PLANILLA DE METRADOS

PROYECTO:

MEJORAMIENTO Y AMPLIACION DE LA INFRAESTRUCCTURA EDUCATIVA EN LA I.E.S.M.A HACA BLANCA - C


DE CHONGOYAPE PROVINCIA DE CHICLAYO DEPARTAMENTO DE LAMBAYEQU
DISTRITO DE LA VICTORIA - PROV. CHICLAYO - DPTO LAMBAYEQUE

LUGAR:

DIMENSIONES

ITEM

03.00.00.
03.01.00.

DESCRIPCIN

ARQUITECTURA
MUROS DE LADRILLO KK ARCILLA 18 HUECOS
DE CABEZA
INGRESO PRINCIPAL AL COLEGIO
AREAS NEGATIVAS DE PUERTAS

SS.HH. HOMBRES - MUJERES


Eje 5"-5"
Eje 6"-6"
Eje 7"-7"

CREP/CRES
Eje 1-1
Eje 4-4

SALA DE PROFESORES
EJE 6-6

SALA DE COMPUTO
EJE 8-8
EJE 11"-11"

LABORATORIOS
EJE D-D
EJE H-H

UND
N

LARGO

ANCHO

ALTURA (H1)

1
-1
-1

6.00
1.20
3.60

4.1
2.13
2.60

M2
M2
M2
M2
M2
M2

1
1
1
1
1
1

2.96
2.95
2.96
2.95
2.96
2.95

3.03
2.96
3.03
2.96
3.03
2.96

M2
M2
M2
M2

1
1
1
1

2.96
2.95
2.96
2.95

3.03
2.96
3.03
2.96

M2
M2

1
1

2.96
2.95

3.03
2.96

M2
M2
M2
M2

1
1
1
1

2.96
2.95
2.96
2.95

3.03
2.96
3.03
2.96

M2
M2
M2

1
1
1

2.96
2.95
2.96

3.03
2.96
3.03

M2
M2
M2
M2

M2

2.95

2.96

DEPOSITO
EJE C-C

M2

2.95

2.96

ALMACEN
EJE C-C ENTRE EJES 11-11 Y 12-12

M2

2.96

3.03

EJE E"-E"
EJE G"-G"
EJE H"-H"

M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1

4.67
4.67
4.67
-1.80
-1.80
-0.90
-0.25

3.03
3.03
3.03
2.50
0.90
2.10
2.965

MUROS DE LADRILLO PANDERETA

M2

11

1.65

1.8

3.56

1.8

260.77

2.80

CAFETERIA - COCINA

03.01.02.

SS.HH. HOMBRES - MUJERES

SS.HH. PROFESORES - PROFESORAS


M2
03.01.03.

MUROS DE LADRILLO KK ARCILLA 18 HUECOS


DE SOGA

M2

CERCO PERIMETRICO
SS.HH. HOMBRES - MUJERES
Eje J"-J" ENTRE EJE 5-5 Y EJE 7-7
Eje I-I ENTRE EJE 5-5 Y EJE 7-8

M2
M2

MUROS DE DIVISION DE MINUSVALIDOS

M2

MURO SOBRE VIGA


CREP/CRES
Eje J-J ENTRE EJE 1-1 Y EJE 4-4
Eje I-I ENTRE EJE 1-1 Y EJE 4-5

2
1

3.36
2.61

1.90
1.90

3.24

M2
M2

1
2
2

0.25

3.25
3.15
2.9

M2
M2

1
1

9.33
7.24

1.90
1.90

M2
M2

1
1

3.24
1.95

3.19
2.29

M2

3.09

1.9

2.10

DEPOSITO DE LIBROS

ARCHIVO
EJE A-A ENTRE EJE 7-7 Y 8-8

2.60

MUROS DE VID DE ARCHIVO

M2

1
1

3.5
2.3

3.17
2.82

SALA PROFESORES
EJE A-A ENTRE EJE 6-6 Y EJE 7-7
EJE B-B ENTRE EJE 6-6 Y EJE 7-7
EJE B-B ENTRE EJE 7-7 Y EJE 8-8

M2
M2
M2

1
1
1

3.13
2.13
3.14

1.9
1.9
1.9

SALA DE COMPUTO
EJE A-A ENTRE EJE 8-8 Y 9-9
EJE A-A ENTRE EJE 9-9 Y 10-10
EJE A-A ENTRE EJE 10-10 Y 11-11
EJE B-B ENTRE EJE 8-8 Y 9-9
EJE B-B ENTRE EJE 9-9 Y 10-10
EJE B-B ENTRE EJE 10-10 Y 11-11

M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1

3.12
3.12
3.13
2.12
3.12
2.13

1.90
1.90
1.90
1.90
1.90
1.90

DEPOSITO
EJE 11-11 ENTRE C-C y D-D

M2

3.13

1.9

M2
M2
M2

1
1
1

1.64
2.70
2.70

0.90
3.24
3.19

M2
M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1
1

3.1
3.1
3.1
3.1
1.9
3.1
3.1
1.9

1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9

F"- F"
G"- G"
F"- F"
G"- G"

M2
M2
M2
M2

1
1
1
1

2.23
2.48
2.23
2.48

1.3
1.3
1.3
1.3

COCINA
EJE 1"-1" ENTRE H"-H" Y G"- G"
EJE 2"-2" ENTRE H"-H" Y G"- G"

M2
M2

1
1

2.50
2.50

1.30
1.30

ACERO DE AMARRE EN MUROS

KG

ALMACEN
EJE 12-12 ENTRE EJES C-C Y D-D
muros div de almacen
LABORATORIOS
EJE 12-12 ENTRE EJES D-D Y E-E
EJE 12-12 ENTRE EJES E-E Y F-F
EJE 12-12 ENTRE EJES F-F Y G-G
EJE 12-12 ENTRE EJES G-G Y H-H
EJE 11-11 ENTRE EJES D-D Y E-E
EJE 11-11 ENTRE EJES E-E Y F-F
EJE 11-11 ENTRE EJES F-F Y G-G
EJE 11-11 ENTRE EJES G-G Y H-H
CAFETERIA
EJE 1"-1" ENTRE E"-E" Y
EJE 1"-1" ENTRE F"-F" Y
EJE 2"-2" ENTRE E"-E" Y
EJE 2"-2" ENTRE F"-F" Y

03.01.04

0.25

1072.00

KG
KG
KG
KG

0.25
0.25
0.25
0.25

1008.00
275.56
42.67
40.00

M2
M2
M2
M2
M2

1
1
1
1
1
1

2.96
2.95
2.96
2.95
2.96
2.95

Eje J"-J" ENTRE EJE 5-5 Y EJE 7-7


Eje I-I ENTRE EJE 5-5 Y EJE 7-8

M2
M2

2
1

3.36
2.61

1.90
1.90

MUROS DE DIVISION DE MINUSVALIDOS

M2

3.24
2.10

MURO SOBRE VIGA

M2
M2

1
2
2

3.25
3.15
2.9

M2

11

1.65

1.8

M2

3.56

1.8

M2
M2
M2
M2

1
1
1
1

2.96
2.95
2.96
2.95

3.03
2.96
3.03
2.96

M2
M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1
1

03.02.00.

REVOQUES Y REVESTIMIENTOS

03.02.01.

TARRAJEO PRIMARIO, MORTERO C:A, 1:5

M2

SS.HH. HOMBRES - MUJERES


Eje 5"-5"
Eje 6"-6"
Eje 7"-7"

3.03
2.96
3.03
2.96
3.03
2.96

0.25

SS.HH. PROFESORES - PROFESORAS

LABORATORIOS
EJE D-D
EJE H-H

EJE 12-12 ENTRE EJES D-D Y E-E


EJE 12-12 ENTRE EJES E-E Y F-F
EJE 12-12 ENTRE EJES F-F Y G-G
EJE 12-12 ENTRE EJES G-G Y H-H
EJE 11-11 ENTRE EJES D-D Y E-E
EJE 11-11 ENTRE EJES E-E Y F-F
EJE 11-11 ENTRE EJES F-F Y G-G
EJE 11-11 ENTRE EJES G-G Y H-H

3.1
3.1
3.1
3.1
1.9
3.1
3.1
1.9

1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9

CAFETERIA - COCINA
M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1

F"- F"
G"- G"
F"- F"
G"- G"

M2
M2
M2
M2

1
1
1
1

2.23
2.48
2.23
2.48

1.3
1.3
1.3
1.3

COCINA
EJE 1"-1" ENTRE H"-H" Y G"- G"
EJE 2"-2" ENTRE H"-H" Y G"- G"

M2
M2

1
1

2.50
2.50

1.30
1.30

3.36
2.61

3.03
2.96
3.03
2.96
3.03
2.96
1.90
1.90

EJE E"-E"
EJE G"-G"
EJE H"-H"

4.67
4.67
4.67
-1.80
-1.80
-0.90
-0.25

3.03
3.03
3.03
2.50
0.90
2.10
2.965

CAFETERIA
EJE 1"-1" ENTRE E"-E" Y
EJE 1"-1" ENTRE F"-F" Y
EJE 2"-2" ENTRE E"-E" Y
EJE 2"-2" ENTRE F"-F" Y

03.02.02.

TARRAJEO EN MUROS INTERIORES E=1.5CM,


C:A, 1:5

M2

SS.HH. HOMBRES - MUJERES


Eje 5"-5"

1
1
1
1
1
1
2
1

Eje J"-J" ENTRE EJE 5-5 Y EJE 7-7


Eje I-I ENTRE EJE 5-5 Y EJE 7-8

M2
M2
M2
M2
M2
M2
M2

MUROS DE DIVISION DE MINUSVALIDOS

M2

MURO SOBRE VIGA

M2
M2
M2

1
2
2
11

M2

M2
M2
M2
M2
M2
M2
M2

Eje 6"-6"
Eje 7"-7"

2.96
2.95
2.96
2.95
2.96
2.95

3.24

1.65

3.25
3.15
2.9
1.8

3.56

1.8

1
1
1
1
1
1
1

2.96
2.95
2.96
2.95

3.03
2.96
3.03
2.96
1.9
1.9
1.9

2.10
0.25

SS.HH. PROFESORES - PROFESORAS

LABORATORIOS
EJE D-D
EJE H-H
EJE 12-12 ENTRE EJES D-D Y E-E
EJE 12-12 ENTRE EJES E-E Y F-F
EJE 12-12 ENTRE EJES F-F Y G-G

3.1
3.1
3.1

EJE 12-12 ENTRE EJES G-G Y H-H


EJE 11-11 ENTRE EJES D-D Y E-E
EJE 11-11 ENTRE EJES E-E Y F-F
EJE 11-11 ENTRE EJES F-F Y G-G
EJE 11-11 ENTRE EJES G-G Y H-H

M2
M2
M2
M2
M2

1
1
1
1
1

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1
1
1
1
1
1
1

4.67
4.67
4.67
-1.80
-1.80
-0.90
-0.25

M2
M2
M2
M2
M2
M2

2
2
2
2
2
2

2.96
2.95
2.96
2.95

M2
M2
M2
M2
M2

2
2
2
2
2

2.96
2.95

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

2
2
2
2
2
2
2
2
2
2

2.96
2.95
2.96
2.95

3.1
1.9
3.1
3.1
1.9

1.9
1.9
1.9
1.9
1.9

2.23
2.48
2.23
2.48
2.50
2.50

3.03
3.03
3.03
2.50
0.90
2.10
2.965
1.3
1.3
1.3
1.3
1.30
1.30

9.33
7.24

3.03
2.96
3.03
2.96
1.90
1.90

3.13
2.13
3.14

3.03
2.96
1.9
1.9
1.9

3.12
3.12
3.13
2.12
3.12
2.13

3.03
2.96
3.03
2.96
1.90
1.90
1.90
1.90
1.90
1.90

CAFETERIA - COCINA
EJE E"-E"
EJE G"-G"
EJE H"-H"

EJE 1"-1" ENTRE E"-E" Y F"- F"


EJE 1"-1" ENTRE F"-F" Y G"- G"
EJE 2"-2" ENTRE E"-E" Y F"- F"
EJE 2"-2" ENTRE F"-F" Y G"- G"
EJE 1"-1" ENTRE H"-H" Y G"- G"
EJE 2"-2" ENTRE H"-H" Y G"- G"
CREP/CRES
Eje 1-1
Eje 4-4
Eje J-J ENTRE EJE 1-1 Y EJE 4-4
Eje I-I ENTRE EJE 1-1 Y EJE 4-5
SALA DE PROFESORES
EJE 6-6
EJE A-A ENTRE EJE 6-6 Y EJE 7-7
EJE B-B ENTRE EJE 6-6 Y EJE 7-7
EJE B-B ENTRE EJE 7-7 Y EJE 8-8
SALA DE COMPUTO
EJE 8-8
EJE 11"-11"
EJE A-A ENTRE EJE 8-8 Y 9-9
EJE A-A ENTRE EJE 9-9 Y 10-10
EJE A-A ENTRE EJE 10-10 Y 11-11
EJE B-B ENTRE EJE 8-8 Y 9-9
EJE B-B ENTRE EJE 9-9 Y 10-10
EJE B-B ENTRE EJE 10-10 Y 11-11

DEPOSITO
EJE C-C
EJE 11-11 ENTRE C-C y D-D
ALMACEN
EJE C-C ENTRE EJES 11-11 Y 12-12
EJE 12-12 ENTRE EJES C-C Y D-D
muros div de almacen

M2
M2

2
2
2

2.95

M2
M2
M2
M2

2
2
2
2

2.96

M2
M2

2
2

2.60

260.77

3.13

2.96
1.9

1.64
2.70
2.70

3.03
0.90
3.24
3.19

3.24
1.95

3.19
2.29

DEPOSITO DE LIBROS

03.02.03.

