PROYECTO: VIVIENDA MULTIFAMILIAR BARRIO 13 DE JUNIO

PROPIETARIO: MICHAEL CONTRERAS CONTRERAS


FECHA ELABORACION: SEPTIEMBRE 1 DE 2013
PRESUPUESTO DE OBRA
Item
1

Capitulo

Unidad

Cantidad

Vr. Unitario

Vr. Parcial

PRELIMINARES

1.1

Campamento

Un

1.3

Instalacion provisional de Energia

1.4

Instalacion Provisional de Agua

1.6
1.7

1.00

Gl
Gl

2,500,000

2.0

1.00

700,000

1.00

600,000

Trazado y replanteo

m2

312.00

1,600

Excavacin Manual

m3

350.00

17,000

SUB TOTAL PRELIMINARES

2,500,000
700,000
600,000

499,200

5,950,000

10,249,200

CIMENTACIONES

2.3

Concreto 4000 PSI de Zapata

M3

240.00

400,000

96,000,000.00

2.4

Refuerzo de zapata

Kg

4800.00

3,500

16,800,000.00

2.5

Concreto 4000 PSI de viga inferior de amarre (0,20*0,40)

M3

20.00

500,000

10,000,000.00

2.6

Refuerzo de viga inferior

Kg

422.00

3,500

1,477,000.00

250,000

2.9

30.80

40.00

45,000

M3

576.00

618,000

3.3

Refuerzo de Columnas

Kg

6422.00

3,500

22,477,000

3.4

Concreto 4000 PSI de viga estructurales


Refuerzo de viga estructurales

M3

556.00

618,000

343,608,000

2.1

Concreto solado

M3

Relleno en material seleccionado

M3

SUB TOTAL CIMENTACIONES


3

ESTRUCTURA

3.1

Concreto Columnas

3.5

3,500

7,700,000.00
1,800,000.00
133,777,000

355,968,000

6000.00

21,000,000

Concreto de placa 4000 PSI de Entrepisos aligerada

M3

248.00

450,000

111,600,000

Concreto de Escalera Entrepisos

M3

8.00

618,000

Refuerzo escalera

Kg

576.00

3,500

3.2

Kg

3.2
3.2

SUB TOTAL ESTRUCTURA

4,944,000

2,016,000

861,613,000

49,200,000

MAMPOSTERIA

4.1

Levante en Block No. 4 exterior

M2

1230.00

4.2

Levante en Block No. 4 interior

M2

1095.00

40,000

43,800,000

4.4

Dintel de vanos o en concreto para puertas y ventanas

Ml

326.40

38,999

12,729,274

Plantilla para pisos (e=0.05M)

M2

364.00

30,000

4.6

40,000

SUB TOTAL MAMPOSTERIA


5

10,920,000

116,649,274

28,470,000

PAETES (INCLUYE FILOS Y DILATACIONES)

5.1

Paete Interiores

5.2

Paete Exterior

M2

2190.00

13,000

M2

615.00

16,000

9,840,000

38,310,000

SUB TOTAL PAETES


6

INSTALACIONES HIDRAULICAS
SUB TOTAL HIDRAULICAS

INSTALACIONES SANITARIAS O AGUAS RESIDUALES

GL

SUB TOTAL SANITARIAS


10

INSTALACIONES DE GAS NATURAL

GL

INSTALACIONES ELECTRICAS
SUB TOTAL INSTALACIONES ELECTRICAS
ENCHAPES Y ACCESORIOS

22,000,000
22,000,000

20,000,000

20,000,000

SUB TOTAL INSTALACIONES DE GAS

11

12

$
$

30,000,000

30,000,000

GL

30,000,000
30,000,000

12.1

Enchape Baos Principales

M2

248.00

35,000

12.2

Enchape de Cocinas

M2

162.00

35,000

5,670,000
33,950,000

12.4

Suministro e instalacion de Meson de cocina

Ml

97.00

350,000

12.11
12.12
12.13
12.14

Suministro e instalacion de Sanitario


Lavamano de sobreponer
Griferia de lavamano y ducha
Llave de Ducha

Un
Un
Un
Un

16.00
16.00
32.00
27.00

$
$
$
$

375,000
15,000
145,000
130,922

$
$
$
$

12.15

Lavaderos 60x60

Un

16.00

303,600

Lavaplato + griferia + canastilla

Un

16.00

25,000

12.17

SUB TOTAL DE ENCHAPES


13

PISOS Y ACABADOS

13.2

Suministro e instalacion de piso en porcelanato

M2

1064.00
800.00

65,000

24,508

6,000,000
240,000
4,640,000
3,534,894
4,857,600
400,000
67,972,494

69,160,000

13.3

Suministro e instlacion de zocalo en Porcelanato

13.4

Piso en ceramica de baos ppales

M2

109.00

35,000

3,815,000

Cielo raso en yeso carton draywall

M2

817.00

23,500

19,199,500

111,780,812

13.7

Ml

8,680,000

$
$

SUB TOTAL PISOS Y ACABADOS


14

PINTURA

14.1

Estuco de paredes

M2

6500.00

Pintura paredes interiores en viniltex de pintuco


Pintura de exteriores sobre estucos

M2

4600.00

M2

615.00

7,000

Un

32.00

359,600

14.3
14.5

CARPINTERIA DE MADERA
Suministro e instalacion de puerta para Alcobas

19,606,312

3,200

20,800,000

4,500

20,700,000

SUB TOTAL PINTURA


15
15.1

4,305,000

45,805,000

11,507,200

15.2

Suminstro e instalacion de puertas de baos

Un

16.00

258,002

4,128,032

15.3

M2

90.00

350,000

31,500,000

15.6

Suminstro e instalacion de closet


Mueble superior de cocina en madera natural de cedro e
interiores en madecor
Suministro e instalacion de Puerta Principal apto

16

CARPINTERIA METALICA

15.4

Ml

76.00

350,000

26,600,000

Un

16.00

695,000

11,120,000

84,855,232

SUB TOTAL CARPINTERIA DE MADERA

16.1

Suministro inslacion de ventana de aluminio

m2

212.00

180,000

38,160,000

16.3

Pasamano de la escalera

Ml

87.00

200,000

17,400,000

Puerta de acceso principal al edificio

Un

16.4
16.6

Baranda de balcones

1.00

1,400,000

Ml

58.00

180,000

M2

364.00

16,000

M2

60.00

250,000

SUB TOTAL CARPINTERIA METALICA


17

IMPERMEABILIZACIONES

17.3

Impermeabilizacion con sika mortero 101 para placa


SUB TOTAL IMPERMEABILIZACIONES

18

1,400,000

10,440,000

67,400,000

5,824,000

5,824,000

VIDRIOS Y ESPEJOS

18.3

Divisiones de bao en vidrio templado 8mm


SUB TOTAL VIDRIOS Y ESPEJOS

20

CERRADURAS Y HERRAJES

20.1

Suministro e instalacion de cerradura de puerta acceso edificio

20.2

Un

1.00

330,000

15,000,000

15,000,000

330,000
5,280,000

Suministro e instalacion de Cerradura de puerta ppal de aptos

Un

16.00

330,000

20.3

Suministro e instalaicon de Cerraduras de Puerta de baos

Un

16.00

35,500

20.4

Cerradura puertas de alcobas


SUB TOTAL DE OBRAS EXTERIORES

Un

32.00

40,000

568,000

1,280,000

7,458,000

22

ASEO Y LIMPIEZA

22.1

Limpieza General

Gl

1.00

3,000,000

3,000,000

Retiro de sobrantes

M2

436.00

16,000

6,976,000

22.2

$
SUB TOTAL ASEO Y LIMPIEZA
COSTOS DIRECTOS
A.I.U. 25%

25%

COSTO TOTAL

9,976,000

1,678,670,012

419,667,503

2,098,337,515

PRESUPUESTO DE COSTO INDIRECTO


Captulos del Presupuesto

TOTAL

PROYECTO ARQUITECTNICO

8,000,000

DISEO ESTRUCTURAL

7,000,000

DISEO ELECTRICO

6,000,000

DISEO HIDROSANITARIO Y GAS

6,000,000

PRESUPUESTO Y PROGRAMACIN

4,500,000

ESCRITURA DE REGLAMENTO Y REGISTRO

4,600,000

ASIGNACIN REF. CATASTRALES CODAZZI

1,400,000

SECRETARIA

9,600,000

CONTABILIDAD Y AUDITORIA CONTABLE

13,000,000

ARRIENDO OFICINA CON SERV. PUBLICOS

2,400,000

GASTOS DE REGISTRO

5,000,000

PUBLICIDAD Y PROMOCIN

15,000,000

LICENCIA CURADURA URBANA

8,000,000

IMPUESTO DE VALORIZACIN

40,000,000

ARRIENDO PAPELERA Y UTILES DE OFICINA

7,000,000

TOTAL

137,500,000

2,235,837,515

DATOS ADICIONALES DEL PROYECTO


Construccin de 4 pisos 16 Apartamentos
Cuadro de reas

No.

Area

Total

Apartamento

16

91.00

1456

Total area vendible

1456

Zonas comunes y escaleras

96

Total rea construida

1552

Se programa la obra para 12 meses de construccin y 2 adicionales para comercializacin

Fijar el precio de venta al pblico, equivalente al 25% de los costos totales

El valor del lote se establece en $100 millones y se aporta con los estudios y publicidad

Descontar la comisin de venta del 2,5%

Proyectar la correccin monetaria a la tasa del 6,52% anual, con un valor inicial de 176,75

Calcular los intereses a la tasa del 16% anual trimestre anticipado.

El proyecto se construye en el sector de junio.

Elaborar la evaluacin correspondiente.

