CANTIDADES DE OBRAc

También podría gustarte

Está en la página 1de 45

MEMORIAS DE CALCULO CANTIDADES DE OBRA

1. ACTIVIDADES PRELIMINARES
UN: M 2

1.1. DESCAPOTE
1.1. CALCULO AREA
ANCHO
13

LARGO
25
TOTAL AREA

cantidad
1.00

SUBTOTAL
325
M2
325

UN: M 2

1.2. LOCALIZACION Y REPLANTEO


1.2. CALCULO REA A LOCALIZAR Y REPLANTEAR
ANCHO
LARGO
13
25
TOTAL REA

SUBTOTAL
325
325

M2

ACTIVIDAD 1.3. :CERRAMIENTO

UN:ML

1.3. CALCULO PERIMETRO CERRAMIENTO


ELEMENTO
L1
L2

MEDIDA
13
25
TOTAL PERIMETRO

CANTIDAD
2
2

SUBTOTAL
26
50
76
ML

2.0. EXCAVACION
ACTIVIDAD 2.1. EXCAVACIN ZAPATAS
2.1. CALCULO VOLUMEN A EXCAVAR ZAPATAS
ELEMENTO
ZP-1
ZP-2

ANCHO
1.5
1.5

LARGO
1.5
2.8
TOTAL VOLUMEN

CANTIDAD
2
1

ALTO
0.85
0.85

SUBTOTAL
3.825
3.57
7.395

M3

SUBTOTAL
2.49
3.68
2.26
2.08
1.91
5.88
4.40
3.43
22.70

M3

ACTIVIDAD 2.2. EXCAVACIN DADOS


2.2. CALCULO VOLUMEN A EXCAVAR DADOS
ELEMENTO
D-1
D-2
D-3
D-4
D-5
D-6
D-7
D-8

ANCHO

LARGO
0.7
1.25
1.25
3.1
1.25
1.9
1.25
1.75
3.1
0.65
1.25
4.95
2.198
1.9
1.9
TOTAL VOLUMEN

CANTIDAD
3
1
1
1
1
1
2

ANCHO

LARGO
CANTIDAD ALTO
SUBTOTAL
0.4
1.43
1
0.95
0.543
0.27
0.04185
2
0.95
0.080
1.52
0.31
1
0.95
0.448
0.83
0.59345
2
0.95
1.128
TOTAL VOLUMEN DADO D7
2.198

1.

A1

1.

0.95

ELEMENTO
A1
A2
A3
A4

0.4

A4

A4

0.83

0.83

A2

A3

A2

0.

0.

0.31

0.95
0.95
0.95
0.95
0.95
0.95

DETALLE DADO 7

1.43

ALTO

0.27

0.27
1.52

ACTIVIDAD 2.3. EXCAVACIN VIGAS

ELEMENTO
VS - 1
VS - 2 A
VS - 2 B
VS - 3
VS - 4
VS - 5
VS - 6
VS - 7
VS - 8
VS - 9

ANCHO

LARGO
0.4
0.3
0.5
0.4
0.4
0.3
0.3
0.3
0.3
0.3

16.45
4.55
16.9
4.8
16.45
11.7
11.3
11.3
11.3
11.7
TOTAL VOLUMEN

CANTIDAD
1
1
1
1
1
1
1
1
1
1

ALTO
0.95
0.65
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95

SUBTOTAL
6.25
0.89
8.03
1.82
6.25
3.33
3.22
3.22
3.22
3.33
39.57

M3

SUBTOTAL
15.01
0.47
1.33
1.33
1.48
0.81
20.43

M3

SUBTOTAL
1.57
4.67
2.71
8.94

M3

SUBTOTAL
13.98
-0.22
-0.41
13.35

M3

ACTIVIDAD 2.4. EXCAVACIN VIGUETAS

ELEMENTO
VTS -1
VTS -2
VTS -3
VTS -4
VTS -5
VTS -7

ANCHO

LARGO
0.15
0.15
0.15
0.15
0.15
0.15

11.7
3.3
9.35
9.35
10.4
5.7
TOTAL VOLUMEN

CANTIDAD
9
1
1
1
1
1

ALTO
0.95
0.95
0.95
0.95
0.95
0.95

ACTIVIDAD 2.5. EXCAVACIN RIOSTRAS

ELEMENTO
RS - 1
RS - 2
RS - 3

ANCHO

LARGO
0.12
0.12
0.12

13.75
4.55
4.75
TOTAL VOLUMEN

CANTIDAD
1
9
5

ALTO
0.95
0.95
0.95

ACTIVIDAD 2.6. EXCAVACIN LOSA CONTRAPISO

ELEMENTO
AREA TOTAL
DTO FOSO ASC.
DTO TANQUE

ANCHO

LARGO
21.5
2
2.03

13
-2.15
-4.04
TOTAL VOLUMEN

3.0. CIMENTACION
ACTIVIDAD 3.1 Pilotes hincados d = 0,40 L = 24 m UNIDAD: M3
CANTIDAD OBRA CONCRETO

CANTIDAD
1
1
1

ALTO
0.05
0.05
0.05

ELEMENTO
P1

AREA
0.125664
TOTAL VOLUMEN

CANTIDAD
30

ALTO
24

SUBTOTAL
90.48
90.48

M3

CANTIDAD OBRA ACERO


DATOS PARA REFUERZO
DIAMETRO
LONGITUD (m)
(N
VARILLA)
4
12.00
3
58.00

UBICACIN

CANTIDAD DE
ELEMENTOS

NUMERO DE
ELEMENTO

CANTIDAD DE
VARILLAS (UN)

P1
P1

1
1

ACERO LISO
CHIPA

10
1

2/8"

3/8"

1/2"

5/8"

3/4"

7/8"

TOTAL
REF. KG

1"

1.52

1.52
0.31
1.83

0.31
PESO TOTAL
2/8"

PESO POR KG

ACTIVIDAD 3.2. CONCRETO DE LIMPIEZA O FLUIDO

3/8"
0.31

1/2"
1.52

5/8"

3/8"

1/2"

5/8"

3/4"
-

7/8"
-

1"
-

UN:M3

CALCULO VOLUMEN CONCRETO LIMPIEZA


ELEMENTO
AREA TOTAL

ANCHO
25.00

LARGO
13.00
TOTAL VOLUMEN

CANTIDAD
1

ALTO
0.05

SUBTOTAL
16.25
16.25

M3

SUBTOTAL
1.125
1.05
2.175

M3

ACTIVIDAD 3.3. CIMENTACIN ZAPATAS


CALCULO VOLUMEN CONCRETO ZAPATAS
ELEMENTO
ZP-1
ZP-2

ANCHO
1.5
1.5

LARGO
1.5
2.8
TOTAL VOLUMEN

CANTIDAD
2
1

ALTO
0.25
0.25

CANTIDAD OBRA ACERO


DATOS PARA REFUERZO
DIAMETRO
LONGITUD (m)
(N
VARILLA)
4
1.70
4
1.70
4
1.70
5
3.20

UBICACIN

CANTIDAD DE
ELEMENTOS

NUMERO DE
ELEMENTO

CANTIDAD DE
VARILLAS (UN)

CIMENTACIN

1
1
1
1

ZP-1 SUP
ZP-1 INF
ZP-2 HORIZ
ZP-2 VERT

32
32
20
14

2/8"

3/4"

7/8"

TOTAL
REF. KG

1"

0.69
0.69
0.43

0.69
0.69
0.43
1.14
2.95

1.14
PESO TOTAL
2/8"

PESO POR KG

3/8"
-

1/2"
1.81

5/8"
1.14

3/4"

7/8"
-

1"
-

ACTIVIDAD 3.4. CIMENTACIN DADOS


CALCULO VOLUMEN CONCRETO DADOS
ELEMENTO
D-1
D-2
D-3
D-4
D-5
D-6
D-7
D-8

ANCHO

LARGO
0.7
1.25
1.25
3.1
1.25
1.9
1.25
1.75
3.1
0.65
1.25
4.95
2.082
1.9
1.9
TOTAL VOLUMEN

CANTIDAD
3
1
1
1
1
1
2

SUBTOTAL
2.36
3.49
2.14
1.97
1.81
5.57
4.16
3.25
24.75

M3

ANCHO

LARGO
CANTIDAD ALTO
0.4
1.43
1
0.27
0.042
2
1.52
0.31
1
0.83
0.593
2
TOTAL VOLUMEN DADO D7

0.9
0.9
0.9
0.9

SUBTOTAL
0.515
0.076
0.424
1.067
2.082

1.

A1

1.

0.9

ELEMENTO
A1
A2
A3
A4

0.4

A4

A4

0.83
A2

0.83
A3

A2

0.

0.

0.31

0.9
0.9
0.9
0.9
0.9
0.9

DETALLE DADO 7

1.43

ALTO

0.27

0.27
1.52

CANTIDAD OBRA ACERO


DATOS PARA REFUERZO
DIAMETRO
(N
LONGITUD (m)
VARILLA)
7
1.70
7
2.25
5
3.50
7
3.60
5
2.30
7
2.40
5
2.10
7
2.20
5
3.50
8
3.60
6
2.14
6
2.11
6
2.11

UBICACIN

CANTIDAD DE
ELEMENTOS

NUMERO DE
ELEMENTO

CANTIDAD DE
VARILLAS (UN)

D-1

CIMENTACIN

3
3
1
1
1
1
1
1
1
1
2
2
2

30
24
4
4
4
4
4
5
4
4
16
16
16

D-2
D-3
D-4
D-5
D-7

2/8"

3/8"

1/2"

5/8"

3/4"

7/8"

TOTAL
REF. KG

1"

10.34
10.95
0.36
0.97
0.23
0.65
0.21
0.74
0.36
1.45
6.91

2.92
2.88
2.88
PESO TOTAL
2/8"

PESO POR KG

3/8"
-

1/2"
-

5/8"
1.16

ACTIVIDAD 3.5. CIMENTACIN VIGAS AMARRE


CALCULO VOLUMEN CONCRETO VIGAS
ELEMENTO
ANCHO
LARGO
VS - 1
0.4
16.45
VS - 2 A
0.3
4.55
VS - 2 B
0.5
16.9
VS - 3
0.4
4.8
VS - 4
0.4
16.45
VS - 5
0.3
11.7
VS - 6
0.3
11.3
VS - 7
0.3
11.3
VS - 8
0.3
11.3
VS - 9
0.3
11.7
TOTAL VOLUMEN

CANTIDAD
1
1
1
1
1
1
1
1
1
1

ALTO
0.9
0.6
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9

SUBTOTAL
5.92
0.82
7.61
1.73
5.92
3.16
3.05
3.05
3.05
3.16
37.47

#3
#4
#5
#6
#7
#8

M3

0.56
1.00
1.60
2.24
3.04
3.97

3/4"
8.68

7/8"
23.65

1"
8.36

10.34
10.95
0.36
0.97
0.23
0.65
0.21
0.74
0.36
1.45
9.83
2.88
2.88
41.85

CANTIDAD OBRA ACERO

UBICACIN

CANTIDAD DE
ELEMENTOS

CIMENTACIN

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

NUMERO DE
ELEMENTO

VS-1

VS-2

VS-3

VS-4

VS-5

VS-6

VS-7

VS-8

VS-9

DATOS PARA REFUERZO


DIAMETRO
LONGITUD (m)
(N
VARILLA)
7
9.00
7
7.75
7
9.20
7
8.00
7
3.70
3
2.40
7
6.00
8
6.00
8
9.00
8
5.20
7
6.00
8
4.50
8
7.00
8
8.50
3
1.60
3
2.34
7
5.35
3
2.40
7
9.00
7
9.20
7
4.00
7
11.00
7
4.40
3
2.40
7
8.50
7
6.10
8
3.00
7
4.60
7
10.00
3
2.20
8
8.50
8
6.10
8
3.00
7
3.00
7
4.60
7
10.00
3
2.20
8
8.50
8
6.10
8
3.00
7
3.00
7
4.80
7
9.80
7
3.50
3
2.20
8
8.50
8
6.30
8
3.00
7
4.80
7
10.00
7
3.50
3
2.20
7
8.50
7
6.10
8
3.00
7
4.60
7
10.00
3
2.20

CANTIDAD DE
VARILLAS (UN)
4
4
4
4
4
56
3
4
4
4
3
4
4
4
28
160
8
21
4
4
4
4
4
46
3
3
4
3
3
50
3
3
2
3
3
3
51
3
3
2
2
3
3
2
50
3
3
8
3
3
2
51
3
3
6
3
3
40

2/8"

3/8"

1/2"

5/8"

3/4"

7/8"

TOTAL
REF. KG

1"

2.43
2.09
2.49
2.16
1.00
0.72
1.22
2.42
3.63
2.10
1.22
1.82
2.82
3.43
0.24
2.00
2.89
0.27
2.43
2.49
1.08
2.97
1.19
0.59
1.72
1.24
1.21
0.93
2.03
0.59
2.57
1.85
0.61
0.61
0.93
2.03
0.60
2.57
1.85
0.61
0.41
0.97
1.99
0.47
0.59
2.57
1.91
2.42
0.97
2.03
0.47
0.60
1.72
1.24
1.82
0.93
2.03
0.47
PESO TOTAL
2/8"

PESO POR KG

3/8"
6.65

1/2"

3/8"

1/2"

5/8"
-

3/4"
-

7/8"
48.38

1"
36.18

7/8"

1"

2.43
2.09
2.49
2.16
1.00
0.72
1.22
2.42
3.63
2.10
1.22
1.82
2.82
3.43
0.24
2.00
2.89
0.27
2.43
2.49
1.08
2.97
1.19
0.59
1.72
1.24
1.21
0.93
2.03
0.59
2.57
1.85
0.61
0.61
0.93
2.03
0.60
2.57
1.85
0.61
0.41
0.97
1.99
0.47
0.59
2.57
1.91
2.42
0.97
2.03
0.47
0.60
1.72
1.24
1.82
0.93
2.03
0.47
90.74

ACTIVIDAD 3.6. CIMENTACION VIGUETAS


CALCULO VOLUMEN CONCRETO VIGUETAS
ELEMENTO
ANCHO
LARGO
VTS -1
0.15
11.7
VTS -2
0.15
3.3
VTS -3
0.15
9.35
VTS -4
0.15
9.35
VTS -5
0.15
10.4
VTS -7
0.15
5.7
TOTAL VOLUMEN

CANTIDAD
9
1
1
1
1
1

ALTO
0.9
0.9
0.9
0.9
0.9
0.9

SUBTOTAL
14.22
0.45
1.26
1.26
1.40
0.77
19.36

M3

CANTIDAD OBRA ACERO

UBICACIN

CANTIDAD DE
ELEMENTOS

CIMENTACIN

9
9
9
9
9
9
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

NUMERO DE
ELEMENTO

VTS-1

VTS-2

VTS-3

VTS-4

VTS-5

VTS-7

DATOS PARA REFUERZO


DIAMETRO
LONGITUD (m)
(N
VARILLA)
7
7.10
7
7.50
3
4.00
6
7.00
3
4.00
3
2.00
6
4.60
3
4.40
3
2.00
5
4.60
4
7.30
7
5.00
3
2.50
6
6.00
3
4.00
3
2.00
7
4.80
7
7.50
3
2.50
6
6.00
3
4.00
3
2.00
5
3.20
6
4.80
7
7.50
4
5.00
6
6.50
3
3.60
3
2.00
7
7.05
4
2.00
3
6.75
3
2.00

CANTIDAD DE
VARILLAS (UN)
2
2
2
2
2
37
2
2
12
2
2
1
2
2
2
31
2
2
2
2
2
31
2
2
2
2
2
2
38
2
2
2
18

2/8"

5/8"

3/4"

TOTAL
REF. KG

8.63
9.12

8.63
9.12
0.38
5.38
0.38
3.55
0.39
0.05
0.13
0.23
0.19
0.34
0.03
0.51
0.04
0.33
0.65
1.01
0.03
0.51
0.04
0.33
0.16
0.41
1.01
0.13
0.55
0.04
0.41
1.13
0.05
0.07
0.19
36.42

0.38
5.38
0.38
3.55
0.39
0.05
0.13
0.23
0.19
0.34
0.03
0.51
0.04
0.33
0.65
1.01
0.03
0.51
0.04
0.33
0.16
0.41
1.01
0.13
0.55
0.04
0.41
0.18

0.95
0.05

0.07
0.19
PESO TOTAL
2/8"

PESO POR KG

ACTIVIDAD 3.7. CIMENTACION LOSA CONTRAPISO SUPERIOR


CALCULO VOLUMEN CONCRETO LOSA DE CONTRAPISO SUPERIOR
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
21.5
13
1
DTO FOSO ASC.
2
-2.15
1
DTO TANQUE
2.03
-4.04
1

ALTO
0.05
0.05
0.05

SUBTOTAL
13.98
-0.22
-0.41

3/8"
6.18

1/2"
0.36

5/8"
0.40

3/4"
7.76

7/8"
21.72

1"
-

TOTAL VOLUMEN

13.35

M3

ACTIVIDAD 3.8. CALCULO PESO MALLA M-1.31 sup


CANTIDAD OBRA ACERO
AREA TIL MALLA
12.8 M2
AREA LOSA DE CONTRAPISO
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
21.5
13
1
DTO FOSO ASC.
2
-2.15
1
DTO TANQUE
2.03
-4.04
1
TOTAL REA

SUBTOTAL
279.5
-4.3
-8.2012
267.00

CANTIDAD MALLAS PLACA SUPERIOR


CALCULO PESO MALLA
AREA
ANCHO
4

M2
21 UNIDADES MALLA DIAMETRO 5,5 mm

No. DE GRAFILES
ANCHO
ESPACIO
27
0.15

LARGO
ESPACIO
3.20
0.15
TOTAL PARA 21 MALLAS
11602.43687

LONGITUD
(ML)
85.5

LARGO
21

(ML)
85.4

mm
5

DIAMETRO GRAFIL
Pulg.
mm
0.20
5

Pulg.
0.20

PESO
(KG/ML)
0.16

PESO
(KG/ML)
0.16

PESO
TOTAL
556.22

(ML)
85.4

mm
7

DIAMETRO GRAFIL
Pulg.
mm
0.28
7

Pulg.
0.28

PESO
(KG/ML)
0.30

PESO
(KG/ML)
0.30

PESO
TOTAL
1090.20

3/8"

1/2"

7/8"

1"

TOTAL
REF. KG

ACTIVIDAD 3.9. CIMENTACION LOSA CONTRAPISO INFERIOR


CALCULO VOLUMEN CONCRETO LOSA DE CONTRAPISO INFERIOR
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
21.5
13
1
TOTAL VOLUMEN

ALTO

SUBTOTAL
13.98
13.98

0.05

M3

ACTIVIDAD 3.10. CALCULO PESO MALLA M-2.62 inf


CANTIDAD OBRA ACERO
AREA TIL MALLA
12.8 M2
AREA LOSA DE CONTRAPISO
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
21.5
13
1
TOTAL REA

SUBTOTAL
279.5
279.50

CANTIDAD MALLAS PLACA INFERIOR


CALCULO PESO MALLA
AREA
ANCHO
4

LARGO
3.20

M3
22 UNIDADES MALLA DIAMETRO 7 mm

No. DE GRAFILES
ANCHO
ESPACIO
27
0.15

ESPACIO
0.15

LONGITUD
(ML)
85.5

LARGO
21

TOTAL PARA 22 MALLAS


23805.52634 KG

4.0. ESTRUCTURA
ACTIVIDAD 4.1. ESTRUCTURA COLUMNAS

CALCULO VOLUMEN CONCRETO COLUMNAS


ELEMENTO
A1 - A2 - A3
2'E
B1-B2-B3-E1-E2-E3
D1
C2
D2

ANCHO

LARGO
0.3
0.25
0.35
0.35
0.35
0.35

0.3
0.25
0.6
0.6
0.6
0.6
TOTAL VOLUMEN

CANTIDAD
3
1
6
1
1
1

ALTO
3.5
3.6
17.35
20.09
20.09
20.09

SUBTOTAL
0.95
0.23
21.86
4.22
4.22
4.22
35.69

M3

CANTIDAD OBRA ACERO

UBICACIN

COLUMNAS

CANTIDAD DE
ELEMENTOS
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
3

NUMERO DE
ELEMENTO

B1, B3, E1, E2,


E3, B2

D1

C2

D2

A1 - A2 - A3

DATOS PARA REFUERZO


DIAMETRO
LONGITUD (m)
(N
VARILLA)
5
2.15
4
2.15
5
4.65
5
6.00
5
4.60
5
1.90
5
6.50
5
5.50
5
2.50
4
3.50
3
1.48
3
0.62
3
0.42
3
1.78
3
0.72
3
0.47
5
7.50
5
2.95
4
3.50
7
2.10
5
6.50
6
4.80
5
6.50
5
5.50
5
2.50
3
1.48
3
0.62
3
0.42
3
1.78
3
0.72
3
0.47
5
5.00
5
2.15
4
2.80
5
6.00
5
2.35
5
4.65
5
6.00
5
6.50
5
5.50
5
2.50
3
1.48
3
0.62
3
1.78
3
0.72
3
0.47
3
0.42
5
2.25
4
3.50
5
5.10
5
6.00
5
2.35
5
4.65
5
6.00
5
6.50
5
5.50
5
2.50
3
1.48
3
0.62
3
0.42
3
1.78
3
0.72
3
0.47
4
3.80
4
3.80