TARRAJEO EN MUROS EXTERIORES E=1.5CM,


C:A, 1:5

M2

CERCO PERIMETRICO
03.02.04.

TARRAJEO EN COLUMNAS E=1.5CM, C:A, 1:5

2.80

M2

CERCO PERIMETRICO
109
2
2

0.70
1.00
0.85

2.80
2.80
2.80

0.80
0.80
0.25
0.45
0.45
0.60
0.80
0.80
0.25

3.15
3.00
3.08
3.15
3.00
3.08
3.15
3.00
3.08

0.50

2.00

1
1
1
1
1
1
1

1.20
1.20
0.50
1.55
1.55
1.55
1.55

3.15
3.00
3.08
3.15
3.00
3.15
3.00

SS.HH. HOMBRES - MUJERES


Eje 5"-5"

Eje 6"-6"

Eje 7"-7"

COLUMNETAS- SSHOMBRES-MUJERES
CREP/CRES
Eje 1-1

Eje 2-2
Eje 3-3

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

M2
M2
M2
M2
M2
M2
M2

Eje 4-4
COLUMNETAS- CRES
ARCHIVO
EJE A-A ENTRE 7-7 Y 8-8
EJE 8-8 COLUMNA DE 25X25
COLUMNETAS- ARCHIVO

M2
M2
M2

1
1
12

0.80
0.80
0.50

3.15
3.00
2.00

M2
M2
M2
M2

2
1
3
2

1.55
0.45
0.50
0.5

3.15
3.00
2.00
3.17

M2
M2
M2
M2
M2

1
1
1
1
1

1.20
1.20
0.50
1.55
1.55

3.15
3.00
3.08
3.00
3.00

0.50

2.00

M2
M2
M2
M2
M2
M2

2
1
2
1
1
10

1.55
1.20
1.55
1.20
0.60
0.50

3.15
3.15
3.00
3.00
3.08
2.00

M2
M2
M2

1
1
1

1.20
1.20
0.50

3.15
3.00
3.08

M2
M2
M2

1
1
1

1.55
1.55
0.6

3.15
3.00
3.08

M2

0.5

M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1

1.55
1.55
1.55
1.55
0.6
1.55
1.55

3.15
3.00
3.15
3.00
3.08
3.15
3.00

SALA DE PROFESORES
EJE 6-6

EJE 7-7
EJE 8-8
COLUMNETAS- SALA DE PROFESORES

M2

SALA DE COMPUTO
EJE A-A ENTRE 8-8 Y 11-11
EJE B-B ENTRE 8-8 Y 11-11

COLUMNETAS- SALA DE COMPUTO


ALMACEN - DEPOSITO
EJE C-C

EJE D-D

COLUMNETAS- ALMACEN DEPOSITO


LABORATORIO
EJE E-E
EJE F-F

EJE G-G

EJE H-H

M2
M2
M2
M2

1
1
1
14

1.2
1.2
0.5
0.5

3.15
3.00
3.08
2

EJE 2" - 2"

M2
M2
M2
M2
M2

2
2
2
2
1

1.20
1.55
1.20
1.55
0.50

3.15
3.15
3.00
3.00
3.08

COLUMNETAS CAFETERIA - COCINA

M2

16

0.50

1.55

TARRAJEO EN VIGAS E=1.5CM, C:A, 1:5

M2

COLUMNETAS- LABORATORIOS
CAFETERIA - COCINA
EJE 1" - 1"

03.02.05.

CERCO PERIMETRICO
VIGETAS

260.77

0.20

1
1
1
2
2

7.80
7.80
7.80
3.90
3.90

0.4
0.4
0.4
0.7
0.7

3.90

0.2

M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1

7.80
7.80
7.80
7.80
11.00
11.00
11.00

0.60
0.95
0.95
0.20
0.7
0.7
0.2

M2
M2
M2
M2
M2
M2

1
1
1
1
1
1

7.80
7.80
7.80
7.80
7.80
7.80

0.60
0.95
0.60
0.95
0.95
0.60

SS.HH. HOMBRES - MUJERES


Eje 5"-5"
Eje 6"-6"
Eje 7"-7"
Eje I-I ENTRE EJES 5-5Y 7"-7"
Eje J-J ENTRE EJES 5-5 Y 7"-7"

M2
M2
M2
M2
M2

VIGETAS-SS.HH. HOMBRES - MUJERES

M2

CREP/CRES
Eje 1-1
Eje 2-2
Eje 3-3
Eje 4-4
Eje J-J ENTRE EJES 1-1Y 4"-4"
Eje I-I ENTRE EJES 1-1Y 4"-4"
VIGETAS - CREP/CRES
ARCHIVO - SALA DE COMPUTO - PROFESORES
EJE 6-6
EJE 7-7
EJE 8-8
EJE 9-9
EJE 10-10
EJE 11-11

EJE A-A
EJE B-B

M2
M2

VIGETAS-ARCHIVO - SALA DE COMPUTO PROFESORES

M2

1
1

18.30
18.30

0.70
0.70

18.30

0.2

1
1
1
1
1
1
1
1

7.80
7.80
7.80
7.80
7.80
7.80
18.27
18.27

0.60
0.40
0.95
0.65
0.95
0.60
0.70
0.70

18.27

0.20

1
1
1
1
1
1
2

5.90
5.90
5.90
5.90
9.04
9.04
9.04

0.70
0.95
0.70
0.60
0.70
0.70
0.20

ALMACEN DEPOSITO Y LABORATORIOS

03.02.06.

EJE C-C
EJE D-D
EJE E-E
EJE F-F
EJE G-G
EJE H-H
EJE 11-11
EJE 11-12
VIGETAS - ALMACEN DEPOSITO Y
LABORATORIOS

M2
M2
M2
M2
M2
M2
M2
M2

CAFETERIA - COCINA
EJE E"-E"
EJE F"-F"
EJE G"-G"
EJE H"-H"
EJE 1"-1"
EJE 2"-2"
VIGETAS CAFETERIA - COCINA

M2
M2
M2
M2
M2
M2
M2
M2

VESTIDURA DE DERRAMES, C:A, 1:5


CERCO PERIMETRICO

M3

M
M
1
1

SS.HH. HOMBRES - MUJERES


VENTANA DE 3.9X1.05

M
4
4
2
4
2
1
2
4

VENTANA DE 2.0 X 0.9


PUERTA DE 0.90 X 2.10
VENTANA DE 1.74 X 0.9
PUERTA DE 0.90 X 2.10
CREP/CRES
VENTANA DE 1.05 X 3.67
VENTANA DE 1.05 X 3.68
VENTANA DE 1.05 X 3.65
VENTANA DE 0.9 X 3.67
VENTANA DE 0.9 X 3.68

M
1
1
1
1
1

VENTANA DE 0.9 X 3.65


LONGITUD NEGATIVA
PUERTAS DE 1.2 X 2.10
VENTANA DE 2.85 X 0.80
PUERTA DE 0.90 X 2.10
ARCHIVO - SALA DE COMPUTO - PROFESORES

1
-2
2
1
2
M

VENTANA DE 1.05 X 3.67


VENTANA DE 1.05 X 3.68
VENTANA DE 1.05 X 3.65
VENTANA DE 0.9X 3.67
VENTANA DE 0.9X 3.68
VENTANA DE 0.9 X 3.65
LONGITUD NEGATIVA
PUERTA DE 1.20 X 2.10
ALMACEN DEPOSITO Y LABORATORIOS

1
1
3
1
1
3
-3
3
M

VENTANA DE 1.05 X 3.65


VENTANA DE 1.05 X 3.67
VENTANA DE 0.9 X 3.65
VENTANA DE 0.9X 3.67
LONGITUD NEGATIVA
PUERTA DE 1.20 X 2.10
PUERTA DE 0.90 X 2.10
CAFETERIA - COCINA

4
1
4
1
-2
2
1
M

VENTANA DE 3.00X1.60
VENTANA DE 3.02X1.60
VENTANA DE 1.80X1.61
PUERTA DE 1.8 X 2.50
PUERTA DE 0.9 X 2.10
03.02.07.

2
4
1
1
1

BRUAS SEGN DETALLE

CERCO PERIMETRICO - FACHADA

M
M

SS.HH. HOMBRES - MUJERES

Eje 5"-5"
Eje 6"-6"
Eje 7"-7"
Eje I-I ENTRE EJES 5-5Y 7"-7"
Eje I-I ENTRE EJES 5-5Y 7"-7" PARTE POSTERIOR
DE MURO
Eje J-J ENTRE EJES 5-5 Y 7"-7"
Eje J-J ENTRE EJES 5-5 Y 7"-7"PARTE POSTERIOR
DE MURO

M
M
M
M

1
1
1
1

M
M

1
1

CREP/CRES
Eje 1-1
Eje 4-4
Eje J-J ENTRE EJES 1-1Y 4"-4"
Eje I-I ENTRE EJES 1-1Y 4"-4"
ARCHIVO - SALA DE COMPUTO - PROFESORES
EJE 6-6
EJE 8-8
EJE 11-11
EJE A-A
EJE B-B

M
M
M
M

2
1
2
2

M
M
M
M
M
M

2
2
2
2
2

M
M
M
M

2
1
2
1

M
M
M

1
1
1

EJE E"-E"
EJE E"-E" INTERIOR DE CAFETERIA
EJE G"-G"
EJE H"-H"
EJE H"-H" PARTE POSTERIO
EJE 1"-1"
EJE 2"-2"

M
M
M
M
M
M
M

1
1
1
1
1
1
1

TARRAJEO DE CIELORRASO

M2

SS.HH. HOMBRES - MUJERES- CRES

M2

7.80

20.7

M2

7.80

20.6

M2

7.80

19.98

M2

5.90

10.65

ALMACEN DEPOSITO Y LABORATORIOS


EJE C-C
EJE D-D
EJE H-H
EJE 11-11
EJE 11-11 LADO POSTERIOR DE MURO
EJE 12-12
EJE 12-12 LADO FACHADA
CAFETERIA - COCINA

03.03.00.

ARCHIVO - SALA DE COMPUTO - PROFESORES

ALMACEN DEPOSITO Y LABORATORIOS


CAFETERIA - COCINA

03.04.00.

PISOS Y PAVIMENTOS

03.04.01.

CONTRAPISO E=35MM

SS.HH. HOMBRES - MUJERES- CRES- DEPOSITO

AREA NEGATIVA GRES

AREA NEGATIVA DE MUROS DIVISORES DE


DEPOSITO

M2

M2
M2
M2
M2
M2
M2

2
2
1
-4
-4
-4

4.90
2.30
7.10
0.60
0.20
0.15

4.02
2.1
12.5
0.1
0.25
0.1

M2

-1

0.15

4.58

M2

1
1
1

7.10
4.13
1.20

4.1
3.45
0.15

-3
-2
-2

0.10
0.60
0.25

0.15
0.1
0.2

M2
M2
M2
M2

1
-6
-6
-4

7.10
0.60
0.20
0.15

16.75
0.1
0.25
0.1

M2
M2
M2
M2
M2
M2

1
1
-4
-4
-4
-1

5.20
1.80
0.60
0.20
0.15
0.15

10.65
0.15
0.1
0.25
0.1
3.6

2
2

4.90
2.30

4.02
2.1

SALA DE COMPUTO - PROFESORES

AREA NEGATIVA DE SALA DE PROFESORES

LABORATORIOS

AREA NEGATIVA LABORATORIOS

CAFETERIA - COCINA

AREA NEGATIVA COCINA

MURO
03.04.02.

PISOS

03.04.02.01.

