CONTROL SEMANAL DE UNIDADES MOVILES ARTECON PERU S.A.C.

Semana 28: Del 07 de Julio a 12 de Julio 2014


Revisado por:
Realizado por:

Maquinaria

Scania 82V-907

Operador

Rolfo Sandoval

Hormetro
Inicial

Hormetro
Final

7-Jul
8-Jul
9-Jul

1070.5
1072.6
1076.6

1072.6
1076.6
1078.9

2.1
4
2.3

10-Jul
11-Jul

1078.9
0
0

1084.5
0
0

5.6
0
0

7678.4

7682

7682

7684.4

7684.4

7685.8

1574.2
1583.5
1589.3

1583.5
1589.3
1595.6

10-Jul
11-Jul

1595.6

1600.8

1600.8

1608

5.2
7.2

12-Jul

1608

1611.2

3.2

7-Jul

9495.4

9501.9

6.5

8-Jul

9501.9

9506.9

9-Jul

9506.9

9507

10-Jul

11-Jul

12-Jul

7-Jul
8-Jul
9-Jul

0
0
0

0
0
0

0
0
0

Stand By

10-Jul

Stand By

7-Jul
8-Jul

Luis Salazar

9-Jul
10-Jul

11-Jul

Retroexcavadora
JCB Alquilada

Excavadora
Komatsu PCC
220

Rodillo Bomag

Aniceto Reyes

Santos Quispe

Henrry Vsquez

Empresa:

Semana

12-Jul

Cargador Frontal
950 H

Construccin de Pozos De Residuos Slidos (02 celdas)


Contratista: SiderPer
Artecon Per S.A.C

Obra:

Ing. Residente Karyn Olivo


Grecia Castillo Cueva

TIpo de Cambio: S/.

12-Jul
7-Jul
8-Jul
9-Jul

Horas
Trabajadas

Total

14

Costo por
Hora

S/.

80.00

Importe a
Cobrar

S/.

1,120.00

Observaciones

NO SE ENCUENTRA EN OBRA

3.6

Conducico por el Sr. Rolfo


Sandoval. Operario Luis Salazar no
se encuentre en obra.

2.4

Conducico por el Sr. Rolfo


Sandoval. Operario Luis Salazar no
se encuentre en obra.

1.4

Conducico por el Sr. Rolfo


Sandoval. Operario Luis Salazar no
se encuentre en obra.
No hubo frente. Operario Luis
Salazar no se encuentra en obra.

0
0
0
9.3
5.8
6.3

NO SE ENCUENTRA EN OBRA

7.4

S/.

140.00

S/.

1,036.00

37

S/.

75.00

S/.

2,775.00
Se sac 30 gl del tractor T4U-849
Se sac 15 gl del Volquete T4x-880
y 15 gl del Volquete T4x-879.

5
0.1

No hubo frente por problemas de


Arcilla.

No hubo frente por problemas de


Arcilla.
NO SE ENCUENTRA EN OBRA

11.6

46.02

S/.

1,494.73
Stand By
Stand By

100.00

2.80

Rodillo Bomag

Mini Cargador
L223

Luminaria Terex

Henrry Vsquez

Henrry Vsquez

Grecia Castillo

11-Jul

12-Jul
7-Jul
8-Jul

3532.5
3535

3535
3541

0
2.5
6
1.3

9-Jul

3541

3542.3

10-Jul

11-Jul

12-Jul
7-Jul
8-Jul
9-Jul

0
0
0

0
0
0

0
0
0
0

10-Jul

11-Jul

12-Jul

NOTA: Precioa de Excavadoras incluye IGV, pero


no incluye sueldo de Operador

Stand By

100.00

Stand By

Stand By
Stand By

9.8

$
$
$
$

17.00
26.00
26.00
26.00

S/.

26.00

26.00

26.00

TOTAL A PAGAR: S/.

466.48
0
0
0

6,892.21

Stand By

Hormetro no funciona

CONTROL SEMANAL DE UNIDADES MOVILES ARTECON PERU S.A.C.


Semana 28: Del 07 de Julio a 12 de Julio 2014

Maquinaria

Operador

Empresa:

Semana

Hormetro
Inicial

Hormetro
Final

7-Jul

1114.6

1124.6

1124.6

1132.8

9-Jul

1132.8

1132.8

10-Jul

1132.8

1133.4

11-Jul

12-Jul
7-Jul

1106.6

1116.4

0
9.8

8-Jul

1116.4

1125.8

9-Jul

1125.8

1125.8

10-Jul

1125.8

1126.2

11-Jul

0
0

0
0

8-Jul
Volquete
T4X-880

Volquete
T4X-879

Daniel
Taboada

Gerson
Marquina

Construccin de Pozos De Residuos Slidos (02 celdas)


Artecon Per S.A.C

Obra:

Revisado por: Ing. Residente Karyn Olivo


Realizado por: Grecia Castillo Cueva

12-Jul

Horas
Trabajadas

Total Horas

Precio de
Traslado por
hora

Importe a
Cobrar

10
8.2
0
0.6

18.8

S/.

80.00 S/.

1,504.00

19.6

S/.

80.00 S/.

1,568.00

9.4
0
0.4
0
0

TOTAL A PAGAR: S/.

NOTA: Por traslado de material obra SiderPer

3,072.00

TOTAL A PAGAR:
Maquinarias: S/.

6,892.21

Volquetes: S/.
Pago Semanal: S/.

3,072.00
9,964.21

.
TIpo de Cambio: S/.

lidos (02 celdas)


Contratista:

SiderPer

Observaciones

A las 8:00 am se abasteci de 15 gl de


combustible a excavadora.
No hubo traslado de Arcilla por
problemas de terceros.
No hubo traslado de Arcilla por
problemas de terceros
NO SE ENCUENTRA EN OBRA

Hoy se abasteci de 15 gl de
combustible a excavadora.
No hubo traslado de Arcilla por
problemas de terceros.
No hubo traslado de Arcilla por
problemas de terceros
NO SE ENCUENTRA EN OBRA

2.80