CANTIDAD DE
VARILLAS (UN)
4
1
4
5
1
2
18
6
6
1
22
22
44
118
118
236
5
4
1
1
4
2
24
6
6
21
21
42
140
140
280
5
4
1
4
1
2
6
18
6
6
22
22
140
140
280
44
4
1
5
4
1
2
6
18
6
6
22
22
44
140
140
280
4
4

2/8"

5/8"

3/4"

1.31
0.16
2.83
4.57
0.70
0.58
17.83
5.03
2.29
0.27
1.04
0.44
0.59
6.72
2.72
3.55
0.95
0.30
0.04
0.14
0.66
0.41
3.96
0.84
0.38
0.17
0.07
0.09
1.33
0.54
0.70
0.64
0.22
0.04
0.61
0.06
0.24
0.91
2.97
0.84
0.38
0.17
0.07
1.33
0.54
0.70
0.10
0.23
0.04
0.65
0.61
0.06
0.24
0.91
2.97
0.84
0.38
0.17
0.07
0.10
1.33
0.54
0.70
0.58
0.58

1.31
0.16
2.83
4.57
0.70
0.58
17.83
5.03
2.29
0.27
1.04
0.44
0.59
6.72
2.72
3.55
0.95
0.30
0.04
0.14
0.66
0.41
3.96
0.84
0.38
0.17
0.07
0.09
1.33
0.54
0.70
0.64
0.22
0.04
0.61
0.06
0.24
0.91
2.97
0.84
0.38
0.17
0.07
1.33
0.54
0.70
0.10
0.23
0.04
0.65
0.61
0.06
0.24
0.91
2.97
0.84
0.38
0.17
0.07
0.10
1.33
0.54
0.70
0.58
0.58

3
3
1
1

A1 - A2 - A3

29
58
8
29

2E

3
3
4
3

1.08
0.42
3.90
0.88

0.50
0.39

0.50
0.39
0.40
0.14
83.46

0.40
0.14
PESO TOTAL
2/8"

PESO POR KG

3/8"
24.81

1/2"
2.11

5/8"
55.99

3/4"
0.41

7/8"
0.14

1"

(ML)
85.4

mm
3.5

DIAMETRO GRAFIL
Pulg.
mm
0.14
3.5

Pulg.
0.14

PESO
(KG/ML)
0.08

PESO
(KG/ML)
0.08

PESO
TOTAL
272.55

(ML)
85.4

mm
4.5

DIAMETRO GRAFIL
Pulg.
mm
0.18
4.5

Pulg.
0.18

PESO
(KG/ML)
0.13

PESO
(KG/ML)
0.13

PESO
TOTAL
450.54

3/8"

1/2"

7/8"

1"

TOTAL
REF. KG

ACTIVIDAD 4.2. ESTRUCTURA LOSA PRIMER PISO INFERIOR


CALCULO VOLUMEN CONCRETO LOSA DE ENTREPISO INFERIOR
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
21.5
13
1
DTO FOSO ASCENSOR
2
-1.95
1
DTO ESCALERAS
2
-2.03
1
TOTAL VOLUMEN

ALTO

SUBTOTAL
8.385
-0.117
-0.1218
8.15

0.03
0.03
0.03

M3

ACTIVIDAD 4.3. CALCULO PESO MALLA M-0.64 inf


CANTIDAD OBRA ACERO
AREA TIL MALLA
12.8 M2
AREA LOSA DE ENTREPISO
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
21.5
13
1
DTO FOSO ASCENSOR
2
-1.95
1
DTO ESCALERAS
2
-2.03
1
TOTAL REA

SUBTOTAL
279.5
-3.9
-4.06
271.54

CANTIDAD MALLAS PLACA INFERIOR


CALCULO PESO MALLA
AREA
ANCHO
4

LARGO
3.20

M3
21 UNIDADES MALLA DIAMETRO 3,5 mm

No. DE GRAFILES
ANCHO
ESPACIO
27
0.15

ESPACIO
0.15

LONGITUD
(ML)
85.5

LARGO
21

TOTAL PARA 21 MALLAS


5781.889643 KG
ACTIVIDAD 4.4. ESTRUCTURA LOSA PRIMER PISO SUPERIOR
CALCULO VOLUMEN CONCRETO LOSA DE ENTREPISO SUPERIOR
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
21.5
13
1
DTO FOSO ASCENSOR
2
-1.95
1
DTO ESCALERAS
2
-2.03
1
TOTAL VOLUMEN

ALTO

SUBTOTAL
12.5775
-0.1755
-0.1827
12.22

0.045
0.045
0.045

M3

ACTIVIDAD 4.5. CALCULO PESO MALLA M-1.06 sup


CANTIDAD OBRA ACERO
AREA TIL MALLA
12.8 M2
AREA LOSA DE ENTREPISO
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
21.5
13
1
DTO FOSO ASCENSOR
2
-1.95
1
DTO ESCALERAS
2
-2.03
1
TOTAL REA

SUBTOTAL
279.5
-3.9
-4.06
271.54

CANTIDAD MALLAS PLACA SUPERIOR


CALCULO PESO MALLA
AREA
ANCHO
4

LARGO
3.20

M2
21 UNIDADES MALLA DIAMETRO 4,5 mm

No. DE GRAFILES
ANCHO
ESPACIO
27
0.15

ESPACIO
0.15

LONGITUD
(ML)
85.5

LARGO
21

TOTAL PARA 21 MALLAS


9557.817574 KG

ACTIVIDAD 4.6. VIGAS PRIMER PISO


CALCULO VOLUMEN CONCRETO VIGAS
ELEMENTO
ANCHO
LARGO
V 101
0.35
21.5
V 102
0.4
21.5
V 103
0.25
6.25
V 104
0.35
4.8
V 105
0.35
21.5
V 106
0.3
11.9
V 107
0.3
11.9
V 108
0.3
11.55
V 109
0.2
3.15
V 110
0.3
11.65
V 111
0.2
2.1
V 112
0.3
6.8
V 113
0.25
2.55
TOTAL VOLUMEN

CANTIDAD
1
1
1
1
1
1
1
1
1
1
1
1
1

ALTO
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

SUBTOTAL
3.39
3.87
0.70
0.76
3.39
1.61
1.61
1.56
0.28
1.57
0.19
0.92
0.29
20.12

M3

CANTIDAD OBRA ACERO

UBICACIN

CANTIDAD DE
ELEMENTOS
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

NUMERO DE
ELEMENTO

V 101

V 102

V 103

V104

V 105
VIGAS PISO 1

DATOS PARA REFUERZO


DIAMETRO
LONGITUD (m)
(N
VARILLA)
6
9.00
6
11.00
6
3.30
4
2.00
5
5.00
4
5.00
5
3.00
4
3.00
6
12.00
6
5.00
6
10.60
3
1.48
6
9.00
6
11.00
5
3.30
5
2.00
4
2.00
6
3.35
6
8.65
6
3.00
4
4.00
5
3.00
5
3.00
6
6.00
5
1.85
5
6.80
6
1.05
3
1.58
3
0.57
3
1.28
5
7.20
5
5.45
5
3.30
3
1.28
5
5.15
5
2.90
3
1.48
3
1.33
6
9.00
6
10.00
6
4.30
6
3.25

CANTIDAD DE
VARILLAS (UN)
2
2
2
1
1
1
2
2
2
1
2
141
2
1
2
1
1
1
1
2
1
2
1
2
1
2
2
105
60
33
2
2
2
42
4
2
22
21
2
1
2
1

2/8"

5/8"

3/4"
0.77
0.94
0.28

0.03
0.13
0.06
0.15
0.08
1.02
0.21
0.90
1.11
0.77
0.47
0.17
0.05
0.03
0.14
0.37
0.26
0.05
0.15
0.08
0.51
0.05
0.35
0.09
0.88
0.18
0.23
0.37
0.28
0.17
0.29
0.52
0.15
0.17
0.15
0.77
0.43
0.37
0.14

0.77
0.94
0.28
0.03
0.13
0.06
0.15
0.08
1.02
0.21
0.90
1.11
0.77
0.47
0.17
0.05
0.03
0.14
0.37
0.26
0.05
0.15
0.08
0.51
0.05
0.35
0.09
0.88
0.18
0.23
0.37
0.28
0.17
0.29
0.52
0.15
0.17
0.15
0.77
0.43
0.37
0.14

VIGAS PISO 1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

V 105

V 106

V 107

V 108

V 109

V 110

V 111
V 112
V 113

1
1
1
1
1
1
1
2
1
2
114
22
2
2
2
2
83
2
2
1
1
1
2
2
82
2
2
1
1
1
2
2
85
4
1
41
1
2
1
1
1
2
1
1
1
1
1
2
84
4
21
4
56
4
22

6
6
4
4
6
6
6
6
6
6
3
3
5
5
5
5
3
5
5
5
5
4
5
5
3
5
5
5
4
4
5
5
3
4
4
3
5
5
5
5
5
5
4
5
5
5
5
5
3
4
3
5
3
5
3

5.10
2.95
3.00
2.50
1.45
5.10
1.75
10.50
7.00
5.80
1.48
1.18
10.00
4.10
5.60
8.10
1.38
10.00
4.10
2.00
3.00
2.00
6.00
8.10
1.38
10.00
4.10
2.00
3.00
1.50
6.00
8.10
1.38
6.80
2.00
1.18
10.00
4.25
3.70
5.80
4.50
2.00
3.00
2.00
3.70
5.80
8.00
6.25
1.38
3.05
1.18
8.20
1.38
3.35
1.28

0.22
0.13

0.22
0.13
0.04
0.03
0.06
0.22
0.07
0.90
0.30
0.49
0.90
0.14
0.51
0.21
0.28
0.41
0.61
0.51
0.21
0.05
0.08
0.03
0.30
0.41
0.60
0.51
0.21
0.05
0.04
0.02
0.30
0.41
0.63
0.35
0.03
0.26
0.25
0.22
0.09
0.15
0.11
0.10
0.04
0.05
0.09
0.15
0.20
0.32
0.62
0.15
0.13
0.83
0.41
0.34
0.15
29.22

0.04
0.03
0.06
0.22
0.07
0.90
0.30
0.49
0.90
0.14
0.51
0.21
0.28
0.41
0.61
0.51
0.21
0.05
0.08
0.03
0.30
0.41
0.60
0.51
0.21
0.05
0.04
0.02
0.30
0.41
0.63
0.35
0.03
0.26
0.25
0.22
0.09
0.15
0.11
0.10
0.04
0.05
0.09
0.15
0.20
0.32
0.62
0.15
0.13
0.83
0.41
0.34
0.15
PESO TOTAL
2/8"

PESO POR KG

3/8"
7.46

1/2"
0.96

5/8"
9.97

3/4"
10.83

7/8"

3/8"

1/2"

5/8"

3/4"

7/8"

1"
-

ACTIVIDAD 4.7. VIGUETAS PRIMER PISO


CALCULO VOLUMEN CONCRETO VIGUETAS
ELEMENTO
ANCHO
LARGO
VT 101
0.1
13
VT 102
0.1
10.7
VT 103
0.1
2.65
VT 104
0.1
5.25
VT 105
0.1
6.95
VT 106
0.1
10.6
VT 107
0.1
5.05
VT 108
0.1
6.35
TOTAL VOLUMEN

CANTIDAD
9
3
2
3
1
1
1
1

ALTO
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

SUBTOTAL
5.27
1.44
0.24
0.71
0.31
0.48
0.23
0.29
8.96

M3

CANTIDAD OBRA ACERO

UBICACIN

CANTIDAD DE
ELEMENTOS

VIGUETAS PISO 1

9
9
9
9
9
9
9
9
9
3
3
3
3
3
3
3
3
2
2
2
3
3
3
3
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

NUMERO DE
ELEMENTO

VT 101

VT 102

VT 103

VT 104

VT 105

V 106

V 107

V 108

DATOS PARA REFUERZO


DIAMETRO
CANTIDAD DE
LONGITUD (m)
(N
VARILLAS (UN)
VARILLA)
1
3
3.50
1
5
7.00
1
3
4.10
1
6
3.50
1
4
4.00
1
5
4.00
1
4
5.70
1
4
7.10
41
2
0.98
1
3
2.50
1
4
6.00
1
3
3.50
1
5
3.50
1
4
4.50
1
5
4.00
1
4
7.10
36
2
0.98
1
3
2.95
1
4
3.05
8
2
0.98
1
3
5.55
1
4
3.50
1
4
5.65
17
2
0.98
1
3
7.10
1
6
4.00
1
4
7.20
21
2
0.98
1
3
2.50
1
4
6.00
1
3
3.40
1
5
3.50
1
5
4.00
1
4
11.00
36
2
0.98
1
3
5.35
1
4
5.45
14
2
0.98
1
3
6.65
1
4
2.50
1
3
3.00
24
2
0.98
1
4
6.75

2/8"

TOTAL
REF. KG

1"

0.17

0.17
1.60
0.20
1.34
0.46
0.91
0.65
0.81
0.57
0.04
0.23
0.06
0.27
0.17
0.30
0.27
0.17
0.03
0.08
0.02
0.09
0.13
0.22
0.08
0.04
0.17
0.09
0.03
0.01
0.08
0.02
0.09
0.10
0.14
0.06
0.03
0.07
0.02
0.04
0.03
0.02
0.04
0.09
10.03

1.60
0.20
1.34
0.46
0.91
0.65
0.81
0.57
0.04
0.23
0.06
0.27
0.17
0.30
0.27
0.17
0.03
0.08
0.02
0.09
0.13
0.22
0.08
0.04
0.17
0.09
0.03
0.01
0.08
0.02
0.09
0.10
0.14
0.06
0.03
0.07
0.02
0.04
0.03
0.02
0.04
0.09
PESO TOTAL
2/8"

PESO POR KG

0.99

ACTIVIDAD 4.8. ESTRUCTURA LOSA PISO TIPO (2 - 5) INF


CALCULO VOLUMEN CONCRETO LOSA DE ENTREPISO INFERIOR
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
17.35
13
1

ALTO
0.03

SUBTOTAL
6.7665

3/8"
0.73

1/2"
3.51

5/8"
3.28

3/4"
1.51

7/8"

1"
-

DTO FOSO ASCENSOR


DTO ESCALERAS
DTO PTO FIJO

2
2
2.86

CANTiDAD PISOS
TOTAL PLACAS

-1.95
-2.03
-3.08
TOTAL VOLUMEN

1
1
1

0.03
0.03
0.03

-0.117
-0.1218
-0.264264
6.26

M3

4
25.05 M3

ACTIVIDAD 4.9. CALCULO PESO MALLA M-0.64 inf


CANTIDAD OBRA ACERO
AREA TIL MALLA
12.8 M2
AREA LOSA DE ENTREPISO
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
17.35
13
1
DTO FOSO ASCENSOR
2
-1.95
1
DTO ESCALERAS
2
-2.03
1
DTO PTO FIJO
2.86
-3.08
1
TOTAL REA
CANTDAD PISOS
TOTAL PLACAS

SUBTOTAL
225.55
-3.9
-4.06
-8.81
208.78

CANTIDAD MALLAS PLACA INFERIOR


CALCULO PESO MALLA
AREA
ANCHO
4

LARGO
3.20

M2

4
835.12 M2

65 UNIDADES MALLA DIAMETRO 3,5 mm

No. DE GRAFILES
ANCHO
ESPACIO
27
0.15

ESPACIO
0.15

LONGITUD
(ML)
85.5

LARGO
21

(ML)
85.4

mm
3.5

DIAMETRO GRAFIL
Pulg.
mm
0.14
3.5

Pulg.
0.14

PESO
(KG/ML)
0.08

PESO
(KG/ML)
0.08

PESO
TOTAL
272.55

(ML)
85.4

mm
4.5

DIAMETRO GRAFIL
Pulg.
mm
0.18
4.5

Pulg.
0.18

PESO
(KG/ML)
0.13

PESO
(KG/ML)
0.13

PESO
TOTAL
450.54

3/8"

1/2"

7/8"

1"

TOTAL
REF. KG

TOTAL PARA 82 MALLAS


17782.27676 KG
ACTIVIDAD 4.10. ESTRUCTURA LOSA PISO TIPO (2 - 5) SUP
CALCULO VOLUMEN CONCRETO LOSA DE ENTREPISO SUPERIOR
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
17.35
13
1
DTO FOSO ASCENSOR
2
-1.95
1
DTO ESCALERAS
2
-2.03
1
DTO PTO FIJO
2.86
-3.08
1
TOTAL VOLUMEN
CANTDAD PISOS
TOTAL PLACAS

ALTO

SUBTOTAL
10.15
-0.18
-0.18
-0.40
9.40

0.045
0.045
0.045
0.045

M3

4
37.58 M3

ACTIVIDAD 4.11. CALCULO PESO MALLA M-1.06 sup


CANTIDAD OBRA ACERO
AREA TIL MALLA
12.8 M2
AREA LOSA DE ENTREPISO
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
17.35
13
1
DTO FOSO ASCENSOR
2
-1.95
1
DTO ESCALERAS
2
-2.03
1
DTO PTO FIJO
2.86
-3.08
1
TOTAL REA
CANTDAD PISOS
TOTAL PLACAS

SUBTOTAL
225.55
-3.90
-4.06
-8.81
208.78

CANTIDAD MALLAS PLACA SUPERIOR


CALCULO PESO MALLA
AREA
ANCHO
4

LARGO
3.20

M2

4
835.12 M2

65 UNIDADES MALLA DIAMETRO 4,5 mm

No. DE GRAFILES
ANCHO
ESPACIO
27
0.15

ESPACIO
0.15

LONGITUD
(ML)
85.5

LARGO
21

TOTAL PARA 82 MALLAS29395.1922 KG

ACTIVIDAD 4.12. VIGAS PISO TIPO


CALCULO VOLUMEN CONCRETO VIGAS
ELEMENTO
ANCHO
LARGO
V1 (2 A 5 PISO )
0.35
17.35
V2 (2 A 5 PISO )
0.20
5.73
V3 (2 A 5 PISO )
0.40
17.35
V4 (2 A 5 PISO )
0.35
4.80
V5 (2 A 5 PISO )
0.35
17.35
V6 (2 A 5 PISO )
0.30
11.90
V7 (2 A 5 PISO )
0.30
11.35
V8 (2 A 5 PISO )
0.30
11.35
V9 (2 A 5 PISO )
0.30
11.90
V10 (2 A 5 PISO )
0.20
5.58
TOTAL VOLUMEN

CANTIDAD
4
4
4
4
4
4
4
4
4
4

ALTO
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

SUBTOTAL
10.93
2.06
12.49
3.02
10.93
6.43
6.13
6.13
6.43
2.01
64.55

M3

CANTIDAD OBRA ACERO

UBICACIN

CANTIDAD DE
ELEMENTOS
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

NUMERO DE
ELEMENTO

V1 (2 Y 3 PISO
)

V2 (2 Y 3 PISO
)

V3 (2 Y 3 PISO
)

V4 (2 Y 3 PISO
)

