,464,393.13
1,699,259.82
4.29
1,708,458.65
1,982,469.79
5.00
1,952,524.17
2,265,679.76
5.72
2,196,589.69
2,548,889.73
6.43
2,440,655.22
2,832,099.70
7.15
2,684,720.74
3,115,309.67
7.86
2,928,786.26
3,172,851.78
3,398,519.64
3,681,729.61
8.58
9.29
40%
5.2.
3,340,391.88
3,884,226.37
0
9.8
0
3,416,917.30
3,964,939.58
10.0
1
Anlisis de Sostenibilidad
Ingresos Propios
Costos de
Mantenimiento
37,707
Saldo
16,563
21,144
2
39,5
93
21,1
44
18,4
49
3
41,5
72
21,1
44
20,4
28
4
43,6
51
21,1
44
22,5
07
5
45,834
99,539
53,705
6
48,1
25
21,1
44
26,9
81
7
50,5
31
21,1
44
29,3
87
8
53,0
58
21,1
44
31,9
14
9
55,7
11
21,1
44
34,5
67
10
58,4
97
21,1
44
37,3
53
5.2.2.
Arreglos institucionales para la ejecucin del PIP y operacin del
servicio.
Gobierno Regional de Loreto asignar los recursos necesarios para ejecucin del
proyecto.
La Direccin Regional Agraria de Loreto a travs de la Agencia Agraria de Alto
Amazonas, es el responsable del pago de las remuneraciones del personal y a la
vez del mantenimiento del proyecto.
5.2.3.
Organizacin y Gestin
Movimiento de Tierras
concreto
Arquitectura
OPERACIN Y MANTENIMIENTO
CIERRE
CONSTRUCCION
Movimiento de Tierras
Arquitectura
OPERACIN Y MANTENIMIENTO
CIERRE
Unidad
Cantida
d
Costo
Unitario
Costo S/.
800
1.1
Ingeniero de Seguridad
Charla
500
500
1.2
Millar
300
300
4800
2.1
Tacho
50
100
2.2
Charla
800
1600
2.3
Movilidad
Glb.
350
700
2.3
Charla
500
1000
2.4
Refrigerio
Glb.
150
300
2.5
Materiales
Glb.
50
100
2.6
Glb.
500
500
Glb.
500
500
Monitore
o
200
Unidad
200
1600
800
2.7
3
3.1
4
Monitoreo de Ruidos
Servicio
200
2750
4.1
Plantones
4.2
Saco
10
80
4.3
Transporte y flete
Glb.
350
200
350
1350
5.1
Charla
Glb.
500
500
5.2
Refrigerio
Glb
350
350
5.3
Glb
500
TOTAL
500
9,900.00
Este costo fue incluido en el presupuesto del proyecto para las dos alternativas, en
cuanto al grado de impacto ambiental en la etapa de inversin es media y en la
operacin es nula debido a que se est implementadas medidas para disminuir
estos impactos en esta etapa del proyecto.
5.4. Seleccin de alternativa de solucin
Con respecto a la alternativa se determino que la alternativa 1 es la ms adecuada
por ser la menos costosa en relacin a la cantidad de beneficiarios a lo largo del
horizonte, capacidades del personal de la Agencia Agraria que contribuir a mejorar
el servicio agrario.
5.5. Plan de Implementacin
El Plan de Implementacin es el cronograma de ejecucin de las acciones o metas.
A continuacin se presenta el
Plan de Implementacin para la alternativa
seleccionada:
CUADRO N 69: Plan de Implementacin
Actividad
INVERSIN
MESES
1
RESPONSABL
E
RECURS
OS
Oficina Sub
Regional
de
Infraestructura.
Profesion
ales con
experienc
ia para
elaborar
TDR.
Proceso de
licitacin y
contratacin
Oficina Sub
Regional de
Administracin.
Conforma
cn de
comit de
contrataci
ones.
Elaborar
expediente
tecnico
Empresa
contratista
seleccionada
en proceso
de licitacin GSRAA
METAS
9
10
11
12
Expediente
Tcnico
aprobado y
Ejecucin de
Obra:
Terminos de
Referencia
1.1.1. Construccin de
un nuevo local para la
Agencia Agraria de
Alto Amazonas.
Aprobacin de
Expediente
tecnico
Oficina Sub
Regional
de
Infraestructura
Ejecucin de
obra y
supervisin
Empresa
contratista
seleccionada
en proceso
de licitacin GSRAA
Conforma
cin de
equipo
para
evaluar y
aprobar
ezxpedien
te
tecnico.
1.1.2. Implementacin
de
un
plan
de
mantenimiento
para
la infraestructura.
Elaborar plan de
manteniemiento
para la
infraestructura.
Empresa
contratista
seleccionada
en proceso
de licitacin GSRAA
2.1.1. Adquisicin de
equipos y mobiliarios
modernos.
Adquisicin de
mobiliarios y
equipos
para la Agencia
Agraria de Alto
Amazonas.
Empresa
contratista
seleccionada
en proceso
de licitacin GSRAA
2.1.2. Implementacin
de
un
plan
de
mantenimiento
para
mobiliarios y equipos
Elaborar plan de
manteniemiento
para mobiliario y
equipos.
Empresa
contratista
seleccionada
en proceso
de licitacin GSRAA
3.1.1. Fortalecimiento
de capaciades a todo
el Personal de la
Agencia Agraria de
Alto Amazonas.
Contratacin de
especialistas
para elaborar el
Plan de
capacitacin
para todo el
personal de la
Agencia Agraria
en los temas
referidos en el
proyecto.
Empresa
contratista
seleccionada
en proceso
de licitacin GSRAA
5.6.
Estrategia de
Inversin
FIN
PROPOSITO
Resumen de Objetivos
Indicadores
Verificables
objetivamente
Mejores
Niveles de
Desarrollo
Socio Economico de la Poblacin de
la Provincia de Alto Amazonas.
Al
ao
10
la
poblacin
de
la
Provincia
de
Alto
Amazonas tendra un
Mejor
Nivel
de
Desarrollo
Socio
Economico.
Al ao 10% del
proyecto se lograra
un
Desarrollo
Sostenible en toda la
Provincia
de
Alto
Amazonas ofertando
productos de buena
calidad al mercado
Nacional
e
Internacional debido
al eficiente servicio
agrario brindado por
la Agencia Agraria.
Medios de
Verificacin
Supuestos/
Riesgos
Encuestas Socio
Economico. INEI
, ONGs
Estabilidad de
la
Politica
Nacional.
Regional y
Local.
Estadistica del
sector agrario
Adecuada
Infraestructura
para
brindar un mejor servicio agrario.
COMPONENTE
S
Suficiente
y
adecuado
equipamiento
para brindar un
eficiente servicio agrario.
Al ao 1 el 100% los
beneficiarios acceden
a un mejor servicio
agrario.
Estadistica del
sector agrario
No
existan
cambios en la
Politica
de
desarrollo
Institucional.
ACTIVIDADES
58,239.13
Supervisin
97,065.22
Costo
infraestructura
S/
S/
Total
S/
Contrato
obra, acta
entrega
recepcin
liquidacin
obras.
Resolucin
aprobacin
Expediente
tcnico.
Contrato
supervisin
obra.
de
de
y
y
de
Se dispone de
los
recursos
econmicos
para
el
financiamiento
del proyecto.
de
de
de
de
2,096,608.75
Implementacin
mantenimiento
infraestructura.
de
un plan
para
Adquisicin
de
equipos
mobiliarios modernos.
de
la
Implementacin de un plan de
mantenimiento para mobiliarios y
equipos
Fortalecimiento de capaciades a
todo el Personal de la Agencia
Agraria de Alto Amazonas.
Mitigacin Ambiental
Costo Total de
Mobiliario y Equipos
S/
585,964.40
Costo de la
Capacitacin
S/
119,000.00
Costo del Plan
S/
9,900.00
Plan
de
Mantenimiento
de
infraestrcutura.
Informe
de
verificacin de
la
entrega
y
calidad
del
mobiliario
y
equipos para la
Agencia Agraria.
Plan
de
Mantenimiento
y reposicin de
mobiliario.
Capacitaciones
y Talleres
Talleres
TOTAL
S/
2,815,473.15
VI.
CONCLUSIONES Y RECOMENDACIONES
En el presente estudio se concluye lo siguiente:
Con la implementacin del proyecto se solucionar el problema del Deficiente
Servicio Pblico Agrario en la Agencia Agraria de Alto Amazonas.
El costo de inversin del proyecto de la alternativa seleccionada a precios
privados asciende a S/
2,815,473.15 y a precios sociales es de S/
2,385,994.20
Se determin que la Alternativa 1, es la ms conveniente por mostrar un ratio CE
de S/. 7.00 por beneficiario, que es menos CE de la alternativa 2 que alcanza los
S/. 7.15 por beneficiario.
Con el presente proyecto se beneficiar a un total de 396,212 beneficiarios
(productores) en todo el horizonte del proyecto.
De acuerdo al anlisis de sensibilidad, an incrementando o disminuyendo en 40%
el costo de inversin, la alternativa 1 sigue siendo menos costosa que la
alternativa 2.
La sostenibilidad del proyecto est garantizada al asumir el Gobierno Regional de
Loreto el financiamiento del proyecto; el compromiso de la Agencia Agraria de Alto
Amazonas para los gastos de operacin y mantenimeinto.
El proyecto ocasionar impactos medios en el ambiente en la fase de ejecucin
por lo cual se implementara un plan de mitigacin ambiental.
Finalmente, se concluye que el proyecto es tcnica, socialmente viable.
ANEXOS
ANEXO N 01
ANALISIS DE RIESGOS
DESCRIPCIN DE ACTIVIDADES
Und.
Metrado
Precio
S/.
Precio
Privado
S/.
F.C
Precio
Social S/
OBRAS PROVISIONALES
74,408.66
01.01
TRABAJOS PROVISIONALES
MOVILIZACION Y
DESMOVIIZACION DE EQUIPOS,
HERRAMENTAS Y PERSONAL
CARTEL DE IDENTIFICACION DE
OBRA (5.40 m x 3.60 m)
28,892.78
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
01.01.06
01.01.07
01.02
01.02.01
01.02.05
01.02.06
01.02.07
01.02.08
01.02.09
01.02.12
3,750.00
7,500.00
und
2.00
1,232.29
2,464.58
ALQUILER DE ALMACEN
CISTERNA PARA
ALMACENAMIENTO DE AGUA PARA
LA CONSTRUCCION
PLAN DE SEGURIDAD E HIGIENE,
PRIMEROS AUXILIOS, PREVENCION
DE ACCIDENTES Y MOVILIZACION
MANEJO DE RESIDUOS DE
CONSTRUCCION Y MONITOREO DE
RESIDUOS
MES
3.50
900.00
3,150.00
0.84
7
0.84
7
0.84
7
Gbl
1.00
2,000.00
2,000.00
0.84
7
1,694.92
Gbl
1.00
9,200.00
9,200.00
0.84
7
7,796.61
Gbl
1.00
515.00
515.00
mes
5.00
150.00
750.00
150.60
22.00
3,313.20
TRABAJOS PRELIMINARES
DESMONTAJE DE COBERTURA DE
CALMINA INCL. CORREAS DE
MADERA
DESMONTAJE DE PUNTOS DE LUZ
INCLUYE CABLEADO
DESMONTAJE DE TIJERAL DE
MADERA
DESMONTAJE Y ELIMINACION DE
CIELORRASO DE TRIPLAY INCL.
ENTRAMADO
DESMONTAJE Y ELIMINACION DE
COLUMNETAS DE MADERA
DESMONTAJE DE PUERTAS DE
MADERA
DESMONTAJE DE VENTANAS DE
MADERA
45,515.88
m2
1,240.00
6.56
8,134.40
und
50.00
5.00
250.00
pza
95.00
12.00
1,140.00
m2
550.00
5.00
2,750.00
und
40.00
8.00
320.00
und
18.00
35.56
640.08
und
35.00
35.40
1,239.00
und
2.00
12.50
25.00
01.02.14
DESMONTAJE DE LAVATORIOS
und
2.00
8.90
17.80
01.02.16
DEMOLICION DE MUROS
DEMOLICION DE COLUMNAS Y
VIGAS
DEMOLICION DE CIMIENTOS
CORRIDOS Y SOBRECIMIENTOS
m2
790.00
5.78
4,566.20
m2
100.00
6.80
680.00
m2
85.00
117.08
9,951.80
m2
120.00
127.90
15,348.00
01.02.20
m3
90.00
5.04
02.00
MODULO PRINCIPAL
453.60
564,411.1
0
01.02.19
02.01
02.01.01
02.01.02
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
24,485.41
2.00
DESMONTAJE DE INODOROS
01.02.18
63,058.19
Gbl
01.02.13
01.02.17
0.84
7
0.84
7
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO NIVEL Y REPLANTEO
PRELIMINAR
1,022.52
m2
546.80
0.55
300.74
m2
546.80
1.32
721.78
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL ORGANICO
EXCAVACION DE ZANJAS PARA
ZAPATAS
EXCAVACION DE ZANJAS PARA
CIMIENTOS CORRIDOS
RELLENO COMPACTADO
C/COMPACTADORA 5.8HP MAT.