PROGRAMACION Y FLUJO DE CAJA


COSTOS DIRECTOS

Mes 1
VALOR TOTAL

PRELIMINARES
CIMENTACIONES
ESTRUCTURA
MAMPOSTERIA
PAETES Y FILOS
INSTALACIONES HIDRAULICAS
INSTALACIONES SANITARIAS O AGUAS
INSTALACIONES DE GAS NATURAL
INSTALACIONES ELECTRICAS
ENCHAPES Y ACCESORIOS
PISOS Y ACABADOS
PINTURA
CARPINTERIA DE MADERA
CARPINTERIA METALICA
IMPERMEABILIZACIONES
VIDRIOS Y ESPEJOS
INSTALACIONES ELECTROMECANICAS
CERRADURAS Y HERRAJES
OBRAS EXTERIORES
ASEO Y LIMPIEZA

Mes 2

Mes 3

DICIEMBRE

Mes 4

Mes 5

168,219,685

29,162,319

54,254,005

287,204,339

Mes 9

Mes 10

JULIO
-

65,129,179

$
$
$

22,357,778

21,283,333

OCTUBRE
$

TOTAL
$

133,776,999
861,613,018

116,649,276

12,333,334

7,666,667

6,500,000

23,500,001

5,200,000

24,800,001

67,972,494

62,937,495

111,780,812

5,035,000

79,488,580

10,687,834

45,805,000

84,855,232

26,719,584

8,397,584

82,969,560

1,885,672

65,902,222

1,497,778

7,458,000

$
$
$

13,222,022

52,024,389

54,254,005

151,716,276

278,998,501

$
$

287,204,339

208,382,004

$
$

100,162,513

168,369,275

$
$

127,238,080

$
$

207,883,602

22,000,001
20,000,001
30,000,001
30,000,001
67,972,494

$
$

9,976,000

38,310,000

111,780,816

1,678,670,012

$
$
$

15,000,000

5,824,000

15,000,000

32,292,236

5,824,000

67,400,000

$
$

10,249,200

$
$

Mes 12

SEPTIEMBRE
-

17,026,667

11,000,000

Mes 11

AGOSTO
-

$
$

11,000,000

$
$

$
$

$
$

20,000,000
30,000,000

278,998,501

$
$

30,000,000

Mes 8

JUNIO

Mes 7

127,190,493

52,024,389

MAYO

$
$

Mes 6

24,525,783

ABRIL

MARZO

2,972,822

38,310,000

FEBRERO

$
$

116,649,274
22,000,000

ENERO

10,249,200

133,777,000
861,613,000

$
$
$

10,249,200

NOVIEMBRE
$

$
$

7,458,000

45,805,001
84,855,232
67,400,000
5,824,000
15,000,000

$
$

7,458,000

9,976,000

9,976,000

29,215,033

1,678,670,040

AUI

419,667,503

3,305,506

13,006,097

13,563,501

37,929,069

69,749,625

71,801,085

52,095,501

25,040,628

42,092,319

31,809,520

51,970,900

7,303,758

419,667,510

Total COSTO DIRECTO

2,098,337,515

16,527,528

65,030,486

67,817,507

189,645,346

348,748,126

359,005,424

260,477,505

125,203,142

210,461,593

159,047,600

259,854,502

36,518,791

2,098,337,549

Mes 1
COSTOS INDIRECTOS

VALOR TOTAL

Mes 2

NOVIEMBRE

Mes 3

DICIEMBRE

Mes 4

ENERO

Mes 5

FEBRERO

Mes 6

MARZO

Mes 7

ABRIL

Mes 8

MAYO

Mes 9

JUNIO

Mes 10

JULIO

Mes 11

AGOSTO

Mes 12

SEPTIEMBRE

Mes 13

OCTUBRE

Duracion Total: 14 Meses

Mes 14

NOVIEMBRE

8,000,000

1,896,296

2,074,074

2,162,963

1,866,667

7,000,000

1,659,259

1,814,815

1,892,593

1,633,333

DISEO ELECTRICO

6,000,000

1,422,222

1,555,556

1,622,222

1,400,000

DISEO HIDROSANITARIO Y GAS

6,000,000

1,422,222

1,555,556

1,622,222

1,400,000

PRESUPUESTO Y PROGRAMACIN

4,500,000

1,750,000

1,025,000

25,556

1,737,778

1,788,889

1,047,778

7,778

528,889

544,444

318,889

9,600,000

13,000,000

ARRIENDO OFICINA CON SERV. PUBLICOS

2,400,000

928,571

171,429

GASTOS DE REGISTRO

5,000,000

PUBLICIDAD Y PROMOCIN

15,000,000

2,500,000
8,000,000

LICENCIA CURADURA URBANA

8,000,000

IMPUESTO DE VALORIZACIN

40,000,000

ARRIENDO PAPELERA Y UTILES DE OFICINA

928,571

171,429

5,583,333

1,700,000

$
$

4,600,000
1,400,000

25,000

$
$

SECRETARIA

ESCRITURA DE REGLAMENTO Y REGISTRO


ASIGNACIN REF. CATASTRALES CODAZZI
CONTABILIDAD Y AUDITORIA CONTABLE

928,571

171,429

53,333

3,626,667

3,733,333

2,186,667

928,571

928,571

928,571

928,571

171,429

6,083,333

833,333

171,429

833,333

171,429
-

171,429
-

928,571

171,429

1,861,111

928,571

171,429

2,027,778

928,571

171,429

277,778

12,888,889

928,571

171,429

$
$
$

928,571
171,429

$
$
$

928,571
171,429

$
$

928,571
171,429

$
$

15,555,556

$
$

11,555,556

Total

DICIEMBRE

PROYECTO ARQUITECTNICO
DISEO ESTRUCTURAL

7,000,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

137,500,000.00

18,500,000.13

14,183,333.46

14,983,333.47

8,845,000.14

9,193,333.30

9,416,666.63

7,011,666.65

3,461,111.10

3,627,777.77

14,766,666.62

17,155,555.50

13,155,555.51

1,600,000.00

1,600,000.00

8,000,000

7,000,000

6,000,000

6,000,000

4,500,000

4,600,000

1,400,000

9,600,000

13,000,000

2,400,000

5,000,000

15,000,000

8,000,000

40,000,000

7,000,000

137,500,000.28

Entidad financiera del credito


AV Villas
UVR + 13,91% efectivo anual

Pesos Colombianos por UVR

El banco financia los costos directos segn el avance de la obra.

Fecha
10/15/2013

Fecha programada de inicio de Obra: 01 de Noviembre de 2013


Variacin mensual IPC Agosto de 2013 :

0.08%

Variacin mensual IPC Agosto de 2013 :

2.66564E-05

mensual

208.0137
209.0145

11/1/2013

diario

Aporte de los socios


LOTE

$ 100,000,000

PROYECTO ARQUITECTNICO

$ 8,000,000

DISEO ESTRUCTURAL

$ 7,000,000

DISEO ELECTRICO

$ 6,000,000

DISEO HIDROSANITARIO Y GAS

$ 6,000,000

PRESUPUESTO Y PROGRAMACIN

$ 4,500,000

Duracion Total del proyecto: 14 Meses

$ 131,500,000

Tasa
Pago de intereses - Banco Av Villas

13.91%

Mes 1

Periodo
Desemboloso - Bancario

NOVIEMBRE
$ 16,527,528

Pago de intereses
$ 9,326,267
de DICIEMBRE
$ - Mes 2

$ 8,620,629

Pago de intereses
$ 0 de NOVIEMBRE
$ - Mes 13

Pago de intereses
$ 0 de DICIEMBRE
$ - Mes 14

186,023,587.04

Mes 1

NOVIEMBRE

Mes 2

DICIEMBRE

546,986.53

$
$

Fecha

11/1/2013

Valor de la UVR inicial

$ 209.0145

Desembolso

Valor de la UVR

$
$

16,527,528

2,152,215.38

$
$

$
$

No. De UVR

$ 209.0145

65,030,486

2,244,453.18

$
$

67,817,507

$ 209.3491

189,645,346

$ 209.5166

MARZO

348,748,126

$ 209.6842

1663206.6986

$ 351,267,163

ABRIL

359,005,424

$ 209.8519

1710755.9379

$ 361,309,503

$ 210.0198

323944.6072

$ 68,416,694

905156.8184

$ 191,167,982

Mes 7

MAYO

Mes 8

JUNIO

125,203,142

$ 210.1878

595672.6757

$ 125,805,320

Mes 9

JULIO

210,461,593

$ 210.3560

1000502.1113

$ 211,304,788

1240252.1018

10

Mes 10

AGOSTO

159,047,600

$ 210.5243

755483.4906

$ 159,557,163

Mes 11

SEPTIEMBRE

259,854,502

$ 210.6927

1233334.2938

$ 260,478,652

Mes 12

OCTUBRE

Mes 13

NOVIEMBRE

DICIEMBRE

36,518,791

$ 210.8612

$ 211.0299

$ 211.1987

$ 2,098,337,549

$ 211.1987

$
$
$
$

14,125,911.34

15,444,019.96

$
$
$

$ 8,620,629
-

$ 5,263,757
$
$
$
$

173188.7439

$ 3,598,157,472

$
$
$

Jan-13
Feb-13
Mar-13
Apr-13
May-13
Jun-13
Jul-13

$0
$0
$ 2,110,181,967

$ 11,844,418

Precio de venta al pblico:

42.01%

de los costos totales

$ 107,944,724

VENTAS NETAS

$
$

$ 8,600,010

20,707,777.20

$
$
$

$ 5,747,086
-

$ 3,509,171

$
$
$
$

COSTOS DIRECTOS

$ 224,884,842

Precio por apartamento

$ 2,471,262

Precio por m2

$ 2,098,337,515

$ 158,356,595

Costo por apartamento

$ 1,740,182

Costo por m2

$ 137,500,000

$ 66,528,247

CORRECCION MONETARIA

$ 11,844,418

Precio promedio por m2

$ 100,000,000

Bolivar - Cartagena - Estrato 4

Vivienda
VIS

% VIS

No VIS

% No VIS

0
0
68,904
4,661
59
410
576

0.00%
0.00%
72.54%
9.59%
0.05%
1.03%
1.14%

2,029
8,313
16,582
20,972
4,358
30,820
30,207

1.15%
16.58%
17.46%
43.14%
4.04%
77.43%
59.71%

74610.00

13.12%

113281.00

19.91%

Precio de venta por m2


Bolivar - Cartagena - Estrato 4

$ 621,729,698

Porcentaje de venta

0.11

ESTADO DE FLUJO DE FONDOS

No. De proyectos

$ 180,000,000

19

$ 2,471,262
$0

0.09

Mes 1

0.11

Mes 2

NOVIEMBRE

Rango de precios
$ 270,000,000

$ 956,507,228
$ 334,777,530

UTILIDAD NETA

FUENTES

$ 2,471,262

$ 2,533,705,519

UTILIDAD ANTES DE IMPUSTOS


IMPUESTOS 35%

APORTE DE SOCIOS

0.12

Mes 3

DICIEMBRE

0.06

Mes 4

ENERO

0.06

Mes 5

FEBRERO

0.06

Mes 6

MARZO

0.06

Mes 7

ABRIL

0.06

Mes 8

MAYO

0.06

Mes 9

JUNIO

0.06

Mes 10

JULIO

0.06

Mes 11

AGOSTO

0.06

Mes 12

SEPTIEMBRE

0.01

Mes 13

OCTUBRE

Mes 14

NOVIEMBRE

DICIEMBRE

$ 131,500,000

CREDITO BANCARIO

$ 2,098,337,515

VENTAS

395,797,321.92

323,834,172.48

395,797,321.92

431,778,896.64

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

$ 223,085,763.26

43,177,889.66

TOTAL FUENTES

2,625,634,836.42

323,834,172.48

395,797,321.92

431,778,896.64

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

$ 223,085,763.26

43,177,889.66

LOTE

100,000,000

INTERESES

2,152,215

2,244,453

6,823,391

13,694,203

14,125,911

15,444,020

17,837,862

21,091,240

20,707,777

26,437,872

22,299,847

USOS

CORRECCION

546,987

COSTOS DIRECTO

COSTOS INDIRECTO

RETIRO DE LOS SOCIOS

COMISIONES

IMPUESTOS

$
$

$
$

16,527,528

65,030,486

67,817,507

18,500,000

14,183,333

14,983,333

11,873,920

CANCELACION DEL CREDITO


TOTAL USOS

147,448,434

$
$
$
$
$

9,715,025
91,081,060

$
$

11,873,920

$
$

96,919,213

8,845,000

12,953,367

$
$

189,645,346

$
$

218,267,104

$
$
$
$
$

348,748,126

9,193,333

6,692,573
378,328,236

$
$
$
$
$

359,005,424

9,416,667

6,692,573
389,240,575

$
$
$
$
$

260,477,505

7,011,667

6,692,573
289,625,764

$
$
$
$
$

125,203,142

3,461,111

6,692,573
153,194,688

$
$
$
$
$

210,461,593

3,627,778

6,692,573
241,873,184

$
$
$
$
$

159,047,600

14,766,667

6,692,573
201,214,616

$
$
$
$
$

259,854,502

36,518,791

17,155,556

13,155,556

6,692,573
310,140,503

$
$
$
$
$

6,692,573
78,666,767

$
$
$

13,805,185
5,922,209
1,600,000
6,692,573
-

2,478,186,402

232,753,113

298,878,109

213,511,793

(155,242,473)

(166,154,812)

(66,540,001)

69,891,076

(18,787,420)

21,871,147

(87,054,739)

144,418,997

(854,102,961)

2,478,186,402

2,710,939,515

3,009,817,624

3,223,329,417

3,068,086,944

2,901,932,132

2,835,392,131

2,905,283,207

2,886,495,787

2,908,366,934

2,821,312,194

2,965,731,191

2,111,628,231

Utilidad

621,729,698
$

(753,229,734)

Mes 1
Mes 2

131,500,000

(131,500,000)

TIR

$0

TMAR

Mes 3

$0

VPN

Mes 4

$0

Mes 5

$0

Mes 6

$0

Mes 7

$0

Mes 8

$0

Mes 9

$0

Mes 10

$0

Mes 11

$0

Mes 12

$0

Mes 13

$0

Mes 14

$ 753,229,698

14.37%
4.73%
$

413,050,440

-$ 544,550,440

8,812,624
5,922,209
1,600,000
753,229,698
1,295,337
334,777,530
1,049,168,757
2,154,806,155

753,229,698

$
$
$

$
$

1,049,168,757
1,077,188,724

SALDO INICIAL DE CAJA

$
$
$

$
$

SALDO FINAL DE CAJA

Inversion

8,812,624.09

176,779
50,134
94,990
48,619
107,939
39,802
50,593

Valor de las viviendas nuevas en cartagena

$ 2,533,705,519

568856.00

$ 731,080

$ 186,023,587

LOTE

$
$
$

COSTO FINANCIERO
INTERESES

$ 2,866,670

13,805,184.80

$ 3,490,212,748

COSTOS INDIRECTOS

$ 1,381,220

$
$

$ 3,847,329

22,299,846.63

$ 717,405

$
$

DICIEMBRE
$

364,657.68

$ 4,184,270
$
$

$ 6,965,328

$ 1,208,607

26,437,872.26

$
$

Total rea

$ 36,577,245

0.0000
0.0000
9991451.3838

COSTO TOTAL DE PROYECTO


TOTAL VENTAS
COMISIONES (3%)

Mes 14

NOVIEMBRE
$

$ 2,244,453

$ 11,881,458

$ 4,143,659
$

21,091,239.56

$
$

$
$

17,837,861.84

$ 6,965,328

Mes 13

$ 36,518,791
$

$ 11,541,988

$ 261,939,684

11

Mes 14

$
$

Mes 12

$ 2,152,215

$
$

OCTUBRE

$ 259,854,502
$

$ 6,276,404

$
$

$ 65,657,533

ENERO
FEBRERO

Mes 5
Mes 6

260,477,505

13,694,203.31

546,986.53

$
$

$
-

Mes 11
SEPTIEMBRE

$ 159,047,600
$

$ 11,881,458

$ 16,700,242

310880.3206

Mes 3
Mes 4

$ 4,143,659

$ 2,244,453

$
$

Mes 10
AGOSTO

$ 210,461,593
$

$ 11,541,988

Valor de la UVR final

79073.5841

$ 209.1817

6,823,390.96

12

$ 2,152,215

$
$

JULIO

$ 125,203,142
$

$
$

13

546,986.53

$ 6,276,404

$ 11,881,458

Pago de intereses
$ 9,668,537
de JUNIO - Mes
$ 8

Correccion monetaria

14

$
$

Mes 9

JUNIO

$ 260,477,505
$

$ 2,244,453

Pago de intereses
$ 13,930,656
de JULIO - Mes
$ 9

$
$

Mes 8

MAYO

$ 359,005,424
$

$ 11,541,988

Mes 7

ABRIL
-

$ 2,152,215
$
$

$
$

$ 6,276,404

Mes 6

$ 348,748,126

546,986.53

$
$

$
$

Pago de intereses
$ 1,208,607
de OCTUBRE
$ - Mes 12

efectivo Trimestral

MARZO

$ 189,645,346

$ 2,244,453

Pago de intereses
$ 8,772,929
de AGOSTO $- Mes 10

$
$

Mes 5

FEBRERO

$ 67,817,507
-

$ 2,152,215
$
$

3.31%

Mes 4

ENERO

$ 65,030,486

Pago de intereses
$ 38,473,293
de MARZO - $Mes 5
Pago de intereses
$ 35,644,374
de ABRIL - Mes
$ 6

Pago de intereses
$ 11,466,681
de SEPTIEMBRE
$
- Mes 11

Tasa

Mes 3

DICIEMBRE
$

Pago de intereses
$ 8,977,813
de ENERO - $Mes 3
Pago de intereses
$ 23,013,483
de FEBRERO
$ - Mes 4

Pago de intereses
$ 22,988,344
de MAYO - Mes
$ 7

efectivo anual

Mes 2

VALOR TOTAL
$ 2,098,337,549

Pago de intereses
$ 2,552,604
de NOVIEMBRE
$ - Mes546,986.53
1

$ (2,111,628,266)
$

(35)

Proyecto
Edificio
Cuadro 1. Cuadro de areas
1. Informacion general
Localizacion:
Numero de Pisos:
4
Usos:
Vivienda multifamiliar
Duracion de la Construccion:
9 meses
2
2. Lote
400 m
3. Cuadro de areas construidas
Area vendible
Descripcion
Numero de viviendas
101
1
102
1
103
1
104
1
201
1
202
1
203
1
204
1
301
1
302
1
303
1
304
1
401
1
402
1
403
1
404
1
Total vivienda
16
Deposito

PROYECTO

EDIFICIO

Duracion del proyecto (preoperativos, finalizacion flujo d

Area construida (m 2)
91
91
91
91
91
91
91
91
91
91
91
91
91
91
91
91
1456

rativos, finalizacion flujo de caja, etc)

11 meses

PROYECTO: VIVIENDA MULTIFAMILIAR BARRIO 13 DE JUNIO


FECHA ELABORACION: SEPTIEMBRE 1 DE 2013
PRESUPUESTO DE OBRA
Item
1

Capitulo

Unidad

Cantidad

Vr. Unitario

Vr. Parcial

PRELIMINARES

1.1

Campamento

Un

1.3

Instalacion provisional de Energia

1.4

Instalacion Provisional de Agua

1.6
1.7

1.00

Gl
Gl

2,500,000

2.0

1.00

700,000

1.00

600,000

Trazado y replanteo

m2

312.00

1,600

Excavacin Manual

m3

350.00

17,000

SUB TOTAL PRELIMINARES

2,500,000
700,000
600,000

499,200

5,950,000

10,249,200

CIMENTACIONES

2.3

Concreto 4000 PSI de Zapata

M3

240.00

400,000

96,000,000.00

2.4

Refuerzo de zapata

Kg

4800.00

3,500

16,800,000.00

2.5

Concreto 4000 PSI de viga inferior de amarre (0,20*0,40)

M3

20.00

500,000

10,000,000.00

2.6

Refuerzo de viga inferior

Kg

422.00

3,500

1,477,000.00

250,000

2.9

30.80

40.00

45,000

M3

576.00

618,000

3.3

Refuerzo de Columnas

Kg

6422.00

3,500

22,477,000

3.4

Concreto 4000 PSI de viga estructurales


Refuerzo de viga estructurales

M3

556.00

618,000

343,608,000

2.1

Concreto solado

M3

Relleno en material seleccionado

M3

SUB TOTAL CIMENTACIONES


3

ESTRUCTURA

3.1

Concreto Columnas

3.5

3,500

7,700,000.00
1,800,000.00
133,777,000

355,968,000

6000.00

21,000,000

Concreto de placa 4000 PSI de Entrepisos aligerada

M3

248.00

450,000

111,600,000

Concreto de Escalera Entrepisos

M3

8.00

618,000

Refuerzo escalera

Kg

576.00

3,500

3.2

Kg

3.2
3.2

SUB TOTAL ESTRUCTURA

4,944,000

2,016,000

861,613,000

49,200,000

MAMPOSTERIA

4.1

Levante en Block No. 4 exterior

M2

1230.00

4.2

Levante en Block No. 4 interior

M2

1095.00

40,000

43,800,000

4.4

Dintel de vanos o en concreto para puertas y ventanas

Ml

326.40

38,999

12,729,274

Plantilla para pisos (e=0.05M)

M2

364.00

30,000

4.6

40,000

SUB TOTAL MAMPOSTERIA


5

10,920,000

116,649,274

28,470,000

PAETES (INCLUYE FILOS Y DILATACIONES)