V5 (2 Y 3 PISO
)

DATOS PARA REFUERZO


DIAMETRO
LONGITUD (m)
(N
VARILLA)
6
4.00
6
11.00
6
4.00
7
2.00
6
2.50
8
5.00
5
2.50
6
11.00
8
3.00
7
5.00
6
7.30
3
1.48
4
6.00
5
5.00
5
5.00
3
1.18
6
9.00
6
9.30
6
2.00
6
3.00
7
3.00
5
3.00
5
2.50
6
11.00
6
7.30
3
1.58
3
0.57
3
1.53
5
5.20
5
2.90
3
1.48
3
1.33
6
9.00
6
9.45
6
6.35
6
5.10
6
7.55
4
2.00
6
2.50
4
2.50
6
5.10
6
6.35

CANTIDAD DE
VARILLAS (UN)
2
2
2
2
2
2
2
2
1
1
2
114
2
2
2
37
2
2
2
1
1
2
2
2
2
94
58
19
4
2
22
22
1
1
1
1
1
1
1
1
1
1

2/8"

5/8"

3/4"
0.68
1.88
0.68

0.54
0.43
2.02
0.25
1.88
0.61
0.68
1.25
1.80
0.30
0.51
0.51
0.47
1.54
1.59
0.34
0.26
0.41
0.30
0.25
1.88
1.25
1.58
0.35
0.31
1.06
0.29
0.35
0.31
0.77
0.81
0.54
0.44
0.64
0.05
0.21
0.06
0.44
0.54

0.68
1.88
0.68
0.54
0.43
2.02
0.25
1.88
0.61
0.68
1.25
1.80
0.30
0.51
0.51
0.47
1.54
1.59
0.34
0.26
0.41
0.30
0.25
1.88
1.25
1.58
0.35
0.31
1.06
0.29
0.35
0.31
0.77
0.81
0.54
0.44
0.64
0.05
0.21
0.06
0.44
0.54

V5 (2 Y 3 PISO
)

VIGAS PISO TIPO

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

V6 (2 Y 3 PISO
)

V7 (2 Y 3 PISO
)

V8 (2 Y 3 PISO)

V9 (2 Y 3 PISO)

V10 (2 Y 3
PISO)

V1 (4 Y 5 PISO
)

V2 (4 Y 5 PISO
)

V3 (4 Y 5 PISO
)

V4 (4 Y 5 PISO
)

V5 (4 Y 5 PISO
)

V6 (4 Y 5 PISO
)

V7 (4 Y 5 PISO
)

V8 (4 Y 5 PISO
)

V9 (4 Y 5 PISO
)

1
1
2
88
22
2
2
1
1
2
2
2
82
2
2
2
4
2
1
2
2
1
85
1
2
1
1
1
2
2
1
1
1
1
1
1
1
1
85
2
2
2
2
2
2
2
82
2
1
2
42
2
2
2
2
2
2
2
1
1
2
2
114
2
4
37
2
2
1
1
2
2
2
2
2
94
58
19
4
2
22
22
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
22
88
2
2
1
1
2
2
2
82
2
2
1
1
2
2
1
1
2
2
1
85
1
2
1
1
1
2
1
1
1
1
1
2
1
1
2
85
2
2
2

6
6
6
3
3
5
5
6
6
5
5
5
3
5
5
6
5
6
5
5
5
4
3
5
6
5
5
5
7
6
6
7
5
6
5
5
5
5
3
5
5
5
5
6
5
5
3
4
5
4
3
6
6
6
6
6
7
5
7
7
6
6
3
4
5
3
6
6
6
7
6
5
6
6
6
3
3
3
5
5
3
3
6
6
6
6
6
4
6
5
4
6
6
6
6
6
6
3
3
5
5
6
6
5
5
5
3
5
5
7
6
5
6
6
7
5
5
4
3
5
6
5
5
5
8
6
7
7
6
4
4
5
5
6
3
5
5
5

1.50
11.50
6.95
1.48
1.18
10.00
4.10
2.00
3.00
2.00
6.00
8.10
1.38
10.00
4.10
2.50
3.00
2.00
2.50
8.10
6.00
8.10
1.38
10.00
4.30
3.35
4.50
5.65
2.00
2.50
3.00
3.00
2.50
6.00
6.30
3.35
8.00
6.30
1.38
10.00
4.10
2.00
3.00
2.00
6.00
8.10
1.38
7.00
2.00
7.00
1.18
4.00
11.00
4.00
2.00
2.50
5.00
2.50
3.00
5.00
11.00
7.30
1.48
6.00
5.00
1.18
9.00
9.30
2.00
2.00
3.00
3.00
2.50
11.00
7.30
1.58
0.57
1.53
5.20
2.90
1.48
1.33
9.00
9.45
6.35
5.10
7.55
2.00
2.50
2.00
2.50
6.35
5.10
7.60
5.50
11.00
2.65
1.18
1.48
10.00
4.10
2.00
3.00
2.00
6.00
8.10
1.38
10.00
4.10
2.50
2.00
2.50
2.00
2.50
3.00
6.00
8.10
8.10
1.38
10.00
4.30
3.35
5.65
4.50
2.00
2.50
2.50
3.00
3.00
6.00
3.35
6.30
8.00
6.30
1.38
10.00
4.10
2.00

0.13
0.98
1.19
1.39
0.28
1.02
0.42
0.17
0.26
0.20
0.61
0.82
1.21
1.02
0.42
0.43
0.61
0.34
0.13
0.82
0.85
0.21
1.25
0.51
0.73
0.17
0.23
0.29
0.54
0.43
0.26
0.41
0.13
0.51
0.32
0.17
0.41
0.32
1.25
1.02
0.42
0.20
0.30
0.34
0.61
0.82
1.21
0.36
0.10
0.36
0.53
0.68
1.88
0.68
0.34
0.43
1.35
0.25
0.41
0.68
1.88
1.25
1.80
0.30
1.02
0.47
1.54
1.59
0.17
0.27
0.51
0.30
0.43
1.88
1.25
1.58
0.35
0.31
1.06
0.29
0.35
0.31
0.77
0.81
0.54
0.44
0.64
0.05
0.21
0.10
0.06
0.54
0.44
0.65
0.47
0.94
0.23
0.28
1.39
1.02
0.42
0.17
0.26
0.20
0.61
0.82
1.21
1.02
0.42
0.34
0.17
0.25
0.34
0.21
0.41
0.61
0.82
0.21
1.25
0.51
0.73
0.17
0.29
0.23
0.81
0.21
0.34
0.41
0.26
0.15
0.17
0.32
0.41
1.08
1.25
1.02
0.42
0.20

0.13
0.98
1.19
1.39
0.28
1.02
0.42
0.17
0.26
0.20
0.61
0.82
1.21
1.02
0.42
0.43
0.61
0.34
0.13
0.82
0.85
0.21
1.25
0.51
0.73
0.17
0.23
0.29
0.54
0.43
0.26
0.41
0.13
0.51
0.32
0.17
0.41
0.32
1.25
1.02
0.42
0.20
0.30
0.34
0.61
0.82
1.21
0.36
0.10
0.36
0.53
0.68
1.88
0.68
0.34
0.43
1.35
0.25
0.41
0.68
1.88
1.25
1.80
0.30
1.02
0.47
1.54
1.59
0.17
0.27
0.51
0.30
0.43
1.88
1.25
1.58
0.35
0.31
1.06
0.29
0.35
0.31
0.77
0.81
0.54
0.44
0.64
0.05
0.21
0.10
0.06
0.54
0.44
0.65
0.47
0.94
0.23
0.28
1.39
1.02
0.42
0.17
0.26
0.20
0.61
0.82
1.21
1.02
0.42
0.34
0.17
0.25
0.34
0.21
0.41
0.61
0.82
0.21
1.25
0.51
0.73
0.17
0.29
0.23
0.81
0.21
0.34
0.41
0.26
0.15
0.17
0.32
0.41
1.08
1.25
1.02
0.42
0.20

2
2
2
2
2
2
2
2

V9 (4 Y 5 PISO
)

2
2
2
2
82
4
1
43

V10 (4 Y 5 PISO
)

5
6
5
5
3
4
6
3

3.00
2.00
6.00
8.10
1.38
7.00
2.00
1.18

0.30

0.30
0.34
0.61
0.82
1.21
0.71
0.17
0.54
117.27

0.34
0.61
0.82
1.21
0.71
0.17
0.54
PESO TOTAL
2/8"

PESO POR KG

3/8"
24.58

1/2"
2.99

5/8"
29.76

3/4"
49.74

7/8"
6.76

1"

3/8"

1/2"

5/8"

3/4"

7/8"

1"

3.43

ACTIVIDAD 4.13. VIGUETAS PISO TIPO


CALCULO VOLUMEN CONCRETO VIGUETAS
ELEMENTO
ANCHO
LARGO
VT -1
0.1
VT -2
0.1
VT -3
0.1
VT -4
0.1
VT -5
0.1
VT -6
0.1
VT -7
0.1
VT -8
0.1
VT -9
0.1
VT -10
0.1
VT -11
0.1

11.9
2.9
3.6
9.55
11.9
4.9
2.75
2.08
3.05
5.68
1.24

CANTIDAD
20
12
8
8
16
4
4
4
4
4
4

ALTO

SUBTOTAL
10.71
1.57
1.30
3.44
8.57
0.88
0.50
0.37
0.55
1.02
0.22
29.12

0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

M3

CANTIDAD OBRA ACERO

UBICACIN

CANTIDAD DE
ELEMENTOS

VIGAS PISO TIPO

20
20
20
20
20
20
20
20
20
12
12
12
8
8
8
8
8
8
8
8
8
8
8
16
16
16
16
16
16
16
16
16
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4

NUMERO DE
ELEMENTO

DATOS PARA REFUERZO


DIAMETRO
LONGITUD (m)
(N
VARILLA)
3
3.00
4
7.00
3
4.20
6
3.50
3
4.00
4
4.00
4
6.70
4
7.10
2
0.98
3
3.65
4
3.75
2
0.98
3
4.45
3
3.00
4
4.55
2
0.98
3
6.00
3
5.50
4
2.50
3
2.00
4
7.85
4
3.75
2
0.98
3
3.00
4
7.00
3
4.20
6
3.50
4
4.50
4
4.00
4
6.80
4
7.00
2
0.98
3
5.65
4
3.50
4
5.75
2
0.98
3
3.35
4
3.45
2
0.98
3
2.75
4
2.85
2
0.98
3
4.50
4
2.50
4
4.60
2
0.98
3
6.70
4
4.00
4
6.80
2
0.98
3
1.85
4
1.95
2
1.06

CANTIDAD DE
VARILLAS (UN)

VT-1

VT-2

VT-3

VT-4

VT-5

VT-6

VT-7

VT-8

VT-9

VT-10

VT-11

1
1
1
1
1
1
1
1
43
1
1
10
1
1
1
13
1
1
1
1
1
1
35
1
1
1
1
1
1
1
1
42
1
1
1
18
1
1
10
1
1
8
1
1
1
12
1
1
1
19
1
1
5

2/8"

TOTAL
REF. KG

0.32

0.32
1.78
0.45
2.99
0.43
1.02
1.70
1.80
1.34
0.23
0.57
0.19
0.19
0.13
0.46
0.16
0.26
0.23
0.25
0.09
0.80
0.38
0.44
0.26
1.42
0.36
2.39
0.91
0.81
1.38
1.42
1.05
0.12
0.18
0.29
0.11
0.07
0.18
0.06
0.06
0.14
0.05
0.10
0.13
0.23
0.07
0.14
0.20
0.35
0.12
0.04
0.10
0.03
28.98

1.78
0.45
2.99
0.43
1.02
1.70
1.80
1.34
0.23
0.57
0.19
0.19
0.13
0.46
0.16
0.26
0.23
0.25
0.09
0.80
0.38
0.44
0.26
1.42
0.36
2.39
0.91
0.81
1.38
1.42
1.05
0.12
0.18
0.29
0.11
0.07
0.18
0.06
0.06
0.14
0.05
0.10
0.13
0.23
0.07
0.14
0.20
0.35
0.12
0.04
0.10
0.03
PESO TOTAL
2/8"

PESO POR KG

3.62

3/8"
3.47

1/2"
16.52

(ML)
85.4

mm
3.5

5/8"
-

3/4"
5.38

7/8"

1"
-

ACTIVIDAD 4.14. ESTRUCTURA LOSA AREA BAJO CUBIERTA INF


CALCULO VOLUMEN CONCRETO LOSA AREA BAJO CUBIERTA DE ENTREPISO INFERIOR
ELEMENTO
ANCHO
LARGO
CANTIDAD
ALTO
AREA TOTAL
17.35
13.00
1
0.03
DTO FOSO ASCENSOR
2.00
-1.95
1
0.03
DTO ESCALERA 1
2.00
-2.03
1
0.03
DTO ESCALERA 2
1.93
-1.75
1
0.03
DTO ESCALERA 3
1.35
-2.85
1
0.03
DTO ESCALERA 4
1.10
-2.98
1
0.03
DTO PTO FIJO
2.86
-3.07
1
0.03
TOTAL VOLUMEN

SUBTOTAL
6.77
-0.12
-0.12
-0.10
-0.12
-0.10
-0.26
5.95

M3

ACTIVIDAD 4.15. CALCULO PESO MALLA M-0.64 inf


CANTIDAD OBRA ACERO
AREA TIL MALLA
12.8 M2
AREA LOSA DE ENTREPISO
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
17.35
13.00
1
DTO FOSO ASCENSOR
2.00
-1.95
1
DTO ESCALERA 1
2.00
-2.03
1
DTO ESCALERA 2
1.93
-1.75
1
DTO ESCALERA 3
1.35
-2.85
1
DTO ESCALERA 4
1.10
-2.98
1
DTO PTO FIJO
2.86
-3.07
1
TOTAL REA

SUBTOTAL
225.55
-3.90
-4.06
-3.38
-3.85
-3.28
-8.78
198.31

CANTIDAD MALLAS PLACA INFERIOR


CALCULO PESO MALLA
AREA
ANCHO
4

LARGO
3.20

ESPACIO
0.15

TOTAL PARA 20 MALLAS


4222.538238 KG

M2

15 UNIDADES MALLA DIAMETRO 3,5 mm

No. DE GRAFILES
ANCHO
ESPACIO
27
0.15

LARGO
21

LONGITUD
(ML)
85.5

DIAMETRO GRAFIL
Pulg.
mm
0.14
3.5

Pulg.
0.14

PESO
(KG/ML)
0.08

PESO
(KG/ML)
0.08

PESO
TOTAL
272.55

ACTIVIDAD 4.16. ESTRUCTURA LOSA AREA BAJO CUBIERTA SUP


CALCULO VOLUMEN CONCRETO LOSA DE ENTREPISO SUPERIOR
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
17.35
13.00
1
DTO FOSO ASCENSOR
2.00
-1.95
1
DTO ESCALERA 1
2.00
-2.03
1
DTO ESCALERA 2
1.93
-1.75
1
DTO ESCALERA 3
1.35
-2.85
1
DTO ESCALERA 4
1.10
-2.98
1
DTO PTO FIJO
2.86
-3.07
1
TOTAL VOLUMEN

ALTO

SUBTOTAL
10.15
-0.18
-0.18
-0.15
-0.17
-0.15
-0.40
8.92

0.045
0.045
0.045
0.045
0.045
0.045
0.045

M3

ACTIVIDAD 4.17. CALCULO PESO MALLA M-1.06 sup


CANTIDAD OBRA ACERO
AREA TIL MALLA
12.8 M2
AREA LOSA DE ENTREPISO
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
17.35
13
1
DTO FOSO ASCENSOR
2
-1.95
1
DTO ESCALERAS
2
-2.03
1
DTO PTO FIJO
2.86
-3.08
1
TOTAL REA

SUBTOTAL
225.55
-3.9
-4.06
-8.8088
208.78

CANTIDAD MALLAS PLACA SUPERIOR


CALCULO PESO MALLA
AREA
ANCHO
4

LARGO
3.20

16 UNIDADES MALLA DIAMETRO 4,5 mm

No. DE GRAFILES
ANCHO
ESPACIO
27
0.15

ESPACIO
0.15

TOTAL PARA 21 MALLAS

M2

LONGITUD
(ML)
85.5

LARGO
21

(ML)
85.4

mm
4.5

3/8"

1/2"

DIAMETRO GRAFIL
Pulg.
mm
0.18
4.5

Pulg.
0.18

PESO
(KG/ML)
0.13

PESO
(KG/ML)
0.13

7/8"

1"

TOTAL
REF. KG

7348.80 KG

ACTIVIDAD 4.18. VIGAS PISO AREA BAJO CUBIERTA


CALCULO VOLUMEN CONCRETO VIGAS
ELEMENTO
ANCHO
LARGO
V 601
0.35
17.35
V 602
0.20
11.60
V 603
0.20
6.05
V 604
0.40
17.35
V 605
0.20
6.05
V 606
0.35
4.80
V 607
0.35
17.35
V 608
0.30
11.50
V 609
0.30
10.95
V 610
0.30
11.35
V 611
0.30
11.70
V 612
0.20
3.60
TOTAL VOLUMEN

CANTIDAD
1
1
1
1
1
1
1
1
1
1
1
1

ALTO
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45

SUBTOTAL
2.73
1.04
0.54
3.12
0.54
0.76
2.73
1.55
1.48
1.53
1.58
0.32
17.94

M3

CANTIDAD OBRA ACERO

UBICACIN

VIGAS PISO AREA BAJO


CUBIERTA

CANTIDAD DE
ELEMENTOS
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

NUMERO DE
ELEMENTO

V 601

V 602

V 603

V 604

V 605

V 606

V 607

V 608

DATOS PARA REFUERZO


DIAMETRO
LONGITUD (m)
(N
VARILLA)
6
4.00
6
11.00
6
4.00
6
2.00
7
2.50
6
4.50
5
2.50
6
2.50
6
11.00
6
7.30
3
1.48
4
3.50
5
6.00
4
3.70
5
3.00
4
4.00
4
3.50
4
11.75
3
1.18
4
6.25
6
5.00
3
1.18
6
9.50
6
8.80
6
2.00
6
3.00
7
3.00
6
4.60
6
3.00
6
3.35
6
2.50
4
4.00
6
3.10
6
3.00
6
3.55
6
11.00
6
7.30
3
1.58
3
0.57
3
1.53
3
1.28
4
6.05
6
4.00
5
6.25
3
1.18
5
5.20
5
2.90
3
1.48
3
1.33
6
9.00
6
9.45
6
6.35
6
5.10
6
7.55
5
2.00
4
2.50
6
6.35
6
5.10
6
1.50
4
2.00
6
11.50
6
6.95
3
1.48
3
1.18
5
10.00
4
10.00
5
4.10
4
4.10
5
2.00
5
3.00
6
2.00
5
6.00
4
6.00
3
6.00
5
8.10
4
8.10

CANTIDAD DE
VARILLAS (UN)
2
2
2
1
1
1
1
1
2
2
114
2
2
2
1
1
1
2
61
2
4
30
2
1
2
1
1
1
1
1
2
1
1
1
1
2
1
89
68
19
6
2
1
2
29
4
2
22
22
1
1
1
1
1
1
1
1
1
1
1
1
2
89
22
2
1
2
1
1
1
1
2
1
2
2
1

2/8"

5/8"

3/4"
0.34
0.94
0.34
0.09

0.17
0.19
0.06
0.11
0.94
0.62
0.90
0.09
0.30
0.09
0.08
0.05
0.04
0.30
0.38
0.16
0.85
0.19
0.81
0.38
0.17
0.13
0.20
0.20
0.13
0.14
0.21
0.05
0.13
0.13
0.15
0.94
0.31
0.75
0.21
0.16
0.04
0.15
0.17
0.32
0.18
0.53
0.15
0.17
0.16
0.38
0.40
0.27
0.22
0.32
0.05
0.03
0.27
0.22
0.06
0.03
0.49
0.59
0.70
0.14
0.51
0.13
0.21
0.05
0.05
0.08
0.09
0.30
0.08
0.06
0.41
0.10