PROPIO SELECCIONADO C/AGUA
ELIMINACION DE MATERIAL
EXCEDENTE
14,128.84
m3
546.80
2.20
1,202.96
m3
112.40
25.71
2,889.80
m3
28.36
28.92
820.17
m3
83.40
25.53
2,129.20
m3
141.30
18.17
2,567.42
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
6,355.93
2,088.63
2,669.49
436.44
635.59
2,807.80
38,572.78
6,893.56
211.86
966.10
2,330.51
271.19
542.44
1,050.00
21.19
15.08
3,869.66
576.27
8,433.73
13,006.78
384.41
478,314.4
9
866.54
254.86
611.67
11,973.59
1,019.46
2,448.99
695.06
1,804.41
2,175.78
02.02.06
02.02.07
02.03
NIVELACION INTERIOR Y
APISONADO MANUAL
CAMA DE ARENA E= 2"
COMPACTADA
02.03.04
02.03.05
02.03.01
02.03.02
02.03.03
02.04
02.04.01
02.04.01.01
02.04.01.02
02.04.02
02.04.02.01
02.04.02.02
02.04.02.03
02.04.02.04
02.04.03
02.04.03.01
02.04.03.02
02.04.03.03
02.04.03.04
02.04.04
02.04.04.01
02.04.04.02
02.04.04.03
02.04.04.04
02.04.05
02.04.05.01
02.04.05.02
02.04.05.03
02.04.05.04
02.04.05.05
02.04.06
02.04.06.01
02.04.06.02
02.04.06.03
02.05
02.05.01
02.05.02
02.05.03
m2
423.55
5.82
2,465.06
m2
423.55
4.85
2,054.22
31,195.61
m2
60.70
26.26
1,593.98
m3
38.50
236.34
9,099.09
m3
18.60
358.06
6,659.92
m2
60.50
28.44
1,720.62
m2
423.55
28.62
12,122.00
164,250.7
3
18,849.95
m3
26.52
kg
2,159.93
371.97
9,864.64
4.16
8,985.31
57,675.39
m3
81.24
451.79
36,703.42
m2
288.00
36.36
10,471.68
kg
1,621.80
4.16
6,746.69
kg
920.00
4.08
3,753.60
29,987.73
m3
30.40
401.18
12,195.87
m2
52.00
24.26
1,261.52
kg
2,267.10
4.16
9,431.14
kg
1,740.00
4.08
7,099.20
3,986.29
m3
4.04
384.87
1,554.87
m2
71.00
24.26
1,722.46
kg
120.60
4.16
501.70
kg
50.80
4.08
207.26
49,115.84
m3
35.48
464.92
16,495.36
m2
405.55
26.18
10,617.30
und
3,378.00
3.11
10,505.58
kg
2,450.00
4.16
10,192.00
kg
320.00
4.08
1,305.60
4,635.52
m3
4.05
m2
26.50
kg
438.75
536.87
2,174.32
24.00
636.00
4.16
1,825.20
41,054.00
pza
12.00
5.00
60.00
m2
520.05
67.81
35,264.59
m2
6.48
62.41
404.42
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
2,089.03
1,740.86
26,436.96
1,350.83
7,711.09
5,644.00
1,458.15
10,272.88
139,195.5
3
15,974.54
8,359.87
7,614.67
48,877.45
31,104.59
8,874.31
5,717.53
3,181.02
25,413.33
10,335.48
1,069.08
7,992.49
6,016.27
3,378.22
1,317.69
1,459.71
425.17
175.65
41,623.59
13,979.12
8,997.71
8,903.03
8,637.29
1,106.44
3,928.41
1,842.65
538.98
1,546.78
34,791.53
50.85
29,885.25
342.73
02.05.04
02.05.05
02.06
02.06.01
02.06.02
02.07
02.07.01
02.07.02
02.07.03
02.07.04
02.07.05
02.08
CUMBRERAS DE CALAMINA
FIBRAFORTE
FRISO DE FIBRAFORTE
MUROS Y TABIQUES DE
ALBAILERA
MURO DE SOGA LADRILLO
TUBULAR DE ARCILLA (10x14x24cm)
MEZCLA 1:5
PARAPETOS EN ESCALERA
REVOQUES ENLUCIDOS Y
MOLDURAS
TARRAJEO PRIMARIO RAYADO,
MORTERO 1:5 (c-a) E=1.5 cm.
TARRAJEO FROTACHADO DE
MUROS INT. Y EXT. MORTERO 1:5 (ca) E=1.5 cm.
TARRAJEO FROTACHADO DE
COLUMNAS, MORTERO 1:5 (c-a)
E=1.5 cm.
TARRAJEO FROTACHADO DE VIGAS
Y DINTELES, MORTERO 1:5 (c-a)
E=1.5 cm.
VESTIDURA DE DERRAMES,
MORTERO 1:5 (c:a), E=1.5cm.
65.34
21.46
1,402.20
93.69
41.87
3,922.80
40,260.74
20.09
2,291.47
m2
1,331.14
17.24
22,948.85
0.84
7
19,448.18
m2
288.00
40.15
11,563.20
0.84
7
9,799.32
m2
630.00
40.15
25,294.50
120.00
13.46
1,615.20
39,800.24
m2
15.35
30.00
460.50
63,713.22
25,200.88
m2
405.55
24.20
9,814.31
02.08.02
CIELORRAZO SUPERBOARD
m3
405.55
37.94
15,386.57
02.09.02
02.09.03
02.09.04
02.09.05
02.10
02.10.01
02.10.01.01
02.10.01.02
02.10.02
02.10.02.01
02.11
02.11.01
02.11.01.01
02.11.01.02
02.12
02.12.01
02.12.02
02.12.03
02.12.04
02.12.05
02.12.06
02.12.07
41,983.60
m2
269.34
34.98
9,421.51
m2
269.34
68.73
18,511.74
m2
445.62
24.18
10,775.09
m2
76.60
37.69
2,887.05
60.00
6.47
388.20
1,308.68
0.84
7
13,290.40
CONTTRAZOCALOS
CONTRAZOCALO DE CEMENTO
S/N COLOREAR DE H=30 cm
CONTRAZOCALO DE CEMENTO
S/N COLOREAR DE H=15 cm
6,303.08
REVESTIMIENTO
REVESTIMIENTO DE GRADAS Y
ESCALERAS
REVESTIMIENTOS DE GRADAS
CON MORTERO 1:4 X 2 cm. PULIDO
COLOREADO, MEZCLA 1:2X1cm
REVESTIMIENTOS DE DESCANSO
CON MORTERO 1:4 X 2 cm. PULIDO
COLOREADO, MEZCLA 1:2X1cm
CARPINTERIA DE MADERA
PUERTA DE MADERA APANELDA,
(5.15x2.50)
PUERTA DE MADERA APANELADA
(1.00x2.10)
PUERTA DE MADERA APANELADA
(0.90x2.10)
PUERTA DE MADERA APANELADA
(0.80x2.10)
PUERTA DE MADERA
MACHIEMBRAD (0.80x1.80)
PUERTA DE MACHIEMBRADA
(0.75x2.10)
PUERTA DE MACHIEMBRADA
(0.70x1.80)
74.80
12.46
932.01
468.68
11.46
5,371.07
6,987.32
m2
114.06
61.26
6,987.32
1,308.68
m2
30.20
39.58
1,195.32
m2
4.10
27.65
113.37
14,325.00
und
1.00
und
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALOS DE MAYOLICA DE
COLOR DE 20X30 DE 1ERA
34,119.27
114.06
50.23
02.09.01
3,324.41
m2
792.36
CIELORRASO
PISOS Y PAVIMENTOS
CONTRAPISO DE 35mm MEZCLA
1.5
PISO CERAMICA DE 0.40X0.40 cm.
COLOR CLARO ANTIDEZLIZANTE
ALTO TRANSITO
1,188.30
0.84
7
0.84
7
0.84
7
0.84
7
m2
02.08.01
02.09
0.84
7
0.84
7
0.84
7
1,200.00
1,200.00
11.00
600.00
6,600.00
und
5.00
545.00
2,725.00
und
2.00
420.00
840.00
und
4.00
370.00
1,480.00
und
2.00
390.00
780.00
und
2.00
350.00
700.00
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
33,729.02
390.25
53,994.25
1,941.92
21,436.02
1,368.81
21,356.68
8,317.21
13,039.46
35,579.32
7,984.33
15,687.91
9,131.43
2,446.66
328.98
11,263.05
5,341.59
789.84
4,551.76
5,921.45
5,921.45
1,109.05
1,109.05
1,012.98
96.07
12,139.83
1,016.95
5,593.22
2,309.32
711.86
1,254.24
661.02
593.22
02.13
02.13.01
02.13.02
02.13.03
02.13.04
02.14
02.14.01
02.14.02
02.14.03
02.15
02.15.01
02.15.02
02.15.03
02.15.04
02.15.05
02.15.06
02.15.07
02.15.08
02.16
02.16.01
02.16.02
02.16.03
02.16.04
02.16.05
CARPINTERIA METALICA
PUERTA DE VIDRIO
CONTRAPLACADO, CON MARCO BICELES DE ALUMINIO
VENTANA DE VIDRIO SEMIDOBLE,
CON MARCO - BICELES DE ALUMINIO
(corrediza)
REJAS DE PROTECCIN PARA
VENTANAS DE FIERRO LISO
CUADRADO DE 1/2"
BARANDA METALICA
CERRAJERIA
BISAGRA ALUMINIZADA DE 3 1/2"
X 3 1/2"
CERRADURA PARA PUERTA
PRINCIPAL TRES GOLPES
CERRADURA PARA PUERTA
INTERIOR DE PERILLA LLAVE EXT.
SUGURO INTE.
PINTURA
PINTURA LATEX SATINADO EN
MUROS INTERIORES Y EXTERIORES 2
MANOS
PINTURA LATEX SATINADO EN
COLUMNAS Y VIGAS 2 MANOS
PINTURA LATEX STINADO EN
CIELORRASO 2 MANOS
PINTURA ESMALTE EN
CONTRAZCALOS, 2 MANOS H=0.15
PINTURA ESMALTE EN
CONTRAZCALOS, 2 MANOS H=0.30
PINTURA EN CARPINTERIA DE
MADERA CON BARNIZ, 2 MANOS
PINTURA ANTICORROSIVO EN
PUERTAS Y VENTANAS DE FIERRO 2
MANOS
PINTURA ESMALTE
ANTICORROSIVO EN BARANDAS 2
MANOS
APARATOS Y ACCESORIOS
SANITARIOS
INODORO TANQUE BAJO DE LOSA
VITRIFICADA BLANCO (INCL.
ACCESORIOS)
LAVATORIO DE PARED DE COLOR
1 LLAVE
LAVATORIO TIPO OVALIN 1 LLAVE
URINARIO DE LOSA DE PICO
BLANCO
DUCHAS CROMADAS GIRATORIAS
CON ACCESORIOS COMPLETOS
41,331.05
0.84
7
35,026.31
und
1.00
795.00
795.00
0.84
7
673.73
m2
194.76
150.00
29,214.00
0.84
7
24,757.63
m2
131.52
72.40
9,522.05
und
1.00
1,800.00
1,800.00
2,414.53
pza
84.00
10.12
850.08
pza
1.00
74.29
74.29
pza
28.00
53.22
1,490.16
23,466.78
1,331.14
7.00
9,317.98
m2
918.00
8.20
7,527.60
m2
405.55
6.62
2,684.74
m2
70.03
7.09
496.51
m2
22.44
7.90
177.28
m2
138.20
13.26
1,832.53
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
m2
131.52
7.91
1,040.32
0.84
7
m2
26.50
14.71
389.82
6,972.19
pza
11.00
235.20
2,587.20
pza
3.00
162.08
486.24
pza
12.00
185.98
2,231.76
pza
8.00
143.59
1,148.72
pza
1.00
81.63
81.63
pza
11.00
34.71
381.81
02.16.07
pza
1.00
54.83
54.83
02.17.01
02.17.02
02.17.03
02.17.04
02.17.05
02.17.05.01
02.17.05.02
02.17.05.03
02.17.05.04
02.17.05.05
INSTALACIONES SANITARIAS
EXCAV. DE ZANJA PARA
BIODIGESTOR Hmax=2.50 EN
TERRENO NORMAL
EXCAV. DE ZANJA PARA TUBERIA
PVC -S ALDE 4"
RELLENO C/MATERIAL PROPIO DE
ZANJA PARA TUBERIA PVC-SAL DE 4"
ELIMINACION DE MATERIAL
EXCEDENTE
SALIDAS DE DESAGUE Y
VENTILACION
SALIDA DE DESAGUE PVC-SAL
4"-INODORO
SALIDA DE DESAGUE PVC-SAL
2"-LAVATORIO
SALIDA DE DESAGUE PVC-SAL
2"-URINARIO
SALIDA DE DESAGUE PVC-SAL
2"-DUCHA
SALIDA DE DESAGUE PVC-SAL
2"-SUMIDERO
0.84
7
0.84
7
m2
02.16.06
02.17
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
10,317.86
m3
29.05
28.92
840.13
m3
26.00
28.92
751.92
m3
28.00
8.26
231.28
m3
15.00
13.63
204.45
2,705.80
pto
11.00
69.81
767.91
pto
15.00
51.03
765.45
pto
8.00
37.76
302.08
pto
1.00
37.76
37.76
pto
11.00
31.17
342.87
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
8,069.53
1,525.42
2,046.21
720.41
62.96
1,262.85
19,887.10
7,896.59
6,379.32
2,275.20
420.77
150.23
1,552.99
881.63
330.35
5,908.64
2,192.54
412.07
1,891.32
973.49
69.18
323.57
46.47
8,743.95
711.97
637.22
196.00
173.26
2,293.05
650.77
648.69
256.00
32.00
290.57
02.17.05.06
02.17.05.07
02.17.06
02.17.06.01
02.17.06.02
02.17.06.03
02.17.07
pto
11.00
28.77
316.47
pto
2.00
86.63
173.26
3,068.52
110.00
18.92
2,081.20
73.00
10.62
775.26
46.00
4.61
212.06
ACCESORIO DE REDES
2,515.76
02.17.07.01
pza
14.00
27.74
388.36
02.17.07.02
pza
28.00
11.74
328.72
02.17.07.03
pza
3.00
16.76
50.28
02.17.07.04
pza
2.00
16.76
33.52
02.17.07.05
pza
8.00
15.20
121.60
02.17.07.06
pza
20.00
2.00
40.00
02.17.07.07
pza
2.00
22.02
44.04
02.17.07.08
pza
18.00
23.02
414.36
pza
14.00
15.20
212.80
und
14.00
21.64
302.96
pza
4.00
144.78
579.12
02.17.07.09
02.17.07.10
02.17.07.11
02.18
02.18.01
02.18.02
SUMIDEROS DE 2"
REGISTRO ROSCADO DE
BRONCE DE 4"
CAJA DE REGISTRO DE DESAGUE
DE 0.30X0.60 m.