PISO CERAMICO ALTO TRANSITO 40X40 CM


SS.HH. HOMBRES - MUJERES

M2
M2
M2

CAFETERIA - COCINA

MURO

M2
M2
M2
M2
M2
M2

PISO CERAMICO 40X40 CM

M2

AREA NEGATIVA COCINA

03.04.02.02

1
1
-4
-4
-4
-1

5.20
1.80
0.60
0.20
0.15
0.15

10.65
0.15
0.1
0.25
0.1
3.6

1
1
1

7.10
4.13
1.20

4.1
3.45
0.15

-3
-2
-2

0.10
0.60
0.25

0.15
0.1
0.2

M2
M2
M2
M2

1
-6
-6
-4

7.10
0.60
0.20
0.15

16.75
0.1
0.25
0.1

M2
M2
M2
M2

1
-4
-4
-4

7.10
0.60
0.20
0.15

12.5
0.1
0.25
0.1

M2

-1

0.15

4.58

M2
M2

1
-1

4.00
0.25

3.5
0.1

M2
M2
M2
M2

4
0.9
-1
-1

2.80
0.25
0.17
1.90

0.1
0.95

SALA DE COMPUTO - PROFESORES


M2

AREA NEGATIVA DE SALA DE PROFESORES

03.04.02.03

PISO DE LOSETA VENECIANA

M2

LABORATORIOS

AREA NEGATIVA LABORATORIOS

CRES
AREA NEGATIVA GRES

AREA NEGATIVA DE MUROS DIVISORES DE


DEPOSITO
03.04.02.04

PISO DE CEMENTO PULIDO BRUADO

M2

ARCHIVO
AREAS NEGATIVAS DE ARCHIVO
ALMACEN

AREAS NEGATIVAS DE ALMACEN


AREA DE LAVATORIO

DEPOSITO
AREAS NEGATIVAS DEPOSITO

M2
M2

1
-1

4.00
0.25

4.15
0.1

M2

7.50
0.90

5.3
4.1

M2

13.40
5.30
4.10

0.3
0.3
0.3

M2

6.02

4.01

2
2
1

5.25
1.00
1.50

1.4
2.11
2.93

2
2
1
1
1
1

1.40
1.40
1.50
1.50
1.40
1.40

0.5
0.3
0.5
0.3
0.75
0.45

ATRIO

GRADAS DE ATRIO

ESTRADO

03.04.02.05

PISO DE CEMENTO PULIDO

M2

INGRESOS A ESTRADO

ESALERAS DE INGRESOS
M2

03.04.02.06

03.04.02.07

SARDINEL DE CONCRETO

ENTRADA PRINCIPAL
CIRCULACION

M
M

1
1

CIRCULACION . CERNANA A COCINA

VEREDA CONCRETO F'C=175 KG/CM2


E=4",SEMIPULIDO Y BRUADO

SS.HH. HOMBRES - MUJERES- CRES

M2

M2

1
1
1

22.90
22.90
7.40

1.5
0.6
1.1

M2
M2
M2

1
1
1

22.70
22.70
7.40

1.5
0.6
1.2

ARCHIVO - SALA DE COMPUTO - PROFESORES

ALMACEN DEPOSITO Y LABORATORIOS


M2
M2
M2

1
1
1

22.70
22.70
7.40

1.5
0.6
1.2

M2
M2
M2

1
1
1

11.05
11.05
5.50

0.6
0.6
0.6

5.40

0.3

2
1

1.00
0.90

3.59
1.49

CAFETERIA - COCINA

PEDESTAL PARA ASTAS DE BANDERA

03.04.02.08

RAMPAS

M2

M2
M2
M2

03.04.02.09

VEREDA DE ADOQUIN

M2

ENTRADA PRINCIPAL
CIRCULACION

M2
M2
M2
M2

1
1
1
-1

6.16
5.50
0.53
2.94

9.2
60.93
16.42
0.78

CIRCULACION . CERNANA A COCINA

M2
M2

1
1

35.92
35.92

1.72
1.3

PEDESTAL PARA ASTAS DE BANDERA

M2

1
1

2.40
9.60

2.9
3

30.00

20

AREA NEGATIVA DE CIRCULACION

03.04.02.09.

03.05.00.
03.05.01.
03.05.01.01.

PATIO CONCRETO F'C=175 KG/CM2 E=5", PULIDO


LOSA DE USOS MULTIPLES

M2
M2

ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO 40X40 CM

M2
M2

SS.HH. HOMBRES - MUJERES

M2

1
1

38.40
41.00

1.3
1.3

CAFETERIA - COCINA

M2

1
1
1

3.47
3.47
2.82

0.62
0.5
0.1

LABORATORIOS
MESA DE LABORATORIOS
MURO EJE H-H
03.05.02.

CONTRAZOCALOS

03.05.02.01

CONTRAZOCALO DE CERAMICO DE 40X 10 CM

03.05.02.02

03.05.02.03

1
1
1
1

4.50
5.00
4.50
3.85

0.62
0.5
0.1
1.3

1
4
1

20.15
4.00
6.80

0.36
0.77
1.3

SS.HH. HOMBRES - MUJERES

CAFETERIA - COCINA

SALA DE PROFESORES

1
1
1

CONTRAZOCALO DE LOSETA VENECIANA

LABORATORIOS

M
M

1
1

CRES Y DEPOSITO DE LIBROS

CONTRAZOCALO CEMENTO S/COLOREAR,


E=1.5CM, H=20CM

SS.HH. HOMBRES - MUJERES- CRES

PERIMETRO DE SS.HH Y CRES


LONGITUDES NEGATIVAS

M
M

1
-2
-4

PERIMETRO DE ARCHIVO - SALA DE COMPUTO PROFESORES


LONGITUDES NEGATIVAS

M
M

1
-3

PERIMETRO INTERIOR DE ARCHIVO

ARCHIVO - SALA DE COMPUTO - PROFESORES

ALMACEN DEPOSITO Y LABORATORIOS

PERIMETRO DE ALMACEN DEPOSITO Y


LABORATORIOS
LONGITUDES NEGATIVAS

M
M

1
-2

PERIMETRO INTERIOR DE ALMACEN

PERIMETRO INTERIOR DE DEPOSITO

M
M

1
-1

M2

CERCO PERIMETRICO

M2

6.01

0.4

SS.HH. HOMBRES - MUJERES- CRES

M2

20.7

8.3

M2

20.6

8.3

M2

19.98

8.3

M2

10.65

6.4

CAFETERIA - COCINA

PERIMETRO DE CAFETERIA - COCINA


LONGITUDES NEGATIVAS
03.06.00.

COBERTURAS

03.06.01

LADRILLO PASTELERO SOBRE MORTERO

ARCHIVO - SALA DE COMPUTO - PROFESORES

ALMACEN DEPOSITO Y LABORATORIOS


CAFETERIA - COCINA
03.06.00.
03.06.01.
03.06.02.
03.06.03

CARPINTERIA DE MADERA
PUERTA DE MADERA APANELADA CON VISOR DE
VIDRIO DE 1.2 X 2.1
PUERTA DE MADERA CONTRAPLACADA DE 1.00
X 2.1
PUERTA DE MADERA APANELADA DE 1.00 X 2.1

03.06.06
03.06.07
03.06.08
03.06.09
03.06.10
03.06.11

PUERTA DE MADERA CONTRAPLACADA DE


0.6X1.4
PUERTA DE MADERA CONTRAPLACADA DE
0.9X2.1
REHABILITACION DE PUERTAS
REHABILITACION DE VENTANAS
VENTANA DE MADERA DE 3.48 X 0.9
VENTANA DE MADERA DE 3.65 X 0.9
VENTANA DE MADERA DE 1.75 X 0.9
VENTANA DE MADERA DE 1.80 X 0.9

03.06.12

VENTANA DE MADERA DE 3.48 X 1.05

03.06.07

VENTANA DE MADERA DE 3.65 X 1.05

03.06.04.
03.06.05

UND
UND

UND

UND

UND

11

UND
UND
UND
UND
UND
UND
UND

13
11
22
6
3
6
9

UND

UND

03.06.07

VENTANA DE MADERA DE 3.55 X 1.05

03.06.07

VENTANA DE MADERA DE 2.85 X 0.8

03.07.00.

CARPINTERIA METALICA Y HERRERIA

03.07.01

UND
UND

4
3

PUERTA METALICA DE 1.8X 2.6

UND

03.07.02.

PUERTA METALICA DE 1.2 X2.1

UND

03.07.0.

TUBO DE FIERRO NEGRO DE 2"X 2.5

UND

03.07.0.

TUBO DE FIERRO NEGRO DE 3"X 2.5

UND

03.07.0.

TUBO DE FIERRO NEGRO DE 4"X 2.5

UND

03.08.00.

CERRAJERIA

03.08.01.

BISAGRA ALUMINIZADA DE 4" PESASA EN


PUERTA

UND

03.08.02.

BISAGRA ALUMINIZADA DE 2" PESASA EN


VENTANA

UND

03.08.03.

CERRADURA DOS GOLPES EN PUERTA CON


TIRADOR

UND

03.08.03

MANIJA DE BRONCE 4" PARA PUERTAS

UND

03.08.04

PICAPORTE DE 4" DE FIERRO

UND

03.09.00.

VIDRIOS, CRISTALES Y SIMILARES

03.09.01.

VIDRIOS SEMIDOBLES INCOLORO

M2

108

03.10.00.

PINTURA

03.10.01.

PINTURA LATEX 2 MANOS EN CIELO RASO

SS.HH. HOMBRES - MUJERES- CRES


ARCHIVO - SALA DE COMPUTO - PROFESORES

ALMACEN DEPOSITO Y LABORATORIOS

57

33

11

32

M2

M2

7.80

20.7

M2

7.80

20.6

M2

7.80

19.98

CAFETERIA - COCINA

03.10.02.

M2

5.90

2
2
2
2
2
2
4
2

2.96
2.95
2.96
2.95
2.96
2.95

Eje J"-J" ENTRE EJE 5-5 Y EJE 7-7


Eje I-I ENTRE EJE 5-5 Y EJE 7-8

M2
M2
M2
M2
M2
M2
M2
M2

MUROS DE DIVISION DE MINUSVALIDOS

M2

MURO SOBRE VIGA

M2
M2
M2

2
4
4
22

M2

10.65

PINTURA LATEX 2 MANOS EN MUROS


INTERIORES Y EXTERIORES
SS.HH. HOMBRES - MUJERES
Eje 5"-5"
Eje 6"-6"
Eje 7"-7"

3.36
2.61
3.24

3.03
2.96
3.03
2.96
3.03
2.96
1.90
1.90

1.65

3.25
3.15
2.9
1.8

3.56

1.8

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

2
2
2
2
2
2
2
2
2
2
2
2

2.96
2.95
2.96
2.95
3.1
3.1
3.1
3.1
1.9
3.1
3.1
1.9

3.03
2.96
3.03
2.96
1.9
1.9
1.9
1.9
1.9
1.9
1.9
1.9

M2
M2
M2
M2
M2
M2
M2
M2
M2

2
2
2
2
2
2
2
2
2

4.67
4.67
4.67
-1.80
-1.80
-0.90
-0.25
2.23
2.48

3.03
3.03
3.03
2.50
0.90
2.10
2.965
1.3
1.3

2.10
0.25

SS.HH. PROFESORES - PROFESORAS

LABORATORIOS
EJE D-D
EJE H-H
EJE 12-12 ENTRE EJES D-D Y E-E
EJE 12-12 ENTRE EJES E-E Y F-F
EJE 12-12 ENTRE EJES F-F Y G-G
EJE 12-12 ENTRE EJES G-G Y H-H
EJE 11-11 ENTRE EJES D-D Y E-E
EJE 11-11 ENTRE EJES E-E Y F-F
EJE 11-11 ENTRE EJES F-F Y G-G
EJE 11-11 ENTRE EJES G-G Y H-H
CAFETERIA - COCINA
EJE E"-E"
EJE G"-G"
EJE H"-H"

EJE 1"-1" ENTRE E"-E" Y F"- F"


EJE 1"-1" ENTRE F"-F" Y G"- G"

EJE 2"-2" ENTRE E"-E" Y F"- F"


EJE 2"-2" ENTRE F"-F" Y G"- G"
EJE 1"-1" ENTRE H"-H" Y G"- G"
EJE 2"-2" ENTRE H"-H" Y G"- G"

M2
M2
M2
M2

2
2
2
2

M2
M2
M2
M2
M2
M2

2
2
2
2
2
2

2.96
2.95
2.96
2.95

M2
M2
M2
M2
M2

2
2
2
2
2

2.96
2.95

2
2
2
2
2
2
2
2
2
2

2.96
2.95
2.96
2.95

EJE A-A ENTRE EJE 8-8 Y 9-9


EJE A-A ENTRE EJE 9-9 Y 10-10
EJE A-A ENTRE EJE 10-10 Y 11-11
EJE B-B ENTRE EJE 8-8 Y 9-9
EJE B-B ENTRE EJE 9-9 Y 10-10
EJE B-B ENTRE EJE 10-10 Y 11-11

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

DEPOSITO
EJE C-C
EJE 11-11 ENTRE C-C y D-D

M2
M2

2
2
2

2.95

M2
M2
M2
M2

2
2
2
2

2.96

M2
M2

2
2

2.60

M2

260.77

CREP/CRES
Eje 1-1
Eje 4-4
Eje J-J ENTRE EJE 1-1 Y EJE 4-4
Eje I-I ENTRE EJE 1-1 Y EJE 4-5
SALA DE PROFESORES
EJE 6-6
EJE A-A ENTRE EJE 6-6 Y EJE 7-7
EJE B-B ENTRE EJE 6-6 Y EJE 7-7
EJE B-B ENTRE EJE 7-7 Y EJE 8-8
SALA DE COMPUTO
EJE 8-8
EJE 11"-11"

ALMACEN
EJE C-C ENTRE EJES 11-11 Y 12-12
EJE 12-12 ENTRE EJES C-C Y D-D
muros div de almacen

2.23
2.48
2.50
2.50

1.3
1.3
1.30
1.30

9.33
7.24

3.03
2.96
3.03
2.96
1.90
1.90

3.13
2.13
3.14

3.03
2.96
1.9
1.9
1.9

3.12
3.12
3.13
2.12
3.12
2.13

3.03
2.96
3.03
2.96
1.90
1.90
1.90
1.90
1.90
1.90

3.13

2.96
1.9

1.64
2.70
2.70

3.03
0.90
3.24
3.19

3.24
1.95

3.19
2.29

DEPOSITO DE LIBROS

CERCO PERIMETRICO

2.80

AREAS NEGATIVAS DE ZOCALOS EN PAREDES


ZOCALO DE CERAMICO 40X40 CM
03.10.03.

