Predimensionamiento:
VIGA
VIGA
COLUMNAS
A=B
A = 23.32cm o A = 25cm
Area de C2 = P.A.N/ 0.35 fc
Fc= 210 kg/m2
P= 1000 kg/m2
A= 2 X 5 = 10m2
N= 4 pisos
Area de C2 = 1000 kg/m2 x 10 m2 x 4/ 0.35 x 210 kg/cm2
Area de C2 = 544.21cm2
A x B = 544.21
A=B
A = 23.32cm o A = 25cm
Area de C1 = P.A.N/ 0.35 fc
Fc= 210 kg/m2
P= 1000 kg/m2
A= 2 X 2.5 = 5m2
N= 4 pisos
Area de C1 = 1000 kg/m2 x 5m2 x 4/ 0.35 x 210 kg/cm2
Area de C1 = 272.10cm2
A x B = 272.10
A=B
A = 16.49cm o A = 15cm
Losa (Maciza)
E1 = permetro/180 = 4+4+5+5/180 = 18/180 = 0.1 m
E2 = luz mayor/40 = 5/40 = 0.125 m; E2 = 0.13 m
Predimensionamiento:
VIGA
VIGA
Luz peralte (h) Luz
12
10
(6m de Luz)
0.5 peralte 0.6
peralte (h) = 0.60m
__________________________
0.3(peralte) ancho 0.5(peralte)
0.3 (0.6m) ancho 0.5 (0.6m)
0.18m ancho 0.3m
a= 0.30m
COLUMNAS
Area de C3 = 1071cm2
A x B = 1071
A=B
A = 32.72cm o A = 35cm
Area de C2 = P.A.N/ 0.35 fc
Fc= 210 kg/m2
P= 1250 kg/m2
A= 7 X 4.5 = 31.5m2
N= 3 pisos
Area de C3 = 1250 kg/m2 x 31.5m2 x 3/ 0.35 x 210 kg/cm2
Area de C3 = 1607cm2
A x B = 1607
A=B
A = 40cm
Area de C1 = P.A.N/ 0.35 fc
Fc= 210 kg/m2
P= 1250 kg/m2
A= 3.5 X 3 = 10.5m2
N= 3 pisos
Area de C3 = 1250 kg/m2 x 10.5m2 x 3/ 0.35 x 210 kg/cm2
Area de C3 = 536cm2
A x B = 536
A=B
A = 23.15cm o A = 25cm
Losa (Maciza)
E1 = permetro/180 = 7+7+6+6/180 = 26/180 = 0.14 m
E2 = luz mayor/40 = 7/40 = 0.175 m; E2 = 0.18 m
1) Carga Muerta:
1.a) Peso Propio:
1.a.1) Losa Maciza:
rea= 8x15 + 5x4x2 = 160m2
Volumen= 160m2 x 0.15m = 24m3
Peso Propio= 24m3 x 2.4 ton/m = 57.6 toneladas
1.a.2) Vigas Transversales: (0.40mx0.50m)
Longitud de Vigas= 15x3 + 5x2 = 55ml
Volumenes= 55x0.4x0.35 = 7.7m3
Peso Propio= Volumen x 2.4
Peso Propio= 7.7m3 x 2.4 ton/m3 = 18.48 toneladas
1.a.3) Vigas Longitudinales: (0.50mx0.50m)
Longitud de Vigas= 16x2 + 8x2 = 48ml
Volumen= 48x0.50x(0.50-0,15) = 8.4m3
Peso Propio= 8.4m3 x 2.4ton/m3 = 20.16 toneladas
1.a.4) Columnas:
Numero de Columnas = 16
Volumen= 16x0.4x0.5x4.5= 14.4m3
Peso Propio= 14.4m3 x 2.4ton/m3 = 34.56 toneladas
Techo 1: PP. Losa
= 57.60 toneladas
PP. VIGAS TRANSVERSALES= 18.48 toneladas
PP. VIGAS LONGITUDINALES= 20.16 toneladas
PP. COLUMNAS
= 34.56 toneladas
TOTAL
= 130.8 toneladas
1.b) Acabados:
Considerar= 0.1 ton/m2
Acabados= 160m2 x 0.1 ton/m2 = 16 toneladas
Carga Muerta Total 1er Piso = 130.8 ton + 16 ton = 146.8 ton
Techo 2:
Columnas= 16 x 0.4 x 0.5 x 3.5 = 11.2m3
Peso Propio= 11.2m3 x 2.4 ton/m3 = 26.88 toneladas
PP. LOSA
= 57.60 ton
PP. VIGA TRANSVERSAL = 18.48 ton
PP. VIGA LONGITUDINAL= 20.16 ton
PP. COLUMNAS
= 26.88 ton
TOTAL
= 123,12 ton
ACABADOS
= 16 ton
Carga Muerta Total 2do Piso = 139.12 ton
Techo 3:
3.a) Losa Maciza: e= 0.12m
Volumen= 160m3 x 0.12m = 19.2m3
PP. LOSA = 19.2m3 x 2.4 ton/m3 = 46.08 toneladas
3.b.1) Vigas Transversales: (0.40m x 0.50m)
Longitud= 55ml
Volumen= 55 x 0.4 x (0.5-0.12) = 8.36m3
Peso Propio= 8.36m3 x 2.4 ton/m3 = 20.06 toneladas
3.b.2) Vigas Longitudinales: (0.5m x 0.50m)
Longitud: 48ml
Volumen: 48 x 0.5 x (0.5-0.12) = 9.12 m3
Peso Propio = 9.12m3 x 2.4 ton/m3 = 21.89 toneladas
3.c) Columnas = 26.88 toneladas
PP. LOSA
= 46.08 toneladas
PP. VIGAS TRANSVERSALES = 20.06 toneladas
PP. VIGAS LONGITUDINALES = 21.89 toneladas
PP. COLUMNAS
= 26.88 toneladas
TOTAL
= 114.91 toneladas
Acabados = 16 toneladas
Carga Muerta Total 3er Piso = 130.91 toneladas
Carga Viva = 500 kg/m2
solo para centro comercial
1ra CV = 160m2 x 0.5 ton/m2 = 80 toneladas
2da CV = 80 toneladas
3ra CV = 80 toneladas
1er
2do
3er
TOTAL
CM
146.80
139.12
130.91
416.83
ton
ton
ton
ton
CV
80 ton
80 ton
80 ton
240 ton
656.83 toneladas
1) Carga Muerta:
1.a) Peso Propio:
1.a.1) Losa Aligerada:
rea= 240m x 0.20m = 48m2
Volumen= 48m2 x 0.20m = 9.6m3
Peso Propio= 9.6m3 x 2.4 ton/m2 = 23.04 toneladas
1.a.2) Vigas Transversales: (0.40mx0.50m)
Longitud de Vigas= 15x5 = 75ml
Volumenes= 75x0.4x0.3 = 9m3
Peso Propio= Volumen x 2.4
Peso Propio= 9m3 x 2.4 ton/m3 = 21.6 toneladas
1.a.3) Vigas Longitudinales: (0.50mx0.50m)
Longitud de Vigas= 16x4 = 64ml
Volumen= 64x0.50x(0.50-0,20) = 9.6m3
Peso Propio= 9.6m3 x 2.4ton/m3 = 23 toneladas
1.a.4) Columnas:
Numero de Columnas = 20
Volumen= 20x0.4x0.5x4.5= 18m3
1er
2do
3er
4to
TOTAL
CM
114.68
168.44
168.44
198.28
649.84
ton
ton
ton
ton
ton
CV
72 ton
72 ton
72 ton
72 ton
288 ton
361.84 toneladas