SISTEMA DE AGUA FRIA Y
CONTRA INCENDIO
EXCAV. DE ZANJA PARA PVC-SAP
1/2", 3/4"
RELLENO C/MATERIAL PROPIO DE
ZANJA PARA TUBERIA PVC-SAL DE 4"
02.18.03
02.18.03.01
02.18.03.02
02.18.03.03
02.18.03.04
02.18.04
REDES DE DISTRIBUCION
RED DE DISTRIBUCION TUBERIA
PVC-SAP 1/2"
RED DE DISTRIBUCION TUBERIA
PVC-SAP 3/4
ACCESORIOS DE
DISTRIBUCION
02.18.04.01
02.18.04.02
02.18.05
4,192.97
m3
15.60
m3
9.10
23.12
360.67
8.26
75.17
834.75
und
11.00
23.85
262.35
und
15.00
23.85
357.75
und
8.00
23.85
190.80
und
1.00
23.85
23.85
807.63
45.00
11.55
519.75
40.32
7.14
287.88
992.66
02.18.05.01
und
45.00
7.50
337.50
02.18.05.02
und
24.00
11.49
275.76
02.18.05.03
und
14.00
11.49
160.86
02.18.05.04
und
14.00
11.99
167.86
02.18.05.05
und
4.00
12.67
50.68
02.18.06
02.18.06.01
02.18.06.02
02.19
02.19.01
02.19.01.01
LLAVES Y VALVULAS
GRIFO CROMADO DE 1/2"
VALVULA COMPUERTA DE
BRONCE DE 1/2"
INSTALACIONES ELECTRICAS
SALIDA DE TECHO (CENTRO
DE LUZ)
SALIDA DE CENTRO DE LUZ
(TECHO)
1,122.09
und
15.00
44.41
666.15
und
9.00
50.66
455.94
17,709.41
5,724.00
pto
90.00
63.60
5,724.00
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
268.19
146.83
2,600.44
1,763.73
657.00
179.71
2,132.00
329.12
278.58
42.61
28.41
103.05
33.90
37.32
351.15
180.34
256.75
490.78
3,553.37
305.65
63.70
707.42
222.33
303.18
161.69
20.21
684.44
440.47
243.97
841.24
286.02
233.69
136.32
142.25
42.95
950.92
564.53
386.39
15,007.98
4,850.85
4,850.85
02.19.02
SALIDA DE INTERRUPTOR
925.80
02.19.02.01
pto
30.00
25.55
766.50
02.19.02.02
pto
6.00
26.55
159.30
02.19.03
02.19.03.01
02.19.04
02.19.05
02.19.06
02.19.06.01
02.19.06.02
02.19.06.03
02.19.06.04
02.19.07
02.19.07.01
02.19.07.02
02.19.07.03
02.20
02.21
02.21.01
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.03
03.03.01
03.03.02
03.03.03
03.03.04
15.28
1.00
610.52
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA
ZAPATAS
EXCAVACION DE ZANJAS PARA
CIMIENTOS CORRIDOS
ELIMINACION DE MATERIAL
EXCEDENTE
NIVELACION INTERIOR Y
APISONADO MANUAL
CAMA DE ARENA E= 2"
COMPACTADA
OBRAS DE CONCRETO SIMPLE
SOLADO PARA ZAPATAS DE 4"
MEZCLA 1:10, CEMENTO-ARENA
CIMIENTOS CORRIDOS MEZCLA
1:8 + 30% DE PIEDRA MEDIANA
CONCRETO EN RAMPA F'C=140
KG/CM2
ENCOFRADO Y DESENCOFRADO
EN RAMPA
610.52
30.00
8.70
261.00
30.00
10.74
322.20
186.68
3.90
728.05
40.00
6.31
252.40
6,700.00
80.00
17.11
1,368.80
280.00
10.11
2,830.80
190.00
13.16
2,500.40
1,083.01
1,083.01
und
1.00
1,083.01
1,083.01
5,189.09
5,189.09
und
38.00
und
7.00
122.59
4,658.42
75.81
530.67
230,823.6
0
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO NIVEL Y REPLANTEO
PRELIMINAR
122.24
1,563.65
ARTEFACTOS
SALA DE CONFERENCIAS
03.01.02
8.00
TABLEROS ELCTRICOS
TABLERO DE DISTRIBUCION TD02
2,063.20
610.52
03.00
03.01.01
pto
und
02.21.01.02
03.01
51.58
122.24
LMPARAS
LAMPARA FLUORESCENTE RECTO
DE 2X36W., EQUIPO COMPLETO.
LAMPARA FLUORESCENTE
CIRCULAR DE 32 W., EQUIPO
COMPLETO.
02.21.01.01
40.00
POZO A TIERRA
02.20.01
02.20.01.01
pto
CAJA DE PASE
02.19.04.01
02.19.05.01
2,063.20
841.50
m2
450.00
0.55
247.50
m2
450.00
1.32
594.00
4,097.83
m3
33.75
25.71
867.71
m3
30.77
28.92
889.87
m3
28.13
18.17
511.12
m2
125.35
5.82
729.54
m2
226.72
4.85
1,099.59
19,688.15
m2
14.40
26.26
378.14
m3
30.77
236.34
7,272.18
m3
0.25
357.63
89.41
m2
3.25
357.63
1,162.30
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
784.58
649.58
135.00
1,748.47
1,748.47
103.59
103.59
517.39
517.39
1,325.13
221.19
273.05
616.99
213.90
5,677.97
1,160.00
2,398.98
2,118.98
917.81
917.81
917.81
4,397.53
4,397.53
3,947.81
449.72
195,613.2
2
713.14
209.75
503.39
3,472.74
735.35
754.13
433.15
618.25
931.86
16,684.87
320.46
6,162.87
75.77
985.00
03.03.06
03.03.07
03.03.05
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.02
03.04.02.01
03.04.02.02
03.04.02.03
03.04.02.04
03.04.03
03.04.03.01
03.04.03.02
03.04.03.03
03.04.03.04
03.04.04
03.04.04.01
03.04.04.02
03.04.04.03
03.04.04.04
03.04.05
ZAPATAS
CONCRETO F'C=210 KG/CM2
PARA ZAPATAS
ACERO CORRUGADO 1/2"
fy=4200 kg/cm2
COLUMNAS
MORTERO F'C=210 KG/CM2
PARA COLUMNAS
ENCOFRADO Y DESENCOFRADO
NORMAL EN COLUMNAS
ACERO CORRUGADO 1/2"
fy=4200 kg/cm2
ACERO CORRUGADO 3/8"
fy=4200 kg/cm2
VIGAS
MORTERO F'C=210 KG/CM2
PARA VIGAS
ENCOFRADO Y DESENCOFRADO
NORMAL EN VIGAS
ACERO CORRUGADO 1/2"
fy=4200 kg/cm2
ACERO CORRUGADO 3/8"
fy=4200 kg/cm2
DINTEL
CONCRETO F'C=175 KG/CM2
PARA DINTEL
ENCOFRADO Y DESENCOFRADO
NORMAL EN DINTEL
ACERO CORRUGADO 1/2"
fy=4200 kg/cm2
ACERO CORRUGADO 3/8"
fy=4200 kg/cm2
03.04.05.03
03.05
ESTRUCTURA METALICA
03.04.05.02
6.82
358.06
2,441.97
m2
65.24
28.44
1,855.43
m2
226.72
28.62
6,488.73
GRADAS
CONCRETO F'C=210 KG/CM2
PARA GRADAS
ENCOFRADO Y DESENCOFRADO
NORMAL EN GRADAS
ACERO CORRUGADO 1/2"
fy=4200 kg/cm2
03.04.05.01
m3
17,172.13
2,743.00
m3
5.76
kg
144.34
371.97
2,142.55
4.16
600.45
8,365.97
m3
5.50
451.79
2,484.85
m2
85.49
36.36
3,108.42
kg
380.76
4.16
1,583.96
kg
291.36
4.08
1,188.75
4,915.47
m3
4.07
401.18
1,632.40
m2
28.70
24.26
696.26
kg
373.00
4.16
1,551.68
kg
253.71
4.08
1,035.13
817.25
m3
0.90
384.87
344.46
m2
5.34
24.26
129.55
kg
57.99
4.16
241.24
kg
25.00
4.08
102.00
330.44
m3
0.50
536.87
268.44
m2
1.37
24.00
32.88
kg
7.00
4.16
29.12
73,735.87
03.05.01
und.
6.00
2,000.00
12,000.00
03.05.02
und.
6.00
264.24
1,585.44
03.05.03
ml
478.94
54.34
26,025.60
03.05.04
ml
478.94
5.62
2,691.64
m2
365.46
67.81
24,781.84
ml
26.33
21.46
565.04
ml
79.46
41.87
3,326.99
m2
59.34
46.50
2,759.31
03.05.05
03.05.06
03.05.07
03.05.08
03.06
03.06.01
03.07
03.07.01
03.07.02
15,151.38
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
m2
55.62
20.09
1,117.41
0.84
7
0.84
7
0.84
7
m2
603.28
17.24
10,400.55
0.84
7
m2
301.64
50.23
15,151.38
15,756.22
2,069.47
1,572.39
5,498.92
14,552.65
2,324.58
1,815.72
508.86
7,089.81
2,105.80
2,634.25
1,342.34
1,007.41
4,165.65
1,383.39
590.05
1,314.98
877.23
692.58
291.91
109.79
204.44
86.44
280.03
227.49
27.86
24.68
62,488.02
10,169.49
1,343.59
22,055.59
2,281.05
21,001.56
478.85
2,819.48
2,338.40
12,840.15
12,840.15
13,352.73
946.95
8,814.02
03.07.03
03.07.04
03.07.05
03.08
TARRAJEO FROTACHADO DE
COLUMNAS, MORTERO 1:5 (c-a)
E=1.5 cm.
TARRAJEO FROTACHADO DE VIGAS
Y DINTELES, MORTERO 1:5 (c-a)
E=1.5 cm.
VESTIDURA DE DERRAMES,
MORTERO 1:5 (c:a), E=1.5cm.
03.08.02
PISOS Y PAVIMENTOS
CONTRAPISO DE 35mm MEZCLA
1.5
PISO CERAMICA DE 0.40X0.40 cm.
COLOR CLARO ANTIDEZLIZANTE
ALTO TRANSITO
03.08.03
03.08.01
03.09
03.09.01
03.09.01.01
03.09.02
03.09.02.01
03.10
03.10.01
03.10.01.01
03.11
03.11.01
03.11.02
03.11.03
03.11.04
03.11.05
03.11.06
03.12
03.12.01
03.12.02
03.12.03
03.13
03.13.01
03.13.02
03.13.03
03.13.04
03.14
03.14.01
03.14.02
03.14.03
03.14.04
03.14.05
m2
40.00
40.15
1,606.00
m2
20.94
40.15
840.74
133.10
13.46
1,791.53
25,912.38
m2
230.76
34.98
8,071.98
m2
230.70
65.73
15,163.91
m2
110.69
24.18
2,676.48
ZOCALOS Y CONTRAZOCALOS
5,076.09
CONTTRAZOCALOS
CONTRAZOCALO DE CEMENTO
S/N COLOREAR DE H=15 cm
1,668.81
ZOCALOS
ZOCALOS DE MAYOLICA DE
COLOR DE 20X30 DE 1ERA
REVESTIMIENTO
REVESTIMIENTO DE GRADAS Y
ESCALERAS
REVESTIMIENTOS DE GRADAS
CON MORTERO 1:4 X 2 cm. PULIDO
COLOREADO, MEZCLA 1:2X1cm
CARPINTERIA DE MADERA
PUERTA DE MADERA APANELDA,
(2.00x2.50)
PUERTA DE MADERA APANELDA,
(1.00x2.10)
PUERTA DE MADERA APANELADA
(0.90x2.10)
PUERTA DE MADERA
MACHIEMBRAD (0.70x2.10)
PUERTA DE MADERA
MACHIEMBRAD (0.80x2.10)
PUERTA DE MADERA
MACHIEMBRAD (0.75x2.10)
CARPINTERIA METALICA
PUERTA METALICA FG 2", Y
FIERRO CUADRADO DE 1/2"DOBLE
HOJA (3.00x2.50)
VENTANA DE VIDRIO SEMIDOBLE,
CON MARCO - BICELES DE ALUMINIO
(corrediza)
REJAS DE PROTECCIN PARA
VENTANAS DE FIERRO LISO
CUADRADO DE 1/2"
CERRAJERIA
BISAGRA ALUMINIZADA DE 3 1/2"
X 3 1/2"
CERRADURA PARA PUERTA
PRINCIPAL TRES GOLPES
BISABRA ALUMINIZADA
PIVOTANTE
CERRADURA PARA PUERTA
INTERIOR DE PERILLA LLAVE EXT.