PINTURA LATEX 2 MANOS EN VIGAS


CERCO PERIMETRICO
VIGETAS

M2

M2

M2

260.77

0.20

Eje 5"-5"
Eje 6"-6"
Eje 7"-7"
Eje I-I ENTRE EJES 5-5Y 7"-7"
Eje J-J ENTRE EJES 5-5 Y 7"-7"

M2
M2
M2
M2
M2

1
1
1
2
2

7.80
7.80
7.80
3.90
3.90

0.4
0.4
0.4
0.7
0.7

VIGETAS-SS.HH. HOMBRES - MUJERES

M2

3.90

0.2

M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1

7.80
7.80
7.80
7.80
11.00
11.00
11.00

0.60
0.95
0.95
0.20
0.7
0.7
0.2

EJE 6-6
EJE 7-7
EJE 8-8
EJE 9-9
EJE 10-10
EJE 11-11
EJE A-A
EJE B-B

M2
M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1
1

7.80
7.80
7.80
7.80
7.80
7.80
18.30
18.30

0.60
0.95
0.60
0.95
0.95
0.60
0.70
0.70

VIGETAS-ARCHIVO - SALA DE COMPUTO PROFESORES

M2

18.30

0.2

1
1

7.80
7.80

0.60
0.40

SS.HH. HOMBRES - MUJERES

CREP/CRES
Eje 1-1
Eje 2-2
Eje 3-3
Eje 4-4
Eje J-J ENTRE EJES 1-1Y 4"-4"
Eje I-I ENTRE EJES 1-1Y 4"-4"
VIGETAS - CREP/CRES
ARCHIVO - SALA DE COMPUTO - PROFESORES

ALMACEN DEPOSITO Y LABORATORIOS


EJE C-C
EJE D-D

M2
M2

03.10.04.

EJE E-E
EJE F-F
EJE G-G
EJE H-H
EJE 11-11
EJE 11-12
VIGETAS - ALMACEN DEPOSITO Y
LABORATORIOS

M2
M2
M2
M2
M2
M2

CAFETERIA - COCINA
EJE E"-E"
EJE F"-F"
EJE G"-G"
EJE H"-H"
EJE 1"-1"
EJE 2"-2"
VIGETAS CAFETERIA - COCINA

M2
M2
M2
M2
M2
M2
M2
M2

M3

1
1
1
1
1
1

7.80
7.80
7.80
7.80
18.27
18.27

0.95
0.65
0.95
0.60
0.70
0.70

18.27

0.20

1
1
1
1
1
1
2

5.90
5.90
5.90
5.90
9.04
9.04
9.04

0.70
0.95
0.70
0.60
0.70
0.70
0.20

PINTURA LATEX 2 MANOS EN COLUMNAS


CERCO PERIMETRICO
M2

109
2
2

0.70
1.00
0.85

2.80
2.80
2.80

0.80
0.80
0.25
0.45
0.45
0.60
0.80
0.80
0.25

3.15
3.00
3.08
3.15
3.00
3.08
3.15
3.00
3.08

0.50

2.00

1
1
1
1
1
1
1
1

1.20
1.20
0.50
1.55
1.55
1.55
1.55
0.80

3.15
3.00
3.08
3.15
3.00
3.15
3.00
3.15

SS.HH. HOMBRES - MUJERES


Eje 5"-5"

Eje 6"-6"

Eje 7"-7"

COLUMNETAS- SSHOMBRES-MUJERES
CREP/CRES
Eje 1-1

Eje 2-2
Eje 3-3
Eje 4-4

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

M2
M2
M2
M2
M2
M2
M2
M2

COLUMNETAS- CRES
ARCHIVO
EJE A-A ENTRE 7-7 Y 8-8
EJE 8-8 COLUMNA DE 25X25
COLUMNETAS- CRES

M2
M2

1
12

0.80
0.50

3.00
2.00

M2
M2
M2
M2

2
1
3
2

1.55
0.45
0.50
0.5

3.15
3.00
2.00
3.17

M2
M2
M2
M2
M2

1
1
1
1
1

1.20
1.20
0.50
1.55
1.55

3.15
3.00
3.08
3.00
3.00

0.50

2.00

M2
M2
M2
M2
M2
M2

2
1
2
1
1
10

1.55
1.20
1.55
1.20
0.60
0.50

3.15
3.15
3.00
3.00
3.08
2.00

M2
M2
M2

1
1
1

1.20
1.20
0.50

3.15
3.00
3.08

M2
M2
M2

1
1
1

1.55
1.55
0.6

3.15
3.00
3.08

M2

0.5

M2
M2
M2
M2
M2
M2
M2
M2

1
1
1
1
1
1
1
1

1.55
1.55
1.55
1.55
0.6
1.55
1.55
1.2

3.15
3.00
3.15
3.00
3.08
3.15
3.00
3.15

SALA DE PROFESORES
EJE 6-6

EJE 7-7
EJE 8-8
COLUMNETAS- SALA DE PROFESORES

M2

SALA DE COMPUTO
EJE A-A ENTRE 8-8 Y 11-11
EJE B-B ENTRE 8-8 Y 11-11

COLUMNETAS- SALA DE COMPUTO


ALMACEN - DEPOSITO
EJE C-C

EJE D-D

COLUMNETAS- ALMACEN DEPOSITO


LABORATORIO
EJE E-E
EJE F-F

EJE G-G
EJE H-H

M2
M2
M2

1
1
14

1.2
0.5
0.5

3.00
3.08
2

EJE 2" - 2"

M2
M2
M2
M2
M2

2
2
2
2
1

1.20
1.55
1.20
1.55
0.50

3.15
3.15
3.00
3.00
3.08

COLUMNETAS CAFETERIA - COCINA

M2

16

0.50

1.55

COLUMNETAS- LABORATORIOS
CAFETERIA - COCINA
EJE 1" - 1"

03.10.05.

PINTURA LATEX 2 MANOS EN VESTIDURA DE


DERRAMES
CERCO PERIMETRICO

M
1
1

SS.HH. HOMBRES - MUJERES


VENTANA DE 3.9X1.05

M
4
4
2
4
2
1
2
4

VENTANA DE 2.0 X 0.9


PUERTA DE 0.90 X 2.10
VENTANA DE 1.74 X 0.9
PUERTA DE 0.90 X 2.10
CREP/CRES

VENTANA DE 1.05 X 3.67


VENTANA DE 1.05 X 3.68
VENTANA DE 1.05 X 3.65
VENTANA DE 0.9 X 3.67
VENTANA DE 0.9 X 3.68
VENTANA DE 0.9 X 3.65
LONGITUD NEGATIVA
PUERTAS DE 1.2 X 2.10
VENTANA DE 2.85 X 0.80
PUERTA DE 0.90 X 2.10
ARCHIVO - SALA DE COMPUTO - PROFESORES
VENTANA DE 1.05 X 3.67
VENTANA DE 1.05 X 3.68
VENTANA DE 1.05 X 3.65
VENTANA DE 0.9X 3.67
VENTANA DE 0.9X 3.68

1
1
1
1
1
1
-2
2
1
2
M
1
1
3
1
1

VENTANA DE 0.9 X 3.65


LONGITUD NEGATIVA
PUERTA DE 1.20 X 2.10
ALMACEN DEPOSITO Y LABORATORIOS

3
-3
3
M

VENTANA DE 1.05 X 3.65


VENTANA DE 1.05 X 3.67
VENTANA DE 0.9 X 3.65
VENTANA DE 0.9X 3.67
LONGITUD NEGATIVA
PUERTA DE 1.20 X 2.10
PUERTA DE 0.90 X 2.10
CAFETERIA - COCINA

4
1
4
1
-2
2
1
M

VENTANA DE 3.00X1.60
VENTANA DE 3.02X1.60
VENTANA DE 1.80X1.61
PUERTA DE 1.8 X 2.50
PUERTA DE 0.9 X 2.10
03.10.06.

2
4
1
1
1

PINTURA ESMALTE 2 MANOS EN


CONTRAZOCALO

M2

SS.HH. HOMBRES - MUJERES- CRES

PERIMETRO DE SS.HH Y CRES


LONGITUDES NEGATIVAS

M
M

1
-2
-4

0.2
0.2
0.2

PERIMETRO DE ARCHIVO - SALA DE COMPUTO PROFESORES


LONGITUDES NEGATIVAS

M
M

1
-3

0.2
0.2

PERIMETRO INTERIOR DE ARCHIVO

0.2

PERIMETRO DE ALMACEN DEPOSITO Y


LABORATORIOS
LONGITUDES NEGATIVAS

M
M

1
-2

0.2
0.2

PERIMETRO INTERIOR DE ALMACEN

0.2

PERIMETRO INTERIOR DE DEPOSITO

0.2

ARCHIVO - SALA DE COMPUTO - PROFESORES

ALMACEN DEPOSITO Y LABORATORIOS

CAFETERIA - COCINA

03.10.07.

03.10.08.

03.10.09.

PERIMETRO DE CAFETERIA - COCINA


LONGITUDES NEGATIVAS

M
M

PINTURA ESMALTE 2 MANOS EN SARDINELES

M2

CIRCULACION

M2

1
-1

0.2
0.2

0.10

PINTURA BARNIZ EN CARPINTERIA DE MADERA


PUERTA DE MADERA APANELADA CON VISOR DE
VIDRIO DE 1.2 X 2.1

M2

PUERTA DE MADERA CONTRAPLACADA DE 1.00


X 2.1

M2

PUERTA DE MADERA APANELADA DE 1.00 X 2.1

M2

PUERTA DE MADERA CONTRAPLACADA DE


0.6X1.4

M2

PUERTA DE MADERA CONTRAPLACADA DE


0.9X2.1

M2

PINTURA ANTICORROSIVA Y ESMALTE EN


ESTRUC. METALICAS

M2

16

1.20

2.1

10

1.00

2.1

12

1.00

2.1

22

0.60

1.4

26

0.90

2.1

PUERTA METALICA DE 1.8X 2.6

UND

1.80

2.6

PUERTA METALICA DE 1.2 X2.1

UND

1.20

2.1

276.68

03.10.10.

PINTADO DE MARCAS EN LOSA DEPORTIVA

M2

03.11.00.
03.11.01.

VARIOS, LIMPIEZA Y JARDINERIA


LIMPIEZA PERMANENTE DE OBRA

GLB

03.11.02.

LIMPIEZA FINAL

GLB

03.11.03.

SEMBRIO DE GRASS

M2

03.11.04.