5.1

Paete Interiores

5.2

Paete Exterior

M2

2190.00

13,000

M2

615.00

16,000

9,840,000

38,310,000

SUB TOTAL PAETES


6

INSTALACIONES HIDRAULICAS
SUB TOTAL HIDRAULICAS

INSTALACIONES SANITARIAS O AGUAS RESIDUALES

GL

SUB TOTAL SANITARIAS


10

INSTALACIONES DE GAS NATURAL

GL

INSTALACIONES ELECTRICAS
SUB TOTAL INSTALACIONES ELECTRICAS
ENCHAPES Y ACCESORIOS

22,000,000
22,000,000

20,000,000

20,000,000

SUB TOTAL INSTALACIONES DE GAS

11

12

$
$

30,000,000

30,000,000

GL

30,000,000
30,000,000

12.1

Enchape Baos Principales

M2

248.00

35,000

12.2

Enchape de Cocinas

M2

162.00

35,000

5,670,000
33,950,000

12.4

Suministro e instalacion de Meson de cocina

Ml

97.00

350,000

12.11
12.12
12.13
12.14

Suministro e instalacion de Sanitario


Lavamano de sobreponer
Griferia de lavamano y ducha
Llave de Ducha

Un
Un
Un
Un

16.00
16.00
32.00
27.00

$
$
$
$

375,000
15,000
145,000
130,922

$
$
$
$

12.15

Lavaderos 60x60

Un

16.00

303,600

Lavaplato + griferia + canastilla

Un

16.00

25,000

12.17

SUB TOTAL DE ENCHAPES


13

PISOS Y ACABADOS

13.2

Suministro e instalacion de piso en porcelanato

M2

1064.00
800.00

65,000

24,508

6,000,000
240,000
4,640,000
3,534,894
4,857,600
400,000
67,972,494

69,160,000

13.3

Suministro e instlacion de zocalo en Porcelanato

13.4

Piso en ceramica de baos ppales

M2

109.00

35,000

3,815,000

Cielo raso en yeso carton draywall

M2

817.00

23,500

19,199,500

111,780,812

13.7

Ml

8,680,000

$
$

SUB TOTAL PISOS Y ACABADOS


14

PINTURA

14.1

Estuco de paredes

M2

6500.00

Pintura paredes interiores en viniltex de pintuco


Pintura de exteriores sobre estucos

M2

4600.00

M2

615.00

7,000

Un

32.00

359,600

14.3
14.5

CARPINTERIA DE MADERA
Suministro e instalacion de puerta para Alcobas

19,606,312

3,200

20,800,000

4,500

20,700,000

SUB TOTAL PINTURA


15
15.1

4,305,000

45,805,000

11,507,200

15.2

Suminstro e instalacion de puertas de baos

Un

16.00

258,002

4,128,032

15.3

M2

90.00

350,000

31,500,000

15.6

Suminstro e instalacion de closet


Mueble superior de cocina en madera natural de cedro e
interiores en madecor
Suministro e instalacion de Puerta Principal apto

16

CARPINTERIA METALICA

15.4

Ml

76.00

350,000

26,600,000

Un

16.00

695,000

11,120,000

84,855,232

SUB TOTAL CARPINTERIA DE MADERA

16.1

Suministro inslacion de ventana de aluminio

m2

212.00

180,000

38,160,000

16.3

Pasamano de la escalera

Ml

87.00

200,000

17,400,000

Puerta de acceso principal al edificio

Un

16.4
16.6

Baranda de balcones

1.00

1,400,000

Ml

58.00

180,000

M2

364.00

16,000

M2

60.00

250,000

SUB TOTAL CARPINTERIA METALICA


17

IMPERMEABILIZACIONES

17.3

Impermeabilizacion con sika mortero 101 para placa


SUB TOTAL IMPERMEABILIZACIONES

18

1,400,000

10,440,000

67,400,000

5,824,000

5,824,000

VIDRIOS Y ESPEJOS

18.3

Divisiones de bao en vidrio templado 8mm


SUB TOTAL VIDRIOS Y ESPEJOS

20

CERRADURAS Y HERRAJES

20.1

Suministro e instalacion de cerradura de puerta acceso edificio

20.2

Un

1.00

330,000

15,000,000

15,000,000

330,000
5,280,000

Suministro e instalacion de Cerradura de puerta ppal de aptos

Un

16.00

330,000

20.3

Suministro e instalaicon de Cerraduras de Puerta de baos

Un

16.00

35,500

20.4

Cerradura puertas de alcobas


SUB TOTAL DE OBRAS EXTERIORES

Un

32.00

40,000

568,000

1,280,000

7,458,000

22

ASEO Y LIMPIEZA

22.1

Limpieza General

Gl

1.00

3,000,000

3,000,000

Retiro de sobrantes

M2

436.00

16,000

6,976,000

22.2

$
SUB TOTAL ASEO Y LIMPIEZA
COSTOS DIRECTOS
A.I.U. 25%

25%

COSTO TOTAL

9,976,000

1,678,670,012

419,667,503

2,098,337,515

2,235,837,515

PRESUPUESTO DE COSTO INDIRECTO


Captulos del Presupuesto

TOTAL

PROYECTO ARQUITECTNICO

8,000,000

DISEO ESTRUCTURAL

7,000,000

DISEO ELECTRICO

6,000,000

DISEO HIDROSANITARIO Y GAS

6,000,000

PRESUPUESTO Y PROGRAMACIN

4,500,000

ESCRITURA DE REGLAMENTO Y REGISTRO

4,600,000

ASIGNACIN REF. CATASTRALES CODAZZI

1,400,000

SECRETARIA

9,600,000

CONTABILIDAD Y AUDITORIA CONTABLE

13,000,000

ARRIENDO OFICINA CON SERV. PUBLICOS

2,400,000

GASTOS DE REGISTRO

5,000,000

PUBLICIDAD Y PROMOCIN

15,000,000

LICENCIA CURADURA URBANA

8,000,000

IMPUESTO DE VALORIZACIN

40,000,000

ARRIENDO PAPELERA Y UTILES DE OFICINA

7,000,000

TOTAL

137,500,000

DATOS ADICIONALES DEL PROYECTO


Construccin de 4 pisos 16 Apartamentos
Cuadro de reas

No.

Area

Total

Apartamento

16

91.00

1456

Total area vendible

1456

Zonas comunes y escaleras

96

Total rea construida

1552

Se programa la obra para 12 meses de construccin y 2 adicionales para comercializacin

Fijar el precio de venta al pblico, equivalente al 25% de los costos totales

El valor del lote se establece en $100 millones y se aporta con los estudios y publicidad

Descontar la comisin de venta del 2,5%

Proyectar la correccin monetaria a la tasa del 6,52% anual, con un valor inicial de 176,75

Calcular los intereses a la tasa del 16% anual trimestre anticipado.

El proyecto se construye en el sector de junio.

Elaborar la evaluacin correspondiente.

PROGRAMACION Y FLUJO DE CAJA


COSTOS DIRECTOS

Mes 1
VALOR TOTAL

PRELIMINARES
CIMENTACIONES
ESTRUCTURA
MAMPOSTERIA
PAETES Y FILOS
INSTALACIONES HIDRAULICAS
INSTALACIONES SANITARIAS O AGUAS
INSTALACIONES DE GAS NATURAL
INSTALACIONES ELECTRICAS
ENCHAPES Y ACCESORIOS
PISOS Y ACABADOS
PINTURA
CARPINTERIA DE MADERA
CARPINTERIA METALICA
IMPERMEABILIZACIONES
VIDRIOS Y ESPEJOS
INSTALACIONES ELECTROMECANICAS
CERRADURAS Y HERRAJES
OBRAS EXTERIORES
ASEO Y LIMPIEZA