SUGURO INTE.
PINTURA
PINTURA LATEX SATINADO EN
MUROS INTERIORES Y EXTERIORES 2
MANOS
PINTURA LATEX SATINADO EN
COLUMNAS Y VIGAS 2 MANOS
PINTURA ESMALTE EN
CONTRAZCALOS, 2 MANOS H=0.15
PINTURA EN CARPINTERIA DE
MADERA CON BARNIZ, 2 MANOS
PINTURA ANTICORROSIVO EN
PUERTAS Y VENTANAS DE FIERRO 2
145.62
11.46
1,668.81
3,407.28
m2
55.62
61.26
3,407.28
57.79
57.79
m2
1.46
39.58
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
1,361.02
712.49
1,518.24
21,959.64
6,840.67
12,850.77
2,268.21
4,301.77
1,414.24
1,414.24
2,887.53
2,887.53
48.97
48.97
20,480.11
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
17,356.02
57.79
4,905.40
und
2.00
580.20
1,160.40
und
2.00
390.00
780.00
und
2.00
545.00
1,090.00
und
2.00
375.00
750.00
und
2.00
375.00
750.00
und
1.00
375.00
375.00
48.97
4,157.12
983.39
661.02
923.73
635.59
635.59
317.80
und
1.00
266.93
266.93
0.84
7
226.21
m2
90.50
150.95
13,660.98
0.84
7
11,577.10
m2
90.50
72.40
6,552.20
1,885.27
pza
39.00
10.12
394.68
pza
6.00
74.29
445.74
pza
7.00
111.25
778.75
pza
5.00
53.22
266.10
6,158.24
m2
603.28
7.00
4,222.96
m2
60.94
8.20
499.71
m2
21.84
7.09
154.85
m2
m2
42.60
90.50
13.26
7.91
564.88
715.86
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
5,552.71
1,597.69
334.47
377.75
659.96
225.51
5,218.85
3,578.78
423.48
131.23
478.71
606.66
03.15
03.15.01
03.15.02
03.15.03
03.15.04
MANOS
APARATOS Y ACCESORIOS
SANITARIOS
INODORO TANQUE BAJO DE LOSA
VITRIFICADA BLANCO (INCL.
ACCESORIOS)
LAVATORIO DE PARED DE COLOR
1 LLAVE
LAVATORIO DE TIPO OVALIN
URINARIO DE LOSA DE PICO
BLANCO
2,917.29
pza
5.00
235.20
1,176.00
pza
3.00
162.08
486.24
pza
3.00
162.08
486.24
pza
3.00
143.59
430.77
03.15.05
pza
5.00
34.71
173.55
03.15.06
pza
3.00
54.83
164.49
03.16
03.16.02
03.16.03
03.16.04
03.16.01
03.16.01.01
03.16.01.02
03.16.01.03
03.16.01.04
03.16.01.05
03.16.02
03.16.02.01
03.16.02.02
03.16.03
INSTALACIONES SANITARIAS
EXCAV. DE ZANJA PARA TUBERIA
PVC -S ALDE 4"
RELLENO C/MATERIAL PROPIO DE
ZANJA PARA TUBERIA PVC-SAL DE 4"
ELIMINACION DE MATERIAL
EXCEDENTE
SALIDAS DE DESAGUE Y
VENTILACION
SALIDA DE DESAGUE PVC-SAL
4"-INODORO
SALIDA DE DESAGUE PVC-SAL
2"-LAVATORIO
SALIDA DE DESAGUE PVC-SAL
2"-URINARIO
SALIDA DE DESAGUE PVC-SAL
2"-SUMIDERO
SALIDA DE DESAGUE PVC-SAL
4"-REGISTRO
REDES DE DISTRIBUCION
RED DE DISTRIBUSION TUBERIA
PVC-SAL DE 4"
RED DE DISTRIBUCION TUBERIA
PVC-SAL DE 2"
3,615.88
m3
15.00
28.92
433.80
m3
5.34
8.26
44.11
m3
9.66
13.63
131.67
1,101.42
pto
5.00
69.81
349.05
pto
9.00
51.03
459.27
pto
3.00
37.76
113.28
pto
3.00
31.17
93.51
pto
3.00
28.77
86.31
486.95
35.00
10.62
371.70
25.00
4.61
115.25
ACCESORIO DE REDES
1,417.94
03.16.03.01
pza
10.00
27.74
277.40
03.16.03.02
pza
21.00
11.74
246.54
03.16.03.03
pza
7.00
16.76
117.32
03.16.03.04
pza
5.00
16.76
83.80
03.16.03.05
pza
3.00
15.20
45.60
03.16.03.06
pza
9.00
2.00
18.00
03.16.03.07
pza
1.00
22.02
22.02
03.16.03.08
pza
9.00
23.02
207.18
pza
3.00
15.20
45.60
und
3.00
21.64
64.92
pza
2.00
144.78
289.56
03.16.03.09
03.16.03.10
03.16.03.11
03.17
03.17.01
03.17.02
03.17.03
03.17.03.01
03.17.03.02
03.17.03.03
03.17.04
SUMIDEROS DE 2"
REGISTRO ROSCADO DE
BRONCE DE 4"
CAJA DE REGISTRO DE DESAGUE
DE 0.30X0.60 m.
SISTEMA DE AGUA FRIA Y
CONTRA INCENDIO
EXCAV. DE ZANJA PARA PVC-SAP
1/2", 3/4"
RELLENO C/MATERIAL PROPIO DE
ZANJA PARA TUBERIA PVC-SAL DE 6"
SALIDA DE AGUA FRIA
SALIDA DE AGUA FRIA PVC-SAP
1/2" - INODORO
SALIDA DE AGUA FRIA PVC-SAP
1/2" - LAVATORIo
SALIDA DE AGUA FRIA PVC-SAP
1/2" - URINARIO
REDES DE DISTRIBUCION
2,024.30
m3
6.93
23.12
160.22
m3
4.65
8.26
38.41
357.75
und
5.00
23.85
119.25
und
6.00
23.85
143.10
und
4.00
23.85
95.40
545.16
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
2,472.28
996.61
412.07
412.07
365.06
147.08
139.40
3,064.31
367.63
37.38
111.58
933.41
295.81
389.21
96.00
79.25
73.14
412.67
315.00
97.67
1,201.64
235.08
208.93
99.42
71.02
38.64
15.25
18.66
175.58
38.64
55.02
245.39
1,715.51
135.78
32.55
303.18
101.06
121.27
80.85
462.00
03.17.04.01
03.17.04.02
03.17.05
25.78
11.55
297.76
34.65
7.14
247.40
440.78
03.17.05.01
und
18.00
03.17.05.02
und
03.17.05.03
03.17.05.04
03.17.05.05
03.17.06
03.17.06.01
03.17.06.02
03.17.06.03
03.18
03.18.01
03.18.01.01
7.50
135.00
9.00
11.49
103.41
und
7.00
11.49
80.43
und
7.00
11.99
83.93
und
3.00
12.67
38.01
LLAVES Y VALVULAS
GRIFO CROMADO DE 1/2"
VALVULA COMPUERTA DE
BRONCE DE 1/2"
VALVULA COMPUERTA DE
BRONCE DE 3/4"
INSTALACIONES ELECTRICAS
SALIDA DE TECHO (CENTRO
DE LUZ)
SALIDA DE CENTRO DE LUZ
(TECHO)
03.18.02
481.98
und
6.00
44.41
266.46
und
3.00
50.66
151.98
und
1.00
63.54
63.54
7,545.22
1,653.60
pto
26.00
63.60
SALIDA DE INTERRUPTOR
1,653.60
308.60
03.18.02.01
pto
10.00
25.55
255.50
03.18.02.02
pto
2.00
26.55
53.10
03.18.03
03.18.03.01
03.18.04
03.18.04.01
03.18.05
03.18.05.01
03.18.05.02
03.18.05.03
03.18.05.04
03.18.06
03.18.06.01
03.18.06.02
03.18.06.03
03.19
03.20
03.20.01
03.20.01.01
03.20.01.02
04.00
pto
25.00
51.58
CAJA DE PASE
pto
3.00
15.28
34.65
8.70
301.46
25.26
10.74
271.29
52.00
3.90
202.80
26.00
6.31
164.06
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
252.34
209.66
373.54
114.41
87.64
68.16
71.13
32.21
408.46
225.81
128.80
53.85
6,394.26
1,401.36
1,401.36
261.53
216.53
45.00
1,092.80
1,092.80
38.85
38.85
796.28
255.47
und
16.00
122.59
1,961.44
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
und
10.00
75.81
758.10
0.84
7
642.46
66,323.04
0.84
7
56,205.97
3,308.08
m
69.30
17.11
1,185.72
115.32
10.11
1,165.89
72.68
13.16
956.47
1,083.01
1,083.01
und
1.00
1,083.01
ARTEFACTOS
LMPARAS
LAMPARA FLUORESCENTE RECTO
DE 2X36W., EQUIPO COMPLETO.
LAMPARA FLUORESCENTE
CIRCULAR DE 32 W., EQUIPO
COMPLETO.
CAFETERIA Y
ESTACIONAMIENTOS DE
CAMIONETAS Y YATES
45.84
939.61
TABLEROS ELCTRICOS
TABLERO DE DISTRIBUCION TD02
1,289.50
45.84
03.19.01
03.19.01.01
1,289.50
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
1,083.01
2,719.54
2,719.54
229.91
171.86
139.03
2,803.46
1,004.85
988.04
810.57
917.81
917.81
917.81
2,304.69
2,304.69
1,662.24
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.03
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO NIVEL Y REPLANTEO
PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA
ZAPATAS
EXCAVACION DE ZANJAS PARA
CIMIENTOS CORRIDOS
ELIMINACION DE MATERIAL
EXCEDENTE
NIVELACION INTERIOR Y
APISONADO MANUAL
CAMA DE ARENA E= 2"
COMPACTADA
04.03.04
04.03.05
04.03.01
04.03.02
04.03.03
04.04
04.04.01
04.04.01.01
04.04.01.02
04.04.02
04.04.02.01
04.04.02.02
04.04.02.03
04.04.02.04
04.04.03
04.04.03.01
04.04.03.02
04.04.03.03
04.04.03.04
04.04.04
04.04.04.01
04.04.04.02
04.04.04.03
04.04.04.04
04.05
261.97
m2
140.09
0.55
77.05
m2
140.09
1.32
184.92
1,418.40
m3
8.00
25.71
205.68
m3
2.98
28.92
86.18
m3
6.50
18.17
118.11
m2
95.57
5.82
556.22
m2
93.24
4.85
452.21
4,627.21
m2
8.00
26.26
210.08
m3
3.00
236.34
709.02
m3
2.26
358.06
809.22
m2
8.10
28.44
230.36
m2
93.24
28.62
2,668.53
7,282.70
1,561.96
m3
3.20
kg
89.34
371.97
1,190.30
4.16
371.65
2,702.11
m3
1.90
451.79
858.40
m2
25.80
36.36
938.09
kg
142.56
4.16
593.05
kg
76.61
4.08
312.57
2,962.60
m3
2.78
401.18
1,115.28
m2
25.56
24.26
620.09
kg
191.93
4.16
798.43
kg
105.10
4.08
428.81
56.04
m3
0.04
384.87
16.16
m2
0.70
24.26
16.98
kg
3.58
4.16
14.89
kg
1.96
4.08
8.00
ESTRUCTURA METALICA
32,395.36
04.05.01
und.
4.00
2,000.00
8,000.00
04.05.02
und.