SEMBRADO DE PALMERAS

UND

15

03.11.05

SEMBRADO DE FICUS

UND

39

1182.94

03.11.06

SEMBRADO DE PLANTAS ORNAMENTALES

UND

03.11.07

EQUIPAMIENTO DE AULAS

UND

03.11.08

JUNTA DE DILATACION RELLENO CON MORTERO


ASFALTICO E=1"

25

35

M
M
M

17
4

2.10
1.20

275.29

03.11.08

CANALETA PLUVIAL

03.11.08

GARGOLAS PLUVIALES

UND

11

03.11.08

BANCAS DE GRANITO

UND

20

03.11.08

CUNETAS

03.11.08

BAOS

UND

15

03.11.08

URINARIOS

UND

03.11.08

LAVATORIOS

UND

13

03.11.08

LETRAS DE BRONCE DE FACHADA

UND

13

03.11.08

JUNTAS DE 1 CM

159.70

CERCO PERIMETRICO
M
SS.HH. HOMBRES - MUJERES- CRES
COLUMNETAS- SSHOMBRES-MUJERES
COLUMNETAS- CRES

25

3.30

M2

8
12

2.00
2.00

M
M

3
2

2.00
3.17

2.00

6
14

2
2

M
M

ARCHIVO - SALA DE COMPUTO - PROFESORES


COLUMNETAS- ARCHIVO

COLUMNETAS- SALA DE PROFESORES

ALMACEN DEPOSITO Y LABORATORIOS


COLUMNETAS- ALMACEN DEPOSITO
COLUMNETAS- LABORATORIOS
CAFETERIA - COCINA

M
M

0.5

COLUMNETAS CAFETERIA - COCINA

16

0.50

1.55

LA I.E.S.M.A HACA BLANCA - C.P. HUACA BLANCA - DISTRITO


PARTAMENTO DE LAMBAYEQUE

AYO - DPTO LAMBAYEQUE


DIMENSIONES

ALTURA (H2)

PROM

PERIM

PARCIAL

TOTAL

238.23
12.68
24.60
-2.56
-9.36

3.00
2.93
3.00
2.93
3.00
2.93

52.57
8.88
8.64
8.88
8.64
8.88
8.64

2.97
2.9
2.97
2.9

3.00
2.93
3.00
2.93

35.05
8.88
8.64
8.88
8.64

2.97
2.9

3.00
2.93

17.52
8.88
8.64

2.97
2.9
2.97
2.9

3.00
2.93
3.00
2.93

35.05
8.88
8.64
8.88
8.64

3.00
2.93
3.00

35.05
8.88
8.64
8.88

2.97
2.9
2.97
2.9
2.97
2.9

2.97
2.9
2.97

2.9

2.93

8.64

2.9

2.93

8.64
8.64

2.97

3.00

8.88
8.88

2.9
2.9
2.9

2.97
2.97
2.97

32.79
13.85
13.85
13.85
-4.50
-1.62
-1.89
-0.74
39.08
32.67
32.67

6.41
6.41

974.03
730.16
730.16
42.85
12.77
4.96

3.11

3.13

10.53
13.15
1.45
31.48
17.73
13.76

3.215

12.82
8.36
4.47
22.85
5.87

SECCION TRAPEZOIDAL

2.86

2.56

11.10
5.89
15.96
5.95
4.05
5.97
31.81
5.93
5.93
5.95
4.03
5.93
4.05
5.95
5.95
18.84
1.48
8.75
8.61
42.56
5.89
5.89
5.89
5.89
3.61
5.89
5.89
3.61
12.25
2.90
3.22
2.90
3.22
6.50
3.25
3.25
609.56
268.00

252.00
68.89
10.67
10.00

263.64

2.97
2.9
2.97
2.9
2.97
2.9

3.00
2.93
3.00
2.93
3.00
2.93

52.57
8.88
8.64
8.88
8.64
8.88
8.64
42.85
12.77
4.96

3.11

3.13

10.53
13.15
1.45
32.67
32.67

6.41
6.41

2.97
2.9
2.97
2.9

3.00
2.93
3.00
2.93

35.05
8.88
8.64
8.88
8.64
42.56
5.89
5.89
5.89
5.89
3.61
5.89
5.89
3.61

2.9
2.9
2.9

2.97
2.97
2.97

32.79
13.85
13.85
13.85
-4.50
-1.62
-1.89
-0.74
12.25
2.90
3.22
2.90
3.22
6.50
3.25
3.25

707.64

2.97
2.9
2.97
2.9
2.97
2.9

3.00
2.93
3.00
2.93
3.00
2.93

3.11

3.13

128.09
8.88
8.64
8.88
8.64
8.88
8.64
12.77
4.96
10.53
13.15
1.45
32.67

6.41
6.41

2.97
2.9
2.97
2.9

3.00
2.93
3.00
2.93

77.61
8.88
8.64
8.88
8.64
5.89
5.89
5.89

5.89
3.61
5.89
5.89
3.61

2.9
2.9
2.9

2.97
2.97
2.97

2.97
2.9
2.97
2.9

3.00
2.93
3.00
2.93

2.97
2.9

3.00
2.93

2.97
2.9
2.97
2.9

3.00
2.93
3.00
2.93

51.53
13.85
13.85
13.85
-4.50
-1.62
-1.89
-0.74
2.90
3.22
2.90
3.22
3.25
3.25
133.06
17.76
17.29
17.76
17.29
35.45
27.51
66.97
17.76
17.29
11.89
8.09
11.93
133.71
17.76
17.29
17.76
17.29
11.86
11.86
11.89
8.06
11.86
8.09

2.9

2.97

2.93

3.00

3.215

29.18
17.29
11.89
55.43
17.76
2.95
17.50
17.23
25.65
16.72
8.93

1,460.31
1460.31
1460.31

501.11
224.00
213.64
5.60
4.76
23.99
2.52
2.40
0.77
1.42
1.35
1.85
2.52
2.40
0.77
8.00
44.90
3.78
3.60
1.54
4.88
4.65
4.88
4.65

2.52
2.40
12.00
17.29
9.77
1.35
3.00
3.17
25.22
3.78
3.60
1.54
4.65
4.65
7.00
38.29
9.77
3.78
9.30
3.60
1.85
10.00
26.30
3.78
3.60
1.54
4.88
4.65
1.85
6.00
53.36
4.88
4.65
4.88
4.65
1.85
4.88
4.65

3.78
3.60
1.54
14.00
47.77
7.56
9.77
7.20
9.30
1.54
12.40

334.51
104.31
104.31

23.40
3.12
3.12
3.12
5.46
5.46
3.12
38.66
4.68
7.41
7.41
1.56
7.70
7.70
2.20

69.21
4.68
7.41
4.68
7.41
7.41
4.68

12.81
12.81
7.32

65.26
4.68
3.12
7.41
5.07
7.41
4.68
12.789
12.789
7.308
33.68
4.13
5.605
4.13
3.54
6.328
6.328
3.616

403.39

8.8
5.46

14.26
8.8
5.46

3.9
1.05
2
0.9
2.1
1.74
0.9
2.1

43.54
15.6
4.2
4
3.6
4.2
1.74
1.8
8.4

9.44
9.46
9.4
9.14
9.16

66.15
9.44
9.46
9.4
9.14
9.16

2
2
2
2
2

1
1
1

9.1
1.2
2.1
4.45
2.1

9.1
-2.4
4.2
4.45
4.2

9.44
9.46
9.4
9.14
9.16
9.1
1.2
4.2

101.70
9.44
9.46
28.2
9.14
9.16
27.3
-3.6
12.6

9.4
9.44
9.1
9.14
1.2
4.2
5.1

103.68
37.6
9.44
36.4
9.14
-2.4
8.4
5.1
74.06

9.2
9.24
6.8
6.8
5.1

18.4
36.96
6.8
6.8
5.1
619.85

8.14

8.14
8.14
62.43

11
11.8
11
7.8

11
11.8
11
7.8

5.4
10.03

5.4
10.03

5.4

5.4

12
12
19.95
23.45

122.80
24
12
39.9
46.9

194.98

19
12.35
19
15.59
31.55

38
24.7
38
31.18
63.1

163.30
12.66
12.6
12.66
16.4

25.32
12.6
25.32
16.4

27.6
18.9
37.16

27.6
18.9
37.16
68.20

10.4
10.4
3.84
7.8
10.4
12.68
12.68

10.4
10.4
3.84
7.8
10.4
12.68
12.68
540.819

161.46

160.68

155.844
62.835

352.71
136.62
39.396
9.66
88.75
-0.24
-0.2
-0.06
-0.687
43.27
29.11
14.2485
0.18
-0.045
-0.12
-0.1

118.21
118.925
-0.36
-0.3
-0.06

54.61
55.38
0.27
-0.24
-0.2
-0.06
-0.54

103.67
49.06
39.396
9.66

54.61
55.38
0.27
-0.24
-0.2
-0.06
-0.54
43.27
43.27
29.11
14.2485
0.18
-0.045
-0.12
-0.1
205.77
118.21
118.925
-0.36
-0.3
-0.06
87.56
88.75
-0.24
-0.2
-0.06
-0.687

114.57
13.98
14
-0.025
9.60
11.2
0.225
-0.017
-1.805

16.58
16.6
-0.025
43.44
39.75
3.69
6.84
4.02
1.59
1.23
24.14
24.1402
28.435
14.7
4.22
4.395
1.4
0.84
0.75
0.45
1.05
0.63
260.94
24.51
134.98

260.94
24.51
134.98

101.45

101.45

187.51
56.23
34.35
13.74
8.14
56.55
34.05
13.62
8.88

56.55
34.05
13.62
8.88
16.56
6.63
6.63
3.3

1.62

8.52
8.52
7.18
1.341
542.4348
542.43
56.672
335.115
8.7026
-2.2932
61.7824
46.696
6.96
28.8

600
600

146.55
103.22
49.92
53.3
14.91
2.1514
1.735
0.282

2.79
2.5
0.45
5.005
28.41
7.254
12.32
8.84

111.91

21.6

43.2

16.3
23.27
29.14

16.3
23.27
29.14

80.84
4.74
27.81

4.74
27.81

48.29

48.29

229.91

58.6
1.2
1

52.20
58.6
-2.4
-4

68.35
57.8
1.2

57.8
-3.6

14.15

14.15

78.06
57.8
1.2

57.8
-2.4

12.1

12.1

10.56

10.56

31.30
33.1
1.8

33.1
-1.8

579.19
579.19
2.404

171.81

170.98

165.834
68.16

8
5
6
11
13
11
22
6
3
6
9

3.132
3.285
1.575
1.62

18.792
9.855
9.45
14.58

3.654

21.924

3.8325

11.4975

4
3

2
1

57

33

11

32
3

107.85

540.819

161.46

160.68

155.844

3.7275
2.28

14.91
6.84

62.835

2285.05

2.97
2.9
2.97
2.9
2.97
2.9

3.11

3.00
2.93
3.00
2.93
3.00
2.93

3.13

256.19
17.76
17.29
17.76
17.29
17.76
17.29
25.54
9.92
21.06
26.29
2.90
65.34

12.82
12.82

2.97
2.9
2.97
2.9

2.9
2.9
2.9

3.00
2.93
3.00
2.93

2.97
2.97
2.97

155.21
17.76
17.29
17.76
17.29
11.78
11.78
11.78
11.78
7.22
11.78
11.78
7.22
103.07
27.69
27.69
27.69
-9.00
-3.24
-3.78
-1.48
5.80
6.45

5.80
6.45
6.50
6.50

2.97
2.9
2.97
2.9

3.00
2.93
3.00
2.93

2.97
2.9

3.00
2.93

2.97
2.9
2.97
2.9

2.9

2.97

3.00
2.93
3.00
2.93

2.93

3.00

3.215

133.06
17.76
17.29
17.76
17.29
35.45
27.51
66.97
17.76
17.29
11.89
8.09
11.93
133.71
17.76
17.29
17.76
17.29
11.86
11.86
11.89
8.06
11.86
8.09
29.18
17.29
11.89
55.43
17.76
2.95
17.50
17.23
25.65
16.72
8.93
1460.31
1460.31

-146.55

334.51
104.31
104.31

23.40
3.12
3.12
3.12
5.46
5.46
3.12
38.66
4.68
7.41
7.41
1.56
7.70
7.70
2.20

69.21
4.68
7.41
4.68
7.41
7.41
4.68
12.81
12.81
7.32

65.26
4.68
3.12

7.41
5.07
7.41
4.68
12.789
12.789
7.308
33.68
4.13
5.605
4.13
3.54
6.328
6.328
3.616

501.11
224.00
213.64
5.60
4.76
23.99
2.52
2.40
0.77
1.42
1.35
1.85
2.52
2.40
0.77
8.00
44.90
3.78
3.60
1.54
4.88
4.65
4.88
4.65
2.52

2.40
12.00
17.29
9.77
1.35
3.00
3.17
25.22
3.78
3.60
1.54
4.65
4.65
7.00
38.29
9.77
3.78
9.30
3.60
1.85
10.00
26.30
3.78
3.60
1.54
4.88
4.65
1.85
6.00
53.36
4.88
4.65
4.88
4.65
1.85
4.88
4.65
3.78

3.60
1.54
14.00
47.77
7.56
9.77
7.20
9.30
1.54
12.40

403.39

8.8
5.46

14.26
8.8
5.46

3.9
1.05
2
0.9
2.1
1.74
0.9
2.1

43.54
15.6
4.2
4
3.6
4.2
1.74
1.8
8.4

9.44
9.46
9.4
9.14
9.16
9.1
1.2
2.1
4.45
2.1

66.15
9.44
9.46
9.4
9.14
9.16
9.1
-2.4
4.2
4.45
4.2

9.44
9.46
9.4
9.14
9.16

101.70
9.44
9.46
28.2
9.14
9.16

9.1
1.2
4.2

27.3
-3.6
12.6

9.4
9.44
9.1
9.14
1.2
4.2
5.1

103.68
37.6
9.44
36.4
9.14
-2.4
8.4
5.1
74.06

9.2
9.24
6.8
6.8
5.1

18.4
36.96
6.8
6.8
5.1

45.98

58.6
1.2
1

10.44
11.72
-0.48
-0.8

13.67
57.8
1.2

11.56
-0.72

14.15

2.83

15.61
57.8
1.2

11.56
-0.48

12.1

2.42

10.56

2.112

6.26
33.1
1.8

6.62
-0.36

26.094
260.94

26.094

154.14

40.32

21.00

25.20

18.48

49.14

7.56
FACTOR
1.05

4.91

1.05

2.65

276.68

1.00

1.00

1.00

1.00

1182.94

1182.94

15.00

15.00

39.00

39.00

25.00

25.00

35.00

35.00

40.50
35.70
4.80
275.29

275.29

11.00

11.00

20.00

20.00

159.70

159.70

15.00

15.00

5.00

5.00

13.00

13.00

13.00

13.00
187.24

82.50

16.00
24.00

6.00
6.34
14.00

12.00
14.00

12.40

R
PROYECTO

PROPIERTARIO
COLEGIO
FECHA
SUB PRESUPUESTO

ITEM

03.00.00
03.01.00.
03.01.01
03.01.02
03.01.03
03.02.00
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.02.08
03.03.00
03.03.01
03.04.00
03.04.01.
03.04.01.01
03.04.02
03.04.02.01
03.04.02.02
03.04.02.03
03.04.02.04
03.04.02.05
03.04.03
03.04.03.01
03.04.03.02
03.04.04
03.04.04.01
03.04.05
03.04.05.01
03.05.00
03.05.01