Mes 2

Mes 3

DICIEMBRE

Mes 4

Mes 5

168,219,685

29,162,319

54,254,005

287,204,339

Mes 9

Mes 10

JULIO
-

65,129,179

$
$
$

22,357,778

21,283,333

OCTUBRE
$

TOTAL
$

133,776,999
861,613,018

116,649,276

12,333,334

7,666,667

6,500,000

23,500,001

5,200,000

24,800,001

67,972,494

62,937,495

111,780,812

5,035,000

79,488,580

10,687,834

45,805,000

84,855,232

26,719,584

8,397,584

82,969,560

1,885,672

65,902,222

1,497,778

7,458,000

$
$
$

13,222,022

52,024,389

54,254,005

151,716,276

278,998,501

$
$

287,204,339

208,382,004

$
$

100,162,513

168,369,275

$
$

127,238,080

$
$

207,883,602

22,000,001
20,000,001
30,000,001
30,000,001
67,972,494

$
$

9,976,000

38,310,000

111,780,816

1,678,670,012

$
$
$

15,000,000

5,824,000

15,000,000

32,292,236

5,824,000

67,400,000

$
$

10,249,200

$
$

Mes 12

SEPTIEMBRE
-

17,026,667

11,000,000

Mes 11

AGOSTO
-

$
$

11,000,000

$
$

$
$

$
$

20,000,000
30,000,000

278,998,501

$
$

30,000,000

Mes 8

JUNIO

Mes 7

127,190,493

52,024,389

MAYO

$
$

Mes 6

24,525,783

ABRIL

MARZO

2,972,822

38,310,000

FEBRERO

$
$

116,649,274
22,000,000

ENERO

10,249,200

133,777,000
861,613,000

$
$
$

10,249,200

NOVIEMBRE
$

$
$

7,458,000

45,805,001
84,855,232
67,400,000
5,824,000
15,000,000

$
$

7,458,000

9,976,000

9,976,000

29,215,033

1,678,670,040

AUI

419,667,503

3,305,506

13,006,097

13,563,501

37,929,069

69,749,625

71,801,085

52,095,501

25,040,628

42,092,319

31,809,520

51,970,900

7,303,758

419,667,510

Total COSTO DIRECTO

2,098,337,515

16,527,528

65,030,486

67,817,507

189,645,346

348,748,126

359,005,424

260,477,505

125,203,142

210,461,593

159,047,600

259,854,502

36,518,791

2,098,337,549

Mes 1
COSTOS INDIRECTOS

VALOR TOTAL

Mes 2

NOVIEMBRE

Mes 3

DICIEMBRE

Mes 4

ENERO

Mes 5

FEBRERO

Mes 6

MARZO

Mes 7

ABRIL

Mes 8

MAYO

Mes 9

JUNIO

Mes 10

JULIO

Mes 11

AGOSTO

Mes 12

SEPTIEMBRE

Mes 13

OCTUBRE

Duracion Total: 14 Meses

Mes 14

NOVIEMBRE

8,000,000

1,896,296

2,074,074

2,162,963

1,866,667

7,000,000

1,659,259

1,814,815

1,892,593

1,633,333

DISEO ELECTRICO

6,000,000

1,422,222

1,555,556

1,622,222

1,400,000

DISEO HIDROSANITARIO Y GAS

6,000,000

1,422,222

1,555,556

1,622,222

1,400,000

PRESUPUESTO Y PROGRAMACIN

4,500,000

1,750,000

1,025,000

25,556

1,737,778

1,788,889

1,047,778

7,778

528,889

544,444

318,889

9,600,000

13,000,000

ARRIENDO OFICINA CON SERV. PUBLICOS

2,400,000

928,571

171,429

GASTOS DE REGISTRO

5,000,000

PUBLICIDAD Y PROMOCIN

15,000,000

2,500,000
8,000,000

LICENCIA CURADURA URBANA

8,000,000

IMPUESTO DE VALORIZACIN

40,000,000

ARRIENDO PAPELERA Y UTILES DE OFICINA

928,571

171,429

5,583,333

1,700,000

$
$

4,600,000
1,400,000

25,000

$
$

SECRETARIA

ESCRITURA DE REGLAMENTO Y REGISTRO


ASIGNACIN REF. CATASTRALES CODAZZI
CONTABILIDAD Y AUDITORIA CONTABLE

928,571

171,429

53,333

3,626,667

3,733,333

2,186,667

928,571

928,571

928,571

928,571

171,429

6,083,333

833,333

171,429

833,333

171,429
-

171,429
-

928,571

171,429

1,861,111

928,571

171,429

2,027,778

928,571

171,429

277,778

12,888,889

928,571

171,429

$
$
$

928,571
171,429

$
$
$

928,571
171,429

$
$

928,571
171,429

$
$

15,555,556

$
$

11,555,556

Total

DICIEMBRE

PROYECTO ARQUITECTNICO
DISEO ESTRUCTURAL

7,000,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

137,500,000.00

18,500,000.13

14,183,333.46

14,983,333.47

8,845,000.14

9,193,333.30

9,416,666.63

7,011,666.65

3,461,111.10

3,627,777.77

14,766,666.62

17,155,555.50

13,155,555.51

1,600,000.00

1,600,000.00

8,000,000

7,000,000

6,000,000

6,000,000

4,500,000

4,600,000

1,400,000

9,600,000

13,000,000

2,400,000

5,000,000

15,000,000

8,000,000

40,000,000

7,000,000

137,500,000.28

Entidad financiera del credito


AV Villas
UVR + 13,91% efectivo anual

Pesos Colombianos por UVR

El banco financia los costos directos segn el avance de la obra.

Fecha
10/15/2013

Fecha programada de inicio de Obra: 01 de Noviembre de 2013


Variacin mensual IPC Agosto de 2013 :

0.08%

Variacin mensual IPC Agosto de 2013 :

2.66564E-05

mensual

208.0137
209.0145

11/1/2013

diario

Aporte de los socios


LOTE

$ 100,000,000

PROYECTO ARQUITECTNICO

$ 8,000,000

DISEO ESTRUCTURAL

$ 7,000,000

DISEO ELECTRICO

$ 6,000,000

DISEO HIDROSANITARIO Y GAS

$ 6,000,000

PRESUPUESTO Y PROGRAMACIN

$ 4,500,000

Duracion Total del proyecto: 14 Meses

$ 131,500,000

Tasa
Pago de intereses - Banco Av Villas

13.91%

Mes 1

Periodo
Desemboloso - Bancario

NOVIEMBRE
$ 16,527,528

Pago de intereses
$ 9,326,267
de DICIEMBRE
$ - Mes 2

$ 8,620,629

Pago de intereses
$ 0 de NOVIEMBRE
$ - Mes 13

Pago de intereses
$ 0 de DICIEMBRE
$ - Mes 14

186,023,587.04

Mes 1

NOVIEMBRE

Mes 2

DICIEMBRE

546,986.53

$
$

Fecha

11/1/2013

Valor de la UVR inicial

$ 209.0145

Desembolso

Valor de la UVR

$
$

16,527,528

2,152,215.38

$
$

$
$

No. De UVR

$ 209.0145

65,030,486

2,244,453.18

$
$

67,817,507

$ 209.3491

189,645,346

$ 209.5166

MARZO

348,748,126

$ 209.6842

1663206.6986

$ 351,267,163

ABRIL

359,005,424

$ 209.8519

1710755.9379

$ 361,309,503

$ 210.0198

323944.6072

$ 68,416,694

905156.8184

$ 191,167,982

Mes 7

MAYO

Mes 8

JUNIO

125,203,142

$ 210.1878

595672.6757

$ 125,805,320

Mes 9

JULIO

210,461,593

$ 210.3560

1000502.1113

$ 211,304,788

1240252.1018

10

Mes 10

AGOSTO

159,047,600

$ 210.5243

755483.4906

$ 159,557,163

Mes 11

SEPTIEMBRE

259,854,502

$ 210.6927

1233334.2938

$ 260,478,652

Mes 12

OCTUBRE

Mes 13

NOVIEMBRE

DICIEMBRE

36,518,791

$ 210.8612

$ 211.0299

$ 211.1987

$ 2,098,337,549

$ 211.1987

$
$
$
$

14,125,911.34

15,444,019.96

$
$
$

$ 8,620,629
-

$ 5,263,757
$
$
$
$

173188.7439

$ 3,598,157,472

$
$
$

Jan-13
Feb-13
Mar-13
Apr-13
May-13
Jun-13
Jul-13

$0
$0
$ 2,110,181,967

$ 11,844,418

Precio de venta al pblico:

42.01%

de los costos totales

$ 107,944,724

VENTAS NETAS

$
$

$ 8,600,010

20,707,777.20

$
$
$

$ 5,747,086
-

$ 3,509,171

$
$
$
$

COSTOS DIRECTOS

$ 224,884,842

Precio por apartamento

$ 2,471,262

Precio por m2

$ 2,098,337,515

$ 158,356,595

Costo por apartamento

$ 1,740,182

Costo por m2

$ 137,500,000

$ 66,528,247

CORRECCION MONETARIA

$ 11,844,418

Precio promedio por m2

$ 100,000,000

Bolivar - Cartagena - Estrato 4

Vivienda
VIS

% VIS

No VIS

% No VIS

0
0
68,904
4,661
59
410
576

0.00%
0.00%
72.54%
9.59%
0.05%
1.03%
1.14%

2,029
8,313
16,582
20,972
4,358
30,820
30,207

1.15%
16.58%
17.46%
43.14%
4.04%
77.43%
59.71%

74610.00

13.12%

113281.00

19.91%

Precio de venta por m2


Bolivar - Cartagena - Estrato 4

$ 621,729,698

Porcentaje de venta

0.11

ESTADO DE FLUJO DE FONDOS

No. De proyectos

$ 180,000,000

19

$ 2,471,262
$0

0.09

Mes 1

0.11

Mes 2

NOVIEMBRE

Rango de precios
$ 270,000,000

$ 956,507,228
$ 334,777,530

UTILIDAD NETA

FUENTES

$ 2,471,262

$ 2,533,705,519

UTILIDAD ANTES DE IMPUSTOS


IMPUESTOS 35%

APORTE DE SOCIOS

0.12

Mes 3

DICIEMBRE

0.06

Mes 4

ENERO

0.06

Mes 5

FEBRERO

0.06

Mes 6

MARZO

0.06

Mes 7

ABRIL

0.06

Mes 8

MAYO

0.06

Mes 9

JUNIO

0.06

Mes 10

JULIO

0.06

Mes 11

AGOSTO

0.06

Mes 12

SEPTIEMBRE

0.01

Mes 13

OCTUBRE

Mes 14

NOVIEMBRE

DICIEMBRE

$ 131,500,000

CREDITO BANCARIO

$ 2,098,337,515

VENTAS

395,797,321.92

323,834,172.48

395,797,321.92

431,778,896.64

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

$ 223,085,763.26

43,177,889.66

TOTAL FUENTES

2,625,634,836.42

323,834,172.48

395,797,321.92

431,778,896.64

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

223,085,763.26

$ 223,085,763.26

43,177,889.66

LOTE

100,000,000

INTERESES

2,152,215

2,244,453

6,823,391

13,694,203

14,125,911

15,444,020

17,837,862

21,091,240

20,707,777

26,437,872

USOS

CORRECCION

546,987

COSTOS DIRECTO

COSTOS INDIRECTO

RETIRO DE LOS SOCIOS

COMISIONES

IMPUESTOS

$
$

$
$

16,527,528

18,500,000

53,802,121

11,873,920

CANCELACION DEL CREDITO


TOTAL USOS

201,250,555

$
$
$

65,030,486

14,183,333

53,802,121

9,715,025

144,883,181

67,817,507

14,983,333

53,802,121

11,873,920

$
$

150,721,334

189,645,346

8,845,000

53,802,121

12,953,367

$
$

272,069,225

$
$
$

348,748,126

9,193,333

53,802,121

6,692,573

432,130,357

$
$
$

359,005,424

9,416,667

53,802,121

6,692,573

443,042,696

$
$
$

260,477,505

7,011,667

53,802,121

6,692,573

343,427,886

$
$
$

125,203,142

3,461,111

53,802,121

6,692,573

206,996,809

$
$
$

210,461,593

3,627,778

53,802,121

6,692,573

295,675,305

$
$
$

159,047,600

14,766,667

53,802,121

6,692,573

255,016,738

$
$
$

259,854,502

17,155,556

53,802,121

6,692,573

363,942,624

$
$
$

22,299,847
-

36,518,791

13,155,556

53,802,121

6,692,573

132,468,888

13,805,185
5,922,209
1,600,000

6,692,573

2,424,384,281

178,950,991

245,075,988

159,709,672

(209,044,594)

(219,956,933)

(120,342,122)

16,088,954

(72,589,542)

(31,930,975)

(140,856,861)

90,616,875

(907,905,082)

2,424,384,281

2,603,335,272

2,848,411,260

3,008,120,932

2,799,076,338

2,579,119,404

2,458,777,282

2,474,866,237

2,402,276,695

2,370,345,721

2,229,488,860

2,320,105,735

1,412,200,653

Utilidad

621,729,698
$

(753,229,734)

Mes 1
Mes 2

131,500,000

(131,500,000)