4.00
264.24
1,056.96
04.05.03
ml
192.61
54.34
10,466.43
04.05.04
ml
192.61
5.62
1,082.47
m2
138.33
67.81
9,380.16
ml
17.51
21.46
375.76
04.05.05
04.05.06
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
222.01
65.30
156.71
1,202.03
174.31
73.04
100.09
471.37
383.23
3,921.36
178.03
600.86
685.78
195.22
2,261.47
6,171.78
1,323.69
1,008.73
314.96
2,289.92
727.46
794.99
502.58
264.89
2,510.68
945.15
525.50
676.63
363.40
47.49
13.70
14.39
12.62
6.78
27,453.70
6,779.66
895.73
8,869.85
917.35
7,949.29
318.44
04.05.07
04.05.08
04.06
04.06.01
04.07
04.07.01
04.07.02
04.07.03
04.07.04
04.07.05
04.08
04.08.01
04.09
04.09.01
04.09.01.01
04.09.02
04.09.02.01
04.10
04.10.01
04.11
04.11.01
04.11.02
04.12
04.12.01
04.12.02
04.12.03
04.12.04
04.13
04.13.01
04.13.02
04.13.03
04.13.04
04.13.05
04.14
04.14.01
04.14.02
04.15
ml
35.02
41.87
1,466.29
m2
12.20
46.50
567.30
1,394.89
20.09
58.66
m2
55.54
17.24
957.51
0.84
7
811.45
m2
5.20
40.15
208.78
0.84
7
176.93
m2
35.24
40.15
1,414.89
19.70
13.46
265.16
1,394.89
2,905.00
4,025.70
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
2,269.29
m2
93.85
24.18
2,269.29
CONTTRAZOCALOS
CONTRAZOCALO DE CEMENTO
S/N COLOREAR DE H=15 cm
171.90
CARPINTERIA METALICA
VENTANA DE VIDRIO SEMIDOBLE,
CON MARCO - BICELES DE ALUMINIO
(corrediza)
REJAS DE PROTECCIN PARA
VENTANAS DE FIERRO LISO
CUADRADO DE 1/2"
CERRAJERIA
BISAGRA ALUMINIZADA DE 3 1/2"
X 3 1/2"
CERRADURA PARA PUERTA
PRINCIPAL TRES GOLPES
BISABRA ALUMINIZADA
PIVOTANTE
CERRADURA PARA PUERTA
INTERIOR DE PERILLA LLAVE EXT.
SUGURO INTE.
PINTURA
PINTURA LATEX SATINADO EN
MUROS INTERIORES Y EXTERIORES 2
MANOS
PINTURA LATEX SATINADO EN
COLUMNAS Y VIGAS 2 MANOS
PINTURA ESMALTE EN
CONTRAZCALOS, 2 MANOS H=0.15
PINTURA EN CARPINTERIA DE
MADERA CON BARNIZ, 2 MANOS
PINTURA ANTICORROSIVO EN
PUERTAS Y VENTANAS DE FIERRO 2
MANOS
APARATOS Y ACCESORIOS
SANITARIOS
LAVATORIO DE PARED DE COLOR
1 LLAVE
JABONERA COLOR BLANCO
INSTALACIONES SANITARIAS
1,182.11
2.92
50.23
350.78
CARPINTERIA DE MADERA
PUERTA DE MADERA APANELDA,
(0.80x2.10)
480.76
m2
27.77
ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALOS DE MAYOLICA DE
COLOR DE 20X30 DE 1ERA
1,242.62
0.84
7
0.84
7
0.84
7
m2
PISOS Y PAVIMENTOS
PISO DE CEMENTO PULIDO E=2"
0.84
7
0.84
7
0.84
7
15.00
11.46
171.90
178.88
m2
2.92
61.26
178.88
580.20
und
1.00
580.20
580.20
m2
17.70
150.95
2,671.82
m2
18.70
72.40
1,353.88
1,101.09
pza
3.00
10.12
30.36
pza
1.00
74.29
74.29
pza
8.00
111.25
890.00
pza
2.00
53.22
106.44
943.47
m2
55.54
7.00
388.78
m2
40.54
8.20
332.43
m2
2.25
7.09
15.95
m2
5.00
13.26
66.30
m2
17.70
7.91
140.01
378.99
pza
2.00
162.08
324.16
pza
1.00
54.83
54.83
1,026.86
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
1,182.11
2,461.86
49.71
1,199.06
224.71
1,923.13
1,923.13
297.27
145.68
145.68
151.59
151.59
491.69
491.69
3,411.61
2,264.25
1,147.36
933.13
25.73
62.96
754.24
90.20
799.55
329.47
281.72
13.52
56.19
118.65
321.18
274.71
46.47
870.22
04.15.01
04.15.02
04.15.03
04.15.04
04.15.04.01
04.15.04.02
04.15.04.03
04.15.05
04.15.05.01
04.15.05.02
04.15.06
m3
0.32
28.92
9.25
m3
0.25
8.26
2.07
m3
0.07
13.63
0.95
224.34
pto
2.00
51.03
102.06
pto
3.00
31.17
93.51
pto
1.00
28.77
28.77
196.59
12.00
10.62
127.44
15.00
4.61
69.15
ACCESORIO DE REDES
593.66
04.15.06.01
pza
5.00
27.74
138.70
04.15.06.02
pza
6.00
11.74
70.44
04.15.06.03
pza
2.00
16.76
33.52
04.15.06.04
pza
2.00
16.76
33.52
04.15.06.05
pza
2.00
15.20
30.40
04.15.06.06
pza
4.00
2.00
8.00
04.15.06.07
pza
2.00
22.02
44.04
04.15.06.08
pza
1.00
23.02
23.02
pza
3.00
15.20
45.60
und
1.00
21.64
21.64
pza
1.00
144.78
144.78
04.15.06.09
04.15.06.10
04.15.06.11
04.16
04.16.01
04.16.02
04.16.02.01
04.16.03
04.16.03.01
04.16.03.02
04.16.04
SUMIDEROS DE 2"
REGISTRO ROSCADO DE
BRONCE DE 4"
CAJA DE REGISTRO DE DESAGUE
DE 0.30X0.60 m.
SISTEMA DE AGUA FRIA Y
CONTRA INCENDIO
EXCAV. DE ZANJA PARA PVCSAP 1/2", 3/4"
SALIDA DE AGUA FRIA
SALIDA DE AGUA FRIA PVC-SAP
1/2" - LAVATORIO
REDES DE DISTRIBUCION
RED DE DISTRIBUCION TUBERIA
PVC-SAP 1/2"
RED DE DISTRIBUCION TUBERIA
PVC-SAP 3/4
ACCESORIOS DE
DISTRIBUCION
735.51
m3
1.50
23.12
34.68
47.70
und
2.00
23.85
47.70
297.16
18.65
11.55
215.41
11.45
7.14
81.75
152.95
04.16.04.01
und
6.00
7.50
45.00
04.16.04.02
und
2.00
11.49
22.98
04.16.04.03
und
2.00
11.49
22.98
04.16.04.04
und
2.00
11.99
23.98
04.16.04.05
und
3.00
12.67
38.01
04.16.05
04.16.05.01
04.16.05.02
04.16.05.03
04.17
04.17.01
LLAVES Y VALVULAS
GRIFO CROMADO DE 1/2"
VALVULA COMPUERTA DE
BRONCE DE 1/2"
VALVULA COMPUERTA DE
BRONCE DE 3/4"
INSTALACIONES ELECTRICAS
SALIDA DE TECHO (CENTRO
DE LUZ)
203.02
und
2.00
44.41
88.82
und
1.00
50.66
50.66
und
1.00
63.54
63.54
2,871.60
445.20
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
7.84
1.75
0.81
190.12
86.49
79.25
24.38
166.60
108.00
58.60
503.10
117.54
59.69
28.41
28.41
25.76
6.78
37.32
19.51
38.64
18.34
122.69
623.31
29.39
40.42
40.42
251.83
182.55
69.28
129.62
38.14
19.47
19.47
20.32
32.21
172.05
75.27
42.93
53.85
2,433.56
377.29
04.17.01.01
04.17.02
pto
7.00
63.60
SALIDA DE INTERRUPTOR
445.20
104.20
04.17.02.01
pto
2.00
25.55
51.10
04.17.02.02
pto
2.00
26.55
53.10
04.17.03
04.17.03.01
04.17.04
04.17.04.01
04.17.05
04.17.05.01
04.17.05.02
04.17.05.03
04.17.05.04
04.17.06
04.17.06.01
04.17.06.02
04.17.06.03
04.18
04.19
04.19.01
pto
02
ESTACIONAMIENTO DE MOTOS
05.01.01.01
05.01.01.02
05.01.02
05.01.02.01
05.02
05.02.01
05.02.01.01
05.02.01.02
05.02.02
05.02.02.01
05.02.02.02
05.02.02.03
05.02.02.04
2.00
15.28
30.56
21.00
8.70
182.70
21.00
10.74
225.54
25.00
3.90
97.50
15.00
6.31
94.65
1,433.35
35.00
17.11
598.85
50.00
10.11
505.50
25.00
13.16
329.00
1,083.01
1,083.01
und
1.00
1,083.01
1,083.01
671.01
671.01
und
3.00
122.59
367.77
und
4.00
75.81
303.24
35,879.10
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS EN
ZAPATA
ELIMINACION DE MATERIAL
EXCEDENTE
257.90
600.39
ARTEFACTOS
05.00
05.01.01
51.58
TABLEROS ELCTRICOS
TABLERO DE DISTRIBUCION TD-
04.19.01.02
05.01
5.00
30.56
LMPARAS
LAMPARA FLUORESCENTE RECTO
DE 2X36W., EQUIPO COMPLETO.
LAMPARA FLUORESCENTE
CIRCULAR DE 32 W., EQUIPO
COMPLETO.
04.19.01.01
pto
CAJA DE PASE
04.18.01
04.18.01.01
257.90
1,093.74
89.42
m3
2.25
32.01
72.02
m3
2.81
6.19
17.39
1,004.32
m3
2.70
371.97
1,004.32
34,785.37
15,562.30
10.00
1,500.00
15,000.00
10.00
56.23
562.30
7,615.55
10.00
37.88
378.80
10.00
28.11
281.10
63.96
26.66
1,705.17
63.96
11.25
719.55
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
377.29
88.31
43.31
45.00
218.56
218.56
25.90
25.90
508.81
154.83
191.14
82.63
80.21
1,214.70
507.50
428.39
278.81
917.81
917.81
917.81
568.65
568.65
311.67
256.98
30,406.02
926.89
75.78
61.04
14.74
851.12
851.12
29,479.13
13,188.39
12,711.86
476.53
6,453.86
321.02
238.22
1,445.06
609.79
05.02.02.05
05.02.02.06
05.02.03
05.02.03.01
05.02.03.02
05.02.03.03
05.02.03.04
05.02.03.05
05.02.03.06
05.02.03.07
05.02.03.08
05.02.04
05.02.04.01
05.02.05
05.02.05.01
06.00
06.01
06.01.01
06.01.01.01
06.01.01.02
06.01.01.03
06.01.01.04
06.01.01.05
06.01.01.06
06.01.01.07
06.01.01.08
06.01.02
06.01.02.0
1
06.01.02.01.
01
06.01.02.01.
02
06.01.02.0
2
06.01.02.02.
01
06.01.02.02.
02
06.01.02.0
3
06.01.02.03.
02
06.01.02.03.
03
06.01.02.03.
04
06.01.02.03.
05
06.01.02.03.
06
06.02
06.02.01
127.92
25.78
3,297.78
127.92
9.64
1,233.15
6,770.18
10.00
100.00
1,000.00
10.00
11.25
112.50
10.00
110.00
1,100.00
10.00
8.44
84.40
10.00
120.00
1,200.00
10.00
8.44
84.40
78.36
23.65
1,853.21
61.98
21.55
1,335.67
2,038.77
m2
35.50
57.43
2,798.57
m
31.98
87.51
2,798.57
66,588.17
ESTRUCTURAS
57,367.55
MOVIMIENTO DE TIERRAS
CORTE A NIVEL DE SUB BASE
2,038.77
10,995.61
m3
33.96
3.97
134.83
m3
67.92
63.82
4,334.65
m3
54.92
5.79
317.99
m3
55.00
11.86
652.30
m3
67.92
62.82
4,266.73
m3
45.98
5.79
266.22
m3
55.00
11.86
652.30
m3
42.45
8.73
370.59
46,371.94
SARDINEL
CONCRETO EN SARDINEL
f'c=175 kg/cm2
ENCOFRADO Y DESENCOFRADO
EN SARDINEL.
20,317.78
PAVIMENTO
CONCRETO f'c=210 kg/cm2. EN
PAVIMENTO.
ENCOFRADO Y DESENCOFRADO
EN PAVIMENTO.
m3
40.10
478.78
19,199.08
m2
65.69
17.03
1,118.70
1,693.11
m3
33.96
44.37
1,506.81
m2
10.94
17.03
186.31
VARIOS
PASADORES PARA PAVIMENTO
BARRAS DE UNIN EN
PAVIMENTOS
SELLADO DE JUNTAS EN
SARDINEL
SELLADO DE JUNTAS EN
PAVIENTOS
FRAGUADO DE CONCRETO EN
PAVIMENTO
24,361.04
u
254.00
65.00
16,510.00
280.00
3.00
840.00
150.00
3.50
525.00
220.00
5.91
1,300.20
m2
339.61
15.27
5,185.84
ARQUITECTURA
PINTURA LINEAL E= 0.10 M.
