CLCULO DE PIEZAS DE TABIQUE POR M2

c
a
b

a (alto)=
b (base)=
c (ancho)=
z (mezcla)=

7.00 cm
28.00 cm
14.00 cm
1.00 cm

No. Piezas/m2 =

43.10

CLCULO DE MORTERO
Mortero 1:5
m3/pza =
m3/m2 =

0.00050
0.02172

MEZCLA CEMENTO-CALHIDRA-ARENA 1:4


Cemento
Calhidra
Arena

Ton
Ton
m3

0.31
0.155
1.08

Muro de tabicn
Material
Cemento
Calhidra
Tabiques
Arena
Impermeabilizacin

Unidad
ton
ton
pza
m3
lote

Precio

Cantidad

Importe

1650
1000
4.5
84
5000

2
2
4700
12
1
sub-total

3300
2000
21150
1008
5000
32458

1650
65
130
84
134

2.5
70
15
4
4

4125
4550
1950
336
536
11497

1.7
63
700
150
2.5

2805
4095
1750
1800
210
17000
335
27995

Castillos
Cemento
Varillas #3
Varillas #4
Arena
Grava

ton
pza
pza
m3
m3

sub-total
Dala de desplante
Cemento
Varillas #3
Alambrn
Almbre recocido
Arena
IMSS,INFONAVIT
Grava

ton
pza
ml
kg
m3

1650
65
2.5
12
84

m3

134

2.5
sub-total

Dala de cerramiento
Cemento
Armex
Arena
Grava

ton
pza
m3
m3

1650
120
84
134

1.3
25
2
2

2145
3000
168
268
5581

1.3
25
120
2
2

2145
1625
300
168
268
4506

2
2

7000
4000

sub-total
Zapatas
Cemento
Varillas #3
Alambrn
Arena
Grava

ton
pza
ml
m3
m3

1650
65
2.5
84
134
sub-total

Demolicin y acarreo de escombro


Rotomartillo
Retroexcavadora

das
das

3500
2000

Acarreos

viaje

350

25

8750
19750

420
500

42000
25000
67000

20
4

1500
1440
2940

sub-total
Mano de Obra
Muro de tabique
Zapatas

m2
pza

100
50
sub-total

Indirectos
Madera
Andamios

pza
pza

75
360
sub-total

35,590.00

Costo directo Utilidad


171,727.00 197,486.05

5%
9,874.30

177.2809524

214.06675

224.260405

229.94

277.65255

290.8741

199.9642857

241.456875

252.954821

39.86428571

48.136125

50.4283214

90.12

590.12

712.5699

10% Total (5%)


Total (10%)
19,748.61 238,464.41 249,819.85

746.5018

23848.125

24983.75

3550.05

3719.1

CLASIFICACIN
fc kg/cm2

REVENIMEINTO cm
8 a 10

100

12 a 15

8 a 10
150

12 a 15

8 a 10
200

12 a 15

8 a 10
250

fc kg/cm2

12 a 15

CLASIFICACIN
REVENIMEINTO cm
8 a 10

100

12 a 15

8 a 10
150

12 a 15

8 a 10
200

12 a 15

8 a 10
250

fc kg/cm2

12 a 15

CLASIFICACIN
REVENIMEINTO cm
8 a 10

100

12 a 15

8 a 10
150

12 a 15

8 a 10
200

12 a 15

8 a 10
250

12 a 15

AGREGADO
MXIMO

CEMENTO
ton

ARENA
m3

GRAVA
m3

AGUA
m3

VOLUMEN
m3

CEMENTO
ton

ARENA
m3

GRAVA
m3

AGUA
m3

3/4"
1 1/2"
3/4"
1 1/2"

0.260
0.254
0.286
0.280

0.500
0.470
0.500
0.470

0.680
0.700
0.680
0.700

0.195
0.190
0.215
0.210

1.0
1.0
1.0
1.0

0.26
0.25
0.29
0.28

0.50
0.47
0.50
0.47

0.68
0.70
0.68
0.70

0.20
0.19
0.22
0.21

3/4"
1 1/2"
3/4"
1 1/2"

0.323
0.308
0.354
0.338

0.480
0.450
0.480
0.450

0.670
0.700
0.670
0.700

0.210
0.200
0.230
0.220

1.0
1.0
1.0
1.0

0.32
0.31
0.35
0.34

0.48
0.45
0.48
0.45

0.67
0.70
0.67
0.70

0.21
0.20
0.23
0.22

3/4"
1 1/2"
3/4"
1 1/2"

0.355
0.337
0.391
0.373

0.470
0.440
0.470
0.440

0.650
0.680
0.650
0.680

0.195
0.185
0.215
0.205

1.0
1.0
1.0
1.0

0.36
0.34
0.39
0.37

0.47
0.44
0.47
0.44

0.65
0.68
0.65
0.68

0.20
0.19
0.22
0.21

3/4"
1 1/2"
3/4"
1 1/2"