0.34
0.94
0.34
0.09
0.17
0.19
0.06
0.11
0.94
0.62
0.90
0.09
0.30
0.09
0.08
0.05
0.04
0.30
0.38
0.16
0.85
0.19
0.81
0.38
0.17
0.13
0.20
0.20
0.13
0.14
0.21
0.05
0.13
0.13
0.15
0.94
0.31
0.75
0.21
0.16
0.04
0.15
0.17
0.32
0.18
0.53
0.15
0.17
0.16
0.38
0.40
0.27
0.22
0.32
0.05
0.03
0.27
0.22
0.06
0.03
0.49
0.59
0.70
0.14
0.51
0.13
0.21
0.05
0.05
0.08
0.09
0.30
0.08
0.06
0.41
0.10

PESO
TOTAL
450.54

CUBIERTA

V 608

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

V 609

V 610

V 611

V 612

2
68
68
15
15
2
2
2
1
2
1
2
1
2
2
85
1
2
1
1
1
2
2
2
1
1
1
1
1
2
1
86
2
2
1
1
1
2
2
2
2
83
4
1
43

3
3
3
3
3
5
5
6
6
6
5
5
4
5
5
3
5
6
5
5
5
7
6
6
4
6
5
5
5
5
6
3
5
5
6
6
6
5
3
5
3
3
4
6
3

8.00
1.38
1.29
1.38
1.17
10.00
4.10
2.50
3.00
2.00
2.00
3.00
4.50
6.00
8.10
1.38
10.00
4.30
3.50
5.65
4.50
2.00
2.50
3.00
2.50
2.50
6.30
3.50
8.00
6.30
6.30
1.38
10.00
4.10
2.00
3.00
2.00
6.00
6.00
8.10
8.10
1.38
7.00
2.00
1.18

0.09
0.50
0.47
0.11
0.09

0.09
0.50
0.47
0.11
0.09
0.51
0.21
0.21
0.13
0.17
0.05
0.15
0.06
0.30
0.41
0.63
0.25
0.37
0.09
0.14
0.11
0.27
0.21
0.26
0.03
0.11
0.16
0.09
0.20
0.32
0.27
0.63
0.51
0.21
0.09
0.13
0.09
0.30
0.06
0.41
0.09
0.61
0.36
0.09
0.27
31.37

0.51
0.21
0.21
0.13
0.17
0.05
0.15
0.06
0.30
0.41
0.63
0.25
0.37
0.09
0.14
0.11
0.27
0.21
0.26
0.03
0.11
0.16
0.09
0.20
0.32
0.27
0.63
0.51
0.21
0.09
0.13
0.09
0.30
0.06
0.41
0.09
0.61
0.36
0.09
0.27
PESO TOTAL
2/8"

PESO POR KG

3/8"
7.59

1/2"
1.80

5/8"
7.49

3/4"
13.85

7/8"
0.64

1"

3/8"

1/2"

5/8"

3/4"

7/8"

1"

ACTIVIDAD 4.19. VIGUETAS PISO AREA BAJO CUBIERTA


CALCULO VOLUMEN CONCRETO VIGUETAS
ELEMENTO
ANCHO
LARGO
VT 601
0.10
1.15
VT 602
0.10
2.60
VT 603
0.10
8.40
VT 604
0.10
11.50
VT 605
0.10
2.90
VT 606
0.10
3.60
VT 607
0.15
3.07
VT 608
0.10
5.90
VT 609
0.10
11.90
VT 610
0.10
6.40
VT 611
0.10
5.95
VT 612
0.10
5.95
VT 613
0.10
2.90
VT 614
0.10
4.90
VT 615
0.10
2.83
VT 616
0.10
2.08
VT 617
0.10
3.70
VT 618
0.10
4.35
VT 619
0.10
5.28
VT 620
0.10
1.14
VT 621
0.10
3.03
VT 622
0.10
1.00

CANTIDAD
2
2
2
2
4
2
1
1
1
2
1
2
1
1
1
1
2
1
1
1
1
1

ALTO
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
1.45
2.45
3.45
4.45

SUBTOTAL
0.10
0.23
0.76
1.04
0.52
0.32
0.21
0.27
0.54
0.58
0.27
0.54
0.13
0.22
0.13
0.09
0.33
0.20
0.77
0.28
1.04
0.45
9.00

M3

CANTIDAD OBRA ACERO

UBICACIN

VIGUETAS AREA BAJO


CUBIERTA

CANTIDAD DE
ELEMENTOS
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
4
4
4
2
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
1
1
1
1
2
2
2
2

NUMERO DE
ELEMENTO

VT 601

VT 602

VT 603

VT 604

VT 605

VT 606

VT 607

VT 608

VT 609

VT 610

VT 611

VT 612

DATOS PARA REFUERZO


DIAMETRO
LONGITUD (m)
(N
VARILLA)
3
4.90
3
3.00
4
5.00
2
0.98
3
3.40
4
3.50
2
0.98
3
9.85
4
2.50
4
9.95
2
0.98
3
2.50
4
9.00
3
2.70
4
8.80
4
5.00
2
0.98
3
3.65
4
3.75
2
0.98
3
4.45
3
3.00
4
4.55
2
0.98
3
3.85
2
1.14
3
2.00
3
2.10
4
2.50
4
4.00
4
7.20
2
0.98
3
3.50
4
8.50
3
2.20
4
4.00
4
6.80
4
3.00
4
7.00
2
0.98
3
2.00
4
3.50
3
2.20
4
6.85
2
0.98
3
3.75
4
4.00
4
3.85
2
0.98
3
6.90
6
4.00
4
7.00
2
0.98

CANTIDAD DE
VARILLAS (UN)
1
1
1
15
1
1
10
1
1
1
32
1
1
1
1
1
42
1
1
11
1
1
1
13
4
11
1
1
1
1
1
22
1
1
1
1
1
1
1
41
1
1
1
1
21
1
1
1
21
1
1
1
21

2/8"

0.05
0.03
0.13
0.05
0.04
0.09
0.03
0.11
0.06
0.25
0.10
0.03
0.23
0.03
0.22
0.13
0.13
0.08
0.19
0.07
0.05
0.03
0.12
0.04
0.08
0.02
0.01
0.01
0.03
0.05
0.09
0.03
0.02
0.11
0.01
0.05
0.09
0.04
0.09
0.06
0.02
0.09
0.02
0.17
0.07
0.02
0.05
0.05
0.03
0.07
0.34
0.18
0.07

TOTAL
REF. KG
0.05
0.03
0.13
0.05
0.04
0.09
0.03
0.11
0.06
0.25
0.10
0.03
0.23
0.03
0.22
0.13
0.13
0.08
0.19
0.07
0.05
0.03
0.12
0.04
0.08
0.02
0.01
0.01
0.03
0.05
0.09
0.03
0.02
0.11
0.01
0.05
0.09
0.04
0.09
0.06
0.02
0.09
0.02
0.17
0.07
0.02
0.05
0.05
0.03
0.07
0.34
0.18
0.07

VIGUETAS AREA BAJO


CUBIERTA

1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

VT 613

VT 614

VT 615

VT 616

VT 617

VT 618

VT 619

VT 620
VT 621

VT 622

1
1
10
1
1
1
18
1
1
10
1
1
8
1
1
15
1
1
12
1
1
1
20
2
5
1
1
11
1
1
4

3
4
2
3
3
4
2
3
4
2
3
4
2
3
4
2
3
4
2
3
5
4
2
4
2
3
4
2
3
5
2

3.50
3.60
0.98
5.65
2.00
5.75
0.98
3.50
3.60
0.98
2.75
2.85
0.98
4.70
4.80
0.98
4.65
4.75
0.98
6.70
4.00
6.80
0.98
1.95
0.98
3.75
3.85
0.98
1.50
1.60
0.98

0.02

0.02
0.05
0.02
0.03
0.01
0.07
0.03
0.02
0.05
0.02
0.01
0.04
0.01
0.05
0.12
0.05
0.02
0.06
0.02
0.04
0.10
0.09
0.03
0.05
0.01
0.02
0.05
0.02
0.01
0.04
0.01
5.40

0.05
0.02
0.03
0.01
0.07
0.03
0.02
0.05
0.02
0.01
0.04
0.01
0.05
0.12
0.05
0.02
0.06
0.02
0.04
0.10
0.09
0.03
0.05
0.01
0.02
0.05
0.02
0.01
0.04
0.01
PESO TOTAL
2/8"

PESO POR KG

0.90

3/8"
0.94

1/2"
3.07

5/8"
0.14

3/4"
0.34

7/8"

3/8"

1/2"

5/8"

3/4"

7/8"

1"
-

ACTIVIDAD 4.20. VIGAS CUBIERTA


CALCULO VOLUMEN CONCRETO VIGAS
ELEMENTO
ANCHO
LARGO
VC-1
0.25
17.35
VC-2
0.25
6.25
VC-3
0.25
8.40
VC-4
0.25
5.20
VC-5
0.25
17.35
VC-6
0.30
12.00
VC-7
0.30
8.90
VC-8
0.25
12.00
VC-9
0.25
3.60
VC-10
0.20
3.60
VC-11
0.20
6.45
VC-12
0.20
3.60
TOTAL VOLUMEN

CANTIDAD
1
1
1
1
1
1
1
1
1
2
2
2

ALTO
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.30
0.30
0.30
0.30

SUBTOTAL
1.52
0.55
0.74
0.46
1.52
1.26
0.93
1.05
0.27
0.43
0.77
0.43
9.93

M3

CANTIDAD OBRA ACERO

UBICACIN

VIGAS CUBIERTA

CANTIDAD DE
ELEMENTOS
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

NUMERO DE
ELEMENTO

VC-1

VC-2

VC-3

VC-4

VC-5

VC-6

VC-7

VC-8

DATOS PARA REFUERZO


DIAMETRO
CANTIDAD DE
LONGITUD (m)
(N
VARILLAS (UN)
VARILLA)
2
5
6.20
2
4
2.90
2
4
9.50
2
5
5.80
2
4
2.00
2
7
2.50
4
5
1.50
2
4
4.30
2
4
4.40
2
4
6.50
2
4
5.80
146
3
1.08
2
5
3.20
2
4
5.50
2
4
1.50
2
5
1.50
2
4
4.30
2
4
3.70
52
3
1.08
2
4
7.60
2
5
3.20
1
4
2.50
2
4
5.90
2
4
4.40
2
5
1.50
78
3
1.08
2
4
5.60
1
4
2.50
2
4
5.60
46
3
1.08
2
5
6.20
2
4
2.90
2
4
9.50
2
5
5.80
4
4
2.00
4
5
1.50
2
4
4.30
2
4
6.50
2
4
5.80
2
4
4.40
136
3
1.08
1
4
3.50
1
4
10.30
1
4
3.20
1
4
9.90
1
4
11.50
1
7
2.00
1
4
2.50
1
4
1.50
1
4
2.00
1
4
2.50
1
4
11.50
1
4
3.20
1
4
9.90
2
3
9.80
1
4
3.00
1
4
10.70
26
3
1.08
77
3
1.08
77
3
1.07
4
4
9.90
2
3
9.80
82
3
1.22
1
4
6.00
1
4
7.20
1
4
1.70
1
4
3.20
1
4
11.70
1
6
2.00
1
3
2.50
1
4
2.00
1
4
3.20
1
4
2.50
1
4
7.20
1
4
6.00

2/8"

0.31
0.07
0.24
0.29
0.05
0.34
0.15
0.11
0.11
0.17
0.15
0.84
0.16
0.14
0.04
0.08
0.11
0.09
0.30
0.19
0.16
0.03
0.15
0.11
0.08
0.45
0.14
0.03
0.14
0.26
0.31
0.07
0.24
0.29
0.10
0.15
0.11
0.17
0.15
0.11
0.78
0.04
0.13
0.04
0.13
0.15
0.14
0.03
0.02
0.03
0.03
0.15
0.04
0.13
0.10
0.04
0.14
0.15
0.44
0.44
0.50
0.10
0.53
0.08
0.09
0.02
0.04
0.15
0.09
0.01
0.03
0.04
0.03
0.09
0.08

1"

TOTAL
REF. KG
0.31
0.07
0.24
0.29
0.05
0.34
0.15
0.11
0.11
0.17
0.15
0.84
0.16
0.14
0.04
0.08
0.11
0.09
0.30
0.19
0.16
0.03
0.15
0.11
0.08
0.45
0.14
0.03
0.14
0.26
0.31
0.07
0.24
0.29
0.10
0.15
0.11
0.17
0.15
0.11
0.78
0.04
0.13
0.04
0.13
0.15
0.14
0.03
0.02
0.03
0.03
0.15
0.04
0.13
0.10
0.04
0.14
0.15
0.44
0.44
0.50
0.10
0.53
0.08
0.09
0.02
0.04
0.15
0.09
0.01
0.03
0.04
0.03
0.09
0.08

VC-8

1
1
1
1
1
1
2
2
2
2
2
2
2
2

VC-9
VC-10
VC-11

VC-12

1
1
104
2
2
27
4
27
2
2
43
2
2
27

4
4
3
6
4
3
4
3
6
4
3
5
4
3

1.70
11.70
1.08
4.05
3.95
0.98
3.95
0.88
6.75
6.65
0.88
3.95
3.95
0.98

0.02
0.15

0.02
0.15
0.60
0.35
0.10
0.14
0.40
0.25
1.15
0.34
0.40
0.40
0.20
0.28
17.04

0.60
0.35
0.10
0.14
0.40
0.25
1.15
0.34
0.40
0.40
0.20
0.28
PESO TOTAL
2/8"

PESO POR KG

3/8"
6.11

1/2"
6.47

5/8"
2.40

3/4"
1.58

7/8"
0.47

1"

(ML)
85.4

mm
3.5

DIAMETRO GRAFIL
Pulg.
mm
0.14
3.5

Pulg.
0.14

PESO
(KG/ML)
0.08

PESO
(KG/ML)
0.08

PESO
TOTAL
272.55

(ML)
85.4

mm
4.5

DIAMETRO GRAFIL
Pulg.
mm
0.18
4.5

Pulg.
0.18

PESO
(KG/ML)
0.13

PESO
(KG/ML)
0.13

PESO
TOTAL
450.54

(ML)
85.4

mm
3.5

DIAMETRO GRAFIL
Pulg.
mm
0.14
3.5

Pulg.
0.14

PESO
(KG/ML)
0.08

PESO
(KG/ML)
0.08

PESO
TOTAL
272.55

(ML)
85.4

mm
4.5

DIAMETRO GRAFIL
Pulg.
mm
0.18
4.5

Pulg.
0.18

PESO
(KG/ML)
0.13

PESO
(KG/ML)
0.13

PESO
TOTAL
450.54

ACTIVIDAD 4.21. ESTRUCTURA LOSA CUARTO DE MQUINAS INF


CALCULO VOLUMEN CONCRETO LOSA CUARTO DE MAQUINAS INFERIOR
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
6.36
3.62
1.00
DTO 1
2.00
-3.42
1.00
TOTAL VOLUMEN

ALTO

SUBTOTAL
0.69
-0.21
0.49

0.03
0.03

M3

ACTIVIDAD 4.22. CALCULO PESO MALLA M-0.64 inf


CANTIDAD OBRA ACERO
AREA TIL MALLA
12.8 M2
AREA LOSA DE ENTREPISO
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
6.63
3.62
1.00
DTO 1
2.00
-3.42
1.00
TOTAL REA

SUBTOTAL
24.00
-6.84
17.16

CANTIDAD MALLAS PLACA INFERIOR


CALCULO PESO MALLA
AREA
ANCHO
4

LARGO
3.20

ESPACIO
0.15

M2

1 UNIDADES MALLA DIAMETRO 3,5 mm

No. DE GRAFILES
ANCHO
ESPACIO
27
0.15

LONGITUD
(ML)
85.5

LARGO
21

TOTAL PARA 20 MALLAS


365.3999242 KG
ACTIVIDAD 4.23. ESTRUCTURA LOSA CUARTO DE MQUINAS SUP
CALCULO VOLUMEN CONCRETO LOSA CUARTO DE MAQUINAS SUPERIOR
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
6.36
3.62
1.00
DTO FOSO ASCENSOR
2.00
-3.42
1.00
TOTAL VOLUMEN

ALTO

SUBTOTAL
1.04
-0.31
0.73

0.045
0.045

M3

ACTIVIDAD 4.24. CALCULO PESO MALLA M-1.06 sup


CANTIDAD OBRA ACERO
AREA TIL MALLA
12.8 M2
AREA LOSA DE ENTREPISO
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
6.36
3.62
1.00
DTO FOSO ASCENSOR
2.00
-3.42
1.00
TOTAL REA

SUBTOTAL
23.02
-6.84
16.18

CANTIDAD MALLAS PLACA SUPERIOR


CALCULO PESO MALLA
AREA
ANCHO
4

LARGO
3.20

ESPACIO
0.15

M2

1 UNIDADES MALLA DIAMETRO 4,5 mm

No. DE GRAFILES
ANCHO
ESPACIO
27
0.15

LONGITUD
(ML)
85.5

LARGO
21

TOTAL PARA 21 MALLAS


569.6253714 KG

ACTIVIDAD 4.25. ESTRUCTURA LOSA CUBIERTA CUARTO DE MQUINAS INF


CALCULO VOLUMEN CONCRETO LOSA CUBIERTA CUARTO DE MAQUINAS INFERIOR
ELEMENTO
ANCHO
LARGO
CANTIDAD
ALTO
AREA TOTAL
6.36
3.62
1
0.03
TOTAL VOLUMEN

SUBTOTAL
0.69
0.69

M3

ACTIVIDAD 4.26. CALCULO PESO MALLA M-0.64 inf


CANTIDAD OBRA ACERO
AREA TIL MALLA
12.8 M2
AREA LOSA DE ENTREPISO
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
6.36
3.62
1
TOTAL REA

SUBTOTAL
23.02
23.02

CANTIDAD MALLAS PLACA INFERIOR


CALCULO PESO MALLA
AREA
ANCHO
4

LARGO
3.20

ESPACIO
0.15

M2

2 UNIDADES MALLA DIAMETRO 3,5 mm

No. DE GRAFILES
ANCHO
ESPACIO
27
0.15

LONGITUD
(ML)
85.5

LARGO
21

TOTAL PARA 2 MALLAS490.2320161 KG


ACTIVIDAD 4.27. ESTRUCTURA LOSA CUBIERTA CUARTO DE MQUINAS SUP
CALCULO VOLUMEN CONCRETO LOSA CUBIERTA CUARTO DE MAQUINAS SUPERIOR
ELEMENTO
ANCHO
LARGO
CANTIDAD
ALTO
AREA TOTAL
6.36
3.62
1
0.045
TOTAL VOLUMEN

SUBTOTAL
1.036044
1.04

M3

ACTIVIDAD 4.28. CALCULO PESO MALLA M-1.06 sup


CANTIDAD OBRA ACERO
AREA TIL MALLA
12.8 M2
AREA LOSA DE ENTREPISO
ELEMENTO
ANCHO
LARGO
CANTIDAD
AREA TOTAL
6.36
3.62
1
TOTAL REA

SUBTOTAL
23.0232
23.02

CANTIDAD MALLAS PLACA SUPERIOR


CALCULO PESO MALLA
AREA
ANCHO
4

LARGO
3.20

ESPACIO
0.15

TOTAL PARA 2 MALLAS810.3835367 KG

M2
2 UNIDADES MALLA DIAMETRO 4,5 mm

No. DE GRAFILES
ANCHO
ESPACIO
27
0.15

LARGO
21

LONGITUD
(ML)
85.5

MEMORIAS DE CALCULO CANTIDADES DE OBRA


ACTIVIDAD 4.29. ESTRUCTURA LOSA FONDO TANQUE
CALCULO VOLUMEN CONCRETO LOSA FONDO TANQUE
ELEMENTO
ANCHO
LARGO
AREA TOTAL
4.04
2.35
TOTAL VOLUMEN