03.05.01.01
03.05.02
03.05.02.01
03.05.02.02
03.05.02.03
03.05.02.04
03.06.00
03.06.01
03.06.02
03.06.03
03.06.04
03.07.00
03.07.01
03.07.01
03.07.02
03.07.02.01
03.07.03
03.07.03.01
03.07.03.02
03.07.03.03
03.08.00
OE.3.8.1
OE.3.8.1.1
OE.3.8.2
OE.3.8.2.1
OE.3.8.3
OE.3.8.3.1
OE.3.8.4
OE.3.8.4.1
OE.3.8.5
OE.3.8.5.1
OE.3.8.6
OE.3.8.6.1
OE.3.8.7.1
OE.3.8.7.1
OE.3.8.7.2
OE.3.8.7.3
03.09.00
03.09.01
03.09.01.01
03.09.01.02
03.09.01.03
03.09.02
03.09.02.01
03.09.02.02
03.09.03

03.09.03.01
03.10.00
03.10.01
03.10.02
03.10.03
03.11.00
03.11.01
03.11.02
03.11.03
03.11.04
03.11.05
03.11.06
03.11.07
03.11.08
03.11.09
03.12.00
03.12.01
03.12.02
03.12.03
03.13.00
03.13.01
03.13.02
03.13.03
03.13.04
03.13.05
03.13.06
03.13.07
03.13.08
03.13.09
03.13.10

RESUMEN DE

GOBIERNO REGIONAL DE LAMBAYEQUE

May-16
ARQUITECTURA
DESCRIPCION

ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO KK TIPO IV CABEZA M:1:1:4 E=1.5CM
MUROS DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5CM
ALAMBRE #8 DE AMARRE HORIZONTAL EN MUROS
REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO, MORTERO E=1.5 CM, C:A 1:5
TARRAJEO EN MUROS INTERIORES E=1.5CM, C:A, 1:5
TARRAJEO EN MUROS EXTERIORES E= 1.5 CM, C;A 1:5
TARRAJEO EN COLUMNAS E=1.5CM, C:A, 1:5
TARRAJEO EN VIGAS E=1.5CM, C:A, 1:5
VESTIDURA DE DERRAMES, C:A, 1:5
BRUAS SEGN DETALLE
TARRAJEO COM IMPERMEABILIZANTE
CIELO RASO
CIELO RASO SUSPENDIDO GYPLACDE 4MM
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO 25 MM PARA CERAMICO
PISOS
PISO CERAMICO 30x30 CM
PISO CERAMICO 40x40 CM
PISO DE LOSETA VENECIANA 30 X 30 CM
PISO DE PARQUETON
PISO DE CEMENTO PULIDO E=2" MEZ. 1:4
SARDINELES
SARDINELES DE CONCRETO
SARDINELES - ENCOFRADO Y DESENCOFRADO
VEREDAS DE CONCRETO
VEREDAS DE CONCRETO FC= 175 KG/CM2 E=4", PULIDO Y FROTACHADO
JUNTAS
JUNTAS DE DILATACION RELLENA CON MORTERO ASFALTICO E=1"
ZOCALOS Y CONTRAZOCALOS
ZOCALOS

ZOCALO CERAMICO DE 0.35X0.35M2


CONTRAZOCALOS
CONTRAZOCALO - LOSETA VENECIANA
CONTRAZOCALO DE CEMENTO PULIDO H=0.20 M
CONTRAZOCALO - PORCELANATO H=0.10M
CONTRAZOCALO CERAMICO INTERIOR H=0.10 M
COBERTURAS
COBERTURA PANEL TERMOACUSTICO
IMPERMEABILIZANTE DE TECHO CON PINTURA ASF.
CUMBRERAS TEJA ANDINA
COBERTURA DE POLICARBONATO
CARPINTERIA DE MADERA
PUERTAS
PUERTA DE MADERA (1 HOJA BATIENTE)
VENTANAS
VENTANAS DE MADERA
PERGOLAS
COLUMNA DE ACERO D = 2 '', L = 2.30 m
VIGA MADERA EUCALIPTO D = 0.05 m, L = 3.70 m
VIGUETA DE PLATINA DE ACERO 2'' x 1/4'' x 2.10 m
CARPINTERIA METALICA Y HERRERIA
VENTANAS
VENTANA DE FIERRO
PUERTAS
PUERTA DE CASETA DE ELECTROBOMBA
DIVISIN DE ALUMINIO PARA SERVICIOS HIGINICOS
TABIQUERIA DE ALUMINIO - DIVISORIO DE URINARIOS
BARANDAS METLICAS
BARANDAS METALICAS de 2"x 2"
PASAMANOS AISLADOS
BARRA DE APOYO DE ACERO INOX. DESCAPACITADO
ESCALERAS METLICAS
ESCALERA DE GATO DE TUB. 1 1/2" Y 1"
ELEMENTOS METLICOS ESPECIALES
PUERTA METLICA DE 2.4 X 1.00 m,CON TUBO DE FIERRO CUADRADO 1/2"X1"X5''
CON PLATINA DE 3" X 3/16''
PORTON METALICO DE 2.40 X 2.20 m,CON TUBO DE FIERRO CUADRADO 1/2"X1"X5''
CON PLATINA DE 3" X 3/16''
MARCO Y TAPA DE FIERRO 0.60X0.60 CISTERNA
CERRAJERIA
BISAGRAS
BISAGRA ALUMINIZADA DE 2 1/2 " PESASA EN PUERTA
BISAGRA ALUMINIZADA DE 2" PESASA EN VENTANA
BISAGRA ALUMINIZADA DE 3 1/2 " PESASA EN PUERTA
CERRADURAS
CERRADURA DOS GOLPES EN PUERTA CON TIRADOR
CERROJO DE 2" PARA PUERTAS
ACCESORIOS DE CIERRE

CANDADO TIPO FORTE 60MM


VIDRIOS, CRISTALES Y SIMILARES
VIDRIO TEMPLADO DE 8 MM
VIDRIO TEMPLADO DE 6 MM
ESPEJO 6 mm/INC. COLOCACION
PINTURA
PINTURA LATEX 2 MANOS EN MUROS INTERIORES Y EXTERIORES
PINTURA LATEX 2 MANOS EN CIELO RASO
PINTURA LATEX 2 MANOS EN VIGAS
PINTURA LATEX 2 MANOS EN COLUMNAS
PINTURA LATEX 2 MANOS EN VESTIDURA DE DERRAMES
PINTURA BARNIZ PARA CARPINTERIA DE MADERA
PINTURA ESMALTE DOS MANOS CARPINTERIA METALICA
PINTURA ESMALTE EN CONTRAZOCALOS
PINTURA DE LETRAS EN PORTICO
VARIOS LIMPIEZA Y JARDINERIA
LIMPIEZA FINAL DE OBRA
SEMBRADO DE GRASS NATURAL
SEMBRADO DE PLANTAS ORNAMENTALES
OTROS
ASTA DE BAMDERA
BANCAS DE CONCRETO CON ASIENTOS DE MADERA
SEALIZACIN PARA RUTAS DE EVACUACIN Y SEALES PREVENTIVAS
JUEGOS MODULAS (JUEGOS INFANTILES)
TOBOGAN (JUEGOS INFANTILES)
SUBE Y BAJA (JUEGOS INFANTILES)
PASAMANOS AISLADOS (JUEGOS INFANTILES)
RELLENO CON ARENA PARA JUEGOS
PLACA RECORDATORIA INCLUIDO MURETE
FLETE

SUMEN DE METRADOS

UND

METRADO

MODULO 01:
ADMINISTRATIVO

MODULO 02: AULAS

M2
M2
KG

95.37
139.01
-

95.37
139.01

M2
M2
M2
M2
M2
M
M
M2

85.35
280.98
214.98
148.75
17.00
184.12
24.84
-

85.35
280.98
214.98
148.75
17.00
184.12
24.84

M2

130.56

130.56

M2

34.37

M2
M2
M2
M2
M2

34.37
96.31
-

M
M2
M2
M

34.37
-

34.37
96.31

46.68

46.68

3.00

3.00

M2
M
M
M
M

70.13
-

M2
M2
M
M2

182.10
-

M2

24.33

M2

UND

UND
UND

M2

M2

M2

UND

UND
UND
UND

UND
UND

70.13
-

182.10

24.33
-

43.25

M2

43.25

UND
M2
M2
M2

2.00
-

M2
M2
M2
M2
M2
M2
M2
M
M2

468.76
24.33
44.19
-

M2
M2
UND

2,390.00
670.30
55.00

UND
UND
GLIB
UND
UND
UND
UND
M3
UND
GLB

1.00
8.00
1.00
1.00
1.00
1.00
1.00
6.34
1.00
1.00

468.76
-

24.33
-

MODULO 03: SUM

OBRAS EXTERIORES

24.33
-

24.33
-

2,390.00
670.30
55.00
1.00
8.00
1.00
1.00
1.00
1.00
1.00
1.00

PLANILLA DE METRA
PROYECTO:
COLEGIO
PARTIDAS
03.00.00
03.01.00.
03.01.01

ESPECIFICACIONES
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO KK TIPO IV CABEZA M:1:1:4 E=1.5CM
MODULO 01: ADMINISTRATIVO

UND

M2

MODULO 02: AULAS


EJE 1, 7
EJE 3, 5
MODULO 03: SUM

03.01.02

MUROS DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5CM


MODULO 01: SECRETARIA + DIRECCION

MODULO 02: AULAS


EJE 4
EJE C
EJE E
INTERIORES

MODULO 03: SUM

03.02.00
03.02.01

REVOQUES Y REVESTIMIENTOS
TARRAJEO PRIMARIO, MORTERO E=1.5 CM, C:A 1:5
MODULO 01: ADMINISTRATIVO

M2

PLANILLA DE METRA
PROYECTO:
COLEGIO
PARTIDAS

ESPECIFICACIONES

UND

MODULO 02: AULAS


SS.HH. NIOS Y NIAS
SS.HH. DISCAPACITADOS

MODULO 03: SUM

03.02.02

TARRAJEO EN MUROS INTERIORES E=1.5CM, C:A, 1:5


MODULO 01: ADMINISTRATIVO

M2

MODULO 02: AULAS


EJE 1, 7
EJE C
EJE E
SS.HH. NIOS
SS.HH. NIAS
SS.HH. DISCAPACITADOS
DEPOSITOS

MODULO 03: SUM

03.02.03

TARRAJEO EN MUROS EXTERIORES E= 1.5 CM, C;A 1:5


MODULO 01: ADMINISTRATIVO

MODULO 02: AULAS

M2

PLANILLA DE METRA
PROYECTO:
COLEGIO
PARTIDAS

ESPECIFICACIONES

UND

EJE 1, 7
EJE C
EJE E
SS.HH. NIOS Y NIAS
SS.HH. DISCAPACITADOS

MODULO 03: SUM

03.02.04

TARRAJEO EN COLUMNAS E=1.5CM, C:A, 1:5


MODULO 01: ADMINISTRATIVO
COLUMNAS - ENCOFRADO Y DESENCOFRADO

M2

MODULO 02: AULAS


COLUMNAS - ENCOFRADO Y DESENCOFRADO
MODULO 03: SUM
COLUMNAS - ENCOFRADO Y DESENCOFRADO
03.02.05

TARRAJEO EN VIGAS E=1.5CM, C:A, 1:5


MODULO 01: ADMINISTRATIVO
VIGAS - ENCOFRADO Y DESENCOFRADO
VIGAS DE CONFINAMIENTO - ENCOFRADO Y DESENCOFRADO

M2

MODULO 02: AULAS


VIGAS - ENCOFRADO Y DESENCOFRADO
VIGAS DE CONFINAMIENTO - ENCOFRADO Y DESENCOFRADO
MODULO 03: SUM
VIGAS - ENCOFRADO Y DESENCOFRADO
VIGAS DE CONFINAMIENTO - ENCOFRADO Y DESENCOFRADO
03.02.06

VESTIDURA DE DERRAMES, C:A, 1:5


VENTANAS
V1(1.9x1.8)
V2(2.2x1.8)
V3(2.04x0.9)