0.423
0.400
0.467
0.445

0.465
0.435
0.465
0.435

0.640
0.670
0.640
0.670

0.190
0.180
0.210
0.200

1.0
1.0
1.0
1.0

0.42
0.40
0.47
0.45

0.47
0.44
0.47
0.44

0.64
0.67
0.64
0.67

0.19
0.18
0.21
0.20

VOLUMEN
m3

AGREGADO
MXIMO

CEMENTO
sacos

ARENA
bote

GRAVA
bote

AGUA
bote

CEMENTO
saco

ARENA
bote

GRAVA
bote

AGUA
bote

3/4"
1 1/2"
3/4"
1 1/2"

5.20
5.08
5.72
5.60

27.78
26.11
27.78
26.11

37.78
38.89
37.78
38.89

10.83
10.56
11.94
11.67

1.00
1.00
1.00
1.00

5.20
5.08
5.72
5.60

27.78
26.11
27.78
26.11

37.78
38.89
37.78
38.89

10.83
10.56
11.94
11.67

3/4"
1 1/2"
3/4"
1 1/2"

6.46
6.16
7.08
6.76

26.67
25.00
26.67
25.00

37.22
38.89
37.22
38.89

11.67
11.11
12.78
12.22

1.00
1.00
1.00
1.00

6.46
6.16
7.08
6.76

26.67
25.00
26.67
25.00

37.22
38.89
37.22
38.89

11.67
11.11
12.78
12.22

3/4"
1 1/2"
3/4"
1 1/2"

7.10
6.74
7.82
7.46

26.11
24.44
26.11
24.44

36.11
37.78
36.11
37.78

10.83
10.28
11.94
11.39

1.00
1.00
1.00
1.00

7.10
6.74
7.82
7.46

26.11
24.44
26.11
24.44

36.11
37.78
36.11
37.78

10.83
10.28
11.94
11.39

3/4"
1 1/2"
3/4"
1 1/2"

8.46
8.00
9.34
8.90

25.83
24.17
25.83
24.17

35.56
37.22
35.56
37.22

10.56
10.00
11.67
11.11

1.00
1.00
1.00
1.00

8.46
8.00
9.34
8.90

25.83
24.17
25.83
24.17

35.56
37.22
35.56
37.22

10.56
10.00
11.67
11.11

AGREGADO
MXIMO

CEMENTO
saco

ARENA
bote

GRAVA
bote

AGUA
bote

3/4"
1 1/2"
3/4"
1 1/2"

1
1
1
1

5.3
5.1
4.9
4.7

7.3
7.7
6.6
6.9

2.1
2.1
2.1
2.1

3/4"
1 1/2"
3/4"
1 1/2"

1
1
1
1

4.1
4.1
3.8
3.7

5.8
6.3
5.3
5.8

1.8
1.8
1.8
1.8

3/4"
1 1/2"
3/4"
1 1/2"

1
1
1
1

3.7
3.6
3.3
3.3

5.1
5.6
4.6
5.1

1.5
1.5
1.5
1.5

3/4"
1 1/2"
3/4"
1 1/2"

1
1
1
1

3.1
3.0
2.8
2.7

4.2
4.7
3.8
4.2

1.2
1.3
1.2
1.2

BOTES ALCOHOLEROS DE 18 lts

Usos
Muros y pisos
Trabes y dalas
Losas y zapatas
Columnas y techos
Alta resistencia

Resistencia (kg/cm2)
100

T.M.A
3/4"
1 1/2"
150
3/4"
1 1/2"
200
3/4"
1 1/2"
250
3/4"
1 1/2"
300
3/4"
1 1/2"
Proporciones para concreto
Revenimiento de 8 a 10 cm

Agua
2
2
1 3/4
1 2/3
1 1/2
1 1/2
1 1/3
1 1/3
1
1

Arena
5
5
4
4
3 1/2
3 1/2
2 1/2
3
2
2 1/2

Grava
6 1/2
8
5 1/2
7
5
6
4
5
3 1/2
4 1/2

Material
Cemento
Mortero Tolteca
Arena
Grava
Varilla 3/8"
Varilla 5/8"
Castillo 15x30-4
Malla electrosoldada 6x6-10/10
Metal desplegado plafon 500 C. 26

Unidad
Ton
Ton
m3
m3
pza
pza
pza
m2
kg
pza

Precio
Proveedor
1,495.83 Construrama
1,000.00 Construrama
Construrama
Construrama
60.87 Construrama
177.39 Construrama
129.85 Excavaciones y mat
16.22 Excavaciones y mat
45.06 Excavaciones y mat
255.91 Excavaciones y mat