TIR

$ 53,802,121

TMAR

Mes 3

$ 53,802,121

VPN

Mes 4

$ 53,802,121

Mes 5

$ 53,802,121

Mes 6

$ 53,802,121

Mes 7

$ 53,802,121

Mes 8

$ 53,802,121

Mes 9

$ 53,802,121

Mes 10

$ 53,802,121

Mes 11

$ 53,802,121

Mes 12

$ 53,802,121

Mes 13

$ 53,802,121

Mes 14

$ 53,802,121

40.42%
4.73%
$

513,710,750

-$ 645,210,750

5,922,209
1,600,000
1,295,337
1,049,168,757
1,455,378,578

753,229,698

8,812,624

53,802,121
334,777,530

$
$

1,049,168,757
1,130,990,845

SALDO INICIAL DE CAJA

$
$
$

53,802,121

$
$

SALDO FINAL DE CAJA

Inversion

8,812,624.09

176,779
50,134
94,990
48,619
107,939
39,802
50,593

Valor de las viviendas nuevas en cartagena

$ 2,533,705,519

568856.00

$ 731,080

$ 186,023,587

LOTE

$
$
$

COSTO FINANCIERO
INTERESES

$ 2,866,670

13,805,184.80

$ 3,490,212,748

COSTOS INDIRECTOS

$ 1,381,220

$
$

$ 3,847,329

22,299,846.63

$ 717,405

$
$

DICIEMBRE
$

364,657.68

$ 4,184,270
$
$

$ 6,965,328

$ 1,208,607

26,437,872.26

$
$

Total rea

$ 36,577,245

0.0000
0.0000
9991451.3838

COSTO TOTAL DE PROYECTO


TOTAL VENTAS
COMISIONES (3%)

Mes 14

NOVIEMBRE
$

$ 2,244,453

$ 11,881,458

$ 4,143,659
$

21,091,239.56

$
$

$
$

17,837,861.84

$ 6,965,328

Mes 13

$ 36,518,791
$

$ 11,541,988

$ 261,939,684

11

Mes 14

$
$

Mes 12

$ 2,152,215

$
$

OCTUBRE

$ 259,854,502
$

$ 6,276,404

$
$

$ 65,657,533

ENERO
FEBRERO

Mes 5
Mes 6

260,477,505

13,694,203.31

546,986.53

$
$

$
-

Mes 11
SEPTIEMBRE

$ 159,047,600
$

$ 11,881,458

$ 16,700,242

310880.3206

Mes 3
Mes 4

$ 4,143,659

$ 2,244,453

$
$

Mes 10
AGOSTO

$ 210,461,593
$

$ 11,541,988

Valor de la UVR final

79073.5841

$ 209.1817

6,823,390.96

12

$ 2,152,215

$
$

JULIO

$ 125,203,142
$

$
$

13

546,986.53

$ 6,276,404

$ 11,881,458

Pago de intereses
$ 9,668,537
de JUNIO - Mes
$ 8

Correccion monetaria

14

$
$

Mes 9

JUNIO

$ 260,477,505
$

$ 2,244,453

Pago de intereses
$ 13,930,656
de JULIO - Mes
$ 9

$
$

Mes 8

MAYO

$ 359,005,424
$

$ 11,541,988

Mes 7

ABRIL
-

$ 2,152,215
$
$

$
$

$ 6,276,404

Mes 6

$ 348,748,126

546,986.53

$
$

$
$

Pago de intereses
$ 1,208,607
de OCTUBRE
$ - Mes 12

efectivo Trimestral

MARZO

$ 189,645,346

$ 2,244,453

Pago de intereses
$ 8,772,929
de AGOSTO $- Mes 10

$
$

Mes 5

FEBRERO

$ 67,817,507
-

$ 2,152,215
$
$

3.31%

Mes 4

ENERO

$ 65,030,486

Pago de intereses
$ 38,473,293
de MARZO - $Mes 5
Pago de intereses
$ 35,644,374
de ABRIL - Mes
$ 6

Pago de intereses
$ 11,466,681
de SEPTIEMBRE
$
- Mes 11

Tasa

Mes 3

DICIEMBRE
$

Pago de intereses
$ 8,977,813
de ENERO - $Mes 3
Pago de intereses
$ 23,013,483
de FEBRERO
$ - Mes 4

Pago de intereses
$ 22,988,344
de MAYO - Mes
$ 7

efectivo anual

Mes 2

VALOR TOTAL
$ 2,098,337,549

Pago de intereses
$ 2,552,604
de NOVIEMBRE
$ - Mes546,986.53
1

$ (1,412,200,689)
$

(35)

PROYECTO: VIVIENDA MULTIFAMILIAR BARRIO 13 DE JUNIO


FECHA ELABORACION: SEPTIEMBRE 1 DE 2013
PRESUPUESTO DE OBRA
Item
1

Capitulo

Unidad

Cantidad

Vr. Unitario

Vr. Parcial

PRELIMINARES

1.1

Campamento

Un

1.3

Instalacion provisional de Energia

1.4

Instalacion Provisional de Agua

1.6
1.7

1.00

Gl
Gl

2,500,000

2.0

1.00

700,000

1.00

600,000

Trazado y replanteo

m2

312.00

1,600

Excavacin Manual

m3

350.00

17,000

SUB TOTAL PRELIMINARES

2,500,000
700,000
600,000

499,200

5,950,000

10,249,200

CIMENTACIONES

2.3

Concreto 4000 PSI de Zapata

M3

240.00

400,000

96,000,000.00

2.4

Refuerzo de zapata

Kg

4800.00

3,500

16,800,000.00

2.5

Concreto 4000 PSI de viga inferior de amarre (0,20*0,40)

M3

20.00

500,000

10,000,000.00

2.6

Refuerzo de viga inferior

Kg

422.00

3,500

1,477,000.00

250,000

2.9

30.80

40.00

45,000

M3

576.00

618,000

3.3

Refuerzo de Columnas

Kg

6422.00

3,500

22,477,000

3.4

Concreto 4000 PSI de viga estructurales


Refuerzo de viga estructurales

M3

556.00

618,000

343,608,000

2.1

Concreto solado

M3

Relleno en material seleccionado

M3

SUB TOTAL CIMENTACIONES


3

ESTRUCTURA

3.1

Concreto Columnas

3.5

3,500

7,700,000.00
1,800,000.00
133,777,000

355,968,000

6000.00

21,000,000

Concreto de placa 4000 PSI de Entrepisos aligerada

M3

248.00

450,000

111,600,000

Concreto de Escalera Entrepisos

M3

8.00

618,000

Refuerzo escalera

Kg

576.00

3,500

3.2

Kg

3.2
3.2

SUB TOTAL ESTRUCTURA

4,944,000

2,016,000

861,613,000

49,200,000

MAMPOSTERIA

4.1

Levante en Block No. 4 exterior

M2

1230.00

4.2

Levante en Block No. 4 interior

M2

1095.00

40,000

43,800,000

4.4

Dintel de vanos o en concreto para puertas y ventanas

Ml

326.40

38,999

12,729,274

Plantilla para pisos (e=0.05M)

M2

364.00

30,000

4.6

40,000

SUB TOTAL MAMPOSTERIA


5

10,920,000

116,649,274

28,470,000

PAETES (INCLUYE FILOS Y DILATACIONES)

5.1

Paete Interiores

5.2

Paete Exterior

M2

2190.00

13,000

M2

615.00

16,000

9,840,000

38,310,000

SUB TOTAL PAETES


6

INSTALACIONES HIDRAULICAS
SUB TOTAL HIDRAULICAS

INSTALACIONES SANITARIAS O AGUAS RESIDUALES

GL

SUB TOTAL SANITARIAS


10

INSTALACIONES DE GAS NATURAL

GL

INSTALACIONES ELECTRICAS
SUB TOTAL INSTALACIONES ELECTRICAS
ENCHAPES Y ACCESORIOS

22,000,000
22,000,000

20,000,000

20,000,000

SUB TOTAL INSTALACIONES DE GAS

11

12

$
$

30,000,000

30,000,000

GL

30,000,000
30,000,000

12.1

Enchape Baos Principales

M2

248.00

35,000

12.2

Enchape de Cocinas

M2

162.00

35,000

5,670,000
33,950,000

12.4

Suministro e instalacion de Meson de cocina

Ml

97.00

350,000

12.11
12.12
12.13
12.14

Suministro e instalacion de Sanitario


Lavamano de sobreponer
Griferia de lavamano y ducha
Llave de Ducha

Un
Un
Un
Un

16.00
16.00
32.00
27.00

$
$
$
$

375,000
15,000
145,000
130,922

$
$
$
$

12.15

Lavaderos 60x60

Un

16.00

303,600

Lavaplato + griferia + canastilla

Un

16.00

25,000

12.17

SUB TOTAL DE ENCHAPES


13

PISOS Y ACABADOS

13.2

Suministro e instalacion de piso en porcelanato

M2

1064.00
800.00

65,000

24,508

6,000,000
240,000
4,640,000
3,534,894
4,857,600
400,000
67,972,494

69,160,000

13.3

Suministro e instlacion de zocalo en Porcelanato

13.4

Piso en ceramica de baos ppales

M2

109.00

35,000

3,815,000

Cielo raso en yeso carton draywall

M2

817.00

23,500

19,199,500

111,780,812

13.7

Ml

8,680,000

$
$

SUB TOTAL PISOS Y ACABADOS


14

PINTURA

14.1

Estuco de paredes

M2

6500.00

Pintura paredes interiores en viniltex de pintuco


Pintura de exteriores sobre estucos

M2

4600.00

M2

615.00

7,000

Un

32.00

359,600

14.3
14.5

CARPINTERIA DE MADERA
Suministro e instalacion de puerta para Alcobas

19,606,312

3,200

20,800,000

4,500

20,700,000

SUB TOTAL PINTURA


15
15.1

4,305,000

45,805,000

11,507,200

15.2

Suminstro e instalacion de puertas de baos

Un

16.00

258,002

4,128,032

15.3

M2

90.00

350,000

31,500,000

15.6

Suminstro e instalacion de closet


Mueble superior de cocina en madera natural de cedro e
interiores en madecor
Suministro e instalacion de Puerta Principal apto