599.02
m
126.01
1.66
209.18
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
2,794.73
1,045.04
5,737.44
847.46
95.34
932.20
71.53
1,016.95
71.53
1,570.52
1,131.92
1,727.77
1,727.77
2,371.67
2,371.67
56,430.65
48,616.57
9,318.32
114.26
3,673.44
269.48
552.80
3,615.88
225.61
552.80
314.06
39,298.25
17,218.46
16,270.41
948.05
1,434.84
1,276.95
157.89
20,644.95
13,991.53
711.86
444.92
1,101.86
4,394.78
507.64
177.27
06.02.02
06.03
SEALIZACIONES
REGLAMENTARIAS
06.03.01
INSTALACIONES SANITARIAS
SUMINISTRO E INSTALACION
TUBERIA UNION FLEXIBLE 4"
07.00
CASETA DE BOMBEO
07.01
07.01.01
07.01.02
07.02
07.02.01
07.02.02
07.02.03
07.02.04
07.02.05
07.02.06
07.02.07
07.03
07.03.05
07.03.03
07.04
07.04.01
07.04.01.01
07.04.01.02
07.04.02
07.04.02.01
07.04.02.02
07.04.02.03
07.04.02.04
07.04.03
07.04.03.01
07.04.03.02
07.04.03.03
07.04.03.04
07.04.04
07.04.04.01
07.04.04.02
07.04.04.03
07.04.04.04
07.04.05
48.73
80.00
107.77
COLUMNAS
MORTERO F'C=210 KG/CM2
PARA COLUMNAS
ENCOFRADO Y DESENCOFRADO
NORMAL EN COLUMNAS
ACERO CORRUGADO 1/2"
fy=4200 kg/cm2
ACERO CORRUGADO 3/8"
fy=4200 kg/cm2
VIGAS
MORTERO F'C=210 KG/CM2
PARA VIGAS
ENCOFRADO Y DESENCOFRADO
NORMAL EN VIGAS
ACERO CORRUGADO 1/2"
fy=4200 kg/cm2
ACERO CORRUGADO 3/8"
fy=4200 kg/cm2
DINTEL
CONCRETO F'C=175 KG/CM2
PARA DINTEL
ENCOFRADO Y DESENCOFRADO
NORMAL EN DINTEL
ACERO CORRUGADO 1/2"
fy=4200 kg/cm2
ACERO CORRUGADO 3/8"
fy=4200 kg/cm2
LOSA MACIZA
8,621.60
66,327.38
24.97
m2
16.00
0.55
8.80
m2
12.25
1.32
16.17
408.05
m3
5.00
5.07
25.35
m3
4.80
25.71
123.41
m3
1.18
28.92
34.13
m3
1.88
25.53
48.00
m3
5.13
18.17
93.21
m2
4.80
5.82
27.94
m2
11.55
4.85
56.02
865.09
m2
4.00
26.26
105.04
m3
1.18
236.34
278.88
m3
0.23
358.06
82.35
m2
2.40
28.44
68.26
m2
11.55
28.62
330.56
389.84
8,621.60
MOVIMIENTO DE TIERRAS
07.03.04
07.03.02
8.00
TRABAJOS PRELIMINARES
07.03.01
17,041.78
644.57
m3
1.60
kg
11.88
371.97
595.15
4.16
49.42
1,438.01
m3
0.83
451.79
374.99
m2
13.20
36.36
479.95
kg
74.45
4.16
309.71
kg
67.00
4.08
273.36
637.59
m3
0.50
401.18
200.59
m2
5.00
24.26
121.30
kg
39.60
4.16
164.74
kg
37.00
4.08
150.96
63.37
m3
0.05
384.87
19.24
m2
0.55
24.26
13.34
kg
4.36
4.16
18.14
kg
3.10
4.08
12.65
2,378.34
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
330.37
7,306.44
7,306.44
56,209.65
21.16
7.46
13.70
345.80
21.48
104.58
28.92
40.67
78.99
23.67
47.47
733.13
89.02
236.34
69.79
57.84
280.14
14,442.19
546.25
504.37
41.88
1,218.65
317.78
406.74
262.47
231.66
540.33
169.99
102.80
139.61
127.93
53.71
16.31
11.31
15.37
10.72
2,015.54
07.04.05.01
07.04.05.02
07.04.05.03
07.04.06
07.04.06.01
07.04.06.02
07.04.06.03
07.05
07.05.01
07.06
07.06.01
07.06.02
07.06.03
07.06.04
07.07
07.07.01
07.08
02.08.01
02.08.02
02.08.03
07.09
07.09.01
07.09.01.01
07.09.01.02
07.10
07.10.01
07.10.02
07.11
07.11.01
07.11.02
07.12
07.12.01
07.12.02
07.12.03
07.12.04
07.12.05
07.12.06
07.13
m3
2.40
m2
16.00
kg
202.80
464.92
1,115.81
26.18
418.88
4.16
843.65
11,879.91
m3
23.40
m2
8.00
kg
292.72
444.08
10,391.47
33.84
270.72
4.16
1,217.72
1,130.18
m2
22.50
50.23
8,806.33
229.42
1,031.96
957.78
1,431.50
957.78
17.24
775.80
0.84
7
657.46
m2
13.20
40.15
529.98
0.84
7
449.14
m2
6.80
40.15
273.02
8.20
13.46
110.37
387.20
m2
16.00
24.20
387.20
639.95
m2
4.80
24.18
116.06
m2
10.25
45.67
468.12
7.28
7.66
55.76
CONTTRAZOCALOS
CONTRAZOCALO DE CEMENTO
S/N COLOREAR DE H=15 cm
CONTRAZOCALO DE CEMENTO
S/N COLOREAR DE H=30 cm
203.82
PINTURA
PINTURA LATEX SATINADO EN
MUROS INTERIORES Y EXTERIORES 2
MANOS
PINTURA LATEX SATINADO EN
COLUMNAS Y VIGAS 2 MANOS
PINTURA LATEX STINADO EN
CIELORRASO 2 MANOS
PINTURA ESMALTE EN
CONTRAZCALOS, 2 MANOS H=0.15
PINTURA ESMALTE EN
CONTRAZCALOS, 2 MANOS H=0.30
PINTURA ANTICORROSIVO EN
PUERTAS Y VENTANAS DE FIERRO 2
MANOS
APARATOS Y ACCESORIOS
SANITARIOS
10,067.72
1,689.17
203.82
CERRAJERIA
BISAGRA ALUMINIZADA DE 3 1/2"
X 3 1/2"
CERRADURA PARA PUERTA
PRINCIPAL TRES GOLPES
714.96
0.84
7
0.84
7
1,130.18
ZOCALOS Y CONTRAZOCALOS
CARPINTERIA METALICA
PUERTA METALICA FG 2", UNA
OJA (0.80x2.10)
REJAS DE PROTECCIN PARA
VENTANAS DE FIERRO LISO
CUADRADO DE 1/2"
354.98
45.00
PISOS Y PAVIMENTOS
PISO DE CEMENTO PULIDO E=2"
MORTERO F'C=140 KG/CM2 EN
VEREDA, BRUADO
JUNTAS DE DILATACIN EN PISOS
Y VEREDAS
945.60
m2
CIELORRASO
CIELORRAZO CON MESCLA 1:4 C-A
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
8.00
11.46
91.68
9.00
12.46
112.14
440.69
und
1.00
266.93
266.93
m2
2.40
72.40
173.76
104.65
pza
3.00
10.12
30.36
pza
1.00
74.29
74.29
530.23
m2
38.76
7.00
271.32
m2
13.20
8.20
108.24
m2
16.00
6.62
105.92
m2
1.20
7.09
8.51
m2
2.70
8.50
22.95
m2
1.68
7.91
13.29
2,500.00
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
231.37
93.54
328.14
328.14
542.33
98.36
396.71
47.26
172.73
172.73
77.69
95.03
373.47
226.21
147.25
88.69
25.73
62.96
449.34
229.93
91.73
89.76
7.21
19.45
11.26
2,118.64
07.13.01
07.14
07.14.01
07.14.02
07.15
07.15.01
07.15.01.01
TANQUE ELEVADO DE
POLITELINEO DE 1100 Lts CON
ACCESORIOS COMPLETOS
SISTEMA DE AGUA FRIA Y
CONTRA INCENDIO
POZO TUBULAR HASTA 40.00m DE
PROFUNDIDAD INCL.
REVESTIMIENTO
PROSPECCION DE POZO 2" CON
MAQUINARIA
INSTALACIONES ELECTRICAS
SALIDA DE TECHO (CENTRO
DE LUZ)
SALIDA DE CENTRO DE LUZ
(TECHO)
07.15.02
02.15.02.01
07.15.03
07.15.03.01
07.16
07.17
07.17.01
02
TABLEROS ELCTRICOS
TABLERO DE DISTRIBUCION TD-
07.17.01.01
08.00
CASETA DE CONTROL
08.01.01
08.01.02
08.02
08.02.01
08.02.02
08.02.03
08.02.04
08.02.05
08.02.06
08.02.07
08.03
08.03.04
08.03.05
08.03.02
08.03.03
08.04
08.04.01
1.00
40.00
30,000.0
0
30,000.00
225.00
9,000.00
156.01
63.60
pto
1.00
63.60
63.60
25.55
pto
1.00
25.55
25.55
51.58
pto
1.00
51.58
51.58
15.28
pto
1.00
15.28
15.28
1,083.01
1,083.01
und
1.00
1,083.01
1,083.01
122.59
122.59
und
1.00
122.59
122.59
22,080.55
37.42
m2
26.64
0.55
14.65
m2
17.25
1.32
22.77
MOVIMIENTO DE TIERRAS
08.03.01
und
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO NIVEL Y REPLANTEO
PRELIMINAR
2,500.00
39,000.00
ARTEFACTOS
LMPARAS
LAMPARA FLUORESCENTE RECTO
DE 2X36W., EQUIPO COMPLETO.
08.01
2,500.00
CAJA DE PASE
07.16.01
07.16.01.01
1.00
SALIDA DE INTERRUPTOR
07.15.04
07.15.04.01
und
410.12
m3
5.33
5.07
27.02
m3
4.00
25.71
102.84
m3
2.10
28.92
60.73
m3
1.88
25.53
48.00
m3
3.85
18.17
69.95
m2
9.52
5.82
55.41
m2
9.52
4.85
46.17
2,815.20
m2
4.00
26.26
105.04
m3
2.10
236.34
496.31
m3
3.38
358.06
1,210.24
m2
8.48
28.44
241.17
m2
26.64
28.62
762.44
6,698.32
644.57
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
2,118.64
33,050.85
25,423.73
7,627.12
132.21
53.90
53.90
21.65
21.65
43.71
43.71
12.95
12.95
917.81
917.81
917.81
103.89
103.89
103.89
18,712.33
31.71
12.42
19.30
347.56
22.90
87.15
51.47
40.67
59.28
46.95
39.13
2,385.77
89.02
420.61
1,025.63
204.38
646.13
5,676.54
546.25
08.04.01.01
08.04.01.02
08.04.02
08.04.02.01
08.04.02.02
08.04.02.03
08.04.02.04
08.04.03
08.04.03.01
08.04.03.02
08.04.03.03
08.04.03.04
08.04.04
08.04.04.01
08.04.04.02
08.04.04.03
08.04.04.04
08.04.05
08.04.05.01
08.04.05.02
08.04.05.03
08.05
08.05.01
08.06
08.06.01
08.06.02
08.06.03
08.06.04
08.07
08.07.01
08.08
08.08.01
08.08.02
08.08.03
08.09
08.09.01
08.09.01.01
08.09.01.02
08.10
m3
1.60
kg
11.88
371.97
595.15
4.16
49.42
1,438.01
m3
0.83
451.79
374.99
m2
13.20
36.36
479.95
kg
74.45
4.16
309.71
kg
67.00
4.08
273.36
859.65
m3
0.70
401.18
280.83
m2
6.88
24.26
166.91
kg
54.49
4.16
226.68
kg
45.40
4.08
185.23
94.56
m3
0.09
384.87
34.64
m2
1.16
24.26
28.14
kg
4.50
4.16
18.72
kg
3.20
4.08
13.06
3,661.54
m3
4.10
m2
26.64
kg
254.31
464.92
1,906.17
26.18
697.44
4.16
1,057.93
1,813.30
m2
36.10
50.23
1,218.65
317.78
406.74
262.47
231.66
728.51
237.99
141.45
192.10
156.98
80.13
29.35
23.85
15.86
11.06
3,103.00
1,615.40
591.05
896.55
1,536.70
2,248.13
0.84
7
0.84
7
1,905.19
1,813.30
1,536.70
17.24
1,244.73
0.84
7
1,054.85
m2
13.20
40.15
529.98
0.84
7
449.14
m2
6.88
40.15
276.23
14.65
13.46
197.19
644.69
m2
26.64
24.20
644.69
986.45
m2
9.52
24.18
230.19
m2
15.11
45.67
690.07
8.64
7.66
66.18
ZOCALOS Y CONTRAZOCALOS
321.80
CONTTRAZOCALOS
CONTRAZOCALO DE CEMENTO
S/N COLOREAR DE H=15 cm
CONTRAZOCALO DE CEMENTO
S/N COLOREAR DE H=30 cm
321.80
CARPINTERIA METALICA
41.88
72.20
PISOS Y PAVIMENTOS
PISO DE CEMENTO PULIDO E=2"
MORTERO F'C=140 KG/CM2 EN
VEREDA, BRUADO
JUNTAS DE DILATACIN EN PISOS
Y VEREDAS
504.37
m2
CIELORRASO
CIELORRAZO CON MESCLA 1:4 C-A
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
13.12
11.46
150.36
13.76
12.46
171.45
1,474.38
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
234.09
167.11
546.35
546.35
835.97
195.08
584.81
56.09
272.72
272.72
127.42
145.30
1,249.47
08.10.01
08.10.02
08.10.03
08.11
08.11.01
08.11.02
08.11.03
08.12
08.12.01
08.12.02
08.12.03
08.12.04
08.12.05
08.12.06
08.12.07
08.12.08
08.13
08.13.01
08.13.02
08.14
08.14.01
08.14.02
08.14.01
08.14.01.01
08.14.01.02
08.14.02
08.14.02.01
08.14.02.02
08.14.02.03
08.14.03
und
1.00
545.00
545.00
und
1.00
390.00
390.00
m2
7.45
72.40
539.38
188.23
pza
6.00
10.12
60.72
pza
1.00
74.29
74.29
pza
1.00
53.22
53.22
1,134.30
m2
72.20
7.00
505.40
m2
13.20
8.20
108.24
m2
26.64
6.62
176.36
m2
1.97
7.09
13.97
m2
4.13
8.50
35.11
m2
6.94
13.26
92.02
m2
7.37
7.91
58.30
m2
0.96
150.95
144.91
397.28
pza
1.00
235.20
235.20
pza
1.00
162.08
162.08
700.68
m3
0.30
23.12
6.94
m3
0.25
8.26
2.07
47.70
und
1.00
23.85
23.85
und
1.00
23.85
23.85
365.40
3.50
38.00
5.00
11.55
40.43
7.14
271.32
10.73
53.65
183.51
08.14.03.01
und
6.00
7.50
45.00
08.14.03.02
und
2.00
11.49
22.98
08.14.03.03
und
4.00
7.81
31.24
08.14.03.04
und
2.00
11.49
22.98
08.14.03.05
und
3.00
11.99
35.97
08.14.03.06
und
2.00
12.67
25.34
08.14.04
08.14.04.01
08.14.04.02
LLAVES Y VALVULAS
GRIFO CROMADO DE 1/2"
VALVULA COMPUERTA DE
BRONCE DE 1/2"
95.07
und
1.00
44.41
44.41
und
1.00
50.66
50.66
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
461.86
330.51
457.10
159.52
51.46
62.96
45.10
961.27
428.31
91.73
149.45
11.84
29.75
77.99
49.40
122.81
336.68
199.32
137.36
593.79
5.88
1.75
40.42
20.21
20.21
309.66
34.26
229.93
45.47
155.52
38.14
19.47
26.47
19.47
30.48
21.47
80.57
37.64
42.93
08.15
08.15.01
08.15.02
08.15.01
08.15.01.02
08.15.01.03
INSTALACIONES SANITARIAS
SALIDA DE DESAGUE PVC-SAL
4"-INODORO
SALIDA DE DESAGUE PVC-SAL
2"-LAVATORIO
REDES DE DISTRIBUCION
RED DE DISTRIBUSION TUBERIA
PVC-SAL DE 4"
RED DE DISTRIBUCION TUBERIA
PVC-SAL DE 2"
08.15.02
591.04
pto
1.00
69.81
69.81
pto
1.00
51.03
51.03
109.82
6.00
10.00
10.62
63.72
4.61
46.10
ACCESORIO DE REDES
360.38
08.15.02.01
pza
3.00
27.74
83.22
08.15.02.02
pza
2.00
11.74
23.48
08.15.02.03
pza
2.00
2.00
4.00
08.15.02.04
pza
1.00
22.02
22.02
08.15.02.05
pza
2.00
23.02
46.04
pza
1.00
15.20
15.20
und
1.00
21.64
21.64
pza
1.00
144.78
144.78
08.15.02.06
08.15.02.07
08.15.02.08
08.16
08.16.01
08.16.01.01
SUMIDEROS DE 2"
REGISTRO ROSCADO DE
BRONCE DE 4"
CAJA DE REGISTRO DE DESAGUE
DE 0.30X0.60 m.