CANTIDAD
1

ALTO
0.2

SUBTOTAL
1.90
1.90
M3

CANTIDAD OBRA ACERO


UBICACIN

CANTIDAD DE ELEMENTOS

PLACA FONDO
TANQUE

1
1
1
1
1
1
1
1

NUMERO DE
ELEMENTO
LONGITUDINAL
TRANSVERSAL
PL PARED 1
PL PARED 1
PL PARED 2
PL PARED 2
PL PARED 3
PL PARED 3

DATOS PARA REFUERZO


CANTIDAD DE
DIAMETRO
LONGITUD (m)
VARILLAS (UN)
(N VARILLA)
18
4
4.04
16
4
2.35
8
4
9.40
16
4
3.80
16
4
4.04
32
4
2.45
16
4
4.04
32
4
2.45

2/8"

3/8"

1/2"

5/8"

3/4"

7/8"

1/2"
6.76

5/8"

3/4"

7/8"

1/2"

5/8"

TOTAL REF.
KG
0.92
0.48
0.96
0.77
0.82
1.00
0.82
1.00
6.76

1"

0.92
0.48
0.96
0.77
0.82
1.00
0.82
1.00
PESO TOTAL
2/8"

PESO POR KG

3/8"
-

1"
-

ACTIVIDAD 4.30. ESTRUCTURA LOSA SUPERIOR TANQUE


CALCULO VOLUMEN CONCRETO LOSA SUPERIOR TANQUE
ELEMENTO
ANCHO
LARGO
AREA TOTAL
4.04
2.03
DTO TAPA
0.6
-0.6
TOTAL VOLUMEN

CANTIDAD
1
1

ALTO
0.03
0.03

SUBTOTAL
0.246036
-0.0108
0.24
M3

CANTIDAD OBRA ACERO


DATOS PARA REFUERZO
UBICACIN

CANTIDAD DE ELEMENTOS

NUMERO DE
ELEMENTO

CANTIDAD DE
VARILLAS (UN)

DIAMETRO
(N VARILLA)

LONGITUD (m)

PLACA SUPERIOR
TANQUE

1
1

LONGITUDINAL
TRANSVERSAL

18
16

4
4

4.04
2.35

2/8"

3/8"

3/4"

7/8"

TOTAL REF.
KG

1"

0.92
0.48

0.92
0.48
1.40

PESO TOTAL
2/8"
PESO POR KG

3/8"
-

1/2"
1.40

5/8"

1/2"

5/8"

3/4"
-

7/8"
-

1"
-

ACTIVIDAD 4.31. ESTRUCTURA ESCALERAS

CALCULO VOLUMEN CONCRETO ESCALERAS


ELEMENTO
PASO
CONTRAPASO
ESCALONES
0.27
0.187
PLACA DEBAJO ESCALONES
0.1
5.23
DESCANSO
0.45
2
TOTAL VOLUMEN

CANTIDAD ESCALERAS
TOTAL VOLUMEN 7 ESCALERAS

CANTIDAD ANCHO ESCALON SUBTOTAL


14
1
0.70686
2
1
1.046
1
2
1.8
3.55

7 UN
24.87002 M3

UBICACIN

CANTIDAD DE ELEMENTOS

NUMERO DE
ELEMENTO

CANTIDAD DE
VARILLAS (UN)

DIAMETRO
(N VARILLA)

LONGITUD (m)

ESCALERAS

7
7
7
7
7
7

ESC. 1
ESC. 2
ESC. 3
ESC. 4
DESC. 5
DESC. 6

7
7
11
7
2
8

3
3
3
3
4
3

0.80
2.75
2.95
0.80
2.00
1.31

2/8"

3/8"

3/4"

7/8"

TOTAL REF.
KG

1"

0.21
0.72
1.21
0.21

0.21
0.72
1.21
0.21
0.36
0.39
3.10

0.36
0.39
PESO TOTAL
2/8"

PESO POR KG

3/8"
2.74

1/2"
0.36

5/8"

3/8"

1/2"

5/8"

3/4"
-

7/8"
-

1"
-

ACTIVIDAD 4.32. RAMPA SALIDA

CALCULO VOLUMEN CONCRETO RAMPA SALIDA


ELEMENTO
ANCHO
LARGO
CORTE C-C
3.5
4.61
TOTAL VOLUMEN

CANTIDAD
1

ALTO
0.20

UBICACIN

CANTIDAD DE ELEMENTOS

NUMERO DE
ELEMENTO

CANTIDAD DE
VARILLAS (UN)

DIAMETRO
(N VARILLA)

LONGITUD (m)

RAMPA ACCESO

1
1
1

RAMP. ACC. 1
RAMP. ACC. 2
RAMP. ACC. 3

34
20
12

3
4
3

3.70
5.50
5.55

SUBTOTAL
3.23
3.23

2/8"

3/4"

7/8"

TOTAL REF.
KG

1"

0.67

0.67
1.40
0.36
2.42

1.40
0.36
PESO TOTAL
2/8"

PESO POR KG

3/8"
1.03

1/2"
1.40

5/8"

3/8"

1/2"

5/8"

3/4"
-

7/8"
-

1"
-

ACTIVIDAD 4.33. RAMPA ACCESO

CALCULO VOLUMEN CONCRETO RAMPA ACCESO


ELEMENTO
ANCHO
LARGO
CORTE D-D
3.35
4.76
TOTAL VOLUMEN

CANTIDAD
1

ALTO
0.20

UBICACIN

CANTIDAD DE ELEMENTOS

NUMERO DE
ELEMENTO

CANTIDAD DE
VARILLAS (UN)

DIAMETRO
(N VARILLA)

LONGITUD (m)

RAMPA ACCESO

1
1
1

RAMP. SAL. 1
RAMP. SAL. 2
RAMP. SAL. 3

34
19
12

3
4
3

3.55
5.65
5.70

SUBTOTAL
3.19
3.19

2/8"

3/4"

7/8"

1"

0.64
1.36
0.36
PESO TOTAL

TOTAL REF.
KG
0.64
1.36
0.36
2.37

2/8"
PESO POR KG

3/8"
1.01

1/2"
1.36

5/8"

3/8"
0.09
0.26
0.29
0.32
0.69

1/2"

5/8"

3/4"
-

7/8"
-

1"
-

ACTIVIDAD 4.16. MURO DE CONTENCIN

CALCULO VOLUMEN CONCRETO RAMPA SALIDA


ELEMENTO
ANCHO
LARGO
M1
0.2
29.2
M2
0.2
21.8
TOTAL VOLUMEN

UBICACIN

MURO EJE 1

MURO EJE 3

CANTIDAD DE ELEMENTOS
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

NUMERO DE

REFUERZO A

REFUERZO B

SECCION 2

SECCION 1

REFUERZO A

REFUERZO B

REFUERZO C

REFUERZO D

REFUERZO E

REFUERZO F

REFUERZO G

REFUERZO H

REFUERZO I

CANTIDAD
1
1

ALTO
3.3
3.3

DATOS PARA REFUERZO


CANTIDAD DE
DIAMETRO
LONGITUD (m)
10
3
1.70
10
3
4.90
10
3
5.50
10
3
6.00
20
3
6.50
10
5
6.00
10
5
3.00
10
5
5.50
8
3
4.60
8
3
1.90
24
3
6.50
16
3
6.00
8
3
5.50
8
3
2.50
128
3
3.12
50
3
1.18
100
3
0.32
100
3
0.32
50
3
1.18
68
3
3.12
3
3
3.50
3
3
5.55
3
3
6.00
3
3
6.50
3
5
6.00
3
5
6.50
2
5
2.10
2
5
5.10
5
7
6.50
5
7
5.50
5
7
3.00
6
4
3.50
6
3
5.65
6
4
6.05
6
3
6.50
6
4
6.00
6
3
6.00
6
4
6.50
6
3
5.50
6
4
2.50
3
3
3.60
3
3
6.00
3
3
5.60
3
3
6.00
3
3
6.50
2
4
2.00
3
4
6.50
2
4
5.00
5
6
6.50
5
7
5.50
5
6
3.00
6
4
3.60
6
3
5.65
6
4
5.90
6
3
6.50
6
4
6.00
6
3
6.00
6
4
6.50
6
3
5.50
6
4
2.50
6
3
3.50
6
3
5.70
6
3
5.70
6
3
6.00
6
5
6.50
6
5
6.50
4
5
2.30
4
5
4.80
10
6
6.50
10
7
6.50
10
6
3.50
6
4
3.70
6
3
5.85
6
4
5.50
6
3
6.00
6
4
6.50
6
3
6.50
6
4
6.00
6
3
6.00
6
4
3.50
3
3
6.00
3
3
5.65
3
3
5.80
3
3
6.50
3
3
6.50
3
4
6.50
2
4
2.20
2
4
5.20
5
7
6.50
5
6
6.00
5
7
3.50
6
4
3.60
6
3
6.00
6
4
5.60
6
3
6.00
6
4
6.50
6
3
6.50
6
4
6.00
6
3
6.00
6
4
3.50
3
3
3.60
3
3
5.70
3
3
5.60
3
3
6.00
3
5
6.50
3
5
6.50
2
5
2.30
2
3
4.80
5
7
6.50
5
7
6.50

SUBTOTAL
19.272
14.388
33.66

2/8"

3/4"

7/8"

1.52
0.76
1.40
0.20
0.08
0.83
0.51
0.23
0.11
2.13
0.31
0.17
0.17
0.31
1.13
0.06
0.09
0.10
0.10
0.46
0.50
0.11
0.26
2.20
1.86
1.01
0.27
0.18
0.46
0.21
0.46
0.19
0.50
0.18
0.19
0.06
0.10
0.09
0.10
0.10
0.05
0.25
0.13
0.35
0.34
0.16

1.39
1.86
0.64
0.27

0.18
0.45
0.21
0.46
0.19
0.50
0.18
0.19
0.11
0.18
0.18
0.19
0.99
0.99
0.23
0.49
2.77
4.39
1.49
0.28
0.19
0.42
0.19
0.50
0.21
0.46
0.19
0.27
0.10
0.09
0.09
0.10
0.10
0.25
0.06
0.13
2.20
1.28
1.18
0.27
0.19
0.43
0.19
0.50
0.21
0.46
0.19
0.27
0.06
0.09
0.09
0.10
0.50
0.50
0.12
0.05
2.20
2.20

1"

TOTAL REF.
0.09
0.26
0.29
0.32
0.69
1.52
0.76
1.40
0.20
0.08
0.83
0.51
0.23
0.11
2.13
0.31
0.17
0.17
0.31
1.13
0.06
0.09
0.10
0.10
0.46
0.50
0.11
0.26
2.20
1.86
1.01
0.27
0.18
0.46
0.21
0.46
0.19
0.50
0.18
0.19
0.06
0.10
0.09
0.10
0.10
0.05
0.25
0.13
1.73
2.20
0.80
0.27
0.18
0.45
0.21
0.46
0.19
0.50
0.18
0.19
0.11
0.18
0.18
0.19
0.99
0.99
0.23
0.49
2.77
4.39
1.49
0.28
0.19
0.42
0.19
0.50
0.21
0.46
0.19
0.27
0.10
0.09
0.09
0.10
0.10
0.25
0.06
0.13
2.20
1.28
1.18
0.27
0.19
0.43
0.19
0.50
0.21
0.46
0.19
0.27
0.06
0.09
0.09
0.10
0.50
0.50
0.12
0.05
2.20
2.20

REFUERZO I

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

5
6
6
6
6
6
6
6
6
6
128
116
158
124
98
6
80
80
77
77
104
74
148
100
74
74
98
71
142

REFUERZO J

SECCION
SECCION
SECCION
SECCION
SECCION
SECCION
SECCION
SECCION
SECCION
SECCION
SECCION
SECCION
SECCION
SECCION
SECCION
SECCION
SECCION
SECCION
SECCION

7
4
3
4
3
4
3
4
3
4
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

3.50
3.50
5.90
5.70
6.00
6.50
6.50
6.00
6.00
3.50
2.27
2.47
2.47
4.52
4.52
2.35
0.32
1.64
0.32
1.64
2.27
1.18
0.27
2.27
1.18
1.18
2.27
1.28
0.37

1.18

1.18
0.27
0.19
0.43
0.19
0.50
0.21
0.46
0.19
0.27
1.55
1.53
2.08
2.99
2.36
0.08
0.14
0.70
0.13
0.67
1.26
0.47
0.21
1.21
0.47
0.47
1.19
0.48
0.28
80.17

0.27
0.19
0.43
0.19
0.50
0.21
0.46
0.19
0.27
1.55
1.53
2.08
2.99
2.36
0.08
0.14
0.70
0.13
0.67
1.26
0.47
0.21
1.21
0.47
0.47
1.19
0.48
0.28
PESO TOTAL
2/8"

PESO POR KG

5.0. INSTALACION HIDRAULICA


ACTIVIDAD 5.1. TUBERIA SOTANO
ELEMENTO
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M13
M14
M15
M16
M17
M18
M19
M20
M21
M22
M23
M24

MEDIDAS (ML)

CANTIDAD
7.42
1.46
0.64
0.46
0.55
0.07
0.08
0.10
0.06
0.02
0.03
0.06
0.04
1.09
0.96
0.59
0.27
0.03
0.02
0.03
0.21
0.07
1.15
1.19

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

TOTAL TUBERA 2 1/2"

SUBTOTAL
7.42
1.46
0.64
0.46
0.55
0.07
0.08
0.10
0.06
0.02
0.03
0.06
0.04
1.09
0.96
0.59
0.27
0.03
0.02
0.03
0.21
0.07
1.15
1.19
16.57 ML

ACTIVIDAD 5.2. ACCESORIOS SOTANO

ELEMENTO
Valvula de Corte
Flotador
Tanque de Almacenamiento
Valvula de Pe
Codo 2 1/2"
Tee 2 1/2"

CANTIDAD

SUBTOTAL
2
1
1
1
11
4

2
1
1
1
11
4

20

un

ACTIVIDAD 5.3. TUBERIA PRIMER PISO RED SUMINISTRO AGUA

ELEMENTO
T1
T2
T3
T4
T5
T6
T7
T8
T9
T10
T11
T12
T13
T14
T15
T16
T17
T18
T19
T20
T21
T22
T23
T24
T25

MEDIDAS (ML)

CANTIDAD
2.18
1.42
0.08
0.36
0.09
0.08
0.36
0.70
1.45
0.07
0.05
0.05
0.11
1.48
0.91
1.95
0.08
0.02
0.23
0.10
0.09
0.23
0.16
0.83
0.10

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

TOTAL TUBERA 1/2"

SUBTOTAL
2.18
1.42
0.08
0.36
0.09
0.08
0.36
0.70
1.45
0.07
0.05
0.05
0.11
1.48
0.91
1.95
0.08
0.02
0.23
0.10
0.09
0.23
0.16
0.83
0.10
13.18 ML

ACTIVIDAD 5.4. ACCESORIOS PISO 1 AGUA

ELEMENTO
Tee 1/2"
Registros
Codo 1/2"

CANTIDAD

SUBTOTAL
2
4
19

2
4
19

25

1
1
1
1
1
1
1

SUBTOTAL
0.07
0.64
0.19
0.11
0.10
1.10
0.80

ACTIVIDAD 5.5. TUBERIA PISO TIPO RED SUMINISTRO AGUA

ELEMENTO
T1
T2
T3
T4
T5
T6
T7

MEDIDAS (ML)

CANTIDAD
0.07
0.64
0.19
0.11
0.10
1.10
0.80

un

3/8"
33.15

1/2"
10.36

5/8"
8.81

3/4"
7.57

7/8"
20.27

1"
-

T8
T9

0.04
0.03

1
1

TOTAL TUBERA 2"

0.04
0.03
3.07
0.08
0.36
5.34
0.63
0.4
0.11
0.67
0.768
0.412
0.634
2.781
0.361
0.082
12.628
0.99
0.90
0.24
0.22
0.44
0.65
3.20
4.13
0.98
0.57
1.16
2.10
0.99
2.32
0.24
0.25
0.11
0.10
0.50
0.12
0.18
0.10
0.25
20.74
0.96
1.10
0.30
0.36
0.09
0.09
0.36
0.30
1.10
0.97
5.63
2.35
38.52
8.04
82.52

0.08
0.36
5.34
0.63
0.4
0.11
0.67
0.768
0.412
0.634
2.781
0.361
0.082

1
1
1
1
1
1
1
1
1
1
1
1
1

0.99
0.90
0.24
0.11
0.44
0.65
3.20
4.13
0.98
0.57
1.16
2.10
0.99
2.32
0.24
0.25
0.11
0.10
0.25
0.06
0.18
0.10
0.25

1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1
1
1

0.96
1.10
0.30
0.36
0.09
0.09
0.36
0.30
1.10
0.97

1
1
1
1
1
1
1
1
1
1

2.35

8.04

CANTIDAD DE PISOS
TOTAL TUBERA 1 1/2"
TOTAL TUBERA 1"
TOTAL TUBERA 3/4"
TOTAL TUBERA 1/2"
TOTAL TUBERA 2 1/2"
TOTAL TUBERA 2"
SUBTOTAL

4
12.288
50.512
82.96
22.52
154.08
330.08
652.44

TOTAL TUBERA 1 1/2"


T1
T2
T3
T4
T5
T6
T7
T8
T9
T10
T11
T12
T13
TOTAL TUBERA 1"
T1
T2
T7
T8
T9
T10
T11
T12
T13
T14
T15
T17
T18
T19
T20
T21
T22
T23
T24
T25
T26
T27
T28
TOTAL TUBERA 3/4"
T1
T2
T3
T4
T5
T6
T7
T8
T9
T10
TOTAL TUBERA 1/2"
T1
TOTAL TUBERA 2 1/2"
T1

ML

ML

ML

ML
ML
ML

ML
ML
ML
ML
ML
ML
ML

ACTIVIDAD 5.6. ACCESORIOS PISO TIPO AGUA

ELEMENTO
Codo 1/2"
Codo 1"
Codo 1 1/2"
Registros
Tee 1 1/2"
Tee 3/4"

CANTIDAD

CANTIDAD PISOS
8
10
5
5
2
11

4
4
4
4
4
4

SUBTOTAL
32
40
20
20
8
44

ACTIVIDAD 5.7. TUBERIA PISO QUINTO AGUA

ELEMENTO
T1
T2
T3
T4
T5
T6
T7
T8
T9
T10
T11
T12
T13
T14
T15
T16
T17

MEDIDAS (ML)

CANTIDAD
0.08
0.36
5.34
2.65
1.00
0.36
0.09
0.64
0.04
0.07
0.11
0.07
0.63
0.77
2.78
0.36
0.90

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

0.60
5.32
1.27
7.24
1.27
2.36
0.59
2.55
0.58
1.47

1
1
1
1
1
1
1
1
1
1

2.18
0.30
0.36
0.10
0.09
0.37
0.30
2.18
0.10
2.21
2.66
0.37
1.27

1
1
1
1
1
1
1
1
1
1
1
1
1

TOTAL TUBERA 1"


T1
T2
T3
T4
T5
T6
T7
T8
T9
T10
TOTAL TUBERA 3/4"
T1
T2
T3
T4
T5
T6
T7
T8
T9
T10
T11
T18
T19
TOTAL TUBERA 1/2"

SUBTOTAL
0.08
0.36
5.34
2.65
1.00
0.36
0.09
0.64
0.04
0.07
0.11
0.07
0.63
0.77
2.78
0.36
0.90
16.25 ML
0.60
5.32
1.27
7.24
1.27
2.36
0.59
2.55
0.58
1.47
23.25 ML
2.18
0.30
0.36
0.10
0.09
0.37
0.30
2.18
0.10
2.21
2.66
0.37
1.27
12.49 ML

164

un

T1
T2
T3
T4

0.64
1.25
0.80
0.40

1
1
1
1

0.64
1.25
0.80
0.40
3.09 ML
55.08 ML

TOTAL TUBERA 1 1/2"


SUBTOTAL
ACTIVIDAD 5.8. ACCESORIOS PISO 5 AGUA

ELEMENTO
Codo 1/2"
Codo 1"
Codo 3/4"
Tee 1 "
Tee 1 1/2"
Tee 3/4
Registros

CANTIDAD

SUBTOTAL
7
10
44
2
2
14
5

7
10
44
2
2
14
5

84

un

ACTIVIDAD 5.9. TUBERIA AREA BAJO CUBIERTA AGUA

ELEMENTO
T1
T2
T3
T4
T5
T6
T7
T8
T9
T10

MEDIDAS (ML)