16

CARPINTERIA METALICA

15.4

Ml

76.00

350,000

26,600,000

Un

16.00

695,000

11,120,000

84,855,232

SUB TOTAL CARPINTERIA DE MADERA

16.1

Suministro inslacion de ventana de aluminio

m2

212.00

180,000

38,160,000

16.3

Pasamano de la escalera

Ml

87.00

200,000

17,400,000

Puerta de acceso principal al edificio

Un

16.4
16.6

Baranda de balcones

1.00

1,400,000

Ml

58.00

180,000

M2

364.00

16,000

M2

60.00

250,000

SUB TOTAL CARPINTERIA METALICA


17

IMPERMEABILIZACIONES

17.3

Impermeabilizacion con sika mortero 101 para placa


SUB TOTAL IMPERMEABILIZACIONES

18

1,400,000

10,440,000

67,400,000

5,824,000

5,824,000

VIDRIOS Y ESPEJOS

18.3

Divisiones de bao en vidrio templado 8mm


SUB TOTAL VIDRIOS Y ESPEJOS

20

CERRADURAS Y HERRAJES

20.1

Suministro e instalacion de cerradura de puerta acceso edificio

20.2

Un

1.00

330,000

15,000,000

15,000,000

330,000
5,280,000

Suministro e instalacion de Cerradura de puerta ppal de aptos

Un

16.00

330,000

20.3

Suministro e instalaicon de Cerraduras de Puerta de baos

Un

16.00

35,500

20.4

Cerradura puertas de alcobas


SUB TOTAL DE OBRAS EXTERIORES

Un

32.00

40,000

568,000

1,280,000

7,458,000

22

ASEO Y LIMPIEZA

22.1

Limpieza General

Gl

1.00

3,000,000

3,000,000

Retiro de sobrantes

M2

436.00

16,000

6,976,000

22.2

$
SUB TOTAL ASEO Y LIMPIEZA
COSTOS DIRECTOS
A.I.U. 25%

25%

COSTO TOTAL

9,976,000

1,678,670,012

419,667,503

2,098,337,515

PRESUPUESTO DE COSTO INDIRECTO


Captulos del Presupuesto

TOTAL

PROYECTO ARQUITECTNICO

8,000,000

DISEO ESTRUCTURAL

7,000,000

DISEO ELECTRICO

6,000,000

DISEO HIDROSANITARIO Y GAS

6,000,000

PRESUPUESTO Y PROGRAMACIN

4,500,000

ESCRITURA DE REGLAMENTO Y REGISTRO

4,600,000

ASIGNACIN REF. CATASTRALES CODAZZI

1,400,000

SECRETARIA

9,600,000

CONTABILIDAD Y AUDITORIA CONTABLE

13,000,000

ARRIENDO OFICINA CON SERV. PUBLICOS

2,400,000

GASTOS DE REGISTRO

5,000,000

PUBLICIDAD Y PROMOCIN

15,000,000

LICENCIA CURADURA URBANA

8,000,000

IMPUESTO DE VALORIZACIN

40,000,000

ARRIENDO PAPELERA Y UTILES DE OFICINA

7,000,000

TOTAL

137,500,000

2,235,837,515

DATOS ADICIONALES DEL PROYECTO


Construccin de 4 pisos 16 Apartamentos
Cuadro de reas

No.

Area

Total

Apartamento

16

91.00

1456

Total area vendible

1456

Zonas comunes y escaleras

96

Total rea construida

1552

Se programa la obra para 12 meses de construccin y 2 adicionales para comercializacin

Fijar el precio de venta al pblico, equivalente al 25% de los costos totales

El valor del lote se establece en $100 millones y se aporta con los estudios y publicidad

Descontar la comisin de venta del 2,5%

Proyectar la correccin monetaria a la tasa del 6,52% anual, con un valor inicial de 176,75

Calcular los intereses a la tasa del 16% anual trimestre anticipado.

El proyecto se construye en el sector de junio.

Elaborar la evaluacin correspondiente.

PROGRAMACION Y FLUJO DE CAJA


COSTOS DIRECTOS

Mes 1
VALOR TOTAL

PRELIMINARES
CIMENTACIONES
ESTRUCTURA
MAMPOSTERIA
PAETES Y FILOS
INSTALACIONES HIDRAULICAS
INSTALACIONES SANITARIAS O AGUAS
INSTALACIONES DE GAS NATURAL
INSTALACIONES ELECTRICAS
ENCHAPES Y ACCESORIOS
PISOS Y ACABADOS
PINTURA
CARPINTERIA DE MADERA
CARPINTERIA METALICA
IMPERMEABILIZACIONES
VIDRIOS Y ESPEJOS
INSTALACIONES ELECTROMECANICAS
CERRADURAS Y HERRAJES
OBRAS EXTERIORES
ASEO Y LIMPIEZA

Mes 2

Mes 3

DICIEMBRE

Mes 4

ENERO

Mes 5

168,219,685

29,162,319

54,254,005

287,204,339

Mes 9

Mes 10

JULIO
-

65,129,179

$
$
$

22,357,778

21,283,333

OCTUBRE
$

TOTAL
-

133,776,999
861,613,018

116,649,276

12,333,334

7,666,667

6,500,000

23,500,001

5,200,000

24,800,001

67,972,494

62,937,495

111,780,812

5,035,000

79,488,580

10,687,834

45,805,000

84,855,232

26,719,584

8,397,584

82,969,560

1,885,672

65,902,222

1,497,778

7,458,000

$
$
$

13,222,022

52,024,389

54,254,005

151,716,276

278,998,501

$
$

287,204,339

208,382,004

$
$

100,162,513

168,369,275

$
$

127,238,080

$
$

207,883,602

22,000,001
20,000,001
30,000,001
30,000,001
67,972,494

$
$

9,976,000

38,310,000

111,780,816

1,678,670,012

$
$
$

15,000,000

5,824,000

15,000,000

32,292,236

5,824,000

67,400,000

$
$

10,249,200

$
$

Mes 12

SEPTIEMBRE
-

17,026,667

11,000,000

Mes 11

AGOSTO
-

$
$

11,000,000

$
$

$
$

$
$

20,000,000
30,000,000

278,998,501

$
$

30,000,000

Mes 8

JUNIO

127,190,493

52,024,389

Mes 7

$
$

MAYO

24,525,783

Mes 6

ABRIL

2,972,822

38,310,000

MARZO

$
$

116,649,274
22,000,000

FEBRERO

10,249,200

133,777,000
861,613,000

$
$
$

10,249,200

NOVIEMBRE
$

$
$

7,458,000

45,805,001
84,855,232
67,400,000
5,824,000
15,000,000

$
$

7,458,000

9,976,000

9,976,000

29,215,033

1,678,670,040

AUI

419,667,503

3,305,506

13,006,097

13,563,501

37,929,069

69,749,625

71,801,085

52,095,501

25,040,628

42,092,319

31,809,520

51,970,900

7,303,758

419,667,510

Total COSTO DIRECTO

2,098,337,515

16,527,528

65,030,486

67,817,507

189,645,346

348,748,126

359,005,424

260,477,505

125,203,142

210,461,593

159,047,600

259,854,502

36,518,791

2,098,337,549

Mes 1
COSTOS INDIRECTOS

VALOR TOTAL

Mes 2

NOVIEMBRE

Mes 3

DICIEMBRE

Mes 4

ENERO

Mes 5

FEBRERO

Mes 6

MARZO

Mes 7

ABRIL

Mes 8

MAYO

Mes 9

JUNIO

Mes 10

JULIO

Mes 11

AGOSTO

Mes 12

SEPTIEMBRE

Mes 13

OCTUBRE

Duracion Total: 14 Meses

Mes 14

NOVIEMBRE

8,000,000

1,896,296

2,074,074

2,162,963

1,866,667

7,000,000

1,659,259

1,814,815

1,892,593

1,633,333

DISEO ELECTRICO

6,000,000

1,422,222

1,555,556

1,622,222

1,400,000

DISEO HIDROSANITARIO Y GAS

6,000,000

1,422,222

1,555,556

1,622,222

1,400,000

PRESUPUESTO Y PROGRAMACIN

4,500,000

1,750,000

1,025,000

25,556

1,737,778

1,788,889

1,047,778

7,778

528,889

544,444

318,889

9,600,000

13,000,000

ARRIENDO OFICINA CON SERV. PUBLICOS

2,400,000

928,571

171,429

GASTOS DE REGISTRO

5,000,000

PUBLICIDAD Y PROMOCIN

15,000,000

2,500,000
8,000,000

LICENCIA CURADURA URBANA

8,000,000

IMPUESTO DE VALORIZACIN

40,000,000

ARRIENDO PAPELERA Y UTILES DE OFICINA

928,571

171,429

5,583,333

1,700,000

$
$

4,600,000
1,400,000

25,000

$
$

SECRETARIA

ESCRITURA DE REGLAMENTO Y REGISTRO


ASIGNACIN REF. CATASTRALES CODAZZI
CONTABILIDAD Y AUDITORIA CONTABLE

928,571

171,429

53,333

3,626,667

3,733,333

2,186,667

928,571

928,571

928,571

928,571

171,429

6,083,333

833,333

171,429

833,333

171,429
-

171,429
-

928,571

171,429

1,861,111

928,571

171,429

2,027,778

928,571

171,429

277,778

12,888,889

928,571

171,429

$
$
$

928,571
171,429

$
$
$

928,571
171,429

$
$
$

928,571
171,429

$
$

15,555,556

$
$

11,555,556

Total

DICIEMBRE

PROYECTO ARQUITECTNICO
DISEO ESTRUCTURAL

7,000,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

500,000

137,500,000.00

18,500,000.13

14,183,333.46

14,983,333.47

8,845,000.14

9,193,333.30

9,416,666.63

7,011,666.65

3,461,111.10

3,627,777.77

14,766,666.62

17,155,555.50

13,155,555.51

1,600,000.00

1,600,000.00

8,000,000

7,000,000

6,000,000

6,000,000

4,500,000

4,600,000

1,400,000

9,600,000

13,000,000

2,400,000

5,000,000

15,000,000

8,000,000

40,000,000

7,000,000

137,500,000.28

Entidad financiera del credito


AV Villas
UVR + 13,91% efectivo anual

Pesos Colombianos por UVR

El banco financia los costos directos segn el avance de la obra.

Fecha
10/15/2013

Fecha programada de inicio de Obra: 01 de Noviembre de 2013


Variacin mensual IPC Agosto de 2013 :

0.08%

Variacin mensual IPC Agosto de 2013 :