INSTALACIONES ELECTRICAS
SALIDA DE TECHO (CENTRO
DE LUZ)
SALIDA DE CENTRO DE LUZ
(TECHO)
08.16.02
08.20.02.01
08.16.03
08.16.03.01
08.17
08.18
08.18.01
02
TABLEROS ELCTRICOS
TABLERO DE DISTRIBUCION TD-
08.18.01.01
09.00
CERCO PERIMETRICO
09.01.01
09.01.02
09.02
09.02.01
09.02.02
09.02.03
09.02.04
09.02.05
3.00
63.60
pto
2.00
25.55
pto
1.00
51.58
51.58
15.28
pto
1.00
15.28
15.28
1,083.01
1,083.01
und
1.00
1,083.01
1,083.01
227.43
227.43
und
3.00
75.81
227.43
210,697.6
1
724.29
m2
387.32
0.55
213.03
m2
387.32
1.32
511.26
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL ORGANICO
EXCAVACION DE ZANJAS PARA
ZAPATAS
EXCAVACION DE ZANJAS PARA
CIMIENTOS CORRIDOS
RELLENO COMPACTADO
C/COMPACTADORA 5.8HP MAT.
PROPIO SELECCIONADO C/AGUA
ELIMINACION DE MATERIAL
EXCEDENTE
51.10
51.58
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO NIVEL Y REPLANTEO
PRELIMINAR
190.80
51.10
ARTEFACTOS
LMPARAS
LAMPARA FLUORESCENTE
CIRCULAR DE 32 W., EQUIPO
COMPLETO.
09.01
pto
CAJA DE PASE
08.17.01
08.17.01.01
190.80
SALIDA DE INTERRUPTOR
08.16.04
08.16.04.01
308.76
8,344.76
m3
63.50
5.07
321.95
m3
110.50
25.71
2,840.96
m3
35.77
28.92
1,034.47
m3
60.77
25.53
1,551.46
m3
120.80
18.17
2,194.94
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
500.88
59.16
43.25
93.07
54.00
39.07
305.41
70.53
19.90
3.39
18.66
39.02
12.88
18.34
122.69
261.66
161.69
161.69
43.31
43.31
43.71
43.71
12.95
12.95
917.81
917.81
917.81
192.74
192.74
192.74
178,557.2
9
613.80
180.53
433.27
7,071.83
272.83
2,407.59
876.67
1,314.80
1,860.12
09.02.06
09.03
09.03.01
09.03.02
09.03.03
09.03.04
09.04
09.04.01
09.04.01.01
09.04.01.02
09.04.02
09.04.02.01
09.04.02.02
09.04.02.03
09.04.02.04
09.04.03
09.04.03.01
09.04.03.02
09.04.03.03
09.04.03.04
09.04.04
09.04.04.01
09.04.04.02
09.04.04.03
09.04.05
09.04.05.01
09.04.05.02
09.04.05.03
09.05
09.05.01
09.06
09.06.01
09.06.02
09.06.03
09.07
09.07.01
09.08
09.08.01
09.08.02
09.09
m3
14.55
27.56
24,146.52
m2
95.00
26.26
2,494.70
m3
58.90
236.34
13,920.43
m3
11.10
358.06
3,974.47
m2
132.10
28.44
3,756.92
84,428.38
16,376.28
m3
33.20
kg
968.00
371.97
12,349.40
4.16
4,026.88
28,727.71
m3
20.23
451.79
9,139.71
m2
230.00
36.36
8,362.80
kg
1,692.90
4.16
7,042.46
kg
1,025.18
4.08
4,182.73
17,856.54
m3
15.10
401.18
6,057.82
m2
152.40
24.26
3,697.22
kg
1,005.84
4.16
4,184.29
kg
960.10
4.08
3,917.21
9,459.31
m3
9.53
m2
63.50
kg
809.18
464.92
4,430.69
26.18
1,662.43
4.16
3,366.19
12,008.53
m3
14.56
464.92
6,769.24
m2
50.50
26.18
1,322.09
kg
960.10
4.08
3,917.21
37,135.80
m2
672.75
55.20
PISOS Y PAVIMENTOS
MORTERO F'C=140 KG/CM2 EN
VEREDA, BRUADO
JUNTAS DE DILATACIN EN PISOS
Y VEREDAS
122.50
40.15
4,918.38
723.88
13.46
9,743.42
ZOCALOS Y CONTRAZOCALOS
1,536.70
1,536.70
8,735.84
219.25
73.00
11,796.97
3,368.19
3,183.83
71,549.47
13,878.21
10,465.60
3,412.61
24,345.52
7,745.52
7,087.12
5,968.19
3,544.69
15,132.66
5,133.74
3,133.24
3,546.01
3,319.67
8,016.36
3,754.82
1,408.84
2,852.70
10,176.72
5,736.64
1,120.42
3,319.67
31,471.02
7,330.10
m2
m2
2,114.15
0.84
7
8,649.51
24.20
20,463.15
19,755.35
40.15
63.50
339.83
23,311.31
215.43
m2
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
37,135.80
m2
CIELORRASO
CIELORRAZO CON MESCLA 1:4 C-A
401.00
37.69
8,263.53
6.47
472.31
3,052.70
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
31,471.02
4,168.11
8,257.14
1,302.29
1,302.29
7,403.26
7,002.99
400.26
2,587.03
09.09.01
09.09.01.02
09.10
CONTTRAZOCALOS
CONTRAZOCALO DE CEMENTO
S/N COLOREAR DE H=30 cm
CARPINTERIA METALICA
PUERTA METALICA FG 2", Y
FIERRO CUADRADO DE 1/2"DOBLE
HOJA (4x3)
REJAS DE PROTECCIN PARA
VENTANAS DE FIERRO LISO
CUADRADO DE 1/2"
09.10.01
09.10.02
09.11
CERRAJERIA
BISAGRA ALUMINIZADA DE 3 1/2"
X 3 1/2"
CERRADURA PARA PUERTA
PRINCIPAL TRES GOLPES
09.11.01
09.11.02
09.12
PINTURA
PINTURA LATEX SATINADO EN
MUROS INTERIORES Y EXTERIORES 2
MANOS
PINTURA LATEX SATINADO EN
COLUMNAS Y VIGAS 2 MANOS
PINTURA LATEX STINADO EN
CIELORRASO 2 MANOS
PINTURA ANTICORROSIVO
VENTANAS DE FIERRO 2 MANOS
PINTURA ANTICORROSIVO PUERTA
DE FIERRO 2 MANOS (DOBLE HOJA
4X3)
09.12.01
09.12.02
09.12.03
09.12.04
09.12.05
245.00
12.46
0.84
7
13,559.32
2.00
8,000.00
16,000.00
m2
1.23
72.40
89.05
344.31
pza
12.00
10.12
121.44
pza
3.00
74.29
222.87
2,847.95
m2
72.20
7.00
505.40
m2
215.43
8.20
1,766.53
m2
63.50
6.62
420.37
m2
1.23
7.91
9.73
m2
24.00
6.08
145.92
1,337,539
.20
Gastos Generales
10%
133,753.92
Utilidad
10%
133,753.92
3%
40,126.18
1,645,173
.22
18%
296,131.18
1,941,304
.40
3%
58,239.13
5%
97,065.22
2,096,608
.75
Imprevistos
Sub Total
IGV
Costo de la Obra
Elaboracin de Estudio Definitivo ( 3
% Costo total de la Obra)
Supervisin ( 5% Costo total de la
Obra)
COSTO TOTAL DE LA OBRA DE
INFRAESTRUCTURA
1.1.2.Implementacin de un plan de
mantenimiento para la infraestructura.
Contratacin de especialista
para elaborar el plan de
1
mantenimiento de la
infraestructura.
13,634.79
3,052.70
und
Costo Directo
16,089.05
0.84
7
0.84
7
0.84
7
3,052.70
Materiales de oficina
Servicio Fotocopiado.
1,000.00
1,000.00
Global
500.00
500.00
Global
500.00
500.00
COSTO TOTAL
2,000.00
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
2,587.03
2,587.03
75.47
291.79
102.92
188.87
2,413.51
428.31
1,497.06
356.25
8.25
123.66
1,133,507
.80
113,350.78
113,350.78
34,005.23
1,394,214
.59
250,958.63
1,645,173
.22
49,355.20
82,258.66
1,776,787
.08
847.46
423.73
423.73
1,694.92
1.1.
Descripcin de Actividades
AMBIENTES
ADMINISTRATIVOS Y SS.HH
Und.
Cant.