CANTIDAD
1.00
0.36
0.36
0.18
1.18
0.30
2.18
1.19
0.30
0.72

1
1
1
1
1
1
1
1
1
1

TOTAL TUBERA 1/2"

SUBTOTAL
1.00
0.36
0.36
0.18
1.18
0.30
2.18
1.19
0.30
0.72
7.77 ML

ACTIVIDAD 5.10. ACCESORIOS AREA BAJO CUBIERTA AGUA

ELEMENTO
Codo 1/2"
Registros

CANTIDAD

SUBTOTAL
14
2

14
2

16

un

6.0. MAMPOSTERIA
ACTIVIDAD 6.1. MAMPOSTERA SEMISTANO

ELEMENTO
A 1-2-2-3
D-E Y 1-2
E 1-2
1-2 E
2 D-E
2D
2-3 Y D-E
E-C Y 2-3
3 D-E
3 B-C
1 D-E
1 C-D
1 B-C
1 A-B
3 A-B

ANCHO

LARGO
2.25
2.25
2.25
2.25
2.25
2.25
2.25
2.25
2.25
2.25
2.25
2.25
2.25
2.25
2.25

12.50
1.35
2.85
2.30
4.90
0.85
5.00
2.30
5.62
5.01
4.38
2.22
5.05
4.80
4.80

CANTIDAD
1
2
2
2
1
1
1
2
1
1
1
1
1
1
1

TOTAL REA

SUBTOTAL
28.13
6.08
12.83
10.35
11.03
1.91
11.25
10.35
12.65
11.27
9.86
5.00
11.36
10.80
10.80
163.64

M2

SUBTOTAL
29.90
6.10
2.76
1.38
0.92
11.50
11.52
13.00
2.07
1.73
1.15
11.29
11.39
10.35
10.07
5.11
11.62
11.50
12.58
1.64
167.57

M2

ACTIVIDAD 6.2. MAMPOSTERA PRIMER PISO

ELEMENTO
A 1-2-2'-3
E 1Y 2
D 2' -3
V6
D 2' -3
3 A-B
3 B-C
3 D-E
2-3 Y D-E
2-3 Y D-E
2-3 Y D-E
2 Y D-E
2 Y D-E
1-2 Y D-E
1 D-E
1 C-D
1 B-C
1 A-B
2-3 Y B-C
V-7

ANCHO

LARGO
2.30
2.30
2.30
1.15
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
1.15

13.00
2.65
0.60
0.60
0.40
5.00
5.01
5.65
0.90
0.75
0.50
4.91
4.95
4.50
4.38
2.22
5.05
5.00
5.47
1.43

CANTIDAD
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

TOTAL REA

ACTIVIDAD 6.3. MAMPOSTERA PISO TIPO

ELEMENTO
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M12'
M13
M14
M15
M16
M17
M18
M19
M20
M21
M22
M23
M24
M25
M26
M27
M28
M29

ANCHO

LARGO
1.65
0.92
1.85
0.25
1.15
1.29
2.95
0.72
2.40
0.52
2.11
3.92
0.33
1.45
1.25
1.34
3.13
2.48
0.53
0.70
0.60
1.65
2.38
0.48
1.10
0.15
2.26
3.55
1.60
0.62

2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30

CANTIDAD
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

SUBTOTAL
3.80
2.12
4.26
0.58
2.65
2.97
6.79
1.66
5.52
1.20
4.85
9.02
0.76
3.34
2.88
3.08
7.20
5.70
1.22
1.61
1.38
3.80
5.47
1.10
2.53
0.35
5.20
8.17
3.68
1.43

M30
M31
M32
M33
M34
M35
M36
M37
M38
M39
M40
M41
M42
M43
M44
M45
M46
M47
M48
M49
M50
M51
M52
M53
M54
M55
M56
M57
M58
M59
M60
M61
M62
M63
M64
M65
M66
M67
M68
M69
M70
M71
M72
M73
M74
M75
M76
V-1
V-8
V-2
V-2A
V-4
V-3
V-5
V-9

0.12
0.30
2.38
0.24
1.61
0.51
1.98
0.84
0.85
1.29
0.81
1.25
1.12
5.05
1.32
3.10
1.65
0.46
0.54
1.59
2.98
4.30
0.38
0.60
1.65
0.81
0.25
2.32
1.87
4.67
0.60
2.22
1.07
2.22
0.79
5.57
0.60
2.23
0.45
1.35
2.05
2.80
1.40
2.90
0.72
4.36
0.42
1.60
0.60
1.20
1.10
0.60
0.90
0.50
0.28

2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
0.92
1.46
0.92
0.92
1.46
0.92
1.46
1.46

1
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
1
1
3
2
1
3
1

TOTAL REA
CANTIDAD PISOS TIPO
TOTAL REA PISOS TIPO

0.28
0.69
5.47
0.55
3.70
1.17
4.55
1.93
1.96
5.93
3.73
2.88
2.58
11.62
3.04
7.13
3.80
1.06
1.24
3.66
6.85
9.89
0.87
1.38
3.80
1.86
0.58
5.34
4.30
10.74
2.76
5.11
2.46
5.11
1.82
12.81
1.38
5.13
1.04
3.11
4.72
6.44
3.22
6.67
1.66
10.03
0.97
4.42
0.88
1.10
3.04
1.75
0.83
2.19
0.41
305.84

M2
4 UN
1223.35 M2

ACTIVIDAD 6.3. MAMPOSTERA PISO SEXTO

ELEMENTO
M 601
M 602
M 602'
M 603
M 604
M 605
M 606
M 607
M 608
M 609
M 610
M 611
M 612
M 613
M 614
M 615
M 616
M 617
M 618
M 619
M 620
M 621
M 622
M 623
M 624
M 625
M 626
M 627
M 628
M 629
M 630
M 631
M 632
M 633
M 634
M 635
M 636
M 637
M 638
M 639
M 640
M 641
M 642
M 643
M 644
M 645
M 646
M 647
M 648
M 649
M 650
M 651
M 652
M 653
M 654
M 655
M 656
M 657
M 658
M 659
M 660
M 661
M 662

ANCHO

LARGO
2.80
5.01
0.55
5.02
1.35
1.85
0.55
1.85
0.71
0.60
4.80
0.91
2.17
0.25
2.22
1.35
0.75
4.38
0.60
4.63
4.32
1.25
0.55
2.73
0.24
0.15
5.61
0.60
0.45
2.44
1.95
0.80
1.98
0.23
1.15
0.70
1.00
2.15
0.44
1.75
4.98
0.58
2.02
0.51
0.94
0.30
2.48
0.55
3.10
2.33
0.55
0.80
0.85
1.85
2.05
1.30
2.23
0.56
3.08
0.33
0.67
0.85
1.40

2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30

CANTIDAD
3
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

SUBTOTAL
19.32
11.52
1.27
11.55
3.11
4.26
1.27
4.26
1.63
2.76
11.04
2.09
4.99
0.58
5.11
3.11
1.73
10.07
1.38
10.65
9.94
2.88
1.27
6.28
0.55
0.35
12.90
1.38
1.04
5.61
4.49
1.84
4.55
0.53
2.65
1.61
4.60
4.95
1.01
4.03
11.45
1.33
4.65
1.17
2.16
0.69
5.70
1.27
7.13
5.36
1.27
1.84
1.96
4.26
4.72
2.99
5.13
1.29
7.08
0.76
1.54
1.96
3.22

M 663
M 664
V-1
V-8
V-2
V-2A
V-4
V-3
V-5
V-9

1.15
1.05
1.60
0.60
1.20
1.10
0.60
0.90
0.50
0.28

2.30
2.30
0.92
1.46
0.92
0.92
1.46
0.92
1.46
1.46

1
1
3
1
1
3
2
1
3
1

TOTAL REA

2.65
2.42
4.42
0.88
1.10
3.04
1.75
0.83
2.19
0.41
282.68

M2

SUBTOTAL
9.78
5.11
9.45
2.30
6.07
3.91
5.82
3.91
3.45
4.26
5.61
7.54
2.99
6.42
4.46
1.38
2.65
2.19
9.57
12.24
11.41
0.92
1.33
1.13
4.26
14.88
2.76
4.49
1.50
7.13
1.15
3.57
6.90
2.07
7.08
1.15
2.48
0.64
3.68
1.68
7.36
4.42
0.88
1.10
3.04
1.75
0.83
2.19
0.41
211.26

M2

ACTIVIDAD 6.3. MAMPOSTERA AREA BAJO CUBIERTA

ELEMENTO
ABC 1
ABC 2
ABC 3
ABC 4
ABC 5
ABC 6
ABC 7
ABC 8
ABC 9
ABC 10
ABC 11
ABC 12
ABC 13
ABC 14
ABC 15
ABC 16
ABC 17
ABC 18
ABC 19
ABC 20
ABC 21
ABC 22
ABC 23
ABC 24
ABC 25
ABC 26
ABC 27
ABC 28
ABC 29
ABC 30
ABC 31
ABC 32
ABC 33
ABC 34
ABC 35
ABC 36
ABC 37
ABC 38
ABC 39
ABC 40
ABC 41
V-1
V-8
V-2
V-2A
V-4
V-3
V-5
V-9

ANCHO

LARGO
4.25
2.22
4.11
1.00
2.64
1.70
2.53
1.70
1.50
1.85
2.44
3.28
1.30
2.79
1.94
0.30
1.15
0.95
4.16
5.32
4.96
0.40
0.58
0.49
1.85
6.47
1.20
1.95
0.65
3.10
0.50
1.55
3.00
0.90
3.08
0.50
1.08
0.28
1.60
0.73
3.20
1.60
0.60
1.20
1.10
0.60
0.90
0.50
0.28

TOTAL REA

2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
2.30
0.92
1.46
0.92
0.92
1.46
0.92
1.46
1.46

CANTIDAD
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
1
1
3
2
1
3
1

ANALISIS COSTO CUADRILLAS


FACTOR PRESTACIONAL PARA OFICIAL Y AYUDANTE PARA 2009
ITEM
1.00
2.00
2.10
2.20
2.30
2.40
3.00
3.10
3.20
3.30
3.40
3.50
4.00
4.10
4.20
4.30
4.40
4.50

DESCRIPCIN
Salario Bse
Prestaciones Sociales
Cesantas
Intereses Cesantas
Vacaciones
Prima
Seguridad Social
Salud (2/3 de 12,5% paga el Empleador)
Pensin (3/4 de 15,5% paga el Empleador)
Fondo Solidaridad Pensional (Salarios > 4 SMMLV)
ARP
Parafiscales (SENA 2% + ICBF 3% + CCF 4%)
Otros
Subsidio Transporte
Fondo Construccin
Seguro Colectivo
Dotacin
Horas Extras
FACTOR PRESTACIONAL

SALARIO MENSUAL 2009


SUBSIDIO DE TRANSPORTE MENSUAL 2009
INCREMENTO CONSIDERADO
SALARIO MENSUAL 2009
SUBSIDIO DE TRANSPORTE MENSUAL 2009

AYUDANTE
$ 535,012

%
100.000%
8.33%
0.08%
5.83%
8.33%

OFICIAL
$ 858,695

%
100.00%
22.58%
8.33%
0.08%
5.83%
8.33%

36.96%
8.50%
11.63%
0.00%
7.83%
9.00%

36.96%
8.50%
11.63%
0.00%
7.83%
9.00%

35.65%
11.71%
3.00%
1.00%
4.31%
15.63%

$ 496,900.00
$ 59,300.00
7.67%
$ 535,012.23
$ 63,848.31

0%
10%
8%
15.4%

0%
10%
8%
15.4%

29.61%
7.30%
3.00%
1.00%
2.69%
15.63%

195.19%

VARIACION EN JORNAL
M.Obra AA - Albailera
M. Obra BB Instalaciones
M. Obra EE Seguridad y Control
M. Obra FF Especializado

100.00%
22.58%

189.15%

CUADRILLA
M.Obra AA - Albailera
M. Obra BB Instalaciones
M. Obra EE Seguridad y Control
M. Obra FF Especializado

AYUDANTE

OFICIAL

JORNAL/HORA

CANTIDAD

JORNAL/HORA

CANTIDAD

$ 4,351
$ 4,786
$ 5,185
$ 5,982

1
1
1
1

$ 6,767
$ 7,444
$ 8,065
$ 9,305

1
1
1
1

VALOR HORA
CUADRILLA
$ 11,119
$ 12,230
$ 13,250
$ 15,287

ANALISIS DE PRECIOS UNITARIOS


1.0. PRELIMINARES
1.1. DESCAPOTE.
UND : M2
RECURSOS
Minicargador
Volqueta
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)

UNIDAD
hr
hr
hr

CANTIDAD
0.05
0.02
0.15

$
$
$

VR. UNITARIO
39,170.00
29,500.00
11,119.00
TOTAL

$
$
$
$

SUBTOTAL
1,958.50
590.00
1,667.85
4,216.35

1.2. LOCALIZACION Y REPLANTEO.


UND : M2
RECURSOS
Durmientes 5 x 5 cm ordinario 3 ml
Puntilla 2"
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)

UNIDAD
ML
Lb
hr

CANTIDAD
0.85
0.03
0.10

$
$
$

VR UNITARIO
1,000.00
7,000.00
11,119.00
TOTAL

$
$
$
$

SUBTOTAL
850.00
42.50
2.13
894.63
$ 322.81

1.3. CERRAMIENTO.
UND : ML
RECURSOS
Parales de madera 6m
Alambre
Lona verde
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)

UNIDAD
ML
Kg
M2
hr

CANTIDAD
1.95
0.50
2.00
0.25

$
$
$
$

VR UNIT
2,700.00
2,200.00
940.00
11,119.00
TOTAL

$
$
$
$
$

SUBTOTAL
5,265.00
1,100.00
1,880.00
2,779.75
11,024.75

2.0. EXCAVACION
2.1. EXCAVACION ZAPATAS, DADOS, VIGAS VIGUETAS, RIOSTRAS Y PLACA CONTRAPISO) (MANUAL, INCLUYE RETIRO Y CARGUE)
RECURSOS
UNIDAD
CANT
VR UNIT
SUBTOTAL
100,000.00 $
30,000.00
Volqueta 6M3 max 30Km
hr
0.30 $
11,119.00 $
12,230.90
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)
hr
1.10 $
$
30,000.00
TOTAL
3.0 CIMENTACION
ACTIVIDAD 3.1. :pilotes hincados d = 0,40 L = 24 m
RECURSOS
Hincadora
Concreto de 3000 psi
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)

3.2. CONCRETO DE LIMPIEZA O FLUIDO


RECURSOS
Mortero 12 horas
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)

UND : M3
UNIDAD
hr
M3
hr

CANT
0.09 $
1.03 $
5.31 $

VR UNIT
34,500.00
270,000.00
11,119.00
TOTAL

SUBTOTAL
$
3,105.00
$
278,100.00
$
58,987.41
$
337,087.41
$ 447,420.00

$
$

VR UNIT
221,000.00
11,119.00
TOTAL

SUBTOTAL
$
13,260.00
$
2,557.37
$
13,260.00

1.05
3.50
3.00
0.70
0.55
8.00

$
$
$
$
$
$

VR UNIT
270,000.00
1,578.00
2,900.00
7,000.00
5,300.00
11,119.00
TOTAL

SUBTOTAL
$
283,500.00
$
5,523.00
$
8,700.00
$
4,900.00
$
2,915.00
$
88,952.00
$
394,490.00

1.05
3.50
3.00
0.70
0.55
8.00

$
$
$
$
$
$

VR UNIT
270,000.00
1,578.00
2,900.00
7,000.00
5,300.00
11,119.00
TOTAL

SUBTOTAL
$
283,500.00
$
5,523.00
$
8,700.00
$
4,900.00
$
2,915.00
$
88,952.00
$
394,490.00

1.03
1.00
1.50
1.25
1.80
0.42
6.50

$
$
$
$
$
$
$

VR UNIT
270,000.00
1,900.00
1,000.00
2,500.00
7,000.00
5,300.00
11,119.00
TOTAL

SUBTOTAL
$
278,100.00
$
1,900.00
$
1,500.00
$
3,125.00
$
12,600.00
$
2,244.44
$
72,273.50
$
371,742.94

UND : M3
UNIDAD
M3
hr

CANT
0.06
0.23

3.3. ZAPATA CONCRETO 3000 P.S.I.


UND : M3
RECURSOS
Concreto 3000 psi Comn
Vara de Corredor Inmunizada por inmercin 6.00 ml
Tabla burra ordinaria 0.20 x 3.00 ml
Puntilla 2"
Vibrador a gasolina
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)

UNIDAD
M3
ML
ML
Lb
hr
hr

CANT

3.4. DADOS CONCRETO 3000 P.S.I.


UND : M3
RECURSOS
Concreto 3000 psi
Vara de Corredor Inmunizada por inmercin 6.00 ml
Tabla burra ordinaria 0.20 x 3.00 ml
Puntilla 2"
Vibrador a gasolina
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)

UNIDAD
M3
ML
ML
Lb
hr
hr

CANT

3.5. VIGA DE AMARRE CONCRETO 3000 P.S.I.


RECURSOS
Concreto 3000 psi Comn
Repisas 0.08 x 0.4 x 3 m
Durmientes 5 x 5 cm ordinario 3 ml
Tabla comun o chapa 0.3 x 3.00 ml
Puntilla 2"
Vibrador a gasolina
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)

UND : M3
UNIDAD
M3
ML
ML
ML
Lb
hr
hr

CANT

3.6. VIGUETA DE CONCRETO 3000 P.S.I.


RECURSOS
Concreto 3000 psi Comn
Repisas 0.08 x 0.4 x 3 m
Durmientes 5 x 5 cm ordinario 3 ml
Tabla comun o chapa 0.3 x 3.00 ml
Puntilla 2"
Vibrador a gasolina
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)

UND : M3
UNIDAD
M3
ML
ML
ML
Lb
hr
hr

CANT

ACTIVIDAD 3.7. PLACA CONTRAPISO 3000 P.S.I.