2.66564E-05

mensual

208.0137
209.0145

11/1/2013

diario

Aporte de los socios


LOTE

$ 100,000,000

PROYECTO ARQUITECTNICO

$ 8,000,000

DISEO ESTRUCTURAL

$ 7,000,000

DISEO ELECTRICO

$ 6,000,000

DISEO HIDROSANITARIO Y GAS

$ 6,000,000

PRESUPUESTO Y PROGRAMACIN

$ 4,500,000

Duracion Total del proyecto: 14 Meses

$ 131,500,000

Tasa
Pago de intereses - Banco Av Villas

13.91%

Mes 1

Periodo
Desemboloso - Bancario

NOVIEMBRE

$ 2,098,337,549

$ 16,527,528

Pago de intereses
$ 9,326,267
de DICIEMBRE
$
- Mes 2

546,986.53

$ 8,620,629

Pago de intereses
$ 11,466,681
de SEPTIEMBRE
$
- Mes 11 -

Pago de intereses
$ 0 de NOVIEMBRE
$
- Mes 13

Pago de intereses
$ 0 de DICIEMBRE
$
- Mes 14

186,023,587.04

Mes 1

NOVIEMBRE

Mes 2

DICIEMBRE

546,986.53

$
$

Fecha

11/1/2013

Valor de la UVR inicial

$ 209.0145

Desembolso

Valor de la UVR

$
$

16,527,528

2,152,215.38

$
$

$
$

No. De UVR

$ 209.0145

65,030,486

2,244,453.18

$
$

67,817,507

$ 209.3491

189,645,346

$ 209.5166

MARZO

348,748,126

$ 209.6842

1663206.6986

$ 351,267,163

ABRIL

359,005,424

$ 209.8519

1710755.9379

$ 361,309,503

$ 210.0198

323944.6072

$ 68,416,694

905156.8184

$ 191,167,982

Mes 7

MAYO

Mes 8

JUNIO

125,203,142

$ 210.1878

595672.6757

$ 125,805,320

Mes 9

JULIO

210,461,593

$ 210.3560

1000502.1113

$ 211,304,788

1240252.1018

10

Mes 10

AGOSTO

159,047,600

$ 210.5243

755483.4906

$ 159,557,163

Mes 11

SEPTIEMBRE

259,854,502

$ 210.6927

1233334.2938

$ 260,478,652

Mes 12

OCTUBRE

Mes 13

NOVIEMBRE

DICIEMBRE

TOTAL

36,518,791

$ 210.8612

$ 211.0299

$ 211.1987

$ 2,098,337,549

$ 211.1987

$
$
$
$

14,125,911.34

15,444,019.96

$
$
$

$ 8,620,629
-

$ 5,263,757
$
$
$
$

173188.7439

$ 3,167,131,899

$
$
$

Jan-13
Feb-13
Mar-13
Apr-13
May-13
Jun-13
Jul-13

$0
$0
$ 2,110,181,967

$ 11,844,418

Precio de venta al pblico:

25.00%

de los costos totales

$ 95,013,957

VENTAS NETAS

$
$

$
$
$

$ 3,509,171

$
$
$
$

COSTOS DIRECTOS

$ 197,945,744

Precio por apartamento

$ 2,175,228

Precio por m2

$ 2,098,337,515

$ 158,356,595

Costo por apartamento

$ 1,740,182

Costo por m2

$ 137,500,000

$ 39,589,149

CORRECCION MONETARIA

Vivienda
VIS

% VIS

No VIS

% No VIS

0
0
68,904
4,661
59
410
576

0.00%
0.00%
72.54%
9.59%
0.05%
1.03%
1.14%

2,029
8,313
16,582
20,972
4,358
30,820
30,207

1.15%
16.58%
17.46%
43.14%
4.04%
77.43%
59.71%

74610.00

13.12%

113281.00

19.91%

Valor de las viviendas nuevas en cartagena

$ 11,844,418

Precio promedio por m2

$ 100,000,000

Bolivar - Cartagena - Estrato 4

$ 2,533,705,519

Precio de venta por m2


Bolivar - Cartagena - Estrato 4

$ 349,968,075

Porcentaje de venta

0.11

ESTADO DE FLUJO DE FONDOS

No. De proyectos

$ 180,000,000

19

$ 2,175,228
$ 296,034

0.09

Mes 1

0.11

Mes 2

NOVIEMBRE

Rango de precios
$ 270,000,000

$ 538,412,423
$ 188,444,348

UTILIDAD NETA

FUENTES

$ 2,471,262

$ 2,533,705,519

UTILIDAD ANTES DE IMPUSTOS


IMPUESTOS 35%

APORTE DE SOCIOS

0.12

Mes 3

DICIEMBRE

0.06

Mes 4

ENERO

0.06

Mes 5

FEBRERO

0.06

Mes 6

MARZO

0.06

Mes 7

ABRIL

0.06

Mes 8

MAYO

0.06

Mes 9

JUNIO

0.06

Mes 10

JULIO

0.06

Mes 11

AGOSTO

0.06

Mes 12

SEPTIEMBRE

0.01

Mes 13

OCTUBRE

Mes 14

NOVIEMBRE

DICIEMBRE

$ 131,500,000

CREDITO BANCARIO

$ 2,098,337,515

VENTAS

348,384,508.92

285,041,870.93

348,384,508.92

380,055,827.91

196,362,177.75

196,362,177.75

196,362,177.75

196,362,177.75

196,362,177.75

196,362,177.75

196,362,177.75

196,362,177.75

196,362,177.75

38,005,582.79

TOTAL FUENTES

2,578,222,023.42

285,041,870.93

348,384,508.92

380,055,827.91

196,362,177.75

196,362,177.75

196,362,177.75

196,362,177.75

196,362,177.75

196,362,177.75

196,362,177.75

196,362,177.75

196,362,177.75

38,005,582.79

LOTE

100,000,000

INTERESES

2,152,215

2,244,453

6,823,391

13,694,203

14,125,911

15,444,020

17,837,862

21,091,240

20,707,777

26,437,872

22,299,847

13,805,185

USOS

CORRECCION

546,987

COSTOS DIRECTO

COSTOS INDIRECTO

RETIRO DE LOS SOCIOS

COMISIONES

IMPUESTOS

$
$

$
$

16,527,528

65,030,486

67,817,507

18,500,000

14,183,333

14,983,333

10,451,535

CANCELACION DEL CREDITO


TOTAL USOS

146,026,050

$
$
$
$
$

8,551,256
89,917,291

$
$

10,451,535

$
$

95,496,829

8,845,000

11,401,675

$
$

189,645,346

$
$

216,715,411

$
$
$
$
$

348,748,126

9,193,333

5,890,865
377,526,528

$
$
$
$
$

359,005,424

9,416,667

5,890,865
388,438,868

$
$
$
$
$

260,477,505

7,011,667

5,890,865
288,824,057

$
$
$
$
$

125,203,142

3,461,111

5,890,865
152,392,980

$
$
$
$
$

210,461,593

3,627,778

5,890,865
241,071,476

$
$
$
$
$

159,047,600

14,766,667

5,890,865
200,412,909

$
$
$
$
$

259,854,502

36,518,791

17,155,556

13,155,556

5,890,865
309,338,795

$
$
$
$
$

5,890,865
77,865,059

$
$
$

5,922,209
1,600,000
5,890,865
-

2,432,195,974

195,124,580

252,887,680

163,340,416

(181,164,351)

(192,076,690)

(92,461,879)

43,969,198

(44,709,298)

(4,050,731)

(112,976,617)

118,497,119

(880,024,839)

2,432,195,974

2,627,320,554

2,880,208,234

3,043,548,651

2,862,384,300

2,670,307,610

2,577,845,731

2,621,814,929

2,577,105,631

2,573,054,900

2,460,078,282

2,578,575,401

1,698,550,563

Utilidad

349,968,075
$

(481,468,110)

Mes 1
Mes 2

131,500,000

(131,500,000)

TIR

$0

TMAR

Mes 3

$0

VPN

Mes 4

$0

Mes 5

$0

Mes 6

$0

Mes 7

$0

Mes 8

$0

Mes 9

$0

Mes 10

$0

Mes 11

$0

Mes 12

$0

Mes 13

$0

Mes 14

$ 481,468,075

10.50%
4.73%
$

264,023,844

-$ 395,523,844

8,812,624
5,922,209
1,600,000
481,468,075
1,140,167
188,444,348
1,049,168,757
1,736,556,181

481,468,075

$
$
$

$
$

1,049,168,757
1,076,387,016

SALDO INICIAL DE CAJA

$
$
$

$
$

SALDO FINAL DE CAJA

Inversion

8,812,624.09

176,779
50,134
94,990
48,619
107,939
39,802
50,593

$ 435,046

$ 186,023,587

LOTE

568856.00

COSTO FINANCIERO
INTERESES

$ 2,866,670

$
$

$ 3,072,117,942

COSTOS INDIRECTOS

13,805,184.80

$ 1,381,220

$
-

22,299,846.63

$ 3,847,329

$
-

$ 1,208,607

26,437,872.26

$ 5,747,086

$ 717,405

$
$

DICIEMBRE
$

$ 4,184,270

$ 6,965,328

$ 8,600,010
$

20,707,777.20

Mes 14
-

364,657.68

$
$

$ 11,881,458

Total rea

$ 36,577,245

0.0000
0.0000
9991451.3838

COSTO TOTAL DE PROYECTO


TOTAL VENTAS
COMISIONES (3%)

$
$

$
-

21,091,239.56

$ 4,143,659

$ 2,244,453

$
$

17,837,861.84

$ 6,965,328

Mes 13
$

$
$

NOVIEMBRE

$ 36,518,791
$

$ 11,541,988

$ 261,939,684

11

Mes 14

$
$

Mes 12

$ 2,152,215

$
$

OCTUBRE

$ 259,854,502
$

$ 6,276,404

$
$

$ 65,657,533

ENERO
FEBRERO

Mes 5
Mes 6

260,477,505

13,694,203.31

546,986.53

$
$

$
-

Mes 11
SEPTIEMBRE

$ 159,047,600
$

$ 11,881,458

$ 16,700,242

310880.3206

Mes 3
Mes 4

$ 4,143,659

$ 2,244,453

$
$

Mes 10
AGOSTO

$ 210,461,593
$

$ 11,541,988

Valor de la UVR final

79073.5841

$ 209.1817

6,823,390.96

Mes 9

$ 2,152,215

$
$

$
$

JULIO

$ 125,203,142
$

$ 6,276,404

12

$
$

$ 11,881,458

13

Mes 8
JUNIO

$ 260,477,505
$

$ 2,244,453

Pago de intereses
$ 9,668,537
de JUNIO - $Mes 8

14

$
$

Mes 7
MAYO

$ 359,005,424
$

$ 11,541,988

Pago de intereses
$ 13,930,656
de JULIO - $Mes 9

Correccion monetaria

Mes 6

$ 2,152,215

$
$

$
$

$ 6,276,404

ABRIL

$ 348,748,126

546,986.53

$
$

$
$

efectivo Trimestral

MARZO

$ 189,645,346

$ 2,244,453

Pago de intereses
$ 1,208,607
de OCTUBRE
$ - Mes 12

$
$

Mes 5

FEBRERO

$ 67,817,507
-

$ 2,152,215
$
$

3.31%

Mes 4

ENERO

$ 65,030,486

Pago de intereses
$ 38,473,293
de MARZO$- Mes 5
Pago de intereses
$ 35,644,374
de ABRIL - $Mes 6

Pago de intereses
$ 8,772,929
de AGOSTO
$ - Mes 10

Tasa

Mes 3

DICIEMBRE
$

Pago de intereses
$ 8,977,813
de ENERO $- Mes 3
Pago de intereses
$ 23,013,483
de FEBRERO
$ - Mes 4

Pago de intereses
$ 22,988,344
de MAYO - $Mes 7

efectivo anual

Mes 2

VALOR TOTAL

Pago de intereses
$ 2,552,604
de NOVIEMBRE
$
- Mes
546,986.53
1

$ (1,698,550,598)
$

(35)