PLANILLA DE METRA
PROYECTO:
COLEGIO
PARTIDAS

ESPECIFICACIONES

UND

V4(1.9x0.9)
V5(1.56x0.9)
V6(1.2x0.9)
V7(1.18x0.9)
V8(2.24x0.9)
PUERTAS
P1(1.2x2.2)
P2(0.9x2.1)
P3(0.61x1.3)
P4(1x2.2)
P5(0.9x2.2)
P6(1.18x2.2)
03.02.07

BRUAS SEGN DETALLE


BRUAS EN VEREDAS

03.03.00
03.03.01

CIELO RASO
CIELO RASO SUSPENDIDO GYPLACDE 4MM
MODULO 01: ADMINISTRATIVO

MODULO 02: AULAS

MODULO 03: SUM

03.04.00
PISOS Y PAVIMENTOS
03.04.01.01 CONTRAPISO 25 MM PARA CERAMICO
MODULO 01: ADMINISTRATIVO

MODULO 02: AULAS


SS.HH. NIOS
SS.HH. NIAS
SS.HH. DISCAPACITADOS
MODULO 03: SUM

M2

PLANILLA DE METRA
PROYECTO:
COLEGIO
PARTIDAS

ESPECIFICACIONES

03.04.02.01 PISO CERAMICO 30x30 CM


MODULO 01: ADMINISTRATIVO
CONTRAPISO 25 MM PARA CERAMICO

UND

M2

MODULO 02: AULAS


CONTRAPISO 25 MM PARA CERAMICO
MODULO 03: SUM

03.04.02.02 PISO CERAMICO 40x40 CM


MODULO 01: ADMINISTRATIVO
CONTRAPISO 25MM PARA CERMICO

M2

03.04.02.03 PISO DE LOSETA VENECIANA 30 X 30 CM


MODULO 01: ADMINISTRATIVO

M2

MODULO 02: AULAS

MODULO 03: SUM


03.04.02.04 PISO DE PARQUETON

M2

03.04.03.01 SARDINELES DE CONCRETO

03.04.03.02 SARDINELES - ENCOFRADO Y DESENCOFRADO

M2

PLANILLA DE METRA
PROYECTO:
COLEGIO
PARTIDAS

ESPECIFICACIONES

UND

03.04.04.01 VEREDAS DE CONCRETO FC= 175 KG/CM2 E=4", PULIDO Y FROTACHA M2


MODULO 01: ADMINISTRATIVO

MODULO 02: AULAS

MODULO 03: SUM

03.04.05
JUNTAS
03.04.05.01 JUNTAS DE DILATACION RELLENA CON MORTERO ASFALTICO E=1"
MODULO 01: ADMINISTRATIVO

MODULO 02: AULAS


MODULO 03: SUM

03.05.01
ZOCALOS
03.05.01.01 ZOCALO CERAMICO DE 0.35X0.35M2
MODULO 01: ADMINISTRATIVO

MODULO 02: AULAS

MODULO 03: SUM

M2

PLANILLA DE METRA
PROYECTO:
COLEGIO
PARTIDAS

ESPECIFICACIONES

03.05.02
CONTRAZOCALOS
03.05.02.01 CONTRAZOCALO - LOSETA VENECIANA

03.05.02.02 CONTRAZOCALO DE CEMENTO PULIDO H=0.20 M


MODULO 01: ADMINISTRATIVO

UND

MODULO 02: AULAS

MODULO 03: SUM

03.05.02.03 CONTRAZOCALO - PORCELANATO H=0.10M


MODULO 03: SUM

03.05.02.04 CONTRAZOCALO CERAMICO INTERIOR H=0.10 M


MODULO 01: ADMINISTRATIVO

MODULO 02: AULAS

MODULO 03: SUM

03.06.00
03.06.01

COBERTURAS
COBERTURA PANEL TERMOACUSTICO
MODULO 01: ADMINISTRATIVO

MODULO 02: AULAS

MODULO 03: SUM

M2

PLANILLA DE METRA
PROYECTO:
COLEGIO
PARTIDAS
03.06.02

ESPECIFICACIONES

UND

IMPERMEABILIZANTE DE TECHO CON PINTURA ASF.


MODULO 01: ADMINISTRATIVO

M2

MODULO 02: AULAS

MODULO 03: SUM

03.06.03

CUMBRERAS TEJA ANDINA


MODULO 01: ADMINISTRATIVO

MODULO 02: AULAS

MODULO 03: SUM

03.06.04

COBERTURA DE POLICARBONATO

M2

03.07.00
03.07.01

CARPINTERIA DE MADERA
PUERTA DE MADERA (1 HOJA BATIENTE)

M2
P1
P2
P3
P4
P5
P6

MODULO 01: ADMINISTRATIVO

MODULO 02: AULAS

MODULO 03: SUM

PLANILLA DE METRA
PROYECTO:
COLEGIO
PARTIDAS

ESPECIFICACIONES

UND

03.07.02.01 VENTANAS DE MADERA


MODULO 01: ADMINISTRATIVO

M2

MODULO 02: AULAS

MODULO 03: SUM

03.07.03
OE.3.7.3.1

PERGOLAS
COLUMNA DE ACERO D = 2 '', L = 2.30 m

UND

OE.3.7.3.2

VIGA MADERA EUCALIPTO D = 0.05 m, L = 3.70 m

UND

OE.3.7.3.3

VIGUETA DE PLATINA DE ACERO 2'' x 1/4'' x 2.10 m

UND

03.08.00
OE.3.8.1
OE.3.8.1.1

CARPINTERIA METALICA Y HERRERIA


VENTANAS
VENTANA DE FIERRO

OE.3.8.2
OE.3.8.2.1
OE.3.8.3
OE.3.8.3.1

PUERTAS
PUERTA DE CASETA DE ELECTROBOMBA
DIVISIN DE ALUMINIO PARA SERVICIOS HIGINICOS
TABIQUERIA DE ALUMINIO - DIVISORIO DE URINARIOS

M2

M2
M
MDULO 1
MDULO 2

OE.3.8.4
OE.3.8.4.1

BARANDAS METLICAS
BARANDAS METALICAS de 2"x 2"

PLANILLA DE METRA
PROYECTO:
COLEGIO
PARTIDAS

ESPECIFICACIONES

UND

OE.3.8.5
OE.3.8.5.1

PASAMANOS AISLADOS
BARRA DE APOYO DE ACERO INOX. DESCAPACITADO

OE.3.8.6
OE.3.8.6.1

ESCALERAS METLICAS
ESCALERA DE GATO DE TUB. 1 1/2" Y 1"

OE.3.8.7
OE.3.8.7.1

ELEMENTOS METLICOS ESPECIALES


PUERTA METLICA DE 2.4 X 1.00 m,CON TUBO DE FIERRO CUADRADO 1/
M2
CON PLATINA DE 3" X 3/16''

OE.3.8.7.2

PORTON METALICO DE 2.40 X 2.20 m,CON TUBO DE FIERRO CUADRADOM2


CON PLATINA DE 3" X 3/16''

PLANILLA DE METRA
PROYECTO:
COLEGIO
PARTIDAS

ESPECIFICACIONES

UND

03.09.00
CERRAJERIA
03.09.01.01 BISAGRA ALUMINIZADA DE 2 1/2 " PESASA EN PUERTA
MODULO 01: ADMINISTRATIVO

MODULO 02: AULAS

MODULO 03: SUM

03.09.01.02 BISAGRA ALUMINIZADA DE 2" PESASA EN VENTANA


MODULO 01: ADMINISTRATIVO

MODULO 02: AULAS

MODULO 03: SUM

03.09.01.03 BISAGRA ALUMINIZADA DE 3 1/2 " PESASA EN PUERTA

UND

03.09.02.01 CERRADURA DOS GOLPES EN PUERTA CON TIRADOR


MODULO 01: ADMINISTRATIVO

UND

MODULO 02: AULAS

MODULO 03: SUM


03.09.02.02 CERROJO DE 2" PARA PUERTAS
MODULO 01: ADMINISTRATIVO

MODULO 02: AULAS

MODULO 03: SUM

UND

PLANILLA DE METRA
PROYECTO:
COLEGIO
PARTIDAS

03.10.00
03.10.01

ESPECIFICACIONES

VIDRIOS, CRISTALES Y SIMILARES


VIDRIO TEMPLADO DE 8 MM
MODULO 01: ADMINISTRATIVO

UND

M2

MODULO 02: AULAS

MODULO 03: SUM


03.10.02

VIDRIO TEMPLADO DE 6 MM
MODULO 01: ADMINISTRATIVO

M2

MODULO 02: AULAS

MODULO 03: SUM

03.11.00
03.11.01

PINTURA
PINTURA LATEX 2 MANOS EN MUROS INTERIORES Y EXTERIORES
MODULO 01: ADMINISTRATIVO
MUROS DE LADRILLO KK TIPO IV CABEZA M:1:1:4 E=1.5CM
MUROS DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5CM

M2

MODULO 02: AULAS


MUROS DE LADRILLO KK TIPO IV CABEZA M:1:1:4 E=1.5CM
MUROS DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5CM
MODULO 03: SUM
MUROS DE LADRILLO KK TIPO IV CABEZA M:1:1:4 E=1.5CM
MUROS DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5CM
03.11.02

PINTURA LATEX 2 MANOS EN CIELO RASO


MODULO 01: ADMINISTRATIVO
Encofrado y Desencofrado de losa
MODULO 02: AULAS
Encofrado y Desencofrado de losa

M2

PLANILLA DE METRA
PROYECTO:
COLEGIO
PARTIDAS

ESPECIFICACIONES

UND

MODULO 03: SUM


Encofrado y Desencofrado de losa

03.11.03

PINTURA LATEX 2 MANOS EN VIGAS


MODULO 01: ADMINISTRATIVO
Encofrado y Desencofrado en Vigas

M2

MODULO 02: AULAS


Encofrado y Desencofrado en Vigas
MODULO 03: SUM
Encofrado y Desencofrado en Vigas
03.11.04

PINTURA LATEX 2 MANOS EN COLUMNAS


MODULO 01: ADMINISTRATIVO

M2

MODULO 02: AULAS

MODULO 03: SUM

03.11.05

PINTURA LATEX 2 MANOS EN VESTIDURA DE DERRAMES


MODULO 01: ADMINISTRATIVO

MODULO 02: AULAS

MODULO 03: SUM

M2

PLANILLA DE METRA
PROYECTO:
COLEGIO
PARTIDAS

ESPECIFICACIONES

UND

LA DE METRADO

N DE
VECES

LARGO

MEDIDAS
ANCHO
ALTURA

PERIMETRO

PARCIAL

TOTAL

0.00

95.37
2.00
2.00

6.90
4.32

4.25
4.25

58.65
36.72
0.00

0.00

139.01
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

4.05
8.96
4.32
7.78
2.00
5.47
0.80
2.36
1.82
2.80
0.82

4.25
2.45
3.35
3.35
4.25
4.25
3.35
3.35
4.25
2.05
4.25

17.21
21.95
14.47
26.06
8.50
23.26
2.68
7.91
7.74
5.74
3.49
0.00

0.00

LA DE METRADO

N DE
VECES

LARGO

2.00
1.00
1.00
1.00

8.64
2.80
0.80
0.82

MEDIDAS
ANCHO
ALTURA

PERIMETRO

PARCIAL

TOTAL
85.35

4.25
2.05
3.35
4.25

73.44
5.74
2.68
3.49
0.00

0.00

280.98
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00

6.90
8.96
4.32
7.78
2.00
10.66
1.18
10.36
1.18
4.92
0.80
1.40
1.18
2.52

4.25
2.45
3.35
3.35
4.25
4.25
3.35
4.25
3.35
4.25
3.35
4.25
3.35
4.25

58.65
21.95
14.47
26.06
8.50
45.30
3.95
44.02
3.95
20.92
2.68
11.90
7.91
10.72
0.00