RECURSOS
Concreto 3000 psi Comn
Tubo mueble de teja 4 x 2
Tabla comun o chapa 0.3 x 3.00 ml
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)

UNIDAD
M3
ML
ML
hr

CANT

4.0 ESTRUCTURA
ACTIVIDAD 4.1. COLUMNAS 3000 P.S.I.
RECURSOS
Concreto 3000 psi Comn
Repisas 0.08 x 0.4 x 3 m
Durmientes 5 x 5 cm ordinario 3 ml
Tabla burra ordinaria 0.20 x 3.00 ml
Puntilla 2"
A.C.P.M.
Vibrador a gasolina
Seccin de andamio
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)

UNIDAD
m3
ML
ML
UN
LB
GA
hr
ms
hr

CANT

1.03
1.00
1.50
1.25
1.80
0.42
6.50

$
$
$
$
$
$
$

VR UNIT
270,000.00
1,900.00
1,000.00
2,500.00
7,000.00
5,300.00
11,119.00
TOTAL

SUBTOTAL
$
278,100.00
$
1,900.00
$
1,500.00
$
3,125.00
$
12,600.00
$
2,244.44
$
72,273.50
$
371,742.94

0.11
1.10
0.60
0.75

$
$
$
$

VR UNIT
270,000.00
30,300.00
2,500.00
11,119.00
TOTAL

SUBTOTAL
$
29,700.00
$
33,330.00
$
1,500.00
$
8,339.25
$
72,869.25

1.05
7.26
3.02
2.70
0.80
0.16
0.43
0.25
16.50

VR UNIT SUBTOTAL
$ 283,500.00
$ 270,000.00
$ 13,794.00
$ 1,900.00
$ 3,020.00
$ 1,000.00
$ 7,830.00
$ 2,900.00
$ 5,600.00
$ 7,000.00
$ 790.66
$ 4,941.61
$ 2,273.70
$ 5,300.00
$ 2,750.00
$ 11,000.00
$ 183,463.50
$ 11,119.00
TOTAL
$ 503,021.86

ACTIVIDAD 4.2. LOSA MACISA ENTREPISO PRIMER PISO, INCLUYE VIGAS Y ALIGERAMIENTO, CONCRETO 3000 P.S.I., INCLUYE VIGUETAS
RECURSOS
UNIDAD
CANT
VR UNIT SUBTOTAL
$ 270,000.00
$ 67,500.00
Concreto 3000 psi Comn
m3
0.25
$ 10,000.00
$ 9,300.00
Caseton de guadua
ml
0.93
$ 5,300.00
$ 2,385.00
Vibrador a gasolina
hr
0.45
$ 4,800.00
$ 4,320.00
Formaleta Entrepiso M2
M2
0.90
$ 15,566.60
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)
hr
1.40
$ 11,119.00
TOTAL
$ 99,071.60

ACTIVIDAD 4.3. LOSA MACISA ENTREPISO PISO TIPO, INCLUYE VIGAS Y ALIGERAMIENTO, CONCRETO 3000 P.S.I., INCLUYE VIGUETAS
RECURSOS
UNIDAD
CANT
VR UNIT SUBTOTAL
$ 270,000.00
$ 67,500.00
Concreto 3000 psi Comn
m3
0.25
$ 10,000.00
$ 9,300.00
Caseton de guadua 50 x 25 (placa h = 30)
m2
0.93
$ 5,300.00
$ 2,385.00
Vibrador a gasolina
hr
0.45
$ 4,800.00
$ 4,320.00
Formaleta Entrepiso M2
M2
0.90
$
15,566.60
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)
hr
1.40
$ 11,119.00
TOTAL
$ 99,071.60

ACTIVIDAD 4.4. LOSA MACISA ENTREPISO AREA BAJO CUBIERTA, CTO MAQUINAS, LOSA INF. Y SUPERIOR TANQUE
RECURSOS
UNIDAD
CANT
VR UNIT SUBTOTAL
$ 270,000.00
$ 67,500.00
Concreto 3000 psi Comn
m3
0.25
$ 10,000.00
$ 9,300.00
Caseton de guadua 50 x 25 (placa h = 30)
m2
0.93
$ 5,300.00
$ 2,385.00
Vibrador a gasolina
hr
0.45
$ 4,800.00
$ 4,320.00
Formaleta Entrepiso M2
ml
0.90
$ 15,566.60
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)
hr
1.40
$ 11,119.00
TOTAL
$ 99,071.60

ACTIVIDAD 4.5. ESCALERA UN: M2


RECURSOS
Concreto de 3000 psi
formaleta
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)

UNIDAD
M3
M2
h

CANT

ACTIVIDAD 4.6. RAMPA ACCESO Y SALIDA UN: M2


RECURSOS
Concreto de 3000 psi
formaleta
mano de obra (cuadrilla oficial + ayudante)

UNIDAD
M3
M2
h

CANT

ACTIVIDAD 4.7. MURO DE CONTENCION M1


RECURSOS
Concreto de 3000 psi
formaleta
mano de obra (cuadrilla oficial + ayudante)

UNIDAD
M3
M2
h

CANT

1.03
104.12
45.2706

VR UNIT SUBTOTAL
$ 270,000.00
$ 278,100.00
$ 1,000.00
$ 104,120.00
$ 11,119.00
$ 503,363.80
TOTAL
$ 885,583.80

1.03
104.12
45.2706

VR UNIT SUBTOTAL
$ 270,000.00
$ 278,100.00
$ 1,000.00
$ 104,120.00
$ 6,000.00
$ 271,623.60
TOTAL
$ 653,843.60

1.03
32.9
2.11444

VR UNIT SUBTOTAL
$ 270,000.00
$ 278,100.00
$ 1,000.00
$ 32,900.00
$ 11,119.00
$ 23,510.46
TOTAL
$ 334,510.46

ACTIVIDAD 4.8. MURO DE CONTENCION M2


RECURSOS
Concreto de 3000 psi
formaleta
mano de obra (cuadrilla oficial + ayudante)

UNIDAD
M3
M2
h

CANT

ACTIVIDAD 6.1. CUBIERTA


RECURSOS
TEJA # 8
CABALLETE
mano de obra (cuadrilla oficial + ayudante)

UNIDAD
UNIDAD
UNIDAD
h

CANT

5.0. INSTALACIONES HIDRULICAS RED SUMINISTRO


ACTIVIDAD 5.1.TUBERIA PVC RDE 9 X 2 1/2"
RECURSOS
UNIDAD
TUBERIA PVC 2 1/2"
m
TUBERIA PVC 1/2"
m
TUBERIA PVC
m
TUBERIA PVC 1 1/2"
m
Limpiador removedor
gl
Soldadura PVC
gl
ACCESORIO PVC 2-1/2"
un
un
ACCESORIO PVC 1/2"
un
ACCESORIO PVC 1 1/2"
un
ACCESORIO PVC
Hr
Cuadrilla BB instalaciones

1.03
34.78
6.88

VR UNIT SUBTOTAL
$ 270,000.00
$ 278,100.00
$ 1,000.00
$ 34,780.00
$ 11,119.00
$ 76,498.72
TOTAL
$ 389,378.72

1.03
27.61
2.67556

VR UNIT SUBTOTAL
$ 18,900.00
$ 19,467.00
$ 17,800.00
$ 491,458.00
$ 15,287.00
$ 40,901.29
TOTAL
$ 551,826.29

170.65
55.96
106.21
15.378
0.01
0.002
15
50
23
69
0.11

VR UNIT SUBTOTAL
$ 65,711
$ 11,213,582.15
$ 11,401
$ 637,999.96
$ 15,633.00
$ 1,660,380.93
$ 34,283.00
$ 527,203.97
$ 24,375.00
$ 243.75
$ 50,554.00
$ 101.11
$ 77,314.00
$ 1,159,710.00
$ 2,275.00
$ 113,750.00
$ 22,926.00
$ 527,298.00
$ 3,580.00
$ 247,020.00
$ 12,230.00
$ 1,307.58
TOTAL
$ 16,088,597.45

CANT

6.0. MAMPOSTERIA
ACTIVIDAD 6.1. MAMPOSTERIA EN TOLETE FINO LIVIANO SEMISOTANO, PISO 1, PISO TIPO AREA BAJO CUBIERTA VISTO 2 CARAS E = 0,10 M
RECURSOS
UNIDAD
CANT
VR UNIT SUBTOTAL
$ 39,840.00
Ladrillo Tolete Fino Liviano 20cm x 10cm x 6cm
UN
83
$ 480.00
$ 75.39
Cortadora de Ladrillo (con Disco de corte 800 dia rend. )
DD
0.02
$ 5,026.00
$ 2,893.76
Mortero 12 horas
M3
16.00
$ 180.86
$ 7,228.51
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)
hr
0.70
$ 10,326.45
TOTAL
$ 50,037.66

307.43

14127.48

170040

46449.6

474073.8

12686.64

41280

16053.63

DETALLE CALCULO COSTOS ADMINISTRACIN


Descripcin
GASTO ADMINISTRACIN
COORDINADOR DISEOS TECNICOS
GERENTE DE CONSTRUCCION
ALMACENISTA
ASEADORA
AUXILIAR SEGURIDAD INDUSTRIAL
DIRECTOR DE OBRA
INSPECTOR OBRA
LLAVERA
MENSAJERO
RESIDENTE ADMINISTRATIVO
RESIDENTE OBRA

Unidad

Cantidad

Und
un
un
un
un
un
un
un
un
un
un

1
1
1
1
1
1
1
1
1
1
1

Precio U.

SUBTOTAL

$ 5,195,000.00 $ 5,195,000.00
$ 10,662,000.00 $ 10,662,000.00
$ 2,013,600.00 $ 2,013,600.00
$ 886,760.00
$ 886,760.00
$ 1,512,000.00 $ 1,512,000.00
$ 8,404,960.00 $ 8,404,960.00
$ 2,567,340.00 $ 2,567,340.00
$ 850,000.00
$ 850,000.00
$ 900,000.00
$ 900,000.00
$ 3,165,790.00 $ 3,165,790.00
$ 4,043,980.00 $ 4,043,980.00
TOTAL
$ 40,201,430.00

NOTA:
NO DEBE SER SUPERIOR AL 12 % DEL COSTO DIRECTO (CUMPLE)
PRECIOS A BASE UN PROYECTO EN EL CHICO DE LA EDIFICACION PARQUES DE LA 96.

COTIZACIONES

INSUMOS

UM

VALOR

EMPRESA HORMIGON ANDINO S.A.


CONCRETO
2500
3000
7

PSI
PSI
Kg/cm2

valor
3
$ 259,000 m
3
$ 270,000 m
$ 124,000

MORTERO PEGA PAETE


Kg/Cm2

telefono
vigencia
6371837 EXT. 107
Nov-03

telefono
vigencia
6371837 EXT. 107
Nov-03
3

70
105

m
12 h
12 h

$ 180.86
$ 221,000
$ 233,500

SURTIR MAYORISTA S.A

telefono
6330111

vigencia
Nov-03

3077115

vigencia
Nov-03

HIERRO
EMPRESA HOMECENTER

telefono

KILO DE HIERRO CORRUGADO


KILO DE HIERRO CORRUGADO FIGURADO
MALLA M-064
MALLA M-131
MALLA M-262
MALLA M-106
ALAMBRE MEGRO

kg
kg
kg
kg
kg
kg
kg

$1.800
$1.775
$30.600
$62.800
$125.900
$51.000
$ 2,200

DURMIENTES 5 x 5
VARA 6 m
LONA VERDE
TABLA BURRA
VARA INMUNISADA
REPISAS
TABLA COMUN
TUBO MUEBLE TEJA 4 x 2
SECCION DE ANDAMIO
CASETON DE GUADUA
FORMALETA ENTREPISO
FORMALETA ESCALERA

Lb
m
m
m2
m
m
m
m
m
ms
m
m
m

$ 7,000
$ 1,000
$ 2,700
$ 940
$ 2,900
$ 1,578
$ 1,900
$ 2,500
$ 30,300
$ 11,000
$ 10,000
$ 4,800
$ 1,000

MAQUINARIA DE OBRA
VOLQUETA
VOLQUETA
INCADORA
MINICARGADOR
CORTADORA DE LADRILLO
VIBRADOR A GASOLINA
ACPM

vj
hr
hr
hr
hr
hr
gl

$ 100,000
$ 29,500
$ 34,500
$ 39,170
$ 5,026
$ 5,300
$ 4,942

MADERA

PUNTILLA

PAVCO
TUBERIA
PSI
500
400
160
200
225

2
1
1 3/4.

$ 11,401
$ 15,633
$65.711
$ 34,283
$ 38,568

VALVULAS, ACCESORIOS, GRIFERIA, ETC


PAVCO
TEE
TEE
TEE
TEE
CODO
CODO
CODO
CODO
S/CODO
S/CODO
S/CODO
S/CODO
UNION
UNION
UNION
UNION
ADACTADOR MACHO
ADACTADOR MACHO
ADACTADOR MACHO
ADACTADOR MACHO
ADACTADOR HEMBRA
ADACTADOR HEMBRA
BUJE
BUJE
SOLDADURA LIQUIDA
LIMPIADOR LIQUIDO
TOTAL ACCESORIOS
TOTAL ACCESORIOS
TOTAL ACCESORIOS
TOTAL ACCESORIOS

2
1

2
1

2
1

2
1

2
1

X
2X1
1/4 GL
1/4 GL

2
1

$427
$722
$18.101
$4.788
$322
$516
$17.201
$3.641
$537
$856
$18.446
$3.957
$206
$327
$8.693
$1.338
$221
$402
$7.757
$2.086
$250
$453
$312
$7.116
$50.554
$24.375
$ 2,275
$ 3,580
$ 77,314
$ 22,926

LADRILLOS Y BLOQUES
LADRILLO TOLETE 6 x 20 x 10

ESTANDAR

$ 480

TEJAS
TEJA
TEJA
CABALLETE

#8
#4

$18.900
$11.900
$17.800

MAQUINA DE BOMBEO
EQUIPO HIDROFRORH BOMBA CENTRIFUGA

1HP 100

$1379.900

LISTA DE PRECIOS PARA CONCRETOS


NOVIEMBRE DEL 2003

CODIGO

RDCO-001

VIGENTE DESDE

Noviembre-03

VERSION

01

HORMIGON ANDINO S.A.

Retardado

$ 231,000
$ 245,000
$ 259,000
$ 270,000
$ 287,500
$ 300,000
$ 314,000
$ 329,500
$ 341,000
$ 356,500

Baja
Permeab.
$ 239,500
$ 253,500
$ 267,500
$ 278,500
$ 296,000
$ 308,500
$ 322,500
$ 338,000
$ 349,500
$ 365,000

$ 237,000
$ 251,000
$ 265,000
$ 276,000
$ 293,500
$ 306,000
$ 320,000
$ 335,500
$ 347,000
$ 362,500

Retardado
Imperm
$ 239,000
$ 253,000
$ 267,000
$ 278,000
$ 295,500
$ 308,000
$ 322,000
$ 337,500
$ 349,000
$ 364,500

$ 241,000
$ 255,000
$ 269,000
$ 280,000
$ 297,500
$ 310,000
$ 324,000
$ 339,500
$ 351,000
$ 366,500

$ 249,500
$ 263,500
$ 277,500
$ 288,500
$ 306,000
$ 318,500
$ 332,500
$ 348,000
$ 359,500
$ 375,000

$ 247,000
$ 261,000
$ 275,000
$ 286,000
$ 303,500
$ 316,000
$ 330,000
$ 345,500
$ 357,000
$ 372,500

$ 249,000
$ 263,000
$ 277,000
$ 288,000
$ 305,500
$ 318,000
$ 332,000
$ 347,500
$ 359,000
$ 374,500

P.S.I

Corriente

1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
5,500
6,000

1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
5,500
6,000

GRAVA COMUN (3/4)


Acelerados
7 das
14 das
$ 261,000
$ 248,000
$ 275,000
$ 262,000
$ 289,000
$ 276,000
$ 300,000
$ 287,000
$ 317,500
$ 304,500
$ 330,000
$ 317,000
$ 344,000
$ 331,000
$ 359,500
$ 346,500
$ 371,000
$ 358,000
$ 386,500
$ 373,500

3 das
$ 276,000
$ 290,000
$ 304,000
$ 315,000
$ 332,500
$ 345,000
$ 359,000
$ 374,500
$ 386,000
$ 401,500

Bomba

Tremie.

Contech

Outinord

Grouting

SIU

$ 236,500
$ 250,500
$ 264,500
$ 275,500
$ 293,000
$ 305,500
$ 319,500
$ 335,000
$ 346,500
$ 362,000

$ 252,000
$ 266,000
$ 280,000
$ 291,000
$ 308,500
$ 321,000
$ 335,000
$ 350,500
$ 362,000
$ 377,500

$ 243,500
$ 257,500
$ 271,500
$ 282,500
$ 300,000
$ 312,500
$ 326,500
$ 342,000
$ 353,500
$ 369,000

$ 252,000
$ 266,000
$ 280,000
$ 291,000
$ 308,500
$ 321,000
$ 335,000
$ 350,500
$ 362,000
$ 377,500

$ 270,000
$ 280,000
$ 290,000
$ 307,000
$ 320,000
$ 334,000
$ 352,000
$ 370,000
$ 380,000
$ 390,000

$ 257,000
$ 271,000
$ 285,000
$ 296,000
$ 313,500
$ 326,000
$ 340,000
$ 355,500
$ 367,000
$ 382,500

$ 246,500
$ 260,500
$ 274,500
$ 285,500
$ 303,000
$ 315,500
$ 329,500
$ 345,000
$ 356,500
$ 372,000

$ 262,000
$ 276,000
$ 290,000
$ 301,000
$ 318,500
$ 331,000
$ 345,000
$ 360,500
$ 372,000
$ 387,500

Tremie
Tornillo
$ 269,000
$ 283,000
$ 297,000
$ 308,000
$ 325,500
$ 338,000
$ 352,000
$ 367,500
$ 379,000
$ 394,500

GRAVA FINA (1/2)

CONCRETO PARA
PAVIMENTO
Mdulo

PSI
3,000
3,500
4,000
4,500
5,000
6,000

36
39
41
43
45
50

Rotura
$ 277,000
$ 287,500
$ 301,500
$ 312,000
$ 320,500
$ 355,000

$ 286,000
$ 300,000
$ 314,000
$ 325,000
$ 342,500
$ 355,000
$ 369,000
$ 384,500
$ 396,000
$ 411,500

$ 271,000
$ 285,000
$ 299,000
$ 310,000
$ 327,500
$ 340,000
$ 354,000
$ 369,500
$ 381,000
$ 396,500

MORTEROS
CONVENCIONALES
Kg
Cm2

105
140
175
210
245
280
315
350

$
$ 237,000
$ 250,000
$ 261,000
$ 276,000
$ 287,000
$ 307,000
$ 321,000
$ 336,000

$ 258,000
$ 272,000
$ 286,000
$ 297,000
$ 314,500
$ 327,000
$ 341,000
$ 356,500
$ 368,000
$ 383,500

RELLENO
FLUIDO
PSI
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000

Kg
Cm2

7
10
15
20
30
50
60
80

USOS

Kg
Cm2

$
$ 124,000
$ 136,000
$ 141,000
$ 146,000
$ 153,000
$ 162,000
$ 169,000
$ 174,000

Zanja
Zanja
Andenes
Pavimentos
Pavimentos
Pavimentos
Pavimentos
Pavimentos

70
105
125
140
175

Sistema
Industrial
Autonivel
$ 298,500
$ 310,000
$ 328,000
$ 340,000

Tremie T.
CONCRETO OCRE
Autonivel
3/4
1/2
$ 274,000
$ 288,000
$ 302,000
$ 451,500
$ 462,000
$ 313,000
$ 462,500
$ 472,500
$ 330,500
$ 480,500
$ 490,500
$ 343,000
$ 492,000
$ 502,000
$ 357,000
$ 506,500
$ 516,500
$ 372,500
$ 522,000
$ 532,000
$ 384,000
$ 399,500
Otros colores se cotizan
segn solicitud

MORTERO PEGA PAETE


Edad
12h
$ 221,000
$ 233,500
$ 236,000
$ 257,000
$ 269,500

COSTOS ADICIONALES
$ / m3
Servicios
Fibra
$ 20,000
3
Bombeo/m
$ 30,000
Los precios anteriores no incluyen el 16% del IVA
Recargo por
y estan sujetos a modificaciones.
transporte en la $ 22,000
sabana/m3
La cantidad mmima de bombeo es de 20 m 3 con estacionaria y 30 m 3 con autobomba.
Cantidad mnima despachada sin recargo 3 m 3 La obra deber contar con mezcladero dimensionable para las descargas de concreto.
OFICINAS: CALLE 125 21A - 18 PISO 4 BOGOTA D.C.
PROGRAMACIN: PBX 6371837 - FAX: 6371615
VENTAS: 6371837 EXT. 107 - 134 - FAX: 6371681

SIU
Autonivelante
$ 274,000
$ 288,000
$ 302,000
$ 313,000
$ 330,500
$ 343,000
$ 357,000
$ 372,500
$ 384,000
$ 399,500

24h
$ 223,500
$ 236,000
$ 238,500
$ 259,500
$ 272,000

36h
$ 226,000
$ 238,500
$ 241,000
$ 262,000
$ 274,500

48h
$ 228,500
$ 241,000
$ 243,500
$ 264,500
$ 277,000

TABLAS DE PRECIOS DE RECURSOS EN UNIDADES DE MEDIDA APLICABLES A LOS APU

ITEM
1.1
1.2
1.3

ACTIVIDAD
PRELIMINARES
DESCAPOTE
LOCALIZACION Y REPLANTEO
CERRAMIENTO

2.1

EXCAVACION
EXCAVACION ZAPATAS, DADOS, VIGAS VIGUETAS, Y PLACA CONTRAPISO

1.0.

CONFORMACION CUADRILLA

VR UNITARIO

Cuadrilla AA Albaileria (Ofic + Ayud + Pres)


Cuadrilla AA Albaileria (Ofic + Ayud + Pres)
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)

$
$
$

4,216.65
894.63
11,024.75

Cuadrilla AA Albaileria (Ofic + Ayud + Pres)

42,230.90

CANTIDAD TOTAL
325
325
76
TOTAL

2.0.