0.85
4,990.00
5,065.00
0.85
450.00
450.00
0.85
150.00
150.00
0.85
600.00
600.00
0.85
3,000.00
3,000.00
0.85
15.00
15.00
0.85
71,185.0
0
43,070.0
0
1 er Piso
Secretaria
Escritorio Secretaria (madera
cedro o similar)
Precio
Privado
174,945.0
0
110,450.0
0
P.U
Silla Giratoria
Armario de madera ( madera
cedro o similar)
Computadora + impresora
multifuncional
1
1
1.20 x 0.60 x
0.75
0.90 x 0.41 x
1.85
F.C
0.85
Precio
Social
148,258.4
7
93,601.69
4,292.37
381.36
127.12
508.47
2,542.37
12.71
Sillas Plasticas
Estantes ( madera cedro o
similar)
Ventilador de Pie
4
1
0.30 x 3.60
Direccin + SS.HH
Escritorio (madera cedro o
similar)
Silla Giratoria
Armario de madera ( madera
cedro o similar)
Equipo Multimedia
( Proyector+Scran)
Computadora + impresora
multifuncional
1.20 x 0.60 x
0.75
1
1
25.00
100.00
0.85
650.00
650.00
0.85
100.00
100.00
0.85
84.75
7,990.00
8,065.00
0.85
6,834.75
450.00
0.85
150.00
0.85
600.00
0.85
3,000.00
0.85
3,000.00
0.85
0.85
12.71
84.75
450.00
150.00
0.90 x 0.41 x
1.85
600.00
3,000.00
1
1
3,000.00
84.75
550.85
381.36
127.12
508.47
2,542.37
2,542.37
15.00
15.00
Sillas Plasticas
Estantes ( madera cedro o
similar)
25.00
100.00
0.85
650.00
0.85
100.00
100.00
0.85
84.75
9,995.00
31,870.00
0.85
27,008.47
2,700.00
0.85
570.00
0.85
0.85
12,711.86
Ventilador de Pie
0.30 x 3.60
Area Tierras
Escritorio (madera cedro o
similar)
Silla ( madera cedro o similar)
6
6
1.20 x 0.60 x
0.75
0.42 x 0.30
x0.64
650.00
450.00
95.00
550.85
2,288.14
483.05
Equipos de Computo
2,500.00
15,000.00
Impresora Multifuncional
500.00
1,000.00
0.85
847.46
0.85
2,966.10
Laptop
3,500.00
3,500.00
Camara Fotografica
500.00
1,000.00
0.85
847.46
1,600.00
4,800.00
0.85
4,067.80
Bancas
150.00
600.00
0.85
508.47
100.00
300.00
0.85
254.24
2,400.00
0.85
27,420.00
0.85
2,700.00
0.85
570.00
0.85
Ventiladores de Pie
Armario de madera ( madera
cedro o similar)
3
4
0.90 x 0.41 x
1.85
Area PROCREA
Escritorio (madera cedro o
similar)
Silla ( madera cedro o similar)
600.00
6,470.00
6
6
1.20 x 0.60 x
0.75
0.42 x 0.30
x0.64
450.00
95.00
2,033.90
23,237.29
2,288.14
483.05
Equipos de Computo
2,500.00
15,000.00
0.85
12,711.86
Impresora Multifuncional
500.00
1,000.00
0.85
847.46
2,400.00
0.85
600.00
Camara Fotografica
500.00
500.00
0.85
423.73
0.85
127.12
2,033.90
Sillas Plasticas
25.00
150.00
Ventiladores de Pie
100.00
200.00
0.85
169.49
Pizarra Acrilica
100.00
100.00
0.85
84.75
1,600.00
4,800.00
0.85
4,067.80
675.00
2,100.00
0.85
1,779.66
1,950.00
0.85
0.85
76.27
0.85
50.85
Almacen General
Estantes ( madera cedro o
similar)
0.30 x 3.60
650.00
Escobas
15.00
90.00
Recogedor de basura
10.00
10,420.0
0
60.00
Area DISAFILPA
Escritorio (madera cedro o
similar)
Silla ( madera cedro o similar)
6
6
1.20 x 0.60 x
0.75
0.42 x 0.30
x0.64
0.90 x 0.41 x
1.85
450.00
95.00
32,570.00
0.85
1,652.54
27,601.69
2,700.00
0.85
570.00
0.85
2,400.00
0.85
15,000.00
0.85
12,711.86
423.73
2,288.14
483.05
Equipos de Computo
2,500.00
Camara Fotografica
500.00
500.00
0.85
0.85
847.46
0.85
4,067.80
600.00
Impresora Multifuncional
500.00
1,000.00
1,600.00
4,800.00
2,033.90
Sillas Plasticas
Laptop
0.30 x 3.60
Caja
Escritorio (madera cedro o
similar)
Silla Giratoria
Armario de madera ( madera
cedro o similar)
1.20 x 0.60 x
0.75
2
1
0.30 x 3.60
SS.HH de Mujeres
Deposito plastico para basura.
Area de Mantenimiento
Estantes ( madera cedro o
similar)
0.30 x 3.60
2 do Piso
Jefatura de la Direccin de
Promocin Agraria ( DPA) +
SS.HH
Escritorio (madera cedro o
similar)
Silla Giratoria
Armario de madera ( madera
cedro o similar)
Equipo Multimedia
( Proyector+Scran)
Computadora + impresora
multifuncional
25.00
150.00
0.85
3,500.00
3,500.00
0.85
2,966.10
1,200.00
1,350.00
0.85
1,144.07
450.00
0.85
300.00
0.85
600.00
0.85
1,300.00
0.85
1,300.00
0.85
15.00
30.00
0.85
25.42
15.00
30.00
0.85
25.42
15.00
30.00
0.85
25.42
15.00
30.00
0.85
25.42
650.00
650.00
0.85
550.85
650.00
0.85
450.00
600.00
650.00
SS.HH de Hombres
Deposito plastico para basura.
0.85
150.00
0.90 x 0.41 x
1.85
Almacen
Estantes ( madera cedro o
similar)
1,950.00
650.00
1.20 x 0.60 x
0.75
1
1
650.00
650.00
28,115.0
0
64,495.00
7,990.00
8,715.00
450.00
150.00
0.90 x 0.41 x
1.85
600.00
3,000.00
3,000.00
0.85
0.85
3,000.00
0.85
0.85
12.71
84.75
0.85
1,300.00
0.85
100.00
0.85
4,645.00
6
6
3
1.20 x 0.60 x
0.75
0.42 x 0.30
x0.64
0.90 x 0.41 x
1.85
450.00
95.00
600.00
7,385.59
0.85
100.00
100.00
54,656.78
3,000.00
25.00
550.85
0.85
15.00
1,101.69
600.00
650.00
508.47
1,101.69
0.85
0.30 x 3.60
254.24
150.00
Sillas Plasticas
381.36
0.85
15.00
Ventilador de Pie
127.12
450.00
1,652.54
21,070.00
0.85
381.36
127.12
508.47
2,542.37
2,542.37
1,101.69
84.75
17,855.93
2,700.00
0.85
570.00
0.85
1,800.00
0.85
0.85
12,711.86
2,288.14
483.05
1,525.42
Equipos de Computo
2,500.00
15,000.00
Camara Fotografica
500.00
500.00
0.85
423.73
Impresora Multifuncional
500.00
500.00
0.85
423.73
8,045.00
0.85
6,817.80
450.00
0.85
95.00
0.85
600.00
0.85
3,000.00
0.85
3,900.00
0.85
Archivo General
Escritorio (madera cedro o
similar)
Silla ( madera cedro o similar)
Armario de madera ( madera
cedro o similar)
Equipo de Computo +
impresora
Estantes ( madera cedro o
similar)
Oficina de SENASA +
Deposito
Escritorio (madera cedro o
similar)
Silla ( madera cedro o similar)
Sillas Plasticas
4,795.00
1
1
1
1.20 x 0.60 x
0.75
0.42 x 0.30
x0.64
0.90 x 0.41 x
1.85
1
6
450.00
95.00
600.00
3,000.00
0.30 x 3.60
650.00
5,320.00
3
3
1.20 x 0.60 x
0.75
0.42 x 0.30
x0.64
Equipos de Computo
450.00
95.00
25.00
0.90 x 0.41 x
1.85
600.00
2,500.00
11,460.00
0.85
1,350.00
0.85
285.00
0.85
75.00
0.85
600.00
0.85
7,500.00
0.85
381.36
80.51
508.47
2,542.37
3,305.08
9,711.86
1,144.07
241.53
63.56
508.47
6,355.93
Camara Fotografica
Impresora Multifuncional
Estantes ( madera cedro o
similar)
Oficina de Autoridad del
Agua + SS.HH
Escritorio (madera cedro o
similar)
Silla ( madera cedro o similar)
Sillas Plasticas
1
1
1
0.30 x 3.60
4
4
4
Equipos de Computo
423.73
500.00
0.85
423.73
650.00
0.85
650.00
14,495.00
0.85
550.85
12,283.90
1,800.00
0.85
380.00
0.85
100.00
0.85
1,200.00
0.85
2,500.00
10,000.00
0.85
8,474.58
0.85
423.73
450.00
95.00
25.00
0.90 x 0.41 x
1.85
600.00
1,525.42
322.03
84.75
1,016.95
500.00
500.00
Camara Fotografica
500.00
500.00
0.85
423.73
15.00
15.00
0.85
12.71
15.00
30.00
0.85
25.42
15.00
30.00
0.85
25.42
15.00
30.00
0.85
25.42
15.00
30.00
0.85
25.42
650.00
650.00
0.85
550.85
SS.HH de Mujeres
Deposito plastico para basura.
Area de Mantenimiento
Estantes ( madera cedro o
similar)
0.30 x 3.60
AMBIENTES DE SERVICIOS
Sala de Conferencia +area
de preparacin de
ponencias + SS.HH
Mesa de madera de cedro o
similar
Escritorio (madera cedro o
similar)
Silla de Madera
Deposito plastico para basura.
Equipo Multimedia
( Proyector+Scran)
SS.HH ( hombres y
mujeres) de la Sala de
Conferencia
Deposito plastico para basura.
1
1
60
1m x2m x
0.70m
1.20 x 0.60 x
0.75
0.42 x 0.30
x0.64
1
1
0.85
4,400.00
10,625.00
0.85
4,210.00
9,815.00
650.00
450.00
95.00
3,000.00
0.85
650.00
0.85
450.00
0.85
5,700.00
0.85
15.00
0.85
3,000.00
0.85
550.85
9,004.24
8,317.80
550.85
381.36
4,830.51
12.71
2,542.37
0.85
4
Mesas de plastico
Sillas de plastico
12
EXTERIORES
Caseta de Vigilancia +
SS.HH
Mesa de madera de cedro o
similar
650.00
650.00
15.00
Cafetaria + cocina +
deposito
1.4.
0.85
500.00
Impresora Multifuncional
1.3.
500.00
4,685.00
1.20 x 0.60 x
0.75
0.42 x 0.30
x0.64
SS.HH de Hombres
1.2.
500.00
15.00
60.00
15.00
60.00
0.85
50.85
175.00
750.00
150.00
450.00
0.85
381.36
25.00
300.00
0.85
254.24
490.00
0.85
415.25
490.00
0.85
450.00
0.85
0.85
21.19
12.71
263,152.5
4
490.00
1.20 x 0.60 x
0.75
50.85
0.85
450.00
635.59
415.25
381.36
Silla Plastica
25.00
25.00
15.00
278,355.
00
15.00
0.85
310,520.0
0
0.85
50,000.0
0
85,000.0
0
50,000.00
0.85
85,000.00
0.85
8,000.00
35,000.0
0
100,000.
00
32,000.00
0.85
35,000.00
0.85
100,000.00
0.85
20.00
480.00
0.85
0.85
508.47
OTROS
Deslizador con motor
( Chalupa para 8 pasajeros +
motor EVIMRUDE de 85 HP)
1
1
24
42,372.88
72,033.90
27,118.64
29,661.02
84,745.76
406.78
24
25.00
600.00
Tiendas de Campaa
24
150.00
3,600.00
0.85
3,050.85
Colchonetas
24
150.00
3,600.00
0.85
3,050.85
Linternas
24
10.00
353,940.
00
Sub Total
IGV 18%
COSTO TOTAL DE
MOBILIARIO Y EQUIPOS
2.1.2. Implementacin de un plan de
mantenimiento para mobiliarios y equipos
Contratacin de especialista
para elaborar eL plan de
1
mantenimiento y reposicin de
mobiliario.
Adquisicin de materiales de
2
oficina.
3
Servicio Fotocopiado.
18%
Global
Global
1,000.00
1
1
3,000.00
119,000.
00
1.1
1.2
500.00
500.00
5,000.00
111,000.
00
Unidad
500.00
Cantidad
5,000.00
111,000.00
3,000.00
119,000.0
0
2,805,573
.15
Costo
Unitario
Primeros
2.2
Charla sobre
construccin
Movilidad
847.46
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
0.84
7
423.73
423.73
1694.92
4,237.29
94,067.80
2,542.37
100,847.4
6
2,377,604
.37
Costo S/.
800
Charla
500
Millar
300
2.1
75,749.49
496,580.0
0
1,000.00
500.00
Actividades
0.84
7
0.84
7
203.39
420,830.5
1
0.84
7
COSTO TOTAL
89,384.40
2,000.00
Charlas de Bioseguridad
Auxilios.
Ingeniero de Seguridad
0.85
0.85
585,964.4
0
COSTO TOTAL
240.00
496,580.0
0
500
300
4800
Tacho
50
100
de
Charla
800
1600
Glb.
350
700
Charla
500
1000
2.4
Glb.
150
300
2.5
Materiales
Glb.
50
100
2.6
Glb.
500
500
Glb.
500
2.3
2.3
2.7
3
3.1
4
manejo
de
residuos
Monitoreo de Ruidos
Servicio
Monitoreo
200
Unidad
200
1600
800
200
2750
4.1
Plantones
4.2
Saco
10
80
4.3
Transporte y flete
Glb.
350
500
200
350
5.1
Glb.
500
500
5.2
Refrigerio
Glb
350
350
5.3
Glb
500
TOTAL
1350
500
9,900.00
DOCUMENTOS
RECABADOS
PLANOS
INFORME TECNICO