0.00

214.98

LA DE METRADO

N DE
VECES
2.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00

LARGO
6.90
8.96
4.32
7.78
2.00
8.64
2.80
0.80
0.82

MEDIDAS
ANCHO
ALTURA
4.25
2.45
3.35
3.35
4.25
4.25
2.05
3.35
4.25

PERIMETRO

PARCIAL

TOTAL

58.65
21.95
14.47
26.06
8.50
73.44
5.74
2.68
3.49
0.00

0.00

148.75
148.75
0.00

0.00

17.00
4.00
13.00
0.00

184.12
4.00
4.00
1.00

7.40
8.00
5.88

29.60
32.00
5.88

LA DE METRADO

N DE
VECES

LARGO

MEDIDAS
ANCHO
ALTURA

1.00
2.00
3.00
2.00
1.00

PERIMETRO
5.60
4.92
4.20
4.16
6.28

3.00
1.00
4.00
1.00
2.00
2.00

6.80
6.00
3.82
6.40
6.20
6.76

PARCIAL

TOTAL

5.60
9.84
12.60
8.32
6.28

20.40
6.00
15.28
6.40
12.40
13.52

24.84

24.84

0.00

130.56
1.00

16.32

8.00

130.56

0.00

34.37
1.00
1.00
1.00

13.47
13.34
7.56

13.47
13.34
7.56
0.00

LA DE METRADO

N DE
VECES

LARGO

MEDIDAS
ANCHO
ALTURA

PERIMETRO

PARCIAL

TOTAL

0.00

34.37
34.37
0.00

0.00

96.31
1.00

96.31

96.31

LA DE METRADO

N DE
VECES

LARGO

MEDIDAS
ANCHO
ALTURA

PERIMETRO

PARCIAL

TOTAL
0.00

1.00
1.00
2.00

34.22
10.48
3.26

0.60
1.50
1.60

20.53
15.72
10.43

46.68

0.00

0.00

20.00

0.15

3.00

3.00
0.00

0.00

0.00

0.00

LA DE METRADO

N DE
VECES

LARGO

MEDIDAS
ANCHO
ALTURA

PERIMETRO

PARCIAL

TOTAL

70.13
1.00

70.13

70.13

0.00

0.00

0.00

0.00

0.00

0.00

182.10
1.00
1.00

17.51
17.51

4.74
5.66

83.00
99.11

LA DE METRADO

N DE
VECES

LARGO

MEDIDAS
ANCHO
ALTURA

PERIMETRO

PARCIAL

TOTAL

24.33
3.00
1.00
4.00
1.00
2.00
2.00

1.20
0.90
0.61
1.00
0.90
1.18

2.20
2.10
1.30
2.20
2.20
2.20

7.92
1.89
3.17
2.20
3.96
5.19

LA DE METRADO

N DE
VECES

LARGO

MEDIDAS
ANCHO
ALTURA

PERIMETRO

PARCIAL

TOTAL

0.00

0.00

0.00
0.00
0.00

43.25
4.00
4.00
1.00
1.00
2.00
3.00
2.00
1.00

1.90
2.20
2.04
1.90
1.56
1.20
1.18
2.24

1.80
1.80
0.90
0.90
0.90
0.90
0.90
0.90

13.68
15.84
1.84
1.71
2.81
3.24
2.12
2.02

0.00
0

LA DE METRADO

N DE
VECES

LARGO

MEDIDAS
ANCHO
ALTURA

PERIMETRO

PARCIAL

TOTAL

0.00

0.00

0.00

0.00

LA DE METRADO

N DE
VECES

LARGO

MEDIDAS
ANCHO
ALTURA

PERIMETRO

PARCIAL

TOTAL

0.00

0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

LA DE METRADO

N DE
VECES

LARGO

MEDIDAS
ANCHO
ALTURA

PERIMETRO

PARCIAL

TOTAL

0.00

0.00

0.00

0.00

0.00

0.00

Area:
Area:
468.76
2.00
2.00

Area:
Area:

95.37
139.01

190.74
278.02

Area:
Area:

0.00

0.00

LA DE METRADO

N DE
VECES

LARGO

MEDIDAS
ANCHO
ALTURA

PERIMETRO

PARCIAL

TOTAL
0.00

LA DE METRADO

N DE
VECES

LARGO

MEDIDAS
ANCHO
ALTURA

PERIMETRO

PARCIAL

TOTAL

También podría gustarte

  • 335 MD Ed01 Rv00 072007
    335 MD Ed01 Rv00 072007
    Documento616 páginas
    335 MD Ed01 Rv00 072007
    bt
    Aún no hay calificaciones
  • Calculo de Buzones
    Calculo de Buzones
    Documento13 páginas
    Calculo de Buzones
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Calculo de Buzones
    Calculo de Buzones
    Documento13 páginas
    Calculo de Buzones
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Metrado
    Metrado
    Documento13 páginas
    Metrado
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Nsumos PDF
    Nsumos PDF
    Documento3 páginas
    Nsumos PDF
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • 5-Diseño Zapatas
    5-Diseño Zapatas
    Documento3 páginas
    5-Diseño Zapatas
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Estac. Señaliz - Seguridad
    Estac. Señaliz - Seguridad
    Documento1 página
    Estac. Señaliz - Seguridad
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Estudio
    Estudio
    Documento33 páginas
    Estudio
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Factor de Viento
    Factor de Viento
    Documento1 página
    Factor de Viento
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Estac Arquitect
    Estac Arquitect
    Documento1 página
    Estac Arquitect
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Cálculo Sistema de Agua
    Cálculo Sistema de Agua
    Documento31 páginas
    Cálculo Sistema de Agua
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Metrados para Planos
    Metrados para Planos
    Documento10 páginas
    Metrados para Planos
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • VIVIENDA MULTIFAMILIAR - 1 y 2 Piso
    VIVIENDA MULTIFAMILIAR - 1 y 2 Piso
    Documento1 página
    VIVIENDA MULTIFAMILIAR - 1 y 2 Piso
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Relacion de Planos - Estructuras
    Relacion de Planos - Estructuras
    Documento2 páginas
    Relacion de Planos - Estructuras
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Cerco Perimetrico General
    Cerco Perimetrico General
    Documento1 página
    Cerco Perimetrico General
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Estac Estructuras
    Estac Estructuras
    Documento1 página
    Estac Estructuras
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • ESPECTROS Casa
    ESPECTROS Casa
    Documento5 páginas
    ESPECTROS Casa
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Seguridad Durante La Construcc. Obra Lambayeque
    Seguridad Durante La Construcc. Obra Lambayeque
    Documento25 páginas
    Seguridad Durante La Construcc. Obra Lambayeque
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Análisis Sísmico Hospital
    Análisis Sísmico Hospital
    Documento72 páginas
    Análisis Sísmico Hospital
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Descripción de Terreno
    Descripción de Terreno
    Documento4 páginas
    Descripción de Terreno
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Módulo A - Cimentación
    Módulo A - Cimentación
    Documento1 página
    Módulo A - Cimentación
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Descripción de Terreno
    Descripción de Terreno
    Documento4 páginas
    Descripción de Terreno
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Metrados para Planos
    Metrados para Planos
    Documento10 páginas
    Metrados para Planos
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Metrados para Planos
    Metrados para Planos
    Documento10 páginas
    Metrados para Planos
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Metrado
    Metrado
    Documento13 páginas
    Metrado
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Predim
    Predim
    Documento4 páginas
    Predim
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • FD Jaén Colasay Chunchuca
    FD Jaén Colasay Chunchuca
    Documento14 páginas
    FD Jaén Colasay Chunchuca
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • FD Jaén Sallique Mochica
    FD Jaén Sallique Mochica
    Documento14 páginas
    FD Jaén Sallique Mochica
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Analisis Granulometrico Ps
    Analisis Granulometrico Ps
    Documento27 páginas
    Analisis Granulometrico Ps
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Inst. Sanitarias
    Inst. Sanitarias
    Documento1 página
    Inst. Sanitarias
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Diseño Aligerado
    Diseño Aligerado
    Documento4 páginas
    Diseño Aligerado
    Erwin Hassan Ramos Cobeñas
    Aún no hay calificaciones
  • Locomotora 2200 3 PDF
    Locomotora 2200 3 PDF
    Documento7 páginas
    Locomotora 2200 3 PDF
    luistonto
    Aún no hay calificaciones
  • Como Se Hace
    Como Se Hace
    Documento8 páginas
    Como Se Hace
    ruedanton131
    Aún no hay calificaciones
  • Planos Arquitectonicos
    Planos Arquitectonicos
    Documento4 páginas
    Planos Arquitectonicos
    Itzel Morales
    Aún no hay calificaciones
  • Reporte Diario
    Reporte Diario
    Documento13 páginas
    Reporte Diario
    Ferdinand Raul Stone
    Aún no hay calificaciones
  • Metrados de Arquitectura Plantilla - 2017
    Metrados de Arquitectura Plantilla - 2017
    Documento40 páginas
    Metrados de Arquitectura Plantilla - 2017
    Oscar Eduardo
    Aún no hay calificaciones
  • Metrado de Estructuras
    Metrado de Estructuras
    Documento362 páginas
    Metrado de Estructuras
    JoseAstorga
    Aún no hay calificaciones
  • Sistema Clasificacion de Ruedas Ferroviarias
    Sistema Clasificacion de Ruedas Ferroviarias
    Documento9 páginas
    Sistema Clasificacion de Ruedas Ferroviarias
    Jorge Sanango
    Aún no hay calificaciones
  • Roco 2006-2007
    Roco 2006-2007
    Documento24 páginas
    Roco 2006-2007
    Narcis Madern
    Aún no hay calificaciones
  • PDF 10
    PDF 10
    Documento6 páginas
    PDF 10
    J̵̨̬̫̳̰͉̮̘̇͒̎͐̃̽̚ȟ̷̭͇̄̈́͊̄͐͊ò̵̖͉̩͔̟̹̀́̏̂̎̉͘͝͠s̴̢̧̱̜͚͕̲̋̎̈̾͘͠s̵̛͈̍̽̈̎͝͝ē̴͙̯͙͚̽̒̈̕ Öf̲̲̅̅ı̲̲̅̅c̲̲̅̅ı̲̲̅̅a̲̲̅̅l̲̲̅̅'̲̲̅̅f̲̲̅̅b
    Aún no hay calificaciones
  • Partes de Una Locomotora A Diesel
    Partes de Una Locomotora A Diesel
    Documento34 páginas
    Partes de Una Locomotora A Diesel
    Diego TC
    Aún no hay calificaciones
  • Ferrocarriles U6
    Ferrocarriles U6
    Documento17 páginas
    Ferrocarriles U6
    Maria Angela Vaca Lopez
    Aún no hay calificaciones
  • Lista de Actividades
    Lista de Actividades
    Documento47 páginas
    Lista de Actividades
    Miguel Fernando Antezana Alba
    Aún no hay calificaciones
  • Informe Metodo Directo
    Informe Metodo Directo
    Documento4 páginas
    Informe Metodo Directo
    Alvaro Christian Apaza Lajo
    Aún no hay calificaciones
  • Metrado de I .E. Modulo A
    Metrado de I .E. Modulo A
    Documento12 páginas
    Metrado de I .E. Modulo A
    Fritz Del Río Altamirano
    Aún no hay calificaciones
  • Antapique
    Antapique
    Documento3 páginas
    Antapique
    Carlos Bartolo
    Aún no hay calificaciones
  • Examen Parcial Construccion I - Resuelto
    Examen Parcial Construccion I - Resuelto
    Documento98 páginas
    Examen Parcial Construccion I - Resuelto
    Viktor Bryan Rodriguez Jave
    Aún no hay calificaciones
  • Metrados de Estructura
    Metrados de Estructura
    Documento34 páginas
    Metrados de Estructura
    Fiorela Matias
    Aún no hay calificaciones
  • Resumen y Sustento de Metrados Infraestructura PNP - Comisaria Mazuko
    Resumen y Sustento de Metrados Infraestructura PNP - Comisaria Mazuko
    Documento34 páginas
    Resumen y Sustento de Metrados Infraestructura PNP - Comisaria Mazuko
    Eliasib Jadon Mesulam
    Aún no hay calificaciones
  • Hoja D
    Hoja D
    Documento1110 páginas
    Hoja D
    maryfe
    Aún no hay calificaciones
  • Origen Maquina de Vapor
    Origen Maquina de Vapor
    Documento13 páginas
    Origen Maquina de Vapor
    Manuel Brito
    Aún no hay calificaciones
  • Metrados de Colegio
    Metrados de Colegio
    Documento12 páginas
    Metrados de Colegio
    Elvis Rodriguez Rodrigues
    Aún no hay calificaciones
  • Locomotora
    Locomotora
    Documento29 páginas
    Locomotora
    Fabio Romero
    Aún no hay calificaciones
  • Fcalp Tramo Cremallera
    Fcalp Tramo Cremallera
    Documento17 páginas
    Fcalp Tramo Cremallera
    CINECHILE JOSE
    Aún no hay calificaciones
  • Planilla de Metrado Local Comunal
    Planilla de Metrado Local Comunal
    Documento36 páginas
    Planilla de Metrado Local Comunal
    Onerom Luar
    Aún no hay calificaciones
  • Fichas Técnicas Locomotoras - Ejercitación (VF)
    Fichas Técnicas Locomotoras - Ejercitación (VF)
    Documento8 páginas
    Fichas Técnicas Locomotoras - Ejercitación (VF)
    Alejandro fabian Coifin
    Aún no hay calificaciones
  • 02 Características de Los Vehículos Ferroviarios I-2021
    02 Características de Los Vehículos Ferroviarios I-2021
    Documento23 páginas
    02 Características de Los Vehículos Ferroviarios I-2021
    Matheo Ramiro Cavezas Rivera
    Aún no hay calificaciones
  • LOCOMOTORA
    LOCOMOTORA
    Documento2 páginas
    LOCOMOTORA
    rogerroman24
    Aún no hay calificaciones
  • CP - Mallet Handbook ES (December 2015)
    CP - Mallet Handbook ES (December 2015)
    Documento28 páginas
    CP - Mallet Handbook ES (December 2015)
    mariosilver
    Aún no hay calificaciones
  • Augustinus Lex Ikon
    Augustinus Lex Ikon
    Documento44 páginas
    Augustinus Lex Ikon
    eduiqons
    Aún no hay calificaciones