112.39
TOTAL

3.0.
3.1
3.2
3.3
3.4
3.5
3.6
3.8

CIMENTACION
PILOTES HINCADOS d = 0,40 L = 24 m
CONCRETO DE LIMPIEZA O FLUIDO
ZAPATA CONCRETO
DADOS CONCRETO
VIGA DE AMARRE
VIGUETA DE CONCRETO
PLACA CONTRAPISO 3000 P.S.I.

Cuadrilla AA
Cuadrilla AA
Cuadrilla AA
Cuadrilla AA
Cuadrilla AA
Cuadrilla AA
Cuadrilla AA

Albaileria (Ofic + Ayud + Pres)


Albaileria (Ofic + Ayud + Pres)
Albaileria (Ofic + Ayud + Pres)
Albaileria (Ofic + Ayud + Pres)
Albaileria (Ofic + Ayud + Pres)
Albaileria (Ofic + Ayud + Pres)
Albaileria (Ofic + Ayud + Pres)

$
$
$
$
$
$
$

337,087.41
15,817.37
394,490.00
394,490.00
371,742.94
371,742.94
72,869.25

4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8

ESTRUCTURA
COLUMNAS 3000 P.S.I.
LOSA MACISA ENTREPISO PRIMER PISO, INCLUYE VIGAS Y ALIGERAMIENTO, CONCRETO 3000 P.S.I., INCLUYE VIGUETAS.
LOSA MACISA ENTREPISO PISO TIPO, INCLUYE VIGAS Y ALIGERAMIENTO, CONCRETO 3000 P.S.I., INCLUYE VIGUETAS.
LOSA MACISA ENTREPISO AREA BAJO CUBIERTA, CTO MAQUINAS, LOSA INF. Y SUPERIOR TANQUE INCLUYE VIGAS Y VIGUETAS.
ESCALERA
RAMPA ACCESO Y SALIDA
MURO DE CONTENCION M1-M2
CUBIERTA

Cuadrilla AA Albaileria (Ofic + Ayud + Pres)


Cuadrilla AA Albaileria (Ofic + Ayud + Pres)
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)
Cuadrilla AA Albaileria (Ofic + Ayud + Pres)
mano de obra (cuadrilla oficial + ayudante)
mano de obra (cuadrilla oficial + ayudante)
mano de obra (cuadrilla oficial + ayudante)
herramienta menor

$
$
$
$
$
$
$
$

503,021.86
99,071.60
99,071.70
99,071.60
885,583.80
653,843.60
988,354.06
551,826.29

90.48
16.25
2.18
24.75
37.47
19.36
13.35
TOTAL

4.0.

35.69
49.45
156.31
41.81
24.87
6.24
33.66
12.88
TOTAL

5.0.
5.1.
5.2.
5.3.
5.4.
5.5.
5.6.
5.7.
5.8.
5.9.
5.10.

INSTALACIONES HIDRULICAS
TUBERIA PVC 2 1/2"
TUBERIA PVC 1/2"
TUBERIA PVC
TUBERIA PVC 1 1/2"
Limpiador removedor
Soldadura PVC
ACCESORIO PVC 2-1/2"
ACCESORIO PVC 1/2"
ACCESORIO PVC 1 1/2"
ACCESORIO PVC

Cuadrilla hidrosanitaria
Cuadrilla hidrosanitaria
Cuadrilla hidrosanitaria
Cuadrilla hidrosanitaria
Cuadrilla hidrosanitaria
Cuadrilla hidrosanitaria
Cuadrilla hidrosanitaria
Cuadrilla hidrosanitaria
Cuadrilla hidrosanitaria
Cuadrilla hidrosanitaria

$
$
$
$
$
$
$
$
$
$

65,711.00
11,401.00
15,633.00
34,283.00
24,375.00
50,554.00
77,314.00
2,275.00
22,926.00
3,580.00

6.1.

MAMPOSTERIA
MAMPOSTERIA EN TOLETE FINO LIVIANO SEMISOTANO, PISO 1, PISO TIPO AREA BAJO CUBIERTA VISTO 2 CARAS E = 0,10 M

Cuadrilla AA Albaileria (Ofic + Ayud + Pres)

50,037.66

170.65
55.96
106.21
15.378
0.01
0.002
15
50
23
69
TOTAL

6.0.

2048
TOTAL

COSTO TOTAL CAPITULOS

COSTO TOTAL
$
$
$
$

1,370,411.25
290,754.75
837,881.00
2,499,047.00

$
$

4,746,330.85
4,746,330.85

$
$
$
$
$
$
$
$

30,499,021.65
514,064.53
859,988.20
9,763,627.50
13,929,207.96
7,196,943.32
972,800.12
63,735,653.27

$
$
$
$
$
$
$
$
$

17,952,850.18
4,899,090.62
15,485,897.43
4,142,183.60
22,024,486.82
4,079,984.06
33,267,997.66
7,107,522.62
108,960,012.98

$
$
$
$
$
$
$
$
$
$
$

11,213,582.15
637,999.96
1,660,380.93
527,203.97
243.75
101.11
1,159,710.00
113,750.00
527,298.00
247,020.00
16,087,289.87

$
$
$

102,501,646.13
102,501,646.13
298,529,980.11

PRESUPUESTO CON SUBTOTALES DE COSTOS DIRECTOS POR CAPITULO


ITEM
1.1
1.2
1.3

ACTIVIDAD
PRELIMINARES
DESCAPOTE
LOCALIZACION Y REPLANTEO
CERRAMIENTO

2.1

1.0.

UNIDAD

VR UNITARIO

CANTIDAD TOTAL

COSTO TOTAL

M2
M2
ML

$
$
$

4,216.65
894.63
11,024.75

325
325
76
TOTAL

$
$
$
$

1,370,411.25
290,754.75
837,881.00
2,499,047.00

EXCAVACION
EXCAVACION ZAPATAS, DADOS, VIGAS VIGUETAS, Y PLACA CONTRAPISO

M3

42,230.90

112.39
TOTAL

$
$

4,746,330.85
4,746,330.85

3.1
3.2
3.3
3.4
3.5
3.6
3.8

CIMENTACION
PILOTES HINCADOS d = 0,40 L = 24 m
CONCRETO DE LIMPIEZA O FLUIDO
ZAPATA CONCRETO
DADOS CONCRETO
VIGA DE AMARRE
VIGUETA DE CONCRETO
PLACA CONTRAPISO 3000 P.S.I.

M3
M3
M3
M3
M3
M3
M3

$
$
$
$
$
$
$

337,087.41
15,817.37
394,490.00
394,490.00
371,742.94
371,742.94
72,869.25

90.48
16.25
2.18
24.75
37.47
19.36
13.35
TOTAL

$
$
$
$
$
$
$
$

30,499,021.65
514,064.53
859,988.20
9,763,627.50
13,929,207.96
7,196,943.32
972,800.12
63,735,653.27

4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8

ESTRUCTURA
COLUMNAS 3000 P.S.I.
LOSA MACISA ENTREPISO PRIMER PISO, INCLUYE VIGAS Y ALIGERAMIENTO, CONCRETO 3000 P.S.I., INCLUYE VIGUETAS.
LOSA MACISA ENTREPISO PISO TIPO, INCLUYE VIGAS Y ALIGERAMIENTO, CONCRETO 3000 P.S.I., INCLUYE VIGUETAS.
LOSA MACISA ENTREPISO AREA BAJO CUBIERTA, CTO MAQUINAS, LOSA INF. Y SUPERIOR TANQUE INCLUYE VIGAS Y VIGUETAS.
ESCALERA
RAMPA ACCESO Y SALIDA
MURO DE CONTENCION M1-M2
CUBIERTA

M3
M3
M3
M3
M3
M3
M3
M3

$
$
$
$
$
$
$
$

503,021.86
99,071.60
99,071.70
99,071.60
885,583.80
653,843.60
988,354.06
551,826.29

35.69
49.45
156.31
41.81
24.87
6.24
33.66
12.88
TOTAL

$
$
$
$
$
$
$
$
$

17,952,850.18
4,899,090.62
15,485,897.43
4,142,183.60
22,024,486.82
4,079,984.06
33,267,997.66
7,107,522.62
108,960,012.98

M
M
M
M
GL
GL
UND
UND
UND
UND

$
$
$
$
$
$
$
$
$
$

65,711.00
11,401.00
15,633.00
34,283.00
24,375.00
50,554.00
77,314.00
2,275.00
22,926.00
3,580.00

170.65
55.96
106.21
15.378
0.01
0.002
15
50
23
69
TOTAL

$
$
$
$
$
$
$
$
$
$
$

11,213,582.15
637,999.96
1,660,380.93
527,203.97
243.75
101.11
1,159,710.00
113,750.00
527,298.00
247,020.00
16,087,289.87

M2

50,037.66

$
$
$

102,501,646.13
102,501,646.13
298,529,980.11

$
$
$
$
$

44,779,497.02
14,926,499.01
14,926,499.01
74,632,495.03
373,162,475.14

2.0.

3.0.

4.0.

5.0.
5.1.
5.2.
5.3.
5.4.
5.5.
5.6.
5.7.
5.8.
5.9.
5.10.

INSTALACIONES HIDRULICAS
TUBERIA PVC 2 1/2"
TUBERIA PVC 1/2"
TUBERIA PVC
TUBERIA PVC 1 1/2"
Limpiador removedor
Soldadura PVC
ACCESORIO PVC 2-1/2"
ACCESORIO PVC 1/2"
ACCESORIO PVC 1 1/2"
ACCESORIO PVC

6.1.

MAMPOSTERIA
MAMPOSTERIA EN TOLETE FINO LIVIANO SEMISOTANO, PISO 1, PISO TIPO AREA BAJO CUBIERTA VISTO 2 CARAS E = 0,10 M

6.0.

2048
TOTAL
TOTAL COSTOS DIRECTOS.
COSTOS INDIRECTOS
ADMINISTRACION 20%
IMPUESTOS 5%
UTILIDAD 5%
TOTAL COSTOS INDIRECTOS.
VALOR TOTAL.

COSTOS INDIRECTOS
ITEM
1.1
1.2
1.3

ACTIVIDAD
PRELIMINARES
DESCAPOTE
LOCALIZACION Y REPLANTEO
CERRAMIENTO

2.1

EXCAVACION
EXCAVACION ZAPATAS, DADOS, VIGAS VIGUETAS, Y PLACA CONTRAPISO

3.1
3.2
3.3
3.4
3.5
3.6
3.8

CIMENTACION
PILOTES HINCADOS d = 0,40 L = 24 m
CONCRETO DE LIMPIEZA O FLUIDO
ZAPATA CONCRETO
DADOS CONCRETO
VIGA DE AMARRE
VIGUETA DE CONCRETO
PLACA CONTRAPISO 3000 P.S.I.

m
m3
3
m
3
m
3
m
m3
m3

4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8

ESTRUCTURA
COLUMNAS 3000 P.S.I.
LOSA MACISA ENTREPISO PRIMER PISO, INCLUYE VIGAS Y ALIGERAMIENTO, CONCRETO 3000 P.S.I., INCLUYE VIGUETAS.
LOSA MACISA ENTREPISO PISO TIPO, INCLUYE VIGAS Y ALIGERAMIENTO, CONCRETO 3000 P.S.I., INCLUYE VIGUETAS.
LOSA MACISA ENTREPISO AREA BAJO CUBIERTA, CTO MAQUINAS, LOSA INF. Y SUPERIOR TANQUE INCLUYE VIGAS Y VIGUETAS.
ESCALERA
RAMPA ACCESO Y SALIDA
MURO DE CONTENCION M1-M2
CUBIERTA

5.1.
5.2.
5.3.
5.4.
5.5.
5.6.
5.7.
5.8.
5.9.
5.10.

6.1.

1.0.

2.0.

3.0.

4.0.

5.0.

6.0.

UNIDAD
2

m
m2
m

COSTO TOTAL

0.12
0.02
ADMINISTRACION 12% IMPREVISTOS 2%

0.07
UTILIDADES 7%
COSTO TOTAL INDIRECTO APU

$ 1,370,411.25
$ 290,754.75
$ 831,881.00

$ 164,449.35
$ 34,890.57
$ 99,825.72

$ 27,408.23
$ 95,928.79
$ 5,815.10
$ 20,352.83
$ 16,637.62
$ 58,231.67
COSTO TOTAL CAPITULO

$ 287,786.36
$ 61,058.50
$ 174,695.01
$ 523,539.87

$ 4,746,330.85

$ 569,559.70

$ 94,926.62
$ 332,243.16
COSTO TOTAL CAPITULO

$ 996,729.48
$ 996,729.48

$ 30,499,021.65
$ 514,064.53
$ 859,988.20
$ 9,763,627.50
$ 13,929,207.96
$ 7,196,943.32
$ 972,800.12

$ 3,659,882.60
$ 61,687.74
$ 103,198.58
$ 1,171,635.30
$ 1,671,504.96
$ 863,633.20
$ 116,736.01

$ 609,980.43
$ 2,134,931.52
$ 10,281.29
$ 35,984.52
$ 17,199.76
$ 60,199.17
$ 195,272.55
$ 683,453.93
$ 278,584.16
$ 975,044.56
$ 143,938.87
$ 503,786.03
$ 19,456.00
$ 68,096.01
COSTO TOTAL CAPITULO

$ 6,404,794.55
$ 107,953.55
$ 180,597.52
$ 2,050,361.78
$ 2,925,133.67
$ 1,511,358.10
$ 204,288.03
$ 13,384,487.19

m
m3
m3
m3
3
m
3
m
m3
m3

$ 17,952,850.18
$ 4,899,090.62
$ 15,485,897.43
$ 4,142,183.60
$ 22,024,486.82
$ 4,079,984.06
$ 33,267,997.66
$ 7,107,522.62

$ 2,154,342.02
$ 587,890.87
$ 1,858,307.69
$ 497,062.03
$ 2,642,938.42
$ 489,598.09
$ 3,992,159.72
$ 852,902.71

$ 359,057.00
$ 1,256,699.51
$ 97,981.81
$ 342,936.34
$ 309,717.95
$ 1,084,012.82
$ 82,843.67
$ 289,952.85
$ 440,489.74
$ 1,541,714.08
$ 81,599.68
$ 285,598.88
$ 79,843.19
$ 2,328,759.84
$ 142,150.45
$ 497,526.58
COSTO TOTAL CAPITULO

$ 3,770,098.54
$ 1,028,809.03
$ 3,252,038.46
$ 869,858.56
$ 4,625,142.23
$ 856,796.65
$ 6,400,762.75
$ 1,492,579.75
$ 22,296,085.97

INSTALACIONES HIDRULICAS
TUBERIA PVC 2 1/2"
TUBERIA PVC 1/2"
TUBERIA PVC
TUBERIA PVC 1 1/2"
LIMPIADOR REMOVEDOR
SOLDADURA PVC
ACCESORIO PVC 2-1/2"
ACCESORIO PVC 1/2"
ACCESORIO PVC 1 1/2"
ACCESORIO PVC

m
m
m
m
gl
gl
un
un
un
un

$ 11,213,582.15
$ 637,999.96
$ 1,660,380.93
$ 527,203.97
$ 243.75
$ 101.11
$ 1,159,710.00
$ 113,750.00
$ 527,298.00
$ 247,020.00

$ 1,345,629.86
$ 76,560.00
$ 199,245.71
$ 63,264.48
$ 29.25
$ 12.13
$ 139,165.20
$ 13,650.00
$ 63,275.76
$ 29,642.40

$ 224,271.64
$ 784,950.75
$ 12,760.00
$ 44,660.00
$ 33,207.62
$ 116,226.67
$ 10,544.08
$ 36,904.28
$ 4.88
$ 17.06
$ 2.02
$ 7.08
$ 23,194.20
$ 81,179.70
$ 2,275.00
$ 7,962.50
$ 10,545.96
$ 36,910.86
$ 4,940.40
$ 17,291.40
COSTO TOTAL CAPITULO

$ 2,354,852.25
$ 133,979.99
$ 348,680.00
$ 110,712.83
$ 51.19
$ 21.23
$ 243,539.10
$ 23,887.50
$ 110,732.58
$ 51,874.20
$ 3,378,330.87

MAMPOSTERIA
MAMPOSTERIA EN TOLETE FINO LIVIANO SEMISOTANO, PISO 1, PISO TIPO AREA BAJO CUBIERTA VISTO 2 CARAS E = 0,10 M

m2

$ 102,501,646.13

$ 12,300,197.54

TOTAL ADMINISTRACIN, IMPREVISTOS Y UTILIDAD (COSTOS INDIRECTOS)

$ 35,822,877.61

$ 2,050,032.92
$ 7,175,115.23
COSTO TOTAL CAPITULO
$ 5,384,962.84
$ 20,896,678.61

$ 21,525,345.69
$ 21,525,345.69
$ 62,104,519.07

CUADRO DE TRABAJO
ITEM
1.1
1.2
1.3

ACTIVIDAD
PRELIMINARES
DESCAPOTE
LOCALIZACION Y REPLANTEO
CERRAMIENTO

2.1

1.0.

UNIDAD
2

CANTIDAD TOTAL

TRABAJO POR UNIDAD


HORAS
DIAS

m
m2
m

325
325
76

8
8
4

EXCAVACION
EXCAVACION ZAPATAS, DADOS, VIGAS VIGUETAS, Y PLACA CONTRAPISO

m3

112.39

16

3.1
3.2
3.3
3.4
3.5
3.6
3.8

CIMENTACION
PILOTES HINCADOS d = 0,40 L = 24 m
CONCRETO DE LIMPIEZA O FLUIDO
ZAPATA CONCRETO
DADOS CONCRETO
VIGA DE AMARRE
VIGUETA DE CONCRETO
PLACA CONTRAPISO 3000 P.S.I.

m3
3
m
m3
3
m
m3
m3
m3

90.48
16.25
2.18
24.75
37.47
19.36
13.35

16
8
16
16
16
16
16

4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8

ESTRUCTURA
COLUMNAS 3000 P.S.I.
LOSA MACISA ENTREPISO PRIMER PISO, INCLUYE VIGAS Y ALIGERAMIENTO, CONCRETO 3000 P.S.I., INCLUYE VIGUETAS.
LOSA MACISA ENTREPISO PISO TIPO, INCLUYE VIGAS Y ALIGERAMIENTO, CONCRETO 3000 P.S.I., INCLUYE VIGUETAS.
LOSA MACISA ENTREPISO AREA BAJO CUBIERTA, CTO MAQUINAS, LOSA INF. Y SUPERIOR TANQUE INCLUYE VIGAS Y VIGUETAS.
ESCALERA
RAMPA ACCESO Y SALIDA
MURO DE CONTENCION M1-M2
CUBIERTA

m
3
m
3
m
m3
m3
m3
m3
3
m

35.69
49.45
156.31
41.81
24.87
6.24
33.66
12.88

5.1.
5.2.
5.3.
5.4.

INSTALACIONES HIDRULICAS
TUBERIA PVC 2 1/2"
TUBERIA PVC 1/2"
TUBERIA PVC
TUBERIA PVC 1 1/2"

m
m
m
m

170.65
55.96
106.21
15.378

6.1.

MAMPOSTERIA
MAMPOSTERIA EN TOLETE FINO LIVIANO SEMISOTANO, PISO 1, PISO TIPO AREA BAJO CUBIERTA VISTO 2 CARAS E = 0,10 M

2.0.

3.0.

4.0.

5.0.

6.0.

2048

TRABAJO TOTAL (DIAS)

1
1
0.5

UNIDADES DE RECURSO DURACION

325
325
38

4
4
4
TOTAL DURACION

1
1
1
3

337.17

4
TOTAL DURACION

1
1

2
1
2
2
2
2
2

180.96
16.25
4.36
49.50
74.94
38.72
26.70

2
2
2
2
2
2
2
TOTAL DURACION

1
1
1
1
1
1
1
7

16
8
24
24
24
16
16
16

2
1
3
3
3
2
2
2

71.38
49.45
468.93
125.43
74.61
12.48
67.32
25.76

2
2
2
2
2
2
2
2
TOTAL DURACION

1
1
1
1
1
1
1
1
8

16
16
16
16

2
2
2
2

341.30
111.92
212.42
30.76

2
2
2
2
TOTAL DURACION

1
1
1
1
4

30727.35

10
TOTAL DURACION

1
1

120

15

También podría gustarte